REAL COST
PPN10%
GRAND TOTAL
DIBULATKAN
Terbilang :
Dua Puluh Lima Juta Rupiah
LASI
AN BIAYA (RAB)
Rp 22,727,500.00
Rp 22,727,500.00
Rp 2,272,750.00
Rp 25,000,250.00 25,000,000
Rp 25,000,000.00 -
-
a Rupiah
RENCANAN
ANGGARAN BIAYA
KEGIATAN
PEKERJAAN
SUB ITEM PEKERJAAN
TAHUN ANGGARAN
LOKASI
KABUPATEN/KOTA
PROVINSI
TOTAL
A
Rp - Rp 22,727,500.00
25000000
100%
DAFTAR HARGA BANGUNAN DAN UPAH KERJA KAB.PANGKEP
Provinsi : Sulawesi Selatan
Kabupaten : Pangkaje'ne dan Kepulauan
Bulan : Januari
Triwulan : 1 (Satu)
Tahun : 2019
BAHAN PASANGAN
1 Batu Kali
- Utuh M3 Rp 128,000.00
- Batu Pecah 10-15 cm M3 Rp 184,000.00
- Batu Pecah 7-10 cm M3 Rp 215,000.00
- Batu Pecah 5-7 cm M3 Rp 242,000.00
- Batu Pecah 3-5 cm M3 Rp 265,000.00
- Batu Pecah 2-3 cm M3 Rp 300,000.00
- Batu Pecah 1-2 cm M3 Rp 300,000.00
- Batu Pecah 0,5- M3 Rp 400,000.00
2 Batu Gunung M3 Rp 150,000.00
3 Tanah Timbunan M3 Rp 65,000.00
Timbunan Pilihan M3 Rp 90,000.00
4 Pasir
- Pasir Urug M3 Rp 150,000.00
- Pasir Pasang Lokal M3 Rp 160,000.00
- Pasir Pasang pilihan M3 Rp 200,000.00
- Pasir Beton M3 Rp 195,000.00
5 Krikil
- Krikil Halus M3 Rp 125,000.00
- Krikil Kasar M3 Rp 135,000.00
6 Sirtu
- Sirtu disaring M3 Rp 105,000.00
- Sirtu tidak disaring M3 Rp 100,000.00
7 Kapur Hidrasi M3 Rp 115,500.00
8 Semen
- Semen Putih Zak Rp 55,000.00
- Semen @ 50 kg Zak Rp 60,000.00
- Semen @ 40 kg Zak Rp 45,000.00
9 Semen Mortar Untuk Bata Ringan
- Semen MU 100 kg Rp 3,500.00
- Semen MU 200 kg Rp 5,000.00
- Semen MU 301 kg Rp 3,000.00
- Semen MU 380 kg Rp 5,500.00
- Semen MU 460 25 kg kg Rp 15,000.00
- Semen MU 408 kg Rp 10,000.00
10 Batu Merah Bj Rp 850.00
11 Bata Ringan M3 Rp 1,100,000.00
12 Paving Mar-Mar 20x10x3 cm Bj Rp 1,400.00
NO BAHAN / MATERIAL SATUAN 2019
BAHAN KAYU
1 Kayu Kls I (Ulin)
- Balok Gergaji Sawmil M3 Rp 13,000,000.00
- Papan Gergaji Sawmil M3 Rp 17,000,000.00
2 Kayu Kls I (Bayam)
- Balok Gergaji Sawmil M3 Rp 10,000,000.00
- Papan Gergaji Sawmil M3 Rp 17,000,000.00
3 Kayu Kls I (Kumea)
- Balok Gergaji Sawmil M3 Rp 6,500,000.00
- Papan Gergaji Sawmil M3 Rp 7,500,000.00
4 Kayu Kls II
- Balok M3 Rp 3,700,000.00
- Papan M3 Rp 3,700,000.00
