Você está na página 1de 20

OBIECTIV: Camin Cultural Margineni

Beneficiar: ________________________________________
Proiectant: ________________________________________
Executant: ________________________________________

Durata proiect: 178 zile / 249 zile calendaristice

Durata_x Ore_x000D Ore_x000D Capac.auto/ Ore/


Nr._x000D_ Denumire capitole de lucrari/_x000D_ Nr._x000D_ Nr._x000D_ Nr._x000D_
000D_ _ UM Cantitate _ _x000D_ _x000D_ Data inceput Data sfarsit luna 1
crt. activitati muncitori utilaje mijl auto
in zile manopera utilaj mijl. auto cursa
ianuarie
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
4 Camin Cultural Margineni 178 14 20,839.15 buc 1.00 11,994.95 0 0 1/12/2020 9/16/2020
4.1 Camin cultural sat Marginenii de Jos 178 14 20,839.15 buc 1.00 11,994.95 0 0 1/12/2020 9/16/2020
0004.1.2 Rezistenta camin 71 18 10,031.18 buc 1.00 11,877.12 0 0 1/12/2020 4/20/2020
0004.1.2.5 RPCT09F1-Demolarea elementelor de beton simplu si beton armat cu mij5 3 85.75 mc 19.40 11.25 0 0 1/12/2020 1/17/2020 100.00 % d=5 zile, NrMunc=3, manopera [85.75 ora]
0004.1.2.6 RPCT09D1-Demolarea elementelor de beton simplu si beton armat cu mi4 2 37.13 mc 2.50 0 0 1/16/2020 1/21/2020 100.00 % d=4 zile, NrMunc=2, manopera [37.13
0004.1.2.1 TSA02D1-Sapatura manuala de pamant in spatii limitate,avand sub 1.00 9 2 95.93 mc 36.20 0 0 1/14/2020 1/24/2020 100.00 % d=9 zile, NrMunc=2, manop
0004.1.2.2 TSA12D1-Sapatura manuala de pamant,de pana la 6.00 m adancime,in gro 10 3 189.95 mc 42.40 0 0 1/15/2020 1/28/2020 100.00 %
0004.1.2.52 TRI1AA02C1-Incarcarea materialelor, grupa...a-grele in bulgari,prin 11 1 84.15 tona 187.00 0 0 1/13/2020 1/27/2020 100.00 %
0004.1.2.53 TRA01A10P-Transportul rutier al...pamantului sau molozului cu auto 11 1 0.00 tona 63.00 0 0 1/13/2020 1/27/2020 100.00 %
0004.1.2.8 CA01D1-Turnarea betonului simplu în straturi de 3—20 cm grosime, pent9 1 19.82 mc 5.40 2.16 0 0 1/17/2020 1/29/2020 100.00 %
0004.1.2.7 CA01B1-Turnarea betonului simplu în fundatii continue, izolate, soclu 10 2 89.27 mc 32.70 16.35 0 0 1/20/2020 1/31/2020 100.00 %
0004.1.2.9 CA01B1-Turnarea betonului simplu în fundatii continue, izolate, soclu 7 2 71.25 mc 26.10 1 13.05 0 0 1/23/2020 1/31/2020 100.00 %
0004.1.2.36 CZ0301A1-Confectionarea armaturilor din otel beton pentru beton armat 11 1 35.64 kg 1,080.00 13.18 0 0 1/20/2020 2/3/2020 90.91 %
0004.1.2.37 CZ0301D1-Confectionarea armaturilor din otel beton pentru beton armat 11 1 0.74 kg 20.00 0.24 0 0 1/20/2020 2/3/2020 90.91 %
0004.1.2.38 CZ0301E1-Confectionarea armaturilor din otel beton pentru beton armat 11 1 78.00 kg 3,120.00 38.06 0 0 1/20/2020 2/3/2020 90.91 %
0004.1.2.39 CZ0301F1-Confectionarea armaturilor din otel beton pentru beton armat 11 1 17.04 kg 710.00 8.66 0 0 1/20/2020 2/3/2020 90.91 %
0004.1.2.23 CC01C1-Montarea armaturilor din otel-beton in fundatii continue si rad 11 1 33.20 kg 1,660.00 0 0 1/21/2020 2/4/2020 81.82 %
0004.1.2.22 CC01A1-Montarea armaturilor din otel-beton in fundatii izolate (inclusi 11 2 107.91 kg 3,270.00 0 0 1/22/2020 2/5/2020 72.73 %
0004.1.2.13 CB10A1-Cofraje pentru beton în cuzineti, fundatii pahar si fundatii de u 11 2 164.30 mp 164.30 0 0 1/23/2020 2/6/2020 63.64 %
0004.1.2.10 CA02D1-Turnarea betonului armat in elementele constructiilor, exclusiv 11 1 7.25 mc 2.40 1.80 0 0 1/24/2020 2/7/2020 54.55 %
0004.1.2.11 CA02D1-Turnarea betonului armat in elementele constructiilor, exclusiv 11 2 131.67 mc 43.60 32.70 0 0 1/27/2020 2/10/2020 45.45 %
0004.1.2.44 IZF01A-Amorsarea suprafetelor pentru aplicarea stratului de lifuzie, a 11 1 3.38 mp 84.40 0.10 0 0 1/28/2020 2/11/2020
0004.1.2.45 IZF04F-Strat hidroizolant executat la cald la terase, acoperisuri sau la 11 1 5.06 mp 84.40 1.18 0 0 1/28/2020 2/11/2020
0004.1.2.46 IZF10A-Strat termoizolator la terase, acoperisuri si plansee din pla 11 1 41.55 mp 42.40 0.13 0 0 1/28/2020 2/11/2020
0004.1.2.34 CZ0122A1-Variatia cantitatii de ciment fata de cantitatile prevazute i 11 kg 83.00 0 0 1/29/2020 2/12/2020
0004.1.2.35 CZ0209A1-Mortar de var - ciment pentru zidarie marca M 100-T prepara11 1 0.21 mc 0.40 0.08 0 0 1/29/2020 2/12/2020
0004.1.2.3 TSD01D1-Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm11 1 28.16 mc 49.40 0 0 1/29/2020 2/12/2020
0004.1.2.4 TSD04D1-Compactarea cu maiul de mana a umpluturilor executate in sap 12 1 33.10 mc 49.40 0 0 1/29/2020 2/13/2020
0004.1.2.47 IZF10A-Strat termoizolator la terase, acoperisuri si plansee din plac 5 7 215.80 mp 220.20 0.66 0 0 2/10/2020 2/14/2020
0004.1.2.48 IZF18C-Strat suport, de egalizare sau de protectie pentru izolatii, in 3 1 4.55 mp 13.00 0.27 0 0 2/12/2020 2/14/2020
0004.1.2.49 IZK03C-Ecrane termoizolante din...foi de polietilena 3 4 56.62 mp 269.60 0 0 2/12/2020 2/14/2020
0004.1.2.50 IFB09A1-Strat drenant din nisip, avand grosimea dupa compactare de 3 1 5.43 mp 49.40 0 0 2/13/2020 2/17/2020
0004.1.2.51 IZB09B-Protectia anticorosiva cu masa de spaclu executata din chit A 2 11 84.47 mp 49.40 26.68 0 0 2/14/2020 2/17/2020
0004.1.2.31 RPCT10A1-Desfacerea tencuielilor interioare sau exterioare...obisnui 6 5 164.00 mp 820.00 0 0 2/17/2020 2/24/2020
0004.1.2.32 RPCU11F2-Executarea de santuri pentru montarea conductelor cu sec 6 7 277.76 m 173.60 0 0 2/17/2020 2/24/2020
0004.1.2.28 H1B01B-Pregatirea suprafetei rocii de fundatie in vederea betonarii in 6 8 306.25 mp 875.00 0 0 2/18/2020 2/25/2020
0004.1.2.29 RPCJ67A1-Refacerea rosturilor la zidarie de...caramida aparenta 6 30 1,399.98 mp 875.00 0 0 2/18/2020 2/25/2020
0004.1.2.30 RPCJ68H1-Reconditionarea tencuielilor speciale la fatade prin...peri 6 3 113.72 mp 875.00 0 0 2/19/2020 2/26/2020
0004.1.2.27 RPCG22A1-Consolidarea zidariei portante prin camasuire...cu plas 31 11 2,623.98 mp 820.00 0 0 2/24/2020 4/6/2020
0004.1.2.40 CZ0302A1-Confectionarea armaturilor din otel beton pentru beton armat 5 3 90.00 kg 2,500.00 22.50 0 0 2/17/2020 2/21/2020
0004.1.2.41 CZ0302E1-Confectionarea armaturilor din otel beton pentru beton armat 5 3 68.40 kg 2,850.00 26.22 0 0 2/17/2020 2/21/2020
0004.1.2.42 CZ0302F1-Confectionarea armaturilor din otel beton pentru beton armat 5 2 45.10 kg 2,050.00 18.86 0 0 2/17/2020 2/21/2020
0004.1.2.43 CZ0302T1-Confectionarea armaturilor din otel beton pentru beton armat 5 1 17.08 kg 610.00 0 0 2/17/2020 2/21/2020
0004.1.2.24 CC02C1-Montarea armaturilor din otel-beton în elemente de constructii, e27 2 264.33 kg 8,010.00 0 0 2/21/2020 3/30/2020
0004.1.2.25 CC02P1-Montarea armaturilor din otel-beton în elemente de constructii, e27 1 35.50 kg 1,420.00 0 0 2/21/2020 3/30/2020
0004.1.2.14 CB13A1-Cofraje pentru beton armat în placi, grinzi si stîlpi din panouri 29 1 184.45 mp 217.00 0 0 2/19/2020 3/30/2020
0004.1.2.15 CB13B1-Cofraje pentru beton armat în placi, grinzi si stîlpi din panour 29 2 245.63 mp 199.70 0 0 2/19/2020 3/30/2020
0004.1.2.16 RPCC06A1-Cofraje din scânduri rasinoase...pentru returnari buiandrugi 27 8 1,698.20 mp 820.40 0 0 2/24/2020 3/31/2020
0004.1.2.18 CB44B1-Sustineri cu popi metalici extensibili tip PE 5100 R 30 1 34.16 buc 56.00 0 0 2/19/2020 3/31/2020
0004.1.2.19 AUT1326-Ora pr pop metalic extens pe5100 incl teava D 51x3,5mm 30 ora 9,408.00 9,408.00 0 0 2/19/2020 3/31/2020
0004.1.2.20 CB45B1-Sustineri din grinzi metalice extensibile la constructii având î 30 1 30.03 buc 13.00 0 0 2/19/2020 3/31/2020
0004.1.2.21 AUT1301-Ora pr grinda met .extens. l=3-5m tip GE1 3sch. 30 ora 2,184.00 2,184.00 0 0 2/19/2020 3/31/2020
0004.1.2.12 CA02J1-Turnarea betonului armat in elementele constructiilor, exclusiv 31 1 182.68 mc 59.70 29.85 0 0 2/24/2020 4/6/2020
0004.1.2.55 TRA06A30-Transportul rutier al betonului-mortarului cu autobetoniera 31 tona 424.00 0 0 2/24/2020 4/6/2020
0004.1.2.17 CB18F1-Strat de închidere a rostului de dilatatie dintre tronsoane, re 2 3 19.76 mp 98.80 1.58 0 0 4/6/2020 4/7/2020
0004.1.2.33 CO22A1-Grinzi la plansee executate din lemn brut rotund de foioase p 4 8 170.50 mc 12.40 0 0 4/7/2020 4/10/2020
0004.1.2.26 CE17A1-Sarpanta din lemn la acoperisuri simple cu una pana la patru p 6 9 332.35 mp 391.00 19.55 0 0 4/13/2020 4/20/2020
0004.1.2.54 TRA01A10-Transportul rutier al...materialelor,semifabricatelor cu aut 66 tona 124.00 0 0 1/20/2020 4/20/2020 15.15 %
0004.1.1 Lucrari de arhitectura sala Camin 105 10 8,033.59 buc 1.00 40.15 0 0 4/20/2020 9/11/2020
0004.1.1.1 IZF10F-Strat termoizolator la terase, acoperisuri si plansee din plac 3 2 24.75 mp 275.00 2 3.58 0 0 4/20/2020 4/22/2020
0004.1.1.2 RPCH23A1-Podina între grinzi pentru sustinerea umpluturii la plansee 3 8 173.24 mp 275.00 0 0 4/21/2020 4/23/2020
0004.1.1.3 RPCH14A1-Streasina simpla cu capriori aparenti cu profile simple...gat 4 5 143.78 mp 70.00 0 0 4/27/2020 4/30/2020
0004.1.1.4 RPCH15B1-Inlocuire paziei de lemn deteriorate la streasina sau calca 4 2 44.06 m 102.00 0 0 4/27/2020 4/30/2020
0004.1.1.5 RPCH17A1-Profilatul obisnuit si geluitul capriorilor sau al penelor apa 4 1 22.13 buc 62.00 0 0 4/27/2020 4/30/2020
0004.1.1.10 CN15D1-Vopsirea lemnariei cu solutii speciale solutii speciale, cu vo 2 16 254.89 mp 688.90 0 0 4/30/2020 5/1/2020
0004.1.1.9 CE23A1-Plasa de siguranta, refolosibila, la executarea invelitorii cons 2 3 35.42 mp 506.00 0 0 5/1/2020 5/4/2020
0004.1.1.6 RPCI15A1-Învelitoare din tabla ondulata, la cladirile existente, inclu 6 18 818.80 mp 460.00 0 0 5/4/2020 5/11/2020
0004.1.1.7 RPCI21B1-Jgheaburi din tabla zincata de 0,5 mm grosime, la cladirile e 3 3 59.48 m 86.20 0 0 5/11/2020 5/13/2020
0004.1.1.26 CO21A1-Schelet din lemn brut rotund de foioase pentru constructii (rur 3 10 234.55 mc 12.43 0 0 5/14/2020 5/18/2020
0004.1.1.43 CD04G1-Zidarie din caramida presata arsa format 240x115x63 mm execut 4 11 333.64 mc 38.00 0 0 5/15/2020 5/20/2020
0004.1.1.17 TSD17A1-Umpluturi compactate la profilul taluzului,pe o grosime med 5 2 48.90 mc 24.45 0 0 5/18/2020 5/22/2020
0004.1.1.18 IFB09B3-Strat drenant din pietris, avand grosimea dupa compactare 5 1 30.00 mp 150.00 0 0 5/19/2020 5/25/2020
0004.1.1.19 TSD15B1-Strat de repartitie din nisip cu granulatie de 0.7 mm,prevaz 4 1 12.81 mc 10.50 0.53 0 0 5/20/2020 5/25/2020
0004.1.1.20 IZK03C-Ecrane termoizolante din...foi de polietilena 2 6 92.40 mp 440.00 0 0 5/25/2020 5/26/2020
0004.1.1.21 CC03XB-Armaturi din plase sudate la constr.cu inaltimea pina la 35 m 2 2 17.39 kg 496.84 0.50 0 0 5/26/2020 5/27/2020
0004.1.1.22 CG18A1-Pardoseli din beton turnate pe loc marca B 100, în grosime d 7 3 132.48 mp 276.00 13.80 0 0 5/28/2020 6/5/2020
0004.1.1.23 CG01D1-Strat suport pentru pardoseli executate din mortar de cimen 7 2 104.88 mp 276.00 5.52 0 0 6/1/2020 6/9/2020
0004.1.1.11 CK03A1-Usi exterioare din PVC 3 2 29.19 mp 21.15 0.13 0 0 6/3/2020 6/5/2020
0004.1.1.12 CK11I1-Ferestre metalice ferestre din aluminiu montate la constructii c 3 3 49.40 mp 13.25 0 0 6/3/2020 6/5/2020
0004.1.1.13 CK01A1-Ferestre din lemn simple, duble sau cuplate cu deschidere obis 3 3 62.94 mp 23.93 0 0 6/3/2020 6/5/2020
0004.1.1.29 RPCJ13C1-Reparatii de tencuieli interioare, în jurul tocurilor si perva 3 3 65.73 m 79.00 0 0 6/8/2020 6/10/2020
0004.1.1.28 CI06E1-Placaj din faianta la pereti si stâlpi placi de aceeasi culoare 3 3 52.44 mp 22.80 0.11 0 0 6/11/2020 6/15/2020
0004.1.1.30 CK20B1-Tavane suspendate PFL sau PAL melaminat sau emailat, acoperi 11 7 550.55 mp 223.80 1.12 0 0 6/10/2020 6/24/2020
0004.1.1.14 RPCJ36A1-Glet de ipsos pe tencuieli interioare driscuite de 3 mm gros 7 7 375.05 mp 650.00 0 0 6/22/2020 6/30/2020
0004.1.1.15 RPCR14A1-Zugraveli lavabile, executate la interior pe pereti si tavane 8 1 58.50 mp 650.00 0 0 7/1/2020 7/10/2020
0004.1.1.16 6104353-Vopsea vinarom alba v.108-210 stas 7359-80 8 kg 292.50 0 0 7/1/2020 7/10/2020
0004.1.1.24 CG11A1-Pardoseli din placi din gresie ceramica inclusiv stratul supor 6 2 94.60 mp 86.00 1.72 0 0 7/10/2020 7/17/2020
0004.1.1.25 CG12A1-Scafe sau plinte din gresie ceramica fixate cu mortar de ci 5 1 22.40 m 64.00 0.32 0 0 7/13/2020 7/17/2020
0004.1.1.27 CG02A1-Pardoseli din parchet cu parchet de stejar sau fag1) montat la 5 6 226.10 mp 190.00 0.95 0 0 7/20/2020 7/24/2020
0004.1.1.46 CF05A1-Sistem termoizolant pentru elemente de fatada strat finisaj 10 13 966.00 mp 460.00 1 0 0 7/27/2020 8/7/2020
0004.1.1.31 CF05A1-Termoizolatii la elemente de soclu cu polistiren extrudat 10 1 18.11 mp 25.50 0.09 0 0 7/27/2020 8/7/2020
