Tab. Ref.

abril/2011
LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

01.01.001
RETIRANDO A VEGETACAO, TRONCOS ATE 5CM DE DIAMETRO E RASPAGEM.
M2
1.01.46
SERVENTE
H
0,25000
Mo-de-Obra 0,95500
LS
1,16510
SubMO
2,12010
Material
0,00000

Custo Unit.

Custo Total
2,60
0,95500

BDI

3,82
0,48762

BDI

3,90
6,95
14,31
25,62798

BDI

303,91
3,90
23,40000
6,95
13,90000
67,83
135,66000
14,31
28,62000
56,82978

BDI

379,89
3,90
29,25000
6,95
17,37500
67,83
169,57500
14,31
35,77500
71,03723
455,87
3,90
35,10000
6,95
20,85000
67,83
203,49000
14,31
42,93000
85,24467

01.01.010
CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>5<15CM
1.01.01
AJUDANTE
1.01.55
OPERADOR
8.01.87
MOTOSSERRA
Mo-de-Obra 37,30000
LS
45,50600
SubMO
82,80600

UN
H
6,00000
H
2,00000
H
2,00000
Material
28,62000

01.01.011
CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>15<30CM
1.01.01
AJUDANTE
1.01.55
OPERADOR
8.01.08
RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP
8.01.87
MOTOSSERRA
SubMO
82,80600
Mo-de-Obra 37,30000
LS
45,50600

UN
H
6,00000
H
2,00000
H
2,00000
H
2,00000
Material
164,28000

01.01.012
CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>30<60CM
1.01.01
AJUDANTE
1.01.55
OPERADOR
8.01.08
RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP
8.01.87
MOTOSSERRA
Mo-de-Obra 46,62500
LS
56,88250
SubMO
103,50750

UN
H
7,50000
H
2,50000
H
2,50000
H
2,50000
Material
205,35000

01.01.013
CORTE, RECORTE E REMOCAO DE ARVORES INCL RAIZES DIAM>60CM
1.01.01
AJUDANTE
1.01.55
OPERADOR
8.01.08
RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP
8.01.87
MOTOSSERRA
Mo-de-Obra 55,95000
LS
68,25900
SubMO
124,20900

UN
H
9,00000
H
3,00000
H
3,00000
H
3,00000
Material
246,42000

BDI

01.01.099
LIMPEZAS DO TERRENO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

SubMO

0,00000

01.02.001
CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO
1.01.46
SERVENTE
SubMO
21,20100
Mo-de-Obra 9,55000
LS
11,65100

M3
H
2,50000
Material
0,00000

01.02.002
CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M
1.01.46
SERVENTE
8.03.10
CAMINHAO BASCULANTE 6M3
Mo-de-Obra 2,29200
LS
2,79624
SubMO
5,08824

M3
H
0,60000
H
0,15000
Material
9,19950

01.02.003
ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M
1.01.46
SERVENTE
8.03.10
CAMINHAO BASCULANTE 6M3
Mo-de-Obra 2,29200
LS
2,79624
SubMO
5,08824

M3
H
0,60000
H
0,15000
Material
9,19950

01.02.004
TRANSPORTE POR CAMINHAO
8.03.10
CAMINHAO BASCULANTE 6M3
Mo-de-Obra 0,00000
LS
0,00000

137,05
23,40000
13,90000
28,62000

26,07
9,55000

BDI

3,82
4,87623

BDI

3,82
61,33
3,28618

BDI

3,82
61,33
3,28618

0,00000

KM
H
0,00830
Material
0,50904

BDI

61,33
0,11708

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

01.03.001
CORTE E ATERRO DENTRO DA OBRA COM TRANSPORTE INTERNO
1.01.55
OPERADOR
8.01.15
ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV
8.03.05
TRATOR DE ESTEIRAS C/LAMINA POT 80HP
Mo-de-Obra 0,13900
LS
0,16958
SubMO
0,30858

M3
H
0,02000
H
0,02000
H
0,04000
Material
4,91320

6,95
40,50
102,58
BDI
1,20101

01.03.002
CORTE COM RETIRADA POR CAMINHAO NOS PRIMEIROS 100 M
8.01.04
PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M3
8.03.05
TRATOR DE ESTEIRAS C/LAMINA POT 80HP
8.03.10
CAMINHAO BASCULANTE 6M3
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M3
H
0,02000
H
0,02000
H
0,06000
Material
7,99020

112,94
102,58
61,33
BDI
1,83775

01.02.099
MOVIMENTOS DE TERRA MANUAL
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

01.03.004
1.01.55
8.01.04
8.01.15
Exerccio:

M3X
SubMO

SubMO

ATERRO COM TRANSPORTE POR CAMINHAO NOS PRIMEIROS 100 M


OPERADOR
PA-CARREGADEIRA DE PNEUS CAP APROX DE 1,7M3
ROLO COMPACTADOR PE-DE-CARNEIRO POT 100 A 130CV

2011

M3
H
H
H

0,02000
0,02000
0,02000

6,95
112,94
40,50

17,57
2,29200
9,19950

17,57
2,29200
9,19950

0,62
0,50904

6,42
0,13900
0,81000
4,10320

9,82
2,25880
2,05160
3,67980

11,20
0,13900
2,25880
0,81000
Pgina: 1

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

8.03.05
TRATOR DE ESTEIRAS C/LAMINA POT 80HP
8.03.10
CAMINHAO BASCULANTE 6M3
Mo-de-Obra 0,13900
LS
0,16958
01.03.005
TRANSPORTE POR CAMINHAO
1.01.46
SERVENTE
8.03.10
CAMINHAO BASCULANTE 6M3
Mo-de-Obra 0,07487
LS
0,09134
01.03.099
MOVIMENTOS DE TERRA MECANIZADOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
01.04.006
PONTALETADO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.10.52
ESTRONCAS DE EUCALIPTO - DIAM DE 15CM
2.67.60
PREGO
Mo-de-Obra 2,56800
LS
3,13296

UN Coeficiente
H
H
SubMO

SubMO

SubMO

01.04.010
ESCORAMENTO DE VALAS CONTINUO AT 2,00M
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.52
ESTRONCAS DE EUCALIPTO - DIAM DE 15CM
2.10.54
PRANCHAS PEROBA DE 3 CM
2.67.60
PREGO
SubMO
Mo-de-Obra 8,21304
LS
10,01991
01.04.011
ESCORAMENTO DE VALAS CONTINUO AT 4,00M
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.66
VIGA DE PEROBA 8X18CM
2.10.88
ESTRONCA DE EUCALIPTO DN 20CM
2.67.60
PREGO
Mo-de-Obra 6,27912
LS
7,66053
SubMO
01.04.015
ESCORAMENTO DE VALAS DESCONTINUO AT 2,00M
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.52
ESTRONCAS DE EUCALIPTO - DIAM DE 15CM
2.10.54
PRANCHAS PEROBA DE 3 CM
2.67.60
PREGO
Mo-de-Obra 6,57288
LS
8,01891
SubMO
01.04.016
ESCORAMENTO DE VALAS DESCONTINUO AT 4,00M
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.66
VIGA DE PEROBA 8X18CM
2.10.88
ESTRONCA DE EUCALIPTO DN 20CM
2.67.60
PREGO
SubMO
Mo-de-Obra 5,10260
LS
6,22517
01.04.099
ESCORAMENTOS DE TERRA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

01.05.001
ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M
1.01.46
SERVENTE
Mo-de-Obra 8,78600
LS
10,71892
SubMO
01.05.002
ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M
1.01.46
SERVENTE
Mo-de-Obra 11,46000
LS
13,98120
SubMO
01.05.099
ESCAVACOES MANUAIS EM TERRA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
01.06.001
Exerccio:

PARA SIMPLES REGULARIZACAO

2011

SubMO

Custo Total

102,58
61,33
BDI
2,09502

2,05160
3,67980

0,30858

Material

0,16622

KM
H
0,01960
H
0,00980
Material
0,60103

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

5,70096

M2
H
0,30000
H
0,30000
M3
0,01500
M
0,02500
KG
0,10000
Material
21,58040

4,60
3,96
1.393,66
8,34
4,67
BDI
6,27471

18,23295

M2
H
0,67100
H
1,34200
M
0,10530
M
0,07020
M2
0,23160
KG
0,70000
Material
20,93280

BDI

4,60
3,82
13,00
8,34
67,83
4,67
9,00812

13,93965

M2
H
0,51300
H
1,02600
M
1,34620
M
0,10260
M
0,06840
KG
0,70000
Material
23,52167

BDI

4,60
3,82
13,00
18,15
13,01
4,67
8,61610

14,59179

M2
H
0,53700
H
1,07400
M
0,10530
M
0,07020
M2
0,11600
KG
0,56000
Material
12,43785

BDI

4,60
3,82
13,00
8,34
67,83
4,67
6,21682

11,32777

M2
H
0,42000
H
0,83000
M
0,68000
M
0,10260
M
0,06840
KG
0,56000
Material
14,20727

BDI

4,60
3,82
13,00
18,15
13,01
4,67
5,87306

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

19,50492

M3
H
2,30000
Material
0,00000

BDI

3,82
4,48613

25,44120

M3
H
3,00000
Material
0,00000

BDI

3,82
5,85148

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M3X

SubMO

0,02000
0,06000

Custo Unit.

8,80020

M2

3,82
61,33
0,17647

0,94
0,07487
0,60103

33,55
1,38000
1,18800
20,90490
0,20850
0,46700

48,17
3,08660
5,12644
1,36890
0,58547
15,70943
3,26900

46,07
2,35980
3,91932
17,50060
1,86219
0,88988
3,26900

33,24
2,47020
4,10268
1,36890
0,58547
7,86828
2,61520

31,40
1,93200
3,17060
8,84000
1,86219
0,88988
2,61520

23,99
8,78600

31,29
11,46000

4,17
Pgina: 2

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
Mo-de-Obra 1,52800

H
LS

1,86416

01.06.005
REATERRO INTERNO APILOADO
1.01.46
SERVENTE
Mo-de-Obra 13,37000
LS
16,31140
01.06.099
APILOAMENTO E ATERRO DE CAVAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
01.07.002
LASTRO DE PEDRA BRITADA - 5CM
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 0,57300
LS
0,69906
01.07.010
LASTRO DE CONCRETO - 5 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 4,44800
LS
5,42656
01.07.099
LASTROS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

UN Coeficiente

LS

0,00000

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

3,82
0,78020

29,68140

M3
H
3,50000
Material
0,00000

BDI

3,82
6,82672

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

1,27206

M2
H
0,15000
M3
0,05500
Material
3,36435

Material

0,40000
0,00000

01.08.021
TUBO DE CONCRETO - CLASSE C1 - DN 400MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.02
TUBO CONCRETO DE 40CM DIAM C-1
Mo-de-Obra 7,66240
LS
9,34813
01.08.022
TUBO DE CONCRETO - CLASSE C1 - DN 500MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.03
TUBO CONCRETO DE 50CM DIAM C-1
8.01.90
GUINDASTE SOBRE PNEUS 5T
Mo-de-Obra 10,07460
LS
12,29101
01.08.023
1.01.39
1.01.46
2.05.03
2.05.08
6.01.04
8.01.90
Exerccio:

TUBO DE CONCRETO - CLASSE C1 - DN 600MM


PEDREIRO
SERVENTE
AREIA
CIMENTO
TUBO CONCRETO DE 60CM DIAM C-1
GUINDASTE SOBRE PNEUS 5T

2011

SubMO

SubMO

1,52800

36,50
13,37000

5,70
0,57300
3,36435

BDI

3,82
61,17
1,06637

9,87456

M2
H
0,30000
H
0,80000
M3
0,03000
KG
10,00000
M3
0,04000
Material
8,56060

BDI

4,64
3,82
80,46
0,37
61,17
4,24009

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

1,00000
1,00000
1,10000
1,00000

01.08.017
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 150MM (6") CLASSE A INCL CONEX
M
1.01.18
ENCANADOR
H
1,20000
1.01.19
AJUDANTE DE ENCANADOR
H
1,20000
6.25.34
TUBO PVC P/ESGOTO 150MM
M
1,10000
6.26.74
ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM
UN
1,00000
Mo-de-Obra 10,94400
LS
13,35168
SubMO
24,29568
Material
19,32400

SubMO

Custo Total

BDI

3,39216

01.08.016
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 100MM (4") CLASSE A INCL CONEX
M
1.01.18
ENCANADOR
H
1.01.19
AJUDANTE DE ENCANADOR
H
6.25.33
TUBO PVC P/ESGOTO 100MM
M
6.26.73
ANEL BORRACHA P/TUBO PVC ESGOTO DN=100MM
UN
Mo-de-Obra 9,12000
LS
11,12640
Material
7,73600
SubMO
20,24640

01.08.020
TUBO DE CONCRETO - CLASSE C1 - DN 300MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.01
TUBO CONCRETO DE 30CM DIAM C-1
Mo-de-Obra 6,01420
LS
7,33732

Custo Unit.

13,35152

M
H
0,30000
H
1,21000
M3
0,00100
KG
0,45000
M
1,05000
Material
38,37246

17,01053

M
H
0,40000
H
1,52000
M3
0,00230
KG
0,91000
M
1,05000
Material
49,01076

22,36561

M
H
0,50000
H
2,03000
M3
0,00310
KG
1,36000
M
1,05000
H
0,10000
Material
75,88513
M
H
H
M3
KG
M
H

0,70000
2,54000
0,00420
1,81000
1,05000
0,10000

BDI

5,05
4,07
5,96
1,18
6,43595

BDI

5,05
4,07
14,04
3,88
10,03253

BDI

4,64
3,82
80,46
0,37
36,31
11,89652

BDI

4,64
3,82
80,46
0,37
46,18
15,18490

BDI

4,64
3,82
80,46
0,37
64,97
69,14
22,59767

4,64
3,82
80,46
0,37
81,68
69,14

22,67
1,39200
3,05600
2,41380
3,70000
2,44680

34,41
5,05000
4,07000
6,55600
1,18000

53,65
6,06000
4,88400
15,44400
3,88000

63,62
1,39200
4,62220
0,08046
0,16650
38,12550

81,20
1,85600
5,80640
0,18506
0,33670
48,48900

120,84
2,32000
7,75460
0,24943
0,50320
68,21850
6,91400

150,59
3,24800
9,70280
0,33793
0,66970
85,76400
6,91400
Pgina: 3

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 12,95080

LS

15,79998

01.08.024
TUBO DE CONCRETO - CLASSE CA1 - DN 700MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.33
TUBO DE CONCRETO DE 70CM-CA-1
8.01.90
GUINDASTE SOBRE PNEUS 5T
Mo-de-Obra 15,40120
LS
18,78946
01.08.025
TUBO DE CONCRETO - CLASSE CA1 - DN 800MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.41
TUBO CONCRETO DE 80CM DIAM CA-1
8.01.90
GUINDASTE SOBRE PNEUS 5T
Mo-de-Obra 18,69760
LS
22,81107
01.08.026
TUBO DE CONCRETO - CLASSE CA1 - DN 900MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.35
TUBO DE CONCRETO DE 90CM-CA-1
8.01.90
GUINDASTE SOBRE PNEUS 5T
Mo-de-Obra 23,14000
LS
28,23080

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

01.08.027
TUBO DE CONCRETO - CLASSE CA1 - DN 1000MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.02.04
TUBO CONCRETO DE 1,M DIAM CA-1
8.01.90
GUINDASTE SOBRE PNEUS 5T
Mo-de-Obra 32,17200
LS
39,24984
SubMO
01.08.028
TUBO DE CONCRETO - CLASSE CA1 - DN 1100MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.02.05
TUBO DE CONCRETO DE 110CM-CA-1
8.01.90
GUINDASTE SOBRE PNEUS 5T
Mo-de-Obra 36,78400
LS
44,87648
SubMO
01.08.029
TUBO DE CONCRETO - CLASSE CA1 - DN 1200MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.02.06
TUBO DE CONCRETO DE 120CM-CA-1
8.01.90
GUINDASTE SOBRE PNEUS 5T
Mo-de-Obra 45,24400
LS
55,19768
SubMO

93,68563

BDI

Material

34,19066

M
H
0,80000
H
3,06000
M3
0,00630
KG
2,72000
M
1,05000
H
0,11000
Material
133,01870

205,66
4,64
3,71200
3,82
11,68920
80,46
0,50690
0,37
1,00640
118,00
123,90000
69,14
7,60540
BDI
38,45815

41,50867

M
H
1,00000
H
3,68000
M3
0,00840
KG
3,62000
M
1,05000
H
0,12000
Material
204,05806

302,04
4,64
4,64000
3,82
14,05760
80,46
0,67586
0,37
1,33940
184,52
193,74600
69,14
8,29680
BDI
56,48035

51,37080

M
H
1,20000
H
4,60000
M3
0,01050
KG
4,53000
M
1,05000
H
0,13000
Material
196,30913

304,64
4,64
5,56800
3,82
17,57200
80,46
0,84483
0,37
1,67610
176,00
184,80000
69,14
8,98820
BDI
56,96638

71,42184

M
H
1,50000
H
6,60000
M3
0,01570
KG
6,80000
M
1,05000
H
0,15000
Material
283,98972

437,15
4,64
6,96000
3,82
25,21200
80,46
1,26322
0,37
2,51600
256,99
269,83950
69,14
10,37100
BDI
81,74466

81,66048

M
H
2,00000
H
7,20000
M3
0,02090
KG
9,06000
M
1,05000
H
0,17000
Material
213,73611

363,33
4,64
9,28000
3,82
27,50400
80,46
1,68161
0,37
3,35220
187,57
196,94850
69,14
11,75380
BDI
67,94122

100,44168

M
H
3,00000
H
8,20000
M3
0,02610
KG
11,33000
M
1,05000
H
0,20000
Material
409,39711

4,64
3,82
80,46
0,37
370,74
69,14
BDI
117,26292

M
H
1,00000
H
1,00000
UN
0,12000
M
1,10000
L
0,21000
Material
20,08430

01.08.033
TUBO DRENO PLASTICO CORRUGADO PERFURADO DE 150MM EM BARRAS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.81.04
TUBO PVC RIG CORRUG PERF P/ DRENAGEM 150MM
6.95.13
ADESIVO PARA TUBOS PVC
SubMO
24,29568
Mo-de-Obra 10,94400
LS
13,35168

M
H
1,20000
H
1,20000
UN
0,14000
M
1,10000
L
0,24000
Material
35,05240

Exerccio:

MANTA GEOTEXTIL DE 200 GR/M2


PEDREIRO

2011

Custo Total

28,75078

01.08.032
TUBO DRENO PLASTICO CORRUGADO PERFURADO DE 100MM EM BARRAS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.81.03
TUBO PVC RIG CORRUG PERF P/ DRENAG 100MM
6.95.13
ADESIVO PARA TUBOS PVC
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640

01.08.034
1.01.39

Custo Unit.

M2
H

0,30000

28,16037

BDI

5,05
4,07
0,72
12,97
27,29
9,27606

BDI

5,05
4,07
0,72
25,82
27,29
13,65006

4,64

627,10
13,92000
31,32400
2,10001
4,19210
389,27700
13,82800

49,60
5,05000
4,07000
0,08640
14,26700
5,73090

72,99
6,06000
4,88400
0,10080
28,40200
6,54960

10,31
1,39200
Pgina: 4

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.40.80
BIDIM OP-20 (200 GR/M2)
Mo-de-Obra 2,53800
LS

3,09636

01.08.035
MANTA GEOTEXTIL DE 300 GR/M2
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.40.49
BIDIM OP-30 (300 GR/M2)
Mo-de-Obra 2,53800
LS
3,09636
01.08.036
MANTA GEOTEXTIL DE 600 GR/M2
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.40.29
BIDIM OP-60 (600 GR/M2)
Mo-de-Obra 2,53800
LS
3,09636

UN Coeficiente

SubMO

SubMO

SubMO

01.08.040
ENVOLVIMENTO DE DRENOS COM PEDRA BRITADA
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 9,55000
LS
11,65100
SubMO
01.08.041
ENVOLVIMENTO DE DRENOS COM AREIA GROSSA
1.01.46
SERVENTE
2.05.03
AREIA
SubMO
Mo-de-Obra 7,64000
LS
9,32080

H
0,30000
M2
1,00000
2,75000

5,63436

Material

5,63436

M2
H
0,30000
H
0,30000
M2
1,00000
Material
3,89000

5,63436

M2
H
0,30000
H
0,30000
M2
1,00000
Material
7,83000

21,20100

M3
H
2,50000
M3
1,10000
Material
67,28700

16,96080

M3
H
2,00000
M3
1,10000
Material
88,50600

01.08.044
FORNEC E INST DE DHP EM FUROS DE 100MM C/TUBO PVC 1 1/2" INCL TXS INST
2.15.56
FORN IN DHP FUROS 100MM TUBO PVC 1 1/2" C/TXS INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material

M
M
1,00000
54,90000

01.08.045
FORNEC E INST DE DHP EM FUROS DE 100MM C/TUBO PVC 2" INCL TXS INST
2.15.55
FORN INST DHP FUROS 100MM C/TUBO PVC 2" C/TXS INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

Material

M
M
1,00000
64,90000

01.08.050
CAIXA DE LIGACAO OU INSPECAO - ALVENARIA DE 1/2 TIJOLO REVESTIDA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 32,60400
LS
39,77688
SubMO
72,38088

M2
H
4,03000
H
3,64000
M3
0,06300
KG
4,83000
KG
17,57000
UN
84,00000
Material
31,74038

01.08.051
CAIXA DE LIGACAO OU INSPECAO - ALVENARIA DE 1 TIJOLO REVESTIDA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 42,60760
LS
51,98127
SubMO
94,58887

M2
H
4,49000
H
5,70000
M3
0,12100
KG
13,96000
KG
23,94000
UN
196,00000
Material
66,59946

01.08.052
CAIXA DE LIGACAO OU INSPECAO - TAMPA DE CONCRETO ARMADO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 29,11460
LS
35,51981
SubMO
64,63441

M2
H
2,42000
H
2,42000
H
0,46000
H
0,46000
H
0,30000
H
0,80000
M3
0,03300
KG
16,20000
M3
0,04000
M2
0,12000
M2
0,40000
KG
5,27000
KG
0,09000
Material
32,41928

01.08.060
1.01.18
1.01.19
1.01.46
2.05.18
2.40.49
Exerccio:

TUBO DRENO PEAD CORRUG PERF DN 65MM EM ROLOS


ENCANADOR
AJUDANTE DE ENCANADOR
SERVENTE
PEDRA BRITADA 2
BIDIM OP-30 (300 GR/M2)

2011

M
H
H
H
M3
M2

0,40000
0,40000
0,60000
0,14000
1,63000

Custo Unit.

Custo Total

BDI

3,82
2,75
1,92840

BDI

4,64
3,82
3,89
2,19060

BDI

4,64
3,82
7,83
3,09680

BDI

3,82
61,17
20,35224

BDI

3,82
80,46
24,25736

BDI

54,90
12,62700

BDI

64,90
14,92700

BDI

4,64
3,82
80,46
0,35
0,37
0,22
23,94789

BDI

4,64
3,82
80,46
0,35
0,37
0,22
37,07332

BDI

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,37
62,03
17,18
11,40
2,70
4,87
22,32235

5,05
4,07
3,82
61,17
3,89

1,14600
2,75000

11,71
1,39200
1,14600
3,89000

16,56
1,39200
1,14600
7,83000

108,84
9,55000
67,28700

129,72
7,64000
88,50600

67,52
54,90000

79,82
64,90000

128,06
18,69920
13,90480
5,06898
1,69050
6,50090
18,48000

198,26
20,83360
21,77400
9,73566
4,88600
8,85780
43,12000

119,37
11,13200
9,58320
2,19420
1,75720
1,39200
3,05600
2,65518
5,99400
2,48120
2,06160
4,56000
14,22900
0,43830

43,17
2,02000
1,62800
2,29200
8,56380
6,34070
Pgina: 5

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

6.81.10
TUBO DRENO PEAD CORRUG PERF DN 65MM EM ROLO
SubMO
Mo-de-Obra 5,94000
LS
7,24680

Custo Unit.

Custo Total

Material

M
1,05000
21,91850

Material

M
H
0,45000
H
0,45000
H
0,65000
M3
0,16000
M2
1,75000
M
1,05000
24,96320

Material

M
H
0,50000
H
0,50000
H
0,70000
M3
0,18000
M2
1,83000
M
1,05000
28,48230

Material

M
H
0,60000
H
0,60000
H
0,80000
M3
0,25000
M2
2,15000
M
1,05000
48,16300

Material

M
H
0,40000
H
0,40000
H
0,60000
M3
0,14000
M2
1,63000
M
1,05000
17,54000

01.08.065
TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 110MM EM ROLO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.40.49
BIDIM OP-30 (300 GR/M2)
6.81.21
TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 110MM
Mo-de-Obra 7,23400
LS
8,82548
SubMO
16,05948

Material

M
H
0,50000
H
0,50000
H
0,70000
M3
0,18000
M2
1,83000
M
1,05000
21,33180

01.08.099
SERVICOS EM DRENAGEM DO TERRENO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

19,50492

M3
H
2,30000
Material
0,00000

01.08.061
TUBO DRENO PEAD CORRUG PERF DN 80MM EM ROLO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.40.49
BIDIM OP-30 (300 GR/M2)
6.81.11
TUBO DRENO PEAD CORRUG PERF DN 80MM EM ROLO
Mo-de-Obra 6,58700
LS
8,03614
SubMO
01.08.062
TUBO DRENO PEAD CORRUG PERF DN 100MM EM ROLO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.40.49
BIDIM OP-30 (300 GR/M2)
6.81.12
TUBO DRENO PEAD CORRUG PERF DN 100MM EM ROLO
Mo-de-Obra 7,23400
LS
8,82548
SubMO
01.08.063
TUBO DRENO PEAD CORRUG PERF DN 170MM EM ROLO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.40.49
BIDIM OP-30 (300 GR/M2)
6.81.13
TUBO DRENO PEAD CORRUG PERF DN 170MM EM ROLO
Mo-de-Obra 8,52800
LS
10,40416
SubMO

13,18680

14,62314

16,05948

18,93216

01.08.064
TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 65MM EM ROLO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.40.49
BIDIM OP-30 (300 GR/M2)
6.81.20
TUBO DRENO PEAD CORRUG PERF P/ PAISAGISMO DN 65MM
Mo-de-Obra 5,94000
LS
7,24680
SubMO
13,18680

01.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
01.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
01.70.099
RECOLOCACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
01.80.099
SERVICOS PARCIAIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

LS

LS

LS

0,00000

0,00000

0,00000

0,00000

SubMO

SubMO

SubMO

SubMO

SubMO

02.01.001
ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M
1.01.46
SERVENTE
SubMO
Mo-de-Obra 8,78600
LS
10,71892
02.01.002
1.01.46
Exerccio:

ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M


SERVENTE

2011

M3
H

3,00000

BDI

6,68
8,07422

BDI

5,05
4,07
3,82
61,17
3,89
7,97
9,10486

BDI

5,05
4,07
3,82
61,17
3,89
9,86
10,24461

BDI

5,05
4,07
3,82
61,17
3,89
23,34
15,43189

BDI

5,05
4,07
3,82
61,17
3,89
2,51
7,06716

BDI

5,05
4,07
3,82
61,17
3,89
3,05
8,59999

BDI

3,82
4,48613

3,82

7,01400

48,69
2,27250
1,83150
2,48300
9,78720
6,80750
8,36850

54,78
2,52500
2,03500
2,67400
11,01060
7,11870
10,35300

82,52
3,03000
2,44200
3,05600
15,29250
8,36350
24,50700

37,79
2,02000
1,62800
2,29200
8,56380
6,34070
2,63550

45,99
2,52500
2,03500
2,67400
11,01060
7,11870
3,20250

23,99
8,78600

31,29
11,46000
Pgina: 6

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 11,46000

Descrio
LS

13,98120

02.01.005
ESCORAMENTO DE TERRA CONTINUO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.54
PRANCHAS PEROBA DE 3 CM
2.67.60
PREGO
Mo-de-Obra 5,99200
LS
7,31024
02.01.006
ESCORAMENTO DE TERRA DESCONTINUO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.54
PRANCHAS PEROBA DE 3 CM
2.67.60
PREGO
Mo-de-Obra 3,42400
LS
4,17728

UN Coeficiente
SubMO

SubMO

SubMO

02.01.010
APILOAMENTO PARA SIMPLES REGULARIZACAO
1.01.46
SERVENTE
Mo-de-Obra 1,52800
LS
1,86416
SubMO
02.01.012
LASTRO DE PEDRA BRITADA - 5CM
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 0,57300
LS
0,69906
02.01.015
LASTRO DE CONCRETO - 5 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 4,44800
LS
5,42656
02.01.025
REATERRO INTERNO APILOADO
1.01.46
SERVENTE
Mo-de-Obra 13,37000
LS
16,31140
02.01.027
REATERRO COM ADICAO DE 2% DE CIMENTO
1.01.46
SERVENTE
2.05.08
CIMENTO
Mo-de-Obra 32,47000
LS
39,61340
02.01.099
ESCAVACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

SubMO

SubMO

SubMO

SubMO

02.02.001
TUBULOES: ESCAVACAO MANUAL - DIAMETRO DE 70CM
1.01.42
POCEIRO
1.01.90
AJUDANTE DE POCEIRO
Mo-de-Obra 82,70000
LS
100,89400
SubMO
02.02.002
TUBULOES: ESCAVACAO MECANICA - DIAMETRO DE 50CM
2.01.43
ESCAVACAO MECANICA DIAM 50 CM
Mo-de-Obra 0,00000
LS
0,00000
SubMO
02.02.003
TUBULOES: ESCAVACAO MECANICA - DIAMETRO DE 60CM
2.01.44
ESCAVACAO MECANICA DIAM 60 CM
Mo-de-Obra 0,00000
LS
0,00000
SubMO
02.02.017
TUBULES : CONCRETO FCK 20 MPA PARA BASE E FUSTE
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
Mo-de-Obra 50,76000
LS
61,92720
SubMO
02.02.021
ACO CA-50 (A OU B) FYK = 500 MPA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.25
ACO CA-50-A $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798
Exerccio:

2011

SubMO

25,44120

Material

0,00000

13,30224

M2
H
0,70000
H
0,70000
M
1,20000
M2
0,40000
KG
0,80000
Material
46,46800

7,60128

M2
H
0,40000
H
0,40000
M
0,60000
M2
0,20000
KG
0,40000
Material
23,23400

3,39216

M2
H
0,40000
Material
0,00000

1,27206

M2
H
0,15000
M3
0,05500
Material
3,36435

9,87456

M2
H
0,30000
H
0,80000
M3
0,03000
KG
10,00000
M3
0,04000
Material
8,56060

29,68140

M3
H
3,50000
Material
0,00000

Custo Unit.
BDI

Custo Total

5,85148
73,51
3,22000
2,77200
15,60000
27,13200
3,73600

BDI

4,60
3,96
13,00
67,83
4,67
13,74716

BDI

4,60
3,96
13,00
67,83
4,67
7,09211

BDI

3,82
0,78020

BDI

3,82
61,17
1,06637

BDI

4,64
3,82
80,46
0,37
61,17
4,24009

BDI

3,82
6,82672

72,08340

M3
H
8,50000
KG
28,40000
Material
10,50800

BDI

3,82
0,37
18,99602

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

183,59400

M3
H
10,00000
H
10,00000
Material
0,00000

Material

M
M
1,00000
19,83000

0,00000

Material

M
M
1,00000
24,97000

112,68720

M3
H
6,00000
H
6,00000
M3
1,00000
Material
241,38000

1,90698

KG
H
H
KG
KG
Material
3,19090

0,00000

BDI

4,50
3,77
42,22662

BDI

19,83
4,56090

BDI

24,97
5,74310

37,92
1,84000
1,58400
7,80000
13,56600
1,86800

4,17
1,52800

5,70
0,57300
3,36435

22,67
1,39200
3,05600
2,41380
3,70000
2,44680

36,50
13,37000

101,58
32,47000
10,50800

225,82
45,00000
37,70000

24,39
19,83000

30,71
24,97000

435,50
4,64
27,84000
3,82
22,92000
241,38
241,38000
BDI
81,43546

0,10000
0,10000
1,15000
0,02000
BDI

4,77
3,82
2,69
4,87
1,17251

6,27
0,47700
0,38200
3,09350
0,09740

Pgina: 7

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

02.02.025
BROCA DE CONCRETO DE DIAMETRO 20CM - INCL ARRANQUES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
Mo-de-Obra 5,94040
LS
7,24729
SubMO
13,18769

M
H
0,21000
H
1,30000
M3
0,02100
KG
10,50000
M3
0,02800
KG
1,40000
Material
11,05342

02.02.026
BROCA DE CONCRETO DE DIAMETRO 25CM - INCL ARRANQUES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
Mo-de-Obra 8,46720
LS
10,32998
SubMO
18,79718

M
H
0,31000
H
1,84000
M3
0,03200
KG
15,90000
M3
0,04300
KG
2,30000
Material
17,27503

02.02.027
BROCA DE CONCRETO DE DIAMETRO 30CM - INCL ARRANQUES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
SubMO
25,75156
Mo-de-Obra 11,59980
LS
14,15176

M
H
0,45000
H
2,49000
M3
0,04800
KG
23,70000
M3
0,06400
KG
4,00000
Material
27,30596

02.02.035
ESTACAS TIPO STRAUSS DIAM 25CM CAPACIDADE ATE 20 TF
1.01.46
SERVENTE
2.01.17
M.OBRA EQUIPAMENTO P/ESTACA ATE 20T
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 0,38200
LS
0,46604
SubMO
0,84804

M
H
0,10000
M
1,00000
M3
0,03200
KG
15,00000
M3
0,04300
KG
0,30000
Material
40,82603

02.02.036
ESTACAS TIPO STRAUSS DIAM 32CM CAPACIDADE ATE 30 TF
1.01.46
SERVENTE
2.01.18
M.OBRA EQUIPAMENTO P/ESTACA ATE 30T
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 0,38200
LS
0,46604
SubMO
0,84804

M
H
0,10000
M
1,00000
M3
0,04800
KG
24,00000
M3
0,06400
KG
0,30000
Material
50,40796

02.02.037
ESTACAS TIPO STRAUSS DIAM 38CM CAPACIDADE ATE 40 TF
1.01.46
SERVENTE
2.01.19
M.OBRA EQUIPAMENTO P/ESTACA ATE 40T
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 0,38200
LS
0,46604
SubMO
0,84804

M
H
0,10000
M
1,00000
M3
0,07500
KG
37,50000
M3
0,10000
KG
0,30000
Material
66,82750

02.02.038
ESTACAS TIPO STRAUSS DIAM 45CM CAPACIDADE ATE 60 TF
1.01.46
SERVENTE
2.01.22
M.OBRA EQUIPAMENTO P/ESTACA ATE 60T
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 0,57300
LS
0,69906
SubMO
1,27206

M
H
0,15000
M
1,00000
M3
0,09600
KG
47,70000
M3
0,12900
KG
0,30000
Material
91,78509

02.02.039
ESTACAS TIPO STRAUSS DIAM 55CM CAPACIDADE ATE 90 TF
1.01.46
SERVENTE
2.01.21
M.OBRA EQUIPAMENTO P/ESTACA ATE 90T
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
SubMO
1,69608
Mo-de-Obra 0,76400
LS
0,93208

M
H
0,20000
M
1,00000
M3
0,16000
KG
79,50000
M3
0,21500
KG
0,30000
Material
114,26115

02.02.045
1.01.46
Exerccio:

ESTACA ESCAVADA MECANICAMENTE DIAM 25CM CAPACIDADE ATE 20 TF


SERVENTE

2011

M
H

0,10000

Custo Unit.

Custo Total

BDI

4,64
3,82
80,46
0,37
61,17
2,69
5,57546

BDI

4,64
3,82
80,46
0,37
61,17
2,69
8,29661

BDI

4,64
3,82
80,46
0,37
61,17
2,69
12,20323

BDI

3,82
29,27
80,46
0,37
61,17
2,67
9,58504

BDI

3,82
32,95
80,46
0,37
61,17
2,67
11,78888

BDI

3,82
40,00
80,46
0,37
61,17
2,67
15,56537

BDI

3,82
57,72
80,46
0,37
61,17
2,67
21,40315

BDI

3,82
58,02
80,46
0,37
61,17
2,67
26,67016

3,82

29,81
0,97440
4,96600
1,68966
3,88500
1,71276
3,76600

44,36
1,43840
7,02880
2,57472
5,88300
2,63031
6,18700

65,26
2,08800
9,51180
3,86208
8,76900
3,91488
10,76000

51,25
0,38200
29,27000
2,57472
5,55000
2,63031
0,80100

63,04
0,38200
32,95000
3,86208
8,88000
3,91488
0,80100

83,24
0,38200
40,00000
6,03450
13,87500
6,11700
0,80100

114,46
0,57300
57,72000
7,72416
17,64900
7,89093
0,80100

142,62
0,76400
58,02000
12,87360
29,41500
13,15155
0,80100

33,34
0,38200
Pgina: 8

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.01.40
ESCAVACAO MECANICA DIAN 25 CM
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 0,38200
LS
0,46604

UN Coeficiente

SubMO

0,84804

M
1,00000
M3
0,03500
KG
19,71000
M3
0,05000
KG
0,30000
Material
26,25830

02.02.046
ESTACA ESCAVADA MECANICAMENTE DIAM 30CM CAPACIDADE ATE 30 TF
1.01.46
SERVENTE
2.01.41
ESCAVACAO MECANICA DIAM 30 CM
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 0,42020
LS
0,51264
SubMO
0,93284

M
H
0,11000
M
1,00000
M3
0,06400
KG
36,46000
M3
0,09300
KG
0,34000
Material
39,10625

02.02.047
ESTACA ESCAVADA MECANICAMENTE DIAM 35CM CAPACIDADE ATE 40 TF
1.01.46
SERVENTE
2.01.42
ESCAVACAO MECANICA DIAM 35 CM
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 0,45840
LS
0,55925
SubMO
1,01765

M
H
0,12000
M
1,00000
M3
0,09400
KG
51,94000
M3
0,13700
KG
0,35000
Material
51,00583

02.02.051
ESTACA PRE-MOLD CONC SECAO MIN 225 CM2 P/ATE 15 TF
2.01.89
ESTACA CONC PM CRAV SECAO MIN 225 CM2 P/ATE 15TF
Mo-de-Obra 0,00000
LS
0,00000
SubMO

Custo Unit.

Custo Total

BDI

12,29
80,46
0,37
61,17
2,67
6,23446

BDI

3,82
13,87
80,46
0,37
61,17
2,67
9,20899

BDI

3,82
14,91
80,46
0,37
61,17
2,67
11,96540

BDI

73,44
17,39794

BDI

85,67
20,29522

BDI

87,62
20,75718

86,80
20,56292

12,29000
2,81610
7,29270
3,05850
0,80100

49,24
0,42020
13,87000
5,14944
13,49020
5,68881
0,90780

63,98
0,45840
14,91000
7,56324
19,21780
8,38029
0,93450

Material

M
M
1,03000
75,64320

Material

M
M
1,03000
88,24010

Material

M
M
1,03000
90,24860

Material

M
M
1,03000
89,40400

BDI

Material

M
M
1,03000
124,69180

153,37
121,06
124,69180
BDI
28,67911

Material

M
M
1,03000
173,75070

213,71
168,69
173,75070
BDI
39,96266

02.02.057
ESTACA PRE-MOLD CONC SECAO MIN 855 CM2 P/ATE 70 TF
2.02.06
ESTACA DE CONCR PM CRAV SECAO MIN 885CM2 P/ATE 70T
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

Material

M
M
1,03000
191,76540

235,87
186,18
191,76540
BDI
44,10604

02.02.060
ESTACA RAIZ DN 150MM - CAPACIDADE ATE 25 TF
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.71
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=150MM ATE 25 TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 2,23340
LS
2,72475
SubMO

4,95815

M
H
0,26000
H
0,26000
M
1,00000
M3
0,04500
KG
27,00000
KG
9,20000
Material
191,78470

241,99
4,77
1,24020
3,82
0,99320
154,53
154,53000
80,46
3,62070
0,37
9,99000
2,57
23,64400
BDI
45,25086

4,95815

M
H
0,26000
H
0,26000
M
1,00000
M3
0,05100
KG
31,00000
KG
9,20000
Material
201,39746

253,81
4,77
1,24020
3,82
0,99320
162,18
162,18000
80,46
4,10346
0,37
11,47000
2,57
23,64400
BDI
47,46179

02.02.052
ESTACA PRE-MOLD CONC SECAO MIN 289 CM2 P/ATE 20 TF
2.01.98
ESTACA CONC PM CRAV SECAO MIN 289 CM2 P/ATE 20TF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
02.02.053
ESTACA PRE-MOLD CONC SECAO MIN 314 CM2 P/ATE 25 TF
2.02.01
ESTACA CONC PM CRAV SECAO MIN 314 CM2 P/ATE 25TF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
02.02.054
ESTACA PRE-MOLD CONC SECAO MIN 415 CM2 P/ATE 30 TF
2.02.03
ESTACA CONC PM CRAV SECAO MIN 415 CM2 P/ATE 30TF
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

0,00000

0,00000

0,00000

02.02.055
ESTACA PRE-MOLD CONC SECAO MIN 531 CM2 P/ATE 40 TF
2.02.04
ESTACA DE CONCR PM CRAV SECAO MIN 531CM2 P/ATE 40T
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000
02.02.056
ESTACA PRE-MOLD CONC SECAO MIN 616 CM2 P/ATE 50 TF
2.02.05
ESTACA DE CONCR PM CRAV SECAO MIN 616CM2 P/ATE 50T
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

02.02.061
ESTACA RAIZ DN 160MM - CAPACIDADE ATE 30 TF
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.72
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=160MM ATE 30 TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
SubMO
Mo-de-Obra 2,23340
LS
2,72475
02.02.062
1.01.21
1.01.46
Exerccio:

ESTACA RAIZ DN 200MM - CAPACIDADE ATE 50 TF


FERREIRO
SERVENTE

2011

M
H
H

0,30000
0,30000

4,77
3,82

93,04
75,64320

108,53
88,24010

111,00
90,24860

109,96
89,40400

278,47
1,43100
1,14600
Pgina: 9

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.02.73
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=200MM ATE 50 TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 2,57700
LS
3,14394
SubMO

UN Coeficiente

Custo Unit.

Custo Total

5,72094

M
1,00000
M3
0,06500
KG
40,00000
KG
10,20000
Material
220,68390

174,44
174,44000
80,46
5,22990
0,37
14,80000
2,57
26,21400
BDI
52,07311

5,72094

M
H
0,30000
H
0,30000
M
1,00000
M3
0,10160
KG
62,00000
KG
15,00000
Material
258,77474

325,32
4,77
1,43100
3,82
1,14600
189,11
189,11000
80,46
8,17474
0,37
22,94000
2,57
38,55000
BDI
60,83401

6,48373

M
H
0,34000
H
0,34000
M
1,00000
M3
0,15620
KG
96,00000
KG
24,00000
Material
324,70785

407,36
4,77
1,62180
3,82
1,29880
214,94
214,94000
80,46
12,56785
0,37
35,52000
2,57
61,68000
BDI
76,17406

7,62792

M
H
0,40000
H
0,40000
M
1,00000
M3
0,27340
KG
168,00000
KG
42,00000
Material
456,52776

4,77
3,82
264,43
80,46
0,37
2,57
BDI
106,75581

02.02.070
ESTACA TIPO HELICE DN 25CM PARA CARGAS ATE 25 TF
2.02.20
EXEC DE ESTACA TIPO HELICE DN 25CM P/ATE 25 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

Material

M
M
1,00000
M3
0,04910
44,55564

30,57
284,84
BDI
10,24780

Material

M
M
1,00000
M3
0,07070
55,07819

34,94
284,84
BDI
12,66798

Material

M
M
1,00000
M3
0,09620
68,02161

40,62
284,84
BDI
15,64497

Material

M
M
1,00000
M3
0,12570
82,62439

46,82
284,84
BDI
19,00361

Material

M
M
1,00000
M3
0,19640
114,43258

58,49
284,84
BDI
26,31949

Material

M
M
1,00000
M3
0,28270
150,37427

69,85
284,84
BDI
34,58608

Material

M
M
1,00000
M3
0,38480
191,39643

235,41
81,79
81,79000
284,84
109,60643
BDI
44,02118

Material

M
M
1,00000
M3
0,50270
238,15907

292,93
94,97
94,97000
284,84
143,18907
BDI
54,77659

02.02.063
ESTACA RAIZ DN 250MM - CAPACIDADE ATE 70 TF
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.74
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=250MM ATE 70 TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 2,57700
SubMO
LS
3,14394
02.02.064
ESTACA RAIZ DN 310MM - CAPACIDADE ATE 100 TF
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.75
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=310MM ATE 100TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 2,92060
LS
3,56313
SubMO
02.02.065
ESTACA RAIZ DN 410MM - CAPACIDADE ATE 140 TF
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.76
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=410MM ATE 140TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 3,43600
LS
4,19192
SubMO

02.02.071
ESTACA TIPO HELICE DN 30CM PARA CARGAS ATE 35 TF
2.02.21
EXEC DE ESTACA TIPO HELICE DN 30CM P/ATE 35 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
02.02.072
ESTACA TIPO HELICE DN 35CM PARA CARGAS ATE 50 TF
2.02.22
EXEC DE ESTACA TIPO HELICE DN 35CM P/ATE 50 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
02.02.073
ESTACA TIPO HELICE DN 40CM PARA CARGAS ATE 60 TF
2.02.23
EXEC DE ESTACA TIPO HELICE DN 40CM P/ATE 60 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
02.02.074
ESTACA TIPO HELICE DN 50CM PARA CARGAS ATE 100 TF
2.02.24
EXEC DE ESTACA TIPO HELICE DN 50CM P/ATE 100 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
02.02.075
ESTACA TIPO HELICE DN 60CM PARA CARGAS ATE 150 TF
2.02.26
EXEC DE ESTACA TIPO HELICE DN 60CM P/ATE 150 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
02.02.076
ESTACA TIPO HELICE DN 70CM PARA CARGAS ATE 200 TF
2.02.27
EXEC DE ESTACA TIPO HELICE DN 70CM P/ATE 200 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
02.02.077
ESTACA TIPO HELICE DN 80CM PARA CARGAS ATE 250 TF
2.02.28
EXEC DE ESTACA TIPO HELICE DN 80CM P/ATE 250 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000
02.02.078
Exerccio:

ESTACA TIPO HELICE DN 90CM PARA CARGAS ATE 300 TF

2011

570,91
1,90800
1,52800
264,43000
21,99776
62,16000
107,94000

54,80
30,57000
13,98564

67,74
34,94000
20,13819

83,66
40,62000
27,40161

101,62
46,82000
35,80439

140,75
58,49000
55,94258

184,96
69,85000
80,52427

361,73
Pgina: 10

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.02.29
EXEC DE ESTACA TIPO HELICE DN 90CM P/ATE 300 TF
2.05.60
CONCRETO DOSADO (COND-A) BOMB FCK 20MPA C/PEDRISCO
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

Custo Unit.

Custo Total

M
1,00000
M3
0,63620
294,09521

112,88
112,88000
284,84
181,21521
BDI
67,64190

02.02.094
TAXA DE MOBILIZACAO DE EQUIPAMENTO PARA ESTACA TIPO HELICE
2.03.18
TAXA DE MOBILIZACAO DE EQUIPAMENTO - ESTACA HELICE
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
22.084,00000

27.163,32
22.084,00
22.084,00000
BDI
5.079,32000

02.02.095
EMENDA COM ANEIS SOLDADOS PARA ESTACA
2.01.80
FORN E APLIC EMENDA SOLDADA
Mo-de-Obra 0,00000
LS
0,00000

UN
UN
1,00000
Material
169,08000

207,96
169,08
169,08000
BDI
38,88840

02.02.097
TAXA DE MOBILIZACAO DE EQUIPAMENTO - ESCATAS PRE-MOLDADAS
2.01.60
TAXA DE MOBILIZACAO EQUIPAMENTOS-ESTACAS PRE-MOLD
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
6.958,00000

8.558,34
6.958,00
6.958,00000
BDI
1.600,34000

02.02.098
TAXA DE MOBILIZACAO DE EQUIPAMENTOS - ESCATAS STRAUSS
2.03.17
TAXA DE MOBILIZACAO EQUIPAMENTOS-ESTACAS STRAUSS
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
1.239,00000

1.523,97
1.239,00
1.239,00000
BDI
284,97000

02.02.099
FUNDACOES PROFUNDAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

20,90352

M2
H
1,10000
H
1,10000
M
2,00000
M2
0,50000
KG
0,20000
Material
13,70400

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,19090

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,20240

0,00000

02.03.001
FORMA DE MADEIRA MACICA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.67.60
PREGO
Mo-de-Obra 9,41600
LS
11,48752
02.03.099
FORMAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

02.04.002
ACO CA 50 (A OU B) FYK= 500 M PA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.25
ACO CA-50-A $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798
02.04.003
ACO CA 60 (A OU B) FYK= 600 M PA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.38
ACO CA-60-B $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

02.04.005
TELA ARMADURA (MALHA ACO CA 60 FYK= 600 M PA)
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.60
TELA ARMADURA (MALHA AO CA-60)
Mo-de-Obra 0,25770
LS
0,31439
SubMO
02.04.099
ARMADURAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

02.05.014
CONCRETO DOSADO E LANCADO FCK= 20 M PA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
Mo-de-Obra 50,76000
LS
61,92720
SubMO
02.05.018
CONCRETO DOSADO E LANCADO FCK=25MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
Mo-de-Obra 50,76000
LS
61,92720
02.05.019

Exerccio:

CONCRETO DOSADO E LANCADO FCK=30MPA

2011

SubMO

0,00000

Material

4,60
3,96
2,09
17,18
4,67
7,95973

42,56
5,06000
4,35600
4,18000
8,59000
0,93400

6,27
0,47700
0,38200
3,09350
0,09740

BDI

4,77
3,82
2,69
4,87
1,17251

BDI

4,77
3,82
2,70
4,87
1,17516

0,57209

KG
H
0,03000
H
0,03000
KG
1,10000
Material
4,70800

BDI

4,77
3,82
4,28
1,21442

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

112,68720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
246,20760

441,44
4,64
27,84000
3,82
22,92000
241,38
246,20760
BDI
82,54580

112,68720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
256,81560

454,48
4,64
27,84000
3,82
22,92000
251,78
256,81560
BDI
84,98564

M3

6,28
0,47700
0,38200
3,10500
0,09740

6,49
0,14310
0,11460
4,70800

469,84

Pgina: 11

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.38
CONCRETO DOSADO (CONDICAO A) FCK=30MPA
Mo-de-Obra 50,76000
LS
61,92720

UN Coeficiente

Custo Unit.

Custo Total

H
6,00000
H
6,00000
M3
1,02000
269,30040

4,64
27,84000
3,82
22,92000
264,02
269,30040
BDI
87,85715

02.05.024
CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.53
CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA
Mo-de-Obra 25,38000
LS
30,96360
SubMO
56,34360

M3
H
3,00000
H
3,00000
M3
1,02000
Material
283,93740

418,54
4,64
13,92000
3,82
11,46000
278,37
283,93740
BDI
78,26463

02.05.028
CONCRETO DOSADO,BOMBEADO E LANCADO FCK=25MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.37
CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA
Mo-de-Obra 25,38000
LS
30,96360
SubMO

56,34360

M3
H
3,00000
H
3,00000
M3
1,02000
Material
299,30880

437,45
4,64
13,92000
3,82
11,46000
293,44
299,30880
BDI
81,80005

56,34360

M3
H
3,00000
H
3,00000
M3
1,02000
Material
310,16160

450,80
4,64
13,92000
3,82
11,46000
304,08
310,16160
BDI
84,29620

197,49120

M3
H
6,00000
H
16,00000
M3
0,72000
KG
20,00000
KG
283,00000
M3
0,28000
Material
188,18000

474,37
4,64
27,84000
3,82
61,12000
80,46
57,93120
0,35
7,00000
0,37
104,71000
66,21
18,53880
88,70438

SubMO

02.05.029
CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.39
CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA
Mo-de-Obra 25,38000
LS
30,96360
SubMO
02.05.050
CONCRETO GROUT
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
Mo-de-Obra 88,96000

LS

108,53120

SubMO

112,68720

Material

BDI

02.05.098
FORNECIMENTO E MONTAGEM DE ESTRUTURA PRE-MOLDADA DE CONCRETO
M3
2.20.55
ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT
M3
1,00000
Mo-de-Obra 0,00000
LS
0,00000
Material
2.677,26000
SubMO
0,00000

3.293,02
2.677,26
2.677,26000
BDI
615,76980

02.05.099
CONCRETOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

02.06.001
ALVENARIA DE FUNDACAO E EMBASAMENTO COM TIJ MACICOS COMUNS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 65,75680
LS
80,22330
SubMO
145,98010

M3
H
6,40000
H
9,44000
M3
0,32400
KG
56,74000
KG
30,03000
UN
560,00000
Material
180,23914

BDI

401,24
4,64
29,69600
3,82
36,06080
80,46
26,06904
0,35
19,85900
0,37
11,11110
0,22
123,20000
75,03042

02.06.014
ALVENARIA DE EMBASAMENTO: BLOCO DE CONCRETO E=14CM CLASSE A
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.04
BLOCO DE CONCRETO 14X19X39CM - 6MPa
SubMO
134,32578
Mo-de-Obra 60,50711
LS
73,81867

M3
H
6,57160
H
7,85730
M3
0,16430
KG
29,57200
KG
23,14330
UN
92,85900
Material
212,27926

BDI

426,32
4,64
30,49222
3,82
30,01489
80,46
13,21958
0,35
10,35020
0,37
8,56302
1,94
180,14646
79,71916

BDI

4,64
23,93173
3,82
23,12055
80,46
6,77473
0,35
4,67880
0,37
5,18000
3,09
211,41471
76,47599

LS

0,00000

SubMO

0,00000

ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS DE CONCRETO


ESTRUTURAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
Mo-de-Obra 47,05228
LS
57,40378
SubMO
104,45606

02.06.015

02.06.016
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
Exerccio:

M3

ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS CERAMICOS PORTANTE


PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO

2011

408,98

H
5,15770
H
6,05250
M3
0,08420
KG
13,36800
KG
14,00000
UN
68,41900
Material
228,04824
M3
H
H
M3
KG
KG

6,57160
7,85730
0,08570
8,50020
27,50060

4,64
3,82
80,46
0,35
0,37

443,43
30,49222
30,01489
6,89542
2,97507
10,17522
Pgina: 12

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.25.31
BLOCO CERAMICO ESTRUTURAL 14X19X39 CM
Mo-de-Obra 60,50711
LS
73,81867

UN Coeficiente
SubMO

134,32578

ALVENARIA DE FUNDACAO E EMBASAMENTO COM BLOCOS CERAMICOS DE


VEDACAO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.21
BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM
Mo-de-Obra 60,50711
LS
73,81867
SubMO
134,32578

02.06.017

Material

UN
92,85900
226,19269

02.06.019
ALVENARIA DE FUNDACAO E EMBASAMENTO COM TIJOLOS LAMINADOS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.36
TIJOLO LAMINADO FURADO
Mo-de-Obra 182,74000
SubMO
405,68280
LS
222,94280
02.06.099
EMBASAMENTOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

SubMO

0,00000

0,00000

02.50.001
DE CONCRETO SIMPLES (MANUAL)
1.01.46
SERVENTE
Mo-de-Obra 42,02000
LS
51,26440
02.50.002
LASTRO DE CONCRETO SIMPLES (MANUAL)
1.01.46
SERVENTE
Mo-de-Obra 49,66000
LS
60,58520
02.50.003
DE ALVENARIA DE FUNDACAO (MANUAL)
1.01.46
SERVENTE
Mo-de-Obra 22,92000
LS
27,96240
Exerccio:

2011

SubMO

SubMO

SubMO

SubMO

BDI

4,64
30,49222
3,82
30,01489
80,46
6,89542
0,35
2,97507
0,37
10,17522
1,78
165,28902
73,52192
478,99

BDI

4,64
53,02963
3,82
51,57115
80,46
13,27590
0,35
10,21472
0,37
5,72190
0,56
128,00256
89,56863

M3
H
24,40000
H
18,20000
M3
0,32000
KG
56,70000
KG
30,00000
UN
700,00000
Material
525,69220

BDI

4,64
3,82
80,46
0,35
0,37
0,67
214,21625

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

1,00000
1,20000
0,02100
9,28000
0,30000

1.145,59
113,21600
69,52400
25,74720
19,84500
11,10000
469,00000

32,41
4,64000
4,58400
1,68966
3,43360
0,75000

BDI

4,64
3,82
80,46
0,37
2,50
6,06062

BDI

4,64
3,82
80,46
0,37
6,23
2,50
7,49352

1,03008

M2
H
0,10000
KG
3,00000
KG
0,15000
Material
6,14250

BDI

4,64
1,49
11,15
1,64969

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

93,28440

M3
H
11,00000
Material
0,00000

110,24520

M3
H
13,00000
Material
0,00000

50,88240

M3
H
6,00000
Material
0,00000

02.07.002
IMPERM RESP ALV EMBAS C/ CIM-AREIA 1-3 HIDROFUGO/TINTA BETUMINUSA
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,20000
2.05.03
AREIA
M3
0,02100
2.05.08
CIMENTO
KG
9,28000
2.40.56
TINTA BETUMINOSA
L
1,00000
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
KG
0,30000
SubMO
20,47728
Mo-de-Obra 9,22400
LS
11,25328
Material
12,10326

02.07.099
IMPERMEABILIZACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

2,22
206,14698
82,91925

M3

02.07.001
IMPERM RESP ALV EMBAS COM ARGAM CIM-AREIA 1:3 CONTENDO HIDROFUGO
M2
1.01.39
PEDREIRO
H
1.01.46
SERVENTE
H
2.05.03
AREIA
M3
2.05.08
CIMENTO
KG
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
KG
Mo-de-Obra 9,22400
LS
11,25328
SubMO
20,47728
Material
5,87326

02.07.003
IMPERMEABILIZACAO POR CRISTALIZACAO - SUB SOLOS
1.01.39
PEDREIRO
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
Mo-de-Obra 0,46400
LS
0,56608
SubMO

BDI

393,18

H
6,57160
H
7,85730
M3
0,08570
KG
8,50020
KG
27,50060
UN
92,85900
Material
185,33473

H
11,42880
H
13,50030
M3
0,16500
KG
29,18490
KG
15,46460
UN
228,57600
Material
157,21508

0,00000

Custo Total

M3

ALVENARIA DE FUNDACAO E EMBASAMENTO C/ TIJOLO CERAMICO FURADO


02.06.018
(BAIANO)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.29
TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM
Mo-de-Obra 104,60078
LS
127,61295
SubMO
232,21373

LS

Custo Unit.

BDI

3,82
21,45541

BDI

3,82
25,35640

BDI

3,82
11,70295

40,07
4,64000
4,58400
1,68966
3,43360
6,23000
0,75000

8,82
0,46400
4,47000
1,67250

114,73
42,02000

135,60
49,66000

62,58
22,92000

Pgina: 13

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

02.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

UN Coeficiente

Custo Unit.

Custo Total

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

24,70416

M2
H
1,30000
H
1,30000
M
3,00000
M2
0,50000
KG
0,20000
Material
20,86400

03.01.002
FORMAS PLANAS PLASTIFICADA PARA CONCRETO APARENTE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.34
CHAPA COMPENSADA PLASTIFICADA E=12MM
2.67.60
PREGO
Mo-de-Obra 17,12000
LS
20,88640
SubMO
38,00640

M2
H
2,00000
H
2,00000
M
3,00000
M2
0,10000
M2
0,33000
KG
0,20000
Material
19,94520

03.01.003
FORMAS CURVAS PLASTIFICADA PARA CONCRETO APARENTE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.67.60
PREGO
Mo-de-Obra 23,96800
LS
29,24096
SubMO
53,20896

M2
H
2,80000
H
2,80000
M
3,00000
M2
0,25000
M2
0,33000
KG
0,20000
Material
21,84900

03.01.005
CIMBRAMENTO DE MADEIRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.09
PONTALETE PINHO DE 3"X3"
2.67.60
PREGO
Mo-de-Obra 4,28000
LS

9,50160

M3
H
H
M
KG
Material
6,37050

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
38,62830

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
49,53830

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
63,59830

02.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
02.70.099
RECOLOCACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

LS

LS

0,00000

0,00000

0,00000

02.80.099
SERVICOS DE INFRA ESTRUTURA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
03.01.001
FORMAS DE MADEIRA MACICA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.67.60
PREGO
Mo-de-Obra 11,12800
LS
13,57616

5,22160

03.01.011
FORMA DE TUBO DE PAPELAO DIAM. 15 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.31
FORMA DE TUBO DE PAPELAO DIAM. 15CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.012
FORMA DE TUBO DE PAPELAO DIAM. 20 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.28
FORMA DE TUBO DE PAPELAO DIAM.20 CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.013
FORMA DE TUBO DE PAPELAO DIAM. 25 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.32
FORMA DE TUBO DE PAPELAO DIAM. 25CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.014
Exerccio:

FORMA DE TUBO DE PAPELAO DIAM. 30 CM

2011

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

BDI

4,60
3,96
3,78
17,18
4,67
10,48068

BDI

4,60
3,96
3,78
17,18
18,04
4,67
13,32887

BDI

4,60
3,96
3,78
17,18
16,00
4,67
17,26333

BDI

4,60
3,96
3,78
4,67
3,65058

BDI

4,60
3,96
17,18
36,52
4,67
9,65756

BDI

4,60
3,96
17,18
47,43
4,67
12,16686

BDI

4,60
3,96
17,18
61,49
4,67
15,40066

0,50000
0,50000
1,50000
0,15000

56,04
5,98000
5,14800
11,34000
8,59000
0,93400

71,28
9,20000
7,92000
11,34000
1,71800
5,95320
0,93400

92,32
12,88000
11,08800
11,34000
4,29500
5,28000
0,93400

19,52
2,30000
1,98000
5,67000
0,70050

51,64
0,92000
0,59400
2,06160
36,52000
0,04670

65,06
0,92000
0,59400
2,06160
47,43000
0,04670

82,36
0,92000
0,59400
2,06160
61,49000
0,04670

99,01
Pgina: 14

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.29
FORMA DE TUBO DE PAPELAO DIAM.30 CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.015
FORMA DE TUBO DE PAPELAO DIAM. 35 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.33
FORMA DE TUBO DE PAPELAO DIAM. 35CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.016
FORMA DE TUBO DE PAPELAO DIAM. 40 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.34
FORMA DE TUBO DE PAPELAO DIAM. 40CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.017
FORMA DE TUBO DE PAPELAO DIAM. 45 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.35
FORMA DE TUBO DE PAPELAO DIAM. 45CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.018
FORMA DE TUBO DE PAPELAO DIAM. 50 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.36
FORMA DE TUBO DE PAPELAO DIAM. 50CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.019
FORMA DE TUBO DE PAPELAO DIAM. 55 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.37
FORMA DE TUBO DE PAPELAO DIAM. 55CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.020
FORMA DE TUBO DE PAPELAO DIAM. 60 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.38
FORMA DE TUBO DE PAPELAO DIAM. 60CM
2.67.60
PREGO
Mo-de-Obra 1,51400
LS
1,84708
03.01.099
FORMAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

03.02.002
ACO CA 50 (A OU B) FYK= 500 M PA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.25
ACO CA-50-A $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798
03.02.003
ACO CA 60 (A OU B) FYK= 600 M PA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.38
ACO CA-60-B $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798
03.02.005
Exerccio:

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

TELA ARMADURA (MALHA ACO CA 60 FYK= 600 M PA)

2011

3,36108

H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
77,13830

Custo Unit.

Custo Total

BDI

4,60
3,96
17,18
75,03
4,67
18,51486

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
85,23830

BDI

4,60
3,96
17,18
83,13
4,67
20,37786

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
113,12830

143,28
4,60
0,92000
3,96
0,59400
17,18
2,06160
111,02
111,02000
4,67
0,04670
BDI
26,79256

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
120,05830

151,80
4,60
0,92000
3,96
0,59400
17,18
2,06160
117,95
117,95000
4,67
0,04670
BDI
28,38646

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
151,91830

190,99
4,60
0,92000
3,96
0,59400
17,18
2,06160
149,81
149,81000
4,67
0,04670
BDI
35,71426

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
155,68830

195,63
4,60
0,92000
3,96
0,59400
17,18
2,06160
153,58
153,58000
4,67
0,04670
BDI
36,58136

3,36108

M
H
0,20000
H
0,15000
M2
0,12000
M
1,00000
KG
0,01000
Material
188,59830

236,11
4,60
0,92000
3,96
0,59400
17,18
2,06160
186,49
186,49000
4,67
0,04670
BDI
44,15066

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,19090

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,20240
KG

BDI

4,77
3,82
2,69
4,87
1,17251

BDI

4,77
3,82
2,70
4,87
1,17516

0,92000
0,59400
2,06160
75,03000
0,04670

108,97
0,92000
0,59400
2,06160
83,13000
0,04670

6,27
0,47700
0,38200
3,09350
0,09740

6,28
0,47700
0,38200
3,10500
0,09740

6,49
Pgina: 15

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.60
TELA ARMADURA (MALHA AO CA-60)
Mo-de-Obra 0,25770
LS
0,31439

UN Coeficiente

Custo Unit.

Custo Total

0,57209

H
0,03000
H
0,03000
KG
1,10000
Material
4,70800

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M2
H
0,27000
H
0,27000
H
0,35000
H
0,70000
M3
0,04400
M
1,06000
M
0,63000
M2
0,18000
M2
1,00000
KG
0,03000
Material
66,96562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
45,75
4,67
BDI
18,77675

03.03.005
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP12-300KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,27000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,27000
1.01.39
PEDREIRO
H
0,35000
1.01.46
SERVENTE
H
0,70000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04400
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,06000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
0,63000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,18000
2.21.02
LAJE PRE-FABR UNIDIR VIGOTA PROT LP12-300KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
SubMO
14,67242
Mo-de-Obra 6,60920
LS
8,06322
Material
66,15562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
44,94
4,67
BDI
18,59045

03.03.006
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP16-100KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,27000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,27000
1.01.39
PEDREIRO
H
0,37000
1.01.46
SERVENTE
H
0,74000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04400
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,06000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
0,63000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,18000
2.21.04
LAJE PRE-FABR UNIDIR VIGOTA PROT LP16-100KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
SubMO
15,21766
Mo-de-Obra 6,85480
LS
8,36286
Material
70,39562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
49,18
4,67
BDI
19,69105

03.03.007
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP16-300KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,27000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,27000
1.01.39
PEDREIRO
H
0,37000
1.01.46
SERVENTE
H
0,74000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04400
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,06000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
0,63000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,18000
2.21.05
LAJE PRE-FABR UNIDIR VIGOTA PROT LP16-300KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
Mo-de-Obra 6,85480
LS
8,36286
SubMO
15,21766
Material
73,44562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
52,23
4,67
BDI
20,39255

03.03.008
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-100KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,27000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,27000
1.01.39
PEDREIRO
H
0,40000
1.01.46
SERVENTE
H
0,80000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04400
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,06000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
0,63000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,18000
2.21.07
LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-100KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
SubMO
16,03550
Mo-de-Obra 7,22320
LS
8,81230
Material
74,77562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
53,56
4,67
BDI
20,88656

03.02.099
ARMADURAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

SubMO

03.03.003
LAJE PRE-FABRICADA UNID C/VIGOTAS PROTENDIDAS LP12-100KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.01
LAJE PRE-FABR UNIDIR VIGOTA PROT LP12-100KGF/M2
2.67.60
PREGO
Mo-de-Obra 6,60920
LS
8,06322
SubMO
14,67242

03.03.009
Exerccio:

LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-300KGF/M2

2011

M2

4,77
3,82
4,28
1,21442

0,14310
0,11460
4,70800

100,41
1,24200
1,06920
1,62400
2,67400
11,07832
4,00680
2,89800
3,09240
45,75000
0,14010

99,41
1,24200
1,06920
1,62400
2,67400
11,07832
4,00680
2,89800
3,09240
44,94000
0,14010

105,30
1,24200
1,06920
1,71680
2,82680
11,07832
4,00680
2,89800
3,09240
49,18000
0,14010

109,05
1,24200
1,06920
1,71680
2,82680
11,07832
4,00680
2,89800
3,09240
52,23000
0,14010

111,69
1,24200
1,06920
1,85600
3,05600
11,07832
4,00680
2,89800
3,09240
53,56000
0,14010

117,24
Pgina: 16

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.08
LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-300KGF/M2
2.67.60
PREGO
SubMO
Mo-de-Obra 7,22320
LS
8,81230

Custo Unit.

Custo Total

H
0,27000
H
0,27000
H
0,40000
H
0,80000
M3
0,04400
M
1,06000
M
0,63000
M2
0,18000
M2
1,00000
KG
0,03000
Material
79,28562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
58,07
4,67
BDI
21,92386

03.03.010
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP20-500KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,27000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,27000
1.01.39
PEDREIRO
H
0,40000
1.01.46
SERVENTE
H
0,80000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04400
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,06000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
0,63000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,18000
2.21.09
LAJE PRE-FABR UNIDIR VIGOTA PROT LP20-500KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
Mo-de-Obra 7,22320
LS
8,81230
SubMO
16,03550
Material
79,28562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
58,07
4,67
BDI
21,92386

03.03.012
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-100KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,27000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,27000
1.01.39
PEDREIRO
H
0,37000
1.01.46
SERVENTE
H
0,74000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04400
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,06000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
0,63000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,18000
2.21.10
LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-100KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
Mo-de-Obra 6,85480
LS
8,36286
SubMO
15,21766
Material
81,71562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
60,50
4,67
BDI
22,29465

03.03.014
CONCRETO DOSADO E LANCADO FCK= 20 M PA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
Mo-de-Obra 50,76000
LS
61,92720
SubMO

441,44
4,64
27,84000
3,82
22,92000
241,38
246,20760
BDI
82,54580

16,03550

112,68720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
246,20760

1,24200
1,06920
1,85600
3,05600
11,07832
4,00680
2,89800
3,09240
58,07000
0,14010

117,24
1,24200
1,06920
1,85600
3,05600
11,07832
4,00680
2,89800
3,09240
58,07000
0,14010

119,22
1,24200
1,06920
1,71680
2,82680
11,07832
4,00680
2,89800
3,09240
60,50000
0,14010

03.03.015
LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-300KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,27000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,27000
1.01.39
PEDREIRO
H
0,37000
1.01.46
SERVENTE
H
0,74000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04400
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,06000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
0,63000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,18000
2.21.11
LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-300KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
Mo-de-Obra 6,85480
LS
8,36286
SubMO
15,21766
Material
83,37562

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
62,16
4,67
BDI
22,67645

03.03.016
CONCRETO DOSADO E LANCADO FCK=25 MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
Mo-de-Obra 50,76000
LS
61,92720

454,48
4,64
27,84000
3,82
22,92000
251,78
256,81560
BDI
84,98564

03.03.017
1.01.11
1.01.12
1.01.39
1.01.46
2.05.36
2.10.09
2.10.17
2.10.21
2.21.12
2.67.60

Exerccio:

SubMO

112,68720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
256,81560

LAJE PRE-FABRICADA UNIDIRECIONAL C/VIGOTAS PROTENDIDAS LP24-500KGF/M2


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
PONTALETE PINHO DE 3"X3"
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
LAJE PRE-FABR UNIDIR VIGOTA PROT LP24-500KGF/M2
PREGO

2011

M2
H
H
H
H
M3
M
M
M2
M2
KG

0,27000
0,27000
0,37000
0,74000
0,04400
1,06000
0,63000
0,18000
1,00000
0,03000

4,60
3,96
4,64
3,82
251,78
3,78
4,60
17,18
64,45
4,67

121,26
1,24200
1,06920
1,71680
2,82680
11,07832
4,00680
2,89800
3,09240
62,16000
0,14010

124,08
1,24200
1,06920
1,71680
2,82680
11,07832
4,00680
2,89800
3,09240
64,45000
0,14010

Pgina: 17

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 6,85480

LS

8,36286

UN Coeficiente
SubMO

15,21766

Material

85,66562

Custo Unit.
BDI

Custo Total

23,20315

03.03.018
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT12-100KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.21
LAJE PRE-FABR VIGOTA TREL UNIDIR LT12-100KGF/M2
2.67.60
PREGO
Mo-de-Obra 6,69300
LS
8,16546
SubMO
14,85846

M2
H
0,29000
H
0,29000
H
0,29000
H
0,75000
M3
0,04900
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
46,01350

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
24,92
4,67
BDI
14,00055

03.03.019
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT16-100KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.24
LAJE PRE-FABR VIGOTA TREL UNIDIR LT16-100KGF/M2
2.67.60
PREGO
Mo-de-Obra 7,73540
LS
9,43719
SubMO
17,17259

M2
H
0,29000
H
0,29000
H
0,35000
H
0,95000
M3
0,06270
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
57,46289

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
32,92
4,67
BDI
17,16616

03.03.020
CONCRETO DOSADO E LANCADO FCK=30MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.38
CONCRETO DOSADO (CONDICAO A) FCK=30MPA
Mo-de-Obra 50,76000
LS
61,92720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
269,30040

469,84
4,64
27,84000
3,82
22,92000
264,02
269,30040
BDI
87,85715

03.03.022
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT16-300KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.25
LAJE PRE-FABR VIGOTA TREL UNIDIR LT16-300KGF/M2
2.67.60
PREGO
Mo-de-Obra 7,73540
LS
9,43719
SubMO
17,17259

M2
H
0,29000
H
0,29000
H
0,35000
H
0,95000
M3
0,06270
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
57,46289

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
32,92
4,67
BDI
17,16616

03.03.024
CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.53
CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA
Mo-de-Obra 25,38000
LS
30,96360
SubMO
56,34360

M3
H
3,00000
H
3,00000
M3
1,02000
Material
283,93740

418,54
4,64
13,92000
3,82
11,46000
278,37
283,93740
BDI
78,26463

03.03.026
CONCRETO DOSADO,BOMBEADO E LANCADO FCK 25 MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.37
CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA
Mo-de-Obra 25,38000
LS
30,96360
SubMO

M3
H
3,00000
H
3,00000
M3
1,02000
Material
299,30880

437,45
4,64
13,92000
3,82
11,46000
293,44
299,30880
BDI
81,80005

M2
H
0,29000
H
0,29000
H
0,40000
H
1,06000
M3
0,07420
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
68,97836

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
41,54
4,67
BDI
20,14773

SubMO

112,68720

56,34360

03.03.027
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-100KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.27
LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-100KGF/M2
2.67.60
PREGO
SubMO
18,62047
Mo-de-Obra 8,38760
LS
10,23287
03.03.028
1.01.11
1.01.12
Exerccio:

LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-300KGF/M2


CARPINTEIRO
AJUDANTE DE CARPINTEIRO

2011

M2
H
H

0,29000
0,29000

4,60
3,96

74,87
1,33400
1,14840
1,34560
2,86500
12,33722
4,34700
0,81600
3,45318
24,92000
0,14010

91,80
1,33400
1,14840
1,62400
3,62900
15,78661
4,34700
0,81600
3,45318
32,92000
0,14010

91,80
1,33400
1,14840
1,62400
3,62900
15,78661
4,34700
0,81600
3,45318
32,92000
0,14010

107,74
1,33400
1,14840
1,85600
4,04920
18,68208
4,34700
0,81600
3,45318
41,54000
0,14010

107,74
1,33400
1,14840
Pgina: 18

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.28
LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-300KGF/M2
2.67.60
PREGO
SubMO
Mo-de-Obra 8,38760
LS
10,23287

UN Coeficiente

Custo Unit.

Custo Total

H
0,40000
H
1,06000
M3
0,07420
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
68,97836

4,64
3,82
251,78
3,78
1,36
17,18
41,54
4,67
BDI
20,14773

03.03.029
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT20-500KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.29
LAJE PRE-FABR VIGOTA TREL UNIDIR LT20-500KGF/M2
2.67.60
PREGO
Mo-de-Obra 8,38760
LS
10,23287
SubMO
18,62047

M2
H
0,29000
H
0,29000
H
0,40000
H
1,06000
M3
0,07420
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
68,97836

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
41,54
4,67
BDI
20,14773

03.03.030
CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.39
CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA
Mo-de-Obra 25,38000
LS
30,96360
SubMO

M3
H
3,00000
H
3,00000
M3
1,02000
Material
310,16160

450,80
4,64
13,92000
3,82
11,46000
304,08
310,16160
BDI
84,29620

03.03.031
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT25-300KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.30
LAJE PRE-FABR VIGOTA TREL UNIDIR LT25-300KGF/M2
2.67.60
PREGO
Mo-de-Obra 9,40000
LS
11,46800
SubMO
20,86800

M2
H
0,29000
H
0,29000
H
0,47000
H
1,24000
M3
0,07970
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
76,83315

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
48,01
4,67
BDI
22,47126

03.03.032
LAJE PRE-FABRICADA VIGOTA TRELICADA UNIDIRECIONAL LT25-500KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.31
LAJE PRE-FABR VIGOTA TREL UNIDIR LT25-500KGF/M2
2.67.60
PREGO
Mo-de-Obra 9,40000
LS
11,46800
SubMO
20,86800

M2
H
0,29000
H
0,29000
H
0,47000
H
1,24000
M3
0,07970
M
1,15000
M
0,60000
M2
0,20100
M2
1,00000
KG
0,03000
Material
76,83315

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
48,01
4,67
BDI
22,47126

03.03.033
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H10-100KGF/M2
M2
1.01.39
PEDREIRO
H
0,16000
1.01.46
SERVENTE
H
0,24000
2.05.03
AREIA
M3
0,00220
2.05.08
CIMENTO
KG
1,37610
2.05.22
PEDRISCO
M3
0,00310
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,05500
2.21.41
LAJE PRE-FABR PAINEL ALVEOLAR PROT H10-100KGF/M2
M2
1,00000
2.80.40
ADITIVO EXPANSOR
KG
0,01400
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
SubMO
3,68342
Mo-de-Obra 1,65920
LS
2,02422
Material
106,50392

4,64
3,82
80,46
0,37
66,21
251,78
84,44
5,26
108,71
BDI
25,34309

03.03.034
1.01.39
1.01.46
2.05.03
2.05.08
2.05.22
2.05.36
2.21.44
Exerccio:

18,62047

56,34360

LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-100KGF/M2


PEDREIRO
SERVENTE
AREIA
CIMENTO
PEDRISCO
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-100KGF/M2

2011

M2
H
H
M3
KG
M3
M3
M2

0,16000
0,24000
0,00380
2,35220
0,00520
0,05500
1,00000

4,64
3,82
80,46
0,37
66,21
251,78
104,65

1,85600
4,04920
18,68208
4,34700
0,81600
3,45318
41,54000
0,14010

107,74
1,33400
1,14840
1,85600
4,04920
18,68208
4,34700
0,81600
3,45318
41,54000
0,14010

120,17
1,33400
1,14840
2,18080
4,73680
20,06687
4,34700
0,81600
3,45318
48,01000
0,14010

120,17
1,33400
1,14840
2,18080
4,73680
20,06687
4,34700
0,81600
3,45318
48,01000
0,14010

135,53
0,74240
0,91680
0,17701
0,50916
0,20525
13,84790
84,44000
0,07364
7,25096

161,22
0,74240
0,91680
0,30575
0,87031
0,34429
13,84790
104,65000
Pgina: 19

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.80.40
ADITIVO EXPANSOR
8.03.28
GUINDASTE SOBRE PNEUS 13 T
Mo-de-Obra 1,65920
LS
2,02422

UN Coeficiente

SubMO

3,68342

KG
0,02400
H
0,06670
Material
127,39545

Custo Unit.

Custo Total

5,26
108,71
BDI
30,14814

0,12624
7,25096

03.03.036
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-300KGF/M2
M2
1.01.39
PEDREIRO
H
0,16000
1.01.46
SERVENTE
H
0,24000
2.05.03
AREIA
M3
0,00380
2.05.08
CIMENTO
KG
2,35220
2.05.22
PEDRISCO
M3
0,00520
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,05500
2.21.45
LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-300KGF/M2
M2
1,00000
2.80.40
ADITIVO EXPANSOR
KG
0,02400
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 1,65920
LS
2,02422
SubMO
3,68342
Material
129,81545

164,20
4,64
0,74240
3,82
0,91680
80,46
0,30575
0,37
0,87031
66,21
0,34429
251,78
13,84790
107,07
107,07000
5,26
0,12624
108,71
7,25096
BDI
30,70474

03.03.037
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H15-500KGF/M2
M2
1.01.39
PEDREIRO
H
0,16000
1.01.46
SERVENTE
H
0,24000
2.05.03
AREIA
M3
0,00380
2.05.08
CIMENTO
KG
2,35220
2.05.22
PEDRISCO
M3
0,00520
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,05500
2.21.46
LAJE PRE-FABR PAINEL ALVEOLAR PROT H15-500KGF/M2
M2
1,00000
2.80.40
ADITIVO EXPANSOR
KG
0,02400
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 1,65920
LS
2,02422
SubMO
3,68342
Material
134,25545

169,66
4,64
0,74240
3,82
0,91680
80,46
0,30575
0,37
0,87031
66,21
0,34429
251,78
13,84790
111,51
111,51000
5,26
0,12624
108,71
7,25096
BDI
31,72594

03.03.038
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H20-300KGF/M2
M2
1.01.39
PEDREIRO
H
0,16000
1.01.46
SERVENTE
H
0,24000
2.05.03
AREIA
M3
0,00660
2.05.08
CIMENTO
KG
4,02090
2.05.22
PEDRISCO
M3
0,00880
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,05500
2.21.47
LAJE PRE-FABR PAINEL ALVEOLAR PROT H20-300KGF/M2
M2
1,00000
2.80.40
ADITIVO EXPANSOR
KG
0,04120
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 1,65920
LS
2,02422
SubMO
3,68342
Material
147,12699

185,49
4,64
0,74240
3,82
0,91680
80,46
0,53104
0,37
1,48773
66,21
0,58265
251,78
13,84790
123,21
123,21000
5,26
0,21671
108,71
7,25096
BDI
34,68639

03.03.039
LAJE PRE-FABRICADA PAINEL ALVEOLAR CONCRETO PROTENDIDO H20-500KGF/M2
M2
1.01.39
PEDREIRO
H
0,16000
1.01.46
SERVENTE
H
0,24000
2.05.03
AREIA
M3
0,00660
2.05.08
CIMENTO
KG
4,02090
2.05.22
PEDRISCO
M3
0,00880
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,05500
2.21.48
LAJE PRE-FABR PAINEL ALVEOLAR PROT H20-500KGF/M2
M2
1,00000
2.80.40
ADITIVO EXPANSOR
KG
0,04120
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 1,65920
LS
2,02422
SubMO
3,68342
Material
158,31699

199,26
4,64
0,74240
3,82
0,91680
80,46
0,53104
0,37
1,48773
66,21
0,58265
251,78
13,84790
134,40
134,40000
5,26
0,21671
108,71
7,25096
BDI
37,26009

03.03.040
LAJE MISTA B-11 SOBRECARGA 100 KG
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.35
LAJE PRE-FABR B-11 41-1-100
2.67.60
PREGO
Mo-de-Obra 7,59312
LS
9,26361

4,77
3,82
4,64
3,82
251,78
3,78
4,60
17,18
2,69
15,34
4,67
BDI
14,70658

03.03.042
1.01.21
1.01.22
1.01.39
1.01.46
2.05.36
2.10.09
2.10.17
2.10.21
Exerccio:

LAJE MISTA B-16 SOBRECARGA 500 KG


FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
PONTALETE PINHO DE 3"X3"
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.

2011

SubMO

16,85674

M2
H
0,38360
H
0,38360
H
0,35000
H
0,70000
M3
0,04490
M
1,06000
M
0,63000
M2
0,18000
KG
3,83000
M2
1,00000
KG
0,03000
Material
47,08492
M2
H
H
H
H
M3
M
M
M2

0,38360
0,38360
0,40000
0,80000
0,04490
1,13000
0,67000
0,19000

4,77
3,82
4,64
3,82
251,78
3,78
4,60
17,18

78,64
1,82977
1,46535
1,62400
2,67400
11,30492
4,00680
2,89800
3,09240
10,30270
15,34000
0,14010

90,07
1,82977
1,46535
1,85600
3,05600
11,30492
4,27140
3,08200
3,26420
Pgina: 20

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.37
LAJE PRE-FABR B-1641-2-500
2.67.60
PREGO
Mo-de-Obra 8,20712
LS

Descrio

10,01269

03.03.043
LAJE MISTA B-16 SOBRECARGA 300 KG
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.38
LAJE PRE-FABR B-16 41-2-300
2.67.60
PREGO
Mo-de-Obra 8,20712
LS
10,01269
03.03.044
LAJE MISTA B-20 SOBRECARGA 300 KG
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.39
LAJE PRE-FABR B20-41-2-300
2.67.60
PREGO
Mo-de-Obra 8,61372
LS
10,50874
03.03.045
LAJE MISTA B-12 SOBRECARGA 100 KG
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.56
LAJE PRE-FABRICADA B-12-41-1-100
2.67.60
PREGO
Mo-de-Obra 7,83872
LS
9,56324
03.03.046
LAJE MISTA B-12 SOBRECARGA 300 KG
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.57
LAJE PRE-FABRICADA B-12-41-2-300
2.67.60
PREGO
Mo-de-Obra 7,83872
LS
9,56324
03.03.047
LAJE MISTA B-16 SOBRECARGA 100 KG
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.58
LAJE PRE-FABRICADA B-16-41-1-100
2.67.60
PREGO
Mo-de-Obra 8,20712
LS
10,01269

Exerccio:

2011

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

Custo Unit.

Custo Total

18,21982

KG
3,83000
M2
1,00000
KG
0,03000
Material
55,01532

2,69
22,65
4,67
16,84408

BDI

18,21982

M2
H
0,38360
H
0,38360
H
0,40000
H
0,80000
M3
0,05860
M
1,13000
M
0,67000
M2
0,19000
KG
3,83000
M2
1,00000
KG
0,03000
Material
52,87471

4,77
3,82
4,64
3,82
251,78
3,78
4,60
17,18
2,69
17,06
4,67
BDI
16,35174

19,12247

M2
H
0,38360
H
0,38360
H
0,43000
H
0,87000
M3
0,06500
M
1,13000
M
0,67000
M2
0,19000
KG
3,83000
M2
1,00000
KG
0,03000
Material
67,13610

4,77
3,82
4,64
3,82
251,78
3,78
4,60
17,18
2,69
29,71
4,67
BDI
19,83947

17,40197

M2
H
0,38360
H
0,38360
H
0,37000
H
0,74000
M3
0,04420
M
1,13000
M
0,67000
M2
0,19000
KG
3,83000
M2
1,00000
KG
0,03000
Material
57,06908

4,77
3,82
4,64
3,82
251,78
3,78
4,60
17,18
2,69
24,88
4,67
BDI
17,12834

17,40197

M2
H
0,38360
H
0,38360
H
0,37000
H
0,74000
M3
0,04420
M
1,13000
M
0,67000
M2
0,19000
KG
3,83000
M2
1,00000
KG
0,03000
Material
60,33908

4,77
3,82
4,64
3,82
251,78
3,78
4,60
17,18
2,69
28,15
4,67
BDI
17,88044

18,21982

M2
H
0,38360
H
0,38360
H
0,40000
H
0,80000
M3
0,05330
M
1,13000
M
0,67000
M2
0,19000
KG
3,83000
M2
1,00000
KG
0,03000
Material
51,54027

4,77
3,82
4,64
3,82
251,78
3,78
4,60
17,18
2,69
17,06
4,67
BDI
16,04482

10,30270
22,65000
0,14010

87,44
1,82977
1,46535
1,85600
3,05600
14,75431
4,27140
3,08200
3,26420
10,30270
17,06000
0,14010

106,09
1,82977
1,46535
1,99520
3,32340
16,36570
4,27140
3,08200
3,26420
10,30270
29,71000
0,14010

91,59
1,82977
1,46535
1,71680
2,82680
11,12868
4,27140
3,08200
3,26420
10,30270
24,88000
0,14010

95,62
1,82977
1,46535
1,71680
2,82680
11,12868
4,27140
3,08200
3,26420
10,30270
28,15000
0,14010

85,80
1,82977
1,46535
1,85600
3,05600
13,41987
4,27140
3,08200
3,26420
10,30270
17,06000
0,14010

Pgina: 21

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

03.03.048
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT12-100KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.61
PRE-LAJE TREL BIDIR C/EPS PLT12-100KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
Mo-de-Obra 9,17360
LS
11,19179
SubMO
20,36539

M2
H
0,29000
H
0,29000
H
0,52000
H
1,12000
M3
0,04900
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
68,21966

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
39,78
4,67
108,71
BDI
20,37456

03.03.049
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT16-100KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.62
PRE-LAJE TREL BIDIR C/EPS PLT16-100KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
Mo-de-Obra 9,17360
LS
11,19179
SubMO
20,36539

M2
H
0,29000
H
0,29000
H
0,52000
H
1,12000
M3
0,06270
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
80,63904

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
48,75
4,67
108,71
BDI
23,23102

03.03.050
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT-16 300KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,52000
1.01.46
SERVENTE
H
1,12000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,06270
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.63
PRE-LAJE TREL BIDIR C/EPS PLT16-300KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 9,17360
LS
11,19179
SubMO
20,36539
Material
80,63904

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
48,75
4,67
108,71
BDI
23,23102

03.03.051
PAINEIS/LAJES PISO EM CONCRETO CELULAR AUTOCLAVADO E=7,50CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.20.11
PAINEL/LAJE FORRO CONCR. CEL. AUTOCLAVADO E=7,5CM
Mo-de-Obra 4,29800
LS
5,24356
SubMO
9,54156

M2
H
0,35000
H
0,70000
M3
0,00300
KG
0,60000
KG
0,50000
M3
0,03000
M2
1,00000
Material
110,87778

148,11
4,64
1,62400
3,82
2,67400
80,46
0,24138
0,35
0,21000
0,37
0,18500
241,38
7,24140
103,00
103,00000
BDI
27,69645

03.03.053
PAINEIS/LAJES FORRO EM CONCRETO CELULAR AUTOCLAVADO E=7,50CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.20.11
PAINEL/LAJE FORRO CONCR. CEL. AUTOCLAVADO E=7,5CM
SubMO
6,81540
Mo-de-Obra 3,07000
LS
3,74540

M2
H
0,25000
H
0,50000
M3
0,00300
KG
0,60000
KG
0,50000
M2
1,00000
Material
103,63638

135,85
4,64
1,16000
3,82
1,91000
80,46
0,24138
0,35
0,21000
0,37
0,18500
103,00
103,00000
BDI
25,40391

03.03.054
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT20-100KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.64
PRE-LAJE TREL BIDIR C/EPS PLT20-100KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
SubMO
21,81328
Mo-de-Obra 9,82580
LS
11,98748

M2
H
0,29000
H
0,29000
H
0,57000
H
1,23000
M3
0,07420
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
90,62451

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
55,84
4,67
108,71
BDI
25,86069

Exerccio:

2011

108,95
1,33400
1,14840
2,41280
4,27840
12,33722
4,34700
0,91120
3,45318
39,78000
0,14010
7,25096

124,23
1,33400
1,14840
2,41280
4,27840
15,78661
4,34700
0,91120
3,45318
48,75000
0,14010
7,25096

124,23
1,33400
1,14840
2,41280
4,27840
15,78661
4,34700
0,91120
3,45318
48,75000
0,14010
7,25096

138,29
1,33400
1,14840
2,64480
4,69860
18,68208
4,34700
0,91120
3,45318
55,84000
0,14010
7,25096

Pgina: 22

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

03.03.055
TIJOLO FURADO CERAMICO P/ENCHIMENTO DE REBAIXO DE LAJE
1.01.46
SERVENTE
2.25.16
TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM
Mo-de-Obra 19,10000
LS
23,30200
SubMO
42,40200

M3
H
5,00000
UN
262,50000
Material
141,75000

BDI

03.03.056
CONCRETO PREPARADO NO LOCAL C/AGREGADO LEVE P/ENCHIMENTO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.45.02
ARGILA EXPANDIDA
Mo-de-Obra 88,96000
LS
108,53120
SubMO
197,49120

M3
H
6,00000
H
16,00000
M3
0,60000
KG
300,00000
M3
0,80000
Material
344,34800

4,64
3,82
80,46
0,37
231,34
BDI
124,62302

03.03.058
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT20-300KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.65
PRE-LAJE TREL BIDIR C/EPS PLT20-300KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
SubMO
21,81328
Mo-de-Obra 9,82580
LS
11,98748

M2
H
0,29000
H
0,29000
H
0,57000
H
1,23000
M3
0,07420
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
90,62451

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
55,84
4,67
108,71
BDI
25,86069

03.03.059
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT20-500KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.66
PRE-LAJE TREL BIDIR C/EPS PLT20-500KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
Mo-de-Obra 9,82580
LS
11,98748
SubMO
21,81328

M2
H
0,29000
H
0,29000
H
0,57000
H
1,23000
M3
0,07420
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
90,62451

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
55,84
4,67
108,71
BDI
25,86069

03.03.063
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT25-300KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.67
PRE-LAJE TREL BIDIR C/EPS PLT25-300KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
Mo-de-Obra 10,83820
LS
13,22260
SubMO
24,06080

M2
H
0,29000
H
0,29000
H
0,64000
H
1,41000
M3
0,07970
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
96,27930

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
60,11
4,67
108,71
BDI
27,67823

03.03.064
LAJE STEEL DECK E=0,95MM PARA PISO E=15CM C/ CAPA CONCRETO FCK=25
M2
1.01.39
PEDREIRO
H
0,68000
1.01.44
SERRALHEIRO
H
0,19000
1.01.45
AJUDANTE SERRALHEIRO
H
0,19000
1.01.46
SERVENTE
H
0,68000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,11250
2.15.46
TELA TELCON Q-75
M2
1,05000
2.20.01
LAJE METALICA COMPOSTA TIPO STEEL DECK E=0.95MM
M2
1,00000
Mo-de-Obra 8,11260
LS
9,89737
SubMO
18,00997
Material
90,70425

4,64
8,08
4,34
3,82
251,78
4,98
57,15
BDI
25,00427

03.03.065
LAJE STEEL DECK E=0,80MM PARA FORRO E=15CM C/ CAPA CONCRETO FCK=25
M2
1.01.39
PEDREIRO
H
0,68000
1.01.44
SERRALHEIRO
H
0,19000
1.01.45
AJUDANTE SERRALHEIRO
H
0,19000
1.01.46
SERVENTE
H
0,68000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,11250
2.15.46
TELA TELCON Q-75
M2
1,05000
2.20.05
LAJE METALICA COMPOSTA TIPO STEEL DECK E=0,80MM
M2
1,00000
SubMO
18,00997
Mo-de-Obra 8,11260
LS
9,89737
Material
83,55425

4,64
8,08
4,34
3,82
251,78
4,98
50,00
BDI
23,35977

Exerccio:

2011

226,50
3,82
19,10000
0,54
141,75000
42,35496
666,46
27,84000
61,12000
48,27600
111,00000
185,07200

138,29
1,33400
1,14840
2,64480
4,69860
18,68208
4,34700
0,91120
3,45318
55,84000
0,14010
7,25096

138,29
1,33400
1,14840
2,64480
4,69860
18,68208
4,34700
0,91120
3,45318
55,84000
0,14010
7,25096

148,01
1,33400
1,14840
2,96960
5,38620
20,06687
4,34700
0,91120
3,45318
60,11000
0,14010
7,25096

133,71
3,15520
1,53520
0,82460
2,59760
28,32525
5,22900
57,15000

124,92
3,15520
1,53520
0,82460
2,59760
28,32525
5,22900
50,00000

Pgina: 23

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

03.03.067
LAJE PRE-FABRICADA PRE-LAJE TRELICADA BIDIR C/ EPS PLT25-500KGF/M2
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.68
PRE-LAJE TREL BIDIR C/EPS PLT25-500KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
Mo-de-Obra 10,83820
LS
13,22260
SubMO
24,06080

M2
H
0,29000
H
0,29000
H
0,64000
H
1,41000
M3
0,07970
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
96,27930

03.03.080
REFORCO PARA LAJE MISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.38
LAJE PRE-FABR B-16 41-2-300
2.67.60
PREGO
Mo-de-Obra 2,45600
LS
2,99632

M
H
0,20000
H
0,40000
M3
0,01800
KG
11,00000
M3
0,02100
M
0,56500
M
0,33500
M2
0,09500
KG
0,20000
M2
0,50000
KG
0,01500
Material
21,26776

SubMO

5,45232

Custo Unit.

Custo Total

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
60,11
4,67
108,71
BDI
27,67823

BDI

4,64
3,82
80,46
0,37
62,03
3,78
4,60
17,18
2,69
17,06
4,67
6,14562

03.03.082
LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT12-100KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,52000
1.01.46
SERVENTE
H
1,12000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,04900
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.51
PRE-LAJE TREL UNIDIR C/EPS PLT12-100KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 9,17360
LS
11,19179
SubMO
20,36539
Material
68,26966

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
39,83
4,67
108,71
BDI
20,38606

03.03.083
LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT16-100KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,52000
1.01.46
SERVENTE
H
1,12000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,06270
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.52
PRE-LAJE TREL UNIDIR C/EPS PLT16-100KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 9,17360
LS
11,19179
SubMO
20,36539
Material
77,71904

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
45,83
4,67
108,71
BDI
22,55942

03.03.084
LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT16-300KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,52000
1.01.46
SERVENTE
H
1,12000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,06270
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.53
PRE-LAJE TREL UNIDIR C/EPS PLT16-300KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 9,17360
LS
11,19179
SubMO
20,36539
Material
77,71904

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
45,83
4,67
108,71
BDI
22,55942

03.03.085
1.01.11
1.01.12
1.01.39
1.01.46
Exerccio:

LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT20-100KGF/M2


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE

2011

M2
H
H
H
H

0,29000
0,29000
0,57000
1,23000

4,60
3,96
4,64
3,82

148,01
1,33400
1,14840
2,96960
5,38620
20,06687
4,34700
0,91120
3,45318
60,11000
0,14010
7,25096

32,86
0,92800
1,52800
1,44828
4,07000
1,30263
2,13570
1,54100
1,63210
0,53800
8,53000
0,07005

109,02
1,33400
1,14840
2,41280
4,27840
12,33722
4,34700
0,91120
3,45318
39,83000
0,14010
7,25096

120,64
1,33400
1,14840
2,41280
4,27840
15,78661
4,34700
0,91120
3,45318
45,83000
0,14010
7,25096

120,64
1,33400
1,14840
2,41280
4,27840
15,78661
4,34700
0,91120
3,45318
45,83000
0,14010
7,25096

136,81
1,33400
1,14840
2,64480
4,69860
Pgina: 24

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.21.54
PRE-LAJE TREL UNIDIR C/EPS PLT20-100KGF/M2
2.67.60
PREGO
8.03.28
GUINDASTE SOBRE PNEUS 13 T
Mo-de-Obra 9,82580
LS
11,98748

UN Coeficiente

Custo Unit.

Custo Total

M3
0,07420
M
1,15000
M
0,67000
M2
0,20100
M2
1,00000
KG
0,03000
H
0,06670
Material
89,41451

251,78
3,78
1,36
17,18
54,63
4,67
108,71
BDI
25,58239

03.03.086
LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT20-300KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,57000
1.01.46
SERVENTE
H
1,23000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,07420
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.55
PRE-LAJE TREL UNIDIR C/EPS PLT20-300KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 9,82580
SubMO
21,81328
LS
11,98748
Material
89,47451

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
54,69
4,67
108,71
BDI
25,59619

03.03.087
LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT20-500KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,57000
1.01.46
SERVENTE
H
1,23000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,07420
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.56
PRE-LAJE TREL UNIDIR C/EPS PLT20-500KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 9,82580
LS
11,98748
Material
89,47451
SubMO
21,81328

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
54,69
4,67
108,71
BDI
25,59619

03.03.088
LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT25-300KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,64000
1.01.46
SERVENTE
H
1,41000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,07970
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.57
PRE-LAJE TREL UNIDIR C/EPS PLT25-300KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 10,83820
LS
13,22260
SubMO
24,06080
Material
97,20930

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
61,04
4,67
108,71
BDI
27,89213

03.03.089
LAJE PRE-FABRICADA PRE-LAJE TRELICADA UNIDIR C/ EPS PLT25-500KGF/M2
M2
1.01.11
CARPINTEIRO
H
0,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,29000
1.01.39
PEDREIRO
H
0,64000
1.01.46
SERVENTE
H
1,41000
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,07970
2.10.09
PONTALETE PINHO DE 3"X3"
M
1,15000
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
M
0,67000
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,20100
2.21.58
PRE-LAJE TREL UNIDIR C/EPS PLT25-500KGF/M2
M2
1,00000
2.67.60
PREGO
KG
0,03000
8.03.28
GUINDASTE SOBRE PNEUS 13 T
H
0,06670
Mo-de-Obra 10,83820
LS
13,22260
SubMO
24,06080
Material
97,30930

4,60
3,96
4,64
3,82
251,78
3,78
1,36
17,18
61,14
4,67
108,71
BDI
27,91513

03.03.098
FORNECIMENTO E MONTAGEM DE ESTRUTURA PRE-MOLDADA DE CONCRETO
M3
2.20.55
ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT
M3
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
2.677,26000

3.293,02
2.677,26
2.677,26000
BDI
615,76980

03.03.099
CONCRETOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

301,12
244,82
244,82000
BDI
56,30860

03.04.001
2.50.17
Exerccio:

LS

0,00000

SubMO

SubMO

21,81328

0,00000

MV
MV
1,00000
Material
244,82000

FORNECIMENTO DE EST MET - ACO ESTRUTURAL ASTM OU ABNT - NAO PATINAVEL


ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL

2011

KG
KG

1,00000

10,14

18,68208
4,34700
0,91120
3,45318
54,63000
0,14010
7,25096

136,88
1,33400
1,14840
2,64480
4,69860
18,68208
4,34700
0,91120
3,45318
54,69000
0,14010
7,25096

136,88
1,33400
1,14840
2,64480
4,69860
18,68208
4,34700
0,91120
3,45318
54,69000
0,14010
7,25096

149,16
1,33400
1,14840
2,96960
5,38620
20,06687
4,34700
0,91120
3,45318
61,04000
0,14010
7,25096

149,28
1,33400
1,14840
2,96960
5,38620
20,06687
4,34700
0,91120
3,45318
61,14000
0,14010
7,25096

12,47
10,14000
Pgina: 25

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 0,00000

Descrio
LS

0,00000

UN Coeficiente
SubMO

0,00000

Material

10,14000

Custo Unit.

Custo Total

BDI

2,33220

BDI

10,27
2,36210

BDI

2,18
0,50140

1,94
0,44620

03.04.003
FORNEC DE ESTR METALICA ACO ASTM A709/A588 (RESIST A CORROSAO)
2.50.16
ESTR MET ACO RESIST A CORROSAO (ASTM A709/A588)
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

KG
KG
1,00000
Material
10,27000

03.04.005
MONTAGEM DE ESTRUTURA METALICA
2.50.20
MONTAGEM DE ESTRUTURA METALICA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

KG
KG
1,00000
Material
2,18000

0,00000

KG
KG
1,00000
Material
1,94000

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

99,97211

UN
H
2,98000
H
2,98000
H
1,07200
H
1,07200
H
0,84000
H
1,68000
M3
0,13400
M
0,38000
M2
0,38000
M
5,00000
KG
7,72000
KG
3,00000
CJ
8,00000
KG
0,15000
KG
0,20000
Material
144,40882

4,60
3,96
4,77
3,82
4,64
3,82
241,38
2,09
17,18
13,00
2,69
2,70
1,15
4,67
4,87
BDI
56,20761

6,08102

M
H
0,32000
H
0,32000
M
1,05000
KG
0,02000
Material
10,27840

03.04.030
DESMONTAGEM DE ESTRUTURA METALICA
2.50.40
DESMONTAGEM DE ESTRUTURA METALICA
Mo-de-Obra 0,00000
LS
0,00000
03.04.099
ESTRUTURAS METALICAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

SubMO

SubMO

03.05.010
PILAR DE MADEIRA (PASSAGEM COBERTA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.27
VIGAS PEROBA DE 6X16 CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.32
PARAFUSO FRANCES 3/8"X8" C/ PORCA E ARRUELA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 45,03248
LS
54,93963
SubMO
03.05.011
VIGA DE MADEIRA 6X12 CM (PASSAGEM COBERTA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.26
VIGAS PEROBA DE 6X12 CM
2.67.60
PREGO
SubMO
Mo-de-Obra 2,73920
LS
3,34182
03.05.012
VIGA DE MADEIRA 6X16 CM (PASSAGEM COBERTA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.27
VIGAS PEROBA DE 6X16 CM
2.67.60
PREGO
Mo-de-Obra 3,68080
LS
4,49058
SubMO
03.05.099
ESTRUTURAS DE MADEIRA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

03.50.001
DE CONCRETO INCLUINDO REVESTIMENTOS (MANUAL)
1.01.46
SERVENTE
Mo-de-Obra 76,40000
LS
93,20800
SubMO

12,63
10,27000

2,68
2,18000

2,38
1,94000

300,58
13,70800
11,80080
5,11344
4,09504
3,89760
6,41760
32,34492
0,79420
6,52840
65,00000
20,76680
8,10000
9,20000
0,70050
0,97400

20,12
1,47200
1,26720
10,18500
0,09340

BDI

4,60
3,96
9,70
4,67
3,76267

8,17138

M
H
0,43000
H
0,43000
M
1,05000
KG
0,02900
Material
13,78543

BDI

4,60
3,96
13,00
4,67
5,05007

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

169,60800

M3
H
20,00000
Material
0,00000

27,00
1,97800
1,70280
13,65000
0,13543

208,61
76,40000

BDI

3,82
39,00984

03.50.005
DE LAJES MISTAS OU PRE-MOLDADAS INCLUINDO REVESTIMENTOS (MANUAL)
M2
1.01.46
SERVENTE
H
1,50000
Mo-de-Obra 5,73000
LS
6,99060
SubMO
12,72060
Material
0,00000

BDI

3,82
2,92574

03.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

03.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
03.70.099
RECOLOCACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
Exerccio:

2011

LS

LS

LS

0,00000

0,00000

0,00000

SubMO

SubMO

SubMO

15,64
5,73000

Pgina: 26

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

03.80.099
SERVICOS PARCIAIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente

SubMO

04.01.001
ALVENARIA DE TIJOLO DE BARRO MACICO E=1/4 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 8,84200
LS
10,78724
SubMO
04.01.002
ALVENARIA DE TIJOLO DE BARRO MACICO E=1/2 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 13,63400
LS
16,63348
SubMO
04.01.003
ALVENARIA DE TIJOLO DE BARRO MACICO E=1 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 22,67240
LS
27,66033
SubMO
04.01.012
ALVENARIA DE TIJOLO DE BARRO A VISTA E=1/4 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.14
TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA
SubMO
Mo-de-Obra 8,84200
LS
10,78724

0,00000

MV
MV
1,00000
Material
244,82000

19,62924

M2
H
1,00000
H
1,10000
M3
0,01700
KG
3,00000
KG
1,20000
UN
35,00000
Material
10,56182

30,26748

M2
H
1,44000
H
1,82000
M3
0,03400
KG
6,00000
KG
3,00000
UN
70,00000
Material
21,34564

50,33273

M2
H
2,40000
H
3,02000
M3
0,07900
KG
14,00000
KG
7,00000
UN
140,00000
Material
44,64634

19,62924

M2
H
1,00000
H
1,10000
M3
0,01700
KG
3,00000
KG
1,50000
UN
35,00000
Material
26,07282

04.01.013
REVESTIMENTO DE TIJOLO DE BARRO A VISTA E=1/2 TIJOLO/DISP ALTERNADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.14
TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA
Mo-de-Obra 18,27400
LS
22,29428
SubMO
40,56828
Material
04.01.014
ALVENARIA DE TIJOLO DE BARRO A VISTA E=1/2 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.14
TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA
SubMO
Mo-de-Obra 18,27400
LS
22,29428
04.01.015
ALVENARIA DE TIJOLO DE BARRO A VISTA E=1 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.14
TIJOLO ESPECIAL MACICO P/ALVENARIA A VISTA
Mo-de-Obra 22,67240
LS
27,66033
SubMO
04.01.017
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.25.36
Exerccio:

40,56828

M2
H
2,44000
H
1,82000
M3
0,03400
KG
6,00000
KG
3,00000
UN
70,00000
Material
52,14564

50,33273

M2
H
2,40000
H
3,02000
M3
0,07900
KG
14,00000
KG
7,00000
UN
140,00000
Material
106,24634

ALVENARIA DE TIJOLO LAMINADO A VISTA E=1/2 TIJOLO/DISP ALTERNADO


PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
TIJOLO LAMINADO FURADO

2011

M2
H
2,44000
H
1,82000
M3
0,01000
KG
1,74000
KG
0,90000
UN
40,00000
28,14660

M2
H
H
M3
KG
KG
UN

2,44000
1,82000
0,01000
1,74000
0,90000
40,00000

Custo Unit.

Custo Total

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
80,46
0,35
0,37
0,22
6,94394

BDI

4,64
3,82
80,46
0,35
0,37
0,22
11,87102

BDI

4,64
3,82
80,46
0,35
0,37
0,22
21,84519

BDI

4,64
3,82
80,46
0,35
0,37
0,66
10,51147

BDI

4,64
3,82
80,46
0,35
0,37
0,66
15,80442

BDI

4,64
3,82
80,46
0,35
0,37
0,66
21,32420

BDI

4,64
3,82
80,46
0,35
0,37
0,66
36,01319

4,64
3,82
80,46
0,35
0,37
0,67

37,13
4,64000
4,20200
1,36782
1,05000
0,44400
7,70000

63,48
6,68160
6,95240
2,73564
2,10000
1,11000
15,40000

116,82
11,13600
11,53640
6,35634
4,90000
2,59000
30,80000

56,21
4,64000
4,20200
1,36782
1,05000
0,55500
23,10000

84,51
11,32160
6,95240
0,80460
0,60900
0,33300
26,40000

114,03
11,32160
6,95240
2,73564
2,10000
1,11000
46,20000

192,59
11,13600
11,53640
6,35634
4,90000
2,59000
92,40000

85,01
11,32160
6,95240
0,80460
0,60900
0,33300
26,80000
Pgina: 27

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 18,27400

Descrio
LS

22,29428

UN Coeficiente
SubMO

04.01.018
ALVENARIA DE TIJOLO LAMINADO A VISTA E=1/4 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.36
TIJOLO LAMINADO FURADO
Mo-de-Obra 13,48200
LS
16,44804
SubMO
04.01.019
ALVENARIA DE TIJOLO LAMINADO A VISTA E=1/2 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.36
TIJOLO LAMINADO FURADO
SubMO
Mo-de-Obra 18,27400
LS
22,29428
04.01.020
ALVENARIA DE TIJOLO LAMINADO A VISTA E=1 TIJOLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.36
TIJOLO LAMINADO FURADO
Mo-de-Obra 27,31240
LS
33,32113
SubMO
04.01.030
ALVENARIA DE BLOCOS DE CONCRETO E=9CM CLASSE C
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
Mo-de-Obra 8,09420
LS
9,87492
SubMO
04.01.031
ALVENARIA DE BLOCOS DE CONCRETO E=14CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
Mo-de-Obra 8,47080
LS
10,33438
SubMO
04.01.032
ALVENARIA DE BLOCOS DE CONCRETO E=19CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.80
BLOCO DE CONCRETO 19X19X39CM - 3MPa
Mo-de-Obra 8,94020
LS
10,90704
SubMO
04.01.042
ALVENARIA DE BLOCO CERAMICO PORTANTE E=14CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.31
BLOCO CERAMICO ESTRUTURAL 14X19X39 CM
Mo-de-Obra 8,47080
LS
10,33438
SubMO
04.01.043
ALVENARIA DE BLOCO CERAMICO PORTANTE E=19CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.32
BLOCO CERAMICO ESTRUTURAL 19X19X39 CM
SubMO
Mo-de-Obra 8,94020
LS
10,90704

Exerccio:

2011

40,56828

Material

28,54660

29,93004

M2
H
2,00000
H
1,10000
M3
0,00800
KG
1,35000
KG
0,70000
UN
35,00000
Material
24,82518

40,56828

M2
H
2,44000
H
1,82000
M3
0,03200
KG
5,67000
KG
3,00000
UN
70,00000
Material
52,56922

60,63353

M2
H
3,40000
H
3,02000
M3
0,07500
KG
13,24000
KG
7,00000
UN
140,00000
Material
107,05850

17,96912

M2
H
0,88000
H
1,05000
M3
0,01500
KG
2,76000
KG
2,16000
UN
13,00000
Material
22,60210

18,80518

M2
H
0,92000
H
1,10000
M3
0,01000
KG
1,78500
KG
2,52000
UN
13,00000
Material
27,58175

19,84724

M2
H
0,98000
H
1,15000
M3
0,01300
KG
2,67000
KG
3,78000
UN
13,00000
Material
29,24908

18,80518

M2
H
0,92000
H
1,10000
M3
0,01200
KG
1,19000
KG
3,85000
UN
13,00000
Material
31,66652

19,84724

M2
H
0,98000
H
1,15000
M3
0,01700
KG
1,62000
KG
5,25000
UN
13,00000
Material
40,40732

Custo Unit.

Custo Total

BDI

15,89642

BDI

4,64
3,82
80,46
0,35
0,37
0,67
12,59370

BDI

4,64
3,82
80,46
0,35
0,37
0,67
21,42163

BDI

4,64
3,82
80,46
0,35
0,37
0,67
38,56917

BDI

4,64
3,82
80,46
0,35
0,37
1,51
9,33138

BDI

4,64
3,82
80,46
0,35
0,37
1,94
10,66899

BDI

4,64
3,82
80,46
0,35
0,37
1,99
11,29215

BDI

4,64
3,82
80,46
0,35
0,37
2,22
11,60849

BDI

4,64
3,82
80,46
0,35
0,37
2,81
13,85855

67,34
9,28000
4,20200
0,64368
0,47250
0,25900
23,45000

114,55
11,32160
6,95240
2,57472
1,98450
1,11000
46,90000

206,26
15,77600
11,53640
6,03450
4,63400
2,59000
93,80000

49,90
4,08320
4,01100
1,20690
0,96600
0,79920
19,63000

57,05
4,26880
4,20200
0,80460
0,62475
0,93240
25,22000

60,38
4,54720
4,39300
1,04598
0,93450
1,39860
25,87000

62,08
4,26880
4,20200
0,96552
0,41650
1,42450
28,86000

74,11
4,54720
4,39300
1,36782
0,56700
1,94250
36,53000

Pgina: 28

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

04.01.045
CONCRETO GROUT PARA PAREDE AUTO PORTANTE
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
Mo-de-Obra 88,96000
LS
108,53120
SubMO
04.01.046
ARMADURA CA 50 PARA PAREDE AUTO-PORTANTE
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.25
ACO CA-50-A $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798
SubMO
04.01.047
ARMADURA CA 60 PARA PAREDE AUTO-PORTANTE
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.38
ACO CA-60-B $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798
SubMO

UN Coeficiente

197,49120

M3
H
6,00000
H
16,00000
M3
0,72000
KG
20,00000
KG
283,00000
M3
0,28000
Material
188,18000

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,19090

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,20240

04.01.049
ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 19X19X19CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.09
BLOCO DE CONCRETO 19X19X19CM - 6MPa
Mo-de-Obra 8,94020
LS
10,90704
Material
SubMO
19,84724

M2
H
0,98000
H
1,15000
M3
0,01600
KG
2,54000
KG
2,66000
UN
26,00000
49,44056

04.01.050
ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 14X19X39CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.75
BLOCO DE CONCRETO 14X19X39CM - 4MPa
Mo-de-Obra 8,47080
LS
10,33438
SubMO
18,80518
Material

M2
H
0,92000
H
1,10000
M3
0,01200
KG
1,86000
KG
1,95000
UN
13,00000
32,10802

04.01.051
ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 19X19X39CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.05
BLOCO DE CONCRETO 19X19X39CM - 4MPa
Mo-de-Obra 8,94020
LS
10,90704
SubMO
19,84724
Material

M2
H
0,98000
H
1,15000
M3
0,01600
KG
2,54000
KG
2,66000
UN
13,00000
35,79056

04.01.057
VERGA/CINTA EM BLOCO DE CONCRETO CANALETA - 11,5X19X39CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
2.26.01
BLOCO DE CONCRETO CANALETA 11,5X19X39CM
Mo-de-Obra 2,92000
LS
3,56240
SubMO
6,48240

M
H
H
M3
KG
M3
KG
UN
Material
8,78954

04.01.058
VERGA/CINTA EM BLOCO DE CONCRETO CANALETA - 14 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
SubMO
8,36052
Mo-de-Obra 3,76600
LS
4,59452

M
H
0,40000
H
0,50000
M3
0,00900
KG
4,36500
M3
0,01300
KG
0,50000
UN
2,50000
Material
10,75440

04.01.059
1.01.39
1.01.46
2.05.03
Exerccio:

VERGA/CINTA EM BLOCO DE CONCRETO CANALETA - 19 CM


PEDREIRO
SERVENTE
AREIA

2011

M
H
H
M3

Custo Unit.

BDI

474,37
4,64
27,84000
3,82
61,12000
80,46
57,93120
0,35
7,00000
0,37
104,71000
66,21
18,53880
88,70438

BDI

4,77
3,82
2,69
4,87
1,17251

BDI

4,77
3,82
2,70
4,87
1,17516

BDI

4,64
3,82
80,46
0,35
0,37
1,78
15,93620

BDI

4,64
3,82
80,46
0,35
0,37
2,29
11,71004

BDI

4,64
3,82
80,46
0,35
0,37
2,51
12,79670

BDI

4,64
3,82
80,46
0,37
61,17
2,69
2,43
3,51255

BDI

4,64
3,82
80,46
0,37
61,17
2,69
2,51
4,39643

0,30000
0,40000
0,00400
2,00500
0,00500
0,50000
2,50000

0,40000
0,50000
0,01400

Custo Total

4,64
3,82
80,46

6,27
0,47700
0,38200
3,09350
0,09740

6,28
0,47700
0,38200
3,10500
0,09740

85,22
4,54720
4,39300
1,28736
0,88900
0,98420
46,28000

62,62
4,26880
4,20200
0,96552
0,65100
0,72150
29,77000

68,43
4,54720
4,39300
1,28736
0,88900
0,98420
32,63000

18,78
1,39200
1,52800
0,32184
0,74185
0,30585
1,34500
6,07500

23,51
1,85600
1,91000
0,72414
1,61505
0,79521
1,34500
6,27500

28,04
1,85600
1,91000
1,12644
Pgina: 29

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.97
BLOCO DE CONCRETO CANALETA 19X19X39CM - 3MPa
Mo-de-Obra 3,76600
LS
4,59452
SubMO

UN Coeficiente

Custo Total

BDI

0,37
61,17
2,69
3,34
5,24329

04.01.060
ALVENARIA DE CONCR CELULAR - CHAPAS ARMADAS SIMPLES ESPESS 7,5 CM
M2
1.01.39
PEDREIRO
H
0,40000
1.01.46
SERVENTE
H
0,60000
2.05.03
AREIA
M3
0,00500
2.05.05
CAL HIDRATADA
KG
1,35000
2.05.08
CIMENTO
KG
1,95000
2.35.37
CHAPA ARM SIMP CONCRETO CELUL ESP 7,5CM
M2
1,02000
Mo-de-Obra 4,14800
SubMO
9,20856
LS
5,06056
Material
71,97630

BDI

4,64
3,82
80,46
0,35
0,37
69,00
18,67252

04.01.061
ALVENARIA DE CONCR CELULAR - CHAPAS ARMADAS SIMPLES ESPESS 10 CM
M2
1.01.39
PEDREIRO
H
0,50000
1.01.46
SERVENTE
H
0,70000
2.05.03
AREIA
M3
0,00700
2.05.05
CAL HIDRATADA
KG
1,80000
2.05.08
CIMENTO
KG
2,60000
2.35.38
CHAPA ARM SIMP CONCRETO CELUL ESP 10CM
M2
1,02000
Mo-de-Obra 4,99400
LS
6,09268
SubMO
11,08668
Material
124,55522

166,83
4,64
2,32000
3,82
2,67400
80,46
0,56322
0,35
0,63000
0,37
0,96200
120,00
122,40000
BDI
31,19764

04.01.063
ALVENARIA DE CONCRETO CELULAR - BLOCOS E=7CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.45.66
CONCRETO CELULAR ESP 7,5CM P/ PROT TERM-MEC
Mo-de-Obra 7,53200
LS
9,18904
SubMO
04.01.064
ALVENARIA DE CONCRETO CELULAR - BLOCOS E=11CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.45.67
CONCRETO CELULAR ESP 10CM P/ PROT TERM-MEC
Mo-de-Obra 9,22400
LS
11,25328
SubMO
04.01.065
ALVENARIA DE CONCRETO CELULAR BLOCOS E=14CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.45.68
CONCRETO CELULAR ESP=15CM P/ PROT TERM-MEC
Mo-de-Obra 9,22400
LS
11,25328
SubMO

8,36052

KG
6,62900
M3
0,01900
KG
0,50000
UN
2,50000
Material
14,43640

Custo Unit.

16,72104

M2
H
0,80000
H
1,00000
M3
0,00900
KG
1,65600
KG
1,30000
M2
1,02000
Material
30,14074

20,47728

M2
H
1,00000
H
1,20000
M3
0,01800
KG
3,30000
KG
2,60000
M2
1,02000
Material
38,21468

20,47728

M2
H
1,00000
H
1,20000
M3
0,01800
KG
3,30000
KG
2,60000
M2
1,02000
Material
53,24948

04.01.070
ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM. 10 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.16
TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM
Mo-de-Obra 8,80920
LS
10,74722
SubMO
19,55642

M2
H
0,96000
H
1,14000
M3
0,01600
KG
2,83000
KG
1,50000
UN
25,00000
Material
16,33286

04.01.071
ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM. 12.5 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.29
TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM
Mo-de-Obra 9,52420
LS
11,61952
SubMO
21,14372

M2
H
1,04000
H
1,23000
M3
0,01920
KG
3,39600
KG
1,80000
UN
28,00000
Material
19,07943

04.01.072
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
Exerccio:

ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM 15 CM


PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO

2011

M2
H
H
M3
KG
KG

1,60000
1,89000
0,02310
4,08580
2,16500

BDI

4,64
3,82
80,46
0,35
0,37
27,80
10,77821

BDI

4,64
3,82
80,46
0,35
0,37
33,97
13,49915

BDI

4,64
3,82
80,46
0,35
0,37
48,71
16,95716

BDI

4,64
3,82
80,46
0,35
0,37
0,54
8,25454

BDI

4,64
3,82
80,46
0,35
0,37
0,56
9,25133

4,64
3,82
80,46
0,35
0,37

2,45273
1,16223
1,34500
8,35000

99,85
1,85600
2,29200
0,40230
0,47250
0,72150
70,38000

57,63
3,71200
3,82000
0,72414
0,57960
0,48100
28,35600

72,19
4,64000
4,58400
1,44828
1,15500
0,96200
34,64940

90,68
4,64000
4,58400
1,44828
1,15500
0,96200
49,68420

44,14
4,45440
4,35480
1,28736
0,99050
0,55500
13,50000

49,47
4,82560
4,69860
1,54483
1,18860
0,66600
15,68000

67,05
7,42400
7,21980
1,85863
1,43003
0,80105
Pgina: 30

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.25.29
TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM
SubMO
Mo-de-Obra 14,64380
LS
17,86544

32,50924

Material

UN
32,00000
22,00971

Custo Unit.

Custo Total

BDI

0,56
12,53936

4,64
3,82
80,46
0,35
0,37
0,54
15,66291

17,92000

04.01.073
ALVENARIA DE TIJOLO CERAMICO FURADO (BAIANO) ESP.NOM. 20 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.16
TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM
Mo-de-Obra 14,68200
LS
17,91204
SubMO
32,59404

M2
H
1,60000
H
1,90000
M3
0,04800
KG
8,51000
KG
4,50000
UN
50,00000
Material
35,50558

BDI

04.01.099
ALVENARIAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

LS

0,00000

SubMO

0,00000

ELEMENTO VAZADO DE CONCRETO QUADRICULADO REF NEO-REX 18 / REF UNICA


4D
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.15.10
ACO CA-25 $MD BITOLAS
2.30.21
ELEMENTO VAZ DE CONCR 50X50X7 CM QUADRIC
Mo-de-Obra 12,79440
LS
15,60917
SubMO
28,40357
Material

04.02.012

M2

102,40

H
2,00000
H
0,92000
M3
0,01100
KG
1,24000
KG
1,43000
KG
0,30000
UN
4,20000
54,85516

04.02.013
ELEMENTO VAZADO DE CONCRETO TIPO VENEZIANA REF UNICA 11A
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.15.10
ACO CA-25 $MD BITOLAS
2.30.20
ELEMENTO VAZADO DE CONCRETO REF UNICA N.11
Mo-de-Obra 22,38000
LS
27,30360
SubMO
49,68360

M2
H
4,00000
H
1,00000
M3
0,01600
KG
5,24000
KG
3,24000
KG
0,60000
UN
36,20000
Material
89,90616

04.02.018
ELEMENTO VAZADO DE BLOCO DE CONCRETO 19X19X39CM CLASSE C
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.80
BLOCO DE CONCRETO 19X19X39CM - 3MPa
Mo-de-Obra 8,37800
LS
10,22116
SubMO
18,59916

M2
H
0,90000
H
1,10000
M3
0,02000
KG
1,94000
KG
6,30000
UN
10,00000
Material
24,51920

04.02.020
ELEMENTO VAZADO DE BLOCOS CERAMICOS DE VEDACAO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.16
TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM
Mo-de-Obra 17,61840
LS
21,49445
SubMO
39,11285

M2
H
1,92000
H
2,28000
M3
0,03400
KG
5,79000
KG
3,00000
UN
40,00000
Material
27,47214

04.02.029
ELEMENTO VAZADO REF NEO REX 4A / REF UNICA 2C
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.28
ELEMENTO VAZADO "NEO-REX" N.4A (20X40X10CM)
SubMO
Mo-de-Obra 15,42000
LS
18,81240

34,23240

M2
H
2,50000
H
1,00000
M3
0,00740
KG
3,12000
UN
11,60000
Material
52,78980

43,62300

M2
H
3,00000
H
1,50000
M3
0,01000
KG
4,25000
UN
23,80000
Material
64,73310

04.02.030
ELEMENTO VAZADO REF NEO REX 16 / REF UNICA 1 I
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.10
ELEMENTO VAZADO "NEO-REX" N.16 (19X19X10)CM
SubMO
Mo-de-Obra 19,65000
LS
23,97300
04.02.032
1.01.39
1.01.46
2.05.03
Exerccio:

ELEMENTO VAZADO REF NEO REX 16DS/16DC


PEDREIRO
SERVENTE
AREIA

2011

M2
H
H
M3

83,76
7,42400
7,25800
3,86208
2,97850
1,66500
27,00000

3,00000
1,50000
0,02000

BDI

4,64
3,82
80,46
0,35
0,37
2,67
12,43
19,14951

BDI

4,64
3,82
80,46
0,35
0,37
2,67
2,32
32,10565

BDI

4,64
3,82
80,46
0,35
0,37
1,99
9,91722

BDI

4,64
3,82
80,46
0,35
0,37
0,54
15,31455

BDI

4,64
3,82
80,46
0,37
4,40
20,01511

BDI

4,64
3,82
80,46
0,37
2,62
24,92190

4,64
3,82
80,46

9,28000
3,51440
0,88506
0,43400
0,52910
0,80100
52,20600

171,69
18,56000
3,82000
1,28736
1,83400
1,19880
1,60200
83,98400

53,03
4,17600
4,20200
1,60920
0,67900
2,33100
19,90000

81,89
8,90880
8,70960
2,73564
2,02650
1,11000
21,60000

107,03
11,60000
3,82000
0,59540
1,15440
51,04000

133,27
13,92000
5,73000
0,80460
1,57250
62,35600

210,46
13,92000
5,73000
1,60920
Pgina: 31

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.08
CIMENTO
2.30.12
ELEMENTO VAZADO "NEO-REX" N.16D (19X19X20)CM
SubMO
Mo-de-Obra 19,65000
LS
23,97300

UN Coeficiente

43,62300

KG
8,29000
UN
22,70000
Material
127,48350

34,23240

M2
H
2,50000
H
1,00000
M3
0,06500
KG
2,77000
UN
10,40000
Material
58,04680

04.02.035
ELEMENTO VAZADO REF NEO REX 19B/19C / REF UNICA 5/5B
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.22
ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM
Mo-de-Obra 12,52700
LS
15,28294
SubMO
27,80994

M2
H
2,00000
H
0,85000
M3
0,00400
KG
1,81000
UN
6,30000
Material
48,49354

04.02.036
ELEMENTO VAZADO REF NEO REX 22B / REF UNICA 4B
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.09
ELEMENTO VAZADO "NEO-REX" N.22B (33X33X10)CM
Mo-de-Obra 15,42000
LS
18,81240
SubMO

34,23240

M2
H
2,50000
H
1,00000
M3
0,00400
KG
1,75000
UN
11,20000
Material
84,29734

34,23240

M2
H
2,50000
H
1,00000
M3
0,00400
KG
1,75000
UN
11,20000
Material
48,34534

27,80994

M2
H
2,00000
H
0,85000
M3
0,00500
KG
2,18000
UN
6,10000
Material
49,27690

29,24681

M2
H
2,01600
H
1,00000
M3
0,01000
KG
4,25000
UN
16,00000
Material
58,69710

34,23240

M2
H
2,50000
H
1,00000
M3
0,00400
KG
1,52000
UN
25,00000
Material
79,13424

27,80994

M2
H
2,00000
H
0,85000
M3
0,00400
KG
1,54000
UN
6,30000
Material
44,61364

04.02.033
ELEMENTO VAZADO REF NEO REX 17A
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.29
ELEMENTO VAZADO "NEO-REX" N.17A (30X30X10CM)
Mo-de-Obra 15,42000
LS
18,81240
SubMO

04.02.037
ELEMENTO VAZADO REF NEO REX 22C / REF UNICA 4A
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.01
ELEMENTO VAZADO "NEO-REX" N.22C (29X29X6)CM
Mo-de-Obra 15,42000
LS
18,81240
SubMO
04.02.039
ELEMENTO VAZADO REF NEO REX 23A / REF UNICA 3A
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.13
ELEMENTO VAZADO "NEO-REX" N.23A (39X39X10)CM
SubMO
Mo-de-Obra 12,52700
LS
15,28294
04.02.044
ELEMENTO VAZADO REF NEO REX 41 / REF UNICA 4
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.03
ELEMENTO VAZADO "NEO REX" N.0 41
Mo-de-Obra 13,17424
LS
16,07257
SubMO
04.02.047
ELEMENTO VAZADO REF NEO REX 59 / REF UNICA 11
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.17
ELEMENTO VAZADO "NEO-REX" N.59 B / UNICA N.11
Mo-de-Obra 15,42000
LS
18,81240
SubMO
04.02.058
ELEMENTO VAZADO REF NEO REX 90
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.19
ELEMENTO VAZADO "NEO-REX" N.90 (39X39X7)CM
Mo-de-Obra 12,52700
LS
15,28294
SubMO
04.02.060
1.01.39
1.01.46
2.05.03
2.05.08
2.30.08
Exerccio:

ELEMENTO VAZADO REF NEO REX 95 / REF UNICA 23A


PEDREIRO
SERVENTE
AREIA
CIMENTO
ELEMENTO VAZADO "NEO-REX" N.95 A (39X39X10CM)

2011

M2
H
H
M3
KG
UN

2,00000
0,85000
0,00400
1,54000
8,33000

Custo Unit.

BDI

Custo Total

0,37
3,06730
5,41
122,80700
39,35450

BDI

4,64
3,82
80,46
0,37
4,98
21,22422

BDI

4,64
3,82
80,46
0,37
7,54
17,54980

BDI

4,64
3,82
80,46
0,37
7,44
27,26184

BDI

4,64
3,82
80,46
0,37
4,23
18,99288

BDI

4,64
3,82
80,46
0,37
7,88
17,72997

BDI

4,64
3,82
80,46
0,37
3,52
20,22710

BDI

4,64
3,82
80,46
0,37
3,13
26,07433

BDI

4,64
3,82
80,46
0,37
6,94
16,65742

4,64
3,82
80,46
0,37
10,20

113,50
11,60000
3,82000
5,22990
1,02490
51,79200

93,85
9,28000
3,24700
0,32184
0,66970
47,50200

145,79
11,60000
3,82000
0,32184
0,64750
83,32800

101,57
11,60000
3,82000
0,32184
0,64750
47,37600

94,81
9,28000
3,24700
0,40230
0,80660
48,06800

108,17
9,35424
3,82000
0,80460
1,57250
56,32000

139,44
11,60000
3,82000
0,32184
0,56240
78,25000

89,08
9,28000
3,24700
0,32184
0,56980
43,72200

139,81
9,28000
3,24700
0,32184
0,56980
84,96600
Pgina: 32

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 12,52700

Descrio
LS

15,28294

UN Coeficiente
SubMO

04.02.061
ELEMENTO VAZADO REF NEO REX 97 / REF UNICA 1H
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.30.30
ELEMENTO VAZADO "NEO-REX" N.97 (10X10X10CM)
Mo-de-Obra 23,88000
LS
29,13360
SubMO

27,80994

Material

85,85764

53,01360

M2
H
3,50000
H
2,00000
M3
0,01730
KG
7,36000
UN
82,65000
Material
110,73366

Custo Unit.
BDI

Custo Total

26,14354

BDI

201,40
4,64
16,24000
3,82
7,64000
80,46
1,39196
0,37
2,72320
1,29
106,61850
37,66187

53,01360

M2
H
3,50000
H
2,00000
M3
0,02010
KG
2,01670
KG
4,01680
UN
82,65000
Material
123,65181

BDI

217,29
4,64
16,24000
3,82
7,64000
80,46
1,61725
0,35
0,70585
0,37
1,48622
1,45
119,84250
40,63304

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

51,19320

M
H
2,50000
H
3,00000
M2
1,95000
KG
0,10260
Material
187,80526

BDI

293,96
4,64
11,60000
3,82
11,46000
95,86
186,92700
8,56
0,87826
54,96965

51,19320

M
H
2,50000
H
3,00000
M2
1,95000
KG
0,10260
Material
187,80526

BDI

293,96
4,64
11,60000
3,82
11,46000
95,86
186,92700
8,56
0,87826
54,96965

04.03.003
DV-03 DIVISORIA DE GRANILITE - FRONTAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.35.23
DIVISORIA SANITARIA DE GRANILITE E=4CM
2.67.19
PARAFUSO SEXTAVADO 3/8"X3" C/ PORCA E ARRUELA
2.67.45
PARAFUSO AUTO-ATARRACHANTE (3,5X25MM)-CABEA CHATA
2.67.79
BUCHA TIPO S-5 (CENTO)
3.10.54
BATENTE DE ALUMINIO P/ DIVISORIA GRANILITE
3.10.55
FIXACAO (FERRO TRABALHADO)
3.80.47
CERA VIRGEM
Mo-de-Obra 25,59800
LS
31,22956
SubMO
56,82756

M
H
2,80000
H
3,30000
M2
1,95000
UN
22,00000
UN
24,00000
UN
0,24000
M
17,90000
KG
3,70000
KG
0,10260
Material
788,27046

BDI

4,64
3,82
95,86
0,55
0,03
3,38
23,78
43,56
8,56
194,37254

04.03.004
DV-04 DIVISORIA DE GRANILITE - ANTEPARO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.35.27
DIVISORIA SANITARIA DE GRANILITE E=3CM
2.67.45
PARAFUSO AUTO-ATARRACHANTE (3,5X25MM)-CABEA CHATA
2.67.79
BUCHA TIPO S-5 (CENTO)
3.11.91
CAIXILHARIA EM ALUMINIO
3.80.47
CERA VIRGEM
Mo-de-Obra 23,90600
LS
29,16532
SubMO
53,07132

M
H
2,60000
H
3,10000
M2
1,95000
UN
2,00000
UN
0,02000
KG
0,56000
KG
0,10260
Material
207,46006

BDI

320,45
4,64
12,06400
3,82
11,84200
95,86
186,92700
0,03
0,06000
3,38
0,06760
34,87
19,52720
8,56
0,87826
59,92222

04.03.020
PLACAS DE CONCRETO - ESPESSURA 5 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
Mo-de-Obra 49,36780
LS
60,22872

M2
H
3,63000
H
3,63000
H
0,44000
H
0,44000
H
1,49000
H
1,99000
M3
0,03300
KG
16,20000
M3
0,04000
M2
0,11000
M2
0,38000
KG
5,01000
Material
30,84478

BDI

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,37
61,17
17,18
11,40
2,70
32,30150

04.02.062
ELEMENTO VAZADO CERAMICO 18X18X7CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.30.50
ELEMENTO VAZADO CERAMICO 18X18X7CM
Mo-de-Obra 23,88000
LS
29,13360
04.02.099
ELEMENTOS VAZADOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

SubMO

04.03.001
DV-01 DIVISORIA DE GRANILITE - LATERAL ABERTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.35.27
DIVISORIA SANITARIA DE GRANILITE E=3CM
3.80.47
CERA VIRGEM
Mo-de-Obra 23,06000
LS
28,13320
SubMO
04.03.002
DV-02 DIVISORIA DE GRANILITE - LATERAL FECHADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.35.27
DIVISORIA SANITARIA DE GRANILITE E=3CM
3.80.47
CERA VIRGEM
Mo-de-Obra 23,06000
LS
28,13320
SubMO

Exerccio:

2011

SubMO

109,59652

1.039,47
12,99200
12,60600
186,92700
12,10000
0,72000
0,81120
425,66200
161,17200
0,87826

172,74
16,69800
14,37480
2,09880
1,68080
6,91360
7,60180
2,65518
5,99400
2,44680
1,88980
4,33200
13,52700

Pgina: 33

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

04.03.022
DIVISORIA CHAPA FIBRA MAD PRENS BP/PAINEL/VIDRO/VENTIL PERM E=35MM
M2
2.35.31
DIVIS PAINEL/VIDRO/VENT PERMAN-COL
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
Material
103,44000
SubMO
0,00000

127,23
103,44
103,44000
BDI
23,79120

04.03.023
DIVISORIA CHAPA FIBRA MAD PRENS BP/PAINEL CEGO 1,20X2,11M E=35MM
2.35.32
DIVISORIA PAINEL CEGO 1,20X2,52M COLOCADA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
UN
0,33100
Material
64,15442

193,82
BDI
14,75552

04.03.025
DIVISORIA CHAPA FIBRA MAD PRENS BP/PAINEL VENT PERM 1,20X2,11M E=35MM
M2
2.35.34
DIVISORIA VENT PERMANENTE 1,20X2,96M COLOCADA
UN
0,28200
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
74,55234

264,37
BDI
17,14704

04.03.026
DV-05 DIVISORIA PARA SALA DE INFORMTICA
2.35.29
FORN INST DIV BP-PLUS PERFIL AO GALV H=1,055M
Mo-de-Obra 0,00000
LS
0,00000
SubMO
04.03.030
DIVISORIAS DE GESSO ACARTONADO
2.35.36
DIVISORIA DE GESSO ACARTONADA FORN E INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
04.03.099
PLACAS DIVISORIAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

0,00000

M2
M2
1,00000
Material
69,06000

0,00000

M2
M2
1,00000
Material
70,62000

BDI

70,62
16,24260

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

04.50.010
DIVISORIAS DE MADEIRA INCLUINDO ENTARUGAMENTO
1.01.46
SERVENTE
Mo-de-Obra 1,14600
LS
1,39812
SubMO

2,54412

M2
H
0,30000
Material
0,00000

2,54412

M2
H
0,30000
Material
0,00000

04.50.012
DE PLACAS DE FIBRO CIMENTO
1.01.11
CARPINTEIRO
Mo-de-Obra 1,38000
LS
1,68360
04.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

SubMO

BDI

3,82
0,58515

BDI

3,82
0,58515

3,06360

M2
H
0,30000
Material
0,00000

BDI

4,60
0,70463

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

04.60.011
DE DIVISORIAS EM CHAPA DE MADEIRA,EXCLUSIVE ENTARUGAMENTO
1.01.11
CARPINTEIRO
Mo-de-Obra 0,92000
LS
1,12240
SubMO
2,04240

M2
H
0,20000
Material
0,00000

04.60.012
DE PAINEIS DIVISORIAS COM MONTANTES METALICAS
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 1,30680
LS
1,59430
SubMO

0,00000

SubMO

7,53
2,76000

BDI

2,90110

M2
H
0,33000
Material
0,00000

BDI

3,96
0,66725

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M2
H
0,40000
H
0,40000
Material
0,00000

2011

3,76
1,38000

4,60
0,46975

04.70.011
DE DIVISORIAS EM CHAPAS DE MADEIRA EXCLUSIVE ENTARUGAMENTO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
SubMO
7,60128
Mo-de-Obra 3,42400
LS
4,17728

Exerccio:

3,12
1,14600

BDI

M2
H
1,20000
H
1,20000
KG
0,20000
Material
0,93400

DE PAINEIS DIVISORIOS COM MONTANTES METALICAS

3,12
1,14600

4,60
1,40926

04.70.010
DE DIVISORIAS EM CHAPAS DE MADEIRA INCLUSIVE ENTARUGAMENTO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
Mo-de-Obra 10,27200
LS
12,53184
SubMO
22,80384

04.70.012

48,28
1,92560
15,75750

BDI

M2
H
0,60000
Material
0,00000

LS

86,86
70,62000

4,64
3,82
9,02899

04.60.010
DE DIVISORIAS EM CHAPAS DE MADEIRA, INCLUSIVE ENTARUGAMENTO
1.01.11
CARPINTEIRO
SubMO
6,12720
Mo-de-Obra 2,76000
LS
3,36720

04.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

84,94
69,06000

BDI

M3
H
0,41500
H
4,12500
Material
0,00000

SubMO

91,69
74,55234

69,06
15,88380

04.50.001
DE ALVENARIAS EM GERAL E ELEMENTOS VAZADOS,INCL REVESTIMENTOS
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 17,68310
LS
21,57338
SubMO
39,25648

04.50.011
DE DIVISORIAS EM PLACAS PARA SANITARIOS
1.01.46
SERVENTE
Mo-de-Obra 1,14600
LS
1,39812

78,90
64,15442

M2

BDI

4,60
3,96
4,67
5,45970

BDI

4,60
3,96
1,74829

2,51
0,92000

3,56
1,30680

29,19
5,52000
4,75200
0,93400

9,34
1,84000
1,58400

23,14
Pgina: 34

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 8,47440
LS

UN Coeficiente
H
H

10,33877

SubMO

18,81317

Material

Custo Unit.

0,99000
0,99000
0,00000

BDI

Custo Total

4,60
3,96
4,32703

4,55400
3,92040

04.70.099
RECOLOCACOES DE ALVENARIA E OUTROS ELEMENTOS DIVISORIOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

04.80.001
ALVENARIA DE CHAPAS DE CONCRETO CELULAR SIMPLES E=10 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.75.17
CHAPA CONCRETO CELULAR SIMPLES E=10CM
Mo-de-Obra 4,99400
LS
6,09268
SubMO
11,08668

M2
H
0,50000
H
0,70000
M3
0,00500
KG
1,12000
KG
0,70000
M2
1,02000
Material
123,45330

165,48
4,64
2,32000
3,82
2,67400
80,46
0,40230
0,35
0,39200
0,37
0,25900
120,00
122,40000
BDI
30,94420

04.80.010
DIVISORIA DE CHAPA COMPENSADO PINHO E=4MM AMBAS FACES,INCL ENTARUG
M2
1.01.11
CARPINTEIRO
H
1,20000
1.01.12
AJUDANTE DE CARPINTEIRO
H
1,20000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
4,50000
2.10.42
CHAPA COMPENSADA PINHO E=4MM
M2
2,20000
2.67.60
PREGO
KG
0,20000
SubMO
22,80384
Mo-de-Obra 10,27200
LS
12,53184
Material
43,96400
04.80.011
DIVISORIA CHAPA COMPENSADO CEDRO DE E=4MM AMBAS FACES INCL ENTARUG
M2
1.01.11
CARPINTEIRO
H
1,20000
1.01.12
AJUDANTE DE CARPINTEIRO
H
1,20000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
4,50000
2.10.40
CHAPA COMPENSADA CEDRO E=4MM
M2
2,20000
2.67.60
PREGO
KG
0,20000
Mo-de-Obra 10,27200
LS
12,53184
SubMO
22,80384
Material
55,27200

BDI

4,60
3,96
4,60
10,15
4,67
15,35660

BDI

4,60
3,96
4,60
15,29
4,67
17,95744

BDI

4,60
3,96
4,60
18,37
4,67
19,51592

BDI

4,60
3,96
18,37
6,39590

76,55
17,60650

82,12
5,52000
4,75200
20,70000
22,33000
0,93400

96,03
5,52000
4,75200
20,70000
33,63800
0,93400

04.80.015
DIVISORIAS DE CHAPAS DURATEX OU SIMILAR,INCL ENTARUGAMENTO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.35.26
CHAPA DURATEX 4,5MM
2.67.60
PREGO
Mo-de-Obra 10,27200
LS
12,53184
SubMO
22,80384

M2
H
1,20000
H
1,20000
M
4,50000
M2
2,20000
KG
0,20000
Material
62,04800

04.80.016
CHAPA DURATEX OU SIMILAR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.35.26
CHAPA DURATEX 4,5MM
Mo-de-Obra 3,42400
LS

7,60128

M2
H
0,40000
H
0,40000
M2
1,10000
Material
20,20700

0,00000

M2
M2
1,00000
Material
76,55000

BDI

04.80.099
SERVICOS DE ALVENARIA E OUTROS ELEMENTOS DIVISORIOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

05.01.001
PM-67 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=82CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.01.69
PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348

UN
H
4,10000
H
4,10000
H
1,30000
H
2,00000
H
2,00000
H
1,30000
FL
1,00000
M
5,00000
UN
3,00000
CJ
1,00000
L
0,00600
Material
587,01562

4,60
3,96
4,64
8,08
4,34
3,82
289,32
34,59
7,28
101,95
159,27
BDI
171,23249

4,17728

04.80.017
DIVISORIAS DE CHAPAS DIVILUX OU SIMILAR
2.35.30
DIVISORIA DIVILUX-FORN E COLOCADA
Mo-de-Obra 0,00000
LS
0,00000

05.01.002
1.01.11
1.01.12
1.01.39
1.01.44
Exerccio:

SubMO

SubMO

PM-68 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=92CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERRALHEIRO

2011

UN
H
H
H
H

4,10000
4,10000
1,30000
2,00000

4,60
3,96
4,64
8,08

104,36
5,52000
4,75200
20,70000
40,41400
0,93400

34,20
1,84000
1,58400
20,20700

94,15
76,55000

915,72
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
289,32000
172,95000
21,84000
101,95000
0,95562

921,34
18,86000
16,23600
6,03200
16,16000
Pgina: 35

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.01.68
PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348

H
2,00000
H
1,30000
FL
1,00000
M
5,10000
UN
3,00000
CJ
1,00000
L
0,00600
Material
591,58462

4,34
3,82
290,43
34,59
7,28
101,95
159,27
BDI
172,28336

05.01.004
PM-04 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=82CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.67.60
PREGO
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.02.23
PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
SubMO
102,32868

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
UN
2,00000
KG
0,20000
CJ
4,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
UN
1,00000
CJ
1,00000
Material
316,51400

515,17
4,60
18,86000
3,96
16,23600
4,64
6,03200
3,82
4,96600
0,06
0,12000
4,67
0,93400
0,31
1,24000
68,56
68,56000
12,19
12,19000
83,55
83,55000
7,28
21,84000
26,13
26,13000
101,95
101,95000
BDI
96,33382

05.01.005
PM-05 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=92CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.67.60
PREGO
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.02.24
PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
SubMO
102,32868

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
UN
2,00000
KG
0,20000
CJ
4,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
UN
1,00000
CJ
1,00000
Material
324,22400

524,65
4,60
18,86000
3,96
16,23600
4,64
6,03200
3,82
4,96600
0,06
0,12000
4,67
0,93400
0,31
1,24000
68,56
68,56000
12,19
12,19000
91,26
91,26000
7,28
21,84000
26,13
26,13000
101,95
101,95000
BDI
98,10712

05.01.006
PM-69 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=124CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.01.71
PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 88,84000
LS
108,38480
SubMO
197,22480

UN
H
5,50000
H
5,50000
H
2,00000
H
2,00000
H
2,00000
H
2,00000
UN
2,00000
M
5,40000
UN
6,00000
UN
2,00000
CJ
1,00000
L
0,00600
Material
834,53162

4,60
3,96
4,64
8,08
4,34
3,82
234,59
34,59
7,28
15,99
101,95
159,27
BDI
237,30398

05.01.007
PM-08 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=124CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.67.60
PREGO
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.37
BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.64
PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
SubMO
142,08000
Mo-de-Obra 64,00000
LS
78,08000

UN
H
5,50000
H
5,50000
H
2,00000
H
2,00000
UN
2,00000
KG
0,30000
CJ
4,00000
UN
1,00000
UN
1,00000
FL
2,00000
UN
6,00000
UN
1,00000
UN
2,00000
CJ
1,00000
Material
490,81100

4,60
3,96
4,64
3,82
0,06
4,67
0,31
106,02
12,19
83,05
7,28
26,13
15,99
101,95
BDI
145,56493

05.01.009
1.01.11
Exerccio:

PM-19 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=62CM


CARPINTEIRO

2011

UN
H

4,10000

4,60

8,68000
4,96600
290,43000
176,40900
21,84000
101,95000
0,95562

1.269,06
25,30000
21,78000
9,28000
16,16000
8,68000
7,64000
469,18000
186,78600
43,68000
31,98000
101,95000
0,95562

778,45
25,30000
21,78000
9,28000
7,64000
0,12000
1,40100
1,24000
106,02000
12,19000
166,10000
43,68000
26,13000
31,98000
101,95000

667,14
18,86000
Pgina: 36

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.71
PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
SubMO
102,32868
Mo-de-Obra 46,09400
LS
56,23468

UN Coeficiente

Custo Unit.

Custo Total

H
4,10000
H
1,30000
H
1,30000
KG
0,20000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
CJ
1,00000
Material
440,06400

3,96
4,64
3,82
4,67
68,56
12,19
234,59
7,28
101,95
BDI
124,75032

05.01.010
PM-20 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=82CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.69
PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
SubMO
102,32868
LS
56,23468

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
KG
0,20000
UN
1,00000
UN
1,00000
FL
1,00000
UN
3,00000
CJ
1,00000
Material
494,79400

4,60
3,96
4,64
3,82
4,67
68,56
12,19
289,32
7,28
101,95
BDI
137,33822

05.01.011
PM-21 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=92CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.68
PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
SubMO
102,32868

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
KG
0,20000
UN
1,00000
UN
1,00000
FL
1,00000
UN
3,00000
CJ
1,00000
Material
495,90400

4,60
3,96
4,64
3,82
4,67
68,56
12,19
290,43
7,28
101,95
BDI
137,59352

05.01.012
PM-22 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=124CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.37
BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.71
PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 64,00000
LS
78,08000
SubMO
142,08000

UN
H
5,50000
H
5,50000
H
2,00000
H
2,00000
KG
0,30000
UN
1,00000
UN
1,00000
UN
2,00000
UN
6,00000
UN
2,00000
CJ
1,00000
Material
766,40100

4,60
3,96
4,64
3,82
4,67
106,02
12,19
234,59
7,28
15,99
101,95
BDI
208,95063

05.01.013
PM-23 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MADEIRA L=72CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.67
PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
SubMO
102,32868

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
KG
0,20000
UN
1,00000
UN
1,00000
FL
1,00000
UN
3,00000
CJ
1,00000
Material
494,79400

4,60
3,96
4,64
3,82
4,67
68,56
12,19
289,32
7,28
101,95
BDI
137,33822

05.01.014
1.01.11
1.01.12
1.01.39
1.01.46
2.67.46
2.67.60
2.68.41
3.01.35
3.01.50
3.02.22
Exerccio:

PM-24 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MADEIRA L=72CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
PREGO
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
GUARNICAO 5CM - CEDRINHO
PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1

2011

UN
H
H
H
H
UN
KG
CJ
UN
UN
UN

4,10000
4,10000
1,30000
1,30000
2,00000
0,20000
4,00000
1,00000
1,00000
1,00000

4,60
3,96
4,64
3,82
0,06
4,67
0,31
68,56
12,19
83,55

16,23600
6,03200
4,96600
0,93400
68,56000
12,19000
234,59000
21,84000
101,95000

734,46
18,86000
16,23600
6,03200
4,96600
0,93400
68,56000
12,19000
289,32000
21,84000
101,95000

735,82
18,86000
16,23600
6,03200
4,96600
0,93400
68,56000
12,19000
290,43000
21,84000
101,95000

1.117,43
25,30000
21,78000
9,28000
7,64000
1,40100
106,02000
12,19000
469,18000
43,68000
31,98000
101,95000

734,46
18,86000
16,23600
6,03200
4,96600
0,93400
68,56000
12,19000
289,32000
21,84000
101,95000

515,17
18,86000
16,23600
6,03200
4,96600
0,12000
0,93400
1,24000
68,56000
12,19000
83,55000
Pgina: 37

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
SubMO
102,32868
Mo-de-Obra 46,09400
LS
56,23468

UN Coeficiente
UN
3,00000
UN
1,00000
CJ
1,00000
Material
316,51400

Custo Unit.

Custo Total

7,28
21,84000
26,13
26,13000
101,95
101,95000
BDI
96,33382

05.01.024
PM-34 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=72CM
UN
1.01.11
CARPINTEIRO
H
4,10000
1.01.12
AJUDANTE DE CARPINTEIRO
H
4,10000
1.01.39
PEDREIRO
H
1,30000
1.01.44
SERRALHEIRO
H
2,00000
1.01.45
AJUDANTE SERRALHEIRO
H
2,00000
1.01.46
SERVENTE
H
1,30000
3.01.67
PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1
FL
1,00000
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
M2
0,35000
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
M
4,90000
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
UN
3,00000
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
CJ
1,00000
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
L
0,00600
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348
Material
642,36012

4,60
3,96
4,64
8,08
4,34
3,82
289,32
168,01
34,59
7,28
101,95
159,27
BDI
183,96173

05.01.025
PM-35 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=82CM
UN
1.01.11
CARPINTEIRO
H
4,10000
1.01.12
AJUDANTE DE CARPINTEIRO
H
4,10000
1.01.39
PEDREIRO
H
1,30000
1.01.44
SERRALHEIRO
H
2,00000
1.01.45
AJUDANTE SERRALHEIRO
H
2,00000
1.01.46
SERVENTE
H
1,30000
3.01.69
PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1
FL
1,00000
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
M2
0,40000
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
M
5,00000
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
UN
3,00000
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
CJ
1,00000
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
L
0,00600
Mo-de-Obra 70,93400
LS
86,53948
Material
654,21962
SubMO
157,47348

4,60
3,96
4,64
8,08
4,34
3,82
289,32
168,01
34,59
7,28
101,95
159,27
BDI
186,68941

05.01.026
PM-36 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=92CM
UN
1.01.11
CARPINTEIRO
H
4,10000
1.01.12
AJUDANTE DE CARPINTEIRO
H
4,10000
1.01.39
PEDREIRO
H
1,30000
1.01.44
SERRALHEIRO
H
2,00000
1.01.45
AJUDANTE SERRALHEIRO
H
2,00000
1.01.46
SERVENTE
H
1,30000
3.01.68
PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1
FL
1,00000
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
M2
0,45000
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
M
5,10000
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
UN
3,00000
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
CJ
1,00000
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
L
0,00600
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348
Material
667,18912

4,60
3,96
4,64
8,08
4,34
3,82
290,43
168,01
34,59
7,28
101,95
159,27
BDI
189,67240

05.01.027
PM-37 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MET. L=124CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.01.71
PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 88,84000
LS
108,38480
SubMO
197,22480
Material

4,60
3,96
4,64
8,08
4,34
3,82
234,59
168,01
34,59
7,28
15,99
101,95
159,27
BDI
260,48936

05.01.028
PORTAS PARA DIVISORIAS CHAPA FIBRA MAD PRENS BP COM FERRAGENS
2.35.35
DIVISORIA PORTA 0,82X2,10M COLOCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.71
FECHADURA TIPO TUBULAR COMPLETA - 90 MM DIST.
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000
05.01.029
1.01.11
1.01.12
Exerccio:

PM-74 PORTA DE SARRAFEADO MACIO P/BOXES L=62CM-COMPLETA


CARPINTEIRO
AJUDANTE DE CARPINTEIRO

2011

UN
H
5,50000
H
5,50000
H
2,00000
H
2,00000
H
2,00000
H
2,00000
UN
2,00000
M2
0,60000
M
5,40000
UN
6,00000
UN
2,00000
CJ
1,00000
L
0,00600
935,33762

UN
UN
1,00000
UN
3,00000
UN
1,00000
Material
139,35000
UN
H
H

4,10000
4,10000

BDI

84,60
7,28
32,91
32,05050

4,60
3,96

983,79
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
289,32000
58,80350
169,49100
21,84000
101,95000
0,95562

998,38
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
289,32000
67,20400
172,95000
21,84000
101,95000
0,95562

1.014,33
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
290,43000
75,60450
176,40900
21,84000
101,95000
0,95562

1.393,05
25,30000
21,78000
9,28000
16,16000
8,68000
7,64000
469,18000
100,80600
186,78600
43,68000
31,98000
101,95000
0,95562

171,40
84,60000
21,84000
32,91000

405,90
18,86000
16,23600
Pgina: 38

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.02.06
PORTA SARRAFEADA MACIA P/ BOX 62X150CM G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.35
CABIDE SIMPLES GANCHO GRANDE - ZAMACK
3.17.15
TARGETA DE SOBREPOR LIVRE-OCUP
Mo-de-Obra 35,09600
LS
42,81712
SubMO

UN Coeficiente

77,91312

UN
1,00000
UN
3,00000
UN
2,00000
UN
1,00000
Material
252,09000

Custo Unit.

Custo Total

192,93
192,93000
7,28
21,84000
1,39
2,78000
34,54
34,54000
BDI
75,90072

05.01.036
PM-38 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=72CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.67
PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
SubMO
102,32868
LS
56,23468
Material

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
KG
0,25000
UN
1,00000
UN
1,00000
FL
1,00000
M2
0,35000
UN
3,00000
CJ
1,00000
553,83100

4,60
3,96
4,64
3,82
4,67
68,56
12,19
289,32
168,01
7,28
101,95
BDI
150,91673

05.01.037
PM-39 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=82CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.69
PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
Material
SubMO
102,32868

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
KG
0,25000
UN
1,00000
UN
1,00000
FL
1,00000
M2
0,40000
UN
3,00000
CJ
1,00000
562,23150

4,60
3,96
4,64
3,82
4,67
68,56
12,19
289,32
168,01
7,28
101,95
BDI
152,84884

05.01.044
PM-40 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=92CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.68
PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
SubMO
102,32868
Material

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
KG
0,25000
UN
1,00000
UN
1,00000
FL
1,00000
M2
0,45000
UN
3,00000
CJ
1,00000
571,74200

4,60
3,96
4,64
3,82
4,67
68,56
12,19
290,43
168,01
7,28
101,95
BDI
155,03626

05.01.045
PM-41 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. C/ BAND. BAT. MAD. L=124CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.37
BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.01.71
PORTA MADEIRA MACHO FEMEA 62X210CM G1-C1
3.03.09
BANDEIRA P/ PORTA MACHO-FEMEA G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 64,00000
LS
78,08000
SubMO
142,08000
Material

UN
H
5,50000
H
5,50000
H
2,00000
H
2,00000
KG
0,35000
UN
1,00000
UN
1,00000
UN
2,00000
M2
0,60000
UN
6,00000
UN
2,00000
CJ
1,00000
867,44050

4,60
3,96
4,64
3,82
4,67
106,02
12,19
234,59
168,01
7,28
15,99
101,95
BDI
232,18972

05.01.046
1.01.11
1.01.12
1.01.39
1.01.44
1.01.45
1.01.46
2.67.46
2.68.41
3.02.22
3.13.12
3.15.33

UN
H
H
H
H
H
H
UN
CJ
UN
M
UN

Exerccio:

PM-70 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=72CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"

2011

4,10000
4,10000
1,30000
2,00000
2,00000
1,30000
2,00000
4,00000
1,00000
4,90000
3,00000

4,60
3,96
4,64
8,08
4,34
3,82
0,06
0,31
83,55
34,59
7,28

807,07
18,86000
16,23600
6,03200
4,96600
1,16750
68,56000
12,19000
289,32000
58,80350
21,84000
101,95000

817,40
18,86000
16,23600
6,03200
4,96600
1,16750
68,56000
12,19000
289,32000
67,20400
21,84000
101,95000

829,10
18,86000
16,23600
6,03200
4,96600
1,16750
68,56000
12,19000
290,43000
75,60450
21,84000
101,95000

1.241,71
25,30000
21,78000
9,28000
7,64000
1,63450
106,02000
12,19000
469,18000
100,80600
43,68000
31,98000
101,95000

692,18
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
0,12000
1,24000
83,55000
169,49100
21,84000
Pgina: 39

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
SubMO
157,47348
Mo-de-Obra 70,93400
LS
86,53948

UN
1,00000
CJ
1,00000
L
0,00600
Material
405,27662

26,13
26,13000
101,95
101,95000
159,27
0,95562
BDI
129,43252

05.01.047
PM-71 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=82CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.02.23
PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348

UN
H
4,10000
H
4,10000
H
1,30000
H
2,00000
H
2,00000
H
1,30000
UN
2,00000
CJ
4,00000
UN
1,00000
M
5,00000
UN
3,00000
UN
1,00000
CJ
1,00000
L
0,00600
Material
408,73562

4,60
3,96
4,64
8,08
4,34
3,82
0,06
0,31
83,55
34,59
7,28
26,13
101,95
159,27
BDI
130,22809

05.01.048
PM-72 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=92CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.02.24
PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348

UN
H
4,10000
H
4,10000
H
1,30000
H
2,00000
H
2,00000
H
1,30000
UN
2,00000
CJ
4,00000
UN
1,00000
M
5,10000
UN
3,00000
UN
1,00000
CJ
1,00000
L
0,00600
Material
419,90462

4,60
3,96
4,64
8,08
4,34
3,82
0,06
0,31
91,26
34,59
7,28
26,13
101,95
159,27
BDI
132,79696

05.01.049
PM-73 PORTA DE MADEIRA SARRAFEADA P/ PINT. BAT. MET. L=124CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.64
PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 88,84000
LS
108,38480
SubMO
197,22480

UN
H
5,50000
H
5,50000
H
2,00000
H
2,00000
H
2,00000
H
2,00000
UN
2,00000
CJ
4,00000
FL
2,00000
M
5,40000
UN
6,00000
UN
1,00000
UN
2,00000
CJ
1,00000
L
0,00600
Material
558,94162

4,60
3,96
4,64
8,08
4,34
3,82
0,06
0,31
83,05
34,59
7,28
26,13
15,99
101,95
159,27
BDI
173,91828

05.01.050
PM-81 PORTA DE SARRAFEADO MACIO P/BOXE ACESSIVEL-COMPLETA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.48
PARAFUSO INOX AUTO-ATARR CABECA PANELA 6X25MM
3.02.07
PORTA SARRAFEADA MACIA P/ BOX 92X150CM G1-C1
3.13.40
BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1")
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.35
CABIDE SIMPLES GANCHO GRANDE - ZAMACK
3.17.15
TARGETA DE SOBREPOR LIVRE-OCUP
Mo-de-Obra 47,08000
LS
57,43760
SubMO
104,51760

UN
H
5,50000
H
5,50000
UN
12,00000
UN
1,00000
UN
2,00000
UN
3,00000
UN
1,00000
UN
1,00000
Material
575,85000

4,60
3,96
0,31
216,82
148,77
7,28
1,39
34,54
BDI
156,48455

05.01.051
1.01.11
1.01.12
1.01.39
1.01.44
1.01.45
1.01.46
Exerccio:

PM-75 PORTA SARRAFEADO MACICO SANIT. ACESSIVEL BAT. MET.


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE

2011

UN
H
H
H
H
H
H

5,50000
5,50000
1,30000
2,00000
2,00000
1,30000

4,60
3,96
4,64
8,08
4,34
3,82

696,43
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
0,12000
1,24000
83,55000
172,95000
21,84000
26,13000
101,95000
0,95562

710,17
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
0,12000
1,24000
91,26000
176,40900
21,84000
26,13000
101,95000
0,95562

930,08
25,30000
21,78000
9,28000
16,16000
8,68000
7,64000
0,12000
1,24000
166,10000
186,78600
43,68000
26,13000
31,98000
101,95000
0,95562

836,85
25,30000
21,78000
3,72000
216,82000
297,54000
21,84000
1,39000
34,54000

998,94
25,30000
21,78000
6,03200
16,16000
8,68000
4,96600
Pgina: 40

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.66.40
CHAPA DE ACO INOX P/ PROTECAO E=0,79MM
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
3.02.10
PORTA LISA SARRAFEADA MACIA 92X210CM P/PINTURA G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.13.40
BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1")
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
SubMO
184,07796
Mo-de-Obra 82,91800
LS
101,15996

M2
0,37000
UN
8,00000
UN
1,00000
M
5,10000
UN
1,00000
UN
3,00000
CJ
1,00000
L
0,00600
Material
628,06922

115,58
0,06
134,90
34,59
148,77
7,28
101,95
159,27
BDI
186,79385

05.01.062
PM-76 PORTA SARRAFEADO MACICO SANIT. ACESSIVEL BAT. MAD.
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.40
CHAPA DE ACO INOX P/ PROTECAO E=0,79MM
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.02.10
PORTA LISA SARRAFEADA MACIA 92X210CM P/PINTURA G1-C1
3.13.40
BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1")
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 66,53800
LS
81,17636
SubMO
147,71436

UN
H
5,50000
H
5,50000
H
2,30000
H
2,30000
M2
0,37000
UN
8,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
CJ
1,00000
Material
519,26460

4,60
3,96
4,64
3,82
115,58
0,06
68,56
134,90
148,77
7,28
101,95
BDI
153,40516

05.01.067
PM-79 PORTA PARA HALL DO ELEVADOR BAT. MET.
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.66.40
CHAPA DE ACO INOX P/ PROTECAO E=0,79MM
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
3.02.10
PORTA LISA SARRAFEADA MACIA 92X210CM P/PINTURA G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.13.40
BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1")
3.15.10
MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2)
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.67
FECHADURA YALE S/ MACANETA (PAPAIZ 341)
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 89,12800
LS
108,73616
SubMO
197,86416

UN
H
5,50000
H
5,50000
H
1,30000
H
2,50000
H
2,50000
H
1,30000
M2
0,37000
UN
8,00000
UN
1,00000
M
5,10000
UN
1,00000
UN
1,00000
UN
3,00000
UN
1,00000
L
0,00600
Material
713,38922

4,60
3,96
4,64
8,08
4,34
3,82
115,58
0,06
134,90
34,59
148,77
109,83
7,28
77,44
159,27
BDI
209,58828

05.01.068
PM-80 PORTA PARA HALL DO ELEVADOR BAT. MAD.
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.40
CHAPA DE ACO INOX P/ PROTECAO E=0,79MM
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.02.10
PORTA LISA SARRAFEADA MACIA 92X210CM P/PINTURA G1-C1
3.13.40
BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1")
3.15.10
MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2)
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.67
FECHADURA YALE S/ MACANETA (PAPAIZ 341)
Mo-de-Obra 70,81800
LS
86,39796
SubMO
157,21596

UN
H
6,00000
H
6,00000
H
2,30000
H
2,30000
M2
0,37000
UN
8,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
UN
1,00000
Material
604,58460

4,60
3,96
4,64
3,82
115,58
0,06
68,56
134,90
148,77
109,83
7,28
77,44
BDI
175,21413

05.01.069
1.01.11
1.01.12
1.01.39
1.01.44
1.01.45
1.01.46
2.66.40
2.66.79
2.66.89
2.67.39
2.67.46
2.68.10
3.02.05
3.13.12
3.13.40
3.15.36
3.15.37
Exerccio:

PM-82 PORTA DE CORRER ACESSIVEL SARRAF.MACIA P/PINTURA(L=111CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
CHAPA DE ACO INOX P/ PROTECAO E=0,79MM
FERRO CANTONEIRA 2 1/2"X2 1/2"X1/8" GALV.
PARAFUSO AUTO ATARRACHANTE 8,0X50MM
PARAFUSO AUTOATARRACHANTE 9,5X2,9MM
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
BUCHA PLASTICA TIPO S-10 (CENTO)
PORTA SARRAFEADA MACIA 111X211CM DE CORRER G1-C1
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1")
TRILHO CANALETA DE ALUMINIO "U" DE 1/2"
PIVOT RETO DE LATAO DE 1/2"

2011

UN
H
H
H
H
H
H
M2
M
UN
UN
UN
UN
UN
M
UN
M
UN

6,64000
6,64000
1,57000
2,42000
2,42000
1,57000
0,45000
2,08000
4,00000
10,00000
16,00000
0,04000
1,00000
2,11000
2,00000
1,15000
1,00000

4,60
3,96
4,64
8,08
4,34
3,82
115,58
21,83
0,18
0,02
0,06
2,48
338,96
34,59
148,77
3,47
7,94

42,76460
0,48000
134,90000
176,40900
148,77000
21,84000
101,95000
0,95562

820,38
25,30000
21,78000
10,67200
8,78600
42,76460
0,48000
68,56000
134,90000
148,77000
21,84000
101,95000

1.120,84
25,30000
21,78000
6,03200
20,20000
10,85000
4,96600
42,76460
0,48000
134,90000
176,40900
148,77000
109,83000
21,84000
77,44000
0,95562

937,01
27,60000
23,76000
10,67200
8,78600
42,76460
0,48000
68,56000
134,90000
148,77000
109,83000
21,84000
77,44000

1.505,23
30,54400
26,29440
7,28480
19,55360
10,50280
5,99740
52,01100
45,40640
0,72000
0,20000
0,96000
0,09920
338,96000
72,98490
297,54000
3,99050
7,94000
Pgina: 41

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.15.41
TRILHO CHAPA 50X60X1,9MM GALV.P/PORTA CORRER
3.15.97
RODIZIO DE AO DUPLO DN 1 1/2" (JOCEC REF.71203)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 100,17700
LS
122,21594
SubMO
222,39294

UN Coeficiente

Custo Unit.

Custo Total

M
2,08000
UN
2,00000
CJ
1,00000
L
0,00600
Material
1.001,37762

30,00
62,40000
7,63
15,26000
101,95
101,95000
159,27
0,95562
BDI
281,46723

05.01.075
PORTA ARMARIO EMBUTIDO EM COMPENSADO 3 CM -BAT MADEIRA 1,5X7CM
M2
1.01.11
CARPINTEIRO
H
1,20000
1.01.12
AJUDANTE DE CARPINTEIRO
H
1,20000
1.01.39
PEDREIRO
H
0,70000
1.01.46
SERVENTE
H
0,70000
3.03.25
PORTA ARMARIO EMBUT C/BATENTE E GUARNI. G1-C1
M2
1,00000
Mo-de-Obra 16,19400
LS
19,75668
SubMO
35,95068
Material
218,87000

313,42
4,60
5,52000
3,96
4,75200
4,64
3,24800
3,82
2,67400
218,87
218,87000
BDI
58,60876

05.01.090
PM-58 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=72CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.02.22
PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
LS
86,53948
Material
SubMO
157,47348

UN
H
4,10000
H
4,10000
H
1,30000
H
2,00000
H
2,00000
H
1,30000
UN
2,00000
CJ
4,00000
UN
1,00000
M2
0,35000
M
4,90000
UN
3,00000
UN
1,00000
CJ
1,00000
L
0,00600
422,25862

4,60
3,96
4,64
8,08
4,34
3,82
0,06
0,31
83,55
48,52
34,59
7,28
26,13
101,95
159,27
BDI
133,33838

05.01.091
PM-59 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=82CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.02.23
PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348
Material

UN
H
4,10000
H
4,10000
H
1,30000
H
2,00000
H
2,00000
H
1,30000
UN
2,00000
CJ
4,00000
UN
1,00000
M2
0,40000
M
5,00000
UN
3,00000
UN
1,00000
CJ
1,00000
L
0,00600
428,14362

4,60
3,96
4,64
8,08
4,34
3,82
0,06
0,31
83,55
48,52
34,59
7,28
26,13
101,95
159,27
BDI
134,69193

05.01.092
PM-60 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=92CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.02.24
PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
LS
86,53948
SubMO
157,47348
Material

UN
H
4,10000
H
4,10000
H
1,30000
H
2,00000
H
2,00000
H
1,30000
UN
2,00000
CJ
4,00000
UN
1,00000
M2
0,45000
M
5,10000
UN
3,00000
UN
1,00000
CJ
1,00000
L
0,00600
441,73862

4,60
3,96
4,64
8,08
4,34
3,82
0,06
0,31
91,26
48,52
34,59
7,28
26,13
101,95
159,27
BDI
137,81878

05.01.093
1.01.11
1.01.12
1.01.39
1.01.44
1.01.45
1.01.46

UN
H
H
H
H
H
H

Exerccio:

PM-61 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MET. L=124CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE

2011

5,50000
5,50000
2,00000
2,00000
2,00000
2,00000

4,60
3,96
4,64
8,08
4,34
3,82

713,07
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
0,12000
1,24000
83,55000
16,98200
169,49100
21,84000
26,13000
101,95000
0,95562

720,30
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
0,12000
1,24000
83,55000
19,40800
172,95000
21,84000
26,13000
101,95000
0,95562

737,03
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
0,12000
1,24000
91,26000
21,83400
176,40900
21,84000
26,13000
101,95000
0,95562

965,89
25,30000
21,78000
9,28000
16,16000
8,68000
7,64000
Pgina: 42

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.64
PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
SubMO
197,22480
Mo-de-Obra 88,84000
LS
108,38480

UN Coeficiente
UN
2,00000
CJ
4,00000
FL
2,00000
M2
0,60000
M
5,40000
UN
6,00000
UN
1,00000
UN
2,00000
CJ
1,00000
L
0,00600
Material
588,05362

Custo Unit.

Custo Total

0,06
0,31
83,05
48,52
34,59
7,28
26,13
15,99
101,95
159,27
BDI
180,61404

05.01.094
PM-62 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=72CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.67.60
PREGO
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.02.22
PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
Material
SubMO
102,32868

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
UN
2,00000
KG
0,25000
CJ
4,00000
UN
1,00000
UN
1,00000
UN
1,00000
M2
0,35000
UN
3,00000
UN
1,00000
CJ
1,00000
333,72950

4,60
3,96
4,64
3,82
0,06
4,67
0,31
68,56
12,19
83,55
48,52
7,28
26,13
101,95
BDI
100,29338

05.01.095
PM-63 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=82CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.67.60
PREGO
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.02.23
PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
SubMO
102,32868
Material

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
UN
2,00000
KG
0,25000
CJ
4,00000
UN
1,00000
UN
1,00000
UN
1,00000
M2
0,40000
UN
3,00000
UN
1,00000
CJ
1,00000
336,15550

4,60
3,96
4,64
3,82
0,06
4,67
0,31
68,56
12,19
83,55
48,52
7,28
26,13
101,95
BDI
100,85136

05.01.096
PM-64 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=92CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.67.60
PREGO
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
3.01.50
GUARNICAO 5CM - CEDRINHO
3.02.24
PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 46,09400
LS
56,23468
SubMO
102,32868
Material

UN
H
4,10000
H
4,10000
H
1,30000
H
1,30000
UN
2,00000
KG
0,25000
CJ
4,00000
UN
1,00000
UN
1,00000
UN
1,00000
M2
0,45000
UN
3,00000
UN
1,00000
CJ
1,00000
346,29150

4,60
3,96
4,64
3,82
0,06
4,67
0,31
68,56
12,19
91,26
48,52
7,28
26,13
101,95
BDI
103,18264

05.01.097
1.01.11
1.01.12
1.01.39
1.01.46
2.67.46
2.67.60
2.68.41
3.01.37
3.01.50
3.01.64
3.03.08

UN
H
H
H
H
UN
KG
CJ
UN
UN
FL
M2

Exerccio:

PM-65 PORTA DE MADEIRA SARRAFEADA P/ PINT. C/ BAND. BAT. MAD. L=124CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
PREGO
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1
GUARNICAO 5CM - CEDRINHO
PORTA SARRAF SEMI OCA LISA P/ PINT 62X210CM G1-C1
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1

2011

5,50000
5,50000
2,00000
2,00000
2,00000
0,35000
4,00000
1,00000
1,00000
2,00000
0,60000

4,60
3,96
4,64
3,82
0,06
4,67
0,31
106,02
12,19
83,05
48,52

0,12000
1,24000
166,10000
29,11200
186,78600
43,68000
26,13000
31,98000
101,95000
0,95562

536,35
18,86000
16,23600
6,03200
4,96600
0,12000
1,16750
1,24000
68,56000
12,19000
83,55000
16,98200
21,84000
26,13000
101,95000

539,33
18,86000
16,23600
6,03200
4,96600
0,12000
1,16750
1,24000
68,56000
12,19000
83,55000
19,40800
21,84000
26,13000
101,95000

551,80
18,86000
16,23600
6,03200
4,96600
0,12000
1,16750
1,24000
68,56000
12,19000
91,26000
21,83400
21,84000
26,13000
101,95000

814,55
25,30000
21,78000
9,28000
7,64000
0,12000
1,63450
1,24000
106,02000
12,19000
166,10000
29,11200
Pgina: 43

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 64,00000
LS
78,08000
SubMO
142,08000

UN
6,00000
UN
1,00000
UN
2,00000
CJ
1,00000
Material
520,15650

7,28
26,13
15,99
101,95
BDI
152,31440

05.01.098
PM-66 PORTA DE MADEIRA MACHO/FEMEA P/ PINT. BAT. MET. L=72CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.01.67
PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 70,93400
SubMO
157,47348
LS
86,53948

UN
H
4,10000
H
4,10000
H
1,30000
H
2,00000
H
2,00000
H
1,30000
FL
1,00000
M
4,90000
UN
3,00000
CJ
1,00000
L
0,00600
Material
583,55662

4,60
3,96
4,64
8,08
4,34
3,82
289,32
34,59
7,28
101,95
159,27
BDI
170,43692

05.01.099
ELEMENTOS DE MADEIRA COM ACESSORIO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

05.02.001
JM-01 JANELA VENEZIANA
1.01.11
CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.67.10
JM-01 GRAPA PARA FIXACAO
3.01.07
JANELA MADEIRA GUILHOTINA C/VENEZ 120X120CM (JM-01) G1-C1
3.01.57
GUARNICAO IMBUIA P/ JANELA 120X120CM (JM-01)
3.17.22
CARRANCA EM LATAO FUNDIDO
Mo-de-Obra 14,29840
LS
17,44405
SubMO
31,74245

UN
H
0,46000
H
1,44000
H
1,44000
M3
0,00700
KG
1,14000
KG
0,86000
UN
2,00000
CJ
1,00000
CJ
1,00000
UN
2,00000
Material
367,87042

491,52
4,60
2,11600
4,64
6,68160
3,82
5,50080
80,46
0,56322
0,35
0,39900
0,37
0,31820
2,30
4,60000
304,13
304,13000
16,74
16,74000
20,56
41,12000
BDI
91,91096

05.02.099
ELEMENTOS DE MADEIRA COM ACESSORIO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

76,22437

M
H
0,31000
H
2,90000
H
5,03000
M3
0,10500
KG
9,32000
KG
14,78000
KG
0,28000
UN
27,00000
M2
0,45000
M2
0,65000
Material
203,25460

343,75
5,37
1,66470
4,64
13,45600
3,82
19,21460
80,46
8,44830
0,35
3,26200
0,37
5,46860
1,04
0,29120
0,22
5,94000
21,60
9,72000
261,73
170,12450
BDI
64,28016

05.03.099
FERRAGENS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

05.04.099
QUADRO NEGRO / QUADROS DE AVISO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
05.05.034
BS-05 BANCADA PARA COZINHA - GRANITO
1.01.06
AZULEJISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.25.15
TIJOLO COMUM MACICO
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.50.39
GRANITO CINZA ANDORINHA E=2CM
Mo-de-Obra 34,33530
LS
41,88907
05.05.046
1.01.06
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
Exerccio:

SubMO

SubMO

SubMO

SubMO

SubMO

0,00000

BE-02 BANCADA LABORATORIO / EDUC.ART. / AULA PRATICA - L=10,80M


AZULEJISTA
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3

9,30000
21,20000
21,20000
3,50000
3,50000
4,68000
4,68000
13,56000
4,16000
4,00000
47,30000
1,04570

5,37
4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,74
3,80
3,82
80,46

43,68000
26,13000
31,98000
101,95000

911,46
18,86000
16,23600
6,03200
16,16000
8,68000
4,96600
289,32000
169,49100
21,84000
101,95000
0,95562

6.170,55
49,94100
97,52000
83,95200
17,67500
14,24500
22,32360
17,87760
62,91840
19,71840
15,20000
180,68600
84,13702
Pgina: 44

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.17
PEDRA BRITADA 1
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.31
CHAPA COMPENSADA RESINADA E=10MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.21
BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM
2.41.60
FORNECIMENTO E APLICACAO DE RESINA ACRILICA
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.67.77
BUCHA TIPO S-8 (CENTO)
2.80.70
TRAVA QUIMICA
3.10.55
FIXACAO (FERRO TRABALHADO)
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.50.36
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
3.75.02
TINTA ESMALTE
3.80.16
MASSA PARA MADEIRA
6.40.45
VALVULA AMERICANA P/PIA 3 1/2'
6.45.13
SIFAO METALICO TIPO COPO DN 1 1/2X2"
6.55.16
SABONETEIRA LOUCA BRANCA 7.5X15CM
6.56.13
CUBA DUPLA ACO INOX 304 CH.20 1020X400X250MM
6.60.13
TUBO LIGACAO CROMADO C/CANOPLA
6.60.74
TORNEIRA MEC/CER 1/4 VOLTA TIPO MESA CROMADO 1/2"
Mo-de-Obra 582,05700
LS
710,10954
SubMO

1.292,16654

KG
73,03000
KG
340,09000
KG
3,40000
M3
0,47900
M
7,62000
M
12,80000
M2
7,56000
KG
53,77000
UN
29,00000
M2
11,00000
UN
12,00000
UN
0,12000
GR
0,50000
KG
31,04000
M2
14,61000
M2
0,24000
L
0,32000
L
1,44000
UN
2,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
2,00000
UN
2,00000
Material
3.724,54499

05.05.048
BE-03 BANCADA LABORATORIO / EDUCACAO ARTISTICA / AULA PRATICA L=7,20M
1.01.06
AZULEJISTA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.17
PEDRA BRITADA 1
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.31
CHAPA COMPENSADA RESINADA E=10MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.21
BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM
2.41.60
FORNECIMENTO E APLICACAO DE RESINA ACRILICA
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.67.77
BUCHA TIPO S-8 (CENTO)
2.80.70
TRAVA QUIMICA
3.10.55
FIXACAO (FERRO TRABALHADO)
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.50.36
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
3.75.02
TINTA ESMALTE
3.80.16
MASSA PARA MADEIRA
6.40.45
VALVULA AMERICANA P/PIA 3 1/2'
6.45.13
SIFAO METALICO TIPO COPO DN 1 1/2X2"
6.55.16
SABONETEIRA LOUCA BRANCA 7.5X15CM
6.56.13
CUBA DUPLA ACO INOX 304 CH.20 1020X400X250MM
6.60.13
TUBO LIGACAO CROMADO C/CANOPLA
6.60.74
TORNEIRA MEC/CER 1/4 VOLTA TIPO MESA CROMADO 1/2"
Mo-de-Obra 410,41400
LS
500,70508
Material
SubMO
911,11908
05.05.064
PR-08 PRATELEIRA DE GRANITO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.50.39
GRANITO CINZA ANDORINHA E=2CM
Mo-de-Obra 2,19960
LS
2,68351
05.05.067
1.01.39
Exerccio:

PR-03 PRATELEIRA DE GRANILITE - L=30CM


PEDREIRO

2011

SubMO

4,88311

Custo Unit.

Custo Total

0,35
25,56050
0,37
125,83330
1,04
3,53600
62,03
29,71237
3,78
28,80360
4,60
58,88000
9,49
71,74440
2,70
145,17900
1,78
51,62000
12,21
134,31000
0,16
1,92000
11,95
1,43400
1,68
0,84000
43,56
1.352,10240
21,60
315,57600
465,15
111,63600
10,12
3,23840
9,80
14,11200
21,74
43,48000
63,57
127,14000
12,24
24,48000
504,03
504,03000
20,97
41,94000
211,65
423,30000
BDI
1.153,84365

UN
H
6,90000
H
14,10000
H
14,10000
H
3,50000
H
3,50000
H
2,88000
H
2,88000
H
10,06000
H
4,16000
H
4,00000
H
29,95000
M3
0,69000
KG
31,62000
KG
243,75000
KG
2,55000
M3
0,30900
M
5,53000
M
12,80000
M2
5,04000
KG
33,07000
UN
18,00000
M2
11,00000
UN
12,00000
UN
0,12000
GR
0,50000
KG
31,04000
M2
10,74000
M2
0,24000
L
0,32000
L
1,44000
UN
2,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
2,00000
UN
2,00000
3.443,47997

5.356,15
5,37
37,05300
4,60
64,86000
3,96
55,83600
5,05
17,67500
4,07
14,24500
4,77
13,73760
3,82
11,00160
4,64
46,67840
4,74
19,71840
3,80
15,20000
3,82
114,40900
80,46
55,51740
0,35
11,06700
0,37
90,18750
1,04
2,65200
62,03
19,16727
3,78
20,90340
4,60
58,88000
9,49
47,82960
2,70
89,28900
1,78
32,04000
12,21
134,31000
0,16
1,92000
11,95
1,43400
1,68
0,84000
43,56
1.352,10240
21,60
231,98400
465,15
111,63600
10,12
3,23840
9,80
14,11200
21,74
43,48000
63,57
127,14000
12,24
24,48000
504,03
504,03000
20,97
41,94000
211,65
423,30000
BDI
1.001,55778

M
H
0,26000
H
0,26000
M3
0,02000
KG
0,80000
M2
0,40000
Material
106,59720

137,12
4,64
1,20640
3,82
0,99320
80,46
1,60920
0,37
0,29600
261,73
104,69200
BDI
25,64047

M
H

4,20000

4,64

411,50
19,48800
Pgina: 45

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.67.31
PARAFUSO AUTO-ATARRACHANTE CABECA OVAL 4,8 X 75MM
2.67.77
BUCHA TIPO S-8 (CENTO)
2.68.65
PERFIL DE FERRO "T" 1 1/4X1 1/4X1/8"
2.80.56
GRAFITE
3.55.31
PLACA GRANILITE 3CM
3.80.47
CERA VIRGEM
Mo-de-Obra 61,33950
LS
74,83419
SubMO
136,17369

Custo Total

BDI

4,74
4,62150
3,80
2,85000
3,82
34,38000
80,46
0,48276
0,37
1,09890
0,14
4,66666
11,95
3,98294
5,05
18,93750
13,57
0,67850
95,86
167,75500
8,56
0,77896
76,94763

148,60213

M
H
4,33070
H
1,28500
H
0,99200
H
9,68140
M3
0,00620
KG
3,06250
CJ
26,67000
UN
0,26670
M
4,33000
L
0,08000
M2
2,33000
KG
0,12120
Material
257,93131

BDI

500,03
4,64
20,09445
4,74
6,09090
3,80
3,76960
3,82
36,98295
80,46
0,49885
0,37
1,13313
0,14
3,73380
11,95
3,18707
5,52
23,90160
13,57
1,08560
95,86
223,35380
8,56
1,03747
93,50269

05.05.078
GS-03 GUICHE DE SECRETARIA/JANELA DE 2 FOLHAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.24
GRANITEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
3.01.09
GS-03 JANELA SARRAF.MACIA (60X130CM E=25MM) X 2 (G1-C1)
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.16.44
DOBRADICA DE ACO CROMADO C/ PINOS BOLAS 3"X2 1/2"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.50.38
GRANITO CINZA ANDORINHA E=3CM
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
SubMO
130,45297
Mo-de-Obra 58,76260
LS
71,69037

UN
H
2,00000
H
2,00000
H
2,50000
H
2,50000
H
4,18000
M3
0,00200
KG
1,80000
KG
1,60000
UN
1,00000
M
3,80000
UN
4,00000
UN
4,00000
M2
1,34000
L
0,00460
Material
1.341,27936

4,60
3,96
5,63
4,64
3,82
80,46
0,37
0,35
711,90
34,59
6,57
15,99
302,67
159,27
BDI
338,49844

05.05.079
PR-10 PRATELEIRA EM GRANILITE L=70CM
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.66.93
CHUMBADOR BOLT 1/4" X 3"
2.68.66
PERFIL DE FERRO BRUTO T 1 1/4X1 1/4X1/8
3.55.31
PLACA GRANILITE 3CM
3.75.02
TINTA ESMALTE
3.80.47
CERA VIRGEM
Mo-de-Obra 68,79962
LS
83,93553

152,73515

M
H
4,53270
H
1,28500
H
0,99200
H
9,92340
M3
0,01120
KG
0,91100
KG
3,77550
UN
2,86000
UN
15,00000
M
6,50000
M2
3,00000
L
0,08000
KG
0,15600
Material
347,42030

BDI

4,64
4,74
3,80
3,82
80,46
0,35
0,37
1,94
0,91
5,52
95,86
10,12
8,56
115,03575

0,56480

M
H
0,06660
UN
4,00000
Material
33,20000

BDI

3,82
8,30
7,76590

05.05.075
PR-09 PRATELEIRA EM GRANILITE - L=55CM
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
2.68.66
PERFIL DE FERRO BRUTO T 1 1/4X1 1/4X1/8
2.80.56
GRAFITE
3.55.31
PLACA GRANILITE 3CM
3.80.47
CERA VIRGEM
Mo-de-Obra 66,93790
SubMO
LS
81,66423

05.05.080
ET-05 ESTRADO DE POLIPROPILENO
1.01.46
SERVENTE
3.91.20
ESTRADO DE POLIPROPILENO (25X50X2,5CM)
Mo-de-Obra 0,25441
LS
0,31038
05.05.083
1.01.06
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
Exerccio:

SubMO

SubMO

BA-07 BALCAO DE DISTRIBUICAO 1,50X0,50M(GRANITO)


AZULEJISTA
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR

2011

H
0,97500
H
0,75000
H
9,00000
M3
0,00600
KG
2,97000
UN
33,33330
UN
0,33330
M
3,75000
L
0,05000
M2
1,75000
KG
0,09100
Material
198,38122

Custo Unit.

UN
H
H
H
H
H
H
H
H

2,64000
1,21000
1,21000
0,89000
0,89000
3,05000
0,95000
0,81000

5,37
4,60
3,96
4,77
3,82
4,64
4,74
3,80

1.810,23
9,20000
7,92000
14,07500
11,60000
15,96760
0,16092
0,66600
0,56000
711,90000
131,44200
26,28000
63,96000
405,57780
0,73264

615,19
21,03173
6,09090
3,76960
37,90739
0,90115
0,31885
1,39694
5,54840
13,65000
35,88000
287,58000
0,80960
1,33536

41,53
0,25441
33,20000

1.377,62
14,17680
5,56600
4,79160
4,24530
3,39980
14,15200
4,50300
3,07800
Pgina: 46

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.30.10
ELEMENTO VAZADO "NEO-REX" N.16 (19X19X10)CM
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.75.30
TELA DE ACO INOX (MALHA 14 FIO 30)
3.10.72
BA-07 PORTA DE ACO DE ENROLAR DE 1,50X1,35M
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.50.39
GRANITO CINZA ANDORINHA E=2CM
3.75.02
TINTA ESMALTE
SubMO
Mo-de-Obra 70,79690
LS
86,37222
05.05.085
BA-12 BALCO DE ATENDIMENTO DE GRANITO (210X60CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.38
CONCRETO DOSADO (CONDICAO A) FCK=30MPA
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.10.73
BA-12 PORTA FERRO BASC.ACION.MANUAL (2,10X1,50)
3.50.39
GRANITO CINZA ANDORINHA E=2CM
3.75.02
TINTA ESMALTE
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
Mo-de-Obra 140,03617
LS
170,84413
SubMO

UN Coeficiente

157,16912

3,82
80,46
0,35
0,37
61,17
0,35
3,78
17,18
11,40
2,70
2,62
4,67
4,87
50,59
544,05
10,15
261,73
10,12
BDI
257,60377

310,88030

UN
H
4,04000
H
4,04000
H
1,01300
H
1,01300
H
4,44300
H
7,18200
H
6,23700
H
4,81500
M3
0,11400
KG
5,54000
M
6,06000
M2
0,20200
M2
0,66700
KG
2,68000
KG
8,97000
KG
0,40400
KG
0,20300
UN
1,00000
M2
1,49000
L
2,36300
L
1,41800
Material
2.637,90437

3.627,00
4,60
18,58400
3,96
15,99840
4,77
4,83201
3,82
3,86966
4,64
20,61552
4,74
34,04268
3,80
23,70060
3,82
18,39330
264,02
30,09828
0,35
1,93900
3,78
22,90680
17,18
3,47036
11,40
7,60380
2,69
7,20920
2,70
24,21900
4,67
1,88668
4,87
0,98861
2.094,75
2.094,75000
261,73
389,97770
10,12
23,91356
20,41
28,94138
BDI
678,22047

UN
H
3,00000
H
3,00000
H
2,50000
H
2,50000
H
2,50000
KG
1,60000
M
1,80000
M
0,45000
UN
5,00000
UN
0,05000
UN
1,00000
UN
1,00000
UN
1,00000
M
2,54000
UN
2,00000
M
1,30000
UN
1,00000
M2
1,34000
1.405,60730

05.05.088
1.01.06
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46

UN
H
H
H
H
H
H
H
H
H

Exerccio:

2011

Custo Total

H
4,42000
M3
0,09500
KG
6,73000
KG
45,01000
M3
0,08500
KG
2,79000
M
2,79000
M2
0,23000
M2
0,93000
KG
10,28000
UN
4,00000
KG
0,46000
KG
0,18000
M2
0,16000
UN
1,00000
KG
6,65000
M2
0,93000
L
0,06000
Material
962,84725

05.05.087
GS-04 GUICHE DE SECRETARIA/JANELA DE CORRER
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.24
GRANITEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.66.83
PERFIL CANTONEIRA DE FERRO DE 1/2" X 1/2" X 1/8"
2.66.84
PERFIL "T" DE FERRO 1/2" X 1/2" X 1/8"
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.67.77
BUCHA TIPO S-8 (CENTO)
3.01.10
GS-04 JANELA SARRAF MACIA (130X125CM) C/BATENTE E GUARNICOES (G1-C1)
3.15.20
FECHADURA LATAO CROMADO P/PORTA DE CORRER
3.15.21
CONCHA LATAO CROMADO C/FURO P/CHAVE
3.15.34
TRILHO PARA JANELA DE CORRER
3.15.35
ROLDANA DUPLA DE FERRO RINCADO P/JANELA DE CORRER
3.15.36
TRILHO CANALETA DE ALUMINIO "U" DE 1/2"
3.15.37
PIVOT RETO DE LATAO DE 1/2"
3.50.38
GRANITO CINZA ANDORINHA E=3CM
Mo-de-Obra 60,90500
LS
74,30410
Material
SubMO
135,20910
BA-09 BALCAO DE ADENDIMENTO 2,10X0,50M (GRANITO)
AZULEJISTA
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE

Custo Unit.

3,92000
3,39000
3,39000
1,24600
1,24600
4,27000
1,28400
1,28400
7,47000

4,60
3,96
5,63
4,64
3,82
0,35
2,12
2,12
0,16
11,95
908,29
24,24
3,56
13,15
5,68
3,47
7,94
302,67
BDI
354,38777

5,37
4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82

16,88440
7,64370
2,35550
16,65370
5,19945
0,97650
10,54620
3,95140
10,60200
27,75600
10,48000
2,14820
0,87660
8,09440
544,05000
67,49750
243,40890
0,60720

1.895,20
13,80000
11,88000
14,07500
11,60000
9,55000
0,56000
3,81600
0,95400
0,80000
0,59750
908,29000
24,24000
3,56000
33,40100
11,36000
4,51100
7,94000
405,57780

1.887,01
21,05040
15,59400
13,42440
5,94342
4,75972
19,81280
6,08616
4,87920
28,53540
Pgina: 47

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.30.10
ELEMENTO VAZADO "NEO-REX" N.16 (19X19X10)CM
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.75.30
TELA DE ACO INOX (MALHA 14 FIO 30)
3.11.75
PORTA DE ACO DE ENROLAR 2,10X1,35M (BA-09)
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.50.39
GRANITO CINZA ANDORINHA E=2CM
3.75.02
TINTA ESMALTE
Mo-de-Obra 120,08550
LS
146,50431
SubMO
05.05.089
BA-10 BALCO DE DISTRIB.DE GRANITO (L=350CM)
1.01.06
AZULEJISTA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.75
BLOCO DE CONCRETO 14X19X39CM - 4MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.10.75
BA-10 PORTA BASCULANTE ACION.MANUAL (3,50X1,50)
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.50.39
GRANITO CINZA ANDORINHA E=2CM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 205,52581
LS
250,74149
SubMO
05.05.090
BA-11 BALCO DE DEVOLUO DE GRANITO (L=70CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.10.76
BA-11 PORTA DE FERRO (0,70X1,50)
3.50.39
GRANITO CINZA ANDORINHA E=2CM
3.75.02
TINTA ESMALTE
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
SubMO
Mo-de-Obra 34,52704
LS
42,12299
05.05.091
1.01.06
Exerccio:

UN Coeficiente

Custo Total

266,58981

M3
0,13300
KG
9,42200
KG
63,01400
M3
0,11900
KG
3,90600
M
3,91000
M2
0,32200
M2
1,30200
KG
14,39200
UN
4,00000
KG
0,64400
KG
0,25200
M2
0,16000
UN
1,00000
KG
6,65000
M2
1,30200
L
0,06000
Material
1.267,56963

80,46
0,35
0,37
61,17
0,35
3,78
17,18
11,40
2,70
2,62
4,67
4,87
50,59
715,91
10,15
261,73
10,12
BDI
352,85667

456,26730

UN
H
0,73100
H
6,42000
H
6,42000
H
2,00000
H
2,00000
H
2,85100
H
11,97000
H
10,39500
H
5,23500
M3
0,06400
KG
4,28100
KG
20,72800
M3
0,01800
M3
0,16400
KG
14,34000
KG
0,60700
M
9,63000
M2
0,32100
M2
1,05900
KG
23,00000
UN
10,00000
KG
0,64200
KG
0,40000
UN
1,00000
M2
1,44900
M2
2,00000
L
3,93800
L
2,36300
Material
4.327,21790

5.883,68
5,37
3,92547
4,60
29,53200
3,96
25,42320
4,77
9,54000
3,82
7,64000
4,64
13,22864
4,74
56,73780
3,80
39,50100
3,82
19,99770
80,46
5,14944
0,35
1,49835
0,37
7,66936
66,21
1,19178
251,78
41,29192
0,35
5,01900
1,65
1,00155
3,78
36,40140
17,18
5,51478
11,40
12,07260
2,69
61,87000
2,29
22,90000
4,67
2,99814
4,87
1,94800
3.491,25
3.491,25000
21,60
31,29840
261,73
523,46000
10,12
39,85256
14,74
34,83062
BDI
1.100,20160

76,65003

UN
H
0,49600
H
0,49600
H
0,07200
H
0,07200
H
1,20400
H
2,39400
H
2,07900
H
1,26400
M3
0,00920
KG
0,89400
M
0,74400
M2
0,02480
M2
0,24800
KG
0,83000
KG
0,04960
KG
0,01500
UN
1,00000
M2
0,24000
L
0,78750
L
0,47250
Material
585,17329

814,04
4,60
2,28160
3,96
1,96416
4,77
0,34344
3,82
0,27504
4,64
5,58656
4,74
11,34756
3,80
7,90020
3,82
4,82848
241,38
2,22070
0,35
0,31290
3,78
2,81232
17,18
0,42606
11,40
2,82720
2,70
2,24100
4,67
0,23163
4,87
0,07305
493,60
493,60000
261,73
62,81520
10,12
7,96950
20,41
9,64373
BDI
152,21936

CC-01 CUBA INOX (60X50X30 CM) INCL VALV. AMERICANA - GRANITO


AZULEJISTA

2011

Custo Unit.

UN
H

0,85000

5,37

10,70118
3,29770
23,31518
7,27923
1,36710
14,77980
5,53196
14,84280
38,85840
10,48000
3,00748
1,22724
8,09440
715,91000
67,49750
340,77246
0,60720

2.687,75
4,56450
Pgina: 48

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.67.77
BUCHA TIPO S-8 (CENTO)
2.80.70
TRAVA QUIMICA
3.10.55
FIXACAO (FERRO TRABALHADO)
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.50.36
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
6.40.45
VALVULA AMERICANA P/PIA 3 1/2'
6.45.13
SIFAO METALICO TIPO COPO DN 1 1/2X2"
6.55.16
SABONETEIRA LOUCA BRANCA 7.5X15CM
6.56.12
CUBA SIMPLES ACO INOX 304 CH 20 600X500X300MM
6.60.73
TORNEIRA MEC/CER 1/4 VOLTA TIPO PARED CROMADO 1/2"
Mo-de-Obra 70,65240
LS
86,19593
SubMO
05.05.093
CC-O3 CUBA INOX 50X40X25CM - TORNEIRA PAREDE
1.01.06
AZULEJISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.67.77
BUCHA TIPO S-8 (CENTO)
2.80.70
TRAVA QUIMICA
3.10.55
FIXACAO (FERRO TRABALHADO)
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.50.36
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
6.40.45
VALVULA AMERICANA P/PIA 3 1/2'
6.45.13
SIFAO METALICO TIPO COPO DN 1 1/2X2"
6.55.16
SABONETEIRA LOUCA BRANCA 7.5X15CM
6.56.20
CUBA SIMPLES ACO INOX 304 CH.20 500X400X250MM
6.60.73
TORNEIRA MEC/CER 1/4 VOLTA TIPO PARED CROMADO 1/2"
Mo-de-Obra 70,65240
LS
86,19593
SubMO
05.05.094
1.01.06
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.09
2.05.18
2.25.15
2.66.90
2.67.77
2.80.70
3.10.55
3.20.01
3.50.36
6.40.45
6.45.13
6.55.16
6.56.13
Exerccio:

UN Coeficiente

Custo Total

156,84833

H
1,50000
H
1,50000
H
0,23000
H
0,23000
H
5,74000
H
6,23000
M3
0,22400
KG
22,61000
KG
38,03000
KG
0,63000
M3
0,02400
UN
78,00000
UN
6,00000
UN
0,06000
GR
0,50000
KG
15,52000
M2
1,61000
M2
1,08000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
2.028,31712

5,05
4,07
4,77
3,82
4,64
3,82
80,46
0,35
0,37
1,04
61,17
0,22
0,16
11,95
1,68
43,56
21,60
465,15
21,74
63,57
12,24
471,90
183,87
BDI
502,58805

156,84833

UN
H
0,85000
H
1,50000
H
1,50000
H
0,23000
H
0,23000
H
5,74000
H
6,23000
M3
0,20600
KG
22,61000
KG
38,03000
KG
0,63000
M3
0,02400
UN
78,00000
UN
6,00000
UN
0,06000
GR
0,50000
KG
3,92000
M2
1,61000
M2
1,08000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
1.287,44284

5,37
5,05
4,07
4,77
3,82
4,64
3,82
80,46
0,35
0,37
1,04
61,17
0,22
0,16
11,95
1,68
43,56
21,60
465,15
21,74
63,57
12,24
237,77
183,87
BDI
332,18697

CC-04 CUBA DUPLA INOX (102X40X25 CM) INCL VALV. AMERICANA - GRANITO
AZULEJISTA
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
CIMENTO BRANCO
PEDRA BRITADA 2
TIJOLO COMUM MACICO
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
BUCHA TIPO S-8 (CENTO)
TRAVA QUIMICA
FIXACAO (FERRO TRABALHADO)
AZULEJO LISO BRANCO BRILHANTE
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
VALVULA AMERICANA P/PIA 3 1/2'
SIFAO METALICO TIPO COPO DN 1 1/2X2"
SABONETEIRA LOUCA BRANCA 7.5X15CM
CUBA DUPLA ACO INOX 304 CH.20 1020X400X250MM

2011

Custo Unit.

UN
H
H
H
H
H
H
H
M3
KG
KG
KG
M3
UN
UN
UN
GR
KG
M2
M2
UN
UN
UN
UN

1,00000
3,00000
3,00000
0,27000
0,27000
7,01000
6,76000
0,28000
27,45000
42,50000
0,74000
0,02900
78,00000
6,00000
0,06000
1,50000
15,52000
1,94000
1,47000
2,00000
2,00000
1,00000
1,00000

5,37
5,05
4,07
4,77
3,82
4,64
3,82
80,46
0,35
0,37
1,04
61,17
0,22
0,16
11,95
1,68
43,56
21,60
465,15
21,74
63,57
12,24
504,03

7,57500
6,10500
1,09710
0,87860
26,63360
23,79860
18,02304
7,91350
14,07110
0,65520
1,46808
17,16000
0,96000
0,71700
0,84000
676,05120
34,77600
502,36200
21,74000
63,57000
12,24000
471,90000
183,87000

1.776,47
4,56450
7,57500
6,10500
1,09710
0,87860
26,63360
23,79860
16,57476
7,91350
14,07110
0,65520
1,46808
17,16000
0,96000
0,71700
0,84000
170,75520
34,77600
502,36200
21,74000
63,57000
12,24000
237,77000
183,87000

3.623,27
5,37000
15,15000
12,21000
1,28790
1,03140
32,52640
25,82320
22,52880
9,60750
15,72500
0,76960
1,77393
17,16000
0,96000
0,71700
2,52000
676,05120
41,90400
683,77050
43,48000
127,14000
12,24000
504,03000
Pgina: 49

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

6.60.71
MISTURADOR P/PIA 1/4 VOLTA TIPO PARED CROMADO 1/2"
6.60.73
TORNEIRA MEC/CER 1/4 VOLTA TIPO PARED CROMADO 1/2"
SubMO
Mo-de-Obra 93,39890
LS
113,94666
05.05.095
CC-05 CUBA INOX (50X40X25CM) TORNEIRA DE MESA
1.01.06
AZULEJISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.67.77
BUCHA TIPO S-8 (CENTO)
2.80.70
TRAVA QUIMICA
3.10.55
FIXACAO (FERRO TRABALHADO)
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.50.36
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
6.40.45
VALVULA AMERICANA P/PIA 3 1/2'
6.45.13
SIFAO METALICO TIPO COPO DN 1 1/2X2"
6.55.16
SABONETEIRA LOUCA BRANCA 7.5X15CM
6.56.20
CUBA SIMPLES ACO INOX 304 CH.20 500X400X250MM
6.60.74
TORNEIRA MEC/CER 1/4 VOLTA TIPO MESA CROMADO 1/2"
Mo-de-Obra 70,65240
LS
86,19593
SubMO
05.05.099
COMPONENTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

05.06.010
BI-02 BRISE EM ALETAS DE CHAPA METALICA L=0,40M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.68.10
BUCHA PLASTICA TIPO S-10 (CENTO)
3.05.10
BRISE METALICO-VAO 1,80M-4 ALETAS MET CH 14-L=40CM
Mo-de-Obra 1,26900
LS
1,54818
SubMO

Custo Unit.

Custo Total

207,34556

UN
1,00000
UN
1,00000
Material
2.738,40753

394,16
394,16000
183,87
183,87000
BDI
677,52321

156,84833

UN
H
0,85000
H
1,50000
H
1,50000
H
0,23000
H
0,23000
H
5,74000
H
6,23000
M3
0,20600
KG
22,61000
KG
38,03000
KG
0,63000
M3
0,02400
UN
78,00000
UN
6,00000
UN
0,06000
GR
0,50000
KG
15,52000
M2
1,61000
M2
1,08000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
1.820,51884

5,37
5,05
4,07
4,77
3,82
4,64
3,82
80,46
0,35
0,37
1,04
61,17
0,22
0,16
11,95
1,68
43,56
21,60
465,15
21,74
63,57
12,24
237,77
211,65
BDI
454,79445

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

2,81718

M
H
0,15000
H
0,15000
UN
1,11110
UN
0,01110
UN
0,13890
Material
158,44852

198,35
4,64
0,69600
3,82
0,57300
0,16
0,17778
2,48
0,02753
1.139,26
158,24321
BDI
37,09111

2.432,16
4,56450
7,57500
6,10500
1,09710
0,87860
26,63360
23,79860
16,57476
7,91350
14,07110
0,65520
1,46808
17,16000
0,96000
0,71700
0,84000
676,05120
34,77600
502,36200
21,74000
63,57000
12,24000
237,77000
211,65000

05.06.022
REVESTIM INT DE ARMARIOS EMBUT-C/COMPENSADO CEDRO DE E=6MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.35.43
CHAPA COMPENSADA CEDRO E=6MM
2.67.60
PREGO
Mo-de-Obra 8,56000
LS
10,44320
SubMO
19,00320

M2
H
1,00000
H
1,00000
M
2,00000
M2
1,10000
KG
0,10000
Material
28,18700

BDI

05.06.051
CHAPA DE POLICARBONATO (LEXAN/POLYHARD) ESP=3MM
3.30.35
CHAPA POLICARBONATO E=3MM (LEXAN/POLYHARD) C/FIX
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,10000
Material
473,93500

582,94
430,85
473,93500
BDI
109,00505

05.06.052
CHAPA DE POLICARBONATO COMPACTA E=4MM
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
3.30.36
CHAPA DE POLICARBONATO COMPACTA E=4MM
Mo-de-Obra 24,46740
LS
29,85023
SubMO

54,31763

M2
H
1,97000
H
1,97000
M2
1,10000
Material
140,33800

239,42
8,08
15,91760
4,34
8,54980
127,58
140,33800
BDI
44,77079

54,31763

M2
H
1,97000
H
1,97000
M2
1,10000
Material
39,80900

4,75080

UN
H
0,25000
H
0,25000
UN
2,00000
CJ
4,00000
UN
1,00000
Material
27,49000

05.06.053
CHAPA DE POLICARBONATO ALVEOLAR E=6MM
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
3.30.37
CHAPA DE POLICARBONATO ALVEOLAR E=6MM
Mo-de-Obra 24,46740
LS
29,85023
SubMO
05.06.061
RP-02 REFORCO DE FECHADURAS PARA PORTAS (RP-02)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
2.68.41
PARAFUSO SEXT 5/16X1 3/4" C/ PORCA E ARRUELA PRES
3.15.60
REFORCO DE FECHADURA PARA PORTA (RP-02)
SubMO
Mo-de-Obra 2,14000
LS
2,61080
Exerccio:

2011

4,60
3,96
2,09
21,40
4,67
10,85375

BDI

8,08
4,34
36,19
21,64912

BDI

4,60
3,96
0,06
0,31
26,13
7,41538

58,04
4,60000
3,96000
4,18000
23,54000
0,46700

115,77
15,91760
8,54980
39,80900

39,65
1,15000
0,99000
0,12000
1,24000
26,13000

Pgina: 50

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
05.06.099
COMPONENTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

Descrio

LS

0,00000

UN Coeficiente

SubMO

0,00000

MV
MV
1,00000
Material
244,82000

Custo Unit.

Custo Total

301,12
244,82
244,82000
BDI
56,30860

05.50.015
DE QUADRO NEGRO TIPO GREEMBOARD INCLUINDO ENTARUGAMENTO
1.01.46
SERVENTE
Mo-de-Obra 1,14600
LS
1,39812
SubMO
2,54412

M2
H
0,30000
Material
0,00000

BDI

05.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

5,10600

UN
H
0,50000
Material
0,00000

22,53744

UN
H
1,20000
H
1,20000
Material
0,00000

LS

0,00000

05.60.001
DE FOLHAS DE PORTAS OU JANELAS
1.01.11
CARPINTEIRO
Mo-de-Obra 2,30000
LS
2,80600
05.60.005
DE BATENTES DE ESQUADRIAS DE MADEIRA
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 10,15200
LS
12,38544
05.60.010
DE GUARNICAO OU MOLDURAS
1.01.11
CARPINTEIRO
Mo-de-Obra 0,32200
LS
0,39284
05.60.017
DE PORTA GIZ, INCLUSIVE SUPORTES
1.01.11
CARPINTEIRO
Mo-de-Obra 1,84000
LS
2,24480
05.60.050
DE FECHADURAS DE EMBUTIR
1.01.11
CARPINTEIRO
Mo-de-Obra 2,30000
LS
2,80600

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

05.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

LS

1,12240

0,00000

05.70.001
DE FOLHAS DE PORTA OU JANELA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 18,83200
LS
22,97504
05.70.005
DE BATENTES DE ESQUADRIAS DE MADEIRA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
Mo-de-Obra 10,99800
LS
13,41756
05.70.010
DE GUARNICAO OU MOLDURAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 0,42800
LS
0,52216

SubMO

SubMO

SubMO

SubMO

SubMO

05.70.013
DE PORTA-GIZ, INCLUINDO SUPORTES
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
Mo-de-Obra 4,28000
LS
5,22160
SubMO
05.70.015
DE FECHADURAS DE EMBUTIR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 13,61040
LS
16,60469

Exerccio:

2011

SubMO

3,12
1,14600

6,28
2,30000

BDI

4,60
1,17438

BDI

4,64
3,82
5,18361

BDI

4,60
0,16441

BDI

4,60
0,93950

BDI

4,60
1,17438

BDI

4,60
0,46975

2,04240

UN
H
0,20000
Material
0,00000

BDI

4,60
0,46975

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

41,80704

UN
H
2,20000
H
2,20000
Material
0,00000

24,41556

UN
H
1,30000
H
1,30000
KG
0,20000
Material
0,93400

Material

M
H
0,07000
0,00000

4,08480

Material

M
H
0,40000
0,00000

5,10600

UN
H
0,50000
Material
0,00000

0,71484

05.60.055
DE CREMONA FECHO DE ALAVANCA DE EMBUTIR,TARJETAS E FECHAD SOBREPOR
UN
1.01.11
CARPINTEIRO
H
0,20000
Mo-de-Obra 0,92000
LS
1,12240
SubMO
2,04240
Material
0,00000
05.60.060
DE DOBRADICAS
1.01.11
CARPINTEIRO
Mo-de-Obra 0,92000

3,82
0,58515

M
H
0,05000
H
0,05000
0,00000

0,95016

Material

9,50160

M
H
H
CJ
UN
Material
0,62280

30,21509

UN
H
1,59000
H
1,59000
Material
0,00000

BDI

4,60
3,96
9,61562

BDI

4,64
3,82
4,67
5,83040

BDI

4,60
3,96
0,21854

BDI

4,60
3,96
0,14
11,95
2,32861

BDI

4,60
3,96
6,94947

0,50000
0,50000
2,40000
0,02400

27,72
5,56800
4,58400

0,87
0,32200

5,02
1,84000

6,28
2,30000

2,51
0,92000

2,51
0,92000

51,42
10,12000
8,71200

31,17
6,03200
4,96600
0,93400

1,16
0,23000
0,19800

12,45
2,30000
1,98000
0,33600
0,28680

37,16
7,31400
6,29640

Pgina: 51

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

DE CREMONA,FECHOS DE ALAVANCA EMBUTIR,TARJETAS E FECHADURAS


SOBREPOR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 11,04240
LS
13,47173
SubMO
24,51413

05.70.016

Custo Unit.