5 Kayu Kls III
- Balok M3 Rp 2,500,000.00
- Papan M3 Rp 2,800,000.00
- Bambu Btg Rp 30,000.00
BAHAN LANTAI
1 Tegel PC
- PC Abu-abu 20x20 cm Dos Rp 55,000.00
- PC Abu-abu 30 x 30 cm Dos Rp 50,000.00
- PC Warna 20 x 20 cm Dos Rp 55,000.00
- PC Badak 20 x 20 cm Dos Rp 55,000.00
- Plin 15 x 20 cm Dos Rp 15,000.00
- Plin 15 x 30 cm Dos Rp 15,000.00
2 Tegel Keramik
- Putih 10 x 20 cm Dos Rp 55,000.00
- Warna 10 x 20 cm Dos Rp 55,000.00
- Putih 20 x 20 cm Dos Rp 60,000.00
- Warna 20 x 20 cm Dos Rp 60,000.00
- Putih 30 x 30 Dos Rp 52,000.00
- Warna 30 x30 cm Dos Rp 55,000.00
- Putih 40 x 40 cm Dos Rp 52,000.00
- Warna 40 x 40 Dos Rp 70,000.00
- Polos 60 x 60 Dos Rp 180,000.00
- Warna 60 x 60 cm Dos Rp 195,000.00
- Polos 20 x 60 Dos Rp 140,000.00
- Warna 20 x 60 cm Dos Rp 180,000.00
- Polos 20 x 25 Dos Rp 48,500.00
BAHAN KACA
1 Kaca Bening 3 mm M2 Rp 120,000.00
2 Kaca Bening 2 mm M2 Rp 95,000.00
3 Kaca Buram 3 mm M2 Rp 94,500.00
4 Kaca Buram 2 mm M2 Rp 78,700.00
NO BAHAN / MATERIAL SATUAN 2019
5 Riben 3 mm M2 Rp 130,000.00
6 Riben 5 mm M2 Rp 165,000.00
7 Rangka nako lengkap trali Set Rp 30,000.00
NO BAHAN / MATERIAL SATUAN 2019
BAHAN ALUMINIUM
1 - Aluminium Warna (2x1") M Rp 97,800.00
2 - Aluminium Warna (3x1") M Rp 182,300.00
3 - Aluminium Warna (3x2") M Rp 47,200.00
4 - Aluminium Warna (4x2") M Rp 81,900.00
BAHAN PIPA
1 Pipa Besi GIP
- Ø 1/2" medium A Btg Rp 200,000.00
- Ø 3/4" medium A Btg Rp 250,000.00
- Ø 1" medium A Btg Rp 350,000.00
- Ø 1,5" medium A Btg Rp 500,000.00
2 Pipa PVC
- Ø 1/2 Inci - 4 m Btg Rp 22,000.00
- Ø 3/4 Inci - 4 m Btg Rp 28,000.00
- Ø 1 Inci - 4 m Btg Rp 37,000.00
- Ø 1,5 Inci - 4 m AW Btg Rp 45,000.00
- Ø 2 Inci - 4 m AW Btg Rp 65,000.00
- Ø 2 1/2 Inci - 4 m AW Btg Rp 95,000.00
- Ø 3 Inci - 4 m AW Btg Rp 130,000.00
- Ø 4 Inci - 4 m AW Btg Rp 240,000.00
3 Pipa PVC Ø 50 (RR) S 12,5 T 10 Bar Btg Rp 160,000.00
4 Pipa PVC Ø 75 (RR) S 12,5 T 10 Bar Btg Rp 350,000.00
5 Pipa PVC Ø 100 (RR) S 12,5 T 10 Bar Btg Rp 365,000.00
6 Pipa PVC Ø 150 (RR) S 12,5 T 10 Bar Btg Rp 792,000.00
7 Pipa PVC Ø 200 (RR) S 12,5 T 10 Bar Btg Rp 1,331,000.00