0004.1.1.32 20028828-Polistiren extrudat de fatada , grosime 10cm 10 mp 26.01 0 0 7/27/2020 8/7/2020
0004.1.1.33 CF09H1-Tencuieli exterioare speciale cu mozaic, terasit, dolomita etc. 16 6 734.40 mp 480.00 11.58 0 0 8/10/2020 8/31/2020
0004.1.1.44 CF06B1-Tencuieli exterioare obisnuite executate manual, driscuite, pe 5 4 133.12 mp 104.00 0 0 8/10/2020 8/14/2020
0004.1.1.37 CF08C1-Tencuieli exterioare speciale in simili-piatra buciardate sau pi 24 14 1,780.80 mp 480.00 0 0 8/11/2020 9/11/2020
0004.1.1.8 RPCI25C1-Burlane din taba zincata de 0,5 mm grosime, la cladirile exist 2 4 50.70 m 60.00 0 0 8/17/2020 8/18/2020
0004.1.1.34 CO01A1-Trotuar din beton simplu turnat pe loc 6 2 69.00 mp 150.00 0 0 8/19/2020 8/26/2020
0004.1.1.35 RPCE34A1-Umplerea rosturilor dintre trotuar si...soclul cladirii cu bit 5 1 4.20 m 70.00 0 0 8/24/2020 8/28/2020
0004.1.1.36 CG11C1-Pardoseli din placi din gresie ceramica inclusiv stratul supor 4 1 15.96 mp 10.64 0.21 0 0 8/31/2020 9/3/2020
0004.1.1.38 TRA02A20-Transportul rutier al materialelor,semifabricatelor cu autoc 105 tona 55.00 0 0 4/20/2020 9/11/2020
0004.1.1.39 TRA06A20-Transportul rutier al betonului-mortarului cu autobetoniera 105 tona 88.20 0 0 4/20/2020 9/11/2020
0004.1.1.40 TRB01A15-Transportul materialelor cu roaba pe pneuri inc asezare d 105 1 59.51 tona 55.00 0 0 4/20/2020 9/11/2020
0004.1.1.41 TRI1AA02A1-Incarcarea materialelor, grupa...a-grele in bulgari prin 105 1 12.05 tona 21.90 0 0 4/20/2020 9/11/2020
0004.1.1.42 TRI1AA08F1-Descarcarea materialelor,grupa a-grele si marunte prin.. 105 1 19.25 tona 55.00 0 0 4/20/2020 9/11/2020
0004.1.1.45 TRA01A30-Transportul rutier al...materialelor,semifabricatelor cu aut 105 tona 40.00 0 0 4/20/2020 9/11/2020
0004.1.3 Instalatii termice 62 1 238.31 buc 1.00 0 0 5/25/2020 8/18/2020
0004.1.3.1 IC09C1-Teava otel Instalatie sud. long. ng+filet+mufa incalz. centrala 5 1 6.64 m 8.00 0 0 5/25/2020 5/29/2020
0004.1.3.2 IC08B1-Teava otel Instalatie sud. Long. Ng+filet+mufa incalz. centrala 5 2 50.42 m 42.00 0 0 6/1/2020 6/5/2020
0004.1.3.3 IC08C1-Teava otel Instalatie sud. Long. Ng+filet+mufa incalz. centrala 4 2 47.26 m 34.00 0 0 6/8/2020 6/11/2020
0004.1.3.4 IC08C1-Teava otel Instalatie sud. Long. Ng+filet+mufa incalz. centrala 4 1 2.78 m 2.00 0 0 6/9/2020 6/12/2020
0004.1.3.5 ID14B2-Robinet de retinere cu ventil, drept, cu mufe pentru Instalatie 2 1 0.75 buc 3.00 0 0 6/15/2020 6/16/2020
0004.1.3.6 IA32A1-Separator de namol tip a cu fund demontabil cu d: 40- 80 mm 2 1 4.91 buc 1.00 0 0 6/16/2020 6/17/2020
0004.1.3.7 IA32A1-Separator de namol tip a cu fund demontabil cu d: 40- 80 mm 2 1 4.91 buc 1.00 0 0 6/16/2020 6/17/2020
0004.1.3.8 IA32A1-Separator de namol tip a cu fund demontabil cu d: 40- 80 mm 2 1 4.91 buc 1.00 0 0 6/16/2020 6/17/2020
0004.1.3.12 ID06A2-Robinet cu sertar pana , cu mufe , pentru instalatie incalzire 2 1 0.66 buc 3.00 0 0 6/17/2020 6/18/2020
0004.1.3.10 IB22A01-Element de sustinere a corpurilor de incalzire avand pina la 2 1 1.50 kg 6.50 0 0 6/18/2020 6/19/2020
0004.1.3.11 IB23A01-Procurare elemente de sustinere corpuri incalzire 2 kg 6.50 0 0 7/27/2020 7/28/2020