Custo Total

UN

30,15

BDI

4,60
3,96
5,63825

3,23054

UN
H
0,17000
H
0,17000
Material
0,00000

BDI

4,60
3,96
0,74303

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

24,70416

M2
H
1,30000
H
1,30000
UN
0,60000
Material
50,13000

BDI

05.80.002
PORTA MADEIRA COMPENS LISA COM VISOR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.72
PORTA MADEIRA COMPENS LISA P/PINT C/VISOR 82X210CM G1-C1
Mo-de-Obra 11,12800
LS
13,57616
SubMO
24,70416

M2
H
1,30000
H
1,30000
UN
0,60000
Material
185,25000

258,24
4,60
5,98000
3,96
5,14800
308,75
185,25000
BDI
48,28946

05.80.003
PORTA MADEIRA ALMOFADADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.73
PORTA MADEIRA ALMOFADADA 82X210CM G1-C1
Mo-de-Obra 11,12800
LS
13,57616
SubMO

24,70416

M2
H
1,30000
H
1,30000
UN
0,60000
Material
123,39600

182,16
4,60
5,98000
3,96
5,14800
205,66
123,39600
BDI
34,06304

24,70416

M2
H
1,30000
H
1,30000
FL
0,60000
Material
173,59200

243,90
4,60
5,98000
3,96
5,14800
289,32
173,59200
BDI
45,60812

14,63246

M2
H
0,77000
H
0,77000
UN
1,00000
Material
289,56000

374,15
4,60
3,54200
3,96
3,04920
289,56
289,56000
BDI
69,96427

19,00320

M2
H
1,00000
H
1,00000
UN
1,00000
Material
191,08000

258,40
4,60
4,60000
3,96
3,96000
191,08
191,08000
BDI
48,31914

12,16205

M2
H
0,64000
H
0,64000
M2
1,00000
Material
105,56000

144,79
4,60
2,94400
3,96
2,53440
105,56
105,56000
BDI
27,07607

19,00320

M2
H
1,00000
H
1,00000
M2
1,00000
Material
48,52000

05.80.020
BATENTE DE MADEIRA PARA PORTAS DE 1 FL SEM BANDEIRA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
SubMO
24,41556
Mo-de-Obra 10,99800
LS
13,41756

CJ
H
1,30000
H
1,30000
KG
0,20000
UN
1,00000
Material
69,49400

05.70.017
DE DOBRADICAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 1,45520
LS

1,77534

SubMO

05.70.099
RECOLOCACAO DE ELEM DE MADEIRA/COMPONENTES
6.96.02
MODULO DE VERBA
SubMO
Mo-de-Obra 0,00000
LS
0,00000
05.80.001
PORTA MADEIRA COMPENS LISA P/ PINTURA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.02.23
PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1
Mo-de-Obra 11,12800
LS
13,57616
SubMO

05.80.004
PORTA MADEIRA MACHO-FEMEA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.69
PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1
Mo-de-Obra 11,12800
LS
13,57616
SubMO
05.80.005
PORTA TIPO VENEZIANA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.79
PORTA VENEZIANA MADEIRA 82X210CM G1-C1
Mo-de-Obra 6,59120
LS
8,04126

SubMO

05.80.006
FOLHA DE PORTA LISA DE 22 MM PARA ARMARIOS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.80
FOLHA PORTA MADEIRA LISA P/ARMARIO 22MM G1-C1
Mo-de-Obra 8,56000
LS
10,44320
SubMO
05.80.011
JANELA MADEIRA GUILHOTINA: FOLHA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.06
JANELA MADEIRA GUILHOTINA: FOLHA G1-C1
Mo-de-Obra 5,47840
LS
6,68365

SubMO

05.80.015
BANDEIRA P/ PORTA MADEIRA COMPENS LISA P/ PINTURA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.03.08
BANDEIRA P/ PORTA SARRAF SEMI OCA LISA P/ PINT G1-C1
Mo-de-Obra 8,56000
LS
10,44320
SubMO

05.80.021
1.01.39
1.01.46
2.67.60
Exerccio:

BATENTE DE MADEIRA PARA PORTAS DE 1 FOLHA COM BANDEIRA


PEDREIRO
SERVENTE
PREGO

2011

H
H
Material

1,29000
1,29000
0,00000

CJ
H
H
KG

1,30000
1,30000
0,27000

4,60
3,96
83,55
17,21186

BDI

4,60
3,96
48,52
15,53034

BDI

4,64
3,82
4,67
68,56
21,59920

4,64
3,82
4,67

5,93400
5,10840

3,97
0,78200
0,67320

92,04
5,98000
5,14800
50,13000

83,05
4,60000
3,96000
48,52000

115,50
6,03200
4,96600
0,93400
68,56000

115,91
6,03200
4,96600
1,26090
Pgina: 52

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

3.01.35
BATENTE MADEIRA 3,5X14CM VAO 50 A 90X210CM G1-C1
SubMO
Mo-de-Obra 10,99800
LS
13,41756

24,41556

Material

UN
1,00000
69,82090

Custo Unit.
BDI

Custo Total

68,56
21,67439

68,56000

05.80.022
BATENTE DE MADEIRA PARA PORTA DE 2 FLS SEM BANDEIRA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.37
BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1
Mo-de-Obra 16,92000
LS
20,64240
SubMO
37,56240

CJ
H
2,00000
H
2,00000
KG
0,30000
UN
1,00000
Material
107,42100

178,32
4,64
9,28000
3,82
7,64000
4,67
1,40100
106,02
106,02000
BDI
33,34618

05.80.023
BATENTE DE MADEIRA PARA PORTAS DE 2 FLS COM BANDEIRA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.37
BATENTE MADEIRA 3,5X14CM VAO 122X210CM G1-C1
Mo-de-Obra 16,92000
LS
20,64240
SubMO
37,56240

CJ
H
2,00000
H
2,00000
KG
0,39000
UN
1,00000
Material
107,84130

178,84
4,64
9,28000
3,82
7,64000
4,67
1,82130
106,02
106,02000
BDI
33,44285

05.80.025
BATENTE DE MADEIRA PARA PORTAS DE BOX SANITARIO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.01.36
BATENTE MADEIRA 3,5X3,5CM VAO 60X210CM G1-C1
Mo-de-Obra 10,99800
LS
13,41756
SubMO

24,41556

CJ
H
1,30000
H
1,30000
UN
1,00000
Material
66,02000

13,14684

Material

M
H
0,70000
H
0,70000
M
1,00000
22,58000

7,88810

M
H
0,42000
H
0,42000
KG
0,04000
M
1,00000
Material
13,35680

05.80.030
BATENTE METALICO - PERFIL CHAPA 14 DOBRADA 57X30X42 MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
Mo-de-Obra 2,53800
LS
3,09636
SubMO
5,63436

Material

M
H
0,30000
H
0,30000
M
1,00000
27,38000

Material

M
H
0,30000
H
0,30000
M
1,00000
27,38000

5,63436

Material

M
H
0,30000
H
0,30000
M
1,00000
34,59000

5,70096

CJ
H
0,30000
H
0,30000
UN
0,50000
Material
6,09500

10,83182

CJ
H
0,57000
H
0,57000
UN
0,50000
Material
6,09500

05.80.026
BATENTE DE MADEIRA PARA ARMARIO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.01.33
BATENTE MADEIRA 3,5X3,5CM P/ARMARIO G1-C1
Mo-de-Obra 5,92200
LS
7,22484
SubMO
05.80.028
BATENTE DE MADEIRA PARA JANELAS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.01.39
BATENTE MADEIRA PARA JANELA G1-C1
Mo-de-Obra 3,55320
LS
4,33490

SubMO

05.80.033
BATENTE METALICO EM PERFIL CHAPA 16 ZINC DOBRADA 57X30X42 MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
Mo-de-Obra 2,53800
LS
3,09636
SubMO
5,63436
05.80.034
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
SubMO
Mo-de-Obra 2,53800
LS
3,09636
05.80.035
GUARNICAO DE 5 CM PARA PORTA DE 1 FOLHA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.50
GUARNICAO 5CM - CEDRINHO
Mo-de-Obra 2,56800
LS
3,13296

SubMO

05.80.036
GUARNICAO DE 5 CM PARA PORTA DE 2 FOLHAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.50
GUARNICAO 5CM - CEDRINHO
Mo-de-Obra 4,87920
LS
5,95262
SubMO
05.80.037
GUARNICAO MADEIRA DE 5,0CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.52
GUARNICAO PEROBA 5CM
Mo-de-Obra 0,85600
LS
1,04432
05.80.038
1.01.11
Exerccio:

GUARNICAO MADEIRA DE 7,0CM


CARPINTEIRO

2011

SubMO

1,90032

Material

M
H
0,10000
H
0,10000
M
1,10000
3,30000
M
H

0,10000

BDI

4,64
3,82
66,02
20,80018

BDI

4,64
3,82
22,58
8,21717

BDI

4,64
3,82
4,67
13,17
4,88633

BDI

4,64
3,82
27,38
7,59330

BDI

4,64
3,82
27,38
7,59330

BDI

4,64
3,82
34,59
9,25160

BDI

4,60
3,96
12,19
2,71307

BDI

4,60
3,96
12,19
3,89317

BDI

4,60
3,96
3,00
1,19607

4,60

111,23
6,03200
4,96600
66,02000

43,94
3,24800
2,67400
22,58000

26,13
1,94880
1,60440
0,18680
13,17000

40,60
1,39200
1,14600
27,38000

40,60
1,39200
1,14600
27,38000

49,47
1,39200
1,14600
34,59000

14,50
1,38000
1,18800
6,09500

20,81
2,62200
2,25720
6,09500

6,39
0,46000
0,39600
3,30000

12,91
0,46000
Pgina: 53

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.12
AJUDANTE DE CARPINTEIRO
3.01.55
GUARNICAO PEROBA 7,0CM
Mo-de-Obra 0,85600
LS

1,04432

05.80.039
GUARNICAO MADEIRA DE 10,0CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.53
GUARNICAO PEROBA 10CM
Mo-de-Obra 0,85600
LS
1,04432
05.80.040
GUARNICAO MADEIRA DE 15,0CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.54
GUARNICAO PEROBA 15CM
Mo-de-Obra 0,85600
LS
1,04432

UN Coeficiente

SubMO

SubMO

SubMO

05.80.041
PORTA GIZ, INCLUSIVE SUPORTES
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.66.78
FERRO CANTONEIRA 1X1X1/8'
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
3.12.72
PORTA GIZ EM CEDRINHO ENCERADO
Mo-de-Obra 4,28000
LS
5,22160
SubMO
05.80.042
LG-01 LOUSA QUADRICULADA L=4.61M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.29
CHAPA COMPENSADA VIROLINHA E=10MM
2.11.22
SARRAFO CEDRINHO APARELHADO 5X2,5CM
2.11.24
SARRAFO EM CEDRINHO APAR. 2X5CM - ABAULADO
2.66.78
FERRO CANTONEIRA 1X1X1/8'
2.67.20
PARAFUSO P/ MADEIRA 3,2X40MM
2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
3.12.72
PORTA GIZ EM CEDRINHO ENCERADO
3.40.51
CHAPA LAMINADO GREENBOARD QUADRIC (5X5CM) E=1MM
3.90.75
COLA PARA CHAPAS MELAMINICAS
Mo-de-Obra 64,20000
LS
78,32400
SubMO
05.80.043
CHAPA GREENBOARD DE 1,3 MM DE ESPESSURA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.40.50
CHAPA LAMINADO GREENBOARD E=1,3MM
3.90.75
COLA PARA CHAPAS MELAMINICAS
Mo-de-Obra 6,84800
LS
8,35456
SubMO
05.80.044
LG-02 LOUSA QUADRICULADA L=2.55M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.29
CHAPA COMPENSADA VIROLINHA E=10MM
2.11.22
SARRAFO CEDRINHO APARELHADO 5X2,5CM
2.11.24
SARRAFO EM CEDRINHO APAR. 2X5CM - ABAULADO
2.66.78
FERRO CANTONEIRA 1X1X1/8'
2.67.20
PARAFUSO P/ MADEIRA 3,2X40MM
2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
3.12.72
PORTA GIZ EM CEDRINHO ENCERADO
3.40.51
CHAPA LAMINADO GREENBOARD QUADRIC (5X5CM) E=1MM
3.90.75
COLA PARA CHAPAS MELAMINICAS
Mo-de-Obra 24,99520
LS
30,49414
SubMO
05.80.045
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.10.14
2.11.24
2.65.97
Exerccio:

LG-03 LOUSA EM ARGAMASSA L=4.61M


PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
SARRAFO PINHO APARELHADO 5X2,5 CM
SARRAFO EM CEDRINHO APAR. 2X5CM - ABAULADO
PARAFUSO P/ MADEIRA 3,2X20MM - CABECA REDONDA

2011

Material

H
0,10000
M
1,10000
8,60200

Material

M
H
0,10000
H
0,10000
M
1,10000
5,44500

1,90032

Material

M
H
0,10000
H
0,10000
M
1,10000
10,72500

9,50160

M
H
0,50000
H
0,50000
KG
0,35800
CJ
2,40000
UN
0,02400
M
1,00000
Material
65,86940

142,52400

UN
H
7,50000
H
7,50000
M2
5,50000
M
20,00000
M
7,10000
KG
6,00000
UN
52,00000
CJ
31,00000
KG
1,10000
UN
0,31000
M
4,61000
M2
5,50000
KG
0,78300
Material
675,85244

15,20256

M2
H
0,80000
H
0,80000
M2
1,00000
KG
0,90000
Material
42,36200

55,48934

UN
H
2,92000
H
2,92000
M2
3,17000
M
8,80000
M
5,03000
KG
3,60000
UN
30,00000
CJ
15,00000
KG
0,63000
UN
0,15000
M
2,50000
M2
3,17000
KG
0,46000
Material
373,44900

1,90032

1,90032

UN
H
H
H
H
M3
KG
KG
M
M
UN

7,32000
3,66000
3,10000
9,29000
0,13510
26,91000
25,90000
11,80000
11,80000
12,00000

Custo Unit.

Custo Total

BDI

3,96
7,82
2,41553

BDI

4,60
3,96
4,95
1,68942

BDI

4,60
3,96
9,75
2,90382

BDI

4,60
3,96
2,70
0,14
11,95
64,28
17,33533

BDI

4,60
3,96
14,21
2,80
2,43
2,70
0,03
0,28
4,67
11,95
64,28
32,70
16,58
188,22658

BDI

4,60
3,96
27,44
16,58
13,23985

BDI

527,59
4,60
13,43200
3,96
11,56320
14,21
45,04570
2,80
24,64000
2,43
12,22290
2,70
9,72000
0,03
0,90000
0,28
4,20000
4,67
2,94210
11,95
1,79250
64,28
160,70000
32,70
103,65900
16,58
7,62680
98,65582

4,64
4,74
3,80
3,82
80,46
0,35
0,37
2,09
2,43
0,02

0,39600
8,60200

9,03
0,46000
0,39600
5,44500

15,52
0,46000
0,39600
10,72500

92,70
2,30000
1,98000
0,96660
0,33600
0,28680
64,28000

1.006,60
34,50000
29,70000
78,15500
56,00000
17,25300
16,20000
1,56000
8,68000
5,13700
3,70450
296,33080
179,85000
12,98214

70,80
3,68000
3,16800
27,44000
14,92200

838,21
33,96480
17,34840
11,78000
35,48780
10,87015
9,41850
9,58300
24,66200
28,67400
0,24000
Pgina: 54

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.66.78
FERRO CANTONEIRA 1X1X1/8'
2.67.20
PARAFUSO P/ MADEIRA 3,2X40MM
2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
2.67.77
BUCHA TIPO S-8 (CENTO)
3.12.72
PORTA GIZ EM CEDRINHO ENCERADO
3.75.30
TINTA ESMALTE SINTETICO VERDE ESCOLAR
3.80.16
MASSA PARA MADEIRA
3.80.39
LIXA PARA MADEIRA
3.80.57
PREPERADOR LIQUIDO BASE DE OLEO
Mo-de-Obra 98,58100
LS
120,26882
05.80.046
ALCAPAO DE MADEIRA
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.90
ALCAPAO MADEIRA,REQUADRO 60X60CM
Mo-de-Obra 23,51880
LS
28,69294

UN Coeficiente

SubMO

SubMO

05.80.047
QUADRO NEGRO EM MASSA - COMPLETO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.65.97
PARAFUSO P/ MADEIRA 3,2X20MM - CABECA REDONDA
2.66.78
FERRO CANTONEIRA 1X1X1/8'
2.67.20
PARAFUSO P/ MADEIRA 3,2X40MM
2.67.77
BUCHA TIPO S-8 (CENTO)
3.12.72
PORTA GIZ EM CEDRINHO ENCERADO
3.61.06
CORDAO MEIA CANA 1X1 CM
3.80.16
MASSA PARA MADEIRA
3.80.34
TINTA A OLEO
3.80.40
LIXA D"AGUA
3.80.57
PREPERADOR LIQUIDO BASE DE OLEO
Mo-de-Obra 21,70440
LS
26,47937
SubMO

218,84982

KG
6,00000
UN
12,00000
CJ
10,00000
UN
0,12000
M
4,61000
L
1,13000
L
3,38000
UN
2,82000
L
1,13000
Material
462,62835

52,21174

M2
H
2,78000
H
2,78000
UN
2,78000
Material
102,38740

48,18377

M2
H
0,75000
H
0,75000
H
0,90000
H
1,00000
H
0,55000
H
1,12000
M3
0,02000
KG
5,11000
KG
3,39000
UN
2,00000
KG
1,00000
UN
2,00000
UN
0,02000
M
0,80000
M
1,20000
L
0,50000
L
0,20000
UN
0,25000
L
0,20000
Material
72,97300

05.80.048
FP-01 FAIXA DE PROTEO EM MDF
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.46
SERVENTE
2.67.35
PARAFUSO P/ MADEIRA 6,1 X 65 MM
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
3.01.58
FP-01 TABUA MDF REV LAMINADO,CANTO ARRED(290X15MM)
3.80.39
LIXA PARA MADEIRA
3.80.51
SELADORA PARA MADEIRA
Mo-de-Obra 2,64000
LS
3,22080
SubMO
5,86080

M
H
0,20000
H
0,20000
H
0,20000
UN
3,70000
UN
0,03700
M
1,00000
UN
0,20000
L
0,05000
Material
35,49938

05.80.049
FP-02 FAIXA DE EXPOSIO EM MDF
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.46
SERVENTE
2.10.50
SARRAFO DE PINHO APARELHADO 2,5 X 7,5 CM
2.67.35
PARAFUSO P/ MADEIRA 6,1 X 65 MM
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
3.01.59
FP-02 TABUA MDF REV LAMINADO,CANTOS ARRED(90X15MM)
3.80.39
LIXA PARA MADEIRA
3.80.50
VERNIZ SINTETICO BRILHANTE
3.80.51
SELADORA PARA MADEIRA
Mo-de-Obra 4,43400
LS
5,40948
SubMO
9,84348

M
H
0,30000
H
0,40000
H
0,30000
M
2,00000
UN
3,70000
UN
0,03700
M
2,00000
UN
0,50000
L
0,30000
L
0,10000
Material
49,71538

05.80.070
FECHADURA COMPLETA, CILINDRICA DE EMBUTIR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 13,61040
LS
16,60469
SubMO
30,21509

Material

05.80.071
FECHADURA COMPLETA, TIPO GORGE DE EMBUTIR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.72
FECHAD GORGES COMPL (FECHAD.ROSETA ENTRADA MACAN)
SubMO
30,21509
Mo-de-Obra 13,61040
LS
16,60469

JG
H
1,59000
H
1,59000
UN
1,00000
Material
46,84000

Exerccio:

2011

JG
H
1,59000
H
1,59000
CJ
1,00000
101,95000

Custo Unit.

Custo Total

BDI

2,70
0,03
0,28
11,95
64,28
13,36
9,80
0,35
11,37
156,73998

16,20000
0,36000
2,80000
1,43400
296,33080
15,09680
33,12400
0,98700
12,84810

BDI

190,15
4,64
12,89920
3,82
10,61960
36,83
102,38740
35,55780

BDI

4,60
3,96
4,64
4,74
3,80
3,82
80,46
0,35
0,37
0,02
2,70
0,03
11,95
64,28
3,87
9,80
9,30
0,72
11,37
27,86606

BDI

4,64
4,74
3,82
0,10
0,74
34,29
0,35
14,84
9,51284

BDI

4,64
4,74
3,82
4,00
0,10
0,74
18,10
0,35
11,53
14,84
13,69854

149,02
3,45000
2,97000
4,17600
4,74000
2,09000
4,27840
1,60920
1,78850
1,25430
0,04000
2,70000
0,06000
0,23900
51,42400
4,64400
4,90000
1,86000
0,18000
2,27400

50,87
0,92800
0,94800
0,76400
0,37000
0,02738
34,29000
0,07000
0,74200

73,25
1,39200
1,89600
1,14600
8,00000
0,37000
0,02738
36,20000
0,17500
3,45900
1,48400

162,56
4,60
7,31400
3,96
6,29640
101,95
101,95000
BDI
30,39797

BDI

4,60
3,96
46,84
17,72267

94,77
7,31400
6,29640
46,84000

Pgina: 55

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

05.80.072
FECHADURA COMPL TIPO TARGETA DE SOBREPOR C/VISOR "LIVRE-OCUPADO"
JG
1.01.11
CARPINTEIRO
H
1,29000
1.01.12
AJUDANTE DE CARPINTEIRO
H
1,29000
3.17.15
TARGETA DE SOBREPOR LIVRE-OCUP
UN
1,00000
Mo-de-Obra 11,04240
LS
13,47173
Material
34,54000
SubMO
24,51413
05.80.073
FECHADURA DE SOBREPOR CILINDRICA PARA PORTOES
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
3.15.88
FECHADURA DE SOBREPOR CILINDRICA PARA PORTOES
Mo-de-Obra 16,14600
LS
19,69812
SubMO

35,84412

UN
H
1,30000
H
1,30000
UN
1,00000
Material
51,82000

05.80.080
DOBRADICA DE 3 1/2" X 3" CROMADO, COM EIXO E BOLA DE LATAO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
Mo-de-Obra 2,14000
LS
2,61080
SubMO
4,75080

UN
H
0,25000
H
0,25000
UN
1,00000
Material
7,28000

05.80.081
DOBRADICA DE 3 1/2" X 3" EM ACO LAMINADO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.52
DOBRADICA DE FERRO POL PINO E BOLAS FERRO 3 1/2X3"
Mo-de-Obra 2,14000
LS
2,61080
SubMO

UN
H
0,25000
H
0,25000
UN
1,00000
Material
3,15000

4,75080

05.80.082
DOBRADICA FERRO CROMADO COM PINO E BOLAS DE FERRO 3" X 2 1/2"
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.44
DOBRADICA DE ACO CROMADO C/ PINOS BOLAS 3"X2 1/2"
Mo-de-Obra 2,14000
LS
2,61080
SubMO
4,75080

UN
H
0,25000
H
0,25000
UN
1,00000
Material
6,57000

05.80.083
DOBRADICA DE 3" X 2 1/2" EM ACO LAMINADO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.44
DOBRADICA DE ACO CROMADO C/ PINOS BOLAS 3"X2 1/2"
Mo-de-Obra 2,14000
LS
2,61080
SubMO

4,75080

UN
H
0,25000
H
0,25000
UN
1,00000
Material
6,57000

7,60128

JG
H
0,40000
H
0,40000
UN
1,00000
Material
87,21000

7,60128

Material

M
H
0,40000
H
0,40000
M
1,00000
10,63000

4,75080

PR
H
0,25000
H
0,25000
UN
1,00000
Material
4,26000

5,70096

UN
H
0,30000
H
0,30000
UN
1,00000
Material
5,61000

5,70096

UN
H
0,30000
H
0,30000
UN
1,00000
Material
34,62000

5,70096

UN
H
0,30000
H
0,30000
UN
1,00000
Material
83,26000

05.80.086
CREMONA COMPLETO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.30
CREMONA C/VARETA DE FERRO P/PINTURA
Mo-de-Obra 3,42400
LS
4,17728
05.80.087
VARETA PARA CREMONA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.94
VARETA P/CREMONA
Mo-de-Obra 3,42400
LS

4,17728

05.80.090
BORBOLETA PARA JANELAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.10
BORBOLETA DE ZAMACK P/ JANELA
Mo-de-Obra 2,14000
LS
2,61080

SubMO

SubMO

SubMO

05.80.091
FECHO TIPO UNHO DE EMBUTIR DE 10 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.88
FECHO UNHO 10 CM DE EMBUTIR - ACO CROMADO
Mo-de-Obra 2,56800
LS
3,13296
SubMO
05.80.092
FECHO TIPO UNHO DE EMBUTIR DE 22 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.89
FECHO UNHO 22CM DE EMBUTIR - LATAO CROMADO
Mo-de-Obra 2,56800
LS
3,13296
SubMO
05.80.093
FECHO TIPO UNHO DE EMBUTIR DE 40 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.90
FECHO UNHO 40 CM DE EMBUTIR - LATAO CROMADO
SubMO
Mo-de-Obra 2,56800
LS
3,13296
05.80.094

Exerccio:

DOBRADICA FERRO CROM C/ PINO BOLAS ANEIS FERRO 3 1/2"X3"

2011

UN

Custo Unit.

Custo Total

BDI

4,60
3,96
34,54
13,58245

BDI

8,08
4,34
51,82
20,16275

BDI

4,60
3,96
7,28
2,76708

BDI

4,60
3,96
3,15
1,81718

BDI

4,60
3,96
6,57
2,60378

BDI

4,60
3,96
6,57
2,60378

BDI

4,60
3,96
87,21
21,80659

BDI

4,60
3,96
10,63
4,19319

BDI

4,60
3,96
4,26
2,07248

BDI

4,60
3,96
5,61
2,60152

BDI

4,60
3,96
34,62
9,27382

BDI

4,60
3,96
83,26
20,46102

72,63
5,93400
5,10840
34,54000

107,82
10,50400
5,64200
51,82000

14,79
1,15000
0,99000
7,28000

9,71
1,15000
0,99000
3,15000

13,92
1,15000
0,99000
6,57000

13,92
1,15000
0,99000
6,57000

116,61
1,84000
1,58400
87,21000

22,42
1,84000
1,58400
10,63000

11,08
1,15000
0,99000
4,26000

13,91
1,38000
1,18800
5,61000

49,59
1,38000
1,18800
34,62000

109,42
1,38000
1,18800
83,26000

12,92

Pgina: 56

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
SubMO
Mo-de-Obra 1,45520
LS
1,77534

UN Coeficiente

Custo Unit.

Custo Total

H
0,17000
H
0,17000
UN
1,00000
Material
7,28000

BDI

05.80.095
FECHADURA CILINDRICA COMPLETO (FECHAD ROSETA MACAN)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 13,61040
LS
16,60469
SubMO
30,21509

UN
H
1,59000
H
1,59000
CJ
1,00000
Material
101,95000

162,56
4,60
7,31400
3,96
6,29640
101,95
101,95000
BDI
30,39797

05.80.099
SERVICOS DE ELEMENTOS DE MADEIRA/COMPONENTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

3,23054

0,00000

4,60
3,96
7,28
2,41743

0,78200
0,67320
7,28000

05.81.001
PORTA MADEIRA COMPENS LISA P/ VERNIZ 72X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.02.19
PORTA MADEIRA COMPENS LISA P/ VERNIZ 72X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO
43,70736

UN
H
2,30000
H
2,30000
UN
1,00000
Material
77,80000

05.81.002
PORTA MADEIRA COMPENS LISA P/ VERNIZ 82X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.02.17
PORTA MADEIRA COMPENS LISA P/ VERNIZ 82X210CM G1-C1
SubMO
43,70736
Mo-de-Obra 19,68800
LS
24,01936

UN
H
2,30000
H
2,30000
UN
1,00000
Material
77,80000

05.81.003
PORTA MADEIRA COMPENS LISA P/ VERNIZ 92X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.02.18
PORTA MADEIRA COMPENS LISA P/ VERNIZ 92X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO
43,70736

UN
H
2,30000
H
2,30000
UN
1,00000
Material
84,79000

05.81.005
PORTA MADEIRA COMPENS LISA P/ PINTURA 72X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.02.22
PORTA SARRAF SEMI OCA LISA P/ PINT 72X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO

43,70736

UN
H
2,30000
H
2,30000
UN
1,00000
Material
83,55000

43,70736

UN
H
2,30000
H
2,30000
UN
1,00000
Material
83,55000

43,70736

UN
H
2,30000
H
2,30000
UN
1,00000
Material
91,26000

43,70736

UN
H
2,30000
H
2,30000
FL
1,00000
Material
289,32000

409,62
4,60
10,58000
3,96
9,10800
289,32
289,32000
BDI
76,59629

43,70736

UN
H
2,30000
H
2,30000
FL
1,00000
Material
289,32000

409,62
4,60
10,58000
3,96
9,10800
289,32
289,32000
BDI
76,59629

43,70736

UN
H
2,30000
H
2,30000
FL
1,00000
Material
290,43000

410,98
4,60
10,58000
3,96
9,10800
290,43
290,43000
BDI
76,85159

05.81.006
PORTA MADEIRA COMPENS LISA P/ PINTURA 82X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.02.23
PORTA SARRAF SEMI OCA LISA P/ PINT 82X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO
05.81.007
PORTA COMPENS LISA MADEIRA P/ PINTURA 92X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.02.24
PORTA SARRAF SEMI OCA LISA P/ PINT 92X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO
05.81.025
PORTA MADEIRA MACHO-FEMEA 72X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.67
PORTA MADEIRA MACHO-FEMEA 72X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO
05.81.026
PORTA MADEIRA MACHO-FEMEA 82X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.69
PORTA MADEIRA MACHO FEMEA 82X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO
05.81.027
PORTA MADEIRA MACHO-FEMEA 92X210CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.01.68
PORTA MADEIRA MACHO FEMEA 92X210CM G1-C1
Mo-de-Obra 19,68800
LS
24,01936
SubMO
05.81.032
1.01.11
1.01.12
3.03.38
3.16.47
Exerccio:

PORTA DE ARMARIO SOB PIA TIPO VENEZIANA - DE ABRIR


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PORTA VENEZIANA MADEIRA P/ PIA G1-C1
DOBRADICA 2 1/2' X 2' LATAO CROMADO

2011

M2
H
H
M2
UN

2,00000
2,00000
1,00000
4,00000

BDI

4,60
3,96
77,80
27,94669

BDI

4,60
3,96
77,80
27,94669

BDI

4,60
3,96
84,79
29,55439

BDI

4,60
3,96
83,55
29,26919

BDI

4,60
3,96
83,55
29,26919

BDI

4,60
3,96
91,26
31,04249

4,60
3,96
320,24
11,73

149,45
10,58000
9,10800
77,80000

149,45
10,58000
9,10800
77,80000

158,05
10,58000
9,10800
84,79000

156,52
10,58000
9,10800
83,55000

156,52
10,58000
9,10800
83,55000

166,00
10,58000
9,10800
91,26000

510,48
9,20000
7,92000
320,24000
46,92000
Pgina: 57

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.17.45
PUXADOR TIPO BOTAO CONVEXO 30 MM - ZAMACK
3.17.58
FECHO DE PRESSAO ESFERA LATAO CROMADO 12 MM
SubMO
Mo-de-Obra 17,12000
LS
20,88640

UN Coeficiente

Custo Unit.

Custo Total

38,00640

UN
2,00000
UN
4,00000
Material
377,02000

BDI

05.81.033
PORTA DE ARMARIO SOB PIA TIPO VENEZIANA - DE CORRER
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.03.38
PORTA VENEZIANA MADEIRA P/ PIA G1-C1
3.15.98
ROLDANA EM ZAMACK E NYLON (RODIZIO NAPOLEAO) 6 MM
3.17.18
TRILHO ALUMUMINIO - 6 MM
3.17.47
PUXADOR TIPO CONCHA 40 X 100 MM - LATAO LAMINADO
Mo-de-Obra 17,12000
LS
20,88640
SubMO
38,00640

M2
H
2,00000
H
2,00000
M2
1,00000
UN
2,00000
M
1,00000
UN
2,00000
Material
353,12000

481,08
4,60
9,20000
3,96
7,92000
320,24
320,24000
7,57
15,14000
2,64
2,64000
7,55
15,10000
BDI
89,95907

05.81.034
PORTA DE ARMARIO SOB PIA REVEST LAMINADO FENOL-MELAMINICO - DE ABRIR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.03.36
PORTA P/ PIA REVEST LAM FENOL-MEL
3.16.47
DOBRADICA 2 1/2' X 2' LATAO CROMADO
3.17.45
PUXADOR TIPO BOTAO CONVEXO 30 MM - ZAMACK
3.17.58
FECHO DE PRESSAO ESFERA LATAO CROMADO 12 MM
Mo-de-Obra 17,12000
LS
20,88640
Material
SubMO
38,00640

0,51
2,21
95,45607

1,02000
8,84000

M2
H
2,00000
H
2,00000
M2
1,00000
UN
4,00000
UN
2,00000
UN
4,00000
307,44000

424,89
4,60
9,20000
3,96
7,92000
250,66
250,66000
11,73
46,92000
0,51
1,02000
2,21
8,84000
BDI
79,45267

05.81.035
PORTA DE ARMARIO SOB PIA REVEST LAMINADO FENOL-MELAMINICO - DE CORRER
M2
1.01.11
CARPINTEIRO
H
2,00000
1.01.12
AJUDANTE DE CARPINTEIRO
H
2,00000
3.03.36
PORTA P/ PIA REVEST LAM FENOL-MEL
M2
1,00000
3.15.98
ROLDANA EM ZAMACK E NYLON (RODIZIO NAPOLEAO) 6 MM
UN
2,00000
3.17.18
TRILHO ALUMUMINIO - 6 MM
M
1,00000
3.17.47
PUXADOR TIPO CONCHA 40 X 100 MM - LATAO LAMINADO
UN
2,00000
SubMO
38,00640
Mo-de-Obra 17,12000
LS
20,88640
Material
283,54000

395,50
4,60
9,20000
3,96
7,92000
250,66
250,66000
7,57
15,14000
2,64
2,64000
7,55
15,10000
BDI
73,95567

05.81.047
FECHADURAS E FECHOS PARA PORTAS INT WC - TARGETA LATAO LIVRE-OCUPADO
CJ
1.01.11
CARPINTEIRO
H
0,90000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,90000
3.17.15
TARGETA DE SOBREPOR LIVRE-OCUP
UN
1,00000
Mo-de-Obra 7,70400
LS
9,39888
SubMO
17,10288
Material
34,54000
05.81.048
ESPELHOS RET 200 X 50 MM PESO MINIMO 170 G
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
6.57.22
ESPELHO RET 200X50MM PESO MINIMO 170G
Mo-de-Obra 2,14000
LS
2,61080
SubMO

BDI

4,60
3,96
34,54
11,87786

BDI

4,60
3,96
32,00
8,45268

4,60
3,96
34,62
9,71089

63,52
4,14000
3,56400
34,54000

4,75080

PR
H
0,25000
H
0,25000
PR
1,00000
Material
32,00000

7,60128

UN
H
0,40000
H
0,40000
UN
1,00000
Material
34,62000

BDI

05.81.055
JM-01 JANELA VENEZIANA
1.01.11
CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.67.10
JM-01 GRAPA PARA FIXACAO
3.01.07
JANELA MADEIRA GUILHOTINA C/VENEZ 120X120CM (JM-01) G1-C1
3.01.57
GUARNICAO IMBUIA P/ JANELA 120X120CM (JM-01)
3.17.22
CARRANCA EM LATAO FUNDIDO
Mo-de-Obra 14,29840
LS
17,44405
SubMO
31,74245

UN
H
0,46000
H
1,44000
H
1,44000
M3
0,00700
KG
1,14000
KG
0,86000
UN
2,00000
CJ
1,00000
CJ
1,00000
UN
2,00000
Material
367,87042

491,52
4,60
2,11600
4,64
6,68160
3,82
5,50080
80,46
0,56322
0,35
0,39900
0,37
0,31820
2,30
4,60000
304,13
304,13000
16,74
16,74000
20,56
41,12000
BDI
91,91096

05.81.056
CHAPA LAMINADO MELAMINICO ACAB TEXTURIZADO E=1MM
1.01.48
MARCENEIRO
1.01.59
AJUDANTE MARCENEIRO
3.55.80
CHAPA LAMINADO MELAMINICO ACAB TEXTURIZADO E=1MM
3.90.75
COLA PARA CHAPAS MELAMINICAS
Mo-de-Obra 8,96000
LS
10,93120
SubMO
19,89120

M2
H
0,80000
H
0,80000
M2
1,00000
KG
0,30000
Material
23,72400

05.81.053
FECHOS DE EMBUTIR DE ALAVANCA DE 22 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.16.89
FECHO UNHO 22CM DE EMBUTIR - LATAO CROMADO
Mo-de-Obra 3,42400
LS
4,17728
SubMO

05.81.057
1.01.11
1.01.12
1.01.39
1.01.46
Exerccio:

JANELAS DE MADEIRA TIPO GUILHOTINA - COM VENEZIANAS


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE

2011

M2
H
H
H
H

2,88000
2,88000
1,28000
1,28000

BDI

7,14
4,06
18,75
16,58
10,03150

4,60
3,96
4,64
3,82

45,20
1,15000
0,99000
32,00000

51,93
1,84000
1,58400
34,62000

53,64
5,71200
3,24800
18,75000
4,97400

389,77
13,24800
11,40480
5,93920
4,88960
Pgina: 58

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.60
PREGO
3.02.30
JANELA MADEIRA GUILHOTINA C/ VENEZIANA G1-C1
3.17.22
CARRANCA EM LATAO FUNDIDO
SubMO
Mo-de-Obra 35,48160
LS
43,28755

UN Coeficiente

Custo Unit.

Custo Total

KG
0,13000
M2
1,00000
UN
1,28000
Material
238,12390

4,67
0,60710
211,20
211,20000
20,56
26,31680
BDI
72,88540

05.81.060
FERRAGEM PORTAS EXTERNAS 1 FOLHA - COM DOBRAD DE FERRO POLIDO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.15.16
MACANETA ALAVANCA MACICA CROMADA BORDAS ARREDOND
3.16.52
DOBRADICA DE FERRO POL PINO E BOLAS FERRO 3 1/2X3"
3.17.51
FECHADURA EMBUTIR CIL. DIAM. 3 CM
6.57.22
ESPELHO RET 200X50MM PESO MINIMO 170G
Mo-de-Obra 17,97600
LS
21,93072
SubMO
39,90672

CJ
H
2,10000
H
2,10000
PR
1,00000
UN
3,00000
UN
1,00000
PR
1,00000
Material
171,05000

259,47
4,60
9,66000
3,96
8,31600
15,56
15,56000
3,15
9,45000
114,04
114,04000
32,00
32,00000
BDI
48,52005

05.81.065
FERRAGEM PORTINHOLAS ARMARIO SOB PIA - COM 2 FOLHAS DE CORRER
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.15.98
ROLDANA EM ZAMACK E NYLON (RODIZIO NAPOLEAO) 6 MM
3.17.18
TRILHO ALUMUMINIO - 6 MM
3.17.47
PUXADOR TIPO CONCHA 40 X 100 MM - LATAO LAMINADO
Mo-de-Obra 12,84000
LS
15,66480
SubMO
28,50480

CJ
H
1,50000
H
1,50000
UN
2,00000
M
1,00000
UN
2,00000
Material
32,88000

05.81.070
CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 25 MM
1.01.11
CARPINTEIRO
3.17.23
CADEADO LATAO CIL. TRAVA DUPLA 25 MM
SubMO
0,51060
Mo-de-Obra 0,23000
LS
0,28060

UN
H
0,05000
UN
1,00000
Material
9,75000

05.81.071
CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 35 MM
1.01.11
CARPINTEIRO
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
Mo-de-Obra 0,23000
LS
0,28060
SubMO
0,51060

UN
H
0,05000
UN
1,00000
Material
14,61000

05.81.072
CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 45 MM
1.01.11
CARPINTEIRO
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
Mo-de-Obra 0,23000
LS
0,28060
SubMO
0,51060

UN
H
0,05000
UN
1,00000
Material
19,32000

05.81.073
CADEADO DE LATAO COM CILINDRO - TRAVA DUPLA DE 50 MM
1.01.11
CARPINTEIRO
3.17.28
CADEADO LATAO CIL. TRAVA DUPLA 50 MM
Mo-de-Obra 0,23000
LS
0,28060
SubMO
0,51060

UN
H
0,05000
UN
1,00000
Material
23,26000

05.81.076
CADEADO DE LATAO C/ CILINDRO-TRAVA DUPLA DE 30MM - PESO MIN 110G
1.01.11
CARPINTEIRO
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
Mo-de-Obra 0,23000
LS
0,28060
SubMO
0,51060

UN
H
0,05000
UN
1,00000
Material
11,20000

05.81.080
PORTA CADEADO EM FERRO PINTADO - DE 60MM - PESO MIN 25G
1.01.11
CARPINTEIRO
3.16.12
PORTA CADEADO 63 MM - ACO ZINCADO
Mo-de-Obra 1,38000
LS
1,68360
SubMO
3,06360

UN
H
0,30000
UN
1,00000
Material
1,34000

05.81.081
PORTA CADEADO EM FERRO PINTADO - DE 90MM - PESO MIN 115G
1.01.11
CARPINTEIRO
3.16.16
PORTA CADEADO 89 MM - ACO ZINCADO
Mo-de-Obra 1,38000
LS
1,68360
SubMO
3,06360

UN
H
0,30000
UN
1,00000
Material
3,94000

05.81.082
PORTA CADEADO EM FERRO PINTADO - DE 110MM - PESO MIN 135G
1.01.11
CARPINTEIRO
3.16.15
PORTA CADEADO 114 MM - ACO ZINCADO
Mo-de-Obra 1,38000
LS
1,68360
SubMO
3,06360
05.81.099
RECOLOCACOES DE ELEM DE MADEIRA/COMPONENTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
05.82.001
1.01.06
1.01.11
1.01.12
1.01.21
1.01.22
1.01.28
1.01.39
Exerccio:

78,76915

0,00000

BL-01 BANCADA LATERAL PARA LABORATORIO (PARTE CIVIL)


AZULEJISTA
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
LADRILHISTA
PEDREIRO

2011

75,50
6,90000
5,94000
15,14000
2,64000
15,10000

BDI

4,60
3,96
7,57
2,64
7,55
14,11850

BDI

4,60
9,75
2,35994

BDI

4,60
14,61
3,47774

BDI

4,60
19,32
4,56104

BDI

4,60
23,26
5,46724

BDI

4,60
11,20
2,69344

BDI

4,60
1,34
1,01283

BDI

4,60
3,94
1,61083

UN
H
0,30000
UN
1,00000
Material
4,47000

BDI

4,60
4,47
1,73273

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M
H
H
H
H
H
H
H

1,27000
1,43000
1,43000
0,25000
0,25000
1,05000
1,82000

5,37
4,60
3,96
4,77
3,82
5,09
4,64

12,62
0,23000
9,75000

18,59
0,23000
14,61000

24,39
0,23000
19,32000

29,23
0,23000
23,26000

14,40
0,23000
11,20000

5,41
1,38000
1,34000

8,61
1,38000
3,94000

9,26
1,38000
4,47000

244,18
6,81990
6,57800
5,66280
1,19250
0,95500
5,34450
8,44480
Pgina: 59

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.45.30
LADRILHO CERAMICO 7.5X15CM VERMELHO
3.60.35
RODAPE CERAMICO VERMELHO 7.5X1 5CM
Mo-de-Obra 50,88870
LS
62,08421

UN Coeficiente

SubMO

112,97291

H
4,16000
M3
0,05700
KG
5,56000
KG
20,63000
KG
1,87000
M3
0,03000
M2
0,07000
M2
0,24000
KG
2,89000
UN
49,00000
M2
0,70000
M2
1,03000
M
0,31000
Material
85,55422

05.82.002
BL-02 BANCADA LATERAL PARA LABORATORIO (PARTE CIVIL EXCETO PORTAS)
1.01.06
AZULEJISTA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.45.30
LADRILHO CERAMICO 7.5X15CM VERMELHO
3.60.35
RODAPE CERAMICO VERMELHO 7.5X1 5CM
Mo-de-Obra 55,17190
LS
67,30972
Material
SubMO
122,48162

M
H
1,05000
H
1,80000
H
1,80000
H
0,34000
H
0,34000
H
1,38000
H
1,91000
H
4,01000
M3
0,10400
KG
7,56000
KG
25,10000
KG
0,15000
M3
0,04000
M2
0,30000
M2
0,09000
KG
0,18000
UN
61,00000
KG
0,68000
KG
3,89000
M2
0,66000
M2
0,55000
M
1,03000
97,62714

Custo Unit.

Custo Total

BDI

3,82
80,46
0,35
0,37
1,04
62,03
17,18
11,40
2,70
0,22
21,60
28,29
2,59
45,66124

BDI

5,37
4,60
3,96
4,77
3,82
5,09
4,64
3,82
80,46
0,35
0,37
1,04
62,03
17,18
11,40
2,70
0,22
4,67
4,87
21,60
28,29
2,59
50,62501

15,89120
4,58622
1,94600
7,63310
1,94480
1,86090
1,20260
2,73600
7,80300
10,78000
15,12000
29,13870
0,80290

270,73
5,63850
8,28000
7,12800
1,62180
1,29880
7,02420
8,86240
15,31820
8,36784
2,64600
9,28700
0,15600
2,48120
5,15400
1,02600
0,48600
13,42000
3,17560
18,94430
14,25600
15,55950
2,66770

05.82.008
BS-03 BANCADA LIVRE COZINHA - GRANITO (PARTE CIVIL EXCETO PORTAS)
1.01.06
AZULEJISTA
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.25.15
TIJOLO COMUM MACICO
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.45.30
LADRILHO CERAMICO 7.5X15CM VERMELHO
3.50.38
GRANITO CINZA ANDORINHA E=3CM
3.60.35
RODAPE CERAMICO VERMELHO 7.5X1 5CM
Mo-de-Obra 48,22350
LS
58,83267
SubMO
107,05617

M
H
2,34000
H
1,13000
H
2,51000
H
4,78000
M3
0,08400
KG
10,86000
KG
11,68000
KG
0,29000
UN
70,00000
M2
1,28000
M2
1,03000
M2
1,05000
M
0,37000
Material
406,13134

5,37
5,09
4,64
3,82
80,46
0,35
0,37
1,04
0,22
21,60
28,29
302,67
2,59
BDI
118,03313

05.82.010
TAMPO DE PIA EM GRANITO E=2CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.50.39
GRANITO CINZA ANDORINHA E=2CM
Mo-de-Obra 2,53800
LS
3,09636

5,63436

M
H
0,30000
H
0,30000
M3
0,02000
KG
0,80000
M2
0,65000
Material
172,02970

218,52
4,64
1,39200
3,82
1,14600
80,46
1,60920
0,37
0,29600
261,73
170,12450
BDI
40,86273

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

9,39060

UN
H
0,50000
H
0,50000
UN
1,00000
Material
205,92000

264,83
4,64
2,32000
3,82
1,91000
205,92
205,92000
BDI
49,52144

SubMO

05.82.099
SERVICOS DE ELEMENTOS DE MADEIRA/COMPONENTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
06.01.001
EF-01 ESQUADRIA DE FERRO 90X60CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.18
EF-01 ESQUADRIA DE FERRO 90X60CM
Mo-de-Obra 4,23000
LS
5,16060
06.01.002
Exerccio:

EF-02 ESQUADRIA DE FERRO 90X120CM

2011

SubMO

UN

631,22
12,56580
5,75170
11,64640
18,25960
6,75864
3,80100
4,32160
0,30160
15,40000
27,64800
29,13870
317,80350
0,95830

476,27
Pgina: 60

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.19
EF-02 ESQUADRIA DE FERRO 90X120CM
Mo-de-Obra 8,03700
LS
9,80514

UN Coeficiente

Custo Unit.

Custo Total

17,84214

H
0,95000
H
0,95000
UN
1,00000
Material
369,37000

4,64
4,40800
3,82
3,62900
369,37
369,37000
BDI
89,05879

22,53744

UN
H
1,20000
H
1,20000
UN
1,00000
Material
459,32000

592,68
4,64
5,56800
3,82
4,58400
459,32
459,32000
BDI
110,82721

20,65932

UN
H
1,10000
H
1,10000
UN
1,00000
Material
379,84000

492,61
4,64
5,10400
3,82
4,20200
379,84
379,84000
BDI
92,11484

39,44052

UN
H
2,10000
H
2,10000
UN
1,00000
Material
744,65000

964,43
4,64
9,74400
3,82
8,02200
744,65
744,65000
BDI
180,34082

48,83112

UN
H
2,60000
H
2,60000
UN
1,00000
Material
934,60000

1.209,62
4,64
12,06400
3,82
9,93200
934,60
934,60000
BDI
226,18916

15,21277

UN
H
0,81000
H
0,81000
UN
1,00000
Material
289,55000

374,85
4,64
3,75840
3,82
3,09420
289,55
289,55000
BDI
70,09544

30,42554

UN
H
1,62000
H
1,62000
UN
1,00000
Material
558,14000

723,93
4,64
7,51680
3,82
6,18840
558,14
558,14000
BDI
135,37008

06.01.015
EF-15 ESQUADRIA DE FERRO / VENTILACAO CRUZADA H=30 A 45CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.60
EF-15 ESQUADRIA DE FERRO / VENT. CRUZ. L=180CM
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120

M2
H
1,00000
H
1,00000
M2
1,00000
Material
254,30000

335,88
4,64
4,64000
3,82
3,82000
254,30
254,30000
BDI
62,80868

06.01.016
EF-16 ESQUADRIA DE FERRO FIXA L=90CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.88
EF-16 ESQUADRIA DE FERRO FIXA L=90CM
Mo-de-Obra 42,30000
LS
51,60600

93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
Material
763,19000

1.054,22
4,64
23,20000
3,82
19,10000
763,19
763,19000
BDI
197,13208

93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
Material
1.467,70000

1.920,77
4,64
23,20000
3,82
19,10000
1.467,70
1.467,70000
BDI
359,16938

06.01.019
EF-18 ESQUADRIA DE FERRO / VENTILACAO PERMANENTE L=90X60CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.67
EF-18 ESQUADRIA DE FERRO / VENT. PERM. 90X60CM
Mo-de-Obra 4,23000
LS
5,16060
SubMO
9,39060

UN
H
0,50000
H
0,50000
UN
1,00000
Material
175,27000

227,13
4,64
2,32000
3,82
1,91000
175,27
175,27000
BDI
42,47194

06.01.020
EF-19 ESQUADRIA DE FERRO VENTILACAO PERMANENTE L=180X60CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.68
EF-19 ESQUADRIA DE FERRO / VENT. PERM. 180X60CM
SubMO
20,65932
Mo-de-Obra 9,30600
LS
11,35332

UN
H
1,10000
H
1,10000
UN
1,00000
Material
350,53000

456,56
4,64
5,10400
3,82
4,20200
350,53
350,53000
BDI
85,37354

06.01.003
EF-03 ESQUADRIA DE FERRO 90X150CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.55
EF-03 ESQUADRIA DE FERRO 90X150CM
Mo-de-Obra 10,15200
LS
12,38544
06.01.004
EF-04 ESQUADRIA DE FERRO 180X60CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.11
EF-04 ESQUADRIA DE FERRO 180X60CM
Mo-de-Obra 9,30600
LS
11,35332
06.01.005
EF-05 ESQUADRIA DE FERRO 180X120CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.12
EF-05 ESQUADRIA DE FERRO 180X120CM
Mo-de-Obra 17,76600
LS
21,67452
06.01.006
EF-06 ESQUADRIA DE FERRO 180X150CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.13
EF-06 ESQUADRIA DE FERRO180X150CM
Mo-de-Obra 21,99600
LS
26,83512
06.01.013
EF-13 ESQUADRIA DE FERRO 90X90CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.71
EF-13 ESQUADRIA DE FERRO 90X90CM
Mo-de-Obra 6,85260
LS
8,36017
06.01.014
EF-14 ESQUADRIA DE FERRO 180X90CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.70
EF-14 ESQUADRIA DE FERRO 180X90CM
Mo-de-Obra 13,70520
LS
16,72034

06.01.017
EF-17 ESQUADRIA DE FERRO FIXA L=180CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.89
EF-17 ESQUADRIA DE FERRO FIXA L=180CM
Mo-de-Obra 42,30000
LS
51,60600

06.01.022
1.01.39
1.01.46
Exerccio:

EF-20 ESQUADRIA DE FERRO 180X180CM


PEDREIRO
SERVENTE

2011

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

UN
H
H

3,10000
3,10000

4,64
3,82

1.388,57
14,38400
11,84200
Pgina: 61

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.12.20
EF-20 ESQUADRIA DE FERRO 180X180CM
Mo-de-Obra 26,22600
LS
31,99572

UN Coeficiente

Custo Unit.

Custo Total

58,22172

Material

UN
1,00000
1.070,70000

1.070,70
1.070,70000
BDI
259,65200

72,30762

UN
H
3,85000
H
3,85000
UN
1,00000
Material
1.254,73000

1.632,25
4,64
17,86400
3,82
14,70700
1.254,73
1.254,73000
BDI
305,21865

93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
Material
882,64000

1.201,15
4,64
23,20000
3,82
19,10000
882,64
882,64000
BDI
224,60558

18,78120

M2
H
1,00000
H
1,00000
M2
1,00000
Material
324,65000

422,42
4,64
4,64000
3,82
3,82000
324,65
324,65000
BDI
78,98918

18,78120

M2
H
1,00000
H
1,00000
M2
1,00000
Material
240,63000

319,07
4,64
4,64000
3,82
3,82000
240,63
240,63000
BDI
59,66458

06.01.027
CAIXILHOS DE FERRO -FIXO COM VENTILACAO PERMANENTE
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.46
CAIXILHO DE FERRO FIXO C/VENT PERMANENTE
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120

M2
H
1,00000
H
1,00000
M2
1,00000
Material
324,57000

422,32
4,64
4,64000
3,82
3,82000
324,57
324,57000
BDI
78,97078

06.01.028
EF-23 ESQUADRIA DE FERRO COM BASCULANTE L=180CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.84
EF-23 ESQUADRIA DE FERRO C/BASCULANTE L=180CM
Mo-de-Obra 42,30000
LS
51,60600
SubMO

93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
Material
1.750,18000

2.268,22
4,64
23,20000
3,82
19,10000
1.750,18
1.750,18000
BDI
424,13978

06.01.040
EF-24 ESQ FERRO VENEZIANA DA CAIXA DO ELEVADOR (0.80X0.40M)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.23
EF-24 ESQ. FERRO VENEZ. P/ ELEVADOR (0.80X0.40M)
Mo-de-Obra 9,30600
LS
11,35332
SubMO
20,65932

UN
H
1,10000
H
1,10000
UN
1,00000
Material
117,60000

170,05
4,64
5,10400
3,82
4,20200
117,60
117,60000
BDI
31,79964

06.01.041
EF-25 ESQ DE FERRO VENTILACAO CRUZADA (H=60 A 80CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.61
EF-25 ESQ FERRO /VENTILACAO CRUZADA (H=60 A 80CM)
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120

M2
H
1,00000
H
1,00000
M2
1,00000
Material
202,60000

272,29
4,64
4,64000
3,82
3,82000
202,60
202,60000
BDI
50,91768

06.01.042
EF-26 ESQ DE FERRO VENTILACAO CRUZADA (180X65CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.62
EF-26 ESQ FERRO / VENTILACAO CRUZADA (180X65CM)
Mo-de-Obra 9,30600
LS
11,35332
SubMO

20,65932

UN
H
1,10000
H
1,10000
UN
1,00000
Material
256,00000

340,29
4,64
5,10400
3,82
4,20200
256,00
256,00000
BDI
63,63164

20,65932

UN
H
1,10000
H
1,10000
UN
1,00000
Material
268,00000

355,05
4,64
5,10400
3,82
4,20200
268,00
268,00000
BDI
66,39164

39,44052

UN
H
2,10000
H
2,10000
UN
1,00000
Material
619,42000

810,39
4,64
9,74400
3,82
8,02200
619,42
619,42000
BDI
151,53792

06.01.023
EF-21 ESQUADRIA DE FERRO 180X210CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.27
EF-21 ESQUADRIA DE FERRO 180X210CM
Mo-de-Obra 32,57100
LS
39,73662

SubMO

SubMO

06.01.024
EF-22 ESQUADRIA DE FERRO COM BASCULANTE L=90CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.83
EF-22 ESQUADRIA DE FERRO C/BASCULANTE L=90CM
Mo-de-Obra 42,30000
LS
51,60600
SubMO
06.01.025
CAIXILHOS DE FERRO -BASCULANTES
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.44
CAIXILHO DE FERRO BASCULANTE
Mo-de-Obra 8,46000
LS
10,32120
06.01.026
CAIXILHOS DE FERRO -FIXOS
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.45
CAIXILHO DE FERRO FIXO
Mo-de-Obra 8,46000
LS

10,32120

SubMO

SubMO

06.01.043
EF-27 ESQ DE FERRO VENTILACAO CRUZADA (180X75CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.63
EF-27 ESQ FERRO / VENTILACAO CRUZADA (180X75CM)
Mo-de-Obra 9,30600
LS
11,35332
SubMO
06.01.049
EV-01 ESQUADRIA VENEZIANA DE ACO (1,20X2,00 M)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.59
EV-01 / ESQUADRIA VENEZIANA DE ACO (1,20X2,00M)
Mo-de-Obra 17,76600
LS
21,67452
SubMO
06.01.062
1.01.39
1.01.46
3.11.21

Exerccio:

EA-13 JANELA DE ALUMINIO - 1,80 X 1,50 M


PEDREIRO
SERVENTE
(EA-13) JANELA DE ALUMINIO

2011

UN
H
H
UN

2,60000
2,60000
1,00000

4,64
3,82
1.130,01

1.449,97
12,06400
9,93200
1.130,01000

Pgina: 62

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 21,99600

Descrio
LS

26,83512

UN Coeficiente
Material

39,44052

UN
H
2,10000
H
2,10000
UN
1,00000
Material
887,24000

1.139,81
4,64
9,74400
3,82
8,02200
887,24
887,24000
BDI
213,13652

20,65932

UN
H
1,10000
H
1,10000
UN
1,00000
Material
484,85000

621,77
4,64
5,10400
3,82
4,20200
484,85
484,85000
BDI
116,26714

15,21277

UN
H
0,81000
H
0,81000
UN
1,00000
Material
346,03000

444,32
4,64
3,75840
3,82
3,09420
346,03
346,03000
BDI
83,08584

30,42554

UN
H
1,62000
H
1,62000
UN
1,00000
Material
702,23000

901,16
4,64
7,51680
3,82
6,18840
702,23
702,23000
BDI
168,51078

06.01.067
EA-18 JANELA DE ALUMINIO (VENTILACAO CRUZADA) L= 180 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.34
EA-18 / JANELA DE ALUMINIO VENTILACAO CRUZADA
Mo-de-Obra 12,69000
LS
15,48180
SubMO
28,17180

M2
H
1,50000
H
1,50000
M2
1,00000
Material
427,11000

559,99
4,64
6,96000
3,82
5,73000
427,11
427,11000
BDI
104,71481

06.01.072
CAIXILHOS DE ALUMINIO -BASCULANTES
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.53
CAIXILHO ALUMINIO BASCULANTES
Mo-de-Obra 12,69000
LS
15,48180

28,17180

M2
H
1,50000
H
1,50000
M2
1,00000
Material
440,04000

575,90
4,64
6,96000
3,82
5,73000
440,04
440,04000
BDI
107,68871

28,17180

M2
H
1,50000
H
1,50000
M2
1,00000
Material
415,65000

545,90
4,64
6,96000
3,82
5,73000
415,65
415,65000
BDI
102,07901

06.01.064
EA-15 JANELA DE ALUMINIO - 1,80 X 0,60 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.20
(EA-15) JANELA DE ALUMINIO
Mo-de-Obra 9,30600
LS
11,35332
06.01.065
EA-16 JANELA DE ALUMINIO (0,90X0,90M)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.22
EA-16 JANELA DE ALUMINIO 0.90X0.90M
Mo-de-Obra 6,85260
LS
8,36017
06.01.066
EA - 17 JANELA DE ALUMINIO (1,80 X0,90 M)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.23
EA-17 JANELA DE ALUMINIO 1.80X0.90M
Mo-de-Obra 13,70520
LS
16,72034

06.01.075
CAIXILHOS DE ALUMINIO -FIXO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.55
CAIXILHO ALUMINIO FIXO
Mo-de-Obra 12,69000
LS
15,48180

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

1.130,01000

BDI

Custo Total

48,83112

06.01.063
EA-14 JANELA DE ALUMINIO - 1,80 X 1,20 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.19
(EA-14) JANELA DE ALUMINIO
Mo-de-Obra 17,76600
LS
21,67452

SubMO

Custo Unit.

271,13346

06.01.080
VENEZIANA INDUSTRIAL -ALETAS PVC MONTANTES ACO GALVANIZADO REF 100
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.92
VENEZIANA IND.ALETAS PVC MONT ACO GALV (REF 100)
M2
1,00000
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120
Material
96,03000

BDI

06.01.081
VENEZIANA INDUSTRIAL-ALETAS FIBRA DE VIDRO MONTANTES ACO GALV REF 100
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.93
VENEZIANA IND.ALETAS FIBRA VIDRO MONT GALV REF 100
M2
1,00000
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120
Material
128,67000

181,36
4,64
4,64000
3,82
3,82000
128,67
128,67000
BDI
33,91378

06.01.082
VENEZIANA INDUSTRIAL-ALETAS PVC MONTANTES ACO PRE-PINTADO REF 100
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.94
VENEZIANA IND.ALETAS PVC MONT ACO PRE-PINT REF 100
M2
1,00000
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120
Material
116,27000

166,11
4,64
4,64000
3,82
3,82000
116,27
116,27000
BDI
31,06178

06.01.083
VENEZIANA INDUSTRIAL-ALETAS FIBRA VIDRO MONTANTES ACO PRE-PINT REF 100
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.95
VENEZIANA IND.ALETAS FIBRA VIDRO MONT ACO PRE R100
M2
1,00000
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120
Material
156,64000

215,76
4,64
4,64000
3,82
3,82000
156,64
156,64000
BDI
40,34688

06.01.084
VENEZIANA INDUSTRIAL-ALETAS PVC MONTANTE ALUMINIO ANODIZADO REF 100
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.96
VENEZIANA IND.ALETAS PVC MONT ALUM ANOD (REF 100)
M2
1,00000
SubMO
18,78120
Mo-de-Obra 8,46000
LS
10,32120
Material
145,24000

201,74
4,64
4,64000
3,82
3,82000
145,24
145,24000
BDI
37,72488

Exerccio:

2011

4,64
3,82
96,03
26,40658

141,21
4,64000
3,82000
96,03000

Pgina: 63

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

06.01.085
VENEZIANA INDUSTRIAL-ALETAS FIBRA VIDRO MONTANTES ALUM ANODIZ REF 100
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.97
VENEZIANA IND.ALETAS FIBRA VIDRO MONT ALUM REF 100
M2
1,00000
Mo-de-Obra 8,46000
LS
10,32120
Material
155,08000
SubMO
18,78120

213,84
4,64
4,64000
3,82
3,82000
155,08
155,08000
BDI
39,98808

06.01.086
VENEZIANA INDUSTRIAL-ALETAS PVC/MONTANTES ACO GALVANIZADO/REF.50
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.98
VENEZIANA IND.ALETAS PVC MONT ACO GALV(REF 50)
M2
1,00000
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120
Material
132,08000

185,55
4,64
4,64000
3,82
3,82000
132,08
132,08000
BDI
34,69808

06.01.087
VENEZIANA INDUSTRIAL-ALETAS PVC/MONTANTES ALUM. ANODIZADO/REF.50
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,00000
3.10.99
VENEZIANA IND.ALETAS PVC MONT ALUM ANOD (REF 50)
M2
1,00000
Mo-de-Obra 8,46000
LS
10,32120
Material
166,44000
SubMO
18,78120

227,82
4,64
4,64000
3,82
3,82000
166,44
166,44000
BDI
42,60088

06.01.099
SERVICOS EM ELEMENTOS METALICOS/COMPONENTES
6.96.02
MODULO DE VERBA
SubMO
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

84,51540

UN
H
4,50000
H
4,50000
M3
0,01800
KG
8,70000
M3
0,01940
UN
1,00000
UN
1,00000
UN
1,00000
Material
964,93066

4,64
3,82
80,46
0,37
62,03
434,83
518,14
6,09
BDI
241,37259

06.02.010
PF-11 PORTA/JANELA DE FERRO 180X260CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.28
PF-11 PORTA/JANELA DE FERRO 180X260CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.94
TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 50,76000
LS
61,92720
SubMO
112,68720

UN
H
6,00000
H
6,00000
UN
1,00000
M
7,00000
UN
6,00000
UN
2,00000
UN
2,00000
CJ
1,00000
Material
2.505,64000

3.220,54
4,64
27,84000
3,82
22,92000
2.127,71
2.127,71000
27,38
191,66000
7,28
43,68000
4,33
8,66000
15,99
31,98000
101,95
101,95000
BDI
602,21526

06.02.013
PF-20 PORTA DE FERRO COM BANDEIRA L=180CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.68
PF-20 PORTA DE FERRO COM BANDEIRA L=180CM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.94
TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
SubMO
112,68720
Mo-de-Obra 50,76000
LS
61,92720

UN
H
6,00000
H
6,00000
UN
1,00000
UN
6,00000
UN
2,00000
UN
2,00000
CJ
1,00000
Material
2.095,25000

2.715,76
4,64
27,84000
3,82
22,92000
1.908,98
1.908,98000
7,28
43,68000
4,33
8,66000
15,99
31,98000
101,95
101,95000
BDI
507,82556

06.02.015
PF-15 PORTA EM CHAPA DE FERRO (L=82 CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.13.62
PF-15 / PORTA EM CHAPA DE FERRO - L=82 CM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

UN
H
5,00000
H
5,00000
M
5,02000
UN
1,00000
UN
3,00000
CJ
1,00000
Material
923,34760

4,64
3,82
27,38
662,11
7,28
101,95
BDI
233,96833

06.02.016
PF-16 PORTA EM CHAPA DE FERRO (L=92 CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.13.63
PF-16 / PORTA EM CHAPA DE FERRO - L=92 CM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 42,30000
SubMO
93,90600
LS
51,60600

UN
H
5,00000
H
5,00000
M
5,12000
UN
1,00000
UN
3,00000
CJ
1,00000
Material
1.006,87560

4,64
3,82
27,38
742,90
7,28
101,95
BDI
253,17977

06.02.001
PC-01 PORTA CORTA-FOGO P90 L=90CM COMPLETA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
3.13.02
PORTA CORTA-FOGO CLASSE P90 L=90CM
3.15.45
BP-01 BARRA ANTIPANICO SIMPLES
3.87.40
ADESIVO PARA PORTA CORTA FOGO (APERTE E EMPURRE)
Mo-de-Obra 38,07000
LS
46,44540
SubMO

06.02.017
1.01.39
Exerccio:

PF-17 PORTA EM CHAPA DE FERRO L=102CM


PEDREIRO

2011

UN
H

5,00000

4,64

1.290,81
20,88000
17,19000
1,44828
3,21900
1,20338
434,83000
518,14000
6,09000

1.251,22
23,20000
19,10000
137,44760
662,11000
21,84000
101,95000

1.353,96
23,20000
19,10000
140,18560
742,90000
21,84000
101,95000

1.475,26
23,20000
Pgina: 64

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

1.01.46
SERVENTE
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.13.64
PF-17 / PORTA EM CHAPA DE FERRO - L=102 CM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
SubMO
93,90600
Mo-de-Obra 42,30000
LS
51,60600

H
5,00000
M
5,22000
UN
1,00000
UN
3,00000
CJ
1,00000
Material
1.105,49360

3,82
27,38
838,78
7,28
101,95
BDI
275,86191

06.02.019
PF-19 PORTA DE FERRO P/ RESERVATORIO - GALVANIZADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.17
PF-19 PORTA DE FERRO P/ RESERVATORIO - GALVANIZADA
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

H
5,00000
H
5,00000
UN
1,00000
M
4,26000
UN
3,00000
CJ
1,00000
L
0,01200
Material
1.127,84464

4,64
3,82
854,79
34,59
7,28
101,95
159,27
BDI
281,00265

06.02.020
PORTA DE FERRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.28
PF-11 PORTA/JANELA DE FERRO 180X260CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.15.94
TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 10,84657
LS
13,23281
SubMO
24,07938

M2
H
1,28210
H
1,28210
UN
0,21370
M
1,49570
UN
1,28210
UN
0,42740
UN
0,42740
CJ
0,21370
Material
535,44906

688,21
4,64
5,94894
3,82
4,89762
2.127,71
454,69163
27,38
40,95227
7,28
9,33369
4,33
1,85064
15,99
6,83413
101,95
21,78672
BDI
128,69154

06.02.024
PORTA EM CHAPA DE AO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.70
PF-24 PORTA EM CHAPA DE FERRO GALV. L=82CM
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 24,59322
LS
30,00373
SubMO
54,59695

M2
H
2,90700
H
2,90700
UN
0,58140
M
2,92000
UN
1,74420
CJ
0,58140
L
0,01200
Material
937,82770

4,64
3,82
1.312,25
34,59
7,28
101,95
159,27
BDI
228,25767

06.02.025
PAINEL FIXO EM CH.PERFURADA (E=1,5MM D=1/2" AA 45%)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.31
PAINEL CH.PERF. (E=1,5 1/2" AA 45%) COM REQUADRO
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
Mo-de-Obra 7,34074
LS
8,95571
SubMO

M2
H
0,86770
H
0,86770
M2
1,00000
M
1,94440
Material
287,23767

373,34
4,64
4,02613
3,82
3,31461
234,00
234,00000
27,38
53,23767
BDI
69,81285

06.02.026
PF-23 PORTA DE FERRO C/ BANDEIRA EM CHAPA PERFURADA L=140CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.74
PF-23 PORTA DE FERRO C/ BAND. CHAPA PERF. L=140CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
M
5,60000
UN
6,00000
UN
2,00000
CJ
1,00000
Material
1.805,14800

2.335,83
4,64
23,20000
3,82
19,10000
1.474,21
1.474,21000
27,38
153,32800
7,28
43,68000
15,99
31,98000
101,95
101,95000
BDI
436,78242

06.02.028
PF-21 PORTA DE FERRO COM BANDEIRA EM CHAPA PERFURADA L=102CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.73
PF-21 PORTA DE FERRO C/ BAND. CHAPA PERF. L=102CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
M
5,22000
UN
3,00000
CJ
1,00000
Material
1.313,97360

1.731,69
4,64
23,20000
3,82
19,10000
1.047,26
1.047,26000
27,38
142,92360
7,28
21,84000
101,95
101,95000
BDI
323,81231

06.02.029
PF-22 PORTA DE FERRO C/ BANDEIRA EM CHAPA PERFURADA L=82CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.72
PF-22 PORTA DE FERRO C/ BANDEIRA, CH PERF L=82CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
SubMO
93,90600
Mo-de-Obra 42,30000
LS
51,60600

UN
H
5,00000
H
5,00000
UN
1,00000
M
5,06000
UN
3,00000
CJ
1,00000
Material
1.140,15280

4,64
3,82
877,82
27,38
7,28
101,95
BDI
283,83352

06.02.043
1.01.39
Exerccio:

PF-24 PORTA EM CHAPA DE FERRO GALVANIZADO L=82CM


PEDREIRO

2011

16,29645

UN
H

5,00000

4,64

19,10000
142,92360
838,78000
21,84000
101,95000

1.502,75
23,20000
19,10000
854,79000
147,35340
21,84000
101,95000
1,91124

1.220,68
13,48848
11,10474
762,94215
101,00280
12,69778
59,27373
1,91124

1.517,89
23,20000
19,10000
877,82000
138,54280
21,84000
101,95000

2.097,76
23,20000
Pgina: 65

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

1.01.46
SERVENTE
3.11.70
PF-24 PORTA EM CHAPA DE FERRO GALV. L=82CM
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

H
5,00000
UN
1,00000
M
5,02000
UN
3,00000
CJ
1,00000
L
0,01200
Material
1.611,59304

3,82
19,10000
1.312,25
1.312,25000
34,59
173,64180
7,28
21,84000
101,95
101,95000
159,27
1,91124
BDI
392,26478

06.02.044
PF-25 PORTA EM CHAPA DE FERRO GALVANIZADO L=140CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.71
PF-25 PORTA EM CHAPA DE FERRO GALV. L=140CM
3.13.12
BATENTE METALICO EM PERFIL DE CHAPA ZINCADA
3.15.10
MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2)
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 50,76000
SubMO
112,68720
LS
61,92720

UN
H
6,00000
H
6,00000
UN
1,00000
M
5,60000
UN
1,00000
UN
6,00000
UN
2,00000
CJ
1,00000
L
0,01200
Material
2.242,15524

2.896,45
4,64
27,84000
3,82
22,92000
1.759,10
1.759,10000
34,59
193,70400
109,83
109,83000
7,28
43,68000
15,99
31,98000
101,95
101,95000
159,27
1,91124
BDI
541,61376

06.02.045
PF-26 PORTA DE FERRO PARA HALL ELEVADOR L=90CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.46
PARAFUSO AUTO-ATARRACHANTE 4,8X25MM
3.10.66
PF-26 PORTA DE FERRO P/HALL ELEVADOR L=90CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.13.40
BARRA DE ABERTURA LATAO CROMADO (D=7/8" OU 1")
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

UN
H
5,00000
H
5,00000
UN
8,00000
UN
1,00000
M
6,60000
UN
1,00000
UN
3,00000
CJ
1,00000
Material
1.633,77800

2.125,05
4,64
23,20000
3,82
19,10000
0,06
0,48000
1.180,03
1.180,03000
27,38
180,70800
148,77
148,77000
7,28
21,84000
101,95
101,95000
BDI
397,36732

06.02.046
PF-27 PORTA DE FERRO 90X215CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.01
PF-27 PORTA DE FERRO 90X215CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 38,07000
LS
46,44540
SubMO
84,51540

UN
H
4,50000
H
4,50000
UN
1,00000
M
5,20000
UN
3,00000
CJ
1,00000
Material
1.153,09600

4,64
3,82
886,93
27,38
7,28
101,95
BDI
284,65062

06.02.047
PF-28 PORTA DE FERRO COM BANDEIRA 90X260CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.02
PF-28 PORTA DE FERRO C/BANDEIRA 90X260CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
M
6,10000
UN
3,00000
CJ
1,00000
Material
1.311,22800

1.728,31
4,64
23,20000
3,82
19,10000
1.020,42
1.020,42000
27,38
167,01800
7,28
21,84000
101,95
101,95000
BDI
323,18082

06.02.048
PF-29 PORTA DE FERRO COM BANDEIRA EM CHAPA PERFURADA 90X260CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.03
PF-29 PORTA FERRO C/BANDEIRA CHAPA PERF 90X260CM
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
Mo-de-Obra 42,30000
LS
51,60600
SubMO
93,90600

UN
H
5,00000
H
5,00000
UN
1,00000
M
6,10000
UN
3,00000
CJ
1,00000
Material
1.429,87800

1.874,25
4,64
23,20000
3,82
19,10000
1.139,07
1.139,07000
27,38
167,01800
7,28
21,84000
101,95
101,95000
BDI
350,47032

06.02.049
PF-30 PORTA EM CHAPA DE AO C/VENT.PERM (L=140CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.04
PF-30 PORTA EM CHAPA DE AO C/VENT.PERM.(L=140CM) - GALVANIZADA
3.13.06
FRISO PARA VEDAO EM ALUMNIO E BORRACHA
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.10
MOLA HIDRAULICA AEREA ( REF. DORMA MA200/2)
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.16.86
FECHO UNHA (18A20CM) DE EMBUTIR ACO CROMADO
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
SubMO
112,68720
Mo-de-Obra 50,76000
LS
61,92720

UN
H
6,00000
H
6,00000
UN
1,00000
M
1,40000
M
5,60000
UN
1,00000
UN
6,00000
UN
2,00000
CJ
1,00000
L
0,01600
Material
1.788,80432

2.338,83
4,64
27,84000
3,82
22,92000
1.332,93
1.332,93000
8,97
12,55800
27,38
153,32800
109,83
109,83000
7,28
43,68000
15,99
31,98000
101,95
101,95000
159,27
2,54832
BDI
437,34305

06.02.050
1.01.39
1.01.46
3.12.05
Exerccio:

PF-31 PORTA EM CH.DE AO COM VENT.PERM.(L=82CM)


PEDREIRO
SERVENTE
PF-31 PORTA EM CHAPA DE AO C/VENT.PERM.(L=82CM) - GALVANIZADA

2011

UN
H
H
UN

5,00000
5,00000
1,00000

4,64
3,82
704,19

1.522,26
20,88000
17,19000
886,93000
142,37600
21,84000
101,95000

1.315,16
23,20000
19,10000
704,19000
Pgina: 66

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

3.13.06
FRISO PARA VEDAO EM ALUMNIO E BORRACHA
3.13.08
BATENTE METALICO - PERFIL CH14 DOBR 38X35X22 MM
3.15.33
DOBRADICA ACO CROM. C/PINO BOLAS ACO 3 1/2X3"
3.17.53
CONJ. FECHADURA EXT. D=55MMM C/ MACANETA E ROSETA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
SubMO
93,90600
Mo-de-Obra 42,30000
LS
51,60600
06.02.052
PORTA DE ENROLAR EM GRADES RETANGULARES
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.36
PORTA ENROLAR EM GRADES RETANGULARES
Mo-de-Obra 14,56200
LS
17,76564
SubMO
06.02.060
PT-38 PORTAO EM GRADIL ELETROFUNDIDO (345X230CM)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.13.76
PT-38 PORTAO EM GRADIL ELETROFUNDIDO (345X230CM)
3.15.32
DOBRADICA 3 ESTAGIOS FERRO GALV DN 1"X4"
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 123,25328
LS
150,36900
SubMO
06.02.061
PT-39 PORTAO EM GRADIL ELETROFUNDIDO (165X230CM)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.13.77
PT-37 PORTAO EM GRADIL ELETROFUNDIDO (165X230CM)
3.15.32
DOBRADICA 3 ESTAGIOS FERRO GALV DN 1"X4"
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 134,63600
LS
164,25592
SubMO
06.02.062
PT-40 BANDEIRA EM GRADIL ELETROFUNDIDO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.13.70
PT-40 BANDEIRA EM GRADIL ELETROFUNDIDO
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 13,69060
LS
16,70253
SubMO
06.02.063
PORTO EM GRADIL ELETROFUNDIDO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.13.76
PT-38 PORTAO EM GRADIL ELETROFUNDIDO (345X230CM)
3.15.32
DOBRADICA 3 ESTAGIOS FERRO GALV DN 1"X4"
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
Mo-de-Obra 15,53326
LS
18,95058
06.02.064
1.01.39
1.01.40
Exerccio:

Custo Total

M
0,82000
M
5,02000
UN
3,00000
CJ
1,00000
L
0,01600
Material
975,33132

8,97
7,35540
27,38
137,44760
7,28
21,84000
101,95
101,95000
159,27
2,54832
BDI
245,92458

32,32764

M2
H
0,40000
H
0,90000
H
0,90000
H
0,40000
M2
1,00000
Material
218,43000

308,43
4,64
1,85600
8,08
7,27200
4,34
3,90600
3,82
1,52800
218,43
218,43000
BDI
57,67426

273,62228

UN
H
6,88500
H
4,26700
H
4,26700
H
2,30000
H
2,30000
H
6,88500
UN
1,00000
UN
4,00000
UN
2,00000
L
1,18900
L
0,01800
L
0,71500
Material
4.182,27864

5.480,75
4,64
31,94640
4,74
20,22558
3,80
16,21460
8,08
18,58400
4,34
9,98200
3,82
26,30070
4.090,00
4.090,00000
7,05
28,20000
19,32
38,64000
10,12
12,03268
159,27
2,86686
14,74
10,53910
BDI
1.024,85721

298,89192

UN
H
8,50000
H
4,00000
H
4,00000
H
2,30000
H
2,30000
H
8,50000
UN
1,00000
UN
2,00000
UN
1,00000
L
0,88300
L
0,01600
L
0,53100
Material
2.102,73122

2.953,99
4,64
39,44000
4,74
18,96000
3,80
15,20000
8,08
18,58400
4,34
9,98200
3,82
32,47000
2.050,00
2.050,00000
7,05
14,10000
19,32
19,32000
10,12
8,93596
159,27
2,54832
14,74
7,82694
BDI
552,37332

30,39313

M2
H
1,20000
H
0,49000
H
0,32000
H
1,20000
M2
1,00000
L
0,16000
L
0,00600
UN
0,17000
L
0,10000
Material
239,94832

332,51
4,64
5,56800
4,74
2,32260
3,80
1,21600
3,82
4,58400
235,00
235,00000
14,18
2,26880
159,27
0,95562
1,47
0,24990
14,74
1,47400
BDI
62,17853

34,48383

M2
H
0,86770
H
0,53770
H
0,53770
H
0,28990
H
0,28990
H
0,86770
UN
0,12600
UN
0,50410
UN
0,12600
L
0,14980
L
0,00600
L
0,09010
Material
525,12789

688,32
4,64
4,02613
4,74
2,54870
3,80
2,04326
8,08
2,34239
4,34
1,25817
3,82
3,31461
4.090,00
515,34000
7,05
3,55391
19,32
2,43432
10,12
1,51598
159,27
0,95562
14,74
1,32807
BDI
128,71070

PT-43 PORTAO DE CORRER EM GRADIL ELETROF (360X230CM)


PEDREIRO
PINTOR

2011

Custo Unit.

UN
H
H

2,95000
4,06000

4,64
4,74

5.477,43
13,68800
19,24440
Pgina: 67

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.51
PT-43 PORTAO CORRER EM GRADIL ELETROF (360X230CM)
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
Mo-de-Obra 66,69140
LS
81,36351

UN Coeficiente

Custo Unit.

Custo Total

148,05491

H
2,65000
H
1,00000
H
1,00000
H
2,95000
UN
1,00000
UN
1,00000
L
1,32000
L
0,01800
UN
1,41000
L
0,83000
Material
4.305,14216

3,80
10,07000
8,08
8,08000
4,34
4,34000
3,82
11,26900
4.260,00
4.260,00000
14,61
14,61000
10,12
13,35840
159,27
2,86686
1,47
2,07270
14,74
12,23420
BDI
1.024,23533

06.02.065
PT-44 PORTAO DE CORRER EM GRADIL ELETROF (720X230CM)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.52
PT-44 PORTAO CORRER EM GRADIL ELETROF (720X230CM)
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 123,60640
LS
150,79981
SubMO
274,40621

UN
H
4,75000
H
8,11000
H
5,30000
H
2,00000
H
2,00000
H
4,75000
UN
1,00000
UN
1,00000
L
2,65000
L
0,02600
UN
2,82000
L
1,66000
Material
10.924,18282

13.774,26
4,64
22,04000
4,74
38,44140
3,80
20,14000
8,08
16,16000
4,34
8,68000
3,82
18,14500
10.850,00
10.850,00000
14,61
14,61000
10,12
26,81800
159,27
4,14102
1,47
4,14540
14,74
24,46840
BDI
2.575,67548

06.02.066
PT-45 PORTAO DE CORRER EM GRADIL ELETROF (372X230CM)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.53
PT-45 PORTAO CORRER EM GRADIL ELETROF (372X230CM)
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
151,30898
Mo-de-Obra 68,15720
LS
83,15178

UN
H
3,01000
H
4,19000
H
2,74000
H
1,00000
H
1,00000
H
3,01000
UN
1,00000
UN
1,00000
L
1,37000
L
0,02000
UN
1,46000
L
0,86000
Material
5.601,48240

7.075,93
4,64
13,96640
4,74
19,86060
3,80
10,41200
8,08
8,08000
4,34
4,34000
3,82
11,49820
5.555,00
5.555,00000
14,61
14,61000
10,12
13,86440
159,27
3,18540
1,47
2,14620
14,74
12,67640
BDI
1.323,14202

06.02.067
PT-46 PORTAO DE CORRER EM GRADIL ELETROF (732X230CM)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.54
PT-46 PORTAO CORRER EM GRADIL ELETROF (732X230CM)
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 125,11960
LS
152,64591
SubMO
277,76551

UN
H
4,81000
H
8,25000
H
5,39000
H
2,00000
H
2,00000
H
4,81000
UN
1,00000
UN
1,00000
L
2,69000
L
0,02600
UN
2,86000
L
1,68000
Material
10.824,94122

13.656,32
4,64
22,31840
4,74
39,10500
3,80
20,48200
8,08
16,16000
4,34
8,68000
3,82
18,37420
10.750,00
10.750,00000
14,61
14,61000
10,12
27,22280
159,27
4,14102
1,47
4,20420
14,74
24,76320
BDI
2.553,62255

06.02.073
PT-47 PORTO BASCULANTE-GRADIL ELETROFUND 705X230CM (USO INT)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.55
PT-47 PORTAO BASCULANTE-GRADIL ELETROF 705X230CM
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 106,28349
LS
129,66586
SubMO
235,94936

UN
H
2,92000
H
7,94110
H
5,18960
H
1,95000
H
1,95000
H
2,92000
UN
1,00000
UN
2,00000
L
2,59480
L
1,64500
Material
6.547,32668

8.343,42
4,64
13,54880
4,74
37,64081
3,80
19,72048
8,08
15,75600
4,34
8,46300
3,82
11,15440
6.467,60
6.467,60000
14,61
29,22000
10,12
26,25938
14,74
24,24730
BDI
1.560,15349

06.02.074
1.01.39
1.01.40
1.01.41
1.01.44
Exerccio:

PT-48 PORTO BASCULANTE-GRADIL ELETROFUND 525X230CM (USO INT)


PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERRALHEIRO

2011

UN
H
H
H
H

2,46000
5,90000
3,80000
1,40000

4,64
4,74
3,80
8,08

6.286,96
11,41440
27,96600
14,44000
11,31200
Pgina: 68

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.56
PT-48 PORTAO BASCULANTE-GRADIL ELETROF 525X230CM
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 80,60560
LS
98,33883
SubMO

UN Coeficiente

Custo Unit.

Custo Total

H
1,40000
H
2,46000
UN
1,00000
UN
2,00000
L
1,93350
L
1,21380
Material
4.932,40843

4,34
6,07600
3,82
9,39720
4.872,55
4.872,55000
11,20
22,40000
10,12
19,56702
14,74
17,89141
BDI
1.175,61116

06.02.075
PT-49 PORTO BASCULANTE-GRADIL ELETROFUND 345X230CM (USO INT)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.57
PT-49 PORTAO BASCULANTE-GRADIL ELETROF 345X230CM
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 65,78018
LS
80,25182
SubMO
146,03200

UN
H
2,00000
H
4,26700
H
4,26700
H
1,00000
H
1,00000
H
2,00000
UN
1,00000
UN
2,00000
L
1,18900
L
0,71500
Material
3.253,29178

4.181,16
4,64
9,28000
4,74
20,22558
3,80
16,21460
8,08
8,08000
4,34
4,34000
3,82
7,64000
3.201,50
3.201,50000
14,61
29,22000
10,12
12,03268
14,74
10,53910
BDI
781,84447

06.02.088
PORTO DE CORRER EM GRADIL ELETROFUNDIDO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.51
PT-43 PORTAO CORRER EM GRADIL ELETROF (360X230CM)
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 8,05466
LS
9,82668
SubMO

17,88134

M2
H
0,35630
H
0,49030
H
0,32000
H
0,12080
H
0,12080
H
0,35630
UN
0,12080
UN
0,12080
L
0,15940
L
0,00600
UN
0,17030
L
0,10020
Material
520,66892

662,41
4,64
1,65323
4,74
2,32402
3,80
1,21600
8,08
0,97606
4,34
0,52427
3,82
1,36107
4.260,00
514,60800
14,61
1,76489
10,12
1,61313
159,27
0,95562
1,47
0,25034
14,74
1,47695
BDI
123,86656

14,55199

M2
H
0,18010
H
0,48970
H
0,32000
H
0,12030
H
0,12030
H
0,18010
UN
0,06170
UN
0,12330
L
0,16000
L
0,10140
Material
403,96617

514,77
4,64
0,83566
4,74
2,32118
3,80
1,21600
8,08
0,97202
4,34
0,52210
3,82
0,68798
6.467,60
399,05092
14,61
1,80141
10,12
1,61920
14,74
1,49464
BDI
96,25918

06.02.089
PORTO BASCULANTE EM GRADIL ELETROFUNDIDO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.12.55
PT-47 PORTAO BASCULANTE-GRADIL ELETROF 705X230CM
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 6,55495
LS
7,99704
SubMO

178,94443

06.02.092
ME-02 MONTANTE ESTRUTURAL VERTICAL P/ ESQUADRIAS EM VAO DE 7,20M
M
1.01.39
PEDREIRO
H
0,75000
1.01.44
SERRALHEIRO
H
0,36000
1.01.45
AJUDANTE SERRALHEIRO
H
0,36000
1.01.46
SERVENTE
H
0,75000
3.10.55
FIXACAO (FERRO TRABALHADO)
KG
0,28900
3.11.97
TUBO DE ACO GALVANIZADO RETANGULAR 50X70X3MM
M
1,05000
Mo-de-Obra 10,81620
LS
13,19576
SubMO
24,01196
Material
48,37284

BDI

4,64
8,08
4,34
3,82
43,56
34,08
16,64851

4,64
8,08
4,34
3,82
43,56
34,08
16,64851

89,03
3,48000
2,90880
1,56240
2,86500
12,58884
35,78400

06.02.093
ME-03 MONTANTE ESTRUTURAL HORIZONTAL P/ ESQUADRIAS
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.10.55
FIXACAO (FERRO TRABALHADO)
3.11.97
TUBO DE ACO GALVANIZADO RETANGULAR 50X70X3MM
SubMO
24,01196
Mo-de-Obra 10,81620
LS
13,19576

M
H
0,75000
H
0,36000
H
0,36000
H
0,75000
KG
0,28900
M
1,05000
Material
48,37284

BDI

06.02.099
SERVICOS EM ELEMENTOS METALICOS/COMPONENTES
6.96.02
MODULO DE VERBA
SubMO
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

06.03.001
1.01.39
1.01.40
1.01.41
Exerccio:

TI-01 TAMPA DE INSPECAO - ACO


PEDREIRO
PINTOR
AJUDANTE DE PINTOR

2011

0,00000

UN
H
H
H

1,10000
1,00000
0,33000

4,64
4,74
3,80

89,03
3,48000
2,90880
1,56240
2,86500
12,58884
35,78400

341,24
5,10400
4,74000
1,25400
Pgina: 69

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
3.13.89
TI-01 TAMPA DE INSPECAO - GALVANIZADA
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.34
TINTA A OLEO
Mo-de-Obra 15,30000
LS
18,66600

UN Coeficiente

SubMO

06.03.003
AF-01 ALCAPAO PARA LAJE DE FORRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.11.90
CAIXILHARIA EM FERRO
3.15.91
FECHO COM PORTA CADEADO 4"
3.16.52
DOBRADICA DE FERRO POL PINO E BOLAS FERRO 3 1/2X3"
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.75.02
TINTA ESMALTE
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 23,75200
SubMO
LS
28,97744
06.03.009
CO-06 CORRIMAO TUBULAR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.13.14
CO-06 CORRIMAO EM TUBO DE ACO CARBONO GALV PINT
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 5,45581
LS
6,65609
SubMO
06.03.012
CO-08 GUARDA CORPO TUBULAR SOBRE ALVENARIA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.10.74
CO-08 CORRIMAO TUBULAR ACO CARBONO GALV PINT
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 7,73200
LS
9,43304
SubMO
06.03.016
BP-01 BARRA ANTIPANICO SIMPLES
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
3.15.45
BP-01 BARRA ANTIPANICO SIMPLES
Mo-de-Obra 24,84000
LS
30,30480
06.03.017
BP-02 BARRA ANTIPANICO DUPLA
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
3.15.46
BP-02 BARRA ANTIPANICO DUPLO
Mo-de-Obra 49,68000
LS
60,60960
06.03.019
EM-05 ESCADA MARINHEIRO (GALVANIZADA)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.75
EM-05 ESCADA MARINHEIRO GALVANIZADA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 3,38400
LS
4,12848
06.03.020
1.01.39
1.01.40
1.01.41
1.01.46
3.13.74
3.75.07
3.75.91
3.80.66

Exerccio:

SubMO

SubMO

SubMO

Custo Total

33,96600

H
1,10000
UN
1,00000
UN
1,00000
L
0,00500
UN
0,55000
L
0,17000
L
0,28000
Material
243,47205

3,82
4,20200
225,35
225,35000
11,20
11,20000
159,27
0,79635
1,47
0,80850
15,96
2,71320
9,30
2,60400
BDI
63,81075

52,72944

UN
H
2,00000
H
0,80000
H
0,80000
H
2,00000
KG
14,50000
UN
1,00000
UN
2,00000
UN
1,00000
L
0,18000
UN
0,30000
L
0,14400
Material
199,23084

309,91
4,64
9,28000
4,74
3,79200
3,80
3,04000
3,82
7,64000
11,56
167,62000
6,14
6,14000
3,15
6,30000
14,61
14,61000
10,12
1,82160
1,47
0,44100
15,96
2,29824
57,95086

12,11189

Material

M
H
0,60000
H
0,05720
H
0,02860
H
0,60000
M
1,00000
L
0,02150
L
0,00500
L
0,01430
78,66471

4,64
4,74
3,80
3,82
77,44
10,12
159,27
14,74
BDI
20,87862

17,16504

Material

M
H
0,60000
H
0,40000
H
0,20000
H
0,60000
M
1,00000
L
0,03000
L
0,00800
L
0,02000
163,11256

221,74
4,64
2,78400
4,74
1,89600
3,80
0,76000
3,82
2,29200
161,24
161,24000
10,12
0,30360
159,27
1,27416
14,74
0,29480
BDI
41,46385

55,14480

UN
H
2,00000
H
2,00000
UN
1,00000
Material
518,14000

705,14
8,08
16,16000
4,34
8,68000
518,14
518,14000
BDI
131,85550

110,28960

UN
H
4,00000
H
4,00000
UN
1,00000
Material
969,73000

1.328,42
8,08
32,32000
4,34
17,36000
969,73
969,73000
BDI
248,40451

7,51248

M
H
0,40000
H
0,40000
UN
4,00000
M
1,00000
L
0,00600
Material
294,38562

371,33
4,64
1,85600
3,82
1,52800
2,01
8,04000
285,39
285,39000
159,27
0,95562
BDI
69,43656

EM-06 ESCADA DE MARINHEIRO C/GUARDA CORPO GALVANIZADA


PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
EM-06 ESCADA MARINHEIRO GALVANIZADO
TINTA ESMALTE SINTETICO - ALUMINIO
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO

2011

Custo Unit.

M
H
H
H
H
M
L
L
L

0,80000
1,84000
0,81000
0,80000
1,00000
0,51000
0,01400
0,31000

BDI

4,64
4,74
3,80
3,82
476,28
14,18
159,27
14,74

111,65
2,78400
0,27113
0,10868
2,29200
77,44000
0,21758
0,79635
0,21078

653,78
3,71200
8,72160
3,07800
3,05600
476,28000
7,23180
2,22978
4,56940

Pgina: 70

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 18,56760

LS

22,65247

UN Coeficiente
SubMO

41,22007

Material

490,31098

Custo Unit.
BDI

Custo Total

122,25214

06.03.021
CO-13 CORRIMAO TUBULAR INTERMEDIARIO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.13.18
CO-13 CORRIMAO TUBULAR ACO CARBONO - GALVANIZADO
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
9.10.52
CHUMBADOR EXPANSIVEL D=3/8"
Mo-de-Obra 9,34600
LS
11,40212
SubMO
20,74812

M
H
0,60000
H
0,50000
H
0,50000
H
0,60000
M
1,00000
L
0,12000
L
0,00500
L
0,07000
UN
5,00000
Material
205,06255

277,74
4,64
2,78400
4,74
2,37000
3,80
1,90000
3,82
2,29200
196,47
196,47000
10,12
1,21440
159,27
0,79635
14,74
1,03180
1,11
5,55000
BDI
51,93645

06.03.023
CO-15 GUARDA CORPO TUBULAR H=1,10M (USO INTERNO)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.13.19
CO-15 GUARDA CORPO TUBULAR ACO CARBONO H=1,10M INT
3.75.02
TINTA ESMALTE
3.76.50
GALVANIZACAO A FOGO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
9.10.52
CHUMBADOR EXPANSIVEL D=3/8"
SubMO
20,74812
Mo-de-Obra 9,34600
LS
11,40212

M
H
0,60000
H
0,50000
H
0,50000
H
0,60000
M
1,00000
L
0,12000
KG
20,06000
L
0,07000
UN
5,00000
Material
347,37180

452,78
4,64
2,78400
4,74
2,37000
3,80
1,90000
3,82
2,29200
304,27
304,27000
10,12
1,21440
1,76
35,30560
14,74
1,03180
1,11
5,55000
BDI
84,66758

06.03.024
TP-12 TELA DE PROTECAO REMOVIVEL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.75.28
TP-12 TELA DE PROTECAO REMOVIVEL 90X60CM COMPLETA - GALVANIZADA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 2,81718
LS
3,43696
SubMO
6,25414

M2
H
0,33300
H
0,33300
UN
1,85000
L
0,00400
Material
313,52758

393,33
4,64
1,54512
3,82
1,27206
169,13
312,89050
159,27
0,63708
BDI
73,54980

06.03.025
CO-15 GUARDA CORPO TUBULAR H=1,30M (USO EXTERNO)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.13.09
CO-15 GUARDA CORPO TUBULAR ACO CARBONO H=1,30M EXT
3.75.02
TINTA ESMALTE
3.76.50
GALVANIZACAO A FOGO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
9.10.52
CHUMBADOR EXPANSIVEL D=3/8"
Mo-de-Obra 9,34600
LS
11,40212
SubMO
20,74812

M
H
0,60000
H
0,50000
H
0,50000
H
0,60000
M
1,00000
L
0,12000
KG
25,06000
L
0,07000
UN
5,00000
Material
417,00180

538,43
4,64
2,78400
4,74
2,37000
3,80
1,90000
3,82
2,29200
365,10
365,10000
10,12
1,21440
1,76
44,10560
14,74
1,03180
1,11
5,55000
BDI
100,68248

06.03.027
TP-03 TELA DE PROTECAO ARAME GALVANIZADO ONDULADO-REQUADRO DE FERRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
2.66.16
PERFIL "L" DE FERRO 1"X1"X1/8" GALV.
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.31
PARAFUSO AUTO-ATARRACHANTE CABECA OVAL 4,8 X 75MM
2.67.70
REBITE TIPO POP 440 (CENTO)
2.67.77
BUCHA TIPO S-8 (CENTO)
2.68.18
PERFIL TUBULAR 30X30MM E=3MM GALVANIZADO
2.68.24
FERRO CHATO 7/8``X1/8`` GALVANIZADO
2.75.34
TELA ARAME GALV. MALHA QUADRANGULA 1" FIO 12
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 47,19600
LS
57,57912
SubMO
104,77512
Material
06.03.030
GRADE DE PROTECAO DE FERRO PINTADO - COM TELA EMERG.83/84
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
2.75.26
TELA PROT 3/8' X 3/8' FIO 14 P/CAIXILHO
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.34
TINTA A OLEO
SubMO
55,52664
Mo-de-Obra 25,01200
LS
30,51464
06.03.031
1.01.40
1.01.41
1.01.44
Exerccio:

GRADE DE PROTECAO DE FERRO PINTADO - SEM TELA EMERG.83/84


PINTOR
AJUDANTE DE PINTOR
SERRALHEIRO

2011

M2
H
3,80000
H
3,80000
M
4,00000
CJ
6,00000
UN
6,00000
UN
0,32000
UN
0,04000
M
3,00000
M
4,00000
M2
1,00000
L
0,00400
179,01588

M2
H
0,40000
H
0,20000
H
1,80000
H
1,80000
M2
1,00000
KG
22,17000
UN
0,50000
L
0,10000
L
0,15000
Material
274,79150
M2
H
H
H

0,40000
0,20000
1,50000

8,08
4,34
16,33
0,14
0,14
4,44
11,95
15,02
8,63
29,90
159,27
BDI
65,27193

BDI

349,06
30,70400
16,49200
65,32000
0,84000
0,84000
1,42080
0,47800
45,06000
34,52000
29,90000
0,63708

406,29
4,74
1,89600
3,80
0,76000
8,08
14,54400
4,34
7,81200
46,04
46,04000
10,15
225,02550
1,47
0,73500
15,96
1,59600
9,30
1,39500
75,97317

4,74
3,80
8,08

288,55
1,89600
0,76000
12,12000
Pgina: 71

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.45
AJUDANTE SERRALHEIRO
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.34
TINTA A OLEO
Mo-de-Obra 21,28600
LS
25,96892

UN Coeficiente

BDI

15,28692

M2
H
0,50000
H
0,40000
H
0,20000
H
0,50000
KG
20,64000
UN
0,50000
L
0,10000
L
0,15000
Material
213,22200

BDI

281,06
4,64
2,32000
4,74
1,89600
3,80
0,76000
3,82
1,91000
10,15
209,49600
1,47
0,73500
15,96
1,59600
9,30
1,39500
52,55705

22,12496

UN
H
0,78000
H
0,51000
H
0,25000
H
0,78000
UN
1,00000
L
0,19000
UN
0,64000
L
0,12000
Material
223,76880

302,44
4,64
3,61920
4,74
2,41740
3,80
0,95000
3,82
2,97960
218,99
218,99000
10,12
1,92280
1,47
0,94080
15,96
1,91520
BDI
56,55557

CHAPA PERFURADA GALV 14(FUROS REDONDOS E ALTERNADOS 3/8")AREA PERF


M2
48%
1.01.44
SERRALHEIRO
H
1,20000
1.01.45
AJUDANTE SERRALHEIRO
H
1,20000
6.80.18
CHAPA PERFUR GALV No 14 FUROS D=3/8" AREA PERF 48%
M2
1,00000
6.95.65
SOLDA ELETRICA
KG
1,60000
Mo-de-Obra 14,90400
LS
18,18288
SubMO
33,08688
Material
191,20200

8,08
9,69600
4,34
5,20800
168,05
168,05000
14,47
23,15200
BDI
51,58644

06.03.033
GR-01 GRADE DE PROTECAO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.34
TINTA A OLEO
Mo-de-Obra 6,88600
LS
8,40092

SubMO

06.03.034
GR-02 GRADE DE PROTECAO / GUICHE (122X92 CM)
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.10.81
GR-02 GRADIL DE PROTECAO/GUICHE 122X105 CM
3.75.02
TINTA ESMALTE
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 9,96620
LS
12,15876
SubMO

47,25492

Custo Total

4,34
6,51000
10,15
183,61350
1,47
0,73500
15,96
1,59600
9,30
1,39500
53,95672

SubMO

H
1,50000
KG
18,09000
UN
0,50000
L
0,10000
L
0,15000
Material
187,33950

Custo Unit.

06.03.036

06.03.037
PERFIL METALICO TUBULAR SECCAO QUADRADA 8X8CM E=3MM
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
2.68.20
PERFIL METALICO TUBULAR SECAO QUADRADA 8X8CM E=3MM
6.95.65
SOLDA ELETRICA
Mo-de-Obra 7,45200
LS
9,09144
SubMO
16,54344

M
H
0,60000
H
0,60000
M
1,00000
KG
0,80000
Material
39,37600

06.03.038
PERFIL L DE FERRO 1"X1"X1/8"
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
2.66.15
PERFIL L DE FERRO 1"X1"X1/8"
6.95.65
SOLDA ELETRICA
Mo-de-Obra 7,45200
LS
9,09144

16,54344

M
H
0,60000
H
0,60000
M
1,00000
KG
0,80000
Material
14,79600

15,20256

M2
H
H
M
KG
M2
Material
9,99940

6,25414

M2
H
0,33300
H
0,33300
M2
1,00000
Material
200,59000

SubMO

06.03.039
TELA DE PROTEO CONTRA NIDIFICACAO DE PASSAROS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.12.21
ANDAIME TIPO TORRE - ALUGUEL MENSAL
2.70.31
ARAME GALVANIZADO No. 16
2.75.31
TELA P/ VIVEIRO ARAME GALV MALHA 1/2 FIO 24
Mo-de-Obra 6,84800
LS
8,35456
SubMO
06.03.040
TELA DE ARAME CONTRA INSETOS DE ARAME GALV
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.10.29
TELA MOSQUITEIRA ARAMA GALV C/REQUADRO
Mo-de-Obra 2,81718
LS
3,43696
SubMO
06.03.041
1.01.39
1.01.40
1.01.41
1.01.46
3.13.78
3.75.02
3.75.91
3.80.66

Exerccio:

CO-16 CORRIMAO TUBULAR DUPLO


PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
CO-16 CORRIMAO EM TUBO DE ACO CARBONO GALV PINTADO
TINTA ESMALTE
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO

2011

M
H
H
H
H
M
L
L
L

275,87

BDI

8,08
4,34
27,80
14,47
12,86147

BDI

8,08
4,34
3,22
14,47
7,20807

BDI

4,60
3,96
13,28
7,65
6,13
5,79645

0,80000
0,80000
0,13000
0,20000
1,10000

0,80000
0,11440
0,05720
0,80000
1,00000
0,04300
0,00400
0,02860

68,78
4,84800
2,60400
27,80000
11,57600

38,54
4,84800
2,60400
3,22000
11,57600

30,99
3,68000
3,16800
1,72640
1,53000
6,74300

254,41
4,64
1,54512
3,82
1,27206
200,59
200,59000
BDI
47,57415

4,64
4,74
3,80
3,82
199,84
10,12
159,27
14,74

268,19
3,71200
0,54226
0,21736
3,05600
199,84000
0,43516
0,63708
0,42156

Pgina: 72

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 7,52762

LS

9,18369

UN Coeficiente
SubMO

16,71131

06.03.042
CO-17 CORRIMAO TUBULAR DUPLO LATERAL
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.13.79
CO-17 CORRIMAO EM TUBO DE ACO CARBONO GALV PINTADO
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
9.10.52
CHUMBADOR EXPANSIVEL D=3/8"
Mo-de-Obra 12,26381
LS
14,96185
SubMO
27,22565

Material

201,33380

Custo Unit.
BDI

Custo Total

50,15038

M
H
0,90000
H
0,55720
H
0,52860
H
0,90000
M
1,00000
L
0,14150
L
0,00400
L
0,08430
UN
5,00000
Material
261,12164

354,66
4,64
4,17600
4,74
2,64113
3,80
2,00868
3,82
3,43800
252,26
252,26000
10,12
1,43198
159,27
0,63708
14,74
1,24258
1,11
5,55000
BDI
66,31988

15,02496

Material

M
H
0,80000
H
0,80000
M
1,00000
158,20000

213,06
4,64
3,71200
3,82
3,05600
158,20
158,20000
BDI
39,84174

22,53744

M
H
1,20000
H
1,20000
UN
5,00000
M
1,00000
Material
279,47000

371,46
4,64
5,56800
3,82
4,58400
2,01
10,05000
269,42
269,42000
BDI
69,46171

11,26872

M
H
0,60000
H
0,60000
UN
5,00000
M
1,00000
Material
288,43000

368,62
4,64
2,78400
3,82
2,29200
2,01
10,05000
278,38
278,38000
BDI
68,93071

11,26872

M
H
0,60000
H
0,60000
M
1,00000
110,28000

149,50
4,64
2,78400
3,82
2,29200
110,28
110,28000
BDI
27,95621

06.03.047
CO-22 CORRIMO SIMPLES COM MONTANTE VERTICAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.99
CO-22 CORRIMO SIMPLES C/MONT.VERT.C/PINT.ELETROST
Mo-de-Obra 5,07600
LS
6,19272
SubMO
11,26872

M
H
0,60000
H
0,60000
UN
5,00000
M
1,00000
Material
162,14000

213,29
4,64
2,78400
3,82
2,29200
2,01
10,05000
152,09
152,09000
BDI
39,88401

06.03.048
CO-23 CORRIMO SIMPLES INTERMEDIRIO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.73
CO-23 CORRIMO SIMPLES INTERMED. C/PINT. ELETROST.
Mo-de-Obra 5,07600
LS
6,19272
SubMO

11,26872

M
H
0,60000
H
0,60000
UN
5,00000
M
1,00000
Material
194,65000

253,28
4,64
2,78400
3,82
2,29200
2,01
10,05000
184,60
184,60000
BDI
47,36131

06.03.049
CO-24 GUARDA CORPO TUBULAR SOBRE ALVENARIA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.84
CO-24 GUARDA CORPO TUBULAR S/ALVEN.C/PINT.ELETROST
Mo-de-Obra 5,07600
LS
6,19272
SubMO
11,26872

M
H
0,60000
H
0,60000
UN
1,00000
M
1,00000
Material
137,82000

183,37
4,64
2,78400
3,82
2,29200
2,01
2,01000
135,81
135,81000
BDI
34,29041

06.03.056
CO-25 GUARDA CORPO METLICO C/CHAPA LISA (H=110CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.97
CO-25 GUARDA CORPO MET.CH.LISA H=110CM PINT.ELETRO
Mo-de-Obra 9,30600
LS
11,35332
SubMO
20,65932

M
H
1,10000
H
1,10000
UN
5,00000
M
1,00000
Material
563,91000

719,02
4,64
5,10400
3,82
4,20200
2,01
10,05000
553,86
553,86000
BDI
134,45094

06.03.043
CO-18 CORRIMO DUPLO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.88
CO-18 CORRIMO DUPLO C/PINTURA ELETROSTTICA
Mo-de-Obra 6,76800
LS
8,25696
SubMO
06.03.044
CO-19 CORRIMO DUPLO COM MONTANTE VERTICAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.94
CO-19 CORRIMO DUPLO C/MONT.VERT.C/PINT.ELETROST.
Mo-de-Obra 10,15200
LS
12,38544
SubMO
06.03.045
CO-20 CORRIMO DUPLO INTERMEDIRIO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.96
CO-20 CORRIMO DUPLO INTERMED.C/PINT.ELETROST.
Mo-de-Obra 5,07600
LS
6,19272
SubMO
06.03.046
CO-21 CORRIMO SIMPLES
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.98
CO-21 CORRIMO SIMPLES C/ PINTURA ELETROSTTICA
Mo-de-Obra 5,07600
LS
6,19272
SubMO

06.03.057
1.01.39
1.01.46
2.66.91
3.13.87

Exerccio:

CO-25 GUARDA CORPO METLICO C/CHAPA LISA (130CM)


PEDREIRO
SERVENTE
CHUMBADOR URS 1/4"
CO-25 GUARDA CORPO METAL CH.LISA H=130CM PINT.ELET

2011

Material

M
H
H
UN
M

1,10000
1,10000
5,00000
1,00000

4,64
3,82
2,01
624,98

806,49
5,10400
4,20200
10,05000
624,98000

Pgina: 73

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 9,30600

LS

11,35332

UN Coeficiente
SubMO

20,65932

Material

635,03000

Custo Unit.
BDI

Custo Total

150,80854

06.03.058
CO-26 GUARDA CORPO METLICO C/CHAPA PERFURADA (H=110CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.85
CO-26 GUARDA CORPO METAL CH.PERF.H=110CM PINT.ELET
Mo-de-Obra 9,30600
LS
11,35332
SubMO
20,65932

M
H
1,10000
H
1,10000
UN
5,00000
M
1,00000
Material
573,11000

730,33
4,64
5,10400
3,82
4,20200
2,01
10,05000
563,06
563,06000
BDI
136,56694

06.03.059
CO-26 GUARDA CORPO METLICO C/CHAPA PERFURADA (H=130CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.91
CHUMBADOR URS 1/4"
3.13.86
CO-26 GUARDA CORPO METAL CH.PERF.H=130CM PINT.ELET
Mo-de-Obra 9,30600
LS
11,35332
SubMO
20,65932

M
H
1,10000
H
1,10000
UN
5,00000
M
1,00000
Material
647,03000

821,25
4,64
5,10400
3,82
4,20200
2,01
10,05000
636,98
636,98000
BDI
153,56854

06.03.060
BARRA DE APOIO P/DEFICIENTES EM LATAO CROMADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
3.13.35
BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE
Mo-de-Obra 4,23000
LS
5,16060
SubMO

CJ
H
0,50000
H
0,50000
UN
12,00000
UN
0,12000
UN
2,00000
Material
544,16880

680,87
4,64
2,32000
3,82
1,91000
0,50
6,00000
0,74
0,08880
269,04
538,08000
BDI
127,31866

M
H
0,78000
H
0,78000
H
0,63000
H
0,63000
H
3,12000
H
1,37500
H
1,37500
H
1,50000
H
1,50000
H
6,87400
M3
0,09900
KG
12,80000
KG
35,61000
M3
0,04600
M3
0,00600
M3
0,05200
M
0,91000
M
0,80000
M2
0,35000
KG
7,25000
KG
1,87000
UN
13,00000
UN
2,60000
KG
4,08000
KG
0,20000
KG
0,14000
KG
0,12000
KG
0,70000
M2
4,00000
L
0,14170
L
0,49000
L
0,00600
L
0,39000
UN
0,28170
UN
0,58000
L
0,08540
M
2,64000
M
2,46000
Material
295,32010

4,60
3,96
4,77
3,82
4,64
4,74
3,80
8,08
4,34
3,82
80,46
0,35
0,37
61,17
66,21
251,78
3,78
2,09
17,18
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
7,65
24,23
14,18
4,23
159,27
10,36
1,47
0,72
14,74
8,78
16,18
BDI
110,40375

9,39060

06.03.067
FQ-05 ALAMBRADO PARA QUADRA COBERTA TRREA (BROCA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.70.31
ARAME GALVANIZADO No. 16
2.75.09
TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2"
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.13
TINTA LATEX ECONOMICA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.09
SELADOR P/PINTURA LATEX
3.80.12
LIXA PARA FERRO
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.15
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM)
6.05.16
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM)
Mo-de-Obra 83,19648
LS
101,49971
SubMO
184,69619
06.03.068
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.44
1.01.45
Exerccio:

FQ-06 ALAMBRADO PARA QUADRA COBERTA TERREA (SAPATA)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERRALHEIRO
AJUDANTE SERRALHEIRO

2011

M
H
H
H
H
H
H
H
H
H

0,58000
0,58000
0,39100
0,39100
3,08700
1,37500
1,37500
1,50000
1,50000

4,60
3,96
4,77
3,82
4,64
4,74
3,80
8,08
4,34

590,42
3,58800
3,08880
3,00510
2,40660
14,47680
6,51750
5,22500
12,12000
6,51000
26,25868
7,96554
4,48000
13,17570
2,81382
0,39726
13,09256
3,43980
1,67200
6,01300
19,50250
5,04900
25,22000
6,52600
6,07920
2,23000
0,65380
0,58440
5,35500
96,92000
2,00931
2,07270
0,95562
4,04040
0,41410
0,41760
1,25880
23,17920
39,80280

556,50
2,66800
2,29680
1,86507
1,49362
14,32368
6,51750
5,22500
12,12000
6,51000
Pgina: 74

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.70.31
ARAME GALVANIZADO No. 16
2.75.09
TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2"
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.13
TINTA LATEX ECONOMICA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.09
SELADOR P/PINTURA LATEX
3.80.12
LIXA PARA FERRO
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.15
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM)
6.05.16
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM)
Mo-de-Obra 77,20027
LS
94,18433
SubMO
06.03.069
QE-36 REDE DE PROTECAO PARA QUADRAS DE ESPORTES
3.67.31
TELA POLIETILENO CRISTAL #10 F 4 COMPL FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO

UN Coeficiente

Exerccio:

QE-39 TABELA DE BASQUETE (LAJE ALVEOLAR)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRISCO
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
TABUAS PINHO DE 1"X12" DE 3A.
FORMA DE TUBO DE PAPELAO DIAM. 40CM

2011

Custo Total

171,38460

H
6,33000
M3
0,10100
KG
12,80000
KG
25,43000
M3
0,02000
M3
0,00600
M3
0,07200
M
0,91000
M
0,40000
M2
0,25000
KG
2,46000
KG
2,04000
UN
13,00000
UN
2,60000
KG
4,68000
KG
0,23400
KG
0,10000
KG
0,07800
KG
0,70000
M2
4,00000
L
0,14170
L
0,49000
L
0,00600
L
0,39000
UN
0,28170
UN
0,58000
L
0,08540
M
2,64000
M
2,46000
Material
281,06126

0,00000

M2
M2
1,05000
Material
6,19500

BDI

UN
H
4,46000
H
5,97000
H
10,40000
H
10,40000
H
9,11000
H
35,02000
M3
0,36300
KG
173,40000
M3
0,49000
M3
6,95000
M
4,32000
M2
1,55000
M
3,90000
KG
117,00000
KG
3,00000
KG
50,00000
KG
50,00000
KG
0,47000
KG
2,10000
UN
1,00000
KG
52,00000
Material
3.876,00598

5.612,71
4,60
20,51600
3,96
23,64120
4,77
49,60800
3,82
39,72800
4,64
42,27040
3,82
133,77640
80,46
29,20698
0,37
64,15800
61,17
29,97330
251,78
1.749,87100
2,09
9,02880
17,18
26,62900
75,03
292,61700
2,69
314,73000
2,70
8,10000
10,14
507,00000
2,18
109,00000
4,67
2,19490
4,87
10,22700
631,75
631,75000
1,76
91,52000
BDI
1.049,53250

06.03.070
QE-38 TABELA DE BASQUETE (FUNDACAO DIRETA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.29
FORMA DE TUBO DE PAPELAO DIAM.30 CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.50.17
ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL
2.50.20
MONTAGEM DE ESTRUTURA METALICA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.67.09
TABELA DE BASQUETE COM ARO E CESTO
3.76.50
GALVANIZACAO A FOGO
Mo-de-Obra 309,54000
LS
377,63880
SubMO
687,17880
06.03.071
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.22
2.05.36
2.10.21
2.12.34

Custo Unit.

UN
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M3
M2
M

1,72000
3,25500
0,15500
0,15500
4,40200
1,91000
1,91000
7,27200
0,02660
0,74000
10,50000
0,01040
0,28000
0,20400
0,60000

3,82
80,46
0,35
0,37
61,17
66,21
251,78
3,78
2,09
17,18
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
7,65
24,23
14,18
4,23
159,27
10,36
1,47
0,72
14,74
8,78
16,18
BDI
104,06255

5,90
1,42485

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
66,21
251,78
17,18
111,02

24,18060
8,12646
4,48000
9,40910
1,22340
0,39726
18,12816
3,43980
0,83600
4,29500
6,61740
5,50800
25,22000
6,52600
6,97320
2,60910
0,46700
0,37986
5,35500
96,92000
2,00931
2,07270
0,95562
4,04040
0,41410
0,41760
1,25880
23,17920
39,80280

7,61
6,19500

3.306,08
7,91200
12,88980
0,73935
0,59210
20,42528
9,05340
7,25800
27,77904
2,14024
0,25900
3,88500
0,68858
70,49840
3,50472
66,61200
Pgina: 75

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.12.39
FORMA DE TUBO DE PAPELAO 70CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.55
ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT
2.50.17
ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL
2.50.20
MONTAGEM DE ESTRUTURA METALICA
2.67.17
BRACADEIRA DE ACO GALV 64X13MM DN 30CM
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.67.09
TABELA DE BASQUETE COM ARO E CESTO
3.75.02
TINTA ESMALTE
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
3.76.50
GALVANIZACAO A FOGO
3.80.60
TINNER
SubMO
192,36071
Mo-de-Obra 86,64897
LS
105,71174

M
0,50000
KG
15,50000
M3
0,29000
KG
50,00000
KG
50,00000
UN
2,00000
KG
0,01700
KG
0,03100
UN
1,00000
L
0,32000
L
0,32000
KG
52,00000
L
0,20000
Material
2.495,51330

224,11
2,69
2.677,26
10,14
2,18
33,60
4,67
4,87
631,75
10,12
20,41
1,76
6,50
BDI
618,21102

06.03.072
QE-40 TABELA DE BASQUETE (PRE-LAJE TRELICADA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.34
FORMA DE TUBO DE PAPELAO DIAM. 40CM
2.12.39
FORMA DE TUBO DE PAPELAO 70CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.20.55
ESTRUTURA PRE-MOLDADA DE CONCRETO FORN/MONT
2.50.17
ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL
2.50.20
MONTAGEM DE ESTRUTURA METALICA
2.67.17
BRACADEIRA DE ACO GALV 64X13MM DN 30CM
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.67.09
TABELA DE BASQUETE COM ARO E CESTO
3.75.02
TINTA ESMALTE
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
3.76.50
GALVANIZACAO A FOGO
3.80.60
TINNER
Mo-de-Obra 111,71242
LS
136,28915
SubMO
248,00157

UN
H
1,72000
H
3,25500
H
1,95000
H
1,95000
H
5,54200
H
1,91000
H
1,91000
H
8,41200
M3
0,02660
KG
0,74000
KG
10,50000
M3
0,01040
M3
0,47000
M2
0,20400
M
0,60000
M
0,50000
KG
19,50000
M3
0,29000
KG
50,00000
KG
50,00000
UN
2,00000
KG
0,01700
KG
0,39000
UN
1,00000
L
0,32000
L
0,32000
KG
52,00000
L
0,20000
Material
2.555,85983

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
66,21
251,78
17,18
111,02
224,11
2,69
2.677,26
10,14
2,18
33,60
4,67
4,87
631,75
10,12
20,41
1,76
6,50
BDI
644,88812

06.03.073
QE-41 TABELA DE BASQUETE (SOMENTE TRELICA - FIXACAO PAREDE/PILAR)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.50.17
ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL
2.50.20
MONTAGEM DE ESTRUTURA METALICA
2.66.92
CHUMBADOR KWIKBOLT - ACO CARBONO 3/4"X 51/2"
3.67.09
TABELA DE BASQUETE COM ARO E CESTO
3.75.02
TINTA ESMALTE
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
3.76.50
GALVANIZACAO A FOGO
3.80.60
TINNER
Mo-de-Obra 71,34240
LS
87,03773
Material
SubMO
158,38013
06.03.074
QE-42 POSTE PARA REDE DE VOLEIBOL (FUNDACAO DIRETA)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.17
QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR
3.67.20
REDE DE VOLEI C/ 4 FAIXAS
6.25.01
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM
6.25.08
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM
SubMO
27,26160
Mo-de-Obra 12,28000
LS
14,98160
06.03.075
Exerccio:

QE-43 POSTE PARA REDE VOLEIBOL (LAJE ALVEOLAR)

2011

UN
H
1,50000
H
3,00000
H
2,50000
H
2,56000
H
2,56000
H
5,00000
KG
67,00000
KG
67,00000
UN
4,00000
UN
1,00000
L
0,43000
L
0,43000
KG
70,00000
L
0,20000
1.628,77790

4,60
3,96
4,64
4,74
3,80
3,82
10,14
2,18
8,49
631,75
10,12
20,41
1,76
6,50
BDI
411,04635

PR
H
1,00000
H
2,00000
M3
0,12300
UN
2,00000
PR
1,00000
UN
1,00000
M
0,80000
M
0,80000
Material
657,15294

4,64
3,82
251,78
10,69
496,35
92,63
1,30
18,48
BDI
157,41534

PR

112,05500
41,69500
776,40540
507,00000
109,00000
67,20000
0,07939
0,15097
631,75000
3,23840
6,53120
91,52000
1,30000

3.448,74
7,91200
12,88980
9,30150
7,44900
25,71488
9,05340
7,25800
32,13384
2,14024
0,25900
3,88500
0,68858
118,33660
3,50472
66,61200
112,05500
52,45500
776,40540
507,00000
109,00000
67,20000
0,07939
1,89930
631,75000
3,23840
6,53120
91,52000
1,30000

2.198,20
6,90000
11,88000
11,60000
12,13440
9,72800
19,10000
679,38000
146,06000
33,96000
631,75000
4,35160
8,77630
123,20000
1,30000

841,82
4,64000
7,64000
30,96894
21,38000
496,35000
92,63000
1,04000
14,78400

857,32
Pgina: 76

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.17
QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR
3.67.20
REDE DE VOLEI C/ 4 FAIXAS
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
SubMO
Mo-de-Obra 20,19920
LS
24,64302

Custo Unit.

Custo Total

44,84222

H
1,62000
H
3,32000
M3
0,01440
KG
0,40000
KG
5,66000
M3
0,00560
UN
2,00000
PR
1,00000
UN
1,00000
M
0,70000
Material
652,16860

4,64
3,82
80,46
0,35
0,37
66,21
10,69
496,35
92,63
54,35
BDI
160,31249

06.03.076
QE-44 POSTE PARA REDE VOLEIBOL (PRE-LAJE TRELICADA)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.17
QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR
3.67.20
REDE DE VOLEI C/ 4 FAIXAS
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
6.25.34
TUBO PVC P/ESGOTO 150MM
Mo-de-Obra 14,05920
LS
17,15222
SubMO
31,21142

PR
H
1,12000
H
2,32000
M3
0,01440
KG
0,40000
KG
5,66000
M3
0,00560
UN
2,00000
PR
1,00000
UN
1,00000
M
0,70000
M
0,50000
Material
659,18860

4,64
3,82
80,46
0,35
0,37
66,21
10,69
496,35
92,63
54,35
14,04
BDI
158,79201

06.03.077
QE-45 TRAVE DE FUTEBOL DE SALAO (FUNDACAO DIRETA)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
3.67.12
REDE PARA TRAVE DE GOL
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.18
QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE
6.25.01
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM
6.25.08
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM
Mo-de-Obra 30,45600
LS
37,15632
SubMO

67,61232

UN
H
3,60000
H
3,60000
M3
0,12300
UN
1,00000
UN
2,00000
UN
1,00000
M
0,80000
M
0,80000
Material
711,79294

4,64
3,82
251,78
36,81
10,69
606,81
1,30
18,48
BDI
179,26321

44,84222

UN
H
1,62000
H
3,32000
M3
0,01440
KG
0,40000
KG
5,66000
M3
0,00560
UN
1,00000
UN
2,00000
UN
1,00000
M
0,70000
Material
706,80860

4,64
3,82
80,46
0,35
0,37
66,21
36,81
10,69
606,81
54,35
BDI
172,87969

06.03.079
QE-47 TRAVE DE FUTEBOL DE SALAO (PRE-LAJE TRELICADA)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
3.67.12
REDE PARA TRAVE DE GOL
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.18
QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
6.25.34
TUBO PVC P/ESGOTO 150MM
Mo-de-Obra 14,05920
LS
17,15222
SubMO
31,21142

UN
H
1,12000
H
2,32000
M3
0,01440
KG
0,40000
KG
5,66000
M3
0,00560
UN
1,00000
UN
2,00000
UN
1,00000
M
0,70000
M
0,50000
Material
713,82860

4,64
3,82
80,46
0,35
0,37
66,21
36,81
10,69
606,81
54,35
14,04
BDI
171,35921

06.03.090
CAIXILHARIA EM ALUMINIO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.91
CAIXILHARIA EM ALUMINIO
Mo-de-Obra 3,38400
LS

7,51248

KG
H
0,40000
H
0,40000
KG
1,00000
Material
34,87000

0,00000

KG
KG
1,00000
Material
11,56000

06.03.078
QE-46 TRAVE DE FUTEBOL DE SALAO (LAJE ALVEOLAR)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
3.67.12
REDE PARA TRAVE DE GOL
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.18
QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
Mo-de-Obra 20,19920
LS
24,64302
SubMO

06.03.091
CAIXILHARIA EM FERRO
3.11.90
CAIXILHARIA EM FERRO
Mo-de-Obra 0,00000
LS
06.03.099
Exerccio:

4,12848

0,00000

SubMO

SubMO

SERVICOS EM ELEMENTOS METALICOS/COMPONENTES

2011

MV

BDI

4,64
3,82
34,87
9,74797

BDI

11,56
2,65880

7,51680
12,68240
1,15862
0,14000
2,09420
0,37078
21,38000
496,35000
92,63000
38,04500

849,19
5,19680
8,86240
1,15862
0,14000
2,09420
0,37078
21,38000
496,35000
92,63000
38,04500
7,02000

958,66
16,70400
13,75200
30,96894
36,81000
21,38000
606,81000
1,04000
14,78400

924,53
7,51680
12,68240
1,15862
0,14000
2,09420
0,37078
36,81000
21,38000
606,81000
38,04500

916,39
5,19680
8,86240
1,15862
0,14000
2,09420
0,37078
36,81000
21,38000
606,81000
38,04500
7,02000

52,13
1,85600
1,52800
34,87000

14,21
11,56000

301,12
Pgina: 77

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente
SubMO

06.50.030
DEGRAUS DE ESCADA DE MARINHEIRO EM GRAMPOS
1.01.46
SERVENTE
Mo-de-Obra 0,76400
LS
0,93208
SubMO
06.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

06.60.001
DE ESQUADRIAS METALICAS
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 5,92200
LS
06.60.002
RETIRADA DE TELA
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
Mo-de-Obra 2,17350
LS
06.60.005
DE BATENTES
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 10,15200

LS

06.60.050
DE BRACO DE ALAVANCA
1.01.44
SERRALHEIRO
Mo-de-Obra 4,04000
LS
06.60.051
DE ALAVANCA
1.01.44
SERRALHEIRO
Mo-de-Obra 3,23200

LS

0,00000

7,22484

2,65167

12,38544

4,92880

3,94304

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

06.60.052
DE PUXADOR DE ENGATE PARA CAIXILHO DE CORRER
1.01.44
SERRALHEIRO
Mo-de-Obra 1,13120
LS
1,38006
SubMO
06.60.060
DE ESCADA DE MARINHEIRO COM GUARDA-CORPO
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 6,76800
LS
8,25696
SubMO
06.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

06.70.001
DE ESQUADRIAS METALICAS
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 8,46000
LS
06.70.005
DE BATENTES
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 10,99800

LS

06.70.020
RECOLOCACAO DE TELA
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
Mo-de-Obra 2,85660
LS
06.70.050
DE BRACO DE ALAVANCA
1.01.44
SERRALHEIRO
Mo-de-Obra 9,69600
LS
06.70.051
DE ALAVANCA
1.01.44
SERRALHEIRO
Mo-de-Obra 8,88800
06.70.052
1.01.44

Exerccio:

LS

0,00000

10,32120

13,41756

3,48505

11,82912

10,84336

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

DE PUXADOR DE ENGATE PARA CAIXILHO DE CORRER


SERRALHEIRO

2011

MV
1,00000
244,82000

Custo Unit.

Custo Total

244,82
244,82000
56,30860

0,00000

Material

1,69608

UN
H
0,20000
Material
0,00000

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

13,14684

M2
H
0,70000
H
0,70000
Material
0,00000

4,82517

M2
H
0,17500
H
0,17500
Material
0,00000

22,53744

UN
H
1,20000
H
1,20000
Material
0,00000

8,96880

UN
H
0,50000
Material
0,00000

7,17504

UN
H
0,40000
Material
0,00000

2,51126

UN
H
0,14000
Material
0,00000
M
H
0,80000
H
0,80000
0,00000

15,02496

Material

0,00000

MV
MV
1,00000
Material
244,82000

18,78120

M2
H
1,00000
H
1,00000
Material
0,00000

24,41556

UN
H
1,30000
H
1,30000
Material
0,00000

6,34165

M2
H
0,23000
H
0,23000
Material
0,00000
M
H
1,20000
0,00000

21,52512

Material

19,73136

UN
H
1,10000
Material
0,00000
UN
H

0,20000

BDI

3,82
0,39010

BDI

4,64
3,82
3,02377

BDI

8,08
4,34
1,10979

BDI

4,64
3,82
5,18361

BDI

8,08
2,06282

BDI

8,08
1,65026

BDI

8,08
0,57759

BDI

4,64
3,82
3,45574

2,08
0,76400

16,17
3,24800
2,67400

5,93
1,41400
0,75950

27,72
5,56800
4,58400

11,03
4,04000

8,82
3,23200

3,08
1,13120

18,48
3,71200
3,05600

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
4,31968

BDI

4,64
3,82
5,61558

BDI

8,08
4,34
1,45858

BDI

8,08
4,95078

BDI

8,08
4,53821

8,08

23,10
4,64000
3,82000

30,03
6,03200
4,96600

7,80
1,85840
0,99820

26,47
9,69600

24,26
8,88800

4,41
1,61600

Pgina: 78

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 1,61600

LS

1,97152

UN Coeficiente
SubMO

06.70.060
DE ESCADA MARINHEIRO COM GUARDA CORPO
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 6,76800
LS
8,25696
SubMO

3,58752

15,02496

Material

Material

0,00000
M
H
0,80000
H
0,80000
0,00000

Custo Unit.

Custo Total

BDI

0,82513

BDI

4,64
3,82
3,45574

18,48
3,71200
3,05600

06.70.099
RECOLOCACOES DE ELEMENTOS METALICOS/COMPONENTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

06.80.001
CAIXILHO BASCULANTE EM PERFIL DE FERRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.44
CAIXILHO DE FERRO BASCULANTE
Mo-de-Obra 8,46000
LS
10,32120

18,78120

M2
H
1,00000
H
1,00000
M2
1,00000
Material
324,65000

422,42
4,64
4,64000
3,82
3,82000
324,65
324,65000
BDI
78,98918

18,78120

M2
H
1,00000
H
1,00000
M2
1,00000
Material
240,63000

319,07
4,64
4,64000
3,82
3,82000
240,63
240,63000
BDI
59,66458

24,41556

M2
H
1,30000
H
1,30000
UN
0,18000
Material
55,02780

4,64
3,82
305,71
BDI
18,27197

14,35008

M2
H
0,80000
UN
0,72000
Material
194,40720

256,77
8,08
6,46400
270,01
194,40720
BDI
48,01417

24,41556

M2
H
1,30000
H
1,30000
UN
0,18000
Material
207,57780

285,35
4,64
6,03200
3,82
4,96600
1.153,21
207,57780
BDI
53,35847

37,56240

M2
H
2,00000
H
2,00000
M2
1,00000
Material
516,29000

681,23
4,64
9,28000
3,82
7,64000
516,29
516,29000
BDI
127,38605

15,02496

M2
H
0,80000
H
0,80000
M2
1,00000
Material
464,42000

589,71
4,64
3,71200
3,82
3,05600
464,42
464,42000
BDI
110,27234

15,02496

M2
H
0,80000
H
0,80000
M2
1,00000
Material
212,03000

279,27
4,64
3,71200
3,82
3,05600
212,03
212,03000
BDI
52,22264

15,02496

M2
H
0,80000
H
0,80000
M2
1,00000
Material
218,43000

287,14
4,64
3,71200
3,82
3,05600
218,43
218,43000
BDI
53,69464

06.80.023
PORTAO DE 1 FOLHA DE TUBOS E TELA GALVANIZADOS COM PORTA CADEADO
M2
1.01.39
PEDREIRO
H
0,85000
1.01.46
SERVENTE
H
0,85000
3.12.25
PORTA DE TELA PT-06
UN
0,27000
SubMO
15,96402
Mo-de-Obra 7,19100
LS
8,77302
Material
298,24200

386,47
4,64
3,94400
3,82
3,24700
1.104,60
298,24200
BDI
72,26739

06.80.003
CAIXILHO FIXO EM PERFIL DE FERRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.45
CAIXILHO DE FERRO FIXO
Mo-de-Obra 8,46000
LS
10,32120
06.80.005
CAIXILHO DE CORRER EM PERFIL DE FERRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.49
CAIXILHO CORRER 068005
Mo-de-Obra 10,99800
LS
13,41756

SubMO

SubMO

SubMO

06.80.007
FOLHA PARA CAIXILHO DE CORRER EM PERFIL DE FERRO
1.01.44
SERRALHEIRO
3.12.14
FOLHA P/CAIXILHO 068007
Mo-de-Obra 6,46400
LS
7,88608
SubMO
06.80.009
CAIXILHO MAXIMAR DE FERRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.13
CAIXILHO MAXIMAR
Mo-de-Obra 10,99800
LS
13,41756

SubMO

06.80.015
PORTA DE ABRIR COM BATENTE EM CHAPA DE FERRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.22
PF-05 PORTA CHAPA N.14 C/BATENTE
Mo-de-Obra 16,92000
LS
20,64240
SubMO
06.80.019
PORTA PANTOGRAFICA
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.35
PORTA PANTOGRAFICA
Mo-de-Obra 6,76800
LS

8,25696

06.80.020
PORTA DE ENROLAR EM TIRAS ARTICULADAS
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.37
BA-02PORTA DE ACO DE ENROLAR
Mo-de-Obra 6,76800
LS
8,25696

SubMO

SubMO

06.80.021
PORTA DE ENROLAR EM GRADES RETANGULARES
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.12.36
PORTA ENROLAR EM GRADES RETANGULARES
Mo-de-Obra 6,76800
LS
8,25696
SubMO

06.80.025
1.01.39
1.01.46
3.12.33
Exerccio:

PORTAO DE 2 FOLHAS DE TUBO E TELA GALVANIZADOS COM PORTA CADEADO


PEDREIRO
SERVENTE
PORTA DE TELA PT-05

2011

M2
H
H
UN

0,55000
0,55000
0,14000

4,64
3,82
2.195,44

97,71
6,03200
4,96600
55,02780

390,76
2,55200
2,10100
307,36160
Pgina: 79

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 4,65300

LS

5,67666

UN Coeficiente
SubMO

10,32966

Material

307,36160

06.80.029
TELA DE PROTEC P/CAIXILHO C/REQ DE PERFIL DE FERRO E TELA ARAME GALV
M2
1.01.44
SERRALHEIRO
H
1,80000
1.01.45
AJUDANTE SERRALHEIRO
H
1,80000
2.66.78
FERRO CANTONEIRA 1X1X1/8'
KG
4,62000
2.75.29
TELA PROT. 1/2 X 1/2 FIO 15 PARA CAIXILHO
M2
1,00000
Mo-de-Obra 22,35600
LS
27,27432
SubMO
49,63032
Material
64,47400

Custo Unit.

Custo Total

BDI

73,06899

BDI

8,08
4,34
2,70
52,00
26,24399

BDI

4,64
3,82
20,22
14,87654

BDI

8,08
4,34
2,86
14,47
26,77796

196,23
4,64
9,28000
3,82
7,64000
70,51
121,98230
36,69528

140,34
14,54400
7,81200
12,47400
52,00000

06.80.031
TELA MOSQUITEIRO COM REQUADRO DE PERFIL DE FERRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.75.23
TP-01 TELA/DISPENSA COMPLETA
Mo-de-Obra 8,46000
LS
10,32120
SubMO
18,78120

M2
H
1,00000
H
1,00000
UN
2,27000
Material
45,89940

06.80.033
CHAPA DE FERRO N 14, INCLUSIVE SOLDAGEM
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
2.67.04
CHAPA DE FERRO N.14
6.95.65
SOLDA ELETRICA
Mo-de-Obra 22,35600
LS
27,27432

49,63032

M2
H
1,80000
H
1,80000
KG
15,26000
KG
1,60000
Material
66,79560

37,56240

M2
H
2,00000
H
2,00000
UN
1,73000
Material
121,98230

BDI

35,87520

UN
H
2,00000
UN
1,00000
UN
1,00000
Material
104,79000

173,01
8,08
16,16000
104,46
104,46000
0,33
0,33000
BDI
32,35300

21,52512

M
H
1,20000
KG
0,01040
M
1,00000
Material
2,02009

06.80.044
ALAVANCA PARA CAIXILHO BASCULANTE
1.01.44
SERRALHEIRO
2.65.51
REBITE DE FERRO ZINCADO CABECA REDONDA 5/32"X3/4"
3.16.01
ALAVANCA ACO CARBONO ZINCADO E=3MM COMP 140/145MM
Mo-de-Obra 8,88800
LS
10,84336
SubMO
19,73136

UN
H
1,10000
KG
0,00450
UN
1,00000
Material
2,77061

06.80.045
PUXADORES DE ENGATE EM LATAO CROMADO PARA CAIXILHO DE CORRER
1.01.44
SERRALHEIRO
3.17.49
PUCHADOR DE CENTRO PARA JANELAS
Mo-de-Obra 4,04000
LS
4,92880
SubMO
8,96880

UN
H
0,50000
UN
1,00000
Material
40,57000

06.80.046
CADEADO E PORTA CADEADO
1.01.44
SERRALHEIRO
3.16.12
PORTA CADEADO 63 MM - ACO ZINCADO
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
Mo-de-Obra 4,04000
LS
4,92880

8,96880

UN
H
0,50000
UN
1,00000
UN
1,00000
Material
12,54000

4,30502

M2
H
0,24000
KG
0,01730
L
0,05000
Material
0,56003

SubMO

06.80.035
ALCAPAO EM CHAPA DE FERRO COM PORTA CADEADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.13.90
PF-07TAMPA INSPECAO
Mo-de-Obra 16,92000
LS
20,64240
SubMO
06.80.042
COLUNA DE BATENTE MOVEL PARA PORTAS DE ENROLAR
1.01.44
SERRALHEIRO
3.13.65
COLUNA MOVEL P/PORTA ENROLAR
3.16.02
ALAVANCA P/COLUNA MOVEL
Mo-de-Obra 16,16000
LS
19,71520
SubMO
06.80.043
BRACO DE ALAVANCA DE FERRO
1.01.44
SERRALHEIRO
2.68.50
REBITE DE FERRO ZINCADO CABECA REDONDA 5/32"X1/2"
3.16.06
BRACO DE ALAVANCA - FERRO CHATO 5/8" X 3/16"
Mo-de-Obra 9,69600
LS
11,82912
SubMO

SubMO

06.80.049
LUBRIFICACAO DE CAIXILHO E TROCA DE REBITES
1.01.44
SERRALHEIRO
2.68.50
REBITE DE FERRO ZINCADO CABECA REDONDA 5/32"X1/2"
3.12.99
OLEO LUBRIFICANTE
Mo-de-Obra 1,93920
LS
2,36582
SubMO
06.80.050
FERRO TRABALHADO (CAIXILHO)
3.12.17
ESQUADRIA DE FERRO (TIPO CONESP)
Mo-de-Obra 0,00000
LS
0,00000
06.80.082
CAIXILHO FIXO EM ALUMINIO ANODIZADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.11
CAIXILHO FIXO 068082
Mo-de-Obra 8,46000
LS
10,32120
06.80.084
Exerccio:

CAIXILHO DE CORRER EM ALUMINIO ANODIZADO

2011

SubMO

SubMO

79,55
4,64000
3,82000
45,89940

143,20
14,54400
7,81200
43,64360
23,15200

28,96
9,69600
0,14009
1,88000

BDI

8,08
13,47
1,88
5,41540

BDI

8,08
13,47
2,71
5,17545

BDI

8,08
40,57
11,39392

BDI

8,08
1,34
11,20
4,94702

BDI

8,08
13,47
6,54
1,11896

0,00000

KG
KG
1,00000
Material
21,73000

BDI

21,73
4,99790

18,78120

M2
H
1,00000
H
1,00000
UN
0,36000
Material
107,87040

155,78
4,64
4,64000
3,82
3,82000
299,64
107,87040
BDI
29,12987

M2

27,67
8,88800
0,06062
2,71000

60,93
4,04000
40,57000

26,45
4,04000
1,34000
11,20000

5,98
1,93920
0,23303
0,32700

26,72
21,73000

126,23
Pgina: 80

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.12
CAIXILHO CORRER 068084
Mo-de-Obra 10,99800
LS

UN Coeficiente

Custo Unit.

Custo Total

24,41556

H
1,30000
H
1,30000
UN
0,18000
Material
78,21360

4,64
3,82
434,52
BDI
23,60471

06.80.086
FOLHA PARA CAIXILHO DE CORRER EM ALUMINIO ANODIZADO
1.01.44
SERRALHEIRO
3.11.17
FOLHA P/CAIXILHO 068086
Mo-de-Obra 6,46400
LS
7,88608
SubMO
14,35008

M2
H
0,80000
UN
0,72000
Material
292,83120

377,83
8,08
6,46400
406,71
292,83120
BDI
70,65169

06.80.088
CAIXILHO MAXIMAR EM ALUMINIO ANODIZADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.11.56
CAIXILHO ALUMINIO TIPO MAXIMAR
Mo-de-Obra 10,99800
LS
13,41756

24,41556

M2
H
1,30000
H
1,30000
M2
1,00000
Material
415,15000

540,66
4,64
6,03200
3,82
4,96600
415,15
415,15000
BDI
101,10008

21,52512

M
H
1,20000
KG
0,01000
M
1,00000
Material
2,99650

13,41756

SubMO

SubMO

06.80.094
BRACO DE ALAVANCA DE ALUMINIO
1.01.44
SERRALHEIRO
2.68.55
REBITE DE ALUMINIO CABECA REDONDA 5/32"X3/4"
3.16.05
BRACO DE ALAVANCA ALUMINIO 3/4" X 1/4"
Mo-de-Obra 9,69600
LS
11,82912
SubMO

BDI

8,08
38,65
2,61
5,63997

8,08
4,21
1,79343

6,03200
4,96600
78,21360

30,16
9,69600
0,38650
2,61000

06.80.096
PUXADOR DE ENGATE DE ALUMINIO TIPO "BICO DE PAPAGAIO"
1.01.44
SERRALHEIRO
3.17.11
PUXADOR ENGATE ALUM 'BICO PAPAGAIO'
SubMO
3,58752
Mo-de-Obra 1,61600
LS
1,97152

UN
H
0,20000
UN
1,00000
Material
4,21000

BDI

06.80.099
SERVICOS EM ELEMENTOS METALICOS/COMPONENTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

07.01.001
EM TESOURAS PARA TELHAS CERAMICAS - VAOS ATE 7.00 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
2.67.60
PREGO
SubMO
23,75400
Mo-de-Obra 10,70000
LS
13,05400

M2
H
1,25000
H
1,25000
M3
0,02700
KG
0,22000
KG
0,11000
Material
41,05972

4,60
3,96
1.393,66
13,26
4,67
BDI
14,90716

07.01.002
EM TESOURAS PARA TELHAS CERAMICAS - VAOS DE 7.01 A 10.00 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
2.67.60
PREGO
Mo-de-Obra 11,12800
LS
13,57616
SubMO
24,70416

M2
H
1,30000
H
1,30000
M3
0,02900
KG
0,23000
KG
0,12000
Material
44,02634

4,60
3,96
1.393,66
13,26
4,67
BDI
15,80802

07.01.003
EM TESOURAS PARA TELHAS CERAMICAS - VAOS DE 10.01 A 13.00 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
2.67.60
PREGO
Mo-de-Obra 11,55600
LS
14,09832
SubMO
25,65432

M2
H
1,35000
H
1,35000
M3
0,03100
KG
0,24000
KG
0,13000
Material
46,99296

4,60
3,96
1.393,66
13,26
4,67
BDI
16,70887

07.01.004
EM TESOURAS PARA TELHAS CERAMICAS - VAOS DE 13.01 A 18.00 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
2.67.60
PREGO
Mo-de-Obra 12,41200
LS
15,14264
SubMO
27,55464

M2
H
1,45000
H
1,45000
M3
0,03400
KG
0,26000
KG
0,15000
Material
51,53254

4,60
3,96
1.393,66
13,26
4,67
BDI
18,19005

07.01.010
EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS ATE 7,00 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
2.67.60
PREGO
Mo-de-Obra 8,13200
SubMO
18,05304
LS
9,92104

M2
H
0,95000
H
0,95000
M3
0,01800
KG
0,22000
KG
0,09000
Material
28,42338

4,60
3,96
1.393,66
13,26
4,67
BDI
10,68958

07.01.011
1.01.11
1.01.12
Exerccio:

0,00000

EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS DE 7.01 A 10,00 M


CARPINTEIRO
AJUDANTE DE CARPINTEIRO

2011

M2
H
H

1,00000
1,00000

4,60
3,96

9,59
1,61600
4,21000

79,72
5,75000
4,95000
37,62882
2,91720
0,51370

84,53
5,98000
5,14800
40,41614
3,04980
0,56040

89,35
6,21000
5,34600
43,20346
3,18240
0,60710

97,27
6,67000
5,74200
47,38444
3,44760
0,70050

57,16
4,37000
3,76200
25,08588
2,91720
0,42030

61,98
4,60000
3,96000
Pgina: 81

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
2.67.60
PREGO
Mo-de-Obra 8,56000
LS
10,44320

UN Coeficiente

Custo Unit.

Custo Total

M3
0,02000
KG
0,23000
KG
0,10000
Material
31,39000

1.393,66
13,26
4,67
BDI
11,59044

07.01.012
EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS DE 10.01 A 13,00 M
M2
1.01.11
CARPINTEIRO
H
1,05000
1.01.12
AJUDANTE DE CARPINTEIRO
H
1,05000
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
M3
0,02200
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
KG
0,24000
2.67.60
PREGO
KG
0,11000
Mo-de-Obra 8,98800
LS
10,96536
SubMO
19,95336
Material
34,35662

4,60
3,96
1.393,66
13,26
4,67
BDI
12,49130

07.01.013
EM TESOURAS PARA TELHAS OND CIM-AM/AL/PLAST - VAOS DE 13,01 A 18,00 M
M2
1.01.11
CARPINTEIRO
H
1,15000
1.01.12
AJUDANTE DE CARPINTEIRO
H
1,15000
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
M3
0,02400
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
KG
0,26000
2.67.60
PREGO
KG
0,13000
Mo-de-Obra 9,84400
LS
12,00968
Material
37,50254
SubMO
21,85368

4,60
3,96
1.393,66
13,26
4,67
BDI
13,65193

07.01.025
EM TERCAS PARA TELHAS CERAMICAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.67.60
PREGO
Mo-de-Obra 5,56400
LS
6,78808

12,35208

M2
H
0,65000
H
0,65000
M3
0,01700
KG
0,06000
Material
23,97242

4,60
3,96
1.393,66
4,67
BDI
8,35464

0,15000
0,10000
0,00600
0,05000

2,41092

M2
H
H
M3
KG
Material
8,59546

4,60
3,96
1.393,66
4,67
BDI
2,53147

0,15000
0,10000
0,00370
0,05000

2,41092

M2
H
H
M3
KG
Material
5,39004

4,60
3,96
1.393,66
4,67
BDI
1,79422

SubMO

SubMO

07.01.026
EM TERCAS PARA TELHAS DE CIM-AM/AL/PLAST
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.67.60
PREGO
Mo-de-Obra 1,08600
LS
1,32492
SubMO
07.01.027
EM TERCAS PARA TELHAS TRAPEZOIDAIS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.67.60
PREGO
Mo-de-Obra 1,08600
LS
1,32492

SubMO

19,00320

27,87320
3,04980
0,46700

66,80
4,83000
4,15800
30,66052
3,18240
0,51370

73,00
5,29000
4,55400
33,44784
3,44760
0,60710

44,67
2,99000
2,57400
23,69222
0,28020

13,53
0,69000
0,39600
8,36196
0,23350

9,59
0,69000
0,39600
5,15654
0,23350

07.01.035
EM TRELICAS PARA TELHAS ONDULADAS CIM-AM - PROJ.MOD.81
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
2.67.60
PREGO
Mo-de-Obra 6,76240
LS
8,25013
SubMO
15,01253

M2
H
0,79000
H
0,79000
M3
0,01900
KG
0,50000
KG
0,05000
Material
33,34304

4,60
3,96
1.393,66
13,26
4,67
BDI
11,12178

07.01.098
PECAS DE MADEIRA MACICA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.67.60
PREGO
Mo-de-Obra 385,20000
LS
469,94400

855,14400

M3
H
45,00000
H
45,00000
M3
1,00000
KG
3,00000
Material
1.407,67000

2.783,26
4,60
207,00000
3,96
178,20000
1.393,66
1.393,66000
4,67
14,01000
BDI
520,44722

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

07.01.099
ESTRUTURAS DE COBERTURA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

07.02.001
FORNECIMENTO DE EST MET - ACO ESTRUTURAL ASTM OU ABNT - NAO PATINAVEL
KG
2.50.17
ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL
KG
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
10,14000
07.02.003
FORNEC DE ESTR METALICA ACO ASTM A709/A588 (RESIST A CORROSAO)
2.50.16
ESTR MET ACO RESIST A CORROSAO (ASTM A709/A588)
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

KG
KG
1,00000
Material
10,27000

07.02.006
FORNECIMENTO DE ESTRUTURA METALICA EM ALUMINIO (ESPACIAL)
2.50.21
ESTRUTURA ESPACIAL EM ALUMINIO - MATERIAL
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

KG
KG
1,00000
Material
31,44000

07.02.010
Exerccio:

MONTAGEM DE ESTRUTURA METALICA

2011

KG

BDI

10,14
2,33220

BDI

10,27
2,36210

BDI

31,44
7,23120

59,47
3,63400
3,12840
26,47954
6,63000
0,23350

12,47
10,14000

12,63
10,27000

38,67
31,44000

2,68
Pgina: 82

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.50.20
MONTAGEM DE ESTRUTURA METALICA
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente
SubMO

0,00000

Material

KG
1,00000
2,18000

Custo Unit.

Custo Total

BDI

2,18
0,50140

BDI

3,95
0,90850

3,79
0,87170

2,18000

07.02.015
MONTAGEM DE ESTRUTURA METALICO EM ALUMINIO (ESPACIAL)
2.50.22
MONTAGEM ESTRUTURA ESPACIAL EM ALUMINIO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

KG
KG
1,00000
Material
3,95000

07.02.020
FORNECIMENTO E MONTAGEM DE ESTRUTURA METALICA - MULTIVIGAS
2.50.30
FORNEC E MONTAGEM DE ESTRUTURA METALICA-MULTIVIGAS
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

KG
KG
1,00000
Material
3,79000

BDI

07.02.099
ESTRUTURAS DE COBERTURA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

13,58640

M2
H
1,00000
H
0,50000
UN
16,00000
Material
21,60000

27,41167

M2
H
1,98000
H
1,04000
M3
0,00100
KG
0,19000
KG
0,10000
UN
30,00000
Material
41,58396

22,24884

M2
H
1,60000
H
0,85000
M3
0,00100
KG
0,19000
KG
0,10000
UN
24,00000
Material
31,14396

15,45564

M2
H
1,10000
H
0,60000
M3
0,00100
KG
0,19000
KG
0,10000
UN
16,00000
Material
13,94396

15,45564

M2
H
1,10000
H
0,60000
M3
0,00100
KG
0,19000
KG
0,10000
UN
16,00000
Material
15,54396

22,24884

M2
H
1,60000
H
0,85000
M3
0,00100
KG
0,19000
KG
0,10000
UN
24,00000
Material
38,82396

18,41712

M2
H
0,80000
H
1,20000
UN
24,00000
Material
500,40000

07.03.001
TELHAS DE BARRO FRANCESA
1.01.46
SERVENTE
1.01.50
TELHADISTA
2.55.01
TELHA TIPO FRANCESA
Mo-de-Obra 6,12000
LS
7,46640
07.03.002
TELHAS DE BARRO PAULISTA
1.01.46
SERVENTE
1.01.50
TELHADISTA
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.55.02
TELHA TIPO PAULISTA
Mo-de-Obra 12,34760
LS
07.03.003
TELHAS DE BARRO PLAN
1.01.46
SERVENTE
1.01.50
TELHADISTA
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.55.08
TELHA DE BARRO TIPO PLAN
Mo-de-Obra 10,02200
LS
07.03.004
TELHA DE BARRO ROMANA
1.01.46
SERVENTE
1.01.50
TELHADISTA
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.55.06
TELHA DE BARRO ROMANA
Mo-de-Obra 6,96200
LS

15,06407

12,22684

8,49364

07.03.005
TELHA DE BARRO PORTUGUESA
1.01.46
SERVENTE
1.01.50
TELHADISTA
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.55.04
TELHA DE BARRO TIPO PORTUGUESA
Mo-de-Obra 6,96200
LS
8,49364
07.03.006
TELHA DE BARRO COLONIAL
1.01.46
SERVENTE
1.01.50
TELHADISTA
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.55.05
TELHA DE BARRO TIPO COLONIAL
Mo-de-Obra 10,02200
LS
12,22684
07.03.010
TELHAS DE VIDRO PLAN
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.50
TELHA DE VIDRO TIPO "PLAN"
Mo-de-Obra 8,29600
LS
07.03.011
1.01.39
Exerccio:

TELHAS DE VIDRO PAULISTA


PEDREIRO

2011

10,12112

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

M2
H

1,20000

4,85
3,95000

4,66
3,79000

43,27
3,82000
2,30000
21,60000

BDI

3,82
4,60
1,35
8,09287

BDI

3,82
4,60
80,46
0,35
0,37
1,38
15,86900

BDI

3,82
4,60
80,46
0,35
0,37
1,29
12,28034

BDI

3,82
4,60
80,46
0,35
0,37
0,86
6,76191

BDI

3,82
4,60
80,46
0,35
0,37
0,96
7,12991

BDI

3,82
4,60
80,46
0,35
0,37
1,61
14,04674

BDI

638,14
4,64
3,71200
3,82
4,58400
20,85
500,40000
119,32794

4,64

84,86
7,56360
4,78400
0,08046
0,06650
0,03700
41,40000

65,67
6,11200
3,91000
0,08046
0,06650
0,03700
30,96000

36,16
4,20200
2,76000
0,08046
0,06650
0,03700
13,76000

38,12
4,20200
2,76000
0,08046
0,06650
0,03700
15,36000

75,11
6,11200
3,91000
0,08046
0,06650
0,03700
38,64000

217,27
5,56800
Pgina: 83

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.55.62
TELHA DE VIDRO TIPO "PAULISTA"
Mo-de-Obra 11,68000
LS
14,24960
07.03.012
TELHAS DE VIDRO FRANCESA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.61
TELHA DE VIDRO TIPO "FRANCESA"
Mo-de-Obra 5,37600
LS
6,55872
07.03.013
TELHAS DE VIDRO ROMANA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.60
TELHA DE VIDRO TIPO ROMANA
Mo-de-Obra 5,37600
LS
6,55872
07.03.018
TELHAS DE VIDRO PORTUGUESA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.63
TELHA DE VIDRO TIPO PORTUGUESA
Mo-de-Obra 5,37600
LS
6,55872

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

07.03.019
TELHA DE VIDRO COLONIAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.64
TELHA DE VIDRO TIPO COLONIAL CAPA E CANAL
Mo-de-Obra 8,29600
LS
10,12112
SubMO
07.03.023
TELHA TECNOLOGIA CRFS MODULAR E=8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.63
TELHA TECNOLOGIA CRFS MODULAR E=8MM
2.65.78
CALCO PLASTICO P/ FIXACAO TELHA MODULADA FIBROCIM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 3,75600
LS
4,58232
SubMO
07.03.024
TELHA TECNOLOGIA CRFS TRAPEZOIDAL 44CM E=8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.64
TELHA TECNOLOGIA CRFS TRAPEZOIDAL 44CM E=8MM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.12
PARAFUSO 8X65MM OU GANCHO FIX.TELHA TRAPEZOIDAL
2.66.53
FIXADOR DE ABAS PARA TELHAS DE FIBRA
Mo-de-Obra 3,25520
LS
3,97134
SubMO
07.03.027
TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM E=8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.66
TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM E=8MM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.13
PARAFUSO 8X110MM OU GANCHO FIX.TELHA TRAPEZOIDAL
2.66.53
FIXADOR DE ABAS PARA TELHAS DE FIBRA
Mo-de-Obra 4,94400
LS
6,03168
SubMO

25,92960

H
1,60000
UN
16,00000
Material
150,72000

11,93472

M2
H
0,50000
H
0,80000
UN
16,00000
Material
364,32000

11,93472

M2
H
0,50000
H
0,80000
UN
16,00000
Material
349,28000

11,93472

M2
H
0,50000
H
0,80000
UN
16,00000
Material
415,04000

18,41712

M2
H
0,80000
H
1,20000
UN
24,00000
Material
598,56000

8,33832

M2
H
0,30000
H
0,60000
M2
1,24000
UN
1,10000
CJ
1,10000
UN
1,10000
Material
53,22040

7,22654

M2
H
0,26000
H
0,52000
M2
1,09000
CJ
0,75000
UN
0,75000
UN
0,25000
Material
47,47750

10,97568

M2
H
0,30000
H
0,90000
M2
1,09000
CJ
0,24000
UN
0,24000
UN
0,54000
Material
38,23870

07.03.028
TELHA DE ALUMINIO ONDULADA ACAB. NATURAL E=0,5MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.66.54
GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO
Mo-de-Obra 2,56800
LS
3,13296
SubMO
5,70096

M2
H
0,30000
H
0,30000
KG
1,67000
UN
2,76000
Material
30,17700

07.03.029
TELHA DE ALUMINIO ONDULADA ACAB. NATURAL E=0,7MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.66.54
GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO
Mo-de-Obra 2,56800
LS
3,13296
SubMO
5,70096

M2
H
0,30000
H
0,30000
KG
2,34000
UN
2,76000
Material
41,23200

07.03.030
1.01.11
1.01.12
2.55.30
2.66.51
Exerccio:

TELHA DE ALUMINIO TRAPEZOIDAL ACAB. NATURAL E=0,5MM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO

2011

M2
H
H
KG
UN

0,30000
0,30000
1,60000
1,80000

Custo Unit.

Custo Total

BDI

3,82
6,11200
9,42
150,72000
40,62941

BDI

462,79
4,64
2,32000
3,82
3,05600
22,77
364,32000
86,53859

BDI

444,29
4,64
2,32000
3,82
3,05600
21,83
349,28000
83,07939

BDI

525,17
4,64
2,32000
3,82
3,05600
25,94
415,04000
98,20419

BDI

758,88
4,64
3,71200
3,82
4,58400
24,94
598,56000
141,90474

BDI

4,60
3,96
40,56
2,09
0,08
0,49
14,15851

BDI

4,60
3,96
43,00
0,08
0,43
0,90
12,58193

BDI

4,60
3,96
34,51
0,08
0,49
0,90
11,31931

BDI

4,60
3,96
16,50
0,95
8,25193

BDI

4,60
3,96
16,50
0,95
10,79458

4,60
3,96
16,50
0,95

75,71
1,38000
2,37600
50,29440
2,29900
0,08800
0,53900

67,28
1,19600
2,05920
46,87000
0,06000
0,32250
0,22500

60,53
1,38000
3,56400
37,61590
0,01920
0,11760
0,48600

44,12
1,38000
1,18800
27,55500
2,62200

57,72
1,38000
1,18800
38,61000
2,62200

41,58
1,38000
1,18800
26,40000
1,71000
Pgina: 84

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 2,56800

LS

3,13296

UN Coeficiente
SubMO

5,70096

Material

28,11000

BDI

07.03.031
TELHA DE ALUMINIO TRAPEZOIDAL ACAB. NATURAL E=0,7MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.66.51
GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO
Mo-de-Obra 2,56800
LS
3,13296
SubMO
5,70096

M2
H
0,30000
H
0,30000
KG
2,24500
UN
1,80000
Material
38,75250

07.03.032
TELHA DE POLIESTER (PERFIL DA ONDULADA ALUMINIO) - E=1,2MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.75
TELHA DE POLIESTER (PERFIL OND. ALUM.) - E=1,2MM
2.66.54
GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO
Mo-de-Obra 2,56800
LS
3,13296
SubMO
5,70096

M2
H
0,30000
H
0,30000
M2
1,15000
UN
2,76000
Material
37,36350

07.03.033
TELHA DE PVC RIGIDO TRANSLUCIDA - PERFIL FIBROCIMENTO ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.44
TELHA PVC RIGIDO TRANSLUCIDA - PERFIL OND FIBROCIM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 1,88320
LS
2,29750
SubMO
4,18070

M2
H
0,22000
H
0,22000
M2
1,15000
CJ
1,42000
UN
1,42000
Material
48,03990

07.03.035
TELHA DE POLIESTER (PERFIL DA TRAPEZOIDAL ALUMINIO) - E=1,2MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.59
TELHA DE POLIESTER (PERFIL TRAP. ALUM.) - E=1,2MM
2.66.51
GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO
Mo-de-Obra 2,56800
LS
3,13296
SubMO
5,70096

M2
H
0,30000
H
0,30000
M2
1,15000
UN
1,80000
Material
35,93400

07.03.037
TELHA CALANDRADA ACO GALV NATURAL ONDULADA E=0,80MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.57
TELHA CALANDRADA DE ACO GALV NAT OND E=0,80MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
SubMO
7,60128
Mo-de-Obra 3,42400
LS
4,17728

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
48,96050

07.03.038
TELHA DE CONCRETO CINZA PEROLA / NATURAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.65
TELHA DE CONCRETO TIPO TEGULA - COR PEROLA
Mo-de-Obra 4,98000
LS
6,07560
SubMO

11,05560

M2
H
0,25000
H
1,00000
UN
10,50000
Material
20,79000

11,05560

M2
H
0,25000
H
1,00000
UN
10,50000
Material
24,46500

07.03.039
TELHA DE CONCRETO COLORIDA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.66
TELHA DE CONCRETO TIPO TEGULA - COR VERMELHA
Mo-de-Obra 4,98000
LS
6,07560
SubMO

07.03.050
TELHA DE ACO GALV PINT 1 FACE PO OU COIL-COATING ONDULADA E=0,5 MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.55.80
TELHA ACO GALV PINT 1 FACE ONDULADA E=0.5MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
Material
29,59450
SubMO
7,60128
07.03.051
TELHA CALANDRADA ACO GALVANIZADA PINTADA 1 FACE OND E=0,80MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.81
TELHA CALANDRADA ACO GALV PINT 1 FACE OND E=0,80MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
69,94800

07.03.052
TELHA DE ACO GALV PINT 1 FACE PO OU COIL-COATING ONDULADA E=0,65MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.55.84
TELHA ACO GALV PINT 1 FACE ONDULADA E=0.65MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
SubMO
7,60128
LS
4,17728
Material
36,58650
07.03.053
1.01.11
1.01.12
Exerccio:

TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,5MM H ATE 40MM
CARPINTEIRO
AJUDANTE DE CARPINTEIRO

2011

M2
H
H

Custo Unit.

0,40000
0,40000

Custo Total

7,77652

BDI

4,60
3,96
16,50
0,95
10,22430

BDI

4,60
3,96
30,21
0,95
9,90483

BDI

4,60
3,96
41,07
0,08
0,49
12,01074

BDI

4,60
3,96
29,76
0,95
9,57604

BDI

4,60
3,96
41,67
0,26
13,00921

BDI

4,64
3,82
1,98
7,32449

BDI

4,64
3,82
2,33
8,16974

BDI

4,60
3,96
24,83
0,26
8,55503

BDI

4,60
3,96
59,92
0,26
17,83633

BDI

4,60
3,96
30,91
0,26
10,16319

4,60
3,96

54,67
1,38000
1,18800
37,04250
1,71000

52,96
1,38000
1,18800
34,74150
2,62200

64,23
1,01200
0,87120
47,23050
0,11360
0,69580

51,21
1,38000
1,18800
34,22400
1,71000

69,57
1,84000
1,58400
47,92050
1,04000

39,17
1,16000
3,82000
20,79000

43,69
1,16000
3,82000
24,46500

45,75
1,84000
1,58400
28,55450
1,04000

95,38
1,84000
1,58400
68,90800
1,04000

54,35
1,84000
1,58400
35,54650
1,04000

45,69
1,84000
1,58400
Pgina: 85

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.55.85
TELHA ACO GALV PINT 1 FACE TRAP E=0,5MM H ATE 40MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
SubMO
7,60128
Mo-de-Obra 3,42400
LS
4,17728

M2
1,15000
UN
4,00000
Material
29,54850

07.03.054
TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,65MM H ATE 40MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.55.86
TELHA ACO GALV PINT 1 FACE TRAPEZ E=0.65MM H=40MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
Material
36,52900
SubMO
7,60128
07.03.055
TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,5MM H=100MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.55.87
TELHA ACO GALV PINT 1 FACE TRAPEZ E=0,5MM H=100MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128
Material
30,54900
07.03.056
TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,65MM H=100MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.55.88
TELHA ACO GALV PINT 1 FACE TRAPEZ E=0,65MM H=100M
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128
Material
45,68300
07.03.057
TELHA DE ACO GALV PINT 1 FACE PO OU COIL-COATING ONDULADA E=0.8MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.56.21
TELHA ACO GALV PINT 1 FACE ONDULADA E=0,80MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128
Material
47,79900
07.03.060
TELHA DE POLIESTER (PERFIL DA ONDULADA FIBROCIMENTO)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.40
TELHA DE POLIESTER PERFIL ONDULADO FIBROCIMENTO
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 1,88320
LS
2,29750
SubMO
4,18070

M2
H
0,22000
H
0,22000
M2
1,15000
CJ
1,42000
UN
1,42000
Material
33,80290

07.03.061
TELHA DE POLIESTER (PERFIL DA CANALETE 49/KALHETA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.08
TELHA DE POLIESTER (PERFIL 49 OU KALHETA)
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.05
PARAFUSO OU GANCHO FIX TELHA TRAPEZ 49CM
Mo-de-Obra 3,46080
LS
4,22218
SubMO

M2
H
0,21000
H
0,63000
M2
1,06000
CJ
0,59000
UN
0,59000
Material
29,87010

7,68298

07.03.062
TELHA DE POLIESTER (PERFIL DA CANALETA 90/KACHETAO)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.09
TELHA DE POLIESTER (PERFIL 90 OU KALHETAO)
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.13
PARAFUSO 8X110MM OU GANCHO FIX.TELHA TRAPEZOIDAL
2.66.53
FIXADOR DE ABAS PARA TELHAS DE FIBRA
SubMO
10,97568
Mo-de-Obra 4,94400
LS
6,03168

M2
H
0,30000
H
0,90000
M2
1,09000
CJ
0,24000
UN
0,24000
UN
0,54000
Material
47,04590

07.03.063
TELHA DE POLIESTER (PERFIL DA MAXIPLAC)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.10
TELHA DE POLIESTER (PERFIL MAXIPLAC)
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
SubMO
Mo-de-Obra 1,88320
LS
2,29750

4,18070

M2
H
0,22000
H
0,22000
M2
1,15000
CJ
1,42000
UN
1,42000
Material
32,68740

07.03.064
TELHA DE POLIESTER (PERFIL DA ONDULADA ACO) - E=1,2MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.11
TELHA DE POLIESTER (PERFIL OND. ACO) - E=1,2MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
SubMO
4,18070
Mo-de-Obra 1,88320
LS
2,29750

M2
H
0,22000
H
0,22000
M2
1,15000
UN
4,00000
Material
32,37750

07.03.065
1.01.11
Exerccio:

TELHA DE POLIESTER (PERFIL DA TRAPEZOIDAL ACO H ATE 40MM) - E=1,2MM


CARPINTEIRO

2011

M2
H

0,22000

Custo Unit.

Custo Total

BDI

24,79
0,26
8,54445

BDI

4,60
3,96
30,86
0,26
10,14996

BDI

4,60
3,96
25,66
0,26
8,77456

BDI

4,60
3,96
38,82
0,26
12,25538

BDI

4,60
3,96
40,66
0,26
12,74206

BDI

4,60
3,96
28,69
0,08
0,49
8,73623

BDI

4,60
3,96
27,35
0,08
1,41
8,63721

BDI

4,60
3,96
42,59
0,08
0,49
0,90
13,34496

BDI

4,60
3,96
27,72
0,08
0,49
8,47966

BDI

4,60
3,96
27,25
0,26
8,40839

4,60

28,50850
1,04000

54,28
1,84000
1,58400
35,48900
1,04000

46,92
1,84000
1,58400
29,50900
1,04000

65,53
1,84000
1,58400
44,64300
1,04000

68,14
1,84000
1,58400
46,75900
1,04000

46,71
1,01200
0,87120
32,99350
0,11360
0,69580

46,19
0,96600
2,49480
28,99100
0,04720
0,83190

71,36
1,38000
3,56400
46,42310
0,01920
0,11760
0,48600

45,34
1,01200
0,87120
31,87800
0,11360
0,69580

44,96
1,01200
0,87120
31,33750
1,04000

46,38
1,01200
Pgina: 86

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.12
AJUDANTE DE CARPINTEIRO
2.56.12
TELHA DE POLIESTER (PERF.TRAP.ACO H=40MM)- E=1,2MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
SubMO
4,18070
Mo-de-Obra 1,88320
LS
2,29750

UN Coeficiente
H
0,22000
M2
1,15000
UN
4,00000
Material
33,52750

07.03.066
TELHA DE POLIESTER (PERFIL DA TRAPEZOIDAL ACO H=100MM) - E=1,2MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.13
TELHA DE POLIESTER (PERF.TRAP.ACO H=100M)- E=1,2MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 1,88320
LS
2,29750
SubMO
4,18070

M2
H
0,22000
H
0,22000
M2
1,15000
UN
4,00000
Material
58,27550

07.03.067
TELHA DE POLIESTER (PERFIL DA ONDULADA CRFS) - E=1,2MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.15
TELHA DE POLIESTER (PERFIL OND. CRFS) - E=1,2MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
SubMO
4,18070
Mo-de-Obra 1,88320
LS
2,29750

M2
H
0,22000
H
0,22000
M2
1,15000
UN
4,00000
Material
36,72450

07.03.068
TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,8MM H=40MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.22
TELHA ACO GALV PINT 1 FACE TRAP E=0,8MM H=40MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
47,63800

07.03.069
TELHA ACO GALV PINT 1 FACE PO/COIL-COATING TRAPEZ E=0,8MM H=100MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.56.23
TELHA ACO GALV PINT 1 FACE TRAP E=0,8MM H=100MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
Material
59,57500
SubMO
7,60128
07.03.070
TELHA DE ACO GALV. ACAB. NATURAL OND. E=0,5MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.24
TELHA DE ACO GALV ACAB NATURAL ONDULADA E=0,5MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
SubMO
7,60128
Mo-de-Obra 3,42400
LS
4,17728

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
25,30500

07.03.071
TELHA DE ACO GALV.ACAB. NATURAL OND.E=0,65MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.25
TELHA DE ACO GALV ACAB NATURAL ONDULADA E=0,65MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
32,37750

07.03.072
TELHA DE ACO GALV.ACAB. NATURAL OND.E=0,8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.26
TELHA DE ACO GALV ACAB NATURAL ONDULADA E=0,8MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
42,55500

07.03.073
TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ.E=0,5MM H= AT 40,0MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.27
TELHA ACO GALV ACAB NAT TRAP E=0,5MM H= ATE 40MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
25,33950

07.03.074
TELHA DE ACO GALV.ACAB. NATURAL TRAPEZ.E=0,5MM H=100,0MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.28
TELHA DE ACO GALV ACAB NAT TRAP E=0,5MM H=100MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
26,89200

07.03.075
1.01.11
1.01.12
2.56.29
2.65.99

Exerccio:

TELHA DE ACO GALV. ACAB.NATURAL TRAPEZ.E=0,65MM H= AT40,0MM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
TELHA ACO GALV ACAB NAT TRAP E=0,65MM H= ATE 40MM
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO

2011

M2
H
H
M2
UN

0,40000
0,40000
1,15000
4,00000

Custo Unit.

Custo Total

BDI

3,96
28,25
0,26
8,67289

BDI

4,60
3,96
49,77
0,26
14,36493

BDI

4,60
3,96
31,03
0,26
9,40820

BDI

4,60
3,96
40,52
0,26
12,70503

BDI

4,60
3,96
50,90
0,26
15,45054

BDI

4,60
3,96
21,10
0,26
7,56844

BDI

4,60
3,96
27,25
0,26
9,19512

BDI

4,60
3,96
36,10
0,26
11,53594

BDI

4,60
3,96
21,13
0,26
7,57638

BDI

4,60
3,96
22,48
0,26
7,93345

4,60
3,96
27,28
0,26

0,87120
32,48750
1,04000

76,82
1,01200
0,87120
57,23550
1,04000

50,31
1,01200
0,87120
35,68450
1,04000

67,94
1,84000
1,58400
46,59800
1,04000

82,62
1,84000
1,58400
58,53500
1,04000

40,47
1,84000
1,58400
24,26500
1,04000

49,17
1,84000
1,58400
31,33750
1,04000

61,69
1,84000
1,58400
41,51500
1,04000

40,51
1,84000
1,58400
24,29950
1,04000

42,42
1,84000
1,58400
25,85200
1,04000

49,21
1,84000
1,58400
31,37200
1,04000

Pgina: 87

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 3,42400

LS

4,17728

UN Coeficiente
SubMO

7,60128

Material

32,41200

BDI

07.03.076
TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ. E=0,65MM H=100,0MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.30
TELHA DE ACO GALV ACAB NAT TRAP E=0,65MM H=100MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
39,10500

07.03.077
TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ. E=0,8MM H=40,0MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.31
TELHA DE ACO GALV ACAB NAT TRAP E=0,8MM H=40MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
42,52050

07.03.078
TELHA DE ACO GALV.ACAB.NATURAL TRAPEZ.E=0,8MM H=100,0MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.32
TELHA DE ACO GALV ACAB NAT TRAP E=0,8MM H=100MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
50,32900

07.03.079
TELHA ACO GALV AUTO PORTANTE ACAB NATURAL E=0,8MM H=180MM
1.01.50
TELHADISTA
1.01.51
AJUDANTE DE TELHADISTA
2.56.38
TELHA ACO GALV AUTOPORTANTE NAT E=0,8MM H=180MM
2.65.02
CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE
Mo-de-Obra 5,13600
LS
6,26592
SubMO
11,40192

M2
H
0,60000
H
0,60000
M2
1,15000
CJ
3,66300
Material
45,47315

07.03.080
TELHA CALANDRADA ACO GALV PINT 1 FACE PO/COIL-COATING OND E=0,65MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.56.33
TELHA CALANDRADA ACO GALV PINT 1 FACE OND E=0,65MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
Material
66,01500
SubMO
7,60128
07.03.081
TELHA MULTIDOBRA/CALANDRADA ACO GALV PINT 1 FACE TRAP E=0,8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.16
TELHA MULT/CALAN ACO GALV PINT 1FACE TRAP E=0,80MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
SubMO
7,60128
Mo-de-Obra 3,42400
LS
4,17728

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
65,03750

07.03.082
TELHA MULTIDOBRA/CALANDRADA ACO GALV PINT 1 FACE TRAP E=0,65MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.17
TELHA MULT/CALAN ACO GALV PINT 1FACE TRAP E=0,65MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
55,63050

07.03.083
TELHA CALANDRADA ACO GALV NATURAL OND E=0,65MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.18
TELHA CALANDRADA ACO GALV NAT OND E=0,65MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M2
H
0,40000
H
0,40000
M2
1,15000
UN
4,00000
Material
43,32550

07.03.084
TELHA MULTIDOBRA/CALANDRADA ACO GALVANIZADA NATURAL TRAP E=0,80MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.56.19
TELHA MULT/CALANDRADA ACO GALV NAT TRAP E=0,80MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128
Material
52,89350
07.03.085
TELHA MULTIDOBRA/CALANDRADA ACO GALVANIZADA NATURAL TRAP E=0,65MM
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.56.20
TELHA MULT/CALAN ACO GALV NAT TRAP E=0,65MM
M2
1,15000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
SubMO
7,60128
LS
4,17728
Material
44,53300
07.03.086
1.01.50
Exerccio:

TELHA ACO GALV AUTO PORTANTE ACAB NATURAL E=0,8MM H=260MM


TELHADISTA

2011

M2
H

Custo Unit.

0,40000

Custo Total

9,20305

BDI

4,60
3,96
33,10
0,26
10,74244

BDI

4,60
3,96
36,07
0,26
11,52801

BDI

4,60
3,96
42,86
0,26
13,32396

BDI

4,60
3,96
37,79
0,55
13,08127

BDI

4,60
3,96
56,50
0,26
16,93174

BDI

4,60
3,96
55,65
0,26
16,70692

BDI

4,60
3,96
47,47
0,26
14,54331

BDI

4,60
3,96
36,77
0,26
11,71316

BDI

4,60
3,96
45,09
0,26
13,91380

BDI

4,60
3,96
37,82
0,26
11,99088

4,60

57,44
1,84000
1,58400
38,06500
1,04000

61,64
1,84000
1,58400
41,48050
1,04000

71,25
1,84000
1,58400
49,28900
1,04000

69,95
2,76000
2,37600
43,45850
2,01465

90,54
1,84000
1,58400
64,97500
1,04000

89,34
1,84000
1,58400
63,99750
1,04000

77,77
1,84000
1,58400
54,59050
1,04000

62,63
1,84000
1,58400
42,28550
1,04000

74,40
1,84000
1,58400
51,85350
1,04000

64,12
1,84000
1,58400
43,49300
1,04000

81,17
1,84000
Pgina: 88

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.51
AJUDANTE DE TELHADISTA
2.56.34
TELHA ACO GALV AUTOPORT ACAB NAT E=0,80MM H=260MM
2.65.02
CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE
SubMO
7,60128
Mo-de-Obra 3,42400
LS
4,17728

Custo Total

BDI

3,96
50,56
0,55
15,17891

07.03.088
TELHA ACO GALV AUTOPORTANTE SAND LA DE ROCHA ACAB NAT E=0,8MM H=260MM M2
1.01.50
TELHADISTA
H
0,40000
1.01.51
AJUDANTE DE TELHADISTA
H
0,40000
2.56.36
TELHA ACO GAL AP/SAND LA ROCHA NAT E=0,8MM H=260MM
M2
1,15000
2.65.02
CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE
CJ
0,45450
Mo-de-Obra 3,42400
LS
4,17728
Material
99,58698
SubMO
7,60128

BDI

4,60
3,96
86,38
0,55
24,65330

07.03.089
TELHA ACO GALV AUTOPORTANTE SAND LA DE ROCHA ACAB NAT E=0,8MM H=180MM M2
1.01.50
TELHADISTA
H
0,60000
1.01.51
AJUDANTE DE TELHADISTA
H
0,60000
2.56.37
TELHA ACO GAL AP/SAND LA ROCHA NAT E=0,8MM H=180MM
M2
1,15000
2.65.02
CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE
CJ
3,66300
SubMO
11,40192
Mo-de-Obra 5,13600
LS
6,26592
Material
134,78215

179,80
4,60
2,76000
3,96
2,37600
115,45
132,76750
0,55
2,01465
BDI
33,62234

07.03.090
TELHA TECNOLOGIA CRFS ONDULADA E=6MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.61
TELHA TECNOLOGIA CRFS ONDULADA 6MM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 1,88320
LS
2,29750
SubMO

Material

H
0,40000
M2
1,15000
CJ
0,45450
58,39398

Custo Unit.

4,18070

M2
H
0,22000
H
0,22000
M2
1,15000
CJ
1,42000
UN
1,42000
Material
15,65590

4,18070

M2
H
0,22000
H
0,22000
M2
1,15000
CJ
1,42000
UN
1,42000
Material
21,46340

1,58400
58,14400
0,24998

131,84
1,84000
1,58400
99,33700
0,24998

24,39
1,01200
0,87120
14,84650
0,11360
0,69580

BDI

4,60
3,96
12,91
0,08
0,49
4,56242

BDI

4,60
3,96
17,96
0,08
0,49
5,89814

BDI

4,60
3,96
74,03
0,26
19,86574

07.03.098
TELHA ACO GALV TRAP SAND POLIURETANO PINT 1 FACE CHAPA 0,5MM E=50MM
M2
1.01.50
TELHADISTA
H
0,40000
1.01.51
AJUDANTE DE TELHADISTA
H
0,40000
2.56.56
TELHA GALV SAND POLIURET CHAPA 0,5MM E=50MM C/ACAB
M2
1,05000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128
Material
90,01700

BDI

4,60
3,96
84,74
0,26
22,45220

07.03.099
COBERTURAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

301,12
244,82
244,82000
BDI
56,30860

07.03.091
TELHA TECNOLOGIA CRFS ONDULADA E=8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.62
TELHA TECNOLOGIA CRFS ONDULADA 8MM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 1,88320
LS
2,29750
SubMO

07.03.097
TELHA ACO GALV TRAP SAND POLIURETANO PINT 1 FACE CHAPA 0,5MM E=30MM
M2
1.01.50
TELHADISTA
H
0,40000
1.01.51
AJUDANTE DE TELHADISTA
H
0,40000
2.56.55
TELHA GALV SAND POLIURET CHAPA 0,5MM E=30MM C/ACAB
M2
1,05000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
4,00000
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128
Material
78,77150

LS

0,00000

SubMO

0,00000

07.04.001
CUMEEIRA E ESPIGAO EMBOCADOS PARA TELHA DE BARRO FRANCESA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.60.77
CUMEEIRA P/TELHA TIPO FRANCES
Mo-de-Obra 3,38400
LS
4,12848
SubMO
7,51248

MV
MV
1,00000
Material
244,82000
M
H
H
M3
KG
KG
UN
Material
6,82072

07.04.006
CUMEEIRA ACO GALV NATURAL P/ TELHA ZIPADA(PERFIL 305MM)FORNEC/MONT
2.55.79
CUMEEIRA ACO GALV NAT P/TELHA ZIP(305MM)FORN MONT
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
07.04.007
CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.76
CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA
Mo-de-Obra 1,02720
SubMO
2,28038
LS
1,25318
07.04.008
1.01.11
Exerccio:

CUMEEIRA ARTICULADA P/ TELHA TECNOLOGIA CRFS ONDULADA


CARPINTEIRO

2011

0,40000
0,40000
0,00700
1,13000
0,60000
4,00000
BDI

M
M
1,00000
349,84000

M
H
0,12000
H
0,12000
UN
0,95000
Material
20,79550
M
H

0,12000

4,64
3,82
80,46
0,35
0,37
1,41
3,29664

31,54
1,01200
0,87120
20,65400
0,11360
0,69580

106,23
1,84000
1,58400
77,73150
1,04000

120,07
1,84000
1,58400
88,97700
1,04000

17,62
1,85600
1,52800
0,56322
0,39550
0,22200
5,64000

430,30
349,84
349,84000
BDI
80,46320

BDI

4,60
3,96
21,89
5,30745

4,60

28,38
0,55200
0,47520
20,79550

38,91
0,55200
Pgina: 89

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.12
AJUDANTE DE CARPINTEIRO
2.56.77
CUMEEIRA ARTICULADA P/ TELHA TECNOLOGIA CRFS ONDUL
SubMO
2,28038
Mo-de-Obra 1,02720
LS
1,25318
07.04.009
CUMEEIRA SHED P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.78
CUMEEIRA SHED P/ TELHA TECNOLOGIA CRFS ONDULADA
Mo-de-Obra 0,68480
LS
0,83546
SubMO

1,52026

H
0,12000
PR
0,95000
Material
29,35500
M
H
0,08000
H
0,08000
UN
0,95000
Material
18,89550

07.04.014
CUMEEIRA ARTICULADA DE VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDULADA
M
1.01.11
CARPINTEIRO
H
0,12000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,12000
2.56.79
CUMEEIRA ARTIC DE VENT P/ TELHA TECNOL. CRFS ONDUL
PR
0,95000
Mo-de-Obra 1,02720
LS
1,25318
SubMO
2,28038
Material
25,92550
07.04.018
CUMEEIRA SHED PARA TELHA DE ALUMINIO TRAPEZOIDAL
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.66.54
GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M
H
0,40000
H
0,40000
KG
1,40000
UN
6,00000
Material
28,80000

07.04.019
ESPIGAO NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.80
ESPIGAO NORMAL P/ TELHA TECNOLOGIA CRFS ONDULADA
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.27
PARAFUSO P/ ESPIGAO NORMAL DE TELHA FIBRA ONDULADA
Mo-de-Obra 1,02720
LS
1,25318
SubMO
2,28038

M
H
0,12000
H
0,12000
UN
0,90000
CJ
0,90000
UN
0,90000
Material
18,43200

07.04.026
TELHA DE VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.81
TELHA DE VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDUL
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
SubMO
3,80064
Mo-de-Obra 1,71200
LS
2,08864

UN
H
0,20000
H
0,20000
UN
1,00000
CJ
2,00000
UN
2,00000
Material
79,05000

07.04.028
TELHA DE CLARABOIA P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.82
TELHA DE CLARABOIA P/ TELHADO TECNOL. CRFS ONDULAD
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 8,56000
LS
10,44320
SubMO
19,00320

UN
H
1,00000
H
1,00000
UN
1,00000
CJ
2,00000
UN
2,00000
Material
70,81000

07.04.029
ARESTA P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.83
ARESTA P/ TELHA TECNOL. CRFS ONDULADA C=1,83M
Mo-de-Obra 0,77040
LS
0,93989
SubMO

M
H
0,09000
H
0,09000
UN
0,60000
Material
19,51800

1,71029

07.04.031
CUMEEIRA SHED PARA TELHA DE ALUMINIO ONDULADA ACAB. NATURAL
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.66.54
GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M
H
0,40000
H
0,40000
KG
1,25000
UN
6,00000
Material
26,32500

07.04.032
CUMEEIRA PARA TELHA DE ALUMINIO ONDULADA ACAB. NATURAL E=0,8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.66.54
GANCHO E ACESSORIOS P/ FIX TELHA OND ALUMINIO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
7,60128

M
H
0,40000
H
0,40000
KG
1,60000
UN
6,00000
Material
32,10000

07.04.033
CUMEEIRA PARA TELHA DE ALUMINIO TRAPEZOIDAL ACAB. NATURAL E=0,8MM
M
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
KG
1,50000
2.66.51
GANCHO E ACESSORIOS P/ FIX TELHA TRAPEZ ALUMINIO
UN
6,00000
Mo-de-Obra 3,42400
SubMO
7,60128
LS
4,17728
Material
30,45000

Exerccio:

2011

Custo Unit.

Custo Total

BDI

3,96
30,90
7,27614

BDI

4,60
3,96
19,89
4,69562

BDI

4,60
3,96
27,29
6,48735

BDI

4,60
3,96
16,50
0,95
8,37229

BDI

4,60
3,96
19,30
0,08
1,10
4,76385

BDI

4,60
3,96
77,91
0,08
0,49
19,05565

BDI

4,60
3,96
69,67
0,08
0,49
20,65704

BDI

4,60
3,96
32,53
4,88251

BDI

4,60
3,96
16,50
0,95
7,80304

BDI

4,60
3,96
16,50
0,95
9,13129

BDI

4,60
3,96
16,50
0,95
8,75179

0,47520
29,35500

25,11
0,36800
0,31680
18,89550

34,69
0,55200
0,47520
25,92550

44,77
1,84000
1,58400
23,10000
5,70000

25,47
0,55200
0,47520
17,37000
0,07200
0,99000

101,90
0,92000
0,79200
77,91000
0,16000
0,98000

110,47
4,60000
3,96000
69,67000
0,16000
0,98000

26,11
0,41400
0,35640
19,51800

41,72
1,84000
1,58400
20,62500
5,70000

48,83
1,84000
1,58400
26,40000
5,70000

46,80
1,84000
1,58400
24,75000
5,70000

Pgina: 90

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

07.04.034
CUMEEIRA ACO PINT PO/COIL-COATING PERFIL OND/TRAP E=0,65MM H ATE 40MM
M
1.01.11
CARPINTEIRO
H
0,47000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,47000
2.55.68
CUMEEIRA ACO PINTADO SIMPLES E=0,65MM
M
1,20000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
8,00000
Mo-de-Obra 4,02320
LS
4,90830
Material
39,25600
SubMO
8,93150
07.04.035
CUMEEIRA DE ACO PINT PO OU COIL-COATING LISA OU LISA DENTADA E=0.5MM
M2
1.01.11
CARPINTEIRO
H
0,20000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,20000
2.55.82
CUMEEIRA ACO PRE-PINTADO SIMPLES 0,5MM
M
1,10000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
8,00000
Mo-de-Obra 1,71200
LS
2,08864
SubMO
3,80064
Material
29,05200
07.04.036
DOMOS P/ VENTILACAO P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.84
DOMO P/ TELHA TECNOLOGIA CRFS ONDULADA
2.66.43
SUPORTE METALICO P/ DOMO DE TELHA FIBRA ONDULADA
2.66.53
FIXADOR DE ABAS PARA TELHAS DE FIBRA
Mo-de-Obra 2,22560
LS
2,71523
SubMO
4,94083

UN
H
0,26000
H
0,26000
UN
1,00000
UN
4,00000
UN
8,00000
Material
137,45000

07.04.037
CUMEEIRA ACO GALV PINT PO/COIL-COATING PERFIL TRAPEZ H=100MM E=0,65MM
M
1.01.11
CARPINTEIRO
H
0,86000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,86000
2.55.90
CUMEEIRA ACO GALV PINT 1 FACE TRAP E=0.65MM H=100M
M
1,20000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
8,00000
Mo-de-Obra 7,36160
LS
8,98115
Material
41,38000
SubMO
16,34275
07.04.039
RUFO P/ TELHA TECNOLOGIA CRFS ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.85
RUFO P/ TELHA TECNOLOGIA CRFS ONDULADA
Mo-de-Obra 0,68480
LS
0,83546

1,52026

M
H
0,08000
H
0,08000
UN
0,95000
Material
16,02650

07.04.040
CUMEEIRA DE ACO NATURAL LISA OU LISA DENTADA E=0,5MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.41
CUMEEIRA DE ACO NATURAL LISA / LISA DENT. E=0,5MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 1,71200
LS
2,08864
SubMO
3,80064

M
H
0,20000
H
0,20000
M
1,10000
UN
8,00000
Material
20,26300

SubMO

07.04.041
CUMEEIRA DE ACO NATURAL PERFIL ONDUL OU TRAP E=0,65MM H ATE 40MM
M
1.01.11
CARPINTEIRO
H
0,47000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,47000
2.56.42
CUMEEIRA ACO NAT. PERF. OND/TRAP E=065 H=ATE 40MM
M
1,20000
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
UN
8,00000
Mo-de-Obra 4,02320
LS
4,90830
SubMO
8,93150
Material
33,11200
07.04.042
CUMEEIRA DE ACO GALV NATURAL PERFIL TRAP E=0,5MM H=100MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.43
CUMEEIRA ACO GALV NAT PERFIL TRAP 0,5MM H=100MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 7,36160
LS
8,98115
SubMO
16,34275

M
H
0,86000
H
0,86000
M
1,20000
UN
8,00000
Material
29,87200

07.04.044
RUFO DE ACO NATURAL SIMPLES E=0,5MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.44
RUFO DE ACO NATURAL SIMPLES E=0,5MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 1,71200
LS
2,08864
SubMO
3,80064

M
H
H
M
UN
Material
8,45400

07.04.045
RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ATE 300MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.45
RUFO LISO DE ACO GALV NAT E=0,65MM CORTE ATE 300MM
2.67.60
PREGO
SubMO
12,14784
Mo-de-Obra 5,47200
LS
6,67584

M
H
0,60000
H
0,60000
M
1,05000
KG
0,10000
Material
11,59700

07.04.047
1.01.18
1.01.19
2.56.46
Exerccio:

RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ATE 400MM


ENCANADOR
AJUDANTE DE ENCANADOR
RUFO LISO DE ACO GALV NAT E=0,65MM CORTE ATE 400MM

2011

M
H
H
M

Custo Unit.

59,27
2,16200
1,86120
37,17600
2,08000

BDI

4,60
3,96
30,98
0,26
11,08313

BDI

4,60
3,96
24,52
0,26
7,55611

BDI

175,14
4,60
1,19600
3,96
1,02960
13,85
13,85000
29,10
116,40000
0,90
7,20000
32,74989

BDI

4,60
3,96
32,75
0,26
13,27623

BDI

4,60
3,96
16,87
4,03575

BDI

4,60
3,96
16,53
0,26
5,53464

BDI

4,60
3,96
25,86
0,26
9,67001

BDI

4,60
3,96
23,16
0,26
10,62939

BDI

4,60
3,96
6,74
0,26
2,81857

BDI

5,05
4,07
10,60
4,67
5,46131

0,20000
0,20000
1,10000
4,00000

0,40000
0,40000
1,05000

Custo Total

5,05
4,07
13,80

40,40
0,92000
0,79200
26,97200
2,08000

70,99
3,95600
3,40560
39,30000
2,08000

21,58
0,36800
0,31680
16,02650

29,59
0,92000
0,79200
18,18300
2,08000

51,71
2,16200
1,86120
31,03200
2,08000

56,84
3,95600
3,40560
27,79200
2,08000

15,07
0,92000
0,79200
7,41400
1,04000

29,20
3,03000
2,44200
11,13000
0,46700

28,35
2,02000
1,62800
14,49000
Pgina: 91

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.60
PREGO
Mo-de-Obra 3,64800

LS

4,45056

UN Coeficiente
SubMO

8,09856

Material

KG
0,10000
14,95700

07.04.048
RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ATE 600MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.47
RUFO LISO ACO GALV NAT E=0,65MM CORTE ATE 600MM
2.67.60
PREGO
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

M
H
0,40000
H
0,40000
M
1,05000
KG
0,10000
Material
21,60350

07.04.049
RUFO LISO DE ACO GALV NATURAL E=0,65MM CORTE ACIMA DE 600MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.48
RUFO LISO ACO GALV NAT E=0,65MM CORTE ACIMA DE 600
2.67.60
PREGO
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

M
H
0,40000
H
0,40000
M
1,05000
KG
0,10000
Material
32,12450

07.04.051
RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,16M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
Mo-de-Obra 5,47200
LS
6,67584
SubMO
12,14784

M
H
H
KG
KG
Material
7,23200

07.04.052
RUFO LISO DE ALUMINIO ACAB. NATURAL E=O,8MM CORTE 0,25M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
Mo-de-Obra 5,47200
LS
6,67584
SubMO
12,14784

M
H
0,60000
H
0,60000
KG
0,63000
KG
0,10000
Material
10,86200

07.04.053
RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,33M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
SubMO
15,18480
Mo-de-Obra 6,84000
LS
8,34480

M
H
0,75000
H
0,75000
KG
0,84000
KG
0,10000
Material
14,32700

07.04.054
RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,50M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
KG
1,27000
KG
0,10000
Material
21,42200

07.04.055
RUFO LISO DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 1,00M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
SubMO
40,49280
Mo-de-Obra 18,24000
LS
22,25280

M
H
2,00000
H
2,00000
KG
2,54000
KG
0,20000
Material
42,84400

07.04.057
RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ATE 300MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.49
RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ATE 300MM
2.67.60
PREGO
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

M
H
0,40000
H
0,40000
M
1,05000
KG
0,10000
Material
12,79400

07.04.058
RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ATE 400MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.50
RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ATE 400MM
2.67.60
PREGO
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

M
H
0,40000
H
0,40000
M
1,05000
KG
0,10000
Material
16,30100

07.04.059
RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ATE 600MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.51
RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ATE 600MM
2.67.60
PREGO
Mo-de-Obra 3,64800
SubMO
8,09856
LS
4,45056

M
H
0,40000
H
0,40000
M
1,05000
KG
0,10000
Material
23,52500

07.04.061
Exerccio:

DOMO DE ACRILICO COM CAIXILHO DE ALUMINIO

2011

M2

Custo Unit.

Custo Total

BDI

4,67
5,30278

BDI

5,05
4,07
20,13
4,67
6,83147

BDI

5,05
4,07
30,15
4,67
9,25130

BDI

5,05
4,07
16,50
4,67
4,45736

BDI

5,05
4,07
16,50
4,67
5,29226

BDI

5,05
4,07
16,50
4,67
6,78771

BDI

5,05
4,07
16,50
4,67
11,44640

BDI

5,05
4,07
16,50
4,67
19,16746

BDI

5,05
4,07
11,74
4,67
4,80529

BDI

5,05
4,07
15,08
4,67
5,61190

BDI

5,05
4,07
21,96
4,67
7,27342

0,60000
0,60000
0,41000
0,10000

0,46700

36,53
2,02000
1,62800
21,13650
0,46700

49,47
2,02000
1,62800
31,65750
0,46700

23,83
3,03000
2,44200
6,76500
0,46700

28,30
3,03000
2,44200
10,39500
0,46700

36,29
3,78750
3,05250
13,86000
0,46700

61,21
7,07000
5,69800
20,95500
0,46700

102,50
10,10000
8,14000
41,91000
0,93400

25,69
2,02000
1,62800
12,32700
0,46700

30,01
2,02000
1,62800
15,83400
0,46700

38,89
2,02000
1,62800
23,05800
0,46700

450,12
Pgina: 92

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.49
DOMO DE ACRILICO C CAIXILHO DE ALUMINIO
Mo-de-Obra 10,27200
LS
12,53184

UN Coeficiente

SubMO

22,80384

07.04.065
RUFO DENTADO ACO GALV NATURAL E=0,65MM CORTE ACIMA DE 600MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.52
RUFO DENTADO ACO GALV NAT E=0,65MM CORTE ACIMA 600
2.67.60
PREGO
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

Material

H
1,20000
H
1,20000
M2
1,00000
343,15000

M
H
0,40000
H
0,40000
M
1,05000
KG
0,10000
Material
35,72600

07.04.077
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 300MM
M
1.01.18
ENCANADOR
H
0,60000
1.01.19
AJUDANTE DE ENCANADOR
H
0,60000
2.55.91
RUFO DENT ACO GALV PINT 1FACE E=0,65MM C ATE 300MM
M
1,05000
2.67.60
PREGO
KG
0,10000
SubMO
12,14784
Mo-de-Obra 5,47200
LS
6,67584
Material
17,66600
07.04.078
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 400MM
M
1.01.18
ENCANADOR
H
0,75000
1.01.19
AJUDANTE DE ENCANADOR
H
0,75000
2.55.92
RUFO DENT ACO GALV PINT 1FACE E=0,65MM C ATE 400MM
M
1,05000
2.67.60
PREGO
KG
0,10000
Mo-de-Obra 6,84000
LS
8,34480
Material
21,78200
SubMO
15,18480
07.04.079
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 300MM
M
1.01.18
ENCANADOR
H
0,60000
1.01.19
AJUDANTE DE ENCANADOR
H
0,60000
2.55.93
RUFO DENT.ACO GALV.PINT.E=0.50MM C=300MM
M
1,05000
2.67.60
PREGO
KG
0,10000
Mo-de-Obra 5,47200
LS
6,67584
Material
15,25100
SubMO
12,14784
07.04.080
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 400MM
M
1.01.18
ENCANADOR
H
0,75000
1.01.19
AJUDANTE DE ENCANADOR
H
0,75000
2.55.94
RUFO DENT.ACO GALV.PINT.E=0.50MM C=400MM
M
1,05000
2.67.60
PREGO
KG
0,10000
SubMO
15,18480
Mo-de-Obra 6,84000
LS
8,34480
Material
18,65300
07.04.081
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 600MM
M
1.01.18
ENCANADOR
H
1,40000
1.01.19
AJUDANTE DE ENCANADOR
H
1,40000
2.55.95
RUFO DENT.ACO GALV.PINT.E=0.50MM C=600MM
M
1,05000
2.67.60
PREGO
KG
0,10000
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496
Material
25,82450
07.04.082
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ACIMA 600MM
M
1.01.18
ENCANADOR
H
2,00000
1.01.19
AJUDANTE DE ENCANADOR
H
2,00000
2.55.96
RUFO DENT.ACO GALV.PINT.E=0.50MM C>600MM
M
1,05000
2.67.60
PREGO
KG
0,20000
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280
Material
38,61850
07.04.083
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 600MM
M
1.01.18
ENCANADOR
H
1,40000
1.01.19
AJUDANTE DE ENCANADOR
H
1,40000
2.55.97
RUFO DENT ACO GALV PINT 1FACE E=0,65MM C ATE 600MM
M
1,05000
2.67.60
PREGO
KG
0,10000
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496
Material
30,45500
07.04.085
RUFO DE ACO PINTADO PO OU COIL-COATING SIMPLES E=0,5MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.55.83
RUFO ACO PRE-PINTADO SIMPLES 0,5MM
2.65.99
PARAFUSO AUTO-PERF C/ CONJ VEDACAO P/ TELHA DE ACO
Mo-de-Obra 1,71200
LS
2,08864
SubMO
3,80064
07.04.086
1.01.18
1.01.19
2.55.98
2.67.60

Exerccio:

M2
H
0,20000
H
0,20000
M
1,10000
UN
4,00000
Material
10,18100

RUFO LISO ACO GALV PINT PO OU COIL-COATING E=0,65MM CORTE ATE 300MM
ENCANADOR
AJUDANTE DE ENCANADOR
RUFO LISO ACO GALV.PINT.E=0.65MM C=300MM
PREGO

2011

M
H
H
M
KG

0,60000
0,60000
1,05000
0,10000

Custo Unit.

Custo Total

4,60
5,52000
3,96
4,75200
343,15
343,15000
BDI
84,16938

BDI

5,05
4,07
33,58
4,67
10,07965

BDI

5,05
4,07
16,38
4,67
6,85718

BDI

5,05
4,07
20,30
4,67
8,50236

BDI

5,05
4,07
14,08
4,67
6,30173

BDI

5,05
4,07
17,32
4,67
7,78269

BDI

5,05
4,07
24,15
4,67
12,45898

BDI

5,05
4,07
35,89
4,67
18,19560

BDI

5,05
4,07
28,56
4,67
13,52399

BDI

4,60
3,96
8,31
0,26
3,21578

5,05
4,07
14,12
4,67

53,90
2,02000
1,62800
35,25900
0,46700

36,67
3,03000
2,44200
17,19900
0,46700

45,46
3,78750
3,05250
21,31500
0,46700

33,70
3,03000
2,44200
14,78400
0,46700

41,62
3,78750
3,05250
18,18600
0,46700

66,62
7,07000
5,69800
25,35750
0,46700

97,30
10,10000
8,14000
37,68450
0,93400

72,32
7,07000
5,69800
29,98800
0,46700

17,19
0,92000
0,79200
9,14100
1,04000

33,75
3,03000
2,44200
14,82600
0,46700

Pgina: 93

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 5,47200

LS

6,67584

UN Coeficiente
SubMO

12,14784

Material

15,29300

07.04.087
RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 400MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.99
RUFO LISO ACO GALV.PINT.E=0.65MM C=400MM
2.67.60
PREGO
Mo-de-Obra 6,84000
LS
8,34480
SubMO
15,18480

M
H
0,75000
H
0,75000
M
1,05000
KG
0,10000
Material
19,17800

07.04.088
RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ATE 600MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.01
RUFO LISO ACO GALV.PINT.E=0.65MM C=600MM
2.67.60
PREGO
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
M
1,05000
KG
0,10000
Material
26,94800

07.04.089
RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ACIMA 600MM
M
1.01.18
ENCANADOR
H
2,00000
1.01.19
AJUDANTE DE ENCANADOR
H
2,00000
2.56.02
RUFO LISO ACO GALV.PINT.E=0.65MM C>600MM
M
1,05000
2.67.60
PREGO
KG
0,20000
Mo-de-Obra 18,24000
LS
22,25280
Material
39,30100
SubMO
40,49280
07.04.090
RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 300MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.03
RUFO LISO ACO GALV.PINT.E=0.50MM C=300MM
2.67.60
PREGO
Mo-de-Obra 5,47200
LS
6,67584
SubMO
12,14784

M
H
0,60000
H
0,60000
M
1,05000
KG
0,10000
Material
12,93050

07.04.091
RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 400MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.04
RUFO LISO ACO GALV.PINT.E=0.50MM C=400MM
2.67.60
PREGO
Mo-de-Obra 6,84000
LS
8,34480
SubMO
15,18480

M
H
0,75000
H
0,75000
M
1,05000
KG
0,10000
Material
16,07000

07.04.092
RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ATE 600MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.56.05
RUFO LISO ACO GALV.PINT.E=0.50MM C=600MM
2.67.60
PREGO
SubMO
28,34496
Mo-de-Obra 12,76800
LS
15,57696

M
H
1,40000
H
1,40000
M
1,05000
KG
0,10000
Material
22,41200

07.04.093
RUFO LISO ACO GALV PINT PO/COIL-COATING E=0,50MM CORTE ACIMA 600MM
M
1.01.18
ENCANADOR
H
2,00000
1.01.19
AJUDANTE DE ENCANADOR
H
2,00000
2.56.06
RUFO LISO ACO GALV.PINT.E=0.50MM C>600MM
M
1,05000
2.67.60
PREGO
KG
0,20000
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280
Material
32,63350
07.04.094
RUFO DENTADO ACO GALV PINT PO/COIL-COATING E=0,65MM CORTE ACIMA 600MM
M
1.01.18
ENCANADOR
H
2,00000
1.01.19
AJUDANTE DE ENCANADOR
H
2,00000
2.56.07
RUFO DENT ACO GALV PINT 1FACE E=0,65MM C > 600MM
M
1,05000
2.67.60
PREGO
KG
0,20000
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280
Material
45,33850
07.04.095
RUFOS ONDULADOS DE ALUMINIO ACAB. NATURAL ESP 0,8MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104

M
H
1,10000
H
1,10000
KG
1,31000
KG
0,10000
Material
22,08200

07.04.096
RUFO TRAPEZOIDAL DE ALUMINIO ACAB. NATURAL ESP 0,8MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
Mo-de-Obra 10,03200
SubMO
22,27104
LS
12,23904

M
H
1,10000
H
1,10000
KG
1,47000
KG
0,10000
Material
24,72200

07.04.097
1.01.18
Exerccio:

CONTRA RUFO ONDULADO DE ALUMINIO ESP 0,8MM


ENCANADOR

2011

M
H

0,75000

Custo Unit.

Custo Total

BDI

6,31139

BDI

5,05
4,07
17,82
4,67
7,90344

BDI

5,05
4,07
25,22
4,67
12,71738

BDI

5,05
4,07
36,54
4,67
18,35257

BDI

5,05
4,07
11,87
4,67
5,76802

BDI

5,05
4,07
14,86
4,67
7,18860

BDI

5,05
4,07
20,90
4,67
11,67410

BDI

5,05
4,07
30,19
4,67
16,81905

BDI

5,05
4,07
42,29
4,67
19,74120

BDI

5,05
4,07
16,50
4,67
10,20120

BDI

5,05
4,07
16,50
4,67
10,80840

5,05

42,26
3,78750
3,05250
18,71100
0,46700

68,01
7,07000
5,69800
26,48100
0,46700

98,14
10,10000
8,14000
38,36700
0,93400

30,84
3,03000
2,44200
12,46350
0,46700

38,44
3,78750
3,05250
15,60300
0,46700

62,43
7,07000
5,69800
21,94500
0,46700

89,94
10,10000
8,14000
31,69950
0,93400

105,57
10,10000
8,14000
44,40450
0,93400

54,55
5,55500
4,47700
21,61500
0,46700

57,80
5,55500
4,47700
24,25500
0,46700

59,84
3,78750
Pgina: 94

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
SubMO
15,18480
Mo-de-Obra 6,84000
LS
8,34480

H
0,75000
KG
2,00000
KG
0,10000
Material
33,46700

07.04.098
CONTRA RUFO TRAPEZOIDAL DE ALUMINIO ESP 0,8MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
Mo-de-Obra 6,84000
LS
8,34480
SubMO
15,18480
07.04.099
PECAS PARA COBERTURA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

0,00000

BDI

M
H
0,75000
H
0,75000
KG
1,87000
KG
0,10000
Material
31,32200

BDI

5,05
4,07
16,50
4,67
10,69656

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M2
H
0,28000
H
0,28000
M2
1,09000
CJ
0,70000
UN
1,40000
Material
20,31840

07.05.004
FECHAMENTO TELHA PERF GALV PINT PO 2 FACES TRAP E=0,95MM H=40MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.39
TELHA PERFURADA GALV PINT 2 FACES E=0,95MM H=40MM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
SubMO
5,32090
Mo-de-Obra 2,39680
LS
2,92410

M2
H
0,28000
H
0,28000
M2
1,09000
CJ
0,70000
UN
1,40000
Material
77,03110

07.05.006
FECHAMENTO TELHA PERFURADA GALV PINT 2 FACES E=0,95MM H=35MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.58
TELHA PERFURADA GALV TRAPEZOIDAL MOD L=35CM E=0,95
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 2,39680
LS
2,92410
SubMO
5,32090

M2
H
0,28000
H
0,28000
M2
1,09000
CJ
0,70000
UN
1,40000
Material
82,72090

07.05.010
VEDACAO LATERAL DE COBERTURA COM TELA DE NYLON
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.01
CAIBRO PEROBA DE 5X6CM
2.67.60
PREGO
2.75.24
TELA DE NYLON TIPO MOSQUITEIRO
Mo-de-Obra 25,68000
LS
31,32960
SubMO

M2
H
3,00000
H
3,00000
M
4,39000
KG
0,05000
M2
1,00000
Material
24,66830

07.05.020
GRADE DE PROTECAO EM MADEIRA PINTADA (PROJ. EMERGENCIA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.67.60
PREGO
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
SubMO
8,94660
Mo-de-Obra 4,03000
LS
4,91660

M
H
0,34000
H
0,34000
H
0,14000
H
0,12000
M
5,86000
KG
0,02300
L
0,12000
UN
0,09000
Material
13,50231

07.05.040
CUMEEIRA P/ TELHA AUTOP ACO GALV ACAB NAT LISA/DENT H 180MM ATE 260MM
1.01.50
TELHADISTA
1.01.51
AJUDANTE DE TELHADISTA
2.55.40
TELHA DE POLIESTER PERFIL ONDULADO FIBROCIMENTO
2.65.02
CONJ. DE FIXACAO P/ TELHA AUTO PORTANTE
Mo-de-Obra 7,36160
LS
8,98115
SubMO
16,34275
Material
07.05.041
CUMEEIRA NORMAL PARA TELHA TECNOLOGIA CRFS MODULAR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.61.03
CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS MODULAR
2.66.11
MASSA DE VEDACAO PARA TELHAS
SubMO
2,66045
Mo-de-Obra 1,19840
LS
1,46205
07.05.042
Exerccio:

CUMEEIRA ARTICULADA PARA TELHA TECNOLOGIA CRFS MODULAR

2011

Custo Total

4,07
16,50
4,67
11,18991

07.05.002
FECHAMENTO DE OITAO C/ TELHA TECNOLOGIA CRFS ONDULADA E=8MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.56.62
TELHA TECNOLOGIA CRFS ONDULADA 8MM
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 2,39680
LS
2,92410
SubMO
5,32090

57,00960

Custo Unit.