8 Pipa PVC Ø 250 (RR) S 12,5 T 10 Bar Btg Rp 2,082,300.00
9 Pipa GIP Ø 150 Medium Btg Rp 2,112,000.00
10 Pipa GIP Ø 250 Medium Btg Rp 5,100,000.00
11 Pipa GIP Ø 200 Medium Btg Rp 3,600,000.00
12 Pipa GIP Ø 100 Medium Btg Rp 1,089,000.00
13 Pipa GIP Ø 75 Medium Btg Rp 855,000.00
14 Pipa GIP Ø 50 Medium Btg Rp 415,000.00
Kloset Duduk (TOTO) bh Rp 2,885,000.00
Kran Air bh Rp 20,000.00
Floor Drain (Stainless) bh Rp 35,000.00
Sealtape bh Rp 12,000.00
Buis Beton d = 90 cm bh Rp 280,000.00
Harga Tangki Air + Kaki (PS 550) bh Rp 2,825,300.00
Pintu KM / WC buah Rp 915,000.00
MEKANIKAL
1 Pompa Air Ø 8" Buah Rp 3,500,000.00
2 Pompa Air Ø 6" Buah Rp 3,000,000.00
3 Genset Power Systim 10 KVA Unit Rp 11,550,000.00
4 Genset Power Systim 5 KVA Unit Rp 5,777,500.00
BAHAN LANGIT-LANGIT
1 Eternit 100 x 100 Lbr Rp 20,000.00
2 Tripleks
- 122 x 224 x 0.2 cm Lbr Rp 45,000.00
- 122 x 224 x 0.3 cm Lbr Rp 55,000.00
NO BAHAN / MATERIAL SATUAN 2019
BAHAN BESI
1 Besi Tulangan Rp 14,500.00
Besi Tulangan Ulir
- Ø 13 x 12 m Kg Rp 12,000.00
- Ø 16 x 12 m Kg Rp 8,443.00
- Ø 19 x 12 m Kg Rp 9,731.00
Besi Tulangan Polos
- Ø 6 x 12 m Kg Rp 11,000.00
- Ø 8 x 12 m Kg Rp 10,196.91
- Ø 10 x 12 m Kg Rp 9,189.00
- Ø 12 x 12 m Kg Rp 10,928.71
- Ø 14 x 12 m Kg Rp 11,371.47
2 Besi Profil
- IWF 150 x 12 m Kg Rp 14,500.00
- IWF 200 x 12 m Kg Rp 14,500.00
- IWF 250 x 12 m Kg Rp 14,507.00
- IWF 300 x 12 m Kg Rp 14,500.00
- IWF 350 x 12 m Kg Rp 14,484.00
- IWF 400 x 12 m Kg Rp 14,500.00
- H Beam 100 x 12 m Kg Rp 15,000.00
- H Beam 150 x 12 m Kg Rp 14,889.00
- H Beam 200 x 12 m Kg Rp 15,000.00
- H Beam 250 x 12 m Kg Rp 15,000.00
- H Beam 300 x 12 m Kg Rp 15,000.00
- H Beam 350 x 12 m Kg Rp 15,000.00
- H Beam 400 x 12 m Kg Rp 15,000.00
- UNP. 50 Kg Rp 135,000.00
- UNP. 65 Kg Rp 215,000.00
- UNP. 80 Kg Rp 250,000.00
NO BAHAN / MATERIAL SATUAN 2019
BAHAN PELUMAS/BBM
1 Oli Mesin SAE 40 Liter Rp 33,000.00
2 Oli Mesin SAE 10 Liter Rp 49,000.00
3 Oli Mesin SAE 90 Liter Rp 31,000.00
4 Bensin Liter Rp 6,450.00
5 Solar Liter Rp 5,150.00
6 Solar Industri Rp 11,338.12
7 Minyak Tanah Liter Rp 10,000.00
BAHAN ATAP
1 Genteng
- Beton Bh Rp 4,900.00