0004.1.3.9 IB02O01-Convectoradiator tip panou 2 rind tevi racordat cu mufa h=6 5 1 1.08 buc 6.00 0 0 7/28/2020 8/3/2020
0004.1.3.13 ID01A2-Robinet ventil dublu reglaj de colt pentru Instalatie incalzire 5 1 1.02 buc 6.00 0 0 7/29/2020 8/4/2020
0004.1.3.14 ID02A2-Teu reglare pentru Instalatie incalzire centr. cu d: 1/2 5 1 1.02 buc 6.00 0 0 7/29/2020 8/4/2020
0004.1.3.15 ID02A2-Teu reglare pentru Instalatie incalzire centr. cu d: 1/2 5 1 1.02 buc 6.00 0 0 7/29/2020 8/4/2020
0004.1.3.16 IA04D1-Cazan sectional otel icma pentru Instalatie incalz. centrala c 6 3 95.75 buc 1.00 0 0 8/5/2020 8/12/2020
0004.1.3.17 IE04A1-Efectuare proba dilat.-contract. si funct. a cond. de alim aerote 3 1 6.84 m 76.00 0 0 8/13/2020 8/17/2020
0004.1.3.18 IE03A1-Efectuare proba etans. la pres. a cond. pentru alim. aeroterme si 3 1 6.84 m 76.00 0 0 8/13/2020 8/17/2020
0004.1.3.19 YC01-Diferenta pret material lei 2 lei 1,500.00 0 0 8/17/2020 8/18/2020
0004.1.3.20 XA01-Diferente cheltuieli de transport 2 lei 1,500.00 0 0 8/17/2020 8/18/2020
0004.1.4 Instalatii Sanitare 90 1 415.64 buc 1.00 0.50 0 0 5/11/2020 9/11/2020
0004.1.4.1 SA06B1-Teava otel sudata longit. pentru Instalatie zincata cu filet+mufa 5 1 10.80 m 24.00 0 0 5/11/2020 5/15/2020
0004.1.4.2 SA04C1-Teava otel sudata longit. pentru Instalatie zincata cu filet+muf 5 3 65.20 m 40.00 0 0 5/13/2020 5/19/2020
0004.1.4.3 SA04B1-Teava otel sudata longit. pentru Instalatie zincata cu filet+muf 4 3 54.40 m 40.00 0 0 5/15/2020 5/20/2020
0004.1.4.4 SB16A1-Teava pvc-u neplastifiata...pentru canalizare,Montare apar 2 1 7.10 m 10.00 0 0 5/20/2020 5/21/2020
0004.1.4.5 SB16E1-Teava pvc-u neplastifiata...pentru canalizare,Montare apar 5 1 10.08 m 24.00 0 0 5/20/2020 5/26/2020
0004.1.4.9 SB16E1-Teava pvc-u neplastifiata...pentru canalizare,Montare apar 4 1 22.68 m 54.00 0 0 5/25/2020 5/28/2020
0004.1.4.20 SB17E1-Coturi...pvc-u,pentru canalizare,cu imbinare prin lipirela 4 4 1 1.65 buc 3.00 0 0 5/25/2020 5/28/2020
0004.1.4.7 SB44C1-Sifon de pardoseala din fonta emailata avand...d= 50mm,dublu 2 1 2.94 buc 3.00 0 0 5/28/2020 5/29/2020
0004.1.4.6 SB21C1-Piesa de curatare...pvc-u,pentru canalizare,cu imbinare pri 2 1 2.44 buc 4.00 0 0 6/16/2020 6/17/2020
0004.1.4.8 SB49A3-Caciula de ventilatie din tabla,Montare pe coloane aeris din 2 1 1.12 buc 2.00 0 0 6/16/2020 6/17/2020
0004.1.4.21 SD12A1-Robinet...de reglaj,de colt,din alama nichelata,avand d=3/8 s 2 1 2.61 buc 9.00 0 0 6/17/2020 6/18/2020
0004.1.4.23 IA30A1-Filtru de combustibil lichid sau ulei 2 1 3.06 buc 1.00 0 0 6/17/2020 6/18/2020
0004.1.4.24 IA30A1-Filtru de combustibil lichid sau ulei 2 1 3.06 buc 1.00 0 0 6/18/2020 6/19/2020
0004.1.4.25 SD19C1-Robinet de retinere cu ventil,drept,din fonta,cu flanse cu... 2 1 0.62 buc 1.00 0 0 6/18/2020 6/19/2020
0004.1.4.26 SD13A1-Robinet...trec. cu ventil si mufe,pentru tevi otel cu d= 1/2 sau 2 1 1.62 buc 9.00 0 0 6/22/2020 6/23/2020
0004.1.4.28 SD13B1-Robinet...trec. cu ventil si mufe,pentru tevi otel cu d=3/4 ,si 2 1 1.75 buc 7.00 0 0 6/23/2020 6/24/2020