M
H
0,86000
H
0,86000
M2
1,20000
CJ
7,32600
38,45730

M
H
0,14000
H
0,14000
UN
1,97000
KG
0,62000
Material
54,72350
M

BDI

4,60
3,96
17,96
0,08
0,49
5,89704

BDI

4,60
3,96
69,99
0,08
0,49
18,94096

BDI

4,60
3,96
75,21
0,08
0,49
20,24961

BDI

4,60
3,96
4,32
4,67
5,47
18,78592

BDI

4,60
3,96
4,74
3,80
2,09
4,67
9,30
0,35
5,16325

BDI

4,60
3,96
28,69
0,55
12,60401

BDI

4,60
3,96
21,89
18,71
13,19831

3,05250
33,00000
0,46700

57,20
3,78750
3,05250
30,85500
0,46700

31,53
1,28800
1,10880
19,57640
0,05600
0,68600

101,29
1,28800
1,10880
76,28910
0,05600
0,68600

108,29
1,28800
1,10880
81,97890
0,05600
0,68600

100,46
13,80000
11,88000
18,96480
0,23350
5,47000

27,61
1,56400
1,34640
0,66360
0,45600
12,24740
0,10741
1,11600
0,03150

67,40
3,95600
3,40560
34,42800
4,02930

70,58
0,64400
0,55440
43,12330
11,60020

82,91
Pgina: 95

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.61.07
CUMEEIRA ARTICULADA P/ TELHA TECNOL CRFS MODULAR
2.66.11
MASSA DE VEDACAO PARA TELHAS
Mo-de-Obra 1,19840
LS
1,46205
SubMO
07.05.045
RUFO PARA TELHA TECNOLOGIA CRFS MODULAR
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.61.34
RUFO PARA TELHA TECNOLOGIA CRFS MODULAR
2.66.11
MASSA DE VEDACAO PARA TELHAS
Mo-de-Obra 1,02720
SubMO
LS
1,25318

2,66045

H
0,14000
H
0,14000
PR
1,97000
KG
0,62000
Material
64,75080

2,28038

M
H
0,12000
H
0,12000
UN
1,97000
KG
0,31000
Material
33,97110

07.05.046
CUMEEIRA NORMAL PARA TELHA TECNOLOGIA CRFS TRAPEZOIDAL 44CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.61.04
CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS TRAP 44CM
2.66.11
MASSA DE VEDACAO PARA TELHAS
Mo-de-Obra 1,19840
LS
1,46205
SubMO
2,66045

M
H
0,14000
H
0,14000
UN
2,27000
KG
0,62000
Material
41,47340

07.05.068
CUMEEIRA NORMAL PARA TELMHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.61.06
CUMEEIRA NORMAL P/ TELHA TECNOLOGIA CRFS TRAP 90CM
2.66.11
MASSA DE VEDACAO PARA TELHAS
Mo-de-Obra 1,71200
LS
2,08864
SubMO
3,80064

M
H
0,20000
H
0,20000
UN
1,09000
KG
0,82000
Material
50,34210

07.05.069
CUMEEIRA ARTICULADA PARA TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM
M
1.01.11
CARPINTEIRO
H
0,20000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,20000
2.61.10
CUMEEIRA ARTICULADA P/ TELHA TECNOL CRFS TRAP 90CM
PR
1,09000
2.66.11
MASSA DE VEDACAO PARA TELHAS
KG
0,82000
Mo-de-Obra 1,71200
LS
2,08864
Material
65,13340
SubMO
3,80064
07.05.077
RUFO PARA TELHA TECNOLOGIA CRFS TRAPEZOIDAL 90CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.61.37
RUFO P/ TELHA TECNOLOGIA CRFS TRAP 90CM
2.66.11
MASSA DE VEDACAO PARA TELHAS
Mo-de-Obra 1,02720
LS
1,25318
SubMO
2,28038

M
H
0,12000
H
0,12000
UN
1,09000
KG
0,41000
Material
18,44030

07.05.080
SUB-COBERTURA COM MANTA ALUMINIZADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.40.40
MANTA ALUMINIZADA PARA SUB-COBERTURA
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 1,71200
LS
2,08864

3,80064

M2
H
H
M2
KG
Material
4,57665

0,00000

MV
MV
1,00000
Material
244,82000

2,63736

M2
H
0,30000
Material
0,00000

07.05.099
FECHAMENTOS E/OU VEDACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

07.50.001
DEMOLICAO DE TELHA FIBRO CIMENTO TRAPEZOIDAL
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 1,18800
LS
1,44936
SubMO

07.60.002
ESTRUTURA DE MADEIRA EM TESOURA PARA TELHAS DE BARRO SOBRE VAO LIVRE
M2
1.01.11
CARPINTEIRO
H
0,85000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,85000
Mo-de-Obra 7,27600
LS
8,87672
SubMO
16,15272
Material
0,00000
07.60.005
ESTRUT DE MADEIRA EM TESOURA,PONTAL OU MISTA P/TELHA FIBRO-CIM SB LAJE
M2
1.01.11
CARPINTEIRO
H
0,40000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,40000
SubMO
7,60128
Mo-de-Obra 3,42400
LS
4,17728
Material
0,00000

Exerccio:

ESTRUT DE MADEIRA EM TESOURA,PARA TELHA DE FIBRO-CIM SOBRE VAO LIVRE


CARPINTEIRO
AJUDANTE DE CARPINTEIRO

2011

M2
H
H

0,65000
0,65000

Custo Total

BDI

4,60
3,96
26,98
18,71
15,50459

BDI

4,60
3,96
14,30
18,71
8,33784

BDI

4,60
3,96
13,16
18,71
10,15079

BDI

4,60
3,96
32,11
18,71
12,45283

BDI

4,60
3,96
45,68
18,71
15,85483

BDI

4,60
3,96
9,88
18,71
4,76576

BDI

4,60
3,96
3,95
6,83
1,92678

0,20000
0,20000
1,15000
0,00500

07.60.001
ESTRUT DE MADEIRA EM TESOURA,PONTAL OU MISTA P/TELHA BARRO SOBRE LAJE M2
1.01.11
CARPINTEIRO
H
0,60000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,60000
SubMO
11,40192
Mo-de-Obra 5,13600
LS
6,26592
Material
0,00000

07.60.006
1.01.11
1.01.12

Custo Unit.

0,64400
0,55440
53,15060
11,60020

44,58
0,55200
0,47520
28,17100
5,80010

54,28
0,64400
0,55440
29,87320
11,60020

66,59
0,92000
0,79200
34,99990
15,34220

84,78
0,92000
0,79200
49,79120
15,34220

25,48
0,55200
0,47520
10,76920
7,67110

10,30
0,92000
0,79200
4,54250
0,03415

301,12
244,82
244,82000
BDI
56,30860

BDI

3,96
0,60659

BDI

4,60
3,96
2,62244

BDI

4,60
3,96
3,71513

BDI

4,60
3,96
1,74829

4,60
3,96

3,24
1,18800

14,02
2,76000
2,37600

19,86
3,91000
3,36600

9,34
1,84000
1,58400

15,19
2,99000
2,57400
Pgina: 96

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 5,56400

LS

6,78808

UN Coeficiente
SubMO

12,35208

Material

0,00000

07.60.010
VIGAMENTO DE APOIO P/TELHAS DE BARRO/FIBRO-CIM/AL/PLAST/PLANA PRE-FAB
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 0,85600
LS
1,04432
SubMO
1,90032
Material

M
H
0,10000
H
0,10000
0,00000

07.60.015
DE CAIBROS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 0,51360
LS

Material

M
H
0,06000
H
0,06000
0,00000

0,19003

Material

M
H
0,01000
H
0,01000
0,00000

2,85048

UN
H
0,15000
H
0,15000
Material
0,00000

2,75804

M2
H
0,02900
H
0,29000
Material
0,00000

1,90210

M2
H
0,02000
H
0,20000
Material
0,00000

2,54412

Material

M
H
0,30000
0,00000

Material

M
H
0,07500
0,00000

07.60.016
DE RIPAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 0,08560
LS

0,62659

0,10443

SubMO

SubMO

07.60.020
DE FERRAGENS PARA ESTRUTURA DE MADEIRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 1,28400
LS
1,56648
SubMO
07.60.050
TELHAS DE BARRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 1,24236

LS

1,51568

07.60.051
TELHAS DE BARRO - S/REAPROV
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 0,85680
LS
1,04530
07.60.055
CUMEEIRAS E ESPIGOES DE BARRO
1.01.46
SERVENTE
Mo-de-Obra 1,14600
LS
1,39812

SubMO

SubMO

SubMO

07.60.056
CUMEEIRAS E ESPIGOES DE BARRO - S/REAPROV
1.01.46
SERVENTE
Mo-de-Obra 0,28650
LS
0,34953
SubMO

1,14019

0,63603

07.60.060
TELHAS OND DE FIBRO-CIM/PLAST OU ALUM/PLANA PRE FAB
1.01.50
TELHADISTA
1.01.51
AJUDANTE DE TELHADISTA
Mo-de-Obra 1,59120
LS
1,94126
SubMO
3,53246

M2
H
0,03600
H
0,36000
Material
0,00000

07.60.061
TELHAS OND DE FIBRO-CIM/PLAST OU ALUM/PLANA PRE FAB - S/REAPROV
1.01.50
TELHADISTA
1.01.51
AJUDANTE DE TELHADISTA
Mo-de-Obra 1,10500
LS
1,34810
SubMO
2,45310

M2
H
0,02500
H
0,25000
Material
0,00000

07.60.065
CUMEEIRAS, ESPIGOES E RUFOS DE FIBRO-CIMENTO
1.01.51
AJUDANTE DE TELHADISTA
Mo-de-Obra 1,98000
SubMO
LS
2,41560

Material

M
H
0,50000
0,00000

07.60.066
CUMEEIRAS, ESPIGOES E RUFOS DE FIBRO-CIMENTO - S/REAPROV
1.01.51
AJUDANTE DE TELHADISTA
Mo-de-Obra 0,49500
LS
0,60390
SubMO
1,09890

Material

M
H
0,12500
0,00000

07.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

0,00000

MV
MV
1,00000
Material
244,82000

0,38006

M
H
0,02000
H
0,02000
KG
0,00100
Material
0,00467

LS

07.70.001
DE RIPAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
Mo-de-Obra 0,17120
LS
07.70.002
1.01.11
1.01.12
2.67.60

Exerccio:

DE CAIBROS
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PREGO

2011

0,00000

0,20886

SubMO

SubMO

4,39560

M
H
H
KG

0,14000
0,14000
0,01000

Custo Unit.

Custo Total

BDI

2,84098

BDI

4,60
3,96
0,43707

BDI

4,60
3,96
0,26224

BDI

4,60
3,96
0,04371

BDI

4,60
3,96
0,65561

BDI

4,64
3,82
0,63435

BDI

4,64
3,82
0,43748

BDI

3,82
0,58515

BDI

3,82
0,14629

BDI

4,60
3,96
0,81247

BDI

4,60
3,96
0,56421

BDI

3,96
1,01099

BDI

3,96
0,25275

2,33
0,46000
0,39600

1,40
0,27600
0,23760

0,23
0,04600
0,03960

3,50
0,69000
0,59400

3,39
0,13456
1,10780

2,33
0,09280
0,76400

3,12
1,14600

0,78
0,28650

4,34
0,16560
1,42560

3,01
0,11500
0,99000

5,40
1,98000

1,35
0,49500

301,12
244,82
244,82000
BDI
56,30860

BDI

4,60
3,96
4,67
0,08849

4,60
3,96
4,67

0,47
0,09200
0,07920
0,00467

3,32
0,64400
0,55440
0,04670

Pgina: 97

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 1,19840

LS

07.70.003
DE VIGAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
Mo-de-Obra 3,16720
LS

1,46205

3,86398

07.70.010
DE FERRAGEM PARA ESTRUTURA DE MADEIRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 2,99600
LS
3,65512

UN Coeficiente
SubMO

SubMO

SubMO

07.70.050
DE TELHAS DE BARRO TIPO FRANCESA / ROMANA
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 5,37600
LS
6,55872
SubMO
07.70.052
DE TELHA DE BARRO TIPO PLAN
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 4,71240
LS
5,74913

SubMO

07.70.055
DE TELHA DE CIMENTO-AMIANTO, PLASTICO OU ALUMINIO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 3,42400
LS
4,17728
SubMO
07.70.080
DE CUMEEIRAS E ESPIGOES DE BARRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 3,38400
LS
4,12848

SubMO

2,66045

Material

0,04670

7,03118

M
H
0,37000
H
0,37000
KG
0,02500
Material
0,11675

6,65112

UN
H
0,35000
H
0,35000
Material
0,00000

11,93472

M2
H
0,50000
H
0,80000
Material
0,00000

10,46153

M2
H
0,11000
H
1,10000
Material
0,00000

7,60128

M2
H
0,40000
H
0,40000
Material
0,00000

7,51248

M
H
H
M3
KG
KG
Material
1,18072

Material

07.70.099
RECOLOCACOES DE COBERTURA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

0,02000
0,02000
1,05000
0,00100

0,38006

M
H
H
M
KG
Material
2,31467

0,14000
0,14000
1,05000
0,01000

2,66045

M
H
H
M
KG
Material
4,58270

3,04051

M
H
0,16000
H
0,16000
M
1,05000
KG
0,01000
Material
10,07420

6,08102

M
H
0,32000
H
0,32000
M
1,05000
KG
0,02000
Material
10,27840

07.80.001
RIPAS DE PEROBA DE 5 X 1,2 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.60
RIPA DE PEROBA 1X5CM
2.67.60
PREGO
Mo-de-Obra 0,17120
LS
0,20886
07.80.002
CAIBRO DE PEROBA DE 5 X 6 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.01
CAIBRO PEROBA DE 5X6CM
2.67.60
PREGO
Mo-de-Obra 1,19840
LS
1,46205
07.80.003
TABUA DE PEROBA DE 12 X 3 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.65
TABUA PEROBA 12X3CM
2.67.60
PREGO
Mo-de-Obra 1,36960
LS
1,67091
07.80.004
VIGA DE PEROBA DE 6 X 12 CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.26
VIGAS PEROBA DE 6X12 CM
2.67.60
PREGO
Mo-de-Obra 2,73920
LS
3,34182
07.80.005
Exerccio:

VIGA DE PEROBA DE 6 X 16 CM

2011

SubMO

SubMO

SubMO

SubMO

M
H
0,20000
H
0,20000
0,00000

Custo Total

BDI

0,62264

BDI

4,60
3,96
4,67
1,64403

BDI

4,60
3,96
1,52976

BDI

4,64
3,82
2,74499

BDI

4,64
3,82
2,40615

BDI

4,60
3,96
1,74829

BDI

4,64
3,82
80,46
0,35
0,37
1,99944

BDI

4,60
3,96
0,87415

0,40000
0,40000
0,00700
1,13000
0,60000

07.70.081
DE CUMEEIRAS, ESPIGOES E RUFOS DE CIMENTO-AMIANTO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 1,71200
LS
2,08864
SubMO
3,80064

SubMO

Custo Unit.

8,79
1,70200
1,46520
0,11675

8,18
1,61000
1,38600

14,67
2,32000
3,05600

12,86
0,51040
4,20200

9,34
1,84000
1,58400

10,69
1,85600
1,52800
0,56322
0,39550
0,22200

4,67
0,92000
0,79200

301,12
244,82
244,82000
BDI
56,30860

BDI

4,60
3,96
2,20
4,67
0,61979

BDI

4,60
3,96
4,32
4,67
1,66592

BDI

4,60
3,96
9,55
4,67
3,01638

BDI

4,60
3,96
9,70
4,67
3,76267

3,31
0,09200
0,07920
2,31000
0,00467

8,90
0,64400
0,55440
4,53600
0,04670

16,13
0,73600
0,63360
10,02750
0,04670

20,12
1,47200
1,26720
10,18500
0,09340

27,00
Pgina: 98

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.27
VIGAS PEROBA DE 6X16 CM
2.67.60
PREGO
Mo-de-Obra 3,68080
LS

4,49058

07.80.006
RIPA DE MADEIRA (GARAPERA) 5X2CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.67
RIPA DE GARAPERA 5X2CM
2.67.60
PREGO
Mo-de-Obra 0,17120
LS
0,20886
07.80.008
SARRAFO DE CEDRINHO 10X2,5CM (BRUTO)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.11.20
SARRAFO BRUTO DE CEDRINHO 10X2,5CM
2.67.60
PREGO
Mo-de-Obra 0,17120
LS
0,20886
07.80.009
PECAS ESPECIAIS DE PEROBA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.67.60
PREGO
Mo-de-Obra 385,20000
LS
469,94400

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

8,17138

H
0,43000
H
0,43000
M
1,05000
KG
0,02900
Material
13,78543

0,02000
0,02000
1,05000
0,00100

0,38006

M
H
H
M
KG
Material
2,54567

0,02000
0,02000
1,05000
0,01000

0,38006

ML
H
H
M
KG
Material
3,29120

855,14400

M3
H
45,00000
H
45,00000
M3
1,00000
KG
3,00000
Material
1.407,67000

07.80.014
PARAFUSO P/ FIXACAO TELHA FIBROC OND/MOD/MAXIPLAC 5/16" X 110 MM GALV
UN
1.01.11
CARPINTEIRO
H
1.01.12
AJUDANTE DE CARPINTEIRO
H
2.63.68
PARAFUSO FIXACAO TELHA FIBROC 5/16' X 110 MM
UN
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
CJ
Mo-de-Obra 1,52368
LS
1,85889
Material
0,57000
SubMO
3,38257
07.80.015
PARAFUSO TIPO FRANCES, COM PORCA E ARRUELA
1.01.11
CARPINTEIRO
2.67.38
PARAFUSO FRANCES C/PORCA E ARRUELA
Mo-de-Obra 0,92000
LS
1,12240
SubMO

2,04240

UN
H
0,20000
UN
1,00000
Material
0,49000
UN
H
0,35000
H
0,35000
UN
1,00000
Material
1,40000

07.80.017
ESTRIBO DE FERRO REDONDO DE DIAM 1/2", PORCAS E CHAPA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.66.56
ESTRIBO F.REDONDO 1/2' PORCA E CHAPA
Mo-de-Obra 2,99600
LS
3,65512
SubMO
6,65112

UN
H
0,35000
H
0,35000
UN
1,00000
Material
3,20000

07.80.018
CHAPA DE EMENDA DE 2" X 1.1/4"
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.66.57
CHAPA DE EMENDA 2'X1/4' C/4 FUROS
Mo-de-Obra 2,99600
LS
3,65512

UN
H
0,35000
H
0,35000
UN
1,00000
Material
2,95000

6,65112

07.80.019
PARAFUSO PARA FIXACAO DE TELHA FIBROCIMENTO ONDULADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
Mo-de-Obra 0,85600
LS
1,04432
SubMO
1,90032

UN
H
H
CJ
UN
Material
0,57000

0,10000
0,10000
1,00000
1,00000

07.80.020
PARAFUSO OU GANCHO P/ FIXACAO TELHA FIBROCIMENTO MAX E MODULADA
UN
1.01.11
CARPINTEIRO
H
1.01.12
AJUDANTE DE CARPINTEIRO
H
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
CJ
2.66.08
PARAFUSO OU GANCHO P/ TELHAS FIBROCIM MAX/MODULADA
UN
Mo-de-Obra 0,85600
SubMO
1,90032
LS
1,04432
Material
1,02000

0,10000
0,10000
1,00000
1,00000

07.80.030
1.01.46
1.01.50
Exerccio:

TELHAS DE BARRO FRANCESA


SERVENTE
TELHADISTA

2011

M2
H
H

1,00000
0,50000

Custo Total

BDI

4,60
3,96
13,00
4,67
5,05007

BDI

4,60
3,96
2,42
4,67
0,67292

BDI

4,60
3,96
3,09
4,67
0,84439

1,97800
1,70280
13,65000
0,13543

3,59
0,09200
0,07920
2,54100
0,00467

4,51
0,09200
0,07920
3,24450
0,04670

2.783,26
4,60
207,00000
3,96
178,20000
1.393,66
1.393,66000
4,67
14,01000
BDI
520,44722

0,17800
0,17800
1,00000
1,00000

07.80.016
FERRO CHATO EM "U" DE 2"X 1.1/4" COM PARAFUSOS, PARA PENDURAL
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.66.55
PENDURAL F.CHATO 2'X1/4' C/PARAF
Mo-de-Obra 2,99600
LS
3,65512
SubMO
6,65112

SubMO

Custo Unit.

BDI

4,60
3,96
0,49
0,08
0,90909

BDI

4,60
0,49
0,58245

BDI

4,60
3,96
1,40
1,85176

BDI

4,60
3,96
3,20
2,26576

BDI

4,60
3,96
2,95
2,20826

BDI

4,60
3,96
0,08
0,49
0,56817

BDI

4,60
3,96
0,08
0,94
0,67167

3,82
4,60

4,86
0,81880
0,70488
0,49000
0,08000

3,11
0,92000
0,49000

9,90
1,61000
1,38600
1,40000

12,11
1,61000
1,38600
3,20000

11,80
1,61000
1,38600
2,95000

3,03
0,46000
0,39600
0,08000
0,49000

3,59
0,46000
0,39600
0,08000
0,94000

43,27
3,82000
2,30000
Pgina: 99

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.55.01
TELHA TIPO FRANCESA
Mo-de-Obra 6,12000
LS

7,46640

UN Coeficiente
SubMO

07.80.031
TELHAS DE VIDRO TIPO FANCESA PARA ILUMINACAO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.55.61
TELHA DE VIDRO TIPO "FRANCESA"
Mo-de-Obra 5,37600
LS
6,55872
SubMO

UN
16,00000
21,60000

13,58640

Material

11,93472

M2
H
0,50000
H
0,80000
UN
16,00000
Material
364,32000

07.80.032
CUMEEIRAS E ESPIGOES DE BARRO EMBOCADAS PARA TELHAS FRANCESAS
M
1.01.39
PEDREIRO
H
1.01.46
SERVENTE
H
2.05.03
AREIA
M3
2.05.05
CAL HIDRATADA
KG
2.05.08
CIMENTO
KG
2.60.77
CUMEEIRA P/TELHA TIPO FRANCES
UN
Mo-de-Obra 3,38400
LS
4,12848
Material
6,82072
SubMO
7,51248
07.80.033
DE OITAO EM TABUAS DE PINHO MACHO E FEMEA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
3.40.41
TABUA PINHO MACHO-FEMEA 1X10CM-FORRO
Mo-de-Obra 5,13600
LS
6,26592
SubMO

11,40192

M2
H
0,60000
H
0,60000
KG
0,25000
M2
1,10000
Material
36,76350
UN
H
H
CJ
UN
Material
0,51000

0,10000
0,10000
1,00000
1,00000

07.80.088
PARAFUSO PARA FIXACAO TELHA FIBROCIMENTO TRAPEZOIDAL C/ 90CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.13
PARAFUSO 8X110MM OU GANCHO FIX.TELHA TRAPEZOIDAL
Mo-de-Obra 0,85600
LS
1,04432
SubMO
1,90032

UN
H
H
CJ
UN
Material
0,57000

0,10000
0,10000
1,00000
1,00000

07.80.089
PARAFUSO P/ FIXACAO TELHA FIBROCIMENTO TRAPEZOIDAL C/ 0,49 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.05
PARAFUSO OU GANCHO FIX TELHA TRAPEZ 49CM
Mo-de-Obra 0,85600
LS
1,04432
SubMO
1,90032

UN
H
H
CJ
UN
Material
1,49000

0,10000
0,10000
1,00000
1,00000

07.80.090
AMARRACAO DE TELHAS DE BARRO COM ARAME DE COBRE
1.01.39
PEDREIRO
2.70.20
ARAME DE COBRE
Mo-de-Obra 2,32000
LS
2,83040
SubMO
5,15040

M2
H
0,50000
KG
0,04000
Material
1,10520

07.80.091
EMBOCAMENTO DE BEIRAL EM TELHAS DE BARRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 2,61440
LS
3,18957
SubMO

5,80397

M
H
H
M3
KG
KG
Material
0,44492

0,00000

MV
MV
1,00000
Material
244,82000

08.01.001
1.01.18
1.01.19
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
Exerccio:

0,00000

SubMO

AC-04 ABRIGO E CAVALETE DE 3/4" COMPLETO 85X65X30CM


ENCANADOR
AJUDANTE DE ENCANADOR
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2

2011

UN
H
H
H
H
H
H
M3
KG
KG
M3

BDI

1,35
8,09287

21,60000

BDI

BDI

4,64
3,82
80,46
0,35
0,37
1,41
3,29664

BDI

4,60
3,96
4,67
32,36
11,07805

BDI

4,60
3,96
0,08
0,43
0,55437

BDI

4,60
3,96
0,08
0,49
0,56817

BDI

4,60
3,96
0,08
1,41
0,77977

BDI

4,64
27,63
1,43879

BDI

4,64
3,82
80,46
0,35
0,37
1,43724

0,30000
0,32000
0,00200
0,60000
0,20000

4,00000
4,00000
6,69000
1,58000
0,72000
9,25000
0,15300
14,71000
37,24000
0,07200

Custo Total

462,79
4,64
2,32000
3,82
3,05600
22,77
364,32000
86,53859

0,40000
0,40000
0,00700
1,13000
0,60000
4,00000

07.80.087
PARAFUSO PARA FIXACAO TELHA FIBROCIMENTO TRAPEZOIDAL C/ 43CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.65.91
VEDACAO ELASTICA - CONJ DE ARRUELAS DE ACO E PVC
2.66.12
PARAFUSO 8X65MM OU GANCHO FIX.TELHA TRAPEZOIDAL
Mo-de-Obra 0,85600
LS
1,04432
SubMO
1,90032

07.80.099
SERVICOS DE COBERTURA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

Custo Unit.

17,62
1,85600
1,52800
0,56322
0,39550
0,22200
5,64000

59,24
2,76000
2,37600
1,16750
35,59600

2,96
0,46000
0,39600
0,08000
0,43000

3,03
0,46000
0,39600
0,08000
0,49000

4,17
0,46000
0,39600
0,08000
1,41000

7,69
2,32000
1,10520

7,68
1,39200
1,22240
0,16092
0,21000
0,07400

301,12
244,82
244,82000
BDI
56,30860

5,05
4,07
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17

675,99
20,20000
16,28000
31,04160
7,48920
2,73600
35,33500
12,31038
5,14850
13,77880
4,40424
Pgina: 100

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
3.10.49
AC-04/05 PORTA DE TELA C/TRINCO P/CAVALETE 65X85CM
3.75.02
TINTA ESMALTE
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.35.61
REGISTRO GAVETA AMARELO 3/4'
SubMO
Mo-de-Obra 113,08180
LS
137,95980

UN Coeficiente

Custo Unit.

Custo Total

251,04160

M
1,38000
M2
0,35000
KG
2,60000
UN
16,00000
UN
1,00000
L
0,20000
L
0,93000
L
0,75000
UN
1,12000
L
0,15000
M
2,30000
UN
1,00000
Material
298,54642

2,09
17,18
2,70
1,51
162,25
10,12
4,23
10,36
0,72
14,74
10,74
19,13
BDI
126,40524

251,04160

UN
H
4,00000
H
4,00000
H
6,69000
H
1,58000
H
0,72000
H
9,25000
M3
0,15000
KG
14,71000
KG
37,24000
M3
0,07200
M
1,38000
M2
0,35000
KG
2,60000
UN
16,00000
UN
1,00000
L
0,20000
L
0,93000
L
0,75000
UN
1,12000
L
0,15000
M
2,30000
UN
1,00000
Material
319,67804

5,05
4,07
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
2,09
17,18
2,70
1,51
162,25
10,12
4,23
10,36
0,72
14,74
16,15
28,06
BDI
131,26552

08.01.003
AC-06 ABRIGO E CAVALETE DE 1 1/4" COMPLETO 200X90X40CM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.80.56
GRAFITE
3.10.42
AC-06PORTA C/TRINCO P/CAVALETE 1 1/4'
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
6.05.04
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4")
6.35.63
REGISTRO GAVETA AMARELO 1 1/4'
Mo-de-Obra 198,95640
LS
242,72681
SubMO
441,68321

UN
H
4,00000
H
4,00000
H
13,38000
H
4,29000
H
2,34000
H
18,63000
M3
0,29800
KG
25,14000
KG
84,39000
M3
0,17000
M
3,12000
M2
0,78000
KG
7,00000
UN
196,00000
L
0,90000
UN
1,00000
KG
1,40000
UN
1,80000
L
0,06000
L
0,54000
M
4,00000
UN
1,00000
Material
889,02848

5,05
4,07
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
2,09
17,18
2,70
0,22
13,57
588,16
0,75
1,47
6,51
15,96
20,79
36,45
BDI
306,06369

08.01.002
AC-05 ABRIGO E CAVALETE DE 1" COMPLETO 85X65X30CM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
3.10.49
AC-04/05 PORTA DE TELA C/TRINCO P/CAVALETE 65X85CM
3.75.02
TINTA ESMALTE
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
6.35.62
REGISTRO GAVETA AMARELO 1'
Mo-de-Obra 113,08180
LS
137,95980
SubMO

08.01.004
1.01.18
1.01.19
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
Exerccio:

AC-07 ABRIGO E CAVALETE DE 1 1/2" COMPLETO 200X90X40CM


ENCANADOR
AJUDANTE DE ENCANADOR
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2

2011

UN
H
H
H
H
H
H
M3
KG
KG
M3

4,00000
4,00000
13,38000
4,29000
2,34000
18,63000
0,29800
25,14000
84,39000
0,17000

5,05
4,07
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17

2,88420
6,01300
7,02000
24,16000
162,25000
2,02400
3,93390
7,77000
0,80640
2,21100
24,70200
19,13000

701,98
20,20000
16,28000
31,04160
7,48920
2,73600
35,33500
12,06900
5,14850
13,77880
4,40424
2,88420
6,01300
7,02000
24,16000
162,25000
2,02400
3,93390
7,77000
0,80640
2,21100
37,14500
28,06000

1.636,77
20,20000
16,28000
62,08320
20,33460
8,89200
71,16660
23,97708
8,79900
31,22430
10,39890
6,52080
13,40040
18,90000
43,12000
12,21300
588,16000
1,05000
2,64600
0,39060
8,61840
83,16000
36,45000

1.667,40
20,20000
16,28000
62,08320
20,33460
8,89200
71,16660
23,97708
8,79900
31,22430
10,39890
Pgina: 101

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.80.56
GRAFITE
3.10.43
AC-07PORTA C/TRINCO P/CAVALETE 1 1/2'
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
6.05.05
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2")
6.35.64
REGISTRO GAVETA AMARELO 1 1/2'
SubMO
Mo-de-Obra 198,95640
LS
242,72681

UN Coeficiente

Custo Unit.

Custo Total

441,68321

M
3,12000
M2
0,78000
KG
7,00000
UN
196,00000
L
0,90000
UN
1,00000
KG
1,40000
UN
1,80000
L
0,06000
L
0,54000
M
4,00000
UN
1,00000
Material
913,92848

2,09
17,18
2,70
0,22
13,57
588,16
0,75
1,47
6,51
15,96
23,88
48,99
BDI
311,79069

08.01.005
AC-08 ABRIGO E CAVALETE DE 2" COMPLETO 245X110X40CM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
3.10.50
AC-08 PORTA DE TELA C/TRINCO P/CAVALETE 2"
3.75.02
TINTA ESMALTE
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.65
KIT CAVALETE 2" FORNC/CERTIFICADO DE GARANTIA
Mo-de-Obra 206,31740
LS
251,70723
SubMO
458,02463

UN
H
0,80000
H
0,80000
H
16,40000
H
5,25000
H
2,86000
H
22,82000
M3
0,37000
KG
30,80000
KG
103,40000
M3
0,20000
M
3,85000
M2
0,95000
KG
8,60000
UN
47,00000
UN
1,00000
L
0,90000
L
2,69000
L
2,15000
UN
3,23000
L
0,67000
UN
1,00000
Material
3.049,94180

4.314,79
5,05
4,04000
4,07
3,25600
4,64
76,09600
4,74
24,88500
3,80
10,86800
3,82
87,17240
80,46
29,77020
0,35
10,78000
0,37
38,25800
61,17
12,23400
2,09
8,04650
17,18
16,32100
2,70
23,22000
1,51
70,97000
681,42
681,42000
10,12
9,10800
4,23
11,37870
10,36
22,27400
0,72
2,32560
14,74
9,87580
2.103,96
2.103,96000
BDI
806,83228

08.01.010
ABRIGO PARA CAVALETE COM PORTINHOLA DE CHAPA DE ACO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.10
ACO CA-25 $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
3.10.52
PORTINHOLA CHAP ACO N18 80X60CM P/ABRIG
3.45.30
LADRILHO CERAMICO 7.5X15CM VERMELHO
Mo-de-Obra 79,52400
LS
97,01928
SubMO
176,54328

UN
H
9,40000
H
9,40000
M3
0,13100
KG
12,50000
KG
9,00000
M3
0,02400
KG
1,20000
UN
140,00000
UN
1,00000
M2
0,40000
Material
225,54398

494,56
4,64
43,61600
3,82
35,90800
80,46
10,54026
0,35
4,37500
0,37
3,33000
62,03
1,48872
2,67
3,20400
0,22
30,80000
160,49
160,49000
28,29
11,31600
BDI
92,48007

08.01.015
CAVALETE DE 3/4" - (TUBO E CONEXOES DE FERRO GALVANIZADO)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.35.53
REGISTRO DE PASSEIO DE 3/4"
6.35.61
REGISTRO GAVETA AMARELO 3/4'
6.50.22
CAIXA PASSEIO (ENTRADA D'AGUA)
Mo-de-Obra 36,48000
LS
44,50560
SubMO
80,98560

UN
H
4,00000
H
4,00000
M
2,30000
UN
1,00000
UN
1,00000
UN
1,00000
Material
65,46200

08.01.016
CAVALETE DE 1" - (TUBO E CONEXOES DE FERRO GALVANIZADO)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
6.35.54
REGISTRO DE PASSEIO DE 1"
6.35.62
REGISTRO GAVETA AMARELO 1'
6.50.22
CAIXA PASSEIO (ENTRADA D'AGUA)
Mo-de-Obra 36,48000
LS
44,50560
SubMO
80,98560

UN
H
4,00000
H
4,00000
M
2,30000
UN
1,00000
UN
1,00000
UN
1,00000
Material
95,76500

08.01.017
1.01.18
1.01.19
6.05.05
6.35.55
6.35.64
Exerccio:

CAVALETE DE 1.1/2" - (TUBO E CONEXOES DE FERRO GALVANIZADO)


ENCANADOR
AJUDANTE DE ENCANADOR
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2")
REGISTRO DE PASSEIO DE 1.1/2"
REGISTRO GAVETA AMARELO 1 1/2'

2011

UN
H
H
M
UN
UN

4,50000
4,50000
2,30000
1,00000
1,00000

BDI

5,05
4,07
10,74
19,13
19,13
2,50
33,68295

BDI

5,05
4,07
16,15
28,06
28,06
2,50
40,65264

5,05
4,07
23,88
46,36
48,99

6,52080
13,40040
18,90000
43,12000
12,21300
588,16000
1,05000
2,64600
0,39060
8,61840
95,52000
48,99000

180,13
20,20000
16,28000
24,70200
19,13000
19,13000
2,50000

217,40
20,20000
16,28000
37,14500
28,06000
28,06000
2,50000

299,97
22,72500
18,31500
54,92400
46,36000
48,99000
Pgina: 102

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.50.22
CAIXA PASSEIO (ENTRADA D'AGUA)
Mo-de-Obra 41,04000
LS
50,06880
08.01.099
SERVICOS EM CAVALETE E ABRIGO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente
SubMO

SubMO

08.02.001
AG-04 ABRIGO PARA GAS COM 2 CILINDROS DE 45 KG
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.42
AG-04PORTAO TELA 1.50X1.50 M
3.80.03
CAL PARA PINTURA
3.80.18
OLEO DE LINHACA
6.07.51
TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4")
6.85.01
CAP 3/4" NPT
6.85.02
CILINDRO ACO 45 KG COM GAS
6.85.04
MEIA LUVA POL(VALV.RET)-GAS
6.85.05
PIGTAIL POL MX7/16 NS(24)
6.85.09
VALVULA DE CILINDRO P/BOTIJAO 45KG (GAS)
6.85.10
VALVULA DE ESFERA METALICO 3/4"
6.85.18
TEE 3/4" NPT
6.85.23
REGULADOR PRESSAO PRIM EST SAIDA 150KPA VAZ 5G/H
6.85.30
VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL
Mo-de-Obra 311,20510
LS
379,67022
SubMO
08.02.002
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.40
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.21
2.10.32
2.15.25
2.15.38
2.25.02
2.67.60
2.70.10
3.11.43
3.80.03
3.80.18
6.07.51
6.85.01
6.85.02
6.85.04
6.85.05
6.85.09
6.85.10
6.85.18
Exerccio:

AG-05 ABRIGO PARA GAS COM 4 CILINDROS DE 45 KG


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-50-A $MD BITOLAS
ACO CA-60-B $MD BITOLAS
BLOCO DE CONCRETO 9X19X39CM - 3MPa
PREGO
ARAME RECOZIDO N.18
AG-05PORTAO TELA 1.50X2.30 M
CAL PARA PINTURA
OLEO DE LINHACA
TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4")
CAP 3/4" NPT
CILINDRO ACO 45 KG COM GAS
MEIA LUVA POL(VALV.RET)-GAS
PIGTAIL POL MX7/16 NS(24)
VALVULA DE CILINDRO P/BOTIJAO 45KG (GAS)
VALVULA DE ESFERA METALICO 3/4"
TEE 3/4" NPT

2011

UN
1,00000
152,77400

Custo Unit.

Custo Total

2,50
56,09304

2,50000

91,10880

Material

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

690,87532

UN
H
5,18000
H
5,18000
H
2,64000
H
2,64000
H
0,93000
H
0,93000
H
21,29000
H
3,76000
H
30,94000
M3
0,57700
KG
52,58000
KG
154,04000
M3
0,31300
M2
0,26000
M2
0,85000
KG
3,05000
KG
7,62000
UN
70,72000
KG
0,52000
KG
0,32000
UN
1,00000
KG
5,38000
L
0,11000
M
2,40000
UN
2,00000
UN
2,00000
UN
2,00000
UN
2,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
2.637,43583

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,74
3,82
80,46
0,35
0,37
61,17
17,18
11,40
2,69
2,70
1,51
4,67
4,87
823,08
0,75
6,51
31,44
7,93
426,30
5,23
17,71
30,86
15,49
14,52
327,91
90,00
BDI
765,51157

UN
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M2
M2
KG
KG
UN
KG
KG
UN
KG
L
M
UN
UN
UN
UN
UN
UN
UN

7,12000
7,12000
3,52000
3,52000
1,21000
1,21000
27,99000
4,89000
40,26000
0,75300
67,86000
200,54000
0,41600
0,36000
1,17000
2,65000
10,83000
88,40000
0,71000
0,40000
1,00000
6,99000
0,14000
3,20000
2,00000
4,00000
4,00000
4,00000
4,00000
2,00000
1,00000

BDI

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,74
3,82
80,46
0,35
0,37
61,17
17,18
11,40
2,69
2,70
1,51
4,67
4,87
1.158,51
0,75
6,51
31,44
7,93
426,30
5,23
17,71
30,86
15,49
14,52

4.093,82
23,82800
20,51280
13,33200
10,74480
4,43610
3,55260
98,78560
17,82240
118,19080
46,42542
18,40300
56,99480
19,14621
4,46680
9,69000
8,20450
20,57400
106,78720
2,42840
1,55840
823,08000
4,03500
0,71610
75,45600
15,86000
852,60000
10,46000
35,42000
61,72000
30,98000
14,52000
327,91000
90,00000

6.093,92
32,75200
28,19520
17,77600
14,32640
5,77170
4,62220
129,87360
23,17860
153,79320
60,58638
23,75100
74,19980
25,44672
6,18480
13,33800
7,12850
29,24100
133,48400
3,31570
1,94800
1.158,51000
5,24250
0,91140
100,60800
15,86000
1.705,20000
20,92000
70,84000
123,44000
30,98000
14,52000
Pgina: 103

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.85.23
REGULADOR PRESSAO PRIM EST SAIDA 150KPA VAZ 5G/H
6.85.30
VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL
SubMO
Mo-de-Obra 410,28890
LS
500,55246
08.02.003
AG-06 ABRIGO PARA GAS COM 6 CILINDROS DE 45 KG
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.44
AG-06PORTAO TELA 1.50X3.10 M
3.80.03
CAL PARA PINTURA
3.80.18
OLEO DE LINHACA
6.07.51
TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4")
6.85.01
CAP 3/4" NPT
6.85.02
CILINDRO ACO 45 KG COM GAS
6.85.04
MEIA LUVA POL(VALV.RET)-GAS
6.85.05
PIGTAIL POL MX7/16 NS(24)
6.85.09
VALVULA DE CILINDRO P/BOTIJAO 45KG (GAS)
6.85.10
VALVULA DE ESFERA METALICO 3/4"
6.85.18
TEE 3/4" NPT
6.85.23
REGULADOR PRESSAO PRIM EST SAIDA 150KPA VAZ 5G/H
6.85.30
VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL
Mo-de-Obra 497,51590
LS
606,96940
SubMO
08.02.004
AG-07 ABRIGO PARA MEDIDOR COMGAS 60X60X30CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.56
GRAFITE
3.11.40
AG-07PORTA EM CHAPA N. 16
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
6.07.52
TUBO ACO GALV NBR 5590-CL PESADA DN 25MM (1")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 115,35250
LS
140,73005
SubMO
08.02.005
1.01.11
1.01.12
1.01.21
Exerccio:

AG-08 ABRIGO PARA GAS COM 2 BUJOES DE 13 KG


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO

2011

UN Coeficiente

Custo Unit.

Custo Total

910,84136

UN
1,00000
UN
1,00000
Material
4.043,56580

327,91
327,91000
90,00
90,00000
BDI
1.139,51365

1.104,48530

UN
H
9,08000
H
9,08000
H
4,40000
H
4,40000
H
1,49000
H
1,49000
H
33,07000
H
5,85000
H
48,61000
M3
0,90700
KG
81,14000
KG
241,70000
M3
0,51200
M2
0,45000
M2
1,50000
KG
3,05000
KG
12,21000
UN
106,08000
KG
0,91000
KG
0,48000
UN
1,00000
KG
8,35000
L
0,17000
M
4,00000
UN
2,00000
UN
6,00000
UN
6,00000
UN
6,00000
UN
6,00000
UN
2,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
5.620,87406

8.272,19
4,60
41,76800
3,96
35,95680
5,05
22,22000
4,07
17,90800
4,77
7,10730
3,82
5,69180
4,64
153,44480
4,74
27,72900
3,82
185,69020
80,46
72,97722
0,35
28,39900
0,37
89,42900
61,17
31,31904
17,18
7,73100
11,40
17,10000
2,69
8,20450
2,70
32,96700
1,51
160,18080
4,67
4,24970
4,87
2,33760
1.672,98
1.672,98000
0,75
6,26250
6,51
1,10670
31,44
125,76000
7,93
15,86000
426,30
2.557,80000
5,23
31,38000
17,71
106,26000
30,86
185,16000
15,49
30,98000
14,52
14,52000
327,91
327,91000
90,00
90,00000
BDI
1.546,83265

256,08255

UN
H
1,38000
H
1,38000
H
2,73000
H
2,73000
H
0,17000
H
0,17000
H
7,50000
H
1,57000
H
0,65000
H
8,50000
M3
0,23200
KG
13,87000
KG
95,60000
M3
0,11800
M2
0,60000
M2
3,42700
KG
16,00000
UN
61,00000
KG
0,13800
KG
0,03000
L
0,18000
UN
1,00000
KG
1,32000
UN
0,36000
L
0,03000
L
0,15000
M
3,15000
UN
0,03020
Material
571,47152

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
62,03
17,18
11,40
2,70
0,22
4,67
4,87
13,57
277,00
0,75
1,47
6,51
15,96
36,44
4,48
BDI
190,33744

UN
H
H
H

1,44000
1,44000
0,38000

4,60
3,96
4,77

1.017,89
6,34800
5,46480
13,78650
11,11110
0,81090
0,64940
34,80000
7,44180
2,47000
32,47000
18,66672
4,85450
35,37200
7,31954
10,30800
39,06780
43,20000
13,42000
0,64446
0,14610
2,44260
277,00000
0,99000
0,52920
0,19530
2,39400
114,78600
0,13530

1.183,56
6,62400
5,70240
1,81260
Pgina: 104

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.52
AG-08 PORTINHOLA CHAPA ACO COMPLETA
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
3.16.91
FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
3.80.34
TINTA A OLEO
6.85.15
VALVULA E MANGUEIRA P/GAS DOMIC 3/8'
6.85.16
BICO ESCALONADO PARA GAS 3/8' BRONZE
6.85.50
BUJAO GAS 13KG COM CARGA
Mo-de-Obra 144,84820
LS
176,71480
SubMO
321,56300

H
0,38000
H
11,32000
H
3,03000
H
0,50000
H
15,83000
M3
0,24300
KG
29,79000
KG
60,92000
M3
0,11300
M2
0,87000
KG
4,31000
UN
133,00000
KG
0,22000
KG
0,08000
UN
1,00000
UN
1,00000
UN
1,00000
KG
2,20000
UN
0,83000
L
0,04000
L
0,25000
L
0,42000
CJ
1,00000
UN
1,00000
UN
2,00000
Material
640,68799

08.02.016
PROTECAO ANTICORROSIVA PARA RAMAIS SOB A TERRA
1.01.19
AJUDANTE DE ENCANADOR
6.95.26
FITA PROT.ANTICORROS.LARG.50MM SCOTCHRAP/TOROFITA
Mo-de-Obra 0,32560
LS
0,39723
SubMO
0,72283

Material

08.02.017
PROTECAO MECANICA PARA RAMAIS SOB ATERRA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 1,82400
LS
2,22528
SubMO

4,04928

M
H
0,20000
H
0,20000
UN
5,00000
Material
1,10000

08.02.020
SG-01 SIFAO PARA REDE DE GAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
6.08.03
TUBO ACO 1' SCH 40 S/COSTURA
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 20,38760
LS
24,87287

SubMO

08.02.021
VG-01 VALVULA E REGULADOR DE PRESSAO DE GAS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.04.36
NIPLE DUPLO FERRO GALV 3/8"
6.05.01
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2")
6.06.01
REDUCAO 3/8"X1/2"
6.06.02
REDUCAO 3/4"X1/4"
6.08.34
NIPLE DUPLO FERRO GALV 3/4"
6.85.10
VALVULA DE ESFERA METALICO 3/4"
6.85.22
REGULADOR SEMI-INDUST 2o ESTAGIO PRESSAO S 2,8KPA
6.85.30
VALVULA DE BLOQUEIO AUTOM C/ REARME MANUAL
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
SubMO
Mo-de-Obra 18,24000
LS
22,25280

Exerccio:

2011

M
H
0,08000
M
3,00000
6,54000

Custo Unit.

Custo Total

3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
17,18
2,70
0,22
4,67
4,87
251,87
11,20
3,81
0,75
1,47
6,51
15,96
9,30
17,12
3,87
112,55
BDI
221,31773

1,45160
52,52480
14,36220
1,90000
60,47060
19,55178
10,42650
22,54040
6,91221
14,94660
11,63700
29,26000
1,02740
0,38960
251,87000
11,20000
3,81000
1,65000
1,22010
0,26040
3,99000
3,90600
17,12000
3,87000
225,10000

8,93
0,32560
6,54000

BDI

4,07
2,18
1,67045

BDI

5,05
4,07
0,22
1,18433

45,26047

UN
H
0,16000
H
0,16000
H
1,10000
H
1,10000
H
0,02000
H
0,02000
H
0,64000
H
1,53000
M3
0,02600
KG
1,66000
KG
7,39000
M3
0,00400
M
0,30000
M2
0,07000
KG
0,23000
UN
28,00000
KG
0,03000
KG
0,00400
M
1,19000
UN
0,01140
Material
38,03849

BDI

4,60
3,96
5,05
4,07
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
19,17
4,48
19,15876

40,49280

UN
H
2,00000
H
2,00000
UN
1,00000
M
0,10000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,03600
Material
269,17028

380,88
5,05
10,10000
4,07
8,14000
3,50
3,50000
8,09
0,80900
2,01
2,01000
2,45
2,45000
3,95
3,95000
15,49
15,49000
150,80
150,80000
90,00
90,00000
4,48
0,16128
BDI
71,22251

6,33
1,01000
0,81400
1,10000

102,45
0,73600
0,63360
5,55500
4,47700
0,09540
0,07640
2,96960
5,84460
2,09196
0,58100
2,73430
0,24468
1,38000
1,20260
0,62100
6,16000
0,14010
0,01948
22,81230
0,05107

Pgina: 105

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

08.02.040
TUBO ACO GALV NBR5590-CLASSE PESADA DN 20MM (3/4") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.07.51
TUBO ACO GALV NBR 5590-CL PESADA DN 20MM (3/4")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104

M
H
1,10000
H
1,10000
M
1,60000
UN
0,01120
Material
50,35418

08.02.041
TUBO ACO GALV NBR5590-CLASSE PESADA DN 25MM (1") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.07.52
TUBO ACO GALV NBR 5590-CL PESADA DN 25MM (1")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 11,85600
LS
14,46432
SubMO
26,32032

M
H
1,30000
H
1,30000
M
1,50000
UN
0,01440
Material
54,72451

08.02.042
TUBO ACO GALV NBR5590-CLASSE PESADA DN 32MM (1 1/4") INCL CONEXOES
M
1.01.18
ENCANADOR
H
1,40000
1.01.19
AJUDANTE DE ENCANADOR
H
1,40000
6.07.53
TUBO ACO GALV NBR 5590-CL PESADA DN 32MM (1 1/4")
M
1,50000
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
UN
0,01800
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496
Material
74,19564
08.02.043
TUBO ACO GALV NBR5590-CLASSE PESADA DN 40MM (1 1/2") INCL CONEXOES
M
1.01.18
ENCANADOR
H
1,60000
1.01.19
AJUDANTE DE ENCANADOR
H
1,60000
6.07.54
TUBO ACO GALV NBR 5590-CL PESADA DN 40MM (1 1/2")
M
1,40000
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
UN
0,02260
Mo-de-Obra 14,59200
LS
17,80224
SubMO
32,39424
Material
80,75525
08.02.050
ENVOLVIMENTO C/ TUBO DE PVC DN 150MM EM TUBULACAO DE GAS DE RUA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.34
TUBO PVC P/ESGOTO 150MM
Mo-de-Obra 0,91200
LS
1,11264
Material
SubMO
2,02464

M
H
0,10000
H
0,10000
M
1,10000
15,44400

Custo Unit.

Custo Total

BDI

5,05
4,07
31,44
4,48
16,70380

BDI

5,05
4,07
36,44
4,48
18,64031

BDI

5,05
4,07
49,41
4,48
23,58434

BDI

5,05
4,07
57,61
4,48
26,02438

BDI

5,05
4,07
14,04
4,01779

BDI

5,05
4,07
11,75
52,90
10,44552

BDI

5,05
4,07
18,63
52,90
13,02589

BDI

5,05
4,07
23,72
52,90
15,49555

BDI

5,05
4,07
35,85
52,90
19,76642

5,05
4,07
43,19
52,90
22,96058

89,32
5,55500
4,47700
50,30400
0,05018

99,68
6,56500
5,29100
54,66000
0,06451

126,12
7,07000
5,69800
74,11500
0,08064

139,17
8,08000
6,51200
80,65400
0,10125

21,48
0,50500
0,40700
15,44400

08.02.060
TUBO DE COBRE P/ GAS CLASSE A S/COST DN=1/2 (15) SOLDA FOSCOPER
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.30.40
TUBO DE COBRE P/ GAS DN=1/2 (15) CLASSE A S/ COST
6.30.50
VARETAS PARA SOLDA FOSCOPER
Mo-de-Obra 11,85600
LS
14,46432
SubMO
26,32032

M
H
1,30000
H
1,30000
M
1,40000
KG
0,05000
Material
19,09500

08.02.061
TUBO DE COBRE P/ GAS CLASSE A S/COST DN=3/4 (22) SOLDA FOSCOPER
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.30.41
TUBO DE COBRE P/ GAS DN=3/4 (22) CLASSE A S/ COST
6.30.50
VARETAS PARA SOLDA FOSCOPER
SubMO
26,32032
Mo-de-Obra 11,85600
LS
14,46432

M
H
1,30000
H
1,30000
M
1,40000
KG
0,08000
Material
30,31400

08.02.062
TUBO DE COBRE P/ GAS CLASSE A S/COST DN=1 (28) SOLDA FOSCOPER
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.30.42
TUBO DE COBRE P/ GAS DN=1 (28) CLASSE A S/ COST
6.30.50
VARETAS PARA SOLDA FOSCOPER
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
M
1,40000
KG
0,11000
Material
39,02700

08.02.063
TUBO DE COBRE P/ GAS CLASSE A S/COST DN=1 1/4 (35) SOLDA FOSCOPER
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.30.43
TUBO DE COBRE P/ GAS DN=1 1/4 (35) CLASSE A S/COST
6.30.50
VARETAS PARA SOLDA FOSCOPER
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
M
1,40000
KG
0,14000
Material
57,59600

08.02.064
TUBO DE COBRE P/ GAS CLSSE A S/COST DN=1 1/2 (42) SOLDA FOSCOPER
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.30.44
TUBO DE COBRE P/ GAS DN=1 1/2 (42) CLASSE A S/COST
6.30.50
VARETAS PARA SOLDA FOSCOPER
Mo-de-Obra 13,68000
LS
16,68960
SubMO
30,36960

M
H
1,50000
H
1,50000
M
1,40000
KG
0,17000
Material
69,45900

BDI

08.02.099
SERVICOS EM ABRIGO E REDE DE GAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.03.001
Exerccio:

SubMO

0,00000

TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN15MM (1/2") - INCL CONEXOES

2011

55,86
6,56500
5,29100
16,45000
2,64500

69,66
6,56500
5,29100
26,08200
4,23200

82,86
7,07000
5,69800
33,20800
5,81900

105,70
7,07000
5,69800
50,19000
7,40600

122,78
7,57500
6,10500
60,46600
8,99300

33,39
Pgina: 106

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.01
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2")
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 6,38400
LS
7,78848
SubMO

UN Coeficiente

14,17248

H
0,70000
H
0,70000
M
1,60000
UN
0,00940
Material
12,97521

Custo Unit.

Custo Total

BDI

5,05
4,07
8,09
3,32
6,24397

3,53500
2,84900
12,94400
0,03121

BDI

5,05
4,07
10,74
3,32
7,68621

BDI

5,05
4,07
16,15
3,32
10,70509

BDI

5,05
4,07
20,79
4,48
12,77910

BDI

5,05
4,07
23,88
4,48
14,23199

BDI

5,05
4,07
33,59
6,23
18,30563

BDI

5,05
4,07
42,97
6,23
22,26678

BDI

5,05
4,07
54,35
6,23
25,61902

180,52
5,05
11,11000
4,07
8,95400
78,40
101,92000
6,23
0,30901
33,75735

08.03.002
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN20MM (3/4") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 7,29600
SubMO
16,19712
LS
8,90112

M
H
0,80000
H
0,80000
M
1,60000
UN
0,01120
Material
17,22118

08.03.003
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN25MM (1") - INCL. CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104

M
H
1,10000
H
1,10000
M
1,50000
UN
0,01440
Material
24,27281

08.03.004
TUBO ACO GALVANIZ NBR 5580-CL MEDIA, DN32MM (1 1/4")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.04
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 10,94400
LS
13,35168
SubMO
24,29568

M
H
1,20000
H
1,20000
M
1,50000
UN
0,01800
Material
31,26564

08.03.005
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN40MM (1 1/2")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.05
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
M
1,40000
UN
0,02260
Material
33,53325

08.03.006
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN50MM (2") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.06
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 14,59200
LS
17,80224
SubMO
32,39424

M
H
1,60000
H
1,60000
M
1,40000
UN
0,02720
Material
47,19546

08.03.007
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN65MM (2 1/2") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.07
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN65MM (2 1/2")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 16,41600
LS
20,02752
SubMO
36,44352

M
H
1,80000
H
1,80000
M
1,40000
UN
0,03380
Material
60,36857

08.03.008
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN80MM (3")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280

M
H
2,00000
H
2,00000
M
1,30000
UN
0,03840
Material
70,89423

08.03.009
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN100MM (4")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.09
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN100MM (4")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 20,06400
LS
24,47808
SubMO
44,54208

M
H
2,20000
H
2,20000
M
1,30000
UN
0,04960
Material
102,22901

BDI

08.03.010
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN 150MM (6") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.11
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN150MM (6")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 24,16800
LS
29,48496
SubMO
53,65296

M
H
2,65000
H
2,65000
M
1,30000
UN
0,06800
Material
163,67764

267,31
5,05
13,38250
4,07
10,78550
125,58
163,25400
6,23
0,42364
BDI
49,98604

08.03.012
PROTECAO ANTICORROSIVA PARA RAMAIS SOB A TERRA
1.01.19
AJUDANTE DE ENCANADOR
6.95.26
FITA PROT.ANTICORROS.LARG.50MM SCOTCHRAP/TOROFITA
Mo-de-Obra 0,32560
SubMO
0,72283
LS
0,39723

Exerccio:

2011

Material

M
H
0,08000
M
3,00000
6,54000

BDI

4,07
2,18
1,67045

41,10
4,04000
3,25600
17,18400
0,03718

57,24
5,55500
4,47700
24,22500
0,04781

68,34
6,06000
4,88400
31,18500
0,08064

76,11
7,07000
5,69800
33,43200
0,10125

97,89
8,08000
6,51200
47,02600
0,16946

119,07
9,09000
7,32600
60,15800
0,21057

137,00
10,10000
8,14000
70,65500
0,23923

8,93
0,32560
6,54000

Pgina: 107

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

08.03.015
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 20MM (1/2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.01
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 3,19200
LS
3,89424
SubMO
7,08624

M
H
H
UN
M
L
L
Material
2,13126

0,35000
0,35000
0,04000
1,60000
0,00060
0,00030

08.03.016
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 25MM (3/4") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.02
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

M
H
H
UN
M
L
L
Material
2,59192

0,40000
0,40000
0,05000
1,60000
0,00080
0,00030

08.03.017
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 32MM (1") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.03
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 32MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
SubMO
9,11088
Mo-de-Obra 4,10400
LS
5,00688

M
H
H
UN
M
L
L
Material
5,22836

0,45000
0,45000
0,06000
1,50000
0,00110
0,00050

08.03.018
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/4") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.04
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 40MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 4,56000
LS
5,56320
SubMO
10,12320

M
H
H
UN
M
L
L
Material
7,48829

0,50000
0,50000
0,07000
1,50000
0,00120
0,00050

08.03.019
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 50MM (1.1/2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.05
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 50MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 5,47200
LS
6,67584
SubMO
12,14784

M
H
H
UN
M
L
L
Material
8,84628

0,60000
0,60000
0,08000
1,40000
0,01680
0,00070

08.03.020
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 60MM (2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.06
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 60MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 6,38400
LS
7,78848
SubMO
14,17248

M
H
0,70000
H
0,70000
UN
0,09000
M
1,40000
L
0,00220
L
0,00080
Material
13,20307

08.03.021
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 75MM (2.1/2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.07
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 75MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 8,20800
LS
10,01376
SubMO
18,22176

M
H
0,90000
H
0,90000
UN
0,10000
M
1,40000
L
0,00310
L
0,00110
Material
20,89892

08.03.022
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 85MM (3") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.08
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
SubMO
20,24640
Mo-de-Obra 9,12000
LS
11,12640

M
H
1,00000
H
1,00000
UN
0,11000
M
1,30000
L
0,00350
L
0,00130
Material
24,22509

08.03.023
1.01.18
Exerccio:

TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 110MM (4") INCL CONEXOES


ENCANADOR

2011

M
H

1,10000

Custo Unit.

Custo Total

BDI

5,05
4,07
0,72
1,30
27,29
20,29
2,12003

BDI

5,05
4,07
0,72
1,58
27,29
20,29
2,45881

BDI

5,05
4,07
0,72
3,43
27,29
20,29
3,29803

BDI

5,05
4,07
0,72
4,93
27,29
20,29
4,05064

BDI

5,05
4,07
0,72
5,94
27,29
20,29
4,82865

BDI

5,05
4,07
0,72
9,33
27,29
20,29
6,29638

BDI

5,05
4,07
0,72
14,80
27,29
20,29
8,99776

BDI

5,05
4,07
0,72
18,48
27,29
20,29
10,22844

5,05

11,33
1,76750
1,42450
0,02880
2,08000
0,01637
0,00609

13,14
2,02000
1,62800
0,03600
2,52800
0,02183
0,00609

17,63
2,27250
1,83150
0,04320
5,14500
0,03002
0,01015

21,66
2,52500
2,03500
0,05040
7,39500
0,03275
0,01015

25,82
3,03000
2,44200
0,05760
8,31600
0,45847
0,01420

33,67
3,53500
2,84900
0,06480
13,06200
0,06004
0,01623

48,11
4,54500
3,66300
0,07200
20,72000
0,08460
0,02232

54,69
5,05000
4,07000
0,07920
24,02400
0,09552
0,02638

75,93
5,55500
Pgina: 108

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.09
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 110MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
SubMO
Mo-de-Obra 10,03200
LS
12,23904
08.03.099
SERVICOS EM REDE DE AGUA FRIA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
08.04.001
REGISTRO DE GAVETA BRUTO DN 15MM (1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.60
REGISTRO GAVETA AMARELO 1/2'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,92480
LS
6,00826
08.04.002
REGISTRO DE GAVETA BRUTO DN 20MM (3/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.61
REGISTRO GAVETA AMARELO 3/4'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,92480
LS
6,00826
08.04.003
REGISTRO DE GAVETA BRUTO DN 25MM (1")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.62
REGISTRO GAVETA AMARELO 1'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,92480
LS
6,00826
08.04.004
REGISTRO DE GAVETA BRUTO DN 32MM (1 1/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.63
REGISTRO GAVETA AMARELO 1 1/4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 7,75200
LS
9,45744
08.04.005
REGISTRO DE GAVETA BRUTO DN 40MM 1 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.64
REGISTRO GAVETA AMARELO 1 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 7,75200
LS
9,45744
08.04.006
REGISTRO DE GAVETA BRUTO DN 50MM (2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.65
REGISTRO GAVETA AMARELO 2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 7,75200
LS
9,45744
08.04.007
REGISTRO DE GAVETA BRUTO DN 65MM (2 1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.66
REGISTRO GAVETA AMARELO 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
08.04.008
REGISTRO DE GAVETA BRUTO DN 80MM (3")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.67
REGISTRO GAVETA AMARELO 3'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
08.04.009
REGISTRO DE GAVETA BRUTO DN 100MM (4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.69
REGISTRO GAVETA AMARELO 4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 13,49760
LS
16,46707

Exerccio:

2011

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

Custo Unit.

Custo Total

22,27104

H
1,10000
UN
0,12000
M
1,30000
L
0,00550
L
0,00230
Material
39,46516

4,07
0,72
30,14
27,29
20,29
14,19933

4,47700
0,08640
39,18200
0,15010
0,04667

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

10,93306

UN
H
0,54000
H
0,54000
UN
1,00000
UN
0,01120
Material
17,58018

10,93306

UN
H
0,54000
H
0,54000
UN
1,00000
UN
0,01880
Material
19,21422

10,93306

UN
H
0,54000
H
0,54000
UN
1,00000
UN
0,02400
Material
28,16752

17,20944

UN
H
0,85000
H
0,85000
UN
1,00000
UN
0,03000
Material
36,63690

17,20944

UN
H
0,85000
H
0,85000
UN
1,00000
UN
0,03760
Material
49,22425

35,07
2,72700
2,19780
17,53000
0,05018

BDI

5,05
4,07
17,53
4,48
6,55804

BDI

5,05
4,07
19,13
4,48
6,93387

BDI

5,05
4,07
28,06
4,48
8,99313

BDI

5,05
4,07
36,45
6,23
12,38466

BDI

5,05
4,07
48,99
6,23
15,27975

17,20944

UN
H
0,85000
H
0,85000
UN
1,00000
UN
0,04520
Material
68,08160

BDI

5,05
4,07
67,80
6,23
19,61694

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,05640
Material
179,09137

248,92
5,05
5,80750
4,07
4,68050
178,74
178,74000
6,23
0,35137
BDI
46,54619

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,06400
Material
280,31872

373,43
5,05
5,80750
4,07
4,68050
279,92
279,92000
6,23
0,39872
BDI
69,82848

29,96467

UN
H
1,48000
H
1,48000
UN
1,00000
UN
0,08280
Material
470,67584

615,78
5,05
7,47400
4,07
6,02360
470,16
470,16000
6,23
0,51584
BDI
115,14732

37,08
2,72700
2,19780
19,13000
0,08422

48,09
2,72700
2,19780
28,06000
0,10752

66,23
4,29250
3,45950
36,45000
0,18690

81,71
4,29250
3,45950
48,99000
0,23425

104,90
4,29250
3,45950
67,80000
0,28160

Pgina: 109

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

08.04.015
REGISTRO DE PRESSAO BRUTO DE 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.30
REGISTRO PRESSAO AMARELO DE 1/2'
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 4,10400
LS
5,00688

UN Coeficiente

9,11088

UN
H
0,45000
H
0,45000
UN
1,00000
UN
0,00480
Material
23,20594

12,14784

UN
H
0,60000
H
0,60000
UN
1,00000
UN
0,00720
Material
25,88226

08.04.021
REGISTRO DE GAVETA COM CANOPLA CROMADA DN 15MM (1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.45
REGISTRO GAVETA C/ CANOPLA CROMADA DN 1/2"
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 5,56320
LS
6,78710
SubMO
12,35030

UN
H
0,61000
H
0,61000
UN
1,00000
UN
0,01120
Material
43,86718

08.04.022
REGISTRO DE GAVETA COM CANOPLA CROMADA DN 20MM (3/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.46
REGISTRO GAVETA C/ CANOPLA CROMADA DN 3/4"
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 5,56320
LS
6,78710
SubMO
12,35030

UN
H
0,61000
H
0,61000
UN
1,00000
UN
0,01880
Material
50,81242

08.04.023
REGISTRO DE GAVETA COM CANOPLA CROMADA DN 25MM (1")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.47
REGISTRO GAVETA C/ CANOPLA CROMADA DN 1"
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 5,56320
LS
6,78710
SubMO
12,35030

UN
H
0,61000
H
0,61000
UN
1,00000
UN
0,02400
Material
62,06752

08.04.024
REGISTRO DE GAVETA COM CANOPLA CROMADA DN 32MM (1 1/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.48
REGISTRO GAVETA C/ CANOPLA CROMADA DN 1 1/4"
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 8,66400
LS
10,57008
SubMO
19,23408

UN
H
0,95000
H
0,95000
UN
1,00000
UN
0,03000
Material
83,77440

08.04.025
REGISTRO DE GAVETA COM CANOPLA CROMADA DN 40MM (1 1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.49
REGISTRO GAVETA C/ CANOPLA CROMADA DN 1 1/2"
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 8,66400
LS
10,57008
SubMO
19,23408

UN
H
0,95000
H
0,95000
UN
1,00000
UN
0,03760
Material
95,64845

08.04.031
REGISTRO DE PRESSAO C/ CANOPLA CROMADA DN 15MM (1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.32
REGISTRO PRESSAO C/ CANOPLA CROMADA DN 1/2"
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 5,56320
LS
6,78710
SubMO
12,35030

UN
H
0,61000
H
0,61000
UN
1,00000
UN
0,01120
Material
47,89718

08.04.032
REGISTRO DE PRESSAO C/ CANOPLA CROMADA DN 20MM (3/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.33
REGISTRO PRESSAO C/ CANOPLA CROMADA DN 3/4"
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 5,56320
LS
6,78710
SubMO
12,35030

UN
H
0,61000
H
0,61000
UN
1,00000
UN
0,01880
Material
50,13242

08.04.016
REGISTRO DE PRESSAO BRUTO DE 3/4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.35
REGISTRO PRESSAO AMARELO DE 3/4'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 5,47200
LS
6,67584

SubMO

SubMO

08.04.041
VALVULA DE DESCARGA COMUM COM CANOPLA CROMADA LISA DN 32MM (1 1/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.35
VALVULA DESC S/REGISTRO 1 1/4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
SubMO
40,49280
Mo-de-Obra 18,24000
LS
22,25280
Material

UN
H
2,00000
H
2,00000
UN
1,00000
UN
1,00000
UN
0,03760
57,68425

08.04.042
1.01.18
1.01.19

UN
H
H

Exerccio:

VALVULA DE DESCARGA COMUM COM CANOPLA CROMADA LISA DN 40MM (1 1/2")


ENCANADOR
AJUDANTE DE ENCANADOR

2011

2,00000
2,00000

Custo Unit.

Custo Total

BDI

5,05
4,07
23,19
3,32
7,43287

BDI

5,05
4,07
25,85
4,48
8,74692

BDI

5,05
4,07
43,83
3,32
12,93002

BDI

5,05
4,07
50,75
3,32
14,52743

BDI

5,05
4,07
61,96
4,48
17,11610

BDI

5,05
4,07
83,64
4,48
23,69195

BDI

5,05
4,07
95,48
4,48
26,42298

BDI

5,05
4,07
47,86
3,32
13,85692

BDI

5,05
4,07
50,07
3,32
14,37103

BDI

5,05
4,07
5,91
51,54
6,23
22,58072

5,05
4,07

39,74
2,27250
1,83150
23,19000
0,01594

46,77
3,03000
2,44200
25,85000
0,03226

69,14
3,08050
2,48270
43,83000
0,03718

77,69
3,08050
2,48270
50,75000
0,06242

91,53
3,08050
2,48270
61,96000
0,10752

126,70
4,79750
3,86650
83,64000
0,13440

141,30
4,79750
3,86650
95,48000
0,16845

74,10
3,08050
2,48270
47,86000
0,03718

76,85
3,08050
2,48270
50,07000
0,06242

120,75
10,10000
8,14000
5,91000
51,54000
0,23425

120,75
10,10000
8,14000
Pgina: 110

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.10
VALVULA DESC S/REGISTRO 1 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280

UN Coeficiente

SubMO

40,49280

UN
1,00000
UN
1,00000
UN
0,03760
Material
57,68425

Custo Unit.

BDI

Custo Total

5,91
51,54
6,23
22,58072

5,91000
51,54000
0,23425

08.04.043
VALVULA DE DESCARGA C/ REG INCORP DN=32MM(1 1/4) ACAB ANTIVANDALISMO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.33
VALVULA DE DESCARGA 1 1/4 ACAB ANTIVANDALISMO
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280
Material

UN
H
2,00000
H
2,00000
UN
1,00000
UN
1,00000
UN
0,03760
192,83425

286,99
5,05
10,10000
4,07
8,14000
5,91
5,91000
186,69
186,69000
6,23
0,23425
BDI
53,66522

08.04.044
VALVULA DE DESCARGA C/ REG INCORP DN=40MM(1 1/2) ACAB ANTIVANDALISMO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.34
VALVULA DE DESCARGA 1 1/2 ACAB ANTIVANDALISMO
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280
Material
SubMO
40,49280

UN
H
2,00000
H
2,00000
UN
1,00000
UN
1,00000
UN
0,03760
189,17425

282,49
5,05
10,10000
4,07
8,14000
5,91
5,91000
183,03
183,03000
6,23
0,23425
BDI
52,82342

08.04.048
VALVULA DE DESCARGA DE FECHAMENTO AUTOMATICO PARA MICTORIO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.80.70
TRAVA QUIMICA
6.40.15
VALVULA DE DESCARGA P/ MICTORIO CICLO FECH AUTOMAT
Mo-de-Obra 6,11040
LS
7,45469
SubMO
13,56509

UN
H
0,67000
H
0,67000
GR
0,50000
UN
1,00000
Material
168,54000

223,98
5,05
3,38350
4,07
2,72690
1,68
0,84000
167,70
167,70000
BDI
41,88417

08.04.051
VALVULA DE DESCARGA C/REG INCORP DN 32MM (1 1/4") C/ ACAB SIMPLES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.36
VALVULA DESC C/REGISTRO 1 1/4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280

UN
H
2,00000
H
2,00000
UN
1,00000
UN
1,00000
UN
0,03760
Material
127,67425

206,84
5,05
10,10000
4,07
8,14000
5,91
5,91000
121,53
121,53000
6,23
0,23425
BDI
38,67842

08.04.052
VALVULA DE DESCARGA C/REG INCORP DN 40MM (1 1/2") C/ ACAB SIMPLES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.11
VALVULA DESC C/REGISTRO 1 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
SubMO
40,49280
Mo-de-Obra 18,24000
LS
22,25280

UN
H
2,00000
H
2,00000
UN
1,00000
UN
1,00000
UN
0,03760
Material
126,59425

205,51
5,05
10,10000
4,07
8,14000
5,91
5,91000
120,45
120,45000
6,23
0,23425
BDI
38,43002

08.04.060
ENVELOPE DE CONCRETO PARA DUTOS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 3,93220
LS
4,79728

8,72948

M
H
H
M3
KG
M3
Material
7,16646

0,00000

MV
MV
1,00000
Material
244,82000

08.04.099
SERVICOS EM REDE DE AGUA FRIA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

0,23000
0,75000
0,02500
7,65000
0,03800
BDI

08.07.002
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN65MM (2 1/2")- INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.07
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN65MM (2 1/2")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 16,41600
LS
20,02752
SubMO
36,44352

M
H
1,80000
H
1,80000
M
1,40000
UN
0,03380
Material
60,36857

08.07.003
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN80MM (3")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
SubMO
40,49280
Mo-de-Obra 18,24000
LS
22,25280

M
H
2,00000
H
2,00000
M
1,30000
UN
0,03840
Material
70,89423

08.07.004
1.01.18
1.01.19
6.05.09
Exerccio:

TUBO ACO GLAVANIZ NBR5580-CL MEDIA, DN100MM (4")-INCL CONEXOES


ENCANADOR
AJUDANTE DE ENCANADOR
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN100MM (4")

2011

M
H
H
M

2,20000
2,20000
1,30000

4,64
3,82
80,46
0,37
61,17
3,65607

19,55
1,06720
2,86500
2,01150
2,83050
2,32446

301,12
244,82
244,82000
BDI
56,30860

BDI

5,05
4,07
42,97
6,23
22,26678

BDI

5,05
4,07
54,35
6,23
25,61902

5,05
4,07
78,40

119,07
9,09000
7,32600
60,15800
0,21057

137,00
10,10000
8,14000
70,65500
0,23923

180,52
11,11000
8,95400
101,92000
Pgina: 111

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 20,06400
LS
24,47808

UN Coeficiente
SubMO

44,54208

08.07.005
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN 150MM (6") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.11
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN150MM (6")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 24,16800
LS
29,48496
SubMO
53,65296

Material

UN
0,04960
102,22901

M
H
2,65000
H
2,65000
M
1,30000
UN
0,06800
Material
163,67764

BDI

Custo Total

6,23
33,75735

0,30901

267,31
5,05
13,38250
4,07
10,78550
125,58
163,25400
6,23
0,42364
BDI
49,98604

08.07.010
PROTECAO ANTI CORROSIVA PARA RAMAIS SOB A TERRA
1.01.19
AJUDANTE DE ENCANADOR
6.95.26
FITA PROT.ANTICORROS.LARG.50MM SCOTCHRAP/TOROFITA
Mo-de-Obra 0,32560
LS
0,39723
SubMO
0,72283

Material

08.07.099
SERVICOS EM REDE DE INCENDIO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,05640
Material
179,09137

248,92
5,05
5,80750
4,07
4,68050
178,74
178,74000
6,23
0,35137
BDI
46,54619

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,06400
Material
280,31872

373,43
5,05
5,80750
4,07
4,68050
279,92
279,92000
6,23
0,39872
BDI
69,82848

29,96467

UN
H
1,48000
H
1,48000
UN
1,00000
UN
0,08280
Material
470,67584

615,78
5,05
7,47400
4,07
6,02360
470,16
470,16000
6,23
0,51584
BDI
115,14732

36,44352

UN
H
1,80000
H
1,80000
UN
1,00000
UN
1,00000
UN
0,04800
Material
150,32904

229,73
5,05
9,09000
4,07
7,32600
111,97
111,97000
38,06
38,06000
6,23
0,29904
BDI
42,95769

98,28384

UN
H
1,15000
H
1,15000
H
3,00000
H
5,20000
M3
0,12000
KG
4,91000
KG
36,22000
M3
0,09600
UN
90,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,02800
UN
1,00000
Material
395,55442

5,05
4,07
4,64
3,82
80,46
0,35
0,37
62,03
0,22
111,97
38,06
41,33
6,23
153,49
BDI
113,58280

08.08.015
VALVULA DE RETENCAO VERT.BRONZE TIPO LEVE DE 2 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.65
VALVULA RET VERT BRONZE 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
SubMO
30,36960
Mo-de-Obra 13,68000
LS
16,68960

UN
H
1,50000
H
1,50000
UN
1,00000
UN
0,02400
Material
130,68952

198,10
5,05
7,57500
4,07
6,10500
130,54
130,54000
6,23
0,14952
BDI
37,04360

08.08.002
REGISTRO DE GAVETA BRUTO DN 65MM (2 1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.66
REGISTRO GAVETA AMARELO 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
08.08.003
REGISTRO DE GAVETA BRUTO DN 80MM (3")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.67
REGISTRO GAVETA AMARELO 3'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
08.08.004
REGISTRO DE GAVETA BRUTO DN 100MM (4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.69
REGISTRO GAVETA AMARELO 4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 13,49760
LS
16,46707
08.08.010
REGISTRO GLOBO ANGULAR AMARELO 2 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.25
REGISTRO GLOBO ANGULAR DE 2 1/2'
6.70.09
ADAP ENG RAPIDO LATAO 2 1/2 X 2 1/2"
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 16,41600
LS
20,02752
08.08.012
REGISTRO DE RECALQUE NO PASSEIO (RR-01)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.25.15
TIJOLO COMUM MACICO
6.35.25
REGISTRO GLOBO ANGULAR DE 2 1/2'
6.70.09
ADAP ENG RAPIDO LATAO 2 1/2 X 2 1/2"
6.95.46
TAMPAO 2.1/2"
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
6.96.05
TAMPA F.F. 0,60X0,40M P/ COM INSCR INCENDIO
Mo-de-Obra 44,27200
LS
54,01184

08.08.016
1.01.18
Exerccio:

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

VALVULA DE RETENCAO VERT.BRONZE TIPO LEVE DE 3"


ENCANADOR

2011

M
H
0,08000
M
3,00000
6,54000

Custo Unit.

UN
H

2,00000

BDI

8,93
0,32560
6,54000

4,07
2,18
1,67045

5,05

607,42
5,80750
4,68050
13,92000
19,86400
9,65520
1,71850
13,40140
5,95488
19,80000
111,97000
38,06000
41,33000
0,17444
153,49000

275,16
10,10000
Pgina: 112

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.19
AJUDANTE DE ENCANADOR
6.40.66
VALVULA RET VERT BRONZE 3'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280

UN Coeficiente

Custo Unit.

Custo Total

40,49280

H
2,00000
UN
1,00000
UN
0,02880
Material
183,21942

4,07
8,14000
183,04
183,04000
6,23
0,17942
BDI
51,45381

40,49280

UN
H
2,00000
H
2,00000
UN
1,00000
UN
0,03840
Material
307,13923

427,58
5,05
10,10000
4,07
8,14000
306,90
306,90000
6,23
0,23923
BDI
79,95537

08.08.021
HIDRANTE COM REGISTRO TIPO GLOBO AMARELO DE 2 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.28
ZARCAO
6.35.25
REGISTRO GLOBO ANGULAR DE 2 1/2'
6.95.11
ESTOPA ALCATROADA
Mo-de-Obra 13,68000
LS
16,68960
SubMO
30,36960

UN
H
1,50000
H
1,50000
L
0,06000
UN
1,00000
KG
0,05000
Material
113,26010

176,66
5,05
7,57500
4,07
6,10500
15,96
0,95760
111,97
111,97000
6,65
0,33250
BDI
33,03483

08.08.022
ABRIGO PARA HIDRANTE 0,60X0,90X0,20 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.70.35
ABRIGO PARA HIDRANTE 0,60X0,90X0,20 M
Mo-de-Obra 18,24000
LS
22,25280

UN
H
2,00000
H
2,00000
UN
1,00000
Material
128,15000

207,43
5,05
10,10000
4,07
8,14000
128,15
128,15000
BDI
38,78784

08.08.025
AH-02 ABRIGO PARA HIDRANTE COMPLETO COM MANGUEIRA DE 1 1/2" - 30M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.96.71
NIPLE DUPLO FERRO GALV 2 1/2"
6.35.25
REGISTRO GLOBO ANGULAR DE 2 1/2'
6.70.01
AH-02/03 ABRIGO PARA HIDRANTE 0,60X0,90X0,17M
6.70.20
MANGUEIRA C/ADAPTADOR '1 1/2'-30 M
6.70.28
ESGUICHO LATAO 1 1/2"X1/2"C/REQUINTE
Mo-de-Obra 47,42400
LS
57,85728
SubMO
105,28128

UN
H
5,20000
H
5,20000
CJ
4,00000
UN
0,04000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
709,93800

5,05
4,07
0,14
11,95
21,67
111,97
183,20
359,04
33,02
BDI
187,50043

08.08.026
AH-03 ABRIGO PARA HIDRANTE COMPLETO COM MANGUEIRA DE 2 1/2" - 30M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.96.71
NIPLE DUPLO FERRO GALV 2 1/2"
6.35.25
REGISTRO GLOBO ANGULAR DE 2 1/2'
6.70.01
AH-02/03 ABRIGO PARA HIDRANTE 0,60X0,90X0,17M
6.70.25
MANGUEIRA C/ADAPTADOR 2 1/2' X 30 M
6.70.29
ESGUICHO LATAO 2 1/2'X5/8' C/REQUINTE
Mo-de-Obra 47,42400
LS
57,85728
SubMO
105,28128

UN
H
5,20000
H
5,20000
CJ
4,00000
UN
0,04000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
909,50800

5,05
4,07
0,14
11,95
21,67
111,97
183,20
526,29
65,34
BDI
233,40153

08.08.027
MO-01 ABRIGO PARA MANGOTINHO COMPLETO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
4.96.71
NIPLE DUPLO FERRO GALV 2 1/2"
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
6.35.25
REGISTRO GLOBO ANGULAR DE 2 1/2'
6.40.05
VALVULA ESFERA POLIDA LATO C/ALAVANCA DE AO
6.70.03
MO-01 ARMRIO PARA MANGOTINHO KIDDE 2P
6.70.18
CARRETEL METALICO C/MANGUEIA 1"X30M E ESGUICHO KIDDE 1SW
Mo-de-Obra 59,28000
LS
72,32160
SubMO
131,60160

UN
H
6,50000
H
6,50000
CJ
4,00000
UN
1,00000
M
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
4.966,59000

6.270,77
5,05
32,82500
4,07
26,45500
0,28
1,12000
21,67
21,67000
16,15
16,15000
111,97
111,97000
39,64
39,64000
1.606,50
1.606,50000
3.169,54
3.169,54000
BDI
1.172,58407

SubMO

08.08.017
VALVULA DE RETENCAO VERT.BRONZE TIPO LEVE DE 4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.38
VALVULA RET VERT BRONZE 4"
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280
SubMO

SubMO

08.08.030
MANGUEIRA COM UNIAO DE ENGATE RAPIDO DE 1 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.70.23
MANGUEIRA UNIAO ENGATE RAPIDO DIA 1.1/2"
Mo-de-Obra 0,91200
LS
1,11264
SubMO
08.08.031
MANGUEIRA COM UNIAO DE ENGATE RAPIDO DE 2 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.70.24
MANGUEIRA UNIAO ENGATE RAPIDO DIA 2.1/2"
SubMO
Mo-de-Obra 0,91200
LS
1,11264

Exerccio:

2011

40,49280

2,02464

2,02464

Material

M
H
0,10000
H
0,10000
M
1,00000
14,59000

Material

M
H
0,10000
H
0,10000
M
1,00000
21,75000

BDI

5,05
4,07
14,59
3,82137

BDI

5,05
4,07
21,75
5,46817

1.002,71
26,26000
21,16400
0,56000
0,47800
21,67000
111,97000
183,20000
359,04000
33,02000

1.248,19
26,26000
21,16400
0,56000
0,47800
21,67000
111,97000
183,20000
526,29000
65,34000

20,43
0,50500
0,40700
14,59000

29,24
0,50500
0,40700
21,75000

Pgina: 113

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

08.08.035
ESGUICHO DE LATAO C/ENGATE RAPIDO ORIFICIO DE 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.70.28
ESGUICHO LATAO 1 1/2"X1/2"C/REQUINTE
Mo-de-Obra 0,91200
LS
1,11264
SubMO
08.08.036
ESGUICHO DE LATAO C/ENGATE RAPIDO ORIFICIO DE 5/8"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.70.30
ESGUICHO LATAO ENG RAPIDO ORIF 1.1/2X5/8
Mo-de-Obra 0,91200
LS
1,11264
SubMO
08.08.037
ESGUICHO DE LATAO C/ENGATE RAPIDO ORIFICIO DE 3/4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.70.31
ESGUICHO LATAO ENG RAPIDO ORIF 2.1/2X3/4
Mo-de-Obra 0,91200
LS
1,11264
SubMO
08.08.041
VALVULA RETENCAO HORIZ BRONZE DE 2 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.21
VALVULA RET HORIZ BRONZE 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536

SubMO

08.08.042
VALVULA RETENCAO HORIZONTAL DE BRONZE DE 3"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.22
VALVULA RET HORIZ BRONZE 3'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
SubMO
08.08.043
VALVULA RETENCAO HORIZONTAL BRONZE DE 4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.23
VALVULA RET HORIZ BRONZE 4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
SubMO
Mo-de-Obra 13,49760
LS
16,46707
08.08.044
EXTINTORES MANUAIS DE CO2 CAPACIDADE 4KG
1.01.18
ENCANADOR
6.70.13
EXTINTOR GAS CARBONICO 4KG C/ CARGA
Mo-de-Obra 3,53500
LS
4,31270
SubMO
08.08.045
EXTINTORES MANUAIS DE CO2 COM CAPACIDADE DE 6 KG
1.01.18
ENCANADOR
6.70.04
EXTINTOR GAS CARBONICO 6 KG C/CARGA
SubMO
Mo-de-Obra 3,53500
LS
4,31270

2,02464

UN
H
0,10000
H
0,10000
UN
1,00000
Material
33,02000

2,02464

UN
H
0,10000
H
0,10000
UN
1,00000
Material
32,47000

Custo Unit.

Custo Total
43,10
0,50500
0,40700
33,02000

BDI

5,05
4,07
33,02
8,06027

BDI

5,05
4,07
32,47
7,93377

2,02464

UN
H
0,10000
H
0,10000
UN
1,00000
Material
67,15000

BDI

5,05
4,07
67,15
15,91017

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,02400
Material
182,97952

253,70
5,05
5,80750
4,07
4,68050
182,83
182,83000
6,23
0,14952
BDI
47,44046

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,02880
Material
211,54942

288,84
5,05
5,80750
4,07
4,68050
211,37
211,37000
6,23
0,17942
BDI
54,01154

29,96467

UN
H
1,48000
H
1,48000
UN
1,00000
UN
0,03840
Material
379,15923

503,22
5,05
7,47400
4,07
6,02360
378,92
378,92000
6,23
0,23923
BDI
94,09850

7,84770

UN
H
0,70000
UN
1,00000
Material
283,57000

358,44
5,05
3,53500
283,57
283,57000
BDI
67,02607

7,84770

UN
H
0,70000
UN
1,00000
Material
286,85000

362,47
5,05
3,53500
286,85
286,85000
BDI
67,78047

42,42
0,50500
0,40700
32,47000

85,08
0,50500
0,40700
67,15000

08.08.046
EXTINTORES MANUAIS PO QUIMICO SECO COM CAPACIDADE DE 4 KG
1.01.18
ENCANADOR
6.70.10
EXTINTOR PO QUIMICO DE 4 KG C/CARGA
Mo-de-Obra 3,53500
LS
4,31270
SubMO
7,84770

UN
H
0,70000
UN
1,00000
Material
76,58000

BDI

08.08.047
EXTINTOR MANUAL PO QUIMICO SECO C/ CAPACIDADE DE 12KG
1.01.18
ENCANADOR
6.70.12
EXTINTOR PO QUIMICO 12 KG COM CARGA
Mo-de-Obra 3,53500
LS
4,31270
SubMO
7,84770

UN
H
0,70000
UN
1,00000
Material
128,38000

167,56
5,05
3,53500
128,38
128,38000
BDI
31,33237

08.08.048
EXTINTOR PORTATIL DE PO QUIMICO BC CAPACIDADE 6 KG
1.01.18
ENCANADOR
6.70.15
EXTINTOR PO QUIMICO BC 6KG COM CARGA
Mo-de-Obra 3,53500
LS
4,31270
SubMO
7,84770

UN
H
0,70000
UN
1,00000
Material
83,65000

BDI

5,05
83,65
21,04447

08.08.050
EXTINTORES MANUAIS DE AGUA PRESSURIZADA CAP DE 10 L
1.01.18
ENCANADOR
6.70.11
EXTINTOR DE AGUA PRESSURIZADO 10 L
Mo-de-Obra 3,53500
LS
4,31270
SubMO
7,84770

UN
H
0,70000
UN
1,00000
Material
76,17000

BDI

5,05
76,17
19,32407

08.08.051
EXTINTOR PORTATIL DE PO QUIMICO ABC CAPACIDADE 6 KG
1.01.18
ENCANADOR
6.70.16
EXTINTOR PO QUIMICO ABC 6KG COM CARGA
SubMO
7,84770
Mo-de-Obra 3,53500
LS
4,31270

UN
H
0,70000
UN
1,00000
Material
124,96000

163,35
5,05
3,53500
124,96
124,96000
BDI
30,54577

Exerccio:

2011

5,05
76,58
19,41837

103,84
3,53500
76,58000

112,54
3,53500
83,65000

103,34
3,53500
76,17000

Pgina: 114

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

08.08.060
MANOMETRO INDUSTRIAL COM TOMADA INFERIOR.
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.01
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2")
6.65.76
MANOMETRO IND INOX ESC O A 15K/O A 400L
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 4,10400
LS
5,00688
SubMO

UN Coeficiente

Custo Unit.

Custo Total

UN
H
0,45000
H
0,45000
M
0,60000
UN
1,00000
UN
0,00880
Material
178,78322

231,10
5,05
2,27250
4,07
1,83150
8,09
4,85400
173,90
173,90000
3,32
0,02922
BDI
43,21564

08.08.061
PRESSOSTATO (VALVULA DE FLUXO) COM SENSOR DIAFRAGMA.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
6.05.01
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2")
6.65.77
PRESSOSTATO INOX ATUAC O/10K-REG O/2.5K
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
SubMO
61,16988
Mo-de-Obra 27,55400
LS
33,61588

UN
H
2,50000
H
2,50000
H
0,45000
H
0,45000
M
3,00000
M
6,00000
M
0,60000
UN
1,00000
UN
0,00880
Material
716,80322

956,90
5,30
13,25000
4,08
10,20000
5,05
2,27250
4,07
1,83150
1,22
3,66000
0,54
3,24000
8,09
4,85400
705,02
705,02000
3,32
0,02922
BDI
178,93381

08.08.069
AI-01 ABRIGO PARA BOMBA DE INCENDIO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.03
BLOCO DE CONCRETO 11,5 X19X39CM - 3MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.93
AI-01 PORTINHOLA EM CHAPA COMPLETA
3.15.94
TARJETA DE SOBREPOR DE LATAO FIO REDONDO 76 MM
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
3.75.02
TINTA ESMALTE
3.75.13
TINTA LATEX ECONOMICA
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 196,28596
LS
239,46887
SubMO

UN
H
2,39200
H
2,39200
H
0,67000
H
0,67000
H
14,15500
H
4,81700
H
2,59200
H
18,76800
M3
0,35450
KG
46,03000
KG
96,65000
M3
0,13920
M2
0,92000
KG
7,70000
UN
43,68000
KG
0,37000
KG
0,13400
UN
1,00000
UN
1,00000
UN
1,00000
L
0,72000
L
1,97000
UN
1,44000
L
0,43200
Material
642,54403

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
17,18
2,70
1,60
4,67
4,87
404,61
4,33
11,20
10,12
4,23
1,47
15,96
BDI
248,00874

08.08.070
CONJ MOTOR-BOMBA (CENTRIFUGA) 1/2 HP (3400 L/H -20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.51
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1/2 HP TRIF
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
535,00000

745,21
5,05
17,67500
4,07
14,24500
535,00
535,00000
BDI
139,34835

08.08.071
CONJ MOTOR-BOMBA (CENTRIFUGA) 3/4 HP (7400 L/H - 20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.52
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 3/4 HP TRIF
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
622,41000

852,72
5,05
17,67500
4,07
14,24500
622,41
622,41000
BDI
159,45265

08.08.072
CONJ MOTOR-BOMBA (CENTRIFUGA) 1 HP (8500 L/H - 20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.53
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1 HP TRIF
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
688,57000

934,10
5,05
17,67500
4,07
14,24500
688,57
688,57000
BDI
174,66945

08.08.073
CONJ MOTOR-BOMBA (CENTRIFUGA) 1.5 HP (10000 L/H - 20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.65
CONJUNTO MOTOR BOMBA PARA INCENDIO 1,5HP
SubMO
70,86240
Mo-de-Obra 31,92000
LS
38,94240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
1.079,55000

1.415,00
5,05
17,67500
4,07
14,24500
1.079,55
1.079,55000
BDI
264,59485

08.08.074
1.01.18
1.01.19
Exerccio:

9,11088

435,75483

CONJ MOTOR-BOMBA (CENTRIFUGA) 2 HP (13900 L/H - 20 MCA)


ENCANADOR
AJUDANTE DE ENCANADOR

2011

UN
H
H

3,50000
3,50000

5,05
4,07

1.326,30
11,00320
9,47232
3,19590
2,55940
65,67920
22,83258
9,84960
71,69376
28,52307
16,11050
35,76050
8,51486
15,80560
20,79000
69,88800
1,72790
0,65258
404,61000
4,33000
11,20000
7,28640
8,33310
2,11680
6,89472

1.579,16
17,67500
14,24500
Pgina: 115

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

6.65.66
CONJUNTO MOTOR BOMBA PARA INCENDIO 2 HP
SubMO
Mo-de-Obra 31,92000
LS
38,94240

Custo Unit.

Custo Total

UN
1,00000
1.213,01000

1.213,01
1.213,01000
BDI
295,29065

08.08.075
CONJ MOTOR-BOMBA (CENTRIFUGA) 3 HP (25000 L/H - 20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.68
CONJUNTO MOTOR BOMBA PARA INCENDIO 3HP
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
1.182,67000

1.541,84
5,05
17,67500
4,07
14,24500
1.182,67
1.182,67000
BDI
288,31245

08.08.076
CONJ MOTOR-BOMBA (CENTRIFUGA) 4 HP (31200 L/H - 20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.56
CONJUNTO MOTOR BOMBA PARA INCENDIO 4HP
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
1.498,24000

1.929,99
5,05
17,67500
4,07
14,24500
1.498,24
1.498,24000
BDI
360,89355

08.08.077
CONJ MOTOR-BOMBA (CENTRIFUGA) 5 HP (31200 L/H -20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.57
CONJUNTO MOTOR BOMBA PARA INCENDIO 5HP
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
1.775,34000

2.270,82
5,05
17,67500
4,07
14,24500
1.775,34
1.775,34000
BDI
424,62655

08.08.078
CONJ MOTOR-BOMBA (CENTRIFUGA) 7,5 HP (40000L/H 20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.58
CONJUNTO MOTOR BOMBA PARA INCENDIO 7,5HP
SubMO
70,86240
Mo-de-Obra 31,92000
LS
38,94240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
2.211,36000

2.807,13
5,05
17,67500
4,07
14,24500
2.211,36
2.211,36000
BDI
524,91115

08.08.079
CONJ MOTOR-BOMBA (CENTRIFUGA) 10 HP (40000 L/H 20MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.67
CONJUNTO MOTOR BOMBA PARA INCENDIO 10HP.
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
3.015,88000

3.796,69
5,05
17,67500
4,07
14,24500
3.015,88
3.015,88000
BDI
709,95075

08.08.099
SERVICOS EM REDE DE INCENDIO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.09.001
TUBO DE FERRO FUNDIDO DN 50MM (2") - INCLUSIVE CONEXOES - DESC
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.01
TUBO DE FERRO FUNDIDO DE 50MM-HL
6.10.64
ANEL DE BORRACHA HL D=50MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
SubMO
36,44352
Mo-de-Obra 16,41600
LS
20,02752

M
H
1,80000
H
1,80000
M
1,60000
UN
1,00000
KG
0,01000
Material
125,50990

BDI

199,20
5,05
9,09000
4,07
7,32600
73,70
117,92000
7,50
7,50000
8,99
0,08990
37,24929

08.09.002
TUBO DE FERRO FUNDIDO DN 75MM (3") - INCLUSIVE CONEXOES - DESC
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.02
TUBO DE FERRO FUNDIDO DE 75MM-HL
6.10.66
ANEL DE BORRACHA HL D=75MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280

M
H
2,00000
H
2,00000
M
1,60000
UN
1,00000
KG
0,01000
Material
175,88990

266,15
5,05
10,10000
4,07
8,14000
103,00
164,80000
11,00
11,00000
8,99
0,08990
BDI
49,76802

08.09.003
TUBO DE FERRO FUNDIDO DN 100MM (4") - INCLUSIVE CONEXOES - DESC
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.03
TUBO DE FERRO FUNDIDO DE 100MM-HL
6.10.67
ANEL DE BORRACHA HL D=100MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
SubMO
46,56672
Mo-de-Obra 20,97600
LS
25,59072

M
H
2,30000
H
2,30000
M
1,50000
UN
1,00000
KG
0,02000
Material
195,88480

298,21
5,05
11,61500
4,07
9,36100
122,09
183,13500
12,57
12,57000
8,99
0,17980
BDI
55,76385

08.09.006
TUBO DE FERRO FUNDIDO DN 75MM (3") - INCLUSIVE CONEXOES - ESGOTO
1.01.09
ESGOTEIRO/CAVOUQUEIRO
1.01.95
AJUDANTE DE ESGOTEIRO
6.10.02
TUBO DE FERRO FUNDIDO DE 75MM-HL
6.10.66
ANEL DE BORRACHA HL D=75MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 16,84000
LS
20,54480
SubMO
37,38480

M
H
2,00000
H
2,00000
M
1,60000
UN
1,00000
KG
0,01000
Material
175,88990

262,32
4,50
9,00000
3,92
7,84000
103,00
164,80000
11,00
11,00000
8,99
0,08990
BDI
49,05318

08.09.007
1.01.09
1.01.95
6.10.03
6.10.67
Exerccio:

SubMO

70,86240

0,00000

TUBO DE FERRO FUNDIDO DN 100MM (4") - INCLUSIVE CONEXOES - ESGOTO


ESGOTEIRO/CAVOUQUEIRO
AJUDANTE DE ESGOTEIRO
TUBO DE FERRO FUNDIDO DE 100MM-HL
ANEL DE BORRACHA HL D=100MM

2011

Material

M
H
H
M
UN

2,30000
2,30000
1,50000
1,00000

4,50
3,92
122,09
12,57

293,81
10,35000
9,01600
183,13500
12,57000
Pgina: 116

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 19,36600
LS
23,62652

UN Coeficiente
SubMO

42,99252

Material

KG
0,02000
195,88480

08.09.008
TUBO DE FERRO FUNDIDO DN 150MM (6") - INCLUSIVE CONEXOES - ESGOTO
1.01.09
ESGOTEIRO/CAVOUQUEIRO
1.01.95
AJUDANTE DE ESGOTEIRO
6.10.04
TUBO DE FERRO FUNDIDO DE 150MM-HL
6.10.75
ANEL DE BORRACHA HL D=150MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 21,05000
LS
25,68100
SubMO
46,73100

M
H
2,50000
H
2,50000
M
1,40000
UN
1,00000
KG
0,03000
Material
269,14170

08.09.015
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.30
TUBO PVC P/ESGOTO 40MM
6.26.70
ANEL BORRACHA P/TUBO PVC 40MM
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712

M
H
H
M
UN
Material
4,03500

0,80000
0,80000
1,50000
1,00000

08.09.016
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 50MM (2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.31
TUBO PVC P/ESGOTO 50MM
6.26.71
ANEL BORRACHA P/TUBO PVC 50MM (2")
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712

M
H
H
M
UN
Material
6,70500

0,80000
0,80000
1,50000
1,00000

08.09.017
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 75MM (3") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.32
TUBO PVC P/ESGOTO 75MM
6.26.72
ANEL BORRACHA P/TUBOS PVC 75MM (3")
Mo-de-Obra 8,20800
LS
10,01376
SubMO
18,22176

M
H
H
M
UN
Material
8,63000

0,90000
0,90000
1,50000
1,00000

08.09.018
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 100MM (4") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.73
ANEL BORRACHA P/TUBO PVC ESGOTO DN=100MM
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640

M
H
1,00000
H
1,00000
M
1,50000
UN
1,00000
Material
10,12000

08.09.019
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 150MM (6") INCL CONEXOES
1.01.09
ESGOTEIRO/CAVOUQUEIRO
1.01.95
AJUDANTE DE ESGOTEIRO
6.25.34
TUBO PVC P/ESGOTO 150MM
6.26.74
ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM
Mo-de-Obra 15,15600
LS
18,49032
SubMO
33,64632

M
H
1,80000
H
1,80000
M
1,20000
UN
1,00000
Material
20,72800

08.09.030
TUBO DE ACO GALVANIZADO DN 40MM (1.1/2") - INCLUSIVE CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.05
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 13,68000
LS
16,68960
SubMO
30,36960

M
H
1,50000
H
1,50000
M
1,45000
UN
0,02260
Material
34,72725

08.09.060
TUBO DE PVC "R" 40MM INCL CONEXOES - COL ESGOTO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.60
TUBO DE PVC "R" 40MMM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 7,29600
LS
8,90112
SubMO
08.09.061
TUBO DE PVC "R" 50MM INCL CONEXOES - COL ESGOTO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.61
TUBO DE PVC "R" 50MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 7,29600
LS
8,90112
SubMO
08.09.062
1.01.18
1.01.19
6.25.62
6.95.13
Exerccio:

TUBO DE PVC "R" 75MM INCL CONEXOES - COL ESGOTO


ENCANADOR
AJUDANTE DE ENCANADOR
TUBO DE PVC "R" 75MM
ADESIVO PARA TUBOS PVC

2011

16,19712

16,19712

0,80000
0,80000
1,10000
0,00160
0,00070

Material

M
H
H
M
L
L
4,33687

0,80000
0,80000
1,10000
0,00220
0,00080

Material

M
H
H
M
L
L
5,82927
M
H
H
M
L

0,90000
0,90000
1,10000
0,00350

Custo Unit.
BDI

Custo Total

8,99
54,94178

0,17980

388,52
4,50
11,25000
3,92
9,80000
177,33
248,26200
20,61
20,61000
8,99
0,26970
BDI
72,65072

BDI

5,05
4,07
2,31
0,57
4,65339

BDI

5,05
4,07
4,07
0,60
5,26749

BDI

5,05
4,07
5,16
0,89
6,17591

BDI

5,05
4,07
5,96
1,18
6,98427

BDI

4,50
3,92
14,04
3,88
12,50609

BDI

5,05
4,07
23,88
4,48
14,97228

BDI

5,05
4,07
3,89
27,29
20,29
4,72282

BDI

5,05
4,07
5,23
27,29
20,29
5,06607

5,05
4,07
6,51
27,29

24,88
4,04000
3,25600
3,46500
0,57000

28,16
4,04000
3,25600
6,10500
0,60000

33,02
4,54500
3,66300
7,74000
0,89000

37,35
5,05000
4,07000
8,94000
1,18000

66,88
8,10000
7,05600
16,84800
3,88000

80,06
7,57500
6,10500
34,62600
0,10125

25,25
4,04000
3,25600
4,27900
0,04366
0,01420

27,09
4,04000
3,25600
5,75300
0,06004
0,01623

31,37
4,54500
3,66300
7,16100
0,09552
Pgina: 117

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 8,20800
LS

UN Coeficiente
L

10,01376

SubMO

08.09.063
TUBO DE PVC "R" 100MM INCL CONEXOES - COL ESGOTO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.63
TUBO DE PVC "R" 100MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 9,12000
LS
11,12640
SubMO
08.09.064
TUBO DE PVC "R" 150MM INCL CONEXOES - COL ESGOTO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.64
TUBO DE PVC "R" 150MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
SubMO
Mo-de-Obra 10,94400
LS
13,35168
08.09.099
SERVICOS EM REDE DE ESGOTO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

18,22176

Material

0,00130
7,28289

Material

M
H
1,00000
H
1,00000
M
1,10000
L
0,00550
L
0,00230
11,85676

24,29568

Material

M
H
1,20000
H
1,20000
M
1,10000
L
0,01100
L
0,00450
25,36150

0,00000

MV
MV
1,00000
Material
244,82000

20,24640

08.10.005
CAIXA SIFONADA DE PVC DN 100X150X50MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.75.12
CX SIFONADA PVC 100X150X50MM - C/GRELHA PVC CROMAD
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

UN
H
1,40000
H
1,40000
UN
1,00000
Material
13,46000

08.10.006
CAIXA SIFONADA DE PVC DN 150X150X50MM C/GRELHA METALICA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.75.01
CX SIFONADA PVC 150X150X50MM - C/GRELHA ALUMINIO
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

UN
H
0,40000
H
0,40000
UN
1,00000
Material
24,62000

08.10.010
CAIXA SIFONADA DE PVC DN 100X100X50MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.75.13
CX.SIFONADA PVC 100X100X50MM-C/GRELHA PVC CROMADO
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856
08.10.036
CG-01 CAIXA DE GORDURA EM ALVENARIA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 174,31055
LS
212,65887
SubMO
386,96942
08.10.038
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.05.36
2.10.14
2.10.21
Exerccio:

CI-01 CAIXA DE INSPECAO 60X60CM PARA ESGOTO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.

2011

Custo Unit.

Custo Total

BDI

20,29
5,86607

BDI

5,05
4,07
10,60
27,29
20,29
7,38373

BDI

5,05
4,07
22,70
27,29
20,29
11,42115

0,02638

39,48
5,05000
4,07000
11,66000
0,15010
0,04667

61,07
6,06000
4,88400
24,97000
0,30019
0,09131

301,12
244,82
244,82000
BDI
56,30860
51,42
7,07000
5,69800
13,46000

BDI

5,05
4,07
13,46
9,61514

BDI

5,05
4,07
24,62
7,52527

UN
H
0,40000
H
0,40000
UN
1,00000
Material
10,95000

BDI

5,05
4,07
10,95
4,38117

UN
H
2,60000
H
2,60000
H
0,17100
H
0,17100
H
11,96000
H
24,89300
M3
0,33160
KG
34,98000
KG
74,94000
M3
0,17100
M2
1,02500
KG
16,02000
KG
1,08000
UN
522,00000
KG
1,31000
KG
0,40000
KG
0,34200
Material
293,19516

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
241,38
17,18
2,69
2,70
0,22
2,50
4,67
4,87
BDI
156,43785

UN
H
H
H
H
H
H
M3
KG
KG
M3
M3
M
M2

0,85000
0,85000
0,17000
0,17000
6,93000
11,55000
0,13200
10,92000
47,92000
0,04000
0,03000
1,54000
0,39000

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
251,78
2,09
17,18

40,24
2,02000
1,62800
24,62000

23,42
2,02000
1,62800
10,95000

836,60
11,96000
10,29600
0,81567
0,65322
55,49440
95,09126
26,68054
12,24300
27,72780
41,27598
17,60950
43,09380
2,91600
114,84000
3,27500
1,86800
1,66554

341,14
3,91000
3,36600
0,81090
0,64940
32,15520
44,12100
10,62072
3,82200
17,73040
2,44680
7,55340
3,21860
6,70020
Pgina: 118

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
SubMO
188,72775
Mo-de-Obra 85,01250
LS
103,71525

KG
2,00000
UN
128,00000
KG
0,86000
KG
0,15000
KG
0,03000
Material
88,62872

BDI

08.10.039
CI-02 CAIXA DE INSPECAO 80X80CM PARA ESGOTO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 219,31110
LS
267,55954
SubMO
486,87064

UN
H
1,29000
H
1,29000
H
0,25000
H
0,25000
H
16,81000
H
33,54000
M3
0,37000
KG
33,48000
KG
114,09000
M3
0,06000
M3
0,04000
M
2,34000
M2
0,58500
KG
2,90000
UN
391,00000
KG
2,21000
KG
0,23400
KG
0,05000
Material
213,06608

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
251,78
2,09
17,18
2,69
0,22
2,50
4,67
4,87
BDI
160,98545

08.10.040
CAIXA DE ALVENARIA - ESCAVACAO MANUAL COM APILOAMENTO DO FUNDO
M3
1.01.46
SERVENTE
H
5,00000
Mo-de-Obra 19,10000
LS
23,30200
SubMO
42,40200
Material
0,00000
08.10.041
CAIXA DE ALVENARIA - LASTRO DE CONCRETO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 104,24000
LS
127,17280

SubMO

231,41280

M3
H
6,00000
H
20,00000
M3
0,67200
KG
180,00000
M3
0,80000
Material
169,60512

08.10.042
CAIXA DE ALVENARIA - PAREDE DE 1/2 TIJOLO REVESTIDO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 33,55900
LS
40,94198
SubMO
74,50098

M2
H
4,03000
H
3,89000
M3
0,06300
KG
4,83000
KG
17,57000
UN
70,00000
L
0,50000
KG
0,27000
Material
32,45038

08.10.043
CAIXA DE ALVENARIA - PAREDE DE 1 TIJOLO REVESTIDO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 43,56260
LS
53,14637
SubMO
96,70897

M2
H
4,49000
H
5,95000
M3
0,12100
KG
13,96000
KG
23,94000
UN
140,00000
L
0,50000
KG
0,27000
Material
58,06946

08.10.044
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.46
2.05.35
2.10.21
2.10.32
2.15.38
2.70.10

Exerccio:

CAIXA DE ALVENARIA - TAMPA DE CONCRETO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-60-B $MD BITOLAS
ARAME RECOZIDO N.18

2011

M2
H
H
H
H
H
H
M3
M2
M2
KG
KG

2,00000
2,00000
0,46000
0,46000
0,30000
0,30000
0,05000
0,10000
0,33000
5,27000
0,09000

2,69
0,22
2,50
4,67
4,87
63,79199

BDI

3,82
9,75246

BDI

4,64
3,82
80,46
0,37
61,17
92,23412

BDI

4,64
3,82
80,46
0,35
0,37
0,22
6,23
2,50
24,59881

BDI

4,64
3,82
80,46
0,35
0,37
0,22
6,23
2,50
35,59904

4,60
3,96
4,77
3,82
4,64
3,82
241,38
17,18
11,40
2,70
4,87

5,38000
28,16000
2,15000
0,70050
0,14610

860,92
5,93400
5,10840
1,19250
0,95500
77,99840
128,12280
29,77020
11,71800
42,21330
3,67020
10,07120
4,89060
10,05030
7,80100
86,02000
5,52500
1,09278
0,24350

52,15
19,10000

493,25
27,84000
76,40000
54,06912
66,60000
48,93600

131,55
18,69920
14,85980
5,06898
1,69050
6,50090
15,40000
3,11500
0,67500

190,37
20,83360
22,72900
9,73566
4,88600
8,85780
30,80000
3,11500
0,67500

104,09
9,20000
7,92000
2,19420
1,75720
1,39200
1,14600
12,06900
1,71800
3,76200
14,22900
0,43830

Pgina: 119

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 23,60940

LS

28,80347

UN Coeficiente
SubMO

52,41287

Material

32,21630

Custo Unit.
BDI

Custo Total

19,46471

08.10.045
RALO SIFONADO CONICO PVC DN 100MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.75.15
RALO SIFONADO CONICO PVC DN 100MM C/GRELHA PVC CRO
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

UN
H
1,40000
H
1,40000
UN
1,00000
Material
7,35000

BDI

08.10.048
RALO SIFONADO DE F.FUNDIDO DN 150 MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.64
ANEL DE BORRACHA HL D=50MM
6.10.66
ANEL DE BORRACHA HL D=75MM
6.75.03
RALO SIFONADO F. FUNDIDO DN 150MM
6.75.35
PLUG F.F. 2' P/RALO
6.75.53
GRELHA PVC RIGIDO ACAB.CROMADO DN 150MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
SubMO
28,34496
Mo-de-Obra 12,76800
LS
15,57696

UN
H
1,40000
H
1,40000
UN
4,00000
UN
1,00000
UN
1,00000
UN
3,00000
UN
1,00000
KG
0,02500
Material
206,65475

289,04
5,05
7,07000
4,07
5,69800
7,50
30,00000
11,00
11,00000
144,18
144,18000
4,05
12,15000
9,10
9,10000
8,99
0,22475
BDI
54,04993

08.10.049
RALO SECO CONICO PVC DN 100MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.75.10
RALO SECO CONICO PVC DN 100MM C/GRELHA PVC CROMADO
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

UN
H
1,40000
H
1,40000
UN
1,00000
Material
4,68000

08.10.050
RALO SECO DE F.FUNDIDO DN 100 MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.75.02
RALO SECO F FUNDIDO DN 100MM
6.75.52
GRELHA PVC RIGIDO ACAB.CROMADO DN 100MM
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

UN
H
1,40000
H
1,40000
UN
1,00000
UN
1,00000
Material
21,01000

08.10.056
TERMINAL DE VENTILACAO EM PVC P/ESGOTO DN 50MM (2")
1.01.18
ENCANADOR
6.21.98
TERMINAL VENTILACAO PVC P/ESGOTO DN 50MM (2")
Mo-de-Obra 1,01000
LS
1,23220
SubMO
2,24220

UN
H
0,20000
UN
1,00000
Material
2,92000

08.10.057
TERMINAL DE VENTILACAO EM PVC P/ ESGOTO DN 75MM (3")
1.01.18
ENCANADOR
6.21.97
TERMINAL VENTILACAO PVC P/ ESGOTO DN 75MM (3")
Mo-de-Obra 1,01000
LS
1,23220
SubMO
2,24220

UN
H
0,20000
UN
1,00000
Material
3,50000

08.10.058
TERMINAL DE VENTILACAO EM PVC P/ ESGOTO DN 100MM(4")
1.01.18
ENCANADOR
6.21.96
TERMINAL VENTILACAO PVC PARA ESGOTO DN100MM (4")
Mo-de-Obra 1,01000
LS
1,23220
SubMO
2,24220
08.10.099
SERVICOS EM REDE DE ESGOTO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

0,00000

5,05
4,07
7,35
8,20984

43,90
7,07000
5,69800
7,35000

40,62
7,07000
5,69800
4,68000

BDI

5,05
4,07
4,68
7,59574

BDI

5,05
4,07
16,78
4,23
11,35164

BDI

5,05
2,92
1,18731

BDI

5,05
3,50
1,32071

UN
H
0,20000
UN
1,00000
Material
4,80000

BDI

5,05
4,80
1,61971

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

60,70
7,07000
5,69800
16,78000
4,23000

6,34
1,01000
2,92000

7,06
1,01000
3,50000

8,66
1,01000
4,80000

08.11.002
TUBO DE FERRO FUNDIDO DN 50MM (2") - INCLUSIVE CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.01
TUBO DE FERRO FUNDIDO DE 50MM-HL
6.10.64
ANEL DE BORRACHA HL D=50MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712

M
H
0,80000
H
0,80000
M
1,20000
UN
1,00000
KG
0,01000
Material
96,02990

BDI

08.11.003
TUBO DE FERRO FUNDIDO DN 75MM (3") - INCLUSIVE CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.02
TUBO DE FERRO FUNDIDO DE 75MM-HL
6.10.66
ANEL DE BORRACHA HL D=75MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 8,20800
SubMO
18,22176
LS
10,01376

M
H
0,90000
H
0,90000
M
1,20000
UN
1,00000
KG
0,01000
Material
134,68990

188,08
5,05
4,54500
4,07
3,66300
103,00
123,60000
11,00
11,00000
8,99
0,08990
BDI
35,16968

08.11.004
1.01.18
1.01.19
6.10.03
6.10.67
6.95.27

Exerccio:

TUBO DE FERRO FUNDIDO DN 100MM (4") - INCLUSIVE CONEXOES


ENCANADOR
AJUDANTE DE ENCANADOR
TUBO DE FERRO FUNDIDO DE 100MM-HL
ANEL DE BORRACHA HL D=100MM
LUBRIFICANTE P/ANEL NEOPRENE

2011

M
H
H
M
UN
KG

1,10000
1,10000
1,20000
1,00000
0,02000

5,05
4,07
73,70
7,50
8,99
25,81221

5,05
4,07
122,09
12,57
8,99

138,03
4,04000
3,25600
88,44000
7,50000
0,08990

223,28
5,55500
4,47700
146,50800
12,57000
0,17980

Pgina: 120

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 10,03200

LS

12,23904

UN Coeficiente
SubMO

22,27104

Material

159,25780

08.11.005
TUBO DE FERRO FUNDIDO DN 150MM (6") - INCLUSIVE CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.04
TUBO DE FERRO FUNDIDO DE 150MM-HL
6.10.75
ANEL DE BORRACHA HL D=150MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 11,85600
LS
14,46432
SubMO
26,32032

M
H
1,30000
H
1,30000
M
1,20000
UN
1,00000
KG
0,03000
Material
233,67570

08.11.020
TUBO DE CONCRETO - CLASSE C1 - DN 300MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.01
TUBO CONCRETO DE 30CM DIAM C-1
Mo-de-Obra 15,29680
LS
18,66210

33,95890

M
H
0,30000
H
3,64000
M3
0,00100
KG
0,45000
M
1,00000
Material
36,55696

38,21153

M
H
0,40000
H
4,02000
M3
0,00230
KG
0,91000
M
1,00000
Material
46,70176

46,53475

M
H
0,50000
H
4,88000
M3
0,00310
KG
1,36000
M
1,00000
Material
65,72263

52,32629

M
H
0,70000
H
5,32000
M3
0,00420
KG
1,81000
M
1,00000
Material
82,68763

08.11.021
TUBO DE CONCRETO - CLASSE C1 - DN 400MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.02
TUBO CONCRETO DE 40CM DIAM C-1
Mo-de-Obra 17,21240
LS
20,99913
08.11.022
TUBO DE CONCRETO - CLASSE C1 - DN 500MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.03
TUBO CONCRETO DE 50CM DIAM C-1
Mo-de-Obra 20,96160
LS
25,57315
08.11.023
TUBO DE CONCRETO - CLASSE C1 - DN 600MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.01.04
TUBO CONCRETO DE 60CM DIAM C-1
Mo-de-Obra 23,57040
LS
28,75589

SubMO

SubMO

SubMO

SubMO

08.11.030
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.30
TUBO PVC P/ESGOTO 40MM
6.26.70
ANEL BORRACHA P/TUBO PVC 40MM
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712

M
H
H
M
UN
Material
3,11100

0,80000
0,80000
1,10000
1,00000

08.11.031
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 50MM (2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.31
TUBO PVC P/ESGOTO 50MM
6.26.71
ANEL BORRACHA P/TUBO PVC 50MM (2")
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712

M
H
H
M
UN
Material
5,07700

0,80000
0,80000
1,10000
1,00000

08.11.032
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 75MM (3") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.32
TUBO PVC P/ESGOTO 75MM
6.26.72
ANEL BORRACHA P/TUBOS PVC 75MM (3")
Mo-de-Obra 8,20800
LS
10,01376
SubMO
18,22176

M
H
H
M
UN
Material
6,56600

0,90000
0,90000
1,10000
1,00000

08.11.033
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 100MM (4") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.73
ANEL BORRACHA P/TUBO PVC ESGOTO DN=100MM
SubMO
20,24640
Mo-de-Obra 9,12000
LS
11,12640

M
H
H
M
UN
Material
7,73600

1,00000
1,00000
1,10000
1,00000

08.11.034
1.01.18
1.01.19
6.25.34
Exerccio:

TUBO DE PVC RIGIDO JUNTA ELASTICA DN 150MM (6") INCL CONEXOES


ENCANADOR
AJUDANTE DE ENCANADOR
TUBO PVC P/ESGOTO 150MM

2011

M
H
H
M

1,20000
1,20000
1,10000

Custo Unit.
BDI

Custo Total

41,75163

319,79
5,05
6,56500
4,07
5,29100
177,33
212,79600
20,61
20,61000
8,99
0,26970
BDI
59,79909

BDI

4,64
3,82
80,46
0,37
36,31
16,21865

BDI

4,64
3,82
80,46
0,37
46,18
19,53006

BDI

4,64
3,82
80,46
0,37
64,97
25,81920

BDI

4,64
3,82
80,46
0,37
81,68
31,05320

BDI

5,05
4,07
2,31
0,57
4,44087

BDI

5,05
4,07
4,07
0,60
4,89305

BDI

5,05
4,07
5,16
0,89
5,70119

BDI

5,05
4,07
5,96
1,18
6,43595

5,05
4,07
14,04

86,73
1,39200
13,90480
0,08046
0,16650
36,31000

104,44
1,85600
15,35640
0,18506
0,33670
46,18000

138,07
2,32000
18,64160
0,24943
0,50320
64,97000

166,06
3,24800
20,32240
0,33793
0,66970
81,68000

23,74
4,04000
3,25600
2,54100
0,57000

26,16
4,04000
3,25600
4,47700
0,60000

30,48
4,54500
3,66300
5,67600
0,89000

34,41
5,05000
4,07000
6,55600
1,18000

53,65
6,06000
4,88400
15,44400
Pgina: 121

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.26.74
ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM
SubMO
Mo-de-Obra 10,94400
LS
13,35168

UN Coeficiente
24,29568

Material

UN
1,00000
19,32400

Custo Unit.

Custo Total

BDI

3,88
10,03253

BDI

4,50
3,92
3,48
26,97
16,84262

BDI

4,50
3,92
10,26
32,53
20,33689

BDI

4,50
3,92
14,69
44,63
26,44471

5,05
4,07
60,95
22,78
23,91457

3,88000

08.11.035
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 200MM (8") INCL CONEXOES
1.01.09
ESGOTEIRO/CAVOUQUEIRO
1.01.95
AJUDANTE DE ESGOTEIRO
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
Mo-de-Obra 16,84000
LS
20,54480
SubMO
37,38480

M
H
2,00000
H
2,00000
UN
1,00000
M
1,20000
Material
35,84400

08.11.036
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 250MM (10") INCL CONEXOES
1.01.09
ESGOTEIRO/CAVOUQUEIRO
1.01.95
AJUDANTE DE ESGOTEIRO
6.26.78
ANEL BORRACHA P/TUBO PVC ESGOTO DN=250MM
6.26.86
TUBO PVC RIGIDO ESGOTO DIAM 250 MM (10")
Mo-de-Obra 17,62400
LS
21,50128
SubMO
39,12528

M
H
2,00000
H
2,20000
UN
1,00000
M
1,20000
Material
49,29600

08.11.037
TUBO DE PVC RIGIDO JUNTA ELASTICA DN 300MM (12") INCL CONEXOES
1.01.09
ESGOTEIRO/CAVOUQUEIRO
1.01.95
AJUDANTE DE ESGOTEIRO
6.26.79
ANEL BORRACHA P/TUBO PVC ESGOTO DN=300MM
6.26.87
TUBO PVC RIGIDO ESGOTO DIAM 300 MM (12")
Mo-de-Obra 21,05000
LS
25,68100
SubMO
46,73100

M
H
2,50000
H
2,50000
UN
1,00000
M
1,20000
Material
68,24600

08.11.040
TUBO DE FERRO FUNDIDO RADIAL COM INSPECAO DE 3"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.23
TE SANITARIO FERRO FUNDIDO 3" (75 MM)
6.10.69
PLACA CEGA FERRO FUNDIDO 3" (75 MM)
Mo-de-Obra 9,12000
LS
11,12640
SubMO

20,24640

UN
H
1,00000
H
1,00000
UN
1,00000
UN
1,00000
Material
83,73000

BDI

24,29568

M
H
1,20000
H
1,20000
UN
1,00000
UN
1,00000
Material
129,13000

188,71
5,05
6,06000
4,07
4,88400
103,16
103,16000
25,97
25,97000
BDI
35,28791

08.11.041
TUBO DE FERRO FUNDIDO RADIAL COM INSPECAO DE 4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.26
TE SANITARIO FERRO FUNDIDO 4" (100 MM)
6.10.70
PLACA CEGA FERRO FUNDIDO 4" (100 MM
SubMO
Mo-de-Obra 10,94400
LS
13,35168

08.11.050
TUBO DE PVC "R" PARA AGUAS PLUVIAIS 40MM - INCL. CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.60
TUBO DE PVC "R" 40MMM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712
08.11.051
TUBO DE PVC "R" PARA AGUAS PLUVIAIS 50MM - INCL. CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.61
TUBO DE PVC "R" 50MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712
08.11.052
TUBO DE PVC "R" PARA AGUAS PLUVIAIS 75MM - INCL. CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.62
TUBO DE PVC "R" 75MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 8,20800
LS
10,01376
SubMO
18,22176
08.11.053
TUBO DE PVC "R" PARA AGUAS PLUVIAIS 100MM - INCL. CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.63
TUBO DE PVC "R" 100MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
SubMO
20,24640
Mo-de-Obra 9,12000
LS
11,12640
08.11.054
1.01.18
1.01.19
6.25.64
Exerccio:

TUBO DE PVC "R" PARA AGUAS PLUVIAIS 150MM - INCL CONEXOES


ENCANADOR
AJUDANTE DE ENCANADOR
TUBO DE PVC "R" 150MM

2011

0,80000
0,80000
1,10000
0,00160
0,00070

Material

M
H
H
M
L
L
4,33687

0,80000
0,80000
1,10000
0,00220
0,00080

Material

M
H
H
M
L
L
5,82927

0,90000
0,90000
1,10000
0,00350
0,00130

Material

M
H
H
M
L
L
7,28289

Material

M
H
1,00000
H
1,00000
M
1,10000
L
0,00550
L
0,00230
11,85676
M
H
H
M

1,20000
1,20000
1,10000

BDI

5,05
4,07
3,89
27,29
20,29
4,72282

BDI

5,05
4,07
5,23
27,29
20,29
5,06607

BDI

5,05
4,07
6,51
27,29
20,29
5,86607

BDI

5,05
4,07
10,60
27,29
20,29
7,38373

5,05
4,07
22,70

90,07
9,00000
7,84000
3,48000
32,36400

108,75
9,00000
8,62400
10,26000
39,03600

141,42
11,25000
9,80000
14,69000
53,55600

127,89
5,05000
4,07000
60,95000
22,78000

25,25
4,04000
3,25600
4,27900
0,04366
0,01420

27,09
4,04000
3,25600
5,75300
0,06004
0,01623

31,37
4,54500
3,66300
7,16100
0,09552
0,02638

39,48
5,05000
4,07000
11,66000
0,15010
0,04667

61,07
6,06000
4,88400
24,97000
Pgina: 122

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 10,94400
LS

UN Coeficiente
L
L

13,35168

08.11.099
SERVICOS EM REDE DE AGUAS PLUVIAIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

08.12.001
CONDUTOR EM CHAPA GALVANIZADA N 24 DESENV. 0,25M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.80.35
CHAPA GALVANIZADA N.24 CORTE 0.25M
Mo-de-Obra 10,03200
LS
12,23904
SubMO
08.12.002
CONDUTOR EM CHAPA GALVANIZADA N 26 DESENV. 0,25M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.80.36
CHAPA GALVANIZADA N.26 CORTE 0.25M
Mo-de-Obra 10,03200
LS
12,23904
SubMO

0,01100
0,00450

24,29568

Material

0,00000

MV
MV
1,00000
Material
244,82000

22,27104

22,27104

08.12.003
CONDUTOR DE CHAPA GALVANIZADA N 24 - DESENVOLVIMENTO DE 0,33 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.80.33
CONDUTOR C/CHAPA GALV 24 DESEN 0,33M
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496
08.12.004
CONDUTOR DE CHAPA GALVANIZADA N 26 - DESENVOLVIMENTO DE 0,33 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.80.09
CONDUTOR C/CHAPA GALV 26 DESEN 0,33M
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

25,36150

BDI

Material

M
H
1,10000
H
1,10000
M
1,05000
9,90150

Material

M
H
1,10000
H
1,10000
M
1,05000
7,84350

Material

M
H
1,40000
H
1,40000
M
1,05000
13,05150

Material

M
H
1,40000
H
1,40000
M
1,05000
10,19550

08.12.007
LIGACAO CALHA CONDUTOR DE CHAPA ACO GALVANIZADO N.24 DIAMETRO DE 3"
UN
1.01.18
ENCANADOR
H
1,00000
1.01.19
AJUDANTE DE ENCANADOR
H
1,00000
6.80.16
LIG CALHA-COND CHAP GALV N24X1,00MX3"
UN
1,00000
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
KG
0,08000
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640
Material
10,01720
08.12.008
LIGACAO CALHA CONDUTOR DE CHAPA ACO GALVANIZADO N.24 DIAMETRO DE 4"
UN
1.01.18
ENCANADOR
H
1,00000
1.01.19
AJUDANTE DE ENCANADOR
H
1,00000
6.80.17
LIG CALHA-COND CHAP GALV N24X1,00MX4"
UN
1,00000
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
KG
0,08000
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640
Material
11,21720
08.12.010
CALHA OU AGUA FURTADA EM FIBRA DE VIDRO-DESENV. 0,33M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.62
CALHA DE FIBRA DE VIDRO DES.0.33M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 8,11680
LS
9,90250
SubMO
18,01930

M
H
0,89000
H
0,89000
M
1,05000
KG
0,10000
Material
20,36000

08.12.011
CALHA OU AGUA FURTADA EM FIBRA DE VIDRO-DESENV. 0,50M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.60
CALHA DE FIBRA DE VIDRO DES.0.50M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 9,30240
LS
11,34893
SubMO
20,65133

M
H
1,02000
H
1,02000
M
1,05000
KG
0,15000
Material
29,83650

08.12.012
CALHA OU AGUA FURTADA EM FIBRA DE VIDRO-DESENV. 1,00M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.61
CALHA DE FIBRA DE VIDRO DES.1.00M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 10,76160
LS
13,12915
SubMO
23,89075

M
H
1,18000
H
1,18000
M
1,05000
KG
0,30000
Material
57,11100

08.12.015
1.01.18
1.01.19
2.67.60
2.67.71
6.80.25
6.95.08
Exerccio:

CALHA OU AGUA FURTADA EM CHAPA GALV. N 24 - CORTE 0,33M


ENCANADOR
AJUDANTE DE ENCANADOR
PREGO
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
CALHA C/CHAPA GALV 24 DESENV 0,33M
SOLDA LIGA CHUMBO E ESTANHO 70:30

2011

Custo Unit.

M
H
H
KG
KG
M
KG

1,10000
1,10000
0,10000
0,00180
1,05000
0,04000

Custo Total

27,29
20,29
11,42115

0,30019
0,09131

301,12
244,82
244,82000
BDI
56,30860

BDI

5,05
4,07
9,43
7,39968

BDI

5,05
4,07
7,47
6,92634

BDI

5,05
4,07
12,43
9,52119

BDI

5,05
4,07
9,71
8,86431

BDI

5,05
4,07
6,85
39,59
6,96063

BDI

5,05
4,07
8,05
39,59
7,23663

BDI

5,05
4,07
18,74
6,83
8,82724

BDI

5,05
4,07
27,44
6,83
11,61220

BDI

5,05
4,07
52,44
6,83
18,63040

5,05
4,07
4,67
12,23
12,43
39,59

39,57
5,55500
4,47700
9,90150

37,04
5,55500
4,47700
7,84350

50,91
7,07000
5,69800
13,05150

47,40
7,07000
5,69800
10,19550

37,22
5,05000
4,07000
6,85000
3,16720

38,70
5,05000
4,07000
8,05000
3,16720

47,20
4,49450
3,62230
19,67700
0,68300

62,10
5,15100
4,15140
28,81200
1,02450

99,63
5,95900
4,80260
55,06200
2,04900

45,99
5,55500
4,47700
0,46700
0,02201
13,05150
1,58360
Pgina: 123

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 10,03200

Descrio
LS

12,23904

UN Coeficiente
SubMO

22,27104

Material

15,12411

08.12.016
CALHA OU AGUA FURTADA EM CHAPA GALV. N 24 - CORTE 0,50M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.26
CALHA C/CHAPA GALV 24 DESENV 0,50M
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
KG
0,15000
KG
0,00230
M
1,05000
KG
0,07000
Material
23,29243

08.12.017
CALHA OU AGUA FURTADA EM CHAPA GALV. N 24 - CORTE 1,00M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.27
CALHA C/CHAPA GALV 24 DESENV 1.00M
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
SubMO
34,41888
Mo-de-Obra 15,50400
LS
18,91488

M
H
1,70000
H
1,70000
KG
0,30000
KG
0,00470
M
1,05000
KG
0,14000
Material
46,56508

08.12.021
CALHA OU AGUA FURTADA EM CHAPA GALV. N 26 - CORTE 0.33M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.01
CALHA C/CHAPA GALV 26 DESENV 0,33M
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104

M
H
1,10000
H
1,10000
KG
0,10000
KG
0,00180
M
1,05000
KG
0,04000
Material
12,26811

08.12.022
CALHA OU AGUA FURTADA EM CHAPA GALV. N 26 - CORTE 0,50M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.02
CALHA C/CHAPA GALV 26 DESENV 0,50M
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
KG
0,15000
KG
0,00230
M
1,05000
KG
0,07000
Material
18,95593

08.12.023
CALHA OU AGUA FURTADA EM CHAPA GALV. N 26 - CORTE 1,00M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.30
CALHA C/CHAPA GALV 26 DESENV 1.00M
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
Mo-de-Obra 15,50400
LS
18,91488
SubMO
34,41888

M
H
1,70000
H
1,70000
KG
0,30000
KG
0,00470
M
1,05000
KG
0,14000
Material
37,90258

08.12.026
CALHA EM CHAPA DE COBRE N 26 - CORTE 0,33 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.20
CALHA DE CHAPA DE COBRE N.26
6.95.07
SOLDA 50X50
Mo-de-Obra 10,94400
LS
13,35168
SubMO

24,29568

M
H
1,20000
H
1,20000
KG
0,10000
KG
0,00300
KG
1,35000
KG
0,04000
Material
118,07169

30,36960

M
H
1,50000
H
1,50000
KG
0,15000
KG
0,00380
KG
2,05000
KG
0,07000
Material
179,70347

36,44352

M
H
1,80000
H
1,80000
KG
0,30000
KG
0,00770
KG
4,10000
KG
0,14000
Material
359,40817

08.12.027
CALHA EM CHAPA DE COBRE N 26 - CORTE 0,50 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.20
CALHA DE CHAPA DE COBRE N.26
6.95.07
SOLDA 50X50
Mo-de-Obra 13,68000
LS
16,68960
SubMO
08.12.028
CALHA DE CHAPA DE COBRE N 26 - CORTE 1,00 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.80.20
CALHA DE CHAPA DE COBRE N.26
6.95.07
SOLDA 50X50
SubMO
Mo-de-Obra 16,41600
LS
20,02752

Exerccio:

2011

Custo Unit.
BDI

Custo Total

8,60089
63,51
7,07000
5,69800
0,70050
0,02813
19,79250
2,77130

BDI

5,05
4,07
4,67
12,23
18,85
39,59
11,87660

BDI

5,05
4,07
4,67
12,23
37,68
39,59
18,62631

BDI

5,05
4,07
4,67
12,23
9,71
39,59
7,94401

BDI

5,05
4,07
4,67
12,23
14,72
39,59
10,87920

BDI

5,05
4,07
4,67
12,23
29,43
39,59
16,63394

BDI

175,11
5,05
6,06000
4,07
4,88400
4,67
0,46700
12,23
0,03669
85,72
115,72200
46,15
1,84600
32,74450

BDI

258,38
5,05
7,57500
4,07
6,10500
4,67
0,70050
12,23
0,04647
85,72
175,72600
46,15
3,23050
48,31681

BDI

486,89
5,05
9,09000
4,07
7,32600
4,67
1,40100
12,23
0,09417
85,72
351,45200
46,15
6,46100
91,04589

99,61
8,58500
6,91900
1,40100
0,05748
39,56400
5,54260

42,48
5,55500
4,47700
0,46700
0,02201
10,19550
1,58360

58,18
7,07000
5,69800
0,70050
0,02813
15,45600
2,77130

88,95
8,58500
6,91900
1,40100
0,05748
30,90150
5,54260

Pgina: 124

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

08.12.031
RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,16 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.60
RUFO C/CHAPA GALV 24 DESENV 0,16M
Mo-de-Obra 5,47200
LS
6,67584
SubMO
08.12.032
RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,25 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.61
RUFO C/CHAPA GALV 24 DESENV 0,25M
Mo-de-Obra 5,47200
LS
6,67584
SubMO
08.12.033
RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,33 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.62
RUFO C/CHAPA GALV 24 DESENV 0,33M
Mo-de-Obra 6,84000
LS
8,34480
SubMO
08.12.034
RUFO EM CHAPA GALVANIZADA N 24 - CORTE 0,50 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.63
RUFO C/CHAPA GALV 24 DESENV 0,50M
Mo-de-Obra 12,76800
LS
15,57696
SubMO
08.12.035
RUFO EM CHAPA GALVANIZADA N 24 - CORTE 1,00 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.68
RUFO C/CHAPA GALV 24 DESENV 1,00M
Mo-de-Obra 18,24000
LS
22,25280
SubMO
08.12.038
RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,16 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.70
RUFO C/CHAPA GALV 26 DESENV 0,16M
Mo-de-Obra 5,47200
LS
6,67584
SubMO
08.12.039
RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,25 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.71
RUFO C/CHAPA GALV 26 DESENV 0,25M
Mo-de-Obra 5,47200
LS
6,67584
SubMO
08.12.040
RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,33 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.72
RUFO C/CHAPA GALV 26 DESENV 0,33M
Mo-de-Obra 6,84000
LS
8,34480
SubMO
08.12.041
RUFO EM CHAPA GALVANIZADA N 26 - CORTE 0,50 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.73
RUFO C/CHAPA GALV 26 DESENV 0,50M
Mo-de-Obra 12,76800
LS
15,57696
SubMO
08.12.042
RUFO EM CHAPA GALVANIZADA N 26 - CORTE 1,00 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.78
RUFO C/CHAPA GALV 26 DESENV 1,00M
SubMO
Mo-de-Obra 18,24000
LS
22,25280
08.12.046
1.01.18
1.01.19
2.67.60
Exerccio:

RUFO EM CHAPA DE COBRE N 26 - CORTE 0,16 M


ENCANADOR
AJUDANTE DE ENCANADOR
PREGO

2011

UN Coeficiente

12,14784

M
H
H
KG
M
Material
7,59650

12,14784

M
H
0,60000
H
0,60000
KG
0,10000
M
1,05000
Material
10,36850

15,18480

M
H
0,75000
H
0,75000
KG
0,10000
M
1,05000
Material
13,51850

28,34496

M
H
1,40000
H
1,40000
KG
0,10000
M
1,05000
Material
20,25950

40,49280

M
H
2,00000
H
2,00000
KG
0,20000
M
1,05000
Material
40,49800

0,60000
0,60000
0,10000
1,05000

12,14784

M
H
H
KG
M
Material
6,06350

0,60000
0,60000
0,10000
1,05000

12,14784

M
H
H
KG
M
Material
8,19500

15,18480

M
H
0,75000
H
0,75000
KG
0,10000
M
1,05000
Material
10,67300

28,34496

M
H
1,40000
H
1,40000
KG
0,10000
M
1,05000
Material
15,92300

40,49280

M
H
2,00000
H
2,00000
KG
0,20000
M
1,05000
Material
31,83550
M
H
H
KG

Custo Unit.

0,60000
0,60000
0,10000
1,05000

0,60000
0,60000
0,10000

Custo Total

BDI

5,05
4,07
4,67
6,79
4,54120

BDI

5,05
4,07
4,67
9,43
5,17876

BDI

5,05
4,07
4,67
12,43
6,60176

BDI

5,05
4,07
4,67
18,85
11,17903

BDI

5,05
4,07
4,67
37,68
18,62788

BDI

5,05
4,07
4,67
5,33
4,18861

BDI

5,05
4,07
4,67
7,36
4,67885

BDI

5,05
4,07
4,67
9,72
5,94729

BDI

5,05
4,07
4,67
14,72
10,18163

BDI

5,05
4,07
4,67
29,43
16,63551

5,05
4,07
4,67

24,28
3,03000
2,44200
0,46700
7,12950

27,69
3,03000
2,44200
0,46700
9,90150

35,30
3,78750
3,05250
0,46700
13,05150

59,78
7,07000
5,69800
0,46700
19,79250

99,61
10,10000
8,14000
0,93400
39,56400

22,39
3,03000
2,44200
0,46700
5,59650

25,02
3,03000
2,44200
0,46700
7,72800

31,80
3,78750
3,05250
0,46700
10,20600

54,44
7,07000
5,69800
0,46700
15,45600

88,96
10,10000
8,14000
0,93400
30,90150

72,24
3,03000
2,44200
0,46700
Pgina: 125

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.80.55
RUFO DE CHAPA DE COBRE N.26
Mo-de-Obra 5,47200
LS
6,67584

UN Coeficiente
SubMO

08.12.047
RUFO EM CHAPA DE COBRE N 26 - CORTE 0,25 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.55
RUFO DE CHAPA DE COBRE N.26
Mo-de-Obra 5,47200
LS
6,67584
SubMO
08.12.048
RUFO EM CHAPA DE COBRE N 26 - CORTE 0,33 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.55
RUFO DE CHAPA DE COBRE N.26
Mo-de-Obra 6,84000
LS
8,34480
SubMO
08.12.049
RUFO EM CHAPA DE COBRE N 26 - CORTE 0,50 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.55
RUFO DE CHAPA DE COBRE N.26
Mo-de-Obra 12,76800
LS
15,57696
SubMO
08.12.050
RUFO EM CHAPA DE COBRE N 26 - CORTE 1,00 M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.60
PREGO
6.80.55
RUFO DE CHAPA DE COBRE N.26
Mo-de-Obra 18,24000
LS
22,25280
SubMO
08.12.055
RUFO EM FIBRA DE VIDRO - DESENV. 0,16M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.50
RUFO DE FIBRA DE VIDRO DES. 0.16M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 5,47200
LS
6,67584
08.12.056
RUFO EM FIBRA DE VIDRO - DESENV. 0,25M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.51
RUFO DE FIBRA DE VIDRO DES. 0.25M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 5,47200
LS
6,67584
08.12.057
RUFO EM FIBRA DE VIDRO - DESENV. 0,33M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.52
RUFO DE FIBRA DE VIDRO DES. 0.33M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 6,84000
LS
8,34480
08.12.058
RUFO EM FIBRA DE VIDRO - DESENV. 0,50M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.71
RUFO DE FIBRA DE VIDRO DES. 0.50M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 12,76800
LS
15,57696
08.12.059
RUFO EM FIBRA DE VIDRO - DESENV. 1,00M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.60.54
RUFO DE FIBRA DE VIDRO DES. 1.00M
2.67.61
PREGO ZINCADO 18X27
Mo-de-Obra 18,24000
LS
22,25280

SubMO

SubMO

SubMO

SubMO

SubMO

08.12.065
GRELHA HEMISFERICA DE FERRO FUNDIDO DN 75MM (3")
1.01.18
ENCANADOR
6.75.04
GRELHA HEMISFERICA FERRO FUND DE 3"
Mo-de-Obra 0,50500
SubMO
LS
0,61610
08.12.066
1.01.18
6.75.05
Exerccio:

GRELHA HEMISFERICA DE FERRO FUNDIDO DN 100MM (4")


ENCANADOR
GRELHA HEMISFERICA F.FUNDIDO DN 100MM (4")

2011

KG
0,65000
46,59100

12,14784

Material

12,14784

M
H
0,60000
H
0,60000
KG
0,10000
KG
1,02000
Material
72,84620

15,18480

M
H
0,75000
H
0,75000
KG
0,10000
KG
1,34000
Material
95,55340

28,34496

M
H
1,40000
H
1,40000
KG
0,10000
KG
2,03000
Material
144,51580

40,49280

M
H
2,00000
H
2,00000
KG
0,20000
KG
4,06000
Material
289,03160

12,14784

M
H
0,60000
H
0,60000
M
1,05000
KG
0,10000
Material
10,29050

12,14784

M
H
0,60000
H
0,60000
M
1,05000
KG
0,10000
Material
15,40400

15,18480

M
H
0,75000
H
0,75000
M
1,05000
KG
0,10000
Material
20,04500

28,34496

M
H
1,40000
H
1,40000
M
1,05000
KG
0,10000
Material
28,36100

40,49280

M
H
2,00000
H
2,00000
M
1,05000
KG
0,20000
Material
52,49050

1,12110

UN
H
0,10000
UN
1,00000
Material
3,33000
UN
H
UN

0,10000
1,00000

Custo Unit.

Custo Total

BDI

70,96
13,50993

BDI

5,05
4,07
4,67
70,96
19,54863

BDI

5,05
4,07
4,67
70,96
25,46979

BDI

212,61
5,05
7,07000
4,07
5,69800
4,67
0,46700
70,96
144,04880
39,75798

BDI

405,31
5,05
10,10000
4,07
8,14000
4,67
0,93400
70,96
288,09760
75,79061

BDI

5,05
4,07
9,15
6,83
5,16082

BDI

5,05
4,07
14,02
6,83
6,33692

BDI

5,05
4,07
18,44
6,83
8,10285

BDI

5,05
4,07
26,36
6,83
13,04237

BDI

5,05
4,07
48,69
6,83
21,38616

BDI

5,05
3,33
1,02375

5,05
4,04

46,12400

104,54
3,03000
2,44200
0,46700
72,37920

136,20
3,78750
3,05250
0,46700
95,08640

27,59
3,03000
2,44200
9,60750
0,68300

33,88
3,03000
2,44200
14,72100
0,68300

43,33
3,78750
3,05250
19,36200
0,68300

69,74
7,07000
5,69800
27,67800
0,68300

114,36
10,10000
8,14000
51,12450
1,36600

5,47
0,50500
3,33000

6,34
0,50500
4,04000
Pgina: 126

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,50500

LS

0,61610

08.12.067
GRELHA HEMISFERICA DE F F DE 6"
1.01.18
ENCANADOR
6.75.06
GRELHA HEMISFERICA FERRO FUND. DE 6"
Mo-de-Obra 0,75750
LS
0,92415

UN Coeficiente
SubMO

SubMO

1,12110

Material

4,04000

1,68165

UN
H
0,15000
UN
1,00000
Material
12,00000

08.12.070
CAIXA DE ALVENARIA - ESCAVACAO MANUAL COM APILOAMENTO DO FUNDO
M3
1.01.46
SERVENTE
H
5,00000
Mo-de-Obra 19,10000
LS
23,30200
SubMO
42,40200
Material
0,00000
08.12.071
CAIXA DE ALVENARIA - LASTRO DE CONCRETO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 104,24000
LS
127,17280

SubMO

08.12.072
CAIXA DE ALVENARIA - PAREDE DE 1/2 TIJOLO REVESTIDO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 32,60400
LS
39,77688
SubMO
08.12.073
CAIXA DE ALVENARIA - PAREDE DE 1 TIJOLO REVESTIDO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 42,60760
LS
51,98127
SubMO
08.12.074
CAIXA DE ALVENARIA - TAMPA DE CONCRETO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 23,60940
LS
28,80347
SubMO

Exerccio:

CA-10 CAIXA DE AREIA 50X50 CM PARA AGUAS PLUVIAIS


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO

2011

Custo Total

BDI

1,18705

BDI

5,05
12,00
3,14678

BDI

3,82
9,75246

BDI

4,64
3,82
80,46
0,37
61,17
92,23412

BDI

4,64
3,82
80,46
0,35
0,37
0,22
23,23949

4,64
3,82
80,46
0,35
0,37
0,22
34,23972

231,41280

M3
H
6,00000
H
20,00000
M3
0,67200
KG
180,00000
M3
0,80000
Material
169,60512

72,38088

M2
H
4,03000
H
3,64000
M3
0,06300
KG
4,83000
KG
17,57000
UN
70,00000
Material
28,66038

94,58887

M2
H
4,49000
H
5,70000
M3
0,12100
KG
13,96000
KG
23,94000
UN
140,00000
Material
54,27946

BDI

52,41287

M2
H
2,00000
H
2,00000
H
0,46000
H
0,46000
H
0,30000
H
0,30000
M3
0,05000
M2
0,10000
M2
0,33000
KG
5,27000
KG
0,09000
Material
32,21630

4,60
3,96
4,77
3,82
4,64
3,82
241,38
17,18
11,40
2,70
4,87
BDI
19,46471

UN
H
7,80000
H
14,60000
M3
0,22000
KG
48,20000
M3
0,07000
KG
1,30000
UN
220,00000
Material
91,74830

4,64
3,82
80,46
0,37
62,03
2,67
0,22
68,05893

08.12.077
CAIXA INSPECAO DE ALVENARIA DE TIJ DE 0,70X0,70X1,00 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.10
ACO CA-25 $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 91,96400
LS
112,19608
SubMO
204,16008
08.12.079
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.21
2.15.38
2.25.15

Custo Unit.

UN
H
H
H
H
H
H
M3
KG
KG
M3
M2
KG
UN

0,62000
0,62000
0,38000
0,38000
3,61000
7,23000
0,09720
4,63000
31,84000
0,04200
0,39000
0,71000
70,00000

BDI

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
17,18
2,70
0,22

16,82
0,75750
12,00000

52,15
19,10000

493,25
27,84000
76,40000
54,06912
66,60000
48,93600

124,28
18,69920
13,90480
5,06898
1,69050
6,50090
15,40000

183,10
20,83360
21,77400
9,73566
4,88600
8,85780
30,80000

104,09
9,20000
7,92000
2,19420
1,75720
1,39200
1,14600
12,06900
1,71800
3,76200
14,22900
0,43830

363,96
36,19200
55,77200
17,70120
17,83400
4,34210
3,47100
48,40000

205,41
2,85200
2,45520
1,81260
1,45160
16,75040
27,61860
7,82071
1,62050
11,78080
2,56914
6,70020
1,91700
15,40000
Pgina: 127

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
SubMO
117,52769
Mo-de-Obra 52,94040
LS
64,58729

Custo Unit.

Custo Total

KG
0,46400
KG
0,09600
KG
0,01240
Material
49,47706

BDI

18,78120

UN
H
1,00000
H
1,00000
UN
1,00000
Material
172,19000

234,89
4,64
4,64000
3,82
3,82000
172,19
172,19000
BDI
43,92338

18,78120

UN
H
1,00000
H
1,00000
UN
1,00000
Material
193,96000

261,67
4,64
4,64000
3,82
3,82000
193,96
193,96000
BDI
48,93048

08.12.087
RALO SECO DE F. FUNDIDO DN 100 MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.75.02
RALO SECO F FUNDIDO DN 100MM
6.75.52
GRELHA PVC RIGIDO ACAB.CROMADO DN 100MM
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

UN
H
1,40000
H
1,40000
UN
1,00000
UN
1,00000
Material
21,01000

08.12.095
CALHA DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,33M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.40.96
SILICONE
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104

M
H
1,10000
H
1,10000
KG
0,04000
KG
0,84000
KG
0,10000
KG
0,00080
Material
15,90878

08.12.096
CALHA DE ALUMINIO ACAB. NATURAL E=0,8MM CORTE 0,50M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.40.96
SILICONE
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
KG
0,07000
KG
1,27000
KG
0,15000
KG
0,00100
Material
24,41873

08.12.097
CALHA DE ALUMINIO ACAB. NATUARL E=0,8MM CORTE 1,00M
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.40.96
SILICONE
2.55.30
TELHA/CUMEEIRA/RUFO DE ALUMINIO ACABAMENTO NATURAL
2.67.60
PREGO
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
Mo-de-Obra 15,50400
LS
18,91488
SubMO
34,41888
08.12.099
SERVICOS EM REDE DE AGUAS PLUVIAIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

08.12.085
GRELHA FERRO PERF. - 1,00X0,40 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
6.75.62
GRELHA FERRO PERFILADO PECA 1,00X0,40M
Mo-de-Obra 8,46000
LS
10,32120
08.12.086
GRELHA FERRO PERF. 1,00X0,50 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
6.75.63
GRELHA FERRO PERFILADO PECA 1,00X0,50M
Mo-de-Obra 8,46000
LS
10,32120

SubMO

SubMO

SubMO

0,00000

BDI

5,05
4,07
39,30
16,50
4,67
12,23
8,78136

BDI

5,05
4,07
39,30
16,50
4,67
12,23
12,13565

M
H
1,70000
H
1,70000
KG
0,14000
KG
2,54000
KG
0,30000
KG
0,00210
Material
48,83868

BDI

5,05
4,07
39,30
16,50
4,67
12,23
19,14924

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,40000
0,40000
0,05000
1,60000
0,00080
0,00030

08.13.002
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 32MM (1") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.03
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 32MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
SubMO
9,11088
Mo-de-Obra 4,10400
LS
5,00688

M
H
H
UN
M
L
L
Material
5,22836

0,45000
0,45000
0,06000
1,50000
0,00110
0,00050

Exerccio:

2011

60,70
7,07000
5,69800
16,78000
4,23000

BDI

M
H
H
UN
M
L
L
Material
2,59192

TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 40MM (1.1/4") INCL CONEXOES

1,16000
0,44832
0,06039

5,05
4,07
16,78
4,23
11,35164

08.13.001
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 25MM (3/4") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.02
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 3,64800
LS
4,45056
SubMO
8,09856

08.13.003

2,50
4,67
4,87
38,41109

BDI

5,05
4,07
0,72
1,58
27,29
20,29
2,45881

BDI

5,05
4,07
0,72
3,43
27,29
20,29
3,29803

46,96
5,55500
4,47700
1,57200
13,86000
0,46700
0,00978

64,89
7,07000
5,69800
2,75100
20,95500
0,70050
0,01223

102,40
8,58500
6,91900
5,50200
41,91000
1,40100
0,02568

13,14
2,02000
1,62800
0,03600
2,52800
0,02183
0,00609

17,63
2,27250
1,83150
0,04320
5,14500
0,03002
0,01015

21,66
Pgina: 128

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.04
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 40MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 4,56000
LS
5,56320

UN Coeficiente

SubMO

10,12320

H
H
UN
M
L
L
Material
7,48829

0,50000
0,50000
0,07000
1,50000
0,00120
0,00050

08.13.004
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 50MM (1.1/2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.05
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 50MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 5,47200
SubMO
12,14784
LS
6,67584

M
H
H
UN
M
L
L
Material
8,84628

08.13.005
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 60MM (2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.06
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 60MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 6,38400
LS
7,78848
SubMO
14,17248

M
H
0,70000
H
0,70000
UN
0,09000
M
1,40000
L
0,00220
L
0,00080
Material
13,20307

08.13.006
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 75MM (2.1/2") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.07
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 75MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 8,20800
LS
10,01376
SubMO
18,22176

M
H
0,90000
H
0,90000
UN
0,10000
M
1,40000
L
0,00310
L
0,00110
Material
20,89892

08.13.007
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 85MM (3") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.08
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
SubMO
20,24640
Mo-de-Obra 9,12000
LS
11,12640

M
H
1,00000
H
1,00000
UN
0,11000
M
1,30000
L
0,00350
L
0,00130
Material
24,22509

08.13.008
TUBO DE PVC RIGIDO JUNTA SOLDAVEL DN 110MM (4") INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.40
LIXA D"AGUA
6.25.09
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 110MM
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104

M
H
1,10000
H
1,10000
UN
0,12000
M
1,30000
L
0,00550
L
0,00230
Material
39,46516

08.13.011
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN20MM (3/4") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712

M
H
0,80000
H
0,80000
M
1,60000
UN
0,01120
Material
17,22118

08.13.012
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN25MM (1") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
6.95.53
FITA VEDANTE PARA ROSCA ROLO 1/2" X 50 M
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104

M
H
1,10000
H
1,10000
M
1,50000
UN
0,01440
Material
24,27281

08.13.013
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN32MM (1 1/4")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.04
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
SubMO
24,29568
Mo-de-Obra 10,94400
LS
13,35168

M
H
1,20000
H
1,20000
M
1,50000
UN
0,01800
Material
31,26564

Exerccio:

2011

Custo Unit.

Custo Total

BDI

5,05
4,07
0,72
4,93
27,29
20,29
4,05064

BDI

5,05
4,07
0,72
5,94
27,29
20,29
4,82865

BDI

5,05
4,07
0,72
9,33
27,29
20,29
6,29638

BDI

5,05
4,07
0,72
14,80
27,29
20,29
8,99776

BDI

5,05
4,07
0,72
18,48
27,29
20,29
10,22844

BDI

5,05
4,07
0,72
30,14
27,29
20,29
14,19933

BDI

5,05
4,07
10,74
3,32
7,68621

BDI

5,05
4,07
16,15
3,32
10,70509

BDI

5,05
4,07
20,79
4,48
12,77910

0,60000
0,60000
0,08000
1,40000
0,01680
0,00070

2,52500
2,03500
0,05040
7,39500
0,03275
0,01015

25,82
3,03000
2,44200
0,05760
8,31600
0,45847
0,01420

33,67
3,53500
2,84900
0,06480
13,06200
0,06004
0,01623

48,11
4,54500
3,66300
0,07200
20,72000
0,08460
0,02232

54,69
5,05000
4,07000
0,07920
24,02400
0,09552
0,02638

75,93
5,55500
4,47700
0,08640
39,18200
0,15010
0,04667

41,10
4,04000
3,25600
17,18400
0,03718

57,24
5,55500
4,47700
24,22500
0,04781

68,34
6,06000
4,88400
31,18500
0,08064

Pgina: 129

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

08.13.014
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN40MM (1 1/2") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.05
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

M
H
1,40000
H
1,40000
M
1,40000
UN
0,02260
Material
33,53325

08.13.015
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN50MM (2") - INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.06
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 14,59200
LS
17,80224
SubMO
32,39424

M
H
1,60000
H
1,60000
M
1,40000
UN
0,02720
Material
47,19546

08.13.016
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN65MM (2 1/2")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.07
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN65MM (2 1/2")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 16,41600
LS
20,02752
SubMO
36,44352

M
H
1,80000
H
1,80000
M
1,40000
UN
0,03380
Material
60,36857

08.13.017
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN80MM (3")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280

M
H
2,00000
H
2,00000
M
1,30000
UN
0,03840
Material
70,89423

08.13.018
TUBO ACO GALVANIZ NBR5580-CL MEDIA, DN100MM (4")-INCL CONEXOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.09
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN100MM (4")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 20,06400
LS
24,47808
SubMO
44,54208
08.13.099
SERVICOS EM RESERVATORIOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
08.14.002
REGISTRO DE GAVETA BRUTO DN 20MM (3/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.61
REGISTRO GAVETA AMARELO 3/4'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,92480
LS
6,00826
08.14.003
REGISTRO DE GAVETA BRUTO DN 25MM (1")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.62
REGISTRO GAVETA AMARELO 1'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,92480
LS
6,00826
08.14.004
REGISTRO DE GAVETA BRUTO DN 32MM (1 1/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.63
REGISTRO GAVETA AMARELO 1 1/4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 7,75200
LS
9,45744
08.14.005
REGISTRO DE GAVETA BRUTO DN 40MM (1.1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.64
REGISTRO GAVETA AMARELO 1 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 7,75200
LS
9,45744
08.14.006
REGISTRO DE GAVETA BRUTO DN 50MM (2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.65
REGISTRO GAVETA AMARELO 2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 7,75200
LS
9,45744

Exerccio:

2011

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

Custo Unit.

Custo Total
76,11
7,07000
5,69800
33,43200
0,10125

BDI

5,05
4,07
23,88
4,48
14,23199

BDI

5,05
4,07
33,59
6,23
18,30563

BDI

5,05
4,07
42,97
6,23
22,26678

BDI

5,05
4,07
54,35
6,23
25,61902

M
H
2,20000
H
2,20000
M
1,30000
UN
0,04960
Material
102,22901

BDI

180,52
5,05
11,11000
4,07
8,95400
78,40
101,92000
6,23
0,30901
33,75735

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

10,93306

UN
H
0,54000
H
0,54000
UN
1,00000
UN
0,01880
Material
19,21422

10,93306

UN
H
0,54000
H
0,54000
UN
1,00000
UN
0,02400
Material
28,16752

17,20944

UN
H
0,85000
H
0,85000
UN
1,00000
UN
0,03000
Material
36,63690

17,20944

UN
H
0,85000
H
0,85000
UN
1,00000
UN
0,03760
Material
49,22425

17,20944

UN
H
0,85000
H
0,85000
UN
1,00000
UN
0,04520
Material
68,08160

BDI

5,05
4,07
19,13
4,48
6,93387

BDI

5,05
4,07
28,06
4,48
8,99313

BDI

5,05
4,07
36,45
6,23
12,38466

BDI

5,05
4,07
48,99
6,23
15,27975

BDI

5,05
4,07
67,80
6,23
19,61694

97,89
8,08000
6,51200
47,02600
0,16946

119,07
9,09000
7,32600
60,15800
0,21057

137,00
10,10000
8,14000
70,65500
0,23923

37,08
2,72700
2,19780
19,13000
0,08422

48,09
2,72700
2,19780
28,06000
0,10752

66,23
4,29250
3,45950
36,45000
0,18690

81,71
4,29250
3,45950
48,99000
0,23425

104,90
4,29250
3,45950
67,80000
0,28160

Pgina: 130

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

08.14.007
REGISTRO DE GAVETA BRUTO DN 65MM (2.1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.66
REGISTRO GAVETA AMARELO 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536

UN Coeficiente

Custo Unit.

Custo Total

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,05640
Material
179,09137

248,92
5,05
5,80750
4,07
4,68050
178,74
178,74000
6,23
0,35137
BDI
46,54619

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,06400
Material
280,31872

373,43
5,05
5,80750
4,07
4,68050
279,92
279,92000
6,23
0,39872
BDI
69,82848

29,96467

UN
H
1,48000
H
1,48000
UN
1,00000
UN
0,08280
Material
470,67584

615,78
5,05
7,47400
4,07
6,02360
470,16
470,16000
6,23
0,51584
BDI
115,14732

15,18480

UN
H
0,75000
H
0,75000
UN
1,00000
UN
0,01000
Material
47,25480

08.14.017
VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 1.1/4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.18
VALVULA RET HORIZ BRONZE 1 1/4'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 8,20800
LS
10,01376
SubMO
18,22176

UN
H
0,90000
H
0,90000
UN
1,00000
UN
0,01200
Material
65,60376

08.14.018
VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 1.1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.19
VALVULA RET HORIZ BRONZE 1 1/2'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640

UN
H
1,00000
H
1,00000
UN
1,00000
UN
0,01500
Material
74,80720

08.14.019
VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.20
VALVULA RET HORIZ BRONZE 2'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 11,40000
LS
13,90800
SubMO

25,30800

UN
H
1,25000
H
1,25000
UN
1,00000
UN
0,01920
Material
108,94602

165,13
5,05
6,31250
4,07
5,08750
108,86
108,86000
4,48
0,08602
BDI
30,87842

08.14.020
VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 2.1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.21
VALVULA RET HORIZ BRONZE 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
SubMO
23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,02400
Material
182,97952

253,70
5,05
5,80750
4,07
4,68050
182,83
182,83000
6,23
0,14952
BDI
47,44046

08.14.021
VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 3"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.22
VALVULA RET HORIZ BRONZE 3'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
SubMO

23,28336

UN
H
1,15000
H
1,15000
UN
1,00000
UN
0,02880
Material
211,54942

288,84
5,05
5,80750
4,07
4,68050
211,37
211,37000
6,23
0,17942
BDI
54,01154

29,96467

UN
H
1,48000
H
1,48000
UN
1,00000
UN
0,03840
Material
379,15923

503,22
5,05
7,47400
4,07
6,02360
378,92
378,92000
6,23
0,23923
BDI
94,09850

08.14.008
REGISTRO DE GAVETA BRUTO DN 80MM (3")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.67
REGISTRO GAVETA AMARELO 3'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 10,48800
LS
12,79536
08.14.009
REGISTRO DE GAVETA BRUTO DN 100MM (4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.35.69
REGISTRO GAVETA AMARELO 4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 13,49760
LS
16,46707

SubMO

SubMO

SubMO

08.14.016
VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 1"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.17
VALVULA RET HORIZ BRONZE 1'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 6,84000
LS
8,34480
SubMO

08.14.022
VALVULA DE RETENCAO HORIZONTAL DE BRONZE DE 4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.23
VALVULA RET HORIZ BRONZE 4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
SubMO
Mo-de-Obra 13,49760
LS
16,46707
08.14.026
1.01.18
1.01.19
6.40.61
Exerccio:

VALVULA DE RETENCAO VERTICAL DE BRONZE DE 1"


ENCANADOR
AJUDANTE DE ENCANADOR
VALVULA RET VERT BRONZE 1'

2011

UN
H
H
UN

0,75000
0,75000
1,00000

BDI

5,05
4,07
47,21
4,48
14,36111

BDI

5,05
4,07
65,55
4,48
19,27987

BDI

5,05
4,07
74,74
4,48
21,86233

5,05
4,07
30,28

76,80
3,78750
3,05250
47,21000
0,04480

103,10
4,54500
3,66300
65,55000
0,05376

116,91
5,05000
4,07000
74,74000
0,06720

55,97
3,78750
3,05250
30,28000
Pgina: 131

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 6,84000
LS
8,34480

UN Coeficiente

Custo Total

BDI

4,48
10,46721

BDI

5,05
4,07
41,84
4,48
13,82657

BDI

5,05
4,07
54,49
4,48
17,20483

25,30800

UN
H
1,25000
H
1,25000
UN
1,00000
UN
0,01920
Material
78,86602

BDI

5,05
4,07
78,78
4,48
23,96002

30,36960

UN
H
1,50000
H
1,50000
UN
1,00000
UN
0,02400
Material
130,68952

198,10
5,05
7,57500
4,07
6,10500
130,54
130,54000
6,23
0,14952
BDI
37,04360

40,49280

UN
H
2,00000
H
2,00000
UN
1,00000
UN
0,02880
Material
183,21942

275,16
5,05
10,10000
4,07
8,14000
183,04
183,04000
6,23
0,17942
BDI
51,45381

40,49280

UN
H
2,00000
H
2,00000
UN
1,00000
UN
0,03840
Material
307,13923

427,58
5,05
10,10000
4,07
8,14000
306,90
306,90000
6,23
0,23923
BDI
79,95537

08.14.035
VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 1"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.27
VALVULA RET PE C/CRIVO BRONZE 1'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
SubMO
15,18480
Mo-de-Obra 6,84000
LS
8,34480

UN
H
0,75000
H
0,75000
UN
1,00000
UN
0,00480
Material
28,41150

08.14.036
VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 1.1/4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.28
VALVULA RET PE C/CRIVO BRONZE 1 1/4'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640

UN
H
1,00000
H
1,00000
UN
1,00000
UN
0,00600
Material
40,27688

08.14.037
VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 1.1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.29
VALVULA RET PE C/CRIVO BRONZE 1 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640

UN
H
1,00000
H
1,00000
UN
1,00000
UN
0,00800
Material
49,77984

08.14.038
VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.30
VALVULA RET PE C/CRIVO BRONZE 2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 11,40000
SubMO
25,30800
LS
13,90800

UN
H
1,25000
H
1,25000
UN
1,00000
UN
0,01000
Material
69,61230

SubMO

08.14.027
VALVULA DE RETENCAO VERTICAL DE BRONZE DE 1.1/4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.62
VALVULA RET VERT BRONZE 1 1/4'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 8,20800
LS
10,01376
SubMO
08.14.028
VALVULA DE RETENCAO VERTICAL DE BRONZE DE 1.1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.63
VALVULA RET VERT BRONZE 1 1/2'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 9,12000
LS
11,12640
SubMO
08.14.029
VALVULA DE RETENCAO VERTICAL DE BRONZE DE 2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.64
VALVULA RET VERT BRONZE 2'
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 11,40000
LS
13,90800
SubMO
08.14.030
VALVULA DE RETENCAO VERTICAL DE BRONZE DE 2.1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.65
VALVULA RET VERT BRONZE 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 13,68000
LS
16,68960
SubMO
08.14.031
VALVULA DE RETENCAO VERTICAL DE BRONZE DE 3"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.66
VALVULA RET VERT BRONZE 3'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
SubMO
Mo-de-Obra 18,24000
LS
22,25280
08.14.032
VALVULA DE RETENCAO VERTICAL DE BRONZE DE 4"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.68
VALVULA RET VERT BRONZE 4'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 18,24000
LS
22,25280
SubMO

08.14.039
Exerccio:

15,18480

Material

18,22176

UN
H
0,90000
H
0,90000
UN
1,00000
UN
0,01200
Material
41,89376

20,24640

UN
H
1,00000
H
1,00000
UN
1,00000
UN
0,01500
Material
54,55720

VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 2.1/2"

2011

UN
0,01000
30,32480

Custo Unit.

UN

BDI

5,05
4,07
28,39
4,48
10,02715

BDI

5,05
4,07
40,25
4,48
13,92035

BDI

5,05
4,07
49,73
6,23
16,10604

BDI

5,05
4,07
69,55
6,23
21,83167

0,04480

73,94
4,54500
3,66300
41,84000
0,05376

92,00
5,05000
4,07000
54,49000
0,06720

128,13
6,31250
5,08750
78,78000
0,08602

53,62
3,78750
3,05250
28,39000
0,02150

74,44
5,05000
4,07000
40,25000
0,02688

86,13
5,05000
4,07000
49,73000
0,04984

116,75
6,31250
5,08750
69,55000
0,06230

180,38
Pgina: 132

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.31
VALVULA RET PE C/CRIVO BRONZE 2 1/2'
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 13,68000
LS
16,68960

UN Coeficiente

Custo Unit.

Custo Total

30,36960

H
1,50000
H
1,50000
UN
1,00000
UN
0,01200
Material
116,28476

5,05
7,57500
4,07
6,10500
116,21
116,21000
6,23
0,07476
BDI
33,73050

08.14.040
VALVULA DE RETENCAO DE PE COM CRIVO DE BRONZE DE 3"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.32
VALVULA RET PE C/CRIVO BRONZE 3"
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 13,68000
SubMO
30,36960
LS
16,68960

UN
H
1,50000
H
1,50000
UN
1,00000
UN
0,02000
Material
166,66460

242,35
5,05
7,57500
4,07
6,10500
166,54
166,54000
6,23
0,12460
BDI
45,31787

08.14.045
TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 20MM (3/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.15
TORN.DE BOIA EM LATAO(BOIA PLAST)DN 20MM (3/4")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 2,73600
LS
3,33792
SubMO
6,07392

UN
H
0,30000
H
0,30000
UN
1,00000
UN
0,01120
Material
34,24018

08.14.046
TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 25MM (1")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.16
TORN.DE BOIA EM LATAO (BOIA PLAST)DN 25MM (1")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 3,64800
LS
4,45056
SubMO

8,09856

UN
H
0,40000
H
0,40000
UN
1,00000
UN
0,01880
Material
42,09422

08.14.047
TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 32MM (1 1/4")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.22
TORN.DE BOIA EM LATAO (BOIA PLAST)DN 32MM (1 1/4")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,10400
LS
5,00688
SubMO
9,11088

UN
H
0,45000
H
0,45000
UN
1,00000
UN
0,02400
Material
61,02752

08.14.048
TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN 40MM (1 1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.17
TORN.DE BOIA EM LATAO (BOIA PLAST)DN 40MM (1 1/2")
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,56000
LS
5,56320
SubMO
10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
UN
0,03000
Material
73,83440

08.14.049
TORNEIRA DE BOIA EM LATAO (BOIA PLAST) DN50MM (2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.18
TORNEIRA DE BOIA EM LATAO (BOIA PLAST)50MM (2")
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 5,47200
LS
6,67584
SubMO

SubMO

49,58
1,51500
1,22100
34,19000
0,05018

BDI

5,05
4,07
34,19
4,48
9,27224

BDI

5,05
4,07
42,01
4,48
11,54434

BDI

5,05
4,07
60,92
4,48
16,13183

BDI

5,05
4,07
73,70
4,48
19,31025

UN
H
0,60000
H
0,60000
UN
1,00000
UN
0,03000
Material
88,12690

BDI

5,05
4,07
87,94
6,23
23,06319

08.14.050
RA-01 RESERVATORIO METALICO ACOPLADO 23M3 H=13,00M
6.51.11
RA-01 RESERVATORIO MET. ACOPLADO 23M3 FORN/INST
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

UN
UN
1,00000
Material
52.058,43000

64.031,86
52.058,43
52.058,43000
BDI
11.973,43890

08.14.051
RA-02 RESERVATORIO METALICO ACOPLADO 30M3 H=13,00M
6.51.12
RA-02 RESERVATORIO MET. ACOPLADO 30M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
54.929,80000

67.563,65
54.929,80
54.929,80000
BDI
12.633,85400

08.14.052
RA-03 RESERVATORIO METALICO ACOPLADO 40M3 H=13,00M
6.51.13
RA-03 RESERVATORIO MET. ACOPLADO 40M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
57.718,10000

70.993,26
57.718,10
57.718,10000
BDI
13.275,16300

08.14.054
RA-04 RESERVATORIO METALICO ACOPLADO 23M3 H=10,00M
6.51.14
RA-04 RESERVATORIO MET. ACOPLADO 23M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
43.870,15000

53.960,28
43.870,15
43.870,15000
BDI
10.090,13450

08.14.056
RA-05 RESERVATORIO METALICO ACOPLADO 28M3 H=10,00M
6.51.15
RA-05 RESERVATORIO MET. ACOPLADO 28M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
46.931,63000

57.725,90
46.931,63
46.931,63000
BDI
10.794,27490

08.14.058
RA-06 RESERVATORIO METALICO ACOPLADO 35M3 H=10,00M
6.51.16
RA-06 RESERVATORIO MET. ACOPLADO 35M3 FORN/INST
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

UN
UN
1,00000
Material
50.055,30000

61.568,01
50.055,30
50.055,30000
BDI
11.512,71900

08.14.059
6.51.17
Exerccio:

RA-07 RESERVATORIO METALICO ACOPLADO 23M3 H=7,00M


RA-07 RESERVATORIO MET. ACOPLADO 23M3 FORN/INST

2011

12,14784

UN
UN

1,00000

35.237,80

61,73
2,02000
1,62800
42,01000
0,08422

86,27
2,27250
1,83150
60,92000
0,10752

103,26
2,52500
2,03500
73,70000
0,13440

123,33
3,03000
2,44200
87,94000
0,18690

43.342,49
35.237,80000
Pgina: 133

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente
SubMO

0,00000

Material

35.237,80000

Custo Unit.
BDI

Custo Total

8.104,69400

08.14.060
RA-08 RESERVATORIO METALICO ACOPLADO 28M3 H=7,00M
6.51.18
RA-08 RESERVATORIO MET. ACOPLADO 28M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
38.248,70000

47.045,90
38.248,70
38.248,70000
BDI
8.797,20100

08.14.061
RA-09 RESERVATORIO METALICO ACOPLADO 40M3 H=7,00M
6.51.19
RA-09 RESERVATORIO MET. ACOPLADO 40M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
41.381,58000

50.899,34
41.381,58
41.381,58000
BDI
9.517,76340

08.14.062
ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=3,00M
M
6.02.12
ANEIS PRE-MOLD RES.CONCR ARM. 3,00X0,50M FORN/MONT
UN
2,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
5.120,00000

6.297,60
2.560,00
5.120,00000
BDI
1.177,60000

08.14.063
LAJE PRE-MOLDADA D=3,00M E=8CM P/ RESERVATORIO
2.20.80
LAJE PRE-MOLD D=3,00M E=08CM P/ RESERV FORN E MONT
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

UN
UN
1,00000
Material
960,00000

1.180,80
960,00
960,00000
BDI
220,80000

0,00000

UN
UN
1,00000
Material
1.480,00000

1.820,40
1.480,00
1.480,00000
BDI
340,40000

0,00000

UN
UN
1,00000
Material
15.926,10000

19.589,10
15.926,10
15.926,10000
BDI
3.663,00300

0,00000

UN
UN
1,00000
Material
19.537,55000

24.031,18
19.537,55
19.537,55000
BDI
4.493,63650

0,00000

UN
UN
1,00000
Material
21.922,95000

26.965,22
21.922,95
21.922,95000
BDI
5.042,27850

0,00000

UN
UN
1,00000
Material
24.991,30000

30.739,29
24.991,30
24.991,30000
BDI
5.747,99900

0,00000

UN
UN
1,00000
Material
27.992,58000

34.430,87
27.992,58
27.992,58000
BDI
6.438,29340

0,00000

UN
UN
1,00000
Material
30.052,40000

36.964,45
30.052,40
30.052,40000
BDI
6.912,05200

08.14.071
CONJ MOTOR-BOMBA (CENTRIFUGA) 1/2 HP (3400 L/H-20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.51
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1/2 HP TRIF
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
535,00000

745,21
5,05
17,67500
4,07
14,24500
535,00
535,00000
BDI
139,34835

08.14.072
CONJ MOTOR-BOMBA(CENTRIFUGA)3/4 HP(7400 L/H-20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.52
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 3/4 HP TRIF
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
622,41000

852,72
5,05
17,67500
4,07
14,24500
622,41
622,41000
BDI
159,45265

08.14.073
CONJ MOTOR-BOMBA(CENTRIFUGA)1,5 HP(10000 L/H-20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.59
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1 1/2 HP TRIF
Mo-de-Obra 31,92000
LS
38,94240
SubMO
70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
813,70000

1.088,01
5,05
17,67500
4,07
14,24500
813,70
813,70000
BDI
203,44935

08.14.074
CONJ MOTOR-BOMBA (CENTRIFUGA) 2 HP (13900 L/H-20 MCA)
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.54
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 2 HP TRIF
SubMO
70,86240
Mo-de-Obra 31,92000
LS
38,94240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
1.017,97000

1.339,26
5,05
17,67500
4,07
14,24500
1.017,97
1.017,97000
BDI
250,43145

08.14.064
LAJE PRE-MOLDADA D=3,00M E=15CM P/ RESERVATORIO
2.20.81
LAJE PRE-MOLD D=3,00M E=15CM P/ RESERV FORN E MONT
SubMO
Mo-de-Obra 0,00000
LS
0,00000
08.14.065
RA-10 RESERVATORIO METALICO INFERIOR 9M3
6.51.20
RA-10 RESERVATORIO MET. INFERIOR 9M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
08.14.066
RA-11 RESERVATORIO METALICO INFERIOR 13M3
6.51.21
RA-11 RESERVATORIO MET. INFERIOR 13M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
08.14.067
RA-12 RESERVATORIO METALICO INFERIOR 17M3
6.51.22
RA-12 RESERVATORIO MET. INFERIOR 17M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
08.14.068
RA-13 RESERVATORIO METALICO SUPERIOR 10M3 H=5,00M
6.51.23
RA-13 RESERVATORIO MET. SUPERIOR 10M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
08.14.069
RA-14 RESERVATORIO METALICO SUPERIOR 15M3 H=5,00M
6.51.24
RA-14 RESERVATORIO MET. SUPERIOR 15M3 FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
08.14.070
RA-15 RESERVATORIO METALICO SUPERIOR 20M3 H=5,00M
6.51.25
RA-15 RESERVATORIO MET. SUPERIOR 20M3 FORN/INST
Mo-de-Obra 0,00000
SubMO
LS
0,00000

08.14.075
1.01.18
1.01.19
Exerccio:

CONJ MOTOR-BOMBA(CENTRIFUGA)3 HP(25000 L/H-20 MCA)


ENCANADOR
AJUDANTE DE ENCANADOR

2011

UN
H
H

3,50000
3,50000

5,05
4,07

1.440,00
17,67500
14,24500
Pgina: 134

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

6.65.55
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 3 HP TRIF
SubMO
Mo-de-Obra 31,92000
LS
38,94240

Custo Unit.

Custo Total

70,86240

Material

UN
1,00000
1.099,87000

1.099,87
1.099,87000
BDI
269,26845

70,86240

UN
H
3,50000
H
3,50000
UN
1,00000
Material
688,57000

934,10
5,05
17,67500
4,07
14,24500
688,57
688,57000
BDI
174,66945

08.14.085
ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=2,50M
M
6.01.83
ANEIS PRE-MOLD RES.CONCR ARM. 2,50X0,50M FORN/MONT
UN
2,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
3.460,00000

4.255,80
1.730,00
3.460,00000
BDI
795,80000

08.14.086
LAJE PRE-MOLDADA D=2,50M E=8CM P/ RESERVATORIO
2.20.76
LAJE PRE-MOLD D=2,50M E=8CM P/RESERV FORN/MONT
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

UN
UN
1,00000
Material
840,00000

1.033,20
840,00
840,00000
BDI
193,20000

0,00000

UN
UN
1,00000
Material
1.270,00000

1.562,10
1.270,00
1.270,00000
BDI
292,10000

08.14.088
ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=2,12M
M
6.01.81
ANEIS PRE-MOLD RES.CONCR ARM. 2,12X0,50M FORN/MONT
UN
2,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
2.500,00000

3.075,00
1.250,00
2.500,00000
BDI
575,00000

08.14.089
LAJE PRE-MOLDADA D=2,12M E=8CM P/ RESERVATORIO
2.20.74
LAJE PRE-MOLD D=2,12M E=8CM P/RESERV FORN/MONT
SubMO
Mo-de-Obra 0,00000
LS
0,00000

0,00000

UN
UN
1,00000
Material
740,00000

910,20
740,00
740,00000
BDI
170,20000

0,00000

UN
UN
1,00000
Material
1.130,00000

1.389,90
1.130,00
1.130,00000
BDI
259,90000

08.14.091
ANEIS PRE-MOLDADOS EM CONCRETO ARMADO P/ RESERVATORIO D'AGUA D=1,80M
M
6.01.80
ANEIS PRE-MOLD RES.CONCR ARM. 1,80X0,50M FORN/MONT
UN
2,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
1.920,00000

2.361,60
960,00
1.920,00000
BDI
441,60000

08.14.092
LAJE PRE-MOLDADA D=1,80M E=6CM P/ RESERVATORIO
2.20.71
LAJE PRE-MOLD D=1,80 E=6CM P/RESERV FORN/MONT
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

UN
UN
1,00000
Material
660,00000

811,80
660,00
660,00000
BDI
151,80000

0,00000

UN
UN
1,00000
Material
1.010,00000

1.242,30
1.010,00
1.010,00000
BDI
232,30000

58,56360

UN
H
2,00000
H
4,00000
UN
2,00000
UN
4,00000
UN
2,00000
UN
1,00000
UN
0,12000
Material
234,53760

360,51
5,05
10,10000
4,07
16,28000
6,87
13,74000
8,87
35,48000
19,14
38,28000
146,29
146,29000
6,23
0,74760
BDI
67,41328

76,63440

UN
H
2,00000
H
6,00000
UN
2,00000
UN
4,00000
UN
2,00000
UN
1,00000
UN
0,12000
Material
281,83760

440,92
5,05
10,10000
4,07
24,42000
6,87
13,74000
8,87
35,48000
19,14
38,28000
193,59
193,59000
6,23
0,74760
BDI
82,44856

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.14.078
CONJ MOTOR-BOMBA (CENTRIFUGA) 1 HP 8500 L/H-20 MCA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.53
CONJUNTO MOTORBOMBA CENTRIFUGO COMPL 1 HP TRIF
Mo-de-Obra 31,92000
LS
38,94240
SubMO

08.14.087
LAJE PRE-MOLDADA D=2,50M E=15CM P/ RESERVATORIO
2.20.75
LAJE PRE-MOLD D=2,50M E=15CM P/RESERV FORN/MONT
Mo-de-Obra 0,00000
LS
0,00000
SubMO

08.14.090
LAJE PRE-MOLDADA D=2,12M E=15CM P/ RESERVATORIO
2.20.73
LAJE PRE-MOLD D=2,12M E=15CM P/RESERV FORN/MONT
Mo-de-Obra 0,00000
LS
0,00000
SubMO

08.14.093
LAJE PRE-MOLDADA D=1,80M E=12CM P/ RESERVATORIO
2.20.72
LAJE PRE-MOLD D=1,80M E=12CM P/RESERV FORN/MONT
SubMO
Mo-de-Obra 0,00000
LS
0,00000
08.14.096
CAIXA D`AGUA CONICA 500L POLIETILENO COM TAMPA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.03.59
FLANGE C/SEXTAVADO ACO GALVANIZADO 3/4"
6.03.60
FLANGE C/SEXTAVADO ACO GALVANIZADO 1"
6.03.63
FLANGE C/SEXTAVADO ACO GALVANIZADO 2"
6.50.20
CAIXA D'AGUA CONICA 500L POLIETILENO COM TAMPA
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 26,38000
LS
32,18360
SubMO
08.14.097
CAIXA D`AGUA CONICA 1000L POLIETILENO COM TAMPA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.03.59
FLANGE C/SEXTAVADO ACO GALVANIZADO 3/4"
6.03.60
FLANGE C/SEXTAVADO ACO GALVANIZADO 1"
6.03.63
FLANGE C/SEXTAVADO ACO GALVANIZADO 2"
6.50.21
CAIXA D'AGUA CONICA 1000L POLIETILENO COM TAMPA
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
Mo-de-Obra 34,52000
LS
42,11440
SubMO
08.14.099
SERVICOS RESERVATORIOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
08.15.012
1.01.18
1.01.19
1.01.39
Exerccio:

0,00000

SubMO

LT-07 LAVATRIO COM TORNEIRA DE MESA (SANIT ADM)


ENCANADOR
AJUDANTE DE ENCANADOR
PEDREIRO

2011

M
H
H
H

1,68000
1,68000
2,61600

5,05
4,07
4,64

1.395,76
8,48400
6,83760
12,13824
Pgina: 135

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.66.17
CANTONEIRA 25X25CM FERRO "T" 1.1/4X1.1/4X1/8
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
2.80.70
TRAVA QUIMICA
3.50.36
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
3.50.39
GRANITO CINZA ANDORINHA E=2CM
3.80.90
MASSA PLASTICA, LATA 400 GR - IBERE
6.40.42
VALVULA ESCOAMENTO LATAO CROMADO DN 1"
6.45.03
SIFAO METALICO TIPO COPO DN 1X1 1/2"
6.55.44
CUBA OVAL DE LOUCA BRANCA
6.57.21
ESPELHO DE CRISTAL - ESP 6MM ADESIVADO
6.60.02
RESTRITOR DE VAZAO P/ 6L/MIN
6.60.60
TORNEIRA DE FECHAMENTO AUTOMATICA DE MESA
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
SubMO
Mo-de-Obra 35,30994
LS
43,07813
08.15.013
LT-04 LAVATORIO /BEBEDOURO COLETIVO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.38
PASTILHEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.82
ARGAMASSA QUARTZOLIT PARA PASTILHAS
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.34
CHAPA COMPENSADA PLASTIFICADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.70
TRAVA QUIMICA
3.20.26
PASTILHA ESMALTADA 5,0X 5,0 CM
3.75.02
TINTA ESMALTE
3.80.28
ZARCAO
6.05.04
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4")
6.40.03
VALVULA ESCOAMENTO LATAO CROMADO D=1.1/4"
6.60.62
TORNEIRA DE PAREDE ANTIVANDALISMO
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 85,69604
LS
104,54917
SubMO
08.15.014
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.40
1.01.46
2.05.03
2.05.08
2.05.09
2.05.30
2.10.09
2.10.21
2.10.34
2.15.38
2.67.60
2.70.10
2.80.05
3.80.05
3.80.11
Exerccio:

UN Coeficiente

Custo Total

78,38807

H
2,05500
M3
0,00250
KG
1,50000
KG
1,26600
UN
1,67000
CJ
6,68000
UN
0,06680
GR
0,84000
M2
0,68000
M2
0,22000
UN
1,67000
UN
1,67000
UN
1,67000
UN
1,67000
M2
0,74000
UN
1,67000
UN
1,67000
UN
0,00640
Material
1.056,37862

3,82
80,46
0,37
1,04
2,52
0,14
11,95
1,68
465,15
261,73
5,88
13,97
49,52
37,50
157,00
30,74
195,84
4,48
BDI
260,99634

190,24520

M
H
4,14000
H
4,14000
H
1,69500
H
1,69500
H
0,72000
H
0,72000
H
2,13000
H
0,66000
H
0,24000
H
0,24000
H
3,13590
M3
0,00200
KG
1,03000
M3
0,02320
KG
8,25000
KG
1,25000
M
0,83000
M2
0,13800
M2
0,37000
KG
5,52000
KG
0,27600
KG
0,09600
GR
0,84000
M2
1,65000
L
0,00600
L
0,00400
M
0,52000
UN
0,55000
UN
1,67000
UN
0,00640
Material
711,07955

4,60
3,96
5,05
4,07
4,77
3,82
5,41
4,64
4,74
3,80
3,82
80,46
0,37
241,38
1,58
1,65
3,78
17,18
18,04
2,70
4,67
4,87
1,68
79,06
10,12
15,96
20,79
21,84
303,09
4,48
BDI
207,30469

LT-05 LAVATORIO COLETIVO C/ TAMPO DE CONCRETO L=50CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
SERVENTE
AREIA
CIMENTO
CIMENTO BRANCO
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
PONTALETE PINHO DE 3"X3"
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA PLASTIFICADA E=12MM
ACO CA-60-B $MD BITOLAS
PREGO
ARAME RECOZIDO N.18
COLA PVA
DISCO DE DESBASTE 7"
LIXA CARBETO DE SILICIO 7"

2011

Custo Unit.

M
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
M2
KG
KG
KG
KG
UN
UN

2,95500
2,95500
1,38800
1,38800
0,43300
0,43300
2,11600
0,47400
1,55500
0,00200
1,03000
0,12660
0,02430
0,83000
0,26400
0,34800
4,98300
0,21100
0,08700
0,08440
0,03380
0,14350

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,74
3,82
80,46
0,37
1,04
234,95
3,78
17,18
18,04
2,70
4,67
4,87
6,21
8,90
2,88

7,85010
0,20115
0,55500
1,31664
4,20840
0,93520
0,79826
1,41120
316,30200
57,58060
9,81960
23,32990
82,69840
62,62500
116,18000
51,33580
327,05280
0,02867

1.108,62
19,04400
16,39440
8,55975
6,89865
3,43440
2,75040
11,52330
3,06240
1,13760
0,91200
11,97914
0,16092
0,38110
5,60002
13,03500
2,06250
3,13740
2,37084
6,67480
14,90400
1,28892
0,46752
1,41120
130,44900
0,06072
0,06384
10,81080
12,01200
506,16030
0,02867

581,70
13,59300
11,70180
7,00940
5,64916
2,06541
1,65406
9,81824
2,24676
5,94010
0,16092
0,38110
0,13166
5,70929
3,13740
4,53552
6,27792
13,45410
0,98537
0,42369
0,52412
0,30082
0,41328
Pgina: 136

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
3.80.90
MASSA PLASTICA, LATA 400 GR - IBERE
6.40.42
VALVULA ESCOAMENTO LATAO CROMADO DN 1"
6.45.03
SIFAO METALICO TIPO COPO DN 1X1 1/2"
6.55.44
CUBA OVAL DE LOUCA BRANCA
6.60.59
TORNEIRA DE PRESSAO CROMADA C=15A20 CM DE 1/2"
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
SubMO
Mo-de-Obra 59,67793
LS
72,80708

UN Coeficiente

Custo Unit.

Custo Total

L
0,12660
L
0,21100
UN
1,67000
UN
1,67000
UN
1,67000
UN
1,67000
UN
1,67000
UN
0,00640
Material
340,44867

BDI

08.15.015
LT-06 LAVATORIO COLETIVO C/ TAMPO DE GRANITO L=50CM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.66.17
CANTONEIRA 25X25CM FERRO "T" 1.1/4X1.1/4X1/8
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
2.80.70
TRAVA QUIMICA
3.50.36
GRANITO CINZA ANDORINHA E=2CM C/ RECORTE P/ CUBA
3.80.90
MASSA PLASTICA, LATA 400 GR - IBERE
6.40.42
VALVULA ESCOAMENTO LATAO CROMADO DN 1"
6.45.03
SIFAO METALICO TIPO COPO DN 1X1 1/2"
6.55.44
CUBA OVAL DE LOUCA BRANCA
6.60.02
RESTRITOR DE VAZAO P/ 6L/MIN
6.60.62
TORNEIRA DE PAREDE ANTIVANDALISMO
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 28,34394
LS
34,57961
SubMO
62,92355

M
H
1,38000
H
1,38000
H
2,11600
H
1,55500
M3
0,00200
KG
1,03000
KG
1,26600
UN
1,67000
CJ
6,68000
UN
0,06680
GR
0,84000
M2
0,58060
UN
1,67000
UN
1,67000
UN
1,67000
UN
1,67000
UN
1,67000
UN
1,67000
UN
0,00640
Material
1.015,27548

5,05
4,07
4,64
3,82
80,46
0,37
1,04
2,52
0,14
11,95
1,68
465,15
5,88
13,97
49,52
37,50
30,74
303,09
4,48
BDI
247,98578

08.15.016
BB-01 BEBEDOURO COLETIVO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.38
PASTILHEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.82
ARGAMASSA QUARTZOLIT PARA PASTILHAS
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.34
CHAPA COMPENSADA PLASTIFICADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.20.26
PASTILHA ESMALTADA 5,0X 5,0 CM
3.75.02
TINTA ESMALTE
3.80.28
ZARCAO
6.05.04
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4")
6.40.03
VALVULA ESCOAMENTO LATAO CROMADO D=1.1/4"
6.60.40
TORNEIRA P/ BEBEDOURO DE PRESSAO TIPO JATO
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 82,86255
LS
101,09231
SubMO

M
H
4,14000
H
4,14000
H
2,25000
H
2,25000
H
0,72000
H
0,72000
H
1,27500
H
0,66000
H
0,24000
H
0,24000
H
2,28000
M3
0,00200
KG
1,03000
M3
0,02220
KG
4,92000
KG
0,74500
M
0,49460
M2
0,08220
M2
0,54200
KG
5,28200
KG
0,40400
KG
0,14000
M2
0,98330
L
0,01330
L
0,00880
M
0,88880
UN
2,22220
UN
2,22220
UN
0,01420
Material
220,12635

4,60
3,96
5,05
4,07
4,77
3,82
5,41
4,64
4,74
3,80
3,82
80,46
0,37
241,38
1,58
1,65
3,78
17,18
18,04
2,70
4,67
4,87
79,06
10,12
15,96
20,79
21,84
13,61
4,48
BDI
92,93868

08.15.023
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
Exerccio:

MT-04 MICTORIO COLETIVO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA

2011

132,48501

183,95486

M
H
H
H
H
H
H
H
H
M3
KG

1,24000
1,24000
2,30000
2,30000
0,25000
0,25000
1,00000
1,95200
0,05100
0,96600

11,49
20,07
5,88
13,97
49,52
37,50
71,75
4,48
108,77475

4,60
3,96
5,05
4,07
4,77
3,82
4,64
3,82
80,46
0,35

1,45463
4,23477
9,81960
23,32990
82,69840
62,62500
119,82250
0,02867

1.326,18
6,96900
5,61660
9,81824
5,94010
0,16092
0,38110
1,31664
4,20840
0,93520
0,79826
1,41120
270,06609
9,81960
23,32990
82,69840
62,62500
51,33580
506,16030
0,02867

497,01
19,04400
16,39440
11,36250
9,15750
3,43440
2,75040
6,89775
3,06240
1,13760
0,91200
8,70960
0,16092
0,38110
5,35864
7,77360
1,22925
1,86959
1,41220
9,77768
14,26140
1,88668
0,68180
77,73970
0,13460
0,14045
18,47815
48,53285
30,24414
0,06362

1.143,67
5,70400
4,91040
11,61500
9,36100
1,19250
0,95500
4,64000
7,45664
4,10346
0,33810
Pgina: 137

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.34
CHAPA COMPENSADA PLASTIFICADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.35.27
DIVISORIA SANITARIA DE GRANILITE E=3CM
2.67.60
PREGO
2.80.70
TRAVA QUIMICA
3.10.55
FIXACAO (FERRO TRABALHADO)
3.50.39
GRANITO CINZA ANDORINHA E=2CM
6.25.01
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM
6.40.15
VALVULA DE DESCARGA P/ MICTORIO CICLO FECH AUTOMAT
6.45.03
SIFAO METALICO TIPO COPO DN 1X1 1/2"
6.55.65
MICTORIO ACO INOXIDAVEL
6.60.02
RESTRITOR DE VAZAO P/ 6L/MIN
SubMO
101,75268
Mo-de-Obra 45,83454
LS
55,91814

KG
22,22000
M3
0,01400
M
1,86000
M2
0,06200
M2
0,20460
KG
2,83000
M2
0,42000
KG
0,12400
GR
0,50000
KG
1,52000
M2
0,33000
M
1,20000
UN
0,55550
UN
0,55550
M
1,00000
UN
0,55550
Material
828,06518

0,37
62,03
3,78
17,18
18,04
2,69
95,86
4,67
1,68
43,56
261,73
1,30
167,70
49,52
461,57
30,74
BDI
213,85811

08.15.099
SERVICOS EM BEBEDOUROS,LAVATORIOS E MICTORIOS PADRONIZADOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.16.001
BACIA SIFONADA DE LOUCA BRANCA (VDR 6L) C/ ASSENTO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.70.43
MASSA PARA VIDRO
6.55.02
BACIA SIFONADA LOUCA BRANCA
6.60.53
TUBO LIGACAO C/CANOPLA P/SANITARIOS
6.60.56
CONJUNTO DE FIXACAO CROMADO P/ BACIAS
6.95.03
BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA
6.95.50
TAMPA PLASTICA P/BACIA SANITARIA
6.95.55
ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA
SubMO
60,73920
Mo-de-Obra 27,36000
LS
33,37920

UN
H
3,00000
H
3,00000
KG
0,25000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
113,81500

BDI

08.16.004
BACIA SIFONADA COM CAIXA DE DESCARGA ACOPLADA BRANCA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.70.43
MASSA PARA VIDRO
6.55.55
BACIA C/CAIXA DESC. ACOPLADA BRANCA
6.60.56
CONJUNTO DE FIXACAO CROMADO P/ BACIAS
6.95.03
BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA
6.95.50
TAMPA PLASTICA P/BACIA SANITARIA
6.95.55
ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA
Mo-de-Obra 27,36000
LS
33,37920
SubMO
60,73920

UN
H
3,00000
H
3,00000
KG
0,25000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
240,91500

371,03
5,05
15,15000
4,07
12,21000
1,38
0,34500
213,31
213,31000
7,40
7,40000
1,76
1,76000
17,53
17,53000
0,57
0,57000
BDI
69,38047

LAVATORIO DE LOUCA BRANCA SEM COLUNA C/ TORNEIRA DE FECHAM


AUTOMATICO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.42
VALVULA ESCOAMENTO LATAO CROMADO DN 1"
6.45.03
SIFAO METALICO TIPO COPO DN 1X1 1/2"
6.55.09
LAVATORIO BRANCO SEM COLUNA 33X45CM
6.60.13
TUBO LIGACAO CROMADO C/CANOPLA
6.60.60
TORNEIRA DE FECHAMENTO AUTOMATICA DE MESA
Mo-de-Obra 22,80000
LS
27,81600
SubMO
50,61600

08.16.010

5,05
4,07
1,38
65,24
20,97
7,40
1,76
17,53
0,57
40,14747

UN

8,22140
0,86842
7,03080
1,06516
3,69098
7,61270
40,26120
0,57908
0,84000
66,21120
86,37090
1,56000
93,15735
27,50836
461,57000
17,07607

214,70
15,15000
12,21000
0,34500
65,24000
20,97000
7,40000
1,76000
17,53000
0,57000

458,71

H
2,50000
H
2,50000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
322,32000

5,05
12,62500
4,07
10,17500
13,97
13,97000
49,52
49,52000
42,02
42,02000
20,97
20,97000
195,84
195,84000
BDI
85,77528

08.16.025
MICTORIO DE LOUCA SIFONADO/AUTO ASPIRANTE BRANCO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.55.38
MICTORIO AUTO SIFONADO LOUCA BRANCA C/ KIT DE INST
Mo-de-Obra 22,80000
LS
27,81600
SubMO
50,61600

UN
H
2,50000
H
2,50000
UN
1,00000
Material
204,96000

314,35
5,05
12,62500
4,07
10,17500
204,96
204,96000
BDI
58,78248

08.16.045
TANQUE DE LOUCA BRANCA,PEQUENO C/COLUNA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.04
VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2"
6.45.10
SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X2"
6.55.20
TANQUE LOUCA BRANCA,PEQUENO C/COLUNA (50X50CM)
6.60.31
TORNEIRA PRESSAO LATAO CROM 1/2" C/ AREJ P/ TANQUE
SubMO
Mo-de-Obra 27,36000
LS
33,37920

UN
H
3,00000
H
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
321,13000

469,69
5,05
15,15000
4,07
12,21000
24,82
24,82000
9,40
9,40000
240,81
240,81000
46,10
46,10000
BDI
87,82992

08.16.046
1.01.18
1.01.19
6.40.04
Exerccio:

TANQUE DE LOUCA BRANCA,GRANDE C/COLUNA


ENCANADOR
AJUDANTE DE ENCANADOR
VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2"

2011

60,73920

UN
H
H
UN

3,00000
3,00000
1,00000

5,05
4,07
24,82

587,48
15,15000
12,21000
24,82000
Pgina: 138

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

6.45.10
SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X2"
6.55.70
TANQUE DE LOUCA BRANCA,GRANDE C/COLUNA (55X60CM)
6.60.31
TORNEIRA PRESSAO LATAO CROM 1/2" C/ AREJ P/ TANQUE
SubMO
Mo-de-Obra 27,36000
LS
33,37920
08.16.050
SABONETEIRA DE LOUCA BRANCA DE 7,5X15 CM
1.01.06
AZULEJISTA
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.55.16
SABONETEIRA LOUCA BRANCA 7.5X15CM
Mo-de-Obra 9,19000
LS
11,21180
SubMO
08.16.051
SABONETEIRA DE LOUCA BRANCA DE 15X15 CM
1.01.06
AZULEJISTA
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.55.18
SABONETEIRA LOUCA BRANCA DIMENSAO APROX 15X15CM
Mo-de-Obra 9,19000
LS
11,21180
SubMO
08.16.065
PAPELEIRA DE LOUCA BRANCA DE 15X15CM
1.01.06
AZULEJISTA
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.55.14
PAPELEIRA LOUCA BRANCA
Mo-de-Obra 9,19000
LS
11,21180
08.16.070
CABIDE DE LOUCA BRANCA COM 2 GANCHOS
1.01.06
AZULEJISTA
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.55.07
CABIDE DE LOUCA C/2 GANCHOS BRANCO
Mo-de-Obra 9,19000
LS
11,21180
08.16.083
VA-01 VARAL/TOALHEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
3.13.39
VA-01 VARAL TOALHEIRO
Mo-de-Obra 3,38400
LS
4,12848

SubMO

SubMO

SubMO

Exerccio:

BR-02 LAVATORIO PARA SANITARIO ACESSIVEL


ENCANADOR
AJUDANTE DE ENCANADOR
PEDREIRO
SERVENTE

2011

Custo Total

60,73920

UN
1,00000
UN
1,00000
UN
1,00000
Material
416,89000

20,40180

UN
H
1,00000
H
1,00000
M3
0,00100
KG
1,00000
UN
1,00000
Material
12,69046

20,40180

UN
H
1,00000
H
1,00000
M3
0,00100
KG
1,00000
UN
1,00000
Material
15,41046

20,40180

UN
H
1,00000
H
1,00000
M3
0,00100
KG
1,00000
UN
1,00000
Material
14,65046

20,40180

UN
H
H
M3
KG
UN
Material
4,98046

7,51248

UN
H
0,40000
H
0,40000
UN
6,00000
UN
0,06000
UN
1,00000
Material
187,80440

240,23
4,64
1,85600
3,82
1,52800
0,50
3,00000
0,74
0,04440
184,76
184,76000
BDI
44,92288

CJ
H
4,50000
H
4,50000
H
0,75000
H
0,75000
M3
0,00500
KG
1,00000
UN
7,00000
UN
12,00000
UN
0,12000
UN
2,00000
KG
0,25000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,03760
UN
1,00000
UN
1,00000
Material
1.295,17035

5,05
4,07
4,64
3,82
80,46
0,37
0,22
0,50
0,74
269,04
1,38
5,91
121,06
275,48
14,20
144,11
20,97
7,40
1,76
6,23
156,65
0,57
BDI
322,08396

08.16.089
BR-01 BACIA P/ SANITARIO ACESSIVEL
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
3.13.35
BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE
3.70.43
MASSA PARA VIDRO
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.14
VALV DESCARGA REG 1 1/2"-1 1/4" C ACAB(BR01/BR003)
6.55.03
BACIA SANITARIA ACESSIVEL
6.55.14
PAPELEIRA LOUCA BRANCA
6.60.19
DUCHA HIGIENICA
6.60.53
TUBO LIGACAO C/CANOPLA P/SANITARIOS
6.60.56
CONJUNTO DE FIXACAO CROMADO P/ BACIAS
6.95.03
BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
6.95.54
ASSENTO C/TAMPA DE MADEIRA MDF-LAQ.OU RES.POL.BRANCA
6.95.55
ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA
Mo-de-Obra 47,38500
LS
57,80970
SubMO
105,19470
08.16.090
1.01.18
1.01.19
1.01.39
1.01.46

Custo Unit.

CJ
H
H
H
H

9,40
9,40000
336,57
336,57000
46,10
46,10000
BDI
109,85472

BDI

5,37
3,82
80,46
0,37
12,24
7,61122

BDI

5,37
3,82
80,46
0,37
14,96
8,23682

BDI

5,37
3,82
80,46
0,37
14,20
8,06202

BDI

5,37
3,82
80,46
0,37
4,53
5,83792

1,00000
1,00000
0,00100
1,00000
1,00000

2,50000
2,50000
1,00000
1,00000

5,05
4,07
4,64
3,82

40,70
5,37000
3,82000
0,08046
0,37000
12,24000

44,04
5,37000
3,82000
0,08046
0,37000
14,96000

43,11
5,37000
3,82000
0,08046
0,37000
14,20000

31,22
5,37000
3,82000
0,08046
0,37000
4,53000

1.722,44
22,72500
18,31500
3,48000
2,86500
0,40230
0,37000
1,54000
6,00000
0,08880
538,08000
0,34500
5,91000
121,06000
275,48000
14,20000
144,11000
20,97000
7,40000
1,76000
0,23425
156,65000
0,57000

1.438,04
12,62500
10,17500
4,64000
3,82000
Pgina: 139

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.80.70
TRAVA QUIMICA
3.13.36
BARRA APOIO P/LAVAT CROMADO D=30/35MM C/FLANGES
6.40.42
VALVULA ESCOAMENTO LATAO CROMADO DN 1"
6.45.16
SIFAO PVC RIGIDO TIPO COPO DN 1X1 1/2"
6.55.11
LAVATRIO ACESSVEL
6.60.02
RESTRITOR DE VAZAO P/ 6L/MIN
6.60.13
TUBO LIGACAO CROMADO C/CANOPLA
6.60.75
TORNEIRA PRES 1/2" C/ALAVANCA TIPO MESA CROMADO
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 31,26000
LS
38,13720
SubMO

UN Coeficiente

Custo Unit.

Custo Total

UN
12,00000
UN
0,12000
GR
0,50000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,00640
Material
1.099,74747

0,50
0,74
1,68
668,19
13,97
8,90
173,36
30,74
20,97
176,66
4,48
BDI
268,90328

08.16.091
BR-03 BOX PARA SANITARIO ACESSIVEL
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.80.70
TRAVA QUIMICA
3.13.35
BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE
3.70.43
MASSA PARA VIDRO
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
6.40.14
VALV DESCARGA REG 1 1/2"-1 1/4" C ACAB(BR01/BR003)
6.55.03
BACIA SANITARIA ACESSIVEL
6.55.12
LAVATRIO DE CANTO ACESSVEL
6.55.14
PAPELEIRA LOUCA BRANCA
6.60.02
RESTRITOR DE VAZAO P/ 6L/MIN
6.60.19
DUCHA HIGIENICA
6.60.53
TUBO LIGACAO C/CANOPLA P/SANITARIOS
6.60.56
CONJUNTO DE FIXACAO CROMADO P/ BACIAS
6.60.75
TORNEIRA PRES 1/2" C/ALAVANCA TIPO MESA CROMADO
6.95.03
BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA
6.95.51
FITA VEDANTE PARA ROSCA ROLO 1" X 50 M
6.95.54
ASSENTO C/TAMPA DE MADEIRA MDF-LAQ.OU RES.POL.BRANCA
6.95.55
ANEL BORRACHA DN 40MM P/LIGACAO BACIA SIFONADA
Mo-de-Obra 47,38500
LS
57,80970
SubMO
105,19470

CJ
H
4,50000
H
4,50000
H
0,75000
H
0,75000
M3
0,00500
KG
1,00000
UN
7,00000
UN
12,00000
UN
0,12000
GR
0,50000
UN
2,00000
KG
0,25000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,03760
UN
1,00000
UN
1,00000
Material
1.558,87035

5,05
4,07
4,64
3,82
80,46
0,37
0,22
0,50
0,74
1,68
269,04
1,38
5,91
121,06
275,48
55,46
14,20
30,74
144,11
20,97
7,40
176,66
1,76
6,23
156,65
0,57
BDI
382,73496

08.16.092
BR-04 BARRA DE APOIO COM FIXAO LATERAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
3.13.50
BARRA DE APOIO P/ LAV BANC CROM D=30/35MM C/FLANGE
Mo-de-Obra 4,23000
LS
5,16060
SubMO

UN
H
0,50000
H
0,50000
UN
9,00000
UN
0,09000
UN
1,00000
Material
413,91660

520,66
4,64
2,32000
3,82
1,91000
0,50
4,50000
0,74
0,06660
409,35
409,35000
BDI
97,36066

08.16.093
1.01.06
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.36
2.05.81
2.05.96
2.10.14
2.10.21
2.10.34
2.15.38
2.25.02
2.67.26
2.67.47
2.67.60
2.67.77
2.67.78
2.70.10
Exerccio:

BR-05 TROCADOR ACESSVEL


AZULEJISTA
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA PLASTIFICADA E=12MM
ACO CA-60-B $MD BITOLAS
BLOCO DE CONCRETO 9X19X39CM - 3MPa
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
PARAFUSO INOX AUTO-ATARR SEXT M6X50
PREGO
BUCHA TIPO S-8 (CENTO)
BUCHA PLASTICA TIPO S-6 (CENTO)
ARAME RECOZIDO N.18

2011

69,39720

9,39060

UN
H
H
H
H
H
H
H
M3
KG
KG
M3
KG
KG
M
M2
M2
KG
UN
CJ
UN
KG
UN
UN
KG

1,34980
3,82000
3,82000
0,85000
0,85000
1,92280
3,71180
0,02150
4,33620
4,90720
0,28860
3,30000
0,29040
5,73000
0,19100
0,63030
9,77500
9,00000
4,00000
12,00000
0,38200
0,04000
0,12000
0,17000

5,37
4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
251,78
0,35
1,65
2,09
17,18
18,04
2,70
1,51
0,14
0,50
4,67
11,95
0,74
4,87

6,00000
0,08880
0,84000
668,19000
13,97000
8,90000
173,36000
30,74000
20,97000
176,66000
0,02867

2.046,80
22,72500
18,31500
3,48000
2,86500
0,40230
0,37000
1,54000
6,00000
0,08880
0,84000
538,08000
0,34500
5,91000
121,06000
275,48000
55,46000
14,20000
30,74000
144,11000
20,97000
7,40000
176,66000
1,76000
0,23425
156,65000
0,57000

1.582,36
7,24843
17,57200
15,12720
4,05450
3,24700
8,92179
14,17908
1,72989
1,51767
1,81566
72,66371
1,15500
0,47916
11,97570
3,28138
11,37061
26,39250
13,59000
0,56000
6,00000
1,78394
0,47800
0,08880
0,82790
Pgina: 140

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

3.01.60
BR-05 TAMPO MDF 25MM C/LAMINADO POSTFORMING 6MM
3.13.35
BARRA DE APOIO LATAO CROMADO D=30/35MM C/ FLANGE
3.20.01
AZULEJO LISO BRANCO BRILHANTE
6.55.07
CABIDE DE LOUCA C/2 GANCHOS BRANCO
Mo-de-Obra 70,34999
LS
85,82699
SubMO

Custo Unit.

Custo Total

156,17699

M2
1,61100
UN
2,00000
M2
0,69300
UN
1,00000
Material
1.130,29607

258,85
417,00735
269,04
538,08000
21,60
14,96880
4,53
4,53000
BDI
295,88880

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

50,61600

M
H
2,50000
H
2,50000
UN
0,50000
UN
0,50000
M
1,00000
UN
1,20000
Material
520,11400

5,05
4,07
24,82
59,70
461,57
13,57
BDI
131,26790

08.17.030
TAMPO PARA PIA MARMORE NACIONAL ESPESSURA DE 3 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.56.52
TAMPO PIA EM MARMORE BRANCO NAC 3CM
Mo-de-Obra 16,92000
LS
20,64240
SubMO
37,56240

M2
H
2,00000
H
2,00000
M3
0,05000
KG
2,00000
M2
1,00000
Material
451,36300

601,37
4,64
9,28000
3,82
7,64000
80,46
4,02300
0,37
0,74000
446,60
446,60000
BDI
112,45284

08.17.037
CHUVEIRO ANTIVANDALISMO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.60.20
CHUVEIRO SIMPLES C/ VALVULA DE ACION HIDROMEC
Mo-de-Obra 13,68000
LS
16,68960
SubMO

UN
H
1,50000
H
1,50000
UN
1,00000
Material
325,36000

437,54
5,05
7,57500
4,07
6,10500
325,36
325,36000
BDI
81,81781

08.17.038
CHUVEIRO SIMPLES C/ARTICULACAO, LATAO CROMADO DN 15MM (1/2")
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.60.21
CHUVEIRO SIMPLES ARTICUL LATAO CROM DN 15MM (1/2")
Mo-de-Obra 4,56000
LS
5,56320
SubMO
10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
Material
112,24000

150,50
5,05
2,52500
4,07
2,03500
112,24
112,24000
BDI
28,14354

08.17.040
CHUVEIRO ELETRICO DE 220V/5400W
1.01.15
ELETRICISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
4.75.05
CHUVEIRO ELETRICO 220V/5400 W
6.60.14
TUBO LIGACAO CROM C/CANOPLA P/CHUV
Mo-de-Obra 7,21000
LS
8,79620

16,00620

UN
H
0,50000
H
0,50000
H
0,50000
UN
1,00000
UN
1,00000
Material
128,03000

177,16
5,30
2,65000
5,05
2,52500
4,07
2,03500
117,27
117,27000
10,76
10,76000
BDI
33,12833

16,00620

UN
H
0,50000
H
0,50000
H
0,50000
UN
1,00000
UN
1,00000
Material
236,57000

310,66
5,30
2,65000
5,05
2,52500
4,07
2,03500
225,81
225,81000
10,76
10,76000
BDI
58,09253

08.17.043
AQUECEDOR ELETRICO DE PASSAGEM COM RESISTENCIA BLINDADA
1.01.15
ELETRICISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
4.75.01
AQUECEDOR ELETRICO DE PASSAGEM C/ RESIST BLINDADA
Mo-de-Obra 7,21000
LS
8,79620
SubMO
16,00620

UN
H
0,50000
H
0,50000
H
0,50000
UN
1,00000
Material
435,70000

555,59
5,30
2,65000
5,05
2,52500
4,07
2,03500
435,70
435,70000
BDI
103,89243

08.17.046
CAIXA DE DESCARGA CAPACIDADE 18 L DE PLASTICO DE SOBREPOR
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.05
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN40MM (1 1/2")
6.50.02
CAIXA DESCARGA SOBREPOR PLASTICO
Mo-de-Obra 22,80000
LS
27,81600
SubMO
50,61600

UN
H
2,50000
H
2,50000
M
2,00000
UN
1,00000
Material
69,68000

08.16.099
SERVICOS EM LOUCAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

08.17.013
MICTORIO COLETIVO DE ACO INOXIDAVEL
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.04
VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2"
6.45.11
SIFAO METALITO TIPO COPO DN 1 1/2X1 1/2"
6.55.65
MICTORIO ACO INOXIDAVEL
6.60.50
ESPARGIDOR P/MICTORIO ACO INOX
SubMO
Mo-de-Obra 22,80000
LS
27,81600

SubMO

08.17.041
CHUVEIRO ELETRICO COM RESISTENCIA BLINDADA
1.01.15
ELETRICISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
4.75.09
CHUVEIRO ELETRICO COM RESISTENCIA BLINDADA
6.60.14
TUBO LIGACAO CROM C/CANOPLA P/CHUV
Mo-de-Obra 7,21000
LS
8,79620
SubMO

08.17.050
1.01.15
1.01.16
1.01.18
1.01.19
Exerccio:

BEBEDOURO ELETRICO COM CAPACIDADE DE 40 L


ELETRICISTA
AJUDANTE ELETRICISTA
ENCANADOR
AJUDANTE DE ENCANADOR

2011

30,36960

UN
H
H
H
H

1,00000
1,00000
1,00000
1,00000

BDI

5,05
4,07
23,88
21,92
27,66808

5,30
4,08
5,05
4,07

701,99
12,62500
10,17500
12,41000
29,85000
461,57000
16,28400

147,96
12,62500
10,17500
47,76000
21,92000

824,30
5,30000
4,08000
5,05000
4,07000
Pgina: 141

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.75.04
BEBEDOURO ELETRICO CAP 40L C/SIST REFRIG
Mo-de-Obra 18,50000
LS
22,57000

UN Coeficiente
SubMO

08.17.051
BEBEDOURO ELETRICO COM CAPACIDADE DE 80 L
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
4.75.08
BEBEDOURO ELETRICO CAP 80L C/SIST REFRIG
Mo-de-Obra 18,50000
LS
22,57000
SubMO
08.17.052
EX-01 EXAUSTOR AXIAL DN 40CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.75.24
TELA DE NYLON TIPO MOSQUITEIRO
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.75.02
TINTA ESMALTE
3.76.50
GALVANIZACAO A FOGO
3.91.11
EXAUSTOR AXIAL DN 40CM 1/3 HP
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.58
INTERRUPTOR 1 TECLA BIPOLAR COMPL
Mo-de-Obra 40,23040
LS
49,08109

SubMO

UN
1,00000
629,10000

Custo Unit.

Custo Total

629,10
629,10000
154,13910

41,07000

Material

41,07000

UN
H
1,00000
H
1,00000
H
1,00000
H
1,00000
UN
1,00000
Material
783,55000

1.014,28
5,30
5,30000
4,08
4,08000
5,05
5,05000
4,07
4,07000
783,55
783,55000
BDI
189,66260

89,31149

UN
H
1,50000
H
1,50000
H
1,88000
H
0,15000
H
0,83000
H
0,83000
H
1,68000
M3
0,01000
KG
4,40000
M2
0,50000
KG
6,00000
L
0,06000
KG
6,00000
UN
1,00000
M
5,00000
M
15,00000
UN
1,00000
UN
1,00000
Material
663,73480

5,30
4,08
4,64
4,74
8,08
4,34
3,82
80,46
0,37
5,47
10,15
10,12
1,76
545,49
3,07
0,86
1,89
10,87
BDI
173,20065

BDI

926,24
7,95000
6,12000
8,72320
0,71100
6,70640
3,60220
6,41760
0,80460
1,62800
2,73500
60,90000
0,60720
10,56000
545,49000
15,35000
12,90000
1,89000
10,87000

08.17.055
FILTRO PRESSAO CUNO(AQUALAR)C/ELEM FILTR CARVAO ATIVADO E CEL 180/L/H
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.35.33
REGISTRO PRESSAO C/ CANOPLA CROMADA DN 3/4"
6.41.20
FILTRO CUNO(AQUALAR)C/ELEM FILT CARVAO/CEL 180/L/H
6.60.42
BICO DE SAIDA CROMADO P/FILTRO PRESSAO
SubMO
40,49280
Mo-de-Obra 18,24000
LS
22,25280
Material

UN
H
2,00000
H
2,00000
M
1,50000
UN
1,00000
UN
1,00000
UN
1,00000
212,61000

311,31
5,05
10,10000
4,07
8,14000
10,74
16,11000
50,07
50,07000
125,54
125,54000
20,89
20,89000
BDI
58,21364

08.17.056
FILTRO PRESSAO CUNO (AQUALAR)C/ELEM FILTRANTE CARVAO E CEL 360/L/H
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.35.33
REGISTRO PRESSAO C/ CANOPLA CROMADA DN 3/4"
6.41.02
FILTRO CUNO(AQUALAR)ABS C/ELEM FIL CAR/CEL 360/L/H
6.60.42
BICO DE SAIDA CROMADO P/FILTRO PRESSAO
Mo-de-Obra 18,24000
LS
22,25280
SubMO
40,49280
Material

UN
H
2,00000
H
2,00000
M
1,50000
UN
1,00000
UN
1,00000
UN
1,00000
318,89000

442,04
5,05
10,10000
4,07
8,14000
10,74
16,11000
50,07
50,07000
231,82
231,82000
20,89
20,89000
BDI
82,65804

40,49280

UN
H
2,00000
H
2,00000
UN
1,00000
M
0,20000
M
0,20000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
276,02600

389,31
5,05
10,10000
4,07
8,14000
2,69
2,69000
8,09
1,61800
10,74
2,14800
2,55
2,55000
4,11
4,11000
2,74
2,74000
26,48
26,48000
1,87
1,87000
231,82
231,82000
BDI
72,79932

19,20300

UN
H
1,00000
H
1,00000
M3
0,00100
KG
1,00000
M2
0,12000
Material
43,40326

3,82
4,83
80,46
0,37
357,94
BDI
14,39944

08.17.058
FT-02 FILTRO PARA AGUA POTAVEL
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
4.96.70
NIPLE DUPLO FERRO GALV 3/4'
6.05.01
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN15MM (1/2")
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.05.23
COTOVELO FERRO GALVANIZADO DE 1/2'
6.05.24
COTOVELO FERRO GALV DE 3/4'
6.05.45
NIPLE DUPLO DE REDUCAO FERRO GALV 3/4" X 1/2"
6.05.52
UNIAO FERRO GALV DE 3/4'
6.06.85
NIPLE DUPLO FERRO GALV 1/2"
6.41.02
FILTRO CUNO(AQUALAR)ABS C/ELEM FIL CAR/CEL 360/L/H
Mo-de-Obra 18,24000
LS
22,25280
SubMO
08.17.065
SUPORTE PARA TALHA EM MARMORE DE CANTO
1.01.46
SERVENTE
1.01.92
ARTIFICE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.98
SUPORTE P/TALHA DE CANTO EM MARMORE 3CM
SubMO
Mo-de-Obra 8,65000
LS
10,55300
08.17.066
1.01.46
1.01.92
Exerccio:

SUPORTE PARA TALHA EM MARMORE DE CENTRO


SERVENTE
ARTIFICE

2011

UN
H
H

1,00000
1,00000

3,82
4,83

77,00
3,82000
4,83000
0,08046
0,37000
42,95280

75,28
3,82000
4,83000
Pgina: 142

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.03
AREIA
2.05.08
CIMENTO
3.61.99
SUPORTE P/TALHA DE CENTRO EM MARMORE 3CM
SubMO
Mo-de-Obra 8,65000
LS
10,55300

UN Coeficiente

19,20300

M3
0,00100
KG
1,00000
M2
0,12000
Material
42,00286

08.17.075
TANQUE SIMPLES DE CONCRETO PRE-MOLDADO 600X600MM/APOIO EM ALVENARIA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.39
LIXA PARA MADEIRA
6.40.40
VALVULA PLASTICA DE 1 1/2'
6.45.12
SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2"
6.55.51
TANQUE PREMOLDADO CONCRETO DE 60CM
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 39,12420
LS
47,73152
Material
SubMO
86,85572

UN
H
2,50000
H
2,50000
H
1,49000
H
0,39000
H
0,08000
H
1,90000
M3
0,02800
KG
5,31000
KG
4,53000
UN
19,60000
L
0,21000
L
0,17000
UN
0,25000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,02260
52,79773

08.17.076
TANQUE SIMPLES DE CONCRETO PRE-MOLDADO 600X600MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.40
VALVULA PLASTICA DE 1 1/2'
6.45.12
SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2"
6.55.51
TANQUE PREMOLDADO CONCRETO DE 60CM
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 22,80000
LS
27,81600
SubMO
50,61600

UN
H
2,50000
H
2,50000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,02260
Material
39,96125

08.17.077
RESTRITOR DE VAZAO 12L/MIN PARA CHUVEIRO SIMPLES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.80.70
TRAVA QUIMICA
6.60.01
RESTRITOR DE VAZAO P/ 12L/MIN
SubMO
Mo-de-Obra 5,56320
LS
6,78710

12,35030

UN
H
0,61000
H
0,61000
GR
0,50000
UN
1,00000
Material
18,09000

08.17.078
RESTRITOR DE VAZAO 6L/MIN PARA TORNEIRAS E MISTURADORES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.80.70
TRAVA QUIMICA
6.60.02
RESTRITOR DE VAZAO P/ 6L/MIN
Mo-de-Obra 5,56320
LS
6,78710
SubMO
12,35030

UN
H
0,61000
H
0,61000
GR
0,50000
UN
1,00000
Material
31,58000

08.17.080
TORNEIRA DE LAVAGEM COM CANOPLA DE 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.60.25
TORNEIRA PRESSAO USO GERAL 140X15MM (1/2")CROM
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 4,56000
LS
5,56320
SubMO

10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
UN
0,00640
Material
32,05867

29,11219

UN
H
0,70000
H
0,70000
H
0,66000
H
0,96000
M3
0,02060
KG
2,58000
KG
4,59000
M3
0,02500
UN
30,00000
GR
0,50000
UN
1,00000
M
1,00000
UN
2,00000
UN
1,00000
M
1,00000
UN
1,00000
UN
0,03000
Material
135,60393

08.17.081
TJ-03 TORNEIRA DE JARDIM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.25.15
TIJOLO COMUM MACICO
2.80.70
TRAVA QUIMICA
3.65.55
TC-11 PLACA DE CONCR. PRE-MOLD PERF. 59,5X34,5X5CM
6.05.02
TUBO ACO GALV.NBR5580-CLASSE MEDIA DN 20MM (3/4")
6.05.24
COTOVELO FERRO GALV DE 3/4'
6.23.70
ADAPT.PVC SOLD.CURTO C/BOLSA/ROSCA D=25MMX3/4"
6.25.33
TUBO PVC P/ESGOTO 100MM
6.60.23
TORNEIRA DE PRESSAO 3/4 ACION RESTR C/ CHAVE DEST
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
SubMO
Mo-de-Obra 13,11360
LS
15,99859

Exerccio:

2011

Custo Unit.

Custo Total

80,46
0,37
346,27
BDI
14,07735

BDI

5,05
4,07
4,64
4,74
3,80
3,82
80,46
0,35
0,37
0,22
4,23
10,36
0,35
3,26
8,06
28,54
4,48
32,12029

BDI

5,05
4,07
3,26
8,06
28,54
4,48
20,83277

BDI

5,05
4,07
1,68
17,25
7,00127

BDI

5,05
4,07
1,68
30,74
10,10397

BDI

5,05
4,07
32,03
4,48
9,70183

BDI

5,05
4,07
4,64
3,82
80,46
0,35
0,37
62,03
0,22
1,68
38,01
10,74
4,11
0,50
5,96
58,79
4,48
37,88471

0,08046
0,37000
41,55240

171,77
12,62500
10,17500
6,91360
1,84860
0,30400
7,25800
2,25288
1,85850
1,67610
4,31200
0,88830
1,76120
0,08750
3,26000
8,06000
28,54000
0,10125

111,41
12,62500
10,17500
3,26000
8,06000
28,54000
0,10125

37,44
3,08050
2,48270
0,84000
17,25000

54,03
3,08050
2,48270
0,84000
30,74000

51,88
2,52500
2,03500
32,03000
0,02867

202,60
3,53500
2,84900
3,06240
3,66720
1,65748
0,90300
1,69830
1,55075
6,60000
0,84000
38,01000
10,74000
8,22000
0,50000
5,96000
58,79000
0,13440

Pgina: 143

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

08.17.084
TORNEIRA ELETRICA - ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.07
FIO DE 6,00 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.55.25
ESPELHO 4"X2"
4.55.35
TOMADA 2P + T 20A - 250V SEM PLACA
4.56.25
PLUG PARA TOMADA 2P + T 20A-250V (PIAL 650671)
4.75.07
TORNEIRA ELETRICA P/PIA
Mo-de-Obra 60,84000
LS
74,22480
SubMO
08.17.085
TORNEIRA DE FECHAMENTO AUTOMATICO DE MESA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.80.70
TRAVA QUIMICA
6.60.60
TORNEIRA DE FECHAMENTO AUTOMATICA DE MESA
Mo-de-Obra 10,94400
LS
13,35168
SubMO
08.17.086
TORNEIRA DE FECHAMENTO AUTOMATICO DE PAREDE
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.80.70
TRAVA QUIMICA
6.60.61
TORNEIRA DE FECHAMENTO AUTOMATICO DE PAREDE
Mo-de-Obra 13,68000
LS
16,68960
SubMO
08.17.087
TORNEIRA DE PAREDE ANTIVANDALISMO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.60.62
TORNEIRA DE PAREDE ANTIVANDALISMO
Mo-de-Obra 16,68960
LS
20,36131

SubMO

08.17.088
TORNEIRA DE USO RESTRITO DE 1/2
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.80.70
TRAVA QUIMICA
6.60.24
TORNEIRA DE PRESSAO 1/2 ACION RESTR C/ CHAVE DEST
Mo-de-Obra 6,11040
LS
7,45469
SubMO
08.17.089
TORNEIRA DE USO RESTRITO DE 3/4
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.80.70
TRAVA QUIMICA
6.60.23
TORNEIRA DE PRESSAO 3/4 ACION RESTR C/ CHAVE DEST
Mo-de-Obra 6,11040
LS
7,45469
SubMO
08.17.099
SERVICOS EM APARELHOS E METAIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

08.50.021
DE CONDUTORES APARENTES
1.01.46
SERVENTE
Mo-de-Obra 0,57300
LS
0,69906
08.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

08.60.005
DE REGISTROS E VALVULAS DE DESCARGA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 13,68000
LS
16,68960

Exerccio:

2011

SubMO

SubMO

SubMO

SubMO

Custo Total

135,06480

UN
H
6,00000
H
6,00000
H
0,50000
H
0,50000
M
12,00000
M
24,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
170,32000

BDI

24,29568

UN
H
1,20000
H
1,20000
GR
0,50000
UN
1,00000
Material
196,68000

271,80
5,05
6,06000
4,07
4,88400
1,68
0,84000
195,84
195,84000
BDI
50,82441

30,36960

UN
H
1,50000
H
1,50000
GR
0,50000
UN
1,00000
Material
174,71000

252,24
5,05
7,57500
4,07
6,10500
1,68
0,84000
173,87
173,87000
BDI
47,16831

37,05091

UN
H
1,83000
H
1,83000
UN
1,00000
Material
303,09000

418,37
5,05
9,24150
4,07
7,44810
303,09
303,09000
BDI
78,23241

13,56509

UN
H
0,67000
H
0,67000
GR
0,50000
UN
1,00000
Material
62,23000

BDI

5,05
4,07
1,68
61,39
17,43287

13,56509

UN
H
0,67000
H
0,67000
GR
0,50000
UN
1,00000
Material
59,63000

BDI

5,05
4,07
1,68
58,79
16,83487

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.50.001
DE TUBULACOES EM GERAL INCLUINDO CONEXOES, CAIXAS E RALOS
1.01.46
SERVENTE
Mo-de-Obra 1,52800
LS
1,86416
SubMO
3,39216
08.50.020
DE CALHAS E RUFOS EM CHAPAS METALICAS
1.01.46
SERVENTE
Mo-de-Obra 0,87860
LS
1,07189

Custo Unit.

Material

M
H
0,40000
0,00000

Material

M
H
0,23000
0,00000

1,27206

Material

M
H
0,15000
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

30,36960

UN
H
1,50000
H
1,50000
Material
0,00000

1,95049

5,30
4,08
5,05
4,07
0,45
2,06
1,89
1,24
9,99
7,86
94,50
70,23850

BDI

3,82
0,78020

BDI

3,82
0,44861

BDI

3,82
0,29257

375,62
31,80000
24,48000
2,52500
2,03500
5,40000
49,44000
1,89000
1,24000
9,99000
7,86000
94,50000

93,22
3,38350
2,72690
0,84000
61,39000

90,02
3,38350
2,72690
0,84000
58,79000

4,17
1,52800

2,39
0,87860

1,56
0,57300

301,12
244,82
244,82000
BDI
56,30860

BDI

5,05
4,07
6,98501

37,35
7,57500
6,10500

Pgina: 144

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

08.60.006
DE VALVULAS DE RETENCAO
1.01.18
ENCANADOR
Mo-de-Obra 5,55500
LS
08.60.007
DE TORNEIRAS
1.01.18
ENCANADOR
Mo-de-Obra 1,31300
08.60.010
DE SIFOES
1.01.18
ENCANADOR
Mo-de-Obra 2,02000

LS

LS

6,77710

1,60186

2,46440

UN Coeficiente

SubMO

SubMO

SubMO

08.60.011
DE APARELHOS SANITARIOS INCLUINDO ACESSORIOS
1.01.18
ENCANADOR
Mo-de-Obra 10,10000
LS
12,32200
SubMO
08.60.012
DE CAIXA DE DESCARGA DE SOBREPOR
1.01.18
ENCANADOR
Mo-de-Obra 3,83800
LS
4,68236

SubMO

08.60.013
DE RESERVATORIOS DE FIBRO CIMENTO ATE 1000 LITROS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
SubMO
Mo-de-Obra 27,36000
LS
33,37920
08.60.014
DE CONJUNTO DE MOTOR-BOMBA
1.01.18
ENCANADOR
Mo-de-Obra 40,40000
LS
49,28800
08.60.015
DE HIDRANTE DE PAREDE COMPLETO
1.01.18
ENCANADOR
Mo-de-Obra 15,15000
LS
18,48300
08.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

08.70.005
DE REGISTRO E VALVULAS DE DESCARGA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.28
ZARCAO
6.95.11
ESTOPA ALCATROADA
Mo-de-Obra 27,36000
LS
33,37920
08.70.006
DE VALVULA DE RETENCAO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
3.80.28
ZARCAO
6.95.11
ESTOPA ALCATROADA
Mo-de-Obra 9,12000
LS
08.70.007
DE TORNEIRAS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 4,56000
LS
08.70.010
DE SIFOES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 4,56000
LS

11,12640

5,56320

5,56320

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

08.70.011
DE APARELHOS SANITARIOS INCLUINDO ACESSORIOS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 36,48000
LS
44,50560
SubMO
08.70.012
DE CAIXAS DE DESCARGA DE SOBREPOR
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 22,80000
LS
27,81600
08.70.013
1.01.18
Exerccio:

SubMO

DE RESERVATORIO DE FIBRO-CIMENTO ATE 1000 L


ENCANADOR

2011

12,33210

UN
H
1,10000
Material
0,00000

2,91486

UN
H
0,26000
Material
0,00000

4,48440

UN
H
0,40000
Material
0,00000

22,42200

UN
H
2,00000
Material
0,00000

8,52036

UN
H
0,76000
Material
0,00000

60,73920

UN
H
3,00000
H
3,00000
Material
0,00000

89,68800

UN
H
8,00000
Material
0,00000

Custo Unit.

Custo Total
15,16
5,55500

BDI

5,05
2,83638

BDI

5,05
0,67042

BDI

5,05
1,03141

BDI

5,05
5,15706

BDI

5,05
1,95968

BDI

5,05
4,07
13,97002

BDI

5,05
20,62824

33,63300

UN
H
3,00000
Material
0,00000

BDI

5,05
7,73559

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

3,00000
3,00000
0,03000
0,02000

60,73920

UN
H
H
L
KG
Material
0,61180

1,00000
1,00000
0,04000
0,03000

20,24640

UN
H
H
L
KG
Material
0,83790

10,12320

UN
H
0,50000
H
0,50000
Material
0,00000

10,12320

UN
H
0,50000
H
0,50000
Material
0,00000

80,98560

UN
H
4,00000
H
4,00000
Material
0,00000

50,61600

UN
H
2,50000
H
2,50000
Material
0,00000
UN
H

4,00000

BDI

5,05
4,07
15,96
6,65
14,11073

BDI

5,05
4,07
15,96
6,65
4,84939

BDI

5,05
4,07
2,32834

BDI

5,05
4,07
2,32834

BDI

5,05
4,07
18,62669

BDI

5,05
4,07
11,64168

5,05

3,58
1,31300

5,51
2,02000

27,57
10,10000

10,48
3,83800

74,70
15,15000
12,21000

110,31
40,40000

41,36
15,15000

75,46
15,15000
12,21000
0,47880
0,13300

25,93
5,05000
4,07000
0,63840
0,19950

12,45
2,52500
2,03500

12,45
2,52500
2,03500

99,61
20,20000
16,28000

62,25
12,62500
10,17500

99,61
20,20000
Pgina: 145

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 36,48000
LS

UN Coeficiente
H

44,50560

08.70.014
DE CONJUNTO MOTOR BOMBA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 36,48000
LS
44,50560
08.70.015
DE HIDRANTE DE PAREDE COMPLETO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 47,42400
LS
57,85728

SubMO

SubMO

SubMO

08.70.099
RECOLOCACOES DE INSTALACOES HIDRAULICAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
08.80.010
CANOPLA PARA REGISTROS
1.01.19
AJUDANTE DE ENCANADOR
6.95.59
CANOPLA P/REGISTRO 3/4'
Mo-de-Obra 0,69190
LS

0,84412

08.80.011
CANOPLA PARA VALVULA DE DESCARGA
1.01.19
AJUDANTE DE ENCANADOR
6.95.58
CANOPLA P/VALVULA DESCARGA
Mo-de-Obra 0,69190
LS
0,84412
08.80.012
VOLANTE CROMADO PARA REGISTRO
1.01.19
AJUDANTE DE ENCANADOR
6.95.62
VOLANTE CROMADO LISO P/REGISTRO
Mo-de-Obra 0,69190
LS
0,84412
08.80.015
BOTAO PARA VALVULA DE DESCARGA
1.01.19
AJUDANTE DE ENCANADOR
6.95.56
BOTAO P/VALVULA DESCARGA
Mo-de-Obra 0,69190
LS
0,84412

SubMO

SubMO

SubMO

SubMO

08.80.020
REPARO DE VALVULA DE DESCARGA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.47
REPARO P/VALVULA DESCARGA HIDRA LISA II
Mo-de-Obra 8,20800
LS
10,01376
08.80.021
TUBO DE DESCARGA EM PVC DN=40MM
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.51
TUBO DE DESCARGA EM PVC (D=40MM)
Mo-de-Obra 4,56000
LS
5,56320

SubMO

SubMO

08.80.031
TORNEIRA DE PRESSAO CROMADA DE 1/2" EM PAREDE
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.60.59
TORNEIRA DE PRESSAO CROMADA C=15A20 CM DE 1/2"
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 2,28000
LS
2,78160
SubMO
08.80.032
1.01.18
1.01.19
6.60.13
6.60.27
6.95.52
Exerccio:

Custo Total

BDI

4,07
18,62669

BDI

5,05
4,07
18,62669

105,28128

UN
H
5,20000
H
5,20000
Material
0,00000

BDI

5,05
4,07
24,21469

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

1,53602

UN
H
0,17000
UN
1,00000
Material
12,87000

1,53602

UN
H
0,17000
UN
1,00000
Material
57,07000

1,53602

UN
H
0,17000
UN
1,00000
Material
9,82000

1,53602

Material

80,98560

UN
H
4,00000
H
4,00000
Material
0,00000

0,00000

16,28000

99,61
20,20000
16,28000

129,49
26,26000
21,16400

17,71
0,69190
12,87000

BDI

4,07
12,87
3,31338

BDI

4,07
57,07
13,47938

BDI

4,07
9,82
2,61188

UN
H
0,17000
UN
1,00000
Material
23,50000

BDI

4,07
23,50
5,75828

UN
H
0,80000
H
0,80000
UN
1,00000
Material
123,94000

172,36
5,05
4,04000
4,07
3,25600
123,94
123,94000
BDI
32,23154

CJ
H
1,00000
H
1,00000
CJ
1,00000
62,61000

20,24640

Material

18,22176

UN
H
0,90000
H
0,90000
UN
1,00000
Material
22,59000

10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
Material
5,91000

5,06160

UN
H
0,25000
H
0,25000
UN
1,00000
UN
0,02260
Material
71,85125

TORNEIRA PARA LAVATORIO DE LOUCA BRANCA OU BANCADA


ENCANADOR
AJUDANTE DE ENCANADOR
TUBO LIGACAO CROMADO C/CANOPLA
TORNEIRA LAV CROM 1/2'X110MM
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M

2011

4,00000

80,98560

08.80.018
ACABAMENTO ANTIVANDALISMO PARA VALVULA DE DESCARGA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.69
ACABAMENTO P/ VALVULA DE DESCARGA ANTIVANDALISMO
Mo-de-Obra 7,29600
LS
8,90112
SubMO
16,19712
08.80.019
REPARO PARA CAIXA DE DESCARGA ACOPLADA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.48
KIT REPARO PARA CAIXA ACOPLADA
Mo-de-Obra 9,12000
LS
11,12640
SubMO

Custo Unit.

UN
H
H
UN
UN
UN

0,50000
0,50000
1,00000
1,00000
0,04520

BDI

5,05
4,07
62,61
19,05697

BDI

5,05
4,07
22,59
9,38670

BDI

5,05
4,07
5,91
3,68764

BDI

5,05
4,07
71,75
4,48
17,68996

5,05
4,07
20,97
21,40
4,48

72,08
0,69190
57,07000

13,96
0,69190
9,82000

30,79
0,69190
23,50000

101,91
5,05000
4,07000
62,61000

50,19
4,54500
3,66300
22,59000

19,72
2,52500
2,03500
5,91000

94,60
1,26250
1,01750
71,75000
0,10125

64,81
2,52500
2,03500
20,97000
21,40000
0,20250
Pgina: 146

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 4,56000

LS

5,56320

UN Coeficiente
SubMO

08.80.091
RECARGA DE EXTINTOR DE GAS CARBONICO DE 6 LITROS
1.01.46
SERVENTE
2.04.35
RECARGA EXTINTOR GAS CARBONICO 6KG
Mo-de-Obra 0,64940
LS
0,79227
SubMO
08.80.092
RECARGA DE EXTINTOR DE ESPUMA DE 10 LITROS
1.01.46
SERVENTE
2.04.36
RECARGA EXTINTOR ESPUMA 10 L
Mo-de-Obra 0,64940
LS
0,79227
SubMO
08.80.093
RECARGA DE EXTINTOR DE PO QUIMICO DE 4 KG
1.01.46
SERVENTE
2.04.37
RECARGA EXTINTOR PO QUIMICO 4KG
Mo-de-Obra 0,64940
LS
0,79227
SubMO

10,12320

Material

42,57250

1,44167

UN
H
0,17000
UN
1,00000
Material
40,40000

1,44167

UN
H
0,17000
UN
1,00000
Material
84,52000

Custo Unit.
BDI

Custo Total

12,12001

BDI

3,82
40,40
9,62358

BDI

3,82
84,52
19,77118

51,46
0,64940
40,40000

105,73
0,64940
84,52000

1,44167

UN
H
0,17000
UN
1,00000
Material
26,10000

BDI

3,82
26,10
6,33458

08.80.095
EXTINTOR DE INCENDIO DE AGUA PRESSURIZADA 10L : RECARGA
1.01.46
SERVENTE
2.04.39
RECARGA EXTINTOR AGUA PRESSURIZADA 10L
Mo-de-Obra 0,64940
LS
0,79227
SubMO
1,44167

UN
H
0,17000
UN
1,00000
Material
20,21000

BDI

3,82
20,21
4,97988

08.80.099
OUTROS SERVICOS DE REDE DE GAS E AGUA FRIA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.82.012
RALO SIFONADO F.FUNDIDO DN 150MM C/GRELHA PVC CROMADO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.10.64
ANEL DE BORRACHA HL D=50MM
6.10.66
ANEL DE BORRACHA HL D=75MM
6.75.03
RALO SIFONADO F. FUNDIDO DN 150MM
6.75.35
PLUG F.F. 2' P/RALO
6.75.53
GRELHA PVC RIGIDO ACAB.CROMADO DN 150MM
6.95.27
LUBRIFICANTE P/ANEL NEOPRENE
Mo-de-Obra 12,76800
LS
15,57696
SubMO
28,34496

UN
H
1,40000
H
1,40000
UN
4,00000
UN
1,00000
UN
1,00000
UN
4,00000
UN
1,00000
KG
0,02500
Material
210,70475

294,03
5,05
7,07000
4,07
5,69800
7,50
30,00000
11,00
11,00000
144,18
144,18000
4,05
16,20000
9,10
9,10000
8,99
0,22475
BDI
54,98143

08.82.023
GRELHA METALICA CROMADA DIAM 15 CM
1.01.46
SERVENTE
6.75.65
GRELHA LATAO CROM DIAM 15 CM P/CX SIFON
Mo-de-Obra 0,38200
LS
0,46604

0,84804

UN
H
0,10000
UN
1,00000
Material
33,24000

0,84804

UN
H
0,10000
UN
1,00000
Material
18,97000

0,84804

UN
H
0,10000
UN
1,00000
Material
14,77000

0,84804

UN
H
0,10000
UN
1,00000
Material
9,21000

10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
Material
96,45000

10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
Material
59,70000

08.82.024
GRELHA METALICA CROMADA DIAM 10 CM
1.01.46
SERVENTE
6.75.64
GRELHA LATAO CROM DIAM 10 CM P/CX SIFON
Mo-de-Obra 0,38200
LS
0,46604
08.82.030
GRELHA DE FERRO FUNDIDO DE 20X20 CM
1.01.46
SERVENTE
6.75.40
GRELHA FERRO FUNDIDO 20X20CM
Mo-de-Obra 0,38200
LS
0,46604
08.82.031
GRELHA DE FERRO FUNDIDO DE 15X15 CM
1.01.46
SERVENTE
6.75.41
GRELHA FERRO FUNDIDO 15X15CM
Mo-de-Obra 0,38200
LS
0,46604
08.82.040
SIFAO METALICO TIPO COPO DN 2X2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.45.15
SIFAO METALICO TIPO COPO DN 2X2"
Mo-de-Obra 4,56000
LS
5,56320
08.82.041
SIFAO METALICO TIPO COPO DN 1 1/2 X 1 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.45.11
SIFAO METALITO TIPO COPO DN 1 1/2X1 1/2"
Mo-de-Obra 4,56000
LS
5,56320
08.82.045
1.01.18
1.01.19
6.45.05

Exerccio:

SIFAO PVC RIGIDO TIPO COPO DN 2X2"


ENCANADOR
AJUDANTE DE ENCANADOR
SIFAO PVC RIGIDO TIPO COPO DN 2X2"

2011

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

0,00000

UN
H
H
UN

0,40000
0,40000
1,00000

BDI

3,82
33,24
7,84025

BDI

3,82
18,97
4,55815

BDI

3,82
14,77
3,59215

BDI

3,82
9,21
2,31335

BDI

5,05
4,07
96,45
24,51184

BDI

5,05
4,07
59,70
16,05934

5,05
4,07
4,47

33,87
0,64940
26,10000

26,63
0,64940
20,21000

41,92
0,38200
33,24000

24,37
0,38200
18,97000

19,21
0,38200
14,77000

12,37
0,38200
9,21000

131,08
2,52500
2,03500
96,45000

85,88
2,52500
2,03500
59,70000

15,45
2,02000
1,62800
4,47000

Pgina: 147

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 3,64800

LS

4,45056

08.82.046
SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.45.12
SIFAO PVC RIGIDO TIPO COPO DN 1 1/2X1 1/2"
Mo-de-Obra 3,64800
LS
4,45056
08.82.050
DESENTUPIMENTO DE RAMAIS DE ESGOTO
1.01.09
ESGOTEIRO/CAVOUQUEIRO
1.01.95
AJUDANTE DE ESGOTEIRO
Mo-de-Obra 2,10500
LS
2,56810
08.82.055
LIMPEZA SIMPLES EM CALHAS METALICAS
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 0,73260
LS
0,89377

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

08.82.056
LIMPEZA SIMPLES EM LAJES/CALHAS DE CONCRETO
1.01.46
SERVENTE
Mo-de-Obra 1,71900
LS
2,09718
SubMO

8,09856

Material

4,47000

8,09856

UN
H
0,40000
H
0,40000
UN
1,00000
Material
8,06000

4,67310

Material

M
H
0,25000
H
0,25000
0,00000

1,62637

Material

M
H
0,18000
0,00000

3,81618

M2
H
0,45000
Material
0,00000

Custo Unit.

Custo Total

BDI

2,89077

BDI

5,05
4,07
8,06
3,71647

BDI

4,50
3,92
1,07481

BDI

4,07
0,37407

BDI

3,82
0,87772

BDI

5,05
4,07
12,23
39,59
7,92371

5,05
4,07
39,59
7,19708

19,87
2,02000
1,62800
8,06000

5,74
1,12500
0,98000

2,00
0,73260

4,69
1,71900

08.82.061
SOLDA E REBITAGEM EM CALHAS DE CHAPA GALVANIZADA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
2.67.71
REBITE TANOEIRO No. 8 (3,0 X 6,1 MM) FERRO ZINCADO
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
Mo-de-Obra 13,68000
LS
16,68960
SubMO
30,36960

M
H
H
KG
KG
Material
4,08130

08.82.062
SOLDA EM CHAPA GALVANIZADA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.08
SOLDA LIGA CHUMBO E ESTANHO 70:30
Mo-de-Obra 12,31200
LS
15,02064

M
H
1,35000
H
1,35000
KG
0,10000
Material
3,95900

BDI

08.82.099
OUTROS SERVICOS DE REDES DE ESGOTO E AGUAS PLUVIAIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.84.005
TAMPA DE PLASTICO PARA BACIA SANITARIA
1.01.19
AJUDANTE DE ENCANADOR
6.95.50
TAMPA PLASTICA P/BACIA SANITARIA
Mo-de-Obra 0,61050
LS
0,74481

1,35531

UN
H
0,15000
UN
1,00000
Material
17,53000

3,44189

UN
H
0,17000
H
0,17000
UN
1,00000
Material
1,76000

50,61600

UN
H
2,50000
H
2,50000
UN
1,00000
UN
1,00000
Material
26,02000

5,06160

UN
H
0,25000
H
0,25000
UN
1,00000
Material
12,40000

20,40180

UN
H
H
M3
KG
Material
0,45046

SubMO

SubMO

08.84.012
BOLSA PLASTICA PARA BACIA SANITARIA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.03
BOLSA DE BORRACHA DN 100MM PARA BACIA SIFONADA
Mo-de-Obra 1,55040
LS
1,89149
SubMO
08.84.015
CAIXA DE DESCARGA DE SOBREPOR - PLASTICA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.25.49
TUBO DESCARGA PVC DE 1 1/2"LONGO
6.50.02
CAIXA DESCARGA SOBREPOR PLASTICO
Mo-de-Obra 22,80000
LS
27,81600
SubMO
08.84.018
BOIA E CORRENTE PARA CAIXA DE DESCARGA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.95.67
BOIA E CORRENTE P/CAIXA DESCARGA
Mo-de-Obra 2,28000
LS
2,78160

SubMO

08.84.020
SUPORTE DE FERRO FUNDIDO PARA LAVATORIO
1.01.06
AZULEJISTA
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 9,19000
LS
11,21180
SubMO
08.84.027
1.01.39
1.01.46
6.55.51

Exerccio:

TANQUE PRE-MOLDADO DE CONCRETO DE 60X50 CM


PEDREIRO
SERVENTE
TANQUE PREMOLDADO CONCRETO DE 60CM

2011

27,33264

UN
H
H
UN

1,50000
1,50000
0,01000
0,10000

BDI

4,07
17,53
4,34362

BDI

5,05
4,07
1,76
1,19643

BDI

5,05
4,07
4,10
21,92
17,62628

BDI

5,05
4,07
12,40
4,01617

BDI

5,37
3,82
80,46
0,37
4,79602

1,00000
1,00000
0,00100
1,00000

2,00000
2,00000
1,00000

4,64
3,82
28,54

42,37
7,57500
6,10500
0,12230
3,95900

38,48
6,81750
5,49450
3,95900

23,22
0,61050
17,53000

6,39
0,85850
0,69190
1,76000

94,26
12,62500
10,17500
4,10000
21,92000

21,47
1,26250
1,01750
12,40000

25,64
5,37000
3,82000
0,08046
0,37000

81,30
9,28000
7,64000
28,54000

Pgina: 148

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 16,92000

Descrio
LS

20,64240

UN Coeficiente
SubMO

08.84.028
TANQUE PRE-MOLDADO DE CONCRETO DE 70X60 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
6.55.51
TANQUE PREMOLDADO CONCRETO DE 60CM
Mo-de-Obra 16,92000
LS
20,64240
SubMO
08.84.029
TANQUE PRE-MOLDADO DE CONCRETO DE 80X70 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
6.55.19
TANQUE PRE-MOLD CONCRETO 80X70CM
Mo-de-Obra 16,92000
LS
20,64240
SubMO

37,56240

Material

28,54000

37,56240

UN
H
2,00000
H
2,00000
UN
1,00000
Material
28,54000

37,56240

UN
H
2,00000
H
2,00000
UN
1,00000
Material
15,00000

08.84.037
FILTRO DE PRESSAO CUNO (AQUALAR)C/ELEM FILTRANTE CARVAO E CEL 360/L/H
UN
1.01.18
ENCANADOR
H
1,50000
1.01.19
AJUDANTE DE ENCANADOR
H
1,50000
6.41.02
FILTRO CUNO(AQUALAR)ABS C/ELEM FIL CAR/CEL 360/L/H
UN
1,00000
Mo-de-Obra 13,68000
LS
16,68960
SubMO
30,36960
Material
231,82000
08.84.042
ELEMENTO FILTRANTE CUNO (AQUALAR)ELEM FILTRANTE CARVAO E CEL/180L/H
UN
1.01.18
ENCANADOR
H
0,25000
6.41.13
ELEMENTO FILTRANTE CUNO(AQUALAR)CARVAO/CEL 180 L/H
UN
1,00000
Mo-de-Obra 1,26250
LS
1,54025
Material
32,45000
SubMO
2,80275

Custo Unit.

Custo Total

BDI

15,20355

BDI

4,64
3,82
28,54
15,20355

BDI

4,64
3,82
15,00
12,08935

81,30
9,28000
7,64000
28,54000

64,65
9,28000
7,64000
15,00000

322,49
5,05
7,57500
4,07
6,10500
231,82
231,82000
BDI
60,30361

BDI

5,05
32,45
8,10813

5,05
45,71
11,15793

43,36
1,26250
32,45000

08.84.043
ELEMENTO FILTRANTE CUNO (AQUALAR) CARVAO E CELULOSE 360 L/H
1.01.18
ENCANADOR
6.41.12
ELEMENTO FILTRANTE CUNO CARVAO/CELULOSE 360L/H
Mo-de-Obra 1,26250
LS
1,54025
SubMO
2,80275

UN
H
0,25000
UN
1,00000
Material
45,71000

BDI

08.84.047
TAMPO DE PIA EM MARMORE BRANCO NACIONAL DE 3 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.56.52
TAMPO PIA EM MARMORE BRANCO NAC 3CM
Mo-de-Obra 16,92000
LS
20,64240
SubMO

37,56240

M2
H
2,00000
H
2,00000
M3
0,05000
KG
2,00000
M2
1,00000
Material
451,36300

601,37
4,64
9,28000
3,82
7,64000
80,46
4,02300
0,37
0,74000
446,60
446,60000
BDI
112,45284

37,56240

M2
H
2,00000
H
2,00000
M3
0,05000
KG
2,00000
M2
1,00000
Material
224,46300

322,29
4,64
9,28000
3,82
7,64000
80,46
4,02300
0,37
0,74000
219,70
219,70000
BDI
60,26584

37,56240

M2
H
2,00000
H
2,00000
M3
0,05000
KG
2,00000
UN
1,11000
Material
1.261,39400

1.597,71
4,64
9,28000
3,82
7,64000
80,46
4,02300
0,37
0,74000
1.132,10
1.256,63100
BDI
298,75997

37,56240

M2
H
2,00000
H
2,00000
M3
0,05000
KG
2,00000
UN
0,83000
Material
1.370,03000

1.731,33
4,64
9,28000
3,82
7,64000
80,46
4,02300
0,37
0,74000
1.644,90
1.365,26700
BDI
323,74625

08.84.048
TAMPO DE PIA EM GRANILITE
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.56.53
TAMPO PIA EM GRANILITE
Mo-de-Obra 16,92000
LS

20,64240

SubMO

08.84.049
TAMPO ACO INOX (304) C/ CUBA SIMPLES - CH.22
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.56.35
TAMPO ACO INOX(304)CHAPA 18-1,50X0,60M CUBA SIMPL
SubMO
Mo-de-Obra 16,92000
LS
20,64240
08.84.050
TAMPO ACO INOX (304) C/ CUBA DUPLA - CH.22
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.56.36
TAMPO ACO INOX(304)CHAPA 18 - 2,00X0,60M CUBA DUPL
Mo-de-Obra 16,92000
LS
20,64240
SubMO

59,67
1,26250
45,71000

08.84.054
CUBA SIMPLES ACO INOX(304) - CHAPA 22 560X330X140MM - SEM PERTENCES
UN
1.01.18
ENCANADOR
H
1,00000
1.01.19
AJUDANTE DE ENCANADOR
H
1,00000
6.56.08
CUBA SIMPLES ACO INOX 304 CH 22 560X330X140MM
UN
1,00000
Mo-de-Obra 9,12000
LS
11,12640
SubMO
20,24640
Material
67,22000

BDI

08.84.055
CUBA SIMPLES ACO INOX(304) CHAP.22 - 400X340X140MM - SEM PERTENCES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.56.11
CUBA SIMPLES ACO INOX 304 CH22 400X340X140MM
SubMO
20,24640
Mo-de-Obra 9,12000
LS
11,12640

155,75
5,05
5,05000
4,07
4,07000
106,38
106,38000
BDI
29,12407

Exerccio:

2011

UN
H
1,00000
H
1,00000
UN
1,00000
Material
106,38000

5,05
4,07
67,22
20,11727

107,58
5,05000
4,07000
67,22000

Pgina: 149

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

08.84.058
CUBA DUPLA ACO INOX(304) CHAPA 22 835X340X140MM - SEM PERTENCES
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.56.07
CUBA DUPLA ACO INOX 304 CH 22-835X340X140MM
Mo-de-Obra 13,68000
LS
16,68960
SubMO
30,36960

UN
H
1,50000
H
1,50000
UN
1,00000
Material
209,26000

294,74
5,05
7,57500
4,07
6,10500
209,26
209,26000
BDI
55,11481

08.84.060
TAMPO LISO EM ACO INOX (304) CHAPA 20
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
6.56.38
TAMPO LISO EM ACO INOX (304) - CHAPA 20
Mo-de-Obra 16,92000
LS
20,64240

37,56240

M2
H
2,00000
H
2,00000
M3
0,05000
KG
2,00000
M2
1,00000
Material
449,30300

598,84
4,64
9,28000
3,82
7,64000
80,46
4,02300
0,37
0,74000
444,54
444,54000
BDI
111,97904

0,84804

UN
H
0,10000
UN
1,00000
Material
21,74000

10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
Material
4,01000

10,12320

UN
H
0,50000
H
0,50000
UN
1,00000
Material
24,82000

08.84.083
ESPARGIDOR DE FERRO GALVANIZADO P/MICTORIO TIPO COCHO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.60.07
ESPARGIDOR ACO GALV 3/4" P/ MICTORIO COLETIVO
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 10,03200
LS
12,23904
SubMO
22,27104
08.84.090
MANGUEIRA PARA HIDRANTE DIAM 1 1/2' L=15,00M
1.01.19
AJUDANTE DE ENCANADOR
6.70.22
MANGUEIRA C/ADAPTADOR 1 1/2' X 15M
Mo-de-Obra 1,01750
LS
1,24135
SubMO

08.84.073
VALVULA AMERICANA
1.01.46
SERVENTE
6.40.45
VALVULA AMERICANA P/PIA 3 1/2'
Mo-de-Obra 0,38200
LS
0,46604
08.84.075
VALVULA DE METAL AMARELO DE 2'
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.46
VALVULA AMARELA DE 2"
Mo-de-Obra 4,56000
LS
5,56320

SubMO

SubMO

SubMO

08.84.076
VALVULA DE METAL CROMADO DE 1 1/2"
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.40.04
VALVULA ESCOAMENTO LATAO CROMADO DN 1 1/2"
Mo-de-Obra 4,56000
LS
5,56320
SubMO

08.84.091
MANGUEIRA PARA HIDRANTE DIAM 1 1/2' L=30,00M
1.01.19
AJUDANTE DE ENCANADOR
6.70.20
MANGUEIRA C/ADAPTADOR '1 1/2'-30 M
Mo-de-Obra 1,01750
LS
1,24135
SubMO
08.84.095
MT-01/02/03 MICTORIO COLETIVO (PARTE CIVIL)
1.01.06
AZULEJISTA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.66.19
CANTONEIRA 'L' ALUM 1/2X1/2X1/8'
2.66.59
CANTONEIRA "L" ALUMINIO 1"X1"X1/8"
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.60.35
RODAPE CERAMICO VERMELHO 7.5X1 5CM
Mo-de-Obra 93,07970
LS
113,55723
08.84.096
1.01.06
Exerccio:

LT-01/02/03 LAVATORIO COLETIVO (PARTE CIVIL)


AZULEJISTA

2011

SubMO

27,78
0,38200
21,74000

BDI

3,82
21,74
5,19525

BDI

5,05
4,07
4,01
3,25064

BDI

5,05
4,07
24,82
8,03694

M
H
1,10000
H
1,10000
M
1,00000
UN
0,00940
Material
10,78211

BDI

5,05
4,07
10,74
4,48
7,60223

2,25885

UN
H
0,25000
UN
1,00000
Material
238,68000

296,35
4,07
1,01750
238,68
238,68000
BDI
55,41594

2,25885

UN
H
0,25000
UN
1,00000
Material
359,04000

444,39
4,07
1,01750
359,04
359,04000
BDI
83,09874

206,63693

M
H
4,34000
H
1,35000
H
1,35000
H
0,20000
H
0,20000
H
0,51000
H
4,57000
H
8,56000
M3
0,28000
KG
34,30000
KG
23,55000
KG
0,54000
M3
0,02000
M2
0,08000
M2
0,25000
KG
2,28000
UN
46,00000
M
0,85000
M
2,60000
M2
2,39000
M
0,88000
Material
136,32130
M
H

3,99000

BDI

5,37
4,60
3,96
4,77
3,82
5,09
4,64
3,82
80,46
0,35
0,37
1,04
62,03
17,18
11,40
2,69
0,22
2,62
5,64
21,60
2,59
78,88039

5,37

17,38
2,52500
2,03500
4,01000

42,98
2,52500
2,03500
24,82000

40,65
5,55500
4,47700
10,74000
0,04211

421,83
23,30580
6,21000
5,34600
0,95400
0,76400
2,59590
21,20480
32,69920
22,52880
12,00500
8,71350
0,56160
1,24060
1,37440
2,85000
6,13320
10,12000
2,22700
14,66400
51,62400
2,27920

361,90
21,42630
Pgina: 150

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.66.19
CANTONEIRA 'L' ALUM 1/2X1/2X1/8'
2.66.77
PERFIL ALUMINIO 'L' 10X1MM
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.20.01
AZULEJO LISO BRANCO BRILHANTE
Mo-de-Obra 86,77740
LS
105,86843

UN Coeficiente

Custo Unit.

Custo Total

192,64583

H
0,60000
H
1,84000
H
1,84000
H
0,23000
H
0,23000
H
3,93000
H
6,87000
M3
0,10300
KG
13,05000
KG
23,85000
KG
0,50000
M3
0,02000
M2
0,09000
M2
0,30000
KG
2,60000
UN
65,00000
M
1,00000
M
1,00000
KG
0,19000
KG
0,04000
M2
2,19000
Material
101,58228

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.86.001
CLORADOR TIPO OMS DE FLUXO CONTINUO DE DIAM 1.50X2.00M COMPLETA
6.97.32
CLORADOR OMS DIAM 1.5X2M-FORN/COLOC
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

UN
UN
1,00000
Material
589,00000

724,47
589,00
589,00000
BDI
135,47000

08.86.010
CAIXA DE DIVISAO PARA FOSSAS DE DIAM = 1,00 M H = 1,00 M
6.97.20
CAIXA DIV OMS 1.X1.M 4 A 8 SALAS COLOCADA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
118,75000

146,06
118,75
118,75000
BDI
27,31250

08.86.099
OUTROS SERVICOS DE TRATAMENTO DE DESPEJOS SANITARIOS
6.96.02
MODULO DE VERBA
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

08.84.099
OUTROS SERVICOS DE APARELHOS E METAIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

09.01.030
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.50
4.05.03
4.05.07
4.10.04
4.21.49
4.21.72
Exerccio:

SubMO

SubMO

TE-01 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO


112,5KVA-ELETROP
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE DE CONCRETO CIRCULAR 12M/1000 DAN
ISOLADOR DISCO 150MM DE PORCELANA
ISOLADOR DE PINO 15KV-PORCELANA
TRANSF 112.5KVA AT=13.2KV/5%BT=
CABEOTE DE ALUMNIO DN=80MM
ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1")

2011

4,60
3,96
4,77
3,82
5,09
4,64
3,82
80,46
0,35
0,37
1,04
62,03
17,18
11,40
2,70
0,22
2,62
0,85
4,67
4,87
21,60
67,67247

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
M

2,76000
7,28640
8,77680
0,87860
1,17070
18,23520
26,24340
8,28738
4,56750
8,82450
0,52000
1,24060
1,54620
3,42000
7,02000
14,30000
2,62000
0,85000
0,88730
0,19480
47,30400

37.765,56
0,84000
0,84000
345,00000
345,00000
345,00000
0,56000
0,56000
18,95000
6,01000
1,00000
27,74000
1,05000
43,33000
187,57000
0,20000
1,54000
0,38000
6,33000
537,77000
0,16000
0,10000
0,81000
2,31000
1,85000
3,00000
0,90000
0,49000
2,77000
1,00000
3,00000
3,00000
1,00000
1,00000
3,50000

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
1.582,08
31,66
10,17
6.960,01
11,31
11,76

3,86400
3,32640
1.828,50000
1.407,60000
2.587,50000
2,67120
2,13920
87,92800
28,48740
3,80000
105,96680
84,48300
15,16550
69,40090
12,23400
7,08400
6,52840
17,09100
118,30940
0,74720
0,48700
10,99170
15,38460
19,16600
4,41000
5,85900
7,82040
1,99440
1.582,08000
94,98000
30,51000
6.960,01000
11,31000
41,16000
Pgina: 151

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.21.77
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
4.30.16
CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.20
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.23
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.38
CABO DE COBRE NU DE 16 MM2
4.30.54
CABO DE COBRE NU 50 MM2
4.31.30
CORDOALHA DE COBRE NU DE 95 MM2
4.37.03
CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL
4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
4.41.59
FUSIVEL NH DE 300 A 400A
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.04
PORTA EXTERNA METLICA C/VENEZIANAS 185X115CM
4.51.07
CAIXA DE MEDICO TIPO A3 P/POSTO PRIMRIO CH.16 MS
4.51.14
CAIXA TIPO "S" 60X110CM # 16 MSG
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.80.70
PARA-RAIO DE LINHA 15KV
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.62
BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.34
PARAFUSO ABAULADO M 16X45MM
4.95.35
PARAFUSO ABAULADO M 10X115MM
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 6.061,78300
LS
7.395,37526
SubMO
09.01.031
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.50
Exerccio:

UN Coeficiente

13.457,15826

M
6,00000
M
3,50000
M
10,00000
M
30,00000
M
6,00000
M
12,00000
M
12,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
UN
3,00000
UN
8,00000
UN
3,00000
UN
2,00000
UN
32,00000
UN
2,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
1,00000
UN
3,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
3,00000
UN
3,00000
UN
1,00000
M
0,20000
Material
17.246,55650

TE-02 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 150KVA-ELETROP.


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE DE CONCRETO CIRCULAR 12M/1000 DAN

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN

0,84000
0,84000
345,00000
345,00000
345,00000
0,56000
0,56000
18,95000
6,01000
1,00000
27,74000
1,05000
43,33000
187,57000
0,20000
1,54000
0,38000
6,33000
537,77000
0,16000
0,10000
0,81000
2,31000
1,85000
3,00000
0,90000
0,49000
2,77000
1,00000

Custo Unit.

Custo Total

41,15
246,90000
9,50
33,25000
36,26
362,60000
71,84
2.155,20000
7,49
44,94000
24,71
296,52000
38,41
460,92000
289,66
289,66000
123,83
371,49000
32,82
98,46000
89,19
89,19000
622,25
622,25000
603,05
603,05000
305,74
611,48000
70,23
210,69000
3,84
11,52000
27,75
83,25000
128,66
385,98000
148,00
296,00000
38,00
76,00000
14,41
14,41000
1,14
4,56000
5,03
15,09000
9,31
74,48000
88,55
265,65000
63,00
126,00000
0,55
17,60000
16,50
33,00000
5,84
5,84000
7,22
21,66000
4,46
13,38000
2,23
20,07000
30,83
30,83000
7,01
21,03000
1,57
6,28000
1,14
2,28000
3,00
9,00000
0,88
2,64000
2,35
7,05000
2,04
18,36000
11,23
33,69000
3,15
9,45000
8,92
8,92000
93,65
18,73000
BDI
7.061,85440

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
1.582,08

41.013,47
3,86400
3,32640
1.828,50000
1.407,60000
2.587,50000
2,67120
2,13920
87,92800
28,48740
3,80000
105,96680
84,48300
15,16550
69,40090
12,23400
7,08400
6,52840
17,09100
118,30940
0,74720
0,48700
10,99170
15,38460
19,16600
4,41000
5,85900
7,82040
1,99440
1.582,08000
Pgina: 152

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.05.03
ISOLADOR DISCO 150MM DE PORCELANA
4.05.07
ISOLADOR DE PINO 15KV-PORCELANA
4.10.05
TRANSF 150 KVA AT=13,2+/-5%BT=220/227
4.21.47
CABEOTE DE ALUMNIO DN=65MM
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.76
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
4.30.19
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
4.30.21
CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.38
CABO DE COBRE NU DE 16 MM2
4.30.41
CABO DE COBRE NU DE 35 MM2
4.31.30
CORDOALHA DE COBRE NU DE 95 MM2
4.37.03
CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL
4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
4.41.59
FUSIVEL NH DE 300 A 400A
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.04
PORTA EXTERNA METLICA C/VENEZIANAS 185X115CM
4.51.07
CAIXA DE MEDICO TIPO A3 P/POSTO PRIMRIO CH.16 MS
4.51.14
CAIXA TIPO "S" 60X110CM # 16 MSG
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.80.70
PARA-RAIO DE LINHA 15KV
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.62
BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.36
TERMINAL PRES P/CABO 150MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.34
PARAFUSO ABAULADO M 16X45MM
4.95.35
PARAFUSO ABAULADO M 10X115MM
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 6.061,78300
LS
7.395,37526
SubMO
09.01.032
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
Exerccio:

UN Coeficiente

13.457,15826

UN
3,00000
UN
3,00000
UN
1,00000
UN
2,00000
M
3,50000
M
12,00000
M
20,00000
M
60,00000
M
15,00000
M
15,00000
M
12,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
UN
3,00000
UN
16,00000
UN
3,00000
UN
2,00000
UN
32,00000
UN
2,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
1,00000
UN
3,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
3,00000
UN
3,00000
UN
1,00000
M
0,20000
Material
19.887,12650

TE-03 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 225KVA-ELETROP.


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN

0,84000
0,84000
345,00000
345,00000
345,00000
0,56000
0,56000
18,95000
6,01000
1,00000
27,74000
1,05000
43,33000
187,57000
0,20000
1,54000
0,38000
6,33000
537,77000
0,16000
0,10000
0,81000
2,31000
1,85000
3,00000

Custo Unit.

Custo Total

31,66
94,98000
10,17
30,51000
8.487,88
8.487,88000
6,54
13,08000
20,14
70,49000
36,37
436,44000
26,17
523,40000
46,74
2.804,40000
7,49
112,35000
19,98
299,70000
38,41
460,92000
289,66
289,66000
123,83
371,49000
32,82
98,46000
89,19
89,19000
622,25
622,25000
603,05
603,05000
305,74
611,48000
70,23
210,69000
3,84
11,52000
27,75
83,25000
128,66
385,98000
148,00
296,00000
38,00
76,00000
14,41
14,41000
1,14
4,56000
5,03
15,09000
7,45
119,20000
88,55
265,65000
63,00
126,00000
0,55
17,60000
16,50
33,00000
5,84
5,84000
7,22
21,66000
4,46
13,38000
2,23
20,07000
30,83
30,83000
7,01
21,03000
1,57
6,28000
1,14
2,28000
3,00
9,00000
0,88
2,64000
2,35
7,05000
2,04
18,36000
11,23
33,69000
3,15
9,45000
8,92
8,92000
93,65
18,73000
BDI
7.669,18550

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47

47.036,49
3,86400
3,32640
1.828,50000
1.407,60000
2.587,50000
2,67120
2,13920
87,92800
28,48740
3,80000
105,96680
84,48300
15,16550
69,40090
12,23400
7,08400
6,52840
17,09100
118,30940
0,74720
0,48700
10,99170
15,38460
19,16600
4,41000
Pgina: 153

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
3.80.40
LIXA D"AGUA
4.01.50
POSTE DE CONCRETO CIRCULAR 12M/1000 DAN
4.05.03
ISOLADOR DISCO 150MM DE PORCELANA
4.05.07
ISOLADOR DE PINO 15KV-PORCELANA
4.10.06
TRANSF 225KVA AT=13.2KV+-5%BT=220/127
4.21.49
CABEOTE DE ALUMNIO DN=80MM
4.21.75
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
4.21.77
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
4.30.20
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.23
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.38
CABO DE COBRE NU DE 16 MM2
4.30.41
CABO DE COBRE NU DE 35 MM2
4.31.30
CORDOALHA DE COBRE NU DE 95 MM2
4.36.88
CHAVE SECCIONADORA NH 3X500A S/ FUSIVEIS
4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
4.41.67
FUSIVEL NH DE 425 A 630A
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.04
PORTA EXTERNA METLICA C/VENEZIANAS 185X115CM
4.51.07
CAIXA DE MEDICO TIPO A3 P/POSTO PRIMRIO CH.16 MS
4.51.14
CAIXA TIPO "S" 60X110CM # 16 MSG
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.80.70
PARA-RAIO DE LINHA 15KV
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.62
BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.34
PARAFUSO ABAULADO M 16X45MM
4.95.35
PARAFUSO ABAULADO M 10X115MM
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 6.061,78300
LS
7.395,37526
SubMO
09.01.033
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
Exerccio:

UN Coeficiente

13.457,15826

L
0,90000
L
0,49000
UN
2,77000
UN
1,00000
UN
3,00000
UN
3,00000
UN
1,00000
UN
2,00000
M
3,50000
M
12,00000
M
20,00000
M
60,00000
M
15,00000
M
15,00000
M
12,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
UN
3,00000
UN
16,00000
UN
3,00000
UN
2,00000
UN
32,00000
UN
2,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
1,00000
UN
3,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
3,00000
UN
3,00000
UN
1,00000
M
0,20000
Material
24.783,89650

TE-04 POSTO DE TRANSFORMAO DE ENERGIA POSTE C/TRAFO 300KVA ELETROP.


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG

0,84000
0,84000
345,00000
345,00000
345,00000
0,56000
0,56000
18,95000
6,01000
1,00000
27,74000
1,05000
43,33000
187,57000
0,20000
1,54000
0,38000
6,33000
537,77000
0,16000
0,10000

Custo Unit.

Custo Total

6,51
5,85900
15,96
7,82040
0,72
1,99440
1.582,08
1.582,08000
31,66
94,98000
10,17
30,51000
11.158,33
11.158,33000
11,31
22,62000
24,66
86,31000
41,15
493,80000
36,26
725,20000
71,84
4.310,40000
7,49
112,35000
19,98
299,70000
38,41
460,92000
656,25
656,25000
123,83
371,49000
45,97
137,91000
89,19
89,19000
622,25
622,25000
603,05
603,05000
305,74
611,48000
70,23
210,69000
3,84
11,52000
27,75
83,25000
128,66
385,98000
148,00
296,00000
38,00
76,00000
14,41
14,41000
1,14
4,56000
5,03
15,09000
9,31
148,96000
88,55
265,65000
63,00
126,00000
0,55
17,60000
16,50
33,00000
5,84
5,84000
7,22
21,66000
4,46
13,38000
2,23
20,07000
30,83
30,83000
7,01
21,03000
1,57
6,28000
1,14
2,28000
3,00
9,00000
0,88
2,64000
2,35
7,05000
2,04
18,36000
11,23
33,69000
3,15
9,45000
8,92
8,92000
93,65
18,73000
BDI
8.795,44260

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87

50.613,12
3,86400
3,32640
1.828,50000
1.407,60000
2.587,50000
2,67120
2,13920
87,92800
28,48740
3,80000
105,96680
84,48300
15,16550
69,40090
12,23400
7,08400
6,52840
17,09100
118,30940
0,74720
0,48700
Pgina: 154

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.80.56
GRAFITE
3.75.42
TINTA LATEX STANDARD
3.80.09
SELADOR P/PINTURA LATEX
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
3.80.40
LIXA D"AGUA
4.01.50
POSTE DE CONCRETO CIRCULAR 12M/1000 DAN
4.05.03
ISOLADOR DISCO 150MM DE PORCELANA
4.05.07
ISOLADOR DE PINO 15KV-PORCELANA
4.10.07
TRANSF 300KVA AT=13.2KV+-5%BT=220/127
4.21.47
CABEOTE DE ALUMNIO DN=65MM
4.21.75
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
4.21.76
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
4.30.19
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
4.30.22
CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.41
CABO DE COBRE NU DE 35 MM2
4.31.30
CORDOALHA DE COBRE NU DE 95 MM2
4.36.88
CHAVE SECCIONADORA NH 3X500A S/ FUSIVEIS
4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
4.41.67
FUSIVEL NH DE 425 A 630A
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.04
PORTA EXTERNA METLICA C/VENEZIANAS 185X115CM
4.51.07
CAIXA DE MEDICO TIPO A3 P/POSTO PRIMRIO CH.16 MS
4.51.14
CAIXA TIPO "S" 60X110CM # 16 MSG
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.80.70
PARA-RAIO DE LINHA 15KV
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.62
BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.35
PARAFUSO ABAULADO M 10X115MM
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 6.061,78300
LS
7.395,37526
SubMO
09.01.036
1.01.15
1.01.16
1.01.17
2.70.29
4.01.14
4.05.02
4.05.07
4.10.03
4.21.12
4.21.67
4.21.78
4.25.04
4.30.15
4.30.23
4.30.41
4.31.30
4.36.58
4.51.23
4.51.25
4.80.06
Exerccio:

UN Coeficiente

13.457,15826

POSTO DE TRANSFORMACAO EM POSTE C/TRAFO 75KVA PADRAO CESP/CPFL


ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
ARAME GALVANIZADO N.12
POSTE RED TRICONICO 400KGX9M
ISOLADOR DE DISCO DE 175MM DE VIDRO
ISOLADOR DE PINO 15KV-PORCELANA
TRANSF 75KVA,AT=132KV+-5%BT=220/127
CURVA ACO GALV QUENTE 89MM (3 1/2")X90-CACHIMBO
LUVA ACO GALV QUENTE (NBR 5624) 89 MM (3 1/2")
ELETROD ACO GALV QUENTE (NBR-5624) 90 MM (3 1/2")
ELETRODUTO PVC RIGIDO 38MM (1 1/4)
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU DE 35 MM2
CORDOALHA DE COBRE NU DE 95 MM2
CHAVE FACA BLIND TRIP C/FUSIVEL 400A
CAIXA P/TRANSF COR 60X70X25CM CESP
CAIXA P/MEDICAO ENERGIA/ATIV/REATI 70X60X25CM CESP
PARA RAIO TIPO VALVULA-15KV C/FERRAG

2011

L
0,81000
L
2,31000
L
1,85000
UN
3,00000
L
0,90000
L
0,49000
UN
2,77000
UN
1,00000
UN
3,00000
UN
3,00000
UN
1,00000
UN
3,00000
M
3,50000
M
18,00000
M
20,00000
M
90,00000
M
15,00000
M
12,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
UN
3,00000
UN
16,00000
UN
3,00000
UN
2,00000
UN
32,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
1,00000
UN
3,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
3,00000
UN
3,00000
UN
1,00000
M
0,20000
Material
27.691,72650
UN
H
H
H
KG
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M
UN
UN
UN
UN

297,50000
297,50000
297,50000
0,82950
1,00000
6,00000
3,00000
1,00000
2,00000
2,00000
3,00000
2,00000
6,00000
40,00000
24,00000
3,00000
1,00000
1,00000
1,00000
3,00000

Custo Unit.

Custo Total

13,57
10,99170
6,66
15,38460
10,36
19,16600
1,47
4,41000
6,51
5,85900
15,96
7,82040
0,72
1,99440
1.582,08
1.582,08000
31,66
94,98000
10,17
30,51000
13.415,13
13.415,13000
6,54
19,62000
24,66
86,31000
36,37
654,66000
26,17
523,40000
57,30
5.157,00000
19,98
299,70000
38,41
460,92000
656,25
656,25000
123,83
371,49000
45,97
137,91000
89,19
89,19000
622,25
622,25000
603,05
603,05000
305,74
611,48000
70,23
210,69000
3,84
11,52000
27,75
83,25000
128,66
385,98000
148,00
296,00000
38,00
76,00000
14,41
14,41000
1,14
4,56000
5,03
15,09000
9,31
148,96000
88,55
265,65000
63,00
126,00000
0,55
17,60000
5,84
5,84000
7,22
21,66000
4,46
13,38000
2,23
20,07000
30,83
30,83000
7,01
21,03000
1,14
2,28000
3,00
9,00000
0,88
2,64000
2,35
7,05000
2,04
18,36000
11,23
33,69000
3,15
9,45000
8,92
8,92000
93,65
18,73000
BDI
9.464,24350

5,30
4,08
7,50
6,53
563,41
20,66
10,17
5.621,15
16,79
3,34
13,47
5,42
5,98
71,84
19,98
38,41
926,85
55,71
75,85
128,66

29.543,55
1.576,75000
1.213,80000
2.231,25000
5,41664
563,41000
123,96000
30,51000
5.621,15000
33,58000
6,68000
40,41000
10,84000
35,88000
2.873,60000
479,52000
115,23000
926,85000
55,71000
75,85000
385,98000
Pgina: 155

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.45
BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.09
CRUZETA MADEIRA DE 2400MM
4.95.12
MAO FRANCESA 710 MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.33
GANCHO OLHAL
4.95.34
PARAFUSO ABAULADO M 16X45MM
4.95.35
PARAFUSO ABAULADO M 10X115MM
4.95.36
PARAFUSO QUADRADO M 16X45MM
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.38
ARRUELA QUADRADA 34MM FURO 12MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.66
SUPORTE P/TRANSF EM POSTE/ESTALEIRO
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.50
NIPLE DUPLO FERRO GALV 3"
6.20.95
TUBO CERAMICO DN 300MM (12")
Mo-de-Obra 5.021,80000
LS
6.126,59600
09.01.037
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.51
4.05.02
4.05.07
4.10.04
4.21.49
4.21.72
4.21.77
4.30.20
4.30.23
4.30.39
4.30.41
4.36.58
4.37.12
4.45.10
4.51.05
4.51.06
4.80.06
Exerccio:

UN Coeficiente

SubMO

11.148,39600

UN
4,00000
UN
4,00000
UN
4,00000
UN
4,00000
UN
1,00000
UN
12,00000
UN
3,00000
UN
4,00000
UN
2,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
10,00000
UN
3,00000
UN
2,00000
UN
4,00000
UN
2,00000
UN
2,00000
UN
4,00000
UN
8,00000
UN
3,00000
UN
2,00000
UN
9,00000
UN
3,00000
UN
3,00000
UN
2,00000
M
4,00000
Material
12.870,75664

TE-05 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 112,5KVA-CPFL


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE DE CONCRETO CIRCULAR 10,50M/400 DAN
ISOLADOR DE DISCO DE 175MM DE VIDRO
ISOLADOR DE PINO 15KV-PORCELANA
TRANSF 112.5KVA AT=13.2KV/5%BT=
CABEOTE DE ALUMNIO DN=80MM
ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1")
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU DE 95 MM2
CABO DE COBRE NU DE 35 MM2
CHAVE FACA BLIND TRIP C/FUSIVEL 400A
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
PORTA EXTERNA METLICA C/VENEZIANAS 180X160CM
CAIXA DE MEDIO B.T. (180X160X40) # 16 MSF-CPFL
PARA RAIO TIPO VALVULA-15KV C/FERRAG

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M
UN
UN
UN
UN
UN
UN

0,80000
0,80000
345,00000
345,00000
345,00000
0,53000
0,53000
18,16000
5,76000
0,93000
26,59000
1,00000
41,53000
179,83000
0,19000
1,47000
0,36000
5,23000
515,59000
0,15000
0,10000
1,10000
1,70000
1,78000
4,08000
0,90000
0,68000
2,70000
1,00000
3,00000
3,00000
1,00000
1,00000
3,50000
6,00000
10,00000
30,00000
6,00000
40,00000
1,00000
3,00000
1,00000
1,00000
1,00000
3,00000

Custo Unit.

BDI

Custo Total

70,23
280,92000
3,84
15,36000
14,41
57,64000
4,50
18,00000
5,03
5,03000
9,31
111,72000
88,55
265,65000
0,55
2,20000
73,99
147,98000
7,37
29,48000
5,84
11,68000
7,22
21,66000
4,46
13,38000
2,23
22,30000
7,01
21,03000
1,57
3,14000
1,14
4,56000
1,70
3,40000
3,00
6,00000
0,34
1,36000
0,88
7,04000
2,35
7,05000
61,70
123,40000
2,04
18,36000
11,23
33,69000
3,15
9,45000
32,41
64,82000
44,97
179,88000
5.524,40511

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
616,39
20,66
10,17
6.960,01
11,31
11,76
41,15
36,26
71,84
42,22
19,98
926,85
123,83
89,19
820,80
912,00
128,66

37.843,19
3,68000
3,16800
1.828,50000
1.407,60000
2.587,50000
2,52810
2,02460
84,26240
27,30240
3,53400
101,57380
80,46000
14,53550
66,53710
11,62230
6,76200
6,18480
14,12100
113,42980
0,70050
0,48700
14,92700
11,32200
18,44080
5,99760
5,85900
10,85280
1,94400
616,39000
61,98000
30,51000
6.960,01000
11,31000
41,16000
246,90000
362,60000
2.155,20000
253,32000
799,20000
926,85000
371,49000
89,19000
820,80000
912,00000
385,98000
Pgina: 156

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.45
BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.34
PARAFUSO ABAULADO M 16X45MM
4.95.35
PARAFUSO ABAULADO M 10X115MM
4.95.36
PARAFUSO QUADRADO M 16X45MM
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.38
ARRUELA QUADRADA 34MM FURO 12MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.66
SUPORTE P/TRANSF EM POSTE/ESTALEIRO
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
4.96.50
NIPLE DUPLO FERRO GALV 3"
Mo-de-Obra 6.051,67330
LS
7.383,04143
SubMO
09.01.038
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.13
4.05.02
4.05.07
4.05.16
4.10.05
4.21.47
4.21.74
4.21.76
4.30.19
4.30.21
4.30.41
4.30.43
4.36.58
4.37.12
Exerccio:

UN Coeficiente

13.434,71473

UN
8,00000
UN
8,00000
UN
8,00000
UN
2,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
8,00000
UN
3,00000
UN
2,00000
UN
4,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
10,00000
UN
1,00000
UN
3,00000
UN
2,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
4,00000
UN
8,00000
UN
3,00000
UN
2,00000
UN
9,00000
UN
3,00000
UN
3,00000
M
0,20000
UN
2,00000
Material
17.332,11320

TE-06 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 150KVA-CPFL


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE CONCRETO 600KGF H=10.5M
ISOLADOR DE DISCO DE 175MM DE VIDRO
ISOLADOR DE PINO 15KV-PORCELANA
ISOLADOR TIPO CASTANHA 85MM PORC 1KV
TRANSF 150 KVA AT=13,2+/-5%BT=220/227
CABEOTE DE ALUMNIO DN=65MM
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU DE 35 MM2
CABO DE COBRE NU DE 70 MM2
CHAVE FACA BLIND TRIP C/FUSIVEL 400A
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M
UN
UN

0,80000
0,80000
345,00000
345,00000
345,00000
0,53000
0,53000
18,16000
5,76000
0,93000
26,59000
1,00000
41,53000
179,83000
0,19000
1,47000
0,36000
5,23000
515,59000
0,15000
0,10000
1,10000
1,70000
1,78000
4,08000
0,90000
0,68000
2,70000
1,00000
3,00000
3,00000
2,00000
1,00000
2,00000
3,50000
12,00000
20,00000
60,00000
40,00000
24,00000
1,00000
3,00000

Custo Unit.

BDI

Custo Total

70,23
561,84000
3,84
30,72000
27,75
222,00000
38,00
76,00000
14,41
28,82000
4,50
13,50000
5,03
15,09000
9,31
74,48000
88,55
265,65000
63,00
126,00000
0,55
2,20000
16,50
66,00000
5,84
11,68000
7,22
21,66000
4,46
13,38000
2,23
22,30000
30,83
30,83000
7,01
21,03000
1,57
3,14000
1,14
3,42000
1,70
3,40000
3,00
6,00000
0,34
1,36000
0,88
7,04000
2,35
7,05000
61,70
123,40000
2,04
18,36000
11,23
33,69000
3,15
9,45000
93,65
18,73000
32,41
64,82000
7.076,37042

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
853,70
20,66
10,17
8,21
8.487,88
6,54
20,14
36,37
26,17
46,74
19,98
38,05
926,85
123,83

41.499,75
3,68000
3,16800
1.828,50000
1.407,60000
2.587,50000
2,52810
2,02460
84,26240
27,30240
3,53400
101,57380
80,46000
14,53550
66,53710
11,62230
6,76200
6,18480
14,12100
113,42980
0,70050
0,48700
14,92700
11,32200
18,44080
5,99760
5,85900
10,85280
1,94400
853,70000
61,98000
30,51000
16,42000
8.487,88000
13,08000
70,49000
436,44000
523,40000
2.804,40000
799,20000
913,20000
926,85000
371,49000
Pgina: 157

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.06
CAIXA DE MEDIO B.T. (180X160X40) # 16 MSF-CPFL
4.80.06
PARA RAIO TIPO VALVULA-15KV C/FERRAG
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.44
BUCHA E ARRUELA EM ZAMAK 76 MM (3")
4.94.34
TERMINAL PRES P/CABO 70MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.41
TERMINAL PRES P/CABO 120MM2
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.95.87
PARAFUSO QUADRADO M 16X150MM
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
4.96.50
NIPLE DUPLO FERRO GALV 3"
Mo-de-Obra 6.051,67330
LS
7.383,04143
SubMO
09.01.039
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.53
4.05.02
4.05.07
4.05.16
4.10.06
4.21.49
4.21.75
4.21.77
4.30.20
4.30.23
4.30.41
4.30.43
4.36.59
4.37.12
4.45.10
Exerccio:

UN Coeficiente

13.434,71473

UN
1,00000
UN
1,00000
UN
3,00000
UN
8,00000
UN
8,00000
UN
8,00000
UN
2,00000
UN
2,00000
UN
2,00000
UN
6,00000
UN
1,00000
UN
3,00000
UN
2,00000
UN
4,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
10,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
13,00000
UN
24,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
3,00000
M
0,20000
UN
4,00000
Material
20.304,92320

TE-07 POSTO DE TRANSFORMACAO DE ENERGIA POSTE C/TRAFO 225KVA-CPFL


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE DE CONCRETO CIRCULAR 10,50M/1000 DAN
ISOLADOR DE DISCO DE 175MM DE VIDRO
ISOLADOR DE PINO 15KV-PORCELANA
ISOLADOR TIPO CASTANHA 85MM PORC 1KV
TRANSF 225KVA AT=13.2KV+-5%BT=220/127
CABEOTE DE ALUMNIO DN=80MM
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU DE 35 MM2
CABO DE COBRE NU DE 70 MM2
CHAVE FACA BLIND TRIP C/FUSIVEL 600A
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M
UN
UN
UN

0,80000
0,80000
345,00000
345,00000
345,00000
0,53000
0,53000
18,16000
5,76000
0,93000
26,59000
1,00000
41,53000
179,83000
0,19000
1,47000
0,36000
5,23000
515,59000
0,15000
0,10000
1,10000
1,70000
1,78000
4,08000
0,90000
0,68000
2,70000
1,00000
3,00000
3,00000
2,00000
1,00000
2,00000
3,50000
12,00000
20,00000
60,00000
40,00000
6,00000
1,00000
3,00000
1,00000

Custo Unit.

Custo Total

89,19
89,19000
912,00
912,00000
128,66
385,98000
70,23
561,84000
3,84
30,72000
27,75
222,00000
148,00
296,00000
38,00
76,00000
14,41
28,82000
3,20
19,20000
3,32
3,32000
88,55
265,65000
63,00
126,00000
0,55
2,20000
16,50
66,00000
5,84
11,68000
7,22
21,66000
4,46
13,38000
2,23
22,30000
30,83
30,83000
7,01
21,03000
3,00
9,00000
0,88
11,44000
7,55
181,20000
2,35
7,05000
11,23
33,69000
2,85
5,70000
3,15
9,45000
93,65
18,73000
32,41
129,64000
BDI
7.760,11672

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
1.264,39
20,66
10,17
8,21
11.158,33
11,31
24,66
41,15
36,26
71,84
19,98
38,05
1.099,33
123,83
89,19

46.665,07
3,68000
3,16800
1.828,50000
1.407,60000
2.587,50000
2,52810
2,02460
84,26240
27,30240
3,53400
101,57380
80,46000
14,53550
66,53710
11,62230
6,76200
6,18480
14,12100
113,42980
0,70050
0,48700
14,92700
11,32200
18,44080
5,99760
5,85900
10,85280
1,94400
1.264,39000
61,98000
30,51000
16,42000
11.158,33000
22,62000
86,31000
493,80000
725,20000
4.310,40000
799,20000
228,30000
1.099,33000
371,49000
89,19000
Pgina: 158

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.51.06
CAIXA DE MEDIO B.T. (180X160X40) # 16 MSF-CPFL
4.80.06
PARA RAIO TIPO VALVULA-15KV C/FERRAG
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.45
BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.95.87
PARAFUSO QUADRADO M 16X150MM
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
4.96.50
NIPLE DUPLO FERRO GALV 3"
Mo-de-Obra 6.051,67330
LS
7.383,04143
SubMO
09.01.040
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.53
4.05.02
4.05.07
4.05.16
4.10.07
4.21.47
4.21.75
4.21.76
4.30.19
4.30.22
4.30.39
4.30.41
4.36.59
4.37.12
4.45.10
Exerccio:

UN Coeficiente

13.434,71473

UN
1,00000
UN
3,00000
UN
8,00000
UN
8,00000
UN
8,00000
UN
2,00000
UN
2,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
8,00000
UN
3,00000
UN
2,00000
UN
4,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
10,00000
UN
1,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
3,00000
UN
9,00000
UN
3,00000
UN
2,00000
UN
3,00000
M
0,20000
UN
2,00000
Material
24.504,37320

TE-08 POSTO DE TRANSFORMAO DE ENERGIA POSTE C/TRAFO 300KVA-CPFL


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE DE CONCRETO CIRCULAR 10,50M/1000 DAN
ISOLADOR DE DISCO DE 175MM DE VIDRO
ISOLADOR DE PINO 15KV-PORCELANA
ISOLADOR TIPO CASTANHA 85MM PORC 1KV
TRANSF 300KVA AT=13.2KV+-5%BT=220/127
CABEOTE DE ALUMNIO DN=65MM
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU DE 95 MM2
CABO DE COBRE NU DE 35 MM2
CHAVE FACA BLIND TRIP C/FUSIVEL 600A
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M
UN
UN
UN

0,80000
0,80000
345,00000
345,00000
345,00000
0,53000
0,53000
18,16000
5,76000
0,93000
26,59000
1,00000
41,53000
179,83000
0,19000
1,47000
0,36000
5,23000
515,59000
0,15000
0,10000
1,10000
1,70000
1,78000
4,08000
0,90000
0,68000
2,70000
1,00000
3,00000
3,00000
2,00000
1,00000
3,00000
3,50000
18,00000
20,00000
90,00000
6,00000
40,00000
1,00000
3,00000
1,00000

Custo Unit.

Custo Total

912,00
912,00000
128,66
385,98000
70,23
561,84000
3,84
30,72000
27,75
222,00000
148,00
296,00000
38,00
76,00000
14,41
28,82000
4,50
13,50000
5,03
15,09000
9,31
74,48000
88,55
265,65000
63,00
126,00000
0,55
2,20000
16,50
66,00000
5,84
11,68000
7,22
21,66000
4,46
13,38000
2,23
22,30000
30,83
30,83000
7,01
21,03000
3,00
6,00000
0,88
1,76000
2,35
7,05000
2,04
18,36000
11,23
33,69000
2,85
5,70000
3,15
9,45000
93,65
18,73000
32,41
64,82000
BDI
8.725,99022

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
1.264,39
20,66
10,17
8,21
13.415,13
6,54
24,66
36,37
26,17
57,30
42,22
19,98
1.099,33
123,83
89,19

51.497,67
3,68000
3,16800
1.828,50000
1.407,60000
2.587,50000
2,52810
2,02460
84,26240
27,30240
3,53400
101,57380
80,46000
14,53550
66,53710
11,62230
6,76200
6,18480
14,12100
113,42980
0,70050
0,48700
14,92700
11,32200
18,44080
5,99760
5,85900
10,85280
1,94400
1.264,39000
61,98000
30,51000
16,42000
13.415,13000
19,62000
86,31000
654,66000
523,40000
5.157,00000
253,32000
799,20000
1.099,33000
371,49000
89,19000
Pgina: 159

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.51.05
PORTA EXTERNA METLICA C/VENEZIANAS 180X160CM
4.51.06
CAIXA DE MEDIO B.T. (180X160X40) # 16 MSF-CPFL
4.80.06
PARA RAIO TIPO VALVULA-15KV C/FERRAG
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.45
BUCHA E ARRUELA EM ZAMAK 89 MM (3 1/2")
4.94.34
TERMINAL PRES P/CABO 70MM2
4.94.36
TERMINAL PRES P/CABO 150MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.33
GANCHO OLHAL
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.95.87
PARAFUSO QUADRADO M 16X150MM
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
4.96.50
NIPLE DUPLO FERRO GALV 3"
Mo-de-Obra 6.051,67330
LS
7.383,04143
SubMO
09.01.046
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.51
4.05.03
4.05.07
4.10.04
4.21.49
4.21.72
4.21.77
4.30.20
4.30.23
4.30.54
4.31.30
4.37.03
4.37.12
4.41.59
Exerccio:

UN Coeficiente

13.434,71473

TE-09 POSTO DE TRANSFORMAO DE ENERGIA POSTE C/TRAFO 112,5KVA


ELEKTRO
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE DE CONCRETO CIRCULAR 10,50M/400 DAN
ISOLADOR DISCO 150MM DE PORCELANA
ISOLADOR DE PINO 15KV-PORCELANA
TRANSF 112.5KVA AT=13.2KV/5%BT=
CABEOTE DE ALUMNIO DN=80MM
ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1")
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU 50 MM2
CORDOALHA DE COBRE NU DE 95 MM2
CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
FUSIVEL NH DE 300 A 400A

2011

UN
1,00000
UN
1,00000
UN
3,00000
UN
8,00000
UN
8,00000
UN
8,00000
UN
2,00000
UN
2,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
8,00000
UN
3,00000
UN
2,00000
UN
4,00000
UN
4,00000
UN
2,00000
UN
3,00000
UN
3,00000
UN
10,00000
UN
3,00000
UN
2,00000
UN
13,00000
UN
3,00000
UN
9,00000
UN
3,00000
UN
2,00000
UN
3,00000
M
0,20000
UN
4,00000
Material
28.433,31320

Custo Unit.

820,80
820,80000
912,00
912,00000
128,66
385,98000
70,23
561,84000
3,84
30,72000
27,75
222,00000
148,00
296,00000
38,00
76,00000
14,41
28,82000
4,50
13,50000
3,32
9,96000
7,45
59,60000
88,55
265,65000
63,00
126,00000
0,55
2,20000
16,50
66,00000
5,84
11,68000
7,22
21,66000
4,46
13,38000
2,23
22,30000
7,01
21,03000
3,00
6,00000
0,88
11,44000
2,35
7,05000
2,04
18,36000
11,23
33,69000
2,85
5,70000
3,15
9,45000
93,65
18,73000
32,41
129,64000
BDI
9.629,64642

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M
UN
UN
UN

Custo Total

36.085,40
0,86000
0,86000
345,00000
345,00000
345,00000
0,57000
0,57000
19,53000
6,19000
1,00000
28,59000
1,08000
44,66000
193,37000
0,20000
1,58000
0,39000
6,52000
554,40000
0,16000
0,11000
0,66000
2,36000
1,87000
3,06000
0,90000
0,50000
2,77000
1,00000
3,00000
3,00000
1,00000
1,00000
3,50000
6,00000
10,00000
30,00000
12,00000
3,50000
1,00000
3,00000
3,00000

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
616,39
31,66
10,17
6.960,01
11,31
11,76
41,15
36,26
71,84
24,71
38,41
289,66
123,83
32,82

3,95600
3,40560
1.828,50000
1.407,60000
2.587,50000
2,71890
2,17740
90,61920
29,34060
3,80000
109,21380
86,89680
15,63100
71,54690
12,23400
7,26800
6,70020
17,60400
121,96800
0,74720
0,53570
8,95620
15,71760
19,37320
4,49820
5,85900
7,98000
1,99440
616,39000
94,98000
30,51000
6.960,01000
11,31000
41,16000
246,90000
362,60000
2.155,20000
296,52000
134,43500
289,66000
371,49000
98,46000
Pgina: 160

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.03
PORTA EXTERNA METLICA C/VENEZIANAS 185X95CM
4.51.09
CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO
4.51.11
CAIXA TIPO 'T' 60X90X25CM ELETROPAULO
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.80.70
PARA-RAIO DE LINHA 15KV
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.62
BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.12
MAO FRANCESA 710 MM
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 6.068,83150
LS
7.403,97443
SubMO
09.01.047
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.13
4.05.03
4.05.07
4.10.05
4.21.47
4.21.74
4.21.76
4.30.19
4.30.21
4.30.43
4.30.54
4.37.03
Exerccio:

UN Coeficiente

13.472,80593

UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
UN
3,00000
UN
8,00000
UN
3,00000
UN
4,00000
UN
32,00000
UN
4,00000
UN
4,00000
UN
4,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
1,00000
UN
3,00000
UN
32,00000
UN
32,00000
UN
9,00000
UN
9,00000
UN
9,00000
UN
3,00000
UN
1,00000
M
0,20000
Material
15.864,92540

TE-10 POSTO DE TRANSFORMAO DE ENERGIA POSTE C/TRAFO 150KVA ELEKTRO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE CONCRETO 600KGF H=10.5M
ISOLADOR DISCO 150MM DE PORCELANA
ISOLADOR DE PINO 15KV-PORCELANA
TRANSF 150 KVA AT=13,2+/-5%BT=220/227
CABEOTE DE ALUMNIO DN=65MM
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU DE 70 MM2
CABO DE COBRE NU 50 MM2
CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M
UN

0,86000
0,86000
345,00000
345,00000
345,00000
0,57000
0,57000
19,53000
6,19000
1,00000
28,59000
1,08000
44,66000
193,37000
0,20000
1,58000
0,39000
6,52000
554,40000
0,16000
0,11000
0,66000
2,36000
1,87000
3,06000
0,90000
0,50000
2,77000
1,00000
3,00000
3,00000
1,00000
2,00000
3,50000
12,00000
20,00000
60,00000
7,00000
12,00000
1,00000

Custo Unit.

Custo Total

89,19
89,19000
520,60
520,60000
662,19
662,19000
242,93
242,93000
70,23
210,69000
3,84
11,52000
27,75
83,25000
128,66
385,98000
148,00
296,00000
38,00
76,00000
14,41
14,41000
1,14
4,56000
5,03
15,09000
9,31
74,48000
88,55
265,65000
63,00
252,00000
0,55
17,60000
7,37
29,48000
16,50
66,00000
5,84
23,36000
7,22
21,66000
4,46
13,38000
2,23
20,07000
30,83
30,83000
7,01
21,03000
3,00
96,00000
0,88
28,16000
2,35
21,15000
2,04
18,36000
11,23
101,07000
3,15
9,45000
8,92
8,92000
93,65
18,73000
BDI
6.747,67821

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
853,70
31,66
10,17
8.487,88
6,54
20,14
36,37
26,17
46,74
38,05
24,71
289,66

39.735,26
3,95600
3,40560
1.828,50000
1.407,60000
2.587,50000
2,71890
2,17740
90,61920
29,34060
3,80000
109,21380
86,89680
15,63100
71,54690
12,23400
7,26800
6,70020
17,60400
121,96800
0,74720
0,53570
8,95620
15,71760
19,37320
4,49820
5,85900
7,98000
1,99440
853,70000
94,98000
30,51000
8.487,88000
13,08000
70,49000
436,44000
523,40000
2.804,40000
266,35000
296,52000
289,66000
Pgina: 161

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
4.41.59
FUSIVEL NH DE 300 A 400A
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.03
PORTA EXTERNA METLICA C/VENEZIANAS 185X95CM
4.51.09
CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO
4.51.11
CAIXA TIPO 'T' 60X90X25CM ELETROPAULO
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.80.70
PARA-RAIO DE LINHA 15KV
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.62
BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2")
4.94.34
TERMINAL PRES P/CABO 70MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.12
MAO FRANCESA 710 MM
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.41
TERMINAL PRES P/CABO 120MM2
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 6.068,83150
LS
7.403,97443
SubMO
09.01.048
1.01.11
1.01.12
1.01.15
1.01.16
1.01.17
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.10.17
2.10.21
2.15.38
2.25.15
2.67.60
2.70.10
2.80.56
3.75.42
3.80.09
3.80.12
3.80.18
3.80.28
3.80.40
4.01.13
4.05.03
4.05.07
4.10.06
4.21.49
4.21.75
4.21.77
4.30.20
4.30.23
4.30.54
4.31.30
Exerccio:

UN Coeficiente

13.472,80593

UN
3,00000
UN
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
UN
6,00000
UN
3,00000
UN
4,00000
UN
32,00000
UN
4,00000
UN
4,00000
UN
4,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
1,00000
UN
3,00000
UN
32,00000
UN
32,00000
UN
16,00000
UN
9,00000
UN
9,00000
UN
9,00000
UN
3,00000
UN
1,00000
M
0,20000
Material
18.832,29040

TE-11 POSTO DE TRANSFORMAO DE ENERGIA POSTE C/TRAFO 225KVA ELEKTRO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO
PREGO
ARAME RECOZIDO N.18
GRAFITE
TINTA LATEX STANDARD
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
OLEO DE LINHACA
ZARCAO
LIXA D"AGUA
POSTE CONCRETO 600KGF H=10.5M
ISOLADOR DISCO 150MM DE PORCELANA
ISOLADOR DE PINO 15KV-PORCELANA
TRANSF 225KVA AT=13.2KV+-5%BT=220/127
CABEOTE DE ALUMNIO DN=80MM
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU 50 MM2
CORDOALHA DE COBRE NU DE 95 MM2

2011

UN
H
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M2
KG
UN
KG
KG
L
L
L
UN
L
L
UN
UN
UN
UN
UN
UN
M
M
M
M
M
M

0,86000
0,86000
345,00000
345,00000
345,00000
0,57000
0,57000
19,53000
6,19000
1,00000
28,59000
1,08000
44,66000
193,37000
0,20000
1,58000
0,39000
6,52000
554,40000
0,16000
0,11000
0,66000
2,36000
1,87000
3,06000
0,90000
0,50000
2,77000
1,00000
3,00000
3,00000
1,00000
2,00000
3,50000
12,00000
20,00000
60,00000
12,00000
7,00000

Custo Unit.

Custo Total

123,83
371,49000
32,82
98,46000
89,19
89,19000
520,60
520,60000
662,19
662,19000
242,93
242,93000
70,23
210,69000
27,75
83,25000
128,66
385,98000
148,00
296,00000
38,00
76,00000
14,41
14,41000
1,14
4,56000
3,32
19,92000
88,55
265,65000
63,00
252,00000
0,55
17,60000
7,37
29,48000
16,50
66,00000
5,84
23,36000
7,22
21,66000
4,46
13,38000
2,23
20,07000
30,83
30,83000
7,01
21,03000
3,00
96,00000
0,88
28,16000
7,55
120,80000
2,35
21,15000
2,04
18,36000
11,23
101,07000
3,15
9,45000
8,92
8,92000
93,65
18,73000
BDI
7.430,17216

4,60
3,96
5,30
4,08
7,50
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
6,66
10,36
1,47
6,51
15,96
0,72
853,70
31,66
10,17
11.158,33
11,31
24,66
41,15
36,26
71,84
24,71
38,41

45.772,04
3,95600
3,40560
1.828,50000
1.407,60000
2.587,50000
2,71890
2,17740
90,61920
29,34060
3,80000
109,21380
86,89680
15,63100
71,54690
12,23400
7,26800
6,70020
17,60400
121,96800
0,74720
0,53570
8,95620
15,71760
19,37320
4,49820
5,85900
7,98000
1,99440
853,70000
94,98000
30,51000
11.158,33000
22,62000
86,31000
493,80000
725,20000
4.310,40000
296,52000
268,87000
Pgina: 162

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

4.36.88
CHAVE SECCIONADORA NH 3X500A S/ FUSIVEIS
4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
4.41.67
FUSIVEL NH DE 425 A 630A
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.51.03
PORTA EXTERNA METLICA C/VENEZIANAS 185X95CM
4.51.09
CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO
4.51.11
CAIXA TIPO 'T' 60X90X25CM ELETROPAULO
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.50
CAIXA DE INSPEO P/TERRA (250X250X250)MM
4.80.70
PARA-RAIO DE LINHA 15KV
4.85.10
SUPORTE PARA TRANSFORMADOR - NBR 5440
4.85.11
ADAPTADOR PARA TRANSFORMADOR CONF. NBR 8159
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.62
BRACADEIRA ACO GALV ELETROLITICO 89 MM (3 1/2")
4.94.35
TERMINAL PRES P/CABO 95MM2
4.94.37
TERMINAL PRES P/CABO 185MM2
4.94.61
CORTA CIRCUITO FUSIVEL
4.94.63
CRUZETA DE MADEIRA TRATADA 90X112,50 (L=2,00)M
4.95.02
PORCA QUADRADA P/PARAF N 16
4.95.12
MAO FRANCESA 710 MM
4.95.13
MO FRANCESA PLANA 993MM
4.95.14
SELA PARA CRUZETA MADEIRA
4.95.17
OLHAL PARA PARAFUSO M-16(5/8")
4.95.20
GRAMPO TENSOR UNIVERSAL (CARACOL)
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
4.95.33
GANCHO OLHAL
4.95.37
PARAFUSO ABAULADO M 16X150MM
4.95.39
ARRUELA QUADRADA 58MM FURO 18MM
4.95.43
CONECTOR SPLIT-BOLT P/CABO 16MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
4.95.86
PINO P/ISOLADOR RIGIDO (CRUZETA)
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 6.068,83150
LS
7.403,97443
SubMO

Custo Unit.

Custo Total

13.472,80593

UN
1,00000
UN
3,00000
UN
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
3,00000
UN
3,00000
UN
3,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
UN
6,00000
UN
16,00000
UN
3,00000
UN
4,00000
UN
32,00000
UN
4,00000
UN
4,00000
UN
4,00000
UN
3,00000
UN
3,00000
UN
9,00000
UN
1,00000
UN
3,00000
UN
32,00000
UN
32,00000
UN
9,00000
UN
9,00000
UN
9,00000
UN
3,00000
UN
1,00000
M
0,20000
Material
23.740,24040

656,25
656,25000
123,83
371,49000
45,97
137,91000
89,19
89,19000
520,60
520,60000
662,19
662,19000
242,93
242,93000
70,23
210,69000
27,75
83,25000
128,66
385,98000
148,00
296,00000
38,00
76,00000
14,41
14,41000
1,14
4,56000
5,03
30,18000
9,31
148,96000
88,55
265,65000
63,00
252,00000
0,55
17,60000
7,37
29,48000
16,50
66,00000
5,84
23,36000
7,22
21,66000
4,46
13,38000
2,23
20,07000
30,83
30,83000
7,01
21,03000
3,00
96,00000
0,88
28,16000
2,35
21,15000
2,04
18,36000
11,23
101,07000
3,15
9,45000
8,92
8,92000
93,65
18,73000
BDI
8.559,00066

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

72,50476

UN
H
2,98000
H
4,93000
M3
0,07400
KG
3,28000
KG
21,43000
M3
0,03500
M3
0,01300
UN
57,00000
L
0,34000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
M
5,50000
Material
480,16560

4,64
3,82
80,46
0,35
0,37
62,03
61,17
0,22
6,23
324,95
6,15
104,76
2,96
1,58
BDI
127,11418

09.02.042
DPS - DISPOSITIVO PROTECAO CONTRA SURTOS (TELEFONIA)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.45.15
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS TEL 20KA
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
40,69000

09.02.043
DPS - DISPOSITIVO PROTECAO CONTRA SURTOS (ENERGIA)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
89,19000

09.01.099
SERVICOS DE LIGACOES EM TENSAO PRIMARIA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
09.02.011
AT-01 ENTRADA AEREA PARA TELEFONE
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.40.56
TINTA BETUMINOSA
4.01.20
POSTE DE ACO GALV 3 1/2'X 6M
4.94.81
ALCA COM ISOLADOR PORCELANA TELESP
4.94.87
TAMPAO FERRO FUNDIDO T-16 TELEBRAS
4.95.67
CABECOTE TIPO TELESP
6.25.02
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM
Mo-de-Obra 32,65980
LS
39,84496

09.02.047
1.01.16
1.01.17
4.35.55

Exerccio:

SubMO

SubMO

DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X300A


AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
DISJUNTOR TERMOMAGNETICO 3X300A

2011

UN
H
H
UN

0,90000
0,90000
1,00000

BDI

5,30
4,08
40,69
13,66919

BDI

5,30
4,08
89,19
24,82419

4,08
7,50
1.177,95

679,78
13,82720
18,83260
5,95404
1,14800
7,92910
2,17105
0,79521
12,54000
2,11820
324,95000
6,15000
104,76000
2,96000
8,69000

73,10
4,77000
3,67200
40,69000

132,75
4,77000
3,67200
89,19000

1.477,33
3,67200
6,75000
1.177,95000

Pgina: 163

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 10,42200

Descrio
LS

12,71484

UN Coeficiente
SubMO

23,13684

Material

1.177,95000

09.02.048
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 240MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.34
CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS
4.21.46
CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.66
LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.77
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
4.30.24
CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.42
CABO DE COBRE NU DE 120 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.85.44
BUCHA E ARRUELA EM ZAMAK 76 MM (3")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
3.290,97200

09.02.049
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 240MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.34
CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS
4.21.46
CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.66
LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.77
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
4.30.24
CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.42
CABO DE COBRE NU DE 120 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.85.44
BUCHA E ARRUELA EM ZAMAK 76 MM (3")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800
09.02.056
AE-22 ABRIGO ENTRADA DE ENERGIA 38/76KVA CPFL
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.56
GRAFITE
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
4.01.03
POSTE DE CONCRETO DUPLO T 300DAN 7,50M
4.05.10
ISOLADOR ROLDANA BAIXA TENSAO
4.51.11
CAIXA TIPO 'T' 60X90X25CM ELETROPAULO
4.51.13
CAIXA TIPO "L" 60X90X25CM ELETROPAULO
4.63.06
MOLDE CLASSE R PARA CONEXAO EXOTERMICA
4.63.11
ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA)
4.63.21
CARTUCHO P/CONEXO EXOTERM.CABO/HASTE P/CABO 50MM2
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.85.28
CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM
4.95.84
ARMACAO SECUNDARIA 1 ESTRIBO
SubMO
740,80088
Mo-de-Obra 333,69409
LS
407,10679
Exerccio:

2011

Custo Unit.
BDI

Custo Total

276,24997

BDI

4.175,96
5,30
26,50000
4,08
20,40000
9,72
9,72000
47,87
47,87000
62,29
62,29000
2,48
4,96000
6,94
13,88000
20,14
70,49000
41,15
246,90000
93,77
2.531,79000
56,04
196,14000
89,19
89,19000
1,05
1,05000
3,20
3,20000
67,46
13,49200
780,87070

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
4.134,90200

BDI

5.213,99
5,30
26,50000
4,08
20,40000
9,72
9,72000
47,87
47,87000
62,29
62,29000
2,48
4,96000
6,94
13,88000
20,14
70,49000
41,15
246,90000
93,77
3.375,72000
56,04
196,14000
89,19
89,19000
1,05
1,05000
3,20
3,20000
67,46
13,49200
974,97460

UN
H
0,68000
H
0,68000
H
17,00000
H
15,00000
H
0,33100
H
0,33100
H
15,34000
H
2,86000
H
0,50000
H
22,80000
M3
0,62000
KG
33,04000
KG
150,20000
M3
0,15720
M
1,24140
M2
0,49600
KG
3,83000
UN
440,00000
KG
0,12000
KG
0,07600
L
0,65200
KG
4,35000
UN
2,50000
L
0,70000
L
0,39000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,02000
UN
0,00200
UN
1,00000
UN
1,00000
UN
2,00000
UN
1,00000
Material
1.273,18896

4,60
3,96
5,30
4,08
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
0,75
1,47
6,51
15,96
341,16
2,25
242,93
277,84
90,63
253,73
17,44
70,23
18,04
7,43
BDI
463,21766

2.477,20
3,12800
2,69280
90,10000
61,20000
1,57887
1,26442
71,17760
13,55640
1,90000
87,09600
49,88520
11,56400
55,57400
9,61592
5,71044
8,52128
10,34100
96,80000
0,56040
0,37012
8,84764
3,26250
3,67500
4,55700
6,22440
341,16000
2,25000
242,93000
277,84000
1,81260
0,50746
17,44000
70,23000
36,08000
7,43000

Pgina: 164

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

09.02.059
AE-19 ABRIGO ENTRADA DE ENERGIA 22KVA AES/BANDEIRANTE/CPFL/ELEKTRO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.56
GRAFITE
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
4.01.01
POSTE DE CONCRETO DUPLO T 90DAN 7,50M
4.05.10
ISOLADOR ROLDANA BAIXA TENSAO
4.51.08
CAIXA CH.ACO - 18 TIPO II 560X300X200 MM EXTERNA
4.63.06
MOLDE CLASSE R PARA CONEXAO EXOTERMICA
4.63.11
ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA)
4.63.21
CARTUCHO P/CONEXO EXOTERM.CABO/HASTE P/CABO 50MM2
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.85.28
CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM
4.95.84
ARMACAO SECUNDARIA 1 ESTRIBO
Mo-de-Obra 232,63160
LS
283,81055
Material
SubMO
516,44215

UN
H
0,29000
H
0,29000
H
14,00000
H
12,00000
H
0,20000
H
0,20000
H
9,66000
H
1,39000
H
0,09000
H
14,01000
M3
0,32400
KG
52,42000
KG
50,06000
M3
0,04900
M
0,52000
M2
0,13000
KG
2,25000
UN
308,00000
KG
0,05000
KG
0,04000
L
0,07500
KG
2,24000
UN
2,00000
L
0,04000
L
0,04500
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,02000
UN
0,00200
UN
1,00000
UN
1,00000
UN
2,00000
UN
1,00000
546,37068

4,60
3,96
5,30
4,08
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
0,75
1,47
6,51
15,96
186,67
2,25
72,51
90,63
253,73
17,44
70,23
18,04
7,43
BDI
244,44695

09.02.060
AE-20 ABRIGO ENTRADA DE ENERGIA 38KVA AES/BANDEIRANTE/CPFL/ELEKTRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.56
GRAFITE
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
4.01.02
POSTE DE CONCRETO DUPLO T 200DAN 7,50M
4.05.10
ISOLADOR ROLDANA BAIXA TENSAO
4.51.21
CAIXA P/ MEDICAO 50X60X25CM 'ELETROPAULO'
4.63.06
MOLDE CLASSE R PARA CONEXAO EXOTERMICA
4.63.11
ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA)
4.63.21
CARTUCHO P/CONEXO EXOTERM.CABO/HASTE P/CABO 50MM2
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.85.28
CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM
4.95.84
ARMACAO SECUNDARIA 1 ESTRIBO
SubMO
589,25904
Mo-de-Obra 265,43200
LS
323,82704
Material

UN
H
0,35000
H
0,35000
H
14,00000
H
12,00000
H
0,26000
H
0,26000
H
12,34000
H
2,19000
H
0,25000
H
17,92000
M3
0,41200
KG
66,46000
KG
64,55000
M3
0,08500
M
0,64000
M2
0,16000
KG
3,01000
UN
385,28000
KG
0,06000
KG
0,05000
L
0,21000
KG
2,90000
UN
2,00000
L
0,06000
L
0,12000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,02000
UN
0,00200
UN
1,00000
UN
1,00000
UN
2,00000
UN
1,00000
805,18903

4,60
3,96
5,30
4,08
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,69
0,22
4,67
4,87
13,57
0,75
1,47
6,51
15,96
279,14
2,25
195,46
90,63
253,73
17,44
70,23
18,04
7,43
BDI
320,72306

09.02.061

UN

Exerccio:

AE-21 ABRIGO ENTRADA DE ENERGIA 38 A 76 KVA AES/BANDEIRANTE/ELEKTRO

2011

1.307,25
1,33400
1,14840
74,20000
48,96000
0,95400
0,76400
44,82240
6,58860
0,34200
53,51820
26,06904
18,34700
18,52220
2,99733
2,39200
2,23340
6,07500
67,76000
0,23350
0,19480
1,01775
1,68000
2,94000
0,26040
0,71820
186,67000
2,25000
72,51000
1,81260
0,50746
17,44000
70,23000
36,08000
7,43000

1.715,17
1,61000
1,38600
74,20000
48,96000
1,24020
0,99320
57,25760
10,38060
0,95000
68,45440
33,14952
23,26100
23,88350
5,19945
2,94400
2,74880
8,09690
84,76160
0,28020
0,24350
2,84970
2,17500
2,94000
0,39060
1,91520
279,14000
2,25000
195,46000
1,81260
0,50746
17,44000
70,23000
36,08000
7,43000

3.319,58
Pgina: 165

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.56
GRAFITE
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
4.01.03
POSTE DE CONCRETO DUPLO T 300DAN 7,50M
4.05.10
ISOLADOR ROLDANA BAIXA TENSAO
4.51.09
CAIXA EM CHAPA TIPO "M" PADRAO ELETROPAULO
4.51.11
CAIXA TIPO 'T' 60X90X25CM ELETROPAULO
4.63.06
MOLDE CLASSE R PARA CONEXAO EXOTERMICA
4.63.11
ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA)
4.63.21
CARTUCHO P/CONEXO EXOTERM.CABO/HASTE P/CABO 50MM2
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.85.28
CINTA ACO ZINCADO P/ POSTE CONCRETO TUBULAR 250MM
4.95.84
ARMACAO SECUNDARIA 1 ESTRIBO
Mo-de-Obra 424,67150
LS
518,09923
SubMO
942,77073

H
0,86000
H
0,86000
H
20,00000
H
18,00000
H
0,57000
H
0,57000
H
19,53000
H
6,19000
H
1,00000
H
28,59000
M3
1,08000
KG
44,66000
KG
193,37000
M3
0,20000
M
1,58000
M2
0,39000
KG
6,52000
UN
554,40000
KG
0,16000
KG
0,11000
L
0,83000
KG
4,54000
UN
3,00000
L
0,90000
L
0,50000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
0,02000
UN
0,00200
UN
1,00000
UN
1,00000
UN
2,00000
UN
1,00000
Material
1.756,07896

09.02.062
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 10MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.63.60
BUCHA E ARRUELA EM ZAMACK 15MM (1/2")
4.20.52
CURVA ACO GALV QUENTE 25 MM (1") X 90 GRAUS
4.20.80
CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS
4.21.41
CURVA ACO GALV QUENTE 25 MM (1") X 180 GRAUS
4.21.59
LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2")
4.21.61
LUVA ACO GALV QUENTE (NBR 5624) 25 MM (1")
4.21.70
ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2")
4.21.72
ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1")
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.37
CABO DE COBRE NU DE 10 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.39
BUCHA E ARRUELA EM ZAMAK 25 MM (1")
4.96.22
BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
M
0,20000
Material
325,89600

09.02.063
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 16MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.63.60
BUCHA E ARRUELA EM ZAMACK 15MM (1/2")
4.20.80
CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS
4.20.83
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS
4.21.42
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS
4.21.59
LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2")
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.70
ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.38
CABO DE COBRE NU DE 16 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.96.22
BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16"
SubMO
104,11800
Mo-de-Obra 46,90000
LS
57,21800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
M
0,20000
Material
421,47600

09.02.064
1.01.15
Exerccio:

CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 25MM2 C/ ELETRODUTOS


ELETRICISTA

2011

UN
H

5,00000

Custo Unit.

Custo Total

4,60
3,96
5,30
4,08
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
4,60
17,18
2,70
0,22
4,67
4,87
13,57
0,75
1,47
6,51
15,96
341,16
2,25
662,19
242,93
90,63
253,73
17,44
70,23
18,04
7,43
BDI
620,73543

3,95600
3,40560
106,00000
73,44000
2,71890
2,17740
90,61920
29,34060
3,80000
109,21380
86,89680
15,63100
71,54690
12,23400
7,26800
6,70020
17,60400
121,96800
0,74720
0,53570
11,26310
3,40500
4,41000
5,85900
7,98000
341,16000
2,25000
662,19000
242,93000
1,81260
0,50746
17,44000
70,23000
36,08000
7,43000

BDI

528,91
5,30
26,50000
4,08
20,40000
0,30
0,30000
3,73
3,73000
2,13
2,13000
5,43
5,43000
0,79
1,58000
1,11
2,22000
6,93
24,25500
11,76
70,56000
3,96
106,92000
5,11
17,88500
89,19
89,19000
0,59
0,59000
5,53
1,10600
98,90322

BDI

5,30
4,08
0,30
2,13
7,29
11,45
0,79
1,62
6,93
15,40
5,98
7,49
89,19
0,86
5,53
120,88662

5,30

646,48
26,50000
20,40000
0,30000
2,13000
7,29000
11,45000
1,58000
3,24000
24,25500
92,40000
161,46000
26,21500
89,19000
0,86000
1,10600

776,13
26,50000
Pgina: 166

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.16
AJUDANTE ELETRICISTA
4.20.51
CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS
4.20.83
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS
4.21.42
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS
4.21.60
LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4")
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.30.16
CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.38
CABO DE COBRE NU DE 16 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.38
BUCHA E ARRUELA EM ZAMAK 19 MM (3/4")
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.96.23
BARRAMENTO COBRE 100 A - 3/8"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO

UN Coeficiente

104,11800

H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
526,88200

09.02.065
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 35MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.20.51
CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS
4.20.83
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS
4.21.42
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS
4.21.60
LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4")
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.30.17
CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.40
CABO DE COBRE NU DE 25 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.38
BUCHA E ARRUELA EM ZAMAK 19 MM (3/4")
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.96.24
BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
639,81500

09.02.066
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 50MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.20.52
CURVA ACO GALV QUENTE 25 MM (1") X 90 GRAUS
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.43
CURVA ACO GALV QUENTE 38 MM (1 1/2") X 180 GRAUS
4.21.61
LUVA ACO GALV QUENTE (NBR 5624) 25 MM (1")
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.72
ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.30.18
CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.40
CABO DE COBRE NU DE 25 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.39
BUCHA E ARRUELA EM ZAMAK 25 MM (1")
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.96.24
BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
829,54000

09.02.067
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 70MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.03
CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO
4.21.30
CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS
4.21.44
CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.64
LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.21.75
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
4.30.19
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
4.30.41
CABO DE COBRE NU DE 35 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.85.42
BUCHA E ARRUELA EM ZAMAK 51 MM (2")
4.96.25
BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
1.137,05400

09.02.068
1.01.15
1.01.16
4.21.03
4.21.30
Exerccio:

CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 95MM2 C/ ELETRODUTOS


ELETRICISTA
AJUDANTE ELETRICISTA
CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO
CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS

2011

UN
H
H
UN
UN

5,00000
5,00000
1,00000
1,00000

Custo Unit.

Custo Total

BDI

4,08
2,71
7,29
11,45
0,85
1,62
9,51
15,40
9,50
7,49
89,19
0,36
0,86
8,41
145,13000

BDI

5,30
4,08
2,71
7,29
11,45
0,85
1,62
9,51
15,40
13,19
11,06
89,19
0,36
0,86
12,45
171,10459

BDI

5,30
4,08
3,73
9,72
19,16
1,11
2,48
11,76
20,14
18,36
11,06
89,19
0,59
1,05
12,45
214,74134

BDI

5,30
4,08
8,62
16,63
28,66
1,62
3,26
15,40
24,66
26,17
19,98
89,19
0,86
1,54
17,07
285,46956

5,30
4,08
8,62
16,63

20,40000
2,71000
7,29000
11,45000
1,70000
3,24000
33,28500
92,40000
256,50000
26,21500
89,19000
0,36000
0,86000
1,68200

915,03
26,50000
20,40000
2,71000
7,29000
11,45000
1,70000
3,24000
33,28500
92,40000
356,13000
38,71000
89,19000
0,36000
0,86000
2,49000

1.148,39
26,50000
20,40000
3,73000
9,72000
19,16000
2,22000
4,96000
41,16000
120,84000
495,72000
38,71000
89,19000
0,59000
1,05000
2,49000

1.526,64
26,50000
20,40000
8,62000
16,63000
28,66000
3,24000
6,52000
53,90000
147,96000
706,59000
69,93000
89,19000
0,86000
1,54000
3,41400

1.882,09
26,50000
20,40000
8,62000
16,63000
Pgina: 167

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.21.44
CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.64
LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.21.75
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
4.30.20
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.54
CABO DE COBRE NU 50 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.85.42
BUCHA E ARRUELA EM ZAMAK 51 MM (2")
4.96.25
BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO

UN Coeficiente

104,11800

UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
1.426,03900

09.02.069
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 120MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.32
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS
4.21.45
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.65
LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.76
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
4.30.21
CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.43
CABO DE COBRE NU DE 70 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.85.43
BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
SubMO
104,11800
LS
57,21800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
1.899,71700

09.02.070
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 150MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.32
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS
4.21.45
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.65
LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.76
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
4.30.22
CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.39
CABO DE COBRE NU DE 95 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.85.43
BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
2.199,43200

09.02.071
CONJ 3 CABOS P/ ENTRADA ENERGIA SECCAO 185MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.34
CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS
4.21.46
CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.66
LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.77
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
4.30.23
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.39
CABO DE COBRE NU DE 95 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.85.44
BUCHA E ARRUELA EM ZAMAK 76 MM (3")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
27,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
2.650,49200

09.02.072
1.01.15
1.01.16
2.63.60
4.20.80
4.20.83
4.21.42
4.21.59
Exerccio:

CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 10MM2 C/ ELETRUDUTOS


ELETRICISTA
AJUDANTE ELETRICISTA
BUCHA E ARRUELA EM ZAMACK 15MM (1/2")
CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS
LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2")

2011

UN
H
H
UN
UN
UN
UN
UN

5,00000
5,00000
1,00000
1,00000
1,00000
1,00000
2,00000

Custo Unit.

Custo Total

BDI

28,66
1,62
3,26
15,40
24,66
36,26
24,71
89,19
0,86
1,54
17,07
351,93611

BDI

2.464,71
5,30
26,50000
4,08
20,40000
9,72
9,72000
34,84
34,84000
50,45
50,45000
2,48
4,96000
4,86
9,72000
20,14
70,49000
36,37
218,22000
46,74
1.261,98000
38,05
133,17500
89,19
89,19000
1,05
1,05000
2,43
2,43000
67,46
13,49200
460,88205

BDI

2.833,36
5,30
26,50000
4,08
20,40000
9,72
9,72000
34,84
34,84000
50,45
50,45000
2,48
4,96000
4,86
9,72000
20,14
70,49000
36,37
218,22000
57,30
1.547,10000
42,22
147,77000
89,19
89,19000
1,05
1,05000
2,43
2,43000
67,46
13,49200
529,81650

BDI

3.388,17
5,30
26,50000
4,08
20,40000
9,72
9,72000
47,87
47,87000
62,29
62,29000
2,48
4,96000
6,94
13,88000
20,14
70,49000
41,15
246,90000
71,84
1.939,68000
42,22
147,77000
89,19
89,19000
1,05
1,05000
3,20
3,20000
67,46
13,49200
633,56030

5,30
4,08
0,30
2,13
7,29
11,45
0,79

28,66000
3,24000
6,52000
53,90000
147,96000
979,02000
86,48500
89,19000
0,86000
1,54000
3,41400

612,98
26,50000
20,40000
0,30000
2,13000
7,29000
11,45000
1,58000
Pgina: 168

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.70
ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.37
CABO DE COBRE NU DE 10 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.96.22
BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16"
SubMO
Mo-de-Obra 46,90000
LS
57,21800

UN Coeficiente

104,11800

UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
M
0,20000
Material
394,24600

09.02.073
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 16MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.63.60
BUCHA E ARRUELA EM ZAMACK 15MM (1/2")
4.20.80
CURVA ACO GALV QUENTE 15 MM (1/2") X 90 GRAUS
4.20.83
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS
4.21.42
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS
4.21.59
LUVA ACO GALV QUENTE (NBR-5624) 15 MM (1/2")
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.70
ELETROD ACO GALV QUENTE (NBR-5624) 15 MM (1/2")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.38
CABO DE COBRE NU DE 16 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.96.23
BARRAMENTO COBRE 100 A - 3/8"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
M
0,20000
Material
475,87200

09.02.074
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 25MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.20.51
CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS
4.20.83
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS
4.21.42
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS
4.21.60
LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4")
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.30.16
CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.38
CABO DE COBRE NU DE 16 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.38
BUCHA E ARRUELA EM ZAMAK 19 MM (3/4")
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.96.23
BARRAMENTO COBRE 100 A - 3/8"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
612,38200

09.02.075
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 35MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.20.51
CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS
4.20.83
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 90 GRAUS
4.21.42
CURVA ACO GALV QUENTE 32 MM (1 1/4") X 180 GRAUS
4.21.60
LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4")
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.30.17
CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.40
CABO DE COBRE NU DE 25 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.38
BUCHA E ARRUELA EM ZAMAK 19 MM (3/4")
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.96.24
BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
758,52500

09.02.076
1.01.15
1.01.16
4.20.52
4.21.04
4.21.43
4.21.61
4.21.63
4.21.72
4.21.74
4.30.18
Exerccio:

CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 50MM2 C/ ELETRODUTOS


ELETRICISTA
AJUDANTE ELETRICISTA
CURVA ACO GALV QUENTE 25 MM (1") X 90 GRAUS
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
CURVA ACO GALV QUENTE 38 MM (1 1/2") X 180 GRAUS
LUVA ACO GALV QUENTE (NBR 5624) 25 MM (1")
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1")
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V)

2011

UN
H
H
UN
UN
UN
UN
UN
M
M
M

5,00000
5,00000
1,00000
1,00000
1,00000
2,00000
2,00000
3,50000
6,00000
36,00000

Custo Unit.

Custo Total

BDI

1,62
6,93
15,40
3,96
5,11
89,19
0,86
5,53
114,62372

BDI

5,30
4,08
0,30
2,13
7,29
11,45
0,79
1,62
6,93
15,40
5,98
7,49
89,19
0,86
8,41
133,39770

BDI

5,30
4,08
2,71
7,29
11,45
0,85
1,62
9,51
15,40
9,50
7,49
89,19
0,36
0,86
8,41
164,79500

BDI

5,30
4,08
2,71
7,29
11,45
0,85
1,62
9,51
15,40
13,19
11,06
89,19
0,36
0,86
12,45
198,40789

5,30
4,08
3,73
9,72
19,16
1,11
2,48
11,76
20,14
18,36

3,24000
24,25500
92,40000
142,56000
17,88500
89,19000
0,86000
1,10600

713,38
26,50000
20,40000
0,30000
2,13000
7,29000
11,45000
1,58000
3,24000
24,25500
92,40000
215,28000
26,21500
89,19000
0,86000
1,68200

881,29
26,50000
20,40000
2,71000
7,29000
11,45000
1,70000
3,24000
33,28500
92,40000
342,00000
26,21500
89,19000
0,36000
0,86000
1,68200

1.061,05
26,50000
20,40000
2,71000
7,29000
11,45000
1,70000
3,24000
33,28500
92,40000
474,84000
38,71000
89,19000
0,36000
0,86000
2,49000

1.351,64
26,50000
20,40000
3,73000
9,72000
19,16000
2,22000
4,96000
41,16000
120,84000
660,96000
Pgina: 169

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.30.40
CABO DE COBRE NU DE 25 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.39
BUCHA E ARRUELA EM ZAMAK 25 MM (1")
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.96.24
BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8"
SubMO
Mo-de-Obra 46,90000
LS
57,21800

UN Coeficiente

104,11800

M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
994,78000

09.02.077
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 70MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.03
CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO
4.21.30
CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS
4.21.44
CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.64
LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.21.75
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
4.30.19
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
4.30.41
CABO DE COBRE NU DE 35 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.85.42
BUCHA E ARRUELA EM ZAMAK 51 MM (2")
4.96.25
BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
1.372,58400

09.02.078
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 95MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.03
CURVA ACO GALV QUENTE 32MM (1 1/4") X 90-CACHIMBO
4.21.30
CURVA ACO GALV QUENTE 51 MM (2") X 90 GRAUS
4.21.44
CURVA ACO GALV QUENTE 51 MM (2") X 180 GRAUS
4.21.62
LUVA ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4")
4.21.64
LUVA ACO GALV QUENTE (NBR 5624) 51 MM (2")
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
4.21.75
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
4.30.20
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.54
CABO DE COBRE NU 50 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.40
BUCHA E ARRUELA EM ZAMAK 32 MM (1 1/4")
4.85.42
BUCHA E ARRUELA EM ZAMAK 51 MM (2")
4.96.25
BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
1.752,37900

09.02.079
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 120MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.32
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS
4.21.45
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.65
LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.76
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
4.30.21
CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.43
CABO DE COBRE NU DE 70 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.85.43
BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
2.320,37700

09.02.080
1.01.15
1.01.16
4.21.04
4.21.32
4.21.45
4.21.63
4.21.65
4.21.74
4.21.76
4.30.22
4.30.39
4.45.10
4.85.41
Exerccio:

CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 150MM2 C/ ELETRODUTOS


ELETRICISTA
AJUDANTE ELETRICISTA
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 90 GRAUS
CURVA ACO GALV QUENTE 64 MM (2 1/2") X 180 GRAUS
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
LUVA ACO GALV QUENTE (NBR 5624) 64 MM (2 1/2")
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V)
CABO DE COBRE NU DE 95 MM2
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")

2011

UN
H
H
UN
UN
UN
UN
UN
M
M
M
M
UN
UN

5,00000
5,00000
1,00000
1,00000
1,00000
2,00000
2,00000
3,50000
6,00000
36,00000
3,50000
1,00000
1,00000

Custo Unit.

Custo Total

BDI

11,06
38,71000
89,19
89,19000
0,59
0,59000
1,05
1,05000
12,45
2,49000
252,74654

BDI

5,30
4,08
8,62
16,63
28,66
1,62
3,26
15,40
24,66
26,17
19,98
89,19
0,86
1,54
17,07
339,64146

BDI

2.283,49
5,30
26,50000
4,08
20,40000
8,62
8,62000
16,63
16,63000
28,66
28,66000
1,62
3,24000
3,26
6,52000
15,40
53,90000
24,66
147,96000
36,26
1.305,36000
24,71
86,48500
89,19
89,19000
0,86
0,86000
1,54
1,54000
17,07
3,41400
426,99431

BDI

2.982,12
5,30
26,50000
4,08
20,40000
9,72
9,72000
34,84
34,84000
50,45
50,45000
2,48
4,96000
4,86
9,72000
20,14
70,49000
36,37
218,22000
46,74
1.682,64000
38,05
133,17500
89,19
89,19000
1,05
1,05000
2,43
2,43000
67,46
13,49200
557,63385

5,30
4,08
9,72
34,84
50,45
2,48
4,86
20,14
36,37
57,30
42,22
89,19
1,05

1.816,34
26,50000
20,40000
8,62000
16,63000
28,66000
3,24000
6,52000
53,90000
147,96000
942,12000
69,93000
89,19000
0,86000
1,54000
3,41400

3.467,67
26,50000
20,40000
9,72000
34,84000
50,45000
4,96000
9,72000
70,49000
218,22000
2.062,80000
147,77000
89,19000
1,05000
Pgina: 170

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.85.43
BUCHA E ARRUELA EM ZAMAK 64 MM (2 1/2")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
LS
57,21800

UN Coeficiente

SubMO

104,11800

UN
1,00000
M
0,20000
Material
2.715,13200

Custo Unit.

Custo Total

BDI

2,43
2,43000
67,46
13,49200
648,42750

BDI

4.183,43
5,30
26,50000
4,08
20,40000
9,72
9,72000
47,87
47,87000
62,29
62,29000
2,48
4,96000
6,94
13,88000
20,14
70,49000
41,15
246,90000
71,84
2.586,24000
42,22
147,77000
89,19
89,19000
1,05
1,05000
3,20
3,20000
67,46
13,49200
782,26910

BDI

5,30
4,08
2,71
3,24
0,85
9,51
0,22
40,69
25,72
14,41
0,36
6,15
57,10417

5,30
83,19
6,69
29,16216

09.02.081
CONJ 4 CABOS P/ ENTRADA ENERGIA SECCAO 185MM2 C/ ELETRODUTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.04
CURVA ACO GALV QUENTE 38MM (1 1/2") X 90-CACHIMBO
4.21.34
CURVA ACO GALV QUENTE 76 MM (3") X 90 GRAUS
4.21.46
CURVA ACO GALV QUENTE 76 MM (3") X 180 GRAUS
4.21.63
LUVA ACO GALV QUENTE (NBR 5624) 38 MM (1 1/2")
4.21.66
LUVA ACO GALV QUENTE (NBR 5624) 76 MM (3")
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
4.21.77
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
4.30.23
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.39
CABO DE COBRE NU DE 95 MM2
4.45.10
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS 40 KA
4.85.41
BUCHA E ARRUELA EM ZAMAK 38 MM (1 1/2")
4.85.44
BUCHA E ARRUELA EM ZAMAK 76 MM (3")
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
M
3,50000
M
6,00000
M
36,00000
M
3,50000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,20000
Material
3.297,05200

09.02.082
CONJ ENTRADA P/ TELEFONE EM ENTRADA DE ENERGIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.20.51
CURVA ACO GALV QUENTE 19 MM (3/4") X 90 GRAUS
4.21.40
CURVA ACO GALV QUENTE 19 MM (3/4") X 180 GRAUS
4.21.60
LUVA ACO GALV QUENTE (NBR 5624) 19 MM (3/4")
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
4.30.60
FIO TRANCADO PARA TELEFONE - PADRAO TELEBRAS
4.45.15
DPS - DISPOSITIVO DE PROT. CONTRA SURTOS TEL 20KA
4.51.32
CAIXA VENEZIANA 'TELESP' 15X25X10CM
4.85.30
CINTA ACO GALVANIZADO DE 170MM
4.85.38
BUCHA E ARRUELA EM ZAMAK 19 MM (3/4")
4.94.81
ALCA COM ISOLADOR PORCELANA TELESP
Mo-de-Obra 23,45000
LS
28,60900
SubMO

52,05900

UN
H
2,50000
H
2,50000
UN
3,00000
UN
1,00000
UN
5,00000
M
8,00000
M
11,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
Material
196,22000

09.02.083
CHAVE SECCIONADORA NH C/ CARGA 3X125A TAM 00 C/ FUSIVEIS
1.01.15
ELETRICISTA
4.35.11
CHAVE SECCIONADORA NH 3X125A SECA
4.41.52
FUSIVEL NH ATE 125 A
Mo-de-Obra 10,60000
LS
12,93200
SubMO
23,53200

UN
H
2,00000
UN
1,00000
UN
3,00000
Material
103,26000

BDI

09.02.084
CHAVE SECCIONADORA NH C/ CARGA 3X250A TAM 01 C/ FUSIVEIS
1.01.15
ELETRICISTA
4.37.07
CHAVE SECCIONADORA NH C/ CARGA 3X250A TAM 01 S/FUS
4.41.56
FUSIVEL NH DE 200 A 250A
Mo-de-Obra 10,60000
LS
12,93200
SubMO
23,53200

UN
H
2,00000
UN
1,00000
UN
3,00000
Material
293,20000

389,58
5,30
10,60000
214,00
214,00000
26,40
79,20000
BDI
72,84836

09.02.085
CHAVE SECCIONADORA NH C/ CARGA 3X400A TAM 02 C/ FUSIVEIS
1.01.15
ELETRICISTA
4.37.03
CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL
4.41.59
FUSIVEL NH DE 300 A 400A
Mo-de-Obra 10,60000
LS
12,93200
SubMO
23,53200

UN
H
2,00000
UN
1,00000
UN
3,00000
Material
388,12000

506,33
5,30
10,60000
289,66
289,66000
32,82
98,46000
BDI
94,67996

09.02.086
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.10
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A
Mo-de-Obra 8,44200
LS
10,29924
SubMO

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
26,77000

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
34,15000

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
32,07000

09.02.087
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.12
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A
Mo-de-Obra 8,44200
LS
10,29924
SubMO
09.02.088
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.15
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A
SubMO
Mo-de-Obra 8,44200
LS
10,29924
09.02.089

Exerccio:

DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A

2011

UN

BDI

5,30
4,08
26,77
10,46759

BDI

5,30
4,08
34,15
12,16499

BDI

5,30
4,08
32,07
11,68659

305,38
13,25000
10,20000
8,13000
3,24000
4,25000
76,08000
2,42000
40,69000
25,72000
28,82000
0,72000
6,15000

155,95
10,60000
83,19000
20,07000

55,97
4,77000
3,67200
26,77000

65,05
4,77000
3,67200
34,15000

62,49
4,77000
3,67200
32,07000

71,99

Pgina: 171

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.40
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A
SubMO
Mo-de-Obra 8,44200
LS
10,29924

Custo Unit.

Custo Total

18,74124

H
0,90000
H
0,90000
UN
1,00000
Material
39,79000

BDI

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
137,08000

191,66
5,30
4,77000
4,08
3,67200
137,08
137,08000
BDI
35,83889

09.02.091
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X125A A 3X225A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.65
DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
137,08000

191,66
5,30
4,77000
4,08
3,67200
137,08
137,08000
BDI
35,83889

09.02.092
CHAVE FACA SECA 2X200A BASE MARMORE
1.01.15
ELETRICISTA
4.36.44
CHAVE FACA SECA 2X200A MARMORE
Mo-de-Obra 10,60000
LS
12,93200

23,53200

UN
H
2,00000
UN
1,00000
Material
53,62000

BDI

23,53200

UN
H
2,00000
UN
1,00000
Material
139,17000

200,12
5,30
10,60000
139,17
139,17000
BDI
37,42146

23,53200

UN
H
2,00000
UN
1,00000
Material
58,99000

BDI

23,53200

UN
H
2,00000
UN
1,00000
Material
198,64000

273,27
5,30
10,60000
198,64
198,64000
BDI
51,09956

16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
Material
83,19000

BDI

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
659,38000

836,65
5,30
5,30000
4,08
4,08000
659,38
659,38000
BDI
156,44683

24,98832

UN
H
1,20000
H
1,20000
UN
1,00000
Material
919,86000

1.162,16
5,30
6,36000
4,08
4,89600
919,86
919,86000
BDI
217,31511

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

1,14530

Material

M
H
0,05500
H
0,05500
M
1,00000
1,39000

Material

M
H
0,06000
H
0,06000
M
1,00000
2,06000

09.02.090
DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.65
DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A
Mo-de-Obra 8,44200
LS
10,29924
SubMO

09.02.093
CHAVE FACA SECA 2X400A BASE MARMORE
1.01.15
ELETRICISTA
4.36.52
CHAVE FACA SECA 2X400A MARMORE
Mo-de-Obra 10,60000
LS
12,93200
09.02.094
CHAVE FACA SECA 3X200A BASE MARMORE
1.01.15
ELETRICISTA
4.36.49
CHAVE FACA SECA 3X200A 'MARMORE'
Mo-de-Obra 10,60000
LS
12,93200
09.02.095
CHAVE FACA SECA 3X400A BASE MARMORE
1.01.15
ELETRICISTA
4.36.50
CHAVE FACA SECA 3X400A 'MAMORE'
Mo-de-Obra 10,60000
LS
12,93200
09.02.096
CHAVE SECCIONADORA NH 3X125A SECA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.11
CHAVE SECCIONADORA NH 3X125A SECA
Mo-de-Obra 7,50400
LS
9,15488
09.02.097
CHAVE SECCIONADORA NH 3X250A SECA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.12
CHAVE SECCIONADORA NH 3X250A SECA
Mo-de-Obra 9,38000
LS
11,44360
09.02.098
CHAVE SECCIONADORA NH 3X400A SECA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.13
CHAVE SECCIONADORA NH 3X400A SECA
Mo-de-Obra 11,25600
LS
13,73232
09.02.099
SERVICOS DE ENTRADA DE BAIXA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
09.03.001
FIO DE 4 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.06
FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,51590
LS
0,62940
09.03.002
FIO DE 6 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.07
FIO DE 6,00 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,56280
LS
0,68662
09.03.003
1.01.15
1.01.16
Exerccio:

FIO DE 10 MM2 - 750 V DE ISOLACAO


ELETRICISTA
AJUDANTE ELETRICISTA

2011

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

1,24942

M
H
H

0,09000
0,09000

5,30
4,08
39,79
13,46219

5,30
53,62
17,74496

5,30
58,99
18,98006

5,30
4,08
83,19
22,96524

BDI

5,30
4,08
1,39
0,58312

BDI

5,30
4,08
2,06
0,76117

5,30
4,08

4,77000
3,67200
39,79000

94,89
10,60000
53,62000

101,50
10,60000
58,99000

122,81
4,24000
3,26400
83,19000

3,11
0,29150
0,22440
1,39000

4,07
0,31800
0,24480
2,06000

6,75
0,47700
0,36720
Pgina: 172

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.30.08
FIO DE 10,0 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,84420
LS
1,02992
09.03.004
CABO DE 16 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 1,21940
LS
1,48767
09.03.005
CABO DE 25 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.16
CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 2,34500
LS
2,86090
09.03.006
CABO DE 35 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.17
CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 3,75200
LS
4,57744
09.03.007
CABO DE 50 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.18
CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 5,62800
LS
6,86616
09.03.008
CABO DE 70 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.19
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
Mo-de-Obra 6,56600
LS
8,01052
09.03.009
CABO DE 95 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.20
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 10,31800
LS
12,58796
09.03.010
CABO DE 120 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.21
CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 12,19400
LS
14,87668
09.03.011
CABO DE 150 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.22
CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 14,07000
LS
17,16540
09.03.012
CABO DE 185 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.23
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 17,82200
LS
21,74284
09.03.013
CABO DE 240 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.24
CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 19,69800
LS
24,03156
09.03.014
CABO DE 300 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.71
EL-CABO DE COBRE 750 V-L-SECAO 300 MM2
Mo-de-Obra 18,76000
LS
22,88720
09.03.017
1.01.15
1.01.16
4.31.57

Exerccio:

CABO DE 4 MM2 - 1000V DE ISOLAO


ELETRICISTA
AJUDANTE ELETRICISTA
EL-CABO DE COBRE 1000 V-C-SECAO 4 MM2

2011

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

1,87412

2,70707

5,20590

8,32944

12,49416

14,57652

22,90596

27,07068

31,23540

39,56484

43,72956

41,64720

Material

M
1,00000
3,62000

Material

M
H
0,13000
H
0,13000
M
1,00000
5,98000

Material

M
H
0,25000
H
0,25000
M
1,00000
9,50000

Material

M
H
0,40000
H
0,40000
M
1,00000
13,19000

Material

M
H
0,60000
H
0,60000
M
1,00000
18,36000

Material

M
H
0,70000
H
0,70000
M
1,00000
26,17000

Material

M
H
1,10000
H
1,10000
M
1,00000
36,26000

Material

M
H
1,30000
H
1,30000
M
1,00000
46,74000

Material

M
H
1,50000
H
1,50000
M
1,00000
57,30000

Material

M
H
1,90000
H
1,90000
M
1,00000
71,84000

Custo Unit.

Custo Total

BDI

3,62
1,26365

BDI

5,30
4,08
5,98
1,99803

BDI

5,30
4,08
9,50
3,38236

BDI

5,30
4,08
13,19
4,94947

BDI

5,30
4,08
18,36
7,09646

BDI

5,30
4,08
26,17
9,37170

BDI

5,30
4,08
36,26
13,60817

BDI

5,30
4,08
46,74
16,97646

BDI

5,30
4,08
57,30
20,36314

BDI

5,30
4,08
71,84
25,62311

Material

M
H
2,10000
H
2,10000
M
1,00000
93,77000

BDI

5,30
4,08
93,77
31,62490

Material

M
H
2,00000
H
2,00000
M
1,00000
149,21000

234,75
5,30
10,60000
4,08
8,16000
149,21
149,21000
BDI
43,89716

M
H
H
M

0,06000
0,06000
1,03000

5,30
4,08
3,08

3,62000

10,68
0,68900
0,53040
5,98000

18,08
1,32500
1,02000
9,50000

26,46
2,12000
1,63200
13,19000

37,95
3,18000
2,44800
18,36000

50,11
3,71000
2,85600
26,17000

72,77
5,83000
4,48800
36,26000

90,78
6,89000
5,30400
46,74000

108,89
7,95000
6,12000
57,30000

137,02
10,07000
7,75200
71,84000

169,12
11,13000
8,56800
93,77000

5,43
0,31800
0,24480
3,17240

Pgina: 173

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 0,56280

Descrio
LS

0,68662

09.03.018
CABO DE 6 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.58
EL-CABO DE COBRE 1000 V-D-SECAO 6 MM2
Mo-de-Obra 0,93800
LS
1,14436
09.03.019
CABO DE 10 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.59
EL-CABO DE COBRE 1000 V-E-SECAO 10 MM2
Mo-de-Obra 1,40700
LS
1,71654
09.03.020
CABO DE 16 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.60
EL-CABO DE COBRE 1000 V-F-SECAO 16 MM2
Mo-de-Obra 2,72020
LS
3,31864
09.03.021
CABO DE 25 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.61
EL-CABO DE COBRE 1000 V-G-SECAO 25 MM2
Mo-de-Obra 4,50240
LS
5,49293
09.03.022
CABO DE 35 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.62
EL-CABO DE COBRE 1000 V-H-SECAO 35 MM2
Mo-de-Obra 6,56600
LS
8,01052
09.03.023
CABO DE 50 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.63
EL-CABO DE COBRE 1000 V-I-SECAO 50 MM2
Mo-de-Obra 7,50400
LS
9,15488
09.03.024
CABO DE 70 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.64
EL-CABO DE COBRE 1000 V-J-SECAO 70 MM2
Mo-de-Obra 9,38000
LS
11,44360
09.03.025
CABO DE 95 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.65
EL-CABO DE COBRE 1000 V-K-SECAO 95 MM2
Mo-de-Obra 12,19400
LS
14,87668
09.03.026
CABO DE 120 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.66
EL-CABO DE COBRE 1000 V-L-SECAO 120 MM2
Mo-de-Obra 14,07000
LS
17,16540
09.03.027
CABO DE 150 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.67
EL-CABO DE COBRE 1000 V-M-SECAO 150 MM2
Mo-de-Obra 15,94600
LS
19,45412
09.03.028
CABO DE 185 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.68
EL-CABO DE COBRE 1000 V-N-SECAO 185 MM2
Mo-de-Obra 18,76000
LS
22,88720
09.03.029
CABO DE 240 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.69
EL-CABO DE COBRE 1000 V-O-SECAO 240 MM2
Mo-de-Obra 20,63600
LS
25,17592

Exerccio:

2011

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

1,24942

2,08236

3,12354

6,03884

9,99533

14,57652

16,65888

20,82360

27,07068

31,23540

35,40012

41,64720

45,81192

Material

3,17240

Custo Unit.

Custo Total

BDI

1,01702

BDI

5,30
4,08
3,19
1,23465

BDI

5,30
4,08
6,46
2,24879

BDI

5,30
4,08
9,43
3,62290

BDI

5,30
4,08
14,59
5,75530

BDI

5,30
4,08
19,59
7,99347

BDI

5,30
4,08
26,11
10,01700

BDI

5,30
4,08
36,94
13,54051

BDI

5,30
4,08
50,05
18,08310

BDI

5,30
4,08
62,97
22,10174

BDI

5,30
4,08
76,60
26,28857

5,30
4,08
95,04
32,09383

Material

M
H
0,10000
H
0,10000
M
1,03000
3,28570

6,60
0,53000
0,40800
3,28570

Material

M
H
0,15000
H
0,15000
M
1,03000
6,65380

Material

M
H
0,29000
H
0,29000
M
1,03000
9,71290

Material

M
H
0,48000
H
0,48000
M
1,03000
15,02770

Material

M
H
0,70000
H
0,70000
M
1,03000
20,17770

Material

M
H
0,80000
H
0,80000
M
1,03000
26,89330

Material

M
H
1,00000
H
1,00000
M
1,03000
38,04820

Material

M
H
1,30000
H
1,30000
M
1,03000
51,55150

Material

M
H
1,50000
H
1,50000
M
1,03000
64,85910

Material

M
H
1,70000
H
1,70000
M
1,03000
78,89800

Material

M
H
2,00000
H
2,00000
M
1,03000
97,89120

BDI

Material

M
H
2,20000
H
2,20000
M
1,03000
127,16380

212,76
5,30
11,66000
4,08
8,97600
123,46
127,16380
BDI
39,78442

12,02
0,79500
0,61200
6,65380

19,37
1,53700
1,18320
9,71290

30,77
2,54400
1,95840
15,02770

42,74
3,71000
2,85600
20,17770

53,56
4,24000
3,26400
26,89330

72,41
5,30000
4,08000
38,04820

96,70
6,89000
5,30400
51,55150

118,19
7,95000
6,12000
64,85910

140,58
9,01000
6,93600
78,89800

171,63
10,60000
8,16000
97,89120

Pgina: 174

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

09.03.030
CABO DE 300 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.70
EL-CABO DE COBRE 1000 V-P-SECAO 300 MM2
Mo-de-Obra 23,45000
LS
28,60900

UN Coeficiente

SubMO

52,05900

09.03.046
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 25MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
09.03.047
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 32MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.03
ELETRODUTO PVC RIGIDO 32MM (1')
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416
09.03.048
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 40MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.04
ELETRODUTO PVC RIGIDO 38MM (1 1/4)
Mo-de-Obra 6,56600
LS
8,01052
SubMO
14,57652
09.03.049
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 50MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.05
ELETRODUTO PVC RIGIDO 50MM (1 1/2')
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888
09.03.050
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 60MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.06
ELETRODUTO PVC RIGIDO 60MM (2')
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124
09.03.051
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 75MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.07
ELETRODUTO PVC RIGIDO 75MM (2 1/2')
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360
09.03.052
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 85MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.08
ELETRODUTO PVC RIGIDO 85MM (3')
Mo-de-Obra 10,31800
LS
12,58796
SubMO
22,90596
09.03.053
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 110MM -INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.09
ELETRODUTO PVC RIGIDO 110MM (4')
Mo-de-Obra 12,19400
LS
14,87668
SubMO
27,07068
09.03.058
ELETRODUTO EM POLIETILENO DE 25MM-INCLUSIVE CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

Material

M
H
2,50000
H
2,50000
M
1,03000
218,47330

Material

M
H
0,50000
H
0,50000
M
1,10000
3,37700

Material

M
H
0,60000
H
0,60000
M
1,10000
4,80700

Material

M
H
0,70000
H
0,70000
M
1,10000
5,96200

Material

M
H
0,80000
H
0,80000
M
1,10000
5,81900

Material

M
H
0,90000
H
0,90000
M
1,10000
6,56700

Material

M
H
1,00000
H
1,00000
M
1,10000
12,72700

Material

M
H
1,10000
H
1,10000
M
1,10000
16,66500

Material

M
H
1,30000
H
1,30000
M
1,10000
24,12300

Material

M
H
0,50000
H
0,50000
M
1,10000
0,49500

09.03.059
ELETRODUTO EM POLIETILENO DE 32MM-INCLUSIVE CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.14
ELETRODUTO DE POLIETILENO 32 MM
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416

Material

M
H
0,60000
H
0,60000
M
1,10000
0,80300

09.03.090
ENVELOPE DE CONCRETO PARA DUTOS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
Mo-de-Obra 2,95260
LS
3,60217

M
H
H
M3
KG
M3
Material
1,75030

Exerccio:

2011

SubMO

6,55477

Custo Unit.

Custo Total

332,75
5,30
13,25000
4,08
10,20000
212,11
218,47330
BDI
62,22243

BDI

5,30
4,08
3,07
3,17142

BDI

5,30
4,08
4,37
3,97927

BDI

5,30
4,08
5,42
4,72386

BDI

5,30
4,08
5,29
5,16991

BDI

5,30
4,08
5,97
5,82090

BDI

5,30
4,08
11,57
7,71664

BDI

5,30
4,08
15,15
9,10132

BDI

5,30
4,08
21,93
11,77455

BDI

5,30
4,08
0,45
2,50856

BDI

5,30
4,08
0,73
3,05835

BDI

4,64
3,82
80,46
0,37
62,03
1,91017

0,20000
0,53000
0,00500
2,52000
0,00670

16,96
2,65000
2,04000
3,37700

21,28
3,18000
2,44800
4,80700

25,26
3,71000
2,85600
5,96200

27,64
4,24000
3,26400
5,81900

31,12
4,77000
3,67200
6,56700

41,26
5,30000
4,08000
12,72700

48,67
5,83000
4,48800
16,66500

62,96
6,89000
5,30400
24,12300

13,41
2,65000
2,04000
0,49500

16,35
3,18000
2,44800
0,80300

10,21
0,92800
2,02460
0,40230
0,93240
0,41560

Pgina: 175

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.03.099
SERVICOS DE INTERLIGACAO AO QUADRO GERAL
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

Custo Unit.

Custo Total

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

09.04.006
CAIXA EM CHAPA DE AO 16 COM PORTA E FECHO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.22
CUBICULO: QUADRO GERAL PORTA/FECH/ACO 100x125x25CM
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

M2
H
5,00000
H
5,00000
UN
0,80000
Material
573,63200

833,63
5,30
26,50000
4,08
20,40000
717,04
573,63200
BDI
155,88250

09.04.007
QUADRO GERAL : CHAVE SECCIONADORA NH C/ FUSIVEL 3X125A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.11
CHAVE SECCIONADORA NH 3X125A SECA
4.41.52
FUSIVEL NH ATE 125 A
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
UN
3,00000
Material
103,26000

BDI

09.04.008
QUADRO GERAL : CHAVE SECCIONADORA NH C/ FUSIVEL 3X250A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.37.05
CHAVE SECCIONADORA NH 3X250A S/ FUSIVEIS
4.41.56
FUSIVEL NH DE 200 A 250A
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
UN
3,00000
Material
293,20000

386,24
5,30
5,30000
4,08
4,08000
214,00
214,00000
26,40
79,20000
BDI
72,22543

09.04.009
QUADRO GERAL : CHAVE SECCIONADORA NH C/ FUSIVEL 3X400A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.37.03
CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL
4.41.59
FUSIVEL NH DE 300 A 400A
Mo-de-Obra 11,25600
LS
13,73232
SubMO
24,98832

UN
H
1,20000
H
1,20000
UN
1,00000
UN
3,00000
Material
388,12000

508,12
5,30
6,36000
4,08
4,89600
289,66
289,66000
32,82
98,46000
BDI
95,01491

09.04.010
QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 30 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.45
CHAVE FACA SECA 3X30A 'MARMORE'
Mo-de-Obra 3,75200
LS
4,57744
SubMO

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
10,10000

12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
Material
13,65000

16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
Material
35,64000

0,00000

5,30
4,08
83,19
6,69
27,58134

147,50
4,24000
3,26400
83,19000
20,07000

22,66
2,12000
1,63200
10,10000

BDI

5,30
4,08
10,10
4,23877

BDI

5,30
4,08
13,65
6,01316

BDI

5,30
4,08
35,64
12,02874

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
58,99000

BDI

5,30
4,08
58,99
18,35713

24,98832

UN
H
1,20000
H
1,20000
UN
1,00000
Material
198,64000

275,06
5,30
6,36000
4,08
4,89600
198,64
198,64000
BDI
51,43451

24,98832

UN
H
1,20000
H
1,20000
UN
1,00000
UN
3,00000
Material
651,89000

832,56
5,30
6,36000
4,08
4,89600
513,98
513,98000
45,97
137,91000
BDI
155,68201

09.04.019
QUADRO GERAL - DISJUNTOR TERMOMAGNETICO 3X10A A 3X50A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.15
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A
SubMO
18,74124
Mo-de-Obra 8,44200
LS
10,29924

UN
H
0,90000
H
0,90000
UN
1,00000
Material
32,07000

09.04.011
QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 60 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
Mo-de-Obra 5,62800
LS
6,86616
SubMO
09.04.012
QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 100 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.47
CHAVE FACA SECA 3X100A 'MARMORE'
Mo-de-Obra 7,50400
LS
9,15488
SubMO
09.04.014
QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 200 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.49
CHAVE FACA SECA 3X200A 'MARMORE'
Mo-de-Obra 9,38000
LS
11,44360
SubMO
09.04.015
QUADRO GERAL-CHAVE GERAL SECA TIPO FACA - 400 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.50
CHAVE FACA SECA 3X400A 'MAMORE'
Mo-de-Obra 11,25600
LS
13,73232
SubMO
09.04.016
CHAVE SECCIONADORA NH C/FUSIVEL 3X630A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.37.20
CHAVE SECCIONADORA NH S/FUSVEL 3X630A
4.41.67
FUSIVEL NH DE 425 A 630A
Mo-de-Obra 11,25600
LS
13,73232

Exerccio:

2011

SubMO

BDI

5,30
4,08
32,07
11,68659

32,15
3,18000
2,44800
13,65000

64,32
4,24000
3,26400
35,64000

98,17
5,30000
4,08000
58,99000

62,49
4,77000
3,67200
32,07000

Pgina: 176

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

09.04.020
QUADRO GERAL - DISJUNTOR TERMOMAGNETICO 3X60A A 3X100A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.40
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
39,79000

BDI

09.04.021
QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X200A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.56
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X200A
Mo-de-Obra 8,44200
LS
10,29924
SubMO

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
134,31000

188,25
5,30
4,77000
4,08
3,67200
134,31
134,31000
BDI
35,20179

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
1.303,27000

1.626,07
5,30
4,77000
4,08
3,67200
1.303,27
1.303,27000
BDI
304,06259

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
2.163,18000

2.683,76
5,30
4,77000
4,08
3,67200
2.163,18
2.163,18000
BDI
501,84189

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
3.963,38000

4.898,00
5,30
4,77000
4,08
3,67200
3.963,38
3.963,38000
BDI
915,88789

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
137,08000

191,66
5,30
4,77000
4,08
3,67200
137,08
137,08000
BDI
35,83889

23,13684

UN
H
0,90000
H
0,90000
UN
1,00000
Material
1.177,95000

1.477,33
4,08
3,67200
7,50
6,75000
1.177,95
1.177,95000
BDI
276,24997

09.04.036
INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 40A/30MA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.93
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/30MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
162,12000

225,02
5,30
5,30000
4,08
4,08000
3,96
11,88000
5,98
17,94000
120,87
120,87000
1,77
5,31000
2,04
6,12000
BDI
42,07703

09.04.037
INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 63A/30MA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.94
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/30MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
190,73000

260,21
5,30
5,30000
4,08
4,08000
3,96
11,88000
5,98
17,94000
149,48
149,48000
1,77
5,31000
2,04
6,12000
BDI
48,65733

09.04.038
INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 40A/300 mA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.95
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/300MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
SubMO
20,82360
Mo-de-Obra 9,38000
LS
11,44360

UN
H
1,00000
H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
168,55000

232,92
5,30
5,30000
4,08
4,08000
3,96
11,88000
5,98
17,94000
127,30
127,30000
1,77
5,31000
2,04
6,12000
BDI
43,55593

09.04.022
QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X400A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.57
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X400A
Mo-de-Obra 8,44200
LS
10,29924
SubMO
09.04.023
QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X600A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.58
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X600A
Mo-de-Obra 8,44200
LS
10,29924
SubMO
09.04.024
QUADRO GERAL - DISJUNTOR TERMO MAGNETICO 3X800A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.59
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X800A
Mo-de-Obra 8,44200
LS
10,29924
SubMO
09.04.025
DISJUNTOR TERMOMAGNETICO 3X125A A 3X225A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.65
DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A
Mo-de-Obra 8,44200
LS
10,29924
SubMO
09.04.028
QUADRO GERAL-DISJUNTOR TERMOMAGNETICO 3X300A
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.35.55
DISJUNTOR TERMOMAGNETICO 3X300A
Mo-de-Obra 10,42200
LS
12,71484
SubMO

09.04.039
1.01.15
Exerccio:

INTERRUPTOR AUTOM. DIFERENCIAL (DISPOSITIVO DR) 63A/300 mA


ELETRICISTA

2011

UN
H

1,00000

5,30
4,08
39,79
13,46219

5,30

71,99
4,77000
3,67200
39,79000

250,70
5,30000
Pgina: 177

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.96
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/300MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
Mo-de-Obra 9,38000
LS
11,44360
SubMO
09.04.040
QUADRO GERAL-BARRAMENTO DE 30 A
1.01.15
ELETRICISTA
4.96.21
BARRAMENTO COBRE 6X1MM P/30A - 1/4"X1/16"
Mo-de-Obra 1,32500
LS
1,61650
09.04.041
QUADRO GERAL-BARRAMENTO DE 60 A
1.01.15
ELETRICISTA
4.96.22
BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16"
Mo-de-Obra 1,32500
LS
1,61650
09.04.042
QUADRO GERAL-BARRAMENTO DE 100 A
1.01.15
ELETRICISTA
4.96.23
BARRAMENTO COBRE 100 A - 3/8"X1/8"
Mo-de-Obra 1,32500
LS
1,61650
09.04.043
QUADRO GERAL-BARRAMENTO DE 150 A
1.01.15
ELETRICISTA
4.96.24
BARRAMENTO COBRE 20X4MM P/150A - 1/2"X1/8"
Mo-de-Obra 1,59000
LS
1,93980

SubMO

SubMO

SubMO

SubMO

09.04.044
QUADRO GERAL-BARRAMENTO DE 200 A
1.01.15
ELETRICISTA
4.96.25
BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8"
SubMO
Mo-de-Obra 1,59000
LS
1,93980
09.04.045
QUADRO GERAL-BARRAMENTO DE 400 A
1.01.15
ELETRICISTA
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 1,59000
LS
1,93980
09.04.046
QUADRO GERAL-BARRAMENTO DE 800 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.95.03
ISOLADOR DE BAIXA TENSAO, EM PORCELANA
4.96.27
BARRAMENTO COBRE 800A 2"X1/4" (TRIFSICO)
Mo-de-Obra 16,88000
LS
20,59360
09.04.047
QUADRO GERAL-BARRAMENTO DE 1000 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.95.03
ISOLADOR DE BAIXA TENSAO, EM PORCELANA
4.96.28
BARRAMENTO COBRE 1000A - 3"X1/4"
Mo-de-Obra 25,32000
LS
30,89040
09.04.049
QUADRO GERAL - BARRAMENTO DE 600A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.95.03
ISOLADOR DE BAIXA TENSAO, EM PORCELANA
4.96.29
BARRAMENTO DE COBRE 600A-1 1/2" X 1/4"
Mo-de-Obra 16,88000
LS
20,59360

SubMO

SubMO

SubMO

SubMO

20,82360

H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
183,00000

Material

M
H
0,25000
M
1,00000
3,22000

Material

M
H
0,25000
M
1,00000
5,53000

Material

M
H
0,25000
M
1,00000
8,41000

Material

M
H
0,30000
M
1,00000
12,45000

Material

M
H
0,30000
M
1,00000
17,07000

3,52980

Material

M
H
0,30000
M
1,00000
67,46000

Exerccio:

4,08
4,08000
3,96
11,88000
5,98
17,94000
141,75
141,75000
1,77
5,31000
2,04
6,12000
BDI
46,87943
7,57
1,32500
3,22000

BDI

BDI

5,30
5,53
1,94845

BDI

5,30
8,41
2,61085

BDI

5,30
12,45
3,67535

BDI

5,30
17,07
4,73795

BDI

5,30
67,46
16,32765

37,47360

M
H
1,00000
H
1,00000
H
1,00000
UN
1,00000
M
1,00000
Material
96,48000

BDI

5,30
4,08
7,50
2,83
93,65
30,80933

56,21040

M
H
1,50000
H
1,50000
H
1,50000
UN
1,00000
M
1,00000
Material
143,31000

245,41
5,30
7,95000
4,08
6,12000
7,50
11,25000
2,83
2,83000
140,48
140,48000
BDI
45,88969

37,47360

M
H
1,00000
H
1,00000
H
1,00000
UN
1,00000
M
1,00000
Material
72,99000

2,94150

2,94150

2,94150

3,52980

3,52980

QUADRO GERAL - ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 32 MM INCL CONEX


ELETRICISTA
AJUDANTE ELETRICISTA
ELETRODUTO PVC RIGIDO 32MM (1')

2011

Custo Total

5,30
3,22
1,41715

09.04.050
PLACA DE ACRILICO TRANSPARENTE ESP=5MM PROTECAO A CONTATO ACIDENTAL
M2
1.01.15
ELETRICISTA
H
0,80000
1.01.16
AJUDANTE ELETRICISTA
H
0,80000
2.67.31
PARAFUSO AUTO-ATARRACHANTE CABECA OVAL 4,8 X 75MM
UN
6,00000
3.71.30
ACRILICO TRANSPARENTE ESP=5MM
M2
1,10000
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888
Material
138,41700
09.04.072
1.01.15
1.01.16
4.25.03

Custo Unit.

M
H
H
M

0,60000
0,60000
1,10000

BDI

5,30
4,08
7,50
2,83
70,16
25,40663

10,41
1,32500
5,53000

13,96
1,32500
8,41000

19,65
1,59000
12,45000

25,33
1,59000
17,07000

87,31
1,59000
67,46000

164,76
5,30000
4,08000
7,50000
2,83000
93,65000

135,87
5,30000
4,08000
7,50000
2,83000
70,16000

190,74
5,30
4,24000
4,08
3,26400
0,14
0,84000
125,07
137,57700
BDI
35,66745

5,30
4,08
4,37

21,28
3,18000
2,44800
4,80700

Pgina: 178

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 5,62800

LS

6,86616

UN Coeficiente
SubMO

09.04.075
QUADRO GERAL - CABO DE COBRE NU DE 6 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.36
CABO DE COBRE NU DE 6 MM2
Mo-de-Obra 0,56280
LS
0,68662
SubMO
09.04.076
QUADRO GERAL - CABO DE COBRE NU DE 10 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.37
CABO DE COBRE NU DE 10 MM2
Mo-de-Obra 0,84420
LS
1,02992
SubMO
09.04.077
QUADRO GERAL - CABO DE COBRE NU DE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.38
CABO DE COBRE NU DE 16 MM2
Mo-de-Obra 1,21940
LS
1,48767
SubMO
09.04.078
QUADRO GERAL - CABO DE COBRE NU DE 25 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.40
CABO DE COBRE NU DE 25 MM2
Mo-de-Obra 2,34500
LS
2,86090
SubMO
09.04.079
QUADRO GERAL - CABO DE COBRE NU DE 35 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.41
CABO DE COBRE NU DE 35 MM2
Mo-de-Obra 3,75200
LS
4,57744
SubMO
09.04.080
QUADRO GERAL - CABO DE COBRE NU DE 50 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.54
CABO DE COBRE NU 50 MM2
Mo-de-Obra 5,62800
LS
6,86616
SubMO
09.04.081
QUADRO GERAL - CABO DE COBRE NU DE 70 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.43
CABO DE COBRE NU DE 70 MM2
Mo-de-Obra 6,56600
LS
8,01052
SubMO
09.04.082
QUADRO GERAL - CABO DE COBRE NU DE 95 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.39
CABO DE COBRE NU DE 95 MM2
Mo-de-Obra 10,31800
LS
12,58796
SubMO
09.04.083
QUADRO GERAL - CABO DE COBRE NU DE 120 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.42
CABO DE COBRE NU DE 120 MM2
Mo-de-Obra 12,19400
LS
14,87668
SubMO
09.04.086
TERRA COMPLETO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
6.20.95
TUBO CERAMICO DN 300MM (12")
Mo-de-Obra 12,47540
LS
15,21999

SubMO

09.04.087
DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.65
DISJUNTOR TRIPOLAR TERMOMAGNETICO 125A A 225A
SubMO
Mo-de-Obra 2,34500
LS
2,86090
09.04.089
1.01.15
1.01.16
4.46.31
Exerccio:

DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X35A A 1X50A


ELETRICISTA
AJUDANTE ELETRICISTA
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X35A A 1X50A

2011

12,49416

Material

4,80700

Custo Unit.

Custo Total

BDI

3,97927

BDI

5,30
4,08
2,45
0,85087

BDI

5,30
4,08
5,11
1,60635

BDI

5,30
4,08
7,49
2,34533

BDI

5,30
4,08
11,06
3,74116

BDI

5,30
4,08
19,98
6,51117

BDI

5,30
4,08
24,71
8,55696

BDI

5,30
4,08
38,05
12,10410

BDI

5,30
4,08
42,22
14,97897

BDI

5,30
4,08
56,04
19,11546

5,30
4,08
70,23
3,84
44,97
33,74914

Material

M
H
0,06000
H
0,06000
M
1,00000
2,45000

Material

M
H
0,09000
H
0,09000
M
1,00000
5,11000

Material

M
H
0,13000
H
0,13000
M
1,00000
7,49000

Material

M
H
0,25000
H
0,25000
M
1,00000
11,06000

Material

M
H
0,40000
H
0,40000
M
1,00000
19,98000

Material

M
H
0,60000
H
0,60000
M
1,00000
24,71000

Material

M
H
0,70000
H
0,70000
M
1,00000
38,05000

Material

M
H
1,10000
H
1,10000
M
1,00000
42,22000

27,07068

Material

M
H
1,30000
H
1,30000
M
1,00000
56,04000

27,69539

UN
H
1,33000
H
1,33000
UN
1,00000
UN
1,00000
M
1,00000
Material
119,04000

BDI

5,20590

UN
H
0,25000
H
0,25000
UN
1,00000
Material
137,08000

175,01
5,30
1,32500
4,08
1,02000
137,08
137,08000
BDI
32,72576

1,24942

1,87412

2,70707

5,20590

8,32944

12,49416

14,57652

22,90596

UN
H
H
UN

0,25000
0,25000
1,00000

5,30
4,08
6,96

4,55
0,31800
0,24480
2,45000

8,59
0,47700
0,36720
5,11000

12,54
0,68900
0,53040
7,49000

20,00
1,32500
1,02000
11,06000

34,82
2,12000
1,63200
19,98000

45,76
3,18000
2,44800
24,71000

64,73
3,71000
2,85600
38,05000

80,10
5,83000
4,48800
42,22000

102,22
6,89000
5,30400
56,04000

180,48
7,04900
5,42640
70,23000
3,84000
44,97000

14,96
1,32500
1,02000
6,96000
Pgina: 179

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 2,34500

LS

2,86090

UN Coeficiente
SubMO

5,20590

Material

5,20590

UN
H
0,25000
H
0,25000
UN
1,00000
Material
4,06000

5,20590

UN
H
0,25000
H
0,25000
UN
1,00000
Material
26,77000

5,20590

UN
H
0,25000
H
0,25000
UN
1,00000
Material
34,15000

5,20590

UN
H
0,25000
H
0,25000
UN
1,00000
Material
45,00000

5,20590

UN
H
0,25000
H
0,25000
UN
1,00000
Material
11,43000

09.04.096
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X90A A 1X100A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.45.72
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X90A A 1X100A
Mo-de-Obra 2,34500
LS
2,86090
SubMO
5,20590
09.04.099
SERVICOS DE QUADRO GERAL
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

09.04.090
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A 1X30A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
Mo-de-Obra 2,34500
LS
2,86090
SubMO
09.04.091
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.10
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A
Mo-de-Obra 2,34500
LS
2,86090
SubMO
09.04.092
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.12
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A
Mo-de-Obra 2,34500
LS
2,86090
SubMO
09.04.094
DISJUNTOR BIPOLAR TERMOMAG. 2X125A A 2X225A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.13
DISJUNTOR BIPOLAR TERMOMAGNTICO 2X125A A 2X225A
Mo-de-Obra 2,34500
LS
2,86090
SubMO
09.04.095
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X50A A 1X70A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.45.62
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X60A A 1X70A
Mo-de-Obra 2,34500
LS
2,86090
SubMO

SubMO

0,00000

09.05.002
ELETROD ACO GALV QUENTE (NBR 5624) 20 MM (3/4") - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416
09.05.003
ELETROD ACO GALV QUENTE (NBR 5624) 25 MM (1") - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.72
ELETROD ACO GALV QUENTE (NBR-5624) 25 MM (1")
Mo-de-Obra 6,56600
LS
8,01052
SubMO
14,57652
09.05.004
ELETROD ACO GALV QUENTE (NBR 5624) 32 MM (1 1/4") - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888
09.05.005
ELETROD ACO GALV QUENTE (NBR 5624) 40 MM (1 1/2") - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.74
ELETROD ACO GALV QUENTE (NBR-5624) 40 MM (1 1/2")
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124
09.05.006
ELETROD ACO GALV QUENTE (NBR 5624) 50 MM (2") - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.75
ELETROD ACO GALV QUENTE (NBR-5624) 50 MM (2")
SubMO
20,82360
Mo-de-Obra 9,38000
LS
11,44360
09.05.007
1.01.15
Exerccio:

ELETROD ACO GALV. QUENTE (NBR5624) 65MM(2X1/2") INCL CONEXOES


ELETRICISTA

2011

6,96000

Custo Unit.

Custo Total

BDI

2,79816

BDI

5,30
4,08
4,06
2,13116

BDI

5,30
4,08
26,77
7,35446

BDI

5,30
4,08
34,15
9,05186

BDI

5,30
4,08
45,00
11,54736

BDI

5,30
4,08
11,43
3,82626

UN
H
0,25000
H
0,25000
UN
1,00000
Material
12,60000

BDI

5,30
4,08
12,60
4,09536

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

Material

M
H
0,60000
H
0,60000
M
1,05000
9,98550

Material

M
H
0,70000
H
0,70000
M
1,05000
12,34800

Material

M
H
0,80000
H
0,80000
M
1,05000
16,17000

Material

M
H
0,90000
H
0,90000
M
1,05000
21,14700

Material

M
H
1,00000
H
1,00000
M
1,05000
25,89300
M
H

1,10000

BDI

5,30
4,08
9,51
5,17032

BDI

5,30
4,08
11,76
6,19264

BDI

5,30
4,08
15,40
7,55064

BDI

5,30
4,08
20,14
9,17430

BDI

5,30
4,08
24,66
10,74482

5,30

11,39
1,32500
1,02000
4,06000

39,33
1,32500
1,02000
26,77000

48,40
1,32500
1,02000
34,15000

61,75
1,32500
1,02000
45,00000

20,46
1,32500
1,02000
11,43000

21,90
1,32500
1,02000
12,60000

27,64
3,18000
2,44800
9,98550

33,11
3,71000
2,85600
12,34800

40,37
4,24000
3,26400
16,17000

49,06
4,77000
3,67200
21,14700

57,46
5,30000
4,08000
25,89300

75,14
5,83000
Pgina: 180

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.16
AJUDANTE ELETRICISTA
4.21.76
ELETROD ACO GALV QUENTE (NBR-5624) 65 MM (2 1/2")
SubMO
Mo-de-Obra 10,31800
LS
12,58796

UN Coeficiente

22,90596

09.05.008
ELETROD ACO GALV QUENTE (NBR5624) 80MM(3") INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.21.77
ELETROD ACO GALV QUENTE (NBR-5624) 80 MM (3")
Mo-de-Obra 11,25600
LS
13,73232
SubMO
24,98832
09.05.013
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 25MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
09.05.014
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 32MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.03
ELETRODUTO PVC RIGIDO 32MM (1')
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416
09.05.015
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 40MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.04
ELETRODUTO PVC RIGIDO 38MM (1 1/4)
Mo-de-Obra 6,56600
LS
8,01052
SubMO
14,57652
09.05.016
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 50MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.05
ELETRODUTO PVC RIGIDO 50MM (1 1/2')
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888
09.05.017
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 60MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.06
ELETRODUTO PVC RIGIDO 60MM (2')
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124
09.05.018
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 75MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.07
ELETRODUTO PVC RIGIDO 75MM (2 1/2')
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360
09.05.019
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 85MM - INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.08
ELETRODUTO PVC RIGIDO 85MM (3')
SubMO
22,90596
Mo-de-Obra 10,31800
LS
12,58796
09.05.020
ELETRODUTO DE PVC RIGIDO ROSCAVEL DE 110MM -INCL CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.09
ELETRODUTO PVC RIGIDO 110MM (4')
Mo-de-Obra 12,19400
LS
14,87668
SubMO
27,07068
09.05.036
ELETRODUTO EM POLIETILENO DE 25MM-INCLUSIVE CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
09.05.037
ELETRODUTO EM POLIETILENO DE 32MM-INCLUSIVE CONEXOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.14
ELETRODUTO DE POLIETILENO 32 MM
SubMO
12,49416
Mo-de-Obra 5,62800
LS
6,86616
09.05.040
1.01.39
1.01.46
2.05.03
Exerccio:

ENVELOPE DE CONCRETO PARA DUTOS


PEDREIRO
SERVENTE
AREIA

2011

Material

H
1,10000
M
1,05000
38,18850

Material

M
H
1,20000
H
1,20000
M
1,05000
43,20750

Material

M
H
0,50000
H
0,50000
M
1,10000
3,37700

Material

M
H
0,60000
H
0,60000
M
1,10000
4,80700

Material

M
H
0,70000
H
0,70000
M
1,10000
5,96200

Material

M
H
0,80000
H
0,80000
M
1,10000
5,81900

Material

M
H
0,90000
H
0,90000
M
1,10000
6,56700

Material

M
H
1,00000
H
1,00000
M
1,10000
12,72700

Material

M
H
1,10000
H
1,10000
M
1,10000
16,66500

Material

M
H
1,30000
H
1,30000
M
1,10000
24,12300

Material

M
H
0,50000
H
0,50000
M
1,10000
0,49500

Material

M
H
0,60000
H
0,60000
M
1,10000
0,80300
M
H
H
M3

0,20000
0,53000
0,00500

Custo Unit.

Custo Total

BDI

4,08
36,37
14,05173

BDI

5,30
4,08
41,15
15,68504

BDI

5,30
4,08
3,07
3,17142

BDI

5,30
4,08
4,37
3,97927

BDI

5,30
4,08
5,42
4,72386

BDI

5,30
4,08
5,29
5,16991

BDI

5,30
4,08
5,97
5,82090

BDI

5,30
4,08
11,57
7,71664

BDI

5,30
4,08
15,15
9,10132

BDI

5,30
4,08
21,93
11,77455

BDI

5,30
4,08
0,45
2,50856

BDI

5,30
4,08
0,73
3,05835

4,64
3,82
80,46

4,48800
38,18850

83,88
6,36000
4,89600
43,20750

16,96
2,65000
2,04000
3,37700

21,28
3,18000
2,44800
4,80700

25,26
3,71000
2,85600
5,96200

27,64
4,24000
3,26400
5,81900

31,12
4,77000
3,67200
6,56700

41,26
5,30000
4,08000
12,72700

48,67
5,83000
4,48800
16,66500

62,96
6,89000
5,30400
24,12300

13,41
2,65000
2,04000
0,49500

16,35
3,18000
2,44800
0,80300

10,21
0,92800
2,02460
0,40230
Pgina: 181

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
Mo-de-Obra 2,95260

UN Coeficiente

BDI

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
96,78000

BDI

5,30
4,08
96,78
31,83826

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
101,40000

175,94
5,30
10,60000
4,08
8,16000
101,40
101,40000
BDI
32,90086

62,47080

UN
H
3,00000
H
3,00000
UN
1,00000
Material
135,47000

243,46
5,30
15,90000
4,08
12,24000
135,47
135,47000
BDI
45,52638

83,29440

UN
H
4,00000
H
4,00000
UN
1,00000
Material
198,46000

346,55
5,30
21,20000
4,08
16,32000
198,46
198,46000
BDI
64,80351

09.05.054
QUADRO DISTRIBUICAO, DISJ. GERAL 100A P/ 28 A 42 DISJS.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.11.12
QUADRO DISTR CAPAC P/ 28 A 42 DISJ C/ BARRAMENTO
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
Material
415,50000

639,13
5,30
26,50000
4,08
20,40000
415,50
415,50000
BDI
119,51214

09.05.061
QUADRO AUTOMATICO CAPACIDADE PARA 42 DISJ C/ BARRAMENTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.11.12
QUADRO DISTR CAPAC P/ 28 A 42 DISJ C/ BARRAMENTO
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
Material
415,50000

639,13
5,30
26,50000
4,08
20,40000
415,50
415,50000
BDI
119,51214

09.05.069
INTERRUPTOR TIPO AUTOMTICO DE BIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.55.50
AUTOMATICO DE BOIA CONTATO MERCURIO
Mo-de-Obra 9,38000
LS
11,44360

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
32,84000

12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
Material
26,77000

12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
Material
34,15000

6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
4,06000

18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
32,07000

3,60217

SubMO

09.05.042
QUADRO DISTRIBUICAO, DISJ. GERAL 30A P/ 4 A 8 DISJS.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.11.03
QUADRO DISTR. CAPAC P/ 4 A 8 DISJ C/BARRAMENTO
Mo-de-Obra 18,76000
LS
22,88720
SubMO
09.05.045
QUADRO DISTRIBUICAO, DISJ. GERAL 50A P/ 10 A 12 DISJS.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.11.05
QUADRO DISTR CAPAC P/ 10 A 12 DISJ C/ BARRAMENTO
Mo-de-Obra 18,76000
LS
22,88720
SubMO
09.05.047
QUADRO DISTRIBUICAO, DISJ. GERAL 60A P/ 14 A 20 DISJS.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.11.07
QUADRO DISTR CAPAC P/ 14 A 20 DISJ C/ BARRAMENTO
Mo-de-Obra 28,14000
LS
34,33080
SubMO
09.05.051
QUADRO DISTRIBUICAO, DISJ. GERAL 80A P/ 22 A 26 DISJS.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.11.10
QUADRO DISTR CAPAC P/ 22 A 26 DISJ C/ BARRAMENTO
Mo-de-Obra 37,52000
LS
45,77440
SubMO

SubMO

09.05.070
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.10
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X10A A 2X50A
SubMO
Mo-de-Obra 5,62800
LS
6,86616
09.05.071
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.12
DISJUNTOR BIPOLAR TERMOMAGNETICO 2X60A A 2X100A
Mo-de-Obra 5,62800
LS
6,86616
SubMO
09.05.073
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
Mo-de-Obra 2,81400
LS
3,43308
SubMO
09.05.074
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.46.15
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X10A A 3X50A
SubMO
Mo-de-Obra 8,44200
LS
10,29924
09.05.075
1.01.15
1.01.16
4.46.40
Exerccio:

DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A


ELETRICISTA
AJUDANTE ELETRICISTA
DISJUNTOR TRIPOLAR TERMOMAGNETICO 3X60A A 3X100A

2011

6,55477

Custo Total

0,37
62,03
1,91017

LS

KG
2,52000
M3
0,00670
Material
1,75030

Custo Unit.

UN
H
H
UN

0,90000
0,90000
1,00000

BDI

5,30
4,08
32,84
12,34263

BDI

5,30
4,08
26,77
9,03076

BDI

5,30
4,08
34,15
10,72816

BDI

5,30
4,08
4,06
2,37063

BDI

5,30
4,08
32,07
11,68659

5,30
4,08
39,79

0,93240
0,41560

170,26
10,60000
8,16000
96,78000

66,00
5,30000
4,08000
32,84000

48,29
3,18000
2,44800
26,77000

57,37
3,18000
2,44800
34,15000

12,67
1,59000
1,22400
4,06000

62,49
4,77000
3,67200
32,07000

71,99
4,77000
3,67200
39,79000
Pgina: 182

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 8,44200

LS

10,29924

UN Coeficiente
SubMO

18,74124

Material

39,79000

Custo Unit.
BDI

Custo Total

13,46219

09.05.076
QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 3/4 A 1 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.17.50
RELE BIMET.DE SOBREC.-FAIXA AJUST.2,5-4A
4.17.70
CONTACTOR TRIPOLAR ATE 9A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 56,28000
LS
68,66160
Material
SubMO
124,94160

UN
H
6,00000
H
6,00000
CJ
8,00000
UN
0,08000
UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
5,00000
UN
5,00000
UN
2,00000
UN
1,00000
UN
4,00000
497,50600

5,30
4,08
0,14
11,95
76,55
89,32
1,22
37,09
13,65
13,63
1,11
4,06
192,02
0,33
BDI
143,16295

09.05.077
QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 1 1/2 A 2 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.17.51
RELE BIMET.DE SOBREC.-FAIXA AJUST.4-6,3A
4.17.70
CONTACTOR TRIPOLAR ATE 9A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 56,28000
LS
68,66160
SubMO
124,94160
Material

UN
H
6,00000
H
6,00000
CJ
8,00000
UN
0,08000
UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
5,00000
UN
5,00000
UN
2,00000
UN
1,00000
UN
4,00000
497,50600

5,30
4,08
0,14
11,95
76,55
89,32
1,22
37,09
13,65
13,63
1,11
4,06
192,02
0,33
BDI
143,16295

09.05.078
QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 2 A 3 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.17.52
RELE BIMET.DE SOBREC.-FAIXA AJUST.6,3-10A
4.17.71
CONTACTOR TRIPOLAR ATE 12A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 56,28000
LS
68,66160
SubMO
124,94160
Material

UN
H
6,00000
H
6,00000
CJ
8,00000
UN
0,08000
UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
5,00000
UN
5,00000
UN
2,00000
UN
1,00000
UN
4,00000
499,55600

5,30
4,08
0,14
11,95
76,36
91,56
1,22
37,09
13,65
13,63
1,11
4,06
192,02
0,33
BDI
143,63445

09.05.079
QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 3 A 4 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.17.53
RELE BIMET.DE SOBREC.-FAIXA AJUST.8-12,5A
4.17.71
CONTACTOR TRIPOLAR ATE 12A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 56,28000
LS
68,66160
SubMO
124,94160
Material

UN
H
6,00000
H
6,00000
CJ
8,00000
UN
0,08000
UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
458,31600

5,30
4,08
0,14
11,95
79,34
91,56
1,22
37,09
13,65
13,63
1,11
4,06
192,02
0,33
BDI
134,14925

09.05.080
1.01.15
1.01.16
2.67.26
2.67.77

UN
H
H
CJ
UN

Exerccio:

QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 4 A 5 HP


ELETRICISTA
AJUDANTE ELETRICISTA
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
BUCHA TIPO S-8 (CENTO)

2011

6,00000
6,00000
8,00000
0,08000

5,30
4,08
0,14
11,95

765,61
31,80000
24,48000
1,12000
0,95600
76,55000
89,32000
3,66000
37,09000
13,65000
68,15000
5,55000
8,12000
192,02000
1,32000

765,61
31,80000
24,48000
1,12000
0,95600
76,55000
89,32000
3,66000
37,09000
13,65000
68,15000
5,55000
8,12000
192,02000
1,32000

768,13
31,80000
24,48000
1,12000
0,95600
76,36000
91,56000
3,66000
37,09000
13,65000
68,15000
5,55000
8,12000
192,02000
1,32000

717,40
31,80000
24,48000
1,12000
0,95600
79,34000
91,56000
3,66000
37,09000
13,65000
27,26000
2,22000
8,12000
192,02000
1,32000

779,44
31,80000
24,48000
1,12000
0,95600
Pgina: 183

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.17.54
RELE BIMET.DE SOBREC.-FAIXA AJUST.10-16A
4.17.72
CONTACTOR TRIPOLAR ATE 16A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
SubMO
Mo-de-Obra 56,28000
LS
68,66160

UN Coeficiente

124,94160

09.05.081
QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA TRIFASICO DE 7,5 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.17.55
RELE BIMET.DE SOBREC FAIXA AJUST 16-25A
4.17.73
CONTACTOR TRIPOLAR ATE 25A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 56,28000
LS
68,66160
SubMO
124,94160

Custo Unit.

Custo Total

UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
5,00000
UN
5,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
508,75600

79,57
97,55
1,22
37,09
13,65
13,63
1,11
4,06
192,02
0,33
BDI
145,75045

UN
H
6,00000
H
6,00000
CJ
8,00000
UN
0,08000
UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
5,00000
UN
5,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
542,39600

5,30
4,08
0,14
11,95
94,88
115,88
1,22
37,09
13,65
13,63
1,11
4,06
192,02
0,33
BDI
153,48765

09.05.082
QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA BIFASICO DE 3/4 A 1 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.17.52
RELE BIMET.DE SOBREC.-FAIXA AJUST.6,3-10A
4.17.70
CONTACTOR TRIPOLAR ATE 9A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.41
CHAVE FACA SECA 2X60A BASE ' MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 58,15600
LS
70,95032
SubMO
129,10632
Material

UN
H
6,20000
H
6,20000
CJ
8,00000
UN
0,08000
UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
4,00000
UN
4,00000
UN
2,00000
UN
1,00000
UN
4,00000
478,50600

5,30
4,08
0,14
11,95
76,36
89,32
1,22
37,09
9,58
13,63
1,11
4,06
192,02
0,33
BDI
139,75083

09.05.083
QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA BIFASICO DE 1 1/2 A 2 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.77
BUCHA TIPO S-8 (CENTO)
4.17.53
RELE BIMET.DE SOBREC.-FAIXA AJUST.8-12,5A
4.17.71
CONTACTOR TRIPOLAR ATE 12A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
4.36.41
CHAVE FACA SECA 2X60A BASE ' MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 58,15600
LS
70,95032
SubMO
129,10632
Material

UN
H
6,20000
H
6,20000
CJ
8,00000
UN
0,08000
UN
1,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
1,00000
UN
4,00000
UN
4,00000
UN
2,00000
UN
1,00000
UN
4,00000
483,72600

5,30
4,08
0,14
11,95
79,34
91,56
1,22
37,09
9,58
13,63
1,11
4,06
192,02
0,33
BDI
140,95143

09.05.084
1.01.15
1.01.16
2.67.26
2.67.77
4.17.54
4.17.71
4.26.01
4.36.10
4.36.41
4.40.01
4.40.10

UN
H
H
CJ
UN
UN
UN
M
UN
UN
UN
UN

Exerccio:

QUADRO COMANDO PARA CONJUNTO MOTOR BOMBA BIFASICO DE 2 A 3 HP


ELETRICISTA
AJUDANTE ELETRICISTA
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
BUCHA TIPO S-8 (CENTO)
RELE BIMET.DE SOBREC.-FAIXA AJUST.10-16A
CONTACTOR TRIPOLAR ATE 12A
ELETRODUTO FLEXIVEL PVC 1/2'
CHAVE REVERSIVEL 3X30 A BASE MARMORE
CHAVE FACA SECA 2X60A BASE ' MARMORE'
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
FUSIVEL DIAZED ATE 25A

2011

6,20000
6,20000
8,00000
0,08000
1,00000
1,00000
3,00000
1,00000
1,00000
4,00000
4,00000

5,30
4,08
0,14
11,95
79,57
91,56
1,22
37,09
9,58
13,63
1,11

79,57000
97,55000
3,66000
37,09000
13,65000
68,15000
5,55000
8,12000
192,02000
1,32000

820,82
31,80000
24,48000
1,12000
0,95600
94,88000
115,88000
3,66000
37,09000
13,65000
68,15000
5,55000
8,12000
192,02000
1,32000

747,36
32,86000
25,29600
1,12000
0,95600
76,36000
89,32000
3,66000
37,09000
9,58000
54,52000
4,44000
8,12000
192,02000
1,32000

753,78
32,86000
25,29600
1,12000
0,95600
79,34000
91,56000
3,66000
37,09000
9,58000
54,52000
4,44000
8,12000
192,02000
1,32000

754,06
32,86000
25,29600
1,12000
0,95600
79,57000
91,56000
3,66000
37,09000
9,58000
54,52000
4,44000
Pgina: 184

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.46.30
DISJUNTOR UNIPOLAR TERMOMAGNETICO 1X10A A 1X30A
4.51.16
CAIXA PROTECAO CHAPA DE FERRO No16 DE 90X40X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
SubMO
Mo-de-Obra 58,15600
LS
70,95032

UN Coeficiente

129,10632

UN
2,00000
UN
1,00000
UN
4,00000
Material
483,95600

09.05.085
QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 3/4 A 2 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
4.17.70
CONTACTOR TRIPOLAR ATE 9A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.51.17
CAIXA CHAPA FERRO 16 DE 50X30X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
CJ
8,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
223,67000

09.05.086
QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 2 A 4 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
4.17.71
CONTACTOR TRIPOLAR ATE 12A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.51.17
CAIXA CHAPA FERRO 16 DE 50X30X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
CJ
8,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
225,91000

09.05.087
QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 5 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
4.17.72
CONTACTOR TRIPOLAR ATE 16A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.51.17
CAIXA CHAPA FERRO 16 DE 50X30X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

Custo Unit.

Custo Total

4,06
8,12000
192,02
192,02000
0,33
1,32000
BDI
141,00433
377,56
21,20000
16,32000
1,12000
89,32000
3,66000
13,65000
27,26000
2,22000
85,12000
1,32000

BDI

5,30
4,08
0,14
89,32
1,22
13,65
13,63
1,11
85,12
0,33
70,60181

BDI

5,30
4,08
0,14
91,56
1,22
13,65
13,63
1,11
85,12
0,33
71,11701

UN
H
4,00000
H
4,00000
CJ
8,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
231,90000

BDI

5,30
4,08
0,14
97,55
1,22
13,65
13,63
1,11
85,12
0,33
72,49471

09.05.088
QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 7,5 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
4.17.73
CONTACTOR TRIPOLAR ATE 25A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.51.17
CAIXA CHAPA FERRO 16 DE 50X30X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
CJ
8,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
250,23000

410,23
5,30
21,20000
4,08
16,32000
0,14
1,12000
115,88
115,88000
1,22
3,66000
13,65
13,65000
13,63
27,26000
1,11
2,22000
85,12
85,12000
0,33
1,32000
BDI
76,71061

09.05.089
QUADRO COMANDO PARA BOMBA DE INCENDIO TRIFASICO DE 10 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
4.17.74
CONTACTOR TRIPOLAR ATE 32A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.47
CHAVE FACA SECA 3X100A 'MARMORE'
4.40.02
BASE FUSIVEIS DIAZED COMPLETA P/ 63 A
4.41.02
FUSIVEL DIAZED RAP/RET 2/35 A $MD
4.51.17
CAIXA CHAPA FERRO 16 DE 50X30X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
CJ
8,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
334,75000

514,19
5,30
21,20000
4,08
16,32000
0,14
1,12000
167,89
167,89000
1,22
3,66000
35,64
35,64000
18,61
37,22000
1,39
2,78000
85,12
85,12000
0,33
1,32000
BDI
96,15021

09.05.090
1.01.15
1.01.16
2.67.26
4.17.70
Exerccio:

QUADRO COMANDO PARA BOMBA DE INCENDIO BIFASICO DE 3/4 A 1 HP


ELETRICISTA
AJUDANTE ELETRICISTA
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
CONTACTOR TRIPOLAR ATE 9A

2011

UN
H
H
CJ
UN

4,00000
4,00000
8,00000
1,00000

5,30
4,08
0,14
89,32

380,32
21,20000
16,32000
1,12000
91,56000
3,66000
13,65000
27,26000
2,22000
85,12000
1,32000

387,68
21,20000
16,32000
1,12000
97,55000
3,66000
13,65000
27,26000
2,22000
85,12000
1,32000

372,56
21,20000
16,32000
1,12000
89,32000
Pgina: 185

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.41
CHAVE FACA SECA 2X60A BASE ' MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.51.17
CAIXA CHAPA FERRO 16 DE 50X30X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 37,52000
LS
45,77440
SubMO

UN Coeficiente

83,29440

M
3,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
219,60000

Custo Unit.

Custo Total

BDI

1,22
9,58
13,63
1,11
85,12
0,33
69,66571

5,30
4,08
0,14
91,56
1,22
9,58
13,63
1,11
85,12
0,33
70,18091

3,66000
9,58000
27,26000
2,22000
85,12000
1,32000

09.05.091
QUADRO COMANDO PARA BOMBA DE INCENDIO BIFASICO DE 1 1/2 A 2 HP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
4.17.71
CONTACTOR TRIPOLAR ATE 12A
4.26.01
ELETRODUTO FLEXIVEL PVC 1/2'
4.36.41
CHAVE FACA SECA 2X60A BASE ' MARMORE'
4.40.01
BASE FUSIVEIS DIAZED COMPLETA ATE 25A
4.40.10
FUSIVEL DIAZED ATE 25A
4.51.17
CAIXA CHAPA FERRO 16 DE 50X30X25CM
4.85.68
BRACADEIRA ACO GALV ELETROLITICO 15 MM (1/2")
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
CJ
8,00000
UN
1,00000
M
3,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
4,00000
Material
221,84000

BDI

09.05.092
INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 40A/30 mA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.93
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/30MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
SubMO
20,82360
Mo-de-Obra 9,38000
LS
11,44360

UN
H
1,00000
H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
162,12000

225,02
5,30
5,30000
4,08
4,08000
3,96
11,88000
5,98
17,94000
120,87
120,87000
1,77
5,31000
2,04
6,12000
BDI
42,07703

09.05.093
INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 63A/30 mA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.94
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/30MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
190,73000

260,21
5,30
5,30000
4,08
4,08000
3,96
11,88000
5,98
17,94000
149,48
149,48000
1,77
5,31000
2,04
6,12000
BDI
48,65733

09.05.094
INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 40A/300 mA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.95
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)40A/300MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
168,55000

232,92
5,30
5,30000
4,08
4,08000
3,96
11,88000
5,98
17,94000
127,30
127,30000
1,77
5,31000
2,04
6,12000
BDI
43,55593

09.05.095
INTERRUPTOR AUTOMATICO DIFERENCIAL (DISPOSITIVO DR) 63A/300 mA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
4.45.96
INTERRUPTOR AUTOM.DIFER.(DISPOSITIVO DR)63A/300MA
4.94.30
TERMINAL PRESSAO CABO 10MM2
4.95.82
TERMINAL PRES P/CABO 16MM2(6AWG)
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
M
3,00000
M
3,00000
UN
1,00000
UN
3,00000
UN
3,00000
Material
183,00000

250,70
5,30
5,30000
4,08
4,08000
3,96
11,88000
5,98
17,94000
141,75
141,75000
1,77
5,31000
2,04
6,12000
BDI
46,87943

09.05.096
CENTRAL DE SISTEMA DE ALARME AT 12 ENDEREOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.75.50
CENTRAL DE SISTEMA DE ALARME AT 12 ENDEREOS
Mo-de-Obra 21,41000
LS
26,12020
SubMO

47,53020

UN
H
2,50000
H
2,00000
UN
1,00000
Material
404,07000

555,46
5,30
13,25000
4,08
8,16000
404,07
404,07000
BDI
103,86805

09.05.097
CENTRAL DE SISTEMA DE ALARME DE 13 A 24 ENDEREOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.75.51
CENTRAL DE SISTEMA DE ALARME DE 13 A 24 ENDEREOS
SubMO
68,35380
Mo-de-Obra 30,79000
LS
37,56380

UN
H
3,50000
H
3,00000
UN
1,00000
Material
539,52000

747,68
5,30
18,55000
4,08
12,24000
539,52
539,52000
BDI
139,81097

09.05.099
6.96.02
Exerccio:

SERVICOS DE DUTOS/QUADROS PARCIAIS LUZ/QUADROS TELEFOE


MODULO DE VERBA

2011

MV
MV

1,00000

244,82

375,31
21,20000
16,32000
1,12000
91,56000
3,66000
9,58000
27,26000
2,22000
85,12000
1,32000

301,12
244,82000
Pgina: 186

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 0,00000

Descrio
LS

0,00000

UN Coeficiente
SubMO

0,00000

Material

244,82000

09.06.001
CAIXA DE PASSAGEM ESTAMPADA COM TAMPA PLASTICA DE 4"X2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.35
CAIXA 4"X2"
4.55.25
ESPELHO 4"X2"
Mo-de-Obra 2,81400
LS
3,43308
SubMO
6,24708

UN
H
H
UN
UN
Material
3,13000

0,30000
0,30000
1,00000
1,00000

09.06.002
CAIXA DE PASSAGEM ESTAMPADA COM TAMPA PLASTICA DE 4"X4"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944

UN
H
H
UN
UN
Material
8,15000

0,40000
0,40000
1,00000
1,00000

09.06.005
CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 10X10X8 CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.01
CAIXA PASS CH TAMPA PARAF 10X10X8 CM
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
3,29000

09.06.007
CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 15X15X8 CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.02
CAIXA PASS CH TAMPA PARAF 15X15X8 CM
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
Material
5,59000

09.06.009
CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 20X20X10 CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.03
CAIXA PASS CH TAMPA PARAF 20X20X10 CM
Mo-de-Obra 8,44200
LS
10,29924
SubMO
18,74124

UN
H
0,90000
H
0,90000
UN
1,00000
Material
9,09000

09.06.012
CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 30X30X12 CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.05
CAIXA PASS CH TAMPA PARAF 30X30X12 CM
Mo-de-Obra 11,25600
LS
13,73232
SubMO
24,98832

UN
H
1,20000
H
1,20000
UN
1,00000
Material
17,42000

09.06.015
CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 40X40X15 CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.07
CAIXA PASS CH TAMPA PARAF 40X40X15 CM
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

UN
H
1,50000
H
1,50000
UN
1,00000
Material
28,67000

09.06.019
CAIXA DE PASSAGEM CHAPA TAMPA PARAFUSADA DE 50X50X15 CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.09
CAIXA PASS CH TAMPA PARAF 50X50X15 CM
SubMO
39,56484
Mo-de-Obra 17,82200
LS
21,74284

UN
H
1,90000
H
1,90000
UN
1,00000
Material
40,81000

09.06.025
CAIXA DE PASSAGEM EM ALVENARIA DE 0,40X0,40X0,40 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.10
ACO CA-25 $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 27,17960
LS
33,15911
SubMO

60,33871

UN
H
2,12000
H
4,54000
M3
0,07700
KG
2,40000
KG
17,80000
M3
0,04100
KG
3,00000
UN
45,00000
Material
34,07465

130,03162

UN
H
4,72000
H
9,60000
M3
0,15900
KG
5,70000
KG
37,15000
M3
0,07200
KG
4,50000
UN
105,00000
Material
68,11480

09.06.026
CAIXA DE PASSAGEM EM ALVENARIA DE 0,60X0,60X0,60 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.10
ACO CA-25 $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 58,57280
SubMO
LS
71,45882

Exerccio:

2011

Custo Unit.
BDI

Custo Total

56,30860

BDI

5,30
4,08
1,89
1,24
2,15673

BDI

5,30
4,08
3,65
4,50
3,79027

BDI

5,30
4,08
3,29
2,67247

BDI

5,30
4,08
5,59
4,15936

BDI

5,30
4,08
9,09
6,40119

BDI

5,30
4,08
17,42
9,75391

BDI

5,30
4,08
28,67
13,77824

BDI

5,30
4,08
40,81
18,48621

BDI

4,64
3,82
80,46
0,35
0,37
62,03
2,67
0,22
21,71507

BDI

4,64
3,82
80,46
0,35
0,37
62,03
2,67
0,22
45,57368

11,53
1,59000
1,22400
1,89000
1,24000

20,26
2,12000
1,63200
3,65000
4,50000

14,29
2,12000
1,63200
3,29000

22,24
3,18000
2,44800
5,59000

34,23
4,77000
3,67200
9,09000

52,16
6,36000
4,89600
17,42000

73,68
7,95000
6,12000
28,67000

98,86
10,07000
7,75200
40,81000

116,12
9,83680
17,34280
6,19542
0,84000
6,58600
2,54323
8,01000
9,90000

243,72
21,90080
36,67200
12,79314
1,99500
13,74550
4,46616
12,01500
23,10000

Pgina: 187

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

09.06.027
CAIXA DE PASSAGEM EM ALVENARIA DE 0,80X0,80X0,80 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.10
ACO CA-25 $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 98,26720
LS
119,88598
SubMO

UN Coeficiente

218,15318

UN
H
7,94000
H
16,08000
M3
0,25600
KG
9,88000
KG
58,98000
M3
0,10400
KG
5,80000
UN
182,00000
Material
107,85548

329,51371

UN
H
12,00000
H
24,28000
M3
0,37500
KG
15,20000
KG
86,95000
M3
0,14800
KG
8,10000
UN
280,00000
Material
160,07144

195,58067

UN
H
7,14000
H
14,39000
M3
0,26900
KG
7,60000
KG
71,06000
M3
0,07600
KG
8,10000
UN
140,00000
Material
107,73722

09.06.035
CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 10X10X6CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.20
CAIXA DE PASSAGEM DE ALUM. 10X10X6CM ANTI-UMIDADE
Mo-de-Obra 13,13200
LS
16,02104
SubMO
29,15304

UN
H
1,40000
H
1,40000
UN
1,00000
Material
15,83000

09.06.036
CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 15X15X10CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.21
CAIXA DE PASSAGEM DE ALUM. 15X15X10CM ANTI-UMIDADE
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

UN
H
1,50000
H
1,50000
UN
1,00000
Material
29,95000

09.06.037
CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 20X20X10CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.22
CAIXA DE PASSAGEM DE ALUM. 20X20X10CM ANTI-UMIDADE
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

Custo Unit.

Custo Total
400,99
36,84160
61,42560
20,59776
3,45800
21,82260
6,45112
15,48600
40,04000

BDI

4,64
3,82
80,46
0,35
0,37
62,03
2,67
0,22
74,98199

BDI

4,64
3,82
80,46
0,35
0,37
62,03
2,67
0,22
112,60459

BDI

4,64
3,82
80,46
0,35
0,37
62,03
2,67
0,22
69,76311

BDI

5,30
4,08
15,83
10,34610

BDI

5,30
4,08
29,95
14,07264

UN
H
1,50000
H
1,50000
UN
1,00000
Material
45,22000

BDI

5,30
4,08
45,22
17,58474

09.06.038
CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 30X30X12CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.23
CAIXA DE PASSAGEM DE ALUM. 30X30X12CM ANTI-UMIDADE
Mo-de-Obra 15,00800
LS
18,30976
SubMO
33,31776

UN
H
1,60000
H
1,60000
UN
1,00000
Material
145,64000

220,11
5,30
8,48000
4,08
6,52800
145,64
145,64000
BDI
41,16029

09.06.039
CAIXA DE PASSAGEM A PROVA DE UMIDADE EM ALUMINIO 40X40X20CM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.50.24
CAIXA DE PASSAGEM DE ALUM. 40X40X20CM ANTI-UMIDADE
Mo-de-Obra 16,88400
LS
20,59848
SubMO
37,48248

UN
H
1,80000
H
1,80000
UN
1,00000
Material
233,53000

333,34
5,30
9,54000
4,08
7,34400
233,53
233,53000
BDI
62,33287

09.06.028
CAIXA DE PASSAGEM EM ALVENARIA DE 1,00X1,00X1,00 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.10
ACO CA-25 $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 148,42960
LS
181,08411
SubMO
09.06.029
CAIXA DE PASSAGEM EM ALVENARIA DE 1,00X1,00X0,50 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.10
ACO CA-25 $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
SubMO
Mo-de-Obra 88,09940
LS
107,48127

09.06.045
QUADRO EM CHAPA COM PORTA E FECHADURA (TELEBRAS) DE 20X20X12CM
UN
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
1,00000
4.12.01
QUADRO EMBUTIR TELESP/TELEBRAS 20X20X12CM /1 PORTA
UN
1,00000
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360
Material
35,53000
09.06.047
1.01.15
1.01.16
4.12.03

Exerccio:

QUADRO EM CHAPA COM PORTA E FECHADURA (TELEBRAS) DE 40X40X12CM


ELETRICISTA
AJUDANTE ELETRICISTA
QUADRO EMBUTIR TELESP/TELEBRAS 40X40X12CM /1 PORTA

2011

UN
H
H
UN

1,00000
1,00000
1,00000

BDI

5,30
4,08
35,53
12,96133

5,30
4,08
72,73

602,18
55,68000
92,74960
30,17250
5,32000
32,17150
9,18044
21,62700
61,60000

373,08
33,12960
54,96980
21,64374
2,66000
26,29220
4,71428
21,62700
30,80000

55,32
7,42000
5,71200
15,83000

75,25
7,95000
6,12000
29,95000

94,04
7,95000
6,12000
45,22000

69,31
5,30000
4,08000
35,53000

115,07
5,30000
4,08000
72,73000

Pgina: 188

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 9,38000

LS

11,44360

UN Coeficiente
SubMO

20,82360

Material

72,73000

Custo Unit.
BDI

Custo Total

21,51733

09.06.049
QUADRO EM CHAPA COM PORTA E FECHADURA (TELEBRAS) DE 60X60X12CM
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
4.12.06
QUADRO EMBUTIR TELESP/TELEBRAS 60X60X12CM/2 PORTAS
UN
1,00000
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720
Material
123,00000

202,51
5,30
10,60000
4,08
8,16000
123,00
123,00000
BDI
37,86886

09.06.099
SERVICOS DE CAIXAS DE PASSAGEM
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

301,12
244,82
244,82000
BDI
56,30860

09.07.003
FIO DE 1,50 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,37520
LS
0,45774
09.07.004
FIO DE 2,50 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,46900
LS
0,57218
09.07.005
FIO DE 4 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.06
FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,51590
LS
0,62940
09.07.006
FIO DE 6 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.07
FIO DE 6,00 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,56280
LS
0,68662
09.07.007
FIO DE 10 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.08
FIO DE 10,0 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 0,84420
LS
1,02992

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

09.07.009
FIO TRANCADO PARA TELEFONE - PAD. TELEBRAS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.60
FIO TRANCADO PARA TELEFONE - PADRAO TELEBRAS
Mo-de-Obra 0,18760
LS
0,22887
SubMO
09.07.011
CABO DE 10 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.14
CABO DE 10 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 1,21940
LS
1,48767
09.07.012
CABO DE 16 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.15
CABO DE 16 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 2,72020
LS
3,31864
09.07.013
CABO DE 25 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.16
CABO DE 25 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 2,34500
LS
2,86090
09.07.014
CABO DE 35 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.17
CABO DE 35 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 3,75200
LS
4,57744
09.07.015
1.01.15
Exerccio:

CABO DE 50 MM2 - 750 V DE ISOLACAO


ELETRICISTA

2011

SubMO

SubMO

SubMO

SubMO

0,00000

MV
MV
1,00000
Material
244,82000

0,83294

Material

M
H
0,04000
H
0,04000
M
1,00000
0,54000

Material

M
H
0,05000
H
0,05000
M
1,00000
0,86000

Material

M
H
0,05500
H
0,05500
M
1,00000
1,39000

Material

M
H
0,06000
H
0,06000
M
1,00000
2,06000

Material

M
H
0,09000
H
0,09000
M
1,00000
3,62000

Material

M
H
0,02000
H
0,02000
M
1,00000
0,22000

Material

M
H
0,13000
H
0,13000
M
1,03000
4,07880

Material

M
H
0,29000
H
0,29000
M
1,00000
5,98000

Material

M
H
0,25000
H
0,25000
M
1,00000
9,50000

Material

M
H
0,40000
H
0,40000
M
1,00000
13,19000

1,04118

1,14530

1,24942

1,87412

0,41647

2,70707

6,03884

5,20590

8,32944

M
H

0,60000

BDI

5,30
4,08
0,54
0,31578

BDI

5,30
4,08
0,86
0,43727

BDI

5,30
4,08
1,39
0,58312

BDI

5,30
4,08
2,06
0,76117

BDI

5,30
4,08
3,62
1,26365

BDI

5,30
4,08
0,22
0,14639

BDI

5,30
4,08
3,96
1,56075

BDI

5,30
4,08
5,98
2,76433

BDI

5,30
4,08
9,50
3,38236

BDI

5,30
4,08
13,19
4,94947

5,30

1,68
0,21200
0,16320
0,54000

2,33
0,26500
0,20400
0,86000

3,11
0,29150
0,22440
1,39000

4,07
0,31800
0,24480
2,06000

6,75
0,47700
0,36720
3,62000

0,78
0,10600
0,08160
0,22000

8,34
0,68900
0,53040
4,07880

14,78
1,53700
1,18320
5,98000

18,08
1,32500
1,02000
9,50000

26,46
2,12000
1,63200
13,19000

37,95
3,18000
Pgina: 189

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.16
AJUDANTE ELETRICISTA
4.30.18
CABO DE 50 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 5,62800
LS
6,86616
09.07.016
CABO DE 70 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.19
CABO DE 70 MM2 (ISOL.PVC ANTICHAMA 750V)
Mo-de-Obra 6,56600
LS
8,01052
09.07.017
CABO DE 95 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.20
CABO DE 95 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 10,31800
LS
12,58796
09.07.018
CABO DE 120 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.21
CABO DE 120 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 12,19400
LS
14,87668
09.07.019
CABO DE 150 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.22
CABO DE 150 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 14,07000
LS
17,16540
09.07.020
CABO DE 185 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.23
CABO DE 185 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 17,82200
LS
21,74284
09.07.021
CABO DE 240 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.24
CABO DE 240 MM2 (ISOL PVC ANTICHAMA 750V)
Mo-de-Obra 19,69800
LS
24,03156
09.07.022
CABO DE 300 MM2 - 750 V DE ISOLACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.71
EL-CABO DE COBRE 750 V-L-SECAO 300 MM2
Mo-de-Obra 18,76000
LS
22,88720
09.07.030
CABO DE 1,5 MM2 - 1000 V - 2 ISOLACOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.55
EL-CABO DE COBRE 1000 V-A-SECAO 1,5 MM2
Mo-de-Obra 0,37520
LS
0,45774
09.07.031
CABO DE 2,5 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.56
EL-CABO DE COBRE 1000 V-B-SECAO 2,5 MM2
Mo-de-Obra 0,46900
LS
0,57218
09.07.032
CABO DE 4 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.57
EL-CABO DE COBRE 1000 V-C-SECAO 4 MM2
Mo-de-Obra 0,56280
LS
0,68662
09.07.033
CABO DE 6 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.58
EL-CABO DE COBRE 1000 V-D-SECAO 6 MM2
Mo-de-Obra 0,93800
LS
1,14436
09.07.034
1.01.15
1.01.16
4.31.59
Exerccio:

CABO DE 10 MM2 - 1000V DE ISOLAO


ELETRICISTA
AJUDANTE ELETRICISTA
EL-CABO DE COBRE 1000 V-E-SECAO 10 MM2

2011

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

12,49416

14,57652

22,90596

27,07068

31,23540

39,56484

43,72956

41,64720

0,83294

1,04118

1,24942

2,08236

Material

H
0,60000
M
1,00000
18,36000

Material

M
H
0,70000
H
0,70000
M
1,00000
26,17000

Material

M
H
1,10000
H
1,10000
M
1,00000
36,26000

Material

M
H
1,30000
H
1,30000
M
1,00000
46,74000

Material

M
H
1,50000
H
1,50000
M
1,00000
57,30000

Material

M
H
1,90000
H
1,90000
M
1,00000
71,84000

Custo Unit.