NO BAHAN / MATERIAL SATUAN 2019
- Keramik Bh Rp 15,000.00
- Asbes Lbr Rp 16,500.00
- Harfleks (155x85x0,5 cm) Lbr Rp 9,300.00
2 Genteng Metal
- Multi Roof Kasar Lbr Rp 90,000.00
NO BAHAN / MATERIAL SATUAN 2019
3 Lampu TL
- 1x20 w Bh Rp 60,000.00
- 2x20 w Bh Rp 200,000.00
- 1x40 w Bh Rp 110,000.00
- 2x40 w Bh Rp 185,000.00
4 Lampu Pijar
NO BAHAN / MATERIAL SATUAN 2019
- 25 Wat Bh Rp 10,000.00
- 40 Wat Bh Rp 10,000.00
- 60 Wat Bh Rp 10,000.00
- 100Wat Bh Rp 10,000.00
5 Lampu Sorot
- LED 50 Wat Bh Rp 190,000.00
- LED 140 Wat Bh Rp 1,000,000.00
- LED 300 Wat Bh Rp 3,000,000.00
6 Armatur Lampu Set Rp 650,000.00
7 Kontaktor
- 20A Bh Rp 650,000.00
- 32A Bh Rp 650,000.00
8 Timer Analog Bh Rp 450,000.00
9 Kilip Kabel Dos Rp 16,000.00
10 MCB
- 16 A Bh Rp 55,000.00
- 20 A Bh Rp 50,000.00
- 25 A Bh Rp 55,000.00
11 BOX MCB 40 x 60 Bh Rp 650,000.00
12 Foto SeLL Bh Rp 100,000.00
13 KWH Meter Listrik
- 5500 Wat PB Rp 8,000,000.00
- 7700 Wat PB Rp 15,000,000.00
14 Service Klem Buah Rp 5,000.00
15 Konektor Buah Rp 15,000.00
16 Sisir MCB Meter Rp 50,000.00
17 Rel MCB Meter Rp 25,000.00
18 Aram Bh Rp 120,000.00
19 Lampu Taman Mercuri set Rp 120,000.00
20 Saklar Phase
- Tunggal Putih (panasonic) Bh Rp 14,000.00
- Tunggal Hitam (panasonic) Bh Rp 28,000.00
- Ganda Putih Bh Rp 25,000.00
- Ganda Hitam Bh Rp 42,000.00
21 Stok Kontak
- Hitam Bh Rp 29,000.00
- Putih Bh Rp 14,000.00
22 Skring Case Lokal Biasa
- Lokal 2 Grup Automatis Bh Rp 5,000.00
- Lokal 3 Grup Biasa Bh Rp 13,000.00
23 Fitting Bh Rp 12,000.00
24 Klem Kabel No. 10 Bh Rp 17,000.00
25 Kabel ITC (2x2x0,6) Bh Rp 14,000.00
26 Klem Kabel No. 12 Bh Rp 13,000.00
27 Inbow Dos Bh Rp 3,000.00
28 Las Dop Bh Rp 1,500.00
29 Isolasi Roll Rp 8,000.00
NO BAHAN / MATERIAL SATUAN 2019
UPAH KERJA
1 Mandor Hari Rp 100,000.00
2 Kepala Tukang Hari Rp 130,000.00
3 Tukang Hari Rp 110,000.00
5 Pekerja Hari Rp 90,000.00
6 Mekanik Terampil Hari Rp 105,000.00
7 Mekanik TakTerampil Hari Rp 90,000.00
8 Operator Trampil Hari Rp 170,000.00
9 Operator Tak Trampil Hari Rp 120,000.00
10 Pembantu Operator Hari Rp 95,000.00
11 Sopir Truk Hari Rp 100,000.00
12 Pembantu Sopir Hari Rp 80,000.00