0004.1.4.29 SD13A1-Robinet...trec. cu ventil si mufe,pentru tevi otel cu d= 1/2 sau 2 1 0.36 buc 2.00 0 0 6/24/2020 6/25/2020
0004.1.4.30 SD19C1-Robinet de retinere cu ventil,drept,din fonta,cu flanse cu... 2 1 1.24 buc 2.00 0 0 6/25/2020 6/26/2020
0004.1.4.37 IZH21A-Izolarea conductelor cu cochilii din polistiren spuma gata conf 5 1 8.58 mp 10.00 0.25 0 0 6/29/2020 7/3/2020
0004.1.4.38 IZH21A-Izolarea conductelor cu cochilii din polistiren spuma gata conf 4 1 8.58 mp 10.00 0.25 0 0 6/30/2020 7/3/2020
0004.1.4.34 SF08A1-Usita metalica de acces la robinete sau piese de Curatare 2 1 2.10 buc 3.00 0 0 7/6/2020 7/7/2020
0004.1.4.35 RPSXF12-Diverse lucrari:...camin de vizitare sau recipient zidarie se 5 3 80.60 buc 2.00 0 0 7/7/2020 7/13/2020
0004.1.4.36 ACD01D1-Capac si rama STAS 2308-81 pentru camine fara piesa supor 2 1 1.64 buc 2.00 0 0 7/13/2020 7/14/2020
0004.1.4.39 M1B08A1-Pompa centrifuga, monoetajata de uz general (tip cris,cerna, 4 1 3.20 buc 1.00 0 0 7/14/2020 7/17/2020
0004.1.4.40 SA14E1-Teava pvc...neplastif. tip g Montare la locuinte+social cult. 6 1 20.52 m 38.00 0 0 7/16/2020 7/23/2020
0004.1.4.41 SA14E1-Teava pvc...neplastif. tip g Montare la locuinte+social cult. 5 1 3.24 m 6.00 0 0 7/20/2020 7/24/2020
0004.1.4.42 SB17E1-Coturi...pvc-u,pentru canalizare,cu imbinare prin lipirela 4 5 1 0.55 buc 1.00 0 0 7/20/2020 7/24/2020
0004.1.4.10 SC07E1-Lavoar din portelan sanitar, montat pe...piedestal 3 1 5.13 buc 3.00 0 0 8/3/2020 8/5/2020
0004.1.4.12 SC07E1-Lavoar din portelan sanitar, montat pe...piedestal 2 1 5.13 buc 3.00 0 0 8/6/2020 8/7/2020
0004.1.4.11 2453835-Piedestal lavoar p1 portelan mono c. 1 ni 806 3 buc 3.03 0 0 8/5/2020 8/7/2020
0004.1.4.22 SD06A1-Baterie amestecatoare,stativa,pentru...lavoar avand d=1/2 to 3 1 4.86 buc 3.00 0 0 8/10/2020 8/12/2020
0004.1.4.15 SC19A1-Sifon din...bachelita pentru lavoar de portelan sanitar 3 1 2.37 buc 3.00 0 0 8/12/2020 8/14/2020
0004.1.4.27 SC19A1-Sifon din...bachelita pentru lavoar de portelan sanitar 3 1 2.37 buc 3.00 0 0 8/12/2020 8/14/2020
0004.1.4.13 SC13A1-Vas pentru closet din portelan sanitar cu sifon interior...s tip . 5 1 6.09 buc 3.00 0 0 8/17/2020 8/21/2020
0004.1.4.14 SC18A1-Rama pentru vas de closet,din...lemn de fag,fara capac 2 1 0.84 buc 3.00 0 0 8/20/2020 8/21/2020
0004.1.4.16 SC24A3-Portprosop din...am nichel. Montare pe pereti tip u,cu 2 br 2 1 1.23 buc 3.00 0 0 8/24/2020 8/25/2020
0004.1.4.17 SC25A1-Etajera din...portelan sanitar tip 2 1 1.53 buc 3.00 0 0 8/25/2020 8/26/2020
0004.1.4.18 SC26A2-Oglinda sanit. semicrist. margini. slef. cu dimens....500x60 2 1 2.94 buc 3.00 0 0 8/26/2020 8/27/2020
0004.1.4.19 SC30A1-Suport...pentru hirtie calitatea 1 (porthirtie) din portelan san 2 1 1.23 buc 3.00 0 0 8/27/2020 8/28/2020
0004.1.4.31 SF03A1-Efectuare proba de etans. la pres. a Instalatie intr....de apa 5 1 7.28 m 104.00 0 0 8/31/2020 9/4/2020
0004.1.4.32 RPSXF08-Diverse lucrari de instalatii:...efectuare probe etanseitate l 2 3 20.24 m 88.00 0 0 9/4/2020 9/7/2020
0004.1.4.33 RPSXF08-Diverse lucrari de instalatii:...efectuare probe etanseitate l 2 5 32.66 m 142.00 0 0 9/7/2020 9/8/2020