Custo Total

BDI

4,08
18,36
7,09646

BDI

5,30
4,08
26,17
9,37170

BDI

5,30
4,08
36,26
13,60817

BDI

5,30
4,08
46,74
16,97646

BDI

5,30
4,08
57,30
20,36314

BDI

5,30
4,08
71,84
25,62311

Material

M
H
2,10000
H
2,10000
M
1,00000
93,77000

BDI

5,30
4,08
93,77
31,62490

Material

M
H
2,00000
H
2,00000
M
1,00000
149,21000

234,75
5,30
10,60000
4,08
8,16000
149,21
149,21000
BDI
43,89716

Material

M
H
0,04000
H
0,04000
M
1,03000
0,52530

Material

M
H
0,05000
H
0,05000
M
1,03000
2,13210

Material

M
H
0,06000
H
0,06000
M
1,03000
3,17240

Material

M
H
0,10000
H
0,10000
M
1,03000
3,28570
M
H
H
M

0,15000
0,15000
1,03000

BDI

5,30
4,08
0,51
0,31240

BDI

5,30
4,08
2,07
0,72985

BDI

5,30
4,08
3,08
1,01702

BDI

5,30
4,08
3,19
1,23465

5,30
4,08
6,46

2,44800
18,36000

50,11
3,71000
2,85600
26,17000

72,77
5,83000
4,48800
36,26000

90,78
6,89000
5,30400
46,74000

108,89
7,95000
6,12000
57,30000

137,02
10,07000
7,75200
71,84000

169,12
11,13000
8,56800
93,77000

1,67
0,21200
0,16320
0,52530

3,90
0,26500
0,20400
2,13210

5,43
0,31800
0,24480
3,17240

6,60
0,53000
0,40800
3,28570

12,02
0,79500
0,61200
6,65380
Pgina: 190

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 1,40700

Descrio
LS

1,71654

09.07.035
CABO DE 16 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.60
EL-CABO DE COBRE 1000 V-F-SECAO 16 MM2
Mo-de-Obra 2,72020
LS
3,31864
09.07.036
CABO DE 25 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.61
EL-CABO DE COBRE 1000 V-G-SECAO 25 MM2
Mo-de-Obra 4,50240
LS
5,49293
09.07.037
CABO DE 35 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.62
EL-CABO DE COBRE 1000 V-H-SECAO 35 MM2
Mo-de-Obra 6,56600
LS
8,01052
09.07.038
CABO DE 50 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.63
EL-CABO DE COBRE 1000 V-I-SECAO 50 MM2
Mo-de-Obra 7,50400
LS
9,15488
09.07.039
CABO DE 70 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.64
EL-CABO DE COBRE 1000 V-J-SECAO 70 MM2
Mo-de-Obra 9,38000
LS
11,44360
09.07.040
CABO DE 95 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.65
EL-CABO DE COBRE 1000 V-K-SECAO 95 MM2
Mo-de-Obra 12,19400
LS
14,87668
09.07.041
CABO DE 120 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.66
EL-CABO DE COBRE 1000 V-L-SECAO 120 MM2
Mo-de-Obra 14,07000
LS
17,16540
09.07.042
CABO DE 150 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.67
EL-CABO DE COBRE 1000 V-M-SECAO 150 MM2
Mo-de-Obra 15,94600
LS
19,45412
09.07.043
CABO DE 185 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.68
EL-CABO DE COBRE 1000 V-N-SECAO 185 MM2
Mo-de-Obra 18,76000
LS
22,88720
09.07.044
CABO DE 240 MM2 - 1000V DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.69
EL-CABO DE COBRE 1000 V-O-SECAO 240 MM2
Mo-de-Obra 20,63600
LS
25,17592
09.07.045
CABO DE 300 MM2 - 1000 V - 2 ISOLACOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.70
EL-CABO DE COBRE 1000 V-P-SECAO 300 MM2
Mo-de-Obra 23,45000
LS
28,60900
09.07.061
FIO BICOLOR POLARIZADO P/ SOM 2X0,75MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.66
FIO BICOLOR POLARIZADO 2X0,75MM2
Mo-de-Obra 0,37520
LS
0,45774

Exerccio:

2011

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

3,12354

6,03884

9,99533

14,57652

16,65888

20,82360

27,07068

31,23540

35,40012

41,64720

45,81192

52,05900

0,83294

Material

6,65380

Custo Unit.

Custo Total

BDI

2,24879

BDI

5,30
4,08
9,43
3,62290

BDI

5,30
4,08
14,59
5,75530

BDI

5,30
4,08
19,59
7,99347

BDI

5,30
4,08
26,11
10,01700

BDI

5,30
4,08
36,94
13,54051

BDI

5,30
4,08
50,05
18,08310

BDI

5,30
4,08
62,97
22,10174

BDI

5,30
4,08
76,60
26,28857

5,30
4,08
95,04
32,09383

Material

M
H
0,29000
H
0,29000
M
1,03000
9,71290

Material

M
H
0,48000
H
0,48000
M
1,03000
15,02770

Material

M
H
0,70000
H
0,70000
M
1,03000
20,17770

Material

M
H
0,80000
H
0,80000
M
1,03000
26,89330

Material

M
H
1,00000
H
1,00000
M
1,03000
38,04820

Material

M
H
1,30000
H
1,30000
M
1,03000
51,55150

Material

M
H
1,50000
H
1,50000
M
1,03000
64,85910

Material

M
H
1,70000
H
1,70000
M
1,03000
78,89800

Material

M
H
2,00000
H
2,00000
M
1,03000
97,89120

BDI

Material

M
H
2,20000
H
2,20000
M
1,03000
127,16380

212,76
5,30
11,66000
4,08
8,97600
123,46
127,16380
BDI
39,78442

Material

M
H
2,50000
H
2,50000
M
1,03000
218,47330

332,75
5,30
13,25000
4,08
10,20000
212,11
218,47330
BDI
62,22243

Material

M
H
0,04000
H
0,04000
M
1,00000
1,50000

BDI

5,30
4,08
1,50
0,53658

19,37
1,53700
1,18320
9,71290

30,77
2,54400
1,95840
15,02770

42,74
3,71000
2,85600
20,17770

53,56
4,24000
3,26400
26,89330

72,41
5,30000
4,08000
38,04820

96,70
6,89000
5,30400
51,55150

118,19
7,95000
6,12000
64,85910

140,58
9,01000
6,93600
78,89800

171,63
10,60000
8,16000
97,89120

2,86
0,21200
0,16320
1,50000

Pgina: 191

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

09.07.062
FIO BICOLOR POLARIZADO P/ SOM 2X1,00MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.67
FIO BICOLOR POLARIZADO 2X1,00MM2
Mo-de-Obra 0,37520
LS
0,45774
09.07.063
FIO BICOLOR POLARIZADO P/ SOM 2X1,50MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.68
FIO BICOLOR POLARIZADO 2X1,50MM2
Mo-de-Obra 0,46900
LS
0,57218
09.07.064
FIO BICOLOR POLARIZADO P/ SOM 2X2,50MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.69
FIO BICOLOR POLARIZADO 2X2,50MM2
Mo-de-Obra 0,65660
LS
0,80105

UN Coeficiente

SubMO

SubMO

SubMO

09.07.065
CABO DE CONTROLE 3X1,5MM2 ATE 1KV DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.75
CABO DE CONTROLE 3X1,5MM2 ATE 1KV DE ISOLAO
Mo-de-Obra 0,46900
LS
0,57218
SubMO
09.07.066
CABO DE CONTROLE 5X1,5MM2 ATE 1KV DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.76
CABO DE CONTROLE 5X1,5MM2 ATE 1KV DE ISOLAO
Mo-de-Obra 0,56280
LS
0,68662
SubMO
09.07.067
CABO DE CONTROLE 7X1,5MM2 ATE 1KV DE ISOLAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.77
CABO DE CONTROLE 7X1,5MM2 ATE 1KV DE ISOLAO
Mo-de-Obra 0,65660
LS
0,80105
SubMO
09.07.099
SERVICOS DE ENFIACAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

Material

M
H
0,04000
H
0,04000
M
1,00000
1,89000

Material

M
H
0,05000
H
0,05000
M
1,00000
2,69000

Material

M
H
0,07000
H
0,07000
M
1,00000
4,23000

Material

M
H
0,05000
H
0,05000
M
1,00000
2,43000

Material

M
H
0,06000
H
0,06000
M
1,00000
3,66000

1,45765

Material

M
H
0,07000
H
0,07000
M
1,00000
4,94000

0,00000

MV
MV
1,00000
Material
244,82000

0,83294

1,04118

1,45765

1,04118

1,24942

09.08.002
INTERRUPTOR DE 1 TECLA SIMPLES EM CX.4"X2"-ELETROD.AO GALV.A QUENTE
UN
1.01.15
ELETRICISTA
H
2,30000
1.01.16
AJUDANTE ELETRICISTA
H
2,30000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
6,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
UN
1,00000
SubMO
47,89428
Mo-de-Obra 21,57400
LS
26,32028
Material
47,15000
09.08.003
INTERRUPTOR DE 2 TECLAS SIMPLES EM CX.4"X2"-ELETROD.AO GALV.A QUENTE
UN
1.01.15
ELETRICISTA
H
3,40000
1.01.16
AJUDANTE ELETRICISTA
H
3,40000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
12,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.68
INTERRUPTOR 2 TECLAS SILENT SEM ESPELHO
UN
1,00000
Mo-de-Obra 31,89200
LS
38,90824
SubMO
70,80024
Material
55,19000
09.08.004
INTERRUPTOR DE 3 TECLAS SIMPLES EM CX.4"X2"-ELETROD.AO GALV.A QUENTE
UN
1.01.15
ELETRICISTA
H
3,40000
1.01.16
AJUDANTE ELETRICISTA
H
3,40000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
18,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.69
INTERRUPTOR 3 TECLAS SILENT SEM ESPELHO
UN
1,00000
Mo-de-Obra 31,89200
LS
38,90824
SubMO
70,80024
Material
63,16000
09.08.005
1.01.15
1.01.16
4.21.71
4.30.05
4.51.71
Exerccio:

INTERRUPTOR DE 1 TECLA BIPOLAR SIMPLES EM CX.4"X2"-ELETROD.DE AO


GALV.A QUENTE
ELETRICISTA
AJUDANTE ELETRICISTA
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"

2011

Custo Unit.

BDI

5,30
4,08
1,89
0,62628

BDI

5,30
4,08
2,69
0,85817

BDI

5,30
4,08
4,23
1,30816

BDI

5,30
4,08
2,43
0,79837

BDI

5,30
4,08
3,66
1,12917

BDI

5,30
4,08
4,94
1,47146

3,34
0,21200
0,16320
1,89000

4,58
0,26500
0,20400
2,69000

6,99
0,37100
0,28560
4,23000

4,26
0,26500
0,20400
2,43000

6,03
0,31800
0,24480
3,66000

7,86
0,37100
0,28560
4,94000

301,12
244,82
244,82000
BDI
56,30860

BDI

5,30
4,08
9,51
0,86
10,53
2,93
21,86018

BDI

5,30
4,08
9,51
0,86
10,53
5,81
28,97776

BDI

5,30
4,08
9,51
0,86
10,53
8,62
30,81086

UN
H
H
M
M
UN

Custo Total

116,90
12,19000
9,38400
28,53000
5,16000
10,53000
2,93000

154,96
18,02000
13,87200
28,53000
10,32000
10,53000
5,81000

164,77
18,02000
13,87200
28,53000
15,48000
10,53000
8,62000

125,47
2,30000
2,30000
3,00000
6,00000
1,00000

5,30
4,08
9,51
0,86
10,53

12,19000
9,38400
28,53000
5,16000
10,53000
Pgina: 192

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.56.63
INTERRUPTOR 1 TECLA BIPOLAR SEM ESPELHO
Mo-de-Obra 21,57400
LS
26,32028

UN Coeficiente
SubMO

47,89428

Material

UN
1,00000
54,12000

09.08.006
2 INTERRUPTORES DE 1 TECLA BIP.SIMPL.CX.4"X4"-ELETR.AO GALV.A QUENTE
UN
1.01.15
ELETRICISTA
H
3,40000
1.01.16
AJUDANTE ELETRICISTA
H
3,40000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
12,00000
4.51.72
CONDULETE DE ALUMINIO 4"X4" "C" D=3/4"
UN
1,00000
4.56.63
INTERRUPTOR 1 TECLA BIPOLAR SEM ESPELHO
UN
2,00000
Mo-de-Obra 31,89200
LS
38,90824
SubMO
70,80024
Material
71,68000
09.08.007
INTERRUPTOR DE 1 TECLA PARAL.SIMPL.CX.4"X2"-ELETR.AO GALV.A QUENTE
UN
1.01.15
ELETRICISTA
H
3,40000
1.01.16
AJUDANTE ELETRICISTA
H
3,40000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
9,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.57
INTERRUPTOR PARAL 1 TECLA S/ESPELHO
UN
1,00000
Mo-de-Obra 31,89200
LS
38,90824
SubMO
70,80024
Material
50,88000
09.08.008
INTERRUPTOR DE 1 TECLA PARAL.BIP.CX.4"X2"-ELETR.AO GALV.A QUENTE
UN
1.01.15
ELETRICISTA
H
3,40000
1.01.16
AJUDANTE ELETRICISTA
H
3,40000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
9,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.70
INTERRUPTOR PARALELO BIPOLAR SEM ESPELHO
UN
1,00000
Mo-de-Obra 31,89200
LS
38,90824
SubMO
70,80024
Material
58,13000
INTERRUPTOR DE 1 TECLA SIMPL.E TOMADA 2P+T UNIV.CX.4"X4" ELETR.AO
09.08.009
UN
GALV.A QUENTE
1.01.15
ELETRICISTA
H
2,30000
1.01.16
AJUDANTE ELETRICISTA
H
2,30000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
6,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.49
INTERRUPTOR 1 TECLA E TOMADA SEM ESPELHO
UN
1,00000
Mo-de-Obra 21,57400
LS
26,32028
SubMO
47,89428
Material
50,20000
TOMADA 2P+T PADRAO NBR 14136, CORRENTE 10A-250V-ELETR. AO GALV. A
UN
QUENTE
1.01.15
ELETRICISTA
H
2,30000
1.01.16
AJUDANTE ELETRICISTA
H
2,80000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
9,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.55.19
TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V
UN
1,00000
Mo-de-Obra 23,61400
LS
28,80908
SubMO
52,42308
Material
51,12000

Custo Unit.

Custo Total

BDI

9,90
23,46328

BDI

5,30
4,08
9,51
0,86
13,03
9,90
32,77046

BDI

5,30
4,08
9,51
0,86
10,53
4,08
27,98646

BDI

5,30
4,08
9,51
0,86
10,53
11,33
29,65396

TOMADA 2P+T PADRAO NBR 14136, CORRENTE 20A-250V-ELETR.AO GALV.A


09.08.016
UN
QUENTE
1.01.15
ELETRICISTA
H
2,30000
1.01.16
AJUDANTE ELETRICISTA
H
2,80000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
4,00000
4.30.06
FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V)
M
12,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.08
TOMADA 2P+T PADRAO NBR 14136 CORRENTE 20A-250V
UN
1,00000
Mo-de-Obra 23,61400
LS
28,80908
SubMO
52,42308
Material
70,78000
09.08.029
1.01.15
1.01.16
4.26.12
4.30.05
4.51.35
Exerccio:

INTERRUPTOR DE 1 TECLA-ELETRODUTO DE POLIETILENO


ELETRICISTA
AJUDANTE ELETRICISTA
ELETRODUTO DE POLIETILENO 25 MM
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
CAIXA 4"X2"

2011

UN
H
H
M
M
UN

2,00000
2,00000
3,00000
6,00000
1,00000

175,25
18,02000
13,87200
28,53000
10,32000
13,03000
19,80000

149,66
18,02000
13,87200
28,53000
7,74000
10,53000
4,08000

158,58
18,02000
13,87200
28,53000
7,74000
10,53000
11,33000

120,65
12,19000
9,38400
28,53000
5,16000
10,53000
5,98000

BDI

5,30
4,08
9,51
0,86
10,53
5,98
22,56168

12,19000
11,42400
28,53000
7,74000
10,53000
4,32000

BDI

5,30
4,08
9,51
0,86
10,53
4,32
23,81491

BDI

5,30
4,08
9,51
0,86
10,53
6,11
24,22661

09.08.013

09.08.014
TOMADA 2P+T PINO CHATO POLARIZ.CORR.15A-250V-ELETR.AO GALV.QUENTE
UN
1.01.15
ELETRICISTA
H
2,30000
1.01.16
AJUDANTE ELETRICISTA
H
2,80000
4.21.71
ELETROD ACO GALV QUENTE (NBR-5624) 20 MM (3/4")
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
9,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.56.07
TOMADA 2P + T PINOS CHATOS POLARIZ. CORRENTE 15A 250V
UN
1,00000
Mo-de-Obra 23,61400
LS
28,80908
SubMO
52,42308
Material
52,91000

9,90000

127,35

129,55
12,19000
11,42400
28,53000
7,74000
10,53000
6,11000

151,53

BDI

5,30
4,08
9,51
1,39
10,53
5,53
28,33671

5,30
4,08
0,45
0,86
1,89

12,19000
11,42400
38,04000
16,68000
10,53000
5,53000

65,97
10,60000
8,16000
1,35000
5,16000
1,89000
Pgina: 193

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.56.52
INTERRUPTOR 1 TECLA SILENTOQUE COMPL
Mo-de-Obra 18,76000
LS
22,88720

UN Coeficiente
SubMO

41,64720

Material

UN
1,00000
11,99000

09.08.030
INTERRUPTOR DE 2 TECLAS-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.53
INTERRUPTOR 2 TECLAS SILENTOQUE COMPL
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316

UN
H
3,10000
H
3,10000
M
3,00000
M
12,00000
UN
1,00000
UN
1,00000
Material
19,72000

09.08.032
INTERRUPTOR DE 3 TECLAS-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.54
INTERRUPTOR 3 TECLAS SILENTOQUE COMPL
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316

UN
H
3,10000
H
3,10000
M
3,00000
M
18,00000
UN
1,00000
UN
1,00000
Material
28,11000

09.08.033
2 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316
Material

UN
H
3,10000
H
3,10000
M
3,00000
M
12,00000
UN
1,00000
UN
1,00000
UN
2,00000
25,68000

09.08.034
3 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
Mo-de-Obra 37,52000
LS
45,77440
Material
SubMO
83,29440

UN
H
4,00000
H
4,00000
M
3,00000
M
18,00000
UN
1,00000
UN
1,00000
UN
1,00000
27,91000

09.08.036
INTERRUPTOR DE 1 TECLA BIPOLAR EM CAIXA 4"X2"-ELETRODUTO POLIETILENO
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
6,00000
4.51.35
CAIXA 4"X2"
UN
1,00000
4.56.58
INTERRUPTOR 1 TECLA BIPOLAR COMPL
UN
1,00000
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720
Material
19,27000
09.08.038
2 INTERRUPTORES 1 TECLA BIPOLAR EM CAIXA 4"X4"-ELETRODUTO POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.59
INTERRUPTOR 2 TECLAS BIPOLAR S/ESP
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316
Material

UN
H
3,10000
H
3,10000
M
6,00000
M
12,00000
UN
1,00000
UN
1,00000
UN
1,00000
30,89000

09.08.039
3 INTERRUPTORES 1 TECLA BIPOLAR EM CAIXA 4"X4"-ELETRODUTO POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440
Material

UN
H
4,00000
H
4,00000
M
3,00000
M
18,00000
UN
1,00000
UN
1,00000
UN
3,00000
33,77000

09.08.041
1.01.15
1.01.16
4.26.12
4.30.05

UN
H
H
M
M

Exerccio:

INTERRUPTORES EM PARALELO EM CAIXA 4"X2"-ELETRODUTO DE POLIETILENO


ELETRICISTA
AJUDANTE ELETRICISTA
ELETRODUTO DE POLIETILENO 25 MM
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)

2011

3,10000
3,10000
3,00000
9,00000

Custo Unit.

Custo Total

BDI

3,59
12,33656

BDI

5,30
4,08
0,45
0,86
1,89
6,16
19,38283

BDI

5,30
4,08
0,45
0,86
1,89
9,39
21,31253

BDI

5,30
4,08
0,45
0,86
3,65
4,50
2,93
20,75363

BDI

5,30
4,08
0,45
0,86
3,65
4,50
2,93
25,57701

BDI

5,30
4,08
0,45
0,86
1,89
10,87
14,01096

BDI

5,30
4,08
0,45
0,86
3,65
4,50
9,72
21,95193

BDI

5,30
4,08
0,45
0,86
3,65
4,50
2,93
26,92481

5,30
4,08
0,45
0,86

3,59000

103,65
16,43000
12,64800
1,35000
10,32000
1,89000
6,16000

113,97
16,43000
12,64800
1,35000
15,48000
1,89000
9,39000

110,98
16,43000
12,64800
1,35000
10,32000
3,65000
4,50000
5,86000

136,78
21,20000
16,32000
1,35000
15,48000
3,65000
4,50000
2,93000

74,92
10,60000
8,16000
1,35000
5,16000
1,89000
10,87000

117,39
16,43000
12,64800
2,70000
10,32000
3,65000
4,50000
9,72000

143,98
21,20000
16,32000
1,35000
15,48000
3,65000
4,50000
8,79000

98,93
16,43000
12,64800
1,35000
7,74000
Pgina: 194

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.51.35
CAIXA 4"X2"
4.56.51
INTERRUPTOR 1 TECLA PARAL SILENT COMPL
Mo-de-Obra 29,07800
LS
35,47516

UN Coeficiente

SubMO

64,55316

UN
1,00000
UN
1,00000
Material
15,88000

09.08.043
INTERRUPTORES EM PARALELO BIPOLAR EM CAIXA 4"X2"-ELETR. POLIETILENO
UN
1.01.15
ELETRICISTA
H
3,10000
1.01.16
AJUDANTE ELETRICISTA
H
3,10000
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
9,00000
4.51.35
CAIXA 4"X2"
UN
1,00000
4.56.55
INTERRUPTOR PARALELO BIPOLAR COMPL
UN
1,00000
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316
Material
25,89000
09.08.045
INTERRUPTOR DE 1 TECLA E TOMADA EM CAIXA 4"X2"-ELETR. POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.50
INTERRUPTOR 1 TECLA SIMPLES E TOMADA 2P+T UNIV.COM
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720

UN
H
2,00000
H
2,00000
M
3,00000
M
6,00000
UN
1,00000
UN
1,00000
Material
15,10000

09.08.047
TOMADA SIMPLES DE EMBUTIR DE 110/220V USO GERAL-ELETR POLIETILENO
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
6,00000
4.51.35
CAIXA 4"X2"
UN
1,00000
4.56.01
TOMADA UNIV. SIMPLES, 2 P - 10A-250V COMPL. 4"X2"
UN
1,00000
SubMO
41,64720
Mo-de-Obra 18,76000
LS
22,88720
Material
12,64000
09.08.048
TOMADA BIFASICA DE 220V APARELHOS FIXOS-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.55.25
ESPELHO 4"X2"
4.56.06
TOMADA UNIVERSAL SIMPLES,2 POLOS -10A-250V S/PLAC.
Mo-de-Obra 51,59000
LS
62,93980
Material
SubMO
114,52980

UN
H
5,50000
H
5,50000
M
12,00000
M
24,00000
UN
1,00000
UN
1,00000
UN
1,00000
32,41000

09.08.050
TOMADA DE PISO-ELETRODUTO DE POLIETILENO
UN
1.01.15
ELETRICISTA
H
2,50000
1.01.16
AJUDANTE ELETRICISTA
H
2,50000
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
M
4,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
8,00000
TOMADA DE PISO 2P+T PADRAO NBR 14136 CORRENTE 10A-250V CX.4"X2" INCL.
UN
4.56.11
1,00000
ESPELHO
Mo-de-Obra 23,45000
LS
28,60900
Material
34,62000
SubMO
52,05900
09.08.052
PONTO SECO PARA TELEFONE-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
Mo-de-Obra 32,83000
LS
40,05260
SubMO
72,88260

UN
H
3,50000
H
3,50000
M
10,00000
UN
1,00000
UN
1,00000
Material
12,65000

09.08.054
BOTAO PARA CAMPAINHA-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.62
BOTAO DE CAMPAINHA COMPLETO
Mo-de-Obra 46,90000
LS
57,21800
SubMO

104,11800

UN
H
5,00000
H
5,00000
M
10,00000
M
40,00000
UN
1,00000
UN
1,00000
Material
45,15000

104,11800

UN
H
5,00000
H
5,00000
M
10,00000
M
40,00000
UN
1,00000
UN
1,00000
Material
106,09000

09.08.055
BOTOEIRA PARA ACIONAMENTO DA BOMBA DE INCENDIO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.55.51
BOTOEIRA COMANDO LIG-DESL P/BOMBA
SubMO
Mo-de-Obra 46,90000
LS
57,21800
Exerccio:

2011

Custo Unit.

Custo Total

BDI

1,89
4,90
18,49963

BDI

5,30
4,08
0,45
0,86
1,89
14,91
20,80193

BDI

5,30
4,08
0,45
0,86
1,89
6,70
13,05186

BDI

5,30
4,08
0,45
0,86
1,89
4,24
12,48606

BDI

5,30
4,08
0,45
0,86
1,89
1,24
3,24
33,79615

BDI

5,30
4,08
0,45
0,86
25,94
19,93617

BDI

5,30
4,08
0,45
3,65
4,50
19,67250

BDI

5,30
4,08
0,45
0,86
1,89
4,36
34,33164

BDI

5,30
4,08
3,07
0,86
1,89
39,10
48,34784

1,89000
4,90000

111,24
16,43000
12,64800
1,35000
7,74000
1,89000
14,91000

69,79
10,60000
8,16000
1,35000
5,16000
1,89000
6,70000

66,77
10,60000
8,16000
1,35000
5,16000
1,89000
4,24000

180,73
29,15000
22,44000
5,40000
20,64000
1,89000
1,24000
3,24000

106,61
13,25000
10,20000
1,80000
6,88000
25,94000

105,20
18,55000
14,28000
4,50000
3,65000
4,50000

183,59
26,50000
20,40000
4,50000
34,40000
1,89000
4,36000

258,55
26,50000
20,40000
30,70000
34,40000
1,89000
39,10000

Pgina: 195

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

09.08.056
CIGARRA-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.36
CAIXA ESTAMPADA 3X3'
4.94.90
CIGARRA TIPO FABRICA
Mo-de-Obra 23,45000
LS
28,60900

UN Coeficiente

SubMO

52,05900

UN
H
2,50000
H
2,50000
M
3,00000
M
6,00000
UN
1,00000
UN
1,00000
Material
58,91000

09.08.057
PONTO SECO P/ INSTALACAO DE SOM/TV/ALARME-ELETR.POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
Mo-de-Obra 23,45000
LS
28,60900
SubMO
52,05900

UN
H
2,50000
H
2,50000
M
10,00000
UN
1,00000
UN
1,00000
Material
12,65000

09.08.058
INTERRUPTOR DE 1 TECLA SIMPLES CAIXA 4"X2"-ELETR PVC RGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.52
INTERRUPTOR 1 TECLA SILENTOQUE COMPL
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720

UN
H
2,00000
H
2,00000
M
3,00000
M
6,00000
UN
1,00000
UN
1,00000
Material
19,85000

09.08.060
INTERRUPTOR 2 TECLAS SIMPL CAIXA DE 4"X2"-ELETR PVC RGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.53
INTERRUPTOR 2 TECLAS SILENTOQUE COMPL
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316

UN
H
3,10000
H
3,10000
M
3,00000
M
12,00000
UN
1,00000
UN
1,00000
Material
27,58000

09.08.062
INTERRUPTOR 3 TECLAS SIMPL CAIXA 4"X2"-ELETR PVC RGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.54
INTERRUPTOR 3 TECLAS SILENTOQUE COMPL
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316

UN
H
3,10000
H
3,10000
M
3,00000
M
18,00000
UN
1,00000
UN
1,00000
Material
35,97000

09.08.063
2 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316

UN
H
3,10000
H
3,10000
M
3,00000
M
12,00000
UN
1,00000
UN
1,00000
UN
2,00000
Material
33,54000

09.08.065
3 INTERRUPTORES DE 1 TECLA EM CAIXA 4"X4"-ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
M
3,00000
M
18,00000
UN
1,00000
UN
1,00000
UN
3,00000
Material
41,63000

09.08.067
INTERRUPTOR 1 TECLA BIPOL SIMPL CAIXA 4"X2"-ELETR PVC RGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.58
INTERRUPTOR 1 TECLA BIPOLAR COMPL
SubMO
41,64720
Mo-de-Obra 18,76000
LS
22,88720

UN
H
2,00000
H
2,00000
M
3,00000
M
6,00000
UN
1,00000
UN
1,00000
Material
27,13000

09.08.069
Exerccio:

2 INTERRUPTORES 1 TECLA BIPOL SIMPL CAIXA 4"X4"-ELETR PVC RGIDO

2011

UN

Custo Unit.

Custo Total

BDI

5,30
4,08
0,45
0,86
1,94
50,46
25,52287

BDI

5,30
4,08
0,45
3,65
4,50
14,88307

BDI

5,30
4,08
3,07
0,86
1,89
3,59
14,14436

BDI

5,30
4,08
3,07
0,86
1,89
6,16
21,19063

BDI

5,30
4,08
3,07
0,86
1,89
9,39
23,12033

BDI

5,30
4,08
3,07
0,86
3,65
4,50
2,93
22,56143

BDI

5,30
4,08
3,07
0,86
3,65
4,50
2,93
28,73261

BDI

5,30
4,08
3,07
0,86
1,89
10,87
15,81876

136,49
13,25000
10,20000
1,35000
5,16000
1,94000
50,46000

79,59
13,25000
10,20000
4,50000
3,65000
4,50000

75,64
10,60000
8,16000
9,21000
5,16000
1,89000
3,59000

113,32
16,43000
12,64800
9,21000
10,32000
1,89000
6,16000

123,64
16,43000
12,64800
9,21000
15,48000
1,89000
9,39000

120,65
16,43000
12,64800
9,21000
10,32000
3,65000
4,50000
5,86000

153,65
21,20000
16,32000
9,21000
15,48000
3,65000
4,50000
8,79000

84,59
10,60000
8,16000
9,21000
5,16000
1,89000
10,87000

137,80
Pgina: 196

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.63
INTERRUPTOR 1 TECLA BIPOLAR SEM ESPELHO
Mo-de-Obra 29,07800
LS
35,47516

UN Coeficiente

SubMO

64,55316

H
3,10000
H
3,10000
M
3,00000
M
12,00000
UN
1,00000
UN
1,00000
UN
2,00000
Material
47,48000

09.08.070
3 INTERRUPTORES DE 1 TECLA BIPOLAR EM CAIXA 4"X4"-ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440
Material

UN
H
4,00000
H
4,00000
M
3,00000
M
18,00000
UN
1,00000
UN
1,00000
UN
3,00000
41,63000

09.08.071
INTERRUPTOR 1 TECLA PARALELO SIMPL CAIXA 4"X2"-ELETR PVC RGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.51
INTERRUPTOR 1 TECLA PARAL SILENT COMPL
SubMO
64,55316
Mo-de-Obra 29,07800
LS
35,47516

UN
H
3,10000
H
3,10000
M
3,00000
M
9,00000
UN
1,00000
UN
1,00000
Material
23,74000

09.08.073
INTERRUPTOR 1 TECLA PARALELO BIPOL CAIXA 4"X2"-ELETR PVC RGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.55
INTERRUPTOR PARALELO BIPOLAR COMPL
Mo-de-Obra 29,07800
LS
35,47516
SubMO
64,55316

UN
H
3,10000
H
3,10000
M
3,00000
M
9,00000
UN
1,00000
UN
1,00000
Material
33,75000

09.08.075
INTERRUPTOR 1 TECLA SIMPLES/TOMADA 2P+T UNIV CAIXA 4"X4"-ELETR PVC RG
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
6,00000
4.51.35
CAIXA 4"X2"
UN
1,00000
4.56.50
INTERRUPTOR 1 TECLA SIMPLES E TOMADA 2P+T UNIV.COM
UN
1,00000
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720
Material
22,96000
09.08.077
TOMADA SIMPLES DE EMBUTIR DE 110/220V USO GERAL-ELETRODUTO DE PVC
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
M
3,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
6,00000
4.51.35
CAIXA 4"X2"
UN
1,00000
4.56.01
TOMADA UNIV. SIMPLES, 2 P - 10A-250V COMPL. 4"X2"
UN
1,00000
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720
Material
20,50000
09.08.078
TOMADA BIFASICA DE 220V APARELHOS FIXOS-ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.55.25
ESPELHO 4"X2"
4.56.06
TOMADA UNIVERSAL SIMPLES,2 POLOS -10A-250V S/PLAC.
Mo-de-Obra 20,80000
LS
25,37600
SubMO
46,17600

UN
H
2,00000
H
2,50000
M
3,00000
M
9,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
23,32000

09.08.079
TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V-ELETR. PVC RGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.55.19
TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V
4.55.25
ESPELHO 4"X2"
SubMO
46,17600
Mo-de-Obra 20,80000
LS
25,37600

UN
H
2,00000
H
2,50000
M
3,00000
M
9,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
24,40000

Exerccio:

2011

Custo Unit.

Custo Total

BDI

5,30
4,08
3,07
0,86
3,65
4,50
9,90
25,76763

BDI

5,30
4,08
3,07
0,86
3,65
4,50
2,93
28,73261

BDI

5,30
4,08
3,07
0,86
1,89
4,90
20,30743

BDI

5,30
4,08
3,07
0,86
1,89
14,91
22,60973

BDI

5,30
4,08
3,07
0,86
1,89
6,70
14,85966

BDI

5,30
4,08
3,07
0,86
1,89
4,24
14,29386

BDI

5,30
4,08
3,07
0,86
1,89
1,24
3,24
15,98408

BDI

5,30
4,08
3,07
0,86
1,89
4,32
1,24
16,23248

16,43000
12,64800
9,21000
10,32000
3,65000
4,50000
19,80000

153,65
21,20000
16,32000
9,21000
15,48000
3,65000
4,50000
8,79000

108,60
16,43000
12,64800
9,21000
7,74000
1,89000
4,90000

120,91
16,43000
12,64800
9,21000
7,74000
1,89000
14,91000

79,46
10,60000
8,16000
9,21000
5,16000
1,89000
6,70000

76,44
10,60000
8,16000
9,21000
5,16000
1,89000
4,24000

85,48
10,60000
10,20000
9,21000
7,74000
1,89000
1,24000
3,24000

86,80
10,60000
10,20000
9,21000
7,74000
1,89000
4,32000
1,24000

Pgina: 197

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.08.080
TOMADA DE PISO 2P+T PADRAO NBR 14136 CORRENTE 10A-250V-ELETR PVC RGIDO
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,50000
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
M
4,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
8,00000
TOMADA DE PISO 2P+T PADRAO NBR 14136 CORRENTE 10A-250V CX.4"X2" INCL.
4.56.11
1,00000
UN
ESPELHO
Mo-de-Obra 20,80000
LS
25,37600
SubMO
46,17600
Material
45,10000
09.08.081
PONTO SECO PARA TELEFONE-ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.51.37
CAIXA 4"X4"
4.55.26
ESPELHO 4"X4"
Mo-de-Obra 13,46000
LS
16,42120
SubMO

29,88120

UN
H
1,00000
H
2,00000
M
6,00000
UN
1,00000
UN
1,00000
Material
26,57000

09.08.082
TOMADA DE PISO PARA TEL/LOGICA - ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.56.12
TOMADA DE PISO TEL/LOGICA CX.4"X2" INCL ESPELHO
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720

UN
H
2,00000
H
2,00000
M
6,00000
UN
1,00000
Material
51,25000

09.08.083
BOTAO PARA CIGARRA - ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.62
BOTAO DE CAMPAINHA COMPLETO
Mo-de-Obra 6,56600
LS
8,01052

14,57652

UN
H
0,70000
H
0,70000
M
10,00000
M
20,00000
UN
1,00000
UN
1,00000
Material
47,75000

09.08.084
CIGARRA PARA CHAMADA DE AULA - ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.36
CAIXA ESTAMPADA 3X3'
4.94.90
CIGARRA TIPO FABRICA
Mo-de-Obra 6,56600
LS
8,01052
SubMO
14,57652

UN
H
0,70000
H
0,70000
M
6,00000
M
12,00000
UN
1,00000
UN
1,00000
Material
81,14000

SubMO

09.08.085
PONTO SECO P/INSTALACAO DE SOM/TV/ALARME/LOGICA - ELETRODUTO PVC
UN
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
M
6,00000
4.51.37
CAIXA 4"X4"
UN
1,00000
4.55.26
ESPELHO 4"X4"
UN
1,00000
Mo-de-Obra 13,46000
LS
16,42120
SubMO
29,88120
Material
26,57000
09.08.086
ACIONADOR DO ALARME DE INCENDIO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.56.62
BOTAO DE CAMPAINHA COMPLETO
Mo-de-Obra 26,10000
LS
31,84200

57,94200

UN
H
3,00000
H
2,50000
M
10,00000
M
20,00000
UN
1,00000
UN
1,00000
Material
47,75000

09.08.087
SIRENE PARA ALARME DE EMERGENCIA- ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.51.36
CAIXA ESTAMPADA 3X3'
4.94.85
SIRENE BITONAL ELETRICA 12/24V ALCANCE 100M
Mo-de-Obra 6,56600
LS
8,01052
SubMO
14,57652

UN
H
0,70000
H
0,70000
M
4,00000
UN
1,00000
UN
1,00000
Material
34,59000

09.08.088
1.01.15
1.01.16
4.25.02
4.30.05
4.51.35
4.55.25
4.56.07
Exerccio:

SubMO

TOMADA 2P+T PINO CHATO POLARIZ.CORR.15A-250V-ELETR.PVC RIGIDO


ELETRICISTA
AJUDANTE ELETRICISTA
ELETRODUTO PVC RIGIDO 25MM (3/4')
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
CAIXA 4"X2"
ESPELHO 4"X2"
TOMADA 2P + T PINOS CHATOS POLARIZ. CORRENTE 15A 250V

2011

UN
H
H
M
M
UN
UN
UN

2,00000
2,50000
3,00000
9,00000
1,00000
1,00000
1,00000

Custo Unit.

Custo Total

BDI

5,30
4,08
3,07
0,86
25,94
20,99348

BDI

5,30
4,08
3,07
3,65
4,50
12,98378

BDI

5,30
4,08
3,07
32,83
21,36636

BDI

5,30
4,08
3,07
0,54
1,89
4,36
14,33510

BDI

5,30
4,08
3,07
0,86
1,94
50,46
22,01480

BDI

5,30
4,08
3,07
3,65
4,50
12,98378

BDI

5,30
4,08
3,07
0,54
1,89
4,36
24,30916

BDI

5,30
4,08
3,07
1,94
20,37
11,30830

5,30
4,08
3,07
0,86
1,89
1,24
6,11

112,26
10,60000
10,20000
12,28000
6,88000
25,94000

69,43
5,30000
8,16000
18,42000
3,65000
4,50000

114,26
10,60000
8,16000
18,42000
32,83000

76,66
3,71000
2,85600
30,70000
10,80000
1,89000
4,36000

117,73
3,71000
2,85600
18,42000
10,32000
1,94000
50,46000

69,43
5,30000
8,16000
18,42000
3,65000
4,50000

130,00
15,90000
10,20000
30,70000
10,80000
1,89000
4,36000

60,47
3,71000
2,85600
12,28000
1,94000
20,37000

89,01
10,60000
10,20000
9,21000
7,74000
1,89000
1,24000
6,11000
Pgina: 198

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 20,80000

Descrio
LS

25,37600

UN Coeficiente
SubMO

46,17600

Material

26,19000

Custo Unit.

Custo Total

BDI

16,64418

5,30
4,08
3,07
1,39
1,89
1,24
5,53
17,60788

09.08.089
TOMADA 2P+T PADRAO NBR 14136, CORRENTE 20A-250V-ELETR.PVC RIGIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.06
FIO DE 4,00 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.35
CAIXA 4"X2"
4.55.25
ESPELHO 4"X2"
4.56.08
TOMADA 2P+T PADRAO NBR 14136 CORRENTE 20A-250V
Mo-de-Obra 20,80000
LS
25,37600
SubMO
46,17600

UN
H
2,00000
H
2,50000
M
3,00000
M
9,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
30,38000

BDI

09.08.099
SERVICOS DE INTERRUPTORES E TOMADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

09.09.025
IL-13 REFLETOR PARA LAMPADA DE VAPOR METLICO 70W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.51
IL-13 REFLETOR TIPO INDUSTRIAL(DD)
4.65.36
LAMPADA VAPOR METALICO ELIPSOIDAL 70W/220W
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
UN
1,00000
Material
191,44000

255,96
5,30
4,24000
4,08
3,26400
68,08
68,08000
123,36
123,36000
BDI
47,86274

09.09.026
IL-14 REFLETOR COM GRADE PARA LAMPADA DE VAPOR METLICO 70 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.52
IL-14 REFLETOR TIPO INDUSTRIAL (DC)C/TELA
4.65.36
LAMPADA VAPOR METALICO ELIPSOIDAL 70W/220W
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
UN
1,00000
Material
195,97000

261,53
5,30
4,24000
4,08
3,26400
72,61
72,61000
123,36
123,36000
BDI
48,90464

09.09.034
IL-42 LUMINARIA C/ DIFUSOR P/ LAMPADA FLUOR (2X32W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.74
LUMINARIA P/ LAMP FLUOR 2X32W C/ DIF/SOQ (IL-42)
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 10,31800
LS
12,58796
SubMO
22,90596

UN
H
1,10000
H
1,10000
UN
1,00000
UN
2,00000
UN
1,00000
Material
103,92000

BDI

09.09.036
IL-57 REFLETOR C/ TELA P/ VAPOR MET 150W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.89
IL-57 REFLETOR INDUSTRIAL (DC) C/ TELA PROTETORA
4.65.28
LAMPADA VAPOR METALICO ELIPSOIDAL 150W/220V
4.97.14
REATOR SIMPLES P/ VAPOR MET AFP 150W-220V CAP/IGN
Mo-de-Obra 15,00800
LS
18,30976
SubMO

UN
H
1,60000
H
1,60000
UN
1,00000
UN
1,00000
UN
1,00000
Material
317,22000

431,16
5,30
8,48000
4,08
6,52800
109,01
109,01000
160,17
160,17000
48,04
48,04000
BDI
80,62369

SubMO

0,00000

33,31776

09.09.037
IL-58 ILUMINACAO P/ QUADRA DE ESP. COB. LAMP. VAPOR METALICO (1X250W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.90
IL-58 PROJETOR P/ VAPOR METALICO (1X250W)
4.65.29
LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V
4.97.15
REATOR SIMPLES P/ VAPOR MET AFP 250W-220V CAP/IGN
Mo-de-Obra 28,14000
LS
34,33080
SubMO
62,47080
Material

5,30
4,08
68,39
5,70
24,13
29,16997

94,16
10,60000
10,20000
9,21000
12,51000
1,89000
1,24000
5,53000

155,99
5,83000
4,48800
68,39000
11,40000
24,13000

UN
H
3,00000
H
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
250,30000

384,70
5,30
15,90000
4,08
12,24000
149,95
149,95000
45,88
45,88000
54,47
54,47000
BDI
71,93728

09.09.044
IL-05 ARANDELA BLINDADA
UN
1.01.15
ELETRICISTA
H
0,80000
1.01.16
AJUDANTE ELETRICISTA
H
0,80000
4.60.23
IL-05 ARANDELA BLINDADA P/LAMP. FLUORESCENTE COMPACTA 23W-25W
UN
1,00000
LAMPADA FLUORESCENTE COMPACTA 23W A 25W C/TEMP.DE COR MAIOR OU IGUAL
4.65.05
UN
1,00000
4000 K
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888
Material
157,85000

214,64
5,30
4,24000
4,08
3,26400
148,89
148,89000
8,96
8,96000
BDI
40,13704

IL-59 ILUMINAO P/PASSAGEM COBERTA E CIRCULAES LAMP.FLUORESC.COMPACTA (1X23W)


1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.24
IL-59 ARAND.BLIND.ALUM.V.VIDRO (TARTARUGA) P/LAMP.FLUORESC.COMPACTA 23-25W
LAMPADA FLUORESCENTE COMPACTA 23W A 25W C/TEMP.DE COR MAIOR OU IGUAL
4.65.05
4000 K
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888
Material

09.09.046

09.09.050
IL-28 ILUMINACAO AUTONOMA DE EMERGENCIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.50
IL-28 ILUMINACAO AUTONOMA DE EMERGENCIA-COMPLETA
SubMO
Mo-de-Obra 10,31800
LS
12,58796
Exerccio:

2011

22,90596

UN
H
0,80000
H
0,80000
UN
1,00000
UN
1,00000
57,65000

UN
H
1,10000
H
1,10000
UN
1,00000
Material
113,69000

91,39

BDI

5,30
4,08
48,69
8,96
17,09104

4,24000
3,26400
48,69000
8,96000

168,01
5,30
5,83000
4,08
4,48800
113,69
113,69000
BDI
31,41707
Pgina: 199

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.09.051
IL-44 LUMINARIA PARA LAMPADA FLUORESCENTE (1X32W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.62
CALHA P/LUNIMARIA FLUOR 1X32W C/REFL ALUM E SOQUET
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
4.97.24
REATOR ELETRONICO PT RAP P/FLUOR AFP 1X32W BIVOLT C/PROTECAO
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
UN
1,00000
UN
1,00000
Material
64,99000

09.09.052
IL-45 LUMINARIA PARA LAMPADA FLUORESCENTE (2X32W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.61
CALHA P/LUMINARIA FLUOR 2X32W C/REFL ALUM E SOQUET
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 10,31800
LS
12,58796
SubMO
22,90596

UN
H
1,10000
H
1,10000
UN
1,00000
UN
2,00000
UN
1,00000
Material
83,85000

09.09.054
IL-47 LUMINARIA ABERTA C/ REFLETOR E PEND P/FLUOR (1X32W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.62
CALHA P/LUNIMARIA FLUOR 1X32W C/REFL ALUM E SOQUET
4.61.29
SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
4.97.24
REATOR ELETRONICO PT RAP P/FLUOR AFP 1X32W BIVOLT C/PROTECAO
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
UN
2,00000
UN
1,00000
UN
1,00000
Material
126,75000

09.09.055
IL-48 LUMINARIA ABERTA C/ REFLETOR E PEND P/FLUOR (2X32W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.61
CALHA P/LUMINARIA FLUOR 2X32W C/REFL ALUM E SOQUET
4.61.29
SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 10,31800
LS
12,58796
SubMO
22,90596

UN
H
1,10000
H
1,10000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
Material
145,61000

IL-60 LUMINARIA DE SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESCENTE


(2X32W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
CALHA P/LUMINARIA SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESC. 2x32W E
4.61.40
SOQUETES
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
SubMO
22,90596
Mo-de-Obra 10,31800
LS
12,58796
Material

H
1,10000
H
1,10000
1,00000
UN
UN
2,00000
UN
1,00000
137,10000

09.09.061
IL-61 LUMINARIA DE EMBUTIR C/ REFLETOR E ALETAS P/ LAMP. FLUORESCENTE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
CALHA P/LUMINARIA EMBUTIR P/REFLETOR E ALETAS P/LAMP.FLUORESC. 2X32W E
4.61.41
SOQUETES
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 11,25600
LS
13,73232
SubMO
24,98832
Material

UN
H
1,20000
H
1,20000
UN
1,00000
UN
2,00000
UN
1,00000
128,77000

09.09.060

Custo Unit.

Custo Total

BDI

5,30
4,08
38,30
5,70
20,99
17,82136

BDI

5,30
4,08
48,32
5,70
24,13
24,55387

BDI

5,30
4,08
38,30
30,88
5,70
20,99
32,02616

BDI

5,30
4,08
48,32
30,88
5,70
24,13
38,75867

UN

95,30
3,18000
2,44800
38,30000
5,70000
20,99000

131,30
5,83000
4,48800
48,32000
11,40000
24,13000

171,27
3,18000
2,44800
38,30000
61,76000
5,70000
20,99000

207,27
5,83000
4,48800
48,32000
61,76000
11,40000
24,13000

196,80
5,30
5,83000
4,08
4,48800
101,57
101,57000
5,70
11,40000
24,13
24,13000
BDI
36,80137

BDI

5,30
4,08
93,24
5,70
24,13
35,36441

189,12
6,36000
4,89600
93,24000
11,40000
24,13000

IL-62 LUMINARIA DE SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESCENTE


(4X16W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
CALHA P/LUMINARIA SOBREPOR C/REFLETOR E ALETAS P/LAMP.FLUORESC.4X16W E
4.61.42
SOQUETES
4.65.14
LAMPADA FLUORESCENTE DE 16W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 12,19400
LS
14,87668
SubMO
27,07068
Material

H
1,30000
H
1,30000
UN
1,00000
UN
4,00000
UN
2,00000
182,72000

5,30
6,89000
4,08
5,30400
113,18
113,18000
5,32
21,28000
24,13
48,26000
BDI
48,25186

09.09.063
IL-63 LUMINARIA DE EMBUTIR C/ REFLETOR E ALETAS P/ LAMP. FLUORESCENTE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
CALHA P/LUMINRIA EMBUTIR C/REFLETOR E ALETAS P/LAMP.FLUORESC.4X16W E
4.61.43
SOQUETES
4.65.14
LAMPADA FLUORESCENTE DE 16W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 13,13200
LS
16,02104
SubMO
29,15304
Material

UN
H
1,40000
H
1,40000
UN
1,00000
UN
4,00000
UN
2,00000
173,98000

249,85
5,30
7,42000
4,08
5,71200
104,44
104,44000
5,32
21,28000
24,13
48,26000
BDI
46,72060

09.09.064
1.01.15
1.01.16
4.61.44
4.65.13
4.97.24

UN
H
H
UN
UN
UN

09.09.062

Exerccio:

IL-66 LUMINRIA DE EMBUTIR C/REFLETOR SEM ALETAS (1X32W)


ELETRICISTA
AJUDANTE ELETRICISTA
CALHA P/ LUMINARIA EMBUTIR C/REFLET. S/ ALETAS P/LAMPADA FLUORESCENTE
1X32W
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
REATOR ELETRONICO PT RAP P/FLUOR AFP 1X32W BIVOLT C/PROTECAO

2011

UN

258,04

1,10000
1,10000
1,00000
1,00000
1,00000

5,30
4,08
95,11
5,70
20,99

177,98
5,83000
4,48800
95,11000
5,70000
20,99000

Pgina: 200

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 10,31800

Descrio
LS

12,58796

UN Coeficiente
SubMO

22,90596

Material

09.09.065
IL-67 LUMINRIA DE EMBUTIR C/REFLETOR SEM ALETAS (2X32W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.45
CALHA P/LUMINRIA EMBUTIR C/REFLET.S/ ALETAS P/LAMPADA FLUORESCENTE 2X32W
4.65.14
LAMPADA FLUORESCENTE DE 16W C/TEMPERATURA DE COR 4000 K
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 11,25600
LS
13,73232
SubMO
24,98832
Material
09.09.099
SERVICOS DE ILUMINACAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

0,00000

121,80000
UN
H
1,20000
H
1,20000
UN
1,00000
UN
2,00000
UN
1,00000
129,88000

MV
MV
1,00000
Material
244,82000

09.10.002
CENTRO DE LUZ EM CAIXA FM-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.40
CAIXA PASSAGEM FUNDO MOVEL 4"X4" (TIPO FM2)
4.85.49
BUCHA DE ENCAIXE 25MM - POLIETILENO
Mo-de-Obra 30,01600
LS
36,61952
SubMO
66,63552

UN
H
3,20000
H
3,20000
M
6,00000
M
18,00000
UN
1,00000
UN
4,00000
Material
23,17000

09.10.003
CENTRO DE LUZ EM CAIXA FM ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.40
CAIXA PASSAGEM FUNDO MOVEL 4"X4" (TIPO FM2)
6.23.56
LUVA DE PRESSAO PVC DE 25MM (3/4")
SubMO
Mo-de-Obra 30,01600
LS
36,61952

66,63552

UN
H
3,20000
H
3,20000
M
6,00000
M
18,00000
UN
1,00000
UN
4,00000
Material
40,89000

66,63552

UN
H
3,20000
H
3,20000
M
6,00000
M
18,00000
UN
1,00000
UN
3,00000
Material
45,42000

09.10.013
CENTRO DE LUZ EM CONDULETE-ELETRODUTO DE POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
4.85.50
BRACADEIRA ACO GALV ELETROLITICO 19 MM (3/4")
Mo-de-Obra 30,01600
LS
36,61952
SubMO
66,63552

UN
H
3,20000
H
3,20000
M
6,00000
M
18,00000
UN
1,00000
UN
3,00000
Material
29,70000

09.10.021
CENTRO DE LUZ EM PERFILADOS-CAIXA FM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.40
CAIXA PASSAGEM FUNDO MOVEL 4"X4" (TIPO FM2)
4.94.70
CANALETA PERFURADA CH 14 GALV(SISA SRS-1650-P-14GE
Mo-de-Obra 30,01600
LS
36,61952
SubMO

UN
H
3,20000
H
3,20000
M
18,00000
UN
1,00000
M
6,00000
Material
106,69000

09.10.011
CENTRO DE LUZ EM CONDULETE-ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
4.85.50
BRACADEIRA ACO GALV ELETROLITICO 19 MM (3/4")
Mo-de-Obra 30,01600
LS
36,61952
SubMO

66,63552

09.10.023
CENTRO DE LUZ EM PERFILADO-TOMADA DE LIGACAO - ELETR POLIETILENO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.21
PARAFUSO P/ MADEIRA 6,1X75MM
2.67.50
PORCAS E CONTRA-PORCAS 3/8'
2.67.77
BUCHA TIPO S-8 (CENTO)
4.26.12
ELETRODUTO DE POLIETILENO 25 MM
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.56.20
TOMADA LIGACAO ALUMINIO P/PERFILADO
4.61.04
SUPORTE CURTO PARA LUMINARIA
4.94.71
PERFILADO EM CHAPA ACO 38X38MM
4.94.78
SUPORTE PARA PERFILADOS
4.96.40
DISTANCIADOR PARA VERGALHAO 3/8'
4.96.42
VERGALHAO GALVANIZADO 3/8'
SubMO
66,63552
Mo-de-Obra 30,01600
LS
36,61952
Material

Exerccio:

2011

UN
H
3,20000
H
3,20000
UN
2,00000
CJ
1,00000
UN
0,02000
M
0,50000
M
18,00000
UN
1,00000
UN
1,00000
M
6,00000
UN
1,00000
UN
1,00000
M
1,00000
96,65400

Custo Unit.

Custo Total

BDI

33,28237

BDI

5,30
4,08
95,11
5,32
24,13
35,61971

190,48
6,36000
4,89600
95,11000
10,64000
24,13000

301,12
244,82
244,82000
BDI
56,30860

BDI

5,30
4,08
0,45
0,86
3,79
0,30
20,65527

BDI

5,30
4,08
3,07
0,86
3,79
0,80
24,73087

BDI

5,30
4,08
3,07
0,86
10,53
0,33
25,77277

BDI

5,30
4,08
0,45
0,86
10,53
0,33
22,15717

BDI

5,30
4,08
0,86
3,79
14,57
39,86487

BDI

5,30
4,08
0,18
0,16
11,95
0,45
0,86
4,56
0,45
11,05
2,05
0,20
6,63
37,55659

110,46
16,96000
13,05600
2,70000
15,48000
3,79000
1,20000

132,25
16,96000
13,05600
18,42000
15,48000
3,79000
3,20000

137,82
16,96000
13,05600
18,42000
15,48000
10,53000
0,99000

118,49
16,96000
13,05600
2,70000
15,48000
10,53000
0,99000

213,19
16,96000
13,05600
15,48000
3,79000
87,42000

200,84
16,96000
13,05600
0,36000
0,16000
0,23900
0,22500
15,48000
4,56000
0,45000
66,30000
2,05000
0,20000
6,63000

Pgina: 201

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.10.024
CENTRO DE LUZ EM PERFILADO-TOMADA DE LIGACAO - ELETRODUTO DE PVC
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.21
PARAFUSO P/ MADEIRA 6,1X75MM
2.67.50
PORCAS E CONTRA-PORCAS 3/8'
2.67.77
BUCHA TIPO S-8 (CENTO)
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.56.20
TOMADA LIGACAO ALUMINIO P/PERFILADO
4.61.04
SUPORTE CURTO PARA LUMINARIA
4.94.71
PERFILADO EM CHAPA ACO 38X38MM
4.94.78
SUPORTE PARA PERFILADOS
4.96.40
DISTANCIADOR PARA VERGALHAO 3/8'
4.96.42
VERGALHAO GALVANIZADO 3/8'
Mo-de-Obra 30,01600
LS
36,61952
SubMO
66,63552
Material

UN
H
3,20000
H
3,20000
UN
2,00000
CJ
1,00000
UN
0,02000
M
0,50000
M
18,00000
UN
1,00000
UN
1,00000
M
6,00000
UN
1,00000
UN
1,00000
M
1,00000
97,96400

Custo Unit.

Custo Total
202,45
16,96000
13,05600
0,36000
0,16000
0,23900
1,53500
15,48000
4,56000
0,45000
66,30000
2,05000
0,20000
6,63000

BDI

5,30
4,08
0,18
0,16
11,95
3,07
0,86
4,56
0,45
11,05
2,05
0,20
6,63
37,85789

16,65888

UN
H
0,80000
H
0,80000
M
1,00000
M
4,00000
UN
1,00000
UN
1,00000
Material
30,20000

BDI

5,30
4,08
3,07
0,54
1,94
23,03
10,77754

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

09.11.010
LUMIN DECORATIVA PARA JARDIM COM LAMP INCANDESCENTE DE 300 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.96
LUMINARIA DEC JARDIM C/LAMP INCAND 300W
Mo-de-Obra 15,00800
LS
18,30976
SubMO
33,31776

UN
H
1,60000
H
1,60000
UN
1,00000
Material
249,41000

347,75
5,30
8,48000
4,08
6,52800
249,41
249,41000
BDI
65,02739

09.11.011
LUMIN DECORATIVA PARA JARDIM COM LAMP COM LAMP MISTA DE 250 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.97
LUMINARIA DEC JARDIM C/LAMP MISTA 250W
Mo-de-Obra 15,00800
LS
18,30976
SubMO
33,31776

UN
H
1,60000
H
1,60000
UN
1,00000
Material
276,36000

380,90
5,30
8,48000
4,08
6,52800
276,36
276,36000
BDI
71,22589

09.11.012
LUMIN DECORATIVA PARA JARDIM COM LAMP VAPOR DE MERCURIO DE 250 W
UN
1.01.15
ELETRICISTA
H
1,60000
1.01.16
AJUDANTE ELETRICISTA
H
1,60000
4.60.98
LUMINARIA DEC JARDIM C/LAMP VA MERC 250W
UN
1,00000
Mo-de-Obra 15,00800
LS
18,30976
SubMO
33,31776
Material
252,86000

351,99
5,30
8,48000
4,08
6,52800
252,86
252,86000
BDI
65,82089

09.10.030
SENSOR DE PRESENA INTERNO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.02
ELETRODUTO PVC RIGIDO 25MM (3/4')
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.36
CAIXA ESTAMPADA 3X3'
4.94.84
SENSOR DE PRESENA INTERNO
Mo-de-Obra 7,50400
LS
9,15488
09.10.099
SERVICOS DE CENTROS DE LUZ
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

09.11.021
IL-37 LUMINARIA C/GRADE C/LAMP. VAPOR SDIO 150W C/ BRACO ACO GALV.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.30
BRACO ACO GALVANIZADO DIAM 25.4MMX1.0M P/ILUM.EXT.
4.60.76
IL-37 LUMINARIA COM GRADE P/LAMPADA VAPOR SODIO 150W
4.63.01
CHUMBADOR P/ FIXACAO BRACO - ILUM. EXT. - 1/2"
4.65.30
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V
Mo-de-Obra 28,14000
LS
34,33080
SubMO
62,47080
Material

UN
H
3,00000
H
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
128,99000

09.11.026
1.01.11
1.01.12
1.01.15
1.01.16
1.01.39
1.01.46
2.05.03
2.05.08
2.05.18
2.10.21
2.10.32
4.01.12
4.30.05
4.51.71
4.60.55
4.60.84
4.65.29

UN
H
H
H
H
H
H
M3
KG
M3
M2
M2
UN
M
UN
UN
UN
UN

Exerccio:

IL-50 LUMINARIA VAPOR MET 2X250W C/ POSTE CONCR TUB 11M (QE)
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
PEDREIRO
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 2
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
POSTE CONCR TUB OCO 11M C/JANELA INSPECAO
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
CRUZETA P/FIX 2 LUMIN EXTERNA
IL-50 PROJETOR P/ LAMP VAPOR MET 250W
LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V

2011

2,80000
2,80000
5,00000
5,00000
1,50000
10,00000
0,04400
24,42000
0,13100
0,14000
0,46000
1,00000
24,00000
1,00000
1,00000
2,00000
2,00000

BDI

5,30
4,08
32,83
72,51
4,45
19,20
44,03598

4,60
3,96
5,30
4,08
4,64
3,82
80,46
0,37
61,17
17,18
11,40
483,06
0,86
10,53
183,96
186,04
45,88

57,63
4,24000
3,26400
3,07000
2,16000
1,94000
23,03000

235,49
15,90000
12,24000
32,83000
72,51000
4,45000
19,20000

1.914,85
12,88000
11,08800
26,50000
20,40000
6,96000
38,20000
3,54024
9,03540
8,01327
2,40520
5,24400
483,06000
20,64000
10,53000
183,96000
372,08000
91,76000
Pgina: 202

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.97.15
REATOR SIMPLES P/ VAPOR MET AFP 250W-220V CAP/IGN
SubMO
Mo-de-Obra 116,02800
LS
141,55416

UN Coeficiente
257,58216

Material

UN
2,00000
1.299,20811

09.11.028
IL-52 LUMINARIA P/ VAPOR DE SODIO 1X150W EM POSTE TUB 7M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
4.01.11
POSTE CONCR TUB OCO 7M C/JANELA INSPECAO
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
4.60.30
BRACO ACO GALVANIZADO DIAM 25.4MMX1.0M P/ILUM.EXT.
4.60.85
IL-52 LUMINARIA ABERTA P/ LAMP VAPOR DE SODIO 150W
4.65.30
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V
4.80.61
BRACADEIRA DE ACO GALVANIZADO P/POSTE REDONDO
4.97.16
REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN
Mo-de-Obra 89,62800
LS
109,34616
SubMO
198,97416

UN
H
2,80000
H
2,80000
H
3,00000
H
3,00000
H
1,50000
H
8,00000
M3
0,04400
KG
24,42000
M3
0,13100
M2
0,14000
M2
0,46000
UN
1,00000
M
16,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
563,23811

09.11.035
IL-06 LUZ DE OBSTACULO COM LAMPADA DE 60W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.17.41
IL-06RELE FOTOELETRICO
4.21.57
COTOVELO DE REDUCAO ACO GALV QUENTE 1" X 3/4"
4.60.63
IL-06 LUZ DE OBSTACULO PARA LAMPADA 60 W
4.65.04
LAMPADA INCANDESCENTE 60W
4.96.70
NIPLE DUPLO FERRO GALV 3/4'
4.96.72
TE REDUCAO FERRO GALV 2'X1'
6.05.04
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN32MM (1 1/4")
Mo-de-Obra 19,69800
LS
24,03156
SubMO

UN
H
2,10000
H
2,10000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
M
0,30000
Material
119,89700

43,72956

09.11.038
IL-51 LUMINARIA P/ VAPOR MET P/SOM/ELETR (2X250W)
UN
1.01.11
CARPINTEIRO
H
2,80000
1.01.12
AJUDANTE DE CARPINTEIRO
H
2,80000
1.01.15
ELETRICISTA
H
6,00000
1.01.16
AJUDANTE ELETRICISTA
H
6,00000
1.01.39
PEDREIRO
H
1,50000
1.01.46
SERVENTE
H
10,00000
2.05.03
AREIA
M3
0,04400
2.05.08
CIMENTO
KG
24,42000
2.05.18
PEDRA BRITADA 2
M3
0,13100
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
M2
0,14000
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
M2
0,46000
4.01.18
POSTE CONCR TUBULAR OCO 11M C/ ACESSORIOS P/ SOM
UN
1,00000
4.30.05
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
M
24,00000
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
UN
1,00000
4.55.71
CONDULETE ALUMNIO 4"X2" XD=3/4" C/ TOMADA BLINDADA PADRO NBR 14136-10A-220VUN
1,00000
4.60.55
CRUZETA P/FIX 2 LUMIN EXTERNA
UN
1,00000
4.60.84
IL-50 PROJETOR P/ LAMP VAPOR MET 250W
UN
2,00000
4.65.29
LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V
UN
2,00000
4.97.15
REATOR SIMPLES P/ VAPOR MET AFP 250W-220V CAP/IGN
UN
2,00000
Mo-de-Obra 125,40800
LS
152,99776
Material
1.316,23811
SubMO
278,40576
09.11.060
1.01.11
1.01.12
1.01.15
1.01.16
1.01.39
1.01.46
2.05.03
2.05.08
2.05.18
2.10.21
2.10.32
4.01.09
4.30.05
4.51.61
4.51.71
Exerccio:

IL-30 LUMINARIA EM POSTE H= 2,50 M C/ LAMPADA VAPOR SDIO 70W


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
PEDREIRO
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 2
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
POSTE EM ACO ZINCADO H=2.50M DIAM 60MM
FIO DE 2,50 MM2 (ISOL PVC ANTICHAMA 750V)
CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"

2011

UN
H
H
H
H
H
H
M3
KG
M3
M2
M2
UN
M
UN
UN

2,80000
2,80000
3,00000
3,00000
1,90000
8,06000
0,08400
46,20000
0,18400
0,14000
0,46000
1,00000
16,00000
1,00000
1,00000

Custo Unit.
BDI

Custo Total

54,47
108,94000
358,06176

4,60
3,96
5,30
4,08
4,64
3,82
80,46
0,37
61,17
17,18
11,40
314,61
0,54
10,53
32,83
36,50
19,20
67,60
45,09
BDI
175,30882

BDI

201,26
11,13000
8,56800
32,23000
3,15000
45,34000
1,30000
2,69000
28,95000
6,23700

5,30
4,08
32,23
3,15
45,34
1,30
2,69
28,95
20,79
37,63411

4,60
3,96
5,30
4,08
4,64
3,82
80,46
0,37
61,17
17,18
11,40
483,09
0,86
10,53
17,00
183,96
186,04
45,88
54,47
BDI
366,76809

4,60
3,96
5,30
4,08
4,64
3,82
80,46
0,37
61,17
17,18
11,40
320,10
0,86
149,12
10,53

937,52
12,88000
11,08800
15,90000
12,24000
6,96000
30,56000
3,54024
9,03540
8,01327
2,40520
5,24400
314,61000
8,64000
10,53000
32,83000
36,50000
19,20000
67,60000
45,09000

1.961,41
12,88000
11,08800
31,80000
24,48000
6,96000
38,20000
3,54024
9,03540
8,01327
2,40520
5,24400
483,09000
20,64000
10,53000
17,00000
183,96000
372,08000
91,76000
108,94000

1.174,57
12,88000
11,08800
15,90000
12,24000
8,81600
30,78920
6,75864
17,09400
11,25528
2,40520
5,24400
320,10000
13,76000
149,12000
10,53000
Pgina: 203

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

4.61.38
IL - 30 LUMINARIA TIPO PRACA
4.65.39
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 70W/220V
4.97.18
REATOR SIMPLES P/VAPOR SODIO AFP 70W 220V CAP/IGN
SubMO
203,60330
Mo-de-Obra 91,71320
LS
111,89010

UN
1,00000
UN
1,00000
UN
1,00000
Material
751,33712

172,28
172,28000
12,73
12,73000
30,06
30,06000
BDI
219,63630

09.11.068
IL-53 LUMINARIA P/ VAPOR DE SODIO 1X150W EM POSTE 6M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.14
CHUMBADOR P/ FIXACAO POSTE METALICO 1/2"X300MM
4.01.25
POSTE GALV,TELECON RETO, FLANGEADO 88,9 MM X 6,0 M
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.61
CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
4.60.86
IL 53/54 LUMINARIA P/ LAMP VAPOR DE SODIO 150W
4.65.30
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V
4.94.91
SUPORTE P/LUMINARIA SIMPLES - IL-53/IL-33/IL35
4.97.16
REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN
Mo-de-Obra 91,71320
LS
111,89010
SubMO
203,60330

UN
H
2,80000
H
2,80000
H
3,00000
H
3,00000
H
1,90000
H
8,06000
M3
0,08400
KG
46,20000
M3
0,18400
M2
0,14000
M2
0,46000
UN
4,00000
UN
1,00000
M
16,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
1.262,17712

4,60
3,96
5,30
4,08
4,64
3,82
80,46
0,37
61,17
17,18
11,40
7,46
789,02
0,54
149,12
10,53
135,30
19,20
32,68
45,09
BDI
337,12950

09.11.070
IL-54 LUMINARIA P/ VAPOR DE SODIO 2X150W EM POSTE 6M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.14
CHUMBADOR P/ FIXACAO POSTE METALICO 1/2"X300MM
4.01.25
POSTE GALV,TELECON RETO, FLANGEADO 88,9 MM X 6,0 M
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.61
CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
4.60.86
IL 53/54 LUMINARIA P/ LAMP VAPOR DE SODIO 150W
4.65.30
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V
4.94.92
SUPORTE P/LUMINARIA DUPLA - IL-54/IL-34/IL-36
4.97.16
REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN
Mo-de-Obra 91,71320
LS
111,89010
SubMO
203,60330

UN
H
2,80000
H
2,80000
H
3,00000
H
3,00000
H
1,90000
H
8,06000
M3
0,08400
KG
46,20000
M3
0,18400
M2
0,14000
M2
0,46000
UN
4,00000
UN
1,00000
M
16,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
2,00000
UN
1,00000
UN
2,00000
Material
1.473,83712

4,60
3,96
5,30
4,08
4,64
3,82
80,46
0,37
61,17
17,18
11,40
7,46
789,02
0,54
149,12
10,53
135,30
19,20
44,75
45,09
BDI
385,81130

09.11.072
IL-55 PROJETOR MEDIO P/ VAPOR DE SODIO 150W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.87
IL-55 PROJETOR MEDIO P/ LAMP VAPOR DE SODIO 150W
4.65.30
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V
4.97.16
REATOR SIMPLES P/VAPOR SODIO AFP 150W-220V CAP/IGN
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
UN
1,00000
UN
1,00000
Material
191,20000

255,66
5,30
4,24000
4,08
3,26400
126,91
126,91000
19,20
19,20000
45,09
45,09000
BDI
47,80754

09.11.073
IL-56 PROJETOR P/ VAPOR DE SODIO 250W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.88
IL-56 PROJETOR P/ LAMP VAPOR DE SODIO 250W
4.65.31
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 250W/220V
4.97.17
REATOR SIMPLES P/VAPOR SODIO AFP 250W-220V CAP/IGN
Mo-de-Obra 28,14000
LS
34,33080
SubMO
62,47080

UN
H
3,00000
H
3,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
207,25000

331,75
5,30
15,90000
4,08
12,24000
126,91
126,91000
22,83
22,83000
57,51
57,51000
BDI
62,03578

09.11.074
1.01.11
1.01.12
1.01.15
1.01.16
1.01.39
1.01.46
Exerccio:

IL-64 ILUMINAO DECORATIVA P/AREA EXTERNA POSTE METLICO 4M LAMP.


VAPOR SODIO 1X70W
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
PEDREIRO
SERVENTE

2011

UN
H
H
H
H
H
H

1.802,90
12,88000
11,08800
15,90000
12,24000
8,81600
30,78920
6,75864
17,09400
11,25528
2,40520
5,24400
29,84000
789,02000
8,64000
149,12000
10,53000
135,30000
19,20000
32,68000
45,09000

2.063,25
12,88000
11,08800
15,90000
12,24000
8,81600
30,78920
6,75864
17,09400
11,25528
2,40520
5,24400
29,84000
789,02000
8,64000
149,12000
10,53000
270,60000
38,40000
44,75000
90,18000

1.316,32
2,80000
2,80000
3,00000
3,00000
1,90000
8,06000

4,60
3,96
5,30
4,08
4,64
3,82

12,88000
11,08800
15,90000
12,24000
8,81600
30,78920
Pgina: 204

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.14
CHUMBADOR P/ FIXACAO POSTE METALICO 1/2"X300MM
POSTE AO GALV. FLANGEADO CONICO RETO C/SUPORTE P/LUMINRIA H=4,00
4.01.26
PINT.EPOXI
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.61
CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
4.61.30
IL-64 LUMINARIA RETANG.P/POSTE TIPO PTALA LAMP. VAPOR SODIO 70W
4.65.39
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 70W/220V
4.97.18
REATOR SIMPLES P/VAPOR SODIO AFP 70W 220V CAP/IGN
Mo-de-Obra 91,71320
LS
111,89010
SubMO
203,60330
Material
IL-65 ILUMINAO DECORATIVA P/AREA EXTERNA POSTE METLICO 4M LAMP.
FLUOR. 2X36W
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.14
CHUMBADOR P/ FIXACAO POSTE METALICO 1/2"X300MM
POSTE AO GALV. FLANGEADO CONICO RETO C/SUPORTE P/LUMINRIA H=4,00
4.01.26
PINT.EPOXI
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.51.61
CAIXA BLINDADA DE ALUMINIO FUNDIDO 200X200MM
4.51.71
CONDULETE DE ALUMINIO 4"X2" "C" D=3/4"
4.61.31
IL-65 LUMINRIA P/POSTE TIPO PETALA 2 X LAMPADA COMPACTA 36W
4.65.06
LAMPADA FLUORESCENTE COMPACTA NO INTEGRADA 4 PINOS 36W
4.97.23
REATOR ELETRON P/2 LAMPADAS FLUORESCENTES 4 PINOS 36W
Mo-de-Obra 91,71320
LS
111,89010
SubMO
203,60330
Material

09.11.075

09.11.099
SERVICOS DE ILUMINACAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

M3
0,08400
KG
46,20000
M3
0,18400
M2
0,14000
M2
0,46000
UN
4,00000
UN
1,00000
M
16,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
866,57712

Custo Unit.

Custo Total

80,46
0,37
61,17
17,18
11,40
7,46
375,70
0,54
149,12
10,53
207,20
12,73
30,06
BDI
246,14150

6,75864
17,09400
11,25528
2,40520
5,24400
29,84000
375,70000
8,64000
149,12000
10,53000
207,20000
12,73000
30,06000

4,60
3,96
5,30
4,08
4,64
3,82
80,46
0,37
61,17
17,18
11,40
7,46
375,70
0,54
149,12
10,53
284,64
17,64
33,88
BDI
270,01780

12,88000
11,08800
15,90000
12,24000
8,81600
30,78920
6,75864
17,09400
11,25528
2,40520
5,24400
29,84000
375,70000
8,64000
149,12000
10,53000
284,64000
35,28000
33,88000

UN

1.444,00

H
2,80000
H
2,80000
H
3,00000
H
3,00000
H
1,90000
H
8,06000
M3
0,08400
KG
46,20000
M3
0,18400
M2
0,14000
M2
0,46000
UN
4,00000
1,00000
UN
M
16,00000
UN
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
UN
1,00000
970,38712

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

09.13.012
PP-02 PARA RAIO FRANKLIN COM HASTE 3MX2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.80.03
CONJ CONTRAVENTAGEM EM ACO GALV C/SUPORT FIXO,D=2"
4.80.07
BASE DE FIXACAO EM FERRO FUNDIDO P/ MASTROS,D=2"
4.80.62
CAPTOR TIPO FRANKLIN,LATAO CROMADO,CONECTOR DUPLO
6.05.06
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2")
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
M
3,00000
Material
309,04000

BDI

508,18
5,30
26,50000
4,08
20,40000
96,18
96,18000
52,02
52,02000
60,07
60,07000
33,59
100,77000
95,02634

09.13.013
PP-03 PARA-RAIO FRANKLIN COM HASTE 6,00M E DIAM=2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.80.03
CONJ CONTRAVENTAGEM EM ACO GALV C/SUPORT FIXO,D=2"
4.80.07
BASE DE FIXACAO EM FERRO FUNDIDO P/ MASTROS,D=2"
4.80.62
CAPTOR TIPO FRANKLIN,LATAO CROMADO,CONECTOR DUPLO
6.05.06
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2")
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
UN
1,00000
UN
1,00000
UN
1,00000
M
6,00000
Material
409,81000

BDI

5,30
4,08
96,18
52,02
60,07
33,59
118,20344

09.13.015
BARRA CHATA ACO GALVANIZADO (3/4"X1/8") - CAPTOR P/ PARA RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
3.11.90
CAIXILHARIA EM FERRO
3.76.50
GALVANIZACAO A FOGO
SubMO
15,61770
Mo-de-Obra 7,03500
LS
8,58270

M
H
H
CJ
KG
KG
Material
6,88968

BDI

5,30
4,08
0,28
11,56
1,76
5,17670

0,00000

09.12.099
SERVICOS DE APARELHOS ELETRICOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

09.13.016
1.01.15
1.01.16
Exerccio:

SubMO

SubMO

BARRA CHATA ALUMUNIO (1/2"X1/4") - CAPTOR P/ PARA RAIOS


ELETRICISTA
AJUDANTE ELETRICISTA

2011

M
H
H

0,75000
0,75000
0,63000
0,50400
0,50400

0,75000
0,75000

5,30
4,08

632,13
26,50000
20,40000
96,18000
52,02000
60,07000
201,54000

27,68
3,97500
3,06000
0,17640
5,82624
0,88704

29,24
3,97500
3,06000
Pgina: 205

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
3.11.91
CAIXILHARIA EM ALUMINIO
Mo-de-Obra 7,03500
LS
8,58270

UN Coeficiente

SubMO

15,61770

CJ
0,63000
KG
0,22900
Material
8,16163

09.13.018
BARRA CHATA ACO GALVANIZADO (3/4"X1/8") - DESCIDA P/ PARA RAIO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
3.11.90
CAIXILHARIA EM FERRO
3.76.50
GALVANIZACAO A FOGO
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

M
H
H
CJ
KG
KG
Material
6,88968

0,50000
0,50000
0,63000
0,50400
0,50400

09.13.019
BARRA CHATA ALUMINIO (1/2"X1/8") - DESCIDA P/ PARA RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.67.24
PARAFUSO SEXT 1/4' X 5CM C/BUCHA PLASTICA
3.11.91
CAIXILHARIA EM ALUMINIO
SubMO
10,41180
Mo-de-Obra 4,69000
LS
5,72180

M
H
H
CJ
KG
Material
4,16902

0,50000
0,50000
0,63000
0,11450

09.13.020
CABO DE COBRE NU DE 35 MM2 - COM SUPORTES DE FIXACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.05.20
ISOLADOR CASTANHA PARA CABO 35 MM2
4.30.41
CABO DE COBRE NU DE 35 MM2
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

M
H
1,00000
H
1,00000
UN
1,00000
M
1,00000
Material
30,13000

09.13.021
CABO DE COBRE NU DE 70 MM2 - COM SUPORTES DE FIXACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.05.17
ISOLADOR CASTANHA P/ CABO DE 70 MM2
4.30.43
CABO DE COBRE NU DE 70 MM2
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

M
H
1,00000
H
1,00000
UN
1,00000
M
1,00000
Material
56,94000

09.13.022
CABO DE COBRE NU DE 95 MM2 - COM SUPORTES DE FIXACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.05.18
ISOLADOR CASTANHA P/CABO N.4/0 AWG
4.31.30
CORDOALHA DE COBRE NU DE 95 MM2
SubMO
20,82360
Mo-de-Obra 9,38000
LS
11,44360

M
H
1,00000
H
1,00000
UN
1,00000
M
1,00000
Material
49,01000

09.13.023
CABO DE COBRE NU DE 50 MM2 - SOB A TERRA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.54
CABO DE COBRE NU 50 MM2
Mo-de-Obra 5,40500
LS
6,59410

SubMO

11,99910

09.13.024
CORDOALHA DE AO GALV. A QUENTE 50MM2 (3/8") C/SUP.DE FIXAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.05.21
ISOLADOR CASTANHA P/CABO 50MM2
4.31.40
CORDOALHA DE AO GALV. 50MM2
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360
09.13.025
CORDOALHA DE AO GALV. A QUENTE 80MM2 (7/16") SOB A TERRA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.42
CORDOALHA DE ACO GALV. 80MM2 (7/16")
Mo-de-Obra 5,40500
LS
6,59410
SubMO
11,99910
09.13.026
1.01.11
1.01.12
1.01.15
1.01.16
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.05.36
2.10.14
Exerccio:

TERRA COMPLETO - 3 HASTES


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ELETRICISTA
AJUDANTE ELETRICISTA
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
SARRAFO PINHO APARELHADO 5X2,5 CM

2011

Material

M
H
0,25000
H
1,00000
M
1,00000
24,71000

M
H
H
UN
M
Material
7,88000

Material

1,58400
1,58400
3,00000
3,00000
0,42000
0,42000
3,76500
11,22900
0,10500
9,72000
25,13100
0,33000
0,06000
2,88000

Custo Total

BDI

0,28
34,87
5,46925

BDI

5,30
4,08
0,28
11,56
1,76
3,97934

BDI

5,30
4,08
0,28
34,87
3,35359

BDI

5,30
4,08
10,15
19,98
11,71933

BDI

5,30
4,08
18,89
38,05
17,88563

BDI

5,30
4,08
10,60
38,41
16,06173

BDI

5,30
4,08
24,71
8,44309

BDI

5,30
4,08
15,00
4,13
6,60183

BDI

5,30
4,08
7,06
4,38359

1,00000
1,00000
0,25000
1,00000

M
H
0,25000
H
1,00000
M
1,00000
7,06000
UN
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M3
M

Custo Unit.

4,60
3,96
5,30
4,08
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
251,78
2,09

0,17640
7,98523

21,28
2,65000
2,04000
0,17640
5,82624
0,88704

17,93
2,65000
2,04000
0,17640
3,99262

62,67
5,30000
4,08000
10,15000
19,98000

95,64
5,30000
4,08000
18,89000
38,05000

85,89
5,30000
4,08000
10,60000
38,41000

45,15
1,32500
4,08000
24,71000

35,30
5,30000
4,08000
3,75000
4,13000

23,44
1,32500
4,08000
7,06000

709,42
7,28640
6,27264
15,90000
12,24000
2,00340
1,60440
17,46960
42,89478
8,44830
3,40200
9,29847
20,18610
15,10680
6,01920
Pgina: 206

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
SubMO
234,59011
Mo-de-Obra 105,67122
LS
128,91889

Custo Unit.

Custo Total

M2
0,72000
KG
4,83000
UN
117,00000
KG
0,32400
KG
0,28800
KG
0,08400
UN
3,00000
UN
4,00000
Material
342,17721

BDI

09.13.027
TERRA SIMPLES - 1 HASTE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
4.80.08
HASTE COPERWELD 19MM (3/4)X3 M
4.80.09
CONECTOR P/ HASTE TERRA DN 19MM (3/4")
Mo-de-Obra 35,22374
LS
42,97296
SubMO
78,19670

UN
H
0,52800
H
0,52800
H
1,00000
H
1,00000
H
0,14000
H
0,14000
H
1,25500
H
3,74300
M3
0,03500
KG
3,24000
KG
8,37700
M3
0,11000
M3
0,02000
M
0,96000
M2
0,24000
KG
1,61000
UN
39,00000
KG
0,10800
KG
0,09600
KG
0,02800
UN
1,00000
UN
1,00000
Material
112,77907

4,60
3,96
5,30
4,08
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
251,78
2,09
17,18
2,69
0,22
2,50
4,67
4,87
70,23
3,84
BDI
43,92443

09.13.031
TUBO DE PVC 2"X 3M PARA PROTECAO DE CORDOALHA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.25.06
ELETRODUTO PVC RIGIDO 60MM (2')
Mo-de-Obra 9,38000
LS
11,44360
SubMO

20,82360

UN
H
1,00000
H
1,00000
M
3,30000
Material
19,70100

BDI

11,76600

UN
H
1,00000
UN
0,02000
UN
0,00200
UN
1,00000
Material
14,80834

5,30
90,63
152,87
12,69
BDI
6,11210

09.13.033
CONEXAO EXOTERMICA CABO/HASTE
1.01.15
ELETRICISTA
4.63.06
MOLDE CLASSE R PARA CONEXAO EXOTERMICA
4.63.11
ALICATE P/ MOLDE CLASSE R (CONEXAO EXOTERMICA)
4.63.21
CARTUCHO P/CONEXO EXOTERM.CABO/HASTE P/CABO 50MM2
Mo-de-Obra 6,36000
LS
7,75920
SubMO
14,11920

UN
H
1,20000
UN
0,02000
UN
0,00200
UN
1,00000
Material
19,76006

5,30
90,63
253,73
17,44
BDI
7,79223

09.13.034
CONEXAO EXOTERMICA EM ESTRUTURA METALICA
1.01.15
ELETRICISTA
4.63.05
MOLDE CLASSE C PARA CONEXO EXOTERMICA
4.63.10
ALICATE P/ MOLDE CLASSE C (CONEXAO EXOTERMICA)
4.63.22
CARTUCHO P/CONEXO EXOT.VB ESTR.MET.P/CABO 35MM2
Mo-de-Obra 5,30000
LS
6,46600
SubMO
11,76600

UN
H
1,00000
UN
0,02000
UN
0,00200
UN
1,00000
Material
19,55834

5,30
90,63
152,87
17,44
BDI
7,20460

09.13.099
SERVICOS DE PARA-RAIOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

09.13.032
CONEXAO EXOTERMICA CABO/CABO
1.01.15
ELETRICISTA
4.63.05
MOLDE CLASSE C PARA CONEXO EXOTERMICA
4.63.10
ALICATE P/ MOLDE CLASSE C (CONEXAO EXOTERMICA)
4.63.20
CARTUCHO P/CONEXO EXOTERM.CABO/CABO 50MM2
SubMO
Mo-de-Obra 5,30000
LS
6,46600

0,00000

SubMO

0,00000

09.50.001
REMOCAO DE OLEO DE DISJUNTOR OU TRANSFORMADOR EM CABINE PRIMARIA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,16320
LS
0,19910
SubMO
0,36230
Material
09.50.003
1.01.15
1.01.16

Exerccio:

REMOCAO DE ISOLADOR TIPO DISCO COMPL, INCL GANCHO DE SUSPENSAO


OLHAL
ELETRICISTA
AJUDANTE ELETRICISTA

2011

L
H

0,04000
0,00000

BDI

17,18
2,69
0,22
2,50
4,67
4,87
70,23
3,84
132,65648

5,30
4,08
5,97
9,32066

4,08
0,08333

UN
H
H

12,36960
12,99270
25,74000
0,81000
1,34496
0,40908
210,69000
15,36000

234,90
2,42880
2,09088
5,30000
4,08000
0,66780
0,53480
5,82320
14,29826
2,81610
1,13400
3,09949
6,72870
5,03560
2,00640
4,12320
4,33090
8,58000
0,27000
0,44832
0,13636
70,23000
3,84000

49,84
5,30000
4,08000
19,70100

32,68
5,30000
1,81260
0,30574
12,69000

41,67
6,36000
1,81260
0,50746
17,44000

38,52
5,30000
1,81260
0,30574
17,44000

0,44
0,16320

3,84
0,15000
0,15000

5,30
4,08

0,79500
0,61200

Pgina: 207

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 1,40700

Descrio
LS

1,71654

UN Coeficiente
SubMO

3,12354

Material

0,00000

09.50.004
REMOCAO DE BUCHA DE PASSAGEM INT/EXT, OU DE CHAPA P/ BUCHA PASS A.T.
UN
1.01.15
ELETRICISTA
H
0,40000
1.01.16
AJUDANTE ELETRICISTA
H
0,40000
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944
Material
0,00000
09.50.005
REMOCAO DE BUCHA DE PASSAGEM PARA NEUTRO EM CABINE PRIMARIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,81400
LS
3,43308
SubMO
6,24708
09.50.007
REMOCAO DE CANTONEIRA METALICA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090

SubMO

5,20590

UN
H
0,30000
H
0,30000
Material
0,00000

Material

M
H
0,25000
H
0,25000
0,00000

09.50.008
REMOCAO DE ISOLADOR TIPO CASTANHA, INCLUSIVE GANCHO DE SUSTENTACAO
UN
1.01.16
AJUDANTE ELETRICISTA
H
0,10000
Mo-de-Obra 0,40800
LS
0,49776
SubMO
0,90576
Material
0,00000
09.50.009
REMOCAO DE ISOLADOR TIPO PINO PARA A.T., INCLUSIVE PINO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO
5,20590
09.50.011
REMOCAO DE VERGALHAO DE COBRE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872
09.50.013
REMOCAO DE MUFLA EXTERNA TRIPOLAR
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 20,19000
LS
24,63180
09.50.014
REMOCAO DE MUFLA INTERNA TRIPOLAR
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 13,46000
LS
16,42120
09.50.016
REMOCAO DE CABO DE A.T. TRIPOLAR
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 6,73000
LS
8,21060

SubMO

SubMO

SubMO

SubMO

UN
H
0,25000
H
0,25000
Material
0,00000
M
H
0,20000
H
0,20000
0,00000

4,16472

Material

44,82180

UN
H
1,50000
H
3,00000
Material
0,00000

29,88120

UN
H
1,00000
H
2,00000
Material
0,00000

14,94060

M
H
0,50000
H
1,00000
0,00000

Material

09.50.018
REMOCAO CHAVE SECCION TRIP SECA, COMANDO POR VARA/ESTRIBO FRONTAL
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
4,00000
Mo-de-Obra 26,92000
LS
32,84240
SubMO
59,76240
Material
0,00000
09.50.020
REMOCAO DE TRANSFORMADOR DE POTENCIAL COMPLETO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 6,09700
LS
7,43834
SubMO
13,53534

UN
H
0,65000
H
0,65000
Material
0,00000

09.50.022
REMOCAO DE DISJUNTOR DE VOLUME NORMAL OU REDUZIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 34,42000
LS
41,99240
SubMO
76,41240

UN
H
2,00000
H
4,00000
H
1,00000
Material
0,00000

REMOCAO DE MANOPLA DE COMANDO DE DISJUNTOR DE A.T.(ENGRENAGEM


UN
INTERNA)
1.01.15
ELETRICISTA
H
0,50000
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
Material
0,00000

Custo Unit.

Custo Total

BDI

0,71841

BDI

5,30
4,08
1,91577

BDI

5,30
4,08
1,43683

BDI

5,30
4,08
1,19736

BDI

4,08
0,20833

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
10,30901

BDI

5,30
4,08
6,87268

BDI

5,30
4,08
3,43634

BDI

5,30
4,08
13,74535

BDI

5,30
4,08
3,11313

BDI

5,30
4,08
7,50
17,57485

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
3,43634

09.50.023

09.50.024
REMOCAO DE JANELA DE VENTILACAO PADRAO LIGHT
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
Mo-de-Obra 6,73000
LS
8,21060

Exerccio:

2011

14,94060

UN
H
0,50000
H
1,00000
Material
0,00000

10,24
2,12000
1,63200

7,68
1,59000
1,22400

6,40
1,32500
1,02000

1,11
0,40800

6,40
1,32500
1,02000

5,12
1,06000
0,81600

55,13
7,95000
12,24000

36,75
5,30000
8,16000

18,37
2,65000
4,08000

73,50
10,60000
16,32000

16,64
3,44500
2,65200

93,98
10,60000
16,32000
7,50000

12,80
2,65000
2,04000

18,37
2,65000
4,08000

Pgina: 208

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.50.025
REMOCAO RELE DE SOBRE-CORRENTE,INFRATENSAO/BOBINA MINIMA DO DISJ A.T.
UN
1.01.15
ELETRICISTA
H
0,80000
Mo-de-Obra 4,24000
LS
5,17280
Material
0,00000
SubMO
9,41280
09.50.026
REMOCAO DE TRANSFORMADOR DE POTENCIA EM CABINE PRIMARIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 61,34000
LS
74,83480
SubMO
136,17480

UN
H
4,00000
H
8,00000
H
1,00000
Material
0,00000

09.50.027
REMOCAO DE TRANSFORMADOR DE POTENCIA EM POSTE OU ESTALEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 68,07000
LS
83,04540
SubMO
151,11540

UN
H
4,50000
H
9,00000
H
1,00000
Material
0,00000

09.50.028
REMOCAO DE POSTE DE CONCRETO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 108,10000
LS
131,88200

UN
H
5,00000
H
20,00000
Material
0,00000

SubMO

239,98200

09.50.030
REMOCAO DE PARA-RAIO TIPO CRISTAL VALVE EM POSTE SINGELO OU ESTALEIRO
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
SubMO
41,64720
Mo-de-Obra 18,76000
LS
22,88720
Material
0,00000
09.50.031
REMOCAO DE PARA-RAIO TIPO CRISTAL-VALVE EM CABINE PRIMARIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

UN
H
1,50000
H
1,50000
Material
0,00000

09.50.032
REMOCAO DE CRUZETA DE MADEIRA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 20,19000
LS
24,63180

44,82180

UN
H
1,50000
H
3,00000
Material
0,00000

9,05760

UN
H
1,00000
Material
0,00000

09.50.033
REMOCAO DE MAO FRANCESA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,08000
LS
4,97760

SubMO

SubMO

09.50.034
REMOCAO DE CHAVE FUSIVEL INDICADORA TIPO MATHEUS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
31,23540
Mo-de-Obra 14,07000
LS
17,16540

UN
H
1,50000
H
1,50000
Material
0,00000

09.50.036
REMOCAO DE SUPORTE DE TRANSFORMADOR EM POSTE SINGELO OU ESTALEIRO
UN
1.01.16
AJUDANTE ELETRICISTA
H
1,60000
Mo-de-Obra 6,52800
LS
7,96416
SubMO
14,49216
Material
0,00000
09.50.037
REMOCAO CINTA FIXACAO DE ELETRODUTO OU SELA P/CRUZETA MAD EM POSTE
UN
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
SubMO
4,52880
Mo-de-Obra 2,04000
LS
2,48880
Material
0,00000

Custo Unit.

Custo Total

BDI

5,30
2,16494

BDI

5,30
4,08
7,50
31,32020

BDI

5,30
4,08
7,50
34,75654

BDI

5,30
4,08
55,19586

BDI

5,30
4,08
9,57886

BDI

5,30
4,08
7,18414

BDI

5,30
4,08
10,30901

BDI

4,08
2,08325

BDI

5,30
4,08
7,18414

BDI

4,08
3,33320

BDI

4,08
1,04162

5,30
4,08
5,51959

11,57
4,24000

167,49
21,20000
32,64000
7,50000

185,87
23,85000
36,72000
7,50000

295,17
26,50000
81,60000

51,22
10,60000
8,16000

38,41
7,95000
6,12000

55,13
7,95000
12,24000

11,14
4,08000

38,41
7,95000
6,12000

17,82
6,52800

5,57
2,04000

09.50.039
REMOCAO DE CAIXAS DE MEDICAO OU CAIXAS P/ TRANSF. DE CORRENTE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 10,81000
LS
13,18820
SubMO
23,99820

UN
H
0,50000
H
2,00000
Material
0,00000

BDI

09.50.099
DEMOLICOES DE ALTA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

SubMO

0,00000

09.52.001
REMOCAO DE POSTE ACO GALV. OU CAIXA ACO P/ ENTRADA ENERGIA EM B.T.
UN
1.01.15
ELETRICISTA
H
4,00000
1.01.16
AJUDANTE ELETRICISTA
H
4,00000
Mo-de-Obra 37,52000
LS
45,77440
Material
0,00000
SubMO
83,29440
09.52.002
REMOCAO DE POSTE DE CONCRETO DE ENTRADA EM B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
Mo-de-Obra 46,90000
LS
57,21800
09.52.003
Exerccio:

REMOCAO DE ARMACAO TIPO BRAQUET

2011

104,11800

UN
H
5,00000
H
5,00000
Material
0,00000
UN

BDI

5,30
4,08
19,15771

BDI

5,30
4,08
23,94714

29,51
2,65000
8,16000

102,45
21,20000
16,32000

128,06
26,50000
20,40000

12,80
Pgina: 209

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS

Descrio

UN Coeficiente
H
H

5,72180

09.52.004
REMOCAO DE CABECOTE TIPO TELESP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090

SubMO

SubMO

09.52.007
REMOCAO DE TUBULACAO ELETRICA EMBUTIDA ATE 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO

Material

5,20590

UN
H
0,25000
H
0,25000
Material
0,00000

5,20590

09.52.008
REMOCAO DE TUBULACAO ELETRICA EMBUTIDA ACIMA DE 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
09.52.009
REMOCAO DE TUBULACAO ELETRICA APARENTE ATE 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,17250
LS
1,43045
SubMO

0,50000
0,50000

10,41180

09.52.005
REMOCAO DE CAIXA DE ENTRADA DE TELEFONE PADRAO TELESP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720

2,60295

09.52.010
REMOCAO DE TUBULACAO ELETRICA APARENTE ACIMA 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO
5,20590

0,00000

UN
H
2,00000
H
2,00000
Material
0,00000

Material

M
H
0,25000
H
0,25000
0,00000

Material

M
H
0,50000
H
0,50000
0,00000

Material

M
H
0,12500
H
0,12500
0,00000

Material

M
H
0,25000
H
0,25000
0,00000

09.52.015
REMOCAO DE CAIXA PARA FUSIVEL OU TOMADA INSTALADA EM PERFILADOS
UN
1.01.15
ELETRICISTA
H
0,50000
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
Material
0,00000
09.52.016
REMOCAO DE CAIXAS ESTAMPADAS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
09.52.017
REMOCAO DE FIO EMBUTIDO ATE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,23450
LS
0,28609

SubMO

SubMO

09.52.018
REMOCAO DE CABO EMBUTIDO ACIMA DE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,46900
LS
0,57218
SubMO
09.52.019
REMOCAO DE FIO APARENTE ATE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,28140
LS
0,34331

SubMO

09.52.020
REMOCAO DE CABO APARENTE ACIMA DE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,56280
LS
0,68662
SubMO

20,82360

0,52059

1,04118

0,62471

1,24942

UN
H
1,00000
H
1,00000
Material
0,00000

Material

M
H
0,02500
H
0,02500
0,00000

Material

M
H
0,05000
H
0,05000
0,00000

Material

M
H
0,03000
H
0,03000
0,00000

Material

M
H
0,06000
H
0,06000
0,00000

09.52.021
REMOCAO DE TERMINAIS ,CONECTORES DE PRESSAO OU ROLDANAS PARA CABOS
UN
1.01.15
ELETRICISTA
H
0,20000
1.01.16
AJUDANTE ELETRICISTA
H
0,20000
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472
Material
0,00000
09.52.022
REMOCAO DE TERMINAIS OU CONECTORES DE SOLDA PARA CABOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
10,41180
Mo-de-Obra 4,69000
LS
5,72180
Exerccio:

2011

Custo Unit.

UN
H
0,50000
H
0,50000
Material
0,00000

Custo Total

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
9,57886

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
0,59868

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
0,11974

BDI

5,30
4,08
0,23947

BDI

5,30
4,08
0,14368

BDI

5,30
4,08
0,28737

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
2,39471

2,65000
2,04000

6,40
1,32500
1,02000

51,22
10,60000
8,16000

6,40
1,32500
1,02000

12,80
2,65000
2,04000

3,20
0,66250
0,51000

6,40
1,32500
1,02000

12,80
2,65000
2,04000

25,61
5,30000
4,08000

0,64
0,13250
0,10200

1,28
0,26500
0,20400

0,76
0,15900
0,12240

1,53
0,31800
0,24480

5,12
1,06000
0,81600

12,80
2,65000
2,04000

Pgina: 210

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

REMOCAO DE FUNDO OU PORTAS MADEIRA/METAL .P/QUADROS OU CAIXAS


PASSAGEM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

09.52.026

09.52.028
REMOCAO DE FECHADURAS TIPO YALE (Q.DISTRIBUICAO)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872
SubMO

4,16472

Custo Unit.

Custo Total

M2
H
H
Material

25,61
1,00000
1,00000

0,00000

UN
H
0,20000
H
0,20000
Material
0,00000

09.52.029
REMOCAO DE CHAVES BASE MARMORE,NH UNIPOLAR OU DISJUNT.NO-FUSE EM BT
UN
1.01.15
ELETRICISTA
H
0,50000
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
Material
0,00000
09.52.030
REMOCAO DE DISJUNTOR QUICK-LAG OU BASE P/ FUSIVEL DIAZED EM B.T
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,17250
LS
1,43045
SubMO
2,60295

UN
H
0,12500
H
0,12500
Material
0,00000

09.52.034
REMOCAO DE BASE OU CHAVE PARA FUSIVEL NH TIPO UNIPOLAR
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
Material
0,00000

09.52.035
REMOCAO DE CHAVE OU BASE NH TRIPOL. OU CHAVE PACCO ROTATIVA EM B.T
UN
1.01.15
ELETRICISTA
H
0,75000
1.01.16
AJUDANTE ELETRICISTA
H
0,75000
Mo-de-Obra 7,03500
LS
8,58270
SubMO
15,61770
Material
0,00000
REMOCAO DE CHAVE DE ACAO RAPIDA,COMANDO FRONTAL MONTADO EM PAINEL
UN
B.T
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
1,00000
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360
Material
0,00000

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
0,59868

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
3,59207

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
2,39471

09.52.037

09.52.039
REMOCAO DE BARRAMENTO DE COBRE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
09.52.099
DEMOLICOES DE BAIXA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

M
H
0,50000
H
0,50000
0,00000

10,41180

Material

0,00000

MV
MV
1,00000
Material
244,82000

09.54.001
REMOCAO DE INTERRUPTORES TOMADAS BOTOES DE CAMPAINHA E CIGARRAS
UN
1.01.15
ELETRICISTA
H
0,40000
1.01.16
AJUDANTE ELETRICISTA
H
0,40000
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944
Material
0,00000
09.54.002
REMOCAO DE CHAVE AUTOMATICA DA BOIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 5,62800
LS
6,86616

SubMO

12,49416

UN
H
0,60000
H
0,60000
Material
0,00000

REMOCAO DE CONTACTOR MAGNETICO P/ QUADRO DE COMANDO DE BOMBA


UN
RECALQUE
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
1,00000
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360
Material
0,00000

SubMO

31,23540

UN
H
1,50000
H
1,50000
Material
0,00000

09.54.005
REMOCAO AP.ILUM FLUORESC.C/PLAFON E PEND,OU CANOPLA P/ LUM.PENDENTE
UN
1.01.15
ELETRICISTA
H
0,15000
1.01.16
AJUDANTE ELETRICISTA
H
0,15000
SubMO
3,12354
Mo-de-Obra 1,40700
LS
1,71654
Material
0,00000
09.54.006
Exerccio:

REMOCAO APARELHO ILUMINACAO,PLAFONS E PENDENTES P/LAMPADAS


FLUORESC

2011

UN

5,12
1,06000
0,81600

12,80
2,65000
2,04000

3,20
0,66250
0,51000

12,80
2,65000
2,04000

19,20
3,97500
3,06000

25,61
5,30000
4,08000

12,80
2,65000
2,04000

301,12
244,82
244,82000
BDI
56,30860

BDI

5,30
4,08
1,91577

BDI

5,30
4,08
2,87366

09.54.003

09.54.004
REMOCAO DE MOTOR BOMBA DE RECALQUE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 14,07000
LS
17,16540

5,30000
4,08000

10,24
2,12000
1,63200

15,36
3,18000
2,44800

25,61

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
7,18414

BDI

5,30
4,08
0,71841

5,30000
4,08000

38,41
7,95000
6,12000

3,84
0,79500
0,61200

3,84
Pgina: 211

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,40700
LS

UN Coeficiente
H
H

1,71654

SubMO

3,12354

REMOCAO DE SOQUETES P/ LAMPADAS INCANDES OU DE CORRENTES P/


PENDENTES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
4,16472
Mo-de-Obra 1,87600
LS
2,28872

Material

09.54.007

REMOCAO DE REATORES P/ LAMP.HG EM CX.PASSAG.OU P/ LAMP.


FLUORESCENTES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

Custo Unit.

0,15000
0,15000
0,00000

BDI

Custo Total

5,30
4,08
0,71841

UN
H
H
Material

09.54.011

5,12
0,20000
0,20000

0,00000

1,06000
0,81600

BDI

5,30
4,08
0,95789

2,65000
2,04000

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
7,18414

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
7,18414

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
7,18414

UN
H
H
Material

0,79500
0,61200

12,80
0,50000
0,50000

0,00000

09.54.013
REMOCAO DE REATORES PARA LAMPADAS HG EM POSTES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
Material
0,00000

09.54.014
REMOCAO DE AP. ILUMIN. EM POSTES OU DE PROJETORES EM FACHADAS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
31,23540
Mo-de-Obra 14,07000
LS
17,16540

UN
H
1,50000
H
1,50000
Material
0,00000

09.54.016
REMOCAO DE PROJETORES EM JARDINS OU DE LUZ DE OBSTACULO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
Material
0,00000

09.54.017
REMOCAO DE ARANDELA EXTERNA EM BRACO DE FERRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 14,07000
LS
17,16540
SubMO

31,23540

UN
H
1,50000
H
1,50000
Material
0,00000

09.54.018
REMOCAO DO APARELHO A PROVA DE TEMPO, GASES E VAPOR
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
Material
0,00000

09.54.019
REMOCAO DE CRUZETAS DE FERRO PARA FIXACAO DE PROJETORES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

UN
H
1,50000
H
1,50000
Material
0,00000

09.54.020
REMOCAO DE POSTE CURVO, INCLUINDO BASES DE FIXACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

UN
H
5,00000
H
5,00000
Material
0,00000

BDI

5,30
4,08
23,94714

09.54.021
REMOCAO DE POSTE DE FERRO RETO ENGASTADO NO SOLO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 75,04000
LS
91,54880
SubMO
166,58880

UN
H
8,00000
H
8,00000
Material
0,00000

BDI

5,30
4,08
38,31542

09.54.099
DEMOLICOES DE APARELHOS E EQUIPAMENTOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

09.56.001
REMOCAO DE CAPTOR DE PARA-RAIOS TIPO FRANKLIN OU RADIATIVO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
Material
0,00000

09.56.003
REMOCAO DE BASE E HASTE DE PARA-RAIO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360

UN
H
1,00000
H
1,00000
Material
0,00000

09.56.004
1.01.15
1.01.16

Exerccio:

SubMO

20,82360

REMOCAO CABOS E ESTICADORES OU DE BRACADEIRAS P/ 3 ESTAIS EM P.RAIOS


ELETRICISTA
AJUDANTE ELETRICISTA

2011

M
H
H

0,50000
0,50000

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
4,78943

5,30
4,08

25,61
5,30000
4,08000

38,41
7,95000
6,12000

25,61
5,30000
4,08000

38,41
7,95000
6,12000

12,80
2,65000
2,04000

38,41
7,95000
6,12000

128,06
26,50000
20,40000

204,90
42,40000
32,64000

12,80
2,65000
2,04000

25,61
5,30000
4,08000

12,80
2,65000
2,04000

Pgina: 212

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 4,69000

LS

5,72180

09.56.005
REMOCAO DE CABO DE COBRE NU
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872

UN Coeficiente
SubMO

SubMO

09.56.006
REMOCAO DE CABO COBRE NU PARA ATERRAMENTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO

10,41180

4,16472

5,20590

Material

0,00000

Material

M
H
0,20000
H
0,20000
0,00000

Material

M
H
0,25000
H
0,25000
0,00000

09.56.007
REMOCAO DE CONECTOR TIPO SPLIT-BOLDT PARA CABOS DE ATERRAMENTO
UN
1.01.15
ELETRICISTA
H
0,20000
1.01.16
AJUDANTE ELETRICISTA
H
0,20000
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472
Material
0,00000

Custo Unit.

Custo Total

BDI

2,39471

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
1,91577

5,30
4,08
4,78943

5,12
1,06000
0,81600

6,40
1,32500
1,02000

5,12
1,06000
0,81600

09.56.009
REMOCAO DE BRACADEIRAS PARA PASSAGEM DE CABOS DE COBRE NU
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944

UN
H
0,40000
H
0,40000
Material
0,00000

09.56.012
REMOCAO DE TUBO DE PROTECAO DE CABO DE COBRE NU INCL. FIXACOES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
Material
0,00000

BDI

09.56.099
DEMOLICOES DE PARA-RAIOS E ATERRAMENTO
6.96.02
MODULO DE VERBA
SubMO
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

09.60.003
DE ISOLADOR TIPO DISCO COMPL INCL GANCHO DE SUSPENSAO TIPO OLHAL
UN
1.01.15
ELETRICISTA
H
0,15000
1.01.16
AJUDANTE ELETRICISTA
H
0,15000
Mo-de-Obra 1,40700
LS
1,71654
SubMO
3,12354
Material
0,00000
09.60.004
DE BUCHA DE PASS.INT/EXT, OU DE CHAPA ACO P/ BUCHA PASSAGEM A.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944
09.60.007
DE CANTONEIRA METALICA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS

2,86090

SubMO

5,20590

UN
H
0,40000
H
0,40000
Material
0,00000

Material

M
H
0,25000
H
0,25000
0,00000

09.60.008
DE ISOLADOR TIPO CASTANHA INCL GANCHO DE SUSTENTACAO
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,40800
LS
0,49776
SubMO
0,90576

UN
H
0,10000
Material
0,00000

09.60.009
DE ISOLADOR TIPO PINO PARA A.T. INCLUSIVE PINO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO

5,20590

UN
H
0,25000
H
0,25000
Material
0,00000

4,16472

M
H
0,20000
H
0,20000
0,00000

09.60.011
DE VERGALHAO DE COBRE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS

2,28872

SubMO

Material

09.60.012
DE TERMINAL OU CONECTOR PARA VERGALHAO DE COBRE
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,81600
LS
0,99552
SubMO
1,81152

UN
H
0,20000
Material
0,00000

09.60.018
DE CHAVE SECCION TRIP SECA, COMANDO POR VARA/ESTRIBO FRONTAL
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
59,76240
Mo-de-Obra 26,92000
LS
32,84240

UN
H
2,00000
H
4,00000
Material
0,00000

09.60.020
1.01.15
1.01.16

Exerccio:

DE TRANSFORMADOR DE POTENCIAL COMPLETO


ELETRICISTA
AJUDANTE ELETRICISTA

2011

UN
H
H

0,65000
0,65000

BDI

5,30
4,08
0,71841

BDI

5,30
4,08
1,91577

BDI

5,30
4,08
1,19736

BDI

4,08
0,20833

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
0,95789

BDI

4,08
0,41665

BDI

5,30
4,08
13,74535

5,30
4,08

10,24
2,12000
1,63200

25,61
5,30000
4,08000

3,84
0,79500
0,61200

10,24
2,12000
1,63200

6,40
1,32500
1,02000

1,11
0,40800

6,40
1,32500
1,02000

5,12
1,06000
0,81600

2,22
0,81600

73,50
10,60000
16,32000

16,64
3,44500
2,65200

Pgina: 213

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 6,09700

Descrio
LS

7,43834

UN Coeficiente
SubMO

09.60.022
DE DISJUNTOR DE VOLUME NORMAL OU REDUZIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 34,42000
LS
41,99240
SubMO

13,53534

Material

0,00000

76,41240

UN
H
2,00000
H
4,00000
H
1,00000
Material
0,00000

09.60.023
DE MANOPLA DE COMANDO DO DISJUNTOR DE A.T. (ENGRENAGEM INTERNA)
UN
1.01.15
ELETRICISTA
H
0,50000
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
Material
0,00000
09.60.026
DE TRANSFORMADOR DE POTENCIA EM CABINE PRIMARIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 61,34000
LS
74,83480
SubMO

Custo Unit.
BDI

Custo Total

3,11313

BDI

5,30
4,08
7,50
17,57485

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
7,50
31,32020

BDI

5,30
4,08
7,50
34,75654

BDI

5,30
4,08
55,19586

5,30
4,08
7,18414

93,98
10,60000
16,32000
7,50000

12,80
2,65000
2,04000

136,17480

UN
H
4,00000
H
8,00000
H
1,00000
Material
0,00000

09.60.027
DE TRANSFORMADOR DE POTENCIA EM POSTE OU ESTALEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 68,07000
LS
83,04540
SubMO
151,11540

UN
H
4,50000
H
9,00000
H
1,00000
Material
0,00000

09.60.028
DE POSTE DE CONCRETO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 108,10000
LS

239,98200

UN
H
5,00000
H
20,00000
Material
0,00000

31,23540

UN
H
1,50000
H
1,50000
Material
0,00000

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

83,29440

UN
H
4,00000
H
4,00000
Material
0,00000

104,11800

UN
H
5,00000
H
5,00000
Material
0,00000

131,88200

SubMO

09.60.034
DE CHAVE FUSIVEL INDICADORA TIPO MATHEUS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 14,07000
LS
17,16540
SubMO
09.60.099
RETIRADAS DE ALTA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

09.62.001
DE POSTE GALVANIZADO DE ENTRADA EM B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 37,52000
LS
45,77440
09.62.002
DE POSTE DE CONCRETO DE ENTRADA EM B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 46,90000
LS
57,21800

SubMO

SubMO

SubMO

09.62.003
DE ARMACAO T BRAQUET, CONDULETES OU DE CX.FUSIV/TOMADAS EM PERFILADO
UN
1.01.15
ELETRICISTA
H
0,50000
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
Mo-de-Obra 4,69000
LS
5,72180
Material
0,00000
SubMO
10,41180
09.62.004
DE CABECOTE TELESP OU DE BASE P/DISJUNTOR QUICK LAG
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO
5,20590
09.62.009
DE TUBULACAO ELETRICA APARENTE ATE 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090

SubMO

09.62.010
DE TUBULACAO ELETRICA APARENTE ACIMA 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
09.62.012
DE PERFILADOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 3,75200
LS
Exerccio:

2011

4,57744

SubMO

5,20590

10,41180

8,32944

UN
H
0,25000
H
0,25000
Material
0,00000

Material

M
H
0,25000
H
0,25000
0,00000

Material

M
H
0,50000
H
0,50000
0,00000

Material

M
H
0,40000
H
0,40000
0,00000

BDI

5,30
4,08
19,15771

BDI

5,30
4,08
23,94714

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
1,91577

167,49
21,20000
32,64000
7,50000

185,87
23,85000
36,72000
7,50000

295,17
26,50000
81,60000

38,41
7,95000
6,12000

102,45
21,20000
16,32000

128,06
26,50000
20,40000

12,80
2,65000
2,04000

6,40
1,32500
1,02000

6,40
1,32500
1,02000

12,80
2,65000
2,04000

10,24
2,12000
1,63200

Pgina: 214

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.62.014
DE GANCHOS DE SUSTENTACAO DE LUMINARIAS EM PERFILADOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472
09.62.017
DE FIO EMBUTIDO ATE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,46900
LS
0,57218
09.62.018
DE CABO EMBUTIDO ACIMA DE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,93800
LS
1,14436
09.62.019
DE FIO APARENTE ATE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,56280
LS
0,68662
09.62.020
DE CABO APARENTE ACIMA DE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,12560
LS
1,37323

SubMO

SubMO

SubMO

SubMO

1,04118

2,08236

1,24942

2,49883

UN
H
0,20000
H
0,20000
Material
0,00000

Material

M
H
0,05000
H
0,05000
0,00000

Material

M
H
0,10000
H
0,10000
0,00000

Material

M
H
0,06000
H
0,06000
0,00000

Material

M
H
0,12000
H
0,12000
0,00000

Custo Unit.

Custo Total

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
0,23947

BDI

5,30
4,08
0,47894

BDI

5,30
4,08
0,28737

BDI

5,30
4,08
0,57473

BDI

5,30
4,08
0,95789

5,30
4,08
9,57886

5,12
1,06000
0,81600

1,28
0,26500
0,20400

2,56
0,53000
0,40800

1,53
0,31800
0,24480

3,07
0,63600
0,48960

09.62.021
DE TERMINAIS/CONECTORES DE PRESSAO P/CABOS OU DE ROLDANAS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472

UN
H
0,20000
H
0,20000
Material
0,00000

09.62.024
E DESMONTAGEM Q.DISTRIB, CAIXA PASSAGEM OU Q. CHAMADA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720

M2
H
2,00000
H
2,00000
Material
0,00000

BDI

09.62.099
RETIRADAS DE BAIXA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

31,23540

UN
H
1,50000
H
1,50000
Material
0,00000

09.64.004
DE MOTOR DE BOMBA DE RECALQUE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 14,07000
LS
17,16540

SubMO

SubMO

09.64.005
DE APARELHO DE ILUMINACAO, PLAFONS E PENDENTES P/LAMPADAS INCANDESC
UN
1.01.15
ELETRICISTA
H
0,10000
1.01.16
AJUDANTE ELETRICISTA
H
0,10000
Mo-de-Obra 0,93800
LS
1,14436
SubMO
2,08236
Material
0,00000
09.64.006
DE APARELHOS DE ILUMINACAO, PLAFONS E PENDENTES P/LAMPADAS FLUORESC
UN
1.01.16
AJUDANTE ELETRICISTA
H
0,15000
SubMO
1,35864
Mo-de-Obra 0,61200
LS
0,74664
Material
0,00000
09.64.014
DE AP.ILUM.EM POSTE,ARANDELA EXT BRACO ACO OU PROJET EM FECHADA
UN
1.01.15
ELETRICISTA
H
1,50000
1.01.16
AJUDANTE ELETRICISTA
H
1,50000
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540
Material
0,00000
09.64.016
DE PROJETORES EM JARDINS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360

SubMO

09.64.018
DE APARELHO A PROVA DE TEMPO, GASES E VAPOR
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
09.64.020
DE POSTE CURVO, INCLUINDO BASES DE FIXACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
SubMO
Mo-de-Obra 46,90000
LS
57,21800

Exerccio:

2011

20,82360

UN
H
1,00000
H
1,00000
Material
0,00000

10,41180

UN
H
0,50000
H
0,50000
Material
0,00000

104,11800

UN
H
5,00000
H
5,00000
Material
0,00000

BDI

5,30
4,08
7,18414

BDI

5,30
4,08
0,47894

BDI

4,08
0,31249

BDI

5,30
4,08
7,18414

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
23,94714

5,12
1,06000
0,81600

51,22
10,60000
8,16000

38,41
7,95000
6,12000

2,56
0,53000
0,40800

1,67
0,61200

38,41
7,95000
6,12000

25,61
5,30000
4,08000

12,80
2,65000
2,04000

128,06
26,50000
20,40000

Pgina: 215

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.64.021
DE POSTE DE FERRO RETO ENGASTADO NO SOLO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 75,04000
LS
91,54880
SubMO

166,58880

UN
H
8,00000
H
8,00000
Material
0,00000

Custo Unit.

Custo Total
204,90
42,40000
32,64000

BDI

5,30
4,08
38,31542

239,98200

UN
H
5,00000
H
20,00000
Material
0,00000

BDI

5,30
4,08
55,19586

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

10,41180

UN
H
0,50000
H
0,50000
Material
0,00000

09.66.003
DE BASE E HASTE,OU DE BRACADEIRA C/3 ESTAIS EM PARA-RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
Material
0,00000

09.64.022
DE POSTE DE CONCRETO DE ATE 10 M ACIMA DO SOLO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 108,10000
LS
131,88200
SubMO
09.64.099
RETIRADAS DE APARELHOS E EQUIPAMENTOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
09.66.001
DE CAPTOR DE PARA-RAIOS TIPO FRANKLIN
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180

SubMO

SubMO

09.66.004
DE CABOS DE ACO E ESTICADORES DE PARA-RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
09.66.005
DE CABO DE COBRE NU
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS

2,28872

09.66.006
DE CABO DE COBRE NU PARA ATERRAMENTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090

SubMO

SubMO

10,41180

4,16472

5,20590

Material

M
H
0,50000
H
0,50000
0,00000

Material

M
H
0,20000
H
0,20000
0,00000

Material

M
H
0,25000
H
0,25000
0,00000

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
0,95789

5,30
4,08
1,91577

295,17
26,50000
81,60000

12,80
2,65000
2,04000

25,61
5,30000
4,08000

12,80
2,65000
2,04000

5,12
1,06000
0,81600

6,40
1,32500
1,02000

09.66.007
DE CONECTOR TIPO SPLIT-BOLDT PARA CABOS DE ATERRAMENTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472

UN
H
0,20000
H
0,20000
Material
0,00000

09.66.009
DE BRACADEIRAS PARA PASSAGEM DE CABO DE COBRE NU
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944

UN
H
0,40000
H
0,40000
Material
0,00000

BDI

09.66.099
RETIRADAS DE PARA-RAIOS E ATERRAMENTOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

SubMO

0,00000

09.70.003
DE ISOLADOR TIPO DISCO COMPL, INCLUS GANCHO DE SUSPENSAO TIPO OLHAL
UN
1.01.15
ELETRICISTA
H
0,20000
1.01.16
AJUDANTE ELETRICISTA
H
0,20000
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472
Material
0,00000
09.70.004
DE BUCHA PASS.INT/EXT OU DE CH.ACO P/BUCHA PASSAGEM EM A.T
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
09.70.007
DE CANTONEIRA METALICA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS

5,72180

SubMO

10,41180

09.70.008
DE ISOLADOR CASTANHA OU DE TERMINAL/CONEC. P/BARRAM.COBRE A.T
1.01.16
AJUDANTE ELETRICISTA
SubMO
1,81152
Mo-de-Obra 0,81600
LS
0,99552
09.70.009
Exerccio:

DE ISOLADOR TIPO PINO PARA A.T. INCLUSIVE PINO

2011

UN
H
0,50000
H
0,50000
Material
0,00000

Material

M
H
0,50000
H
0,50000
0,00000

UN
H
0,20000
Material
0,00000
UN

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
2,39471

BDI

4,08
0,41665

5,12
1,06000
0,81600

10,24
2,12000
1,63200

5,12
1,06000
0,81600

12,80
2,65000
2,04000

12,80
2,65000
2,04000

2,22
0,81600

15,36
Pgina: 216

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 5,62800
LS
09.70.011
DE VERGALHAO DE COBRE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 3,75200
LS

UN Coeficiente
H
H

6,86616

4,57744

SubMO

SubMO

12,49416

8,32944

Material

Material

0,60000
0,60000
0,00000

M
H
0,40000
H
0,40000
0,00000

09.70.018
DE CHAVE SECCIONADORA TRIP SECA,COMANDO POR VARA/ESTRIBO FRONTAL
UN
1.01.15
ELETRICISTA
H
3,00000
1.01.16
AJUDANTE ELETRICISTA
H
6,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
0,50000
Mo-de-Obra 44,13000
LS
53,83860
Material
0,00000
SubMO
97,96860
09.70.020
DE CH.FUSIV.INDICADORA OU DE TRANSF.DE POTENCIAL COMPL. A.T
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 15,71000
LS
19,16620
SubMO
34,87620

UN
H
1,00000
H
2,00000
H
0,30000
Material
0,00000

09.70.022
DE DISJUNTOR DE VOLUME NORMAL OU REDUZIDO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
SubMO
Mo-de-Obra 82,54000
LS
100,69880

UN
H
8,00000
H
8,00000
H
1,00000
Material
0,00000

183,23880

Custo Unit.

09.70.023
DE MANOPLA DE COMANDO DO DISJUNTOR DE A.T. (ENGRENAGEM INTERNA)
UN
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
1,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
0,50000
Mo-de-Obra 13,13000
LS
16,01860
SubMO
29,14860
Material
0,00000

Custo Total

BDI

5,30
4,08
2,87366

BDI

5,30
4,08
1,91577

BDI

5,30
4,08
7,50
22,53278

BDI

5,30
4,08
7,50
8,02153

BDI

5,30
4,08
7,50
42,14492

BDI

5,30
4,08
7,50
6,70418

BDI

5,30
4,08
7,50
70,29941

5,30
4,08
7,50
48,89506

3,18000
2,44800

10,24
2,12000
1,63200

120,50
15,90000
24,48000
3,75000

42,89
5,30000
8,16000
2,25000

225,38
42,40000
32,64000
7,50000

35,85
5,30000
4,08000
3,75000

09.70.026
DE TRANSFORMADOR DE POTENCIA EM POSTE OU CAB.PRIMARIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 137,68000
LS
167,96960
SubMO
305,64960

UN
H
8,00000
H
16,00000
H
4,00000
Material
0,00000

09.70.028
DE POSTE DE CONCRETO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 95,76000
LS
116,82720

212,58720

UN
H
6,00000
H
12,00000
H
2,00000
Material
0,00000

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

152,82480

UN
H
4,00000
H
8,00000
H
2,00000
Material
0,00000

212,58720

UN
H
6,00000
H
12,00000
H
2,00000
Material
0,00000

09.70.099
RECOLOCACOES DE ALTA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
09.72.001
DE POSTE GALVANIZADO DE ENTRADA B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 68,84000
LS
83,98480
09.72.002
DE POSTE DE CONCRETO DE ENTRADA EM B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 95,76000
LS
116,82720

SubMO

SubMO

SubMO

SubMO

09.72.003
DE CABECOTE TELESP,ARMACAO BRAQUET OU CONECTORES PRESSAO P/CABOS
UN
1.01.15
ELETRICISTA
H
0,40000
1.01.16
AJUDANTE ELETRICISTA
H
0,40000
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944
Material
0,00000
09.72.009
DE TUBULACAO ELETRICA APARENTE ATE 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,81400
LS
3,43308
09.72.010
1.01.15
1.01.16
Exerccio:

SubMO

DE TUBULACAO ELETRICA APARENTE ACIMA DE 2"


ELETRICISTA
AJUDANTE ELETRICISTA

2011

6,24708

Material

M
H
0,30000
H
0,30000
0,00000
M
H
H

0,60000
0,60000

BDI

5,30
4,08
7,50
35,14970

BDI

5,30
4,08
7,50
48,89506

BDI

5,30
4,08
1,91577

BDI

5,30
4,08
1,43683

5,30
4,08

375,94
42,40000
65,28000
30,00000

261,48
31,80000
48,96000
15,00000

187,97
21,20000
32,64000
15,00000

261,48
31,80000
48,96000
15,00000

10,24
2,12000
1,63200

7,68
1,59000
1,22400

15,36
3,18000
2,44800
Pgina: 217

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 5,62800

LS

6,86616

UN Coeficiente
SubMO

12,49416

09.72.011
DE CONDULETES OU DE CX.FUSIV. OU DE TOMADA INSTAL. EM PERFILADOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
09.72.012
DE PERFILADOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS

5,72180

SubMO

10,41180

09.72.014
DE GANCHOS DE SUSTENTACAO DE LUMINARIAS E PERFILADOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO
5,20590
09.72.017
DE FIO EMBUTIDO ATE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,46900
LS
0,57218
09.72.018
DE CABO EMBUTIDO ACIMA DE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,93800
LS
1,14436
09.72.019
DE FIO APARENTE ATE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 0,28140
LS
0,34331
09.72.020
DE CABO APARENTE ACIMA DE 16 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,81400
LS
3,43308
09.72.023
DE ROLDANAS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,81400
LS

3,43308

SubMO

SubMO

SubMO

SubMO

SubMO

Material

0,00000

UN
H
0,50000
H
0,50000
Material
0,00000

Material

M
H
0,50000
H
0,50000
0,00000

UN
H
0,25000
H
0,25000
Material
0,00000

Material

M
H
0,05000
H
0,05000
0,00000

Material

M
H
0,10000
H
0,10000
0,00000

Material

M
H
0,03000
H
0,03000
0,00000

6,24708

Material

M
H
0,30000
H
0,30000
0,00000

6,24708

UN
H
0,30000
H
0,30000
Material
0,00000

1,04118

2,08236

0,62471

Custo Unit.

Custo Total

BDI

2,87366

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
2,39471

BDI

5,30
4,08
1,19736

BDI

5,30
4,08
0,23947

BDI

5,30
4,08
0,47894

BDI

5,30
4,08
0,14368

BDI

5,30
4,08
1,43683

BDI

5,30
4,08
1,43683

BDI

5,30
4,08
4,64
28,63445

5,30
4,08
1,19736

12,80
2,65000
2,04000

12,80
2,65000
2,04000

6,40
1,32500
1,02000

1,28
0,26500
0,20400

2,56
0,53000
0,40800

0,76
0,15900
0,12240

7,68
1,59000
1,22400

7,68
1,59000
1,22400

09.72.024
E MONTAGEM DE Q.DISTRIB,CX DE PASSAG MET OU Q.CHAMADA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.39
PEDREIRO
Mo-de-Obra 56,08000
LS
68,41760
SubMO
124,49760

M2
H
4,00000
H
4,00000
H
4,00000
Material
0,00000

09.72.031
DE BASE DE DISJUNTOR TIPO QUICK-LAG EM CHAPA DE FERRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 2,34500
LS
2,86090
SubMO
5,20590

UN
H
0,25000
H
0,25000
Material
0,00000

BDI

09.72.099
RECOLOCACOES DE BAIXA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

62,47080

UN
H
3,00000
H
3,00000
Material
0,00000

09.74.004
DE MOTOR DE BOMBA DE RECALQUE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 28,14000
LS
34,33080

SubMO

SubMO

09.74.005
DE AP.ILUM.(PLAFON OU PEND.)P/LAMP.INCAND OU DE PROJET EM JARDINS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888
DE APARELHO DE ILUMINACAO,PLAFONS OU PENDENTES P/ LAMP
FLUORESCENTES
1.01.15
ELETRICISTA
SubMO
2,35320
Mo-de-Obra 1,06000
LS
1,29320

UN
H
0,80000
H
0,80000
Material
0,00000

09.74.006

09.74.014

Exerccio:

DE APARELHOS DE ILUMINACAO EM POSTE

2011

BDI

5,30
4,08
14,36828

BDI

5,30
4,08
3,83154

UN
H
Material

UN

6,40
1,32500
1,02000

76,83
15,90000
12,24000

20,49
4,24000
3,26400

2,89
0,20000

0,00000

153,13
21,20000
16,32000
18,56000

BDI

5,30
0,54124

1,06000

102,45

Pgina: 218

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 37,52000
LS

Descrio

UN Coeficiente
H
H

45,77440

SubMO

83,29440

Material

Custo Unit.

4,00000
4,00000
0,00000

Custo Total

BDI

5,30
4,08
19,15771

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
9,57886

BDI

5,30
4,08
7,50
35,14970

BDI

5,30
4,08
7,50
48,89506

5,30
4,08
59,36236

21,20000
16,32000

09.74.015
DE PROJ.EM FACHADAS OU AP.ILUMIN.A PROVA DE TEMPO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
Material
0,00000

09.74.017
DE ARANDELA EXTERNA EM BRACO DE FERRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 18,76000
LS
22,88720

41,64720

UN
H
2,00000
H
2,00000
Material
0,00000

152,82480

UN
H
4,00000
H
8,00000
H
2,00000
Material
0,00000

212,58720

UN
H
6,00000
H
12,00000
H
2,00000
Material
0,00000

258,09720

UN
H
5,00000
H
22,00000
Material
0,00000

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

SubMO

09.74.020
DE POSTE CURVO, INCLUINDO BASE DE FIXACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 68,84000
LS
83,98480
SubMO
09.74.021
DE POSTE DE FERRO RETO ENGASTADO NO SOLO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
Mo-de-Obra 95,76000
LS
116,82720
SubMO
09.74.022
DE POSTE DE CONCRETO DE ATE 10 M ACIMA DO SOLO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 116,26000
LS
141,83720
SubMO
09.74.099
RECOLOCACOES DE APARELHOS E EQUIPAMENTOS
6.96.02
MODULO DE VERBA
SubMO
Mo-de-Obra 0,00000
LS
0,00000

09.76.001
DE CAPTOR DE PARA-RAIOS TIPO FRANKLIN OU RADIOATIVO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
Material
0,00000

09.76.003
DE BASE E HASTE DE PARA-RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 37,52000
LS
45,77440

UN
H
4,00000
H
4,00000
Material
0,00000

SubMO

83,29440

09.76.004
DE CABO ACO E ESTICADORES,OU DE CABO COBRE NU P/ATERR. P.RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472
09.76.005
DE CABO DE COBRE NU
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 4,69000
LS

5,72180

SubMO

10,41180

09.76.007
DE CONECTOR TIPO SPLIT-BOOLT PARA CABOS DE ATERRAMENTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472

Material

M
H
0,20000
H
0,20000
0,00000

Material

M
H
0,50000
H
0,50000
0,00000

UN
H
0,20000
H
0,20000
Material
0,00000

BDI

5,30
4,08
4,78943

BDI

5,30
4,08
19,15771

BDI

5,30
4,08
0,95789

BDI

5,30
4,08
2,39471

25,61
5,30000
4,08000

51,22
10,60000
8,16000

187,97
21,20000
32,64000
15,00000

261,48
31,80000
48,96000
15,00000

317,45
26,50000
89,76000

25,61
5,30000
4,08000

102,45
21,20000
16,32000

5,12
1,06000
0,81600

12,80
2,65000
2,04000

5,12
1,06000
0,81600

BDI

5,30
4,08
0,95789

09.76.009
DE BRACADEIRAS PARA 3 ESTAIS OU PARA PASSAGEM DE CABO DE COBRE NU
UN
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
1,00000
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360
Material
0,00000

BDI

5,30
4,08
4,78943

09.76.099
RECOLOCACOES DE PARA-RAIOS E ATERRAMENTO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

301,12
244,82
244,82000
BDI
56,30860

0,00000

09.80.001
OLEO P/DISJUNTOR EM TRANSFOMADOR DE ALTA TENSAO EM CABINE
1.01.16
AJUDANTE ELETRICISTA
4.46.80
OLEO MINERAL P/DISJUNTOR E TRANSF
SubMO
0,36230
Mo-de-Obra 0,16320
LS
0,19910
Exerccio:

2011

MV
MV
1,00000
Material
244,82000
L
H
L
Material

0,04000
1,00000
9,07000

BDI

4,08
9,07
2,16943

25,61
5,30000
4,08000

11,60
0,16320
9,07000

Pgina: 219

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.80.002
OLEO PARA TRANSFORMADOR DE ALTA TENSAO EM POSTE SINGELO OU ESTALEIRO
1.01.16
AJUDANTE ELETRICISTA
4.46.80
OLEO MINERAL P/DISJUNTOR E TRANSF
Mo-de-Obra 0,24480
LS
0,29866
Material
SubMO
0,54346

L
H
L

Custo Unit.

11,82
0,24480
9,07000

BDI

4,08
9,07
2,21109

UN
H
0,20000
H
0,20000
UN
1,00000
Material
53,74000

BDI

5,30
4,08
53,74
13,31809

09.80.004
CHAPA DE FERRO DE 1,50 X 0,50 M PARA BUCHA DE PASSAGEM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.03
CHAPA FERRO 1.5X0.5X1/4' P/BUCHA PASS
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
330,63000

419,48
5,30
2,65000
4,08
2,04000
330,63
330,63000
BDI
78,43961

09.80.005
BUCHA PARA PASSAGEM INTERNA/EXTERNA COM ISOLACAO PARA 15 KV
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.85.47
BUCHA PASSAG PARA NEUTRO
SubMO
10,41180
Mo-de-Obra 4,69000
LS
5,72180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
154,62000

202,98
5,30
2,65000
4,08
2,04000
154,62
154,62000
BDI
37,95731

09.80.006
BUCHA DE PASSAGEM PARA NEUTRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.85.47
BUCHA PASSAG PARA NEUTRO
Mo-de-Obra 3,75200
LS
4,57744

UN
H
0,40000
H
0,40000
UN
1,00000
Material
154,62000

200,42
5,30
2,12000
4,08
1,63200
154,62
154,62000
BDI
37,47837

09.80.003
ISOLADOR TIPO DISCO 15 KV 6" (150 MM)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.35.04
ISOLADOR TIPO DISCO P/15 KV
Mo-de-Obra 1,87600
LS
2,28872

09.80.007
CANTONEIRA DE FERRO 1 1/2" X 1 1/2" X 1/8"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.66.14
CANTONEIRA DE FERRO 1 1/2" X 1 1/2" X 1/8"
Mo-de-Obra 4,69000
LS
5,72180

SubMO

SubMO

SubMO

4,16472

8,32944

10,41180

Material

0,06000
1,00000

Custo Total

9,07000

M
H
0,50000
H
0,50000
M
1,00000
4,97000

09.80.008
JANELA DE VENTILACAO PADRAO LIGHT DE 0,40 X 0,40 X 0,15 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
4.51.65
JANELA VENTILACAO LIGHT 40X40X15CM
Mo-de-Obra 12,28000
LS
14,98160
SubMO
27,26160

UN
H
1,00000
H
2,00000
UN
1,00000
Material
12,63000

09.80.009
ISOLADOR TIPO CASTANHA INCLUINDO GRAMPO DE SUSTENTACAO
1.01.16
AJUDANTE ELETRICISTA
4.05.15
ISOLADOR 'CASTANHA' C/GRAMPO SUSTENT
Mo-de-Obra 0,81600
LS
0,99552
SubMO
1,81152

UN
H
0,20000
UN
1,00000
Material
5,50000

09.80.010
ISOLADOR TIPO PINO PARA 15 KV, INCLUSIVE PINO, INSTALADO EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.05.07
ISOLADOR DE PINO 15KV-PORCELANA
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
Material
10,17000

09.80.011
ISOLADOR TIPO PINO PARA 15 KV, INCLUSIVE PINO, INSTALADO EM POSTE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.05.07
ISOLADOR DE PINO 15KV-PORCELANA
Mo-de-Obra 7,03500
LS
8,58270
SubMO
15,61770

UN
H
0,75000
H
0,75000
UN
1,00000
Material
10,17000

09.80.012
VERGALHAO DE COBRE DE 3/8" (10MM)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.30
VERGALHAO DE COBRE DE 3/8"
Mo-de-Obra 3,75200
LS
4,57744
09.80.013
VERGALHAO DE COBRE DE 1/2" (12,5MM)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.41
VERGALHAO COBRE 1/2'
Mo-de-Obra 3,75200
LS
4,57744
09.80.014
1.01.16
4.95.27
Exerccio:

SubMO

SubMO

8,32944

8,32944

TERMINAL OU CONECTOR PARA VERGALHAO DE COBRE DE 3/8" (10 MM2)


AJUDANTE ELETRICISTA
TERMINAL P/VERGALHAO COBRE 3/8'

2011

Material

M
H
0,40000
H
0,40000
M
1,00000
19,71000

Material

M
H
0,40000
H
0,40000
M
1,00000
33,14000
UN
H
UN

0,20000
1,00000

BDI

5,30
4,08
4,97
3,53781

BDI

4,64
3,82
12,63
9,17507

BDI

4,08
5,50
1,68165

BDI

5,30
4,08
10,17
5,21276

BDI

5,30
4,08
10,17
5,93117

BDI

5,30
4,08
19,71
6,44907

BDI

5,30
4,08
33,14
9,53797

4,08
8,88

71,22
1,06000
0,81600
53,74000

18,91
2,65000
2,04000
4,97000

49,06
4,64000
7,64000
12,63000

8,99
0,81600
5,50000

27,87
3,18000
2,44800
10,17000

31,71
3,97500
3,06000
10,17000

34,48
2,12000
1,63200
19,71000

51,00
2,12000
1,63200
33,14000

13,15
0,81600
8,88000
Pgina: 220

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,81600

LS

0,99552

UN Coeficiente
SubMO

1,81152

Material

8,88000

Custo Unit.

Custo Total

BDI

2,45905

4,08
11,82
3,13525

09.80.015
TERMINAL OU CONECTOR PARA VERGALHAO DE COBRE DE 1/2" (12,5 MM2)
1.01.16
AJUDANTE ELETRICISTA
4.94.55
TERMINAL P/VERGALHAO COBRE 1/2'
Mo-de-Obra 0,81600
LS
0,99552
SubMO
1,81152

UN
H
0,20000
UN
1,00000
Material
11,82000

BDI

09.80.016
MUFLA TRIPOLAR EXTERNA PARA CABO ATE 2 AWG/15KV
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.05.33
MUFLA TRIPOLAR EXT P/CABO 35MM2/15KV
Mo-de-Obra 74,80000
LS
91,25600
SubMO

UN
H
5,00000
H
10,00000
H
1,00000
UN
1,00000
Material
561,20000

894,52
5,30
26,50000
4,08
40,80000
7,50
7,50000
561,20
561,20000
BDI
167,26888

09.80.017
MUFLA TERMINAL UNIPOLAR EXTERNA P/ CABO ISOLAO XLPE 15KV ATE 35MM2
UN
1.01.15
ELETRICISTA
H
3,00000
1.01.16
AJUDANTE ELETRICISTA
H
6,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
0,50000
4.05.30
MUFLA TERM UNIP EXT CABO ISOL XLPE 15KV ATE 35MM2
UN
1,00000
Mo-de-Obra 44,13000
LS
53,83860
Material
129,76000
SubMO
97,96860

280,10
5,30
15,90000
4,08
24,48000
7,50
3,75000
129,76
129,76000
BDI
52,37758

09.80.018
MUFLA TRIPOLAR INTERNA PARA CABO SECO (THV SINTENAX) ATE 2 AWG/15 KV
UN
1.01.15
ELETRICISTA
H
4,00000
1.01.16
AJUDANTE ELETRICISTA
H
8,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
1,00000
4.05.32
MUFLA TRIPOLAR INT P/CABO 35MM2/15KV
UN
1,00000
Mo-de-Obra 61,34000
LS
74,83480
SubMO
136,17480
Material
421,76000

686,25
5,30
21,20000
4,08
32,64000
7,50
7,50000
421,76
421,76000
BDI
128,32500

166,05600

09.80.019
MUFLA TERMINAL UNIPOLAR INTERNA P/ CABO ISOLAO XLPE 15KV ATE 35MM2
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
4,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
0,50000
4.05.31
MUFLA TERM UNIP INT CABO ISOL XLPE 15KV ATE 35MM2
UN
1,00000
Mo-de-Obra 30,67000
LS
37,41740
SubMO
68,08740
Material
99,43000
09.80.021
CABO SECO TRIPOLAR (THV SINTENAX) 3X25 MM2 / 15KV
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.11
CABO THV SINTENAX 3X25MM2/15KV
Mo-de-Obra 7,01600
LS
8,55952
SubMO
09.80.022
CABO SECO TRIPOLAR (THV SINTENAX) 3 X 35 MM2 / 15KV
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.12
CABO THV SINTENAX 3X35MM2/KV
Mo-de-Obra 8,77000
LS
10,69940
SubMO
09.80.023
CABO SECO UNIPOLAR (THV SINTENAX) 16 MM2/15 KV
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.01
CABO THV SINTENAX 1X16MM2/15KV
Mo-de-Obra 3,50800
LS
4,27976
SubMO

15,57552

19,46940

7,78776

09.80.024
CABO DE POTENCIA UNIPOLAR ISOLAO XLPE CLASSE 15KV 25MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.13
CABO DE POT UNIP ISOL XLPE CLASSE 15KV 25MM2
Mo-de-Obra 5,26200
LS
6,41964
SubMO
11,68164
09.80.025
CABO DE POTENCIA UNIPOLAR ISOLAO XLPE CLASSE 15KV 35MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.14
CABO DE POT UNIP ISOL XLPE CLASSE 15KV 35MM2
Mo-de-Obra 7,01600
LS
8,55952
SubMO
15,57552

Material

M
H
0,40000
H
1,20000
M
1,00000
32,89000

Material

M
H
0,50000
H
1,50000
M
1,00000
37,85000

Material

M
H
0,20000
H
0,60000
M
1,00000
27,83000

Material

M
H
0,30000
H
0,90000
M
1,00000
24,67000

Material

M
H
0,40000
H
1,20000
M
1,00000
32,83000

09.80.026
CHAVE SECCIONADORA TRIPOLAR SECA PARA 200A/15 KV C/ CMD PROLONGADO
UN
1.01.15
ELETRICISTA
H
3,00000
1.01.16
AJUDANTE ELETRICISTA
H
6,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
0,50000
4.36.91
CHAVE SECC TRIP SECA 200A/15KV S/FS
UN
1,00000
SubMO
97,96860
Mo-de-Obra 44,13000
LS
53,83860
Material
819,06000
09.80.029
1.01.15
Exerccio:

CHAVE FUSIVEL INDIC 'MATHEUS' P/100 A/15 KV RUPTURA 1200A POSTE/ESTAL


ELETRICISTA

2011

UN
H

1,00000

BDI

5,30
4,08
7,50
99,43
38,52900

BDI

5,30
4,08
32,89
11,14707

BDI

5,30
4,08
37,85
13,18346

BDI

5,30
4,08
27,83
8,19209

BDI

5,30
4,08
24,67
8,36088

BDI

5,30
4,08
32,83
11,13327

16,76
0,81600
11,82000

206,04
10,60000
16,32000
3,75000
99,43000

59,61
2,12000
4,89600
32,89000

70,50
2,65000
6,12000
37,85000

43,80
1,06000
2,44800
27,83000

44,71
1,59000
3,67200
24,67000

59,53
2,12000
4,89600
32,83000

1.127,94
5,30
15,90000
4,08
24,48000
7,50
3,75000
819,06
819,06000
BDI
210,91658

5,30

195,20
5,30000
Pgina: 221

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
Mo-de-Obra 15,71000
LS
19,16620

UN Coeficiente

Custo Unit.

Custo Total

H
2,00000
H
0,30000
UN
1,00000
Material
123,83000

4,08
8,16000
7,50
2,25000
123,83
123,83000
BDI
36,50243

UN
H
0,80000
H
1,60000
H
0,30000
UN
1,00000
Material
123,83000

187,85
5,30
4,24000
4,08
6,52800
7,50
2,25000
123,83
123,83000
BDI
35,12789

09.80.031
CHAVE FUSIVEL INDIC 'MATHEUS' P/ 50/15KV RUPTURA 1200A EM POSTE/ESTAL
UN
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
0,30000
4.35.35
CHAVE FUSIV INDIC 15KV/50A RUP 1200A
UN
1,00000
SubMO
34,87620
Mo-de-Obra 15,71000
LS
19,16620
Material
155,89000

234,64
5,30
5,30000
4,08
8,16000
7,50
2,25000
155,89
155,89000
BDI
43,87623

09.80.032
CHAVE FUSIVEL INDIC 'MATHEUS' P/ 50A/15KV RUPTURA 1200A EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.35.35
CHAVE FUSIV INDIC 15KV/50A RUP 1200A
Mo-de-Obra 13,01800
LS
15,88196
SubMO
28,89996

UN
H
0,80000
H
1,60000
H
0,30000
UN
1,00000
Material
155,89000

227,29
5,30
4,24000
4,08
6,52800
7,50
2,25000
155,89
155,89000
BDI
42,50169

09.80.033
TRANSFORMADOR DE CORRENTE PARA A.T. 15 KV
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.15
TRANSFORMADOR CORRENTE-15KV AT(TAXAX 10=$)
Mo-de-Obra 15,71000
LS
19,16620
SubMO

UN
H
1,00000
H
2,00000
H
0,30000
UN
1,00000
Material
595,92000

775,87
5,30
5,30000
4,08
8,16000
7,50
2,25000
595,92
595,92000
BDI
145,08313

09.80.034
TRANSFORMADOR DE POTENCIAL 400 W/220V COM FUSIVEL DE A.T. 15 KV
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.09
TRANSFORMADOR DE POTENCIAL-15 KV
SubMO
34,87620
Mo-de-Obra 15,71000
LS
19,16620

UN
H
1,00000
H
2,00000
H
0,30000
UN
1,00000
Material
1.148,58000

1.455,65
5,30
5,30000
4,08
8,16000
7,50
2,25000
1.148,58
1.148,58000
BDI
272,19493

09.80.036
DIS VL REDUZ OLEO 15KV/250 PL15B MVA 630 ACION. MANUAL - COMPLETO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.46.56
DISJ. VOL. RED. OLEO 15KV/250 PL15B MVA 630 COMPL
Mo-de-Obra 63,78000
LS
77,81160
SubMO
141,59160

UN
H
6,00000
H
6,00000
H
1,00000
UN
1,00000
Material
11.102,91000

13.830,73
5,30
31,80000
4,08
24,48000
7,50
7,50000
11.102,91
11.102,91000
BDI
2.586,23537

09.80.038
BOBINA MINIMA DO DISJUNTOR
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.46.70
BOBINA MINIMA DO DISJUNTOR OLEO
Mo-de-Obra 7,50000
LS
9,15000

UN
H
1,00000
UN
1,00000
Material
678,18000

854,64
7,50
7,50000
678,18
678,18000
BDI
159,81090

09.80.039
RELE FALTA-DE-FASE TRIFASICO TIPO ST 220/110 V PEXTRON OU SIMILAR
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.40
RELE FALTA-DE-FASE TRIF ST 220/110V
Mo-de-Obra 7,50000
LS
9,15000
SubMO
16,65000

UN
H
1,00000
UN
1,00000
Material
296,07000

384,64
7,50
7,50000
296,07
296,07000
BDI
71,92560

09.80.040
RELE DE SOBRE-CORRENTE DO DISJUNTOR
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.42
RELE DE SOBRECORRENTE DO DISJ.SACE
Mo-de-Obra 7,50000
LS
9,15000

16,65000

UN
H
1,00000
UN
1,00000
Material
455,00000

580,12
7,50
7,50000
455,00
455,00000
BDI
108,47950

29,14860

UN
H
1,00000
H
1,00000
H
0,50000
UN
1,00000
Material
122,04000

185,96
5,30
5,30000
4,08
4,08000
7,50
3,75000
122,04
122,04000
BDI
34,77338

0,45288

UN
H
0,05000
UN
1,00000
Material
156,40000

192,92
4,08
0,20400
156,40
156,40000
BDI
36,07616

SubMO

34,87620

09.80.030
CHAVE FUSIVEL INDIC 'MATHEUS' P/100A/15 KV RUPTURA 1200A EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.37.12
CHAVE 'MATHEUS' 100A/15KV RUPT 1200A
Mo-de-Obra 13,01800
LS
15,88196
SubMO
28,89996

SubMO

SubMO

09.80.041
MANOPLA DE COMANDO DE DISJUNTOR DE A. T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.46.75
MANOPLA DE COMANDO P/DISJUNTOR A.T.
Mo-de-Obra 13,13000
LS
16,01860
SubMO
09.80.042
TAPETE DE BORRACHA DE 100 X 100 X 0,5 CM
1.01.16
AJUDANTE ELETRICISTA
4.97.60
TAPETE BORRACHA 100X100X0.5CM
Mo-de-Obra 0,20400
LS
0,24888

Exerccio:

2011

SubMO

34,87620

16,65000

Pgina: 222

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

09.80.043
LUVA DE BORRACHA PARA A.T. 20 KV
1.01.16
AJUDANTE ELETRICISTA
4.97.67
LUVA BORRACHA P/ A.T. 20KV
Mo-de-Obra 0,20400
LS
0,24888

UN Coeficiente

Custo Unit.

Custo Total

PR
H
0,05000
PR
1,00000
Material
428,50000

527,61
4,08
0,20400
428,50
428,50000
BDI
98,65916

09.80.044
VARA MANOPLA DE FENOLITE DE 2,70 M P/ CHAVE SECCIONADORA - 15 KV
1.01.16
AJUDANTE ELETRICISTA
4.95.97
VARA MANOPLA FENOLITE 2.70M P/CH SEC
Mo-de-Obra 0,20400
LS
0,24888
SubMO
0,45288

UN
H
0,05000
UN
1,00000
Material
123,50000

152,46
4,08
0,20400
123,50
123,50000
BDI
28,50916

09.80.045
PARA-RAIO TIPO CRISTAL-VALVE PARA 15 KV EM POSTE OU CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.80.42
PARA RAIOS CRISTAL VALUE 15 KV
Mo-de-Obra 17,21000
LS
20,99620
SubMO
38,20620

UN
H
1,00000
H
2,00000
H
0,50000
UN
1,00000
Material
70,00000

09.80.047
BRACADEIRA DE ELETRODUTO EM POSTE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.69
BRACADEIRA P/ELETRODUTO EM POSTE
Mo-de-Obra 3,75200
LS
4,57744

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
33,46000

29,88120

UN
H
1,00000
H
2,00000
UN
1,00000
Material
5,84000

09.80.049
SUPORTE DE TRANSFORMADOR EM POSTE OU ESTALEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.66
SUPORTE P/TRANSF EM POSTE/ESTALEIRO
Mo-de-Obra 26,92000
LS
32,84240
SubMO
59,76240

UN
H
2,00000
H
4,00000
UN
1,00000
Material
61,70000

09.80.050
CRUZETA DE MADEIRA DE 2400 MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.09
CRUZETA MADEIRA DE 2400MM
Mo-de-Obra 26,92000
LS
32,84240

59,76240

UN
H
2,00000
H
4,00000
UN
1,00000
Material
73,99000

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
7,37000

09.80.052
CAIXA PARA TRANSFORMADOR DE CORRENTE PADRAO CESP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.51.23
CAIXA P/TRANSF COR 60X70X25CM CESP
Mo-de-Obra 30,67000
LS
37,41740
SubMO
68,08740
09.80.053
CAIXA DE MEDICAO PADRAO CESP - 0,70 X 0,60 X 0,25 M
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.51.21
CAIXA P/ MEDICAO 50X60X25CM 'ELETROPAULO'
Mo-de-Obra 30,67000
LS
37,41740
SubMO

09.80.048
SELA PARA CRUZETA DE MADEIRA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.14
SELA PARA CRUZETA MADEIRA
Mo-de-Obra 13,46000
LS
16,42120

09.80.051
MAO FRANCESA DE 700 MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.12
MAO FRANCESA 710 MM
Mo-de-Obra 9,38000
LS

11,44360

SubMO

SubMO

SubMO

SubMO

SubMO

09.80.054
CAIXA DE MEDICAO PADRAO LIGHT 1,00 X 1,00 X 0,25 M
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.51.10
CAIXA MEDICAO 1.0X1.0X0.30M ELETROP.
Mo-de-Obra 37,40000
LS
45,62800
SubMO
09.80.055
1.01.15
1.01.16
1.01.17
4.10.01

Exerccio:

0,45288

BDI

BDI

5,30
4,08
33,46
9,61157

BDI

5,30
4,08
5,84
8,21588

BDI

5,30
4,08
61,70
27,93635

BDI

5,30
4,08
73,99
30,76305

BDI

5,30
4,08
7,37
6,48453

UN
H
2,00000
H
4,00000
H
0,50000
UN
1,00000
Material
55,71000

BDI

5,30
4,08
7,50
55,71
28,47340

68,08740

UN
H
2,00000
H
4,00000
H
0,50000
UN
1,00000
Material
195,46000

324,16
5,30
10,60000
4,08
16,32000
7,50
3,75000
195,46
195,46000
BDI
60,61590

83,02800

UN
H
2,50000
H
5,00000
H
0,50000
UN
1,00000
Material
911,63000

1.223,42
5,30
13,25000
4,08
20,40000
7,50
3,75000
911,63
911,63000
BDI
228,77134

TRANSF-POT 45 KVA-A.T.13,2(5%)B.T.220/127V(5%)EM POSTE/ESTALEIRO


ELETRICISTA
AJUDANTE ELETRICISTA
ELETRICISTA PARA ALTA TENSAO
TRANSF 45KVA,AT=132KV+-5%BT=220/127

2011

133,09
5,30000
8,16000
3,75000
70,00000

5,30
4,08
7,50
70,00
24,88743

UN
H
H
H
UN

8,00000
16,00000
4,00000
1,00000

5,30
4,08
7,50
4.040,10

51,40
2,12000
1,63200
33,46000

43,93
5,30000
8,16000
5,84000

149,39
10,60000
16,32000
61,70000

164,51
10,60000
16,32000
73,99000

34,67
5,30000
4,08000
7,37000

152,27
10,60000
16,32000
3,75000
55,71000

5.345,27
42,40000
65,28000
30,00000
4.040,10000

Pgina: 223

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 137,68000

LS

167,96960

UN Coeficiente
SubMO

305,64960

Material

4.040,10000

Custo Unit.
BDI

Custo Total

999,52241

09.80.057
TRANSF-POT 75 KVA-A.T.13,2 KV(5%)B.T.220/127V(5%)EM POSTE/ESTALEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.03
TRANSF 75KVA,AT=132KV+-5%BT=220/127
Mo-de-Obra 137,68000
LS
167,96960
SubMO
305,64960

UN
H
8,00000
H
16,00000
H
4,00000
UN
1,00000
Material
5.621,15000

7.289,96
5,30
42,40000
4,08
65,28000
7,50
30,00000
5.621,15
5.621,15000
BDI
1.363,16391

09.80.058
TRANSF-POT 112,5 KVA-A.T.13,2 KV(5%)220/127V(5%) EM POSTE /ESTALEIRO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.04
TRANSF 112.5KVA AT=13.2KV/5%BT=
Mo-de-Obra 172,10000
LS
209,96200
SubMO
382,06200

UN
H
10,00000
H
20,00000
H
5,00000
UN
1,00000
Material
6.960,01000

9.030,74
5,30
53,00000
4,08
81,60000
7,50
37,50000
6.960,01
6.960,01000
BDI
1.688,67656

09.80.059
TRANSF-POT 112,5 KVA-A.T.13,2 KV(5%)B.T.220/127V(5%) EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.04
TRANSF 112.5KVA AT=13.2KV/5%BT=
Mo-de-Obra 137,68000
LS
167,96960
SubMO
305,64960

UN
H
8,00000
H
16,00000
H
4,00000
UN
1,00000
Material
6.960,01000

8.936,76
5,30
42,40000
4,08
65,28000
7,50
30,00000
6.960,01
6.960,01000
BDI
1.671,10171

09.80.060
TRANSF-POT 150 KVA-A.T.13,2 KV(5%) B.T. 220/127V(5%) EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.05
TRANSF 150 KVA AT=13,2+/-5%BT=220/227
Mo-de-Obra 137,68000
LS
167,96960
SubMO
305,64960

UN
H
8,00000
H
16,00000
H
4,00000
UN
1,00000
Material
8.487,88000

10.816,04
5,30
42,40000
4,08
65,28000
7,50
30,00000
8.487,88
8.487,88000
BDI
2.022,51181

09.80.061
TRANSF-POT 225 KVA-A.T.13,2 KV(5%)B.T. 220/127(5%) EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.06
TRANSF 225KVA AT=13.2KV+-5%BT=220/127
Mo-de-Obra 172,10000
LS
209,96200
SubMO
382,06200

UN
H
10,00000
H
20,00000
H
5,00000
UN
1,00000
Material
11.158,33000

14.194,68
5,30
53,00000
4,08
81,60000
7,50
37,50000
11.158,33
11.158,33000
BDI
2.654,29016

09.80.062
TRANSF-POT 300 KVA-A.T.13,2 KV(5%)B.T. 220/127(5%) EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.07
TRANSF 300KVA AT=13.2KV+-5%BT=220/127
SubMO
382,06200
Mo-de-Obra 172,10000
LS
209,96200

UN
H
10,00000
H
20,00000
H
5,00000
UN
1,00000
Material
13.415,13000

16.970,54
5,30
53,00000
4,08
81,60000
7,50
37,50000
13.415,13
13.415,13000
BDI
3.173,35416

09.80.063
TRANSF-POT 500 KVA-A.T.13,2 KV(5%)B.T. 220/127V(5%) EM CABINE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.10.08
TRANSF 500KVA AT=13.2KV+-5%BT=220/127
Mo-de-Obra 172,10000
LS
209,96200
SubMO
382,06200

UN
H
10,00000
H
20,00000
H
5,00000
UN
1,00000
Material
21.156,78000

26.492,77
5,30
53,00000
4,08
81,60000
7,50
37,50000
21.156,78
21.156,78000
BDI
4.953,93366

09.80.064
MUDANCA DE TAP DO TRANSFORMADOR
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
Mo-de-Obra 53,84000
LS
65,68480

119,52480

UN
H
4,00000
H
8,00000
Material
0,00000

09.80.065
LIMPEZA DE POSTO PRIMARIO E PINTURA DOS BARRAMENTOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
3.80.34
TINTA A OLEO
3.80.60
TINNER
6.95.11
ESTOPA ALCATROADA
Mo-de-Obra 172,96000
LS
211,01120
SubMO
383,97120

UN
H
8,00000
H
32,00000
L
0,75000
L
5,00000
KG
0,50000
Material
42,80000

09.80.067
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 2 KVAR-220V/60HZ
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.01
CAPACITOR 2KVAR-220V/60HZ
Mo-de-Obra 66,64000
SubMO
147,94080
LS
81,30080

UN
H
5,00000
H
8,00000
H
1,00000
UN
1,00000
Material
60,79000

09.80.068
1.01.15
1.01.16
Exerccio:

SubMO

CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 2,5 KVAR-220V/60HZ


ELETRICISTA
AJUDANTE ELETRICISTA

2011

UN
H
H

5,00000
8,00000

147,01
21,20000
32,64000

BDI

5,30
4,08
27,49070

BDI

524,92
5,30
42,40000
4,08
130,56000
9,30
6,97500
6,50
32,50000
6,65
3,32500
98,15738

BDI

5,30
4,08
7,50
60,79
48,00808

5,30
4,08

256,73
26,50000
32,64000
7,50000
60,79000

388,82
26,50000
32,64000
Pgina: 224

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.02
CAPACITOR 2.5KVAR-220V/60HZ
Mo-de-Obra 66,64000
LS
81,30080

UN Coeficiente

SubMO

147,94080

H
1,00000
UN
1,00000
Material
168,18000

09.80.069
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 3KVAR-220V/60HZ
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.03
CAPACITOR 3 KVAR -220V/60HZ
Mo-de-Obra 66,64000
LS
81,30080
SubMO
147,94080

UN
H
5,00000
H
8,00000
H
1,00000
UN
1,00000
Material
69,66000

09.80.070
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 4KVAR-220V/60HZ
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.04
CAPACITOR 4 KVAR -220V/60HZ
Mo-de-Obra 66,64000
LS
81,30080
SubMO
147,94080

Custo Unit.

Custo Total

7,50
7,50000
168,18
168,18000
BDI
72,70778
267,64
26,50000
32,64000
7,50000
69,66000

BDI

5,30
4,08
7,50
69,66
50,04818

UN
H
5,00000
H
8,00000
H
1,00000
UN
1,00000
Material
91,34000

BDI

5,30
4,08
7,50
91,34
55,03458

09.80.071
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 5 KVAR-220/60HZ
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.05
CAPACITOR 5 KVAR -220V/60HZ
Mo-de-Obra 66,64000
LS
81,30080
SubMO
147,94080

UN
H
5,00000
H
8,00000
H
1,00000
UN
1,00000
Material
182,15000

406,01
5,30
26,50000
4,08
32,64000
7,50
7,50000
182,15
182,15000
BDI
75,92088

09.80.072
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 6 KVAR-220V/60HZ
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.06
CAPACITOR 6 KVAR -220V/60HZ
Mo-de-Obra 66,64000
LS
81,30080
SubMO
147,94080

UN
H
5,00000
H
8,00000
H
1,00000
UN
1,00000
Material
111,31000

318,87
5,30
26,50000
4,08
32,64000
7,50
7,50000
111,31
111,31000
BDI
59,62768

09.80.074
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 7,5 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
5,00000
1.01.16
AJUDANTE ELETRICISTA
H
8,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
1,00000
4.17.07
CAPACITOR 7.5KVAR-220V/60HZ
UN
1,00000
Mo-de-Obra 66,64000
LS
81,30080
Material
227,77000
SubMO
147,94080

462,12
5,30
26,50000
4,08
32,64000
7,50
7,50000
227,77
227,77000
BDI
86,41348

09.80.075
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 8KVAR-220/60HZ
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.08
CAPACITOR 8 KVAR -220V/60HZ
Mo-de-Obra 66,64000
LS
81,30080
SubMO
147,94080

UN
H
5,00000
H
8,00000
H
1,00000
UN
1,00000
Material
127,05000

338,23
5,30
26,50000
4,08
32,64000
7,50
7,50000
127,05
127,05000
BDI
63,24788

09.80.076
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 10KVAR - 220 V/60HZ
UN
1.01.15
ELETRICISTA
H
5,00000
1.01.16
AJUDANTE ELETRICISTA
H
8,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
1,00000
4.17.09
CAPACITOR 10 KVAR-220V/60HZ
UN
1,00000
Mo-de-Obra 66,64000
LS
81,30080
SubMO
147,94080
Material
401,30000

675,56
5,30
26,50000
4,08
32,64000
7,50
7,50000
401,30
401,30000
BDI
126,32538

09.80.077
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 12 KVAR - 220V/60HZ
UN
1.01.15
ELETRICISTA
H
7,00000
1.01.16
AJUDANTE ELETRICISTA
H
10,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.10
CAPACITOR 12 KVAR-220V/60HZ
UN
1,00000
Mo-de-Obra 92,90000
LS
113,33800
SubMO
206,23800
Material
176,40000

470,64
5,30
37,10000
4,08
40,80000
7,50
15,00000
176,40
176,40000
BDI
88,00674

09.80.078
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 12,5 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
7,00000
1.01.16
AJUDANTE ELETRICISTA
H
10,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.11
CAPACITOR 12.5KVAR-220V/60HZ
UN
1,00000
Mo-de-Obra 92,90000
LS
113,33800
SubMO
206,23800
Material
501,99000

5,30
4,08
7,50
501,99
BDI
162,89244

09.80.079
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 15 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
7,00000
1.01.16
AJUDANTE ELETRICISTA
H
10,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.12
CAPACITOR 15 KVAR -220V/60HZ
UN
1,00000
Mo-de-Obra 92,90000
SubMO
206,23800
LS
113,33800
Material
559,39000

5,30
4,08
7,50
559,39
BDI
176,09444

Exerccio:

2011

294,31
26,50000
32,64000
7,50000
91,34000

871,12
37,10000
40,80000
15,00000
501,99000

941,72
37,10000
40,80000
15,00000
559,39000

Pgina: 225

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

09.80.080
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 18 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
7,00000
1.01.16
AJUDANTE ELETRICISTA
H
10,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.13
CAPACITOR 18 KVAR -220V/60HZ
UN
1,00000
Mo-de-Obra 92,90000
LS
113,33800
Material
669,28000
SubMO
206,23800

5,30
4,08
7,50
669,28
BDI
201,36914

09.80.081
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 20 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
7,00000
1.01.16
AJUDANTE ELETRICISTA
H
10,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.14
CAPACITOR 20 KVAR -220V/60HZ
UN
1,00000
Mo-de-Obra 92,90000
LS
113,33800
SubMO
206,23800
Material
728,35000

5,30
4,08
7,50
728,35
BDI
214,95524

09.80.082
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 24 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
8,00000
1.01.16
AJUDANTE ELETRICISTA
H
12,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.15
CAPACITOR 24KVAR-220V/60HZ
UN
1,00000
Mo-de-Obra 106,36000
LS
129,75920
SubMO
236,11920
Material
336,26000

5,30
4,08
7,50
336,26
BDI
131,64722

09.80.083
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 25 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
8,00000
1.01.16
AJUDANTE ELETRICISTA
H
12,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.16
CAPACITOR 25 KVAR -220V/60HZ
UN
1,00000
Mo-de-Obra 106,36000
LS
129,75920
SubMO
236,11920
Material
887,73000

5,30
4,08
7,50
887,73
BDI
258,48532

09.80.084
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 30 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
8,00000
1.01.16
AJUDANTE ELETRICISTA
H
12,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.17
CAPACITOR 30 KVAR -220V/60HZ
UN
1,00000
Mo-de-Obra 106,36000
LS
129,75920
Material
989,15000
SubMO
236,11920

5,30
4,08
7,50
989,15
BDI
281,81192

09.80.085
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 40 KVAR-220V/60HZ
UN
1.01.15
ELETRICISTA
H
10,00000
1.01.16
AJUDANTE ELETRICISTA
H
16,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.17.18
CAPACITOR 40 KVAR -220V/60HZ
UN
1,00000
Mo-de-Obra 133,28000
LS
162,60160
SubMO
295,88160
Material
1.266,41000

1.921,61
5,30
53,00000
4,08
65,28000
7,50
15,00000
1.266,41
1.266,41000
BDI
359,32707

09.80.086
CAPACITOR PARA CORRECAO DO FATOR DE POTENCIA 50KVAR-220V/60HZ
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.17.19
CAPACITOR 50 KVAR -220V/60HZ
Mo-de-Obra 133,28000
LS
162,60160
SubMO
295,88160

2.209,53
5,30
53,00000
4,08
65,28000
7,50
15,00000
1.500,49
1.500,49000
BDI
413,16547

UN
H
10,00000
H
16,00000
H
2,00000
UN
1,00000
Material
1.500,49000

09.80.088
APARELHO ILUM.EMERGENCIA C/3 PROJETORES P/CABINE PRIM.AUTON.1H A 3H
UN
1.01.15
ELETRICISTA
H
10,00000
1.01.16
AJUDANTE ELETRICISTA
H
16,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.60.22
APARELHO EMERGENCIA 3 PROJ AUTONOMIA 1 A 3 H.
UN
1,00000
Mo-de-Obra 133,28000
LS
162,60160
SubMO
295,88160
Material
34,57000
09.80.090
PLACA DE AVISO EM CABINE PRIMARIA
1.01.46
SERVENTE
4.95.32
PLACA AVISO 30X40CM 'PERIGO...A.T.'
Mo-de-Obra 1,91000
LS
2,33020
09.80.099
OUTROS SERVICOS EM ALTA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

09.82.001
POSTE DE ACO GALVANIZADO DE 3 1/2" X 6,00 M
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.01.20
POSTE DE ACO GALV 3 1/2'X 6M
SubMO
Mo-de-Obra 68,84000
LS
83,98480
09.82.002
1.01.15
Exerccio:

POSTE DE CONCRETO PERFIL I DE 6,00 X 300 KG


ELETRICISTA

2011

1.076,88
37,10000
40,80000
15,00000
669,28000

1.149,54
37,10000
40,80000
15,00000
728,35000

704,02
42,40000
48,96000
15,00000
336,26000

1.382,33
42,40000
48,96000
15,00000
887,73000

1.507,08
42,40000
48,96000
15,00000
989,15000

406,45
53,00000
65,28000
15,00000
34,57000

BDI

5,30
4,08
7,50
34,57
76,00387

4,24020

UN
H
0,50000
UN
1,00000
Material
30,83000

BDI

3,82
30,83
8,06615

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

152,82480

UN
H
4,00000
H
8,00000
H
2,00000
UN
1,00000
Material
324,95000

5,30
4,08
7,50
324,95
BDI
109,88820

UN
H

6,00000

5,30

43,13
1,91000
30,83000

587,66
21,20000
32,64000
15,00000
324,95000

630,88
31,80000
Pgina: 226

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.01.10
POSTE CONCR 'I' 6MX300KG
Mo-de-Obra 95,76000
LS
116,82720
09.82.004
CABECOTE TIPO TELESP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.67
CABECOTE TIPO TELESP
Mo-de-Obra 3,75200
LS

4,57744

09.82.005
BRAQUET COM 2 ISOLADORES PARA B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.65
BRAQUETE COM 2 ISOLADORES P/B.T.
Mo-de-Obra 2,81400
LS
3,43308
09.82.006
BRAQUET COM 3 ISOLADORES PARA B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.04
BRAQUETE COM 3 ISOLADORES P/ B.T.
Mo-de-Obra 3,75200
LS
4,57744
09.82.007
BRAQUET COM 4 ISOLADORES PARA B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.66
BRAQUETE COM 4 ISOLADORES P/B.T.
Mo-de-Obra 4,69000
LS
5,72180
09.82.009
CAIXA ESTAMPADA 4" X 2"
1.01.16
AJUDANTE ELETRICISTA
4.51.35
CAIXA 4"X2"
Mo-de-Obra 2,04000
LS
09.82.010
CAIXA ESTAMPADA 4" X 4"
1.01.16
AJUDANTE ELETRICISTA
4.51.37
CAIXA 4"X4"
Mo-de-Obra 2,04000
LS

2,48880

2,48880

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

09.82.011
BRACADEIRA PARA FIXACAO DE ELETRODUTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.85.53
BRACADEIRA ACO GALV ELETROLITICO 25 MM (1")
Mo-de-Obra 1,40700
LS
1,71654
SubMO
09.82.015
ROLDANA DE PORCELANA COM PARAFUSO DE 30 X 30 MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.23
ROLDANA PORCELANA C/PARAF 30X30MM
Mo-de-Obra 2,81400
LS
3,43308
SubMO
09.82.020
FIO DE COBRE 2 X 1,50 MM2 PLASTICHUMBO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.11
FIO DE COBRE 2X1.5MM2 PLASTICHUMBO
Mo-de-Obra 1,87600
LS
2,28872
09.82.021
FIO DE COBRE 2 X 2,50 MM2 PLASTICHUMBO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.12
FIO DE COBRE 2X2.5MM2 PLASTICHUMBO
Mo-de-Obra 1,87600
LS
2,28872

SubMO

SubMO

09.82.025
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 10MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.30
TERMINAL PRESSAO CABO 10MM2
Mo-de-Obra 2,81400
LS
3,43308
SubMO
09.82.026
1.01.15
1.01.16
4.95.82

Exerccio:

TERMINAL OU CONECTOR DE PRESSAO PARA CABO 16MM


ELETRICISTA
AJUDANTE ELETRICISTA
TERMINAL PRES P/CABO 16MM2(6AWG)

2011

212,58720

H
12,00000
H
2,00000
UN
1,00000
Material
300,33000

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
2,96000

6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
3,46000

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
5,13000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
6,95000

4,52880

UN
H
0,50000
UN
1,00000
Material
1,89000

4,52880

UN
H
0,50000
UN
1,00000
Material
3,65000

3,12354

UN
H
0,15000
H
0,15000
UN
1,00000
Material
0,42000

6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
0,81000

4,16472

Material

M
H
0,20000
H
0,20000
M
1,00000
1,49000

4,16472

Material

M
H
0,20000
H
0,20000
M
1,00000
2,32000

6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
1,77000
UN
H
H
UN

0,30000
0,30000
1,00000

Custo Unit.

Custo Total

4,08
48,96000
7,50
15,00000
300,33
300,33000
BDI
117,97096

BDI

5,30
4,08
2,96
2,59657

BDI

5,30
4,08
3,46
2,23263

BDI

5,30
4,08
5,13
3,09567

BDI

5,30
4,08
6,95
3,99321

BDI

4,08
1,89
1,47632

BDI

4,08
3,65
1,88112

BDI

5,30
4,08
0,42
0,81501

BDI

5,30
4,08
0,81
1,62313

BDI

5,30
4,08
1,49
1,30059

BDI

5,30
4,08
2,32
1,49149

BDI

5,30
4,08
1,77
1,84393

5,30
4,08
2,04

13,88
2,12000
1,63200
2,96000

11,93
1,59000
1,22400
3,46000

16,55
2,12000
1,63200
5,13000

21,35
2,65000
2,04000
6,95000

7,89
2,04000
1,89000

10,05
2,04000
3,65000

4,35
0,79500
0,61200
0,42000

8,68
1,59000
1,22400
0,81000

6,95
1,06000
0,81600
1,49000

7,97
1,06000
0,81600
2,32000

9,86
1,59000
1,22400
1,77000

10,19
1,59000
1,22400
2,04000

Pgina: 227

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 2,81400

LS

3,43308

UN Coeficiente
SubMO

09.82.027
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 25MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.31
TERMINAL PRES P/CABO 25MM2
Mo-de-Obra 2,81400
LS
3,43308
SubMO
09.82.028
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 35MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.28
TERMINAL PRES P/CABO 35MM2(2AWG)
Mo-de-Obra 3,75200
LS
4,57744
SubMO
09.82.029
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 50MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.32
TERMINAL PRES P/CABO 50MM2
Mo-de-Obra 3,75200
LS
4,57744
SubMO
09.82.030
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 70MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.34
TERMINAL PRES P/CABO 70MM2
Mo-de-Obra 3,75200
LS
4,57744
SubMO
09.82.031
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 95MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.35
TERMINAL PRES P/CABO 95MM2
Mo-de-Obra 3,75200
LS
4,57744
SubMO

6,24708

Material

2,04000

6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
2,25000

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
2,23000

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
3,27000

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
3,32000

8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
5,03000

09.82.032
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 120MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.41
TERMINAL PRES P/CABO 120MM2
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
7,55000

09.82.033
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 150MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.36
TERMINAL PRES P/CABO 150MM2
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
7,45000

09.82.034
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 185MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.37
TERMINAL PRES P/CABO 185MM2
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
9,31000

09.82.035
TERMINAL OU CONECTOR DE PRESSAO PARA CABO 240MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.95.42
TERMINAL PRES P/CABO 240MM2
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
10,80000

09.82.037
CXA PASSAG OU QUADRO DE DISTR C/PORTA,TRINCO E FECH T YALE PROF 10CM
M2
1.01.15
ELETRICISTA
H
4,00000
1.01.16
AJUDANTE ELETRICISTA
H
4,00000
1.01.39
PEDREIRO
H
4,00000
4.51.15
CAIXA PASSAGEM 45X36X10CM 098237
UN
6,20000
Mo-de-Obra 56,08000
LS
68,41760
SubMO
124,49760
Material
217,80600
09.82.041
BASE DE MADEIRA EM PINHO DE 1" PARA FUNDO DE QUADROS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.60
FUNDO DE QUADRO EM PINHO 1' DE 2.
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720
09.82.042
1.01.15
1.01.16
4.40.31

Exerccio:

BASE DE CHAPA DE FERRO N 14 PARA FIXACAO DE DISJUNTOR NO Q.D.


ELETRICISTA
AJUDANTE ELETRICISTA
BASE CHAPA 14 P/FIX DISJ NO Q.D.

2011

M2
H
2,00000
H
2,00000
UN
1,00000
Material
9,47000
M2
H
H
M2

3,00000
3,00000
1,00000

Custo Unit.

Custo Total

BDI

1,90603

BDI

5,30
4,08
2,25
1,95433

BDI

5,30
4,08
2,23
2,42867

BDI

5,30
4,08
3,27
2,66787

BDI

5,30
4,08
3,32
2,67937

BDI

5,30
4,08
5,03
3,07267

BDI

5,30
4,08
7,55
4,13121

BDI

5,30
4,08
7,45
4,10821

BDI

5,30
4,08
9,31
4,53601

BDI

5,30
4,08
10,80
4,87871

BDI

421,03
5,30
21,20000
4,08
16,32000
4,64
18,56000
35,13
217,80600
78,72983

BDI

5,30
4,08
9,47
11,75696

5,30
4,08
43,26

10,45
1,59000
1,22400
2,25000

12,98
2,12000
1,63200
2,23000

14,26
2,12000
1,63200
3,27000

14,32
2,12000
1,63200
3,32000

16,43
2,12000
1,63200
5,03000

22,09
2,65000
2,04000
7,55000

21,97
2,65000
2,04000
7,45000

24,25
2,65000
2,04000
9,31000

26,09
2,65000
2,04000
10,80000

62,87
10,60000
8,16000
9,47000

130,04
15,90000
12,24000
43,26000

Pgina: 228

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 28,14000

Descrio
LS

34,33080

UN Coeficiente
SubMO

62,47080

Material

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
8,25000

09.82.047
CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 30 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.20
CHAVE 'MARMORE' 3X30 A C/FUS CARTUCHO
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
16,07000

09.82.048
CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 60 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.22
CHAVE 'MARMORE' 3X60 A C/FUS CARTUCHO
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
26,25000

09.82.049
CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 100 A- BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.23
CHAVE 'MARMORE' 3X100A C/FUS CARTUCHO
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

09.82.046
FECHADURA TIPO YALE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
3.15.64
FECHADURA TIPO YALE/CROMADA PARA ARMARIO
Mo-de-Obra 9,38000
LS
11,44360
SubMO

43,26000

Custo Unit.
BDI

Custo Total

24,31808
35,76
5,30000
4,08000
8,25000

BDI

5,30
4,08
8,25
6,68693

BDI

5,30
4,08
16,07
6,09081

BDI

5,30
4,08
26,25
8,43221

UN
H
0,50000
H
0,50000
UN
1,00000
Material
64,26000

BDI

5,30
4,08
64,26
17,17451

09.82.050
CHAVE COM FUSIVEL TIPO CARTUCHO 3 X 200 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.30
CHAVE FACA'MARMORE'3X200A C/FUS CARTUCHO
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
143,20000

201,74
5,30
5,30000
4,08
4,08000
143,20
143,20000
BDI
37,72543

09.82.055
CHAVE FACA SECA 2X30 A BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.40
CHAVE GERAL DE FACA SECA 2X30A
Mo-de-Obra 4,69000
LS
5,72180

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
6,30000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
9,58000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
25,02000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
10,10000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
13,65000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
35,64000

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
58,99000

09.82.056
CHAVE FACA SECA 2 X 60 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.41
CHAVE FACA SECA 2X60A BASE ' MARMORE'
Mo-de-Obra 4,69000
LS
5,72180
09.82.057
CHAVE FACA SECA 2 X 100A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.42
CHAVE FACA SECA 2X100A BASE 'MARMORE'
Mo-de-Obra 4,69000
LS
5,72180
09.82.060
CHAVE FACA SECA 3X30 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.45
CHAVE FACA SECA 3X30A 'MARMORE'
Mo-de-Obra 4,69000
LS
5,72180
09.82.061
CHAVE FACA SECA 3X60 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.46
CHAVE FACA SECA 3X60A 'MARMORE'
Mo-de-Obra 4,69000
LS
5,72180
09.82.062
CHAVE FACA SECA 3X100 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.47
CHAVE FACA SECA 3X100A 'MARMORE'
Mo-de-Obra 4,69000
LS
5,72180
09.82.063
CHAVE FACA SECA 3X200 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.49
CHAVE FACA SECA 3X200A 'MARMORE'
Mo-de-Obra 9,38000
LS
11,44360

Exerccio:

2011

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

BDI

5,30
4,08
6,30
3,84371

BDI

5,30
4,08
9,58
4,59811

BDI

5,30
4,08
25,02
8,14931

BDI

5,30
4,08
10,10
4,71771

BDI

5,30
4,08
13,65
5,53421

BDI

5,30
4,08
35,64
10,59191

BDI

5,30
4,08
58,99
18,35713

32,57
2,65000
2,04000
16,07000

45,09
2,65000
2,04000
26,25000

91,84
2,65000
2,04000
64,26000

20,55
2,65000
2,04000
6,30000

24,58
2,65000
2,04000
9,58000

43,58
2,65000
2,04000
25,02000

25,22
2,65000
2,04000
10,10000

29,59
2,65000
2,04000
13,65000

56,64
2,65000
2,04000
35,64000

98,17
5,30000
4,08000
58,99000

Pgina: 229

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

09.82.064
CHAVE FACA SECA 3X400 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.50
CHAVE FACA SECA 3X400A 'MAMORE'
Mo-de-Obra 9,38000
LS
11,44360
09.82.065
CHAVE FACA SECA 3 X 600 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.51
CHAVE FACA SECA 3X600A BASE 'MARMORE'
Mo-de-Obra 9,38000
LS
11,44360
09.82.069
CHAVE REVERSIVEL 3X30 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.10
CHAVE REVERSIVEL 3X30 A BASE MARMORE
Mo-de-Obra 4,69000
LS
5,72180
09.82.070
CHAVE REVERSIVEL 3 X 60 A - BASE MARMORE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.12
CHAVE REVERSIVEL 3X60 A BASE MARMORE
Mo-de-Obra 4,69000
LS
5,72180

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

09.82.075
BASE DE CHAPA DE FERRO PARA DISJUNTOR QUICK - LAG
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.40.30
BASE CHAPA FERRO P/DISJ QUICK-LAG
Mo-de-Obra 4,69000
LS
5,72180
SubMO
09.82.084
CHAVE BLINDADA COM FUSIVEIS DE 3 X 30 A - B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.70
CHAVE BLINDADA C/FUSIVEL 3X30A B.T.
Mo-de-Obra 18,76000
LS
22,88720
SubMO
09.82.085
CHAVE BLINDADA COM FUSIVEIS DE 3 X 60 A - B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.71
CHAVE BLINDADA C/FUSIVEL 3X60 A B.T.
Mo-de-Obra 18,76000
LS
22,88720
SubMO
09.82.086
CHAVE BLINDADA COM FUSIVEIS DE 3X100 A - B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.55
CHAVE FACA BLIND TRIP C/FUSIV 100A
Mo-de-Obra 28,14000
LS
34,33080
SubMO
09.82.087
CHAVE BLINDADA COM FUSIVEIS DE 3X200 A - B.T.
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.57
CHAVE FACA BLIND TRIP C/FUSIV 200A
Mo-de-Obra 37,52000
LS
45,77440
SubMO
09.82.090
CHAVE SECCIONADORA NH 3X125A COM FUSIVEIS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.85
CHAVE SECCIONADORA NH 3X125A C/ FUSIVEIS
Mo-de-Obra 18,76000
LS
22,88720
SubMO
09.82.091
CHAVE SECCIONADORA NH 3X250A COM FUSIVEIS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.86
CHAVE SECCIONADORA NH 3X250A C/ FUSIVEIS
Mo-de-Obra 18,76000
LS
22,88720
SubMO
09.82.092
CHAVE SECCIONADORA NH 3X400A COM FUSIVEIS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.87
CHAVE SECCIONADORA NH 3X400A C/ FUSIVEIS
SubMO
Mo-de-Obra 18,76000
LS
22,88720
09.82.093

Exerccio:

CHAVE SECCIONADORA NH 3X600A COM FUSIVEIS

2011

Custo Unit.

Custo Total

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
198,64000

269,94
5,30
5,30000
4,08
4,08000
198,64
198,64000
BDI
50,47663

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
373,20000

484,64
5,30
5,30000
4,08
4,08000
373,20
373,20000
BDI
90,62543

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
37,09000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
50,79000

58,42
2,65000
2,04000
37,09000

BDI

5,30
4,08
37,09
10,92541

BDI

5,30
4,08
50,79
14,07641

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
5,53000

BDI

5,30
4,08
5,53
3,66661

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
122,09000

201,39
5,30
10,60000
4,08
8,16000
122,09
122,09000
BDI
37,65956

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
193,53000

289,26
5,30
10,60000
4,08
8,16000
193,53
193,53000
BDI
54,09076

62,47080

UN
H
3,00000
H
3,00000
UN
1,00000
Material
420,16000

593,63
5,30
15,90000
4,08
12,24000
420,16
420,16000
BDI
111,00508

83,29440

UN
H
4,00000
H
4,00000
UN
1,00000
Material
1.148,17000

1.514,70
5,30
21,20000
4,08
16,32000
1.148,17
1.148,17000
BDI
283,23681

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
94,66000

BDI

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
312,52000

435,62
5,30
10,60000
4,08
8,16000
312,52
312,52000
BDI
81,45846

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
471,80000

631,54
5,30
10,60000
4,08
8,16000
471,80
471,80000
BDI
118,09286

UN

5,30
4,08
94,66
31,35066

75,27
2,65000
2,04000
50,79000

19,60
2,65000
2,04000
5,53000

167,65
10,60000
8,16000
94,66000

997,45

Pgina: 230

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.36.89
CHAVE SECCIONADORA NH 3X600A C/ FUSIVEIS
Mo-de-Obra 18,76000
LS
22,88720
09.82.095
PERFFILADO EM CHAPA DE ACO 38X38MM
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.71
PERFILADO EM CHAPA ACO 38X38MM
Mo-de-Obra 4,69000
LS
5,72180

UN Coeficiente

SubMO

SubMO

09.82.096
BASE ABERTA PARA FUSIVEIS TIPO DIAZED DE 20 A A 25 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.40.40
BASE ARDOSIA ABERTA P/FUS 20/25A
Mo-de-Obra 9,38000
LS
11,44360
SubMO
09.82.097
BASE ABERTA PARA FUSIVEIS TIPO DIAZED DE 35 A A 63 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.40.41
BASE ARDOSIA ABERTA P/FUS 35/63A
Mo-de-Obra 9,38000
LS
11,44360
SubMO
09.82.099
OUTROS SERVICOS DE BAIXA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

41,64720

H
2,00000
H
2,00000
UN
1,00000
Material
769,29000

10,41180

Material

M
H
0,50000
H
0,50000
M
1,10000
12,15500

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
5,53000

Custo Unit.

Custo Total

5,30
10,60000
4,08
8,16000
769,29
769,29000
BDI
186,51556
27,75
2,65000
2,04000
12,15500

BDI

5,30
4,08
11,05
5,19036

BDI

5,30
4,08
5,53
6,06133

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
7,69000

BDI

5,30
4,08
7,69
6,55813

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

32,41
5,30000
4,08000
5,53000

35,07
5,30000
4,08000
7,69000

09.83.001
CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X100 A PAINEL BL.B.T
UN
1.01.15
ELETRICISTA
H
3,00000
1.01.16
AJUDANTE ELETRICISTA
H
3,00000
4.36.95
CHAVE SECC ACAO RAPIDA 3X100 A
UN
1,00000
Mo-de-Obra 28,14000
LS
34,33080
SubMO
62,47080
Material
90,53000

BDI

09.83.002
CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X200 A PAINEL BL.B.T
UN
1.01.15
ELETRICISTA
H
3,00000
1.01.16
AJUDANTE ELETRICISTA
H
3,00000
4.36.96
CHAVE SECC ACAO RAPIDA 3X200 A
UN
1,00000
Mo-de-Obra 28,14000
LS
34,33080
Material
491,40000
SubMO
62,47080

681,26
5,30
15,90000
4,08
12,24000
491,40
491,40000
BDI
127,39028

09.83.003
CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X400 A PAINEL BL.B.T
UN
1.01.15
ELETRICISTA
H
4,00000
1.01.16
AJUDANTE ELETRICISTA
H
4,00000
4.37.03
CHAVE SECC. NH C/CARGA 3X400A TAM. 02 S/ FUSIVEL
UN
1,00000
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440
Material
289,66000

458,73
5,30
21,20000
4,08
16,32000
289,66
289,66000
BDI
85,77951

09.83.004
CH.SEC.DE ACAO RAP.SOBRE CARGA COMANDO FRONTAL 3X630 A PAINEL BL.B.T
UN
1.01.15
ELETRICISTA
H
4,00000
1.01.16
AJUDANTE ELETRICISTA
H
4,00000
4.36.98
CHAVE SECC ACAO RAPIDA 3X630 A
UN
1,00000
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440
Material
541,32000

768,27
5,30
21,20000
4,08
16,32000
541,32
541,32000
BDI
143,66131

09.83.008
FUSIVEL DIAZED TIPO RAPIDO OU RETARDADO DE 2 A 35 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.02
FUSIVEL DIAZED RAP/RET 2/35 A $MD
Mo-de-Obra 1,87600
LS
2,28872
SubMO

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
1,39000

09.83.009
FUSIVEL DIAZED TIPO RAPIDO OU RETARDADO DE 50 A 63 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.01
FUSIVEL DIAZED RAP/RET 50/63 A $MD
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
1,54000

09.83.013
FUSIVEL NH DE 150/160A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.53
FUSIVEL NH DE 150/160A
Mo-de-Obra 1,87600
LS

UN
H
0,20000
H
0,20000
UN
1,00000
Material
9,90000

09.83.014
1.01.15
1.01.16
4.41.59

Exerccio:

FUSIVEL NH DE 300 A 400A


ELETRICISTA
AJUDANTE ELETRICISTA
FUSIVEL NH DE 300 A 400A

2011

2,28872

SubMO

4,16472

UN
H
H
UN

0,20000
0,20000
1,00000

5,30
4,08
90,53
35,19018

BDI

5,30
4,08
1,39
1,27759

BDI

5,30
4,08
1,54
1,31209

BDI

5,30
4,08
9,90
3,23489

5,30
4,08
32,82

188,19
15,90000
12,24000
90,53000

6,83
1,06000
0,81600
1,39000

7,01
1,06000
0,81600
1,54000

17,29
1,06000
0,81600
9,90000

45,49
1,06000
0,81600
32,82000

Pgina: 231

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 1,87600

Descrio
LS

09.83.015
FUSIVEL NH DE 425 A 630 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.67
FUSIVEL NH DE 425 A 630A
Mo-de-Obra 1,87600
LS
09.83.016
FUSIVEL NH ATE 125A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.52
FUSIVEL NH ATE 125 A
Mo-de-Obra 1,87600
LS
09.83.017
FUSIVEL NH DE 200 A 250A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.56
FUSIVEL NH DE 200 A 250A
Mo-de-Obra 1,87600
LS
09.83.019
FUSIVEL CARTUCHO DE 30 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.80
FUSIVEL CARTUCHO 30A
Mo-de-Obra 1,87600
LS
09.83.020
FUSIVEL CARTUCHO DE 60A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.82
FUSIVEL CARTUCHO 60A
Mo-de-Obra 1,87600
LS
09.83.025
FUSIVEL FACA DE 100 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.20
FUSIVEL FACA 100 A
Mo-de-Obra 1,87600
LS
09.83.026
FUSIVEL FACA DE 200 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.41.24
FUSIVEL FACA 200 A
Mo-de-Obra 1,87600
LS

2,28872

2,28872

2,28872

2,28872

2,28872

2,28872

2,28872

2,28872

09.83.030
BARRA DE COBRE PARA NEUTRO - 30 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.21
BARRAMENTO COBRE 6X1MM P/30A - 1/4"X1/16"
Mo-de-Obra 1,87600
LS
2,28872
09.83.031
BARRA DE COBRE PARA NEUTRO - 60 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.22
BARRAMENTO COBRE 10X2MM P/60A - 3/8"X1/16"
Mo-de-Obra 1,87600
LS
2,28872
09.83.032
BARRA DE COBRE PARA NEUTRO - 100 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.23
BARRAMENTO COBRE 100 A - 3/8"X1/8"
Mo-de-Obra 1,87600
LS
2,28872

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

09.83.033
BARRA DE COBRE PARA NEUTRO - 200 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.25
BARRAMENTO COBRE 25X4MM P/ 200A - 3/4"X1/8"
Mo-de-Obra 1,87600
LS
2,28872
SubMO
09.83.034
BARRA DE COBRE PARA NEUTRO - 400 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.26
BARRAMENTO COBRE 40X7MM P/ 400A - 1"X3/8"
Mo-de-Obra 1,87600
LS
2,28872

Exerccio:

2011

SubMO

4,16472

Material

32,82000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
45,97000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
6,69000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
26,40000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
0,65000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
1,32000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
5,84000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
14,13000

4,16472

UN
H
0,20000
H
0,20000
M
1,00000
Material
3,22000

4,16472

UN
H
0,20000
H
0,20000
M
1,00000
Material
5,53000

4,16472

UN
H
0,20000
H
0,20000
M
1,00000
Material
8,41000

4,16472

UN
H
0,20000
H
0,20000
M
1,00000
Material
17,07000

4,16472

UN
H
0,20000
H
0,20000
M
1,00000
Material
67,46000

Custo Unit.
BDI

Custo Total

8,50649

BDI

5,30
4,08
45,97
11,53099

BDI

5,30
4,08
6,69
2,49659

BDI

5,30
4,08
26,40
7,02989

BDI

5,30
4,08
0,65
1,10739

BDI

5,30
4,08
1,32
1,26149

BDI

5,30
4,08
5,84
2,30109

BDI

5,30
4,08
14,13
4,20779

BDI

5,30
4,08
3,22
1,69849

BDI

5,30
4,08
5,53
2,22979

BDI

5,30
4,08
8,41
2,89219

BDI

5,30
4,08
17,07
4,88399

BDI

5,30
4,08
67,46
16,47369

61,66
1,06000
0,81600
45,97000

13,35
1,06000
0,81600
6,69000

37,59
1,06000
0,81600
26,40000

5,92
1,06000
0,81600
0,65000

6,74
1,06000
0,81600
1,32000

12,30
1,06000
0,81600
5,84000

22,50
1,06000
0,81600
14,13000

9,08
1,06000
0,81600
3,22000

11,92
1,06000
0,81600
5,53000

15,46
1,06000
0,81600
8,41000

26,11
1,06000
0,81600
17,07000

88,09
1,06000
0,81600
67,46000

Pgina: 232

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

09.83.035
BARRA DE COBRE PARA NEUTRO - 600 A
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.20
BARRA NEUTRO 600A 1 1/2" X 1/4"
Mo-de-Obra 1,87600
LS
2,28872

UN Coeficiente
UN
H
0,20000
H
0,20000
UN
1,00000
Material
23,86000

Custo Unit.

Custo Total
34,47
1,06000
0,81600
23,86000

BDI

5,30
4,08
23,86
6,44569

BDI

5,30
4,08
57,12
37,08474

09.83.041
CONTAC.MAG.ABERTO C/RELE BIM.P/COR.NOM.DE 11 A 16A QD.CMD BOMBA RECAL
UN
1.01.15
ELETRICISTA
H
5,00000
1.01.16
AJUDANTE ELETRICISTA
H
5,00000
4.17.31
CONTACTOR MAGNET 11/16 A 098341
UN
1,00000
Mo-de-Obra 46,90000
LS
57,21800
Material
65,94000
SubMO
104,11800

BDI

5,30
4,08
65,94
39,11334

09.83.042
CONTAC.MAG.ABERTO C/RELE BIM.P/COR.NOM.DE 17 A 32A QD.CMD BOMBA RECAL
UN
1.01.15
ELETRICISTA
H
5,00000
1.01.16
AJUDANTE ELETRICISTA
H
5,00000
4.17.32
CONTACTOR MAGNET 17/32 A 098342
UN
1,00000
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800
Material
125,54000

282,47
5,30
26,50000
4,08
20,40000
125,54
125,54000
BDI
52,82134

SubMO

4,16472

09.83.040
CONTAC.MAG.ABERTO C/RELE BIM.P/COR NOM.10A QD.CMD BOMBA RECALQUE
UN
1.01.15
ELETRICISTA
H
5,00000
1.01.16
AJUDANTE ELETRICISTA
H
5,00000
4.17.30
CONTACTOR MAGNET 10 A 098340
UN
1,00000
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800
Material
57,12000

198,32
26,50000
20,40000
57,12000

209,17
26,50000
20,40000
65,94000

09.83.045
BOTOEIRA DE COMANDO LIGA-DESLIGA PARA COMANDO DE BOMBA RECALQUE
UN
1.01.15
ELETRICISTA
H
4,00000
1.01.16
AJUDANTE ELETRICISTA
H
4,00000
4.55.51
BOTOEIRA COMANDO LIG-DESL P/BOMBA
UN
1,00000
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440
Material
39,10000

BDI

09.83.099
OUTROS SERVICOS DE BAIXA TENSAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

301,12
244,82
244,82000
BDI
56,30860

09.84.001
INTERRUPTOR DE 1 TECLA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.56.56
INTERRUPTOR 1 TECLA SILENT S/ESPELHO
Mo-de-Obra 1,93700
LS
2,36314
09.84.002
INTERRUPTOR DE 2 TECLAS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.56.59
INTERRUPTOR 2 TECLAS BIPOLAR S/ESP
Mo-de-Obra 2,40600
LS
2,93532
09.84.003
INTERRUPTOR DE 3 TECLAS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.56.69
INTERRUPTOR 3 TECLAS SILENT SEM ESPELHO
Mo-de-Obra 2,87500
LS
3,50750
09.84.004
INTERRUPTOR PARALELO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.56.57
INTERRUPTOR PARAL 1 TECLA S/ESPELHO
Mo-de-Obra 1,93700
LS
2,36314

SubMO

SubMO

SubMO

SubMO

SubMO

09.84.008
TOMADA UNIVERSAL DE 10 A - 2 POLOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.56.06
TOMADA UNIVERSAL SIMPLES,2 POLOS -10A-250V S/PLAC.
Mo-de-Obra 1,93700
LS
2,36314
SubMO
09.84.009
TOMADA TRIPOLAR 15A - 125/250V - 2P+TERRA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.55.19
TOMADA 2P+T PADRAO NBR 14136 CORRENTE 10A-250V
SubMO
Mo-de-Obra 2,40600
LS
2,93532
09.84.011
1.01.15
1.01.16
Exerccio:

0,00000

MV
MV
1,00000
Material
244,82000

4,30014

UN
H
0,25000
H
0,15000
UN
1,00000
Material
2,93000

5,34132

UN
H
0,30000
H
0,20000
UN
1,00000
Material
9,72000

6,38250

UN
H
0,35000
H
0,25000
UN
1,00000
Material
8,62000

4,30014

UN
H
0,25000
H
0,15000
UN
1,00000
Material
4,08000

4,30014

UN
H
0,25000
H
0,15000
UN
1,00000
Material
3,24000

5,34132

UN
H
0,30000
H
0,20000
UN
1,00000
Material
4,32000

TOMADA DE PISO UNIVERSAL COM TAMPA LATONADA - 2 POLOS


ELETRICISTA
AJUDANTE ELETRICISTA

2011

UN
H
H

0,25000
0,25000

5,30
4,08
39,10
28,15071

BDI

5,30
4,08
2,93
1,66293

BDI

5,30
4,08
9,72
3,46410

BDI

5,30
4,08
8,62
3,45058

BDI

5,30
4,08
4,08
1,92743

BDI

5,30
4,08
3,24
1,73423

BDI

5,30
4,08
4,32
2,22210

5,30
4,08

150,54
21,20000
16,32000
39,10000

8,89
1,32500
0,61200
2,93000

18,52
1,59000
0,81600
9,72000

18,45
1,85500
1,02000
8,62000

10,30
1,32500
0,61200
4,08000

9,27
1,32500
0,61200
3,24000

11,88
1,59000
0,81600
4,32000

10,10
1,32500
1,02000
Pgina: 233

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.56.10
TOMADA BIPOLAR P/PISO
Mo-de-Obra 2,34500
LS

2,86090

UN Coeficiente
SubMO

5,20590

Material

UN
1,00000
3,01000

Custo Unit.

Custo Total

BDI

3,01
1,88966

BDI

5,30
4,08
3,60
2,26483

BDI

5,30
4,08
3,58
1,81243

BDI

4,08
1,24
0,49353

BDI

4,08
4,50
1,24333

BDI

4,08
0,64
0,35553

3,01000

09.84.012
TOMADA DE PISO COM TAMPA LATONADA - 3 POLOS E TERRA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.56.17
TOMADA TRIPOLAR P/PISO
Mo-de-Obra 2,81400
LS
3,43308
SubMO
6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
3,60000

09.84.017
BOTAO DE CAMPAINHA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.56.61
BOTAO DE CAMPAINHA S/ESPELHO
Mo-de-Obra 1,93700
LS
2,36314

4,30014

UN
H
0,25000
H
0,15000
UN
1,00000
Material
3,58000

0,90576

UN
H
0,10000
UN
1,00000
Material
1,24000

0,90576

UN
H
0,10000
UN
1,00000
Material
4,50000

0,90576

UN
H
0,10000
UN
1,00000
Material
0,64000

0,90576

UN
H
0,10000
UN
1,00000
Material
0,77000

BDI

4,08
0,77
0,38543

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
50,46000

BDI

5,30
4,08
50,46
14,00051

14,57652

UN
H
0,70000
H
0,70000
UN
1,00000
Material
326,15000

419,09
5,30
3,71000
4,08
2,85600
326,15
326,15000
BDI
78,36710

09.84.020
ESPELHO DE 4'X2'
1.01.16
AJUDANTE ELETRICISTA
4.55.25
ESPELHO 4"X2"
Mo-de-Obra 0,40800
LS
09.84.021
ESPELHO 4'X4'
1.01.16
AJUDANTE ELETRICISTA
4.55.26
ESPELHO 4"X4"
Mo-de-Obra 0,40800
LS

0,49776

0,49776

09.84.024
ESPELHO CEGO DE CHAPA DE FERRO 4'X2'
1.01.16
AJUDANTE ELETRICISTA
4.56.40
ESPELHO CEGO CHAPA FERRO 4'X2'
Mo-de-Obra 0,40800
LS
0,49776

SubMO

SubMO

SubMO

SubMO

09.84.025
ESPELHO CEGO EM CHAPA DE FERRO DE 4" X 4"
1.01.16
AJUDANTE ELETRICISTA
4.56.41
ESPELHO CEGO CHAPA FERRO 4'X4'
Mo-de-Obra 0,40800
LS
0,49776
SubMO
09.84.030
CIGARRA TIPO FABRICA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.90
CIGARRA TIPO FABRICA
Mo-de-Obra 4,69000
LS

5,72180

09.84.031
SIRENE 110/220 V
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.80
SIRENE ELETROMECANICA ROTATIVA 110/220V
Mo-de-Obra 6,56600
LS
8,01052

SubMO

SubMO

09.84.035
PLAFON DE ALUMINIO DE SOBREPOR - BOCA 10 PARA GLOBO TIPO BRASIL
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.46
PLAFON ALUM SOBREPOR BOCA 10 'BR'
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
1,27000

09.84.036
PLAFON DE ALUMINIO DE SOBREPOR - BOCA 15 PARA GLOBO TIPO BRASIL
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.47
PLAFON ALUM SOBREPOR BOCA 15 'BR'
Mo-de-Obra 3,75200
LS
4,57744
SubMO
8,32944

UN
H
0,40000
H
0,40000
UN
1,00000
Material
2,89000

09.84.043
GLOBO TIPO BRASIL - BOCA 10
1.01.16
AJUDANTE ELETRICISTA
4.60.40
GLOBO LEITOSO TIPO BRASIL 10X23 CM
Mo-de-Obra 0,81600
LS
0,99552

1,81152

UN
H
0,20000
UN
1,00000
Material
13,77000

1,81152

UN
H
0,20000
UN
1,00000
Material
21,80000

09.84.044
GLOBO TIPO BRASIL - BOCA 15
1.01.16
AJUDANTE ELETRICISTA
4.60.41
GLOBO LEITOSO TIPO BRASIL 15X30 CM
Mo-de-Obra 0,81600
LS
0,99552
09.84.047
1.01.15
1.01.16
4.60.51

Exerccio:

SubMO

SubMO

LUMINARIA DE FERRO ESMALTADO TIPO BEDD - 14"


ELETRICISTA
AJUDANTE ELETRICISTA
IL-13 REFLETOR TIPO INDUSTRIAL(DD)

2011

UN
H
H
UN

0,50000
0,50000
1,00000

BDI

5,30
4,08
1,27
2,20787

BDI

5,30
4,08
2,89
2,58047

BDI

4,08
13,77
3,58375

BDI

4,08
21,80
5,43065

5,30
4,08
68,08

12,11
1,59000
1,22400
3,60000

9,69
1,32500
0,61200
3,58000

2,63
0,40800
1,24000

6,64
0,40800
4,50000

1,90
0,40800
0,64000

2,06
0,40800
0,77000

74,87
2,65000
2,04000
50,46000

11,80
2,12000
1,63200
1,27000

13,79
2,12000
1,63200
2,89000

19,16
0,81600
13,77000

29,04
0,81600
21,80000

96,54
2,65000
2,04000
68,08000

Pgina: 234

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 4,69000

LS

5,72180

UN Coeficiente
SubMO

09.84.048
LUMINARIA DE FERRO ESMALTADO TIPO BEDD - 16"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.70
LUMIN F.ESMAL 16'BEDD C/SOQ E FLANGE
Mo-de-Obra 4,69000
LS
5,72180
SubMO

10,41180

Material

68,08000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
118,51000

09.84.050
RECEPTACULO PORCELANA P/LAMP INCAND P/ PLAFONS SOBREPOR-ROSCA E-27
UN
1.01.15
ELETRICISTA
H
0,30000
1.01.16
AJUDANTE ELETRICISTA
H
0,30000
4.97.05
SOQUETE PORCELANA C/ROSCA E-27
UN
1,00000
Mo-de-Obra 2,81400
LS
3,43308
SubMO
6,24708
Material
1,49000
09.84.051
RECEPTACULO P/LAMPADA HG OU MHL P/LUMINARIA EXT.OU PROJ-ROSCA E-40
UN
1.01.15
ELETRICISTA
H
0,50000
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
4.94.20
SOQUETE P/LAMP HG/MHL 098451
UN
1,00000
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
Material
8,88000
09.84.052
SOQUETE P/LAMPADA FLUORESCENTE TIPO ANTI-VIBR. S/PORTA-STAR
1.01.15
ELETRICISTA
4.94.21
SOQUETE P/LAMP FLUORESCENTE S/PORTA STA
Mo-de-Obra 0,70649
LS
0,86192
SubMO
1,56841

UN
H
0,13330
UN
1,00000
Material
1,04000

09.84.053
RECEPTACULO P/ LAMPADA FLUORESCENTE COM PORTA STARTEL
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.94.22
SOQUETE P/LAMP FLUORESCENTE C/PORTA STA
Mo-de-Obra 1,87600
LS
2,28872
SubMO
4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
4,60000

09.84.054
PORTA LAMP ROSCA E-27 P/PLAFON PEND,EM BAQUELITE,FIX.P/ROSCA 1/8"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.02
PORTA LAMP E27,BAQUELITE,FIX R.1/8"-4A-250V
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
2,47000

09.84.055
PORTA LAMP ROSCA E-27,PORCEL.C/FLANGE FIX.P/PRATO FIX.P/ROSCA 3/8" GAS
UN
1.01.15
ELETRICISTA
H
0,50000
1.01.16
AJUDANTE ELETRICISTA
H
0,50000
4.97.01
PORTA LAMP E27,PORCEL.C/FLANGE,FIX.3/8"GAS,4A-250V
UN
1,00000
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180
Material
7,66000
09.84.060
CORRENTE PARA PENDENTE DE APARELHO PARA ILUMINACAO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.04
CORRENTE P/PENDENTE APAR ILUMINACAO
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

Material

09.84.063
CALHA TIPO PLAFON. PARA 1 LAMP. FLUORESCENTE 40 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.80
CALHA P/ LUMINARIA FLUOR. 1 X 40 W SEM SOQUETES
SubMO
Mo-de-Obra 9,38000
LS
11,44360

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
10,70000

09.84.064
CALHA TIPO PLAFON. PARA 3 LAMPADAS FLUORESCENTES 40 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.81
CALHA P/ LUMINARIA FLUOR. 3 X 40 W SEM SOQUETES
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
15,44000

09.84.065
CALHA TIPO PLAFON PARA 2 LAMPADAS FLUORESCENTES DE 20 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.35
CALHA P/ LUMIN. FLUOR. 2 X 20 W SEM SOQUETES
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
7,54000

09.84.066
CALHA TIPO PLAFON PARA 4 LAMPADAS FLUORESCENTES DE 20 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.36
CALHA P/ LUMIN. FLUOR. 4 X 20 W SEM SOQUETES
SubMO
31,23540
Mo-de-Obra 14,07000
LS
17,16540

UN
H
1,50000
H
1,50000
UN
1,00000
Material
12,89000

09.84.067
Exerccio:

CALHA TIPO PLAFON PARA 2 LAMPADAS FLUORESCENTES DE 40 W

2011

M
H
0,50000
H
0,50000
M
1,00000
0,82000

UN

Custo Unit.
BDI

Custo Total

18,05311

158,57
5,30
2,65000
4,08
2,04000
118,51
118,51000
BDI
29,65201

BDI

5,30
4,08
1,49
1,77953

BDI

5,30
4,08
8,88
4,43711

BDI

5,30
1,04
0,59993

BDI

5,30
4,08
4,60
2,01589

BDI

5,30
4,08
2,47
2,96281

BDI

5,30
4,08
7,66
4,15651

BDI

5,30
4,08
0,82
2,58331

BDI

5,30
4,08
10,70
7,25043

BDI

5,30
4,08
15,44
8,34063

BDI

5,30
4,08
7,54
6,52363

BDI

5,30
4,08
12,89
10,14884

9,51
1,59000
1,22400
1,49000

23,72
2,65000
2,04000
8,88000

3,20
0,70649
1,04000

10,78
1,06000
0,81600
4,60000

15,84
2,65000
2,04000
2,47000

22,22
2,65000
2,04000
7,66000

13,81
2,65000
2,04000
0,82000

38,77
5,30000
4,08000
10,70000

44,60
5,30000
4,08000
15,44000

34,88
5,30000
4,08000
7,54000

54,27
7,95000
6,12000
12,89000

39,05
Pgina: 235

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.37
CALHA P/ LUMIN. FLUOR. 2 X 40 W SEM SOQUETES
SubMO
Mo-de-Obra 9,38000
LS
11,44360

UN Coeficiente

20,82360

H
1,00000
H
1,00000
UN
1,00000
Material
10,93000

09.84.068
CALHA TIPO PLAFON PARA 4 LAMPADAS FLUORESCENTES DE 40 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.38
CALHA P/ LUMIN. FLUOR. 4 X 40 W SEM SOQUETES
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

UN
H
1,50000
H
1,50000
UN
1,00000
Material
19,64000

09.84.070
CANOPLA DE FIXACAO PARA PENDENTE DE LUMINARIA FLUORESCENTE
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.03
CANOPLA FIX PENDENTE LUM FLUORESC
Mo-de-Obra 4,69000
LS
5,72180
SubMO
10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
5,68000

09.84.073
STARTER PARA LAMPADA FLUORESCENTE DE 40 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.06
STARTER P/LAMP FLUORESCENTE 40W
Mo-de-Obra 1,87600
LS
2,28872
SubMO

UN
H
0,20000
H
0,20000
UN
1,00000
Material
0,82000

4,16472

09.84.081
REATOR ELETRONICO P/LAMPADA FLUORESC.AFP 1X32W - 220V
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.24
REATOR ELETRONICO PT RAP P/FLUOR AFP 1X32W BIVOLT C/PROTECAO
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
20,99000

09.84.082
REATOR ELETRONICO P/LAMPADA FLUORESC.AFP 2X32W - 220V
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.25
REATOR ELETRONICO PT RAP P/FLUOR AFP 2X32W BIVOLT C/PROTECAO
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

UN
H
1,50000
H
1,50000
UN
1,00000
Material
24,13000

09.84.083
REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 110V/20W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.26
REATOR PARTIDA RAPIDA P/FLUOR 1/20W-110V
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
17,91000

09.84.084
REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 220V/20W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.30
REATOR PARTIDA RAPIDA P/FLUOR 1/20W-220V
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
17,91000

09.84.085
REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 110V/2X20W
UN
1.01.15
ELETRICISTA
H
1,50000
1.01.16
AJUDANTE ELETRICISTA
H
1,50000
4.97.27
REATOR PT RAP P/FLUOR AFP 2/20W-110V
UN
1,00000
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540
Material
23,75000
09.84.086
REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 220V/2X20W
UN
1.01.15
ELETRICISTA
H
1,50000
1.01.16
AJUDANTE ELETRICISTA
H
1,50000
4.97.31
REATOR PT RAP P/FLUOR AFP 2/20W-220V
UN
1,00000
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540
Material
26,53000
09.84.087
REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 110V/40W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.28
REATOR PARTIDA RAPIDA P/FLUOR 1/40W-110V
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
21,24000

09.84.088
REATOR SIMPLES PARTIDA RAPIDA P/ LAMP FLUOR 220V/40W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.32
REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V
SubMO
20,82360
Mo-de-Obra 9,38000
LS
11,44360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
23,99000

09.84.089
1.01.15
1.01.16
Exerccio:

REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 110V/2X40W
ELETRICISTA
AJUDANTE ELETRICISTA

2011

UN
H
H

0,50000
0,50000

Custo Unit.

