RELATRIO DE
VISITAS A OBRA
Grupo:
- Joana Teixeira, 28928
- Judith Winker, 47059
Fase da obra:
Localizao:
Data de incio:
Prazo de execuo:
Novembro de 2014
12 meses
Dono-de-obra:
Empreiteiro:
Fiscalizao:
Seaside
Sonangil
DDN
rea de construo:
Valor empreitada:
Data da visita:
2 620 m2
800.000
24 de Setembro de 2015
ndice
1. Introduo ..................................................................................................................................... 4
2. Sequncia da Construo ........................................................................................................ 4
2.1.
2.2.
2.3.
3.1.1.
Lajes ........................................................................................................................................ 6
3.1.2.
3.2.
Betonagem ................................................................................................................................ 7
1. Introduo
O relatrio elaborado visa aprofundar os conhecimentos adquiridos nas aulas
tericas e prticas no mbito da disciplina de Tecnologia das Construes, pois
permite aos alunos um contacto directo com um local de obra.
Realizou-se uma visita obra de reabilitao de um edifcio pombalino localizada
na Praa da Figueira, em Lisboa. A obra tem como objectivo a construo de um
hotel atravs da reabilitao total do edifcio.
Trata-se dum edifcio com cinco pisos e uma cave, tendo sido apenas aproveitada
a fachada do antigo edifcio (Figura 1). Aps a demolio do interior do edifcio,
foram reforadas as fundaes e a prpria fachada, atravs de elementos de
contraventamento (Figura 2).
As fases abordadas neste trabalho sero as observadas aquando das visitas
obra, fazendo uma breve referncia a procedimentos que estejam inerentes.
2. Sequncia da Construo
2.1.
medida que foi feita a demolio, foi aplicada uma malha de ao com beto
projectado (Figura 3) e foram feitos contraventamentos de canto com perfis de
ao (Figura 4) para aumentar a rigidez das fachadas. Foi tambm feita uma
estrutura de ao para suportar a moldura da janela de telhado.
2.2.
Reforo de fundaes
2.3.
Construo (andamento)
3. Aspectos Construtivos
3.1.
Solues Construtivas
3.1.1.
Lajes
Foi adotada uma soluo aligeirada do ponto de vista estrutural: nas zonas
hmidas a laje constituda por elementos metlicos e nas restantes zonas foi
adotada uma soluo em madeira (Figura 12).
A soluo em metal conta com uma laje constituda por uma chapa de ao que
funciona como cofragem colaborante e com uma malha de ao, o que permite
uma laje fina de apenas 12 centmetros. As lajes de madeira so constitudas por
tarugos de 2010 centmetros de seco transversal, afastados 40 centmetros,
levando ainda uma camada de contraplacado martimo por cima. Ambas as lajes
esto apoiadas em perfis de ao HEB120 ou HEB240.
Podemos tambm observar o arranque dos vares da parede (Figura 13), bem
como a ligao do pilar com as vigas metlicas a uma caixa em que as vigas esto
aparafusadas entre si com parafusos com mais de 20 centmetros que
atravessam o pilar (dois dos parafusos ligam os perfis longitudinalmente e os
restantes aparafusam a caixa a qual as vigas esto soldadas) (Figura 14) e
podemos observar a zona inferior das lajes e os prumos a sustentar os perfis de
ao pois a laje do primeiro piso estava quase a ser betonada. Podemos ainda
observar que nas zonas em que a chapa metlica no est em contacto com o
perfil de ao, esto uns papis amarrotados para que, caso caia cimento da parte
de cima da laje entre o perfil metlico e a chapa, este no escorra e no degrade
as condies do beto da laje nesta zona de ligao (Figura 12).
3.1.2.
Pilares Pillars
The construction shows two different types of pillars: those that are connected
to the slab and those that are connected to the concrete wall below.
The pillars, which are connected to the slab are integrated into its steel beamstructure. The crossover between slab and pillar is solved with a section of a
hallow profile with rectangular cross-section into which the pillars longitudinal
reinforcement is inserted (Figura 14). They are part of the main bearing
structure, so the reinforcement consists of 12 longitudinal rebars and double
stirrups while each stirrup encircles nine rebars. In some cases even more.
The other pillars, which are integrated into a concrete wall, need less
reinforcement. Here it is made of only six longitudinal rebars and stirrups with
approximately 20 cm distance from each other.
The pillars reinforcements are already constructed in the height of several
floors, but the concreting afterwards happens section by section.
3.2.
Betonagem
The concreting of the slabs was performed using buckets with a sleeve, as could
be observed at the construction site (Figura 15). The bucket was filled by a
concrete mixing truck and carried with a crane to the area that should be
concreted. . Reinforcement steel meshes, which are made in situ, are located on
the top of the steel plates. Little spacers ensure the required space between steel
plate and reinforcement.
After filling the concrete in the slabs, the construction workers compacted it
using a vibrator, smoothed the surface with a wood ruler, and then it was applied
sand over the concrete to ensure the correct concrete cure (Figura 16 e Figura
17).
The other types of slabs are made of wood so they are not filled with concrete.
4. Observaes Prticas
Apesar de no conseguirmos observar a concluso da fase de toscos desta obra,
foi possvel observar uma grande evoluo e rapidez de processo.
Durante as visitas obra verificamos vrias solues incorretas efetuadas em
obra. No existia um estaleiro, onde os materiais pudessem ser guardados
convenientemente e, por isso, os materiais encontravam-se perdidos na obra
(Figura 18).
A segurana dos trabalhadores no estava, na maior parte dos casos,
salvaguardada. Apesar de quase todos terem o equipamento necessrio
(capacete, colete e botas de biqueira de ao), devido falta de organizao em
obra, as condies de segurana dos trabalhadores no eram as melhores.
Consideraes Finais
Consideramos esta componente da unidade curricular de Tecnologias de
Construo bastante til pois permite observar o ambiente em obra, algumas
solues particulares e inovadores e outras mais gerais, utilizadas em casos
prticos. Alm do que nos foi possvel observar, tivemos contacto com o
engenheiro da empresa construtora que falou abertamente connosco expondo
alguns problemas que teve, ou que habitualmente tem, dando-nos uma maior
percepo da realidade do trabalho deste.
A visita a obra foi bastante til pois ajudou a cimentar os conhecimentos das
aulas tericas e prticas, fornecendo aos elementos do grupo mais dados para
uma anlise crtica de possveis solues para um dado problema terico ou
prtico.
Anexos
Figura 5 - Furao para micro-estacas com trado contnuo
Figura 6 - Microestacas
Figura 8 - Micro estaca betonada
Figura 9 - Perfis de Ao do piso 1 e Arranque dos Pilares
Figura 10 - Chapa Metlica Colaborante e Armaduras
Figura 11 - Ensaio Cone de Abrams
Figura 12 - Vista inferior dos dois tipos de lajes
Figura 13 - Arranque das Armaduras da Parede
Figura 16 - regularizao do beto
Figura 15 - betonagem
Figura 18 - Vista Geral da Obra
Figura 17 - aplicao da membrana de cura