Você está na página 1de 1

DIgSILENT

SEP(60KV) SEP(138KV) SEP(220KV)

108.79 0.00 0.00


-42.41 0.00 0.00
1.124 0.000 0.000

60.0 Nodo 1-60KV 138.0 Nodo 2-138Kv 220.0 Nodo 3-220Kv


1.00 1.00 1.00
0.0 0.0 0.0
108.79
-42.41
1.124
14.784

5 - Lneas 60kV Doble terna


14.8

-104.26
45.10
1.097
14.784

Terminal 59.8
1.00
-5.4
104.26 0.00
-9.37 -35.73
1.011 0.345
20.208

R
36
138kv PSE(1) 0

20.2
T1
6.8
Capacitor 2
138kv PSE
3.56 -27.53 -27.53
6.8 27.63 27.63 -104.26
1.72 -9.32 -9.32 6.27 6.27 11.49
0.017 0.123 0.123 0.119 0.119 0.440
6.811 6.811 6.811 6.811 20.208

136.9
Nodo 4
137.7
Nodo 6 0.99 1.00
51.50 -7.1 -6.6 49.00
16.93 -24.02
0.229 0.229
13.668

13.7
T2
PQ

-49.00
24.40
3.156
13.668

Nodo 5 10.0
1.00
-6.9
49.00 -0.00
36.75 -61.15
3.532 3.526

Load Flow Balanced


61
Nodes Branches
C
Line-Line Voltage, Magnitude [kV] Active Power [MW] Capacitor 1

Voltage, Magnitude [p.u.] Reactive Power [Mvar] Trabajo Monogrfico Project:


Voltage, Angle [deg] Current, Magnitude [kA] ALTERNATIVA 1 Graphic: Grid
Loading [%] Mxima Demanda de Potencia Ao 2018 Date: 6/29/2017
PowerFactory 15.1.7 Alumno: Quispe Perez Wilder Alex 13190039 Annex: