Peso do aço Volume de Consumo de Peso treliças
Pavimento Elemento forma
+10 % (kg) concreto (m³) aço (kg/m³) (kg)
(m²)
Vigas 35.6 0.6 10.2 61.4 0.0
Pilares 41.2 0.4 8.5 98.2 0.0
Lajes 0.0 0.0 0.0 0.0 0.0
Teto do Escadas 0.0 0.0 0.0 0.0 0.0
Reservatório Fundações 0.0 0.0 0.0 0.0 0.0
Reservatórios 0.0 0.0 0.0 0.0 0.0
Muros 0.0 0.0 0.0 0.0 0.0
Total 76.8 1.0 18.7 76.9 0.0
Vigas 163.5 2.3 40.4 71.4 0.0
Pilares 124.1 0.9 18.6 136.3 0.0
Lajes 0.0 0.0 0.0 0.0 0.0
Escadas 0.0 0.0 0.0 0.0 0.0
Platibanda
Fundações 0.0 0.0 0.0 0.0 0.0
Reservatórios 0.0 0.0 0.0 0.0 0.0
Muros 0.0 0.0 0.0 0.0 0.0
Total 287.6 3.2 59.0 89.8 0.0
Vigas 643.6 8.5 144.2 75.7 0.0
Pilares 511.7 3.5 70.5 146.3 0.0
Lajes 133.9 6.2 9.1 21.7 0.0
Escadas 0.0 0.0 0.0 0.0 0.0
Cobertura
Fundações 0.0 0.0 0.0 0.0 0.0
Reservatórios 0.0 0.0 0.0 0.0 0.0
Muros 0.0 0.0 0.0 0.0 0.0
Total 1289.2 18.2 223.7 70.9 0.0
Vigas 866.4 9.7 163.6 89.2 0.0
Pilares 768.8 4.9 99.5 157.4 0.0
Lajes 82.7 6.0 0.0 13.7 0.0
Escadas 165.8 1.6 14.6 103.2 0.0
Superior
Fundações 0.0 0.0 0.0 0.0 0.0
Reservatórios 0.0 0.0 0.0 0.0 0.0
Muros 0.0 0.0 0.0 0.0 0.0
Total 1883.7 22.2 277.8 84.8 0.0
Vigas 383.5 5.5 94.0 70.3 0.0
Pilares 249.2 1.2 25.8 199.9 0.0
Lajes 0.0 0.0 0.0 0.0 0.0
Escadas 0.0 0.0 0.0 0.0 0.0
Térreo
Fundações 244.3 7.4 46.9 32.8 0.0
Reservatórios 0.0 0.0 0.0 0.0 0.0
Muros 0.0 0.0 0.0 0.0 0.0
Total 877.1 14.1 166.7 62.0 0.0
Área de
Peso do aço Volume de Consumo de Peso treliças
Pavimento Elemento forma
+10 % (kg) concreto (m³) aço (kg/m³) (kg)
(m²)
Teto do Lajes PM 0.0 0.0 0.0 0.0 0.0
Reservatório Total 0.0 0.0 0.0 0.0 0.0
Lajes PM 0.0 0.0 0.0 0.0 0.0
Platibanda
Total 0.0 0.0 0.0 0.0 0.0
Lajes PM 156.3 0.0 0.0 0.0 0.0
Cobertura
Total 156.3 0.0 0.0 0.0 0.0
Lajes PM 200.2 0.0 0.0 0.0 0.0
Superior
Total 200.2 0.0 0.0 0.0 0.0
Lajes PM 0.0 0.0 0.0 0.0 0.0
Térreo
Total 0.0 0.0 0.0 0.0 0.0
AltoQi Eberick 2021
Basic
Felipe Bronoski
19/1/2021
Penteado -
11:12:18
Mineiros
Resumo por bitola e por elemento
Quantidade + 10 %
Diâmetro
Aço (Barras)
(mm)
Lajes PM Total
CA50 6.3 37 37
CA50 8.0 16 16
CA50 10.0 15 15
CA50 12.5 8 8
Lajes PM Total
Peso total CA50 356.6 356.6
+ 10% (kg) Total 356.6 356.6
Volume concreto (m³) C-30 0.0 0.0
Área de forma (m²) 0.0 0.0
Consumo de aço (kg/m³) 0.0 0.0
*Os quantitativos dos materiais de capa e armaduras adicionais das lajes pré-moldadas estão
considerados no Resumo de Materiais (Moldado in Loco)
Dimensões (cm)
Pavimento Tipo Nome Quantidade
hb bx by
Cobertura EPS Unidirecional B8/40/40 8 40 40 496