Custo Total

BDI

5,30
4,08
10,93
7,30333

BDI

5,30
4,08
19,64
11,70134

BDI

5,30
4,08
5,68
3,70111

BDI

5,30
4,08
0,82
1,14649

BDI

5,30
4,08
20,99
9,61713

BDI

5,30
4,08
24,13
12,73404

BDI

5,30
4,08
17,91
8,90873

BDI

5,30
4,08
17,91
8,90873

BDI

5,30
4,08
23,75
12,64664

BDI

5,30
4,08
26,53
13,28604

BDI

5,30
4,08
21,24
9,67463

BDI

5,30
4,08
23,99
10,30713

5,30
4,08

5,30000
4,08000
10,93000

62,57
7,95000
6,12000
19,64000

19,79
2,65000
2,04000
5,68000

6,13
1,06000
0,81600
0,82000

51,43
5,30000
4,08000
20,99000

68,09
7,95000
6,12000
24,13000

47,64
5,30000
4,08000
17,91000

47,64
5,30000
4,08000
17,91000

67,63
7,95000
6,12000
23,75000

71,05
7,95000
6,12000
26,53000

51,73
5,30000
4,08000
21,24000

55,12
5,30000
4,08000
23,99000

49,71
2,65000
2,04000
Pgina: 236

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

4.97.29
REATOR PT RAP P/FLUOR AFP 2/40W-110V
Mo-de-Obra 4,69000
LS
5,72180

UN Coeficiente
SubMO

10,41180

Material

UN
1,00000
30,01000

09.84.090
REATOR DUPLO P/ LAMP FLUOR PART RAP ALTO FATOR POTENCIA 220V/2X40W
UN
1.01.15
ELETRICISTA
H
1,50000
1.01.16
AJUDANTE ELETRICISTA
H
1,50000
4.97.33
REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP
UN
1,00000
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540
Material
27,51000
09.84.092
REATOR PARA LAMPADA HG - 220V/250W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.41
REATOR P/LAMPADA HG 220V/250W
Mo-de-Obra 9,38000
LS
11,44360

Custo Unit.

Custo Total

BDI

30,01
9,29701

BDI

5,30
4,08
27,51
13,51144

BDI

5,30
4,08
43,53
14,80133

BDI

5,30
4,08
47,07
15,61553

BDI

4,08
70,25
18,24075

BDI

4,08
73,02
18,87785

BDI

5,30
4,08
9,86
7,05723

5,30
4,08
9,76
7,03423

30,01000

72,25
7,95000
6,12000
27,51000

20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
43,53000

09.84.093
REATOR PARA LAMPADA VAPOR DE MERCURIO HG 220V/400W - AFP
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.42
REATOR P/LAMP VAPOR DE MERCURIO HG 400W/220V AFP
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
47,07000

09.84.094
REATOR P/ LAMP. PART. RAP. ALTO FATOR DE POT. 1/110V-110W
1.01.16
AJUDANTE ELETRICISTA
4.97.50
REATOR P/ LAMP. FLUOR. PART. RAP. AFP 1/110W-110V
SubMO
9,05760
Mo-de-Obra 4,08000
LS
4,97760

UN
H
1,00000
UN
1,00000
Material
70,25000

09.84.095
REATOR P/ LAMP. FLUOR. RAP. AUTO FATOR POT. 2/110W-220V
1.01.16
AJUDANTE ELETRICISTA
4.97.51
REATOR P/ LAMP. FLUOR. PART. RAP. AFP 2/110W-220V
Mo-de-Obra 4,08000
LS
4,97760
SubMO
9,05760

UN
H
1,00000
UN
1,00000
Material
73,02000

09.84.096
REATOR SIMPLES P/ LAMP FLUOR CONV F POTENCIA NATURAL - 220V/20W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.54
REATOR CONV P/ FLUOR F POTENCIA NATURAL 1/20W-220V
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
9,86000

09.84.097
REATOR SIMPLES P/ LAMP FLUOR CONV F POTENCIA NATURAL - 220V/40W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.55
REATOR CONV P/ FLUOR F POTENCIA NATURAL 1/40W-220V
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
9,76000

BDI

09.84.099
OUTROS SERVICOS DE APARELHOS E EQUIPAMENTOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

1,81152

UN
H
0,20000
UN
1,00000
Material
1,30000

09.85.005
LAMPADA FLUORESCENTE DE 32W
1.01.16
AJUDANTE ELETRICISTA
4.65.13
LAMPADA FLUORESCENTE DE 32W C/TEMPERATURA DE COR 4000 K
Mo-de-Obra 0,40800
LS
0,49776
SubMO
0,90576

UN
H
0,10000
UN
1,00000
Material
5,70000

09.85.001
LAMPADA INCANDESCENTE DE 60W
1.01.16
AJUDANTE ELETRICISTA
4.65.04
LAMPADA INCANDESCENTE 60W
Mo-de-Obra 0,81600
LS
0,99552

SubMO

SubMO

09.85.006
LAMPADA FLUORESCENTE COMPACTA 23W
UN
1.01.16
AJUDANTE ELETRICISTA
H
0,20000
LAMPADA FLUORESCENTE COMPACTA 23W A 25W C/TEMP.DE COR MAIOR OU IGUAL
4.65.05
UN
1,00000
4000 K
Mo-de-Obra 0,81600
LS
0,99552
SubMO
1,81152
Material
8,96000
09.85.010
LAMPADA VAPOR DE SODIO 70W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.65.39
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 70W/220V
Mo-de-Obra 2,81400
LS
3,43308
SubMO
6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
12,73000

09.85.011
LAMPADA VAPOR DE SODIO 150W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.65.30
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 150W/220V
SubMO
6,24708
Mo-de-Obra 2,81400
LS
3,43308

UN
H
0,30000
H
0,30000
UN
1,00000
Material
19,20000

Exerccio:

2011

BDI

4,08
1,30
0,71565

BDI

4,08
5,70
1,51933

BDI

4,08
8,96
2,47745

BDI

5,30
4,08
12,73
4,36473

BDI

5,30
4,08
19,20
5,85283

79,15
5,30000
4,08000
43,53000

83,50
5,30000
4,08000
47,07000

97,54
4,08000
70,25000

100,95
4,08000
73,02000

37,74
5,30000
4,08000
9,86000

37,61
5,30000
4,08000
9,76000

3,82
0,81600
1,30000

8,12
0,40800
5,70000

13,24
0,81600
8,96000

23,34
1,59000
1,22400
12,73000

31,29
1,59000
1,22400
19,20000

Pgina: 237

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

09.85.012
LAMPADA VAPOR DE SODIO 250W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.65.31
LAMPADA VAPOR DE SODIO ELIPSOIDAL OU TUBULAR 250W/220V
Mo-de-Obra 2,81400
LS
3,43308
SubMO
6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
22,83000

BDI

09.85.017
LAMPADA VAPOR METLICO 70W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.65.36
LAMPADA VAPOR METALICO ELIPSOIDAL 70W/220W
Mo-de-Obra 2,81400
LS
3,43308
SubMO

6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
123,36000

159,41
5,30
1,59000
4,08
1,22400
123,36
123,36000
BDI
29,80963

6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
160,17000

204,69
5,30
1,59000
4,08
1,22400
160,17
160,17000
BDI
38,27593

09.85.019
LAMPADA VAPOR METALICO 250W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.65.29
LAMPADA VAPOR METALICO ELIPSOIDAL OU TUBULAR 250W/220V
Mo-de-Obra 2,81400
LS
3,43308
SubMO
6,24708

UN
H
0,30000
H
0,30000
UN
1,00000
Material
45,88000

BDI

09.85.023
LUMIN. BLINDADA ARANDELA P/ LAMP. MISTA 160 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.89
LUM. BLINDADA - ARANDELA PARA LAMP. MISTA 160 W
Mo-de-Obra 7,50400
LS
9,15488
SubMO

16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
Material
124,83000

174,03
5,30
4,24000
4,08
3,26400
124,83
124,83000
BDI
32,54244

16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
Material
102,37000

146,40
5,30
4,24000
4,08
3,26400
102,37
102,37000
BDI
27,37664

09.85.025
LUMIN. BLINDADA ARANDELA P/ LAMP. INCANDESC. 100 W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.23
IL-05 ARANDELA BLINDADA P/LAMP. FLUORESCENTE COMPACTA 23W-25W
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
Material
148,89000

203,62
5,30
4,24000
4,08
3,26400
148,89
148,89000
BDI
38,07624

09.85.026
IL-08 LUMINRIA PARA LMPADA FLUORESCENTE (1X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.66
CALHA P/LUMINARIA FLUOR.1X40W C/SOQUETES(IL-08/19)
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.97.32
REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V
Mo-de-Obra 5,62800
LS
6,86616
SubMO

12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
UN
1,00000
UN
1,00000
Material
48,33000

22,90596

UN
H
1,10000
H
1,10000
UN
1,00000
UN
2,00000
UN
1,00000
Material
63,34000

31,23540

UN
H
1,50000
H
1,50000
UN
1,00000
UN
4,00000
UN
2,00000
Material
101,51000

22,90596

UN
H
1,10000
H
1,10000
UN
1,00000
UN
2,00000
UN
1,00000
Material
49,55000

09.85.018
LAMPADA VAPOR METALICO 150W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.65.28
LAMPADA VAPOR METALICO ELIPSOIDAL 150W/220V
Mo-de-Obra 2,81400
LS
3,43308
SubMO

09.85.024
LUMIN. BLINDADA PLAFONIER P/ LAMP. MISTA 160W
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.88
LUM. BLINDADA - PLAFONIER PARA LAMP. MISTA 160 W
Mo-de-Obra 7,50400
LS
9,15488
SubMO

09.85.027
IL-09 LUMINRIA PARA LMPADA FLUORESCENTE (2X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.64
CALHA P/LUMINARIA FLUOR.2X40W C/SOQUETES(IL-09/20)
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.97.33
REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP
Mo-de-Obra 10,31800
LS
12,58796
SubMO
09.85.028
IL-10 LUMINRIA PARA LMPADA FLUORESCENTE (4X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.68
CALHA P/LUMINARIA FLUOR.4X40W C/SOQUETES(IL 10/21)
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.97.33
REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP
Mo-de-Obra 14,07000
LS
17,16540
SubMO
09.85.029
IL-11 LUMINRIA PARA LMPADA FLUORESCENTE (2X20W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.57
CALHA P/LUMINARIA FLUOR.2X20W C/SOQUETES (IL - 11)
4.65.10
LAMPADA FLUORESCENTE DE 20 W
4.97.31
REATOR PT RAP P/FLUOR AFP 2/20W-220V
SubMO
Mo-de-Obra 10,31800
LS
12,58796

Exerccio:

2011

5,30
4,08
22,83
6,68773

5,30
4,08
45,88
11,98923

BDI

5,30
4,08
20,86
3,48
23,99
13,98956

BDI

5,30
4,08
28,87
3,48
27,51
19,83657

BDI

5,30
4,08
32,57
3,48
27,51
30,53144

BDI

5,30
4,08
16,12
3,45
26,53
16,66487

35,76
1,59000
1,22400
22,83000

64,11
1,59000
1,22400
45,88000

74,81
3,18000
2,44800
20,86000
3,48000
23,99000

106,08
5,83000
4,48800
28,87000
6,96000
27,51000

163,27
7,95000
6,12000
32,57000
13,92000
55,02000

89,12
5,83000
4,48800
16,12000
6,90000
26,53000

Pgina: 238

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.85.030
IL-12 LUMINRIA PARA LMPADA FLUORESCENTE (4X20W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.58
CALHA P/LUMINARIA FLUOR.4X20W C/SOQUETES (IL - 12)
4.65.10
LAMPADA FLUORESCENTE DE 20 W
4.97.31
REATOR PT RAP P/FLUOR AFP 2/20W-220V
Mo-de-Obra 14,07000
LS
17,16540
SubMO

31,23540

UN
H
1,50000
H
1,50000
UN
1,00000
UN
4,00000
UN
2,00000
Material
93,74000

09.85.031
IL-19 LUMINRIA P/ LMPADA FLUOR C/PENDENTE (1X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.66
CALHA P/LUMINARIA FLUOR.1X40W C/SOQUETES(IL-08/19)
4.61.29
SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.97.32
REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V
Mo-de-Obra 5,62800
LS
6,86616
SubMO
12,49416

UN
H
0,60000
H
0,60000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
79,21000

09.85.032
IL-20 LUMINRIA P/ LMPADA FLUOR C/PENDENTE (2X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.64
CALHA P/LUMINARIA FLUOR.2X40W C/SOQUETES(IL-09/20)
4.61.29
SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.97.33
REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP
Mo-de-Obra 10,31800
LS
12,58796
SubMO
22,90596

UN
H
1,10000
H
1,10000
UN
1,00000
UN
1,00000
UN
2,00000
UN
1,00000
Material
94,22000

09.85.033
IL-21 LUMINRIA P/ LMPADA FLUOR C/PENDENTE (4X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.68
CALHA P/LUMINARIA FLUOR.4X40W C/SOQUETES(IL 10/21)
4.61.29
SUSPENSAO TIPO PENDENTE P/LUMINARIA FLUORESCENTE
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.97.33
REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540

UN
H
1,50000
H
1,50000
UN
1,00000
UN
1,00000
UN
4,00000
UN
2,00000
Material
132,39000

09.85.034
IL-38 LUMINRIA PARA LMPADA FLUORESCENTE (3X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.61.85
CALHA P/LUMINARIA FLUOR 3X40W C/ SOQUETES (IL-38)
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.97.32
REATOR PARTIDA RAPIDA P/FLUOR 1/40W-220V
4.97.33
REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP
Mo-de-Obra 12,19400
LS
14,87668
SubMO

UN
H
1,30000
H
1,30000
UN
1,00000
UN
3,00000
UN
1,00000
UN
1,00000
Material
93,95000

27,07068

09.85.035
ARANDELA SIMPLES C/REFLETOR ESMALT E BRACO F G C/BASE DE FIXACAO
UN
1.01.15
ELETRICISTA
H
2,00000
1.01.16
AJUDANTE ELETRICISTA
H
2,00000
4.60.26
ARANDELA SIMPLES C/REFL ESM 098535
UN
1,00000
Mo-de-Obra 18,76000
LS
22,88720
SubMO
41,64720
Material
394,13000

Custo Unit.

Custo Total

BDI

5,30
4,08
26,88
3,45
26,53
28,74434

BDI

5,30
4,08
20,86
30,88
3,48
23,99
21,09196

BDI

5,30
4,08
28,87
30,88
3,48
27,51
26,93897

BDI

5,30
4,08
32,57
30,88
3,48
27,51
37,63384

BDI

5,30
4,08
32,01
3,48
23,99
27,51
27,83476

153,71
7,95000
6,12000
26,88000
13,80000
53,06000

112,79
3,18000
2,44800
20,86000
30,88000
3,48000
23,99000

144,06
5,83000
4,48800
28,87000
30,88000
6,96000
27,51000

201,25
7,95000
6,12000
32,57000
30,88000
13,92000
55,02000

148,85
6,89000
5,30400
32,01000
10,44000
23,99000
27,51000

536,00
5,30
10,60000
4,08
8,16000
394,13
394,13000
BDI
100,22876

09.85.036
LUMINRIA EM CALHA P/EMBUTIR DIFUSOR PLAST LAMP FLUOR (2X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.81
EL-LUMI EMBUT DIF PLAST LAMP FLUOR 2X40W
Mo-de-Obra 7,50400
LS
9,15488
SubMO
16,65888

UN
H
0,80000
H
0,80000
UN
1,00000
Material
90,26000

BDI

09.85.037
BRACO ACO GALVANIZADO DN 1 1/2" X 2,00 M
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.97.11
BRACO ACO GALVAN 1.1/2" AFAST BASE 2,00M
Mo-de-Obra 18,76000
LS
22,88720

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
122,27000

201,61
5,30
10,60000
4,08
8,16000
122,27
122,27000
BDI
37,70096

41,64720

UN
H
2,00000
H
2,00000
UN
1,00000
Material
32,83000

BDI

UN
H
1,05000
H
1,05000
UN
1,00000
Material
118,26000

172,35
5,30
5,56500
4,08
4,28400
118,26
118,26000
BDI
32,22870

SubMO

09.85.039
BRACO ACO GALVANIZADO DE 1" X 1.00M
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.30
BRACO ACO GALVANIZADO DIAM 25.4MMX1.0M P/ILUM.EXT.
Mo-de-Obra 18,76000
LS
22,88720
SubMO

09.85.040
LUMINRIA EM CALHA P/EMBUTIR DIFUSOR PLAST LAMP FLUOR (4X40W)
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.83
EL-LUMI EMBUT DIF PLAST LAMP FLUOR 4X40W
SubMO
21,86478
Mo-de-Obra 9,84900
LS
12,01578

Exerccio:

2011

5,30
4,08
90,26
24,59134

5,30
4,08
32,83
17,12976

131,51
4,24000
3,26400
90,26000

91,60
10,60000
8,16000
32,83000

Pgina: 239

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

09.85.041
LUMIN.(APARELHO) FECH. P/ILUMIN. EXTERNA P/LAMP.V.MERC. OU MISTA 250W
UN
1.01.15
ELETRICISTA
H
1,50000
1.01.16
AJUDANTE ELETRICISTA
H
1,50000
4.61.37
IL-33A36 LUMINARIA P/LAMPADA V.MERCURIO/MISTA 250W
UN
1,00000
Mo-de-Obra 14,07000
LS
17,16540
Material
150,88000
SubMO
31,23540
09.85.042
FLUORESCENTE EM PERFILADO (2X40W) - PROJ EMERGNCIA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
2.66.90
PARAFUSO AUTOATARRACHANTE 6,3 X 50 MM
2.67.40
PARAFUSO 3/8 X 3/4 C/ARRUELA/PORCA
2.68.10
BUCHA PLASTICA TIPO S-10 (CENTO)
4.30.04
FIO DE 1,50 MM2 (ISOL PVC ANTICHAMA 750V)
4.65.11
LAMPADA FLUORESCENTE DE 40W/220V
4.85.65
SUPORTE LONGO P/ LUMINARIA EM PERFILADO ACO GALV.
4.94.21
SOQUETE P/LAMP FLUORESCENTE S/PORTA STA
4.94.71
PERFILADO EM CHAPA ACO 38X38MM
4.94.72
EMENDA INTERNA "I"
4.94.73
JUNCAO ANGULAR DUPLA P/ PERFILADO (TIPO SISA -SRS)
4.94.74
CONECTOR MULTIPLO MARCA SINDAL TIPO 112
4.94.75
CANTONEIRA 3 FUROS 38X76 MM
4.94.76
BASE COM 4 FUROS - FIXACAO EXTERNA
4.97.33
REATOR DUPLO P/LAMP FLUOR 40W/220V PART RAP AFP
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
UN
7,00000
UN
7,00000
UN
0,07000
M
20,00000
UN
2,00000
UN
4,00000
UN
4,00000
M
4,50000
UN
1,00000
UN
1,00000
UN
13,00000
UN
1,00000
UN
1,00000
UN
1,00000
Material
119,22860

Custo Unit.

Custo Total

224,00
5,30
7,95000
4,08
6,12000
150,88
150,88000
BDI
41,88654
249,10
21,20000
16,32000
1,12000
2,38000
0,17360
10,80000
6,96000
5,32000
4,16000
49,72500
0,76000
0,89000
6,76000
0,27000
2,40000
27,51000

BDI

5,30
4,08
0,16
0,34
2,48
0,54
3,48
1,33
1,04
11,05
0,76
0,89
0,52
0,27
2,40
27,51
46,58029

09.85.043
LUMINARIA ABERTA (APARELHO) TIPO ECON. P/ LAMP. V. MERC./MISTA 250W
UN
1.01.15
ELETRICISTA
H
1,50000
1.01.16
AJUDANTE ELETRICISTA
H
1,50000
4.60.71
IL-37 LUMIN. ABERTA - LAMP. V. MERC./MISTA 160W
UN
1,00000
Mo-de-Obra 14,07000
LS
17,16540
Material
64,32000
SubMO
31,23540

BDI

5,30
4,08
64,32
21,97774

09.85.044
PROJETOR ANGULAR (APARELHO) P/ ILUMIN. QUADRA P/ LAMP. V. MERC. 400W
UN
1.01.15
ELETRICISTA
H
1,50000
1.01.16
AJUDANTE ELETRICISTA
H
1,50000
4.60.75
IL-02 PROJETOR ANGULAR P/LAMPADA V.MERCURIO 400W
UN
1,00000
Mo-de-Obra 14,07000
LS
17,16540
SubMO
31,23540
Material
179,52000

259,22
5,30
7,95000
4,08
6,12000
179,52
179,52000
BDI
48,47374

09.85.045
CRUZETA DE FERRO GALVANIZADO PARA 2 PROJETORES
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.60.55
CRUZETA P/FIX 2 LUMIN EXTERNA
Mo-de-Obra 28,14000
LS
34,33080
SubMO

UN
H
3,00000
H
3,00000
UN
1,00000
Material
183,96000

303,10
5,30
15,90000
4,08
12,24000
183,96
183,96000
BDI
56,67908

UN
H
5,00000
H
5,00000
UN
1,00000
Material
789,02000

1.098,55
5,30
26,50000
4,08
20,40000
789,02
789,02000
BDI
205,42174

62,47080

09.85.047
POSTE ACO GALVANIZADO RETO 4" X6.00M P/ILUMIN EXTERNA
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.01.25
POSTE GALV,TELECON RETO, FLANGEADO 88,9 MM X 6,0 M
Mo-de-Obra 46,90000
LS
57,21800
SubMO
104,11800

117,53
7,95000
6,12000
64,32000

09.85.048
POSTE DE FERRO GALV.TIPO CURVO,C/JANELAS INSP.R=7 M ACIMA DO SOLO
UN
1.01.15
ELETRICISTA
H
4,00000
1.01.16
AJUDANTE ELETRICISTA
H
8,00000
1.01.17
ELETRICISTA PARA ALTA TENSAO
H
2,00000
4.01.21
POSTE FG CURVO C/JAN INSP R=7M ACIMA
UN
1,00000
Mo-de-Obra 68,84000
LS
83,98480
SubMO
152,82480
Material
615,99000

5,30
4,08
7,50
615,99
BDI
176,82740

09.85.049
POSTE DE FERRO GALV.TIPO RETO, C/JANELA INSP. R=10M ACIMA DO SOLO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
1.01.17
ELETRICISTA PARA ALTA TENSAO
4.01.35
POSTE ACO GALV RETO C/ JAN INSP 4"X2"X10M
Mo-de-Obra 95,76000
LS
116,82720
SubMO
212,58720

UN
H
6,00000
H
12,00000
H
2,00000
UN
1,00000
Material
1.482,68000

2.085,17
5,30
31,80000
4,08
48,96000
7,50
15,00000
1.482,68
1.482,68000
BDI
389,91146

09.85.052
POSTE DE CONCRETO TUBULAR OCO DE 7 M DE COMPR C/ JANELA ISNPECAO
UN
1.01.15
ELETRICISTA
H
5,00000
1.01.16
AJUDANTE ELETRICISTA
H
22,00000
4.01.11
POSTE CONCR TUB OCO 7M C/JANELA INSPECAO
UN
1,00000
Mo-de-Obra 116,26000
LS
141,83720
SubMO
258,09720
Material
314,61000

704,42
5,30
26,50000
4,08
89,76000
314,61
314,61000
BDI
131,72266

09.85.060
1.01.15
1.01.16
4.51.53

Exerccio:

CONDULETE DE 1"
ELETRICISTA
AJUDANTE ELETRICISTA
CONDULETE DE 1"

2011

UN
H
H
UN

0,50000
0,50000
1,00000

5,30
4,08
14,22

945,64
21,20000
32,64000
15,00000
615,99000

30,29
2,65000
2,04000
14,22000

Pgina: 240

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 4,69000

LS

BDI

5,30
4,08
21,35
7,30521

BDI

5,30
4,08
28,59
8,97041

BDI

5,30
4,08
44,56
12,64351

BDI

5,30
4,08
10,53
4,81661

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
9,31000

BDI

5,30
4,08
9,31
4,53601

09.85.080
MOTOR PARA BOMBA DE RECALQUE DE 1/2 HP - 220 V BIFASICO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
6.65.70
MOTOR 1/2 HP BIFASICO P/BOMBA RECALQ
Mo-de-Obra 28,14000
LS
34,33080
SubMO
62,47080

UN
H
3,00000
H
3,00000
UN
1,00000
Material
363,03000

523,36
5,30
15,90000
4,08
12,24000
363,03
363,03000
BDI
97,86518

09.85.081
MOTOR PARA BOMBA DE RECALQUE DE 3/4 HP - 220 V BIFASICO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
6.65.71
MOTOR 3/4 HP BIFASICO P/BOMBA RECALQ
Mo-de-Obra 28,14000
LS
34,33080
SubMO
62,47080

UN
H
3,00000
H
3,00000
UN
1,00000
Material
435,73000

612,78
5,30
15,90000
4,08
12,24000
435,73
435,73000
BDI
114,58618

09.85.082
MOTOR PARA BOMBA DE RECALQUE DE 1 HP - 220 V BIFASICO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
6.65.72
MOTOR 1 HP BIFASICO P/BOMBA RECALQ
Mo-de-Obra 28,14000
LS
34,33080
SubMO
62,47080

UN
H
3,00000
H
3,00000
UN
1,00000
Material
485,74000

674,29
5,30
15,90000
4,08
12,24000
485,74
485,74000
BDI
126,08848

09.85.083
MOTOR PARA BOMBA DE RECALQUE DE 2 HP - 220 V TRIFASICO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
6.65.73
MOTOR 2 HP TRIFASICO P/BOMBA RECALQUE
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
UN
1,00000
Material
468,86000

679,14
5,30
21,20000
4,08
16,32000
468,86
468,86000
BDI
126,99551

09.85.084
MOTOR PARA BOMBA DE RECALQUE DE 3 HP - 220 V TRIFASICO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
6.65.74
MOTOR 3 HP TRIFASICO P/BOMBA RECALQUE
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
UN
1,00000
Material
564,58000

796,88
5,30
21,20000
4,08
16,32000
564,58
564,58000
BDI
149,01111

09.85.085
MOTOR PARA BOMBA DE RECALQUE DE 5 HP - 220 V TRIFASICO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
6.65.75
MOTOR 5 HP TRIFASICO P/BOMBA RECALQUE
Mo-de-Obra 37,52000
LS
45,77440
SubMO
83,29440

UN
H
4,00000
H
4,00000
UN
1,00000
Material
805,95000

1.093,77
5,30
21,20000
4,08
16,32000
805,95
805,95000
BDI
204,52621

09.85.099
OUTROS SERVICOS DE APARELHOS E EQUIPAMENTOS
6.96.02
MODULO DE VERBA
SubMO
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

09.85.062
CONDULETE DE 1 1/2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.55
CONDULETE DE 1 1/2"
Mo-de-Obra 4,69000
LS
09.85.063
CONDULETE DE 2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.56
CONDULETE DE 2"
Mo-de-Obra 4,69000
LS

5,72180

5,72180

09.85.064
CONDULETE DE 3/4"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.70
CONDULETE DE ALUMINIO 4"X2"XD=3/4"
Mo-de-Obra 4,69000
LS
5,72180
09.85.065
CONDULETE DE 1/2"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.50
CONDULETE DE 1/2"
Mo-de-Obra 4,69000
LS

09.86.001
Exerccio:

5,72180

SubMO

SubMO

SubMO

SubMO

SubMO

10,41180

Material

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
21,35000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
28,59000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
44,56000

10,41180

UN
H
0,50000
H
0,50000
UN
1,00000
Material
10,53000

0,00000

CAPTOR TIPO FRANKLIN, BOUQUET NIQUELADO DE 4 PONTAS-CONECTOR


GRANDE

2011

14,22000

Custo Total

5,66531

5,72180

SubMO

Custo Unit.
BDI

09.85.061
CONDULETE DE 1 1/4"
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.51.54
CONDULETE DE 1 1/4"
Mo-de-Obra 4,69000
LS

5,72180

UN Coeficiente

UN

39,06
2,65000
2,04000
21,35000

47,97
2,65000
2,04000
28,59000

67,61
2,65000
2,04000
44,56000

25,75
2,65000
2,04000
10,53000

24,25
2,65000
2,04000
9,31000

176,33
Pgina: 241

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.80.62
CAPTOR TIPO FRANKLIN,LATAO CROMADO,CONECTOR DUPLO
SubMO
83,29440
Mo-de-Obra 37,52000
LS
45,77440
09.86.005
CABO DE COBRE NU DE 25 MM2 PARA ATERRAMENTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.40
CABO DE COBRE NU DE 25 MM2
Mo-de-Obra 1,87600
LS
2,28872
SubMO
09.86.006
CABO DE COBRE NU DE 35 MM2 PARA ATERRAMENTO
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.41
CABO DE COBRE NU DE 35 MM2
Mo-de-Obra 1,87600
LS
2,28872
SubMO
09.86.010
CABO DE COBRE NU DE 25 MM2 PARA PARA-RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.40
CABO DE COBRE NU DE 25 MM2
Mo-de-Obra 4,69000
LS
5,72180
SubMO
09.86.011
CABO DE COBRE NU DE 35 MM2 PARA PARA RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.30.41
CABO DE COBRE NU DE 35 MM2
Mo-de-Obra 4,69000
LS
5,72180
SubMO
09.86.012
CABO DE COBRE NU DE 95 MM2 PARA PARA-RAIOS
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.31.30
CORDOALHA DE COBRE NU DE 95 MM2
Mo-de-Obra 4,69000
LS
5,72180
SubMO

4,16472

4,16472

10,41180

10,41180

10,41180

H
4,00000
H
4,00000
UN
1,00000
Material
60,07000

Material

M
H
0,20000
H
0,20000
M
1,00000
11,06000

Material

M
H
0,20000
H
0,20000
M
1,00000
19,98000

Material

M
H
0,50000
H
0,50000
M
1,00000
11,06000

Material

M
H
0,50000
H
0,50000
M
1,00000
19,98000

Material

M
H
0,50000
H
0,50000
M
1,00000
38,41000

09.86.020
SUPORTE SIMPLES COM ROLDANA PARA CABO DE COBRE NU 25 A 35 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.80.35
SUPORTE SIMPLES C/ROLDANA P/ 2AWG
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
3,27000

09.86.021
SUPORTE SIMPLES COM ROLDANA PARA CABO DE COBRE NU 95 A 70 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.80.36
SUPORTE SIMPLES C/ROLDANA P/ 3/0 AWG
Mo-de-Obra 9,38000
LS
11,44360
SubMO
20,82360

UN
H
1,00000
H
1,00000
UN
1,00000
Material
3,27000

09.86.025
CONECTOR TIPO SPLIT-BOLT PARA CABO DE 25 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.01
CONECTOR SPLIT-BOOLT P/CABO 25MM2
Mo-de-Obra 1,87600
LS
2,28872
SubMO

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
2,53000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
3,15000

4,16472

UN
H
0,20000
H
0,20000
UN
1,00000
Material
8,92000

09.86.026
CONECTOR TIPO SPLIT-BOLT PARA CABO DE 35 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.02
CONECTOR SPLIT-BOOLT P/CABO 35MM2
Mo-de-Obra 1,87600
LS
2,28872
SubMO
09.86.027
CONECTOR TIPO SPLIT-BOLT PARA CABO DE 95 MM2
1.01.15
ELETRICISTA
1.01.16
AJUDANTE ELETRICISTA
4.96.05
CONECTOR SPLIT-BOOLT P/CABO 95MM2
Mo-de-Obra 1,87600
LS
2,28872
SubMO

09.86.035
ELETRODUTO DE PVC DE 2" X 3,00 M PARA PROTECAO DE CABO DE COBRE NU
UN
1.01.15
ELETRICISTA
H
1,00000
1.01.16
AJUDANTE ELETRICISTA
H
1,00000
4.25.06
ELETRODUTO PVC RIGIDO 60MM (2')
M
3,00000
SubMO
20,82360
Mo-de-Obra 9,38000
LS
11,44360
Material
17,91000
09.86.099
6.96.02

Exerccio:

OUTROS SERVICOS DE PARA-RAIOS E ATERRAMENTOS


MODULO DE VERBA

2011

MV
MV

1,00000

Custo Unit.

Custo Total

BDI

5,30
4,08
60,07
32,97381

BDI

5,30
4,08
11,06
3,50169

BDI

5,30
4,08
19,98
5,55329

BDI

5,30
4,08
11,06
4,93851

BDI

5,30
4,08
19,98
6,99011

BDI

5,30
4,08
38,41
11,22901

BDI

5,30
4,08
3,27
5,54153

BDI

5,30
4,08
3,27
5,54153

BDI

5,30
4,08
2,53
1,53979

BDI

5,30
4,08
3,15
1,68239

BDI

5,30
4,08
8,92
3,00949

BDI

5,30
4,08
5,97
8,90873

244,82

21,20000
16,32000
60,07000

18,72
1,06000
0,81600
11,06000

29,69
1,06000
0,81600
19,98000

26,41
2,65000
2,04000
11,06000

37,38
2,65000
2,04000
19,98000

60,05
2,65000
2,04000
38,41000

29,63
5,30000
4,08000
3,27000

29,63
5,30000
4,08000
3,27000

8,23
1,06000
0,81600
2,53000

8,99
1,06000
0,81600
3,15000

16,09
1,06000
0,81600
8,92000

47,64
5,30000
4,08000
17,91000

301,12
244,82000

Pgina: 242

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente
SubMO

0,00000

244,82000

Custo Total

BDI

56,30860

BDI

4,60
3,96
2,09
4,60
9,17
4,67
2,19
23,75
14,12254

BDI

4,60
3,96
4,60
9,17
4,67
2,19
23,75
9,55436

BDI

33,25
2,19
7,93461

BDI

4,60
3,96
2,09
4,60
9,17
4,67
2,31
36,54
16,86143

BDI

4,60
3,96
4,60
9,17
4,67
2,31
36,54
12,40329

10.01.010
FORRO EM LAMINA DE PVC 200MM E=8A12MM SUSTENTACAO METALICA - COLOCADO M2
3.40.28
ARREMATES PARA FORRO LAMINAS DE PVC 200MM
M
0,57000
3.40.39
FORRO LAMINAS PVC 200MM E=15MM INCL SUST MET COLOC
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
44,72670

BDI

2,31
43,41
10,28714

10.01.011
FORRO TIPO FIBRAROC COM PERFIL CARTOLA - PROJ.MOD.81
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.50.13
FERRAGEM P/MADEIRAMENTO DE TELHADOS
3.40.31
FORRO FIBRAROC 50X125CM COLOCADO
SubMO
0,53209
Mo-de-Obra 0,23968
LS
0,29241

M2
H
0,02800
H
0,02800
M3
0,00060
KG
0,03900
M2
1,00000
Material
60,23334

4,60
3,96
1.393,66
13,26
58,88
BDI
13,97605

10.01.013
FORRO DE PLACA MINERAL (625X625X13)MM INCL PERFIS FORN/INST.
3.40.32
FORN INST FORRO PLACA MINERAL (625X625X13)MM PERF.
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
47,52000

BDI

47,52
10,92960

BDI

43,67
10,04410

10.01.003
FORRO EM LAMINA PVC 100MM E=8A10MM ENTARUGAMENTO DE MADEIRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.65.61
PREGO GALVANIZADO 12X12
2.67.60
PREGO
3.40.36
ARREMATES PARA FORRO LAMINAS PVC 100MM
3.40.37
FORRO LAMINA PVC 100MM E=8A10MM (SO LAMINA) COL
Mo-de-Obra 8,13200
SubMO
18,05304
LS
9,92104

Material

Custo Unit.

M2
H
0,95000
H
0,95000
M
2,50000
M
2,50000
KG
0,05000
KG
0,25000
M
0,57000
M2
1,00000
Material
43,34930

10.01.004
FORRO EM LAMINA PVC 100MM E=8A10MM SEMI-ENTARUGAMENTO DE MADEIRA
M2
1.01.11
CARPINTEIRO
H
0,41000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,41000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
1,62000
2.65.61
PREGO GALVANIZADO 12X12
KG
0,05000
2.67.60
PREGO
KG
0,18000
3.40.36
ARREMATES PARA FORRO LAMINAS PVC 100MM
M
0,57000
3.40.37
FORRO LAMINA PVC 100MM E=8A10MM (SO LAMINA) COL
M2
1,00000
Mo-de-Obra 3,50960
LS
4,28171
SubMO
7,79131
Material
33,74940
10.01.006
FORRO EM LAMINA PVC 100MM E=8A10MM SUSTENTACAO METALICA - COLOCADO
M2
3.40.35
FORRO LAMINA PVC 100MM E=8A10MM INCL SUST MET-COL
M2
1,00000
3.40.36
ARREMATES PARA FORRO LAMINAS PVC 100MM
M
0,57000
Mo-de-Obra 0,00000
LS
0,00000
Material
34,49830
SubMO
0,00000
10.01.007
FORRO EM LAMINA DE PVC 200MM E=8A12MM ENTARUGAMENTO DE MADEIRA
M2
1.01.11
CARPINTEIRO
H
0,90000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,90000
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
M
2,50000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
2,50000
2.65.61
PREGO GALVANIZADO 12X12
KG
0,05000
2.67.60
PREGO
KG
0,25000
3.40.28
ARREMATES PARA FORRO LAMINAS DE PVC 200MM
M
0,57000
3.40.38
FORRO LAMINAS PVC 200MM E=15MM COLOCADO
M2
1,00000
Mo-de-Obra 7,70400
LS
9,39888
SubMO
17,10288
Material
56,20770
10.01.008
FORRO EM LAMINA DE PVC 200MM E=8A12MM SEMI-ENTARUGAMENTO DE MADEIRA
M2
1.01.11
CARPINTEIRO
H
0,39000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,39000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
1,62000
2.65.61
PREGO GALVANIZADO 12X12
KG
0,04000
2.67.60
PREGO
KG
0,18000
3.40.28
ARREMATES PARA FORRO LAMINAS DE PVC 200MM
M
0,57000
3.40.38
FORRO LAMINAS PVC 200MM E=15MM COLOCADO
M2
1,00000
Mo-de-Obra 3,33840
LS
4,07285
Material
46,51610
SubMO
7,41125

10.01.014
FORRO DE PLACA MINERAL (1250X625X13)MM INCLUSIVE PERFIS FORNEC/INSTAL.
M2
3.40.33
FORNEC.E INST. PLACA MINERAL (1250X625X13)MM PERFIL
M2
1,00000
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000
Material
43,67000
10.01.020
1.01.11
1.01.12
2.10.17
Exerccio:

FORRO DE TABUA APAR CUMARU/ANGELIM 10X1CM M/F SEMI ENTARUGADO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
SARRAFO PINHO APARELHADO 10X2,5 CM

2011

M2
H
H
M

0,66000
0,66000
1,62000

4,60
3,96
4,60

75,52
4,37000
3,76200
5,22500
11,50000
0,45850
1,16750
1,24830
23,75000

51,09
1,88600
1,62360
7,45200
0,45850
0,84060
1,24830
23,75000

42,43
33,25000
1,24830

90,17
4,14000
3,56400
5,22500
11,50000
0,45850
1,16750
1,31670
36,54000

66,33
1,79400
1,54440
7,45200
0,36680
0,84060
1,31670
36,54000

55,01
1,31670
43,41000

74,74
0,12880
0,11088
0,83620
0,51714
58,88000

58,44
47,52000

53,71
43,67000

93,03
3,03600
2,61360
7,45200
Pgina: 243

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.67.60
PREGO
3.40.42
TABUA APARELHADA CUMARU/ANGELIM M/F 10X1CM
SubMO
Mo-de-Obra 5,64960
LS
6,89251

12,54211

10.01.021
FORRO DE TABUAS APAR CUMARU/ANGELIM 10X1CM M/F ENTARUGADO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.67.60
PREGO
3.40.42
TABUA APARELHADA CUMARU/ANGELIM M/F 10X1CM
Mo-de-Obra 10,27200
LS
12,53184
SubMO
22,80384

KG
0,18000
M2
1,10000
Material
63,09460
M2
H
1,20000
H
1,20000
M
2,50000
M
2,50000
KG
0,25000
M2
1,10000
Material
72,69450

10.01.027
FORRO DE TABUAS APAR CEDRINHO CERNE M/F C/CUPINICIDA SEMI ENTARUGADO
M2
1.01.11
CARPINTEIRO
H
0,66000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,66600
2.11.04
TABUA DE CEDRINHO CERNE MACHO FEMEA 10X1CM P/FORRO
M2
1,10000
2.11.20
SARRAFO BRUTO DE CEDRINHO 10X2,5CM
M
1,62000
2.11.40
ARREMATE MEIA CANA EM CEDRINHO 2X2CM
M
0,60000
2.67.60
PREGO
KG
0,18000
3.80.59
TRATAMENTO CUPINICIDA PARA MADEIRA
L
0,30000
Mo-de-Obra 5,67336
LS
6,92150
SubMO
12,59486
Material
50,80140
10.01.028
FORRO DE TABUAS APAR CEDRINHO CERNE M/F C/CUPINICIDA ENTARUGADO
M2
1.01.11
CARPINTEIRO
H
1,20000
1.01.12
AJUDANTE DE CARPINTEIRO
H
1,20000
2.11.04
TABUA DE CEDRINHO CERNE MACHO FEMEA 10X1CM P/FORRO
M2
1,10000
2.11.20
SARRAFO BRUTO DE CEDRINHO 10X2,5CM
M
2,50000
2.11.21
SARRAFO BRUTO DE CEDRINHO 5X2,5CM
M
2,50000
2.11.40
ARREMATE MEIA CANA EM CEDRINHO 2X2CM
M
0,60000
2.67.60
PREGO
KG
0,25000
3.80.59
TRATAMENTO CUPINICIDA PARA MADEIRA
L
0,30000
Mo-de-Obra 10,27200
LS
12,53184
SubMO
22,80384
Material
58,02250
10.01.037
FORRO DE RIPAS 5X1CM EM XADREZ CEDRINHO CERNE C/ CUPINICIDA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.63
RIPA CEDRINHO CERNE APARELHADA 5X1CM
2.67.60
PREGO
3.80.59
TRATAMENTO CUPINICIDA PARA MADEIRA
Mo-de-Obra 11,92000
LS
14,54240
SubMO
26,46240

M2
H
1,30000
H
1,50000
M
2,50000
M
2,50000
M
22,00000
KG
0,25000
L
0,30000
Material
63,88450

10.01.038
FORRO DE RIPAS 5X1CM EM XADREZ ANGELIM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.64
RIPA ANGELIM APARELHADA 5X1CM
2.67.60
PREGO
Mo-de-Obra 11,12800
LS
13,57616

24,70416

M2
H
1,30000
H
1,30000
M
2,50000
M
2,50000
M
22,00000
KG
0,25000
Material
79,27250

10.01.045
FORRO C/CHAPA FIBRA MADEIRA PRENSADA DURA LISA 3MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.35.51
CHAPA FIB MAD PRENS DURA LISA (1.22X2.75M) E= 3MM
2.67.60
PREGO
Mo-de-Obra 10,27200
LS
12,53184
SubMO
22,80384

M2
H
1,20000
H
1,20000
M
1,80000
M
3,50000
M2
1,05000
KG
0,25000
Material
29,10400

10.01.046
FORRO C/CHAPA FIBRA MADEIRA PRENSADA ISOLANTE 12MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.35.53
CHAPA FIBRA (MAD PRENS ISOLANTE (60X60CM)-ESP 12MM
2.67.60
PREGO
SubMO
22,80384
Mo-de-Obra 10,27200
LS
12,53184

M2
H
1,20000
H
1,20000
M
1,80000
M
3,50000
M2
1,05000
KG
0,25000
Material
30,47950

10.01.047
1.01.11
1.01.12
2.10.14
Exerccio:

SubMO

FORRO C/CHAPA FIBRA MADEIRA PRENSADA ISOLANTE TERMO-ACUSTICAS


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
SARRAFO PINHO APARELHADO 5X2,5 CM

2011

M2
H
H
M

1,20000
1,20000
1,80000

Custo Unit.

Custo Total

BDI

4,67
49,82
17,39644

BDI

4,60
3,96
2,09
4,60
4,67
49,82
21,96462

BDI

4,60
3,96
38,49
3,09
2,14
4,67
4,44
14,58114

BDI

4,60
3,96
38,49
3,09
1,67
2,14
4,67
4,44
18,59006

BDI

4,60
3,96
2,09
4,60
2,03
4,67
4,44
20,77979

BDI

4,60
3,96
2,09
4,60
2,79
4,67
23,91463

BDI

4,60
3,96
2,09
4,60
7,69
4,67
11,93880

BDI

4,60
3,96
2,09
4,60
9,00
4,67
12,25517

4,60
3,96
2,09

0,84060
54,80200

117,46
5,52000
4,75200
5,22500
11,50000
1,16750
54,80200

77,97
3,03600
2,63736
42,33900
5,00580
1,28400
0,84060
1,33200

99,41
5,52000
4,75200
42,33900
7,72500
4,17500
1,28400
1,16750
1,33200

111,12
5,98000
5,94000
5,22500
11,50000
44,66000
1,16750
1,33200

127,89
5,98000
5,14800
5,22500
11,50000
61,38000
1,16750

63,84
5,52000
4,75200
3,76200
16,10000
8,07450
1,16750

65,53
5,52000
4,75200
3,76200
16,10000
9,45000
1,16750

76,38
5,52000
4,75200
3,76200
Pgina: 244

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.35.52
CHAPA FIB (MAD PRENS ISOL TER ACUST(30X30CM)-E19MM
2.67.60
PREGO
SubMO
Mo-de-Obra 10,27200
LS
12,53184

22,80384

M
3,50000
M2
1,05000
KG
0,25000
Material
39,29950

10.01.049
FORRO DE GESSO ACARTONADO INCL ESTRUTURA
3.40.60
FORRO GESSO ACARTONADO FORN COLOCADO INCL ESTRUTUR
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
44,16000

10.01.050
FORRO DE PLACA DE GESSO QUADRICULADA
3.40.56
FORRO PLACA DE GESSO COM COLOCACAO
Mo-de-Obra 0,00000
LS
0,00000

0,00000

M2
M2
1,00000
Material
32,64000

0,00000

M2
M2
1,00000
Material
32,64000

0,00000

M2
M2
1,00000
Material
32,64000

SubMO

10.01.051
FORRO DE PLACA DE GESSO COM FUROS SIMETRICOS
3.40.56
FORRO PLACA DE GESSO COM COLOCACAO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
10.01.052
FORRO DE PLACA DE GESSO COM FUROS ASSIMETRICOS
3.40.56
FORRO PLACA DE GESSO COM COLOCACAO
Mo-de-Obra 0,00000
LS
0,00000
SubMO

10.01.053
FORRO DE PLACA DE GESSO C/ISOLACAO TERMO-ACUSTICA-QUADRICULADAS
M2
3.40.55
FORRO PLACA GESSO COM ISOLAM TERMO-ACUST
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
49,47000
10.01.054
FORRO DE PLACA DE GESSO C/ISOLACAO TERMO-ACUSTICA-FUROS SIMETRICOS
M2
3.40.55
FORRO PLACA GESSO COM ISOLAM TERMO-ACUST
M2
1,00000
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000
Material
49,47000
10.01.055
FORRO DE PLACA DE GESSO C/ISOLACAO TERMO-ACUSTICA-FUROS ASSIMETRICO
M2
3.40.55
FORRO PLACA GESSO COM ISOLAM TERMO-ACUST
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
Material
49,47000
SubMO
0,00000
10.01.056
ESTRUTURA DE ALUMINIO PARA APLICACAO DE FORRO DE GESSO
3.13.93
ESTRUTURA METALICA P/FORRO DE GESSO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
15,01000

10.01.057
FORRO DE PLACA DE GESSO REMOVIVEL
3.40.26
FORRO DE PLACA DE GESSO REMOVIVEL
Mo-de-Obra 0,00000
LS
0,00000

0,00000

M2
M2
1,00000
Material
37,21000

1,69608

M2
H
0,20000
M2
1,00000
Material
10,13000

1,69608

M2
H
0,20000
M2
1,00000
Material
13,52000

0,42402

M2
H
0,05000
M2
1,05000
Material
6,35250

10.01.061
ISOLACAO TERMOACUSTICA - LA DE ROCHA E=2``
1.01.46
SERVENTE
2.45.04
ISOLACAO TERMOACUS-LA DE ROCHA DENSID 32 KG/M3 E=2
Mo-de-Obra 0,76400
LS
0,93208
SubMO
1,69608

M2
H
0,20000
M2
1,00000
Material
13,53000

SubMO

10.01.058
ISOLACAO TERMOACUSTICA - LA DE VIDRO ESP 1"
1.01.46
SERVENTE
2.45.70
LA VIDRO ESP. 1" P/ISOLAMENTO
Mo-de-Obra 0,76400
LS
0,93208
SubMO
10.01.059
ISOLACAO TERMOACUSTICA - LA DE VIDRO E=2"
1.01.46
SERVENTE
2.45.03
ISOLACAO TERMOACUSTICA - LA DE VIDRO E=2"
Mo-de-Obra 0,76400
SubMO
LS
0,93208
10.01.060
ISOLACAO TERMICA - CHAPA DE ISOPOR E=30MM
1.01.46
SERVENTE
2.45.14
ISOLACAO TERMICA - CHAPA DE ISOPOR E=30MM
Mo-de-Obra 0,19100
LS
0,23302
SubMO

10.01.070
FORRO PLACA MINERAL NRC 0,50 ECOMIN FILIGRAN INCL.PERFIS FORNEC/INST.
M2
FORN INST FORRO PLACA MIN. NRC 0,50 ECOMIN FILIGRAN (1250X625/625X625)
3.40.01
M2
1,00000
INCL.PERF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
31,46000
10.01.071
FORRO PLACA MINERAL NRC 0,55 GERGIAN INCL.PERFIS FORNEC/INST.
M2
3.40.02
FORN INST FORRO PLACA MIN. NRC 0,55 GIORGIAN (1250X625/625X625) INCL.PERFIS
M2
1,00000
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000
Material
48,00000
10.01.072
FORRO PLACA MINERAL NRC 0,65 COMET INCL.PERFIS FORNEC/INST.
M2
3.40.03
FORN INST FORRO PLACA MIN. NRC 0,65 COMET (1250X625/625X625) INCL.PERFIS
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
50,00000

Exerccio:

2011

Custo Unit.

Custo Total

BDI

4,60
17,40
4,67
14,28377

BDI

44,16
10,15680

BDI

32,64
7,50720

BDI

32,64
7,50720

BDI

32,64
7,50720

BDI

49,47
11,37810

BDI

49,47
11,37810

BDI

49,47
11,37810

BDI

15,01
3,45230

BDI

37,21
8,55830

BDI

3,82
10,13
2,72000

BDI

3,82
13,52
3,49970

BDI

3,82
6,05
1,55860

BDI

3,82
13,53
3,50200

BDI

31,46
7,23580

BDI

48,00
11,04000

BDI

50,00
11,50000

16,10000
18,27000
1,16750

54,31
44,16000

40,14
32,64000

40,14
32,64000

40,14
32,64000

60,84
49,47000

60,84
49,47000

60,84
49,47000

18,46
15,01000

45,76
37,21000

14,54
0,76400
10,13000

18,71
0,76400
13,52000

8,33
0,19100
6,35250

18,72
0,76400
13,53000

38,69
31,46000

59,04
48,00000

61,50
50,00000

Pgina: 245

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

10.01.073
FORRO PLACA MINERAL NRC 0,65 ECOMIN ANTARIS INCL.PERFIS FORNEC/INST.
M2
FORN INST FORRO PLACA MIN. NRC 0,65 ECOMIN ANTARIS (1250X625/625X625)
3.40.04
M2
1,00000
INCL.PERF.
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
39,76000

Custo Unit.

Custo Total
48,90
39,76000

BDI

39,76
9,14480

BDI

48,00
11,04000

BDI

65,00
14,95000

BDI

41,81
9,61630

10.01.077
FORRO PLACA MINERAL NRC 0,85 THERMOFON INCL.PERFIS FORNEC/INST.
M2
3.40.08
FORN INST FORRO PLACA MIN. NRC 0,85 THERMOFON (1250X625/625X625) INCL.PERFIS M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
48,11000

BDI

48,11
11,06530

10.01.099
FORROS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

301,12
244,82
244,82000
BDI
56,30860

10.01.074
FORRO PLACA MINERAL NRC 0,65 SAHARA INCL.PERFIS FORNEC/INST.
M2
3.40.05
FORN INST FORRO PLACA MIN. NRC 0,65 SAHARA (1250X625/625X625) INCL.PERFIS
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
48,00000
10.01.075
FORRO PLACA MINERAL NRC 0,70 CONSTELATION INCL.PERFIS FORNEC/INST.
M2
3.40.06
FORN INST FORRO PLACA MIN. NRC 0,70 CONSTELATION (1250X625/625X625) INCL.PERF M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
65,00000
10.01.076
FORRO PLACA MINERAL NRC 0,70 MP COMPLETE INCL.PERFIS FORNEC/INST.
M2
3.40.07
FORN INST FORRO PLACA MIN. NRC 0,70 MP COMPLET (1250X625/625X625) INCL.PERFIS M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
41,81000

0,00000

MV
MV
1,00000
Material
244,82000

10.50.001
DE FORRO DE ESTUQUE OU MADEIRA, INCLUSIVE ENTARUGAMENTO
1.01.46
SERVENTE
SubMO
1,35686
Mo-de-Obra 0,61120
LS
0,74566

M2
H
0,16000
Material
0,00000

10.50.002
DE FORROS DE MADEIRA, EXCLUSIVE ENTARUGAMENTO
1.01.46
SERVENTE
Mo-de-Obra 1,14600
LS
1,39812
SubMO

2,54412

M2
H
0,30000
Material
0,00000

1,86569

M2
H
0,22000
Material
0,00000

LS

0,00000

SubMO

59,04
48,00000

79,95
65,00000

51,42
41,81000

59,17
48,11000

1,66
0,61120

BDI

3,82
0,31208

BDI

3,82
0,58515

BDI

3,82
0,42911

0,67843

M2
H
0,08000
Material
0,00000

BDI

3,82
0,15604

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

10.60.001
DE FORROS DE MADEIRA PREGADOS (PLACAS OU TABUAS)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 2,39680
LS
2,92410
SubMO
5,32090

M2
H
0,28000
H
0,28000
Material
0,00000

10.60.002
DE FORROS EM PLACAS APOIADAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 1,28400
LS
1,56648

2,85048

M2
H
0,15000
H
0,15000
Material
0,00000

10.50.003
DE FORRO EM GESSO
1.01.46
SERVENTE
Mo-de-Obra 0,84040
LS
10.50.004
DE ENTARUGAMENTO
1.01.46
SERVENTE
Mo-de-Obra 0,30560
LS
10.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

1,02529

0,37283

0,00000

10.60.005
RETIRADA DE FORRO DE PVC EM LAMINAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 2,39680
LS
2,92410
10.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

10.70.001
DE FORRO DE MADEIRA PREGADO (PLACAS OU TABUAS)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
SubMO
Mo-de-Obra 2,56800
LS
3,13296
10.70.002
1.01.11
1.01.12

Exerccio:

DE FORRO EM PLACAS APOIADAS


CARPINTEIRO
AJUDANTE DE CARPINTEIRO

2011

3,12
1,14600

2,29
0,84040

0,83
0,30560

6,54
1,28800
1,10880

BDI

4,60
3,96
1,22381

BDI

4,60
3,96
0,65561

5,32090

M2
H
0,28000
H
0,28000
Material
0,00000

BDI

4,60
3,96
1,22381

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

5,70096

M2
H
0,30000
H
0,30000
KG
0,08000
Material
0,37360
M2
H
H

0,15000
0,15000

BDI

4,60
3,96
4,67
1,39715

4,60
3,96

3,50
0,69000
0,59400

6,54
1,28800
1,10880

7,47
1,38000
1,18800
0,37360

3,50
0,69000
0,59400

Pgina: 246

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 1,28400

LS

1,56648

UN Coeficiente
SubMO

10.70.005
RECOLOCACAO DE FORRO DE PVC EM LAMINAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 2,39680
LS
2,92410
SubMO
10.70.099
RECOLOCACOES DE FORROS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

2,85048

Material

0,00000

0,65561

5,32090

M2
H
0,28000
H
0,28000
Material
0,00000

BDI

4,60
3,96
1,22381

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M2
H
1,30000
H
1,30000
M
2,50000
M
2,50000
M
22,00000
KG
0,25000
Material
66,29250

10.80.003
FORRO DE RIPAS DE PINHO APARELHADA DE 5 X 1 CM-EM XADRES
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.67.60
PREGO
3.40.40
RIPA PINHO APARELHADA 5X1CM P/FORRO
Mo-de-Obra 11,12800
LS
13,57616
SubMO
24,70416

M2
H
1,30000
H
1,30000
M
2,50000
M
2,50000
KG
0,25000
M
22,00000
Material
48,47250

10.80.005
FORRO EM LAMINA PVC - 100MM - SOMENTE LAMINAS
3.40.36
ARREMATES PARA FORRO LAMINAS PVC 100MM
3.40.37
FORRO LAMINA PVC 100MM E=8A10MM (SO LAMINA) COL
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

M2
M
0,57000
M2
1,00000
Material
24,99830

53,06688

M2
H
0,80000
H
0,80000
H
1,70000
H
2,40000
M3
0,04000
KG
7,60000
KG
4,39000
M
2,50000
M
2,50000
KG
0,20000
M2
1,10000
Material
26,88870

4,75080

M2
H
0,25000
H
0,25000
M2
1,05000
Material
10,96200

3,80064

M2
H
0,20000
H
0,20000
M2
1,05000
Material
15,47700

SubMO

10.80.016
PLACAS PARA FORROS ISOLANTES BISOTADO DE 12 MM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.40.27
PLACA P/FORRO ISOL BISOTADO 12MM
SubMO
Mo-de-Obra 2,14000
LS
2,61080
10.80.017
PLACAS DE MADEIRA MINERALIZADA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.40.14
CHAPA MAD MINERALIZADA S/PINTURA
Mo-de-Obra 1,71200
LS
2,08864

SubMO

10.80.018
PERFIL DE FERRO SECCAO CARTOLA EM CHAPA N 20 P/SUST DE FORRO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.65.88
PERFIL METALICO SECCAO CARTOLA PARA FORRO
Mo-de-Obra 2,05440
LS
2,50637
SubMO
4,56077

Material

10.80.020
TABUAS DE PINHO DE 10 X 1 CM TIPO MACHO-FEMEA PARA FORRO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
3.40.41
TABUA PINHO MACHO-FEMEA 1X10CM-FORRO
Mo-de-Obra 2,56800
SubMO
5,70096
LS
3,13296

M2
H
0,30000
H
0,30000
KG
0,08000
M2
1,10000
Material
35,96960

10.80.022
Exerccio:

TABUAS DE PEROBA DE 10X1CM TIPO MACHO/FEMEA PARA FORROS

2011

Custo Total

BDI

10.80.002
FORRO DE RIPAS DE PEROBA APARELHADA DE 5 X 1 CM - EM XADRES
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.60
RIPA DE PEROBA 1X5CM
2.67.60
PREGO
SubMO
24,70416
Mo-de-Obra 11,12800
LS
13,57616

10.80.010
FORRO DE ESTUQUE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.67.60
PREGO
2.80.03
TELA PARA ESTUQUE
Mo-de-Obra 23,90400
LS
29,16288

Custo Unit.

M
H
0,24000
H
0,24000
M
1,05000
5,48100

M2

BDI

4,60
3,96
2,09
4,60
2,20
4,67
20,92923

BDI

4,60
3,96
2,09
4,60
4,67
1,39
16,83063

BDI

2,19
23,75
5,74961

BDI

4,60
3,96
4,64
3,82
80,46
0,35
0,37
2,09
4,60
4,67
1,57
18,38978

BDI

4,60
3,96
10,44
3,61394

BDI

4,60
3,96
14,74
4,43386

BDI

4,60
3,96
5,22
2,30961

BDI

4,60
3,96
4,67
32,36
9,58423

6,54
1,28800
1,10880

111,92
5,98000
5,14800
5,22500
11,50000
48,40000
1,16750

90,00
5,98000
5,14800
5,22500
11,50000
1,16750
30,58000

30,74
1,24830
23,75000

98,34
3,68000
3,16800
7,88800
9,16800
3,21840
2,66000
1,62430
5,22500
11,50000
0,93400
1,72700

19,32
1,15000
0,99000
10,96200

23,71
0,92000
0,79200
15,47700

12,35
1,10400
0,95040
5,48100

51,25
1,38000
1,18800
0,37360
35,59600

81,49
Pgina: 247

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
3.55.13
TABUA DE PEROBA 10X1CM TIPO MACHO/FEMEA
Mo-de-Obra 2,56800
LS
3,13296
SubMO

Custo Total

BDI

4,60
3,96
4,67
54,71
15,23878

BDI

4,60
3,96
38,49
2,14
4,67
4,44
11,73680

BDI

4,60
4,67
0,51272

BDI

3,73
0,85790

10.80.037
ENTARUGAMENTO PARA FORROS EM CHAPAS DE FIBRA DE MADEIRA PRENSADA
M2
1.01.11
CARPINTEIRO
H
0,95000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,95000
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
M
1,80000
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
M
3,50000
2.67.60
PREGO
KG
0,25000
SubMO
18,05304
Mo-de-Obra 8,13200
LS
9,92104
Material
21,02950

BDI

4,60
3,96
2,09
4,60
4,67
8,98898

10.80.099
SERVICOS EM FORROS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

301,12
244,82
244,82000
BDI
56,30860

5,70096

H
0,30000
H
0,30000
KG
0,08000
M2
1,10000
Material
60,55460

Custo Unit.

10.80.029
TABUAS DE CEDRINHO CERNE MACHO FEMEA 10X1CM TRATADO C/CUPINICIDA
M2
1.01.11
CARPINTEIRO
H
0,30000
1.01.12
AJUDANTE DE CARPINTEIRO
H
0,30000
2.11.04
TABUA DE CEDRINHO CERNE MACHO FEMEA 10X1CM P/FORRO
M2
1,10000
2.11.40
ARREMATE MEIA CANA EM CEDRINHO 2X2CM
M
0,60000
2.67.60
PREGO
KG
0,08000
3.80.59
TRATAMENTO CUPINICIDA PARA MADEIRA
L
0,30000
Mo-de-Obra 2,56800
SubMO
5,70096
LS
3,13296
Material
45,32860
10.80.030
REPREGAMENTO DE FORROS DE MADEIRA
1.01.11
CARPINTEIRO
2.67.60
PREGO
Mo-de-Obra 0,92000
LS
1,12240

2,04240

M2
H
0,20000
KG
0,04000
Material
0,18680

10.80.035
PERFIL DE FERRO PARA REFORCO DE FORRO, INCLUSIVE SOLDA
2.50.15
ESTRUT METAL-FORN,COLOC,ANTI-FERRUG
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

KG
KG
1,00000
Material
3,73000

0,00000

SubMO

SubMO

0,00000

IMPERMEABILIZACAO DE SUB-SOLOS C/ARG CIM-AREIA 1:3 CONTENDO


HIDROFUGO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 9,87900
LS
12,05238
SubMO
21,93138

11.01.001

MV
MV
1,00000
Material
244,82000
M2
H
1,10000
H
1,25000
M3
0,02400
KG
11,27000
KG
0,30000
Material
6,85094

1,38000
1,18800
0,37360
60,18100

62,76
1,38000
1,18800
42,33900
1,28400
0,37360
1,33200

2,74
0,92000
0,18680

4,58
3,73000

48,07
4,37000
3,76200
3,76200
16,10000
1,16750

35,40

BDI

4,64
3,82
80,46
0,37
2,50
6,61993

BDI

4,64
3,82
80,46
0,37
6,23
2,50
8,44293

BDI

4,64
1,49
11,15
1,64969

11.01.010
IMPERMEAB C/ ARGAM POLIMERICA P/ CORTINAS E POCOS DE ELEV - 4 DEMAOS
M2
1.01.87
APLICADOR
H
0,25000
1.01.88
AJUDANTE DE APLICADOR
H
0,25000
2.40.76
IMPERM ARGAMASSA POLIMERICA
KG
4,00000
SubMO
4,74525
Mo-de-Obra 2,13750
LS
2,60775
Material
7,08000

BDI

4,60
3,95
1,77
2,71981

11.01.099
IMPERMEABILIZACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

301,12
244,82
244,82000
BDI
56,30860

11.01.002
IMPERMEABILIZACAO DE SUB-SOLOS C/ARG CIM-AREIA 1:3 HIDR TINTA BETUM
M2
1.01.39
PEDREIRO
H
1,10000
1.01.46
SERVENTE
H
1,45000
2.05.03
AREIA
M3
0,02400
2.05.08
CIMENTO
KG
11,27000
2.40.56
TINTA BETUMINOSA
L
1,00000
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
KG
0,30000
Mo-de-Obra 10,64300
LS
12,98446
SubMO
23,62746
Material
13,08094
11.01.003
IMPERMEABILIZACAO POR CRISTALIZACAO - SUB SOLOS
1.01.39
PEDREIRO
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
Mo-de-Obra 0,46400
LS
0,56608
SubMO

0,00000

SubMO

1,03008

0,00000

11.02.022
IMPERMEABILIZACAO MULTIMEMBRANAS ASFALTICAS - FELTRO ASFALTO
2.40.78
IMPERM MULTIMENBR ASFALT FELTRO ASFALTO-APLICADA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

Exerccio:

2011

M2
H
0,10000
KG
3,00000
KG
0,15000
Material
6,14250

MV
MV
1,00000
Material
244,82000
M2
M2
1,00000
Material
83,05000

BDI

83,05
19,10150

5,10400
4,77500
1,93104
4,16990
0,75000

45,15
5,10400
5,53900
1,93104
4,16990
6,23000
0,75000

8,82
0,46400
4,47000
1,67250

14,54
1,15000
0,98750
7,08000

102,15
83,05000

Pgina: 248

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

11.02.023
IMPERMEABILIZACAO COM MANTA ELASTOMERICA BUTILICA OU EPDM
2.40.62
IMPERM MANTA ELASTOMER 0,8MM BUTIL/EPDM-APLICADA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
112,26000

11.02.024
IMPERMEABILIZACAO COM MANTA ASFALTICA PRE FABRICADA 4MM
2.40.75
IMPERM MANTA ASFALTICA PRE-FABRICADA 4MM-APLICADA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
71,91000

11.02.025
IMPERMEABILIZACAO COM MANTA ASFALTICA PRE FABRICADA 4MM - ACAB AREIA
M2
2.40.88
IMPERM MANTA ASFALT PRE-FABR 4MM,ACAB AREIA-APLIC
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
75,11000
11.02.026
IMPERM C/ EMULSAO ACRILICA ESTRUT C/ VEU DE POLIESTER-6 DEMAOS / 2 EST
M2
1.01.87
APLICADOR
H
0,38000
1.01.88
AJUDANTE DE APLICADOR
H
0,38000
2.40.27
VEU DE POLIESTER
M2
2,00000
2.40.98
IMPERMEABILIZANTE FLEXIVEL DE BASE ACRILICA
KG
1,88000
Mo-de-Obra 3,24900
LS
3,96378
SubMO
7,21278
Material
22,09400
11.02.027
IMPERMEABILIZACAO C/ EMULSAO ACRILICA - 6 DEMAOS
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.40.98
IMPERMEABILIZANTE FLEXIVEL DE BASE ACRILICA
Mo-de-Obra 3,24900
LS
3,96378
SubMO

7,21278

11.02.028
IMPERMEABILIZACAO EMULSAO ASFALTICA ELASTOMERICA 4 DEMAOS
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.40.25
TINTA PRIMER SOLUCAO ASFALTICA
2.40.77
IMPERM EMULSAO ASFALTICA ELASTOMERICA
SubMO
5,69430
Mo-de-Obra 2,56500
LS
3,12930

M2
H
0,38000
H
0,38000
KG
1,88000
Material
16,07400
M2
H
0,30000
H
0,30000
L
0,60000
KG
1,25000
Material
12,41400

IMPERM EMULSAO ASFALT ELASTOMERICA ESTRUT VEU POLIESTER 6 DEMAOS/2


M2
EST
1.01.87
APLICADOR
H
0,43000
1.01.88
AJUDANTE DE APLICADOR
H
0,43000
2.40.25
TINTA PRIMER SOLUCAO ASFALTICA
L
0,60000
2.40.27
VEU DE POLIESTER
M2
2,00000
2.40.77
IMPERM EMULSAO ASFALTICA ELASTOMERICA
KG
1,88000
Mo-de-Obra 3,67650
LS
4,48533
Material
22,66760
SubMO
8,16183

Custo Unit.

Custo Total

138,07
112,26
112,26000
BDI
25,81980

BDI

71,91
16,53930

BDI

75,11
17,27530

BDI

4,60
3,95
3,01
8,55
6,74056

BDI

4,60
3,95
8,55
5,35596

BDI

4,60
3,95
6,69
6,72
4,16491

11.02.029

11.02.030
PINTURA C/ TINTA ALUMINIO PARA PROTECAO DA IMPERMEABILIZACAO-3 DEMAOS
M2
1.01.87
APLICADOR
H
0,20000
1.01.88
AJUDANTE DE APLICADOR
H
0,20000
2.40.24
TINTA ALUMINIO BASE ASFALTICA
L
1,20000
Mo-de-Obra 1,71000
LS
2,08620
SubMO
3,79620
Material
31,62000
11.02.031
PINTURA C/ EMULSAO ACRILICA - 3 DEMAOS
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.40.98
IMPERMEABILIZANTE FLEXIVEL DE BASE ACRILICA
Mo-de-Obra 1,71000
LS
2,08620
SubMO

3,79620

M2
H
0,20000
H
0,20000
KG
0,94000
Material
8,03700

11.02.035
IMPERMEAB C/ MANTA ASF PRE-FABR 4MM ACAB ALUMIN SEM PROT MECANICA
M2
2.40.74
MANTA ASFALTICA PRE-FABRICADA ALUM 4MM FORN/APLIC
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
74,24000
11.02.050
ISOLACAO TERMOACUSTICA - LA DE VIDRO ESP 1"
1.01.46
SERVENTE
2.45.70
LA VIDRO ESP. 1" P/ISOLAMENTO
Mo-de-Obra 0,76400
LS
0,93208
SubMO

1,69608

M2
H
0,20000
M2
1,00000
Material
10,13000

11.02.052
ISOLAMENTO TERMICO COM ESPUMA DE POLIURETANO ESPESSURA DE 3 CM
M2
1.01.87
APLICADOR
H
0,20000
2.45.56
ESPUMA POLIURETANO ESP 3CM P/ISOLAMENTO
M2
1,00000
Mo-de-Obra 0,92000
LS
1,12240
SubMO
2,04240
Material
26,03000
11.02.053
ISOLAMENTO TERMICO COM TIJOLOS CERAMICOS FURADOS ESPESSURA DE 10 CM
M2
1.01.39
PEDREIRO
H
0,10000
1.01.46
SERVENTE
H
0,40000
2.25.16
TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM
UN
27,00000
SubMO
4,42224
Mo-de-Obra 1,99200
LS
2,43024
Material
14,58000

Exerccio:

2011

88,44
71,91000

92,38
75,11000

36,04
1,74800
1,50100
6,02000
16,07400

28,64
1,74800
1,50100
16,07400

22,27
1,38000
1,18500
4,01400
8,40000

37,92

BDI

4,60
3,95
6,69
3,01
6,72
7,09077

BDI

4,60
3,95
26,35
8,14573

BDI

4,60
3,95
8,55
2,72164

BDI

74,24
17,07520

BDI

3,82
10,13
2,72000

BDI

4,60
26,03
6,45665

BDI

4,64
3,82
0,54
4,37052

1,97800
1,69850
4,01400
6,02000
12,63360

43,56
0,92000
0,79000
31,62000

14,55
0,92000
0,79000
8,03700

91,31
74,24000

14,54
0,76400
10,13000

34,52
0,92000
26,03000

23,37
0,46400
1,52800
14,58000

Pgina: 249

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

11.02.054
ISOLAMENTO TERMICO COM CAMADAS DE ARGILA EXPANDIDA
1.01.46
SERVENTE
2.45.02
ARGILA EXPANDIDA
Mo-de-Obra 7,64000
LS
9,32080
SubMO
16,96080

Custo Unit.

Custo Total

M3
H
2,00000
M3
1,00000
Material
231,34000

305,40
3,82
7,64000
231,34
231,34000
BDI
57,10918

11.02.055
FORNEC E COLOCACAO DE ISOPOR P/ TRATAMENTO ACUSTICO ENTRE LAJES
M3
1.01.46
SERVENTE
H
0,20000
2.45.15
ISOPOR PARA ISOLACAO ACUSTICA
M3
1,00000
Mo-de-Obra 0,76400
LS
0,93208
SubMO
1,69608
Material
213,60000

264,81
3,82
0,76400
213,60
213,60000
BDI
49,51810

11.02.061
PROTECAO TERMO-MECANICA C/LAJOTAS CERAM VERM INCL ARGAM ASSENT
M2
1.01.28
LADRILHISTA
H
1,50000
1.01.46
SERVENTE
H
1,05000
2.05.03
AREIA
M3
0,03200
2.05.08
CIMENTO
KG
10,63000
3.45.09
LAJOTAS CERAM VERM P/PROTEC TERMO-MECAN
M2
1,05000
Mo-de-Obra 11,64600
LS
14,20812
Material
31,63432
SubMO
25,85412
11.02.062
PROTECAO TERMO-MECANICA C/LADR HIDRAUL 1 COR INCL ARGAM ASSENT
M2
1.01.28
LADRILHISTA
H
1,50000
1.01.46
SERVENTE
H
1,05000
2.05.03
AREIA
M3
0,03200
2.05.08
CIMENTO
KG
10,63000
3.65.19
LADRILHO HIDRAULICO 20X20CM 1 COR
M2
1,05000
SubMO
25,85412
Mo-de-Obra 11,64600
LS
14,20812
Material
38,23882
11.02.064
REGULARIZACAO DE SUPERFICIE P/ PREPARO IMPERM 1:3 E=2,5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 4,47859
LS
5,46388
SubMO
9,94247

M2
H
0,41650
H
0,66650
M3
0,02630
KG
11,15000
Material
6,24160

11.02.065
ARGAMASSA P/ PROT MECANICA EM SUPERFICIE IMPERM TRACO 1:7 E=3CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.40.31
PAPEL KRAFT BETUMADO
Mo-de-Obra 3,45200
LS
4,21144
SubMO
7,66344

M2
H
H
M3
KG
M2
Material
3,85646

11.02.099
IMPERMEABILIZACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

MV
MV
1,00000
Material
244,82000

0,00000

SubMO

0,00000

11.03.001
COM ARGAMASSA CIM AREIA 1:3 COM HIDROFUGO (APLICACAO INTERNA)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 9,87900
LS
12,05238
SubMO
21,93138

M2
H
1,10000
H
1,25000
M3
0,02400
KG
11,27000
KG
0,30000
Material
6,85094

11.03.003
IMPERMEABILIZACAO ARGAMASA POLIMERICA P/ RESEVATORIO - 4 DEMAOS
M2
1.01.87
APLICADOR
H
0,25000
1.01.88
AJUDANTE DE APLICADOR
H
0,25000
2.40.76
IMPERM ARGAMASSA POLIMERICA
KG
4,00000
Mo-de-Obra 2,13750
LS
2,60775
SubMO
4,74525
Material
7,08000
11.03.004
IMPERMEABILIZACAO POR CRISTALIZACAO - RESERVATORIOS ENTERRADOS
M2
1.01.39
PEDREIRO
H
0,10000
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
KG
3,00000
2.40.10
EMULSAO ADESIVA PVA
KG
0,15000
SubMO
1,03008
Mo-de-Obra 0,46400
LS
0,56608
Material
6,14250

2011

BDI

5,09
3,82
80,46
0,37
30,22
14,74138

BDI

4,64
3,82
80,46
0,37
3,72234

BDI

4,64
3,82
80,46
0,37
0,73
2,64958

0,25000
0,60000
0,02600
2,50000
1,15000

11.03.002
COM ARGAMASSA CIM AREIA 1:3 COM HIDROFUGO E TINTA BET (APLIC INTERNA)
M2
1.01.39
PEDREIRO
H
1,10000
1.01.46
SERVENTE
H
1,45000
2.05.03
AREIA
M3
0,02400
2.05.08
CIMENTO
KG
11,27000
2.40.56
TINTA BETUMINOSA
L
1,00000
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
KG
0,30000
Mo-de-Obra 10,64300
LS
12,98446
SubMO
23,62746
Material
13,08094

Exerccio:

BDI

5,09
3,82
80,46
0,37
23,93
13,22234

70,71
7,63500
4,01100
2,57472
3,93310
25,12650

78,83
7,63500
4,01100
2,57472
3,93310
31,73100

19,90
1,93256
2,54603
2,11610
4,12550

14,16
1,16000
2,29200
2,09196
0,92500
0,83950

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
80,46
0,37
2,50
6,61993

BDI

4,64
3,82
80,46
0,37
6,23
2,50
8,44293

BDI

4,60
3,95
1,77
2,71981

BDI

4,64
1,49
11,15
1,64969

35,40
5,10400
4,77500
1,93104
4,16990
0,75000

45,15
5,10400
5,53900
1,93104
4,16990
6,23000
0,75000

14,54
1,15000
0,98750
7,08000

8,82
0,46400
4,47000
1,67250

Pgina: 250

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

11.03.010
COM TINTA BETUMINOSA (APLICACAO EXTERNA)
1.01.46
SERVENTE
2.40.56
TINTA BETUMINOSA
Mo-de-Obra 0,95500
LS
1,16510
SubMO

Custo Unit.

Custo Total

2,12010

M2
H
0,25000
L
0,50000
Material
3,11500

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

8,72460

M
H
0,60000
H
0,30000
KG
0,05000
M2
0,50000
M
1,05000
Material
83,07600

11.04.002
JUNTAS DE DILATACAO FUGENBAND ELASTICO PERFIL 0-12
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.60.25
JUNTA DILATACAO FUGEMBAND 120MM
SubMO
8,72460
Mo-de-Obra 3,93000
LS
4,79460

Material

M
H
0,60000
H
0,30000
M
1,00000
24,41000

Material

M
H
0,60000
H
0,30000
M
1,00000
41,04000

Material

C3
H
0,00300
C3
1,00000
0,09000

Material

M
H
0,20000
H
0,10000
M
1,00000
2,09000

11.03.099
IMPERMEABILIZACOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

11.04.001
JUNTAS DE DILATACAO EM CHAPA DE COBRE N 26
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
2.80.03
TELA PARA ESTUQUE
2.81.01
CHAPA DE COBRE NUM 26 X 30CM P/JUNT DIL
Mo-de-Obra 3,93000
LS
4,79460
SubMO

11.04.003
JUNTAS DE DILATACAO FUGENBANB ELASTICO PERFIL 0-22
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.60.27
JUNTA DILATACAO FUGEMBAND 220MM
Mo-de-Obra 3,93000
LS
4,79460
SubMO
8,72460
11.04.004
JUNTAS DE DILATACAO/MASTIQUE ELASTICO OU POLIURETANO
1.01.87
APLICADOR
2.80.65
MASTIQUE ELASTICO POLIURETANO P/JUNTAS
Mo-de-Obra 0,01380
LS
0,01684
SubMO
0,03064
11.04.010
MANGUEIRA PLASTICA FLEXIVEL PARA JUNTA DE DILATACAO
1.01.39
PEDREIRO
1.01.46
SERVENTE
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
Mo-de-Obra 1,31000
LS
1,59820
SubMO
2,90820
11.04.012
ISOPOR PARA SUPORTE DE MASTIQUE
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.45.13
ISOPOR ESP= 20 MM
Mo-de-Obra 1,31000
LS
1,59820

SubMO

2,90820

11.04.021
JUNTA ELASTICA ESTRUTURAL NEOPRENE (REF 2020F) INCLUSIVE LIMPEZA
3.60.28
JUNTA ELAST ESTR NEOPRENE-REF JJ2020F EPDM APLIC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
11.04.022
JUNTA ELASTICA ESTRUTURAL NEOPRENE (REF 2027M) INCLUSIVE LIMPEZA
3.60.24
JUNTA ELAST ESTR NEOPRENE-REF JJ2027M EPDM APLIC
Mo-de-Obra 0,00000
SubMO
0,00000
LS
0,00000
11.04.030
PERFIL DE ALUMINIO DE 1"X1"X1/8"
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.65.98
PERFIL ALUMINIO 1'X1'X1/8'
Mo-de-Obra 6,76800
LS
8,25696

SubMO

15,02496

3,82
6,23
1,20407

BDI

BDI

4,64
3,82
24,41
7,62096

BDI

4,64
3,82
41,04
11,44586

BDI

4,60
0,09
0,02775

BDI

4,64
3,82
2,09
1,14959

Material

M
H
0,20000
H
0,10000
M2
0,05000
0,21650

BDI

4,64
3,82
4,33
0,71868

Material

M
M
1,00000
103,30000

127,05
103,30
103,30000
BDI
23,75900

Material

M
M
1,00000
92,95000

Material

M
H
0,80000
H
0,80000
M
1,00000
5,64000

SELANTE DE POLIURETANO P/JUNTAS MOVIMENTACAO/DESSOLIDARIZACAO


M
QUADRO
1.01.39
PEDREIRO
H
1.01.46
SERVENTE
H
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
UN
2.80.74
FITA CREPE (ROLO)
UN
Mo-de-Obra 2,53800
LS
3,09636
SubMO
5,63436
Material
7,89540

11.50.001

Exerccio:

SubMO

0,00000

IMPERMEABILIZACOES COM MULTIMEMBRANAS ASFALT - ELEM SINT

2011

112,91
2,78400
1,14600
0,23350
0,78500
82,05750

4,64
3,82
4,67
1,57
78,15
21,11414

BDI

92,95
21,37850

BDI

4,64
3,82
5,64
4,75294

BDI

4,64
3,82
25,87
3,36
3,11185

11.04.041

11.04.099
SERVICOS EM JUNTAS DE DILATACAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

6,43
0,95500
3,11500

61,21
2,78400
1,14600
41,04000

0,14
0,01380
0,09000

6,14
0,92800
0,38200
2,09000

3,84
0,92800
0,38200
0,21650

114,32
92,95000

25,41
3,71200
3,05600
5,64000

16,64
0,30000
0,30000
0,30000
0,04000

MV
MV
1,00000
Material
244,82000
M2

40,75
2,78400
1,14600
24,41000

1,39200
1,14600
7,76100
0,13440

301,12
244,82
244,82000
BDI
56,30860
5,21

Pgina: 251

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
Mo-de-Obra 1,91000

UN Coeficiente
H

LS

2,33020

11.50.002
ARGAMASSA COM IMPERMEABILIZANTE
1.01.46
SERVENTE
Mo-de-Obra 2,29200
LS
2,79624

SubMO

SubMO

11.50.003
ISOLAMENTO TERMICO COM CONCRETO CELULAR ETC
1.01.46
SERVENTE
Mo-de-Obra 0,38200
LS
0,46604
SubMO
11.50.004
ISOLAMENTO TERMICO DE MANTA DE LA DE VIDRO
1.01.46
SERVENTE
SubMO
Mo-de-Obra 0,19100
LS
0,23302
11.50.005
PROTECAO TERMOMECANICA COM CONCRETO CELULAR
1.01.46
SERVENTE
Mo-de-Obra 1,91000
LS
2,33020
SubMO
11.50.050
JUNTAS DE DILATACAO METALICAS
1.01.46
SERVENTE
Mo-de-Obra 0,76400
LS
0,93208
11.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

SubMO

0,50000

4,24020

Material

5,08824

M2
H
0,60000
Material
0,00000

0,84804

M2
H
0,10000
Material
0,00000

0,42402

M2
H
0,05000
Material
0,00000

4,24020

M2
H
0,50000
Material
0,00000

1,69608

Material

M
H
0,20000
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

11.60.001
ISOLAMENTO TERMICO COM CONCRETO CELULAR OU TIJOLOS CERAMICOS
1.01.46
SERVENTE
SubMO
2,54412
Mo-de-Obra 1,14600
LS
1,39812

Custo Unit.

0,00000

M2
H
0,30000
Material
0,00000

Custo Total

BDI

3,82
0,97525

BDI

3,82
1,17030

BDI

3,82
0,19505

BDI

3,82
0,09753

BDI

3,82
0,97525

BDI

3,82
0,39010

1,91000

6,25
2,29200

1,04
0,38200

0,52
0,19100

5,21
1,91000

2,08
0,76400

301,12
244,82
244,82000
BDI
56,30860
3,12
1,14600

BDI

3,82
0,58515

11.60.002
ISOLAMENTO TERMICO COM DOLOMITA/SEIXOS ROLADOS/ARGILA EXPANDIDA
M2
1.01.46
SERVENTE
H
0,10000
Mo-de-Obra 0,38200
LS
0,46604
SubMO
0,84804
Material
0,00000

BDI

3,82
0,19505

11.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

301,12
244,82
244,82000
BDI
56,30860

LS

0,00000

SubMO

0,00000

MV
MV
1,00000
Material
244,82000

1,04
0,38200

11.70.015
ISOLAMENTO TERMICO EM BRITAS, SEIXOS ROLADOS E ARGILA EXPANDIDA
1.01.46
SERVENTE
Mo-de-Obra 16,42600
LS
20,03972
SubMO
36,46572

M3
H
4,30000
Material
0,00000

BDI

11.70.099
RECOLOCACOES DE IMPERMEABILIZACOES/JUNTA DE DILATACAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

11.80.099
SERVICOS DE IMPERMEABILIZACAO/JUNTAS DE DILATACAO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

12.01.001
CHAPISCO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 2,11500

0,25000
0,25000
0,00300
1,39000

4,69530

M2
H
H
M3
KG
Material
0,75568

0,74000
0,97000
0,01300
3,81000
2,37000

15,84858

M2
H
H
M3
KG
KG
Material
3,25638

0,00000

MV
MV
1,00000
Material
244,82000

LS

12.01.006
EMBOCO DESEMPENADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 7,13900
LS

2,58030

8,70958

12.01.099
REVESTIMENTOS PARA TETOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
12.02.001
1.01.39
1.01.46
Exerccio:

CHAPISCO
PEDREIRO
SERVENTE

2011

SubMO

SubMO

SubMO

M2
H
H

0,25000
0,25000

3,82
8,38712

BDI

4,64
3,82
80,46
0,37
1,25373

BDI

4,64
3,82
80,46
0,35
0,37
4,39414

44,85
16,42600

6,70
1,16000
0,95500
0,24138
0,51430

23,49
3,43360
3,70540
1,04598
1,33350
0,87690

301,12
244,82
244,82000
BDI
56,30860

4,64
3,82

6,70
1,16000
0,95500
Pgina: 252

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 2,11500

LS

2,58030

UN Coeficiente

SubMO

12.02.004
CHAPISCO ROLADO PARA SUPERFICIES LISAS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.99
ADESIVO P/ ARGAMASSA E CHAPISCO BIANCO/SIKAFIX
Mo-de-Obra 1,88300
LS
2,29726
SubMO
12.02.005
EMBOCO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 5,64900

LS

12.02.006
EMBOCO DESEMPENADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 7,13900
LS
12.02.007
REBOCO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
Mo-de-Obra 4,76480

LS

12.02.009
REVESTIMENTO COM GESSO
1.01.23
GESSEIRO
1.01.46
SERVENTE
2.05.80
GESSO
Mo-de-Obra 3,20500
LS

6,89178

8,70958

5,81306

3,91010

SubMO

SubMO

SubMO

SubMO

12.02.010
REVESTIMENTO TEXTURIZADO ACRILICO BRANCO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.05
TEXTURA ACRILICA - BRANCA
Mo-de-Obra 2,56040
LS
3,12369
SubMO

4,69530

M3
0,00300
KG
1,39000
Material
0,75568

0,20000
0,25000
0,00610
2,43000
0,25000

4,18026

M2
H
H
M3
KG
L
Material
2,90241

0,60000
0,75000
0,01300
3,81000
2,37000

12,54078

M2
H
H
M3
KG
KG
Material
3,25638

0,74000
0,97000
0,01300
3,81000
2,37000

15,84858

M2
H
H
M3
KG
KG
Material
3,25638

0,50000
0,64000
0,00600
0,97000

10,57786

M2
H
H
M3
KG
Material
0,82226

7,11510

M2
H
0,50000
H
0,25000
KG
5,00000
Material
2,40000

5,68409

M2
H
0,46000
H
0,10000
L
1,10000
Material
6,45700

12.02.011
REVESTIMENTO TEXTURIZADO ACRILICO BRANCO E PINTURA ACRILICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.05
TEXTURA ACRILICA - BRANCA
3.75.42
TINTA LATEX STANDARD
Mo-de-Obra 3,36700
LS
4,10774
SubMO
7,47474

M2
H
H
L
L
Material
7,12300

12.02.012
CERAMICA ESMALTADA 10X10CM - LARANJA,VERMELHO,AMARELO
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.36
CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL
Mo-de-Obra 11,16370
LS
13,61971
SubMO
24,78341

M2
H
1,03000
H
1,55000
KG
5,00000
KG
0,96000
M2
1,05000
Material
52,34800

12.02.013
CERAMICA ESMALTADA 10X10CM - AZUL,VERDE,PRETO
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.34
CERAMICA ESMALTADA 10X10CM-AZUL,VERDE,PRETO
SubMO
Mo-de-Obra 11,16370
LS
13,61971

M2
H
1,03000
H
1,55000
KG
5,00000
KG
0,96000
M2
1,05000
Material
38,62450

12.02.014
1.01.28
1.01.46
2.05.81
Exerccio:

24,78341

CERAMICA ESMALTADA 10X10CM - BRANCO,AREIA,BEGE,OCRE,CINZA


LADRILHISTA
SERVENTE
ARGAMASSA PRE-FABR TIPO CIMENTCOLA

2011

M2
H
H
KG

Custo Unit.

BDI

80,46
0,37
1,25373

BDI

4,64
3,82
80,46
0,37
6,05
1,62901

BDI

4,64
3,82
80,46
0,35
0,37
3,63335

BDI

4,64
3,82
80,46
0,35
0,37
4,39414

BDI

4,64
3,82
80,46
0,35
2,62203

BDI

4,50
3,82
0,48
2,18847

BDI

4,74
3,80
5,87
2,79245

BDI

4,74
3,80
5,87
6,66
3,35748

BDI

5,09
3,82
0,35
1,65
46,68
17,74023

BDI

5,09
3,82
0,35
1,65
33,61
14,58382

0,55000
0,20000
1,10000
0,10000

1,03000
1,55000
5,00000

Custo Total

5,09
3,82
0,35

0,24138
0,51430

8,71
0,92800
0,95500
0,49081
0,89910
1,51250

19,43
2,78400
2,86500
1,04598
1,33350
0,87690

23,49
3,43360
3,70540
1,04598
1,33350
0,87690

14,02
2,32000
2,44480
0,48276
0,33950

11,70
2,25000
0,95500
2,40000

14,93
2,18040
0,38000
6,45700

17,95
2,60700
0,76000
6,45700
0,66600

94,87
5,24270
5,92100
1,75000
1,58400
49,01400

77,99
5,24270
5,92100
1,75000
1,58400
35,29050

74,59
5,24270
5,92100
1,75000
Pgina: 253

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.35
CERAMICA ESMALT.10X10CM-BRAN,AREIA,BEGE,OCRE,CINZA
SubMO
24,78341
Mo-de-Obra 11,16370
LS
13,61971
12.02.029
CERAMICA ESMALTADA 20X20CM
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.13
CERAMICA ESMALTADA LISA 20X20CM
Mo-de-Obra 3,58970
LS
4,37943
SubMO

7,96913

12.02.037
REVESTIMENTO COM AZULEJOS LISOS, BRANCO BRILHANTE
1.01.06
AZULEJISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.20.01
AZULEJO LISO BRANCO BRILHANTE
Mo-de-Obra 5,90210
LS
7,20056
SubMO
13,10266
12.02.038
PERFIL SEXTAVADO EM ALUMINIO PARA AZULEJO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.67
CANTONEIRA PIN-CAM-PERFIL AZUL SEXT
Mo-de-Obra 6,00400
LS
7,32488
SubMO
12.02.039
PERFIL EM ALUMINIO PARA REBOCO
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.35.15
CANTONEIRA PERFIL EM ALUMINIO REBOCO
Mo-de-Obra 6,00400
LS
7,32488

SubMO

13,32888

13,32888

KG
0,96000
M2
1,05000
Material
35,86300
M2
H
0,33000
H
0,50000
KG
5,00000
KG
0,44000
M2
1,05000
Material
36,37000
M2
H
0,53000
H
0,80000
KG
5,00000
KG
0,44000
M2
1,05000
Material
25,15600

Material

M
H
0,80000
H
0,60000
M
1,00000
2,61000

Material

M
H
0,80000
H
0,60000
M
1,00000
3,54000

12.02.050
REVESTIMENTO TEXT. ACRIL. PIGMENTADO (CORES PRONTAS) - ACAB RANHURADO
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.04
TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS)
L
3.80.09
SELADOR P/PINTURA LATEX
L
Mo-de-Obra 3,70370
LS
4,51851
Material
9,58200
SubMO
8,22221
12.02.051
REVESTIMENTO TEXTURIZADO ACRILICO PIGMENTADO (CORES PRONTAS)
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.04
TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS)
Mo-de-Obra 3,36700
LS
4,10774
SubMO
7,47474

12.02.099
REVESTIMENTOS P/ PAREDES INTERNAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
12.04.001
CHAPISCO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 2,11500

LS

12.04.002
CHAPISCO FINO PENEIRADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 1,30440
LS
12.04.005
1.01.39
1.01.46
2.05.03
Exerccio:

EMBOCO
PEDREIRO
SERVENTE
AREIA

2011

2,58030

1,59137

SubMO

SubMO

SubMO

0,00000

0,25000
0,25000
0,00300
1,39000

4,69530

M2
H
H
M3
KG
Material
0,75568

0,10000
0,22000
0,00610
2,43000

2,89577

M2
H
H
M3
KG
Material
1,38991
M2
H
H
M3

BDI

BDI

5,09
3,82
0,35
1,65
32,28
10,19800

BDI

5,37
3,82
0,35
1,65
21,60
8,79949

BDI

4,64
3,82
2,61
3,66594

BDI

4,64
3,82
3,54
3,87984

BDI

4,74
3,80
7,51
10,36
4,09497

BDI

4,74
3,80
7,51
3,15855

BDI

4,83
0,14
11,95
3,00
1,54923

0,30000
2,00000
0,02000
1,00000

MV
MV
1,00000
Material
244,82000

0,60000
0,75000
0,01300

Custo Total

1,65
30,98
13,94868

0,60500
0,22000
1,00000
0,20000

M2
H
0,55000
H
0,20000
L
0,83330
Material
6,25808

12.02.072
GUARNICAO P/ACABAM JUNTAS DILATACAO- DE CEDRO APARELHADO 5 X 1 CM
M
1.01.92
ARTIFICE
H
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
CJ
2.67.77
BUCHA TIPO S-8 (CENTO)
UN
3.01.52
GUARNICAO PEROBA 5CM
M
SubMO
3,21678
Mo-de-Obra 1,44900
LS
1,76778
Material
3,51900

Custo Unit.

1,58400
32,52900

54,53
1,67970
1,91000
1,75000
0,72600
33,89400

47,05
2,84610
3,05600
1,75000
0,72600
22,68000

19,60
3,71200
2,29200
2,61000

20,74
3,71200
2,29200
3,54000

21,89
2,86770
0,83600
7,51000
2,07200

16,89
2,60700
0,76000
6,25808

8,28
1,44900
0,28000
0,23900
3,00000

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
80,46
0,37
1,25373

BDI

4,64
3,82
80,46
0,37
0,98571

4,64
3,82
80,46

6,70
1,16000
0,95500
0,24138
0,51430

5,27
0,46400
0,84040
0,49081
0,89910

19,43
2,78400
2,86500
1,04598
Pgina: 254

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 5,64900

UN Coeficiente

12,54078

KG
3,81000
KG
2,37000
Material
3,25638

0,74000
0,97000
0,01300
3,81000
2,37000

15,84858

M2
H
H
M3
KG
KG
Material
3,25638

0,50000
0,64000
0,00600
0,97000

10,57786

M2
H
H
M3
KG
Material
0,82226

12.04.013
REVESTIMENTO TEXT. ACRIL. PIGMENTADO (CORES PRONTAS)- ACAB RANHURADO
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.04
TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS)
L
3.80.09
SELADOR P/PINTURA LATEX
L
Mo-de-Obra 3,70370
LS
4,51851
Material
9,58200
SubMO
8,22221

0,60500
0,22000
1,00000
0,20000

LS

12.04.006
EMBOCO DESEMPENADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 7,13900
LS
12.04.007
REBOCO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
Mo-de-Obra 4,76480

LS

6,89178

8,70958

5,81306

SubMO

SubMO

SubMO

12.04.014
REVESTIMENTO TEXTURIZADO ACRILICO PIGMENTADO (CORES PRONTA)
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.04
TEXTURA ACRILICA PIGMENTADA (CORES PRONTAS)
Mo-de-Obra 3,36700
LS
4,10774
SubMO
7,47474

M2
H
0,55000
H
0,20000
L
0,83330
Material
6,25808

12.04.018
REVESTIMENTO TEXTURIZADO ACRILICO BRANCO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.05
TEXTURA ACRILICA - BRANCA
Mo-de-Obra 2,56040
LS
3,12369
SubMO

M2
H
0,46000
H
0,10000
L
1,10000
Material
6,45700

5,68409

12.04.019
REVESTIMENTO TEXTURIZADO ACRILICO BRANCO E PINTURA ACRILICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.05
TEXTURA ACRILICA - BRANCA
3.75.42
TINTA LATEX STANDARD
Mo-de-Obra 3,36700
LS
4,10774
SubMO
7,47474

M2
H
H
L
L
Material
7,12300

12.04.020
REVESTIMENTO COM PASTILHAS NATURAIS 2,5X2,5CM
1.01.38
PASTILHEIRO
1.01.46
SERVENTE
2.05.82
ARGAMASSA QUARTZOLIT PARA PASTILHAS
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.20.22
PASTILHA NATURAL 2,5X2,5CM
Mo-de-Obra 7,39060
LS
9,01653
SubMO

16,40713

M2
H
0,66000
H
1,00000
KG
5,00000
KG
0,76000
M2
1,05000
Material
113,12500

16,40713

M2
H
0,66000
H
1,00000
KG
5,00000
KG
0,76000
M2
1,05000
Material
101,84800

12.04.022
REVESTIMENTO COM PASTILHAS ESMALTADAS 2,5X 2,5 CM
1.01.38
PASTILHEIRO
1.01.46
SERVENTE
2.05.82
ARGAMASSA QUARTZOLIT PARA PASTILHAS
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.20.24
PASTILHA ESMALTADA 2,5X 2,5 CM
Mo-de-Obra 7,39060
LS
9,01653
SubMO
16,40713

M2
H
0,66000
H
1,00000
KG
5,00000
KG
0,76000
M2
1,05000
Material
84,36550

12.04.021
REVESTIMENTO COM PASTILHAS NATURAIS 5,0X5,0CM
1.01.38
PASTILHEIRO
1.01.46
SERVENTE
2.05.82
ARGAMASSA QUARTZOLIT PARA PASTILHAS
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.20.23
PASTILHA NATURAL 5,0X5,0CM
Mo-de-Obra 7,39060
LS
9,01653
SubMO

12.04.023
1.01.38
1.01.46
2.05.82
2.05.96
Exerccio:

REVESTIMENTO COM PASTILHAS ESMALTADAS 4,0X 4,0 CM


PASTILHEIRO
SERVENTE
ARGAMASSA QUARTZOLIT PARA PASTILHAS
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO

2011

M2
H
H
KG
KG

Custo Unit.

BDI

0,35
0,37
3,63335

BDI

4,64
3,82
80,46
0,35
0,37
4,39414

BDI

4,64
3,82
80,46
0,35
2,62203

BDI

4,74
3,80
7,51
10,36
4,09497

BDI

4,74
3,80
7,51
3,15855

BDI

4,74
3,80
5,87
2,79245

BDI

4,74
3,80
5,87
6,66
3,35748

0,55000
0,20000
1,10000
0,10000

0,66000
1,00000
5,00000
0,76000

Custo Total
1,33350
0,87690

23,49
3,43360
3,70540
1,04598
1,33350
0,87690

14,02
2,32000
2,44480
0,48276
0,33950

21,89
2,86770
0,83600
7,51000
2,07200

16,89
2,60700
0,76000
6,25808

14,93
2,18040
0,38000
6,45700

17,95
2,60700
0,76000
6,45700
0,66600

BDI

159,32
5,41
3,57060
3,82
3,82000
1,58
7,90000
1,65
1,25400
99,02
103,97100
29,79239

BDI

5,41
3,82
1,58
1,65
88,28
27,19868

BDI

5,41
3,82
1,58
1,65
71,63
23,17771

5,41
3,82
1,58
1,65

145,45
3,57060
3,82000
7,90000
1,25400
92,69400

123,95
3,57060
3,82000
7,90000
1,25400
75,21150

121,12
3,57060
3,82000
7,90000
1,25400
Pgina: 255

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.20.25
PASTILHA ESMALTADA 4,0X 4,0 CM
Mo-de-Obra 7,39060
LS
9,01653

UN Coeficiente
SubMO

16,40713

Material

M2
1,05000
82,06600

12.04.024
REVESTIMENTO COM PASTILHAS ESMALTADAS 5,0X 5,0 CM
1.01.38
PASTILHEIRO
1.01.46
SERVENTE
2.05.82
ARGAMASSA QUARTZOLIT PARA PASTILHAS
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.20.26
PASTILHA ESMALTADA 5,0X 5,0 CM
Mo-de-Obra 7,39060
LS
9,01653
SubMO
16,40713

M2
H
0,66000
H
1,00000
KG
5,00000
KG
0,76000
M2
1,05000
Material
92,16700

12.04.040
REVESTIMENTO C/ PLAQUETA LAMINADA
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
3.35.62
PLAQUETA LAMINADA PARA REVESTIMENTO
Mo-de-Obra 20,15680
LS
24,59130

44,74810

M2
H
2,00000
H
0,80000
H
1,64000
M3
0,02800
KG
4,98000
KG
3,90000
M2
1,05000
Material
32,44488

12.04.048
CERAMICA ESMALTADA 10X10CM - LARANJA,VERMELHO,AMARELO
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.83
ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.36
CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL
Mo-de-Obra 11,16370
LS
13,61971
SubMO
24,78341

M2
H
1,03000
H
1,55000
KG
5,00000
KG
0,96000
M2
1,05000
Material
58,44800

12.04.049
CERAMICA ESMALTADA 10X10CM - AZUL,VERDE,PRETO
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.83
ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.34
CERAMICA ESMALTADA 10X10CM-AZUL,VERDE,PRETO
SubMO
Mo-de-Obra 11,16370
LS
13,61971

M2
H
1,03000
H
1,55000
KG
5,00000
KG
0,96000
M2
1,05000
Material
44,72450

SubMO

24,78341

12.04.050
CERAMICA ESMALTADA 10X10CM - BRANCO,AREIA,BEGE,OCRE,CINZA
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.83
ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.35
CERAMICA ESMALT.10X10CM-BRAN,AREIA,BEGE,OCRE,CINZA
Mo-de-Obra 11,16370
LS
13,61971
SubMO
24,78341

M2
H
1,03000
H
1,55000
KG
5,00000
KG
0,96000
M2
1,05000
Material
41,96300

12.04.069
CERAMICA ESMALTADA 10X20CM -VERMELHO,LARANJA,AMARELO
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.37
CERAMICA ESMALTADA 10X20CM-VERMELHO,LARANJA,AMAREL
Mo-de-Obra 6,14830
LS
7,50093
SubMO
13,64923

M2
H
0,57000
H
0,85000
KG
5,00000
KG
0,72000
M2
1,05000
Material
26,34250

12.04.070
CERAMICA ESMALTADA 10X20CM - AZUL,VERDE,PRETO
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.38
CERAMICA ESMALTADA 10X20CM-AZUL,VERDE,PRETO
Mo-de-Obra 6,14830
LS
7,50093
SubMO

M2
H
0,57000
H
0,85000
KG
5,00000
KG
0,72000
M2
1,05000
Material
19,95850

13,64923

12.04.072
CERAMICA ESMALTADA 10X20CM - BRANCO,AREIA,BEGE,OCRE CINZA
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.39
CERAMICA ESMALT.10X20CM-BRAN,BEGE,CINZA,OCRE,AREIA
SubMO
13,64923
Mo-de-Obra 6,14830
LS
7,50093

M2
H
0,57000
H
0,85000
KG
5,00000
KG
0,72000
M2
1,05000
Material
19,95850

12.04.090
REVESTIMENTO FULGET - GRANULA 0 E 1 - CINZA
3.25.02
FULGET GRANA 0 E 1 CINZA - APLICADO
SubMO
Mo-de-Obra 0,00000
LS
0,00000

M2
M2
1,00000
Material
67,28000

12.04.091
Exerccio:

REVESTIMENTO FULGET - GRANULA 2 - CINZA

2011

0,00000

M2

Custo Unit.

Custo Total

BDI

69,44
22,64882

BDI

5,41
3,82
1,58
1,65
79,06
24,97205

BDI

5,09
4,64
3,82
80,46
0,35
0,37
25,72
17,75438

BDI

5,09
3,82
1,57
1,65
46,68
19,14323

BDI

5,09
3,82
1,57
1,65
33,61
15,98682

BDI

5,09
3,82
1,57
1,65
30,98
15,35168

BDI

5,09
3,82
0,35
1,65
22,29
9,19810

BDI

5,09
3,82
0,35
1,65
16,21
7,72978

BDI

5,09
3,82
0,35
1,65
16,21
7,72978

BDI

67,28
15,47440

72,91200

133,54
3,57060
3,82000
7,90000
1,25400
83,01300

94,94
10,18000
3,71200
6,26480
2,25288
1,74300
1,44300
27,00600

102,37
5,24270
5,92100
7,85000
1,58400
49,01400

85,49
5,24270
5,92100
7,85000
1,58400
35,29050

82,09
5,24270
5,92100
7,85000
1,58400
32,52900

49,18
2,90130
3,24700
1,75000
1,18800
23,40450

41,33
2,90130
3,24700
1,75000
1,18800
17,02050

41,33
2,90130
3,24700
1,75000
1,18800
17,02050

82,75
67,28000

87,82
Pgina: 256

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.25.03
FULGET GRANA 2 CINZA - APLICADO
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente
M2
1,00000
71,40000

0,00000

Material

0,00000

MV
MV
1,00000
Material
244,82000

12.50.001
DE REVESTIMENTO EM ARGAMASSA/GESSO EM FORRO E PAREDES
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 2,14200
LS
2,61324
SubMO
4,75524

M2
H
0,05000
H
0,50000
Material
0,00000

12.04.099
REVESTIMENTOS PARA PAREDES EXTERNAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

12.50.002
DE REVEST DE AZULEJOS, PASTILHAS E LADRILHOS INCL ARG ASSENTAMENTO
M2
1.01.39
PEDREIRO
H
0,07500
1.01.46
SERVENTE
H
0,75000
Mo-de-Obra 3,21300
LS
3,91986
SubMO
7,13286
Material
0,00000
12.50.003
SOMENTE DE AZULEJO
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 1,07100
LS
12.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

1,30662

0,00000

SubMO

SubMO

0,00000

301,12
244,82
244,82000
BDI
56,30860

M2
H
0,00000

BDI

BDI

12.80.002
CHAPISCO RUSTICO COM PEDRA BRITADA 1
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
Mo-de-Obra 2,88180
LS
3,51580

0,30000
0,39000
0,00800
3,42000
0,00600

6,39760

M2
H
H
M3
KG
M3
Material
2,28126

0,29500
0,16500
0,00500
0,20000
0,50000
0,35000

4,43800

M
H
H
M3
KG
KG
KG
Material
1,59180

12.80.051
1.01.39
1.01.46
2.65.98
Exerccio:

CANTONEIRA DE ALUMINIO DE 1"X1"X1/8"


PEDREIRO
SERVENTE
PERFIL ALUMINIO 1'X1'X1/8'

2011

SubMO

15,02496

Material

M
H
0,80000
H
0,80000
M
1,00000
3,22000
M
H
H
M

0,80000
0,60000
1,00000

3,82
3,51089

6,87600

301,12
244,82
244,82000
BDI
56,30860

2,00000
2,65000
0,02900
5,15000
7,80000

MV
MV
1,00000
Material
244,82000

12.80.050
CANTONEIRA DE FERRO DE 1"X1"X1/8"
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.15
PERFIL L DE FERRO 1"X1"X1/8"
Mo-de-Obra 6,76800
LS
8,25696

2,92
0,11600
0,95500

18,77
1,80000

12.70.099
RECOLOCACOES DE REVESTIMENTOS DE FORRO E PAREDE
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

SubMO

8,77
0,34800
2,86500

MV
MV
1,00000
Material
244,82000

43,07466

12.80.030
REPARO EM TRINCAS E RACHADURAS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.15.10
ACO CA-25 $MD BITOLAS
Mo-de-Obra 1,99910
LS
2,43890

5,84
0,23200
1,91000

BDI

M2
H
H
M3
KG
KG
Material
7,02184

SubMO

BDI

4,64
3,82
1,09371

2,37762

0,00000

SubMO

301,12
244,82
244,82000
BDI
56,30860

4,64
3,82
0,54685

MV
MV
1,00000
Material
244,82000

SubMO

71,40000

BDI

Material

0,00000

71,40
16,42200

M2
H
0,02500
H
0,25000
Material
0,00000

12.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

BDI

Custo Total

4,64
3,82
1,64056

DE MARMORE PEDRAS OU GRANITOS INCL DEMOLICAO ARGAMASSA


12.60.001
ASSENTAMENTO
1.01.46
SERVENTE
Mo-de-Obra 6,87600
LS
8,38872
SubMO
15,26472

12.70.001
DE MARMORE, PEDRAS E GRANITOS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
Mo-de-Obra 19,40300
LS
23,67166

Custo Unit.

4,64
3,82
80,46
0,35
0,37
11,52220

61,61
9,28000
10,12300
2,33334
1,80250
2,88600

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
80,46
0,37
62,03
1,99614

BDI

4,64
3,82
80,46
0,35
0,37
2,67
1,38685

BDI

4,64
3,82
3,22
4,19634

4,64
3,82
5,64

10,67
1,39200
1,48980
0,64368
1,26540
0,37218

7,41
1,36880
0,63030
0,40230
0,07000
0,18500
0,93450

22,44
3,71200
3,05600
3,22000

23,33
3,71200
2,29200
5,64000
Pgina: 257

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 6,00400

LS

7,32488

UN Coeficiente
SubMO

13,32888

Material

0,00000

MV
MV
1,00000
Material
244,82000

13.01.004
LASTRO DE CONCRETO C/ HIDROFUGO E=5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 4,44800
LS
5,42656
SubMO
9,87456

M2
H
0,30000
H
0,80000
M3
0,03000
KG
10,00000
M3
0,04000
KG
0,30600
Material
9,32560

13.01.006
LASTRO DE PEDRA BRITADA - 5CM
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 0,57300
LS
0,69906

1,27206

M2
H
0,15000
M3
0,05500
Material
3,36435

8,73481

M3
H
1,03000
KG
285,00000
Material
142,50000

12.80.099
SERVICOS EM REVESTIMENTOS DE FORRO E PAREDE
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

13.01.009
ENCHIMENTO DE LAJE COM CARVAO VEGETAL
1.01.46
SERVENTE
2.45.20
CARVAO VEGETAL
Mo-de-Obra 3,93460
LS
4,80021

SubMO

SubMO

5,64000

Custo Unit.
BDI

Custo Total

4,36284

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
80,46
0,37
61,17
2,50
4,41604

BDI

3,82
61,17
1,06637

23,61
1,39200
3,05600
2,41380
3,70000
2,44680
0,76500

5,70
0,57300
3,36435

BDI

186,01
3,82
3,93460
0,50
142,50000
34,78401
226,50
3,82
19,10000
0,54
141,75000
42,35496

13.01.010
ENCHIMENTO DE REBAIXO DE LAJE COM TIJ CERAMICOS FURADOS
1.01.46
SERVENTE
2.25.16
TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM
Mo-de-Obra 19,10000
LS
23,30200
SubMO
42,40200

M3
H
5,00000
UN
262,50000
Material
141,75000

BDI

13.01.011
ENCHIMENTO DE REBAIXO DE LAJE COM CACOS DE CONCR CELULAR
1.01.46
SERVENTE
3.30.25
CONCRETO CELULAR (CACOS)
Mo-de-Obra 19,10000
LS
23,30200
SubMO
42,40200

M3
H
5,00000
M3
1,00000
Material
172,50000

264,32
3,82
19,10000
172,50
172,50000
BDI
49,42746

13.01.015
ARGAMASSA DE REGULARIZACAO CIM/AREIA 1:3 ESP=2,50CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 4,47859
LS
5,46388
SubMO
9,94247

M2
H
0,41650
H
0,66650
M3
0,02630
KG
11,15000
Material
6,24160

13.01.016
ARGAMASSA DE REGULARIZACAO CIM/AREIA 1:3 C/ IMPERM. ESP=2,50CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 4,47859
LS
5,46388
SubMO
9,94247
13.01.099
SERVICOS DE LASTROS E/OU ENCHIMENTOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

0,00000

BDI

M2
H
0,41650
H
0,66650
M3
0,02630
KG
11,15000
KG
0,30600
Material
7,00660

BDI

4,64
3,82
80,46
0,37
2,50
3,89829

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

13.02.004
CIMENTADO DESEMPENADO E ALISADO C/ CORANTE E=3,5CM INCL ARG REG
M2
1.01.39
PEDREIRO
H
1,17000
1.01.46
SERVENTE
H
0,93000
2.05.03
AREIA
M3
0,03680
2.05.08
CIMENTO
KG
15,61000
2.10.60
RIPA DE PEROBA 1X5CM
M
0,30000
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
KG
0,10000
Mo-de-Obra 8,98140
LS
10,95731
SubMO
19,93871
Material
11,50763
13.02.005
CIMENTADO DESEMPENADO ALISADO E=3,50CM INCL ARG REG
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.10.60
RIPA DE PEROBA 1X5CM
SubMO
19,93871
Mo-de-Obra 8,98140
LS
10,95731
13.02.007
1.01.21
1.01.22
Exerccio:

PISO DE CONCRETO LISO-FUNDACAO DIRETA FCK-25 MPA


FERREIRO
AJUDANTE DE FERREIRO

2011

19,90
1,93256
2,54603
2,11610
4,12550

4,64
3,82
80,46
0,37
3,72234

M2
H
1,17000
H
0,93000
M3
0,03680
KG
15,61000
M
0,30000
Material
9,39663
M2
H
H

0,30000
0,30000

BDI

4,64
3,82
80,46
0,37
2,20
21,11
7,23266

BDI

4,64
3,82
80,46
0,37
2,20
6,74713

4,77
3,82

20,84
1,93256
2,54603
2,11610
4,12550
0,76500

38,67
5,42880
3,55260
2,96093
5,77570
0,66000
2,11100

36,08
5,42880
3,55260
2,96093
5,77570
0,66000

99,83
1,43100
1,14600
Pgina: 258

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
SubMO
21,71975
Mo-de-Obra 9,78367
LS
11,93608

H
0,83000
H
0,83000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,89000
M
0,90000
M2
1,18000
M2
1,10000
UN
0,08000
M
0,26700
KG
0,25000
KG
0,04800
M2
1,00000
H
0,02130
H
0,00530
Material
59,45056

4,64
3,82
6,95
69,64
251,78
1,78
3,17
10,03
0,91
25,87
0,12
6,43
21,44
11,33
17,83
2,89
BDI
18,66917

13.02.009
PISO DE CONCRETO CAMURCADO-FUNDACAO DIRETA FCK-25 MPA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 7,92247
LS
9,66541
SubMO
17,58788

M2
H
0,30000
H
0,30000
H
0,61000
H
0,61000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,89000
M
0,90000
M2
1,18000
M2
1,10000
UN
0,08000
M
0,26700
KG
0,25000
KG
0,04800
UN
0,01070
M2
1,00000
H
0,02130
H
0,00530
Material
59,49988

4,77
3,82
4,64
3,82
6,95
69,64
251,78
1,78
3,17
10,03
0,91
25,87
0,12
6,43
21,44
4,61
11,33
17,83
2,89
BDI
17,73019

13.02.010
QE-26 QUADRA DE ESPORTES/DE CONCRETO/LAJE ALVEOLAR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
SubMO
7,51603
Mo-de-Obra 3,38560
LS
4,13043

M2
H
H
H
H
UN
KG
KG
UN
L
Material
3,74823

0,38000
0,02000
0,02000
0,38000
0,05000
0,25000
0,03000
0,02830
0,01210

13.02.011
QE-27 QUADRA DE ESPORTES/PISO DE CONCRETO/PRE-LAJE TRELICADA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 3,38560
LS
4,13043
SubMO
7,51603

M2
H
H
H
H
UN
KG
KG
UN
L
Material
3,74823

0,38000
0,02000
0,02000
0,38000
0,05000
0,25000
0,03000
0,02830
0,01210

13.02.012
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.37
2.15.07
2.15.08
2.15.42
Exerccio:

QE-28 QUADRA DE ESPORTES/PISO COM PROTECAO ACUSTICA SOBRE LAJE


FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
ESPAADOR TRELIADO DE AO H=5CM
TELA TELCON Q138 (PAINEL)

2011

M2
H
H
H
H
H
H
M3
UN
M
M2

0,28460
0,28460
0,86660
0,02000
0,02000
0,86660
0,08000
0,67000
0,90000
1,18000

BDI

4,64
4,74
3,80
3,82
25,87
6,43
21,44
4,61
6,08
2,59078

BDI

4,64
4,74
3,80
3,82
25,87
6,43
21,44
4,61
6,08
2,59078

4,77
3,82
4,64
4,74
3,80
3,82
293,44
1,78
3,17
10,03

3,85120
3,17060
0,18487
5,57120
20,14240
1,58420
2,85300
11,83540
1,00100
2,06960
0,03204
1,60750
1,02912
11,33000
0,37978
0,01532

94,81
1,43100
1,14600
2,83040
2,33020
0,18487
5,57120
20,14240
1,58420
2,85300
11,83540
1,00100
2,06960
0,03204
1,60750
1,02912
0,04933
11,33000
0,37978
0,01532

13,85
1,76320
0,09480
0,07600
1,45160
1,29350
1,60750
0,64320
0,13046
0,07357

13,85
1,76320
0,09480
0,07600
1,45160
1,29350
1,60750
0,64320
0,13046
0,07357

164,28
1,35754
1,08717
4,02102
0,09480
0,07600
3,31041
23,47520
1,19260
2,85300
11,83540
Pgina: 259

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.45.09
MANTA DE L DE ROCHA ENVELOPADA DENS 144KG/M3
2.45.13
ISOPOR ESP= 20 MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
SubMO
22,08223
Mo-de-Obra 9,94695
LS
12,13528

UN Coeficiente
M2
1,10000
UN
0,11000
M
0,20000
M2
1,00000
M2
0,04610
KG
0,25000
KG
0,04800
UN
0,03630
L
0,01210
Material
111,48404

13.02.013
QE-29 ESPACO MULTIESPORTIVO/PISO DE CONCRETO/LAJE ALVEOLAR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 6,24492
SubMO
13,86372
LS
7,61880

M2
H
H
H
H
UN
KG
KG
UN
L
Material
4,98420

0,72000
0,01800
0,01800
0,72000
0,09750
0,25000
0,03000
0,03130
0,01100

13.02.014
QE-30 ESPACO MULTIESPORTIVO/PISO DE CONCRETO/PRE-LAJE TRELICADA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 6,26200
LS
7,63964
SubMO
13,90164

M2
H
H
H
H
UN
KG
KG
UN
L
Material
4,99089

0,72000
0,02000
0,02000
0,72000
0,09750
0,25000
0,03000
0,03130
0,01210

13.02.015
QE-31 ESPACO MULTIESPORTIVO/PISO COM PROTECAO ACUSTICA SOBRE LAJE
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.37
CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.45.09
MANTA DE L DE ROCHA ENVELOPADA DENS 144KG/M3
2.45.13
ISOPOR ESP= 20 MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 10,04014
LS
12,24897
Material
SubMO
22,28911

Custo Unit.

Custo Total

BDI

0,91
25,87
0,12
65,18
4,33
6,43
21,44
4,61
6,08
30,72024

BDI

4,64
4,74
3,80
3,82
25,87
6,43
21,44
4,61
6,08
4,33502

BDI

4,64
4,74
3,80
3,82
25,87
6,43
21,44
4,61
6,08
4,34528

M2
H
0,28560
H
0,28560
H
0,87660
H
0,02000
H
0,02000
H
0,87660
M3
0,08000
UN
0,75000
M
0,90000
M2
1,18000
M2
1,10000
UN
0,16500
M
0,22500
M2
1,00000
M2
0,04610
KG
0,25000
KG
0,04800
UN
0,04050
L
0,01210
113,07166

4,77
3,82
4,64
4,74
3,80
3,82
293,44
1,78
3,17
10,03
0,91
25,87
0,12
65,18
4,33
6,43
21,44
4,61
6,08
BDI
31,13298

13.02.017
LADRILHOS HIDRAULICOS DE 20X20 CM LISOS EM UMA COR
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
3.65.19
LADRILHO HIDRAULICO 20X20CM 1 COR
Mo-de-Obra 6,23700
LS
7,60914
SubMO
13,84614

M2
H
0,70000
H
0,70000
KG
5,00000
M2
1,05000
Material
33,48100

BDI

5,09
3,82
0,35
30,22
10,88524

13.02.019
LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DE ALERTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.65.25
LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL ALERTA
SubMO
10,23864
Mo-de-Obra 4,61200
LS
5,62664

M2
H
0,50000
H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
69,02240

BDI

4,64
3,82
80,46
0,37
6,21
65,43
18,23004

13.02.020
1.01.39
Exerccio:

LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DIRECIONAL


PEDREIRO

2011

M2
H

0,50000

4,64

1,00100
2,84570
0,02400
65,18000
0,19961
1,60750
1,02912
0,16734
0,07357

23,18
3,34080
0,08532
0,06840
2,75040
2,52233
1,60750
0,64320
0,14429
0,06688

23,23
3,34080
0,09480
0,07600
2,75040
2,52233
1,60750
0,64320
0,14429
0,07357

166,49
1,36231
1,09099
4,06742
0,09480
0,07600
3,34861
23,47520
1,33500
2,85300
11,83540
1,00100
4,26855
0,02700
65,18000
0,19961
1,60750
1,02912
0,18671
0,07357

58,21
3,56300
2,67400
1,75000
31,73100

97,49
2,32000
2,29200
0,50690
2,77500
0,31050
65,43000

97,49
2,32000
Pgina: 260

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.65.27
LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL DIREC.
SubMO
Mo-de-Obra 4,61200
LS
5,62664

UN Coeficiente

Custo Unit.

Custo Total

10,23864

H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
69,02240

3,82
80,46
0,37
6,21
65,43
18,23004

BDI

13.02.023
BORRACHA COLADA - PISO TATIL DIRECIONAL
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.80.06
COLA DE CONTATO A BASE DE NEOPRENE
3.55.41
PLACAS BORRACHA 250X250MM E=4MM TATIL ALER/DIR-COL
3.80.12
LIXA PARA FERRO
Mo-de-Obra 5,72850
LS
6,98877
SubMO
12,71727

M2
H
0,67000
H
0,67000
KG
0,40000
M2
1,00000
UN
0,50000
Material
114,84300

156,89
4,60
3,08200
3,95
2,64650
22,77
9,10800
105,00
105,00000
1,47
0,73500
BDI
29,33886

13.02.024
BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL DIRECIONAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.55.40
PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG
Mo-de-Obra 4,61200
LS
5,62664
SubMO
10,23864

M2
H
0,50000
H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
134,51240

178,04
4,64
2,32000
3,82
2,29200
80,46
0,50690
0,37
2,77500
6,21
0,31050
130,92
130,92000
BDI
33,29274

CERAMICA ESMALTADA ANTIDERRAPANTE 30X30CM A 45X45CM PEI 4 OU PEI 5 /


COEF.ATRITO 0,30 A 0,60
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.83
ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
3.45.32
CER ESM ANT.30X30/45X45 PEI4/PEI5/COEF 0,30 A 0,60
SubMO
13,84614
Mo-de-Obra 6,23700
LS
7,60914
Material

H
0,70000
H
0,70000
KG
5,00000
KG
0,32000
UN
0,11000
M2
1,05000
29,26270

BDI

13.02.031
QE-32 QUADRA DE ESPORTES/PISO DE CONCRETO ARMADO/FUNDACAO DIRETA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.56
TINTA BETUMINOSA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.70.10
ARAME RECOZIDO N.18
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 2,51925
LS
3,07348
Material
SubMO
5,59272

M2
H
0,03750
H
0,03750
H
0,20000
H
0,03750
H
0,03750
H
0,20000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,27800
M
0,90000
M2
1,18000
M2
1,10000
L
0,06000
UN
0,07500
M
0,09200
KG
0,02800
KG
0,25000
KG
0,04800
UN
0,03170
M2
1,00000
L
0,01600
H
0,02130
H
0,00530
58,96442

4,77
3,82
4,64
4,74
3,80
3,82
6,95
69,64
251,78
1,78
3,17
10,03
0,91
6,23
25,87
0,12
4,87
6,43
21,44
4,61
11,33
6,08
17,83
2,89
BDI
14,84814

13.02.026

13.02.032
FAIXA ANTIDERRAPANTE A BASE DE RES.E AREIA QUARTZOSA L=4CM
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.80.81
FITA CREPE 25MM X 50M
3.30.40
AREIA QUARTZOSA FINA -(FILLER P/COMP.S)-O.BAUNGAR
3.55.14
RESINA EPOXICA (COMPOUND S ) O. BOUMGART
Mo-de-Obra 2,56500
LS
3,12930
SubMO
5,69430
13.02.033
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
Exerccio:

M
H
H
UN
KG
KG
Material
1,42730

QE-33 ESPACO MULTIESPORTIVO/PISO DE CONCRETO ARMADO/FUNDACAO DIRETA


FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR

2011

M2

M2
H
H
H
H
H

2,29200
0,50690
2,77500
0,31050
65,43000

53,02

0,30000
0,30000
0,10000
0,07500
0,01500
BDI

0,03800
0,03800
0,20000
0,03800
0,03800

5,09
3,82
1,57
1,65
25,87
17,18
9,91503

4,60
3,95
4,61
4,44
42,22
1,63797

4,77
3,82
4,64
4,74
3,80

3,56300
2,67400
7,85000
0,52800
2,84570
18,03900

79,40
0,17888
0,14325
0,92800
0,17775
0,14250
0,76400
0,18487
5,57120
20,14240
0,49484
2,85300
11,83540
1,00100
0,37380
1,94025
0,01104
0,13636
1,60750
1,02912
0,14614
11,33000
0,09728
0,37978
0,01532

8,75
1,38000
1,18500
0,46100
0,33300
0,63330

80,66
0,18126
0,14516
0,92800
0,18012
0,14440
Pgina: 261

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.56
TINTA BETUMINOSA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.70.10
ARAME RECOZIDO N.18
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 2,52781
LS
3,08393
SubMO
5,61174

Custo Unit.

Custo Total

H
0,20000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,22000
M
0,90000
M2
1,18100
M2
1,10000
L
0,06000
UN
0,11630
M
0,06900
KG
0,02900
KG
0,25000
KG
0,04800
UN
0,03750
M2
1,00000
L
0,01600
H
0,02130
H
0,00530
Material
59,96849

3,82
6,95
69,64
251,78
1,78
3,17
10,03
0,91
6,23
25,87
0,12
4,87
6,43
21,44
4,61
11,33
6,08
17,83
2,89
BDI
15,08345

6,78432

M2
H
0,80000
KG
9,00000
M2
1,00000
M
2,50000
Material
40,52500

BDI

3,82
0,37
36,12
0,43
10,88114

13.02.038
GRANILITE PRETO/CIMENTO COMUM E=8MM COM POLIMENTO
1.01.46
SERVENTE
2.05.08
CIMENTO
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.60.26
JUNTA PLASTICA 9,0X4,0MM PARA PISO
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
Mo-de-Obra 1,91000
LS
2,33020
SubMO
4,24020

M2
H
0,50000
KG
9,00000
M2
1,00000
M
2,50000
KG
0,16600
Material
44,02926

BDI

3,82
0,37
36,12
0,43
21,11
11,10198

BDI

3,82
0,37
33,50
0,43
21,11
10,41428

13.02.041
PISO DE ALTA RESISTENCIA TIPO MEDIO, POLIDO E=8MM CINZA/CIMENTO COMUM
M2
1.01.46
SERVENTE
H
0,50000
2.05.08
CIMENTO
KG
8,00000
3.55.33
PISO ALTA RESISTENCIA MEDIO POLIDO E=8MM APLICADO
M2
1,00000
3.60.26
JUNTA PLASTICA 9,0X4,0MM PARA PISO
M
2,50000
Mo-de-Obra 1,91000
LS
2,33020
SubMO
4,24020
Material
37,53500

BDI

3,82
0,37
33,50
0,43
9,60830

13.02.047
SOALHO DE TABUAS DE IPE DE 10X2CM SOBRE LASTRO/LAJE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.56
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.55.20
TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO
Mo-de-Obra 14,59100
LS
17,80102
SubMO
32,39202

209,02
4,60
4,60000
3,96
3,96000
4,64
2,78400
3,82
3,24700
80,46
2,33334
0,37
3,88500
62,03
2,41917
4,44
9,99000
2,50
0,75000
4,67
0,93400
106,58
117,23800
BDI
39,08655

13.02.034
GRANILITE CINZA / CIM. COMUM 8MM C/ POLIMENTO
1.01.46
SERVENTE
2.05.08
CIMENTO
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.60.26
JUNTA PLASTICA 9,0X4,0MM PARA PISO
Mo-de-Obra 3,05600
LS
3,72832
SubMO

13.02.040
PISO DE ALTA RESISTENCIA TIPO MEDIO, POLIDO E=8MM PRETO/CIMENTO COMUM
M2
1.01.46
SERVENTE
H
0,50000
2.05.08
CIMENTO
KG
8,00000
3.55.33
PISO ALTA RESISTENCIA MEDIO POLIDO E=8MM APLICADO
M2
1,00000
3.60.26
JUNTA PLASTICA 9,0X4,0MM PARA PISO
M
2,50000
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
KG
0,16600
Mo-de-Obra 1,91000
LS
2,33020
SubMO
4,24020
Material
41,03926

13.02.048
1.01.11
1.01.12
1.01.39
1.01.46
2.05.03
2.05.08
2.05.17
2.10.56
2.40.69
Exerccio:

SOALHO DE TABUAS DE IPE DE 20X2CM SOBRE LASTRO/LAJE


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 1
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO

2011

M2
H
1,00000
H
1,00000
H
0,60000
H
0,85000
M3
0,02900
KG
10,50000
M3
0,03900
M
2,25000
KG
0,30000
KG
0,20000
M2
1,10000
Material
137,54951
M2
H
H
H
H
M3
KG
M3
M
KG

1,00000
1,00000
0,60000
0,85000
0,02900
10,50000
0,03900
2,25000
0,30000

4,60
3,96
4,64
3,82
80,46
0,37
62,03
4,44
2,50

0,76400
0,18487
5,57120
20,14240
0,39160
2,85300
11,84543
1,00100
0,37380
3,00868
0,00828
0,14123
1,60750
1,02912
0,17288
11,33000
0,09728
0,37978
0,01532

58,19
3,05600
3,33000
36,12000
1,07500

59,37
1,91000
3,33000
36,12000
1,07500
3,50426

55,69
1,91000
2,96000
33,50000
1,07500
3,50426

51,38
1,91000
2,96000
33,50000
1,07500

218,06
4,60000
3,96000
2,78400
3,24700
2,33334
3,88500
2,41917
9,99000
0,75000
Pgina: 262

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.60
PREGO
3.55.21
TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO
SubMO
Mo-de-Obra 14,59100
LS
17,80102

UN Coeficiente

32,39202

KG
0,20000
M2
1,10000
Material
144,89751

Custo Unit.

Custo Total

4,67
0,93400
113,26
124,58600
BDI
40,77659

QE-34 QUADRA DE ESPORTES/PISO FIBRA POLIPROPILENO CORRUGADO/FUND


DIR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.56
TINTA BETUMINOSA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.21
FIBRA DE POLIPROPILENO CORRUGADA
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 2,19712
LS
2,68049
Material
SubMO
4,87761

H
0,20000
H
0,03750
H
0,03750
H
0,20000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,67000
M
0,90000
M2
1,10000
L
0,05950
UN
0,11000
M
0,20000
KG
0,25000
KG
0,24000
UN
0,03670
M2
1,00000
L
0,01560
H
0,02130
H
0,00530
51,51642

4,64
4,74
3,80
3,82
6,95
69,64
251,78
1,78
3,17
0,91
6,23
25,87
0,12
6,43
16,33
4,61
11,33
6,08
17,83
2,89
BDI
12,97063

13.02.050
QE-35 ESPACO MULTIESPORTIVO/PISO FIBRA POLIPROP CORRUGADO/FUND DIR
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.56
TINTA BETUMINOSA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.21
FIBRA DE POLIPROPILENO CORRUGADA
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 2,19712
LS
2,68049
SubMO
4,87761
Material

M2
H
0,20000
H
0,03750
H
0,03750
H
0,20000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,75000
M
0,90000
M2
1,10000
L
0,05950
UN
0,16500
M
0,22500
KG
0,25000
KG
0,02400
UN
0,04380
M2
1,00000
L
0,01560
H
0,02130
H
0,00530
49,59012

4,64
4,74
3,80
3,82
6,95
69,64
251,78
1,78
3,17
0,91
6,23
25,87
0,12
6,43
16,33
4,61
11,33
6,08
17,83
2,89
BDI
12,52758

13.02.049

13.02.052
TRATAMENTO SELADOR PARA GRANILITE - BASE AGUA
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
3.80.44
JONSEAL 220
3.80.45
TRAFFIC
Mo-de-Obra 0,51300
LS
0,62586
SubMO

1,13886

M2

M2
H
H
L
L
Material
4,74988

69,36

0,06000
0,06000
0,05000
0,02860
BDI

4,60
3,95
74,48
35,87
1,35441

0,92800
0,17775
0,14250
0,76400
0,18487
5,57120
20,14240
1,19260
2,85300
1,00100
0,37069
2,84570
0,02400
1,60750
3,91920
0,16919
11,33000
0,09485
0,37978
0,01532

66,99
0,92800
0,17775
0,14250
0,76400
0,18487
5,57120
20,14240
1,33500
2,85300
1,00100
0,37069
4,26855
0,02700
1,60750
0,39192
0,20192
11,33000
0,09485
0,37978
0,01532

7,24
0,27600
0,23700
3,72400
1,02588

13.02.053
BORRACHA COLADA - PISO TATIL DE ALERTA
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.80.06
COLA DE CONTATO A BASE DE NEOPRENE
3.55.41
PLACAS BORRACHA 250X250MM E=4MM TATIL ALER/DIR-COL
3.80.12
LIXA PARA FERRO
Mo-de-Obra 5,72850
LS
6,98877
SubMO
12,71727

M2
H
0,67000
H
0,67000
KG
0,40000
M2
1,00000
UN
0,50000
Material
114,84300

156,89
4,60
3,08200
3,95
2,64650
22,77
9,10800
105,00
105,00000
1,47
0,73500
BDI
29,33886

13.02.055
BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL DE ALERTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.55.40
PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG
SubMO
10,23864
Mo-de-Obra 4,61200
LS
5,62664

M2
H
0,50000
H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
134,51240

178,04
4,64
2,32000
3,82
2,29200
80,46
0,50690
0,37
2,77500
6,21
0,31050
130,92
130,92000
BDI
33,29274

Exerccio:

2011

Pgina: 263

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

13.02.058
SINALIZAO VISUAL DE DEGRAUS-PINTURA ESMALTE EPOXI
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.80.81
FITA CREPE 25MM X 50M
3.75.48
TINTA ESMALTE EPOXI BI COMPONENTE
Mo-de-Obra 2,81820
LS
3,43820
SubMO
6,25640

CJ
H
H
UN
L
Material
0,23463

13.02.059
SINALIZAO VISUAL DE DEGRAUS-FITA ADESIVA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.87.20
FITA ADESIVA P/DEMARCAO PISO (3M SCOTCH 471)AMAR
Mo-de-Obra 2,81820
LS
3,43820
SubMO
6,25640

CJ
H
0,33000
H
0,33000
UN
0,01670
Material
0,24649

13.02.061
PISO DE BORRACHA SINT PASTILHADA COR PRETA ESP 7MM FIXAVEL C/AR
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.55.45
PISO DE BORRACHA SINTETICA PASTILHADO PRETO 7MM
Mo-de-Obra 6,59782
LS
8,04934
SubMO
14,64716

M2
H
0,66700
H
0,91700
M3
0,02600
KG
12,93500
KG
0,35700
M2
1,05000
Material
83,15138

13.02.062
PISO DE BORRACHA SINT CANELADO COR PRETA ESP 7MM FIXAVEL C/ARG
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.55.43
PISO DE BORRACHA SINTETICA CANELADO PRETO 7MM
Mo-de-Obra 6,59782
LS
8,04934
SubMO
14,64716

M2
H
0,66700
H
0,91700
M3
0,02600
KG
12,93500
KG
0,35700
M2
1,05000
Material
84,85238

13.02.066
PISO DE COCNCRETO/LAJE ALVEOLAR (TIPO LAJE ZERO)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
SubMO
7,13686
Mo-de-Obra 3,21480
LS
3,92206

M2
H
H
UN
KG
KG
Material
3,54420

0,38000
0,38000
0,05000
0,25000
0,03000

13.02.067
PISO DE CONCRETO/LAJE TRELICADA (TIPO LAJE ZERO)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
Mo-de-Obra 3,21480
LS
3,92206
SubMO
7,13686

M2
H
H
UN
KG
KG
Material
3,54420

0,38000
0,38000
0,05000
0,25000
0,03000

PISO DE CONCRETO SOBRE LAJE IMPERMEABILIZADA OU SOBRE PROTECAO


ACUSTIC
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.37
CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
Mo-de-Obra 9,72031
LS
11,85878
SubMO
21,57910
Material

13.02.068

13.02.073
CERAMICA EXTRUDADA (GRUPO ABSORAO A-1)
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.97
ARGAMASSA P/ REJ BASE EPOXI - CERAMICA EXTRUDADA
3.45.43
CERAMICA ESTRUDADA 24X11 OU 11X11 OU 18X18CM
SubMO
Mo-de-Obra 8,01900
LS
9,78318
13.02.074

Exerccio:

PORCELANATO (GRUPO ABSORAO B1-A

2011

17,80218

Custo Unit.

0,33000
0,33000
0,03000
0,00300

Custo Total

BDI

4,74
3,80
4,61
32,11
1,49294

BDI

4,74
3,80
14,76
1,49567

BDI

4,64
3,82
80,46
0,37
6,21
70,53
22,49366

BDI

4,64
3,82
80,46
0,37
6,21
72,15
22,88489

BDI

4,64
3,82
25,87
6,43
21,44
2,45664

BDI

4,64
3,82
25,87
6,43
21,44
2,45664

M2

7,99
1,56420
1,25400
0,24649

120,29
3,09488
3,50294
2,09196
4,78595
2,21697
74,05650

122,38
3,09488
3,50294
2,09196
4,78595
2,21697
75,75750

13,13
1,76320
1,45160
1,29350
1,60750
0,64320

13,13
1,76320
1,45160
1,29350
1,60750
0,64320

83,51

H
0,28460
H
0,28460
H
0,86000
H
0,86000
M3
0,08000
UN
0,89000
M
0,90000
M2
1,18000
M2
1,10000
UN
0,11000
M
0,26700
KG
0,25000
KG
0,04800
UN
0,01130
46,31525

4,77
3,82
4,64
3,82
293,44
1,78
3,17
10,03
0,91
25,87
0,12
6,43
21,44
4,61
BDI
15,61570

M2
H
0,90000
H
0,90000
KG
6,27000
KG
2,32000
M2
1,05000
Material
73,00840

5,09
3,82
0,35
6,07
54,03
20,88643

M2

7,98
1,56420
1,25400
0,13830
0,09633

BDI

1,35754
1,08717
3,99040
3,28520
23,47520
1,58420
2,85300
11,83540
1,00100
2,84570
0,03204
1,60750
1,02912
0,05209

111,69
4,58100
3,43800
2,19450
14,08240
56,73150

74,96

Pgina: 264

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.45.61
PORCELANATO
SubMO
Mo-de-Obra 8,01900
LS
9,78318

UN Coeficiente

17,80218

H
0,90000
H
0,90000
KG
5,00000
KG
0,27000
M2
1,05000
Material
43,14550

Custo Unit.

Custo Total

BDI

5,09
3,82
0,35
1,65
39,00
14,01797

BDI

0,37
45,25
11,02149

0,37
81,94
19,88212

4,58100
3,43800
1,75000
0,44550
40,95000

13.02.075
CHAPAS VINILICAS (COR ESPECIFICAR) ESPESSURA DE 2 MM
2.05.08
CIMENTO
3.55.08
PISO VINILICO (COLOCADO) 2MM
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
KG
1,10000
M2
1,05000
Material
47,91950

13.02.077
CHAPAS VINILICAS/TRANSITO PESADO (COR ESPECIFICAR) ESP 2MM
2.05.08
CIMENTO
3.55.59
PISO VINILICO / TRANSITO PESADO - 2MM - COLOCADO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
KG
1,10000
M2
1,05000
Material
86,44400

BDI

13.02.083
SOALHO DE TABUAS DE PEROBA DE 10X2,0CM SOBRE LASTRO/LAJE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.56
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.55.02
TABUA DE PEROBA DE 10 X 2.0 CM PARA SOALHO
SubMO
32,39202
Mo-de-Obra 14,59100
LS
17,80102

M2
H
1,00000
H
1,00000
H
0,60000
H
0,85000
M3
0,02900
KG
10,50000
M3
0,03900
M
2,25000
KG
0,30000
KG
0,20000
M2
1,10000
Material
133,76551

204,37
4,60
4,60000
3,96
3,96000
4,64
2,78400
3,82
3,24700
80,46
2,33334
0,37
3,88500
62,03
2,41917
4,44
9,99000
2,50
0,75000
4,67
0,93400
103,14
113,45400
BDI
38,21623

13.02.084
SOALHO DE TABUAS DE PEROBA DE 20X2,0CM SOBRE LASTRO/LAJE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.56
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.55.23
TABUA PEROBA 20X2,0CM MACHO/FEM P/SOALHO
Mo-de-Obra 14,59100
LS
17,80102
SubMO
32,39202

M2
H
1,00000
H
1,00000
H
0,60000
H
0,85000
M3
0,02900
KG
10,50000
M3
0,03900
M
2,25000
KG
0,30000
KG
0,20000
M2
1,10000
Material
141,00351

213,27
4,60
4,60000
3,96
3,96000
4,64
2,78400
3,82
3,24700
80,46
2,33334
0,37
3,88500
62,03
2,41917
4,44
9,99000
2,50
0,75000
4,67
0,93400
109,72
120,69200
BDI
39,88097

13.02.086
TACO DE IPE/CUMARU 7X21X2CM COLADO
1.01.49
TAQUEIRO
1.01.91
AJUDANTE DE TAQUEIRO
3.55.27
TACO DE IPE/CUMARU 7X21X2CM PARA COLA
3.90.76
COLA BRANCA ESPECIF P/PISO TACOS MADEIRA
Mo-de-Obra 7,18000
LS
8,75960
SubMO

15,93960

M2
H
0,70000
H
1,00000
M2
1,05000
KG
0,50000
Material
63,28050

7,96980

M2
H
0,35000
H
0,50000
M2
1,05000
KG
0,50000
Material
82,65300

22,80384

M2
H
1,20000
H
1,20000
M2
1,05000
KG
0,50000
Material
71,63850

13.02.087
TACO DE IPE/CUMARU 10X40X2CM COLADO
1.01.49
TAQUEIRO
1.01.91
AJUDANTE DE TAQUEIRO
3.55.51
TACO DE IPE/CUMARU 10X40X2CM PARA COLA
3.90.76
COLA BRANCA ESPECIF P/PISO TACOS MADEIRA
Mo-de-Obra 3,59000
LS
4,37980
SubMO
13.02.089
TACO DE IPE/CUMARU 7X35X2CM COLADO
1.01.49
TAQUEIRO
1.01.91
AJUDANTE DE TAQUEIRO
3.55.26
TACO DE IPE/CUMARU 7X35X2CM PARA COLA
3.90.76
COLA BRANCA ESPECIF P/PISO TACOS MADEIRA
Mo-de-Obra 10,27200
LS
12,53184
SubMO

13.02.092
SINTEKO - DUAS DEMAOS INCLUSIVE RASPAGEM - APLICADO
3.55.76
RASPAGEM/CALAFETACAO/SINTEKO EM TACOS -APLICADO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
23,54000

13.02.093
RASPAGEM COM CALAFETACAO E APLICACAO DE CERA
3.55.69
RASPAGEM/CALAFETACAO/CERA EM TACOS - APLICADO
SubMO
Mo-de-Obra 0,00000
LS
0,00000

M2
M2
1,00000
Material
21,02000

Exerccio:

2011

0,00000

BDI

4,60
3,96
55,21
10,62
18,22062

BDI

4,60
3,96
73,66
10,62
20,84324

BDI

4,60
3,96
63,17
10,62
21,72174

BDI

23,54
5,41420

BDI

21,02
4,83460

58,94
0,40700
47,51250

106,32
0,40700
86,03700

97,44
3,22000
3,96000
57,97050
5,31000

111,46
1,61000
1,98000
77,34300
5,31000

116,16
5,52000
4,75200
66,32850
5,31000

28,95
23,54000

25,85
21,02000

Pgina: 265

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

13.02.099
SERVICOS DE REVESTIMENTO DE PISOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente

SubMO

13.03.042
PEDRA ARDOSIA 40X40CM E=7A10MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.83
ARGAMASSA DE ASSENTAMENTO TIPO AC-II OU AC-III
3.50.02
PEDRA ARDOSIA 40X40CM E=7A10MM
Mo-de-Obra 9,23480
LS
11,26646
SubMO
13.03.099
SERVICOS DE REVESTIMENTO DE PISOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

0,00000

20,50126

M2
H
0,92000
H
1,30000
M3
0,03200
KG
10,63000
KG
5,00000
M2
1,05000
Material
26,25432

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M
H
H
M3
KG
Material
3,86256

13.04.004
DEGRAU DE CONCRETO LISO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.66.78
FERRO CANTONEIRA 1X1X1/8'
Mo-de-Obra 16,84120
LS

37,38746

M
H
2,23000
H
1,70000
M3
0,01700
KG
1,08000
KG
5,70000
M3
0,01400
UN
23,00000
KG
1,20000
Material
13,01120

19,14528

M
H
1,20000
H
0,80000
M3
0,01600
KG
5,32000
M
1,00000
Material
40,95576

2,96814

M
H
0,35000
M3
0,01600
KG
5,32000
M
1,00000
Material
27,00576

20,54626

SubMO

13.04.027
DEGRAUS DE GRANILITE PRE-MOLDADOS
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.55.30
DEGRAU GRANILITE FORNECIDO E APLICADO
Mo-de-Obra 1,33700
LS
1,63114

SubMO

M
H
1,20000
H
0,80000
M3
0,01600
KG
7,46000
M
1,00000
Material
56,04756

13.04.040
DEGRAUS DE CHAPA VINILICA ESPESS 2 MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.55.37
DEGRAU VINILICO 2MM C/TEST-FORN,COLOC
Mo-de-Obra 8,62400
LS
10,52128

M
H
1,20000
H
0,80000
M3
0,01600
KG
6,96000
M
1,00000
Material
58,18256

13.04.050
1.01.39
1.01.46
2.05.03
2.05.08
2.80.05
3.55.18

Exerccio:

19,14528

DEGRAU DE BORRACHA SINTETICA COR PRETA C/TESTEIRA FIXAVEL C/ARG


PEDREIRO
SERVENTE
AREIA
CIMENTO
COLA PVA
DEGRAU BORRACHA SINTETICA INCL TESTEIRA

2011

M
H
H
M3
KG
KG
M

301,12
244,82
244,82000
BDI
56,30860

1,20000
0,80000
0,01600
6,96000

13.04.031
DEGRAUS COM MASSA GRANITICA ALTA RESISTENCIA TIPO MEDIO 8 MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.55.35
DEGRAU MASSA GRANIT ALT RESIST MED 8MM
Mo-de-Obra 8,62400
LS
10,52128
SubMO
19,14528

SubMO

Custo Total

MV
MV
1,00000
Material
244,82000

13.04.001
DEGRAUS EM ARGAMASSA DE CIMENTO E AREIA 1:3 ESPESSURA DE 2 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 8,62400
LS
10,52128
SubMO
19,14528

13.04.026
DEGRAUS DE GRANILITE MOLDADOS NO LOCAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.50.31
DEGRAU GRANILITE APLICADO (MOLD LOCAL)
Mo-de-Obra 8,62400
LS
10,52128
SubMO

Custo Unit.

0,80000
1,10000
0,01300
6,46800
0,17900
1,05000

4,64
3,82
80,46
0,37
1,57
11,33
10,75378

BDI

4,64
3,82
80,46
0,37
5,29180

BDI

4,64
3,82
80,46
0,35
0,37
61,17
0,22
2,70
11,59169

BDI

4,64
3,82
80,46
0,37
37,70
13,82324

BDI

3,82
80,46
0,37
23,75
6,89400

BDI

4,64
3,82
80,46
0,37
52,00
17,29435

BDI

4,64
3,82
80,46
0,37
54,32
17,78540

4,64
3,82
80,46
0,37
6,21
41,38

57,50
4,26880
4,96600
2,57472
3,93310
7,85000
11,89650

28,29
5,56800
3,05600
1,28736
2,57520

61,99
10,34720
6,49400
1,36782
0,37800
2,10900
0,85638
5,06000
3,24000

73,92
5,56800
3,05600
1,28736
1,96840
37,70000

36,86
1,33700
1,28736
1,96840
23,75000

92,48
5,56800
3,05600
1,28736
2,76020
52,00000

95,11
5,56800
3,05600
1,28736
2,57520
54,32000

80,64
3,71200
4,20200
1,04598
2,39316
1,11159
43,44900

Pgina: 266

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 7,91400

LS

9,65508

13.04.099
SERVICOS DE REVESTIMENTO DE DEGRAUS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente
SubMO

SubMO

17,56908

Material

47,99973

0,00000

MV
MV
1,00000
Material
244,82000

BDI

13.05.001
RODAPES DE ARGAM CIMENTO E AREIA 1:3 COM ALTURA DE 5 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 4,45920
LS
5,44022
SubMO
9,89942

M
H
H
M3
KG
Material
0,33576

0,50000
0,56000
0,00100
0,69000

13.05.002
RODAPES DE ARGAM CIMENTO E AREIA 1:3 COM ALTURA DE 7 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
Mo-de-Obra 4,61200
LS
5,62664
SubMO
10,23864

M
H
H
M3
KG
UN
Material
4,39662

0,50000
0,60000
0,00200
0,96000
0,15000

13.05.003
RODAPE DE CIMENTADO DE 15 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 4,45920
LS
5,44022

0,50000
0,56000
0,00300
1,34000

9,89942

M
H
H
M3
KG
Material
0,73718

13.05.004
RODAPES DE ARGAM CIMENTO E AREIA 1:3 COM ALTURA DE 10 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 4,45920
LS
5,44022
SubMO
9,89942

M
H
H
M3
KG
Material
0,67152

0,50000
0,56000
0,00200
1,38000

13.05.005
RODAPE DE ARGAMASSA DE CIM/AREIA 1:3 PARA ESCADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 7,37160
LS
8,99335
SubMO

0,82800
0,92400
0,00300
1,90000

16,36495

M
H
H
M3
KG
Material
0,94438

0,30000
0,20000
0,15000
0,20000
0,04000
1,03000
1,03000

8,06304

M
H
H
H
H
KG
M
M
Material
5,60460

8,06304

M
H
0,30000
H
0,20000
H
0,15000
H
0,20000
KG
0,04000
M
1,03000
M
1,03000
Material
11,40350

8,06304

M
H
0,30000
H
0,20000
H
0,15000
H
0,20000
KG
0,04000
M
1,03000
M
1,03000
Material
11,58890

13.05.008
RODAPES DE PEROBA DE 5X1,5CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.61.06
CORDAO MEIA CANA 1X1 CM
3.61.39
RODAPE PEROBA 5X1,5CM
Mo-de-Obra 3,63200
LS
4,43104
13.05.009
RODAPES DE PEROBA DE 7X1,5CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.60.02
RODAPE PEROBA 7X1,5CM
3.61.06
CORDAO MEIA CANA 1X1 CM
Mo-de-Obra 3,63200
LS
4,43104
13.05.012
RODAPES DE IPE DE 5X1,5CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.60.57
RODAPE DE IPE 5X1,5CM
3.61.06
CORDAO MEIA CANA 1X1 CM
Mo-de-Obra 3,63200
LS
13.05.013
1.01.11
Exerccio:

4,43104

RODAPES DE IPE/CUMARU DE 7X2CM


CARPINTEIRO

2011

SubMO

SubMO

SubMO

SubMO

M
H

Custo Unit.

0,30000

Custo Total

15,08083

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
80,46
0,37
2,35409

BDI

4,64
3,82
80,46
0,37
25,87
3,36611

BDI

4,64
3,82
80,46
0,37
2,44642

BDI

4,64
3,82
80,46
0,37
2,43132

BDI

4,64
3,82
80,46
0,37
3,98115

BDI

4,60
3,96
4,64
3,82
4,67
3,87
1,39
3,14356

BDI

4,60
3,96
4,64
3,82
4,67
7,02
3,87
4,47730

BDI

4,60
3,96
4,64
3,82
4,67
7,20
3,87
4,51995

4,60

12,58
2,32000
2,13920
0,08046
0,25530

18,00
2,32000
2,29200
0,16092
0,35520
3,88050

13,08
2,32000
2,13920
0,24138
0,49580

13,00
2,32000
2,13920
0,16092
0,51060

21,29
3,84192
3,52968
0,24138
0,70300

16,81
1,38000
0,79200
0,69600
0,76400
0,18680
3,98610
1,43170

23,94
1,38000
0,79200
0,69600
0,76400
0,18680
7,23060
3,98610

24,17
1,38000
0,79200
0,69600
0,76400
0,18680
7,41600
3,98610

26,11
1,38000
Pgina: 267

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.60
PREGO
3.60.56
RODAPE DE IPE/CUMARU 7X2CM
3.61.06
CORDAO MEIA CANA 1X1 CM
Mo-de-Obra 3,63200
LS
4,43104

UN Coeficiente

SubMO

8,06304

H
0,20000
H
0,15000
H
0,20000
KG
0,04000
M
1,03000
M
1,03000
Material
13,16480

13.05.014
RODAPES DE LADRILHO HIDRAULICO UMA COR COM 10 CM DE ALTURA
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.30
RODAPE LADRILHO HIDRAULICO ALT 10CM
Mo-de-Obra 5,19320
LS
6,33570
SubMO
11,52890

M
H
0,60000
H
0,56000
M3
0,00300
KG
1,06000
M
1,00000
Material
10,02358

13.05.015
RODAPE BOLEADO EM CERAMICA EXTRUDADA
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.97
ARGAMASSA P/ REJ BASE EPOXI - CERAMICA EXTRUDADA
3.61.47
RODAPE BOLEADO EM CERAMICA EXTRUDADA
Mo-de-Obra 2,22750
LS
2,71755
SubMO

4,94505

M
H
0,25000
H
0,25000
KG
0,62000
KG
0,23200
M
1,05000
Material
17,48024

4,94505

M
H
0,25000
H
0,25000
KG
0,75000
KG
0,05000
M
1,05000
Material
21,97500

0,42402

M
H
0,05000
KG
0,90000
M
1,00000
Material
20,32300

13.05.021
RODAPE DE GRANILITE SIMPLES DE 7-CM
1.01.46
SERVENTE
2.05.08
CIMENTO
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
3.60.81
RODAPE FORN GRAN APLIC/POL IN LOCO E=10MM H=7CM
Mo-de-Obra 0,38200
LS
0,46604
SubMO
0,84804

M
H
0,10000
KG
0,63000
UN
0,15000
M
1,00000
Material
24,14360

13.05.024
RODAPES DE GRANILITE PARA ESCADA DE 10 CM
1.01.46
SERVENTE
2.05.08
CIMENTO
3.60.82
RODAPE FORN GRAN APL/POL IN LOCO E=10MM H=10CM/ESC
Mo-de-Obra 0,19100
LS
0,23302
SubMO
0,42402

M
H
0,05000
KG
1,00000
M
1,00000
Material
20,36000

13.05.025
RODAPE DE GRANILITE PARA ESCADA DE 7-CM
1.01.46
SERVENTE
2.05.08
CIMENTO
3.60.83
RODAPE FORN GRAN APL/POL IN LOCO E=10MM H=7CM ESC
Mo-de-Obra 0,13370
LS
0,16311
SubMO
0,29681

M
H
0,03500
KG
0,70000
M
1,00000
Material
20,22900

13.05.016
RODAPE BOLEADO EM PORCELANATO
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
3.61.48
RODAPE BOLEADO EM PORCELANATO
Mo-de-Obra 2,22750
LS
2,71755
SubMO
13.05.020
RODAPES DE GRANILITE SIMPLES DE 10 CM
1.01.46
SERVENTE
2.05.08
CIMENTO
3.60.80
RODAPE FORN GRAN APLI/POL IN LOCO E=10MM H=10CM
Mo-de-Obra 0,19100
LS
0,23302
SubMO

13.05.028
RODAPES DE MASSA GRANIT ALTA RESISTENCIA DE 10 CM TIPO MEDIO SIMPLES
M
1.01.39
PEDREIRO
H
0,50000
1.01.46
SERVENTE
H
0,56000
2.05.03
AREIA
M3
0,00300
2.05.08
CIMENTO
KG
1,06000
3.61.40
RODAPE MASSA GRANIT ALT RES 10CM SIM MED
M
1,00000
SubMO
9,89942
Mo-de-Obra 4,45920
LS
5,44022
Material
15,30358
13.05.029
RODAPE EM PLACAS ALTA RESIST.DE 7CM TIPO MEDIO SIMPLES FORN/APLIC
M
1.01.39
PEDREIRO
H
1.01.46
SERVENTE
H
2.05.03
AREIA
M3
2.05.08
CIMENTO
KG
3.60.33
RODAPE EM PLACAS ALTA RESIST APLIC 7A10
M
SubMO
6,99744
Mo-de-Obra 3,15200
LS
3,84544
Material
8,11842
13.05.030
Exerccio:

RODAPES MASSA GRANIT ALTA RES 10CM MEDIO P/ESCADA INCL TRIANG

2011

Custo Unit.

Custo Total

BDI

3,96
4,64
3,82
4,67
8,73
3,87
4,88240

BDI

5,09
3,82
80,46
0,37
9,39
4,95707

BDI

5,09
3,82
0,35
6,07
15,10
5,15782

BDI

5,09
3,82
0,35
1,65
20,60
6,19161

BDI

3,82
0,37
19,99
4,77182

BDI

3,82
0,37
25,87
20,03
5,74808

BDI

3,82
0,37
19,99
4,78033

BDI

3,82
0,37
19,97
4,72094

BDI

4,64
3,82
80,46
0,37
14,67
5,79669

BDI

4,64
3,82
80,46
0,37
7,68
3,47665

0,35000
0,40000
0,00200
0,75000
1,00000

0,79200
0,69600
0,76400
0,18680
8,99190
3,98610

26,50
3,05400
2,13920
0,24138
0,39220
9,39000

27,58
1,27250
0,95500
0,21700
1,40824
15,85500

33,11
1,27250
0,95500
0,26250
0,08250
21,63000

25,51
0,19100
0,33300
19,99000

30,73
0,38200
0,23310
3,88050
20,03000

25,56
0,19100
0,37000
19,99000

25,24
0,13370
0,25900
19,97000

30,99
2,32000
2,13920
0,24138
0,39220
14,67000

18,59
1,62400
1,52800
0,16092
0,27750
7,68000

34,87
Pgina: 268

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.31
RODAPE M GRANIT ALT RES 10CM MED P/ESCAD
SubMO
Mo-de-Obra 5,38720
LS
6,57238

11,95958

H
0,70000
H
0,56000
M3
0,00500
KG
1,74000
M
1,00000
Material
16,39610

13.05.031
RODAPE DE ALTA RESISTENCIA 7-CM TIPO MEDIO PARA ESCADA INCL TRIANGULO
M
1.01.39
PEDREIRO
H
0,49000
1.01.46
SERVENTE
H
0,40000
2.05.03
AREIA
M3
0,00200
2.05.08
CIMENTO
KG
1,22000
3.61.43
RODAPE MASSA GRANIT ALT RES 7-CM C/ TRIANG
M
1,00000
Mo-de-Obra 3,80160
LS
4,63795
Material
15,55232
SubMO
8,43955
13.05.068
RODAPE VINILICO DE 5 CM SIMPLES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.60.39
RODAPE VINILICO 5 CM SIMPLES
Mo-de-Obra 4,45920
LS
5,44022
13.05.069
RODAPE VINILICO DE 7 CM SIMPLES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.53
RODAPE VINILICO 7CM SIMPLES
Mo-de-Obra 4,69120
LS
5,72326

SubMO

SubMO

13.05.070
RODAPE VINILICO DE 7,5 CM SIMPLES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.51
RODAPE VINILICO 7,5CM SIMPLES - SEM COLOCACAO
Mo-de-Obra 4,92320
LS
6,00630
SubMO
13.05.074
RODAPE VINILICO DE 5 CM PARA ESCADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.54
RODAPE VINILICO 5CM P/ESCADA
Mo-de-Obra 4,92320
LS
6,00630
13.05.075
RODAPE VINILICO DE 7,5 CM PARA ESCADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.52
RODAPE VINILICO 7,5CM PARA ESCADA
Mo-de-Obra 5,15520
LS
6,28934

SubMO

SubMO

0,50000
0,56000
0,00100
0,61000
1,00000

9,89942

M
H
H
M3
KG
M
Material
6,16616

0,55000
0,56000
0,00200
0,92000
1,00000

10,41446

M
H
H
M3
KG
M
Material
4,78132

0,60000
0,56000
0,00300
1,22000
1,00000

10,92950

M
H
H
M3
KG
M
Material
4,97278

0,60000
0,56000
0,00200
1,46000
1,00000

10,92950

M
H
H
M3
KG
M
Material
4,60112

0,65000
0,56000
0,00500
1,77000
1,00000

11,44454

M
H
H
M3
KG
M
Material
5,33720

13.05.078
RODAPE CERAMICA ANTIDERRAPANTE (TP MONOQUEIMA) DE 8CM
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
3.61.46
RODAPE CERAMICA ANTIDERRAP (TP MONOQUEIMA) 30X8CM
Mo-de-Obra 1,78200
LS
2,17404
SubMO
3,95604

M
H
0,20000
H
0,20000
KG
0,40000
UN
0,15000
M
1,05000
Material
13,16600

13.05.080
RODAPE DE BORRACHA SINT COR PRETA FAIXA 7CM E=7MM FIXAVEL C/ARG
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.61.10
RODAPE BORRACHA SINT PRETO 7-CM
SubMO
9,89942
Mo-de-Obra 4,45920
LS
5,44022

M
H
0,50000
H
0,56000
M3
0,00100
KG
0,61000
M
1,00000
Material
10,91616

13.05.085
1.01.11
2.67.26
Exerccio:

RODAPE DE ALUMINIO DE 7X1 CM


CARPINTEIRO
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA

2011

M
H
CJ

0,50000
2,00000

Custo Unit.

Custo Total

BDI

4,64
3,82
80,46
0,37
15,35
6,52181

BDI

4,64
3,82
80,46
0,37
14,94
5,51813

BDI

4,64
3,82
80,46
0,37
5,86
3,69508

BDI

4,64
3,82
80,46
0,37
4,28
3,49503

BDI

4,64
3,82
80,46
0,37
4,28
3,65753

BDI

4,64
3,82
80,46
0,37
3,90
3,57204

BDI

4,64
3,82
80,46
0,37
4,28
3,85980

BDI

5,09
3,82
0,35
25,87
8,71
3,93807

BDI

4,64
3,82
80,46
0,37
10,61
4,78758

4,60
0,14

3,24800
2,13920
0,40230
0,64380
15,35000

29,51
2,27360
1,52800
0,16092
0,45140
14,94000

19,76
2,32000
2,13920
0,08046
0,22570
5,86000

18,69
2,55200
2,13920
0,16092
0,34040
4,28000

19,55
2,78400
2,13920
0,24138
0,45140
4,28000

19,10
2,78400
2,13920
0,16092
0,54020
3,90000

20,64
3,01600
2,13920
0,40230
0,65490
4,28000

21,06
1,01800
0,76400
0,14000
3,88050
9,14550

25,60
2,32000
2,13920
0,08046
0,22570
10,61000

13,06
2,30000
0,28000
Pgina: 269

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.77
BUCHA TIPO S-8 (CENTO)
3.61.01
RODAPE ALUMINIO ANODIZ 7X1CM AR.5-AR.6
Mo-de-Obra 2,30000
LS
2,80600
13.05.099
SERVICOS DE REVESTIMENTO DE RODAPES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente

SubMO

SubMO

13.06.005
SOLEIRA DE ARGAMASSA CIM/AREIA 1:3 EM RAMPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 3,79770
LS
4,63319
SubMO

Custo Unit.

Custo Total

5,10600

UN
0,02000
M
1,00000
Material
5,51900

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

8,43089

M
H
H
M3
KG
M3
Material
2,29404

0,39440
0,51510
0,00800
2,46000
0,01210
BDI

11,95
5,00
2,44375

4,64
3,82
80,46
0,37
61,17
2,46673

0,23900
5,00000

13,19
1,83002
1,96768
0,64368
0,91020
0,74016

13.06.008
SOLEIRAS DE 15CM DE TABUAS DE IPE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.56
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.60.58
SOLEIRA 15CM TABUA DE IPE
Mo-de-Obra 6,57200
LS
8,01784
SubMO
14,58984

M
H
0,50000
H
0,30000
H
0,50000
H
0,20000
M3
0,00500
KG
1,50000
M3
0,00600
M
0,30000
KG
0,05000
KG
0,03000
M2
1,03000
Material
139,63848

189,70
4,60
2,30000
3,96
1,18800
4,64
2,32000
3,82
0,76400
80,46
0,40230
0,37
0,55500
62,03
0,37218
4,44
1,33200
2,50
0,12500
4,67
0,14010
132,73
136,71190
BDI
35,47251

13.06.009
SOLEIRAS DE 25CM DE TABUAS DE IPE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.56
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.60.59
SOLEIRA 25CM TABUA DE IPE
Mo-de-Obra 7,41800
LS
9,04996
SubMO
16,46796

M
H
0,50000
H
0,30000
H
0,60000
H
0,30000
M3
0,00900
KG
2,55000
M3
0,01000
M
0,50000
KG
0,09000
KG
0,05000
M2
1,30000
Material
179,55644

241,11
4,60
2,30000
3,96
1,18800
4,64
2,78400
3,82
1,14600
80,46
0,72414
0,37
0,94350
62,03
0,62030
4,44
2,22000
2,50
0,22500
4,67
0,23350
134,30
174,59000
BDI
45,08561

13.06.010
SOLEIRAS DE 15CM DE TABUAS DE PEROBA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.56
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.61.97
SOL 15 CM TABUA PEROBA
Mo-de-Obra 6,57200
LS
8,01784
SubMO
14,58984

M
H
0,50000
H
0,30000
H
0,50000
H
0,20000
M3
0,00500
KG
1,50000
M3
0,00600
M
0,30000
KG
0,05000
KG
0,03000
M
1,03000
Material
22,99098

13.06.040
SOLEIRAS DE 25CM DE TABUAS DE PEROBA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.56
CAIBRO DE PEROBA TRAPEZOIDAL DE 5X6 CM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.61.96
SOL 25 CM TABUA PEROBA
SubMO
16,46796
Mo-de-Obra 7,41800
LS
9,04996

M
H
0,50000
H
0,30000
H
0,60000
H
0,30000
M3
0,00900
KG
2,55000
M3
0,01000
M
0,50000
KG
0,09000
KG
0,05000
M
1,30000
Material
56,90144

13.06.074
1.01.39
1.01.46
Exerccio:

SO-14 SOLEIRA EM CIMENTADO L=15,5CM DESNIVEL 1,5CM


PEDREIRO
SERVENTE

2011

M
H
H

0,71300
0,81500

BDI

4,60
3,96
4,64
3,82
80,46
0,37
62,03
4,44
2,50
4,67
19,48
8,64359

BDI

4,60
3,96
4,64
3,82
80,46
0,37
62,03
4,44
2,50
4,67
39,95
16,87496

4,64
3,82

46,22
2,30000
1,18800
2,32000
0,76400
0,40230
0,55500
0,37218
1,33200
0,12500
0,14010
20,06440

90,24
2,30000
1,18800
2,78400
1,14600
0,72414
0,94350
0,62030
2,22000
0,22500
0,23350
51,93500

65,29
3,30832
3,11330
Pgina: 270

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.03
AREIA
2.05.08
CIMENTO
3.50.90
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
Mo-de-Obra 6,42162
LS
7,83438

UN Coeficiente

SubMO

13.06.075
SO-15 SOLEIRA EM CIMENTADO L=22CM DESNIVEL 1,5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.50.90
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
Mo-de-Obra 8,05328
LS
9,82500
SubMO
13.06.076
SO-16 SOLEIRA EM GRANILITE L=15,5CM DESNIVEL 1,5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.05.03
AREIA
2.05.08
CIMENTO
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.50.90
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
3.80.44
JONSEAL 220
3.80.45
TRAFFIC
Mo-de-Obra 5,58233
LS
6,81044
SubMO
13.06.077
SO-17 SOLEIRA EM GRANILITE L=22CM DESNIVEL 1,5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.87
APLICADOR
1.01.88
AJUDANTE DE APLICADOR
2.05.03
AREIA
2.05.08
CIMENTO
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.50.90
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
3.80.44
JONSEAL 220
3.80.45
TRAFFIC
Mo-de-Obra 6,86117
LS
8,37063
SubMO
13.06.082
SO-22 SOLEIRA DE GRANITO EM NIVEL (L= 14 A 17CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
3.50.91
GRANITO CINZA ANDORINHA LEVIGADO (E=2CM)
SubMO
Mo-de-Obra 4,31200
LS
5,26064
13.06.083
SO-23 SOLEIRA DE GRANITO EM NIVEL (L=19 A 22CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
3.50.91
GRANITO CINZA ANDORINHA LEVIGADO (E=2CM)
Mo-de-Obra 5,60560
LS
6,83883
SubMO

Exerccio:

14,25600

17,87828

M
H
0,88600
H
1,03200
M3
0,02900
KG
12,26400
M
1,00000
Material
40,81102

12,39277

M
H
0,53200
H
0,79500
H
0,00900
H
0,00900
M3
0,01500
KG
7,61700
M2
0,15500
M
1,00000
L
0,00800
L
0,00400
Material
44,30311

15,23180

M
H
0,62900
H
1,00300
H
0,01300
H
0,01300
M3
0,02100
KG
10,81000
M2
0,22000
M
1,00000
L
0,01100
L
0,00600
Material
48,61026

9,57264

M
H
0,60000
H
0,40000
M3
0,00350
KG
0,57000
KG
1,14000
M2
0,17000
Material
49,73201

4,64
3,82
80,46
0,35
0,37
287,23
BDI
13,64007

12,44443

M
H
0,78000
H
0,52000
M3
0,00460
KG
0,74000
KG
1,48000
M2
0,22000
Material
64,36732

4,64
3,82
80,46
0,35
0,37
287,23
BDI
17,66670

M
H
0,70000
H
0,50000
M3
0,00400
KG
0,60000
KG
1,20000
M
1,00000
M2
0,13500
Material
73,69189

4,64
3,82
80,46
0,35
0,37
33,94
287,23
BDI
19,58281

SO-25 SOLEIRA DE GRANITO RAMPADA DESN.AT 1,5CM 2 P (L=19 A 22CM)


PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
GRANITO CINZA ANDORINHA LEVIGADO (E=2CM)

2011

Custo Total

M3
0,02100
KG
8,64200
M
1,00000
Material
38,82720

13.06.084
SO-24 - SOLEIRA DE GRANITO RAMPADA DESN.AT 1,5CM-2P (L=14 17CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
3.50.90
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
3.50.91
GRANITO CINZA ANDORINHA LEVIGADO (E=2CM)
Mo-de-Obra 5,15800
LS
6,29276
SubMO
11,45076
13.06.085
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
3.50.90
3.50.91

Custo Unit.

M
H
H
M3
KG
KG
M
M2

0,88000
0,62000
0,00500
0,79000
1,58000
1,00000
0,18500

BDI

80,46
0,37
33,94
12,20914

BDI

4,64
3,82
80,46
0,37
33,94
13,49854

BDI

4,64
3,82
4,60
3,95
80,46
0,37
36,12
33,94
74,48
35,87
13,04005

BDI

4,64
3,82
4,60
3,95
80,46
0,37
36,12
33,94
74,48
35,87
14,68367

4,64
3,82
80,46
0,35
0,37
33,94
287,23

1,68966
3,19754
33,94000

72,18
4,11104
3,94224
2,33334
4,53768
33,94000

69,73
2,46848
3,03690
0,04140
0,03555
1,20690
2,81829
5,59860
33,94000
0,59584
0,14348

78,52
2,91856
3,83146
0,05980
0,05135
1,68966
3,99970
7,94640
33,94000
0,81928
0,21522

72,94
2,78400
1,52800
0,28161
0,19950
0,42180
48,82910

94,47
3,61920
1,98640
0,37012
0,25900
0,54760
63,19060

104,72
3,24800
1,91000
0,32184
0,21000
0,44400
33,94000
38,77605

126,27
4,08320
2,36840
0,40230
0,27650
0,58460
33,94000
53,13755
Pgina: 271

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 6,45160

LS

7,87095

UN Coeficiente
SubMO

14,32255

Material

88,34095

Custo Unit.
BDI

Custo Total

23,61261

13.06.086
SO-26 SOLEIRA DE GRANITO RAMPADA DESN.AT 1,5CM 3 P (L=14 A 17CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
3.50.90
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
3.50.91
GRANITO CINZA ANDORINHA LEVIGADO (E=2CM)
Mo-de-Obra 6,00400
LS
7,32488
SubMO
13,32888

M
H
0,80000
H
0,60000
M3
0,00400
KG
0,60000
KG
1,20000
M
2,00000
M2
0,10000
Material
97,57884

4,64
3,82
80,46
0,35
0,37
33,94
287,23
BDI
25,50878

13.06.087
SO-27 SOLEIRA DE GRANITO RAMPADA DESN.AT 1,5CM 3 P (L=19 A 22CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
3.50.90
GRANITO LEVIGADO 3,5X2,0 CM (BAGUETE)
3.50.91
GRANITO CINZA ANDORINHA LEVIGADO (E=2CM)
Mo-de-Obra 7,29760
LS
8,90307
SubMO
16,20067

M
H
0,98000
H
0,72000
M3
0,00500
KG
0,79000
KG
1,58000
M
2,00000
M2
0,15000
Material
112,22790

4,64
3,82
80,46
0,35
0,37
33,94
287,23
BDI
29,53857

13.06.099
SERVICOS DE REVESTIMENTO DE SOLEIRAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

31,13195

M
H
H
H
H
M3
KG
M3
M2
M2
Material
6,40919

0,00000

MV
MV
1,00000
Material
244,82000

110,24520

M3
H
13,00000
Material
0,00000

13.07.002
PE-02 PEITORIL
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
Mo-de-Obra 14,02340
LS
17,10855
13.07.099
SERVICOS DE REVESTIMENTO DE PEITORIS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

SubMO

13.50.001
DEMOLICAO PISO DE CONCRETO SIMPLES CAPEADO
1.01.46
SERVENTE
Mo-de-Obra 49,66000
LS
60,58520
SubMO

0,83000
0,83000
1,17000
0,39000
0,01200
4,86000
0,00900
0,04000
0,15000
BDI

13.50.002
DEMOLICAO PISO GRANIL LADR HID/CER CACOS INCLUSIVE BASE
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 5,99760
LS
7,31707
SubMO
13,31467

M2
H
0,14000
H
1,40000
Material
0,00000

13.50.003
DEMOLICAO PISO TACOS DE MADEIRA INCLUSIVE ARG ASSENTAMENTO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 4,42000
LS
5,39240
SubMO
9,81240

M2
H
0,10000
H
1,00000
Material
0,00000

13.50.004
DEMOLICAO PISO SOALHO DE TABUAS INCLUSIVE VIGAMENTOS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
SubMO
8,83116
Mo-de-Obra 3,97800
LS
4,85316

M2
H
0,09000
H
0,90000
Material
0,00000

13.50.006
DE ASSOALHO SOMENTE TABUAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 1,98900
LS
2,42658

M2
H
0,04500
H
0,45000
Material
0,00000

SubMO

4,41558

13.50.010
DE PISOS VINILICOS E DE BORRACHA INCL ARG ASSENT E REGULARIZACAO
1.01.46
SERVENTE
SubMO
3,39216
Mo-de-Obra 1,52800
LS
1,86416
13.50.015
1.01.46

Exerccio:

DEMOLICAO REVEST DE DEGRAUS DE ARG/GRAN/CACOS/LADRIL INCL ARG


ASSENT
SERVENTE

2011

M2
H
0,40000
Material
0,00000

4,60
3,96
4,64
3,82
80,46
0,37
62,03
17,18
16,00
8,63446

157,96
4,54720
2,75040
0,40230
0,27650
0,58460
67,88000
43,08450

46,17
3,81800
3,28680
5,42880
1,48980
0,96552
1,79820
0,55827
0,68720
2,40000

301,12
244,82
244,82000
BDI
56,30860

BDI

3,82
25,35640

BDI

4,64
3,82
3,06238

BDI

4,60
3,96
2,25685

BDI

4,60
3,96
2,03117

BDI

4,60
3,96
1,01558

BDI

3,82
0,78020

M2
H

136,41
3,71200
2,29200
0,32184
0,21000
0,44400
67,88000
28,72300

135,60
49,66000

16,37
0,64960
5,34800

12,06
0,46000
3,96000

10,86
0,41400
3,56400

5,43
0,20700
1,78200

4,17
1,52800

5,21
0,50000

3,82

1,91000

Pgina: 272

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 1,91000

LS

2,33020

UN Coeficiente
SubMO

4,24020

13.50.016
DEMOLICAO RODAPES EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO
1.01.46
SERVENTE
Mo-de-Obra 0,45840
LS
0,55925
SubMO
1,01765

Material

0,00000

Material

M
H
0,12000
0,00000

Material

M
H
0,15000
0,00000

Material

M
H
0,12000
0,00000

13.50.019
DEMOLICAO GUARDA-CORPOS EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO
1.01.46
SERVENTE
Mo-de-Obra 0,45840
LS
0,55925
SubMO
1,01765
Material

M
H
0,12000
0,00000

13.50.017
DEMOLICAO SOLEIRAS EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO
1.01.46
SERVENTE
Mo-de-Obra 0,57300
LS
0,69906
SubMO
1,27206
13.50.018
DEMOLICAO PEITORIS EM GERAL INCLUSIVE ARGAMASSA ASSENTAMENTO
1.01.46
SERVENTE
Mo-de-Obra 0,45840
LS
0,55925
SubMO
1,01765

13.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

13.60.001
DE PISO VINILICO E BORRACHA
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 0,84600
LS
1,03212
13.60.002
DE PISO DE BORRACHA ARGAMASSADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 1,86120
LS
2,27066

SubMO

SubMO

SubMO

13.60.003
DE PISO DE CERAMICA OU LADRILHOS HIDRAULICOS
1.01.46
SERVENTE
Mo-de-Obra 5,73000
LS
6,99060
SubMO
13.60.004
DE PISO DE TACOS DE MADEIRA
1.01.46
SERVENTE
Mo-de-Obra 2,29200
LS
2,79624
13.60.005
DE SOALHO INCLUSIVE VIGAMENTO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 5,13600
LS
6,26592
13.60.006
DE SOALHO SOMENTE TABUAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 2,99600
LS
3,65512
13.60.007
DE PISO DE PEDRA
1.01.46
SERVENTE
Mo-de-Obra 4,96600

LS

6,05852

13.60.008
DE PISO DE GRANITO OU MARMORE
1.01.46
SERVENTE
Mo-de-Obra 6,11200
LS
7,45664
13.60.009
DE DEGRAUS E ESPELHOS EM PEDRA
1.01.46
SERVENTE
Mo-de-Obra 3,82000
LS
4,66040
13.60.010
DE DEGRAUS E ESP DE GRANITO OU MARMORE
1.01.46
SERVENTE
Mo-de-Obra 4,58400
LS
5,59248

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

0,00000

MV
MV
1,00000
Material
244,82000

1,87812

M2
H
0,10000
H
0,10000
Material
0,00000

4,13186

M2
H
0,22000
H
0,22000
Material
0,00000

12,72060

M2
H
1,50000
Material
0,00000

5,08824

M2
H
0,60000
Material
0,00000

11,40192

M2
H
0,60000
H
0,60000
Material
0,00000

6,65112

M2
H
0,35000
H
0,35000
Material
0,00000

11,02452

M2
H
1,30000
Material
0,00000

13,56864

M2
H
1,60000
Material
0,00000

8,48040

10,17648

13.60.011
DE RODAPES DE CERAM LADR-HIDR GRANITO OU MARMORE
1.01.46
SERVENTE
SubMO
1,69608
Mo-de-Obra 0,76400
LS
0,93208
13.60.012
1.01.12

Exerccio:

DE RODAPES DE MADEIRA INCLUSIVE CORDAO


AJUDANTE DE CARPINTEIRO

2011

Material

M
H
1,00000
0,00000

Material

M
H
1,20000
0,00000

Material

M
H
0,20000
0,00000
M
H

0,15000

Custo Unit.

Custo Total

BDI

0,97525

BDI

3,82
0,23406

BDI

3,82
0,29257

BDI

3,82
0,23406

BDI

3,82
0,23406

1,25
0,45840

1,56
0,57300

1,25
0,45840

1,25
0,45840

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
0,43197

BDI

4,64
3,82
0,95033

BDI

3,82
2,92574

BDI

3,82
1,17030

BDI

4,60
3,96
2,62244

BDI

4,60
3,96
1,52976

BDI

3,82
2,53564

BDI

3,82
3,12079

BDI

3,82
1,95049

BDI

3,82
2,34059

BDI

3,82
0,39010

3,96

2,31
0,46400
0,38200

5,08
1,02080
0,84040

15,64
5,73000

6,25
2,29200

14,02
2,76000
2,37600

8,18
1,61000
1,38600

13,56
4,96600

16,68
6,11200

10,43
3,82000

12,51
4,58400

2,08
0,76400

1,62
0,59400

Pgina: 273

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,59400

LS

13.60.013
DE SOLEIRAS EM GERAL
1.01.46
SERVENTE
Mo-de-Obra 0,76400
LS
13.60.014
DE PEITORIS EM GERAL
1.01.46
SERVENTE
Mo-de-Obra 0,76400
LS

0,72468

0,93208

0,93208

13.60.015
DE GUARDA-CORPOS EM GERAL
1.01.46
SERVENTE
Mo-de-Obra 0,76400
LS
0,93208
13.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

13.70.001
DE PISO VINILICO E BORRACHA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.80.73
COLA PARA PISO VINILICO
Mo-de-Obra 1,69200
LS
2,06424
13.70.002
DE PISO DE BORRACHA ARGAMASSADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 10,97100
LS
13,38462
13.70.005
REPREGAMENTO DE SOALHO DE PEROBA
1.01.11
CARPINTEIRO
2.67.60
PREGO
Mo-de-Obra 0,92000
LS
1,12240
13.70.050
DE RODAPES E CORDOES DE MADEIRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 2,17200
LS
2,64984
13.70.099
RECOLOCACOES DE PISOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
13.80.002
LASTRO DE CONCRETO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 88,96000
LS

0,00000

108,53120

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

1,31868

Material

0,00000

Material

M
H
0,20000
0,00000

Material

M
H
0,20000
0,00000

1,69608

Material

M
H
0,20000
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

3,75624

M2
H
0,20000
H
0,20000
L
0,20000
Material
3,22400

24,35562

M2
H
1,50000
H
1,05000
M3
0,03200
KG
14,92000
Material
8,09512

2,04240

M2
H
0,20000
KG
0,04000
Material
0,18680

4,82184

Material

M
H
0,30000
H
0,20000
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

197,49120

M3
H
6,00000
H
16,00000
M3
0,60000
KG
200,00000
M3
0,80000
Material
171,21200

1,69608

1,69608

13.80.003
LASTRO DE BRITA GRADUADA COMPACTAO MECNICA E=8CM
1.01.46
SERVENTE
2.05.23
BRITA GRADUADA
8.01.16
ROLO COMPACTADOR LISO 1000KG
Mo-de-Obra 0,83276
SubMO
1,84873
LS
1,01597

M2
H
0,21800
M3
0,08000
H
0,02130
Material
5,95098

13.80.005
DEGRAU DE CONCRETO LISO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.66.78
FERRO CANTONEIRA 1X1X1/8'
Mo-de-Obra 16,84120
LS

M
H
2,23000
H
1,70000
M3
0,01700
KG
1,08000
KG
5,70000
M3
0,01400
UN
23,00000
KG
1,20000
Material
13,01120

13.80.006
1.01.40
2.80.17

Exerccio:

20,54626

ENDURECEDOR SUPERFICIAL PARA CONCRETO


PINTOR
ENDURECEDOR SUPERFICIAL PARA CONCRETO

2011

SubMO

37,38746

M2
H
KG

0,30000
0,17000

Custo Unit.

Custo Total

BDI

0,30330

BDI

3,82
0,39010

BDI

3,82
0,39010

BDI

3,82
0,39010

2,08
0,76400

2,08
0,76400

2,08
0,76400

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
16,12
1,60546

BDI

4,64
3,82
80,46
0,37
7,46367

BDI

4,60
4,67
0,51272

BDI

4,60
3,96
1,10902

8,58
0,92800
0,76400
3,22400

39,91
6,96000
4,01100
2,57472
5,52040

2,74
0,92000
0,18680

5,93
1,38000
0,79200

301,12
244,82
244,82000
BDI
56,30860

BDI

4,64
3,82
80,46
0,37
61,17
84,80174

BDI

3,82
69,64
17,83
1,79393

BDI

4,64
3,82
80,46
0,35
0,37
61,17
0,22
2,70
11,59169

4,74
6,43

453,50
27,84000
61,12000
48,27600
74,00000
48,93600

9,59
0,83276
5,57120
0,37978

61,99
10,34720
6,49400
1,36782
0,37800
2,10900
0,85638
5,06000
3,24000

5,22
1,42200
1,09310

Pgina: 274

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 1,42200

LS

1,73484

UN Coeficiente
Material

2,81718

M2
H
0,15000
H
0,15000
M3
0,05000
Material
12,58900

4,64
3,82
251,78
BDI
3,54342

13.80.010
SOALHO DE TABUAS DE PEROBA DE 10X2,0CM SOBRE VIGAMENTO 6X12CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.26
VIGAS PEROBA DE 6X12 CM
2.67.60
PREGO
3.55.02
TABUA DE PEROBA DE 10 X 2.0 CM PARA SOALHO
Mo-de-Obra 9,41600
LS
11,48752
SubMO
20,90352

M2
H
1,10000
H
1,10000
M
2,25000
KG
0,20000
M2
1,10000
Material
136,21300

193,25
4,60
5,06000
3,96
4,35600
9,70
21,82500
4,67
0,93400
103,14
113,45400
BDI
36,13680

13.80.011
SOALHO DE PEROBA 10X2,0CM (SOMENTE TABUAS)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
3.55.02
TABUA DE PEROBA DE 10 X 2.0 CM PARA SOALHO
Mo-de-Obra 5,13600
LS
6,26592
SubMO

11,40192

M2
H
0,60000
H
0,60000
KG
0,08000
M2
1,10000
Material
113,82760

154,03
4,60
2,76000
3,96
2,37600
4,67
0,37360
103,14
113,45400
BDI
28,80279

11,40192

M2
H
0,60000
H
0,60000
KG
0,04000
M2
1,10000
Material
124,77280

167,49
4,60
2,76000
3,96
2,37600
4,67
0,18680
113,26
124,58600
BDI
31,32019

0,25441

M2
H
0,03000
M2
1,10000
Material
1,00100

2,93218

M2
H
H
H
UN
Material
6,62210

0,00000

M2
M2
1,00000
Material
45,25000

0,00000

M2
M2
1,00000
Material
56,48000

SubMO

13.80.012
SOALHO DE TABUAS DE IPE 20X2CM (SOMENTE TABUAS)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
3.55.21
TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO
Mo-de-Obra 5,13600
LS
6,26592
SubMO
13.80.013
ISOLAMENTO COM LONA PRETA
1.01.46
SERVENTE
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
Mo-de-Obra 0,11460
LS
0,13981
13.80.014
FRESAMENTO DE PISO CIMENTADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
8.01.50
FRESADORA DE PISO 8"-5,5HP
8.80.08
JOGO DE ROSETAS DE DESBASTE DE VIDEA
Mo-de-Obra 1,32080
LS
1,61138
13.80.015
PISO VINILICO DE 2MM DE ESPESSURA
3.55.08
PISO VINILICO (COLOCADO) 2MM
Mo-de-Obra 0,00000
LS
0,00000
13.80.016
PISO VINILICO DE 3,2MM DE ESPESSURA
3.55.19
PISO VINILICO (COLOCADO) 3,2MM
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

SubMO

SubMO

1,09310

BDI

Custo Total

3,15684

13.80.007
PISO DE CONCRETO FCK=25MPA E=5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
Mo-de-Obra 1,26900
LS
1,54818

SubMO

Custo Unit.

M2
M2
1,00000
Material
16,72000

13.80.021
ARGAMASSA DE REGULARIZACAO CIMENTO/AREIA 1:3 E=2,50CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
Mo-de-Obra 4,47859
LS
5,46388
SubMO
9,94247

M2
H
0,41650
H
0,66650
M3
0,02630
KG
11,15000
Material
6,24160

13.80.022
COLAGEM COM NATA DE CIMENTO E ADESIVO P/ ARGAMASSA E CHAPISCO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.08
CIMENTO
2.80.16
ADESIVO PARA ARGAMASSA E CHAPISCO
Mo-de-Obra 2,07400
LS
2,53028
SubMO
4,60428

M2
H
H
KG
KG
Material
3,67500

13.80.023
1.01.11
1.01.12
2.10.27
2.67.60
3.55.20
Exerccio:

SOALHO DE TABUAS DE IPE 10X2CM SOBRE VIGAMENTO 6X16CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
VIGAS PEROBA DE 6X16 CM
PREGO
TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO

2011

M2
H
H
M
KG
M2

BDI

3,82
0,91
0,28875

BDI

4,64
3,82
6,77
17,40
2,19748

BDI

45,25
10,40750

BDI

56,48
12,99040

BDI

16,72
3,84560

BDI

4,64
3,82
80,46
0,37
3,72234

BDI

4,64
3,82
0,37
6,24
1,90423

0,12000
0,20000
0,13000
0,33000

13.80.018
REPARO COMPLETO EM GRANILITE-RASPAGEM/ESTUCAMENTO/POLIMENTO
3.65.12
RASPAGEM, ESTUCAMENTO E POLIMENTO DE GRANILITE
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

0,20000
0,30000
1,50000
0,50000

1,10000
1,10000
2,25000
0,20000
1,10000

0,97749

4,60
3,96
13,00
4,67
106,58

18,94
0,69600
0,57300
12,58900

1,54
0,11460
1,00100

11,75
0,55680
0,76400
0,88010
5,74200

55,65
45,25000

69,47
56,48000

20,56
16,72000

19,90
1,93256
2,54603
2,11610
4,12550

10,18
0,92800
1,14600
0,55500
3,12000

207,04
5,06000
4,35600
29,25000
0,93400
117,23800
Pgina: 275

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 9,41600

LS

11,48752

UN Coeficiente
SubMO

20,90352

Material

147,42200

Custo Unit.
BDI

Custo Total

38,71487

13.80.024
SOALHO DE TABUAS DE IPE 20X2CM SOBRE VIGAMENTO 6X16CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.27
VIGAS PEROBA DE 6X16 CM
2.67.60
PREGO
3.55.21
TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO
Mo-de-Obra 9,41600
LS
11,48752
SubMO
20,90352

M2
H
1,10000
H
1,10000
M
2,25000
KG
0,10000
M2
1,10000
Material
154,30300

13.80.025
REPREGAMENTO DE SOALHO DE MADEIRA
1.01.11
CARPINTEIRO
2.67.60
PREGO
Mo-de-Obra 0,92000
LS
1,12240

M2
H
0,20000
KG
0,04000
Material
0,18680

BDI

13.80.026
SOALHO DE TABUA DE IPE 20X2CM SOBRE VIGAMENTO 6X12CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.26
VIGAS PEROBA DE 6X12 CM
2.67.60
PREGO
3.55.21
TABUA DE IPE 20X2,0CM MACHO/FEMEA P/SOALHO
Mo-de-Obra 9,41600
LS
11,48752
SubMO
20,90352

M2
H
1,10000
H
1,10000
M
2,25000
KG
0,10000
M2
1,10000
Material
146,87800

206,37
4,60
5,06000
3,96
4,35600
9,70
21,82500
4,67
0,46700
113,26
124,58600
BDI
38,58975

13.80.027
SOALHO DE TABUAS DE IPE 10X2,0CM SOBRE VIGAMENTO 6X12CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.26
VIGAS PEROBA DE 6X12 CM
2.67.60
PREGO
3.55.20
TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO
Mo-de-Obra 9,41600
LS
11,48752
SubMO
20,90352

M2
H
1,10000
H
1,10000
M
2,25000
KG
0,20000
M2
1,10000
Material
139,99700

197,90
4,60
5,06000
3,96
4,35600
9,70
21,82500
4,67
0,93400
106,58
117,23800
BDI
37,00712

13.80.028
SOALHO DE IPE 10X2,0CM (SOMENTE TABUAS)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
3.55.20
TABUA DE IPE 10X2,0CM MACHO/FEMEA P/SOALHO
SubMO
Mo-de-Obra 5,13600
LS
6,26592

11,40192

M2
H
0,60000
H
0,60000
KG
0,08000
M2
1,10000
Material
117,61160

158,68
4,60
2,76000
3,96
2,37600
4,67
0,37360
106,58
117,23800
BDI
29,67311

0,57209

M2
H
0,03000
H
0,03000
M2
1,05000
Material
6,95100

13.80.033
TELA Q-138 E ESPAADOR TRELIADO P/PISO DE CONCRETO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
Mo-de-Obra 0,34360
LS
0,41919
SubMO
0,76279
13.80.034
PISO DE CONCRETO FCK=25MPA E=8CM DESEMPENAMENTO MECNICO
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
Mo-de-Obra 1,70767
LS
2,08336
SubMO
3,79103

13.80.032
TELA Q-92 PARA PISO DE CONCRETO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.44
TELA TELCON Q-92
Mo-de-Obra 0,25770
LS
0,31439

SubMO

2,04240

215,50
4,60
5,06000
3,96
4,35600
13,00
29,25000
4,67
0,46700
113,26
124,58600
BDI
40,29750

4,60
4,67
0,51272

BDI

4,77
3,82
6,62
1,73031

M2
H
0,04000
H
0,04000
M
0,90000
M2
1,05000
Material
13,38450

BDI

4,77
3,82
3,17
10,03
3,25388

M2
H
0,18000
H
0,18000
H
0,02660
M3
0,08000
KG
0,25000
M2
1,00000
Material
33,07990

4,64
3,82
6,95
251,78
6,43
11,33
BDI
8,48031

13.80.035
PISO DE CONCRETO COM FIBRA FCK=25MPA E=8CM DESEMPENAMENTO MECNICO
M2
1.01.39
PEDREIRO
H
0,20000
1.01.46
SERVENTE
H
0,20000
1.01.55
OPERADOR
H
0,02660
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,08000
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
KG
0,25000
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
KG
0,04800
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
M2
1,00000
SubMO
4,16665
Mo-de-Obra 1,87687
LS
2,28978
Material
34,10902

4,64
3,82
6,95
251,78
6,43
21,44
11,33
BDI
8,80340

13.80.050
1.01.39
1.01.46
2.05.03
Exerccio:

RODAPE DE GRANILITE EM PLACAS FORN/APLIC


PEDREIRO
SERVENTE
AREIA

2011

SubMO

M
H
H
M3

0,50000
0,56000
0,00300

4,64
3,82
80,46

2,74
0,92000
0,18680

9,25
0,14310
0,11460
6,95100

17,40
0,19080
0,15280
2,85300
10,53150

45,35
0,83520
0,68760
0,18487
20,14240
1,60750
11,33000

47,07
0,92800
0,76400
0,18487
20,14240
1,60750
1,02912
11,33000

45,66
2,32000
2,13920
0,24138
Pgina: 276

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.08
CIMENTO
3.60.42
RODAPE GRANILITE EM PLACAS
Mo-de-Obra 4,45920
LS
5,44022
13.80.051
RODAPE DE MARMORE DE 15CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.60.52
RODAPE MARMORE 15CM
Mo-de-Obra 2,70200
LS
3,29644
13.80.055
CORDAO DE PEROBA
1.01.11
CARPINTEIRO
2.67.60
PREGO
3.61.06
CORDAO MEIA CANA 1X1 CM
Mo-de-Obra 0,69000
LS

0,84180

UN Coeficiente

SubMO

SubMO

SubMO

13.80.056
RODAPE DE PEROBA DE 7X1,5 CM COM CORDAO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.67.60
PREGO
3.60.02
RODAPE PEROBA 7X1,5CM
3.61.06
CORDAO MEIA CANA 1X1 CM
SubMO
Mo-de-Obra 2,17200
LS
2,64984
13.80.060
DEGRAU DE GRANILITE
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.55.30
DEGRAU GRANILITE FORNECIDO E APLICADO
Mo-de-Obra 8,62400
LS
10,52128
13.80.061
DEGRAUS DE MARMORE
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.60.50
ESPELHO MARMORE 19CM
3.60.51
PATAMAR MARMORE 26CM
Mo-de-Obra 5,97700
LS

7,29194

SubMO

SubMO

13.80.062
DEGRAU VINILICO COM TESTEIRA DE BORRACHA
3.55.37
DEGRAU VINILICO 2MM C/TEST-FORN,COLOC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
13.80.065
TESTEIRA DE BORRACHA
3.60.43
TESTEIRA BORRACHA P/DEGRAU VINIL FC
Mo-de-Obra 0,00000
LS
0,00000

9,89942

KG
1,06000
M
1,00000
Material
27,22358

5,99844

M
H
0,50000
H
0,10000
M3
0,00300
KG
1,06000
M
1,00000
Material
42,08358

1,53180

M
H
0,15000
KG
0,01000
M
1,03000
Material
4,03280

4,82184

M
H
0,30000
H
0,20000
KG
0,06000
M
1,10000
M
1,10000
Material
12,25920

19,14528

M
H
1,20000
H
0,80000
M3
0,01000
KG
4,26000
M
1,00000
Material
26,13080

13,26894

M
H
1,00000
H
0,35000
M3
0,00800
KG
2,45000
M
1,00000
M
1,00000
Material
113,92018

0,00000

Material

M
M
1,00000
54,32000

Material

M
M
1,00000
13,78000

Custo Unit.

Custo Total

BDI

0,37
26,59
8,53829

BDI

4,64
3,82
80,46
0,37
41,45
11,05887

BDI

4,60
4,67
3,87
1,27986

BDI

4,60
3,96
4,67
7,02
3,87
3,92864

BDI

4,64
3,82
80,46
0,37
23,75
10,41350

BDI

4,64
3,82
80,46
0,37
48,62
63,75
29,25350

BDI

54,32
12,49360

0,39220
26,59000

59,14
2,32000
0,38200
0,24138
0,39220
41,45000

6,84
0,69000
0,04670
3,98610

21,00
1,38000
0,79200
0,28020
7,72200
4,25700

55,68
5,56800
3,05600
0,80460
1,57620
23,75000

156,44
4,64000
1,33700
0,64368
0,90650
48,62000
63,75000

66,81
54,32000

16,94
13,78000

BDI

13,78
3,16940

13.80.066
PISO BORRACHA SINT PASTILHADO PRETO ESPES 4/5MM - COLADO
2.05.03
AREIA
2.05.08
CIMENTO
2.80.73
COLA PARA PISO VINILICO
3.55.42
PISO BORR SINT PASTILHADO PRETO E=4/5MM COLADO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M3
0,03650
KG
10,95000
L
0,40000
M2
1,10000
Material
65,60929

BDI

80,46
0,37
16,12
47,43
15,09014

13.80.099
SERVICOS EM PISOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

12,36540

M2
H
1,00000
KG
2,00000
M2
1,10000
Material
36,55200

12,36540

M2
H
1,00000
KG
2,00000
M2
1,10000
Material
48,36600

LS

0,00000

14.01.002
VIDRO LISO COMUM INCOLOR DE 3MM
1.01.86
VIDRACEIRO
3.70.43
MASSA PARA VIDRO
3.70.81
VIDRO LISO COMUM INCOLOR - 3MM
Mo-de-Obra 5,57000
LS
6,79540
14.01.004
VIDRO LISO COMUM INCOLOR DE 4MM
1.01.86
VIDRACEIRO
3.70.43
MASSA PARA VIDRO
3.70.82
VIDRO LISO COMUM INCOLOR - 4MM
Mo-de-Obra 5,57000
LS
6,79540

Exerccio:

2011

SubMO

SubMO

SubMO

SubMO

0,00000

BDI

5,57
1,38
30,72
11,25100

BDI

5,57
1,38
41,46
13,96822

80,69
2,93679
4,05150
6,44800
52,17300

60,16
5,57000
2,76000
33,79200

74,69
5,57000
2,76000
45,60600

Pgina: 277

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

14.01.006
VIDRO LISO COMUM INCOLOR DE 5MM
1.01.86
VIDRACEIRO
3.70.43
MASSA PARA VIDRO
3.70.83
VIDRO LISO COMUM INCOLOR - 5MM
Mo-de-Obra 6,12700
LS
7,47494
14.01.008
VIDRO LISO COMUM INCOLOR DE 6MM
1.01.86
VIDRACEIRO
3.70.43
MASSA PARA VIDRO
3.70.84
VIDRO LISO COMUM INCOLOR - 6MM
Mo-de-Obra 6,12700
LS
7,47494
14.01.032
VIDRO LISO FOSCO (DESPOLIDO) ESPESS 3 MM
1.01.86
VIDRACEIRO
3.70.78
VIDRO LISO FOSCO (DESPOLIDO) ESP 3MM
Mo-de-Obra 11,14000
LS
13,59080
14.01.035
VIDRO IMPRESSO INCOLOR (E=4MM)
1.01.86
VIDRACEIRO
3.70.43
MASSA PARA VIDRO
3.70.68
VIDRO FANTASIA INCOLOR 4MM
Mo-de-Obra 5,57000
LS
6,79540
14.01.040
VIDRO ARAMADO DE 7/8 MM
1.01.86
VIDRACEIRO
3.70.43
MASSA PARA VIDRO
3.70.75
VIDRO ARAMADO 7 MM
Mo-de-Obra 8,35500
LS

10,19310

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

13,60194

M2
H
1,10000
KG
2,00000
M2
1,10000
Material
52,70000

13,60194

M2
H
1,10000
KG
2,50000
M2
1,10000
Material
66,78800

24,73080

M2
H
2,00000
M2
1,10000
Material
72,23700

12,36540

M2
H
1,00000
KG
2,00000
M2
1,10000
Material
38,66400

18,54810

M2
H
1,50000
KG
2,50000
M2
1,10000
Material
106,70700

Custo Unit.

Custo Total
81,55
6,12700
2,76000
49,94000

BDI

5,57
1,38
45,40
15,24945

BDI

5,57
1,38
57,58
18,48969

BDI

5,57
65,67
22,30259

BDI

5,57
1,38
32,64
11,73676

BDI

154,06
5,57
8,35500
1,38
3,45000
93,87
103,25700
28,80867

98,87
6,12700
3,45000
63,33800

119,27
11,14000
72,23700

62,76
5,57000
2,76000
35,90400

14.01.060
FECHAMENTO EM VIDRO LAMINADO 5+5MM INC ACESS ALUM (CX/ELEVADOR)
M2
3.70.10
FORN E INST DE VIDRO LAMINADO 5+5MM INC ACESS ALUM
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
Material
322,50000
SubMO
0,00000

396,67
322,50
322,50000
BDI
74,17500

14.01.070
VITRAL EM POLIESTER REFORC C/FIBER-GLASS 2 FACES MART 3MM
3.71.01
VITRAL 3MM POLIEST/FIBER-FORN-COLOC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
148,50000

182,65
148,50
148,50000
BDI
34,15500

14.01.071
VITRAL EM POLIESTER REFORC C/FIBER-GLASS 2 FACES MART 5MM
3.71.02
VITRAL 5MM POLIEST/FIBER-FORN-COLOC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
193,05000

237,45
193,05
193,05000
BDI
44,40150

14.01.099
SERVICOS EM VIDROS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

9,39060

UN
H
0,50000
H
0,50000
CJ
4,00000
UN
0,08000
UN
0,04000
UN
1,00000
Material
158,36480

206,33
4,64
2,32000
3,82
1,91000
0,14
0,56000
4,44
0,35520
0,74
0,02960
157,42
157,42000
BDI
38,58374

14.02.002
ARMARIO PLAST C/ESPELHO P/BANH (SOBREPOR 31X36X9CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
6.55.86
ARMARIO PLAST C/ESPELHO P/BANH (SOBREP 31X36X9CM)
SubMO
9,39060
Mo-de-Obra 4,23000
LS
5,16060

UN
H
0,50000
H
0,50000
UN
1,00000
Material
31,71000

BDI

14.02.010
ESPELHO DE CRISTAL
1.01.86
VIDRACEIRO
6.57.20
ESPELHO DE CRISTAL-ESPESSURA 6MM
Mo-de-Obra 5,57000
LS
6,79540

12,36540

M2
H
1,00000
M2
1,00000
Material
143,51000

191,72
5,57
5,57000
143,51
143,51000
BDI
35,85134

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

SubMO

14.02.001
EP-01 ESPELHO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.26
PARAFUSO AUTO-ATARRACHANTE 5,5X38MM C/ ARRUELA
2.67.70
REBITE TIPO POP 440 (CENTO)
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
3.72.01
EP-01 ESPELHO 60X45X3MM C/ MOLDURA ALUM ANODIZ
Mo-de-Obra 4,23000
LS
5,16060
SubMO

14.02.099
SERVICOS DE ESPELHOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

SubMO

SubMO

14.60.001
DE VIDRO INCLUSIVE RASPAGEM DE MASSA OU RETIRADA DE BAGUETES
1.01.86
VIDRACEIRO
Mo-de-Obra 2,78500
LS
3,39770
SubMO
6,18270

Exerccio:

2011

M2
H
0,50000
Material
0,00000

BDI

4,64
3,82
31,71
9,45314

5,57
1,42202

50,55
2,32000
1,91000
31,71000

7,60
2,78500

Pgina: 278

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
14.60.099
RETIRADAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

Descrio

LS

0,00000

UN Coeficiente

SubMO

0,00000

MV
MV
1,00000
Material
244,82000

Custo Unit.

Custo Total

301,12
244,82
244,82000
BDI
56,30860

14.70.001
DE VIDRO INCLUSIVE EMASSAMENTO OU RECOLOCACAO DE BAGUETES
1.01.86
VIDRACEIRO
3.70.43
MASSA PARA VIDRO
Mo-de-Obra 11,14000
LS
13,59080
SubMO
24,73080

M2
H
2,00000
KG
2,00000
Material
2,76000

BDI

14.70.099
RECOLOCACOES DE VIDRO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

5,89632

M2
H
0,40000
H
0,20000
L
0,15000
Material
1,39500

5,89632

M2
H
0,40000
H
0,20000
L
0,15000
Material
2,03550

5,89632

M2
H
0,40000
H
0,20000
L
0,15000
Material
2,12700

5,89632

M2
H
0,40000
H
0,20000
L
0,15000
Material
1,51800

14.80.099
SERVICOS EM VIDROS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

0,00000

15.01.001
OLEO EM ESTRUTURA METALICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.34
TINTA A OLEO
Mo-de-Obra 2,65600
LS
3,24032
15.01.002
GRAFITE EM ESTRUTURA METALICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.80.56
GRAFITE
Mo-de-Obra 2,65600
LS
3,24032
15.01.003
PINTURA ALUMINIO EM ESTRUTURA METALICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
Mo-de-Obra 2,65600
LS
3,24032
15.01.004
ESMALTE EM ESTRUTURA METALICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
Mo-de-Obra 2,65600
LS
3,24032

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

15.01.005
PINTURA PARA ESTRUTURA DE ALUMINIO C/ TINTA ESMALTE AUTOMOTIVA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
3.80.35
ESMALTE AUTOMOTIVO (TIPO DUCO)
3.80.60
TINNER
SubMO
5,68764
Mo-de-Obra 2,56200
LS
3,12564

M2
H
H
L
L
L
Material
4,28103

15.01.006
ESMALTE A BASE DE GUA EM ESTRUTURA METLICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.08
TINTA ESMALTE A BASE DE GUA
Mo-de-Obra 2,65600
LS
3,24032
SubMO

M2
H
0,40000
H
0,20000
L
0,15000
Material
1,60500

5,89632

15.01.008
ESMALTE POLIURETANO ACRILICO ALIFATICO P/ESTR.METALICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
1.01.55
OPERADOR
3.75.03
ESMALTE EPOXI
3.75.51
PRIMER EPOXI RICO EM ZINCO
3.76.33
ESMALTE POLIURETANO ACRILICO ALIFATICO
8.01.97
EQUIPAMENTO JATO DE AREIA COMPLETO C/COMPRESSOR
9.10.21
OXIDO DE ALUMINIO
Mo-de-Obra 7,72400
LS
9,42328
SubMO
17,14728

15.01.010
OLEO SEM APAREL E EMASS PREVIOS EM ESTRUT DE MAD APARENTE (GALPOES)
M2
1.01.40
PINTOR
H
0,35000
1.01.41
AJUDANTE DE PINTOR
H
0,35000
3.80.34
TINTA A OLEO
L
0,15000
SubMO
6,63558
Mo-de-Obra 2,98900
LS
3,64658
Material
1,39500

Exerccio:

2011

BDI

4,74
3,80
9,30
1,67700

BDI

4,74
3,80
13,57
1,82432

BDI

4,74
3,80
14,18
1,84536

BDI

4,74
3,80
10,12
1,70529

BDI

4,74
3,80
20,41
21,39
6,50
2,29279

BDI

4,74
3,80
10,70
1,72530

BDI

4,74
3,80
3,82
6,95
22,75
42,29
30,62
21,60
1,33
9,26600

BDI

4,74
3,80
9,30
1,84703

0,30000
0,30000
0,06300
0,13000
0,03300

M2
H
0,40000
H
0,40000
H
0,40000
H
0,40000
L
0,13750
L
0,08300
L
0,08300
H
0,40000
KG
4,00000
Material
23,13966

5,57
1,38
6,32288

33,81
11,14000
2,76000

8,96
1,89600
0,76000
1,39500

9,75
1,89600
0,76000
2,03550

9,86
1,89600
0,76000
2,12700

9,11
1,89600
0,76000
1,51800

12,26
1,42200
1,14000
1,28583
2,78070
0,21450

9,22
1,89600
0,76000
1,60500

49,55
1,89600
1,52000
1,52800
2,78000
3,12813
3,51007
2,54146
8,64000
5,32000

9,87
1,65900
1,33000
1,39500

Pgina: 279

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

15.01.012
ESMALTE S/APAREL EMASS PREVIOS EM ESTRUTURA DE MADEIRA APARENTES
M2
1.01.40
PINTOR
H
0,35000
1.01.41
AJUDANTE DE PINTOR
H
0,35000
3.75.02
TINTA ESMALTE
L
0,15000
Mo-de-Obra 2,98900
LS
3,64658
Material
1,51800
SubMO
6,63558
ESMALTE A BASE DE GUA SEM APARELHAMENTO E EMASSAMENTO PRVIOS EM
M2
ESTRUTURA DE MADEIRA
1.01.40
PINTOR
H
0,35000
1.01.41
AJUDANTE DE PINTOR
H
0,35000
3.75.08
TINTA ESMALTE A BASE DE GUA
L
0,15000
Mo-de-Obra 2,98900
LS
3,64658
SubMO
6,63558
Material
1,60500

Custo Unit.

