Você está na página 1de 6

CORREÇÃO DO EXAME NORMAL

1. a)
Água Fria
Troço Qac Qcalc Diam Diam tab Vel J
AC 2.05 0.79 31.74 0.0346 0.84 0.027
CD 0.4 0.34 20.86 0.0202 1.07 0.079
CE 0.7 0.46 24.08 0.026 0.86 0.039
CF 0.95 0.53 26.05 0.026 1.00 0.052
FG 0.35 0.32 20.16 0.0202 1.00 0.069
FH 0.6 0.42 23.15 0.0202 1.31 0.116

Água Quente
Troço Qac Qcalc Diam Diam tab Vel J
EF 0.7 0.46 24.08 0.026 0.86 0.039
FG 0.2 0.20 15.96 0.0158 1.02 0.097
FH 0.5 0.38 22.09 0.0202 1.20 0.097

Coluna de distribuição
Troço Qac Qcalc Diam Diam tab Vel J
Terraço
Piso8 29.6 3.22 0.0640 0.0656 0.95 0.015
Piso7 25.9 2.99 0.0618 0.0656 0.89 0.013
Piso6 22.2 2.76 0.0593 0.0656 0.82 0.011
Piso5 18.5 2.50 0.0564 0.0656 0.74 0.009
Piso4 14.8 2.22 0.0532 0.0656 0.66 0.008
Piso3 11.1 1.90 0.0492 0.0656 0.56 0.006
Piso2 7.4 1.53 0.0441 0.0506 0.76 0.014
Piso1 3.7 1.07 0.0369 0.0506 0.53 0.007

1. b)
Águas fria - Ponto mais desfavoravel - F
Z= 0.5000 m
P/gama= 15.0000 mca
Dhtotal até ponto A (Entrada)= 6.4166
Pressão em A= 21.92 mca

Águas quente - Ponto mais desfavoravel - L


Z= 0.5000 m
P/gama= 15.0000 mca
Dhtotal até ponto A (Entrada)= 15.0479
Pressão em A= 30.55 mca

PRESSÃO CONDICIONANTE NA ENTRADA = 30.55 mca


Z+P/gama (Tanque)= 30.78 mca

1. c)
Volume de Armazenamento
CD=Cap*pop= 19200.00
Cap= 200.00
Pop= 96.00

Reserv. Inferior= 11520.00


Reserv. Superior= 7680.00

Tubagem de recalque
Volume 19.2 m3
Tempo 24012 s
Q= 0.0007996002 m3/s
D= 26.690606798 mm
D tab= 26 mm
Vel= 1.506803226

Tubagem de sucção
D= 34.6 mm

Bomba
HG= 32.7753
Recalque
L= 32.0753 m
Leq= 2 m
Q= 0.0007996002 m3/s
D= 0.026 m
V= 1.506803226 m/s
J= 0.1041948583
DH 3.5504714274 mca

Sucção
L= 2.5 m
Leq= 26 m
Q= 0.0007996002 m3/s
D= 0.0346 m
V= 0.8508461532 m/s
J= 0.0259099093
DH 0.7384324136 mca
Hman= HG+ DHs+DHr
Hman= 37.06

Potencia
N=1000*Q*Hman/(75n)
N= 0.7903079375 Cv

1. d)
DRENAGEM
RAMAIS DE DESCARGA INDIVIDUAIS

D. Anexo18 D. Real Dim incl Qinst Di(mm)


BR 1.82 1.00 sec. Cheia 20mm/m 90.00 45.600
LV 1.7 2.40 sec. 1/2Cheia 20mm/m 30.00 45.600
CH 1.7 3.10 sec. 1/2Cheia 20mm/m 30.00 45.600
BA inf 2.50 sec. Cheia 20mm/m 60.00 45.600
LL 1.7 2.70 sec. 1/2Cheia 20mm/m 30.00 45.600
MR inf 1.80 sec. Cheia 20mm/m 60.00 45.600
ML inf 1.80 sec. Cheia 20mm/m 60.00 45.600

RAMAIS DE DESCARGA COLECTIVOS


Qac Qc incl Di(mm) Dmin Diam final
Lv+Ch+Ba 120 95.29 20mm/m 70.6 45.60 70.600
LL+MR+ML 150 107.38 20mm/m 70.6 70.60 70.600

TUBOS DE QUEDA
L Qac Qc Ts D
TQ1 24 2880.00 522.0793 1/7 153.00 191.400

COLECTORES PREDIAIS
Qac Qc incl D Dmin D final
CP1 2880 522.08 20mm/m 119.5 153.00 153.000
CP2 5760 756.57 20mm/m 133.9 153.00 153.000
Lreal Leq dHt Zm Zj CPm CPj PDm PDj
3.3 49 6.42 0.60 2.20 37.38 30.96 36.78 30.96
2 28 2.36 2.20 2.20 30.96 28.60 30.96 26.40
3.5 18 0.84 2.20 2.20 30.96 30.12 28.76 27.92
3.41 18 1.12 2.20 2.20 30.96 29.84 28.76 27.64
2 28 2.08 2.20 2.20 29.84 27.76 27.64 25.56
6.1 48 6.27 2.20 2.20 29.84 23.57 27.64 21.37

Lreal Leq dHt Zm Zj CPm CPj PDm PDj


6.91 40 7.84 2.20 2.20 30.12 22.28 27.92 20.08
2 18 1.94 2.20 2.20 22.28 20.34 20.08 18.14
6.1 46 5.08 2.20 2.20 22.28 17.20 20.08 15

Lreal Leq dHt 2.50

3 2.5 0.08
3 2.5 0.07
3 2.5 0.06
3 2.5 0.05
3 2.5 0.04
3 2.5 0.03
3 2.5 0.07
3 1 0.03
0.23
3.00
4.00
1.50

Dmin Diam final


90 105.1
40 45.6
40 45.6
40 45.6
50 70.6
50 70.6
50 70.6

1.50

1.50

(sem ventilação secundária)

1.50