EPS Unidirecional B10/40/50 10 40 50 404
Superior
EPS Unidirecional B12/30/125 12 30 125 52
Laje Bloco
Pavimento Elemento Aço Concreto Forma pré- de Total
fabricada enchimento
Teto do Vigas 319.79 227.40 1047.30 0.00 0.00 1594.50
AltoQi Eberick 2021
Basic
Felipe Bronoski
19/1/2021
Penteado -
11:12:18
Mineiros
Vigas PM 0.00 0.00 0.00 0.00 0.00 0.00
Pilares 321.18 164.90 1110.33 0.00 0.00 1596.41
Pilares PM 0.00 0.00 0.00 0.00 0.00 0.00
Lajes 0.00 0.00 0.00 0.00 0.00 0.00
Reservatório Escadas 0.00 0.00 0.00 0.00 0.00 0.00
Fundações 0.00 0.00 0.00 0.00 0.00 0.00
Reservatórios 0.00 0.00 0.00 0.00 0.00 0.00
Muros 0.00 0.00 0.00 0.00 0.00 0.00
Total 640.98 392.31 2157.62 0.00 0.00 3190.91
Vigas 1431.16 899.42 4142.23 0.00 0.00 6472.81
Vigas PM 0.00 0.00 0.00 0.00 0.00 0.00
Pilares 956.13 357.29 2423.95 0.00 0.00 3737.37
Pilares PM 0.00 0.00 0.00 0.00 0.00 0.00
Lajes 0.00 0.00 0.00 0.00 0.00 0.00
Platibanda
Escadas 0.00 0.00 0.00 0.00 0.00 0.00
Fundações 0.00 0.00 0.00 0.00 0.00 0.00
Reservatórios 0.00 0.00 0.00 0.00 0.00 0.00
Muros 0.00 0.00 0.00 0.00 0.00 0.00
Total 2387.29 1256.71 6566.18 0.00 0.00 10210.18
Vigas 5613.77 3336.02 14796.25 0.00 0.00 23746.04
Vigas PM 0.00 0.00 0.00 0.00 0.00 0.00
Pilares 3941.25 1373.42 9186.00 0.00 0.00 14500.67
Pilares PM 0.00 0.00 0.00 0.00 0.00 0.00
Lajes 1091.16 2426.34 1070.24 5299.71 1557.44 11444.89
Cobertura
Escadas 0.00 0.00 0.00 0.00 0.00 0.00
Fundações 0.00 0.00 0.00 0.00 0.00 0.00
Reservatórios 0.00 0.00 0.00 0.00 0.00 0.00
Muros 0.00 0.00 0.00 0.00 0.00 0.00
Total 10646.18 7135.78 25052.49 5299.71 1557.44 49691.60
Vigas 6916.12 3812.41 16791.67 0.00 0.00 27520.20
Vigas PM 0.00 0.00 0.00 0.00 0.00 0.00
Pilares 5752.00 1917.60 12970.49 0.00 0.00 20640.10
Pilares PM 0.00 0.00 0.00 0.00 0.00 0.00
Lajes 662.35 2365.41 0.00 1270.76 574.60 4873.12
Superior
Escadas 1421.48 630.82 1724.09 0.00 0.00 3776.39
Fundações 0.00 0.00 0.00 0.00 0.00 0.00
Reservatórios 0.00 0.00 0.00 0.00 0.00 0.00
Muros 0.00 0.00 0.00 0.00 0.00 0.00
Total 14751.95 8726.25 31486.25 1270.76 574.60 56809.80
Vigas 3346.08 2140.63 9646.63 0.00 0.00 15133.35
Vigas PM 0.00 0.00 0.00 0.00 0.00 0.00
Pilares 1851.76 489.49 3360.95 0.00 0.00 5702.21
Pilares PM 0.00 0.00 0.00 0.00 0.00 0.00
Lajes 0.00 0.00 0.00 0.00 0.00 0.00
Térreo
Escadas 0.00 0.00 0.00 0.00 0.00 0.00
Fundações 2111.51 2923.17 6713.31 0.00 0.00 11747.99
Reservatórios 0.00 0.00 0.00 0.00 0.00 0.00
Muros 0.00 0.00 0.00 0.00 0.00 0.00
Total 7309.36 5553.29 19720.90 0.00 0.00 32583.54
Custo total do projeto 152486.03