BDI

Custo Total

4,74
3,80
10,12
1,87532

15.01.013

VERNIZ SEM APARELHAMENTO E EMAS PREVIOS EM ESTRUT DE MADEIRA


APARENTE
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.50
VERNIZ SINTETICO BRILHANTE
Mo-de-Obra 2,98900
LS
3,64658
SubMO
6,63558

15.01.015

15.01.030
GALVANIZACAO A FOGO - ESTRUTURAS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.76.50
GALVANIZACAO A FOGO
3.80.12
LIXA PARA FERRO
Mo-de-Obra 0,08540
LS
0,10419

SubMO

0,18959

Material

0,35000
0,35000
0,15000
1,72950

KG
H
H
L
KG
UN
Material
2,58575

BDI

0,01000
0,01000
0,00500
1,00000
0,02000

M2
H
0,20000
H
0,10000
L
0,15000
Material
2,21100

15.01.035
FUNDO ANTI-OXIDANTE EM ESTRUTURAS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 1,59360
LS
1,94419

3,53779

M2
H
H
UN
L
Material
3,12900

0,00000

MV
MV
1,00000
Material
244,82000

0,30000
0,20000
0,20000
0,50000
0,30000

4,84404

M2
H
H
L
L
UN
Material
3,48800

0,45000
0,40000
0,25000
0,20000
0,30000

8,10966

M2
H
H
L
L
UN
Material
3,34550

0,75000
0,60000
0,25000
0,20000
0,50000
0,60000

12,95370

M2
H
H
L
L
L
UN
Material
4,76150

15.01.099
PINTURAS EM ESTRUTURAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

15.02.003
MASSA CORRIDA PVA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.09
SELADOR P/PINTURA LATEX
3.80.17
MASSA NIVELADORA INTERIOR
3.80.40
LIXA D"AGUA
Mo-de-Obra 2,18200
LS
2,66204
15.02.005
LATEX
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS

4,45666

15.02.006
LATEX COM MASSA CORRIDA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.17
MASSA NIVELADORA INTERIOR
3.80.40
LIXA D"AGUA
Mo-de-Obra 5,83500
LS
7,11870
15.02.010
1.01.40
1.01.41
3.75.13
Exerccio:

LATEX EM ELEMENTO VAZADO


PINTOR
AJUDANTE DE PINTOR
TINTA LATEX ECONOMICA

2011

SubMO

SubMO

SubMO

SubMO

BDI

4,74
3,80
10,70
1,89533

M2
H
H
L

1,65900
1,33000
1,60500

10,28

15.01.032
PRIMER P/ GALVANIZADOS (GALVITE/SIMILAR) - ESTRUTURAS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 1,32800
LS
1,62016
SubMO
2,94816

SubMO

10,13

M2
H
H
L

10,02
1,65900
1,33000
1,51800

4,74
3,80
159,27
1,76
1,47
BDI
0,63833

BDI

4,74
3,80
14,74
1,18661

BDI

4,74
3,80
1,47
15,96
1,53336

0,24000
0,12000
0,50000
0,15000

0,45000
0,40000
0,25000

4,74
3,80
11,53
1,92397

1,65900
1,33000
1,72950

3,41
0,04740
0,03800
0,79635
1,76000
0,02940

6,34
0,94800
0,38000
2,21100

8,20
1,13760
0,45600
0,73500
2,39400

301,12
244,82
244,82000
BDI
56,30860

BDI

4,74
3,80
10,36
2,40
0,72
1,91637

BDI

4,74
3,80
4,23
10,36
0,72
2,63469

BDI

4,74
3,80
4,23
10,36
2,40
0,72
4,07450

4,74
3,80
4,23

10,24
1,42200
0,76000
2,07200
1,20000
0,21600

14,08
2,13300
1,52000
1,05750
2,07200
0,21600

21,78
3,55500
2,28000
1,05750
2,07200
1,20000
0,43200

14,08
2,13300
1,52000
1,05750
Pgina: 280

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS

4,45666

15.02.012
MASSA CORRIDA A OLEO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.16
MASSA PARA MADEIRA
3.80.40
LIXA D"AGUA
3.80.61
LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE
Mo-de-Obra 2,79900
LS
3,41478
15.02.015
OLEO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.34
TINTA A OLEO
3.80.40
LIXA D"AGUA
3.80.61
LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE
Mo-de-Obra 3,65300
LS
4,45666
15.02.016
OLEO COM MASSA CORRIDA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.16
MASSA PARA MADEIRA
3.80.34
TINTA A OLEO
3.80.40
LIXA D"AGUA
3.80.61
LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE
Mo-de-Obra 6,45200
LS
7,87144
15.02.018
ESMALTE A BASE DE AGUA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.08
TINTA ESMALTE A BASE DE GUA
3.75.52
FUNDO PARA METAIS E MADEIRA BASE GUA
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS
4,45666
15.02.019
ESMALTE
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
3.80.40
LIXA D"AGUA
3.80.61
LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE
Mo-de-Obra 3,65300
LS
4,45666

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

15.02.020
MASSA NIVELADORA PARA EXTERIOR E INTERIOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.09
SELADOR P/PINTURA LATEX
3.80.14
MASSA NIVELADORA EXTERIOR/INTERIOR
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS
4,45666
SubMO
15.02.025
TINTA ACRILICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.42
TINTA LATEX STANDARD
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS

4,45666

15.02.026
TINTA ACRILICA COM MASSA CORRIDA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.42
TINTA LATEX STANDARD
3.80.09
SELADOR P/PINTURA LATEX
3.80.14
MASSA NIVELADORA EXTERIOR/INTERIOR
3.80.40
LIXA D"AGUA
Mo-de-Obra 5,83500
LS
7,11870
15.02.030
1.01.40
1.01.41
3.75.13
Exerccio:

SubMO

SubMO

TINTA NITROSINTETICA MULTICOLORIDA (QUANTIL)


PINTOR
AJUDANTE DE PINTOR
TINTA LATEX ECONOMICA

2011

8,10966

L
0,20000
UN
0,30000
Material
3,34550

0,35000
0,30000
0,50000
0,30000
0,20000

6,21378

M2
H
H
L
UN
L
Material
7,39000

0,45000
0,40000
0,25000
0,30000
0,20000

8,10966

M2
H
H
L
UN
L
Material
4,81500

0,80000
0,70000
0,50000
0,25000
0,60000
0,20000

14,32344

M2
H
H
L
L
UN
L
Material
9,93100

0,45000
0,40000
0,25000
0,20000
0,30000

8,10966

M2
H
H
L
L
UN
Material
5,67100

0,45000
0,40000
0,25000
0,30000
0,20000

8,10966

M2
H
H
L
UN
L
Material
5,02000

0,45000
0,40000
0,25000
0,30000
0,20000

8,10966

M2
H
H
L
L
UN
Material
3,88600

0,45000
0,40000
0,25000
0,20000
0,30000

8,10966

M2
H
H
L
L
UN
Material
3,95300

0,75000
0,60000
0,25000
0,20000
0,50000
0,60000

12,95370

M2
H
H
L
L
L
UN
Material
6,08900
M2
H
H
L

0,45000
0,40000
0,15000

Custo Unit.

Custo Total

BDI

10,36
0,72
2,63469

BDI

4,74
3,80
9,80
0,72
11,37
3,12887

BDI

4,74
3,80
9,30
0,72
11,37
2,97267

BDI

4,74
3,80
9,80
9,30
0,72
11,37
5,57852

BDI

4,74
3,80
10,70
13,90
0,72
3,16955

BDI

4,74
3,80
10,12
0,72
11,37
3,01982

BDI

4,74
3,80
10,36
3,84
0,72
2,75900

BDI

4,74
3,80
6,66
10,36
0,72
2,77441

BDI

4,74
3,80
6,66
10,36
3,84
0,72
4,37982

4,74
3,80
4,23

2,07200
0,21600

16,73
1,65900
1,14000
4,90000
0,21600
2,27400

15,89
2,13300
1,52000
2,32500
0,21600
2,27400

29,83
3,79200
2,66000
4,90000
2,32500
0,43200
2,27400

16,95
2,13300
1,52000
2,67500
2,78000
0,21600

16,14
2,13300
1,52000
2,53000
0,21600
2,27400

14,75
2,13300
1,52000
2,59000
1,15200
0,14400

14,83
2,13300
1,52000
1,66500
2,07200
0,21600

23,42
3,55500
2,28000
1,66500
2,07200
1,92000
0,43200

23,94
2,13300
1,52000
0,63450
Pgina: 281

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.75.25
TINTA NITRO SINTETICA (QUANTIL)
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS
4,45666

UN Coeficiente

SubMO

8,10966

L
0,18000
L
0,20000
UN
0,30000
Material
11,36090

15.02.031
TINTA NITROSINTETICA MULTICOLORIDA (QUANTIL) COM MASSA CORRIDA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.13
TINTA LATEX ECONOMICA
3.75.25
TINTA NITRO SINTETICA (QUANTIL)
3.80.09
SELADOR P/PINTURA LATEX
3.80.17
MASSA NIVELADORA INTERIOR
3.80.40
LIXA D"AGUA
Mo-de-Obra 6,26200
LS
7,63964
SubMO
13,90164

M2
H
0,80000
H
0,65000
L
0,15000
L
0,18000
L
0,20000
L
0,50000
UN
0,30000
Material
12,56090

15.02.035
TINTA EPOXICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.45
TINTA-BASE EPOXI
3.80.40
LIXA D"AGUA
3.80.41
SELADOR PARA TINTA EPOXI
Mo-de-Obra 8,54000
LS

18,95880

M2
H
1,00000
H
1,00000
L
0,50000
UN
0,30000
L
0,30000
Material
26,78700

28,43820

M2
H
1,50000
H
1,50000
L
0,50000
L
0,80000
UN
1,00000
L
0,30000
Material
45,17900

0,60000
0,40000
0,10000
0,40000
0,25000

9,68808

M2
H
H
L
L
UN
Material
4,78750

0,60000
0,40000
0,40000
0,10000
0,25000

9,68808

M2
H
H
L
L
UN
Material
5,11550

0,60000
0,40000
0,40000
0,10000
0,25000

9,68808

M2
H
H
L
L
UN
Material
5,75050

0,40000
0,30000
0,50000
0,30000

6,73992

M2
H
H
UN
L
Material
3,63400

0,09000
0,10000
0,12000
0,06000

1,79065

M2
H
H
L
L
Material
1,75440

10,41880

15.02.036
TINTA EPOXICA COM MASSA CORRIDA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.45
TINTA-BASE EPOXI
3.80.15
MASSA-BASE EPOXI
3.80.40
LIXA D"AGUA
3.80.41
SELADOR PARA TINTA EPOXI
Mo-de-Obra 12,81000
LS
15,62820
15.02.050
OLEO EM FORRO DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.16
MASSA PARA MADEIRA
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 4,36400
LS
5,32408
15.02.052
ESMALTE EM FORRO DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
3.80.16
MASSA PARA MADEIRA
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 4,36400
LS
5,32408

SubMO

SubMO

SubMO

SubMO

15.02.053
ESMALTE A BASE DE AGUA EM FORRO DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.08
TINTA ESMALTE A BASE DE GUA
3.80.19
MASSA NIVELADORA A BASE DE AGUA PARA MADEIRA
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 4,36400
LS
5,32408
SubMO
15.02.055
ENVERNIZAMENTO EM FORRO DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.39
LIXA PARA MADEIRA
3.80.50
VERNIZ SINTETICO BRILHANTE
Mo-de-Obra 3,03600
LS
3,70392

SubMO

15.02.060
FUNDO PREPARADOR PARA REVESTIMENTO COM GESSO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.10
FUNDO PREPARADOR DE PAREDE
3.80.60
TINNER
Mo-de-Obra 0,80660
LS
0,98405
SubMO
15.02.079
1.01.40
1.01.41
3.75.17
Exerccio:

PINTURA ACRILICA PARA PISOS


PINTOR
AJUDANTE DE PINTOR
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)

2011

M2
H
H
L

0,45000
0,45000
0,25000

Custo Unit.

Custo Total

BDI

46,88
10,36
0,72
4,47823

BDI

4,74
3,80
4,23
46,88
10,36
2,40
0,72
6,08638

BDI

4,74
3,80
35,46
0,72
29,47
10,52153

BDI

4,74
3,80
35,46
22,36
0,72
29,47
16,93196

BDI

4,74
3,80
9,80
9,30
0,35
3,32938

BDI

4,74
3,80
10,12
9,80
0,35
3,40482

BDI

4,74
3,80
10,70
13,83
0,35
3,55087

BDI

4,74
3,80
0,35
11,53
2,38600

BDI

4,74
3,80
11,37
6,50
0,81536

4,74
3,80
6,08

8,43840
2,07200
0,21600

32,54
3,79200
2,47000
0,63450
8,43840
2,07200
1,20000
0,21600

56,26
4,74000
3,80000
17,73000
0,21600
8,84100

90,54
7,11000
5,70000
17,73000
17,88800
0,72000
8,84100

17,80
2,84400
1,52000
0,98000
3,72000
0,08750

18,20
2,84400
1,52000
4,04800
0,98000
0,08750

18,98
2,84400
1,52000
4,28000
1,38300
0,08750

12,75
1,89600
1,14000
0,17500
3,45900

4,36
0,42660
0,38000
1,36440
0,39000

12,36
2,13300
1,71000
1,52000
Pgina: 282

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 3,84300

LS

4,68846

UN Coeficiente
8,53146

Material

0,00000

MV
MV
1,00000
Material
244,82000

0,35000
0,30000
0,30000
0,30000

6,21378

M2
H
H
L
UN
Material
3,04500

15.03.002
MASSA NIVELADORA A BASE DE AGUA EM ESQUADRIAS DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.19
MASSA NIVELADORA A BASE DE AGUA PARA MADEIRA
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 2,79900
LS
3,41478
SubMO
6,21378

M2
H
H
L
UN
Material
4,25400

0,35000
0,30000
0,30000
0,30000

15.03.003
OLEO SEM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 3,65300
LS
4,45666
SubMO
8,10966

M2
H
H
L
UN
Material
3,82500

0,45000
0,40000
0,40000
0,30000

15.03.004
OLEO COM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.16
MASSA PARA MADEIRA
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 6,45200
LS
7,87144
SubMO
14,32344

M2
H
H
L
L
UN
Material
6,87000

0,80000
0,70000
0,30000
0,40000
0,60000

15.02.099
PINTURAS EM FORROS/PAREDES INTERNAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

15.03.001
MASSA CORRIDA A OLEO EM ESQUADRIAS DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.16
MASSA PARA MADEIRA
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 2,79900
LS
3,41478
SubMO

1,52000

BDI

15.03.005
OLEO EM MADEIRA SEM APARELHAMENTO E EMASS PREVIOS (PORTOES-CERCAS)
M2
1.01.40
PINTOR
H
0,50000
1.01.41
AJUDANTE DE PINTOR
H
0,50000
3.80.34
TINTA A OLEO
L
0,20000
Mo-de-Obra 4,27000
LS
5,20940
Material
1,86000
SubMO
9,47940
15.03.006
ESMALTE SEM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 3,65300
LS
4,45666
SubMO
8,10966

M2
H
H
L
UN
Material
2,63500

0,45000
0,40000
0,25000
0,30000

15.03.007
ESMALTE COM MASSA CORRIDA EM ESQUADRIAS DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
3.80.16
MASSA PARA MADEIRA
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 6,45200
LS
7,87144
SubMO
14,32344

M2
H
H
L
L
UN
Material
5,68000

0,80000
0,70000
0,25000
0,30000
0,60000

15.03.009
ESMALTE EM CERCAS PORTOES E GRADIS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
Mo-de-Obra 1,59360
LS
1,94419

M2
H
0,24000
H
0,12000
L
0,15000
Material
1,51800

SubMO

3,53779

15.03.010
VERNIZ PLASTICO BASE POLIURET EM ESQUADRIAS E PECAS MADEIRA EXTERNA
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.80.39
LIXA PARA MADEIRA
UN
3.80.49
VERNIZ POLIURETANO
L
Mo-de-Obra 3,41600
LS
4,16752
SubMO
7,58352
Material
3,51300
15.03.012
1.01.40
1.01.41
3.80.39
3.80.50
Exerccio:

ENVERNIZAMENTO EM ESQUADRIAS DE MADEIRA


PINTOR
AJUDANTE DE PINTOR
LIXA PARA MADEIRA
VERNIZ SINTETICO BRILHANTE

2011

M2
H
H
UN
L

Custo Unit.

2,31184

301,12
244,82
244,82000
BDI
56,30860

BDI

4,74
3,80
9,80
0,35
2,12952

BDI

4,74
3,80
13,83
0,35
2,40759

BDI

4,74
3,80
9,30
0,35
2,74497

BDI

4,74
3,80
9,80
9,30
0,35
4,87449

BDI

4,74
3,80
9,30
2,60806

BDI

4,74
3,80
10,12
0,35
2,47127

BDI

4,74
3,80
10,12
9,80
0,35
4,60079

BDI

4,74
3,80
10,12
1,16283

BDI

4,74
3,80
0,35
11,36
2,55220

0,40000
0,40000
0,30000
0,30000

0,40000
0,30000
0,50000
0,30000

Custo Total

4,74
3,80
0,35
11,53

11,38
1,65900
1,14000
2,94000
0,10500

12,87
1,65900
1,14000
4,14900
0,10500

14,67
2,13300
1,52000
3,72000
0,10500

26,06
3,79200
2,66000
2,94000
3,72000
0,21000

13,94
2,37000
1,90000
1,86000

13,21
2,13300
1,52000
2,53000
0,10500

24,60
3,79200
2,66000
2,53000
2,94000
0,21000

6,21
1,13760
0,45600
1,51800

13,64
1,89600
1,52000
0,10500
3,40800

12,75
1,89600
1,14000
0,17500
3,45900
Pgina: 283

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 3,03600

LS

3,70392

15.03.015
ENCERAMENTO DE ESQUADRIAS DE MADEIRA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.39
LIXA PARA MADEIRA
3.80.52
VERNIZ (A BONECA)
3.90.63
CERA PARA PISO
Mo-de-Obra 3,89000
LS
4,74580
15.03.020
OLEO EM ESQUADRIAS DE FERRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.34
TINTA A OLEO
Mo-de-Obra 4,78240
LS
5,83453
15.03.021
ESMALTE EM ESQUADRIAS DE FERRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
Mo-de-Obra 4,78240
LS
5,83453
15.03.022
GRAFITE EM ESQUADRIAS DE FERRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.80.56
GRAFITE
Mo-de-Obra 4,78240
LS
5,83453

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

15.03.024
PINTURA ALUMINIO EM ESQUADRIAS DE FERRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
Mo-de-Obra 4,78240
LS
5,83453
SubMO

6,73992

Material

3,63400

8,63580

M2
H
H
UN
L
KG
Material
6,47300

10,61693

M2
H
0,56000
H
0,56000
L
0,25000
Material
2,32500

10,61693

M2
H
0,56000
H
0,56000
L
0,25000
Material
2,53000

10,61693

M2
H
0,56000
H
0,56000
L
0,25000
Material
3,39250

10,61693

M2
H
0,56000
H
0,56000
L
0,25000
Material
3,54500

Custo Unit.
BDI

2,38600

BDI

4,74
3,80
0,35
6,36
28,66
3,47502

BDI

4,74
3,80
9,30
2,97664

BDI

4,74
3,80
10,12
3,02379

BDI

4,74
3,80
13,57
3,22217

BDI

4,74
3,80
14,18
3,25724

BDI

4,74
3,80
10,70
0,35
2,50462

BDI

4,74
3,80
10,70
13,83
0,35
4,91221

0,50000
0,40000
0,30000
0,10000
0,20000

15.03.025
ESMALTE A BASE DE AGUA SEM MASSA NIVELADORA EM ESQUADRIAS DE MADEIRA M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.08
TINTA ESMALTE A BASE DE GUA
L
3.80.39
LIXA PARA MADEIRA
UN
Mo-de-Obra 3,65300
LS
4,45666
Material
2,78000
SubMO
8,10966

0,45000
0,40000
0,25000
0,30000

15.03.026
ESMALTE A BASE DE AGUA COM MASSA NIVELADORA EM ESQUADRIAS DE MADEIRA M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.08
TINTA ESMALTE A BASE DE GUA
L
3.80.19
MASSA NIVELADORA A BASE DE AGUA PARA MADEIRA
L
3.80.39
LIXA PARA MADEIRA
UN
Mo-de-Obra 6,45200
LS
7,87144
SubMO
14,32344
Material
7,03400

0,80000
0,70000
0,25000
0,30000
0,60000

Custo Total

15.03.027
ESMALTE A BASE DE AGUA EM CERCAS, PORTES E GRADIS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.08
TINTA ESMALTE A BASE DE GUA
SubMO
3,53779
Mo-de-Obra 1,59360
LS
1,94419

M2
H
0,24000
H
0,12000
L
0,15000
Material
1,60500

BDI

4,74
3,80
10,70
1,18284

15.03.028
ESMALTE A BASE DE AGUA EM ESQUADRIAS DE FERRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.08
TINTA ESMALTE A BASE DE GUA
Mo-de-Obra 4,78240
LS
5,83453
SubMO

10,61693

M2
H
0,56000
H
0,56000
L
0,25000
Material
2,67500

BDI

4,74
3,80
10,70
3,05714

0,01000
0,01000
0,00500
1,00000
0,02000

0,18959

KG
H
H
L
KG
UN
Material
2,58575

4,74
3,80
159,27
1,76
1,47
BDI
0,63833

0,50000
0,50000
0,25000

4,74
3,80
14,74

15.03.030
GALVANIZACAO A FOGO - ESQUADRIAS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.76.50
GALVANIZACAO A FOGO
3.80.12
LIXA PARA FERRO
Mo-de-Obra 0,08540
LS
0,10419
15.03.032
1.01.40
1.01.41
3.80.66

Exerccio:

SubMO

PRIMER P/ GALVANIZADOS (GALVIT/SIMILAR) - ESQUADRIAS


PINTOR
AJUDANTE DE PINTOR
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO

2011

M2
H
H
L

18,58
2,37000
1,52000
0,10500
0,63600
5,73200

15,91
2,65440
2,12800
2,32500

16,17
2,65440
2,12800
2,53000

17,23
2,65440
2,12800
3,39250

17,41
2,65440
2,12800
3,54500

13,39
2,13300
1,52000
2,67500
0,10500

26,26
3,79200
2,66000
2,67500
4,14900
0,21000

6,32
1,13760
0,45600
1,60500

16,34
2,65440
2,12800
2,67500

3,41
0,04740
0,03800
0,79635
1,76000
0,02940

16,19
2,37000
1,90000
3,68500

Pgina: 284

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 4,27000

LS

5,20940

15.03.035
FUNDO ANTI-OXIDANTE EM ESQUADRIAS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 4,78240
LS
5,83453

UN Coeficiente
SubMO

SubMO

9,47940

Material

10,61693

M2
H
H
UN
L
Material
4,72500

15.03.040
OLEO EM RODAPES, BAGUETES E MOLDURAS DE MADEIRA
1.01.40
PINTOR
3.80.34
TINTA A OLEO
Mo-de-Obra 0,47400
LS
0,57828
SubMO
1,05228

3,68500

Material

Material

M
H
0,10000
L
0,08000
0,80960

15.03.042
ESMALTE A BASE DE AGUA EM RODAPES BAGUETES E MOLDURAS DE MADEIRA
1.01.40
PINTOR
3.75.08
TINTA ESMALTE A BASE DE GUA
Mo-de-Obra 0,47400
LS
0,57828
Material
SubMO
1,05228

M
H
0,10000
L
0,08000
0,85600

15.03.050
ENVERNIZAMENTO DE RODAPES,BAGUETES OU MOLDURAS DE MADEIRA
1.01.40
PINTOR
3.80.50
VERNIZ SINTETICO BRILHANTE
Mo-de-Obra 0,37920
LS
0,46262
SubMO
0,84182

M
H
0,08000
L
0,08000
0,92240

Material

15.03.060
FACE EXTERNA DE CALHAS/CONDUTORES COM TINTA SINTETICA (ESMALTE)
M
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.02
TINTA ESMALTE
L
3.80.12
LIXA PARA FERRO
UN
3.80.28
ZARCAO
L
Mo-de-Obra 1,70800
LS
2,08376
SubMO
3,79176
Material
2,26360
15.03.061
FACE INTERNA DE CALHAS COM TINTA BETUMINOSA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.40.56
TINTA BETUMINOSA
Mo-de-Obra 0,85400
LS
1,04188
SubMO

Custo Total

BDI

3,02781

BDI

4,74
3,80
1,47
15,96
3,52864

BDI

4,74
9,30
0,41314

BDI

4,74
10,12
0,42823

BDI

4,74
10,70
0,43890

BDI

4,74
11,53
0,40577

BDI

4,74
3,80
10,12
1,47
15,96
1,39273

BDI

4,74
3,80
6,23
0,79428

BDI

4,74
3,80
6,23
0,79428

BDI

4,74
3,80
1,47
15,96
9,30
1,37387

BDI

4,74
3,80
10,70
13,90
1,47
1,40708

0,56000
0,56000
0,50000
0,25000

M
H
0,10000
L
0,08000
0,74400

15.03.041
ESMALTE EM RODAPES, BAGUETES E MOLDURAS DE MADEIRA
1.01.40
PINTOR
3.75.02
TINTA ESMALTE
Mo-de-Obra 0,47400
LS
0,57828
SubMO
1,05228

Custo Unit.

0,20000
0,20000
0,10000
0,20000
0,06000

18,87
2,65440
2,12800
0,73500
3,99000

2,20
0,47400
0,74400

2,29
0,47400
0,80960

2,34
0,47400
0,85600

2,16
0,37920
0,92240

7,44
0,94800
0,76000
1,01200
0,29400
0,95760

Material

M
H
0,10000
H
0,10000
L
0,25000
1,55750

15.03.062
FACE APARENTE DE RUFOS/RINCOES COM TINTA BETUMINOSA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.40.56
TINTA BETUMINOSA
Mo-de-Obra 0,85400
LS
1,04188
SubMO
1,89588

Material

M
H
0,10000
H
0,10000
L
0,25000
1,55750

15.03.063
FACE EXTERNA DE CALHAS/CONDUTORES COM TINTA A OLEO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.34
TINTA A OLEO
Mo-de-Obra 1,70800
LS
2,08376
SubMO
3,79176

M
H
H
UN
L
L
Material
2,18160

0,20000
0,20000
0,20000
0,06000
0,10000

15.03.064
FACE EXTERNA DE CALHAS/CONDUTORES COM ESMALTE A BASE DE AGUA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.08
TINTA ESMALTE A BASE DE GUA
3.75.52
FUNDO PARA METAIS E MADEIRA BASE GUA
3.80.12
LIXA PARA FERRO
Mo-de-Obra 1,70800
LS
2,08376
SubMO
3,79176

M
H
H
L
L
UN
Material
2,32600

0,20000
0,20000
0,06000
0,10000
0,20000

15.03.070
SINALIZACAO. LETRAS,NUMEROS E SIMBOLOS
3.87.01
SINALIZACAO-LETRAS/NUMEROS/SIMBOLOS (APLICADO)
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

UN
UN
1,00000
Material
191,50000

235,54
191,50
191,50000
BDI
44,04500

0,00000

UN
UN
1,00000
Material
215,60000

265,18
215,60
215,60000
BDI
49,58800

15.03.071
SINALIZACAO:PICTOGRAMAS
3.87.02
SINALIZACAO-PICTOGRAMAS (APLICADO)
Mo-de-Obra 0,00000
LS
0,00000
15.03.099
Exerccio:

PINTURAS EM ESQUADRIAS

2011

SubMO

1,89588

MV

4,24
0,47400
0,38000
1,55750

4,24
0,47400
0,38000
1,55750

7,34
0,94800
0,76000
0,29400
0,95760
0,93000

7,52
0,94800
0,76000
0,64200
1,39000
0,29400

301,12
Pgina: 285

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

UN Coeficiente
Material

3,68298

M2
H
0,35000
KG
0,50000
L
0,00750
Material
0,42705

0,45000
0,40000
0,25000
0,20000
0,30000

8,10966

M2
H
H
L
L
UN
Material
3,34550

0,45000
0,40000
0,25000
0,20000
0,30000

8,10966

M2
H
H
L
L
UN
Material
3,95300

0,45000
0,40000
0,25000
0,30000
0,20000

8,10966

UN
H
H
L
L
UN
Material
3,88600

0,45000
0,40000
0,25000
0,20000
0,30000

8,10966

M2
H
H
L
L
UN
Material
3,34550

15.04.009
TRATAMENTO DE CONCRETO COM ESTUQUE E LIXAMENTO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.80.05
COLA PVA
3.80.05
DISCO DE DESBASTE 7"
3.80.11
LIXA CARBETO DE SILICIO 7"
Mo-de-Obra 6,55000
LS
7,99100
SubMO
14,54100

M2
H
H
KG
KG
KG
UN
UN
Material
1,67810

1,00000
0,50000
0,15000
0,15000
0,10000
0,04000
0,17000

15.04.010
VERNIZ ACRILICO
1.01.40
PINTOR
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
Mo-de-Obra 1,89600
LS
2,31312
SubMO

4,20912

M2
H
0,40000
L
0,15000
L
0,25000
Material
6,74100

5,05272

M2
H
0,40000
H
0,10000
KG
0,40000
Material
1,10800

15.04.001
CAIACAO
1.01.40
PINTOR
3.80.03
CAL PARA PINTURA
3.81.03
FIXADOR DE CAL
Mo-de-Obra 1,65900

LS

15.04.005
LATEX
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS
15.04.006
TINTA ACRILICA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.42
TINTA LATEX STANDARD
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS

0,00000

2,02398

4,45666

4,45666

SubMO

MV
1,00000
244,82000

0,00000

LS

SubMO

SubMO

SubMO

15.04.007
MASSA NIVELADORA PARA EXTERIOR E INTERIOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.09
SELADOR P/PINTURA LATEX
3.80.14
MASSA NIVELADORA EXTERIOR/INTERIOR
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS
4,45666
SubMO
15.04.008
LATEX EM ELEMENTO VAZADO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.40
LIXA D"AGUA
Mo-de-Obra 3,65300
LS
4,45666

SubMO

15.04.011
TINTA MINERAL IMPERMEAVEL SEM NATA SELADORA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.15
TINTA MINERAL IMPERMEAVEL
Mo-de-Obra 2,27600
LS
2,77672
SubMO

15.04.012
TINTA MINERAL IMPERMEAVEL C/ NATA SELADORA S/ BLOCO DE CONCRETO
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
2.05.99
ADESIVO P/ ARGAMASSA E CHAPISCO BIANCO/SIKAFIX
L
3.75.15
TINTA MINERAL IMPERMEAVEL
KG
SubMO
9,47940
Mo-de-Obra 4,27000
LS
5,20940
Material
2,31800
15.04.013
1.01.40
1.01.41
3.80.22
Exerccio:

HIDROFUGO A BASE DE SILICONE


PINTOR
AJUDANTE DE PINTOR
SILICONE - HIDRAFUGANTE

2011

M2
H
H
L

Custo Unit.
BDI

244,82
244,82000
56,30860

BDI

4,74
0,75
6,94
0,94531

BDI

4,74
3,80
4,23
10,36
0,72
2,63469

BDI

4,74
3,80
6,66
10,36
0,72
2,77441

BDI

4,74
3,80
10,36
3,84
0,72
2,75900

BDI

4,74
3,80
4,23
10,36
0,72
2,63469

BDI

4,64
3,82
0,37
1,04
6,21
8,90
2,88
3,73039

BDI

4,74
11,49
20,07
2,51853

BDI

4,74
3,80
2,77
1,41697

BDI

4,74
3,80
6,05
2,77
2,71340

0,50000
0,50000
0,20000
0,40000

0,45000
0,10000
0,50000

Custo Total

4,74
3,80
15,93

5,05
1,65900
0,37500
0,05205

14,08
2,13300
1,52000
1,05750
2,07200
0,21600

14,83
2,13300
1,52000
1,66500
2,07200
0,21600

14,75
2,13300
1,52000
2,59000
1,15200
0,14400

14,08
2,13300
1,52000
1,05750
2,07200
0,21600

19,94
4,64000
1,91000
0,05550
0,15600
0,62100
0,35600
0,48960

13,46
1,89600
1,72350
5,01750

7,57
1,89600
0,38000
1,10800

14,51
2,37000
1,90000
1,21000
1,10800

16,65
2,13300
0,38000
7,96500
Pgina: 286

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
Mo-de-Obra 2,51300

Descrio
LS

3,06586

UN Coeficiente
SubMO

5,57886

Material

7,96500

Custo Unit.

Custo Total

BDI

3,11509

BDI

4,74
3,80
10,12
0,72
11,37
2,43774

4,74
12,62
1,30659

15.04.015
ESMALTE EM SUPERFICIE REBOCADA SEM MASSA CORRIDA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
3.80.40
LIXA D"AGUA
3.80.61
LIQUIDO DE FUNDO P/PINT INT OLEO PAREDE
Mo-de-Obra 2,51300
LS
3,06586
SubMO
5,57886

M2
H
H
L
UN
L
Material
5,02000

15.04.020
LIQUIDO IMUNIZANTE EM MADEIRA APARENTE
1.01.40
PINTOR
2.40.47
IMUNIZANTE PARA MADEIRA - CUPINICIDA
Mo-de-Obra 1,42200
LS
1,73484

3,15684

M2
H
0,30000
L
0,20000
Material
2,52400

BDI

15.04.070
SINALIZACAO: LOGOTIPO RESERVATORIO SUPERIOR
3.87.03
SINALIZACAO-BANDEIRA RESERVATORIO SUPERIOR (APLIC)
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

UN
UN
1,00000
Material
2.037,68000

2.506,34
2.037,68
2.037,68000
BDI
468,66640

15.04.071
RS-16 VAGA COM SIMBOLO INTERNACIONAL DE ACESSO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 51,24000
LS
62,51280
SubMO

UN
H
6,00000
H
6,00000
UN
2,00000
L
7,15000
Material
52,69200

SubMO

113,75280

0,45000
0,10000
0,25000
0,30000
0,20000

15.04.073
PINTURA PARA TELHAS DE ALUMINIO COM TINTA ESMALTE AUTOMOTIVA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
3.80.35
ESMALTE AUTOMOTIVO (TIPO DUCO)
3.80.60
TINNER
Mo-de-Obra 2,56200
LS
3,12564
SubMO
5,68764

M2
H
H
L
L
L
Material
4,28103

0,30000
0,30000
0,06300
0,13000
0,03300

15.04.078
SINALIZAO VISUAL DE DEGRAUS-PINTURA ACRLICA P/PISOS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 2,81820
LS
3,43820
SubMO
6,25640

CJ
H
H
UN
L
Material
0,15654

0,33000
0,33000
0,03000
0,00300

15.04.079
PINTURA ACRILICA PARA PISOS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 3,84300
LS
4,68846
SubMO

M2
H
0,45000
H
0,45000
L
0,25000
Material
1,52000

8,53146

15.04.080
PINTURA DE QUADRAS ESP-LINHAS DEMARCATORIAS (600M2)
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 194,71200
LS
237,54864
SubMO
432,26064

UN
H
22,80000
H
22,80000
UN
22,00000
L
9,60000
Material
159,78800

15.04.081
PINTURA DE LINHAS DEMARCATORIAS DE QUADRA DE ESPORTES
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.80.81
FITA CREPE 25MM X 50M
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 0,29036
LS
0,35424
SubMO
0,64460

M
H
H
UN
L
Material
0,34268

15.04.099
PINTURAS EM PAREDES EXTERNAS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

15.50.001
RASPAGEM DE CAIACAO OU TINTA MINERAL IMPERMEAVEL
1.01.41
AJUDANTE DE PINTOR
Mo-de-Obra 0,38000
LS
0,46360
SubMO
0,84360

M2
H
0,10000
Material
0,00000

SubMO

2011

6,98
1,42200
2,52400

204,72
28,44000
22,80000
9,22000
43,47200

4,74
3,80
4,61
6,08
38,28230

12,26
1,42200
1,14000
1,28583
2,78070
0,21450

BDI

4,74
3,80
20,41
21,39
6,50
2,29279

BDI

4,74
3,80
4,61
6,08
1,47498

BDI

4,74
3,80
6,08
2,31184

BDI

4,74
3,80
4,61
6,08
136,17119

BDI

4,74
3,80
4,61
6,08
0,22707

0,03400
0,03400
0,04400
0,02300

15.50.002
REMOCAO DE OLEO,ESMALTE,LATEX/ACRILICO EM PAREDES COM LIXAMENTO
M2
1.01.41
AJUDANTE DE PINTOR
H
0,15000
3.80.40
LIXA D"AGUA
UN
0,50000
SubMO
1,26540
Mo-de-Obra 0,57000
LS
0,69540
Material
0,36000

Exerccio:

BDI

13,03
2,13300
0,38000
2,53000
0,21600
2,27400

7,88
1,56420
1,25400
0,13830
0,01824

12,36
2,13300
1,71000
1,52000

728,21
108,07200
86,64000
101,42000
58,36800

1,21
0,16116
0,12920
0,20284
0,13984

301,12
244,82
244,82000
BDI
56,30860

BDI

3,80
0,19403

BDI

3,80
0,72
0,37384

1,03
0,38000

1,99
0,57000
0,36000

Pgina: 287

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

15.50.003
REMOCAO DE OLEO,ESMALTE OU VERNIZ EM ESQ DE MADEIRA C/LIXAMENTO
M2
1.01.41
AJUDANTE DE PINTOR
H
0,25000
3.80.39
LIXA PARA MADEIRA
UN
0,50000
Mo-de-Obra 0,95000
LS
1,15900
Material
0,17500
SubMO
2,10900
REMOCAO DE OLEO,ESMALTE,ALUMIN OU GRAFITE EM ESQ DE FERRO
C/LIXAMENTO
1.01.41
AJUDANTE DE PINTOR
3.80.12
LIXA PARA FERRO
Mo-de-Obra 0,95000
LS
1,15900
SubMO
2,10900

15.50.004

Custo Unit.

Custo Total

BDI

3,80
0,35
0,52532

BDI

3,80
1,47
0,65412

BDI

3,80
0,35
0,10506

M2

3,49

H
0,25000
UN
0,50000
Material
0,73500

15.50.010
REMOCAO OLEO,ESMALTE/VERNIZ EM RODAPES,BAGUETES E MOLD C/LIXAMENTO
M
1.01.41
AJUDANTE DE PINTOR
H
0,05000
3.80.39
LIXA PARA MADEIRA
UN
0,10000
Mo-de-Obra 0,19000
LS
0,23180
SubMO
0,42180
Material
0,03500
REMOCAO DE OLEO,ESMALTE,LATEX/ACRILICO EM PAREDES COM PRODUTO
M2
QUIMICO
1.01.41
AJUDANTE DE PINTOR
H
0,20000
3.80.29
REMOVEDOR DE TINTA
L
0,10000
Mo-de-Obra 0,76000
LS
0,92720
SubMO
1,68720
Material
1,37500

15.50.011

15.50.012
REMOCAO DE OLEO ESMALTE OU VERNIZ EM ESQ. DE MADEIRA C/PROD QUIMICO
M2
1.01.41
AJUDANTE DE PINTOR
H
0,20000
3.80.29
REMOVEDOR DE TINTA
L
0,10000
SubMO
1,68720
Mo-de-Obra 0,76000
LS
0,92720
Material
1,37500
REMOCAO DE OLEO,ESMALTE,ALUMIN OU GRAFITE EM ESQ DE FERRO C/PROD
M2
QUIM
1.01.41
AJUDANTE DE PINTOR
H
0,20000
3.80.29
REMOVEDOR DE TINTA
L
0,10000
Mo-de-Obra 0,76000
LS
0,92720
Material
1,37500
SubMO
1,68720
M
H
0,04000
L
0,02000
0,27500

0,95000
0,73500

0,56
0,19000
0,03500

3,76

BDI

3,80
13,75
0,70431

BDI

3,80
13,75
0,70431

15.50.013

15.50.014
REMOCAO OLEO,ESMALTE/VERNIZ EM RODAPES,BAGUETES E MOLD C/PROD QUIM
1.01.41
AJUDANTE DE PINTOR
3.80.29
REMOVEDOR DE TINTA
Mo-de-Obra 0,15200
LS
0,18544
SubMO
0,33744
Material

2,80
0,95000
0,17500

0,76000
1,37500

3,76
0,76000
1,37500

3,76

BDI

3,80
13,75
0,70431

BDI

3,80
13,75
0,14086

3,80
1,47
2,44743

0,76000
1,37500

0,75
0,15200
0,27500

15.50.030
REMOCAO DE PINTURA EM ESTRUTURA METALICA COM LIXAMENTO
1.01.41
AJUDANTE DE PINTOR
3.80.12
LIXA PARA FERRO
Mo-de-Obra 3,80000
LS
4,63600
SubMO
8,43600

M2
H
1,00000
UN
1,50000
Material
2,20500

BDI

15.50.099
REMOCOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

15.80.008
OLEO DE LINHACA EM MADEIRAMENTO APARENTE DE TELHADO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.18
OLEO DE LINHACA
Mo-de-Obra 1,61320
LS
1,96810
SubMO
3,58130

M2
H
0,18000
H
0,20000
L
0,10000
Material
0,65100

15.80.010
PINTURA EM AZULEJO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.26
TINTA PARA AJULEJO SAYERLACK OU SIMILAR
Mo-de-Obra 1,61320
LS
1,96810

3,58130

M2
H
0,18000
H
0,20000
L
0,20000
Material
9,40600

3,58130

M2
H
0,18000
H
0,20000
L
0,25600
Material
5,30432

LS

0,00000

SubMO

SubMO

15.80.012
TINTA EPOXI ANTIPICHACAO (SPEEL FLEX) 2 DEMAOS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.18
TINTA EPOXI ANTI PICHACAO MONOCOMP (SPELL FLEX)
Mo-de-Obra 1,61320
LS
1,96810
SubMO

15.80.015
LATEX EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.13
TINTA LATEX ECONOMICA
3.80.17
MASSA NIVELADORA INTERIOR
3.80.40
LIXA D"AGUA
SubMO
5,21367
Mo-de-Obra 2,34850
LS
2,86517
15.80.016
Exerccio:

ESMALTE EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA

2011

M2
H
H
L
L
UN
Material
1,25400
M2

BDI

4,74
3,80
6,51
0,97343

BDI

4,74
3,80
47,03
2,98708

BDI

4,74
3,80
20,72
2,04369

BDI

4,74
3,80
4,23
2,40
0,72
1,48756

0,27500
0,27500
0,20000
0,08000
0,30000

13,08
3,80000
2,20500

5,20
0,85320
0,76000
0,65100

15,97
0,85320
0,76000
9,40600

10,92
0,85320
0,76000
5,30432

7,95
1,30350
1,04500
0,84600
0,19200
0,21600

10,13
Pgina: 288

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.02
TINTA ESMALTE
3.80.16
MASSA PARA MADEIRA
3.80.40
LIXA D"AGUA
Mo-de-Obra 2,34850
LS

UN Coeficiente

5,21367

H
H
L
L
UN
Material
3,02400

15.80.017
OLEO EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.16
MASSA PARA MADEIRA
3.80.34
TINTA A OLEO
3.80.40
LIXA D"AGUA
Mo-de-Obra 2,34850
LS
2,86517
SubMO
5,21367

M2
H
H
L
L
UN
Material
2,86000

0,27500
0,27500
0,08000
0,20000
0,30000

15.80.018
ACRILICA EM SUPERFICIE INCLUSIVE PREPARO E RETOQUE DE MASSA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.42
TINTA LATEX STANDARD
3.80.17
MASSA NIVELADORA INTERIOR
3.80.40
LIXA D"AGUA
Mo-de-Obra 2,34850
LS
2,86517
SubMO
5,21367

M2
H
H
L
L
UN
Material
1,74000

0,27500
0,27500
0,20000
0,08000
0,30000

2,86517

SubMO

ESMALTE EM ESQUADRIAS DE MADEIRA INCLUSIVE PREPARO E RETOQUES DE


M2
MASSA
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.02
TINTA ESMALTE
L
3.80.16
MASSA PARA MADEIRA
L
3.80.39
LIXA PARA MADEIRA
UN
Mo-de-Obra 2,34850
LS
2,86517
Material
2,91300
SubMO
5,21367

Custo Unit.

0,27500
0,27500
0,20000
0,08000
0,30000

Custo Total

BDI

4,74
3,80
10,12
9,80
0,72
1,89466

BDI

4,74
3,80
9,80
9,30
0,72
1,85694

BDI

4,74
3,80
6,66
2,40
0,72
1,59934

BDI

4,74
3,80
10,12
9,80
0,35
1,86913

BDI

4,74
3,80
9,80
9,30
0,35
1,83141

BDI

4,74
3,80
1,47
15,96
9,30
2,78608

BDI

4,74
3,80
10,12
1,47
15,96
2,81437

BDI

4,74
3,80
9,80
9,30
0,35
0,28053

BDI

4,74
3,80
14,18
1,47
15,96
2,95444

15.80.019

0,27500
0,27500
0,08000
0,20000
0,30000

15.80.021
OLEO EM ESQUADRIAS DE FERRO INCLUSIVE PREPARO E RETOQUES DE ZARCAO
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.80.12
LIXA PARA FERRO
UN
3.80.28
ZARCAO
L
3.80.34
TINTA A OLEO
L
SubMO
9,47940
Mo-de-Obra 4,27000
LS
5,20940
Material
2,63400

0,50000
0,50000
0,30000
0,05000
0,15000

15.80.022

15.80.023
OLEO EM RODAPES/BAGUETES/MOLD. MAD. INCL. PREPARO E RETOQUE DE MASSA
M
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.80.16
MASSA PARA MADEIRA
L
3.80.34
TINTA A OLEO
L
3.80.39
LIXA PARA MADEIRA
UN
Mo-de-Obra 0,36062
LS
0,43995
Material
0,41915
SubMO
0,80057
ALUMINIO EM ESQUADRIAS DE FERRO INCLUSIVE PREPARO E RETOQUE DE
ZARCAO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
SubMO
9,47940
Mo-de-Obra 4,27000
LS
5,20940

15.80.024

15.80.025
Exerccio:

REMOVEDOR DE PICHACAO (SPEEL CLEAN) - POS PINTURA ANTIPICHACAO

2011

M2

8,55
1,30350
1,04500
1,33200
0,19200
0,21600

1,30350
1,04500
2,02400
0,78400
0,10500

9,79
1,30350
1,04500
0,78400
1,86000
0,10500

14,89
2,37000
1,90000
0,44100
0,79800
1,39500

15,05
0,50000
0,50000
0,15000
0,30000
0,05000

0,03840
0,04700
0,00400
0,04000
0,02270

M2
H
H
L
UN
L
Material
3,36600

9,93
1,30350
1,04500
0,78400
1,86000
0,21600

9,99
0,27500
0,27500
0,20000
0,08000
0,30000

15.80.020
OLEO EM ESQUADRIAS DE MADEIRA INCLUSIVE PREPARO E RETOQUES DE MASSA
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.80.16
MASSA PARA MADEIRA
L
3.80.34
TINTA A OLEO
L
3.80.39
LIXA PARA MADEIRA
UN
Mo-de-Obra 2,34850
LS
2,86517
SubMO
5,21367
Material
2,74900

ESMALTE EM ESQUADRIAS DE FERRO INCLUSIVE PREPARO E RETOQUES DE


M2
ZARCAO
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.02
TINTA ESMALTE
L
3.80.12
LIXA PARA FERRO
UN
3.80.28
ZARCAO
L
Mo-de-Obra 4,27000
LS
5,20940
SubMO
9,47940
Material
2,75700

1,30350
1,04500
2,02400
0,78400
0,21600

2,37000
1,90000
1,51800
0,44100
0,79800

1,50
0,18202
0,17860
0,03920
0,37200
0,00795

15,79
0,50000
0,50000
0,15000
0,30000
0,05000

2,37000
1,90000
2,12700
0,44100
0,79800

4,49
Pgina: 289

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.41
AJUDANTE DE PINTOR
3.80.62
REMOVEDOR DE PICHACOES (SPEEL CLEAN)
Mo-de-Obra 1,14000
LS
1,39080

UN Coeficiente
H
L
SubMO

2,53080

Material

0,30000
0,04940
1,12731

15.80.027
GRAFITE EM ESQUADRIAS DE FERRO INCL. PREPARO E RETOQUE DE ZARCAO
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
2.80.56
GRAFITE
L
3.80.12
LIXA PARA FERRO
UN
3.80.28
ZARCAO
L
Mo-de-Obra 4,27000
LS
5,20940
Material
3,27450
SubMO
9,47940
15.80.029
VERNIZ ANTIPICHACAO (SPEEL FLEX) 2 DEMAOS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.24
VERNIZ ANTIPICHACAO (SPEEL FLEX)
Mo-de-Obra 2,56200
LS
3,12564
SubMO

5,68764

Custo Unit.

15.80.030
VERNIZ EM ESQUADRIAS DE MADEIRA INCL. PREPARO E RETOQUE DE MASSA
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.80.16
MASSA PARA MADEIRA
L
3.80.39
LIXA PARA MADEIRA
UN
3.80.50
VERNIZ SINTETICO BRILHANTE
L
SubMO
5,68764
Mo-de-Obra 2,56200
LS
3,12564
Material
4,33600
VERNIZ EM RODAPES/BAGUETES/MOLD. MAD. INCL. PREPARO E RETOQUE DE
M
MASSA
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.80.16
MASSA PARA MADEIRA
L
3.80.39
LIXA PARA MADEIRA
UN
3.80.50
VERNIZ SINTETICO BRILHANTE
L
Mo-de-Obra 0,36062
LS
0,43995
Material
0,50835
SubMO
0,80057

BDI

3,80
22,82
0,84137

BDI

4,74
3,80
13,57
1,47
15,96
2,93340

BDI

4,74
3,80
18,20
2,37977

BDI

4,74
3,80
9,80
0,35
11,53
2,30544

BDI

4,74
3,80
9,80
0,35
11,53
0,30105

BDI

4,74
3,80
13,36
9,80
0,72
1,59909

0,50000
0,50000
0,15000
0,30000
0,05000

M2
H
0,30000
H
0,30000
L
0,25600
Material
4,65920

Custo Total

0,30000
0,30000
0,20000
0,20000
0,20000

15.80.032

M2
H
H
L
L
UN
Material
2,94972

15.80.040
PINTURA DE QUADRAS ESPORTIVAS - LINHAS DEMARCATORIAS
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 102,48000
LS
125,02560
SubMO
227,50560

UN
H
12,00000
H
12,00000
L
7,26020
Material
44,14202

0,19200
0,23500
0,20000
0,02000
0,11350

15.80.042
PINTURA DE LINHAS DEMARCATORIAS DE QUADRA DE ESPORTES
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 0,29036
LS
0,35424
SubMO
0,64460

Material

15.80.050
OLEO EM FORRO DE MADEIRA INCLUSIVE PREPARO E RETOQUE DE MASSA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.16
MASSA PARA MADEIRA
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 2,70462
LS
3,29964
SubMO
6,00426

M2
H
H
L
L
UN
Material
2,09572

0,28800
0,35250
0,02000
0,20000
0,11350

15.80.051
ESMALTE EM FORRO DE MADEIRA INCLUSIVE PREPARO E RETOQUE DE MASSA
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.02
TINTA ESMALTE
L
3.80.16
MASSA PARA MADEIRA
L
3.80.39
LIXA PARA MADEIRA
UN
SubMO
6,00426
Mo-de-Obra 2,70462
LS
3,29964
Material
2,25973

0,28800
0,35250
0,20000
0,02000
0,11350

Exerccio:

ESMALTE EM ESTRUTURA METALICA INCLUSIVE PREPARO E RETOQUE DE ZARCAO


PINTOR
AJUDANTE DE PINTOR

2011

M
H
0,03400
H
0,03400
L
0,02500
0,15200

M2
H
H

15,68
2,37000
1,90000
2,03550
0,44100
0,79800

12,72
1,42200
1,14000
4,65920

12,32
1,42200
1,14000
1,96000
0,07000
2,30600

1,60
0,03840
0,04700
0,00400
0,02270
0,04000

15.80.035
PINTURA EM LOUSA INCL. PREPARO E RETOQUE DE MASSA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.30
TINTA ESMALTE SINTETICO VERDE ESCOLAR
3.80.16
MASSA PARA MADEIRA
3.80.40
LIXA D"AGUA
SubMO
4,00284
Mo-de-Obra 1,80308
LS
2,19976

15.80.060
1.01.40
1.01.41

1,14000
1,12731

0,25540
0,31260

BDI

4,74
3,80
6,08
62,47895

BDI

4,74
3,80
6,08
0,18322

BDI

4,74
3,80
9,80
9,30
0,35
1,86300

BDI

4,74
3,80
10,12
9,80
0,35
1,90072

4,74
3,80

0,18202
0,17860
0,03920
0,00795
0,46120

8,55
0,91008
0,89300
2,67200
0,19600
0,08172

334,12
56,88000
45,60000
44,14202

0,97
0,16116
0,12920
0,15200

9,96
1,36512
1,33950
0,19600
1,86000
0,03973

10,16
1,36512
1,33950
2,02400
0,19600
0,03973

9,21
1,21060
1,18788
Pgina: 290

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.75.02
TINTA ESMALTE
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 2,39848

LS

2,92614

UN Coeficiente

SubMO

5,32462

L
0,15000
UN
0,11350
L
0,03000
Material
2,16364

15.80.061
OLEO EM ESTRUTURA METALICA INCLUSIVE PREPARO E RETOQUE DE ZARCAO
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.80.12
LIXA PARA FERRO
UN
3.80.28
ZARCAO
L
3.80.34
TINTA A OLEO
L
Mo-de-Obra 2,39848
LS
2,92614
SubMO
5,32462
Material
2,04065

0,25540
0,31260
0,11350
0,03000
0,15000

15.80.062
GRAFITE EM ESTRUTURA METALICA INCLUSIVE PREPARO E RETOQUE DE ZARCAO
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
2.80.56
GRAFITE
L
3.80.12
LIXA PARA FERRO
UN
3.80.28
ZARCAO
L
Mo-de-Obra 2,39848
LS
2,92614
Material
2,68115
SubMO
5,32462

0,25540
0,31260
0,15000
0,11350
0,03000

Custo Unit.

Custo Total

BDI

10,12
1,47
15,96
1,72230

BDI

4,74
3,80
1,47
15,96
9,30
1,69401

BDI

4,74
3,80
13,57
1,47
15,96
1,84133

15.80.070
GALVANIZACAO A FRIO - PINTURA P/ ESTRUTURAS - CONSERVACAO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
Mo-de-Obra 1,51800
LS
1,85196
SubMO
3,36996

M2
H
0,20000
H
0,15000
L
0,11000
UN
0,30000
Material
17,96070

4,74
3,80
159,27
1,47
BDI
4,90605

15.80.071
GALVANIZACAO A FRIO - PINTURA P/ ESQUADRIAS - CONSERVACAO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
Mo-de-Obra 3,50140
LS
4,27171
SubMO
7,77311

M2
H
0,41000
H
0,41000
L
0,15000
UN
0,30000
Material
24,33150

4,74
3,80
159,27
1,47
BDI
7,38406

15.80.072
PRIMER P/ GALVANIZADOS (GALVIT/SIMILAR) - ESTRUTURAS - CONSERVACAO
M2
1.01.40
PINTOR
H
0,18000
1.01.41
AJUDANTE DE PINTOR
H
0,13000
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
L
0,11000
Mo-de-Obra 1,34720
LS
1,64358
SubMO
2,99078
Material
1,62140

BDI

4,74
3,80
14,74
1,06080

BDI

4,74
3,80
14,74
2,16553

BDI

4,74
3,80
1,47
15,96
1,28031

BDI

4,74
3,80
1,47
15,96
2,43987

15.80.073
PRIMER P/ GALVANIZADOS (GALVIT/SIMILAR) - ESQUADRIAS - CONSERVACAO
M2
1.01.40
PINTOR
H
0,38000
1.01.41
AJUDANTE DE PINTOR
H
0,38000
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
L
0,15000
Mo-de-Obra 3,24520
LS
3,95914
SubMO
7,20434
Material
2,21100
15.80.075
FUNDO ANTI-OXIDANTE EM ESTRUTURAS - CONSERVACAO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 1,51800
LS
1,85196
SubMO
15.80.076
FUNDO ANTI-OXIDANTE EM ESQUADRIAS - CONSERVACAO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
Mo-de-Obra 3,50140
LS
4,27171
SubMO
15.80.099
SERVICOS DE PINTURA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
16.01.005
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.08
Exerccio:

0,00000

SubMO

FD-04 FECHAMENTO DE DIVISAS/PLACAS DE CONCRETO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CIMENTO

2011

0,20000
0,15000
0,30000
0,11000

3,36996

M2
H
H
UN
L
Material
2,19660

0,41000
0,41000
0,30000
0,15000

7,77311

M2
H
H
UN
L
Material
2,83500

0,00000

MV
MV
1,00000
Material
244,82000
M
H
H
H
H
H
H
M3
KG

1,53000
1,53000
0,58000
0,58000
1,72000
6,43000
0,14500
61,25000

1,51800
0,16685
0,47880

9,05
1,21060
1,18788
0,16685
0,47880
1,39500

9,84
1,21060
1,18788
2,03550
0,16685
0,47880

26,23
0,94800
0,57000
17,51970
0,44100

39,48
1,94340
1,55800
23,89050
0,44100

5,67
0,85320
0,49400
1,62140

11,58
1,80120
1,44400
2,21100

6,84
0,94800
0,57000
0,44100
1,75560

13,04
1,94340
1,55800
0,44100
2,39400

301,12
244,82
244,82000
BDI
56,30860

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,37

234,47
7,03800
6,05880
2,76660
2,21560
7,98080
24,56260
11,66670
22,66250
Pgina: 291

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 50,62240
LS
61,75933

UN Coeficiente

SubMO

112,38173

FD-07 FECHAM DIVISA/BL CONCRETO/REV CHAP GROSSO FACE EXT


H=185CM/SAPAT
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 57,87181
LS
70,60361
SubMO
128,47542

16.01.008

FD-08 FECHAM DIVISA/BL CONCRETO/REV CHAP GROSSO FACE EXT


H=185CM/BROCA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 64,65954
LS
78,88464
SubMO
143,54418

16.01.009

16.01.010
FD-10 FECHAMENTO PARA DEVISAS/MOUROES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.70.32
ARAME GALVANIZADO No. 10
2.75.20
FD-10MOURAO CONCRETO 10X10X220CM
Mo-de-Obra 6,14000
LS
7,49080
16.01.011
1.01.39
1.01.46
Exerccio:

SubMO

13,63080

FD-11 FECHAMENTO DE DIVISAS - MOUROES C/ PLACAS PRE MOLDADAS


PEDREIRO
SERVENTE

2011

M3
0,14200
M3
0,07300
M
0,48000
M2
0,24000
M2
0,38000
KG
6,70000
KG
0,28000
KG
0,12000
Material
78,24807

Custo Unit.

Custo Total

62,03
61,17
4,60
17,18
11,40
2,70
4,67
4,87
43,84485

8,80826
4,46541
2,20800
4,12320
4,33200
18,09000
1,30760
0,58440

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
BDI
57,70849

4,83000
4,15800
2,05587
1,64642
20,13760
25,04392
8,44830
3,13600
10,90168
0,55827
3,48669
0,66210
15,35858
0,83600
2,40520
2,40000
9,46880
3,88800
45,39600
6,52600
6,07920
2,27460
0,18680
0,41882

BDI

308,61

H
1,05000
H
1,05000
H
0,43100
H
0,43100
H
4,34000
H
6,55600
M3
0,10500
KG
8,96000
KG
29,46400
M3
0,00900
M3
0,05700
M3
0,01000
M3
0,06100
M
0,40000
M2
0,14000
M2
0,15000
KG
3,52000
KG
1,44000
UN
23,40000
UN
2,60000
KG
4,08000
KG
0,20400
KG
0,04000
KG
0,08600
Material
122,43104
M

347,83

H
1,27000
H
1,27000
H
0,64600
H
0,64600
H
4,37000
H
7,32000
M3
0,12200
KG
8,96000
KG
39,95400
M3
0,00900
M3
0,05800
M3
0,01000
M3
0,04100
M
0,80000
M2
0,24000
M2
0,15000
KG
9,20000
KG
1,27000
UN
23,40000
UN
2,60000
KG
3,48000
KG
0,17400
KG
0,08000
KG
0,13000
Material
139,25251
M
H
0,50000
H
1,00000
KG
0,48950
UN
0,50000
Material
14,01480
M
H
H

0,73000
1,71000

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
BDI
65,04324

BDI

4,64
3,82
6,21
21,95
6,35849

4,64
3,82

5,84200
5,02920
3,08142
2,46772
20,27680
27,96240
9,81612
3,13600
14,78298
0,55827
3,54786
0,66210
10,32298
1,67200
4,12320
2,40000
24,74800
3,42900
45,39600
6,52600
5,18520
1,94010
0,37360
0,63310

34,00
2,32000
3,82000
3,03980
10,97500

121,25
3,38720
6,53220
Pgina: 292

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.75.16
PLACA PREMOLDADA 160X60X3CM
2.75.21
MOURAO P/PLACA PREMOLD. C/DIMENS MIN 10X10X240CM
SubMO
Mo-de-Obra 9,91940
LS
12,10167

UN Coeficiente

22,02107

M3
0,02100
KG
13,87000
M3
0,03300
UN
1,67000
UN
0,56000
Material
76,56347

16.01.012
FD-12 FECHAMENTO DE DIVISAS - MOUROES C/ ARAMES E HIBISCOS
1.01.26
JARDINEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.70.32
ARAME GALVANIZADO No. 10
2.75.20
FD-10MOURAO CONCRETO 10X10X220CM
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.48
ARBUSTO H=0.50/0.70M-HIBISCO
Mo-de-Obra 9,27200
LS
11,31184
SubMO
20,58384
16.01.013
FD-13 FECHAMENTO DIV/BL CONCR/SEM REVESTIMENTO (H=185CM/SAPATA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 54,06481
LS
65,95907
SubMO
120,02388
FD-14 FECHAMENTO DE DIVISA/BLOCO DE CONCRETO/ S/REVEST.
H=185CM/BROCA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
SubMO
135,09264
Mo-de-Obra 60,85254
LS
74,24010

16.01.014

Exerccio:

2011

Custo Unit.

Custo Total

BDI

80,46
0,37
61,17
27,19
39,85
22,67444

M
H
0,36000
H
0,50000
H
1,36000
KG
0,48950
UN
0,50000
KG
0,29600
KG
0,29600
M3
0,12800
KG
0,29600
L
20,00000
UN
4,00000
Material
53,03728

BDI

4,88
4,64
3,82
6,21
21,95
1,71
0,41
89,86
1,53
0,21
5,56
16,93286

M
H
1,05000
H
1,05000
H
0,43100
H
0,43100
H
3,89000
H
6,10600
M3
0,10000
KG
8,96000
KG
26,96200
M3
0,00900
M3
0,05700
M3
0,01000
M3
0,06100
M
0,40000
M2
0,14000
M2
0,15000
KG
3,52000
KG
1,44000
UN
23,40000
UN
2,60000
KG
4,08000
KG
0,20400
KG
0,04000
KG
0,08600
Material
121,10300

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
BDI
55,45918

M
H
1,27000
H
1,27000
H
0,64600
H
0,64600
H
3,92000
H
6,87000
M3
0,11700
KG
8,96000
KG
37,45200
M3
0,00900
M3
0,05800
M3
0,01000
M3
0,04100
M
0,80000
M2
0,24000
M2
0,15000
KG
9,20000
KG
1,27000
UN
23,40000
UN
2,60000
KG
3,43000
KG
0,17400
KG
0,08000
KG
0,13000
Material
137,84997

1,68966
5,13190
2,01861
45,40730
22,31600

90,55
1,75680
2,32000
5,19520
3,03980
10,97500
0,50616
0,12136
11,50208
0,45288
4,20000
22,24000

296,58
4,83000
4,15800
2,05587
1,64642
18,04960
23,32492
8,04600
3,13600
9,97594
0,55827
3,48669
0,66210
15,35858
0,83600
2,40520
2,40000
9,46880
3,88800
45,39600
6,52600
6,07920
2,27460
0,18680
0,41882

335,71
4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
BDI
62,77680

5,84200
5,02920
3,08142
2,46772
18,18880
26,24340
9,41382
3,13600
13,85724
0,55827
3,54786
0,66210
10,32298
1,67200
4,12320
2,40000
24,74800
3,42900
45,39600
6,52600
5,11070
1,94010
0,37360
0,63310

Pgina: 293

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

FD-15 FECHAMENTO DE DIVISA/BL CONCRETO/REVEST CHAP FINO


H=235CM/SAPATA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 80,83607
LS
98,62001
SubMO
179,45608

UN Coeficiente

16.01.015

FD-16 FECHAMENTO DIVISA/BL CONCRETO/REVEST CHAPISCO FINO


H=235CM/BROCA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 84,06602
LS
102,56054
SubMO
186,62656

Exerccio:

449,61

H
1,86600
H
1,86600
H
0,83100
H
0,83100
H
5,14400
H
8,86300
M3
0,14500
KG
11,44400
KG
41,08400
M3
0,00900
M3
0,06700
M3
0,01000
M3
0,09300
M
0,40000
M2
0,45400
M2
0,15000
M
1,88400
KG
6,90000
KG
2,70000
UN
28,60000
UN
5,20000
KG
4,68000
KG
0,23400
KG
0,17000
KG
0,17000
Material
186,08762

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
BDI
84,07505

M
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M3
M3
M3
M
M2

8,58360
7,38936
3,96387
3,17442
23,86816
33,85666
11,66670
4,00540
15,20108
0,55827
4,09839
0,66210
23,41554
0,83600
7,79972
2,40000
9,85332
18,56100
7,29000
55,48400
13,05200
6,97320
2,60910
0,79390
0,82790

473,26

H
2,08600
H
2,08600
H
1,02000
H
1,02000
H
5,08600
H
8,86100
M3
0,15700
KG
11,44400
KG
49,67100
M3
0,00900
M3
0,05500
M3
0,01000
M3
0,06300
M
0,80000
M2
0,55400
M2
0,15000
M
1,88400
KG
12,39000
KG
2,16000
UN
28,60000
UN
5,20000
KG
4,68000
KG
0,23400
KG
0,20600
KG
0,20400
Material
198,14069

FD-21 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO / SAPATA (H=185CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 1
PEDRA BRITADA 2
PEDRISCO
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.

2011

Custo Total

16.01.016

16.01.021
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.44
1.01.45
1.01.46
2.05.03
2.05.05
2.05.08
2.05.17
2.05.18
2.05.22
2.05.36
2.10.14
2.10.21

Custo Unit.

1,34900
1,34900
0,40700
0,40700
2,97900
0,25000
0,25000
5,95700
0,06300
3,65200
19,45800
0,00900
0,05700
0,00500
0,07100
0,40000
0,25500

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
BDI
88,49647

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18

9,59560
8,26056
4,86540
3,89640
23,59904
33,84902
12,63222
4,00540
18,37827
0,55827
3,36435
0,66210
15,86214
1,67200
9,51772
2,40000
9,85332
33,32910
5,83200
55,48400
13,05200
6,97320
2,60910
0,96202
0,99348

512,94
6,20540
5,34204
1,94139
1,55474
13,82256
2,02000
1,08500
22,75574
5,06898
1,27820
7,19946
0,55827
3,48669
0,33105
17,87638
0,83600
4,38090
Pgina: 294

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.44
GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST
3.13.45
MONTANTE P/GRADIL METALGRADE H=1322MM PINT.ELETRO
SubMO
121,49365
Mo-de-Obra 54,72687
LS
66,76678

M2
0,15000
M
0,69000
KG
2,92100
KG
1,76000
UN
7,80000
UN
2,60000
KG
4,68000
KG
0,23400
KG
0,08600
KG
0,08200
UN
0,60700
UN
0,66700
Material
295,53489

16.01.022
FD-22 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO/SAPATA (H=235CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.42
GRADIL METALGRADE H=1718MM C=1650MM PINT.
3.13.43
MONTANTE P/GRADIL METALGRADE H=1718MM PINT.ELETRO
Mo-de-Obra 55,96887
LS
68,28202
Material
SubMO
124,25089
16.01.023
FE-01 FECHAMENTO PARA SETORIZACAO (ALAMBRADO)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.60
PREGO
3.15.96
FE-01 GRADIL TIPO ALAMBRADO COMPLETO-GALVANIZADO
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
Mo-de-Obra 10,11380
LS
12,33884
SubMO

M
H
1,34900
H
1,34900
H
0,40700
H
0,40700
H
2,97900
H
0,35000
H
0,35000
H
5,95700
M3
0,06300
KG
3,65200
KG
19,45800
M3
0,00900
M3
0,05700
M3
0,00500
M3
0,07100
M
0,40000
M2
0,25500
M2
0,15000
M
0,69000
KG
2,92100
KG
1,76000
UN
7,80000
UN
2,60000
KG
4,68000
KG
0,23400
KG
0,08600
KG
0,08200
UN
0,60700
UN
0,66700
341,62997

Custo Unit.

Custo Total

16,00
2,40000
5,23
3,60870
2,69
7,85749
2,70
4,75200
1,94
15,13200
2,51
6,52600
1,49
6,97320
11,15
2,60910
4,67
0,40162
4,87
0,39934
254,50
154,48150
74,03
49,37801
BDI
95,91657

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
311,55
91,22
BDI
107,15260

573,03
6,20540
5,34204
1,94139
1,55474
13,82256
2,82800
1,51900
22,75574
5,06898
1,27820
7,19946
0,55827
3,48669
0,33105
17,87638
0,83600
4,38090
2,40000
3,60870
7,85749
4,75200
15,13200
6,52600
6,97320
2,60910
0,40162
0,39934
189,11085
60,84374

22,45264

M2
H
0,50000
H
0,50000
H
0,08000
H
1,43000
M3
0,01400
M
0,75600
M2
0,02500
M2
0,08300
KG
0,05000
M2
1,00000
L
0,00600
Material
207,20182

282,47
4,60
2,30000
3,96
1,98000
4,64
0,37120
3,82
5,46260
241,38
3,37932
3,78
2,85768
17,18
0,42950
11,40
0,94620
4,67
0,23350
198,40
198,40000
159,27
0,95562
BDI
52,82053

16.01.024
FE-02 FECHAMENTO PARA SETORIZACAO (GRADIL ELETROFUNDIDO)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.60
PREGO
3.13.44
GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST
3.13.45
MONTANTE P/GRADIL METALGRADE H=1322MM PINT.ELETRO
SubMO
31,62612
Mo-de-Obra 14,24600
LS
17,38012

M2
H
0,62000
H
0,62000
H
0,08000
H
0,25000
H
0,25000
H
1,43000
M3
0,01400
M
0,93600
M2
0,03100
M2
0,10300
KG
0,06200
UN
0,45800
UN
0,45800
Material
159,38046

234,93
4,60
2,85200
3,96
2,45520
4,64
0,37120
8,08
2,02000
4,34
1,08500
3,82
5,46260
241,38
3,37932
3,78
3,53808
17,18
0,53258
11,40
1,17420
4,67
0,28954
254,50
116,56100
74,03
33,90574
BDI
43,93151

Exerccio:

2011

Pgina: 295

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

16.01.028
FD-23 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO / BROCA (H=185CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.44
GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST
3.13.45
MONTANTE P/GRADIL METALGRADE H=1322MM PINT.ELETRO
Mo-de-Obra 60,46492
LS
73,76720
Material
SubMO
134,23212

M
H
1,56900
H
1,56900
H
0,63000
H
0,63000
H
3,03800
H
0,25000
H
0,25000
H
6,39300
M3
0,08400
KG
3,65200
KG
31,41800
M3
0,00900
M3
0,06200
M3
0,00500
M3
0,05100
M
0,80000
M2
0,35500
M2
0,15000
M
0,69000
KG
8,90000
KG
1,67000
UN
7,80000
UN
2,60000
KG
4,06000
KG
0,20400
KG
0,12600
KG
0,12600
UN
0,60700
UN
0,66700
314,45729

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
254,50
74,03
BDI
103,19857

16.01.029
FD-24 FECHAMENTO DE DIVISA COM GRADIL ELETROFUNDIDO / BROCA (H=235CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.42
GRADIL METALGRADE H=1718MM C=1650MM PINT.
3.13.43
MONTANTE P/GRADIL METALGRADE H=1718MM PINT.ELETRO
Mo-de-Obra 61,70692
LS
75,28244
Material
SubMO
136,98936

M
H
1,56900
H
1,56900
H
0,63000
H
0,63000
H
3,03800
H
0,35000
H
0,35000
H
6,39300
M3
0,08400
KG
3,65200
KG
31,41800
M3
0,00900
M3
0,06200
M3
0,00500
M3
0,05100
M
0,80000
M2
0,35500
M2
0,15000
M
0,69000
KG
8,90000
KG
1,67000
UN
7,80000
UN
2,60000
KG
4,06000
KG
0,20400
KG
0,12600
KG
0,12600
UN
0,60700
UN
0,66700
360,55237

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
311,55
91,22
BDI
114,43460

16.01.030
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.44
1.01.45
1.01.46
2.05.03
2.05.05

M
H
H
H
H
H
H
H
H
M3
KG

Exerccio:

FD-25 FECHAMENTO DIVISA C/ GRADIL ELETROF / SAPATA (199X132.20CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
AREIA
CAL HIDRATADA

2011

1,55800
1,55800
0,83200
0,83220
4,34200
0,25000
0,25000
7,68000
0,10200
8,62200

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35

551,88
7,21740
6,21324
3,00510
2,40660
14,09632
2,02000
1,08500
24,42126
6,75864
1,27820
11,62466
0,55827
3,79254
0,33105
12,84078
1,67200
6,09890
2,40000
3,60870
23,94100
4,50900
15,13200
6,52600
6,04940
2,27460
0,58842
0,61362
154,48150
49,37801

611,97
7,21740
6,21324
3,00510
2,40660
14,09632
2,82800
1,51900
24,42126
6,75864
1,27820
11,62466
0,55827
3,79254
0,33105
12,84078
1,67200
6,09890
2,40000
3,60870
23,94100
4,50900
15,13200
6,52600
6,04940
2,27460
0,58842
0,61362
189,11085
60,84374

476,81
7,16680
6,16968
3,96864
3,17900
20,14688
2,02000
1,08500
29,33760
8,20692
3,01770
Pgina: 296

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.44
GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST
SubMO
162,22340
Mo-de-Obra 73,07360
LS
89,14980

KG
27,95000
M3
0,00500
M3
0,06700
M3
0,00700
M3
0,09500
M
0,40000
M2
0,46300
M2
0,08100
M
2,04600
KG
7,14000
KG
2,43000
UN
21,50000
UN
4,00000
KG
4,38000
KG
0,21900
KG
0,17600
KG
0,16600
UN
0,26000
Material
225,43014

0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
254,50
BDI
89,16031

16.01.031
FD-26 FECHAMENTO DIVISA C/ GRADIL ELETROF / BROCA (199X132.20CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.44
GRADIL METALGRADE H=1322MM C=1650MM PINT. ELETROST
Mo-de-Obra 81,10121
LS
98,94348
SubMO
180,04469

M
H
1,77800
H
1,77800
H
1,35500
H
1,35500
H
4,30700
H
0,35000
H
0,35000
H
7,83000
M3
0,11600
KG
8,62200
KG
37,69000
M3
0,00500
M3
0,05800
M3
0,00700
M3
0,06500
M
0,80000
M2
0,56300
M2
0,08100
M
2,04600
KG
13,28000
KG
2,30000
UN
21,50000
UN
4,00000
KG
4,38000
KG
0,21900
KG
0,21600
KG
0,27100
UN
0,26000
Material
241,47420

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
254,50
BDI
96,94934

16.01.032
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.44
1.01.45
1.01.46
2.05.03
2.05.05
2.05.08
2.05.17
2.05.18
2.05.22
2.05.36
2.10.14
2.10.21
2.10.33
2.10.38
2.15.25
2.15.38
2.25.77
2.25.96
2.40.09
Exerccio:

FD-27 FECHAMENTO DIVISA C/ GRADIL ELETROF / SAPATA (59X211.40CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 1
PEDRA BRITADA 2
PEDRISCO
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA PLASTIFICADA E=10MM
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
ACO CA-50-A $MD BITOLAS
ACO CA-60-B $MD BITOLAS
BLOCO DE CONCRETO 14X19X39CM - 3MPa
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO

2011

M
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M3
M3
M3
M
M2
M2
M
KG
KG
UN
UN
KG

1,98200
1,98200
0,95000
0,95000
5,28400
0,25000
0,25000
8,47700
0,12000
10,16400
32,83800
0,00800
0,06700
0,00800
0,10000
0,40000
0,53500
0,13000
2,40000
8,30000
2,60000
25,20000
4,80000
4,50000

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49

10,34150
0,31015
4,09839
0,46347
23,91910
0,83600
7,95434
1,29600
10,70058
19,20660
6,56100
41,71000
10,04000
6,52620
2,44185
0,82192
0,80842
66,17000

518,46
8,17880
7,04088
6,46335
5,17610
19,98448
2,82800
1,51900
29,91060
9,33336
3,01770
13,94530
0,31015
3,54786
0,46347
16,36570
1,67200
9,67234
1,29600
10,70058
35,72320
6,21000
41,71000
10,04000
6,52620
2,44185
1,00872
1,31977
66,17000

520,46
9,11720
7,84872
4,53150
3,62900
24,51776
2,02000
1,08500
32,38214
9,65520
3,55740
12,15006
0,49624
4,09839
0,52968
25,17800
0,83600
9,19130
2,08000
12,55200
22,32700
7,02000
48,88800
12,04800
6,70500
Pgina: 297

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.46
GRADIL METALGRADE H=2114MM C=1650MM PINT.ELETROST.
Mo-de-Obra 85,13132
LS
103,86021
SubMO
188,99153

KG
0,22500
KG
0,20000
KG
0,19000
UN
0,17000
Material
234,14742

11,15
4,67
4,87
308,63
BDI
97,32196

16.01.033
FD-28 FECHAMENTO DIVISA C/ GRADIL ELETROF / BROCA (59X211.40CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.46
GRADIL METALGRADE H=2114MM C=1650MM PINT.ELETROST.
Mo-de-Obra 91,72760
LS
111,90767
SubMO
203,63527

M
H
2,20200
H
2,20200
H
1,16000
H
1,16000
H
5,30000
H
0,35000
H
0,35000
H
8,89400
M3
0,14000
KG
10,16400
KG
45,06000
M3
0,00800
M3
0,06500
M3
0,00800
M3
0,07000
M
0,80000
M2
0,63500
M2
0,13000
M
2,40000
KG
14,48000
KG
2,48000
UN
25,20000
UN
4,80000
KG
4,50000
KG
0,22500
KG
0,24000
KG
0,23000
UN
0,17000
Material
251,83882

4,60
3,96
4,77
3,82
4,64
8,08
4,34
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
308,63
BDI
104,75904

16.01.034
PT-50 PORTO DE TELA PARA SETORIZAO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.60
PREGO
3.13.69
PT-50 PORTO DE TELA P/SETORIZAO (1,00X2,00)M-GALVANIZADO
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 47,06440
LS
57,41857
SubMO
104,48297

UN
H
2,72000
H
2,72000
H
0,42000
H
0,40000
H
0,20000
H
5,02000
M3
0,07100
M
4,08000
M2
0,13600
M2
0,44900
KG
0,27200
UN
1,00000
L
0,15000
L
0,00500
L
0,10000
Material
730,28305

4,60
3,96
4,64
4,74
3,80
3,82
241,38
3,78
17,18
11,40
4,67
684,60
14,18
159,27
14,74
BDI
191,99618

16.01.045
PORTO EM GRADIL ELETROFUNDIDO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.13.80
PT30/PT34-PORTAO GRADIL ELETROFUNDIDO (300X185CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 5,70416
LS
6,95908
SubMO

M2
H
0,18010
H
0,48970
H
0,48930
H
0,18010
UN
0,18020
UN
0,18020
L
0,11530
L
0,06940
Material
263,35726

339,50
4,64
0,83566
4,74
2,32118
3,80
1,85934
3,82
0,68798
1.430,00
257,68600
19,32
3,48146
10,12
1,16684
14,74
1,02296
BDI
63,48472

16.01.046
1.01.39
1.01.40
1.01.41
1.01.46
3.13.71
3.17.27
3.75.02
3.80.66
Exerccio:

12,66324

PORTO EM CHAPA DE AO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
PT-41 PORTAO EM CHAPA DE ACO (300X235CM)-GALVANIZADO
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
TINTA ESMALTE
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO

2011

M2
H
H
H
H
UN
UN
L
L

0,18010
0,48970
0,48970
0,18010
0,14180
0,14180
0,22840
0,13760

4,64
4,74
3,80
3,82
2.861,93
19,32
10,12
14,74

2,50875
0,93400
0,92530
52,46710

560,23
10,12920
8,71992
5,53320
4,43120
24,59200
2,82800
1,51900
33,97508
11,26440
3,55740
16,67220
0,49624
3,97605
0,52968
17,62460
1,67200
10,90930
2,08000
12,55200
38,95120
6,69600
48,88800
12,04800
6,70500
2,50875
1,12080
1,12010
52,46710

1.026,76
12,51200
10,77120
1,94880
1,89600
0,76000
19,17640
17,13798
15,42240
2,33648
5,11860
1,27024
684,60000
2,12700
0,79635
1,47400

523,44
0,83566
2,32118
1,86086
0,68798
405,82167
2,73958
2,31141
2,02822
Pgina: 298

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 5,70568

LS

6,96093

UN Coeficiente
SubMO

12,66662

Material

412,90088

Custo Unit.
BDI

Custo Total

97,88053

16.01.047
PM-01 PORTAO DE MADEIRA - 3,60 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.05
BLOCO DE CONCRETO 19X19X39CM - 4MPa
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.01.91
PORTAO PEROBA COMPLETO (PM-01)
3.16.16
PORTA CADEADO 89 MM - ACO ZINCADO
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
3.16.91
FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 292,36310
LS
356,68298
SubMO
649,04608

UN
H
11,54000
H
11,54000
H
1,41000
H
1,41000
H
13,34000
H
5,51000
H
4,90000
H
19,59000
M3
0,38500
KG
8,13000
KG
164,68000
M3
0,08000
M3
0,23900
M
0,80000
M2
0,76000
M2
1,83000
KG
16,18000
UN
42,00000
L
2,00000
KG
0,56000
KG
1,19000
CJ
1,00000
UN
1,00000
UN
1,00000
UN
2,00000
L
4,90000
UN
3,67000
Material
3.837,79303

5.518,81
4,60
53,08400
3,96
45,69840
4,77
6,72570
3,82
5,38620
4,64
61,89760
4,74
26,11740
3,80
18,62000
3,82
74,83380
80,46
30,97710
0,35
2,84550
0,37
60,93160
62,03
4,96240
61,17
14,61963
2,09
1,67200
17,18
13,05680
11,40
20,86200
2,69
43,52420
2,51
105,42000
6,23
12,46000
2,50
1,40000
4,67
5,55730
3.449,89
3.449,89000
3,94
3,94000
11,20
11,20000
3,81
7,62000
9,30
45,57000
0,35
1,28450
BDI
1.031,97300

16.01.048
PM-11 PORTAO DE MADEIRA-1,20 M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.05
BLOCO DE CONCRETO 19X19X39CM - 4MPa
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.01.90
PORTAO COMPLETO COM FERRAGEM (PM-11)
3.16.16
PORTA CADEADO 89 MM - ACO ZINCADO
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
3.16.91
FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 254,08130
LS
309,97919
SubMO
564,06049

UN
H
11,54000
H
11,54000
H
1,41000
H
1,41000
H
12,34000
H
1,84000
H
1,63000
H
18,59000
M3
0,38500
KG
8,13000
KG
164,68000
M3
0,08000
M3
0,23900
M
0,80000
M2
0,76000
M2
1,83000
KG
16,18000
UN
42,00000
L
2,00000
KG
0,56000
KG
1,19000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
L
1,63000
UN
1,22000
Material
1.791,53453

2.897,38
4,60
53,08400
3,96
45,69840
4,77
6,72570
3,82
5,38620
4,64
57,25760
4,74
8,72160
3,80
6,19400
3,82
71,01380
80,46
30,97710
0,35
2,84550
0,37
60,93160
62,03
4,96240
61,17
14,61963
2,09
1,67200
17,18
13,05680
11,40
20,86200
2,69
43,52420
2,51
105,42000
6,23
12,46000
2,50
1,40000
4,67
5,55730
1.438,71
1.438,71000
3,94
3,94000
11,20
11,20000
3,81
3,81000
9,30
15,15900
0,35
0,42700
BDI
541,78685

16.01.049
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.17
Exerccio:

PM-12 PORTAO DE MADEIRA-1,80 M


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 1

2011

UN
H
H
H
H
H
H
H
H
M3
KG
KG
M3

11,54000
11,54000
1,41000
1,41000
12,34000
2,75000
2,45000
18,59000
0,38500
8,13000
164,68000
0,08000

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
62,03

3.324,43
53,08400
45,69840
6,72570
5,38620
57,25760
13,03500
9,31000
71,01380
30,97710
2,84550
60,93160
4,96240
Pgina: 299

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.05
BLOCO DE CONCRETO 19X19X39CM - 4MPa
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
3.01.92
PM-12 PORTAO MADEIRA 1,8M 1 FOLHA
3.16.16
PORTA CADEADO 89 MM - ACO ZINCADO
3.16.21
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
3.16.91
FECHO DE FIO REDONDO 102MM (TIP PEDREZE)ACO ZINCAD
3.80.34
TINTA A OLEO
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 261,51070
LS
319,04305
SubMO
580,55375

M3
0,23900
M
0,80000
M2
0,76000
M2
1,83000
KG
16,18000
UN
42,00000
L
2,00000
KG
0,56000
KG
1,19000
UN
1,00000
UN
1,00000
UN
1,00000
UN
1,00000
L
2,45000
UN
1,84000
Material
2.122,23553

61,17
14,61963
4,60
3,68000
17,18
13,05680
11,40
20,86200
2,69
43,52420
2,51
105,42000
6,23
12,46000
2,50
1,40000
4,67
5,55730
1.759,56
1.759,56000
3,94
3,94000
11,20
11,20000
3,81
3,81000
9,30
22,78500
0,35
0,64400
BDI
621,64154

16.01.058
GRADIL METALGRADE PINT ELETROSTATICA 62X132MM BARRA 25X2MM
1.01.39
PEDREIRO
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
3.10.91
MONTANTE P/GRADIL ORSOMETAL H=1722MM PINT.ELETROST
3.13.46
GRADIL METALGRADE H=2114MM C=1650MM PINT.ELETROST.
Mo-de-Obra 10,97280
SubMO
24,35962
LS
13,38682

M2
H
0,93000
H
0,25000
H
0,25000
H
0,93000
UN
0,35200
UN
0,35200
Material
146,92832

210,68
4,64
4,31520
8,08
2,02000
4,34
1,08500
3,82
3,55260
108,78
38,29056
308,63
108,63776
BDI
39,39623

16.01.060
FD-29 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / SAPATA (239X199CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.30.22
ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 83,92069
LS
102,38324
SubMO
186,30393

M
H
1,93700
H
1,93700
H
0,85300
H
0,85300
H
6,27100
H
8,09300
M3
0,10000
KG
7,13000
KG
29,60200
M3
0,00900
M3
0,06700
M3
0,00700
M3
0,09500
M
0,40000
M2
0,48100
M2
0,15000
M
2,04600
KG
7,40000
KG
2,40000
UN
15,60000
UN
5,20000
UN
5,90000
KG
4,70000
KG
0,24000
KG
0,18000
KG
0,17000
Material
198,26913

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
7,54
1,49
11,15
4,67
4,87
BDI
88,45180

16.01.061
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.17
2.05.18
2.05.22
2.05.36
2.10.14
2.10.21
2.10.33
2.10.38
2.15.25
2.15.38
Exerccio:

FD-30 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / BROCA (239X199CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 1
PEDRA BRITADA 2
PEDRISCO
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA PLASTIFICADA E=10MM
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
ACO CA-50-A $MD BITOLAS
ACO CA-60-B $MD BITOLAS

2011

M
H
H
H
H
H
H
M3
KG
KG
M3
M3
M3
M3
M
M2
M2
M
KG
KG

2,15700
2,15700
1,07000
1,07000
6,21300
8,09800
0,08500
7,13000
38,19200
0,00900
0,05500
0,00700
0,06500
0,80000
0,58100
0,15000
2,04600
12,90000
2,24000

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70

473,02
8,91020
7,67052
4,06881
3,25846
29,09744
30,91526
8,04600
2,49550
10,95274
0,55827
4,09839
0,46347
23,91910
0,83600
8,26358
2,40000
10,70058
19,90600
6,48000
30,26400
13,05200
44,48600
7,00300
2,67600
0,84060
0,82790

486,88
9,92220
8,54172
5,10390
4,08740
28,82832
30,93436
6,83910
2,49550
14,13104
0,55827
3,36435
0,46347
16,36570
1,67200
9,98158
2,40000
10,70058
34,70100
6,04800
Pgina: 300

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.30.22
ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 87,41790
LS
106,64984
SubMO

UN Coeficiente

Custo Unit.

Custo Total

UN
15,60000
UN
2,20000
UN
5,90000
KG
4,70000
KG
0,24000
KG
0,22000
KG
0,22000
Material
201,77039

BDI

16.01.062
FD-31 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / SAPATA (39X199CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.30.22
ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 84,74034
LS
103,38322
SubMO
188,12356

M
H
1,93700
H
1,93700
H
0,87000
H
0,87000
H
5,84400
H
8,78800
M3
0,12600
KG
10,51000
KG
34,64300
M3
0,00900
M3
0,06700
M3
0,01000
M3
0,09500
M
0,40000
M2
0,48100
M2
0,15000
M
2,04600
KG
7,56000
KG
2,43000
UN
26,00000
UN
5,00000
UN
0,90000
KG
4,60000
KG
0,23000
KG
0,15600
KG
0,17200
Material
185,73045

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
7,54
1,49
11,15
4,67
4,87
BDI
85,98642

16.01.063
FD-32 FECHAMENTO DIVISA C/ ELEMENTO VAZADO / BROCA (39X199CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.30.22
ELEMENTO VAZADO "NEO-REX" N.19C (39X39X8)CM
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 87,48471
LS
106,73135
SubMO
194,21606

M
H
2,15700
H
2,15700
H
1,08500
H
1,08500
H
5,76000
H
8,63200
M3
0,07000
KG
10,51000
KG
41,92800
M3
0,00900
M3
0,05200
M3
0,01000
M3
0,06500
M
0,80000
M2
0,58100
M2
0,15000
M
2,04600
KG
13,05000
KG
2,24000
UN
26,00000
UN
5,00000
UN
0,90000
KG
4,60000
KG
0,23000
KG
0,21600
KG
0,21700
Material
192,75764

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
62,03
61,17
66,21
251,78
2,09
17,18
16,00
5,23
2,69
2,70
1,94
2,51
7,54
1,49
11,15
4,67
4,87
BDI
89,00395

16.01.064
1.01.40
1.01.41
1.01.44
1.01.45
3.13.91
3.16.21
3.75.07
Exerccio:

PT-29 PORTAO DE TELA PARA QUADRA


PINTOR
AJUDANTE DE PINTOR
SERRALHEIRO
AJUDANTE SERRALHEIRO
PT-29 PORTAO DE TELA PARA QUADRA-GALVANIZADO
CADEADO LATAO CIL. TRAVA DUPLA 30 MM
TINTA ESMALTE SINTETICO - ALUMINIO

2011

194,06774

M2
H
H
H
H
UN
UN
L

0,90000
0,30000
1,08000
1,08000
0,41000
0,41000
0,25000

1,94
2,51
7,54
1,49
11,15
4,67
4,87
91,04277

4,74
3,80
8,08
4,34
818,06
11,20
14,18

30,26400
5,52200
44,48600
7,00300
2,67600
1,02740
1,07140

459,84
8,91020
7,67052
4,14990
3,32340
27,11616
33,57016
10,13796
3,67850
12,81791
0,55827
4,09839
0,66210
23,91910
0,83600
8,26358
2,40000
10,70058
20,33640
6,56100
50,44000
12,55000
6,78600
6,85400
2,56450
0,72852
0,83764

475,97
9,92220
8,54172
5,17545
4,14470
26,72640
32,97424
5,63220
3,67850
15,51336
0,55827
3,18084
0,66210
16,36570
1,67200
9,98158
2,40000
10,70058
35,10450
6,04800
50,44000
12,55000
6,78600
6,85400
2,56450
1,00872
1,05679

478,74
4,26600
1,14000
8,72640
4,68720
335,40460
4,59200
3,54500
Pgina: 301

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
Mo-de-Obra 18,81960
LS
22,95991

UN Coeficiente

41,77951

L
0,00600
UN
0,50000
L
0,15000
Material
347,44322

16.01.065
VERGA/CINTA EM BLOCO DE CONCRETO CANALETA 14X19X39CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
Mo-de-Obra 3,76600
LS
4,59452
SubMO
8,36052

M
H
0,40000
H
0,50000
M3
0,09000
KG
4,36500
M3
0,01300
KG
0,50000
UN
2,50000
Material
17,27166

16.01.066
VERGA/CINTA EM BLOCO DE CONCRETO CANALETA 19X19X39CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.97
BLOCO DE CONCRETO CANALETA 19X19X39CM - 3MPa
Mo-de-Obra 3,76600
LS
4,59452
SubMO
8,36052

M
H
0,40000
H
0,50000
M3
0,01400
KG
6,62900
M3
0,01900
KG
0,50000
UN
2,50000
Material
14,43640

16.01.080
PT-30 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (300X185CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.80
PT30/PT34-PORTAO GRADIL ELETROFUNDIDO (300X185CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 233,25740
LS
284,57403
Material
SubMO
517,83143

UN
H
5,54000
H
5,54000
H
4,05000
H
4,05000
H
9,55000
H
2,29500
H
2,29500
H
22,81000
M3
0,01470
KG
4,90000
M3
0,01960
M3
0,66600
M
10,32000
M
10,08000
M2
2,52000
M2
1,13520
KG
34,55000
KG
5,63000
L
0,93000
KG
0,50000
KG
1,00800
KG
0,80000
UN
1,00000
UN
2,00000
L
0,64000
L
0,01000
L
0,38500
1.919,66481

16.01.081
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.08
2.05.18
2.05.36
2.10.09
2.10.17
2.10.21
2.10.32
2.15.25
2.15.38
2.40.56

UN
H
H
H
H
H
H
H
H
M3
KG
M3
M3
M
M
M2
M2
KG
KG
L

Exerccio:

PT-31 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (300X235CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 2
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
PONTALETE PINHO DE 3"X3"
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-50-A $MD BITOLAS
ACO CA-60-B $MD BITOLAS
TINTA BETUMINOSA

2011

5,64000
5,64000
4,05000
4,05000
9,92000
2,55000
2,55000
23,80000
0,01470
4,90000
0,01960
0,70600
10,42000
10,18000
2,82000
1,13620
37,07000
6,16000
0,93000

Custo Unit.

Custo Total

159,27
1,47
14,74
BDI
89,52123

BDI

4,64
3,82
80,46
0,37
61,17
2,69
2,51
5,89540

BDI

4,64
3,82
80,46
0,37
61,17
2,69
3,34
5,24329

0,95562
0,73500
2,21100

31,52
1,85600
1,91000
7,24140
1,61505
0,79521
1,34500
6,27500

28,04
1,85600
1,91000
1,12644
2,45273
1,16223
1,34500
8,35000

2.998,12
4,60
25,48400
3,96
21,93840
4,77
19,31850
3,82
15,47100
4,64
44,31200
4,74
10,87830
3,80
8,72100
3,82
87,13420
80,46
1,18276
0,37
1,81300
61,17
1,19893
251,78
167,68548
3,78
39,00960
4,60
46,36800
17,18
43,29360
11,40
12,94128
2,69
92,93950
2,70
15,20100
6,23
5,79390
2,50
1,25000
4,67
4,70736
4,87
3,89600
1.430,00
1.430,00000
19,32
38,64000
10,12
6,47680
159,27
1,59270
14,74
5,67490
BDI
560,62414

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,37
61,17
251,78
3,78
4,60
17,18
11,40
2,69
2,70
6,23

3.385,18
25,94400
22,33440
19,31850
15,47100
46,02880
12,08700
9,69000
90,91600
1,18276
1,81300
1,19893
177,75668
39,38760
46,82800
48,44760
12,95268
99,71830
16,63200
5,79390
Pgina: 302

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.81
PT31/PT35-PORTAO GRADIL ELETROFUNDIDO (300X235CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
536,77313
Mo-de-Obra 241,78970
LS
294,98343

UN Coeficiente
KG
0,50000
KG
1,00800
KG
0,80000
UN
1,00000
UN
2,00000
L
0,69930
L
0,01200
L
0,42150
Material
2.215,40588

Custo Unit.

Custo Total

2,50
1,25000
4,67
4,70736
4,87
3,89600
1.700,00
1.700,00000
19,32
38,64000
10,12
7,07692
159,27
1,91124
14,74
6,21291
BDI
633,00117

16.01.082
PT-32 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (180X185CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.82
PT32/PT36-PORTAO GRADIL ELETROFUNDIDO (180X185CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 218,62213
LS
266,71899
Material
SubMO
485,34112

UN
H
5,54000
H
5,54000
H
4,05000
H
4,05000
H
8,55000
H
1,57190
H
1,57190
H
21,81000
M3
0,01470
KG
4,90000
M3
0,01960
M3
0,66600
M
10,32000
M
10,08000
M2
2,52000
M2
1,13520
KG
34,55000
KG
5,63000
L
0,93000
KG
0,50000
KG
1,00800
KG
0,80000
UN
1,00000
UN
1,00000
L
0,43840
L
0,00600
L
0,26370
2.420,41958

3.574,08
4,60
25,48400
3,96
21,93840
4,77
19,31850
3,82
15,47100
4,64
39,67200
4,74
7,45081
3,80
5,97322
3,82
83,31420
80,46
1,18276
0,37
1,81300
61,17
1,19893
251,78
167,68548
3,78
39,00960
4,60
46,36800
17,18
43,29360
11,40
12,94128
2,69
92,93950
2,70
15,20100
6,23
5,79390
2,50
1,25000
4,67
4,70736
4,87
3,89600
1.954,54
1.954,54000
19,32
19,32000
10,12
4,43661
159,27
0,95562
14,74
3,88694
BDI
668,32496

16.01.083
PT-33 PORTAO GRADIL ELETROFUNDIDO / PILARETE DE CONCRETO (180X235CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.83
PT33/PT37-PORTAO GRADIL ELETROFUNDIDO (180X235CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 224,98612
LS
274,48307
Material
SubMO
499,46919

UN
H
5,64000
H
5,64000
H
4,05000
H
4,05000
H
8,92000
H
1,57300
H
1,57300
H
22,80000
M3
0,01470
KG
4,90000
M3
0,01960
M3
0,70600
M
10,42000
M
10,18000
M2
2,82000
M2
1,13620
KG
37,07000
KG
6,16000
L
0,93000
KG
0,50000
KG
1,00800
KG
0,80000
UN
1,00000
UN
1,00000
L
0,44100
L
0,00800
L
0,27000
1.520,60169

2.484,68
4,60
25,94400
3,96
22,33440
4,77
19,31850
3,82
15,47100
4,64
41,38880
4,74
7,45602
3,80
5,97740
3,82
87,09600
80,46
1,18276
0,37
1,81300
61,17
1,19893
251,78
177,75668
3,78
39,38760
4,60
46,82800
17,18
48,44760
11,40
12,95268
2,69
99,71830
2,70
16,63200
6,23
5,79390
2,50
1,25000
4,67
4,70736
4,87
3,89600
1.030,00
1.030,00000
19,32
19,32000
10,12
4,46292
159,27
1,27416
14,74
3,97980
BDI
464,61630

16.01.084
1.01.11
1.01.12
1.01.39
1.01.40

UN
H
H
H
H

Exerccio:

PT-34 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (300X185CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
PINTOR

2011

3,87800
3,87800
6,68500
3,37090

4,60
3,96
4,64
4,74

2.576,83
17,83880
15,35688
31,01840
15,97807
Pgina: 303

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.88
TUBO DE ACO 100X100X3 MM
3.13.80
PT30/PT34-PORTAO GRADIL ELETROFUNDIDO (300X185CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
341,87002
Mo-de-Obra 153,99551
LS
187,87452

UN Coeficiente

Custo Unit.

Custo Total

H
3,37090
H
15,96700
M3
0,11260
M
0,85700
M
1,47420
M2
1,49140
M2
0,60000
KG
0,25000
KG
0,57400
KG
0,17500
M
5,00000
UN
1,00000
UN
2,00000
L
0,94000
L
0,01000
L
0,56500
Material
1.753,11489

3,80
12,80942
3,82
60,99394
251,78
28,35043
3,78
3,23946
4,60
6,78132
17,18
25,62225
11,40
6,84000
2,50
0,62500
4,67
2,68058
4,87
0,85225
38,01
190,05000
1.430,00
1.430,00000
19,32
38,64000
10,12
9,51280
159,27
1,59270
14,74
8,32810
BDI
481,84653

16.01.085
PT-35 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (300X235CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.88
TUBO DE ACO 100X100X3 MM
3.13.81
PT31/PT35-PORTAO GRADIL ELETROFUNDIDO (300X235CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 164,68102
LS
200,91084
SubMO
365,59186

UN
H
3,87800
H
3,87800
H
6,88500
H
4,26700
H
4,26700
H
16,51800
M3
0,11260
M
0,85700
M
1,47420
M2
1,49140
M2
0,60000
KG
0,25000
KG
0,57400
KG
0,17500
M
6,00000
UN
1,00000
UN
2,00000
L
1,18900
L
0,01200
L
0,71500
Material
2.066,17431

2.991,07
4,60
17,83880
3,96
15,35688
4,64
31,94640
4,74
20,22558
3,80
16,21460
3,82
63,09876
251,78
28,35043
3,78
3,23946
4,60
6,78132
17,18
25,62225
11,40
6,84000
2,50
0,62500
4,67
2,68058
4,87
0,85225
38,01
228,06000
1.700,00
1.700,00000
19,32
38,64000
10,12
12,03268
159,27
1,91124
14,74
10,53910
BDI
559,30622

16.01.086
PT-36 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (180X185CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.88
TUBO DE ACO 100X100X3 MM
3.13.82
PT32/PT36-PORTAO GRADIL ELETROFUNDIDO (180X185CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 134,99640
LS
164,69561
SubMO
299,69201

UN
H
3,87800
H
3,87800
H
5,97000
H
2,30000
H
2,30000
H
14,25600
M3
0,11260
M
0,85700
M
1,47420
M2
1,49140
M2
0,60000
KG
0,25000
KG
0,57400
KG
0,17500
M
5,00000
UN
1,00000
UN
1,00000
L
0,64000
L
0,00600
L
0,38000
Material
2.251,93491

3.138,50
4,60
17,83880
3,96
15,35688
4,64
27,70080
4,74
10,90200
3,80
8,74000
3,82
54,45792
251,78
28,35043
3,78
3,23946
4,60
6,78132
17,18
25,62225
11,40
6,84000
2,50
0,62500
4,67
2,68058
4,87
0,85225
38,01
190,05000
1.954,54
1.954,54000
19,32
19,32000
10,12
6,47680
159,27
0,95562
14,74
5,60120
BDI
586,87419

16.01.087
1.01.11
1.01.12
1.01.39
1.01.40
1.01.41
1.01.46
2.05.36
2.10.09
2.10.17
2.10.21
Exerccio:

PT-37 PORTAO GRADIL ELETROFUNDIDO / PILARETE METALICO (180X235CM)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
PONTALETE PINHO DE 3"X3"
SARRAFO PINHO APARELHADO 10X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.

2011

UN
H
H
H
H
H
H
M3
M
M
M2

3,87800
3,87800
6,21000
2,91000
2,91000
14,83000
0,11260
0,85700
1,47420
1,49140

4,60
3,96
4,64
4,74
3,80
3,82
251,78
3,78
4,60
17,18

2.075,64
17,83880
15,35688
28,81440
13,79340
11,05800
56,65060
28,35043
3,23946
6,78132
25,62225
Pgina: 304

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.88
TUBO DE ACO 100X100X3 MM
3.13.83
PT33/PT37-PORTAO GRADIL ELETROFUNDIDO (180X235CM)
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
318,59682
Mo-de-Obra 143,51208
LS
175,08474

M2
0,60000
KG
0,25000
KG
0,57400
KG
0,17500
M
6,00000
UN
1,00000
UN
1,00000
L
0,81000
L
0,00800
L
0,48000
Material
1.368,91785

11,40
6,84000
2,50
0,62500
4,67
2,68058
4,87
0,85225
38,01
228,06000
1.030,00
1.030,00000
19,32
19,32000
10,12
8,19720
159,27
1,27416
14,74
7,07520
BDI
388,12837

16.01.088
PT-41 PORTAO EM CHAPA DE ACO (300X235CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.71
PT-41 PORTAO EM CHAPA DE ACO (300X235CM)-GALVANIZADO
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
Mo-de-Obra 269,63010
LS
328,94872
SubMO
598,57882

UN
H
5,64000
H
5,64000
H
4,05000
H
4,05000
H
9,92000
H
5,81000
H
5,81000
H
23,80000
M3
0,01470
KG
4,90000
M3
0,01960
M3
0,70600
M
10,42000
M
10,18000
M2
2,82000
M2
1,13620
KG
37,07000
KG
6,16000
L
0,93000
KG
0,50000
KG
1,00800
KG
0,80000
UN
1,00000
UN
2,00000
L
1,61000
L
0,01200
L
0,97000
Material
3.394,63705

4.911,65
4,60
25,94400
3,96
22,33440
4,77
19,31850
3,82
15,47100
4,64
46,02880
4,74
27,53940
3,80
22,07800
3,82
90,91600
80,46
1,18276
0,37
1,81300
61,17
1,19893
251,78
177,75668
3,78
39,38760
4,60
46,82800
17,18
48,44760
11,40
12,95268
2,69
99,71830
2,70
16,63200
6,23
5,79390
2,50
1,25000
4,67
4,70736
4,87
3,89600
2.861,93
2.861,93000
19,32
38,64000
10,12
16,29320
159,27
1,91124
14,74
14,29780
BDI
918,43965

16.01.089
PT-42 PORTAO EM CHAPA DE ACO (180X235CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.13.72
PT-42 PORTAO EM CHAPA DE ACO (180X235CM)-GALVANIZADO
3.17.27
CADEADO LATAO CIL. TRAVA DUPLA 45 MM
3.75.02
TINTA ESMALTE
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
524,81710
Mo-de-Obra 236,40410
LS
288,41300

UN
H
5,64000
H
5,64000
H
4,05000
H
4,05000
H
8,92000
H
2,91000
H
2,91000
H
22,80000
M3
0,01470
KG
4,90000
M3
0,01960
M3
0,70600
M
10,42000
M
10,18000
M2
2,82000
M2
1,13620
KG
37,07000
KG
6,16000
L
0,93000
KG
0,50000
KG
1,00800
KG
0,80000
UN
1,00000
UN
1,00000
L
0,81000
L
0,00800
L
0,48000
Material
2.268,93137

3.436,31
4,60
25,94400
3,96
22,33440
4,77
19,31850
3,82
15,47100
4,64
41,38880
4,74
13,79340
3,80
11,05800
3,82
87,09600
80,46
1,18276
0,37
1,81300
61,17
1,19893
251,78
177,75668
3,78
39,38760
4,60
46,82800
17,18
48,44760
11,40
12,95268
2,69
99,71830
2,70
16,63200
6,23
5,79390
2,50
1,25000
4,67
4,70736
4,87
3,89600
1.771,50
1.771,50000
19,32
19,32000
10,12
8,19720
159,27
1,27416
14,74
7,07520
BDI
642,56215

16.01.099
SERVICOS PARA FECHAMENTOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

Exerccio:

2011

SubMO

0,00000

Pgina: 305

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

16.02.007
PISO DE CONCRETO CAMURCADO - FUNDACAO DIRETA FCK-25 MPA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 7,92247
LS
9,66541
SubMO
17,58788

M2
H
0,30000
H
0,30000
H
0,61000
H
0,61000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,89000
M
0,90000
M2
1,18000
M2
1,10000
UN
0,08000
M
0,26700
KG
0,25000
KG
0,04800
UN
0,01070
M2
1,00000
H
0,02130
H
0,00530
Material
59,49988

4,77
3,82
4,64
3,82
6,95
69,64
251,78
1,78
3,17
10,03
0,91
25,87
0,12
6,43
21,44
4,61
11,33
17,83
2,89
BDI
17,73019

16.02.008
PISO DE CONCRETO LISO-FUNDACAO DIRETA FCK-25 MPA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 9,78367
LS
11,93608
SubMO
21,71975

M2
H
0,30000
H
0,30000
H
0,83000
H
0,83000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,89000
M
0,90000
M2
1,18000
M2
1,10000
UN
0,08000
M
0,26700
KG
0,25000
KG
0,04800
M2
1,00000
H
0,02130
H
0,00530
Material
59,45056

4,77
3,82
4,64
3,82
6,95
69,64
251,78
1,78
3,17
10,03
0,91
25,87
0,12
6,43
21,44
11,33
17,83
2,89
BDI
18,66917

16.02.009
PLACA DE CONCRETO MOLDADA NO LOCAL - 90X90 CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.01
CAIBRO PEROBA DE 5X6CM
2.15.38
ACO CA-60-B $MD BITOLAS
Mo-de-Obra 9,39540
LS
11,46239
SubMO

20,85779

M2
H
0,65000
H
1,67000
M3
0,03000
KG
14,42000
M3
0,03500
M
0,50000
KG
2,00000
Material
17,45015

16.02.012
PAVIMENTACAO ARTICULADA SOBRE BASE AREIA GROSSA E=5A6CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.03
AREIA
2.05.18
PEDRA BRITADA 2
3.65.40
PISO PRE MOLDADO ARTICULADO E=5A6CM
8.01.16
ROLO COMPACTADOR LISO 1000KG
Mo-de-Obra 7,98564
LS
9,74248
SubMO
17,72811

M2
H
0,80000
H
1,08000
H
0,02130
M3
0,05500
M3
0,06000
M2
1,05000
H
0,02130
Material
42,00178

16.02.014
1.01.26
1.01.39
1.01.46
1.01.55
2.05.03
2.05.25
3.65.30
3.85.11
3.86.10
8.01.16

Exerccio:

PAVIMENTAAO DE CONCRETO PARA PISO PERMEAVEL DRENANTE


JARDINEIRO
PEDREIRO
SERVENTE
OPERADOR
AREIA
BICA CORRIDA
BLOCOS DE CONCRETO PR-MOLD.P/PAVIMENTAAO EM AREA PERMEAVEL
TERRA VEGETAL
FORRACAO GRAMA TIPO SAO CARLOS EM PLACAS
ROLO COMPACTADOR LISO 1000KG

2011

M2
H
H
H
H
M3
M3
M2
M3
M2
H

0,25000
0,50000
0,97000
0,02130
0,03000
0,05500
1,05000
0,00500
0,52000
0,02130

BDI

4,64
3,82
80,46
0,37
61,17
4,32
2,70
8,81083

BDI

4,64
3,82
6,95
80,46
61,17
31,93
17,83
13,73787

4,88
4,64
3,82
6,95
80,46
68,00
39,53
89,86
5,29
17,83

94,81
1,43100
1,14600
2,83040
2,33020
0,18487
5,57120
20,14240
1,58420
2,85300
11,83540
1,00100
2,06960
0,03204
1,60750
1,02912
0,04933
11,33000
0,37978
0,01532

99,83
1,43100
1,14600
3,85120
3,17060
0,18487
5,57120
20,14240
1,58420
2,85300
11,83540
1,00100
2,06960
0,03204
1,60750
1,02912
11,33000
0,37978
0,01532

47,11
3,01600
6,37940
2,41380
5,33540
2,14095
2,16000
5,40000

73,46
3,71200
4,12560
0,14804
4,42530
3,67020
33,52650
0,37978

83,21
1,22000
2,32000
3,70540
0,14804
2,41380
3,74000
41,50650
0,44930
2,75080
0,37978

Pgina: 306

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 7,39344

LS

9,01999

UN Coeficiente
Material

2,54412

M2
H
0,30000
M3
0,01300
M3
0,09300
M3
0,00700
KG
6,75000
H
0,00500
H
0,00100
H
0,01000
Material
17,91387

3,82
62,03
58,73
66,21
1,38
68,25
97,77
142,81
BDI
4,70534

16.02.018
BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL DIRECIONAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.55.40
PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG
Mo-de-Obra 4,61200
LS
5,62664
SubMO
10,23864

M2
H
0,50000
H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
134,51240

178,04
4,64
2,32000
3,82
2,29200
80,46
0,50690
0,37
2,77500
6,21
0,31050
130,92
130,92000
BDI
33,29274

16.02.020
BORRACHA ASSENTADA C/ ARGAMASSA - PISO TATIL ALERTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.55.40
PLACAS BORRACHA 250X250MM E=7MM TATIL ALER/DIR-ARG
SubMO
10,23864
Mo-de-Obra 4,61200
LS
5,62664

M2
H
0,50000
H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
134,51240

178,04
4,64
2,32000
3,82
2,29200
80,46
0,50690
0,37
2,77500
6,21
0,31050
130,92
130,92000
BDI
33,29274

16.02.022
PAVIMENTACAO COM PEDRISCO COM ESPESS DE 5 CM
1.01.46
SERVENTE
2.05.22
PEDRISCO
Mo-de-Obra 0,76400
LS
0,93208
SubMO

M2
H
0,20000
M3
0,06000
Material
3,97260

SubMO

1,69608

51,24018

BDI

Custo Total

16,41343

16.02.015
PAVIMENTACAO ASFALTICA
1.01.46
SERVENTE
2.05.17
PEDRA BRITADA 1
2.05.19
PEDRA BRITADA 3
2.05.22
PEDRISCO
2.40.52
ASFALTO 80/100
8.03.12
CAMINHAO ESPARGIDOR 6000KG-BAR/MANG
8.03.14
CARRETA PRANCHA
8.03.26
ROLO COMPRESSOR 10/12 T
Mo-de-Obra 1,14600
LS
1,39812

SubMO

Custo Unit.

PAVIMENTACAO DE PEDRA MOSAICO PORTUGUES 2 COR/SOBRE BASE AREIA


M2
GROSSA
1.01.39
PEDREIRO
H
2,00000
1.01.46
SERVENTE
H
2,20000
2.05.03
AREIA
M3
0,07000
2.05.08
CIMENTO
KG
3,50000
3.50.55
PEDRA EM MOSAICO PORTUGUES 2 CORES
M2
1,00000
Mo-de-Obra 17,68400
LS
21,57448
SubMO
39,25848
Material
51,10720

15,56033

BDI

3,82
66,21
1,30380

BDI

4,64
3,82
80,46
0,37
44,18
20,78411

BDI

4,60
4,64
3,82
80,46
0,37
61,17
17,18
20,52
10,91566

BDI

4,60
4,64
3,82
80,46
0,37
61,17
17,18
9,11760

BDI

4,64
3,82
61,17
12,35
3,47056

16.02.023

16.02.025
GUIAS PRE-MOLDADAS TIPO PMSP
1.01.11
CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
3.65.14
GUIA PRE-MOLDADA CONCR TIPO "PMSP"
Mo-de-Obra 10,59740
LS
12,92883
16.02.026
SARJETAS MOLDADAS NO LOCAL TIPO PMSP
1.01.11
CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
Mo-de-Obra 9,57280
LS
11,67882

SubMO

SubMO

16.02.027
GA-01 GUIA LEVE OU SEPARADOR DE PISOS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
3.65.15
GUIA LEVE PRE-MOLDADA P/ JARDIM 7,5X23X100CM
SubMO
Mo-de-Obra 1,21192
LS
1,47854
16.02.028
1.01.11
Exerccio:

GA-02 GUIA E SARJETA


CARPINTEIRO

2011

23,52623

M
H
0,11000
H
0,80000
H
1,67000
M3
0,00600
KG
2,00000
M3
0,03300
M2
0,01000
M
1,00000
Material
23,93317

21,25162

M
H
0,28000
H
0,60000
H
1,44000
M3
0,04500
KG
21,00000
M3
0,10600
M2
0,03000
Material
18,39012

2,69045

M
H
0,07200
H
0,22980
M3
0,00080
UN
1,00000
Material
12,39894
M
H

0,39000

25,16
1,14600
0,80639
5,46189
0,46347
9,31500
0,34125
0,09777
1,42810

6,97
0,76400
3,97260

111,14

4,60

9,28000
8,40400
5,63220
1,29500
44,18000

58,37
0,50600
3,71200
6,37940
0,48276
0,74000
2,01861
0,17180
20,52000

48,75
1,28800
2,78400
5,50080
3,62070
7,77000
6,48402
0,51540

18,55
0,33408
0,87784
0,04894
12,35000

58,83
1,79400
Pgina: 307

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
3.65.16
GUIA ECONOMICA PRE-MOLDADA 7,5X23X75CM
Mo-de-Obra 9,16200
LS
11,17764
SubMO

Custo Unit.

Custo Total

20,33964

H
0,60000
H
1,20000
M3
0,03000
M3
0,03000
M2
0,04000
UN
1,33330
Material
27,49659

4,64
3,82
61,17
241,38
17,18
13,30
BDI
11,00233

25,79196

Material

M
H
0,39000
H
0,80000
H
1,60000
M3
0,08000
M3
0,07000
M2
0,04000
M
1,00000
42,99740

4,60
4,64
3,82
61,17
241,38
17,18
20,52
BDI
15,82155

20,61381

M
H
0,09610
H
0,09610
H
1,00000
H
1,00000
M3
0,02960
M2
0,44000
M2
0,41000
KG
1,20000
KG
0,09250
KG
0,01780
Material
16,45540

4,77
3,82
4,64
3,82
251,78
10,03
0,91
2,70
6,43
21,44
BDI
8,52592

18,38116

M2
H
0,92000
H
1,05000
M3
0,03200
KG
10,63000
M2
1,05000
Material
24,63082

BDI

4,64
3,82
80,46
0,37
17,26
9,89275

16.02.036
PAVIMENTACAO MOSAICO COM BLOCOS DE CONCRETO NATURAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.65.43
PISO MOSAICO COM BLOCOS DE CONCRETO NATURAL E=5CM
Mo-de-Obra 7,15000
LS
8,72300
SubMO
15,87300

M2
H
0,80000
H
0,90000
M3
0,07000
M2
1,05000
Material
28,81620

BDI

4,64
3,82
80,46
22,08
10,27852

BDI

5,09
3,82
0,35
54,03
15,79031

BDI

4,64
3,82
80,46
0,37
14,62
10,46119

BDI

190,18
5,41
9,19700
4,64
2,78400
3,82
6,87600
80,46
1,68966
0,35
1,62400
1,53
2,05020
0,37
0,82140
1,04
2,60000
99,02
103,97100
35,56232

16.02.029
GA-03 GUIA E SARJETA TIPO PMSP
1.01.11
CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
3.65.14
GUIA PRE-MOLDADA CONCR TIPO "PMSP"
Mo-de-Obra 11,61800
SubMO
LS
14,17396
16.02.031
DEGRAU DE CONCRETO CAMURCADO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.66.78
FERRO CANTONEIRA 1X1X1/8'
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
Mo-de-Obra 9,28550
LS
11,32831
16.02.033
PEDRA MIRACEMA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.50.45
PEDRA MIRACEMA 23X11,5CM
Mo-de-Obra 8,27980
LS

10,10136

SubMO

SubMO

16.02.045
CERAMICA EXTRUDADA 24X11 OU 11X11 OU 18X18CM - DETALHES E REQUADROS
M2
1.01.28
LADRILHISTA
H
0,60000
1.01.46
SERVENTE
H
0,40000
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
KG
5,00000
3.45.43
CERAMICA ESTRUDADA 24X11 OU 11X11 OU 18X18CM
M2
1,05000
Mo-de-Obra 4,58200
LS
5,59004
SubMO
10,17204
Material
58,48150
16.02.048
SEIXO ROLADO - DETALHES E REQUADROS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.28
SEIXO ROLADO MARROM (SACO 30KG)
Mo-de-Obra 10,97100
LS
13,38462

SubMO

16.02.050
PASTILHA NATURAL 2,5X2,5CM - DETALHES E REQUADROS
1.01.38
PASTILHEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.07
CAULIM
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
3.20.22
PASTILHA NATURAL 2,5X2,5CM
SubMO
Mo-de-Obra 18,85700
LS
23,00554
16.02.051
1.01.38
Exerccio:

PASTILHA NATURAL 5,0X5,0CM - DETALHES E REQUADROS


PASTILHEIRO

2011

24,35562

M2
H
1,50000
H
1,05000
M3
0,03200
KG
10,63000
UN
1,00000
Material
21,12782

41,86254

M2
H
1,70000
H
0,60000
H
1,80000
M3
0,02100
KG
4,64000
KG
1,34000
KG
2,22000
KG
2,50000
M2
1,05000
Material
112,75626
M2
H

1,70000

5,41

2,78400
4,58400
1,83510
7,24140
0,68720
17,73289

84,61
1,79400
3,71200
6,11200
4,89360
16,89660
0,68720
20,52000

45,59
0,45840
0,36710
4,64000
3,82000
7,45269
4,41320
0,37310
3,24000
0,59478
0,38163

52,90
4,26880
4,01100
2,57472
3,93310
18,12300

54,96
3,71200
3,43800
5,63220
23,18400

84,44
3,05400
1,52800
1,75000
56,73150

55,94
6,96000
4,01100
2,57472
3,93310
14,62000

176,31
9,19700
Pgina: 308

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.07
CAULIM
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
3.20.23
PASTILHA NATURAL 5,0X5,0CM
Mo-de-Obra 18,85700
LS
23,00554

UN Coeficiente

41,86254

H
0,60000
H
1,80000
M3
0,02100
KG
4,64000
KG
1,34000
KG
2,22000
KG
2,50000
M2
1,05000
Material
101,47926

13,84614

M2
H
0,70000
H
0,70000
KG
5,00000
M2
1,05000
Material
33,48100

16.02.061
LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DE ALERTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.65.25
LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL ALERTA
Mo-de-Obra 4,61200
LS
5,62664
SubMO
10,23864

M2
H
0,50000
H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
69,02240

16.02.062
LADRILHO HIDRAULICO 25X25 E=2CM - PISO TATIL DIRECIONAL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.80.05
COLA PVA
3.65.27
LADRILHO HIDRAUL.(25X25) (E=2CM) PISO TATIL DIREC.
Mo-de-Obra 4,61200
LS
5,62664
SubMO
10,23864

M2
H
0,50000
H
0,60000
M3
0,00630
KG
7,50000
KG
0,05000
M2
1,00000
Material
69,02240

16.02.070
LASTRO DE CONCRETO - 5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 4,44800
LS

9,87456

M2
H
0,30000
H
0,80000
M3
0,03000
KG
10,00000
M3
0,04000
Material
8,56060

1,27206

M2
H
0,15000
M3
0,05500
Material
3,36435

18,38116

M2
H
0,92000
H
1,05000
M3
0,03200
KG
10,63000
M2
1,05000
Material
18,40432

16.02.056
LADRILHO HIDRAULICO 20X20CM LISO 1 COR
1.01.28
LADRILHISTA
1.01.46
SERVENTE
2.05.81
ARGAMASSA PRE-FABR TIPO CIMENTCOLA
3.65.19
LADRILHO HIDRAULICO 20X20CM 1 COR
Mo-de-Obra 6,23700
LS
7,60914

5,42656

16.02.071
LASTRO DE PEDRA BRITADA - 5CM
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 0,57300
LS
0,69906
16.02.080
PEDRA ARDOSIA 40X40CM E=7A10MM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
3.50.02
PEDRA ARDOSIA 40X40CM E=7A10MM
Mo-de-Obra 8,27980
LS
10,10136

SubMO

SubMO

SubMO

SubMO

SubMO

16.02.090
CIMENTADO DESEMPENADO COM JUNTA SECA E=3,5CM INCL ARG REG
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.10.60
RIPA DE PEROBA 1X5CM
Mo-de-Obra 8,98140
LS
10,95731
SubMO
19,93871

M2
H
1,17000
H
0,93000
M3
0,03680
KG
15,61000
M
0,30000
Material
9,39663

16.02.091
CIMENTADO DESEMPENADO ALISADO C/ CORANTE E=3,5CM INCL ARG REG
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.10.60
RIPA DE PEROBA 1X5CM
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
SubMO
19,93871
Mo-de-Obra 8,98140
LS
10,95731

M2
H
1,17000
H
0,93000
M3
0,03680
KG
15,61000
M
0,30000
KG
0,10000
Material
11,50763

16.02.099

Exerccio:

REVESTIMENTOS P/ PISOS EXTERNOS

2011

MV

Custo Unit.

Custo Total

BDI

4,64
3,82
80,46
0,35
1,53
0,37
1,04
88,28
32,96861

BDI

5,09
3,82
0,35
30,22
10,88524

BDI

4,64
3,82
80,46
0,37
6,21
65,43
18,23004

BDI

4,64
3,82
80,46
0,37
6,21
65,43
18,23004

BDI

4,64
3,82
80,46
0,37
61,17
4,24009

BDI

3,82
61,17
1,06637

BDI

4,64
3,82
80,46
0,37
11,33
8,46066

BDI

4,64
3,82
80,46
0,37
2,20
6,74713

BDI

4,64
3,82
80,46
0,37
2,20
21,11
7,23266

2,78400
6,87600
1,68966
1,62400
2,05020
0,82140
2,60000
92,69400

58,21
3,56300
2,67400
1,75000
31,73100

97,49
2,32000
2,29200
0,50690
2,77500
0,31050
65,43000

97,49
2,32000
2,29200
0,50690
2,77500
0,31050
65,43000

22,67
1,39200
3,05600
2,41380
3,70000
2,44680

5,70
0,57300
3,36435

45,24
4,26880
4,01100
2,57472
3,93310
11,89650

36,08
5,42880
3,55260
2,96093
5,77570
0,66000

38,67
5,42880
3,55260
2,96093
5,77570
0,66000
2,11100

301,12

Pgina: 309

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente
SubMO

16.03.001
CORTE DE MATO E GRAMA - ROAGEM MECANIZADA
1.01.01
AJUDANTE
1.01.26
JARDINEIRO
8.01.75
ROADEIRA MECANICA
Mo-de-Obra 0,21950
LS
0,26779
SubMO
16.03.003
GRAMA BATATAIS EM PLACAS
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.07
FORRACAO GRAMA TIPO BATATAIS EM PLACAS
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
Mo-de-Obra 1,34540
LS
1,64139

SubMO

16.03.005
GRAMA SAO CARLOS EM PLACAS
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.10
FORRACAO GRAMA TIPO SAO CARLOS EM PLACAS
Mo-de-Obra 1,34540
LS
1,64139
SubMO
16.03.007
GRAMA PRETA EM MUDAS
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.11
FORRACAO GRAMA TIPO PRETA
Mo-de-Obra 1,08640
LS
1,32541
16.03.008
FORRACAO - ONZE HORAS
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.50
FORRACAO - ONZE HORAS
Mo-de-Obra 0,69600
LS
0,84912
16.03.009
FORRACAO - SALVIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.42
FORRACAO - SALVIA
Mo-de-Obra 0,69600
LS
0,84912
16.03.010
FORRACAO - MARANTA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.46
FORRACAO - MARANTA
Mo-de-Obra 0,69600
LS
0,84912
16.03.014
1.01.21
1.01.22
Exerccio:

AP-02 PROTETOR PARA ARVORES


FERREIRO
AJUDANTE DE FERREIRO

2011

SubMO

SubMO

SubMO

SubMO

MV
1,00000
244,82000

0,00000

Material

0,48729

M2
H
0,02500
H
0,02500
H
0,02500
Material
0,05425

0,08000
0,25000
0,10000
0,15000
1,00000
0,10000
5,00000

2,98679

M2
H
H
KG
KG
M2
KG
L
Material
4,34550

0,08000
0,25000
0,10000
0,15000
0,10000
5,00000
1,00000

2,98679

M2
H
H
KG
KG
KG
L
M2
Material
6,72550

2,41181

M2
H
0,16000
H
0,08000
KG
0,10000
KG
0,15000
KG
0,10000
L
5,00000
M2
1,00000
Material
31,50550

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
23,87710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
9,64710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
18,53710
UN
H
H

0,80000
0,80000

Custo Unit.
BDI

Custo Total

244,82
244,82000
56,30860

BDI

3,90
4,88
2,17
0,12455

BDI

4,88
3,82
1,71
0,41
2,91
1,53
0,21
1,68643

BDI

4,88
3,82
1,71
0,41
1,53
0,21
5,29
2,23383

BDI

4,88
3,82
1,71
0,41
1,53
0,21
30,07
7,80098

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
19,01
5,84711

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
4,78
2,57421

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
13,67
4,61891

4,77
3,82

0,66
0,09750
0,12200
0,05425

9,01
0,39040
0,95500
0,17100
0,06150
2,91000
0,15300
1,05000

11,94
0,39040
0,95500
0,17100
0,06150
0,15300
1,05000
5,29000

41,71
0,78080
0,30560
0,17100
0,06150
0,15300
1,05000
30,07000

31,26
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
19,01000

13,76
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
4,78000

24,70
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
13,67000

53,06
3,81600
3,05600
Pgina: 310

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.15.10
ACO CA-25 $MD BITOLAS
2.70.29
ARAME GALVANIZADO N.12
Mo-de-Obra 6,87200
LS

UN Coeficiente

15,25584

KG
8,00000
KG
1,00000
Material
27,89000

16.03.016
ARVORE ORNAMENTAL H=1,50 A 2,00 M - JACARANDA MIMOSO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.31
ARVORE ORNAM H=1,50/2,00M - JACARANDA MIMOSO
Mo-de-Obra 5,62278
LS
6,85980
SubMO
12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
52,47827

16.03.017
ARVORE ORNAMENTAL H=1,50 A 2,00 M - FEDEGOSO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.32
ARVORE ORNAMENTAL H=1,50 A 2,00 M - FEDEGOSO
Mo-de-Obra 5,62278
LS
6,85980
SubMO

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
52,74827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
50,73827

16.03.019
ARVORE ORNAMENTAL H=1,50 A 2,00 - MAGNOLIA AMARELA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.34
ARVORE ORNAM H=1,50/2,00M - MAGNOLIA AMARELA
Mo-de-Obra 5,62278
LS
6,85980
SubMO
12,48258
16.03.020
ARVORE ORNAMENTAL H=1.50 A 2.00M - CIPRESTE ITALIANO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.12
ARVORE ORNAM. H=1.50/2.00M - CIPRESTE ITALIANO
Mo-de-Obra 5,62278
LS
6,85980
SubMO
12,48258

8,38384

SubMO

16.03.018
ARVORE ORNAMENTAL H=1,50 A 2,00 M - BRASSAIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.33
ARVORE ORNAMENTAL H=1,50 A 2,00 M - BRASSAIA
Mo-de-Obra 5,62278
LS
6,85980
SubMO

16.03.021
1.01.26
1.01.46
2.05.03
3.85.02
3.85.03
3.85.11
3.85.12
3.85.13
3.86.13

Exerccio:

ARVORE ORNAMENTAL H=1.50 A 2.00M - FLAMBOYANT


JARDINEIRO
SERVENTE
AREIA
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
CALCARIO DOLOMITICO
TERRA VEGETAL
FOSFATO DE ROCHAS
ADUBO ORGANICO CURTIDO
ARVORE ORNAM. H=1.50/2.00M-FLAMBOYANT

2011

Custo Unit.

Custo Total

BDI

2,67
6,53
9,92354

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
20,14
14,94100

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
20,41
15,00310

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
18,40
14,54080

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
52,48827

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
20,15
14,94330

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
140,07827

187,64
4,88
1,12435
3,82
4,49843
80,46
0,51494
1,71
1,36800
0,41
0,32800
89,86
18,40333
1,53
1,22400
0,21
10,50000
107,74
107,74000
BDI
35,08900

UN
H
H
M3
KG
KG
M3
KG
L
UN

0,23040
1,17760
0,00640
0,80000
0,80000
0,20430
0,80000
50,00000
1,00000

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
18,19

21,36000
6,53000

79,90
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
20,14000

80,23
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
20,41000

77,76
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
18,40000

79,91
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
20,15000

77,44
1,12435
4,49843
0,51494
1,36800
0,32800
18,35840
1,22400
10,50000
18,19000

Pgina: 311

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 5,62278

LS

6,85980

UN Coeficiente
SubMO

16.03.022
ARVORE ORNAMENTAL H=1.50 A 2.00M - GREVILHA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.14
ARVORE ORNAM. H=1.50/2.00M-GREVILHA
Mo-de-Obra 5,62278
LS
6,85980
SubMO
16.03.023
ARVORE ORNAMENTAL H=1.50 A 2.00M - IPE AMARELO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.15
ARVORE ORNAM. H=1.50/2.00M-IPE AMARELO/ROXO
SubMO
Mo-de-Obra 5,62278
LS
6,85980
16.03.024
ARVORE ORNAMENTAL H=1.50 A 2.00M - IPE ROXO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.15
ARVORE ORNAM. H=1.50/2.00M-IPE AMARELO/ROXO
Mo-de-Obra 5,62278
LS
6,85980
SubMO
16.03.025
ARVORE ORNAMENTAL H=1.5 A 2.00M - JATOBA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.17
ARVORE ORNAM. H=1.50/2.00M - JATOBA
Mo-de-Obra 5,62278
LS
6,85980

SubMO

16.03.026
ARVORE ORNAMENTAL H=1.5 A 2.00M - PAINEIRA ROSA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.18
ARVORE ORNAM. H=1.50/2.00M-PAINEIRA ROSA
SubMO
Mo-de-Obra 5,62278
LS
6,85980
16.03.027
ARVORE ORNAMENTAL H=1.50 A 2.00M - PAU BRASIL
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.19
ARVORE ORNAM. H=1.50/2.00M - PAU BRASIL
SubMO
Mo-de-Obra 5,62278
LS
6,85980
16.03.028
Exerccio:

ARVORE ORNAMENTAL H=1.50 A 2.00M - PAU FERRO

2011

12,48258

Material

50,48334

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
51,37827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
64,07827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
64,07827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
54,30827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
54,14827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
56,47827
UN

Custo Unit.

Custo Total

BDI

14,48216

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
19,04
14,68800

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
31,74
17,60900

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
31,74
17,60900

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
21,97
15,36190

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
21,81
15,32510

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
24,14
15,86100

78,54
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
19,04000

94,16
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
31,74000

94,16
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
31,74000

82,15
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
21,97000

81,95
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
21,81000

84,82
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
24,14000

88,21
Pgina: 312

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.20
ARVORE ORNAM. H=1.50/2.00M - PAU FERRO
Mo-de-Obra 7,90867
LS
9,64858

UN Coeficiente

17,55725

H
0,23040
H
1,77600
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
54,15827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
50,39827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
53,03827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
52,30827

16.03.032
ARVORE ORNAMENTAL H=1.50 A 2.00M - ALECRIM DE CAMPINAS
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.24
ARVORE ORNAM. H=1.50/2.00M - ALECRIM CAMPINAS
Mo-de-Obra 5,62278
LS
6,85980
SubMO
12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
52,98827

16.03.033
ARVORE ORNAMENTAL H=1.50 A 2.00M - CASSIA ALELUIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.25
ARVORE ORNAM. H=1.50/2.00M-CASSIA ALFLUIA
SubMO
Mo-de-Obra 5,62278
LS
6,85980

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
53,96827

SubMO

16.03.029
ARVORE ORNAMENTAL H=1.50 A 2.00M - PLATANO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.21
ARVORE ORNAM. H=1.50/2.00M-PLATANO
Mo-de-Obra 5,62278
SubMO
LS
6,85980
16.03.030
ARVORE ORNAMENTAL H=1.50 A 2.00M - SIBIPIRUNA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.22
ARVORE ORNAM. H=1.50/2.00M-SIBIPIRUNA
Mo-de-Obra 5,62278
LS
6,85980
SubMO
16.03.031
ARVORE ORNAMENTAL H=1,50 A 2.00M - TIPUANA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.23
ARVORE ORNAM. H=1.50/2.00M-TIPUANA
Mo-de-Obra 5,62278
LS
6,85980
SubMO

16.03.034
1.01.26
1.01.46
2.05.03
Exerccio:

ARVORE ORNAMENTAL H=1.50 A 2.00M - CHAPEU DE SOL


JARDINEIRO
SERVENTE
AREIA

2011

12,48258

UN
H
H
M3

0,23040
1,17760
0,00640

Custo Unit.

Custo Total

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
21,82
16,49457

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
18,06
14,46260

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
20,70
15,06980

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
19,97
14,90190

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
20,65
15,05830

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
21,63
15,28370

4,88
3,82
80,46

1,12435
6,78432
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
21,82000

77,34
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
18,06000

80,59
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
20,70000

79,69
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
19,97000

80,52
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
20,65000

81,73
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
21,63000

78,57
1,12435
4,49843
0,51494
Pgina: 313

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.26
ARVORE ORNAM. H=1.50/2.00M-CHAPEU DE SOL
Mo-de-Obra 5,62278
LS
6,85980

UN Coeficiente

12,48258

KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
51,39827

16.03.035
ARVORE ORNAMENTAL H=1.50 A 2.00M - FIGUEIRA PANDURATA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.27
ARVORE ORNAM. H=1.50/2.00M-FIGUEIRA PANDURATA
Mo-de-Obra 5,62278
SubMO
12,48258
LS
6,85980

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
55,15827

16.03.036
ARVORE ORNAMENTAL H=1.50 A 2.00M - PATA DE VACA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.28
ARVORE ORNAM. H=1.50/2.00M-PATA DE VACA
Mo-de-Obra 5,62278
LS
6,85980
SubMO

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
52,65827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
52,96027

16.03.038
ARVORE ORNAMENTAL H=1.50 A 2.00M - MANACA DA SERRA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.30
ARVORE ORNAM. H=1.50/2.00M-MANACA DA SERRA
Mo-de-Obra 5,62278
LS
6,85980
SubMO
12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
51,47027

16.03.039
ARVORE ORNAMENTAL H=1.50 A 2.00M - RESEDA EXTREMOSA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.31
ARVORE ORNAM. H=1.50/2.00M-RESEDA EXTREMOSA
Mo-de-Obra 5,62278
LS
6,85980
SubMO
12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
49,74827

SubMO

16.03.037
ARVORE ORNAMENTAL H=1.50 A 2.00M - QUARESMEIRA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.29
ARVORE ORNAM. H=1.50/2.00M-QUARESMEIRA
Mo-de-Obra 5,62278
LS
6,85980
SubMO

16.03.040
1.01.26
1.01.46
2.05.03
3.85.02
3.85.03
3.85.11
3.85.12
3.85.13
Exerccio:

ARVORE ORNAMENTAL H=1.50 A 2.00M - ALAMO


JARDINEIRO
SERVENTE
AREIA
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
CALCARIO DOLOMITICO
TERRA VEGETAL
FOSFATO DE ROCHAS
ADUBO ORGANICO CURTIDO

2011

UN
H
H
M3
KG
KG
M3
KG
L

0,23040
1,17760
0,00640
0,80000
0,80000
0,20480
0,80000
50,00000

Custo Unit.

Custo Total

BDI

1,71
0,41
89,86
1,53
0,21
19,06
14,69260

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
22,82
15,55740

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
20,32
14,98240

BDI

4,88
3,82
80,46
1,71
89,86
1,53
0,21
20,95
15,05186

BDI

4,88
3,82
80,46
1,71
89,86
1,53
0,21
19,46
14,70916

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
17,41
14,31310

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21

1,36800
0,32800
18,40333
1,22400
10,50000
19,06000

83,19
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
22,82000

80,12
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
20,32000

80,49
1,12435
4,49843
0,51494
1,36800
18,40333
1,22400
10,50000
20,95000

78,66
1,12435
4,49843
0,51494
1,36800
18,40333
1,22400
10,50000
19,46000

76,54
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
17,41000

80,24
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
Pgina: 314

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.86.74
ARVORE ORNAM. H=1.50/2.00M - ALAMO
Mo-de-Obra 5,62278
LS
6,85980

UN Coeficiente
SubMO

UN
1,00000
52,75827

12,48258

Material

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
50,48827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
42,64027

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
44,24827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
42,11827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
42,27827

16.03.049
ARVORE FRUTIFERA H=0.50 A 1.00M - AMEIXA AMARELA (NESPERA)
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.36
ARVORE FRUTIF. H=0.50/1.00M-AMEIXA AMARELA
SubMO
12,48258
Mo-de-Obra 5,62278
LS
6,85980

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
43,46827

16.03.041
ARVORE ORNAMENTAL H=1.50 A 2.00M - CHORAO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.65
ARVORE ORNAM H=1.50/2.00M - CHORAO
Mo-de-Obra 5,62278
LS
6,85980
SubMO
16.03.045
ARVORE FRUTIFERA H=0.50 A 1.00M - ABACATE
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.32
ARVORE FRUTIF. H=50/1.00M - ABACATE
Mo-de-Obra 5,62278
LS
6,85980

SubMO

16.03.046
ARVORE FRUTIFERA H=0.50 A 1.00M - MANGUEIRA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.33
ARVORE FRUTIF. H=0.50/1.00M - MANGUEIRA
Mo-de-Obra 5,62278
LS
6,85980
SubMO
16.03.047
ARVORE FRUTIFERA H=0.50 A 1.00M - JAMBOLAO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.34
ARVORE FRUTIF. H=0.50/1.00-JAMBOLAO
Mo-de-Obra 5,62278
LS
6,85980
SubMO
16.03.048
ARVORE FRUTIFERA H=0.50 A 1.00M - AMOREIRA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.35
ARVORE FRUTIF. H=0.50/1.00M-AMOREIRA
SubMO
Mo-de-Obra 5,62278
LS
6,85980

16.03.050
Exerccio:

ARVORE FRUTIFERA H=0.50 A 1.00M - BANANEIRA

2011

UN

Custo Unit.

Custo Total

BDI

20,42
15,00540

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
18,15
14,48330

BDI

4,88
3,82
80,46
1,71
89,86
1,53
0,21
10,63
12,67826

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
11,91
13,04810

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
9,78
12,55820

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
9,94
12,59500

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
11,13
12,86870

20,42000

77,45
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
18,15000

67,80
1,12435
4,49843
0,51494
1,36800
18,40333
1,22400
10,50000
10,63000

69,77
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
11,91000

67,15
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
9,78000

67,35
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
9,94000

68,81
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
11,13000

72,66
Pgina: 315

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.37
ARVORE FRUTIF. H=0.50/1.00M-BANANEIRA
Mo-de-Obra 5,62278
LS
6,85980

UN Coeficiente

SubMO

12,48258

H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
46,59827

16.03.051
ARVORE FRUTIFERA H=0.50 A 1.00M - ACEROLA (CEREJA DAS ANTILHAS)
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.38
ARVORE FRUTIF. H=0.50/1.00M-ACEROLA
Mo-de-Obra 5,62278
SubMO
12,48258
LS
6,85980

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
42,50827

16.03.052
ARVORE FRUTIFERA H=0.50 A 1.00M - CARAMBOLA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.76
ARVORE FRUTIF. H=0.50/1.00M - CARAMBOLA
Mo-de-Obra 5,62278
LS
6,85980
SubMO

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
41,45827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
43,42827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
41,65827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
43,07827

16.03.053
ARVORE FRUTIFERA H=0.50 A 1.00M - LIMOEIRO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.40
ARVORE FRUTIF. H=0.50/1.00M-LIMOEIRO
Mo-de-Obra 5,62278
LS
6,85980

SubMO

16.03.054
ARVORE FRUTIFERA H=0.50 A 1.00M - PITANGUEIRA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.41
ARVORE FRUTIF. H=0.50/1.00M-PITANGUEIRA
Mo-de-Obra 5,62278
LS
6,85980
SubMO
16.03.055
ARVORE FRUTIFERA H=0.50 A 1.00M - UVAIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.42
ARVORE FRUTIF. H=0.50/1.00M-UVATA
Mo-de-Obra 5,62278
LS
6,85980
16.03.056
1.01.26
1.01.46
2.05.03
Exerccio:

ARVORE FRUTIFERA H=0,50 A 1,00 M - ROMA


JARDINEIRO
SERVENTE
AREIA

2011

SubMO

UN
H
H
M3

0,23040
1,17760
0,00640

Custo Unit.

Custo Total

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
14,26
13,58860

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
10,17
12,64790

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
9,12
12,40640

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
11,09
12,85950

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
9,32
12,45240

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
10,74
12,77900

4,88
3,82
80,46

1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
14,26000

67,63
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
10,17000

66,34
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
9,12000

68,77
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
11,09000

66,59
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
9,32000

68,33
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
10,74000

69,63
1,12435
4,49843
0,51494
Pgina: 316

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.35
ARVORE ORNAMENTAL H=0,50 A 1,00 M - ROMA
Mo-de-Obra 5,62278
LS
6,85980
16.03.057
ARBUSTO H=0,50 A 0,70 M - GREVILHA ANA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.38
ARBUSTO H= 0,50 A 0,70 M - GREVILHA ANA
Mo-de-Obra 0,78300
LS
0,95526
16.03.058
ARBUSTO H=0,50 A 0,70 M - SHEFLERA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.39
ARBUSTO H=0,50 A 0,70 M - SHEFLERA
Mo-de-Obra 0,78300
LS
0,95526
16.03.059
ARBUSTO H=0,50 A 0,70 M - CROTON
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.40
ARBUSTO H=0,50 A 0,70 M - CROTON
Mo-de-Obra 0,78300
LS
0,95526
16.03.060
PALMACEAS H=1.50 A 2.00M - ARECA BAMBU
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.43
PALMACEA H=0.50/1.00M-ARECA BAMBU
Mo-de-Obra 5,62278
LS
6,85980
16.03.061
PALMACEAS H=1.50 A 2.00M - FALSA LATANIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.44
PALMACEA H=0.50/1.00M-FALSA LATANIA
Mo-de-Obra 5,62278
LS
6,85980
16.03.062
1.01.26
1.01.46
2.05.03
3.85.02
3.85.03
3.85.11
3.85.12
3.85.13
3.86.75
Exerccio:

PALMACEAS H=1.50 A 2.00M - SEAFORTIA


JARDINEIRO
SERVENTE
AREIA
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
CALCARIO DOLOMITICO
TERRA VEGETAL
FOSFATO DE ROCHAS
ADUBO ORGANICO CURTIDO
PALMACEA H=1.50/2.00M - SEAFORTIA

2011

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

12,48258

KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
44,12827

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
15,09562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
17,78562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
21,43562

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
46,60827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
66,60827
UN
H
H
M3
KG
KG
M3
KG
L
UN

0,23040
1,17760
0,00640
0,80000
0,80000
0,20480
0,80000
50,00000
1,00000

Custo Unit.

Custo Total

BDI

1,71
0,41
89,86
1,53
0,21
11,79
13,02050

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
10,90
3,87179

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
13,59
4,49049

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
17,24
5,32999

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
14,27
13,59090

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
34,27
18,19090

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
25,11

1,36800
0,32800
18,40333
1,22400
10,50000
11,79000

20,70
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
10,90000

24,01
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
13,59000

28,50
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
17,24000

72,68
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
14,27000

97,28
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
34,27000

86,01
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
25,11000
Pgina: 317

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 5,62278

LS

6,85980

16.03.063
PALMACEA H=1,50 A 2,00 M - JERIVA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.36
PALMACEAS H=1,50 A 2,00 M - JERIVA
Mo-de-Obra 5,62278
LS
6,85980
16.03.064
ARBUSTO H=0,50 A 0,70 M - LIGUSTRINHO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.41
ARBUSTO H=0,50 A 0,70 M - LIGUSTRINHO
Mo-de-Obra 0,78300
LS
0,95526
16.03.065
ARBUSTO H=0.50 A 0.70M - ACALIFA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.45
ARBUSTO H=0.50/0.70M-ACALIFA
Mo-de-Obra 0,78300
LS
0,95526
16.03.066
ARBUSTO H=0.50 A 0.70M - AZALEA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.46
ARBUSTO H=0.50/0.70M-AZALEIA
Mo-de-Obra 0,78300
LS
0,95526
16.03.067
ARBUSTO H=0.50 A 0.70M - BELA EMILIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.47
ARBUSTO H=0.50/0.70M-BELA EMILIA
Mo-de-Obra 0,78300
LS
0,95526
16.03.068
ARBUSTO H=0.50 A 0.70M - HIBISCO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.48
ARBUSTO H=0.50/0.70M-HIBISCO
Mo-de-Obra 0,78300
LS
0,95526
16.03.069
1.01.26
1.01.46
3.85.02
3.85.03
3.85.11
3.85.12
Exerccio:

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

ARBUSTO H=0.50 A 0.70M - JASMIM MANGA (FRANGIPANI)


JARDINEIRO
SERVENTE
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
CALCARIO DOLOMITICO
TERRA VEGETAL
FOSFATO DE ROCHAS

2011

12,48258

Material

57,44827

12,48258

UN
H
0,23040
H
1,17760
M3
0,00640
KG
0,80000
KG
0,80000
M3
0,20480
KG
0,80000
L
50,00000
UN
1,00000
Material
69,62827

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
12,70562

1,73826

UN
H
H
KG
KG
M3
KG
L
UN
Material
9,45562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
15,76528

0,09000
0,09000
0,07400
0,07400
0,03200
0,07400
5,00000
1,00000

1,73826

UN
H
H
KG
KG
M3
KG
L
UN
Material
8,65562

0,09000
0,09000
0,07400
0,07400
0,03200
0,07400
5,00000
1,00000

1,73826

UN
H
H
KG
KG
M3
KG
L
UN
Material
9,75562
UN
H
H
KG
KG
M3
KG

Custo Unit.
BDI

16,08410

BDI

4,88
3,82
80,46
1,71
0,41
89,86
1,53
0,21
37,29
18,88550

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
8,51
3,32209

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
5,26
2,57459

BDI

4,88
3,82
1,71
89,86
1,53
0,21
11,60
4,02581

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
4,46
2,39059

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
5,56
2,64359

0,09000
0,09000
0,07400
0,07400
0,03200
0,07400
5,00000
1,00000

0,09000
0,09000
0,07400
0,07400
0,03200
0,07400

Custo Total

4,88
3,82
1,71
0,41
89,86
1,53

100,99
1,12435
4,49843
0,51494
1,36800
0,32800
18,40333
1,22400
10,50000
37,29000

17,76
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
8,51000

13,76
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
5,26000

21,52
0,43920
0,34380
0,12654
2,87552
0,11322
1,05000
11,60000

12,78
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
4,46000

14,13
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
5,56000

21,78
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
Pgina: 318

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.85.13
ADUBO ORGANICO CURTIDO
3.86.49
ARBUSTO H=0.50/0.70M-JASMIM MANGA
Mo-de-Obra 0,78300
LS
0,95526

UN Coeficiente

1,73826

L
5,00000
UN
1,00000
Material
15,97562

16.03.070
ARBUSTO H=0.50 A 0.70M - MURTA DE CHEIRO (FALSA MURTA)
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.50
ARBUSTO H=0.50/0.70M-MURTA DE CHEIRO
Mo-de-Obra 0,78300
LS
0,95526
SubMO
1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
14,40562

16.03.071
ARBUSTO H=0.50 A 0.70 M - SUINA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.51
ARBUSTO H=0.50/0.70M-SUINA
Mo-de-Obra 0,78300
LS
0,95526

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
14,67562

1,73826

UN
H
H
KG
KG
M3
KG
L
UN
Material
9,67562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
11,88562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
15,72562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
14,68562

16.03.072
ARBUSTO H=0.50 A 0.70 M - MALVAVISCO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.64
ARBUSTO H=0.50/0.70M-MALVAVISCO
Mo-de-Obra 0,78300
LS
0,95526
16.03.073
ARBUSTO H=0.50 A 0.70M - BICO DE PAPAGAIO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.66
ARBUSTO H=0.50/0.70M-BICO DE PAPAGAIO
Mo-de-Obra 0,78300
LS
0,95526
16.03.074
ARBUSTO H=0.50 A 0.70M - PIRACANTA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.67
ARBUSTO H=0.50/0.70M-PIRACANTA
Mo-de-Obra 0,78300
LS
0,95526

SubMO

SubMO

SubMO

SubMO

SubMO

16.03.075
TREPADEIRA H=0.50 A 0.70 M - COSTELA DE ADAO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.52
TREPADEIRA H=0.50/0.70M-COSTELA DE ADAO
Mo-de-Obra 0,78300
LS
0,95526
SubMO
16.03.076
1.01.26
1.01.46
3.85.02
3.85.03
Exerccio:

TREPADEIRA H=0.50 A 0.70 M - GUAIMBE


JARDINEIRO
SERVENTE
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
CALCARIO DOLOMITICO

2011

UN
H
H
KG
KG

Custo Unit.

BDI

0,21
11,78
4,07419

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
10,21
3,71309

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
10,48
3,77519

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
5,48
2,62519

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
7,69
3,13349

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
11,53
4,01669

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
10,49
3,77749

0,09000
0,09000
0,07400
0,07400
0,03200
0,07400
5,00000
1,00000

0,09000
0,09000
0,07400
0,07400

Custo Total

4,88
3,82
1,71
0,41

1,05000
11,78000

19,85
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
10,21000

20,18
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
10,48000

14,03
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
5,48000

16,75
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
7,69000

21,48
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
11,53000

20,20
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
10,49000

22,35
0,43920
0,34380
0,12654
0,03034
Pgina: 319

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.53
TREPADEIRA H=0.50/0.70M - GUAIMBE
Mo-de-Obra 0,78300
LS
0,95526
16.03.077
TREPADEIRA H=0.50 A 0.70 M - PRIMAVERA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.54
TREPADEIRA H=0.50/0.70M-PRIMAVERA
Mo-de-Obra 0,78300
LS
0,95526
16.03.078
TREPADEIRA H=0,10 A 0,15M - UNHA DE GATO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.11
TERRA VEGETAL
3.85.13
ADUBO ORGANICO CURTIDO
3.86.55
TREPADEIRA H=0,10/0,15M - UNHA DE GATO
Mo-de-Obra 0,69600
LS
0,84912
16.03.079
TREPADEIRA H=0.50 A 0.70M-ALAMANDA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.73
TREPADEIRA H=0.50/0.70M-ALAMANDA
Mo-de-Obra 0,78300
LS
0,95526
16.03.080
ARBUSTO H=0,50 A 0,70 M - CALIANDRA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.37
ARBUSTO H=0,50 A 0,70 M - CALIANDRA
Mo-de-Obra 0,78300
LS
0,95526
16.03.081
FOLHAGEM H=0,50 A 0,70 - HELICONIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.43
FOLHAGEM H=0,50 A 0,70 M - HECICONIA
Mo-de-Obra 0,78300
LS
0,95526
16.03.082
TREPADEIRA - JIBOIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.48
TREPADEIRA - JIBOIA
Mo-de-Obra 0,78300
LS
0,95526
16.03.083
1.01.26
1.01.46
3.85.02
3.85.03
3.85.11
Exerccio:

BAMBU H=1,00 A 2,00 M - BAMBUZINHO


JARDINEIRO
SERVENTE
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
CALCARIO DOLOMITICO
TERRA VEGETAL

2011

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

1,73826

M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
16,43562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
17,72562

1,54512

UN
H
H
M3
L
UN
Material
1,68091

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
10,17562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
10,54562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
15,65562

1,73826

UN
H
H
KG
KG
M3
KG
L
UN
Material
5,08562
UN
H
H
KG
KG
M3

Custo Unit.

BDI

89,86
1,53
0,21
12,24
4,17999

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
13,53
4,47669

BDI

4,88
3,82
89,86
0,21
0,77
0,74199

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
5,98
2,74019

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
6,35
2,82529

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
11,46
4,00059

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
0,89
1,56949

0,08000
0,08000
0,00780
1,00000
1,00000

0,09000
0,09000
0,07400
0,07400
0,03200
0,07400
5,00000
1,00000

0,09000
0,09000
0,07400
0,07400
0,03200

Custo Total

4,88
3,82
1,71
0,41
89,86

2,87552
0,11322
1,05000
12,24000

23,94
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
13,53000

3,96
0,39040
0,30560
0,70091
0,21000
0,77000

14,65
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
5,98000

15,10
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
6,35000

21,39
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
11,46000

8,39
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
0,89000

26,52
0,43920
0,34380
0,12654
0,03034
2,87552
Pgina: 320

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.47
BAMBU - H=1,00 A 2,00 M - BAMBUZINHO
Mo-de-Obra 0,78300
LS
0,95526

UN Coeficiente

SubMO

16.03.084
FOLHAGEM-H=0.50 A 0.70M BANANEIRA ZEBRINA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.11
TERRA VEGETAL
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.68
FOLHAGEM-BANANEIRA ZEBRINA
Mo-de-Obra 0,78300
LS
0,95526
SubMO
16.03.085
FORRACAO - CURCULIGO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.80
FORRACAO - CURCULIGO
Mo-de-Obra 0,69600
LS
0,84912
16.03.086
FORRACAO - HERA INGLESA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
3.85.11
TERRA VEGETAL
3.85.13
ADUBO ORGANICO CURTIDO
3.86.57
FORRACAO - HERA INGLESA
Mo-de-Obra 0,69600
LS

0,84912

16.03.087
FORRACAO - LANTANA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.82
FORRACAO - LANTANA
Mo-de-Obra 0,69600
LS
0,84912
16.03.088
FORRACAO - LIRIO AMARELO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.83
FORRACAO - LIRIO AMARELO
Mo-de-Obra 0,69600
LS
0,84912
16.03.089
FORRACAO - MARIA SEM VERGONHA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.84
FORRACAO - MARIA SEM VERGONHA
Mo-de-Obra 0,69600
LS
0,84912
16.03.090
1.01.26
1.01.46
2.05.03
3.85.02
3.85.03
3.85.12
Exerccio:

FORRACAO - SANCHEZIA (DIGITAL)


JARDINEIRO
SERVENTE
AREIA
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
CALCARIO DOLOMITICO
FOSFATO DE ROCHAS

2011

SubMO

SubMO

SubMO

SubMO

SubMO

1,73826

KG
0,07400
L
5,00000
UN
1,00000
Material
19,82562

1,73826

UN
H
0,09000
H
0,09000
KG
0,07400
KG
0,07400
M3
0,03200
KG
0,07400
L
5,00000
UN
1,00000
Material
19,82562

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
15,17710

1,54512

UN
H
H
M3
L
UN
Material
1,64091

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
11,06710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
30,56710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
19,57710
M2
H
H
M3
KG
KG
KG

Custo Unit.

BDI

1,53
0,21
15,63
4,95969

BDI

4,88
3,82
1,71
0,41
89,86
1,53
0,21
15,63
4,95969

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
10,31
3,84611

BDI

4,88
3,82
89,86
0,21
0,73
0,73279

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
6,20
2,90081

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
25,70
7,38581

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
14,71
4,85811

0,08000
0,08000
0,00780
1,00000
1,00000

0,08000
0,08000
0,01000
0,25000
0,25000
0,25000

Custo Total

4,88
3,82
80,46
1,71
0,41
1,53

0,11322
1,05000
15,63000

26,52
0,43920
0,34380
0,12654
0,03034
2,87552
0,11322
1,05000
15,63000

20,56
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
10,31000

3,91
0,39040
0,30560
0,70091
0,21000
0,73000

15,51
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
6,20000

39,49
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
25,70000

25,98
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
14,71000

13,36
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
Pgina: 321

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.85.13
ADUBO ORGANICO CURTIDO
3.86.85
FORRACAO - SANGHEZIA
Mo-de-Obra 0,69600
LS

0,84912

16.03.091
FORRACAO - PILEA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.86
FORRACAO - PILEA
Mo-de-Obra 0,69600
LS
0,84912
16.03.092
FORRACAO - CLOROFITO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.87
FORRACAO - CLOROFITO
Mo-de-Obra 0,69600
LS
0,84912
16.03.093
FORRACAO - VEDELIA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.88
FORRACAO - VEDELIA
Mo-de-Obra 0,69600
LS
0,84912
16.03.095
FORRACAO - ZEBRINA PENDULA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.86.89
FORRACAO - ZEBRINA PENDULA
Mo-de-Obra 0,69600
LS
0,84912
16.03.096
FORRACAO - AGAPANTO
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.44
FORRACAO - AGAPANTO
Mo-de-Obra 0,69600
LS
0,84912
16.03.097
FORRACAO - SETCREASEA
1.01.26
JARDINEIRO
1.01.46
SERVENTE
2.05.03
AREIA
3.85.02
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.45
FORRACAO - SETCREASEA
Mo-de-Obra 0,69600
LS
0,84912
16.03.098
1.01.26
1.01.46
2.05.03
3.85.02
Exerccio:

FORRACAO - COLEO
JARDINEIRO
SERVENTE
AREIA
ADUBO QUIMICO NPK,FORM.BASE (10-10-10)

2011

UN Coeficiente

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

L
15,00000
M2
1,00000
9,31710

1,54512

Material

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
17,08710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
18,21710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
27,53710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
23,94710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
19,49710

1,54512

M2
H
0,08000
H
0,08000
M3
0,01000
KG
0,25000
KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
21,72710
M2
H
H
M3
KG

0,08000
0,08000
0,01000
0,25000

Custo Unit.

Custo Total

BDI

0,21
4,45
2,49831

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
12,22
4,28541

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
13,35
4,54531

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
22,67
6,68891

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
19,08
5,86321

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
14,63
4,83971

BDI

4,88
3,82
80,46
1,71
0,41
1,53
0,21
16,86
5,35261

4,88
3,82
80,46
1,71

3,15000
4,45000

22,91
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
12,22000

24,30
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
13,35000

35,77
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
22,67000

31,35
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
19,08000

25,88
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
14,63000

28,62
0,39040
0,30560
0,80460
0,42750
0,10250
0,38250
3,15000
16,86000

21,94
0,39040
0,30560
0,80460
0,42750
Pgina: 322

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
3.85.03
CALCARIO DOLOMITICO
3.85.12
FOSFATO DE ROCHAS
3.85.13
ADUBO ORGANICO CURTIDO
3.85.49
FORRACAO - COLEO
Mo-de-Obra 0,69600
LS

Descrio

UN Coeficiente

Custo Unit.

Custo Total

1,54512

KG
0,25000
KG
0,25000
L
15,00000
M2
1,00000
Material
16,29710

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

27,26160

PR
H
1,00000
H
2,00000
M3
0,12300
UN
2,00000
PR
1,00000
UN
1,00000
M
0,80000
M
0,80000
Material
657,15294

4,64
3,82
251,78
10,69
496,35
92,63
1,30
18,48
BDI
157,41534

27,26160

UN
H
1,00000
H
2,00000
M3
0,12300
UN
1,00000
UN
2,00000
UN
1,00000
M
0,80000
M
0,80000
Material
711,79294

4,64
3,82
251,78
36,81
10,69
606,81
1,30
18,48
BDI
169,98254

16.04.004
QE-25 TABELA DE BASQUETE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.50.17
ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL
2.50.20
MONTAGEM DE ESTRUTURA METALICA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.67.09
TABELA DE BASQUETE COM ARO E CESTO
3.75.02
TINTA ESMALTE
3.75.50
FUNDO WHASH-PRIMER / FUNDO P/ GALVANIZADOS
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.76.50
GALVANIZACAO A FOGO
3.80.39
LIXA PARA MADEIRA
3.80.60
TINNER
Mo-de-Obra 402,57940
LS
491,14687
SubMO
893,72627

UN
H
16,68000
H
16,68000
H
9,10000
H
9,10000
H
10,21000
H
2,06000
H
2,06000
H
30,54000
M3
0,38000
KG
171,70000
M3
0,50000
M3
1,10000
M
20,25000
M
4,32000
M2
1,76000
KG
127,65000
KG
53,00000
KG
53,00000
KG
1,79000
KG
1,82000
UN
1,00000
L
0,43000
L
0,43000
L
0,02000
KG
55,00000
UN
2,70000
L
0,23000
Material
2.266,88190

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,37
61,17
241,38
3,78
2,09
17,18
2,69
10,14
2,18
4,67
4,87
631,75
10,12
20,41
159,27
1,76
0,35
6,50
BDI
726,93988

16.04.006
QE-11 DEGRAU ARQUIBANCADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.25.04
BLOCO DE CONCRETO 14X19X39CM - 6MPa
2.25.15
TIJOLO COMUM MACICO
3.60.31
JUNTA PLASTICA DILATACAO P/ PISO 19X3MM
Mo-de-Obra 17,69480
LS
21,58766

M
H
1,92000
H
2,30000
M3
0,04300
KG
5,14000
KG
10,30000
M3
0,03300
UN
5,20000
UN
51,00000
M
0,50000
Material
32,76639

16.03.099
SERVICOS DE GRAMADOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,84912

0,00000

SubMO

SubMO

16.04.001
QE-02 POSTE PARA REDE DE VOLEIBOL
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.17
QE-02 POSTE REDE VOLEIBOL/ GALV E PINT ESMALTE-PAR
3.67.20
REDE DE VOLEI C/ 4 FAIXAS
6.25.01
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM
6.25.08
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM
Mo-de-Obra 12,28000
LS
14,98160
SubMO
16.04.002
QE-03 TRAVE DE FUTEBOL DE SALAO (FUNDACAO DIRETA)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
3.67.12
REDE PARA TRAVE DE GOL
3.67.15
TAMPO P/SUPORTE REDE VOLEIBOL/TRAVE DE FUTEBOL
3.67.18
QE-03 TRAVE DE FUTEBOL DE SALAO GALV/PINT ESMALTE
6.25.01
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 20MM
6.25.08
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 85MM
Mo-de-Obra 12,28000
LS
14,98160
SubMO

Exerccio:

2011

SubMO

39,28246

BDI

0,41
1,53
0,21
11,43
4,10371

4,64
3,82
80,46
0,35
0,37
61,17
1,94
0,22
0,74
16,57124

0,10250
0,38250
3,15000
11,43000

841,82
4,64000
7,64000
30,96894
21,38000
496,35000
92,63000
1,04000
14,78400

909,03
4,64000
7,64000
30,96894
36,81000
21,38000
606,81000
1,04000
14,78400

3.887,54
76,72800
66,05280
43,40700
34,76200
47,37440
9,76440
7,82800
116,66280
30,57480
63,52900
30,58500
265,51800
76,54500
9,02880
30,23680
343,37850
537,42000
115,54000
8,35930
8,86340
631,75000
4,35160
8,77630
3,18540
96,80000
0,94500
1,49500

88,62
8,90880
8,78600
3,45978
1,79900
3,81100
2,01861
10,08800
11,22000
0,37000

Pgina: 323

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

QE-12 QUADRA DE ESPORTES/PISO DE CONCRETO ARMADO/FUNDACAO DIRET-600


M2
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.56
TINTA BETUMINOSA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.70.10
ARAME RECOZIDO N.18
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 1.511,82500
LS
1.844,42650
Material
SubMO
3.356,25150

16.04.007

Custo Unit.

Custo Total

UN

47.641,99

H
22,50000
H
22,50000
H
120,00000
H
22,50000
H
22,50000
H
120,00000
H
16,00000
M3
48,00000
M3
48,00000
UN
167,00000
M
540,00000
M2
708,00000
M2
660,00000
L
35,70000
UN
45,00000
M
55,00000
KG
17,00000
KG
150,00000
KG
28,80000
UN
19,00000
M2
600,00000
L
9,38000
H
12,80000
H
3,20000
35.377,07540

4,77
107,32500
3,82
85,95000
4,64
556,80000
4,74
106,65000
3,80
85,50000
3,82
458,40000
6,95
111,20000
69,64
3.342,72000
251,78
12.085,44000
1,78
297,26000
3,17
1.711,80000
10,03
7.101,24000
0,91
600,60000
6,23
222,41100
25,87
1.164,15000
0,12
6,60000
4,87
82,79000
6,43
964,50000
21,44
617,47200
4,61
87,59000
11,33
6.798,00000
6,08
57,03040
17,83
228,22400
2,89
9,24800
BDI
8.908,66519

16.04.011
QE-16 ARQUIBANCADA DE CONCRETO (CIMENTADO DESEMPENADO)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.04
BLOCO DE CONCRETO 14X19X39CM - 6MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 27,71656
LS
33,81420
SubMO
61,53076

M
H
1,78000
H
1,78000
H
0,25000
H
0,25000
H
0,94000
H
1,56300
M3
0,02120
KG
1,81000
KG
2,65000
M3
0,03300
M3
0,03250
M
2,68000
M2
0,90000
M2
0,29000
KG
2,90000
UN
5,20000
KG
0,18000
KG
0,05000
Material
60,84574

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
234,95
3,78
17,18
11,40
2,69
1,94
4,67
4,87
BDI
28,14660

16.04.012
QE-16 ARQUIBANCADA DE CONCRETO (TIJOLO LAMINADO EM ESPELHO)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.04
BLOCO DE CONCRETO 14X19X39CM - 6MPa
2.25.36
TIJOLO LAMINADO FURADO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
SubMO
70,39256
Mo-de-Obra 31,70836
LS
38,68420

M
H
2,18000
H
2,18000
H
0,25000
H
0,25000
H
1,12000
H
1,49300
M3
0,02170
KG
0,82000
KG
2,96500
M3
0,03300
M3
0,03250
M
3,28000
M2
0,11000
M2
0,36000
KG
2,90000
UN
5,20000
UN
8,75000
KG
0,22000
KG
0,05000
Material
56,19912

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
234,95
3,78
17,18
11,40
2,69
1,94
0,67
4,67
4,87
BDI
29,11609

16.04.014
1.01.11
1.01.12
1.01.21
Exerccio:

QE-19 ARQUIBANCADA DE CONCRETO (PLAQUETA DE LAMINADO)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO

2011

M
H
H
H

1,78000
1,78000
0,25000

4,60
3,96
4,77

150,52
8,18800
7,04880
1,19250
0,95500
4,36160
5,97066
1,70575
0,63350
0,98050
2,01861
7,63588
10,13040
15,46200
3,30600
7,80100
10,08800
0,84060
0,24350

155,70
10,02800
8,63280
1,19250
0,95500
5,19680
5,70326
1,74598
0,28700
1,09705
2,01861
7,63588
12,39840
1,88980
4,10400
7,80100
10,08800
5,86250
1,02740
0,24350

156,01
8,18800
7,04880
1,19250
Pgina: 324

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.22
AJUDANTE DE FERREIRO
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.04
BLOCO DE CONCRETO 14X19X39CM - 6MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.35.62
PLAQUETA LAMINADA PARA REVESTIMENTO
Mo-de-Obra 31,48956
LS
38,41726
SubMO

UN Coeficiente

Custo Unit.

Custo Total

69,90682

H
0,25000
H
0,70000
H
0,87000
H
1,70300
M3
0,02530
KG
2,22000
KG
2,69500
M3
0,03300
M3
0,03250
M
2,68000
M2
0,09000
M2
0,29000
KG
2,90000
UN
5,20000
KG
0,18000
KG
0,05000
M2
0,37000
Material
56,93637

3,82
5,09
4,64
3,82
80,46
0,35
0,37
61,17
234,95
3,78
17,18
11,40
2,69
1,94
4,67
4,87
25,72
BDI
29,17394

16.04.016
QUADRA DE ESPORTES-PISO DE CONCRETO ARMADO-FUND. DIRETA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.56
TINTA BETUMINOSA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.70.10
ARAME RECOZIDO N.18
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 2,51925
LS
3,07348
SubMO
5,59272

M2
H
0,03750
H
0,03750
H
0,20000
H
0,03750
H
0,03750
H
0,20000
H
0,02660
M3
0,08000
M3
0,08000
UN
0,27800
M
0,90000
M2
1,18000
M2
1,10000
L
0,06000
UN
0,02800
M
0,09200
KG
0,02850
KG
0,25000
KG
0,04800
UN
0,02830
M2
1,00000
L
0,01560
H
0,02130
H
0,00530
Material
57,73286

4,77
3,82
4,64
4,74
3,80
3,82
6,95
69,64
251,78
1,78
3,17
10,03
0,91
6,23
25,87
0,12
4,87
6,43
21,44
4,61
11,33
6,08
17,83
2,89
BDI
14,56489

16.04.017
QE-37 TABELA DE BASQUETE (FUNDACAO DIRETA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.29
FORMA DE TUBO DE PAPELAO DIAM.30 CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.50.17
ACO ESTRUTURAL NAO PATINAVEL ASTM OU ABNT-MATERIAL
2.50.20
MONTAGEM DE ESTRUTURA METALICA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.67.09
TABELA DE BASQUETE COM ARO E CESTO
3.76.50
GALVANIZACAO A FOGO
Mo-de-Obra 309,54000
LS
377,63880
SubMO
687,17880

UN
H
4,46000
H
5,97000
H
10,40000
H
10,40000
H
9,11000
H
35,02000
M3
0,36300
KG
173,40000
M3
0,49000
M3
6,95000
M
4,32000
M2
1,55000
M
3,90000
KG
117,00000
KG
3,00000
KG
50,00000
KG
50,00000
KG
0,47000
KG
2,10000
UN
1,00000
KG
52,00000
Material
3.876,00598

5.612,71
4,60
20,51600
3,96
23,64120
4,77
49,60800
3,82
39,72800
4,64
42,27040
3,82
133,77640
80,46
29,20698
0,37
64,15800
61,17
29,97330
251,78
1.749,87100
2,09
9,02880
17,18
26,62900
75,03
292,61700
2,69
314,73000
2,70
8,10000
10,14
507,00000
2,18
109,00000
4,67
2,19490
4,87
10,22700
631,75
631,75000
1,76
91,52000
BDI
1.049,53250

16.04.019
1.01.11
1.01.12
1.01.21
1.01.22
Exerccio:

FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - FUNDO - BROCA


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO

2011

M
H
H
H
H

0,83000
0,83000
0,63000
0,63000

4,60
3,96
4,77
3,82

0,95500
3,56300
4,03680
6,50546
2,03564
0,77700
0,99715
2,01861
7,63588
10,13040
1,54620
3,30600
7,80100
10,08800
0,84060
0,24350
9,51640

77,89
0,17888
0,14325
0,92800
0,17775
0,14250
0,76400
0,18487
5,57120
20,14240
0,49484
2,85300
11,83540
1,00100
0,37380
0,72436
0,01104
0,13880
1,60750
1,02912
0,13046
11,33000
0,09485
0,37978
0,01532

629,43
3,81800
3,28680
3,00510
2,40660
Pgina: 325

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.70.31
ARAME GALVANIZADO No. 16
2.75.09
TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2"
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.13
TINTA LATEX ECONOMICA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.09
SELADOR P/PINTURA LATEX
3.80.12
LIXA PARA FERRO
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.15
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM)
6.05.16
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM)
Mo-de-Obra 87,08796
LS
106,24731
SubMO
16.04.020
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.44
1.01.45
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.05.22
2.05.36
2.10.09
2.10.14
2.10.21
2.15.25
2.15.38
2.25.77
2.25.96
2.40.09
2.40.10
2.67.60
2.70.10
2.70.31
2.75.09
3.75.07
3.75.13
3.75.91
3.80.09
3.80.12
3.80.40
3.80.66
6.05.15
6.05.16

Exerccio:

UN Coeficiente

193,33527

FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - FUNDO - SAPATA


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
PEDRISCO
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
PONTALETE PINHO DE 3"X3"
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-50-A $MD BITOLAS
ACO CA-60-B $MD BITOLAS
BLOCO DE CONCRETO 14X19X39CM - 3MPa
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
EMULSAO ADESIVA PVA
PREGO
ARAME RECOZIDO N.18
ARAME GALVANIZADO No. 16
TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2"
TINTA ESMALTE SINTETICO - ALUMINIO
TINTA LATEX ECONOMICA
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
SELADOR P/PINTURA LATEX
LIXA PARA FERRO
LIXA D"AGUA
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM)
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM)

2011

H
3,38400
H
1,37500
H
1,37500
H
1,50000
H
1,50000
H
7,46000
M3
0,09900
KG
12,80000
KG
35,61000
M3
0,04600
M3
0,00600
M3
0,11800
M
0,91000
M
0,80000
M2
0,64000
KG
7,64000
KG
2,03000
UN
13,00000
UN
2,60000
KG
4,08000
KG
0,20000
KG
0,14000
KG
0,12000
KG
0,70000
M2
4,00000
L
0,14170
L
0,49000
L
0,00600
L
0,39000
UN
0,28170
UN
0,58000
L
0,08540
M
2,64000
M
2,46000
Material
318,40088
M
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M3
M3
M
M
M2
KG
KG
UN
UN
KG
KG
KG
KG
KG
M2
L
L
L
L
UN
UN
L
M
M

0,61300
0,61300
0,39100
0,39100
3,35000
1,37500
1,37500
1,50000
1,50000
6,87000
0,10100
12,80000
25,43000
0,02000
0,00600
0,07200
0,91000
0,40000
0,25000
2,46000
2,04000
13,00000
2,60000
4,68000
0,23400
0,10000
0,07800
0,70000
4,00000
0,14170
0,49000
0,00600
0,39000
0,28170
0,58000
0,08540
2,64000
2,46000

Custo Unit.

Custo Total

4,64
4,74
3,80
8,08
4,34
3,82
80,46
0,35
0,37
61,17
66,21
251,78
3,78
2,09
17,18
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
7,65
24,23
14,18
4,23
159,27
10,36
1,47
0,72
14,74
8,78
16,18
BDI
117,69932

4,60
3,96
4,77
3,82
4,64
4,74
3,80
8,08
4,34
3,82
80,46
0,35
0,37
61,17
66,21
251,78
3,78
2,09
17,18
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
7,65
24,23
14,18
4,23
159,27
10,36
1,47
0,72
14,74
8,78
16,18

15,70176
6,51750
5,22500
12,12000
6,51000
28,49720
7,96554
4,48000
13,17570
2,81382
0,39726
29,71004
3,43980
1,67200
10,99520
20,55160
5,48100
25,22000
6,52600
6,07920
2,23000
0,65380
0,58440
5,35500
96,92000
2,00931
2,07270
0,95562
4,04040
0,41410
0,41760
1,25880
23,17920
39,80280

566,24
2,81980
2,42748
1,86507
1,49362
15,54400
6,51750
5,22500
12,12000
6,51000
26,24340
8,12646
4,48000
9,40910
1,22340
0,39726
18,12816
3,43980
0,83600
4,29500
6,61740
5,50800
25,22000
6,52600
6,97320
2,60910
0,46700
0,37986
5,35500
96,92000
2,00931
2,07270
0,95562
4,04040
0,41410
0,41760
1,25880
23,17920
39,80280

Pgina: 326

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 80,76587

LS

98,53436

UN Coeficiente
SubMO

179,30023

Material

281,06126

Custo Unit.
BDI

Custo Total

105,88314

16.04.031
FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - LATERAIS - BROCA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.70.31
ARAME GALVANIZADO No. 16
2.75.09
TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2"
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.13
TINTA LATEX ECONOMICA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.09
SELADOR P/PINTURA LATEX
3.80.12
LIXA PARA FERRO
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.15
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM)
6.05.16
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM)
Mo-de-Obra 58,01248
LS
70,77523
SubMO
128,78771

M
H
0,60000
H
0,60000
H
0,51200
H
0,51200
H
1,89300
H
0,83200
H
0,83200
H
1,00000
H
1,00000
H
5,28000
M3
0,07400
KG
5,75000
KG
25,28000
M3
0,03900
M3
0,00600
M3
0,11400
M
0,36000
M
0,80000
M2
0,58000
KG
6,66000
KG
1,87000
UN
5,20000
UN
2,60000
KG
4,08000
KG
0,21000
KG
0,10400
KG
0,10300
KG
0,70000
M2
2,40000
L
0,14010
L
0,19000
L
0,00500
L
0,15000
UN
0,27890
UN
0,22000
L
0,08430
M
2,64000
M
1,16000
Material
223,19617

4,60
3,96
4,77
3,82
4,64
4,74
3,80
8,08
4,34
3,82
80,46
0,35
0,37
61,17
66,21
251,78
3,78
2,09
17,18
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
7,65
24,23
14,18
4,23
159,27
10,36
1,47
0,72
14,74
8,78
16,18
BDI
80,95629

16.04.034
FQ-02 ALAMBRADO SOBRE DIVISA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
2.70.31
ARAME GALVANIZADO No. 16
2.75.09
TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2"
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.12
LIXA PARA FERRO
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.15
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM)
6.05.16
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM)
SubMO
Mo-de-Obra 7,00187
LS
8,54228

M2
H
0,13810
H
0,13810
H
0,46880
H
0,46880
KG
0,21880
M2
1,00000
L
0,03910
L
0,00400
UN
0,07720
L
0,02330
M
1,31300
M
0,56700
Material
48,25446

4,74
3,80
8,08
4,34
7,65
24,23
14,18
159,27
1,47
14,74
8,78
16,18
BDI
14,67368

16.04.035
1.01.39
1.01.40
1.01.41
1.01.44
1.01.45
1.01.46
2.05.03
2.05.08
2.05.22
2.66.82
2.67.37
2.75.04
3.10.55
3.75.07
3.75.91
3.80.12
Exerccio:

15,54415

FQ-04 ALAMBRADO COM PERFIL E TELA SOLDADA - GALVANIZADOS


PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
AREIA
CIMENTO
PEDRISCO
PERFIL "U" ENRIJECIDO 60X45X20MM CH.14 GALV.
PARAFUSO FRANCES 5/16"X3/4" C/PORCAS E ARRUELAS GA
TELA ALAMBRADO SOLDADA GALV.FIO 3,0MM MALHA 5X15CM
FIXACAO (FERRO TRABALHADO)
TINTA ESMALTE SINTETICO - ALUMINIO
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
LIXA PARA FERRO

2011

M2
H
H
H
H
H
H
M3
KG
M3
M
CJ
M2
KG
L
L
UN

0,12380
0,13810
0,13810
1,50000
1,50000
0,50000
0,00400
1,36000
0,00130
1,18000
1,60000
1,10000
0,11890
0,03910
0,00500
0,07720

4,64
4,74
3,80
8,08
4,34
3,82
80,46
0,37
66,21
37,49
0,28
12,84
43,56
14,18
159,27
1,47

432,94
2,76000
2,37600
2,44224
1,95584
8,78352
3,94368
3,16160
8,08000
4,34000
20,16960
5,95404
2,01250
9,35360
2,38563
0,39726
28,70292
1,36080
1,67200
9,96440
17,91540
5,04900
10,08800
6,52600
6,07920
2,34150
0,48568
0,50161
5,35500
58,15200
1,98662
0,80370
0,79635
1,55400
0,40998
0,15840
1,24258
23,17920
18,76880

78,47
0,65459
0,52478
3,78790
2,03459
1,67382
24,23000
0,55444
0,63708
0,11348
0,34344
11,52814
9,17406

142,92
0,57443
0,65459
0,52478
12,12000
6,51000
1,91000
0,32184
0,50320
0,08607
44,23820
0,44800
14,12400
5,17928
0,55444
0,79635
0,11348
Pgina: 327

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
SubMO
Mo-de-Obra 22,29381
LS
27,19844

L
49,49225

16.04.036
FQ-01 FECHAMENTO PARA QUADRA DE ESPORTES - LATERAIS - SAPATA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.77
BLOCO DE CONCRETO 14X19X39CM - 3MPa
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.70.31
ARAME GALVANIZADO No. 16
2.75.09
TELA ARAME GALV (FIO 10) EM MALHA QUADRADA 2"
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.75.13
TINTA LATEX ECONOMICA
3.75.91
GALVANIZACAO A FRIO (TINTA RICA EM ZINCO)
3.80.09
SELADOR P/PINTURA LATEX
3.80.12
LIXA PARA FERRO
3.80.40
LIXA D"AGUA
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.15
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=32MM)
6.05.16
TUBO DE ACO GALVANIZADO ESP PAREDE 2MM (DN=50MM)
Mo-de-Obra 53,10234
LS
64,78485
SubMO
117,88720

Material

16.04.099
SERVICOS DE QUADRAS DE ESPORTES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

Exerccio:

2011

SubMO

0,00000

0,02330
66,70831

M
H
0,38000
H
0,38000
H
0,27400
H
0,27400
H
1,92000
H
0,83200
H
0,83200
H
1,00000
H
1,00000
H
4,99000
M3
0,20900
KG
5,75000
KG
17,73000
M3
0,02000
M3
0,00600
M3
0,06500
M
0,36000
M
0,40000
M2
0,16000
KG
1,40000
KG
1,75000
UN
5,20000
UN
2,60000
KG
4,68000
KG
0,23400
KG
0,06400
KG
0,05400
KG
0,70000
M2
2,40000
L
0,14010
L
0,19000
L
0,00500
L
0,15000
UN
0,27890
UN
0,22000
L
0,08430
M
2,64000
M
1,16000
Material
195,97649

16.04.043
QE-23 ESPACO MULTIESPORTIVO/PISO DE CONCR. ARMADO/FUND. DIRET - 160 M2
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.23
BRITA GRADUADA
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.15.07
BARRA DE TRANSF AO LISO D=12,5MM (C=35CM)
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
2.40.56
TINTA BETUMINOSA
2.40.91
SELANTE POLIURETANO BISNAGA 300ML DUREZA SHORE A30
2.40.93
BAGUETE PLASTICO TIPO TARUCEL D=6MM
2.70.10
ARAME RECOZIDO N.18
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
8.01.16
ROLO COMPACTADOR LISO 1000KG
8.01.20
PLACA VIBRATORIA - 90KG
Mo-de-Obra 403,15287
LS
491,84650
Material
SubMO
894,99937

Custo Unit.
BDI

Custo Total

14,74
26,72613

4,60
3,96
4,77
3,82
4,64
4,74
3,80
8,08
4,34
3,82
80,46
0,35
0,37
61,17
66,21
251,78
3,78
2,09
17,18
2,69
2,70
1,94
2,51
1,49
11,15
4,67
4,87
7,65
24,23
14,18
4,23
159,27
10,36
1,47
0,72
14,74
8,78
16,18
BDI
72,18865

0,34344

386,05
1,74800
1,50480
1,30698
1,04668
8,90880
3,94368
3,16160
8,08000
4,34000
19,06180
16,81614
2,01250
6,56010
1,22340
0,39726
16,36570
1,36080
0,83600
2,74880
3,76600
4,72500
10,08800
6,52600
6,97320
2,60910
0,29888
0,26298
5,35500
58,15200
1,98662
0,80370
0,79635
1,55400
0,40998
0,15840
1,24258
23,17920
18,76880

UN
H
6,00000
H
6,00000
H
32,00000
H
6,00000
H
6,00000
H
32,00000
H
4,26660
M3
12,80000
M3
12,80000
UN
34,00000
M
144,00000
M2
189,00000
M2
176,00000
L
9,52000
UN
18,60000
M
11,00000
KG
4,60000
KG
40,00000
KG
7,70000
UN
6,00000
M2
160,00000
L
2,50000
H
3,41330
H
0,85330
9.592,49278

12.899,61
4,77
28,62000
3,82
22,92000
4,64
148,48000
4,74
28,44000
3,80
22,80000
3,82
122,24000
6,95
29,65287
69,64
891,39200
251,78
3.222,78400
1,78
60,52000
3,17
456,48000
10,03
1.895,67000
0,91
160,16000
6,23
59,30960
25,87
481,18200
0,12
1,32000
4,87
22,40200
6,43
257,20000
21,44
165,08800
4,61
27,66000
11,33
1.812,80000
6,08
15,20000
17,83
60,85914
2,89
2,46604
BDI
2.412,12319

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

Pgina: 328

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

16.05.004
CA-05 CANALETA P/ AGUAS PLUVIAIS (L=60CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
Mo-de-Obra 5,15760
LS
6,29227
SubMO
16.05.005
CA-06 CANALETA P/ AGUAS PLUVIAIS (L=90CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
Mo-de-Obra 7,19600
LS
8,77912
SubMO

UN Coeficiente

11,44987

15,97512

Custo Unit.

Custo Total

Material

M
H
0,42000
H
0,84000
M3
0,05300
M2
0,01000
12,56635

4,64
3,82
234,95
11,40
BDI
5,52373

Material

M
H
0,53000
H
1,24000
M3
0,08000
M2
0,01000
18,91000

4,64
3,82
234,95
11,40
BDI
8,02358

16.05.012
CA-11 CAIXA DE AREIA COM GRELHA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
6.76.08
CA-11 GRELHA DE FERRO 20 X 20 CM
Mo-de-Obra 51,24930
LS
62,52415
SubMO
113,77345

UN
H
0,74000
H
0,74000
H
0,07000
H
0,07000
H
3,03000
H
7,92000
M3
0,08500
KG
6,24000
KG
22,94000
M3
0,03400
M
1,11000
M2
0,04000
M2
0,12000
KG
0,81000
UN
77,00000
KG
0,36000
KG
0,07000
KG
0,01000
UN
1,00000
Material
121,84618

BDI

16.05.030
CA-20 CANALETA DE AGUAS PLUVIAIS EM CONCRETO (15CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.60
PREGO
Mo-de-Obra 19,97161
LS
24,36536
SubMO
44,33697

M
H
1,45200
H
1,45200
H
0,31200
H
1,59550
M3
0,05200
M
2,64000
M2
0,66000
KG
0,26400
Material
26,49188

4,60
3,96
4,64
3,82
234,95
2,09
11,40
4,67
BDI
16,29064

16.05.031
CA-21 CANALETA DE AGUAS PLUVIAIS EM CONCRETO (20CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.60
PREGO
Mo-de-Obra 20,35882
LS
24,83776
SubMO
45,19658

M
H
1,45200
H
1,45200
H
0,33000
H
1,67500
M3
0,05500
M
2,64000
M2
0,66000
KG
0,26400
Material
27,19673

4,60
3,96
4,64
3,82
234,95
2,09
11,40
4,67
BDI
16,65046

16.05.032
CA-22 CANALETA DE AGUAS PLUVIAIS EM CONCRETO (30CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.30
CONCRETO DOSADO (CONDICAO-A) FCK 15 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.67.60
PREGO
Mo-de-Obra 21,15425
LS
25,80819
SubMO
46,96244

M
H
1,45200
H
1,45200
H
0,36600
H
1,83950
M3
0,06100
M
2,64000
M2
0,66000
KG
0,26400
Material
28,60643

4,60
3,96
4,64
3,82
234,95
2,09
11,40
4,67
BDI
17,38084

16.05.036
1.01.39
1.01.46
2.05.03
2.05.08
2.05.17
Exerccio:

CANALETA DE CONCRETO 1/2 CANA DN 30CM P/ AGUAS PLUVIAIS


PEDREIRO
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 1

2011

M
H
H
M3
KG
M3

0,20000
1,00000
0,00050
0,22600
0,03580

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
3,78
17,18
11,40
2,69
0,22
2,50
4,67
4,87
75,61
54,19251

4,64
3,82
80,46
0,37
62,03

29,53
1,94880
3,20880
12,45235
0,11400

42,90
2,45920
4,73680
18,79600
0,11400

289,81
3,40400
2,93040
0,33390
0,26740
14,05920
30,25440
6,83910
2,18400
8,48780
2,07978
4,19580
0,68720
1,36800
2,17890
16,94000
0,90000
0,32690
0,04870
75,61000

87,11
6,67920
5,74992
1,44768
6,09481
12,21740
5,51760
7,52400
1,23288

89,04
6,67920
5,74992
1,53120
6,39850
12,92225
5,51760
7,52400
1,23288

92,94
6,67920
5,74992
1,69824
7,02689
14,33195
5,51760
7,52400
1,23288

39,25
0,92800
3,82000
0,04023
0,08362
2,22067
Pgina: 329

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.80.41
CANALETA CONCRETO 30X100CM (DXC)
Mo-de-Obra 4,74800
LS
5,79256

UN Coeficiente
SubMO

10,54056

Material

UN
1,00000
21,37452

16.05.037
CANALETA DE CONCRETO 1/2 CANA DN 40CM P/ AGUAS PLUVIAIS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
6.80.40
CANALETA CONCRETO DIAM 40 CM
Mo-de-Obra 6,08671
LS
7,42579
SubMO
13,51250

M
H
0,23330
H
1,31000
M3
0,00110
KG
0,45500
M3
0,05030
UN
1,00000
Material
27,84697

16.05.038
CANALETA DE CONCRETO 1/2 CANA DN 50CM P/ AGUAS PLUVIAIS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
6.80.90
CANALETA DE CONCRETO 1/2 CANA DN 50CM
Mo-de-Obra 7,88320
LS
9,61750
SubMO
17,50070

M
H
0,25000
H
1,76000
M3
0,00160
KG
0,68000
M3
0,06680
M
1,00000
Material
33,31394

16.05.039
CANALETA DE CONCRETO 1/2 CANA DN 60CM P/ AGUAS PLUVIAIS
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
6.80.91
CANALETA DE CONCRETO 1/2 CANA DN 60CM
Mo-de-Obra 9,91060
LS
12,09093
SubMO
22,00153

M
H
0,30000
H
2,23000
M3
0,00210
KG
0,90500
M3
0,08560
M
1,00000
Material
49,33358

16.05.040
TC-03 TAMPA DE CONCRETO P/ CANALETA AP (20CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.65.50
TC-03 PLACA DE CONCRETO PRE-MOLDADO 59,5X19,5X5CM
Mo-de-Obra 3,07000
LS
3,74540
SubMO

6,81540

M
H
0,25000
H
0,50000
UN
1,70000
Material
43,84300

6,81540

M
H
0,25000
H
0,50000
UN
1,70000
Material
52,93800

6,81540

M
H
0,25000
H
0,50000
UN
1,70000
Material
61,79500

16.05.041
TC-04 TAMPA DE CONCRETO P/ CANALETA AP (25CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.65.51
TC-04 PLACA DE CONCRETO PRE-MOLDADO 59,5X24,5X5CM
Mo-de-Obra 3,07000
LS
3,74540
SubMO
16.05.042
TC-05 TAMPA DE CONCRETO P/ CANALETA AP (35CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.65.52
TC-05 PLACA DE CONCRETO PRE-MOLDADO 59,5X34,5X5CM
Mo-de-Obra 3,07000
LS
3,74540
SubMO

16.05.043
TC-06 TAMPA EM GRELHA DE FERRO GALVANIZADO P/ CANALETA (20CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.65
CANTONEIRA DE 1'X1'X1/8'
6.75.68
TC-06 GRELHA FERRO GALV (PERFIL 3/4"X1/4") L=20CM
Mo-de-Obra 5,64282
LS
6,88424
SubMO
12,52706
16.05.044
TC-07 TAMPA EM GRELHA DE FERRO GALVANIZADO P/ CANALETA (25CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.65
CANTONEIRA DE 1'X1'X1/8'
6.75.69
TC-07 GRELHA FERRO GALV (PERFIL 3/4"X1/4") L=25CM
Mo-de-Obra 5,64282
LS
6,88424
SubMO
12,52706
16.05.045
TC-08 TAMPA EM GRELHA DE FERRO GALVANIZADO P/ CANALETA (35CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.66.65
CANTONEIRA DE 1'X1'X1/8'
6.75.70
TC-08 GRELHA FERRO GALV (PERFIL 3/4"X1/4") L=35CM
Mo-de-Obra 5,64282
LS
6,88424
SubMO
12,52706
16.05.046
1.01.39
1.01.46
3.65.53

Exerccio:

TC-09 TAMPA DE CONCRETO PRE-MOLDADA PERF. P/ CANALETA L=20CM


PEDREIRO
SERVENTE
TC-09 PLACA DE CONCR. PRE-MOLD PERF. 59,5X19,5X5CM

2011

Custo Unit.

Custo Total

BDI

19,03
7,34047

BDI

4,64
3,82
80,46
0,37
62,03
24,47
9,51268

BDI

4,64
3,82
80,46
0,37
62,03
28,79
11,68737

BDI

4,64
3,82
80,46
0,37
62,03
43,52
16,40708

BDI

4,64
3,82
25,79
11,65143

BDI

4,64
3,82
31,14
13,74328

BDI

4,64
3,82
36,35
15,78039

19,03000

50,87
1,08251
5,00420
0,08851
0,16835
3,12011
24,47000

62,50
1,16000
6,72320
0,12874
0,25160
4,14360
28,79000

87,74
1,39200
8,51860
0,16897
0,33485
5,30977
43,52000

62,30
1,16000
1,91000
43,84300

73,49
1,16000
1,91000
52,93800

84,39
1,16000
1,91000
61,79500

Material

M
H
0,66700
H
0,66700
M
2,20000
M
1,00000
233,28400

302,34
4,64
3,09488
3,82
2,54794
3,22
7,08400
226,20
226,20000
BDI
56,53654

Material

M
H
0,66700
H
0,66700
M
2,20000
M
1,00000
253,44400

327,14
4,64
3,09488
3,82
2,54794
3,22
7,08400
246,36
246,36000
BDI
61,17334

Material

M
H
0,66700
H
0,66700
M
2,20000
M
1,00000
291,19400

373,57
4,64
3,09488
3,82
2,54794
3,22
7,08400
284,11
284,11000
BDI
69,85584

M
H
H
UN

0,25000
0,50000
1,70000

4,64
3,82
25,18

61,03
1,16000
1,91000
42,80600

Pgina: 330

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 3,07000

LS

3,74540

UN Coeficiente
SubMO

6,81540

Material

42,80600

Custo Unit.

Custo Total

BDI

11,41292

BDI

4,64
3,82
28,32
12,64066

4,64
3,82
38,01
16,42945

16.05.047
TC-10 TAMPA DE CONCRETO PRE-MOLDADA PERF. P/ CANALETA L=25CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.65.54
TC-10 PLACA DE CONCR. PRE-MOLD PERF. 59,5X24,5X5CM
Mo-de-Obra 3,07000
LS
3,74540
SubMO
6,81540

M
H
0,25000
H
0,50000
UN
1,70000
Material
48,14400

16.05.048
TC-11 TAMPA DE CONCRETO PRE-MOLDADA PERF. P/ CANALETA L=35CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.65.55
TC-11 PLACA DE CONCR. PRE-MOLD PERF. 59,5X34,5X5CM
Mo-de-Obra 3,07000
LS
3,74540
SubMO
6,81540

M
H
0,25000
H
0,50000
UN
1,70000
Material
64,61700

BDI

16.05.099
SERVICOS DE DRENAGENS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

74,56332

M
H
1,38500
H
1,38500
H
0,38000
H
0,38000
H
1,29000
H
0,64200
H
0,60400
H
1,87000
M3
0,02000
KG
0,07000
KG
13,74000
M3
0,01600
M3
0,07300
M2
0,08400
M2
0,20000
KG
3,78000
UN
14,00000
L
0,14700
UN
0,18000
L
0,11400
L
0,19000
M
1,12000
Material
65,13386

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
241,38
17,18
11,40
2,70
0,22
6,66
0,72
11,49
20,07
14,80
BDI
32,13035

36,46572

M3
H
4,30000
M3
1,00000
Material
80,46000

BDI

3,82
80,46
26,89292

44,94612

M3
H
5,30000
M3
0,25000
M3
1,00000
Material
78,84500

BDI

3,82
80,46
58,73
28,47196

16.06.012
PG-02 TANQUE DE AREIA/PLAY-GROUND-MURETA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 34,55920
LS
42,16222
SubMO
76,72142

M
H
3,20000
H
5,16000
M3
0,06900
KG
5,98000
KG
17,42000
UN
84,00000
KG
0,39000
Material
33,54514

BDI

4,64
3,82
80,46
0,35
0,37
0,22
2,50
25,36131

0,00000

SubMO

16.06.001
BC-22 BANCO DE CONCRETO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
3.75.42
TINTA LATEX STANDARD
3.80.40
LIXA D"AGUA
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
6.25.07
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 75MM
Mo-de-Obra 33,58708
LS
40,97624
SubMO
16.06.010
PG-01 TANQUE DE AREIA/PLAY-GROUND-AREIA
1.01.46
SERVENTE
2.05.03
AREIA
Mo-de-Obra 16,42600
LS
20,03972

SubMO

16.06.011
PG-02 TANQUE DE AREIA/PLAY-GROUND-CASCALHO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.19
PEDRA BRITADA 3
Mo-de-Obra 20,24600
LS
24,70012
SubMO

16.06.015
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.08
2.05.18
2.10.21
Exerccio:

FL-01 FLOREIRA - CONCRETO


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 2
TABUAS PINHO DE 1"X12" DE 3A.

2011

M
H
H
H
H
H
H
M3
KG
M3
M2

4,00000
4,00000
0,67000
0,67000
0,61000
1,29000
0,04000
19,44000
0,04800
0,20000

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,37
61,17
17,18

67,60
1,16000
1,91000
48,14400

87,86
1,16000
1,91000
64,61700

171,82
6,37100
5,48460
1,81260
1,45160
5,98560
3,04308
2,29520
7,14340
1,60920
0,02450
5,08380
0,97872
17,62074
1,44312
2,28000
10,20600
3,08000
0,97902
0,12960
1,30986
3,81330
16,57600

143,81
16,42600
80,46000

152,26
20,24600
20,11500
58,73000

135,62
14,84800
19,71120
5,55174
2,09300
6,44540
18,48000
0,97500

207,77
18,40000
15,84000
3,19590
2,55940
2,83040
4,92780
3,21840
7,19280
2,93616
3,43600
Pgina: 331

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.05
BLOCO DE CONCRETO 19X19X39CM - 4MPa
2.40.56
TINTA BETUMINOSA
2.45.02
ARGILA EXPANDIDA
3.85.11
TERRA VEGETAL
Mo-de-Obra 47,75350
LS
58,25927

UN Coeficiente

Custo Unit.

Custo Total

106,01277

M2
0,66000
KG
7,80000
UN
0,60000
L
0,55000
M3
0,01600
M3
0,10000
Material
62,90930

11,40
2,69
2,51
6,23
231,34
89,86
BDI
38,85208

447,22744

CJ
H
1,94000
H
1,94000
H
9,78000
H
36,51000
M3
1,34700
M2
0,16000
M2
0,52800
UN
3,00000
Material
4.734,45686

6.373,47
4,60
8,92400
3,96
7,68240
4,64
45,37920
3,82
139,46820
241,38
325,13886
17,18
2,74880
11,40
6,01920
1.466,85
4.400,55000
BDI
1.191,78739

16.06.023
AL-01 ABRIGO PARA LIXO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.38
AL-01/AL-02 PORTAO C/ CHAPA PERFURADA GALV 1.20 X 2.40M
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.75.08
TINTA ESMALTE A BASE DE GUA
3.75.42
TINTA LATEX STANDARD
3.75.52
FUNDO PARA METAIS E MADEIRA BASE GUA
3.80.10
FUNDO PREPARADOR DE PAREDE
3.80.40
LIXA D"AGUA
6.25.02
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM
6.25.31
TUBO PVC P/ESGOTO 50MM
6.60.35
TORN.JARDIM/TANQUE CROM C/ENGATE DN 20MM (3/4")
6.75.01
CX SIFONADA PVC 150X150X50MM - C/GRELHA ALUMINIO
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
Mo-de-Obra 320,12496
LS
390,55245
SubMO
710,67741

UN
H
5,62600
H
5,62600
H
1,22000
H
1,70000
H
1,26000
H
1,26000
H
22,79000
H
4,50000
H
3,42000
H
28,27000
M3
0,35000
KG
77,47000
KG
72,90400
M3
0,52490
M2
0,30600
M2
0,99450
KG
12,96000
UN
82,00000
KG
0,60350
KG
0,34000
UN
1,00000
UN
1,00000
M2
7,96800
L
0,75000
L
1,75000
L
0,60000
L
1,40000
UN
2,10000
M
1,00000
M
1,00000
UN
1,00000
UN
1,00000
L
0,00080
L
0,00300
UN
0,00640
Material
1.339,46104

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
241,38
17,18
11,40
2,70
1,51
4,67
4,87
674,07
14,61
21,60
10,70
6,66
13,90
11,37
0,72
1,58
4,07
14,01
24,62
27,29
20,29
4,48
BDI
471,53184

SubMO

16.06.022
MB-03 MASTRO PARA BANDEIRAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
3.67.02
MASTRO P/BANDEIRA DE ACO 10M - COMPLETO (MB-03)
Mo-de-Obra 201,45380
LS
245,77364
SubMO

16.06.024
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.35
2.10.21
2.10.32
2.15.38
Exerccio:

AL-02 ABRIGO PARA RESDUOS RECICLVEIS


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-60-B $MD BITOLAS

2011

UN
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M2
M2
KG

5,62600
5,62600
1,22000
1,70000
1,26000
1,26000
22,79000
4,50000
3,42000
28,27000
0,35000
77,47000
72,90400
0,52490
0,30600
0,99450
12,96000

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,35
0,37
241,38
17,18
11,40
2,70

7,52400
20,98200
1,50600
3,42650
3,70144
8,98600

2.521,67
25,87960
22,27896
6,16100
6,91900
6,01020
4,81320
105,74560
21,33000
12,99600
107,99140
28,16100
27,11450
26,97448
126,70036
5,25708
11,33730
34,99200
123,82000
2,81835
1,65580
674,07000
14,61000
172,10880
8,02500
11,65500
8,34000
15,91800
1,51200
1,58000
4,07000
14,01000
24,62000
0,02183
0,06087
0,02867

2.521,67
25,87960
22,27896
6,16100
6,91900
6,01020
4,81320
105,74560
21,33000
12,99600
107,99140
28,16100
27,11450
26,97448
126,70036
5,25708
11,33730
34,99200
Pgina: 332

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.25.02
BLOCO DE CONCRETO 9X19X39CM - 3MPa
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.11.38
AL-01/AL-02 PORTAO C/ CHAPA PERFURADA GALV 1.20 X 2.40M
3.17.19
CADEADO LATAO CIL. TRAVA DUPLA 35 MM
3.20.01
AZULEJO LISO BRANCO BRILHANTE
3.75.08
TINTA ESMALTE A BASE DE GUA
3.75.42
TINTA LATEX STANDARD
3.75.52
FUNDO PARA METAIS E MADEIRA BASE GUA
3.80.10
FUNDO PREPARADOR DE PAREDE
3.80.40
LIXA D"AGUA
6.25.02
TUBO PVC JUNTA SOLDAVEL CLASSE 15 - 25MM
6.25.31
TUBO PVC P/ESGOTO 50MM
6.60.35
TORN.JARDIM/TANQUE CROM C/ENGATE DN 20MM (3/4")
6.75.01
CX SIFONADA PVC 150X150X50MM - C/GRELHA ALUMINIO
6.95.13
ADESIVO PARA TUBOS PVC
6.95.14
SOLUCAO LIMPADORA P/ PVC
6.95.52
FITA VEDANTE PARA ROSCA ROLO 3/4" X 50 M
SubMO
710,67741
Mo-de-Obra 320,12496
LS
390,55245
16.06.035
PI-01 BASE P/PORTICO DE IDENTIFICACAO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.15.25
ACO CA-50-A $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 25,44810
LS
31,04668

SubMO

16.06.050
CANTEIRO DE OBRAS - LARG 2,20M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.01
CAIBRO PEROBA DE 5X6CM
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.10.60
RIPA DE PEROBA 1X5CM
2.56.61
TELHA TECNOLOGIA CRFS ONDULADA 6MM
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
2.67.60
PREGO
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.39
LIXA PARA MADEIRA
6.96.02
MODULO DE VERBA
Mo-de-Obra 39,73031
LS
48,47098
SubMO
16.06.051
1.01.11
1.01.12
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.08
2.05.18
2.10.01
2.10.05
2.10.32
2.10.60
2.56.61
2.66.07
2.67.60
3.75.13
3.80.09
3.80.39
Exerccio:

CANTEIRO DE OBRAS - LARG 3.30M


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 2
CAIBRO PEROBA DE 5X6CM
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
CHAPA COMPENSADA RESINADA E=12MM
RIPA DE PEROBA 1X5CM
TELHA TECNOLOGIA CRFS ONDULADA 6MM
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
PREGO
TINTA LATEX ECONOMICA
SELADOR P/PINTURA LATEX
LIXA PARA MADEIRA

2011

UN
82,00000
KG
0,60350
KG
0,34000
UN
1,00000
UN
1,00000
M2
7,96800
L
0,75000
L
1,75000
L
0,60000
L
1,40000
UN
2,10000
M
1,00000
M
1,00000
UN
1,00000
UN
1,00000
L
0,00080
L
0,00300
UN
0,00640
Material
1.339,46104

Custo Unit.

Custo Total

1,51
4,67
4,87
674,07
14,61
21,60
10,70
6,66
13,90
11,37
0,72
1,58
4,07
14,01
24,62
27,29
20,29
4,48
BDI
471,53184

56,49478

UN
H
0,81000
H
0,81000
H
0,98000
H
3,65000
M3
0,09800
KG
53,79000
M3
0,13000
KG
9,35000
KG
0,16000
Material
61,78198

BDI

88,20129

M2
H
1,68200
H
1,65200
H
0,98150
H
1,06200
H
0,94400
H
3,21360
M3
0,05890
KG
20,74000
M3
0,18960
M
2,57250
M3
0,00300
M2
0,42900
M
1,81200
M2
0,64400
UN
0,80000
KG
0,04950
L
0,59000
L
0,47200
UN
0,70800
MV
0,10000
Material
89,23453

4,60
3,96
4,64
4,74
3,80
3,82
80,46
0,37
61,17
4,32
1.393,66
11,40
2,20
12,91
0,49
4,67
4,23
10,36
0,35
244,82
BDI
40,81024

M2
H
H
H
H
H
H
M3
KG
M3
M
M3
M2
M
M2
UN
KG
L
L
UN

1,36000
1,34000
0,87000
0,82800
0,73600
2,77000
0,05000
18,41000
0,89000
2,15000
0,00270
0,33330
1,61000
0,58200
0,70000
0,04000
0,46000
0,36800
0,55200

4,77
3,82
4,64
3,82
80,46
0,37
62,03
2,69
4,87
27,20366

4,60
3,96
4,64
4,74
3,80
3,82
80,46
0,37
61,17
4,32
1.393,66
11,40
2,20
12,91
0,49
4,67
4,23
10,36
0,35

123,82000
2,81835
1,65580
674,07000
14,61000
172,10880
8,02500
11,65500
8,34000
15,91800
1,51200
1,58000
4,07000
14,01000
24,62000
0,02183
0,06087
0,02867

145,48
3,86370
3,09420
4,54720
13,94300
7,88508
19,90230
8,06390
25,15150
0,77920

218,24
7,73720
6,54192
4,55416
5,03388
3,58720
12,27595
4,73909
7,67380
11,59783
11,11320
4,18098
4,89060
3,98640
8,31404
0,39200
0,23117
2,49570
4,88992
0,24780
24,48200

260,60
6,25600
5,30640
4,03680
3,92472
2,79680
10,58140
4,02300
6,81170
54,44130
9,28800
3,76288
3,79962
3,54200
7,51362
0,34300
0,18680
1,94580
3,81248
0,19320
Pgina: 333

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

6.96.02
MODULO DE VERBA
Mo-de-Obra 32,90212

LS

40,14059

UN Coeficiente
SubMO

16.06.061
TAPUME MOVEL - H=1,10M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.10.31
CHAPA COMPENSADA RESINADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.67.60
PREGO
3.75.13
TINTA LATEX ECONOMICA
Mo-de-Obra 3,15781
LS
3,85253
SubMO
16.06.062
TAPUME FIXO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
2.10.31
CHAPA COMPENSADA RESINADA E=10MM
2.10.38
PONTALETE DE PINHO DE 3"X3" DE 2a CONSTRUCAO
2.67.60
PREGO
3.75.13
TINTA LATEX ECONOMICA
SubMO
Mo-de-Obra 2,59175
LS
3,16193
16.06.065
ANDAIME - FACHADA - ALUGUEL MENSAL
2.12.10
ANDAIME-FACHADA-ALUGUEL MENSAL
Mo-de-Obra 0,00000
LS
0,00000
16.06.066
ANDAIME - TORRE - ALUGUEL MENSAL
2.12.21
ANDAIME TIPO TORRE - ALUGUEL MENSAL
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

16.06.076
FORNECIMENTO E INSTALAAO DE PLACAS DE OBRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.67.60
PREGO
3.87.30
FORNECIMENTO DE PLACA DE OBRA
Mo-de-Obra 8,38880
LS
10,23434
SubMO
16.06.077
MANUTENO MENSAL DE PLACAS DE OBRA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
Mo-de-Obra 2,75632
LS
3,36271
16.06.080
TRANSPORTE COM CAMINHAO ATE 6T
2.03.52
TRANSPORTE COM CAMINHAO ATE 6T
Mo-de-Obra 0,00000
LS
0,00000
16.06.081
TRANSPORTE COM UTILITARIO ATE 3 T
2.03.53
TRANSPORTE COM PICK-UP ATE 3T
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

SubMO

MV
0,16000
138,83460

73,04271

Material

7,01033

M
H
0,20880
H
0,20880
H
0,13200
H
0,19600
M2
1,10000
M
1,50000
KG
0,01710
L
0,18250
Material
19,13583

5,75368

M2
H
0,15660
H
0,15650
H
0,12120
H
0,17820
M2
1,05000
M
1,36000
KG
0,00800
L
0,16700
Material
17,82107

0,00000

M2
M2
1,00000
Material
5,42000

0,00000

Material

M
M
1,00000
13,28000

18,62314

M2
H
0,98000
H
0,98000
M3
0,03400
KG
0,26000
M2
1,00000
Material
123,59864

6,11903

M2
H
0,32200
H
0,32200
Material
0,00000

0,00000

KM
KM
1,00000
Material
7,24000

0,00000

KM
KM
1,00000
Material
1,66000

16.06.082
TRANSPORTE C/ VEICULO COMERCIAL LEVE ATE 1,2 T C/ MOTORISTA
1.01.52
MOTORISTA
2.03.55
VEICULO COMERCIAL LEVE ATE 1,2TON INCLUSO IMPOSTOS
8.81.16
GASOLINA
Mo-de-Obra 0,43630
LS
0,53229
SubMO
0,96860

KM
H
0,08140
H
0,06150
L
0,16600
Material
1,25760

16.06.086
INSTALAO DE QUADRO BRANCO (QB-01)
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
Mo-de-Obra 4,21000
LS
5,13620

9,34620

UN
H
0,50000
H
0,50000
Material
0,00000

16.06.087
INSTALACAO DE FAIXAS DE PROTECAO (FP-03/FP-04) POR REGUA
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
SubMO
3,73848
Mo-de-Obra 1,68400
LS
2,05448

UN
H
0,20000
H
0,20000
Material
0,00000

16.06.088
1.01.11
1.01.46

Exerccio:

SubMO

INSTALACAO DE FAIXAS DE EXPOSICAO (FP-05) POR REGUA


CARPINTEIRO
SERVENTE

2011

UN
H
H

0,10000
0,10000

Custo Unit.

Custo Total

BDI

244,82
48,73178

BDI

4,60
3,96
4,74
3,80
9,49
5,23
4,67
4,23
6,01362

BDI

4,60
3,96
4,74
3,80
9,49
5,23
4,67
4,23
5,42219

BDI

5,42
1,24660

BDI

13,28
3,05440

4,60
3,96
1.393,66
4,67
75,00
BDI
32,71101

BDI

4,60
3,96
1,40738

BDI

7,24
1,66520

BDI

1,66
0,38180

BDI

5,36
13,08
2,73
0,51202

BDI

4,60
3,82
2,14963

BDI

4,60
3,82
0,85985

4,60
3,82

39,17120

32,15
0,96048
0,82685
0,62568
0,74480
10,43900
7,84500
0,07986
0,77198

28,99
0,72036
0,61974
0,57449
0,67716
9,96450
7,11280
0,03736
0,70641

6,66
5,42000

16,33
13,28000

174,93
4,50800
3,88080
47,38444
1,21420
75,00000

7,52
1,48120
1,27512

8,90
7,24000

2,04
1,66000

2,73
0,43630
0,80442
0,45318

11,49
2,30000
1,91000

4,59
0,92000
0,76400

2,29
0,46000
0,38200

Pgina: 334

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,84200

LS

1,02724

UN Coeficiente
SubMO

16.06.089
RS-10 REGUA DE SINALIZACAO - PORTA DA PLATAFORMA
1.01.48
MARCENEIRO
2.67.39
PARAFUSO AUTOATARRACHANTE 9,5X2,9MM
3.87.07
RS-10 REGUA DE SINALIZACAO - PLATAFORMA
Mo-de-Obra 1,07100
LS
1,30662
SubMO
16.06.090
INSTALACAO DE LOUSA (LG-07)
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
Mo-de-Obra 8,42000
LS
10,27240
16.06.091
INSTALACAO DE MURAL (MR-02)
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
Mo-de-Obra 2,10500
LS
2,56810
16.06.092
INSTALACAO DE FOGAO INDUSTRIAL
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
Mo-de-Obra 4,56000
LS
5,56320
16.06.093
INSTALACAO DE SUPORTE TV/VIDEO
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
Mo-de-Obra 2,10500
LS
2,56810
16.06.094
INSTALACAO DE PORTICO DE INDENTIFICACAO
1.01.46
SERVENTE
Mo-de-Obra 1,91000
LS
2,33020
16.06.095
COLOCACAO DE REGUAS DE SINALIZACAO
1.01.11
CARPINTEIRO
Mo-de-Obra 1,15000
LS
1,40300
16.06.096
RS-02 REGUA DE SINALIZACAO DE AMBIENTES
1.01.48
MARCENEIRO
2.67.39
PARAFUSO AUTOATARRACHANTE 9,5X2,9MM
3.87.04
RS-02 REGUA DE SINALIZACAO - AMBIENTES
Mo-de-Obra 1,07100
LS
1,30662
16.06.097
RS-05 REGUA DE SINALIZACAO DE SANITARIOS
1.01.48
MARCENEIRO
2.67.39
PARAFUSO AUTOATARRACHANTE 9,5X2,9MM
3.87.05
RS-05 REGUA DE SINALIZACAO - SANITARIO
Mo-de-Obra 1,07100
LS
1,30662
16.06.098
RS-13 REGUA DE SINALIZACAO DE ELEVADOR
1.01.48
MARCENEIRO
2.67.39
PARAFUSO AUTOATARRACHANTE 9,5X2,9MM
3.87.06
RS-13 REGUA DE SINALIZACAO - ELEVADOR
Mo-de-Obra 1,07100
LS
1,30662
16.06.099
SERVICOS DE COMPLEMENTOS EXTERNOS
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

1,86924

Material

2,37762

UN
H
0,15000
UN
6,00000
UN
1,00000
Material
18,12000

18,69240

UN
H
1,00000
H
1,00000
Material
0,00000

4,67310

UN
H
0,25000
H
0,25000
Material
0,00000

10,12320

UN
H
0,50000
H
0,50000
Material
0,00000

4,67310

UN
H
0,25000
H
0,25000
Material
0,00000

4,24020

UN
H
0,50000
Material
0,00000

2,55300

UN
H
0,25000
Material
0,00000

2,37762

UN
H
0,15000
UN
6,00000
UN
1,00000
Material
18,12000

2,37762

UN
H
0,15000
UN
6,00000
UN
1,00000
Material
18,12000

16.07.002
1.01.18
1.01.19
Exerccio:

TR-02 TRONCOS ESCADA INCLINADA


ENCANADOR
AJUDANTE DE ENCANADOR

2011

Custo Total

BDI

0,42993

BDI

7,14
0,02
18,00
4,71445

BDI

4,60
3,82
4,29925

BDI

4,60
3,82
1,07481

BDI

5,05
4,07
2,32834

BDI

4,60
3,82
1,07481

BDI

3,82
0,97525

BDI

4,60
0,58719

BDI

7,14
0,02
18,00
4,71445

BDI

7,14
0,02
18,00
4,71445

2,37762

UN
H
0,15000
UN
6,00000
UN
1,00000
Material
18,12000

BDI

7,14
0,02
18,00
4,71445

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

16.07.001
TR-01 TRONCOS ESCADA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
SubMO
136,61765
Mo-de-Obra 61,53948
LS
75,07817

0,00000

Custo Unit.

UN
H
4,90000
H
4,90000
H
1,05000
H
1,05000
H
2,06400
M
8,60000
UN
14,00000
L
0,70000
L
0,42000
M
10,50000
Material
394,96980
UN
H
H

5,60000
5,60000

BDI

25,21
1,07100
0,12000
18,00000

22,99
4,60000
3,82000

5,74
1,15000
0,95500

12,45
2,52500
2,03500

5,74
1,15000
0,95500

5,21
1,91000

3,14
1,15000

25,21
1,07100
0,12000
18,00000

25,21
1,07100
0,12000
18,00000

25,21
1,07100
0,12000
18,00000

5,05
4,07
4,74
3,80
3,82
23,20
0,90
10,12
14,74
16,15
122,26511

5,05
4,07

653,85
24,74500
19,94300
4,97700
3,99000
7,88448
199,52000
12,60000
7,08400
6,19080
169,57500

709,12
28,28000
22,79200
Pgina: 335

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
SubMO
153,63395
Mo-de-Obra 69,20448
LS
84,42947

H
1,20000
H
1,20000
H
2,06400
M
8,60000
UN
16,00000
L
0,80000
L
0,48000
M
12,00000
Material
422,89120

16.07.003
TR-03 TRONCOS ESCADA DUPLA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
Mo-de-Obra 111,47172
LS
135,99550
SubMO
247,46722

UN
H
9,10000
H
9,10000
H
1,95000
H
1,95000
H
3,09600
M
12,90000
UN
26,00000
L
1,30000
L
0,78000
M
19,50000
Material
662,25820

16.07.004
TR-04 TRONCOS ESCADA INCLINADA DUPLA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
Mo-de-Obra 126,80172
LS
154,69810
SubMO
281,49982

UN
H
10,50000
H
10,50000
H
2,25000
H
2,25000
H
3,09600
M
12,90000
UN
30,00000
L
1,50000
L
0,90000
M
22,50000
Material
718,10100

16.07.005
TR-05 TRONCOS BARRAS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
Mo-de-Obra 11,33220
LS
13,82528
SubMO
25,15748

UN
H
0,70000
H
0,70000
H
0,15000
H
0,15000
H
0,96000
M
4,00000
UN
2,00000
L
0,10000
L
0,06000
M
1,50000
Material
120,72140

16.07.006
TR-06 TRONCOS BARRA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
Mo-de-Obra 20,83080
LS
25,41358
SubMO
46,24438

UN
H
1,40000
H
1,40000
H
0,30000
H
0,30000
H
1,44000
M
6,00000
UN
4,00000
L
0,20000
L
0,12000
M
3,00000
Material
195,04280

16.07.008
TR-08 TRONCOS BARRAS PARALELAS
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
3.75.02
TINTA ESMALTE
3.80.66
FUNDO ESPECIAL PARA ACO GALVANIZADO E ALUMINIO
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
SubMO
54,37437
Mo-de-Obra 24,49296
LS
29,88141

UN
H
1,40000
H
1,40000
H
0,60000
H
0,60000
H
1,72800
M
7,20000
UN
4,00000
L
0,40000
L
0,24000
M
6,00000
Material
275,12560

Exerccio:

2011

Custo Unit.

Custo Total

BDI

4,74
5,68800
3,80
4,56000
3,82
7,88448
23,20
199,52000
0,90
14,40000
10,12
8,09600
14,74
7,07520
16,15
193,80000
132,60078

BDI

5,05
4,07
4,74
3,80
3,82
23,20
0,90
10,12
14,74
16,15
209,23685

BDI

5,05
4,07
4,74
3,80
3,82
23,20
0,90
10,12
14,74
16,15
229,90819

BDI

5,05
4,07
4,74
3,80
3,82
23,20
0,90
10,12
14,74
16,15
33,55214

BDI

296,78
5,05
7,07000
4,07
5,69800
4,74
1,42200
3,80
1,14000
3,82
5,50080
23,20
139,20000
0,90
3,60000
10,12
2,02400
14,74
1,76880
16,15
48,45000
55,49605

BDI

405,28
5,05
7,07000
4,07
5,69800
4,74
2,84400
3,80
2,28000
3,82
6,60096
23,20
167,04000
0,90
3,60000
10,12
4,04800
14,74
3,53760
16,15
96,90000
75,78499

1.118,96
45,95500
37,03700
9,24300
7,41000
11,82672
299,28000
23,40000
13,15600
11,49720
314,92500

1.229,50
53,02500
42,73500
10,66500
8,55000
11,82672
299,28000
27,00000
15,18000
13,26600
363,37500

179,43
3,53500
2,84900
0,71100
0,57000
3,66720
92,80000
1,80000
1,01200
0,88440
24,22500

Pgina: 336

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

16.07.009
TR-09 TRONCOS BARRA DE EQUILIBRIO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.46
SERVENTE
2.11.05
TRONCO EUCALIPTO TRATADO, FURADO E APONTADO D=20CM
2.67.84
ARRUELA 45MM
6.05.03
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN 25MM (1")
Mo-de-Obra 28,51864
LS
34,79274
SubMO
63,31138

UN
H
2,10000
H
2,10000
H
2,45200
M
15,80000
UN
12,00000
M
3,00000
Material
425,81000

16.07.015
AM-01 AMARELINHA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 34,58700
LS
42,19614
SubMO

UN
H
4,05000
H
4,05000
L
2,25000
Material
13,68000

76,78314

16.07.016
BC-16 BANCO RETO-CONCRETO (PASTILHA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.38
PASTILHEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.07
CAULIM
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.12
BLOCO DE CONCRETO APARENTE ESPESS 15 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.20.25
PASTILHA ESMALTADA 4,0X 4,0 CM
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 70,07952
LS
85,49701
SubMO
155,57653

UN
H
2,56000
H
2,56000
H
0,70000
H
0,70000
H
0,61200
H
2,68800
H
0,37800
H
0,37800
H
6,05800
M3
0,14390
KG
4,85760
KG
0,48240
KG
56,88880
KG
0,90000
M3
0,09600
M3
0,01680
M
3,84000
M2
0,12800
M2
0,42240
KG
8,05000
UN
6,24000
L
0,48000
KG
0,14400
KG
0,25600
KG
0,14000
M2
0,37800
L
0,21000
Material
131,46527

16.07.017
BC-17 BANCO RETO-CONCRETO (CERAMICAS)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.12
BLOCO DE CONCRETO APARENTE ESPESS 15 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.45.36
CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
SubMO
149,81350
Mo-de-Obra 67,48356
LS
82,32994

UN
H
2,56000
H
2,56000
H
0,70000
H
0,70000
H
0,54000
H
2,47200
H
0,37800
H
0,37800
H
5,78800
M3
0,14780
KG
3,18720
KG
59,91640
M3
0,09600
M3
0,01680
M
3,84000
M2
0,12800
M2
0,42240
KG
8,05000
UN
6,24000
L
0,48000
KG
0,14400
KG
0,25600
KG
0,14000
M2
0,37800
L
0,21000
Material
122,03728

16.07.018
1.01.11
Exerccio:

BC-18 BANCO RETO-CONCRETO (CACOS CERAMICOS)


CARPINTEIRO

2011

UN
H

2,56000

Custo Unit.

Custo Total

BDI

5,05
4,07
3,82
23,20
0,90
16,15
112,49792

BDI

4,74
3,80
6,08
20,80652

BDI

4,60
3,96
4,77
3,82
5,41
4,64
4,74
3,80
3,82
80,46
0,35
1,53
0,37
1,04
61,17
66,21
3,78
17,18
11,40
2,69
2,01
6,23
2,50
4,67
4,87
69,44
6,08
66,01962

BDI

4,60
3,96
4,77
3,82
5,09
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
66,21
3,78
17,18
11,40
2,69
2,01
6,23
2,50
4,67
4,87
46,68
6,08
62,52568

4,60

601,61
10,60500
8,54700
9,36664
366,56000
10,80000
48,45000

111,26
19,19700
15,39000
13,68000

353,06
11,77600
10,13760
3,33900
2,67400
3,31092
12,47232
1,79172
1,43640
23,14156
11,57819
1,70016
0,73807
21,04886
0,93600
5,87232
1,11233
14,51520
2,19904
4,81536
21,65450
12,54240
2,99040
0,36000
1,19552
0,68180
26,24832
1,27680

334,37
11,77600
10,13760
3,33900
2,67400
2,74860
11,47008
1,79172
1,43640
22,11016
11,89199
1,11552
22,16907
5,87232
1,11233
14,51520
2,19904
4,81536
21,65450
12,54240
2,99040
0,36000
1,19552
0,68180
17,64504
1,27680

314,44
11,77600
Pgina: 337

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.12
BLOCO DE CONCRETO APARENTE ESPESS 15 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.45.01
CACO CERAMICO COLORIDO
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 67,49120
LS
82,33926
SubMO
149,83046

H
2,56000
H
0,70000
H
0,70000
H
0,54000
H
2,47200
H
0,37800
H
0,37800
H
5,79000
M3
0,15630
KG
3,18720
KG
60,13960
M3
0,09600
M3
0,01680
M
3,84000
M2
0,12800
M2
0,42240
KG
8,05000
UN
6,24000
L
0,48000
KG
0,14400
KG
0,25600
KG
0,14000
M2
0,36000
L
0,21000
Material
105,81394

16.07.019
BC-19 BANCO CURVO CONCRETO (PASTILHA)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.38
PASTILHEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.07
CAULIM
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.12
BLOCO DE CONCRETO APARENTE ESPESS 15 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.20.25
PASTILHA ESMALTADA 4,0X 4,0 CM
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 78,07762
LS
95,25470
SubMO
173,33232

UN
H
2,98000
H
2,98000
H
0,80000
H
0,80000
H
0,78200
H
2,80800
H
0,46800
H
0,46800
H
6,39800
M3
0,15200
KG
5,32160
KG
0,61640
KG
60,40760
KG
1,15000
M3
0,10400
M3
0,01680
M
4,47000
M2
0,14900
M2
0,49170
KG
9,20000
UN
6,24000
L
0,48000
KG
0,14400
KG
0,29800
KG
0,16000
M2
0,48300
L
0,26000
Material
149,05017

16.07.020
1.01.11
1.01.12
1.01.21
1.01.22
1.01.28
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.05.22
2.10.09
2.10.21
2.10.32
2.15.25
2.25.12
Exerccio:

BC-20 BANCO CURVO CONCRETO (CERAMICA)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
LADRILHISTA
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
PEDRISCO
PONTALETE PINHO DE 3"X3"
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-50-A $MD BITOLAS
BLOCO DE CONCRETO APARENTE ESPESS 15 CM

2011

UN
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M3
M
M2
M2
KG
UN

2,98000
2,98000
0,80000
0,80000
0,69000
2,53200
0,46800
0,46800
6,05300
0,15700
3,18720
64,27620
0,10400
0,01680
4,47000
0,14900
0,49170
9,20000
6,24000

Custo Unit.

Custo Total

BDI

3,96
4,77
3,82
5,09
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
66,21
3,78
17,18
11,40
2,69
2,01
6,23
2,50
4,67
4,87
1,82
6,08
58,79821

BDI

4,60
3,96
4,77
3,82
5,41
4,64
4,74
3,80
3,82
80,46
0,35
1,53
0,37
1,04
61,17
66,21
3,78
17,18
11,40
2,69
2,01
6,23
2,50
4,67
4,87
69,44
6,08
74,14797

4,60
3,96
4,77
3,82
5,09
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
66,21
3,78
17,18
11,40
2,69
2,01

10,13760
3,33900
2,67400
2,74860
11,47008
1,79172
1,43640
22,11780
12,57590
1,11552
22,25165
5,87232
1,11233
14,51520
2,19904
4,81536
21,65450
12,54240
2,99040
0,36000
1,19552
0,68180
0,65520
1,27680

396,53
13,70800
11,80080
3,81600
3,05600
4,23062
13,02912
2,21832
1,77840
24,44036
12,22992
1,86256
0,94309
22,35081
1,19600
6,36168
1,11233
16,89660
2,55982
5,60538
24,74800
12,54240
2,99040
0,36000
1,39166
0,77920
33,53952
1,58080

372,65
13,70800
11,80080
3,81600
3,05600
3,51210
11,74848
2,21832
1,77840
23,12246
12,63222
1,11552
23,78219
6,36168
1,11233
16,89660
2,55982
5,60538
24,74800
12,54240
Pgina: 338

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.45.36
CERAMICA ESMALTADA 10X10CM-LARANJA,VERMELHO,AMAREL
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 74,76056
LS
91,20788
SubMO
165,96844

L
0,48000
KG
0,14400
KG
0,29800
KG
0,16000
M2
0,48300
L
0,26000
Material
137,00464

16.07.021
BC-21 BANCO CURVO CONCRETO (CACOS CERAMICOS)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.28
LADRILHISTA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.12
BLOCO DE CONCRETO APARENTE ESPESS 15 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.45.01
CACO CERAMICO COLORIDO
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 74,78730
LS
91,24051
SubMO
166,02781

UN
H
2,98000
H
2,98000
H
0,80000
H
0,80000
H
0,69000
H
2,53200
H
0,46800
H
0,46800
H
6,06000
M3
0,17230
KG
3,18720
KG
64,56640
M3
0,10400
M3
0,01680
M
4,47000
M2
0,14900
M2
0,49170
KG
9,20000
UN
6,24000
L
0,48000
KG
0,14400
KG
0,29800
KG
0,16000
M2
0,46000
L
0,26000
Material
116,63381

16.07.031
CR-01 CARACOL
1.01.28
LADRILHISTA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.25.37
TIJOLO REQUEIMADO 10X21CM
3.60.65
JUNTAS PLASTICAS COLORIDAS
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 98,37240
LS
120,01433
SubMO

218,38673

UN
H
7,00000
H
5,75000
H
5,75000
H
3,57000
M3
0,10880
KG
36,14200
UN
143,00000
M
12,50000
L
2,87500
Material
147,15159

16.07.033
FL-03 FLOREIRA / BANCO CIRCULAR GRANILITE DIAM=160CM
1.01.24
GRANITEIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.25.25
BLOCO CERAMICO FURADO VEDACAO - 19X19X39 CM
2.25.27
BLOCO CERAMICO FURADO VEDACAO - 11.5X19X39 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.41.60
FORNECIMENTO E APLICACAO DE RESINA ACRILICA
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.60.12
JUNTA PLASTICA "I" 27MM PARA PISOS
3.60.65
JUNTAS PLASTICAS COLORIDAS
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
Mo-de-Obra 169,71091
LS
207,04731
SubMO
376,75823

UN
H
1,20000
H
14,50740
H
25,03680
M3
0,33380
KG
18,81470
KG
117,39490
KG
27,99000
M3
0,12000
UN
43,55000
UN
20,41000
L
6,79000
KG
2,77140
M2
3,11000
M2
3,11000
M
3,11000
M
2,40000
KG
0,51630
Material
446,34040

16.07.034
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.09
Exerccio:

FL-04 FLOREIRA / CIRCULAR GRANILITE DIAM=180CM


PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
CIMENTO BRANCO

2011

UN
H
H
M3
KG
KG
KG

18,18840
42,79080
0,54250
52,53980
143,89860
64,80000

Custo Unit.

Custo Total

BDI

6,23
2,50
4,67
4,87
46,68
6,08
69,68381

BDI

4,60
3,96
4,77
3,82
5,09
4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
66,21
3,78
17,18
11,40
2,69
2,01
6,23
2,50
4,67
4,87
1,82
6,08
65,01217

BDI

5,09
4,74
3,80
3,82
80,46
0,37
0,69
0,71
6,08
84,07381

BDI

5,63
4,64
3,82
80,46
0,35
0,37
1,04
61,17
2,04
1,42
6,23
2,50
12,21
36,12
0,98
0,71
21,11
189,31268

4,64
3,82
80,46
0,35
0,37
1,04

2,99040
0,36000
1,39166
0,77920
22,54644
1,58080

347,67
13,70800
11,80080
3,81600
3,05600
3,51210
11,74848
2,21832
1,77840
23,14920
13,86326
1,11552
23,88957
6,36168
1,11233
16,89660
2,55982
5,60538
24,74800
12,54240
2,99040
0,36000
1,39166
0,77920
0,83720
1,58080

449,61
35,63000
27,25500
21,85000
13,63740
8,75405
13,37254
98,67000
8,87500
17,48000

1.012,41
6,75600
67,31434
95,64058
26,85755
6,58515
43,43611
29,10960
7,34040
88,84200
28,98220
42,30170
6,92850
37,97310
112,33320
3,04780
1,70400
10,89909

1.646,29
84,39418
163,46086
43,64955
18,38893
53,24248
67,39200
Pgina: 339

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.25.21
BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.41.60
FORNECIMENTO E APLICACAO DE RESINA ACRILICA
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.60.12
JUNTA PLASTICA "I" 27MM PARA PISOS
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
SubMO
550,23817
Mo-de-Obra 247,85503
LS
302,38314

M3
0,29000
UN
218,40000
UN
47,06000
L
10,88000
KG
3,17580
M2
7,20000
M2
7,20000
M
7,20000
KG
1,19520
Material
788,21163

16.07.035
FL-05 FLOREIRA CIRCULAR DIAM=110CM
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.25.21
BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 151,82765
LS
185,22974
SubMO
337,05739

Custo Unit.

Custo Total

BDI

61,17
0,22
1,78
6,23
2,50
12,21
36,12
0,98
21,11
307,84346

UN
H
11,62980
H
1,50300
H
1,50300
H
22,25910
M3
0,29090
KG
30,85780
KG
76,89880
M3
0,07000
UN
165,90000
UN
25,48000
L
3,73000
KG
1,54740
L
0,83500
Material
180,97610

BDI

4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
0,22
1,78
6,23
2,50
6,08
119,14770

16.07.036
FL-06 FLOREIRA RETANGULAR 150X220CM
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
2.05.92
SEIXO ROLADO
2.25.25
BLOCO CERAMICO FURADO VEDACAO - 19X19X39 CM
2.25.27
BLOCO CERAMICO FURADO VEDACAO - 11.5X19X39 CM
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 207,17835
LS
252,75759
SubMO
459,93594

UN
H
14,96570
H
1,66950
H
1,66950
H
32,32460
M3
0,32120
KG
16,55630
KG
114,28600
M3
0,01560
M3
0,11000
UN
40,30000
UN
40,30000
L
4,84000
KG
2,12520
L
0,92750
Material
284,70635

4,64
4,74
3,80
3,82
80,46
0,35
0,37
62,03
266,10
2,04
1,42
6,23
2,50
6,08
BDI
171,26773

16.07.041
LG-06 LOUSA EXTERNA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.25.15
TIJOLO COMUM MACICO
2.25.16
TIJOLO CERAMICO FURADO BAIANINHO 9X19X19 CM
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
3.75.30
TINTA ESMALTE SINTETICO VERDE ESCOLAR
3.80.16
MASSA PARA MADEIRA
Mo-de-Obra 896,64301
LS
1.093,90448
SubMO

UN
H
79,32040
H
12,67650
H
12,67650
H
110,03640
M3
1,70210
KG
307,15020
KG
262,18400
M3
0,20800
UN
694,40000
UN
458,50000
L
1,78750
L
6,30600
L
6,30600
Material
911,45794

4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
0,22
0,54
6,08
13,36
9,80
667,46125

16.07.051
1.01.11
1.01.12
1.01.21
1.01.22
1.01.38
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.05
2.05.07
2.05.08
2.05.09
Exerccio:

MC-01 MESA XADREZ/DAMAS


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PASTILHEIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CAL HIDRATADA
CAULIM
CIMENTO
CIMENTO BRANCO

2011

1.990,54749

UN
H
H
H
H
H
H
H
H
H
M3
KG
KG
KG
KG

2,86800
2,86800
2,68000
2,68000
0,44200
1,34600
0,71000
0,45000
3,39200
0,05950
1,20640
0,34840
29,07470
0,74750

BDI

4,60
3,96
4,77
3,82
5,41
4,64
4,74
3,80
3,82
80,46
0,35
1,53
0,37
1,04

17,73930
48,04800
83,76680
67,78240
7,93950
87,91200
260,06400
7,05600
25,23067

637,18
53,96227
7,12422
5,71140
85,02976
23,40581
10,80023
28,45256
4,28190
36,49800
45,35440
23,23790
3,86850
5,07680

915,91
69,44085
7,91343
6,34410
123,47997
25,84375
5,79471
42,28582
0,96767
29,27100
82,21200
57,22600
30,15320
5,31300
5,63920

3.569,46
368,04666
60,08661
48,17070
420,33905
136,95097
107,50257
97,00808
12,72336
152,76800
247,59000
10,86800
84,24816
61,79880

488,81
13,19280
11,35728
12,78360
10,23760
2,39122
6,24544
3,36540
1,71000
12,95744
4,78737
0,42224
0,53305
10,75764
0,77740
Pgina: 340

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.18
PEDRA BRITADA 2
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.31
CHAPA COMPENSADA RESINADA E=10MM
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.05
COLA PVA
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.20.25
PASTILHA ESMALTADA 4,0X 4,0 CM
3.75.02
TINTA ESMALTE
3.80.05
DISCO DE DESBASTE 7"
3.80.11
LIXA CARBETO DE SILICIO 7"
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
6.05.10
TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM
SubMO
Mo-de-Obra 74,24078
LS
90,57375
16.07.052
MC-02 MESA CIRCULOS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.24
GRANITEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.31
CHAPA COMPENSADA RESINADA E=10MM
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.60.12
JUNTA PLASTICA "I" 27MM PARA PISOS
3.60.65
JUNTAS PLASTICAS COLORIDAS
3.75.02
TINTA ESMALTE
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
6.05.10
TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM
Mo-de-Obra 71,47856
LS
87,20384
SubMO
16.07.053
1.01.11
1.01.12
1.01.21
1.01.22
1.01.24
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.08
2.05.09
2.05.18
2.10.09
2.10.14
2.10.21
2.10.31
2.10.32
2.15.25
2.67.60
Exerccio:

MC-03 MESA ONDAS


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
GRANITEIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CIMENTO
CIMENTO BRANCO
PEDRA BRITADA 2
PONTALETE PINHO DE 3"X3"
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=10MM
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-50-A $MD BITOLAS
PREGO

2011

UN Coeficiente

164,81453

M3
0,07200
M
3,44000
M
0,72000
M2
0,33000
M2
0,07920
M2
0,29700
KG
8,28000
KG
0,30000
KG
0,14400
KG
0,06500
KG
0,80000
M2
0,27300
L
0,12500
UN
0,02600
UN
0,11050
UN
0,25000
L
0,07500
L
0,09750
L
0,16250
M
1,40000
Material
232,59379

158,68240

UN
H
2,86800
H
2,86800
H
2,68000
H
2,68000
H
1,05000
H
0,54000
H
0,45000
H
0,45000
H
3,04900
M3
0,05400
KG
28,40000
KG
8,10000
M3
0,07200
M
3,44000
M
0,72000
M2
0,33000
M2
0,07920
M2
0,29700
KG
8,28000
KG
0,30000
KG
0,14400
KG
0,80000
M2
0,90000
M
0,90000
M
2,10000
L
0,12500
UN
0,25000
L
0,07500
KG
0,14940
M
1,40000
Material
252,33570
UN
H
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M
M
M2
M2
M2
KG
KG

2,86800
2,86800
2,68000
2,68000
1,05000
0,54000
0,45000
0,45000
3,04900
0,05400
28,40000
8,10000
0,07200
3,44000
0,72000
0,33000
0,07920
0,29700
8,28000
0,30000

Custo Unit.

Custo Total

BDI

61,17
4,40424
3,78
13,00320
2,09
1,50480
17,18
5,66940
9,49
0,75161
11,40
3,38580
2,69
22,27320
4,67
1,40100
4,87
0,70128
6,21
0,40365
10,15
8,12000
69,44
18,95712
10,12
1,26500
8,90
0,23140
2,88
0,31824
1,47
0,36750
15,96
1,19700
11,49
1,12028
20,07
3,26138
90,70
126,98000
91,40391

BDI

505,55
4,60
13,19280
3,96
11,35728
4,77
12,78360
3,82
10,23760
5,63
5,91150
4,64
2,50560
4,74
2,13300
3,80
1,71000
3,82
11,64718
80,46
4,34484
0,37
10,50800
1,04
8,42400
61,17
4,40424
3,78
13,00320
2,09
1,50480
17,18
5,66940
9,49
0,75161
11,40
3,38580
2,69
22,27320
4,67
1,40100
4,87
0,70128
10,15
8,12000
36,12
32,50800
0,98
0,88200
0,71
1,49100
10,12
1,26500
1,47
0,36750
15,96
1,19700
21,11
3,15383
90,70
126,98000
94,53416

4,60
3,96
4,77
3,82
5,63
4,64
4,74
3,80
3,82
80,46
0,37
1,04
61,17
3,78
2,09
17,18
9,49
11,40
2,69
4,67

484,56
13,19280
11,35728
12,78360
10,23760
5,91150
2,50560
2,13300
1,71000
11,64718
4,34484
10,50800
8,42400
4,40424
13,00320
1,50480
5,66940
0,75161
3,38580
22,27320
1,40100
Pgina: 341

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.70.10
ARAME RECOZIDO N.18
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.30.15
FORN DE GRANILHA, APLIC, POLIM "IN-LOCO" ESP=8MM
3.60.12
JUNTA PLASTICA "I" 27MM PARA PISOS
3.60.65
JUNTAS PLASTICAS COLORIDAS
3.75.02
TINTA ESMALTE
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.38
PIGMENTO EM PO PARA ARGAMASSA
6.05.10
TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM
SubMO
Mo-de-Obra 71,47856
LS
87,20384
16.07.054
MC-04 MESA JOGO DA VELHA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.31
CHAPA COMPENSADA RESINADA E=10MM
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.05
COLA PVA
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.60.65
JUNTAS PLASTICAS COLORIDAS
3.75.02
TINTA ESMALTE
3.80.05
DISCO DE DESBASTE 7"
3.80.11
LIXA CARBETO DE SILICIO 7"
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
6.05.10
TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM
Mo-de-Obra 81,88946
LS
99,90514
SubMO
16.07.055
1.01.11
1.01.12
1.01.21
1.01.22
1.01.28
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.08
2.05.09
2.05.10
2.05.18
2.10.09
2.10.14
2.10.21
2.10.31
2.10.32
2.15.25
2.67.60
2.70.10
2.80.05
3.12.15
3.45.51
3.75.02
3.80.05
3.80.11
3.80.12
Exerccio:

MC-05 MESA CERAMICA


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
LADRILHISTA
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CIMENTO
CIMENTO BRANCO
CIMENTO COLANTE
PEDRA BRITADA 2
PONTALETE PINHO DE 3"X3"
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=10MM
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-50-A $MD BITOLAS
PREGO
ARAME RECOZIDO N.18
COLA PVA
GRADIL DE FERRO (TIPO PMSP)
CERAMICA ESMALTADA LISA 20 X 30 CM
TINTA ESMALTE
DISCO DE DESBASTE 7"
LIXA CARBETO DE SILICIO 7"
LIXA PARA FERRO

2011

UN Coeficiente

158,68240

KG
0,14400
KG
0,80000
M2
0,42750
M
0,90000
M
2,10000
L
0,12500
UN
0,25000
L
0,07500
KG
0,14940
M
1,40000
Material
235,26900

181,79460

UN
H
2,86800
H
2,86800
H
2,68000
H
2,68000
H
3,69000
H
0,81000
H
0,45000
H
3,04900
M3
0,05400
KG
28,53500
KG
0,13500
M3
0,07200
M
3,44000
M
0,72000
M2
0,33000
M2
0,07920
M2
0,29700
KG
8,28000
KG
0,30000
KG
0,14400
KG
0,09000
KG
0,80000
M
4,50000
L
0,12500
UN
0,03600
UN
0,15300
UN
0,25000
L
0,07500
L
0,13500
L
0,22500
M
1,40000
Material
216,64906
UN
H
H
H
H
H
H
H
H
H
M3
KG
KG
KG
M3
M
M
M2
M2
M2
KG
KG
KG
KG
KG
M2
L
UN
UN
UN

2,86800
2,86800
2,68000
2,68000
0,13500
0,99000
0,63000
0,45000
2,91400
0,05400
28,46750
0,06750
2,25000
0,07200
3,44000
0,72000
0,33000
0,07920
0,29700
8,28000
0,30000
0,14400
0,04500
0,80000
0,47250
0,12500
0,01800
0,07650
0,25000

Custo Unit.

Custo Total

BDI

4,87
0,70128
10,15
8,12000
36,12
15,44130
0,98
0,88200
0,71
1,49100
10,12
1,26500
1,47
0,36750
15,96
1,19700
21,11
3,15383
90,70
126,98000
90,60882

BDI

490,08
4,60
13,19280
3,96
11,35728
4,77
12,78360
3,82
10,23760
4,64
17,12160
4,74
3,83940
3,80
1,71000
3,82
11,64718
80,46
4,34484
0,37
10,55795
1,04
0,14040
61,17
4,40424
3,78
13,00320
2,09
1,50480
17,18
5,66940
9,49
0,75161
11,40
3,38580
2,69
22,27320
4,67
1,40100
4,87
0,70128
6,21
0,55890
10,15
8,12000
0,71
3,19500
10,12
1,26500
8,90
0,32040
2,88
0,44064
1,47
0,36750
15,96
1,19700
11,49
1,55115
20,07
4,51575
90,70
126,98000
91,64204

4,60
3,96
4,77
3,82
5,09
4,64
4,74
3,80
3,82
80,46
0,37
1,04
0,35
61,17
3,78
2,09
17,18
9,49
11,40
2,69
4,67
4,87
6,21
10,15
20,79
10,12
8,90
2,88
1,47

458,47
13,19280
11,35728
12,78360
10,23760
0,68715
4,59360
2,98620
1,71000
11,13148
4,34484
10,53298
0,07020
0,78750
4,40424
13,00320
1,50480
5,66940
0,75161
3,38580
22,27320
1,40100
0,70128
0,27945
8,12000
9,82328
1,26500
0,16020
0,22032
0,36750
Pgina: 342

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.80.28
ZARCAO
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
6.05.10
TUBO ACO GALV NBR 5580 CLASSE MEDIA DN=125MM
Mo-de-Obra 68,67971
LS
83,78925
SubMO

UN Coeficiente

Material

L
0,07500
L
0,06750
L
0,11250
M
1,40000
220,27624

16.07.061
MG-01 MURETA C/ GUARDA CORPO METALICO (BLOCOS DE CONCRETO APARENTE)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.44
SERRALHEIRO
1.01.45
AJUDANTE SERRALHEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
2.05.18
PEDRA BRITADA 2
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.04
BLOCO DE CONCRETO 14X19X39CM - 6MPa
2.25.15
TIJOLO COMUM MACICO
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
2.80.05
COLA PVA
3.12.15
GRADIL DE FERRO (TIPO PMSP)
3.75.02
TINTA ESMALTE
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
3.80.05
DISCO DE DESBASTE 7"
3.80.11
LIXA CARBETO DE SILICIO 7"
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
Mo-de-Obra 106,15504
LS
129,50914
Material
SubMO
235,66418

M
H
0,57140
H
0,57140
H
0,16430
H
0,16430
H
3,60140
H
0,77820
H
0,64250
H
3,07140
H
3,07140
H
10,17410
M3
0,11280
KG
10,33320
KG
30,23490
KG
0,02090
M3
0,07210
M
0,85710
M2
0,02860
M2
0,09430
KG
1,88930
UN
6,68570
UN
22,00000
L
0,60000
KG
0,55160
KG
0,05710
KG
0,03290
KG
0,01390
KG
0,28570
L
0,06000
L
0,31250
UN
0,00560
UN
0,02370
UN
0,20000
L
0,04000
L
0,02090
L
0,03480
M
1,99640
177,54086

16.07.062
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.44
1.01.45
1.01.46
2.05.03
2.05.05
2.05.08
2.05.09
2.05.18
2.10.09
2.10.21
2.10.32
2.15.25
2.25.15
2.25.29
2.40.56
2.40.69
2.67.60
2.70.10
2.80.05
3.12.15
3.75.02
3.75.17
3.75.42

M
H
H
H
H
H
H
H
H
H
H
M3
KG
KG
KG
M3
M
M2
M2
KG
UN
UN
L
KG
KG
KG
KG
KG
L
L
L

Exerccio:

152,46896

MG-02 MURETA C/ GUARDA CORPO METALICO (BLOCOS CERAMICOS)


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERRALHEIRO
AJUDANTE SERRALHEIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
CIMENTO BRANCO
PEDRA BRITADA 2
PONTALETE PINHO DE 3"X3"
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
ACO CA-50-A $MD BITOLAS
TIJOLO COMUM MACICO
TIJOLO CERAMICO FURADO BAIANAO 11,5X14X25CM
TINTA BETUMINOSA
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
PREGO
ARAME RECOZIDO N.18
COLA PVA
GRADIL DE FERRO (TIPO PMSP)
TINTA ESMALTE
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
TINTA LATEX STANDARD

2011

0,57140
0,57140
0,16430
0,16430
3,65340
1,01220
0,85050
3,07140
3,07140
10,28850
0,11600
10,33320
31,49850
0,02090
0,07210
0,85710
0,02860
0,09430
1,88930
22,00000
16,64000
0,60000
0,55160
0,05710
0,03290
0,01390
0,28570
0,06000
0,31250
0,13000

Custo Unit.

Custo Total

BDI

15,96
1,19700
11,49
0,77558
20,07
2,25788
90,70
126,98000
85,73140

BDI

508,24
4,60
2,62844
3,96
2,26274
4,77
0,78371
3,82
0,62763
4,64
16,71050
4,74
3,68867
3,80
2,44150
8,08
24,81691
4,34
13,32988
3,82
38,86506
80,46
9,07589
0,35
3,61662
0,37
11,18691
1,04
0,02174
61,17
4,41036
3,78
3,23984
17,18
0,49135
11,40
1,07502
2,69
5,08222
1,94
12,97026
0,22
4,84000
6,23
3,73800
2,50
1,37900
4,67
0,26666
4,87
0,16022
6,21
0,08632
10,15
2,89986
10,12
0,60720
6,08
1,90000
8,90
0,04984
2,88
0,06826
1,47
0,29400
15,96
0,63840
11,49
0,24014
20,07
0,69844
54,35
108,50434
95,03716

4,60
3,96
4,77
3,82
4,64
4,74
3,80
8,08
4,34
3,82
80,46
0,35
0,37
1,04
61,17
3,78
17,18
11,40
2,69
0,22
0,56
6,23
2,50
4,67
4,87
6,21
10,15
10,12
6,08
6,66

514,13
2,62844
2,26274
0,78371
0,62763
16,95178
4,79783
3,23190
24,81691
13,32988
39,30207
9,33336
3,61662
11,65445
0,02174
4,41036
3,23984
0,49135
1,07502
5,08222
4,84000
9,31840
3,73800
1,37900
0,26666
0,16022
0,08632
2,89986
0,60720
1,90000
0,86580
Pgina: 343

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

3.80.05
DISCO DE DESBASTE 7"
3.80.09
SELADOR P/PINTURA LATEX
3.80.11
LIXA CARBETO DE SILICIO 7"
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
3.80.39
LIXA PARA MADEIRA
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
6.05.08
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN80MM (3")
SubMO
Mo-de-Obra 108,73288
LS
132,65412
16.07.081
RV-01 ROSA DOS VENTOS R=180CM
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 39,11320
LS
47,71810
SubMO
16.07.082
RV-02 ROSA DOS VENTOS R=175CM
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 30,57320
LS
37,29930
SubMO
16.07.091
SD-01 SOBE/DESCE H=30CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.28
FORMA DE TUBO DE PAPELAO DIAM.20 CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 14,25790
LS
17,39464
SubMO
16.07.092
SD-02 SOBE/DESCE H=40CM
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.28
FORMA DE TUBO DE PAPELAO DIAM.20 CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 16,38848
LS
19,99395
SubMO
16.07.093
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
Exerccio:

SD-03 SOBE/DESCE H=50CM


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA

2011

UN Coeficiente

241,38700

UN
0,00560
L
0,10400
UN
0,02370
UN
0,20000
L
0,04000
UN
0,15600
L
0,02090
L
0,03480
M
1,99640
Material
176,61185

86,83130

UN
H
4,58000
H
4,58000
L
2,55000
Material
15,50400

67,87250

UN
H
3,58000
H
3,58000
L
1,33000
Material
8,08640

31,65254

UN
H
0,34400
H
0,32400
H
0,40000
H
0,40000
H
0,36000
H
0,11700
H
0,11700
H
1,38400
M3
0,03600
KG
17,20000
M3
0,04800
M
0,48000
M2
0,16800
M
0,40000
KG
4,60000
KG
0,05200
KG
0,08000
L
0,06500
Material
48,45980

36,38243

UN
H
0,36400
H
0,33900
H
0,50000
H
0,50000
H
0,42000
H
0,14400
H
0,14400
H
1,54400
M3
0,04200
KG
20,50000
M3
0,05600
M
0,48000
M2
0,18000
M
0,50000
KG
5,75000
KG
0,05300
KG
0,10000
L
0,08000
Material
58,88885
UN
H
H
H
H
H
H
H
H
M3

0,38400
0,35400
0,60000
0,60000
0,48000
0,17100
0,17100
1,70400
0,04800

Custo Unit.

BDI

Custo Total

8,90
0,04984
10,36
1,07744
2,88
0,06826
1,47
0,29400
15,96
0,63840
0,35
0,05460
11,49
0,24014
20,07
0,69844
54,35
108,50434
96,13974

BDI

4,74
3,80
6,08
23,53712

BDI

4,74
3,80
6,08
17,47055

BDI

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,37
61,17
2,09
17,18
47,43
2,69
4,67
4,87
6,08
18,42584

BDI

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,37
61,17
2,09
17,18
47,43
2,69
4,67
4,87
6,08
21,91239

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46

125,87
21,70920
17,40400
15,50400

93,42
16,96920
13,60400
8,08640

98,53
1,58240
1,28304
1,90800
1,52800
1,67040
0,55458
0,44460
5,28688
2,89656
6,36400
2,93616
1,00320
2,88624
18,97200
12,37400
0,24284
0,38960
0,39520

117,18
1,67440
1,34244
2,38500
1,91000
1,94880
0,68256
0,54720
5,89808
3,37932
7,58500
3,42552
1,00320
3,09240
23,71500
15,46750
0,24751
0,48700
0,48640

135,82
1,76640
1,40184
2,86200
2,29200
2,22720
0,81054
0,64980
6,50928
3,86208
Pgina: 344

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.12.28
FORMA DE TUBO DE PAPELAO DIAM.20 CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
SubMO
Mo-de-Obra 18,51906
LS
22,59325

UN Coeficiente

41,11231

KG
23,80000
M3
0,06400
M
0,48000
M2
0,19200
M
0,60000
KG
6,90000
KG
0,05400
KG
0,12000
L
0,09500
Material
69,31790

Custo Unit.

Custo Total

BDI

0,37
61,17
2,09
17,18
47,43
2,69
4,67
4,87
6,08
25,39895

8,80600
3,91488
1,00320
3,29856
28,45800
18,56100
0,25218
0,58440
0,57760

BDI

4,64
4,74
3,80
3,82
80,46
0,35
0,37
61,17
2,69
0,22
1,78
2,51
6,23
2,50
6,08
405,85789

4,74
3,80
6,08
19,60437

16.07.094
TB-01 TEATRO DE BONECOS - MURO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.25.21
BLOCO CERAMICO FURADO VEDACAO - 14X19X39 CM
2.25.96
BLOCO DE CONCRETO CANALETA 14X19X39CM - 3MPa
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 515,64904
LS
629,09182
SubMO
1.144,74086

UN
H
40,89280
H
12,52800
H
12,52800
H
57,30820
M3
0,83210
KG
121,26890
KG
212,10410
M3
0,14500
KG
2,50000
UN
378,00000
UN
125,71000
UN
12,50000
L
4,95000
KG
1,97460
L
6,96000
Material
619,85865

16.07.095
TB-02 TEATRO DE BONECOS - PISO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 32,58864
LS
39,75814
SubMO

72,34678

UN
H
3,81600
H
3,81600
L
2,12000
Material
12,88960

BDI

984,23300

UN
H
1,46000
H
1,46000
H
3,40000
H
3,40000
H
5,70000
H
5,70000
H
18,39000
H
10,20000
H
57,50000
M3
0,02000
M3
0,38000
M3
0,70000
KG
21,00000
M
3,00000
M2
0,70000
KG
62,10000
KG
0,90000
UN
2,00000
KG
0,27000
UN
0,00200
KG
1,14000
UN
1,00000
UN
1,00000
UN
1,00000
M
2,00000
UN
4,00000
UN
1,00000
M
2,50000
M
10,00000
Material
1.264,44078

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,50
3,82
80,46
62,03
241,38
1,65
4,60
17,18
2,69
2,70
0,08
4,67
0,74
4,87
42,45
4,00
651,51
14,04
3,88
3,48
26,97
2,09
BDI
517,19497

16.08.034
FS-05 FOSSA SEPTICA ANEIS CONCR. DN=1,4M H=1,5M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.17
PEDRA BRITADA 1
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.36
FS-05 FOSSA EM ANEIS CONCR. DN=1,4M H=1,5M COMPLET
6.25.34
TUBO PVC P/ESGOTO 150MM
6.26.74
ANEL BORRACHA P/TUBO PVC ESGOTO DN=150MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
Mo-de-Obra 443,34820
LS
540,88480
SubMO
16.08.050
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
Exerccio:

FA-01 FILTRO ANAEROBICO DN=1,40M H=2,00M


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO

2011

UN
H
H
H
H
H
H
H

1,82000
1,82000
4,65000
4,65000
7,05000
7,05000
18,39000

4,60
3,96
5,05
4,07
4,77
3,82
4,64

2.170,45
189,74259
59,38272
47,60640
218,91732
66,95077
42,44412
78,47852
8,86965
6,72500
83,16000
223,76380
31,37500
30,83850
4,93650
42,31680

104,84
18,08784
14,50080
12,88960

2.765,86
6,71600
5,78160
17,17000
13,83800
27,18900
21,77400
85,32960
45,90000
219,65000
1,60920
23,57140
168,96600
34,65000
13,80000
12,02600
167,04900
2,43000
0,16000
1,26090
0,00148
5,55180
42,45000
4,00000
651,51000
28,08000
15,52000
3,48000
67,42500
20,90000

3.349,97
8,37200
7,20720
23,48250
18,92550
33,62850
26,93100
85,32960
Pgina: 345

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.17
PEDRA BRITADA 1
2.05.20
PEDRA BRITADA 4
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.30
FA-01 FILTRO ANEIS CONCRETO DN=1,4M H=2,0M COMPLET
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.26.86
TUBO PVC RIGIDO ESGOTO DIAM 250 MM (10")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
Mo-de-Obra 497,15910
LS
606,53410
SubMO
16.08.051
FA-02 FILTRO ANAEROBICO DN=2,00M H=2,00M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.17
PEDRA BRITADA 1
2.05.20
PEDRA BRITADA 4
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.31
FA-02 FILTRO ANEIS CONCRETO DN=2,0M H=2,0M COMPLET
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.26.86
TUBO PVC RIGIDO ESGOTO DIAM 250 MM (10")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
Mo-de-Obra 809,91920
LS
988,10142
SubMO

UN Coeficiente

2011

Custo Total

1.103,69320

H
13,57000
H
60,79000
M3
0,02000
M3
0,38000
M3
1,15000
M3
0,87000
KG
26,00000
M
3,30000
M2
0,82500
KG
76,00000
KG
2,00000
UN
6,00000
KG
0,33000
UN
0,06000
KG
1,56000
UN
1,00000
UN
1,00000
UN
1,00000
UN
4,00000
M
3,00000
M
1,50000
M
15,00000
Material
1.619,86540

4,50
3,82
80,46
62,03
62,82
241,38
1,65
4,60
17,18
2,69
2,70
0,08
4,67
0,74
4,87
42,45
4,00
799,26
3,48
26,97
32,53
2,09
BDI
626,41848

1.798,02062

UN
H
2,35000
H
2,35000
H
4,65000
H
4,65000
H
12,80000
H
12,80000
H
26,50000
H
23,49000
H
107,01000
M3
0,02800
M3
0,58000
M3
2,36000
M3
1,43000
KG
37,00000
M
4,30000
M2
1,07000
KG
125,00000
KG
3,00000
UN
6,00000
KG
0,45000
UN
0,06000
KG
2,66000
UN
1,00000
UN
1,00000
UN
1,00000
UN
4,00000
M
3,00000
M
2,10000
M
20,00000
Material
2.895,18458

5.772,64
4,60
10,81000
3,96
9,30600
5,05
23,48250
4,07
18,92550
4,77
61,05600
3,82
48,89600
4,64
122,96000
4,50
105,70500
3,82
408,77820
80,46
2,25288
62,03
35,97740
62,82
148,25520
241,38
345,17340
1,65
61,05000
4,60
19,78000
17,18
18,38260
2,69
336,25000
2,70
8,10000
0,08
0,48000
4,67
2,10150
0,74
0,04440
4,87
12,95420
42,45
42,45000
4,00
4,00000
1.652,99
1.652,99000
3,48
13,92000
26,97
80,91000
32,53
68,31300
2,09
41,80000
BDI
1.079,43720

UN
H
0,96000
H
0,96000
H
0,07300
H
0,07300
H
4,98000
H
10,18000
M3
0,13600
KG
15,30000
KG
28,28000
M3
0,07300
M2
0,37000
KG
6,46000
KG
0,84000
UN
216,00000
KG
0,48000
KG
0,14800
KG
0,14600
Material
120,50608

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
241,38
17,18
2,69
2,70
0,22
2,50
4,67
4,87
BDI
63,88703

16.08.060
CD-01 CAIXA DE DISTRIBUICAO /2 CAMARAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
SubMO
157,26362
Mo-de-Obra 70,83947
LS
86,42415
Exerccio:

Custo Unit.

61,06500
232,21780
1,60920
23,57140
72,24300
210,00060
42,90000
15,18000
14,17350
204,44000
5,40000
0,48000
1,54110
0,04440
7,59720
42,45000
4,00000
799,26000
13,92000
80,91000
48,79500
31,35000

341,65
4,41600
3,80160
0,34821
0,27886
23,10720
38,88760
10,94256
5,35500
10,46360
17,62074
6,35660
17,37740
2,26800
47,52000
1,20000
0,69116
0,71102

Pgina: 346

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

16.08.061
CD-02 CAIXA DE DISTRIBUICAO /3 CAMARAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 96,84840
LS
118,15505
SubMO
215,00345

UN
H
1,36000
H
1,36000
H
1,02400
H
1,02400
H
6,11100
H
12,58000
M3
0,18000
KG
17,64000
KG
43,26000
M3
0,10240
M2
0,52300
KG
9,01000
KG
1,23000
UN
280,00000
KG
0,69000
KG
0,21000
KG
0,20500
Material
163,22740

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
241,38
17,18
2,69
2,70
0,22
2,50
4,67
4,87
BDI
86,99310

16.08.062
CD-03 CAIXA DE DISTRIBUICAO /4 CAMARAS
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 123,84697
LS
151,09330
SubMO
274,94027

UN
H
1,75000
H
1,75000
H
1,32300
H
1,32300
H
7,95300
H
15,86400
M3
0,22000
KG
24,03600
KG
47,43600
M3
0,13230
M2
0,67000
KG
11,52000
KG
1,71000
UN
336,00000
KG
0,80500
KG
0,27000
KG
0,23040
Material
201,03154

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
241,38
17,18
2,69
2,70
0,22
2,50
4,67
4,87
BDI
109,47352

16.08.065
FS-06-01 FOSSA SEPTICA L=3,00M VOL. UTIL = 7,56M3
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.09
BLOCO DE CONCRETO 19X19X19CM - 6MPa
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
SubMO
Mo-de-Obra 2.378,62840
LS
2.901,92665

UN
H
12,74000
H
12,74000
H
1,50000
H
1,50000
H
28,60000
H
28,60000
H
57,00000
H
457,00000
M3
2,93000
KG
218,00000
KG
870,00000
M3
0,44000
M3
0,62000
M3
1,48000
M
23,16000
M2
5,79000
KG
287,00000
KG
6,00000
UN
25,00000
UN
382,00000
UN
4,00000
KG
2,32000
UN
0,04000
KG
5,14000
UN
1,00000
M
4,00000
UN
2,00000
M
2,70000
Material
3.404,55500

10.682,68
4,60
58,60400
3,96
50,45040
5,05
7,57500
4,07
6,10500
4,77
136,42200
3,82
109,25200
4,64
264,48000
3,82
1.745,74000
80,46
235,74780
0,35
76,30000
0,37
321,90000
61,17
26,91480
66,21
41,05020
241,38
357,24240
2,09
48,40440
17,18
99,47220
2,69
772,03000
2,70
16,20000
1,78
44,50000
3,09
1.180,38000
0,50
2,00000
4,67
10,83440
11,95
0,47800
4,87
25,03180
42,45
42,45000
5,96
23,84000
3,48
6,96000
26,97
72,81900
BDI
1.997,57531

16.08.066
1.01.11
1.01.12
1.01.18
Exerccio:

FS-06-02 FOSSA SEPTICA L=3,80M VOL. UTIL = 9,58M3


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR

2011

5.280,55505

UN
H
H
H

15,00000
15,00000
1,50000

4,60
3,96
5,05

465,22
6,25600
5,38560
4,88448
3,91168
28,35504
48,05560
14,48280
6,17400
16,00620
24,71731
8,98514
24,23690
3,32100
61,60000
1,72500
0,98070
0,99835

585,44
8,05000
6,93000
6,31071
5,05386
36,90192
60,60048
17,70120
8,41260
17,55132
31,93457
11,51060
30,98880
4,61700
73,92000
2,01250
1,26090
1,12205

12.118,22
69,00000
59,40000
7,57500
Pgina: 347

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.09
BLOCO DE CONCRETO 19X19X19CM - 6MPa
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
Mo-de-Obra 2.689,00300
LS
3.280,58366
SubMO
16.08.067
FS-06-03 FOSSA SEPTICA L=5,40M VOL. UTIL = 13,61M3
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.09
BLOCO DE CONCRETO 19X19X19CM - 6MPa
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
Mo-de-Obra 3.426,05440
LS
4.179,78637
SubMO
16.08.068
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.46
2.05.03
2.05.05
2.05.08
2.05.18
2.05.22
2.05.35
2.10.14
2.10.21
2.15.25
Exerccio:

FS-07-01 FOSSA SEPTICA L=4,80M VOL. UTIL = 20,74M3


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 2
PEDRISCO
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
ACO CA-50-A $MD BITOLAS

2011

UN Coeficiente

Custo Unit.

Custo Total

5.969,58666

H
1,50000
H
33,70000
H
33,70000
H
65,00000
H
512,00000
M3
3,21000
KG
247,00000
KG
945,00000
M3
0,48000
M3
0,68000
M3
1,75000
M
27,38000
M2
6,85000
KG
330,00000
KG
7,00000
UN
25,00000
UN
444,00000
UN
4,00000
KG
2,74000
UN
0,04000
KG
6,60000
UN
1,00000
M
4,00000
UN
2,00000
M
2,70000
Material
3.882,62800

4,07
6,10500
4,77
160,74900
3,82
128,73400
4,64
301,60000
3,82
1.955,84000
80,46
258,27660
0,35
86,45000
0,37
349,65000
61,17
29,36160
66,21
45,02280
241,38
422,41500
2,09
57,22420
17,18
117,68300
2,69
887,70000
2,70
18,90000
1,78
44,50000
3,09
1.371,96000
0,50
2,00000
4,67
12,79580
11,95
0,47800
4,87
32,14200
42,45
42,45000
5,96
23,84000
3,48
6,96000
26,97
72,81900
BDI
2.266,00937

7.605,84077

UN
H
20,24000
H
20,24000
H
2,00000
H
2,00000
H
43,00000
H
43,00000
H
85,25000
H
646,50000
M3
4,20000
KG
324,50000
KG
1.231,00000
M3
0,63000
M3
0,85000
M3
2,29000
M
36,80000
M2
9,20000
KG
422,00000
KG
9,00000
UN
38,00000
UN
570,00000
UN
4,00000
KG
3,68000
UN
0,04000
KG
8,44000
UN
1,00000
M
4,00000
UN
2,00000
M
5,50000
Material
5.060,29220

15.579,34
4,60
93,10400
3,96
80,15040
5,05
10,10000
4,07
8,14000
4,77
205,11000
3,82
164,26000
4,64
395,56000
3,82
2.469,63000
80,46
337,93200
0,35
113,57500
0,37
455,47000
61,17
38,53710
66,21
56,27850
241,38
552,76020
2,09
76,91200
17,18
158,05600
2,69
1.135,18000
2,70
24,30000
1,78
67,64000
3,09
1.761,30000
0,50
2,00000
4,67
17,18560
11,95
0,47800
4,87
41,10280
42,45
42,45000
5,96
23,84000
3,48
6,96000
26,97
148,33500
BDI
2.913,21058

UN
H
H
H
H
H
H
H
H
M3
KG
KG
M3
M3
M3
M
M2
KG

22,50000
22,50000
2,00000
2,00000
26,10000
26,10000
85,34000
700,10000
3,95700
288,29000
1.168,48000
0,86400
0,75300
3,24000
40,92000
10,23000
357,00000

4,60
3,96
5,05
4,07
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
66,21
241,38
2,09
17,18
2,69

15.822,10
103,50000
89,10000
10,10000
8,14000
124,49700
99,70200
395,97760
2.674,38200
318,38022
100,90150
432,33760
52,85088
49,85613
782,07120
85,52280
175,75140
960,33000
Pgina: 348

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.15.38
ACO CA-60-B $MD BITOLAS
2.25.09
BLOCO DE CONCRETO 19X19X19CM - 6MPa
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
Mo-de-Obra 3.505,39860
LS
4.276,58629
SubMO
16.08.069
FS-07-02 FOSSA SEPTICA L=5,80M VOL. UTIL = 25,06M3
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.09
BLOCO DE CONCRETO 19X19X19CM - 6MPa
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
Mo-de-Obra 4.001,27400
LS
4.881,55428
SubMO
16.08.070
FS-07-03 FOSSA SEPTICA L=6,40M VOL. UTIL = 29,38M3
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.05.22
PEDRISCO
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.09
BLOCO DE CONCRETO 19X19X19CM - 6MPa
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
2.67.47
PARAFUSO INOX AUTO-ATARR SEXT M6X50
2.67.60
PREGO
2.67.77
BUCHA TIPO S-8 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
6.25.33
TUBO PVC P/ESGOTO 100MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
SubMO
Mo-de-Obra 4.437,00740
LS
5.413,14903

Exerccio:

2011

UN Coeficiente

Custo Unit.

Custo Total

7.781,98489

KG
11,00000
UN
38,00000
UN
574,00000
UN
4,00000
KG
4,09000
UN
0,04000
KG
1,92000
UN
1,00000
M
4,00000
UN
2,00000
M
5,50000
Material
5.081,51543

2,70
29,70000
1,78
67,64000
3,09
1.773,66000
0,50
2,00000
4,67
19,10030
11,95
0,47800
4,87
9,35040
42,45
42,45000
5,96
23,84000
3,48
6,96000
26,97
148,33500
2.958,60507

BDI

8.882,82828

UN
H
26,20000
H
26,20000
H
2,00000
H
2,00000
H
29,60000
H
29,60000
H
97,40000
H
799,10000
M3
4,51600
KG
326,48000
KG
1.336,96000
M3
1,00800
M3
0,86000
M3
3,75000
M
47,64000
M2
11,91000
KG
405,00000
KG
12,00000
UN
38,00000
UN
649,00000
UN
4,00000
KG
4,76400
UN
0,04000
KG
2,18000
UN
1,00000
M
4,00000
UN
2,00000
M
5,50000
Material
5.752,08440

18.000,94
4,60
120,52000
3,96
103,75200
5,05
10,10000
4,07
8,14000
4,77
141,19200
3,82
113,07200
4,64
451,93600
3,82
3.052,56200
80,46
363,35736
0,35
114,26800
0,37
494,67520
61,17
61,65936
66,21
56,94060
241,38
905,17500
2,09
99,56760
17,18
204,61380
2,69
1.089,45000
2,70
32,40000
1,78
67,64000
3,09
2.005,41000
0,50
2,00000
4,67
22,24788
11,95
0,47800
4,87
10,61660
42,45
42,45000
5,96
23,84000
3,48
6,96000
26,97
148,33500
BDI
3.366,02992

9.850,15643

UN
H
29,81000
H
29,81000
H
2,00000
H
2,00000
H
32,80000
H
32,80000
H
106,07000
H
887,35000
M3
4,93460
KG
353,05000
KG
1.468,58000
M3
1,09400
M3
0,95200
M3
4,13000
M
54,20000
M2
13,55000
KG
447,00000
KG
14,00000
UN
38,00000
UN
699,00000
UN
4,00000
KG
5,42000
UN
0,04000
KG
2,38000
UN
1,00000
M
4,00000
UN
2,00000
M
5,50000
Material
6.265,64332

19.822,43
4,60
137,12600
3,96
118,04760
5,05
10,10000
4,07
8,14000
4,77
156,45600
3,82
125,29600
4,64
492,16480
3,82
3.389,67700
80,46
397,03792
0,35
123,56750
0,37
543,37460
61,17
66,91998
66,21
63,03192
241,38
996,89940
2,09
113,27800
17,18
232,78900
2,69
1.202,43000
2,70
37,80000
1,78
67,64000
3,09
2.159,91000
0,50
2,00000
4,67
25,31140
11,95
0,47800
4,87
11,59060
42,45
42,45000
5,96
23,84000
3,48
6,96000
26,97
148,33500
BDI
3.706,63394

Pgina: 349

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

Custo Unit.

Custo Total

16.08.071
FS-08-01 FOSSA SEPTICA ANEIS CONCRETO DN=2,4M H=2,0M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.17
PEDRA BRITADA 1
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.40
FS-08-01 FOSSA SEPTICA ANEIS CONCR. DN=2,4M H=2,0M
6.25.34
TUBO PVC P/ESGOTO 150MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
Mo-de-Obra 833,97870
LS
1.017,45401
SubMO
1.851,43271

UN
H
3,22000
H
3,22000
H
4,00000
H
4,00000
H
18,55000
H
18,55000
H
18,64000
H
30,50000
H
101,27000
M3
0,02000
M3
0,76000
M3
2,27000
KG
51,00000
M
5,90000
M2
1,47000
KG
205,00000
UN
4,00000
KG
0,60000
UN
0,04000
KG
4,10000
UN
1,00000
UN
2,00000
UN
1,00000
M
2,00000
UN
2,00000
M
6,00000
M
23,00000
Material
3.625,42780

6.736,53
4,60
14,81200
3,96
12,75120
5,05
20,20000
4,07
16,28000
4,77
88,48350
3,82
70,86100
4,64
86,48960
4,50
137,25000
3,82
386,85140
80,46
1,60920
62,03
47,14280
241,38
547,93260
1,65
84,15000
4,60
27,14000
17,18
25,25460
2,69
551,45000
0,08
0,32000
4,67
2,80200
0,74
0,02960
4,87
19,96700
42,45
42,45000
4,00
8,00000
2.022,25
2.022,25000
14,04
28,08000
3,48
6,96000
26,97
161,82000
2,09
48,07000
BDI
1.259,67792

16.08.072
FS-08-02 FOSSA SEPTICA ANEIS CONCRETO DN=2,4M H=2,5M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.17
PEDRA BRITADA 1
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.41
FS-08-02 FOSSA SEPTICA ANEIS CONCR. DN=2,4M H=2,5M
6.25.34
TUBO PVC P/ESGOTO 150MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
Mo-de-Obra 990,97010
LS
1.208,98352
SubMO
2.199,95362

UN
H
3,76000
H
3,76000
H
4,10000
H
4,10000
H
21,63000
H
21,63000
H
22,22000
H
38,05000
H
120,75000
M3
0,02500
M3
0,76000
M3
2,65000
KG
66,00000
M
6,85000
M2
1,71000
KG
239,00000
UN
4,00000
KG
0,68000
UN
0,04000
KG
4,80000
UN
1,00000
UN
2,00000
UN
1,00000
M
2,50000
UN
2,00000
M
7,00000
M
31,00000
Material
4.276,33030

7.965,82
4,60
17,29600
3,96
14,88960
5,05
20,70500
4,07
16,68700
4,77
103,17510
3,82
82,62660
4,64
103,10080
4,50
171,22500
3,82
461,26500
80,46
2,01150
62,03
47,14280
241,38
639,65700
1,65
108,90000
4,60
31,51000
17,18
29,37780
2,69
642,91000
0,08
0,32000
4,67
3,17560
0,74
0,02960
4,87
23,37600
42,45
42,45000
4,00
8,00000
2.401,83
2.401,83000
14,04
35,10000
3,48
6,96000
26,97
188,79000
2,09
64,79000
BDI
1.489,54530

16.08.073
1.01.11
1.01.12
1.01.18
1.01.19
1.01.21
1.01.22
1.01.39
1.01.42
1.01.46
2.05.03
2.05.17
2.05.35
2.05.96
2.10.17
Exerccio:

FS-08-03 FOSSA SEPTICA ANEIS CONCRETO DN=2,4M H=3,0M


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
ENCANADOR
AJUDANTE DE ENCANADOR
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
POCEIRO
SERVENTE
AREIA
PEDRA BRITADA 1
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
SARRAFO PINHO APARELHADO 10X2,5 CM

2011

UN
H
H
H
H
H
H
H
H
H
M3
M3
M3
KG
M

4,29000
4,29000
4,20000
4,20000
27,42000
27,42000
23,14000
43,75000
125,73000
0,03000
0,76000
3,03000
83,00000
7,80000

4,60
3,96
5,05
4,07
4,77
3,82
4,64
4,50
3,82
80,46
62,03
241,38
1,65
4,60

9.052,13
19,73400
16,98840
21,21000
17,09400
130,79340
104,74440
107,36960
196,87500
480,28860
2,41380
47,14280
731,38140
136,95000
35,88000
Pgina: 350

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.42
FS-08-03 FOSSA SEPTICA ANEIS CONCR. DN=2,4M H=3,0M
6.25.34
TUBO PVC P/ESGOTO 150MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
SubMO
Mo-de-Obra 1.095,09740
LS
1.336,01883

UN Coeficiente

Custo Unit.

Custo Total

2.431,11623

M2
1,95000
KG
273,00000
UN
4,00000
KG
0,78000
UN
0,04000
KG
5,46000
UN
1,00000
UN
2,00000
UN
1,00000
M
3,00000
UN
2,00000
M
8,00000
M
38,00000
Material
4.928,34140

17,18
33,50100
2,69
734,37000
0,08
0,32000
4,67
3,64260
0,74
0,02960
4,87
26,59020
42,45
42,45000
4,00
8,00000
2.781,41
2.781,41000
14,04
42,12000
3,48
6,96000
26,97
215,76000
2,09
79,42000
BDI
1.692,67525

16.08.074
FS-09-01 FOSSA SEPTICA ANEIS CONCRETO DN=3,0M H=2,5M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.17
PEDRA BRITADA 1
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.50
FS-09-01 FOSSA SEPTICA ANEIS CONCR. DN=3,0M H=2,5M
6.25.34
TUBO PVC P/ESGOTO 150MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
Mo-de-Obra 1.244,06750
LS
1.517,76235
SubMO
2.761,82985

UN
H
5,12000
H
5,12000
H
4,10000
H
4,10000
H
35,01000
H
35,01000
H
24,69000
H
52,21000
H
134,19000
M3
0,02500
M3
1,08000
M3
4,30000
KG
83,00000
M
9,30000
M2
2,33000
KG
387,00000
UN
4,00000
KG
0,93000
UN
0,04000
KG
7,74000
UN
1,00000
UN
2,00000
UN
1,00000
M
2,50000
UN
2,00000
M
7,00000
M
38,00000
Material
6.200,96380

11.024,23
4,60
23,55200
3,96
20,27520
5,05
20,70500
4,07
16,68700
4,77
166,99770
3,82
133,73820
4,64
114,56160
4,50
234,94500
3,82
512,60580
80,46
2,01150
62,03
66,99240
241,38
1.037,93400
1,65
136,95000
4,60
42,78000
17,18
40,02940
2,69
1.041,03000
0,08
0,32000
4,67
4,34310
0,74
0,02960
4,87
37,69380
42,45
42,45000
4,00
8,00000
3.430,13
3.430,13000
14,04
35,10000
3,48
6,96000
26,97
188,79000
2,09
79,42000
BDI
2.061,44254

16.08.075
FS-09-02 FOSSA SEPTICA ANEIS CONCRETO DN=3,0M H=3,0M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.17
PEDRA BRITADA 1
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.23
PARAFUSO 3/16' 2,5CM
2.67.60
PREGO
2.67.78
BUCHA PLASTICA TIPO S-6 (CENTO)
2.70.10
ARAME RECOZIDO N.18
3.87.15
PLACA DE IDENTIFICACAO EM ACRILICO 15X30CM
4.85.71
BRACADEIRA PARA TUBO 200MM ACO GALV.
6.02.51
FS-09-02 FOSSA SEPTICA ANEIS CONCR. DN=3,0M H=3,0M
6.25.34
TUBO PVC P/ESGOTO 150MM
6.26.77
ANEL BORRACHA P/TUBO PVC ESGOTO DN=200MM
6.26.85
TUBO PVC RIGIDO ESGOTO DIAM 200 MM (8")
6.70.21
MANGUEIRA PLASTICA FLEXIVEL 3/4'
SubMO
3.111,33644
Mo-de-Obra 1.401,50290
LS
1.709,83354

UN
H
6,41000
H
6,41000
H
4,20000
H
4,20000
H
43,79000
H
43,79000
H
26,09000
H
59,85000
H
141,83000
M3
0,03000
M3
1,08000
M3
5,38000
KG
103,00000
M
11,64000
M2
2,91000
KG
484,00000
UN
4,00000
KG
1,16000
UN
0,04000
KG
9,68000
UN
1,00000
UN
2,00000
UN
1,00000
M
3,00000
UN
2,00000
M
8,00000
M
48,00000
Material
7.353,13680

12.871,30
4,60
29,48600
3,96
25,38360
5,05
21,21000
4,07
17,09400
4,77
208,87830
3,82
167,27780
4,64
121,05760
4,50
269,32500
3,82
541,79060
80,46
2,41380
62,03
66,99240
241,38
1.298,62440
1,65
169,95000
4,60
53,54400
17,18
49,99380
2,69
1.301,96000
0,08
0,32000
4,67
5,41720
0,74
0,02960
4,87
47,14160
42,45
42,45000
4,00
8,00000
3.941,14
3.941,14000
14,04
42,12000
3,48
6,96000
26,97
215,76000
2,09
100,32000
BDI
2.406,82885

Exerccio:

2011

Pgina: 351

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

16.08.099
SERVICOS EM TRATAMENTO DE ESGOTO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente

SubMO

16.09.003
SM-03 SUMIDOURO - TAMPA DE CONCRETO DN=2,40M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
6.02.60
TAMPA CONCRETO PRE-MOLD C/ SOBRE TAMPA DN=2,40M
Mo-de-Obra 6,76800
LS
8,25696
SubMO
16.09.004
SM-04 SUMIDOURO - TAMPA DE CONCRETO DN=3,00M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.96
ARGAMASSA PRE FABRICADA PARA REJUNTAMENTO
6.02.61
TAMPA CONCRETO PRE-MOLD C/ SOBRE TAMPA DN=3,00M
Mo-de-Obra 8,46000
LS
10,32120
SubMO
16.09.007
SM-03 SUMIDOURO - POCO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.19
PEDRA BRITADA 3
6.02.65
ANEIS PRE-MOLD CONCRETO DN=2,40M
6.25.34
TUBO PVC P/ESGOTO 150MM
Mo-de-Obra 146,25760
LS
178,43427
16.09.008
SM-04 SUMIDOURO - POCO
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.19
PEDRA BRITADA 3
6.02.66
ANEIS PRE-MOLD CONCRETO DN=3,00M
6.25.34
TUBO PVC P/ESGOTO 150MM
Mo-de-Obra 204,34680
LS
249,30310
16.09.099
SERVICOS DE POCO ABSORVENTE
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

SubMO

0,00000

301,12
244,82
244,82000
BDI
56,30860

15,02496

UN
H
0,80000
H
0,80000
M3
0,00800
KG
16,00000
UN
1,00000
Material
396,84368

506,59
4,64
3,71200
3,82
3,05600
80,46
0,64368
1,65
26,40000
369,80
369,80000
BDI
94,72979

18,78120

UN
H
1,00000
H
1,00000
M3
0,01200
KG
20,00000
UN
1,00000
Material
634,96552

804,10
4,64
4,64000
3,82
3,82000
80,46
0,96552
1,65
33,00000
601,00
601,00000
BDI
150,36175

Material

M
H
2,32000
H
15,22000
H
17,54000
M3
0,90400
M
1,00000
M
0,80000
823,48392

4,64
4,50
3,82
58,73
759,16
14,04
BDI
264,08043

453,64990

Material

M
H
3,62000
H
20,88000
H
24,50000
M3
1,41000
M
1,00000
M
1,00000
1.118,86930

1.934,19
4,64
16,79680
4,50
93,96000
3,82
93,59000
58,73
82,80930
1.022,02
1.022,02000
14,04
14,04000
BDI
361,67942

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

324,69187

M2
H
1,06000
H
1,06000
UN
127,32000
Material
28,01040

16.10.011
REVESTIMENTO DE POCOS COM ALVENARIA 1 TIJOLO COM ARGAMASSA
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 18,19320
LS
22,19570
SubMO
40,38890

M2
H
1,70000
H
2,76000
M3
0,09800
KG
15,36000
UN
101,86000
Material
35,67028

Exerccio:

PA-01/01 POCO DE AGUA POTAVEL - SERVICOS - ATE 5 M DE PROFUNDIDADE


CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
POCEIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO
PEDRA BRITADA 1
PEDRA BRITADA 2
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
RIPA DE PEROBA 1X5CM
ACO CA-50-A $MD BITOLAS
ACO CA-60-B $MD BITOLAS
TIJOLO COMUM MACICO

2011

Custo Total

MV
MV
1,00000
Material
244,82000

16.10.010
REVESTIMENTO DE POCOS COM ALVENARIA 1 TIJOLO SEM ARGAMASSA
1.01.42
POCEIRO
1.01.46
SERVENTE
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 8,81920
LS
10,75942
SubMO
19,57862

16.10.020
1.01.11
1.01.21
1.01.22
1.01.39
1.01.42
1.01.46
2.05.03
2.05.05
2.05.08
2.05.17
2.05.18
2.10.21
2.10.32
2.10.60
2.15.25
2.15.38
2.25.15

Custo Unit.

M
H
H
H
H
H
H
M3
KG
KG
M3
M3
M2
M2
M
KG
KG
UN

1,32000
0,61000
0,61000
1,99000
5,60000
8,87000
0,06200
3,01000
21,27000
0,12200
0,05900
0,07000
0,22000
0,76000
1,21000
0,97000
150,87000

BDI

4,50
3,82
0,22
10,94548

BDI

4,50
3,82
80,46
0,35
0,22
17,49361

4,60
4,77
3,82
4,64
4,50
3,82
80,46
0,35
0,37
62,03
61,17
17,18
11,40
2,20
2,69
2,70
0,22

1.412,25
10,76480
68,49000
67,00280
53,09192
759,16000
11,23200

58,53
4,77000
4,04920
28,01040

93,55
7,65000
10,54320
7,88508
5,37600
22,40920

303,67
6,07200
2,90970
2,33020
9,23360
25,20000
33,88340
4,98852
1,05350
7,86990
7,56766
3,60903
1,20260
2,50800
1,67200
3,25490
2,61900
33,19140
Pgina: 352

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
SubMO
176,77616
Mo-de-Obra 79,62890
LS
97,14726

Material

KG
0,23000
70,11151

Custo Unit.

Custo Total

BDI

2,50
56,78416

0,57500

BDI

4,64
4,50
3,82
80,46
0,35
0,37
0,22
56,73503

BDI

4,64
4,50
3,82
80,46
0,35
0,37
0,22
72,07101

BDI

4,64
4,50
3,82
80,46
0,35
0,37
0,22
87,36450

569,44
4,64
3,57280
4,50
101,29500
3,82
89,08240
80,46
0,40230
0,35
0,28000
0,37
0,15170
0,22
31,55900
106,48136

16.10.021
PA-01/02 POCO DE AGUA POTAVEL - DE 5 A 10 M DE PROFUNDIDADE
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 96,52300
SubMO
214,28106
LS
117,75806

M
H
0,77000
H
10,80000
H
11,61000
M3
0,00500
KG
0,80000
KG
0,41000
UN
143,45000
Material
32,39300

16.10.022
PA-01/03 POCO DE AGUA POTAVEL - DE 10 A 15 M DE PROFUNDIDADE
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 126,55820
LS
154,40100
SubMO
280,95920

M
H
0,77000
H
14,41000
H
15,22000
M3
0,00500
KG
0,80000
KG
0,41000
UN
143,45000
Material
32,39300

16.10.023
PA-01/04 POCO DE AGUA POTAVEL - DE 15 A 20 M DE PROFUNDIDADE
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 156,51020
LS
190,94244
SubMO
347,45264

M
H
0,77000
H
18,01000
H
18,82000
M3
0,00500
KG
0,80000
KG
0,41000
UN
143,45000
Material
32,39300

16.10.024
PA-01/05 POCO DE AGUA POTAVEL - DE 20 A 25 M DE PROFUNDIDADE
1.01.39
PEDREIRO
1.01.42
POCEIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 193,95020
LS
236,61924
SubMO
430,56944

M
H
0,77000
H
22,51000
H
23,32000
M3
0,00500
KG
0,80000
KG
0,41000
UN
143,45000
Material
32,39300

BDI

16.10.030
POCO SEMI-ARTESIANO PERF. SOLO ATE 60M - VAZAO 5 M3
2.04.80
M.O./EQUIP. PERF. POCO SEMI-ARTESIANO ATE 60M
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
6.000,00000

7.380,00
6.000,00
6.000,00000
BDI
1.380,00000

16.10.099
SERVICOS DE POCO DE AGUA POTAVEL
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

5,93628

M2
H
0,70000
Material
0,00000

6,78432

UN
H
0,80000
Material
0,00000

5,08824

M2
H
0,60000
Material
0,00000

6,36030

M2
H
0,75000
Material
0,00000

2,39094

M2
H
H
H
L
Material
1,39700

16.11.005
LIMPEZA DA OBRA
1.01.46
SERVENTE
Mo-de-Obra 2,67400

LS

3,26228

16.11.012
LIMPEZA DE APARELHOS SANITARIOS
1.01.46
SERVENTE
Mo-de-Obra 3,05600
LS
3,72832
16.11.013
LIMPEZA DE REVESTIMENTOS HIDRAULICOS
1.01.46
SERVENTE
Mo-de-Obra 2,29200
LS
2,79624
16.11.014
LIMPEZA DE VIDROS
1.01.46
SERVENTE
Mo-de-Obra 2,86500

LS

3,49530

SubMO

SubMO

SubMO

SubMO

SubMO

16.11.020
LIMPEZA DE FACHADA POR HIDROJATEAMENTO
1.01.46
SERVENTE
1.01.55
OPERADOR
9.00.09
MAQUINA LAVA-JATO(AGUA FRIA, PRES 1700PSI)
9.10.08
SOLUCAO LIMPADORA DILUIDA EM AGUA
SubMO
Mo-de-Obra 1,07700
LS
1,31394

Exerccio:

2011

BDI

3,82
1,36534

BDI

3,82
1,56039

BDI

3,82
1,17030

BDI

3,82
1,46287

BDI

3,82
6,95
1,97
1,20
0,87123

0,10000
0,10000
0,10000
1,00000

303,40
3,57280
48,60000
44,35020
0,40230
0,28000
0,15170
31,55900

385,42
3,57280
64,84500
58,14040
0,40230
0,28000
0,15170
31,55900

467,21
3,57280
81,04500
71,89240
0,40230
0,28000
0,15170
31,55900

7,30
2,67400

8,34
3,05600

6,25
2,29200

7,82
2,86500

4,65
0,38200
0,69500
0,19700
1,20000

Pgina: 353

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

16.11.099
SERVICOS DE LIMPEZA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

UN Coeficiente

SubMO

16.13.001
ESCAVACAO MANUAL - PROFUNDIDADE ATE 1.80 M
1.01.46
SERVENTE
Mo-de-Obra 8,78600
LS
10,71892
SubMO
16.13.002
ESCAVACAO MANUAL - PROFUNDIDADE ALEM DE 1.80 M
1.01.46
SERVENTE
Mo-de-Obra 11,46000
LS
13,98120
SubMO
16.13.007
ESCORAMENTO PONTALETADO
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.10.52
ESTRONCAS DE EUCALIPTO - DIAM DE 15CM
2.67.60
PREGO
Mo-de-Obra 2,56800
LS
3,13296

SubMO

16.13.010
APILOAMENTO PARA SIMPLES REGULARIZACAO
1.01.46
SERVENTE
SubMO
Mo-de-Obra 1,52800
LS
1,86416
16.13.015
REATERRO INTERNO APILOADO
1.01.46
SERVENTE
Mo-de-Obra 13,37000
LS
16,31140
16.13.025
LASTRO DE CONCRETO - 5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 4,44800
LS

5,42656

16.13.026
LASTRO DE PEDRA BRITADA - 5CM
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 0,57300
LS
0,69906

SubMO

SubMO

SubMO

16.13.030
ESCORAMENTO DE VALAS CONTINUO AT 2,00M
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.52
ESTRONCAS DE EUCALIPTO - DIAM DE 15CM
2.10.54
PRANCHAS PEROBA DE 3 CM
2.67.60
PREGO
Mo-de-Obra 8,21304
LS
10,01991
SubMO
16.13.031
ESCORAMENTO DE VALAS CONTINUO AT 4,00M
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.66
VIGA DE PEROBA 8X18CM
2.10.88
ESTRONCA DE EUCALIPTO DN 20CM
2.67.60
PREGO
Mo-de-Obra 6,27912
SubMO
LS
7,66053
16.13.035
ESCORAMENTO DE VALAS DESCONTINUO AT 2,00M
1.01.11
CARPINTEIRO
1.01.46
SERVENTE
2.10.27
VIGAS PEROBA DE 6X16 CM
2.10.52
ESTRONCAS DE EUCALIPTO - DIAM DE 15CM
2.10.54
PRANCHAS PEROBA DE 3 CM
2.67.60
PREGO
Mo-de-Obra 6,57288
LS
8,01891
SubMO
16.13.036
1.01.11
1.01.46
2.10.27
2.10.66
2.10.88
Exerccio:

ESCORAMENTO DE VALAS DESCONTINUO AT 4,00M


CARPINTEIRO
SERVENTE
VIGAS PEROBA DE 6X16 CM
VIGA DE PEROBA 8X18CM
ESTRONCA DE EUCALIPTO DN 20CM

2011

0,00000

MV
MV
1,00000
Material
244,82000

19,50492

M3
H
2,30000
Material
0,00000

Custo Unit.

Custo Total

301,12
244,82
244,82000
BDI
56,30860

BDI

3,82
4,48613

25,44120

M3
H
3,00000
Material
0,00000

BDI

3,82
5,85148

5,70096

M2
H
0,30000
H
0,30000
M3
0,01500
M
0,02500
KG
0,10000
Material
21,58040

4,60
3,96
1.393,66
8,34
4,67
BDI
6,27471

3,39216

M2
H
0,40000
Material
0,00000

BDI

3,82
0,78020

29,68140

M3
H
3,50000
Material
0,00000

BDI

3,82
6,82672

9,87456

M2
H
0,30000
H
0,80000
M3
0,03000
KG
10,00000
M3
0,04000
Material
8,56060

BDI

4,64
3,82
80,46
0,37
61,17
4,24009

1,27206

M2
H
0,15000
M3
0,05500
Material
3,36435

BDI

3,82
61,17
1,06637

18,23295

M2
H
0,67100
H
1,34200
M
0,10530
M
0,07020
M2
0,23160
KG
0,70000
Material
20,93280

BDI

4,60
3,82
13,00
8,34
67,83
4,67
9,00812

13,93965

M2
H
0,51300
H
1,02600
M
1,34620
M
0,10260
M
0,06840
KG
0,70000
Material
23,52167

BDI

4,60
3,82
13,00
18,15
13,01
4,67
8,61610

14,59179

M2
H
0,53700
H
1,07400
M
0,10530
M
0,07020
M2
0,11600
KG
0,56000
Material
12,43785

BDI

4,60
3,82
13,00
8,34
67,83
4,67
6,21682

M2
H
H
M
M
M

0,42000
0,83000
0,68000
0,10260
0,06840

4,60
3,82
13,00
18,15
13,01

23,99
8,78600

31,29
11,46000

33,55
1,38000
1,18800
20,90490
0,20850
0,46700

4,17
1,52800

36,50
13,37000

22,67
1,39200
3,05600
2,41380
3,70000
2,44680

5,70
0,57300
3,36435

48,17
3,08660
5,12644
1,36890
0,58547
15,70943
3,26900

46,07
2,35980
3,91932
17,50060
1,86219
0,88988
3,26900

33,24
2,47020
4,10268
1,36890
0,58547
7,86828
2,61520

31,40
1,93200
3,17060
8,84000
1,86219
0,88988
Pgina: 354

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.67.60
PREGO
Mo-de-Obra 5,10260

LS

6,22517

16.13.099
SERVICOS EM TERRA - MUROS DE ARRIMO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente
SubMO

SubMO

Material

0,00000

MV
MV
1,00000
Material
244,82000

16.14.004
FORNEC INST E PROTENSAO DE TIRANTES P/25T SOLO INCL MOB,TRANSP,INSTAL
2.15.54
FORN INST E PROTENSAO TIRANTES 25T SOLO C/TX INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
16.14.006
FORMAS DE MADEIRA MACICA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.67.60
PREGO
Mo-de-Obra 11,12800
LS
13,57616

KG
0,56000
14,20727

11,32777

M
M
1,00000
175,00000

24,70416

M2
H
1,30000
H
1,30000
M
3,00000
M2
0,50000
KG
0,20000
Material
20,86400

16.14.009
FORMAS PLANAS PLASTIFICADAS PARA CONCRETO APARENTE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.34
CHAPA COMPENSADA PLASTIFICADA E=12MM
2.67.60
PREGO
Mo-de-Obra 17,12000
LS
20,88640
SubMO
38,00640

M2
H
2,00000
H
2,00000
M
3,00000
M2
0,10000
M2
0,33000
KG
0,20000
Material
19,94520

16.14.011
ACO CA 50 (A OU B) FYK = 500 M PA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.25
ACO CA-50-A $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,19090

0,10000
0,10000
1,15000
0,02000

1,90698

KG
H
H
KG
KG
Material
3,20240

16.14.012
ACO CA 60 (A OU B) FYK = 600 M PA
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.38
ACO CA-60-B $MD BITOLAS
2.70.10
ARAME RECOZIDO N.18
Mo-de-Obra 0,85900
LS
1,04798

SubMO

SubMO

SubMO

16.14.013
TELA ARMADURA (MALHA ACO CA 60 FYK = 600 M PA)
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.60
TELA ARMADURA (MALHA AO CA-60)
Mo-de-Obra 0,25770
LS
0,31439
SubMO
16.14.034
CONCRETO DOSADO E LANCADO FCK= 20 M PA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.35
CONCRETO DOSADO (CONDICAO-A) FCK 20 M PA
SubMO
Mo-de-Obra 50,76000
LS
61,92720
16.14.038
CONCRETO DOSADO E LANCADO FCK=25 MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
Mo-de-Obra 50,76000
LS
61,92720
16.14.039
CONCRETO DOSADO E LANCADO FCK=30MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.38
CONCRETO DOSADO (CONDICAO A) FCK=30MPA
Mo-de-Obra 50,76000
LS
61,92720

SubMO

SubMO

Exerccio:

CONCRETO DOSADO BOMBEADO E LANCADO FCK=25 MPA


PEDREIRO

2011

BDI

Custo Total

4,67
5,87306

2,61520

301,12
244,82
244,82000
BDI
56,30860
215,25
175,00
175,00000
BDI
40,25000
56,04
5,98000
5,14800
11,34000
8,59000
0,93400

BDI

4,60
3,96
3,78
17,18
4,67
10,48068

BDI

4,60
3,96
3,78
17,18
18,04
4,67
13,32887

BDI

4,77
3,82
2,69
4,87
1,17251

BDI

4,77
3,82
2,70
4,87
1,17516

0,57209

KG
H
0,03000
H
0,03000
KG
1,10000
Material
4,70800

BDI

4,77
3,82
4,28
1,21442

112,68720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
246,20760

441,44
4,64
27,84000
3,82
22,92000
241,38
246,20760
BDI
82,54580

112,68720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
256,81560

454,48
4,64
27,84000
3,82
22,92000
251,78
256,81560
BDI
84,98564

112,68720

M3
H
6,00000
H
6,00000
M3
1,02000
Material
269,30040

469,84
4,64
27,84000
3,82
22,92000
264,02
269,30040
BDI
87,85715

M3
H
3,00000
H
3,00000
M3
1,02000
Material
283,93740

418,54
4,64
13,92000
3,82
11,46000
278,37
283,93740
BDI
78,26463

16.14.044
CONCRETO DOSADO,BOMBEADO E LANCADO FCK= 20 M PA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.53
CONCRETO DOSADO (CONDICAO-A) BOMB FCK 20 M PA
SubMO
56,34360
Mo-de-Obra 25,38000
LS
30,96360
16.14.048
1.01.39

Custo Unit.

M3
H

3,00000

4,64

71,28
9,20000
7,92000
11,34000
1,71800
5,95320
0,93400

6,27
0,47700
0,38200
3,09350
0,09740

6,28
0,47700
0,38200
3,10500
0,09740

6,49
0,14310
0,11460
4,70800

437,45
13,92000
Pgina: 355

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

1.01.46
SERVENTE
2.05.37
CONCRETO DOSADO (CONDICAO A) BOMB FCK 25 MPA
SubMO
Mo-de-Obra 25,38000
LS
30,96360
16.14.049
CONCRETO DOSADO, BOMBEADO E LANCADO FCK=30MPA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.39
CONCRETO DOSADO (CONDICAO A) BOMB FCK=30MPA
Mo-de-Obra 25,38000
LS
30,96360
SubMO
16.14.055
CONCRETO GROUT
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.22
PEDRISCO
Mo-de-Obra 88,96000

LS

108,53120

SubMO

16.14.099
SERVICOS EM CONCRETO ARMADO - MUROS DE ARRIMO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

56,34360

Material

3,82
11,46000
293,44
299,30880
BDI
81,80005

56,34360

M3
H
3,00000
H
3,00000
M3
1,02000
Material
310,16160

450,80
4,64
13,92000
3,82
11,46000
304,08
310,16160
BDI
84,29620

197,49120

M3
H
6,00000
H
16,00000
M3
0,72000
KG
20,00000
KG
283,00000
M3
0,28000
Material
188,18000

BDI

474,37
4,64
27,84000
3,82
61,12000
80,46
57,93120
0,35
7,00000
0,37
104,71000
66,21
18,53880
88,70438

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

M2
H
1,90000
H
1,10000
M3
0,02300
KG
4,14000
KG
3,24000
UN
13,00000
29,71838

16.15.010
ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 19X19X39CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.76
BLOCO DE CONCRETO 19X19X39CM - 6MPa
Mo-de-Obra 13,67300
LS
16,68106
Material
SubMO
30,35406

M2
H
2,00000
H
1,15000
M3
0,01500
KG
2,76000
KG
2,16000
UN
13,00000
43,14210

16.15.029
IMPERMEAB COM ARGAM CIM/AREIA 1:3 COM HIDROFOGO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
Mo-de-Obra 9,22400
LS
11,25328
SubMO
20,47728

M2
H
H
M3
KG
KG
Material
5,87326

16.15.031
IMPERMEABILIZACAO POR CRISTALIZACAO - MUROS DE ARRIMO
1.01.39
PEDREIRO
2.40.09
CIMENTO CRISTALIZANTE PARA IMPERMEABILIZACAO
2.40.10
EMULSAO ADESIVA PVA
Mo-de-Obra 0,46400
LS
0,56608
SubMO
1,03008

M2
H
0,10000
KG
3,00000
KG
0,15000
Material
6,14250

16.15.034
MANTA GEOTEXTIL DE 300GR/M2
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.40.49
BIDIM OP-30 (300 GR/M2)
Mo-de-Obra 2,53800
LS
3,09636

M2
H
0,30000
H
0,30000
M2
1,00000
Material
3,89000

Exerccio:

DRENAGEM COM PEDRA BRITADA


SERVENTE
PEDRA BRITADA 2

2011

5,63436

M3
H
M3

BDI

4,64
3,82
80,46
0,35
0,37
1,94
13,48222

BDI

4,64
3,82
80,46
0,35
0,37
3,09
16,90412

BDI

4,64
3,82
80,46
0,37
2,50
6,06062

BDI

4,64
3,82
80,46
0,37
6,23
2,50
7,68857

BDI

4,64
1,49
11,15
1,64969

BDI

4,64
3,82
3,89
2,19060

1,00000
1,20000
0,02100
9,28000
0,30000

16.15.030
IMPERM COM TINTA BETUMINOSA / COM REG. EM ARGAMASSA CIM AREIA 1:3
M2
1.01.39
PEDREIRO
H
1,00000
1.01.46
SERVENTE
H
1,30000
2.05.03
AREIA
M3
0,02100
2.05.08
CIMENTO
KG
9,28000
2.40.56
TINTA BETUMINOSA
L
1,00000
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
KG
0,30000
Mo-de-Obra 9,60600
LS
11,71932
Material
12,10326
SubMO
21,32532

16.15.040
1.01.46
2.05.18

Custo Total

H
3,00000
M3
1,02000
299,30880

16.15.009
ALVENARIA AUTO-PORTANTE: BLOCO CONCRETO ESTRUTURAL DE 14X19X39CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.04
BLOCO DE CONCRETO 14X19X39CM - 6MPa
SubMO
28,89996
Mo-de-Obra 13,01800
LS
15,88196
Material

SubMO

Custo Unit.

2,50000
1,10000

3,82
61,17

72,10
8,81600
4,20200
1,85058
1,44900
1,19880
25,22000

90,40
9,28000
4,39300
1,20690
0,96600
0,79920
40,17000

32,41
4,64000
4,58400
1,68966
3,43360
0,75000

41,11
4,64000
4,96600
1,68966
3,43360
6,23000
0,75000

8,82
0,46400
4,47000
1,67250

11,71
1,39200
1,14600
3,89000

108,84
9,55000
67,28700

Pgina: 356

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 9,55000

LS

11,65100

UN Coeficiente
21,20100

Material

20,35224

16,96080

M3
H
2,00000
M3
1,10000
Material
88,50600

BDI

3,82
80,46
24,25736

16.15.049
MURO EM GABIAO COM TELA GALVANIZADA 8/10CM - FIO DIAM 2,7MM
1.01.01
AJUDANTE
1.01.92
ARTIFICE
2.70.12
GABIAO MALHA 8/10 FIO 2,7MM INC ARAME ZINC P/ AMAR
2.80.29
PEDRA RACHAO D=10A15CM
Mo-de-Obra 26,19000
LS
31,95180
SubMO
58,14180

M3
H
3,00000
H
3,00000
M3
1,00000
M3
1,15000
Material
172,67450

BDI

3,90
4,83
99,50
63,63
53,08775

16.15.099
OUTROS SERVICOS - MUROS DE ARRIMO
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

16.18.029
PROJETO ARQUITETONICO COMPLETO (ARQ/EST/HID/ELE/INC)
2.04.88
PROJETO ARQUITETONICO COMPLETO (ARQ/EST/HID/ELE/INC)
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

M2
M2
1,00000
Material
47,33000

16.18.030
PROJETO DE ARQUITETURA COMPLETO
2.04.89
PROJETO DE ARQUITETURA COMPLETO
Mo-de-Obra 0,00000
LS
0,00000

0,00000

M2
M2
1,00000
Material
23,50000

0,00000

M2
M2
1,00000
Material
8,98000

0,00000

16.18.001
SERVICOS - CIVIL
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

LS

0,00000

SubMO

SubMO

SubMO

67,28700

Custo Total

BDI

16.15.041
DRENAGEM COM AREIA GROSSA
1.01.46
SERVENTE
2.05.03
AREIA
Mo-de-Obra 7,64000
LS
9,32080

SubMO

Custo Unit.

129,72
7,64000
88,50600

283,90
11,70000
14,49000
99,50000
73,17450

58,21
47,33000

BDI

47,33
10,88590

BDI

23,50
5,40500

BDI

8,98
2,06540

M2
M2
1,00000
Material
10,26000

BDI

10,26
2,35980

16.18.050
PROJETO EXECUTIVO DE ARQUITETURA - PRANCHA TECNICA (ELEV/PLAT)
2.04.83
FORNECIMENTO DE PROJ EXEC ARQ - PRANCHA TECNICA
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

UN
UN
1,00000
Material
1.151,98000

1.416,93
1.151,98
1.151,98000
BDI
264,95540

16.18.051
PROJETO EXECUTIVO DE ESTRUTURA - PRANCHA TECNICA (ELEV/PLAT)
2.04.84
FORNECIMENTO DE PROJ EXEC EST - PRANCHA TECNICA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
921,58000

1.133,54
921,58
921,58000
BDI
211,96340

16.18.061
LEVANTAMENTO PLANIALTIMETRICO
2.04.81
LEVANTAMENTO PLANIALTIMETRICO
Mo-de-Obra 0,00000
LS
0,00000

0,00000

M2
M2
1,00000
Material
0,10000

SubMO

16.18.040
PROJETO EXECUTIVO DE ARQUITETURA
2.04.90
FORNECIMENTO DE PROJ. EXEC. DE ARQUITETURA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.18.041
PROJETO EXECUTIVO DE ESTRUTURA
2.04.91
FORNECIMENTO DE PROJ. EXEC. DE ESTRUTURA
Mo-de-Obra 0,00000
LS
0,00000
SubMO

16.18.062
LEVANTAMENTO CADASTRAL
2.04.82
LEVANTAMENTO CADASTRAL
Mo-de-Obra 0,00000
LS
16.19.001
SERVICOS - HIDRAULICA
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS

0,00000

0,00000

SubMO

SubMO

SubMO

16.19.040
PROJETO EXECUTIVO DE HIDRAULICA
2.04.92
FORNECIMENTO DE PROJ. EXEC. DE HIDRAULICA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.19.041
PROJETO EXECUTIVO DE INCENDIO
2.04.93
FORNECIMENTO DE PROJ. EXEC. DE INCENDIO
Mo-de-Obra 0,00000
LS
0,00000

SubMO

Exerccio:

SERVICOS - ELETRICA
MODULO DE VERBA

2011

11,04
8,98000

12,61
10,26000

0,12
0,10000

BDI

0,10
0,02300

0,00000

M2
M2
1,00000
Material
0,14000

BDI

0,14
0,03220

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

M2
M2
1,00000
Material
3,52000

0,00000

16.19.050
PROJETO EXECUTIVO DE HIDRAULICA - PRANCHA TECNICA (ELEV/PLAT)
2.04.85
FORNECIMENTO DE PROJ EXEC HID - PRANCHA TECNICA
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000
16.20.001
6.96.02

28,90
23,50000

0,17
0,14000

4,32
3,52000

BDI

3,52
0,80960

M2
M2
1,00000
Material
0,61000

BDI

0,61
0,14030

UN
UN
1,00000
Material
529,91000

651,78
529,91
529,91000
BDI
121,87930

MV
MV

1,00000

244,82

0,75
0,61000

301,12
244,82000

Pgina: 357

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente
SubMO

Material

0,00000

UN
UN
1,00000
Material
26.450,00000

32.533,50
26.450,00
26.450,00000
BDI
6.083,50000

16.20.022
ELEVADOR 2 PARADAS MAQ CONJUGADA PORTA UNILARERAL (ACESSIB)
6.65.22
FORN INST DE ELEVADOR 2 PARADAS C/ PORTA UNILATERAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
51.500,00000

63.345,00
51.500,00
51.500,00000
BDI
11.845,00000

16.20.023
ELEVADOR 3 PARADAS MAQ CONJUGADA PORTA UNILATERAL (ACESSIB)
6.65.23
FORN INST DE ELEVADOR 3 PARADAS C/ PORTA UNILATERAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
54.400,00000

66.912,00
54.400,00
54.400,00000
BDI
12.512,00000

16.20.024
ELEVADOR 4 PARADAS MAQUINA CONJUGADA COM PORTAS UNILATERAIS
6.65.24
FORN INST DE ELEVADOR 4 PARADAS C/ PORTA UNILATERAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
96.000,00000

118.080,00
96.000,00
96.000,00000
BDI
22.080,00000

16.20.025
ELEVADOR 5 PARADAS MAQUINA CONJUGADA COM PORTAS BILATERAIS
6.65.25
FORN INST DE ELEVADOR 5 PARADAS C/ PORTA BILATERAL
SubMO
0,00000
Mo-de-Obra 0,00000
LS
0,00000

UN
UN
1,00000
101.000,0000
Material
0

124.230,00
101.000,00
101.000,00000
BDI
23.230,00000

16.20.026
ELEVADOR 5 PARADAS MAQUINA CONJUGADA COM PORTAS UNILATERAIS
6.65.26
FORN INST DE ELEVADOR 5 PARADAS C/ PORTA UNILATERAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
98.000,00000

120.540,00
98.000,00
98.000,00000
BDI
22.540,00000

16.20.029
ELEVADOR 4 PARADAS MAQUINA CONJUGADA COM PORTAS BILATERAIS
6.65.34
FORN INST DE ELEVADOR 4 PARADAS C/ PORTA BILATERAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
98.000,00000

120.540,00
98.000,00
98.000,00000
BDI
22.540,00000

16.20.033
ELEVADOR 3 PARADAS MAQUINA CONJUGADA COM PORTAS BILATERAIS
6.65.33
FORN INST DE ELEVADOR 3 PARADAS C/ PORTA BILATERAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
96.000,00000

118.080,00
96.000,00
96.000,00000
BDI
22.080,00000

16.20.040
PROJETO EXECUTIVO DE ELETRICA
2.04.94
FORNECIMENTO DE PROJ. EXEC. DE ELETRICA
Mo-de-Obra 0,00000
LS
0,00000

M2
M2
1,00000
Material
3,98000

BDI

16.20.041
MANUTENCAO INTEGRAL P/ PLATAFORMA NOVA 2 PARADAS - MENSAL
6.65.11
MANUT INTEGRAL P/ PLAT NOVA 2 PARADAS - MENSAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
449,35000

552,70
449,35
449,35000
BDI
103,35050

16.20.042
MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 2 PARADAS - MENSAL
6.65.12
MANUT INTEGRAL P/ ELEV NOVO 2 PARADAS - MENSAL
Mo-de-Obra 0,00000
SubMO
0,00000
LS
0,00000

UN
UN
1,00000
Material
592,86000

729,21
592,86
592,86000
BDI
136,35780

16.20.043
MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 3 PARADAS - MENSAL
6.65.13
MANUT INTEGRAL P/ ELEV NOVO 3 PARADAS - MENSAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
675,19000

830,48
675,19
675,19000
BDI
155,29370

16.20.044
MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 4 PARADAS - MENSAL
6.65.14
MANUT INTEGRAL P/ ELEVADOR NOVO 4 PARADAS - MENSAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
739,13000

909,12
739,13
739,13000
BDI
169,99990

16.20.045
MANUTENCAO INTEGRAL P/ ELEVADOR NOVO 5 PARADAS - MENSAL
6.65.15
MANUT INTEGRAL P/ ELEVADOR NOVO 5 PARADAS - MENSAL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
816,66000

1.004,49
816,66
816,66000
BDI
187,83180

16.20.050
PROJETO EXECUTIVO DE ELETRICA - PRANCHA TECNICA (ELEV/PLAT)
2.04.86
FORNECIMENTO DE PROJ EXEC ELE - PRANCHA TECNICA
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
764,92000

940,85
764,92
764,92000
BDI
175,93160

16.30.012
1.01.11
1.01.12
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.08
2.05.18
2.10.01
Exerccio:

CANTEIRO DE OBRAS - LARG 2,20M


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 2
CAIBRO PEROBA DE 5X6CM

2011

SubMO

0,00000

M2
H
H
H
H
H
H
M3
KG
M3
M

1,68200
1,65200
0,98150
1,06200
0,94400
3,21360
0,05890
20,74000
0,18960
2,57250

BDI

Custo Total

0,00000

16.20.020
PLATAFORMA 2 PARADAS PORTAS UNILATERAIS
6.65.20
PLATAFORMA 2 PARADAS HID PORTAS UNIL FORN/INST
Mo-de-Obra 0,00000
LS
0,00000
SubMO

244,82000

Custo Unit.

56,30860

3,98
0,91540

4,60
3,96
4,64
4,74
3,80
3,82
80,46
0,37
61,17
4,32

4,89
3,98000

218,24
7,73720
6,54192
4,55416
5,03388
3,58720
12,27595
4,73909
7,67380
11,59783
11,11320
Pgina: 358

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.10.60
RIPA DE PEROBA 1X5CM
2.56.61
TELHA TECNOLOGIA CRFS ONDULADA 6MM
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
2.67.60
PREGO
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.39
LIXA PARA MADEIRA
6.96.02
MODULO DE VERBA
SubMO
Mo-de-Obra 39,73031
LS
48,47098
16.30.013
CANTEIRO DE OBRAS - LARG 3,30M
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.01
CAIBRO PEROBA DE 5X6CM
2.10.05
MADEIRA SERRADA PESADA EXTERNA (G1-C5)
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.10.60
RIPA DE PEROBA 1X5CM
2.56.61
TELHA TECNOLOGIA CRFS ONDULADA 6MM
2.66.07
PARAFUSO OU GANCHO P/ FIX TELHA FIBRA ONDULADA
2.67.60
PREGO
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.39
LIXA PARA MADEIRA
6.96.02
MODULO DE VERBA
Mo-de-Obra 32,90212
LS
40,14059
SubMO
16.30.014
TAPUME MOVEL VERTICAL
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.10.60
RIPA DE PEROBA 1X5CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 9,01318
LS
10,99607
16.30.015
1.01.11
1.01.12
1.01.21
1.01.22
1.01.39
1.01.40
1.01.41
1.01.46
2.05.03
2.05.08
2.05.18
2.10.14
2.10.21
2.10.32
2.10.60
Exerccio:

TAPUME MOVEL HORIZONTAL


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
PINTOR
AJUDANTE DE PINTOR
SERVENTE
AREIA
CIMENTO
PEDRA BRITADA 2
SARRAFO PINHO APARELHADO 5X2,5 CM
TABUAS PINHO DE 1"X12" DE 3A.
CHAPA COMPENSADA RESINADA E=12MM
RIPA DE PEROBA 1X5CM

2011

SubMO

Custo Unit.

Custo Total

88,20129

M3
0,00300
M2
0,42900
M
1,81200
M2
0,64400
UN
0,80000
KG
0,04950
L
0,59000
L
0,47200
UN
0,70800
MV
0,10000
Material
89,23453

1.393,66
11,40
2,20
12,91
0,49
4,67
4,23
10,36
0,35
244,82
BDI
40,81024

73,04271

M2
H
1,36000
H
1,34000
H
0,87000
H
0,82800
H
0,73600
H
2,77000
M3
0,05000
KG
18,41000
M3
0,89000
M
2,15000
M3
0,00270
M2
0,33330
M
1,61000
M2
0,55200
UN
0,70000
KG
0,04000
L
0,46000
L
0,36800
UN
0,55200
MV
0,16000
Material
138,44730

4,60
3,96
4,64
4,74
3,80
3,82
80,46
0,37
61,17
4,32
1.393,66
11,40
2,20
12,91
0,49
4,67
4,23
10,36
0,35
244,82
BDI
48,64270

20,00925

M
H
0,32290
H
0,32290
H
0,03330
H
0,03330
H
0,04000
H
0,66150
H
0,58800
H
0,10670
M3
0,00400
KG
2,20000
M3
0,00530
M
0,16670
M2
0,33330
M2
0,08830
M
0,89710
KG
0,38330
KG
0,01760
KG
0,00670
L
0,36750
L
0,05880
UN
0,44100
Material
13,97872
M
H
H
H
H
H
H
H
H
M3
KG
M3
M
M2
M2
M

0,20880
0,20880
0,03330
0,03330
0,04000
0,32850
0,29200
0,10670
0,00400
2,20000
0,00530
0,16670
0,04170
0,04480
0,45050

BDI

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,37
61,17
2,09
17,18
11,40
2,20
2,69
4,67
4,87
4,23
10,36
0,35
7,81723

4,60
3,96
4,77
3,82
4,64
4,74
3,80
3,82
80,46
0,37
61,17
2,09
17,18
11,40
2,20

4,18098
4,89060
3,98640
8,31404
0,39200
0,23117
2,49570
4,88992
0,24780
24,48200

260,13
6,25600
5,30640
4,03680
3,92472
2,79680
10,58140
4,02300
6,81170
54,44130
9,28800
3,76288
3,79962
3,54200
7,12632
0,34300
0,18680
1,94580
3,81248
0,19320
39,17120

41,80
1,48534
1,27868
0,15884
0,12721
0,18560
3,13551
2,23440
0,40759
0,32184
0,81400
0,32420
0,34840
5,72609
1,00662
1,97362
1,03108
0,08219
0,03263
1,55453
0,60917
0,15435

23,82
0,96048
0,82685
0,15884
0,12721
0,18560
1,55709
1,10960
0,40759
0,32184
0,81400
0,32420
0,34840
0,71641
0,51072
0,99110
Pgina: 359

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia
2.15.25
ACO CA-50-A $MD BITOLAS
2.67.60
PREGO
2.70.10
ARAME RECOZIDO N.18
3.75.13
TINTA LATEX ECONOMICA
3.80.09
SELADOR P/PINTURA LATEX
3.80.39
LIXA PARA MADEIRA
Mo-de-Obra 5,33326
LS

Descrio

6,50658

16.30.016
ANDAIME - FACHADA - ALUGUEL MENSAL
2.12.10
ANDAIME-FACHADA-ALUGUEL MENSAL
Mo-de-Obra 0,00000
LS
0,00000
16.30.017
ANDAIME - TORRE - ALUGUEL MENSAL
2.12.21
ANDAIME TIPO TORRE - ALUGUEL MENSAL
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente

SubMO

SubMO

SubMO

16.31.019
REFORCO FUNDACOES ESTACAS RAIZ 50T
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.73
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=200MM ATE 50 TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 2,57700
LS
3,14394
SubMO
16.31.021
REFORCO FUNDACOES ESTACA RAIZ 20T
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.71
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=150MM ATE 25 TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 2,23340
LS
2,72475
SubMO
16.31.023
REFORCO FUNDACOES ESTACA RAIZ 30T
1.01.21
FERREIRO
1.01.46
SERVENTE
2.02.72
MAO DE OBRA EQUIP P/ ESTACA RAIZ D=160MM ATE 30 TF
2.05.03
AREIA
2.05.08
CIMENTO
2.15.20
ACO CA-50 DE 5/8" - 15,9MM
Mo-de-Obra 2,23340
LS
2,72475
SubMO

Custo Unit.

0,38330
0,01710
0,00670
0,18250
0,14600
0,21900

Custo Total

11,83984

KG
KG
KG
L
L
UN
Material
7,53142

BDI

2,69
4,67
4,87
4,23
10,36
0,35
4,45539

BDI

5,42
1,24660

BDI

13,28
3,05440

1,03108
0,07986
0,03263
0,77198
1,51256
0,07665

0,00000

M2
M2
1,00000
Material
5,42000

0,00000

Material

M
M
1,00000
13,28000

5,72094

M
H
0,30000
H
0,30000
M
1,00000
M3
0,06500
KG
40,00000
KG
10,20000
Material
220,68390

278,47
4,77
1,43100
3,82
1,14600
174,44
174,44000
80,46
5,22990
0,37
14,80000
2,57
26,21400
BDI
52,07311

4,95815

M
H
0,26000
H
0,26000
M
1,00000
M3
0,04500
KG
27,00000
KG
9,20000
Material
191,78470

241,99
4,77
1,24020
3,82
0,99320
154,53
154,53000
80,46
3,62070
0,37
9,99000
2,57
23,64400
BDI
45,25086

4,95815

M
H
0,26000
H
0,26000
M
1,00000
M3
0,05100
KG
31,00000
KG
9,20000
Material
201,39746

253,81
4,77
1,24020
3,82
0,99320
162,18
162,18000
80,46
4,10346
0,37
11,47000
2,57
23,64400
BDI
47,46179

6,66
5,42000

16,33
13,28000

16.31.024
ESTACA REACAO PARA 20T CRAVADA ALEM 5,00M DE PROFUNDIDADE
2.02.10
ESTACA REACAO P/ 20T CRAVADA ALEM 5.00M PROF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

Material

M
M
1,00000
162,30000

199,62
162,30
162,30000
BDI
37,32900

16.31.025
ESTACA REACAO P/20T CRAVADA ATE 5,00 M DE PROFUNDIDADE
2.02.11
ESTACA REACAO P/ 20T CRAVADA ATE 5.00M PROF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
1.066,97000

1.312,37
1.066,97
1.066,97000
BDI
245,40310

16.31.026
ESTACA REACAO PARA 30T CRAVADA ALEM 5,00M DE PROFUNDIDADE
2.02.12
ESTACA REACAO P/30T CRAVADA ALEM 5.00M PROF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

Material

M
M
1,00000
164,30000

202,08
164,30
164,30000
BDI
37,78900

16.31.027
ESTACA REACAO P/30T CRAVADA ATE 5,00M DE PROFUNDIDADE
2.02.13
ESTACA REACAO P/30T CRAVADA ATE 5.00M PROF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

UN
UN
1,00000
Material
1.340,97000

1.649,39
1.340,97
1.340,97000
BDI
308,42310

16.32.034
JATEAMENTO ABRASIVO COM XIDO DE ALUMNIO
1.01.46
SERVENTE
1.01.55
OPERADOR
8.01.97
EQUIPAMENTO JATO DE AREIA COMPLETO C/COMPRESSOR
8.81.14
OLEO DIESEL
9.10.21
OXIDO DE ALUMINIO
Mo-de-Obra 3,16800
SubMO
7,03296
LS
3,86496

M2
H
0,48000
H
0,19200
H
0,19200
L
3,00000
KG
4,00000
Material
15,46720

16.35.001
DEFINICAO E DEMARCACAO DA AREA DE REPARO, COM DISCO DE CORTE
1.01.39
PEDREIRO
1.01.46
SERVENTE
8.80.70
DISCO DE CORTE DIAMANTADO
9.00.01
SERRA CIRCULAR MANUAL
SubMO
1,87812
Mo-de-Obra 0,84600
LS
1,03212

M
H
H
UN
H
Material
0,53380

Exerccio:

2011

BDI

3,82
6,95
21,60
2,00
1,33
5,17504

BDI

4,64
3,82
24,29
0,48
0,55474

0,10000
0,10000
0,02000
0,10000

27,67
1,83360
1,33440
4,14720
6,00000
5,32000

2,96
0,46400
0,38200
0,48580
0,04800

Pgina: 360

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

16.35.002
ESCARIFICACAO MANUAL (CORTE DE CONCRETO) ATE 3CM DE PROFUNDIDADE
M2
1.01.46
SERVENTE
H
10,00000
Mo-de-Obra 38,20000
LS
46,60400
Material
0,00000
SubMO
84,80400
16.35.003
ESCARIFICACAO COM DISCO DE DESBASTE ATE 0,5CM DE PROFUNDIDADE
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.80.05
DISCO DE DESBASTE 7"
9.00.02
LIXADEIRA ELETRICA
Mo-de-Obra 4,23000
LS
5,16060
SubMO
9,39060

M2
H
H
UN
H
Material
2,60900

M2
H
5,00000
H
1,50000
L
5,00000
H
2,50000
Material
49,42500

ESCARIFICACAO MECANICA,CORTE CONCRETO C/REBARBADORES ELETR ATE


M2
5,0CM
1.01.39
PEDREIRO
H
6,00000
1.01.46
SERVENTE
H
3,00000
9.00.03
REBARBADOR ELETRICO E PONTEIROS
H
6,00000
Mo-de-Obra 39,30000
LS
47,94600
SubMO
87,24600
Material
7,62000

Custo Total

BDI

3,82
19,50492

BDI

4,64
3,82
8,90
0,59
2,75991

BDI

4,64
3,82
1,27
13,09151

BDI

4,64
3,82
2,00
15,77
26,13941

0,50000
0,50000
0,26000
0,50000

16.35.004
ESCARIFICACAO MECANICA,CORTE DE CONCRETO ATE 3,0CM PROFUNDIDADE
M2
1.01.39
PEDREIRO
H
3,60000
1.01.46
SERVENTE
H
1,80000
9.00.03
REBARBADOR ELETRICO E PONTEIROS
H
3,60000
Mo-de-Obra 23,58000
LS
28,76760
SubMO
52,34760
Material
4,57200
16.35.005
DEMOLICAO C/MARTELETES PNEUMATICOS ATE 5,0CM DE PROFUNDIDADE
1.01.39
PEDREIRO
1.01.46
SERVENTE
8.81.14
OLEO DIESEL
9.00.04
COMPRESSOR (250 PCM) 2 MARTEL TEX20 FILTROS LINHA
Mo-de-Obra 28,93000
LS
35,29460
SubMO
64,22460

Custo Unit.

16.35.006

BDI

BDI

3,82
0,59
4,20
0,56985

2,79853

M2
H
0,33000
UN
0,25000
Material
0,65000

BDI

3,82
2,60
0,79316

41,20320

M2
H
4,00000
H
4,00000
UN
0,00100
Material
3,50350

4,64
0,85
103,50
BDI
10,28254

14,54100

M2
H
1,00000
H
0,50000
KG
0,20000
Material
0,72200

M
H
0,25000
H
0,25000
UN
0,05000
Material
0,35750

16.35.008
ESCOVAMENTO MANUAL
1.01.46
SERVENTE
9.10.03
ESCOVAS RETANGULAR COM CERDAS DE ACO
Mo-de-Obra 1,26060
LS
1,53793

SubMO

16.35.009
PISTOLA DE AGULHA
1.01.39
PEDREIRO
9.00.05
PISTOLA ELETROMECANICA
9.10.04
JOGO DE AGULHAS PARA PISTOLA ELETROMECANICA
Mo-de-Obra 18,56000
LS
22,64320
SubMO
16.35.011
QUEIMA CONTROLADA
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.06
GAS
Mo-de-Obra 6,55000
LS

7,99100

SubMO

16.35.012
APLICACAO DE SOLVENTE EM SUBSTRATO IMPREGNADOS
1.01.46
SERVENTE
9.10.07
REMOVEDOR DE GRAXAS BASE SOLVENTE NAO CORROSIVO
Mo-de-Obra 1,26060
LS
1,53793
SubMO
2,79853

M2
H
0,33000
L
0,50000
Material
4,70000

16.35.013
FREZAMENTO MECANICO COM MAQUINA DE DESBASTE
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.00.08
FREZADORA E ESCARIFICADORA MECANICA (MOD F-30)
Mo-de-Obra 5,39000
LS
6,57580
SubMO

M2
H
0,75000
H
0,50000
H
0,75000
Material
3,39750

11,96580

16.35.014
LIMPEZA DO SUBSTRATO COM APLICACAO DE JATO DE AGUA FRIA
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.00.09
MAQUINA LAVA-JATO(AGUA FRIA, PRES 1700PSI)
9.10.08
SOLUCAO LIMPADORA DILUIDA EM AGUA
SubMO
3,19902
Mo-de-Obra 1,44100
LS
1,75802
16.35.015
1.01.39
Exerccio:

LIMPEZA DO SUBSTRATO COM APLICACAO DE JATO DE AGUA QUENTE


PEDREIRO

2011

M2
H
H
H
L
Material
1,63340
M2
H

BDI

4,64
3,82
3,61
3,51049

BDI

3,82
9,40
1,72466

BDI

4,64
3,82
4,53
3,53356

BDI

4,64
3,82
1,97
1,20
1,11146

0,22000
0,11000
0,22000
1,00000

0,26000

14,75
2,32000
1,91000
2,31400
0,29500

70,01
16,70400
6,87600
4,57200

139,78
23,20000
5,73000
10,00000
39,42500

116,68
4,64
3,82
1,27
21,81918

16.35.007
LIXAMENTO ELETRICO DE ARMADURA C/ESCOVA CIRCULAR
1.01.46
SERVENTE
9.00.02
LIXADEIRA ELETRICA
9.10.02
ESCOVAS CIRCULAR COM CERDAS DE ACO
Mo-de-Obra 0,95500
LS
1,16510
SubMO
2,12010

104,30
38,20000

4,64

27,84000
11,46000
7,62000

3,04
0,95500
0,14750
0,21000

4,24
1,26060
0,65000

54,98
18,56000
3,40000
0,10350

18,77
4,64000
1,91000
0,72200

9,22
1,26060
4,70000

18,89
3,48000
1,91000
3,39750

5,94
1,02080
0,42020
0,43340
1,20000

8,65
1,20640
Pgina: 361

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
9.00.10
MAQUINA LAVA-JATO (AGUA QUENTE/FRIA PRES 1700PSI)
9.10.08
SOLUCAO LIMPADORA DILUIDA EM AGUA
9.10.09
QUEROSENE
Mo-de-Obra 1,70300
LS
2,07766
SubMO

UN Coeficiente
H
H
L
L
3,78066

Material

0,13000
0,26000
1,00000
0,13000
3,25790

16.35.016
LIMPEZA DO SUBSTRATO, LAVAGEM COM SOLUCOES ACIDAS, PISOS E PAREDES
M2
1.01.39
PEDREIRO
H
0,20000
1.01.46
SERVENTE
H
0,10000
9.10.10
SOLUCAO ACIDA DILUIDA EM AGUA - MURIATICO
L
1,00000
Mo-de-Obra 1,31000
LS
1,59820
SubMO
2,90820
Material
1,22000
16.35.017
LIMPEZA DO SUBSTRATO,LAVAGEM COM SOLUCOES ALCALINAS,PISOS E PAREDES
M2
1.01.39
PEDREIRO
H
0,20000
1.01.46
SERVENTE
H
0,10000
9.10.11
SOLUCAO ALCALINA Ca(OH)2 + H20 (EM MASSA 1:5)
L
2,00000
Mo-de-Obra 1,31000
LS
1,59820
SubMO
2,90820
Material
0,20000
16.35.018
LIMPEZA PARA REMOCAO DE OLEOS E GRAXAS IMPREGNADOS SUPERFICIALMENTE
M2
1.01.46
SERVENTE
H
0,25000
9.10.07
REMOVEDOR DE GRAXAS BASE SOLVENTE NAO CORROSIVO
L
0,50000
Mo-de-Obra 0,95500
LS
1,16510
SubMO
2,12010
Material
4,70000
16.35.019
LIMPEZA DO SUBSTRATO, COM JATO DE AR COMPRIMIDO
1.01.55
OPERADOR
8.81.14
OLEO DIESEL
9.00.11
COMPRESSOR DE 125/250PCM,MANGUEIRA E FILTRO LINHA
Mo-de-Obra 0,69500
LS
0,84790
SubMO

1,54290

M2
H
0,10000
L
0,43000
H
0,10000
Material
1,98800

16.35.020
LIMPEZA DO SUBSTRATO COM UTILIZACAO DE SOLVENTE VOLATEIS
1.01.46
SERVENTE
9.10.12
ACETONA
9.10.13
ESTOPA
9.10.14
ALGODAO
Mo-de-Obra 0,95500
LS
1,16510
SubMO
2,12010

M2
H
L
KG
KG
Material
5,45190

16.35.021
PREPARACAO DO SUBSTRATOS POR SATURACAO COM AGUA
1.01.46
SERVENTE
9.10.15
SACOS DE ANINHAGEM
Mo-de-Obra 0,76400
LS
0,93208
SubMO
1,69608

M2
H
0,20000
UN
1,00000
Material
1,17000

16.36.001
REPAROS SUP LOC,ARGAM CIM C/POLIMEROS (1,0<ESP<3.0CM)-TIPO E
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.16
FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E
Mo-de-Obra 19,65000
LS
23,97300
SubMO
43,62300

M2
H
3,00000
H
1,50000
KG
52,00000
Material
28,60000

16.36.002
REPAROS SUP LOC,ARGAM CIM C/POLIMEROS (1,0<ESP<3.0CM)-TIPO M
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.70
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M
Mo-de-Obra 19,65000
LS
23,97300
SubMO
43,62300

M2
H
3,00000
H
1,50000
KG
52,00000
Material
43,68000

16.36.003
REPAROS SUP LOC,ARGAM CIM C/POLIMEROS (1,0<ESP<3,0CM)-TIPO F
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.71
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F
Mo-de-Obra 19,65000
LS
23,97300
SubMO
43,62300

M2
H
3,00000
H
1,50000
KG
52,00000
Material
54,08000

16.36.005
REPAROS SUPERF LOCALIZ, ARGAM POLIMERICA BASE EPOXI (0,5<ESP<1,5CM)
M2
1.01.39
PEDREIRO
H
3,50000
1.01.46
SERVENTE
H
2,00000
9.10.17
ARGAMASSA POLIMERICA BASE EPOXI
KG
34,50000
9.10.18
SOLVENTE PARA MATERIAIS BASE EPOXI
L
0,18000
SubMO
53,01360
Mo-de-Obra 23,88000
LS
29,13360
Material
332,91540

Exerccio:

REPAROS SUPERF LOCALIZ,ARGAM POLIMERICA BASE POLIESTER (0,5<ESP<1,5CM)


PEDREIRO
SERVENTE
PREPARO E FORNECIMENTO DE ARGAMASSA BASE POLIESTER

2011

M2
H
H
KG

3,50000
2,00000
28,80000

Custo Total

BDI

3,82
3,96
1,20
7,91
1,61887

BDI

4,64
3,82
1,22
0,94949

BDI

4,64
3,82
0,10
0,71489

BDI

3,82
9,40
1,56862

BDI

6,95
2,00
11,28
0,81211

BDI

3,82
10,52
5,23
13,96
1,74156

BDI

3,82
1,17
0,65920

BDI

3,82
4,87623

BDI

4,64
3,82
0,55
16,61129

BDI

4,64
3,82
0,84
20,07969

BDI

4,64
3,82
1,04
22,47169

0,25000
0,50000
0,01000
0,01000

16.35.022
PREPARACAO DO SUBSTRATO POR APICOAMENTO MANUAL DA SUPERFICIE
M2
1.01.46
SERVENTE
H
2,50000
SubMO
21,20100
Mo-de-Obra 9,55000
LS
11,65100
Material
0,00000

16.36.006
1.01.39
1.01.46
9.10.19

Custo Unit.

BDI

0,49660
1,02960
1,20000
1,02830

5,07
0,92800
0,38200
1,22000

3,82
0,92800
0,38200
0,20000

8,38
0,95500
4,70000

4,34
0,69500
0,86000
1,12800

9,31
0,95500
5,26000
0,05230
0,13960

3,52
0,76400
1,17000

26,07
9,55000

88,83
13,92000
5,73000
28,60000

107,38
13,92000
5,73000
43,68000

120,17
13,92000
5,73000
54,08000

474,69
4,64
16,24000
3,82
7,64000
9,57
330,16500
15,28
2,75040
88,76367

4,64
3,82
5,52

260,74
16,24000
7,64000
158,97600
Pgina: 362

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 23,88000

LS

29,13360

UN Coeficiente
SubMO

53,01360

Material

158,97600

Custo Unit.

Custo Total

BDI

48,75761

BDI

4,64
3,82
0,55
19,22032

BDI

4,64
3,82
0,84
24,76976

16.37.003
REPAROS SUPERF ARGAM BASE CIMENTO C/POLIMEROS (1,0<ESP<5,0CM)-TIPO F
M2
1.01.39
PEDREIRO
H
2,60000
1.01.46
SERVENTE
H
1,30000
9.10.71
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F
KG
83,20000
Mo-de-Obra 17,03000
LS
20,77660
SubMO
37,80660
Material
86,52800

BDI

4,64
3,82
1,04
28,59696

16.37.005
REPAROS SUPERF COM ARGAMASSA PROJETADA (1,0<ESP<7,0CM)-TIPO E
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
9.00.12
BICO PROJETOR COMPLETO
9.00.13
MANGOTE DE 1 1/2"
9.00.14
MAQUINA DE JATO VIA SECA
9.00.15
DISCO DE FERRO
9.00.16
DISCO DE BORRACHA SUPERIOR
9.00.17
DISCO DE BORRACHA INFERIOR
9.10.16
FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E
Mo-de-Obra 17,58600
LS
21,45492
SubMO
39,04092

M2
H
2,60000
H
1,30000
H
0,08000
UN
0,00110
M
0,02790
H
0,08000
UN
0,00330
UN
0,00330
UN
0,00330
KG
145,60000
Material
85,05535

4,64
3,82
6,95
456,59
74,57
11,34
148,72
150,70
150,70
0,55
BDI
28,54214

16.37.006
REPAROS SUPERF COM ARGAMASSA PROJETADA (1,0<ESP<7,0CM)-TIPO M
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
9.00.12
BICO PROJETOR COMPLETO
9.00.13
MANGOTE DE 1 1/2"
9.00.14
MAQUINA DE JATO VIA SECA
9.00.15
DISCO DE FERRO
9.00.16
DISCO DE BORRACHA SUPERIOR
9.00.17
DISCO DE BORRACHA INFERIOR
9.10.70
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M
Mo-de-Obra 17,58600
LS
21,45492
SubMO
39,04092

M2
H
2,60000
H
1,30000
H
0,08000
UN
0,00110
M
0,02790
H
0,08000
UN
0,00330
UN
0,00330
UN
0,00330
KG
145,60000
Material
127,27935

204,57
4,64
12,06400
3,82
4,96600
6,95
0,55600
456,59
0,50225
74,57
2,08050
11,34
0,90720
148,72
0,49078
150,70
0,49731
150,70
0,49731
0,84
122,30400
BDI
38,25366

16.37.007
REPAROS SUPERF COM ARGAMASSA PROJETADA (1,0<ESP<7,0CM)-TIPO F
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
9.00.12
BICO PROJETOR COMPLETO
9.00.13
MANGOTE DE 1 1/2"
9.00.14
MAQUINA DE JATO VIA SECA
9.00.15
DISCO DE FERRO
9.00.16
DISCO DE BORRACHA SUPERIOR
9.00.17
DISCO DE BORRACHA INFERIOR
9.10.71
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F
Mo-de-Obra 17,58600
LS
21,45492
SubMO
39,04092

M2
H
2,60000
H
1,30000
H
0,08000
UN
0,00110
M
0,02790
H
0,08000
UN
0,00330
UN
0,00330
UN
0,00330
KG
145,60000
Material
156,39935

240,39
4,64
12,06400
3,82
4,96600
6,95
0,55600
456,59
0,50225
74,57
2,08050
11,34
0,90720
148,72
0,49078
150,70
0,49731
150,70
0,49731
1,04
151,42400
BDI
44,95126

16.37.001
REPAROS SUPERF ARGAM BASE CIMENTO C/POLIMEROS (1,0<ESP<5,0CM)-TIPO E
M2
1.01.39
PEDREIRO
H
2,60000
1.01.46
SERVENTE
H
1,30000
9.10.16
FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E
KG
83,20000
Mo-de-Obra 17,03000
LS
20,77660
SubMO
37,80660
Material
45,76000
16.37.002
REPAROS SUPERF ARGAM BASE CIMENTO C/POLIMEROS (1,0<ESP<5,0CM)-TIPO M
M2
1.01.39
PEDREIRO
H
2,60000
1.01.46
SERVENTE
H
1,30000
9.10.70
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M
KG
83,20000
Mo-de-Obra 17,03000
LS
20,77660
SubMO
37,80660
Material
69,88800

16.37.009
REPAROS SUPERF ESTUCAM CORRETIVO,C/ARGAM POLIMERICA ESP<5MM-TIPO E
M2
1.01.39
PEDREIRO
H
0,50000
1.01.46
SERVENTE
H
0,50000
9.10.16
FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E
KG
10,40000
Mo-de-Obra 4,23000
LS
5,16060
SubMO
9,39060
Material
5,72000
16.37.010
REPAROS SUPERF ESTUCAM CORRETIVO,C/ARGAM POLIMERICA ESP<5MM-TIPO M
M2
1.01.39
PEDREIRO
H
0,50000
1.01.46
SERVENTE
H
0,50000
9.10.70
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M
KG
10,40000
SubMO
9,39060
Mo-de-Obra 4,23000
LS
5,16060
Material
8,73600
16.37.011
1.01.39
1.01.46
Exerccio:

REPAROS SUPERF ESTUCAM CORRETIVO,C/ARGAM POLIMERICA ESP<5MM-TIPO F


PEDREIRO
SERVENTE

2011

M2
H
H

0,50000
0,50000

BDI

4,64
3,82
0,55
3,47544

BDI

4,64
3,82
0,84
4,16912

4,64
3,82

102,78
12,06400
4,96600
45,76000

132,46
12,06400
4,96600
69,88800

152,93
12,06400
4,96600
86,52800

152,63
12,06400
4,96600
0,55600
0,50225
2,08050
0,90720
0,49078
0,49731
0,49731
80,08000

18,58
2,32000
1,91000
5,72000

22,29
2,32000
1,91000
8,73600

24,85
2,32000
1,91000
Pgina: 363

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

9.10.71
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F
SubMO
9,39060
Mo-de-Obra 4,23000
LS
5,16060

Material

KG
10,40000
10,81600

16.38.001
REPAROS DE JUNTAS C/ARGAM BASE CIMENTO C/POLIMEROS-TIPO E
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.16
FORN,PREP ARGAMASSA BASE CIMEMTO POLIMEROS-TIPO E
Mo-de-Obra 26,20000
LS
31,96400
SubMO
58,16400

M2
H
4,00000
H
2,00000
KG
52,00000
Material
28,60000

16.38.002
REPAROS DE JUNTAS C/ARGAM BASE CIMENTO C/POLIMEROS-TIPO M
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.70
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO M
Mo-de-Obra 26,20000
LS
31,96400
SubMO
58,16400

M2
H
4,00000
H
2,00000
KG
52,00000
Material
43,68000

16.38.003
REPAROS DE JUNTAS C/ARGAM BASE CIMENTO C/ POLIMEROS-TIPO F
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.71
FORN,PREP ARGAMASSA BASE CIMENTO POLIMEROS-TIPO F
Mo-de-Obra 26,20000
LS
31,96400
SubMO
58,16400

M2
H
4,00000
H
2,00000
KG
52,00000
Material
54,08000

16.38.005
REPAROS EM JUNTAS, C/ARGAM BASE EPOXI P/ESP ATE 1,5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.17
ARGAMASSA POLIMERICA BASE EPOXI
9.10.18
SOLVENTE PARA MATERIAIS BASE EPOXI
Mo-de-Obra 30,43000
LS
37,12460
SubMO
67,55460

M2
H
4,50000
H
2,50000
KG
34,50000
L
0,18000
Material
332,91540

16.38.006
JUNTAS C/ELASTOMEROS POLISSULFETOS OU BOR SILICONE SEC TRANSV 2X2CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.22
MANGUEIRA CRISTAL DIAM 3/4" ESP=2MM
9.10.23
SELANTE PARA ENCHIMENTO DE JUNTAS
Mo-de-Obra 1,91320
LS
2,33410
SubMO
4,24730
Material
16.39.001
REPAROS PROFUNDOS COM GRAUTE BASE CIMENTO (3,0<ESP<5,0CM)
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.70
GRAUTH
Mo-de-Obra 152,28000
LS
185,78160
SubMO
338,06160

D3
H
0,33000
H
0,10000
M
2,50000
L
1,00000
90,52500

M3
H
18,00000
H
18,00000
KG
1.980,00000
Material
1.643,40000

16.39.002
REPAROS PROFUNDOS, MICROCONCRETO COM POLIMEROS (5,0<ESP<30,0CM)
M3
1.01.39
PEDREIRO
H
21,50000
1.01.46
SERVENTE
H
21,50000
2.05.22
PEDRISCO
M3
0,65000
2.05.70
GRAUTH
KG
1.980,00000
Mo-de-Obra 181,89000
LS
221,90580
SubMO
403,79580
Material
1.686,43650
16.39.003
REPAROS PROF EXEC C/ARGAM SECA DRY PACK ISENTA RETR(3,0<ESP<10,0CM)
M3
1.01.39
PEDREIRO
H
52,00000
1.01.46
SERVENTE
H
26,00000
2.05.17
PEDRA BRITADA 1
M3
0,55000
9.10.73
ARGAMASSA SECA TIPO DRY PACK
KG
2.215,00000
SubMO
756,13200
Mo-de-Obra 340,60000
LS
415,53200
Material
1.518,16650
16.39.004
FORMAS PARA REPAROS PROFUNDOS (ESP>3,0CM)
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
2.10.09
PONTALETE PINHO DE 3"X3"
2.10.16
SARRAFO DE PINHO DE 1X4" DE 3A CONSTR
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.65.69
PREGO 18X27
Mo-de-Obra 51,36000
LS
62,65920
SubMO

114,01920

16.39.005
APLICACAO DE MEMBRANA DE CURA QUIMICA EM REPAROS ESTRUTURAIS
1.01.46
SERVENTE
2.40.45
CURING
Mo-de-Obra 1,52800
LS
1,86416
SubMO
3,39216
16.40.001
1.01.46
3.80.46
9.10.65

Exerccio:

PROTECAO DE ARMADURAS COM TINTA DE ALTO TEOR DE ZINCO


SERVENTE
PRIMER ANTIOXIDANTE RICO EM ZINCO
SOLVENTE

2011

M2
H
6,00000
H
6,00000
M
3,00000
M
3,50000
M2
0,25000
KG
0,20000
Material
19,97800
M2
H
0,40000
L
0,20000
Material
0,62400
M
H
KG
KG

0,25000
0,01600
0,00400

Custo Unit.

Custo Total

BDI

1,04
4,64752

BDI

4,64
3,82
0,55
19,95572

BDI

4,64
3,82
0,84
23,42412

BDI

4,64
3,82
1,04
25,81612

10,81600

106,71
18,56000
7,64000
28,60000

125,26
18,56000
7,64000
43,68000

138,06
18,56000
7,64000
54,08000

BDI

492,57
4,64
20,88000
3,82
9,55000
9,57
330,16500
15,28
2,75040
92,10810

BDI

4,64
3,82
2,09
85,30
21,79763

116,56
1,53120
0,38200
5,22500
85,30000

BDI

2.437,19
4,64
83,52000
3,82
68,76000
0,83
1.643,40000
455,73617

BDI

2.570,98
4,64
99,76000
3,82
82,13000
66,21
43,03650
0,83
1.643,40000
480,75343

BDI

2.797,38
4,64
241,28000
3,82
99,32000
62,03
34,11650
0,67
1.484,05000
523,08866

BDI

4,60
3,96
3,78
1,36
11,40
5,14
30,81936

BDI

3,82
3,12
0,92372

3,82
24,71
3,08

164,81
27,60000
23,76000
11,34000
4,76000
2,85000
1,02800

4,93
1,52800
0,62400

3,10
0,95500
0,39536
0,01232

Pgina: 364

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,95500

LS

1,16510

UN Coeficiente
SubMO

2,12010

16.40.002
ARGAMASSA OU CONCRETO DE REPARO COM INIBIDORES DE CORROSAO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.17
PEDRA BRITADA 1
9.10.24
INIBIDOR DE CORROSAO (NITRO DE SODIO OU CALCIO)
Mo-de-Obra 126,90000
LS
154,81800
SubMO
281,71800

Material

0,40768

BDI

M3
H
15,00000
H
15,00000
M3
0,62000
KG
450,00000
M3
0,79000
KG
7,00000
Material
287,85890

16.41.001
EMENDA POR TRASPASSE, PARA RECONSTITUICAO DA SECAO DA ARMADURA
KG
1.01.21
FERREIRO
H
1.01.22
AJUDANTE DE FERREIRO
H
2.70.10
ARAME RECOZIDO N.18
KG
9.10.72
ACO CA 50 (1/2")
KG
Mo-de-Obra 1,37440
LS
1,67677
SubMO
3,05117
Material
2,78540

0,16000
0,16000
0,02000
1,05000

16.41.002
EMENDAS POR SOLDA DE TOPO, P/RECONSTITUICAO DA SECAO DA ARMADURA
UN
1.01.44
SERRALHEIRO
H
1.01.45
AJUDANTE SERRALHEIRO
H
9.10.25
ELETRODO E7018 OU E6013 (AWS)
KG
9.10.26
PONTAS DE FERRO AUXILIARES
KG
Mo-de-Obra 2,48400
LS
3,03048
SubMO
5,51448
Material
0,95900

0,20000
0,20000
0,05000
0,50000

16.42.001
REPARO ESTRUTURAL POR INJECAO RESINA BASE EPOXI EM FISSURAS 0,3A9,0MM
M
1.01.39
PEDREIRO
H
1,50000
1.01.46
SERVENTE
H
1,60000
9.00.18
CENTRAL INJECAO RESINA C/TANQUE REG PRES E COMPRES
H
1,00000
9.10.18
SOLVENTE PARA MATERIAIS BASE EPOXI
L
0,12000
9.10.28
TUBOS PLASTICOS PARA INJECAO DE GRAUTE
M
1,00000
9.10.29
PASTA TIXOTROPICA BASE POLIESTER SELANTE
KG
0,20000
9.10.30
PASTA DE ALTA PERFORMANCE P/INJECAO BASE IPOXI
KG
2,10000
Mo-de-Obra 13,07200
LS
15,94784
Material
178,99060
SubMO
29,01984
16.42.002
REPARO ESTRUTURAL C/APLICACAO DE GRAUTE BASE EPOXI TRINCAS DE 10A40MM
M
1.01.11
CARPINTEIRO
H
0,50000
1.01.39
PEDREIRO
H
0,50000
1.01.46
SERVENTE
H
0,50000
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
M
0,25000
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
M2
0,10000
2.70.10
ARAME RECOZIDO N.18
KG
0,02000
9.10.18
SOLVENTE PARA MATERIAIS BASE EPOXI
L
0,12000
9.10.27
ARGAMASSA GRAUTE,BASE EPOXI
KG
3,50000
SubMO
14,49660
Mo-de-Obra 6,53000
LS
7,96660
Material
62,95350
16.42.003
REPARO ESTR VIGAS LAJES PILARES C/APLIC GRAUTE BASE EPOXI VAOS 35A70MM
M
1.01.11
CARPINTEIRO
H
0,50000
1.01.39
PEDREIRO
H
0,50000
1.01.46
SERVENTE
H
0,50000
2.10.14
SARRAFO PINHO APARELHADO 5X2,5 CM
M
0,25000
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
M2
0,10000
2.70.10
ARAME RECOZIDO N.18
KG
0,02000
9.10.18
SOLVENTE PARA MATERIAIS BASE EPOXI
L
0,12000
9.10.27
ARGAMASSA GRAUTE,BASE EPOXI
KG
5,30000
Mo-de-Obra 6,53000
LS
7,96660
SubMO
14,49660
Material
93,48150
16.42.004
TRATAMENTO DE MICRO FISSURAS POR SILICATACAO OU FLUORSILICATACAO
M2
1.01.39
PEDREIRO
H
0,27000
1.01.46
SERVENTE
H
0,27000
9.10.32
PRODUTO A BASE DE SILICATO DE SODIO
KG
0,25000
Mo-de-Obra 2,28420
LS
2,78672
SubMO
5,07092
Material
0,90000
16.43.001
FUROS EM CONCRETO COM D=1" E PROFUNDIDADE 5CM
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.33
BROCA COM PONTA DE VIDIA (D=1"X160MM)
Mo-de-Obra 1,45160
LS
1,77095
SubMO
16.43.002
1.01.46
9.00.19
9.00.20
Exerccio:

FUROS EM CONCRETO COM D=1" E PROFUNDIDADE 15CM


SERVENTE
FURADEIRA ELETRICA MOD PROFISSIONAL
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE

2011

3,22255

UN
H
H
H
UN
Material
1,90140
UN
H
H
H

Custo Unit.

0,58139
700,57
69,60000
57,30000
49,88520
166,50000
49,00370
22,47000

BDI

4,64
3,82
80,46
0,37
62,03
3,21
131,00269

BDI

4,77
3,82
4,87
2,56
1,34241

BDI

8,08
4,34
13,18
0,60
1,48890

BDI

255,85
4,64
6,96000
3,82
6,11200
3,50
3,50000
15,28
1,83360
2,04
2,04000
35,62
7,12400
78,33
164,49300
47,84240

BDI

4,60
4,64
3,82
2,09
11,40
4,87
15,28
16,96
17,81352

BDI

4,60
4,64
3,82
2,09
11,40
4,87
15,28
16,96
24,83496

BDI

4,64
3,82
3,60
1,37331

BDI

3,82
0,78
0,30
54,30
1,17851

0,38000
0,33000
0,05000
0,03000

0,96000
0,90000
0,06000

Custo Total

3,82
0,78
0,30

7,17
0,76320
0,61120
0,09740
2,68800

7,96
1,61600
0,86800
0,65900
0,30000

95,26
2,30000
2,32000
1,91000
0,52250
1,14000
0,09740
1,83360
59,36000

132,81
2,30000
2,32000
1,91000
0,52250
1,14000
0,09740
1,83360
89,88800

7,34
1,25280
1,03140
0,90000

6,30
1,45160
0,25740
0,01500
1,62900

16,79
3,66720
0,70200
0,01800
Pgina: 365

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

9.10.34
BROCA COM PONTA DE VIDIA (D=1"X330MM)
Mo-de-Obra 3,66720
LS
4,47398

UN Coeficiente
SubMO

UN
0,06000
5,50980

Custo Unit.

Custo Total

79,83
3,13973

8,14118

Material

0,30000
0,05000
0,25000
0,02000

2,54412

UN
H
H
H
UN
Material
7,79750

3,82
0,30
10,33
260,00
BDI
2,37857

0,35000
0,30000
0,05000
0,03000

2,96814

UN
H
H
H
UN
Material
1,27500

BDI

3,82
0,78
0,30
34,20
0,97592

16.43.005
FUROS EM CONCRETO COM D=3/4" E PROFUNDIDADE 15CM
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.37
BROCA COM PONTA DE VIDIA (D=3/4"X330MM)
Mo-de-Obra 3,43800
LS
4,19436
SubMO
7,63236

UN
H
H
H
UN
Material
4,51860

0,90000
0,85000
0,05000
0,06000
BDI

3,82
0,78
0,30
64,01
2,79472

16.43.006
FUROS EM CONCRETO COM D=3/4" E PROFUNDIDADE 30CM
1.01.46
SERVENTE
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.00.22
EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80)
9.10.38
BROCA EXTRATORA C/PONTA DE DIAMANTE (D=3/4"X400MM)
Mo-de-Obra 1,03140
LS
1,25831
SubMO
2,28971

UN
H
H
H
UN
Material
7,90760

0,27000
0,05000
0,22000
0,02000

3,82
0,30
10,33
281,00
BDI
2,34538

16.43.007
FUROS EM CONCRETO COM D=1/2" E PROFUNDIDADE 5CM
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.39
BROCA COM PONTA DE VIDIA (D=1/2"X160MM)
SubMO
Mo-de-Obra 1,03140
LS
1,25831

0,27000
0,22000
0,05000
0,03000

2,28971

UN
H
H
H
UN
Material
0,52020

BDI

3,82
0,78
0,30
11,12
0,64628

16.43.008
FUROS EM CONCRETO COM D=1/2" E PROFUNDIDADE 15CM
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.40
BROCA COM PONTA DE VIDEA (D=1/2"X330MM)
Mo-de-Obra 3,09420
LS
3,77492
SubMO
6,86912

UN
H
H
H
UN
Material
2,24400

0,81000
0,76000
0,05000
0,06000
BDI

3,82
0,78
0,30
27,27
2,09602

16.43.009
FUROS EM CONCRETO COM D=1/2" E PROFUNDIDADE 30CM
1.01.46
SERVENTE
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.00.22
EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80)
9.10.41
BROCA EXTRATORA C/PONTA DE DIAMANTE (D=1/2"X400MM)
SubMO
2,12010
Mo-de-Obra 0,95500
LS
1,16510

UN
H
H
H
UN
Material
8,20100

0,25000
0,05000
0,20000
0,02000

3,82
0,30
10,33
306,00
BDI
2,37385

16.43.010
FUROS EM CONCRETO COM D=3/8" E PROFUNDIDADE 5CM
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.42
BROCA COM PONTA DE VIDIA (D=3/8"X160MM)
Mo-de-Obra 0,91680
LS
1,11850
SubMO

0,24000
0,19000
0,05000
0,03000

2,03530

UN
H
H
H
UN
Material
0,42390

BDI

3,82
0,78
0,30
8,69
0,56562

16.43.011
FUROS EM CONCRETO COM D=3/8" E PROFUNDIDADE 15CM
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.43
BROCA COM PONTA DE VIDIA (D=3/8"X330MM)
Mo-de-Obra 2,75040
LS
3,35549
SubMO
6,10589

UN
H
H
H
UN
Material
1,62840

0,72000
0,67000
0,05000
0,06000
BDI

3,82
0,78
0,30
18,18
1,77889

16.43.012
FUROS EM CONCRETO COM D=3/8" E PROFUNDIDADE 30CM
1.01.46
SERVENTE
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.00.22
EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80)
9.10.44
BROCA EXTRATORA C/PONTA DE DIAMANTE (D=3/8"X400MM)
Mo-de-Obra 0,76400
SubMO
1,69608
LS
0,93208

UN
H
H
H
UN
Material
5,82450

0,20000
0,05000
0,15000
0,02000

16.43.003
FUROS EM CONCRETO COM D=1" E PROFUNDIDADE 30CM
1.01.46
SERVENTE
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.00.22
EQUIPAMENTO DE PERFURACAO TIPO (HIT DD-80)
9.10.35
BROCA EXTRATORA C/PONTA DE DIAMANTE (D=1"X400MM
Mo-de-Obra 1,14600
LS
1,39812
SubMO
16.43.004
FUROS EM CONCRETO COM D=3/4" E PROFUNDIDADE 5CM
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.36
BROCA COM PONTA DE VIDIA (D=3/4"X160MM)
Mo-de-Obra 1,33700
LS
1,63114
SubMO

16.44.001
Exerccio:

FORNECIMENTO E COLOCACAO DE CHUMBADORES QUIMICOS D=3/4"

2011

UN

BDI

3,82
0,30
10,33
213,00
BDI
1,72973

4,78980

12,72
1,14600
0,01500
2,58250
5,20000

5,21
1,33700
0,23400
0,01500
1,02600

14,94
3,43800
0,66300
0,01500
3,84060

12,54
1,03140
0,01500
2,27260
5,62000

3,45
1,03140
0,17160
0,01500
0,33360

11,20
3,09420
0,59280
0,01500
1,63620

12,69
0,95500
0,01500
2,06600
6,12000

3,02
0,91680
0,14820
0,01500
0,26070

9,51
2,75040
0,52260
0,01500
1,09080

9,25
0,76400
0,01500
1,54950
4,26000

47,68
Pgina: 366

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.37
BROCA COM PONTA DE VIDIA (D=3/4"X330MM)
9.10.47
CHUMBADOR QUIMICO D=3/4"
9.10.66
PARAFUSO PRISIONEIRO COMPR=220MM
Mo-de-Obra 1,69200
LS
2,06424
SubMO

UN Coeficiente

3,75624

H
0,20000
H
0,20000
H
0,20000
H
0,05000
UN
0,10000
UN
1,00000
UN
1,00000
Material
35,01200

16.44.002
FORNECIMENTO E COLOCACAO DE CHUMBADORES QUIMICOS D=1/2"
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.40
BROCA COM PONTA DE VIDEA (D=1/2"X330MM)
9.10.45
PARAFUSO PRISIONEIRO COMPR=160MM
9.10.48
CHUMBADOR QUIMICO D=1/2"
Mo-de-Obra 1,26900
LS
1,54818
SubMO
2,81718

UN
H
0,15000
H
0,15000
H
0,15000
H
0,05000
UN
0,10000
UN
1,00000
UN
1,00000
Material
13,57900

16.44.003
FORNECIMENTO E COLOCACAO DE CHUMBADORES QUIMICOS D=3/8"
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.00.19
FURADEIRA ELETRICA MOD PROFISSIONAL
9.00.20
COMPRESSOR AR PORTATIL P/LIMPEZA DA CAVIDADE
9.10.43
BROCA COM PONTA DE VIDIA (D=3/8"X330MM)
9.10.46
PARAFUSO PRISIONEIRO COMPR=130MM
9.10.49
CHUMBADOR QUIMICO D=3/8"
SubMO
1,87812
Mo-de-Obra 0,84600
LS
1,03212

UN
H
H
H
H
UN
UN
UN
Material
9,72500

16.45.001
FORNECIMENTO E COLOCACAO DE CHUMBADORES EXPANSIVEIS D=3/4"
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.50
CHUMBADOR EXPANSIVEL D=3/4"
Mo-de-Obra 1,69200
LS
2,06424
SubMO
3,75624

UN
H
0,20000
H
0,20000
UN
1,00000
Material
7,47000

16.45.002
FORNECIMENTO E COLOCACAO DE CHUMBADORES EXPANSIVEIS D=1/2"
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.51
CHUMBADOR EXPANSIVEL D=1/2"
Mo-de-Obra 1,26900
LS
1,54818
SubMO
2,81718

UN
H
0,15000
H
0,15000
UN
1,00000
Material
2,63000

16.45.003
FORNECIMENTO E COLOCACAO DE CHUMBADORES ESPANSIVEIS D=3/8"
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.52
CHUMBADOR EXPANSIVEL D=3/8"
Mo-de-Obra 0,84600
LS
1,03212
SubMO
1,87812

UN
H
0,10000
H
0,10000
UN
1,00000
Material
1,11000

16.45.010
PINOS WALSIWA PARA FIXACAO DE ARMADURAS
1.01.55
OPERADOR
4.94.89
PINOS DE ACO 30X30
8.65.95
FINCA PINOS LONGO
8.65.96
PISTOLA PARA FIXACAO DE PINOS
Mo-de-Obra 2,78000
LS
3,39160
SubMO

UN
H
UN
UN
H
Material
0,94000

6,17160

16.46.002
ANCORAGEM DE BARRAS DE ACO COM RESINA BASE EPOXI
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.68
ADESIVO BASE EPOXI
SubMO
3,75624
Mo-de-Obra 1,69200
LS
2,06424

D3
H
0,20000
H
0,20000
KG
1,80000
Material
53,49600

16.47.001
PREPARACAO DE PONTE DE ADERENCIA COM ADESIVO ACRILICO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.08
CIMENTO
9.10.67
ADESIVO BASE ACRILICA
SubMO
3,75624
Mo-de-Obra 1,69200
LS
2,06424

M2
H
H
KG
KG
Material
3,51840

Exerccio:

PREPARACAO DE PONTE DE ADERENCIA COM ADESIVO BASE EPOXI

2011

M2

BDI

BDI

4,64
3,82
0,78
0,30
27,27
3,69
7,03
3,77112

BDI

4,64
3,82
0,78
0,30
18,18
1,76
6,06
2,66872

BDI

4,64
3,82
7,47
2,58204

BDI

4,64
3,82
2,63
1,25285

BDI

4,64
3,82
1,11
0,68727

BDI

6,95
0,30
0,46
0,65
1,63567

BDI

4,64
3,82
10,22
5,09502

BDI

4,64
3,82
29,72
13,16802

BDI

4,64
3,82
0,37
8,54
1,67317

0,40000
1,10000
1,10000
0,16000

D3
H
0,20000
H
0,20000
KG
1,80000
Material
18,39600

Custo Total

4,64
3,82
0,78
0,30
64,01
18,52
9,92
8,91670

0,10000
0,10000
0,10000
0,03000
0,10000
1,00000
1,00000

16.46.001
ANCORAGEM DE BARRAS DE ACO, COM RESINA BASE DE POLIESTER
1.01.39
PEDREIRO
1.01.46
SERVENTE
3.75.21
RESINA DE POLIESTER
Mo-de-Obra 1,69200
LS
2,06424
SubMO
3,75624

16.47.002

Custo Unit.

0,20000
0,20000
1,20000
0,36000

0,92800
0,76400
0,15600
0,01500
6,40100
18,52000
9,92000

20,16
0,69600
0,57300
0,11700
0,01500
2,72700
3,69000
7,03000

14,27
0,46400
0,38200
0,07800
0,00900
1,81800
1,76000
6,06000

13,80
0,92800
0,76400
7,47000

6,70
0,69600
0,57300
2,63000

3,67
0,46400
0,38200
1,11000

8,74
2,78000
0,33000
0,50600
0,10400

27,24
0,92800
0,76400
18,39600

70,42
0,92800
0,76400
53,49600

8,94
0,92800
0,76400
0,44400
3,07440

50,94
Pgina: 367

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.39
PEDREIRO
1.01.46
SERVENTE
9.10.18
SOLVENTE PARA MATERIAIS BASE EPOXI
9.10.68
ADESIVO BASE EPOXI
Mo-de-Obra 8,46000
LS
10,32120
16.48.001
LIXAMENTO MANUAL
1.01.46
SERVENTE
3.80.12
LIXA PARA FERRO
Mo-de-Obra 1,91000
LS

2,33020

UN Coeficiente

SubMO

SubMO

16.48.002
LIXAMENTO GROSSO OU FINO COM LIXADEIRA ELETRICA
1.01.39
PEDREIRO
1.01.46
SERVENTE
9.00.02
LIXADEIRA ELETRICA
9.10.53
DISCO DE LIXA GROSSO (24 OU 36)
9.10.54
DISCO DE BORRACHA
SubMO
Mo-de-Obra 2,62000
LS
3,19640
16.48.003
APLICACAO MANUAL DE ESTUQUE E PREPARO DE PASTA
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.08
CIMENTO
2.05.09
CIMENTO BRANCO
9.10.20
ALVAIADE
9.10.67
ADESIVO BASE ACRILICA
Mo-de-Obra 2,53800
LS
3,09636
SubMO
16.48.004
POLIMENTO DO ESTUQUE, LIXAMENTO MANUAL
1.01.46
SERVENTE
3.80.12
LIXA PARA FERRO
Mo-de-Obra 0,95500
LS
1,16510
SubMO

18,78120

H
1,00000
H
1,00000
L
0,12000
KG
0,70000
Material
22,63760

4,24020

M2
H
0,50000
UN
0,50000
Material
0,73500

0,40000
0,20000
0,60000
0,25000
0,05000

5,81640

M2
H
H
H
UN
KG
Material
1,68650

0,30000
0,30000
0,60000
0,30000
0,30000
0,15000

5,63436

M2
H
H
KG
KG
KG
KG
Material
2,26500

2,12010

M2
H
0,25000
UN
0,50000
Material
0,73500

16.48.005
APLICACAO PINTURA HIDROFUGANTE UMA DEMAO,SILICONE BASE AGUA
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
9.10.55
SILICONE BASE AGUA
Mo-de-Obra 1,32800
LS
1,62016
SubMO
2,94816
APLICACAO PINTURA HIDROFUGANTE EM DUAS DEMAOS,SILICONE BASE
SOLVENTE
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
9.10.56
SILICONE BASE SOLVENTE
Mo-de-Obra 2,39040
LS
2,91629
SubMO
5,30669

M2
H
0,20000
H
0,10000
L
0,50000
Material
18,21000

16.48.006

Custo Unit.

Custo Total

BDI

4,64
3,82
15,28
29,72
9,52632

BDI

3,82
1,47
1,14430

BDI

4,64
3,82
0,59
4,49
4,20
1,72567

BDI

4,64
3,82
0,37
1,04
1,50
8,54
1,81685

BDI

3,82
1,47
0,65667

BDI

4,74
3,80
36,42
4,86638

1,70640
0,68400
9,63000

BDI

4,74
3,80
16,05
3,43544

1,70640
0,68400
7,41600

BDI

4,74
3,80
12,36
2,92622

1,70640
0,68400
7,68000

BDI

4,74
3,80
12,80
2,98694

BDI

4,74
3,80
20,62
3,10425

M2
H
H
L
Material

9,63000

APLICACAO PINTURA HIDROFUGANTE DUAS DEMAOS,SILOXANO OLIGOM BASE


M2
SOLVEN
1.01.40
PINTOR
H
0,36000
1.01.41
AJUDANTE DE PINTOR
H
0,18000
9.10.57
SILOXANO OLIGOMERICO
L
0,60000
Mo-de-Obra 2,39040
LS
2,91629
SubMO
5,30669
Material
7,41600
APLICACAO PINTURA HIDROFUGANTE DUAS DEMAOS,SILOXANO POLIM BASE
M2
SOLVENT
1.01.40
PINTOR
H
0,36000
1.01.41
AJUDANTE DE PINTOR
H
0,18000
9.10.58
SILOXANO POLIMERICO
L
0,60000
Mo-de-Obra 2,39040
LS
2,91629
SubMO
5,30669
Material
7,68000

16.48.009
APLICACAO PINTURA IMPERM DUAS DEMAOS VERNIZ EPOXI BICOMPONENTE
M2
1.01.40
PINTOR
H
0,44000
1.01.41
AJUDANTE DE PINTOR
H
0,22000
3.80.42
EPOXI PINTURA (COMP MF)
KG
0,34000
Mo-de-Obra 2,92160
LS
3,56435
Material
7,01080
SubMO
6,48595

Exerccio:

2011

3,51
0,95500
0,73500

26,02
0,94800
0,38000
18,21000

16,60
2,08560
0,83600
7,01080

29,17
0,66000
0,22000
0,36000
0,04000

14,91800

9,71
1,39200
1,14600
0,22200
0,31200
0,45000
1,28100

15,97

M2

Material

9,22
1,85600
0,76400
0,35400
1,12250
0,21000

15,64

16.48.008

H
H
L
L

6,11
1,91000
0,73500

18,37
0,36000
0,18000
0,60000

16.48.007

APLICACAO PINTURA IMPERM DUAS DEMAOS VERNIZ POLIUR ALIF


16.48.010
BICOMPONENTES
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
9.10.59
VERNIZ POLIURETANO ALIFATICO (BICOMPONENTES)
9.10.61
SOLVENTE PARA VERNIZ POLIURETANO
SubMO
8,80097
Mo-de-Obra 3,96440
LS
4,83657

4,64000
3,82000
1,83360
20,80400

BDI

4,74
3,80
40,86
5,21
5,45536

3,12840
0,83600
14,70960
0,20840

Pgina: 368

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

UN Coeficiente

APLICACAO PINTURA IMPERM DUAS DEMAOS VERNIZ POLIUR ALIF


MONOCOMPONENTE
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
9.10.60
VERNIZ POLIURETANO ALIFATICO (MONOCOMPONENTES)
Mo-de-Obra 2,92160
LS
3,56435
SubMO
6,48595

16.48.011

19,93

H
0,44000
H
0,22000
KG
0,25000
Material
9,72000

0,54000
0,27000
0,20000
0,35000
0,03000

16.48.013
ALICACAO PINTURA IMPERM PRIMER DUAS DEMAOS VERNIZ ACRILICO BASE AGUA
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.80
PRIMER ACRILICO BASE AGUA
L
3.80.54
VERNIZ ACRILICO BASE AGUA (SELADOR FC FUSECOLOR)
L
Mo-de-Obra 3,58560
LS
4,37443
SubMO
7,96003
Material
6,80550

0,54000
0,27000
0,20000
0,35000

16.48.014

H
H
L
L
Material

17,13090

16.48.035
PINTURA INTUMESCENTE P/ REVESTIMENTO CONTRA FOGO EM ESTR METALICA
M2
3.76.40
PINTURA INTUMESCENTE FORNECIDA E APLICADA
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
53,00000
16.48.040
ARGAMASSA PROJETADA P/ REVESTIMENTO CONTRA FOGO EM ESTR METALICA
M2
3.76.45
ARGAMASSA PROJETADA FORNECIDA E APLICADA
M2
1,00000
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
Material
31,00000

16.50.001
1.01.46
Exerccio:

DE TUBO DE F.G. P/ SUST DE TELA ALAMBR INCL BASE FIXACAO


SERVENTE

2011

BDI

4,74
3,80
13,92
11,49
3,39607

0,66000
0,22000
0,36000
0,03000

16.48.031
PREPARACAO SUPERF C/ JATEAMENTO ABRAS PAD SA 2X1/2" APLIC FUNDO PRIMER M2
1.01.40
PINTOR
H
0,40000
1.01.41
AJUDANTE DE PINTOR
H
0,20000
1.01.46
SERVENTE
H
0,48000
1.01.55
OPERADOR
H
0,19200
3.76.35
TINTA FUNDO PRIMER EPOXI
L
0,12860
3.76.37
DILUENTE P/ FUNDO PRIMER EPOXI
L
0,02570
8.01.97
EQUIPAMENTO JATO DE AREIA COMPLETO C/COMPRESSOR
H
0,19200
8.81.14
OLEO DIESEL
L
3,00000
9.10.21
OXIDO DE ALUMINIO
KG
4,00000
Mo-de-Obra 5,82400
LS
7,10528
SubMO
12,92928
Material
20,98842

16,90308

BDI

4,74
3,80
13,92
20,07
5,21
4,12271

Material

D3
H
0,90000
H
0,90000
D3
1,00000
85,89000
UN
H

2,08560
0,83600
9,72000

22,04
2,55960
1,02600
2,78400
7,02450
0,15630

18,16
2,55960
1,02600
2,78400
4,02150

31,89

16.48.016
APLICACAO PINTURA IMPERM DUAS DEMAOS SISTEMA DUPLO SILANO SILOXANO
M2
1.01.40
PINTOR
H
0,54000
1.01.41
AJUDANTE DE PINTOR
H
0,27000
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
L
0,36000
9.10.61
SOLVENTE PARA VERNIZ POLIURETANO
L
0,03000
9.10.69
PRIMER SILANO SILOXANO
L
0,30000
Mo-de-Obra 3,58560
LS
4,37443
SubMO
7,96003
Material
13,10550

SubMO

BDI

4,74
3,80
38,88
3,72737

M2

16.48.015
APLICACAO PINTURA IMPERM DUAS DEMAOS SITEMA DUPLO EPOXI POLIURETANO
M2
1.01.40
PINTOR
H
0,90000
1.01.41
AJUDANTE DE PINTOR
H
0,30000
9.10.59
VERNIZ POLIURETANO ALIFATICO (BICOMPONENTES)
L
0,36000
9.10.61
SOLVENTE PARA VERNIZ POLIURETANO
L
0,03000
9.10.64
VERNIZ EPOXI (BICOMPONENTES)
KG
0,25000
Mo-de-Obra 5,40600
LS
6,59532
SubMO
12,00132
Material
21,11590

16.49.001
APARELHO DE APOIO DE NEOPRENE FRETADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.12.19
APARELHO DE APOIO DE NEOPRENE FRETADO
Mo-de-Obra 7,61400
LS
9,28908

Custo Total

M2

16.48.012
APLICACAO PINTURA INPERM DUAS DEMAOS VERNIZ ACRILICO BASE SOLVENTE
M2
1.01.40
PINTOR
H
1.01.41
AJUDANTE DE PINTOR
H
3.75.80
PRIMER ACRILICO BASE AGUA
L
3.80.55
VERNIZ ACRILICO BASE SOLV PARA PEDRA/CONCR/TIJOLO
L
9.10.61
SOLVENTE PARA VERNIZ POLIURETANO
L
Mo-de-Obra 3,58560
LS
4,37443
Material
9,96480
SubMO
7,96003

APLICACAO PINTURA IMPERM DUAS DEMAOS,BORRACHA CLORADA BASE


SOLVENTE
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
9.10.62
PINTURA BORRACHA CLORADA
9.10.63
SOLVENTE PARA BORRACHA CLORADA
SubMO
8,80097
Mo-de-Obra 3,96440
LS
4,83657

Custo Unit.

1,30000

BDI

4,74
3,80
45,89
20,35
5,96433

BDI

4,74
3,80
40,86
5,21
25,00
7,61696

BDI

4,74
3,80
20,07
5,21
19,08
4,84507

BDI

4,74
3,80
3,82
6,95
39,39
17,73
21,60
2,00
1,33
7,80107

BDI

53,00
12,19000

BDI

31,00
7,13000

BDI

4,64
3,82
85,89
23,64241

3,82

3,12840
0,83600
16,52040
0,61050

40,73
4,26600
1,14000
14,70960
0,15630
6,25000

25,91
2,55960
1,02600
7,22520
0,15630
5,72400

41,71
1,89600
0,76000
1,83360
1,33440
5,06555
0,45566
4,14720
6,00000
5,32000

65,19
53,00000

38,13
31,00000

126,43
4,17600
3,43800
85,89000

13,56
4,96600
Pgina: 369

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 4,96600

LS

6,05852

16.50.002
DE TELA DE ARAME GALVANIZADO
1.01.39
PEDREIRO
1.01.46
SERVENTE
Mo-de-Obra 0,42300
LS
0,51606

UN Coeficiente
SubMO

SubMO

16.50.010
DEMOLICAO DE PISO DE CONCRETO SIMPLES CAPEADO
1.01.46
SERVENTE
Mo-de-Obra 49,66000
LS
60,58520
SubMO

11,02452

Material

0,00000

0,93906

M2
H
0,05000
H
0,05000
Material
0,00000

110,24520

M3
H
13,00000
Material
0,00000

Custo Unit.

Custo Total

BDI

2,53564

BDI

4,64
3,82
0,21598

BDI

3,82
25,35640

3,82
67,83
10,53129

1,15
0,23200
0,19100

135,60
49,66000

16.50.015
DEMOLICAO DE PISO DE CONCRETO COM RETRO ESCAVADEIRA
1.01.46
SERVENTE
8.01.08
RETRO ESCAVADEIRA COM CACAMBA FRONTRA-85HP
Mo-de-Obra 6,87600
LS
8,38872
SubMO
15,26472

M3
H
1,80000
H
0,45000
Material
30,52350

BDI

16.50.099
DEMOLICOES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

LS

0,00000

SubMO

0,00000

16.80.003
FC-05 MURO DE FECHO DE TIJOLOS DE BARRO MACICO S/REVEST-FUND DIRETA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.25
ACO CA-50-A $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
Mo-de-Obra 64,71070
LS
78,94705
Material
SubMO
143,65775

M
H
1,48000
H
1,48000
H
0,23000
H
0,23000
H
5,48000
H
6,45000
M3
0,11900
KG
8,01000
KG
32,20000
M3
0,11300
M
0,80000
M2
0,20000
M2
0,17000
KG
3,00000
UN
122,00000
L
0,26000
KG
0,14000
KG
0,18000
77,97885

16.80.004
FC-05 MURO DE FECHO DE TIJOLOS DE BARRO MACICO S/REVEST-FUND BROCA
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
2.10.17
SARRAFO PINHO APARELHADO 10X2,5 CM
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.32
CHAPA COMPENSADA RESINADA E=12MM
2.15.10
ACO CA-25 $MD BITOLAS
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.38
ACO CA-60-B $MD BITOLAS
2.25.15
TIJOLO COMUM MACICO
2.40.56
TINTA BETUMINOSA
2.40.69
IMPERMEABILIZANTE PEGA NORMAL P/ ARGAM E CONCRETO
2.67.60
PREGO
Mo-de-Obra 76,49310
LS
93,32158
SubMO
169,81468
Material

M
H
1,48000
H
1,48000
H
0,31000
H
0,31000
H
6,06000
H
8,65000
M3
0,13800
KG
8,43000
KG
49,62000
M3
0,11300
M
0,80000
M2
0,20000
M2
0,17000
KG
1,00000
KG
4,00000
KG
1,00000
UN
128,00000
L
0,36000
KG
0,19000
KG
0,18000
96,22799

16.80.006
FERRO TRABALHADO (GRADIL)
3.12.15
GRADIL DE FERRO (TIPO PMSP)
Mo-de-Obra 0,00000
LS
0,00000
16.80.007
1.01.11
1.01.12
1.01.39
1.01.46
2.05.03
2.05.08
Exerccio:

PINGADEIRA PARA MUROS DE ALVENARIA


CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
AREIA
CIMENTO

2011

SubMO

0,00000

KG
KG
1,00000
Material
10,15000
M
H
H
H
H
M3
KG

0,83000
0,83000
1,00000
1,00000
0,00690
4,25000

BDI

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
4,60
17,18
11,40
2,69
0,22
6,23
2,50
4,67
50,97642

BDI

4,60
3,96
4,77
3,82
4,64
3,82
80,46
0,35
0,37
61,17
4,60
17,18
11,40
2,67
2,69
2,70
0,22
6,23
2,50
4,67
61,18982

BDI

10,15
2,33450

4,60
3,96
4,64
3,82
80,46
0,37

56,31
6,87600
30,52350

272,61
6,80800
5,86080
1,09710
0,87860
25,42720
24,63900
9,57474
2,80350
11,91400
6,91221
3,68000
3,43600
1,93800
8,07000
26,84000
1,61980
0,35000
0,84060

327,23
6,80800
5,86080
1,47870
1,18420
28,11840
33,04300
11,10348
2,95050
18,35940
6,91221
3,68000
3,43600
1,93800
2,67000
10,76000
2,70000
28,16000
2,24280
0,47500
0,84060

12,48
10,15000

49,60
3,81800
3,28680
4,64000
3,82000
0,55517
1,57250
Pgina: 370

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.05.17
PEDRA BRITADA 1
2.10.21
TABUAS PINHO DE 1"X12" DE 3A.
2.10.33
CHAPA COMPENSADA PLASTIFICADA E=10MM
Mo-de-Obra 15,56480
LS
18,98906

UN Coeficiente

SubMO

34,55386

Material

M3
0,00900
M2
0,04000
M2
0,15000
5,77314

Custo Unit.

BDI

Custo Total

62,03
17,18
16,00
9,27521

16.80.008
QUADRA DE ESPORTES - PISO DE CONCRETO NAO ARMADO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.18
SARRAFO PINHO 7,5X2,5 CM
2.40.56
TINTA BETUMINOSA
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 2,01225
LS
2,45495
SubMO
4,46720

M2
H
0,20000
H
0,03750
H
0,03750
H
0,20000
M3
0,05000
M3
0,07000
M
0,85000
L
0,06000
UN
0,02500
M2
1,00000
L
0,01500
Material
35,84035

4,64
4,74
3,80
3,82
61,17
251,78
3,82
6,23
4,61
11,33
6,08
BDI
9,27074

16.80.009
QUADRA DE ESPORTES - PISO DE CONCRETO ARMADO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.18
PEDRA BRITADA 2
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.18
SARRAFO PINHO 7,5X2,5 CM
2.15.25
ACO CA-50-A $MD BITOLAS
2.15.44
TELA TELCON Q-92
2.40.56
TINTA BETUMINOSA
2.70.10
ARAME RECOZIDO N.18
2.80.81
FITA CREPE 25MM X 50M
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
3.75.17
TINTA A BASE DE EMULSAO ACRILICA (PARA PISOS)
Mo-de-Obra 2,33438
LS
2,84794
SubMO

5,18231

M2
H
0,03750
H
0,03750
H
0,20000
H
0,03750
H
0,03750
H
0,20000
M3
0,05000
M3
0,07000
M
0,85000
KG
0,10000
M2
1,10400
L
0,06000
KG
0,02800
UN
0,02500
M2
1,00000
L
0,01500
Material
43,55419

4,77
3,82
4,64
4,74
3,80
3,82
61,17
251,78
3,82
2,69
6,62
6,23
4,87
4,61
11,33
6,08
BDI
11,20940

14,08590

M2
H
0,75000
H
0,75000
KG
0,20000
M2
1,05000
Material
17,73150

16.80.010
TELA DE ARAME GALVANIZADO N.12 MALHA 2"
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.70.31
ARAME GALVANIZADO No. 16
2.75.08
TELA ARAME GALV MALHA QUADRANGULAR 2" FIO 12
Mo-de-Obra 6,34500
LS
7,74090
SubMO

16.80.011
TUBO DE F.G. 1 1/4" P/ SUSTENT TELA DE ALAMBRADO EXCL BASE-TRAVAMENTO
M
1.01.39
PEDREIRO
H
0,20000
1.01.40
PINTOR
H
0,10000
1.01.41
AJUDANTE DE PINTOR
H
0,10000
1.01.46
SERVENTE
H
0,20000
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
L
0,02800
3.80.12
LIXA PARA FERRO
UN
0,05500
3.80.28
ZARCAO
L
0,01700
4.21.73
ELETROD ACO GALV QUENTE (NBR-5624) 32 MM (1 1/4")
M
1,00000
Mo-de-Obra 2,54600
LS
3,10612
SubMO
5,65212
Material
16,14921

BDI

4,64
3,82
7,65
15,43
7,31800

BDI

4,64
4,74
3,80
3,82
14,18
1,47
15,96
15,40
5,01431

4,64
4,74
3,80
3,82
14,18
1,47
15,96
33,59
9,56362

16.80.012
TUBO DE F.G. 2" P/ SUSTENT TELA DE ALAMBRADO EXCL BASE-MONTANTE
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
3.75.07
TINTA ESMALTE SINTETICO - ALUMINIO
3.80.12
LIXA PARA FERRO
3.80.28
ZARCAO
6.05.06
TUBO ACO GALV.NBR5580 CLASSE MEDIA DN50MM (2")
Mo-de-Obra 3,05840
LS
3,73125
SubMO
6,78965

M
H
0,20000
H
0,16000
H
0,16000
H
0,20000
L
0,04500
UN
0,09000
L
0,02700
M
1,00000
Material
34,79132

BDI

16.80.013
PISO DE CONCRETO DESEMPENADO C/ REQUADRO 1.80CM E=6CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.10.60
RIPA DE PEROBA 1X5CM
SubMO
8,63935
Mo-de-Obra 3,89160
LS
4,74775

M2
H
0,46000
H
0,46000
M3
0,06000
M
1,20000
Material
17,74680

4,64
3,82
251,78
2,20
BDI
6,06882

16.80.014
Exerccio:

LASTRO DE BRITA GRADUADA COMPACTAO MECNICA E=8CM

2011

M2

0,55827
0,68720
2,40000

49,57
0,92800
0,17775
0,14250
0,76400
3,05850
17,62460
3,24700
0,37380
0,11525
11,33000
0,09120

59,94
0,17888
0,14325
0,92800
0,17775
0,14250
0,76400
3,05850
17,62460
3,24700
0,26900
7,30848
0,37380
0,13636
0,11525
11,33000
0,09120

39,13
3,48000
2,86500
1,53000
16,20150

26,81
0,92800
0,47400
0,38000
0,76400
0,39704
0,08085
0,27132
15,40000

51,14
0,92800
0,75840
0,60800
0,76400
0,63810
0,13230
0,43092
33,59000

32,45
2,13440
1,75720
15,10680
2,64000

9,59
Pgina: 371

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

1.01.46
SERVENTE
2.05.23
BRITA GRADUADA
8.01.16
ROLO COMPACTADOR LISO 1000KG
Mo-de-Obra 0,83276
LS
1,01597

UN Coeficiente

Custo Total

BDI

3,82
69,64
17,83
1,79393

BDI

3,82
0,91
0,28875

BDI

4,77
3,82
6,62
1,73031

M2
H
0,04000
H
0,04000
M
0,90000
M2
1,05000
Material
13,38450

BDI

4,77
3,82
3,17
10,03
3,25388

M2
H
0,15000
H
0,15000
M3
0,05000
Material
12,58900

4,64
3,82
251,78
BDI
3,54342

16.80.019
PISO DE CONCRETO FCK=25MPA E=8CM DESEMPENAMENTO MECNICO
1.01.39
PEDREIRO
1.01.46
SERVENTE
1.01.55
OPERADOR
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
Mo-de-Obra 1,70767
LS
2,08336
SubMO
3,79103

M2
H
0,18000
H
0,18000
H
0,02660
M3
0,08000
KG
0,25000
M2
1,00000
Material
33,07990

4,64
3,82
6,95
251,78
6,43
11,33
BDI
8,48031

16.80.020
TRELICA METALICA PARA TABELA DE BASQUETES
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.67.18
ESTRUT MET TRELICA P/TABELA BASQUETE DES QE-04
Mo-de-Obra 25,38000
LS
30,96360
SubMO

56,34360

UN
H
3,00000
H
3,00000
UN
1,00000
Material
2.263,64000

2.853,57
4,64
13,92000
3,82
11,46000
2.263,64
2.263,64000
BDI
533,59623

19,00320

UN
H
1,00000
H
1,00000
UN
1,00000
Material
316,98000

413,25
4,60
4,60000
3,96
3,96000
316,98
316,98000
BDI
77,27614

9,50160

UN
H
0,50000
H
0,50000
UN
1,00000
UN
1,00000
Material
89,17000

1,84873

Material

0,25441

M2
H
0,03000
M2
1,10000
Material
1,00100

0,57209

M2
H
0,03000
H
0,03000
M2
1,05000
Material
6,95100

16.80.017
TELA Q-138 E ESPAADOR TRELIADO P/PISO DE CONCRETO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.08
ESPAADOR TRELIADO DE AO H=5CM
2.15.42
TELA TELCON Q138 (PAINEL)
Mo-de-Obra 0,34360
LS
0,41919
SubMO
0,76279
16.80.018
PISO DE CONCRETO FCK=25MPA E=5CM
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
Mo-de-Obra 1,26900
LS
1,54818

16.80.015
ISOLAMENTO COM LONA PRETA
1.01.46
SERVENTE
2.40.35
LONA DE PLASTICO PRETO E=0,20MM
Mo-de-Obra 0,11460
LS
0,13981
16.80.016
TELA Q-92 PARA PISO DE CONCRETO
1.01.21
FERREIRO
1.01.22
AJUDANTE DE FERREIRO
2.15.44
TELA TELCON Q-92
Mo-de-Obra 0,25770
LS
0,31439

16.80.021
TABELA DE MADEIRA PARA BASQUETE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.67.14
TABELA BASQUETE COMPLETA (QE-05)
Mo-de-Obra 8,56000
LS
10,44320
16.80.022
CESTO PARA TABELA DE BASQUETE
1.01.11
CARPINTEIRO
1.01.12
AJUDANTE DE CARPINTEIRO
3.67.10
ARO DUPLO DE ACO BASQUETE
3.67.11
CESTO NYLON BASQUETE
Mo-de-Obra 4,28000
LS
5,22160

SubMO

H
0,21800
M3
0,08000
H
0,02130
5,95098

Custo Unit.

SubMO

SubMO

SubMO

SubMO

SubMO

2,81718

16.80.023
PISO DE CONCRETO COM FIBRA FCK=25MPA E=8CM DESEMPENAMENTO MECNICO
M2
1.01.39
PEDREIRO
H
0,20000
1.01.46
SERVENTE
H
0,20000
1.01.55
OPERADOR
H
0,02660
2.05.36
CONCRETO DOSADO (CONDICAO A) FCK 25 MPA
M3
0,08000
2.80.17
ENDURECEDOR SUPERFICIAL PARA CONCRETO
KG
0,25000
2.80.20
FIBRA DE POLIPROPILENO MONOFILAMENTO
KG
0,04800
3.55.90
MAO DE OBRA / EQUIP. MEC. ROT. / CORTE / LASER
M2
1,00000
Mo-de-Obra 1,87687
LS
2,28978
SubMO
4,16665
Material
34,10902
16.80.070
1.01.39
1.01.42
1.01.46
2.05.03
2.05.05
2.05.08
Exerccio:

SUMIDOURO - COROAMENTO, INCLUSIVE ESCAVACAO


PEDREIRO
POCEIRO
SERVENTE
AREIA
CAL HIDRATADA
CIMENTO

2011

M
H
H
H
M3
KG
KG

16,80000
7,51000
28,65000
0,46900
79,73000
41,30000

BDI

4,60
3,96
86,29
2,88
22,69447

4,64
3,82
6,95
251,78
6,43
21,44
11,33
BDI
8,80340

4,64
4,50
3,82
80,46
0,35
0,37

0,83276
5,57120
0,37978

1,54
0,11460
1,00100

9,25
0,14310
0,11460
6,95100

17,40
0,19080
0,15280
2,85300
10,53150

18,94
0,69600
0,57300
12,58900

45,35
0,83520
0,68760
0,18487
20,14240
1,60750
11,33000

121,36
2,30000
1,98000
86,29000
2,88000

47,07
0,92800
0,76400
0,18487
20,14240
1,60750
1,02912
11,33000

968,70
77,95200
33,79500
109,44300
37,73574
27,90550
15,28100
Pgina: 372

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.25.15
TIJOLO COMUM MACICO
Mo-de-Obra 221,19000
LS
16.80.071
SUMIDOURO - ESCAVACAO
1.01.42
POCEIRO
1.01.46
SERVENTE
Mo-de-Obra 75,12960
LS
16.80.072
SUMIDOURO - BRITA
1.01.46
SERVENTE
2.05.19
PEDRA BRITADA 3
Mo-de-Obra 9,55000

LS

269,85180

91,65811

11,65100

16.80.086
LIMPEZA DE APARELHOS SANITARIOS
1.01.46
SERVENTE
Mo-de-Obra 3,05600
LS
3,72832
16.80.087
LIMPEZA DE REVESTIMENTOS HIDRAULICOS
1.01.46
SERVENTE
Mo-de-Obra 2,29200
LS
2,79624
16.80.088
LIMPEZA DE VIDROS
1.01.46
SERVENTE
Mo-de-Obra 2,86500

LS

3,49530

16.80.089
LIMPEZA DE CAIXA D'AGUA ATE 1000 LITROS
1.01.46
SERVENTE
Mo-de-Obra 11,46000
LS
13,98120

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

16.80.090
LIMPEZA DE CAIXAS D'AGUA ATE 10.000 LITROS
1.01.46
SERVENTE
Mo-de-Obra 30,56000
LS
37,28320
SubMO
16.80.091
LIMPEZA DE CAIXAS D'AGUA ACIMA DE 10.000 LITROS
1.01.46
SERVENTE
Mo-de-Obra 68,76000
LS
83,88720
SubMO
16.80.092
LIMPEZA DE CAIXILHOS METALICOS
1.01.46
SERVENTE
Mo-de-Obra 5,73000
LS
6,99060
16.80.093
LIMPEZA DE CAIXA DE INSPECAO
1.01.46
SERVENTE
Mo-de-Obra 1,14600
LS
1,39812
16.80.094
LIMPEZA DE FOSSA SEPTICA
2.04.50
LIMPEZA FOSSA SEPTICA
Mo-de-Obra 0,00000
LS

0,00000

16.80.095
LIMPEZA DE SUMIDOURO POR VIAGEM DE 7 M3
2.04.51
LIMPEZA SUMIDOURO-VIAGEM 7M3
Mo-de-Obra 0,00000
LS
0,00000
16.80.098
RETIRADA DE ENTULHO
1.01.46
SERVENTE
8.03.10
CAMINHAO BASCULANTE 6M3
Mo-de-Obra 4,58400
LS

5,59248

16.80.099
SERVICOS DE SERVICOS COMPLEMENTARES
6.96.02
MODULO DE VERBA
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

16.85.001
TRANSP ATE 50 KM E INST DO EQUIP DE PERFURACAO
2.04.29
TRANSP ATE 50KM E INST EQUIP PERF
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.85.002
TRANSP ADICIONAL POR KM DO SERVICO 168501
2.04.27
TRANSP ADICIONAL P/KM (SERV 168501)
SubMO
Mo-de-Obra 0,00000
LS
0,00000
16.85.005
2.04.16

Exerccio:

PERFURACAO EM ALUVIAO DE 18"-450 MM


PERFURACAO EM ALUVIAO 18'-450MM

2011

Material

UN
980,00000
296,52224

166,78771

Material

M
H
9,03000
H
9,03000
0,00000

21,20100

M3
H
2,50000
M3
1,00000
Material
58,73000

6,78432

UN
H
0,80000
Material
0,00000

5,08824

M2
H
0,60000
Material
0,00000

6,36030

M2
H
0,75000
Material
0,00000

25,44120

UN
H
3,00000
Material
0,00000

67,84320

UN
H
8,00000
Material
0,00000

152,64720

UN
H
18,00000
Material
0,00000

12,72060

M2
H
1,50000
Material
0,00000

2,54412

UN
H
0,30000
Material
0,00000

Custo Unit.

Custo Total

BDI

0,22
215,60000
181,13973

BDI

4,50
3,82
38,36117

BDI

3,82
58,73
18,38413

BDI

3,82
1,56039

BDI

3,82
1,17030

BDI

3,82
1,46287

BDI

3,82
5,85148

BDI

3,82
15,60394

BDI

3,82
35,10886

BDI

3,82
2,92574

BDI

3,82
0,58515

0,00000

M3
M3
1,00000
Material
57,10000

BDI

57,10
13,13300

0,00000

VG
VG
1,00000
Material
394,40000

485,11
394,40
394,40000
BDI
90,71200

10,17648

M3
H
1,20000
H
0,28000
Material
17,17240

BDI

0,00000

MV
MV
1,00000
Material
244,82000

301,12
244,82
244,82000
BDI
56,30860

0,00000

UN
UN
1,00000
Material
4.244,50000

5.220,73
4.244,50
4.244,50000
BDI
976,23500

0,00000

KM
KM
1,00000
Material
4,94000

491,04180

M
M

1,00000

BDI

3,82
61,33
6,29024

4,94
1,13620

452,43

205,14
40,63500
34,49460

98,31
9,55000
58,73000

8,34
3,05600

6,25
2,29200

7,82
2,86500

31,29
11,46000

83,44
30,56000

187,75
68,76000

15,64
5,73000

3,12
1,14600

70,23
57,10000

33,63
4,58400
17,17240

6,07
4,94000

556,48
452,43000

Pgina: 373

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,00000

LS

0,00000

16.85.006
PERFURACAO EM ALUVIAO DE 16"-400 MM
2.04.15
PERFURACAO EM ALUVIAO 16'-400MM
Mo-de-Obra 0,00000
LS
0,00000
16.85.007
PERFURACAO EM ALUVIAO DE 14"-350 MM
2.04.14
PERFURACAO EM ALUVIAO 14'-350MM
Mo-de-Obra 0,00000
LS
0,00000
16.85.008
PERFURACAO EM ALUVIAO DE 12"-300 MM
2.04.18
PERFURACAO EM ALUVIAO 12'-300MM
Mo-de-Obra 0,00000
LS
0,00000
16.85.009
PERFURACAO EM ALUVIAO DE 10"-250 MM
2.04.17
PERFURACAO EM ALUVIAO 10'-250MM
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente
SubMO

SubMO

SubMO

SubMO

SubMO

16.85.011
PERFURACAO EM ROCHA ALTERADA D= 12'-300 MM
2.04.21
PERFURACAO EM ROCHA ALTERADA 12'
SubMO
Mo-de-Obra 0,00000
LS
0,00000
16.85.012
PERFURACAO EM ROCHA ALTERADA D= 10'-250 MM
2.04.20
PERFURACAO EM ROCHA ALTERADA 10'
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.85.013
PERFURACAO EM ROCHA ALTERADA D= 8'-200 MM
2.04.19
PERFURACAO EM ROCHA ALTERADA 8'
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.85.014
PERFURACAO EM ROCHA ALTERADA DN 350MM (14")
2.04.55
PERFURACAO EM ROCHA ALTERADA 14"
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.85.015
PERFURACAO EM ROCHA SA D= 10"-250 MM
2.04.24
PERFURACAO EM ROCHA SA 10'
Mo-de-Obra 0,00000
LS
0,00000
16.85.016
PERFURACAO EM ROCHA SA D= 8"-200 MM
2.04.23
PERFURACAO EM ROCHA SA 8'
Mo-de-Obra 0,00000
LS
0,00000
16.85.017
PERFURACAO EM ROCHA SA D= 6"-150 MM
2.04.22
PERFURACAO EM ROCHA SA 6'
Mo-de-Obra 0,00000
LS
0,00000

SubMO

SubMO

SubMO

0,00000

0,00000

0,00000

0,00000

0,00000

0,00000

0,00000

0,00000

0,00000

0,00000

0,00000

0,00000

16.85.021
TUBO DE REVEST DE BOCA DE CHAPA DE ACO D= 16"X3/16"
2.04.32
TUBO DE ACO 16'X3/16' FORN E APLIC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
16.85.022
TUBO DE REVEST DE BOCA DE CHAPA DE ACO D= 14"X3/16"
2.04.31
TUBO DE ACO 14'X3/16' FORN E APLIC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
16.85.023
TUBO DE REVEST DE BOCA DE CHAPA DE ACO D= 12"X3/16"
2.04.30
TUBO DE ACO 12'X3/16' FORN E APLIC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
16.85.025
REVEST INTERNO DIM 2440 PRETO D= 8"-200 MM
2.04.34
TUBO DIN-2440 PRETO 8' FORN E APLIC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.85.026
REVEST INTERNO DIM 2440 PRETO D= 6"-150 MM
2.04.33
TUBO DIN-2440 PRETO 6' FORN E APLIC
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.85.028
FILTRO TIPO NOLD GALV D= 8"-200 MM
2.04.12
FILTRO 'NOLD' GALV 8' FORN E APLIC
Mo-de-Obra 0,00000
LS
0,00000
16.85.029
2.04.11

Exerccio:

FILTRO TIPO NOLD GALV D= 6"-150 MM


FILTRO 'NOLD' GALV 6' FORN E APLIC

2011

SubMO

0,00000

0,00000

0,00000

Material

452,43000

Custo Unit.
BDI

Custo Total

104,05890

Material

M
M
1,00000
391,10000

481,05
391,10
391,10000
BDI
89,95300

Material

M
M
1,00000
334,60000

411,55
334,60
334,60000
BDI
76,95800

Material

M
M
1,00000
313,05000

385,05
313,05
313,05000
BDI
72,00150

Material

M
M
1,00000
212,60000

261,49
212,60
212,60000
BDI
48,89800

Material

M
M
1,00000
307,08000

377,70
307,08
307,08000
BDI
70,62840

Material

M
M
1,00000
215,10000

264,57
215,10
215,10000
BDI
49,47300

Material

M
M
1,00000
155,61000

191,40
155,61
155,61000
BDI
35,79030

Material

M
M
1,00000
273,50000

336,40
273,50
273,50000
BDI
62,90500

Material

M
M
1,00000
357,58000

439,82
357,58
357,58000
BDI
82,24340

Material

M
M
1,00000
228,61000

281,19
228,61
228,61000
BDI
52,58030

Material

M
M
1,00000
153,56000

188,87
153,56
153,56000
BDI
35,31880

Material

M
M
1,00000
740,83000

911,22
740,83
740,83000
BDI
170,39090

Material

M
M
1,00000
615,50000

757,06
615,50
615,50000
BDI
141,56500

Material

M
M
1,00000
420,50000

517,21
420,50
420,50000
BDI
96,71500

Material

M
M
1,00000
407,07000

500,69
407,07
407,07000
BDI
93,62610

Material

M
M
1,00000
241,32000

296,82
241,32
241,32000
BDI
55,50360

Material

M
M
1,00000
723,34000

889,70
723,34
723,34000
BDI
166,36820

M
M

1,00000

440,28

541,54
440,28000

Pgina: 374

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente
SubMO

16.85.031
PRE-FILTRO DE PEDREGULHO LAVADO E SELECIONADO
2.04.25
PREFILTRO DE PEDREGULHO FORN E APLIC
Mo-de-Obra 0,00000
LS
0,00000
SubMO

Material

0,00000

M3
M3
1,00000
Material
307,67000

378,43
307,67
307,67000
BDI
70,76410

M3
M3
1,00000
Material
1.032,13000

1.269,51
1.032,13
1.032,13000
BDI
237,38990

16.85.035
LIMPEZA E DESENV DO POCO C/ COMPRESSOR DE AR E/OU PISTAO VALV
2.04.13
LIMPEZA E DESENV POCO C/AR OU PISTAO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
16.85.037
ENSAIO DE VAZAO COM BOMBA SUBMERSA
2.04.08
ENSAIO DE VAZAO C/BOMBA SUBMERSA
Mo-de-Obra 0,00000
LS
0,00000
16.85.038
ENSAIO DE VAZAO COM COMPRESSOR DE AR
2.04.10
ENSAIO DE VAZAO C/COMPRESSOR DE AR
Mo-de-Obra 0,00000
LS
0,00000
16.85.039
ENSAIO DE VAZAO COM BOMBA DE PISTAO
2.04.09
ENSAIO DE VAZAO C/BOMBA DE PISTAO
Mo-de-Obra 0,00000
LS
0,00000

SubMO

16.85.046
DESINFECCAO
2.04.05
DESINFECCAO
Mo-de-Obra 0,00000

LS

0,00000

0,00000

16.85.048
LAJE DE PROTECAO DE 2,00X2,00 M
1.01.39
PEDREIRO
1.01.46
SERVENTE
2.05.03
AREIA
2.05.08
CIMENTO
2.05.18
PEDRA BRITADA 2
Mo-de-Obra 35,58400
LS
43,41248

0,00000

SubMO

SubMO

SubMO

SubMO

SubMO

Exerccio:

DOCUMENTACAO TECNICA FINAL


DOCUMENTACAO TECNICA FINAL

2011

342,16
278,18
278,18000
BDI
63,98140

1,00000

122,85
99,88000

99,88
22,97240

BDI

1,00000
164,77000

202,66
164,77
164,77000
BDI
37,89710

0,00000

Material

1,00000
250,00000

307,50
250,00
250,00000
BDI
57,50000

0,00000

UN
UN
1,00000
Material
1.542,78000

1.897,61
1.542,78
1.542,78000
BDI
354,83940

0,00000

KM
KM
1,00000
Material
4,35000

0,00000

UN
UN
1,00000
Material
80,33000

0,00000

Material
H
H

SubMO

101,26440

99,88000

5,35
4,35000

BDI

4,35
1,00050

BDI

80,33
18,47590

0,00000

UN
UN
1,00000
Material
52,50000

BDI

52,50
12,07500

0,00000

UN
UN
1,00000
Material
355,83000

437,67
355,83
355,83000
BDI
81,84090

78,99648

UN
H
2,40000
H
6,40000
M3
0,23000
KG
137,20000
M3
0,34200
Material
90,18994

16.85.049
ABRIGO DE POCO EM ALVENARIA DE 1,00X1,00X0,60 M C/ TAMPA METALICA
1.01.39
PEDREIRO
1.01.40
PINTOR
1.01.41
AJUDANTE DE PINTOR
1.01.46
SERVENTE
2.05.03
AREIA
2.05.05
CAL HIDRATADA
2.05.08
CIMENTO
2.25.15
TIJOLO COMUM MACICO
3.13.90
PF-07TAMPA INSPECAO
3.80.03
CAL PARA PINTURA
3.80.12
LIXA PARA FERRO
3.80.18
OLEO DE LINHACA
3.80.28
ZARCAO
3.80.34
TINTA A OLEO
SubMO
282,05100
Mo-de-Obra 127,05000
LS
155,00100
16.85.050
2.04.07

Material
H
H

16.85.042
TRANSP ADICIONAL POR KM DO SERVICO 168541
2.04.26
TRANSP ADICIONAL P/KM (SERV 168541)
Mo-de-Obra 0,00000
LS
0,00000
SubMO

16.85.045
ANALISE BACTERIOLOGICA
2.04.03
ANALISE BACTERIOLOGICA
Mo-de-Obra 0,00000
LS

Material

1,00000
278,18000

H
H

16.85.041
TRANSP ATE 50 KM E INST EQUIP DE BOMBEAMENTO
2.04.28
TRANSP ATE 50KM E INST EQUIP BOMBEAM
Mo-de-Obra 0,00000
LS
0,00000
SubMO

16.85.044
ANALISE FISICO-QUIMICA DA AGUA
2.04.04
ANALISE FISICO-QUIMICA DA AGUA
Mo-de-Obra 0,00000
LS
0,00000

H
H

BDI

Custo Total

0,00000

16.85.033
CIMENTACAO ENTRE PERFURACAO DE MAIOR "D" E O REVEST DE BOCA
2.04.06
CIMENTADO ENTRE PERFURACAO E TUBO
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000

440,28000

Custo Unit.

UN
H
10,78000
H
5,03000
H
1,20000
H
12,73000
M3
0,12800
KG
24,99000
KG
23,67000
UN
142,80000
UN
1,73000
KG
2,04000
UN
2,00000
L
0,04000
L
0,60000
L
1,00000
Material
204,80798
UN
UN

1,00000

98,80
80,33000

64,57
52,50000

208,09
11,13600
24,44800
18,50580
50,76400
20,92014

BDI

4,64
3,82
80,46
0,37
61,17
38,91288

BDI

4,64
4,74
3,80
3,82
80,46
0,35
0,37
0,22
70,51
0,75
1,47
6,51
15,96
9,30
111,97757

457,08

598,83
50,01920
23,84220
4,56000
48,62860
10,29888
8,74650
8,75790
31,41600
121,98230
1,53000
2,94000
0,26040
9,57600
9,30000

562,20
457,08000
Pgina: 375

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

Mo-de-Obra 0,00000

LS

0,00000

UN Coeficiente
SubMO

16.85.051
REVEST. INT. TUBO LISO DE PVC GEOMECANICO D=6"
2.04.60
TUBO LISO DE PVC GEOMECANICO D=6" FORN APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

Material

457,08000

Custo Unit.
BDI

Custo Total

105,12840

Material

M
M
1,00000
160,10000

196,92
160,10
160,10000
BDI
36,82300

Material

M
M
1,00000
320,79000

394,57
320,79
320,79000
BDI
73,78170

Material

M
M
1,00000
239,90000

295,07
239,90
239,90000
BDI
55,17700

Material

M
M
1,00000
359,58000

442,28
359,58
359,58000
BDI
82,70340

Material

M
M
1,00000
207,75000

255,53
207,75
207,75000
BDI
47,78250

Material

M
M
1,00000
395,10000

485,97
395,10
395,10000
BDI
90,87300

Material

M
M
1,00000
272,58000

335,27
272,58
272,58000
BDI
62,69340

Material

M
M
1,00000
419,01000

515,38
419,01
419,01000
BDI
96,37230

UN
H
5,90000
H
11,80000
UN
1,00000
Material
1.914,76000

2.567,65
5,05
29,79500
4,07
48,02600
1.914,76
1.914,76000
BDI
480,13020

16.85.061
CJ MOTOR BOMBA SUBMERSO 1,5HP EXTR 1700 A 2600 L/H A M 140 A 80 MCA
UN
1.01.18
ENCANADOR
H
5,90000
1.01.19
AJUDANTE DE ENCANADOR
H
11,80000
6.65.61
CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 1,5HP-140MCA
UN
1,00000
Mo-de-Obra 77,82100
LS
94,94162
SubMO
172,76262
Material
2.126,76000

2.828,41
5,05
29,79500
4,07
48,02600
2.126,76
2.126,76000
BDI
528,89020

16.85.062
CJ MOTOR BOMBA SUBMERSO 2HP EXTR 2200 A 4000 L/H A M 160 A 100MCA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.62
CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 2HP-160MCA
Mo-de-Obra 77,82100
LS
94,94162
SubMO
172,76262

UN
H
5,90000
H
11,80000
UN
1,00000
Material
2.394,81000

3.158,11
5,05
29,79500
4,07
48,02600
2.394,81
2.394,81000
BDI
590,54170

16.85.063
CJ MOTOR BOMBA SUBMERSO 3HP EXTR 2600 A 4900 L/H A M 160 A 100MCA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.63
CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 3HP-160MCA
Mo-de-Obra 77,82100
LS
94,94162
SubMO
172,76262

UN
H
5,90000
H
11,80000
UN
1,00000
Material
2.658,59000

3.482,56
5,05
29,79500
4,07
48,02600
2.658,59
2.658,59000
BDI
651,21110

16.85.064
CJ MOTOR BOMBA SUBMERSO 5HP EXTR 3000 A 5700 L/H A M 180 A 100MCA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.64
CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 5HP-180MCA
Mo-de-Obra 77,82100
LS
94,94162
SubMO
172,76262

UN
H
5,90000
H
11,80000
UN
1,00000
Material
3.178,96000

4.122,61
5,05
29,79500
4,07
48,02600
3.178,96
3.178,96000
BDI
770,89620

Material

M
M
1,00000
599,73000

737,66
599,73
599,73000
BDI
137,93790

Material

M
M
1,00000
695,44000

855,39
695,44
695,44000
BDI
159,95120

16.85.052
REVEST. INT. TUBO LISO DE PVC GEOMECANICO D=8"
2.04.61
TUBO LISO DE PVC GEOMECANICO D=8" FORN APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

0,00000

16.85.053
REVEST. INT. TUBO LISO DE PVC REFORCADO GEOMECANICO D=6"
2.04.70
TUBO LISO DE PVC REFORCADO GEOMECANICO 6" FORN APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
16.85.054
REVEST. INT. TUBO LISO DE PVC REFORCADO GEOMECANICO D=8"
2.04.71
TUBO LISO DE PVC REFORCADO GEOMECANICO 8" FORN APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
16.85.056
FILTRO TIPO STANDARD PVC AB 75MM D=6"
2.04.62
TUBO PVC FILTRO STANDARD D=6" AB 75MM FORN APL
SubMO
Mo-de-Obra 0,00000
LS
0,00000
16.85.057
FILTRO TIPO STANDARD PVC AB 75MM D=8"
2.04.63
TUBO PVC FILTRO STANDARD D=8" AB 75MM FORN APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

0,00000

16.85.058
FILTRO TIPO STANDARD PVC REFORCADO AB 75MM D=6"
2.04.68
TUBO PVC REFOR FILTRO STANDARD D=6" AB 75MM FO APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
0,00000
16.85.059
FILTRO TIPO STANDARD PVC REFORCADO AB 75MM D=8"
2.04.69
TUBO PVC REFOR FILTRO STANDARD D=8' AB 75MM FO APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

16.85.060
CJ MOTOR BOMBA SUBMERSO 1HP EXTR 700 A 2000 L/H A M 120 A 80MCA
1.01.18
ENCANADOR
1.01.19
AJUDANTE DE ENCANADOR
6.65.60
CJ MOTOR BOMBA SUBMERSO P/POCO ARTES 1 HP-120 MCA
Mo-de-Obra 77,82100
LS
94,94162
SubMO
172,76262

16.85.065
TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=10"X1/4"
2.04.64
TUBO DE ACO 10"X1/4" FORN APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO
16.85.066
TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=12"X1/4"
2.04.65
TUBO DE ACO 12"X1/4" FORN APL
SubMO
Mo-de-Obra 0,00000
LS
0,00000
16.85.067
Exerccio:

TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=14"X1/4"

2011

0,00000

0,00000

992,29
Pgina: 376

Tab. Ref. abril/2011


LS: 122%

TABELA DE COMPOSIO

BDI: 23%

A tabela oficial a que se encontra disponivel no site: www.fde.sp.gov.br

Referncia

Descrio

2.04.66
TUBO DE ACO 14"X1/4" FORN APL
Mo-de-Obra 0,00000
LS
0,00000

UN Coeficiente

Custo Unit.

Custo Total

Material

M
1,00000
806,74000

BDI

Material

M
M
1,00000
923,07000

1.135,37
923,07
923,07000
BDI
212,30610

UN
H
4,90000
UN
1,00000
Material
720,00000

956,51
5,30
25,97000
720,00
720,00000
BDI
178,86028

16.85.071
QUADRO COMANDO CJ MOTOR BOMBA SUB P/MOTOR 1,5 A 2HP 220V BIFASICO
UN
1.01.15
ELETRICISTA
H
4,90000
4.16.02
QUADRO P/BOMBA 1,5HP (168571)
UN
1,00000
Mo-de-Obra 25,97000
LS
31,68340
SubMO
57,65340
Material
720,00000

956,51
5,30
25,97000
720,00
720,00000
BDI
178,86028

16.85.072
QUADRO DE COMAN CJ MOTOR BOMBA SUB P/ MOTOR DE 3A5HP 220V TRIFASICO
UN
1.01.15
ELETRICISTA
H
4,90000
4.16.03
QUADRO P/BOMBA 3 A 5HP (168572)
UN
1,00000
Mo-de-Obra 25,97000
LS
31,68340
SubMO
57,65340
Material
720,00000

956,51
5,30
25,97000
720,00
720,00000
BDI
178,86028

SubMO

16.85.068
TUBO DE REVEST. DE BOCA DE CHAPA DE ACO D=16"X1/4"
2.04.67
TUBO DE ACO 16"X1/4" FORN APL
Mo-de-Obra 0,00000
LS
0,00000
SubMO

0,00000

0,00000

16.85.070
QUADRO DE COMANDO CJ MOTOR BOMBA P/ MOTOR DE 1HP 220V BIFAS
1.01.15
ELETRICISTA
4.16.04
QUADRO P/BOMBA 1HP (168570)
Mo-de-Obra 25,97000
LS
31,68340
SubMO
57,65340

16.85.080
CABO DE COBRE ATE 600V - 3X14AWG
1.01.15
ELETRICISTA
4.31.25
CABO COBRE SUBMERSIVEL 3X14AWG-600V
Mo-de-Obra 0,21200
LS
0,25864
16.85.081
CABO DE COBRE ATE 600V - 3X12AWG
1.01.15
ELETRICISTA
4.31.24
CABO COBRE SUBMERSIVEL 3X12AWG-600V
Mo-de-Obra 0,21200
LS
0,25864
16.85.082
CABO DE COBRE ATE 600V - 3X10AWG
1.01.15
ELETRICISTA
4.31.23
CABO COBRE SUBMERSIVEL 3X10AWG-600V
Mo-de-Obra 0,21200
LS
0,25864
16.85.083
CABO DE COBRE ATE 600V - 3X8AWG
1.01.15
ELETRICISTA
4.31.22
CABO COBRE SUBMERSIVEL 3X8AWG-600V
Mo-de-Obra 0,21200
LS
0,25864
16.85.084
CABO DE COBRE ATE 600V - 3X6AWG
1.01.15
ELETRICISTA
4.31.21
CABO COBRE SUBMERSIVEL 3X6AWG-600V
Mo-de-Obra 0,21200
LS
0,25864
16.85.085
CABO DE COBRE ATE 600V - 3X4AWG
1.01.15
ELETRICISTA
4.31.20
CABO COBRE SUBMERSIVEL 3X4AWG-600V
Mo-de-Obra 0,21200
LS
0,25864

SubMO

SubMO

SubMO

SubMO

SubMO

SubMO

16.85.090
ELETRODO DE NIVEL CONTRA TRABALHO A SECO
1.01.15
ELETRICISTA
4.96.80
ELETRODO DE NIVEL CONTRA TRAB A SECO
Mo-de-Obra 3,71000
LS
4,52620
SubMO

Exerccio:

2011

Material

M
H
0,04000
M
1,00000
2,76000

Material

M
H
0,04000
M
1,00000
4,14000

Material

M
H
0,04000
M
1,00000
5,82000

Material

M
H
0,04000
M
1,00000
10,09000

Material

M
H
0,04000
M
1,00000
15,05000

0,47064

Material

M
H
0,04000
M
1,00000
23,18000

8,23620

UN
H
0,70000
UN
1,00000
Material
25,00000

0,47064

0,47064

0,47064

0,47064

0,47064

806,74
806,74000
185,55020

BDI

5,30
2,76
0,74305

BDI

5,30
4,14
1,06045

BDI

5,30
5,82
1,44685

BDI

5,30
10,09
2,42895

BDI

5,30
15,05
3,56975

BDI

5,30
23,18
5,43965

BDI

5,30
25,00
7,64433

3,97
0,21200
2,76000

5,67
0,21200
4,14000

7,73
0,21200
5,82000

12,98
0,21200
10,09000

19,09
0,21200
15,05000

29,09
0,21200
23,18000

40,88
3,71000
25,00000

Pgina: 377