0004.1.4.43 YB01-Diferenta pret manopera lei 4 lei 500.00 0 0 9/8/2020 9/11/2020
0004.1.4.44 XA01-Diferente cheltuieli de transport 2 lei 1,000.00 0 0 9/10/2020 9/11/2020
0004.1.5 Instalatii electrice 108 1,880.33 buc 1.00 5.44 0 0 4/20/2020 9/16/2020
0004.1.5.11 RPCU11A3-Executarea de santuri pentru montarea conductelor cu sect 10 2 106.00 m 200.00 0 0 4/20/2020 5/1/2020
0004.1.5.13 RPCU10A1-Strapungeri in zidarie de beton armat, pentru realizarea ga 4 2 42.00 buc 50.00 0 0 5/1/2020 5/6/2020
0004.1.5.7 EA02A3-Tub izolant, de protectie, etans, IPE, din policlorura de vini 5 1 1.76 m 4.00 0 0 5/11/2020 5/15/2020
0004.1.5.8 EA02A2-Tub izolant, de protectie, etans, IPE, din policlorura de vini 5 4 143.00 m 325.00 0 0 5/14/2020 5/20/2020
0004.1.5.9 EA02A1-Tub izolant, de protectie, etans, IPE, din policlorura de vini 5 6 220.00 m 500.00 0 0 5/18/2020 5/22/2020
0004.1.5.10 EA12E#-Racord din tub flexibil, pentru protectia conductoarelor electr 2 2 29.00 m 50.00 0 0 5/25/2020 5/26/2020
0004.1.5.15 EB04E1-Conducta de cupru, cu izolatie, montata pe izolatori, inclusiv 5 1 5.94 m 22.00 0 0 5/26/2020 6/1/2020
0004.1.5.16 EB04D1-Conducta de cupru, cu izolatie, montata pe izolatori, inclusiv 8 3 188.60 m 820.00 0 0 6/1/2020 6/10/2020
0004.1.5.17 EB04D1-Conducta de cupru, cu izolatie, montata pe izolatori, inclusiv 8 4 253.00 m 1,100.00 0 0 6/10/2020 6/19/2020
0004.1.5.14 EI02G1-Etansarea spatiului dintre cablu si teava de protectie la treceri 3 1 24.00 buc 50.00 0 0 6/22/2020 6/24/2020
0004.1.5.12 RPCU15A1-Astuparea santurilor din zidarie, dupa pozarea conductorilo 4 1 32.00 m 200.00 0 0 6/23/2020 6/26/2020
0004.1.5.26 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 5 1 9.00 buc 10.00 0 0 6/29/2020 7/3/2020
0004.1.5.27 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 3 1 4.50 buc 5.00 0 0 6/30/2020 7/2/2020
0004.1.5.28 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 3 1 6.30 buc 7.00 0 0 7/2/2020 7/6/2020
0004.1.5.29 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 2 1 6.30 buc 7.00 0 0 7/6/2020 7/7/2020
0004.1.5.30 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 3 1 0.90 buc 1.00 0 0 7/7/2020 7/9/2020
0004.1.5.31 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 3 1 7.20 buc 8.00 0 0 7/8/2020 7/10/2020
0004.1.5.32 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 2 1 1.80 buc 2.00 0 0 7/13/2020 7/14/2020
0004.1.5.33 ED01XA-Montarea aparatelor monofazate intrerupator,comutator,priza 2 1 4.50 buc 5.00 0 0 7/14/2020 7/15/2020
0004.1.5.6 W1C10A1-Constructii de otel tip mecano zincate...montare 2 1 5.00 kg 50.00 0 0 7/15/2020 7/16/2020
0004.1.5.1 EF02C1-Tablou electric, pe schelet metalic, montat pe perete sau în 1 1 2.27 buc 1.00 0 0 7/16/2020 7/16/2020
0004.1.5.35 ATD23A-Cleme pentru conexiuni pneumatice 2 1 15.20 buc 80.00 0 0 7/16/2020 7/17/2020
0004.1.5.36 ATD23A-Cleme pentru conexiuni pneumatice 2 1 3.80 buc 20.00 0 0 7/16/2020 7/17/2020
0004.1.5.2 5500110-Cutie dubla semnalizare 220 V nid.2940/71 simbol 7020 2 buc 1.00 0 0 7/16/2020 7/17/2020
0004.1.5.3 5500598-Cutie cu contactor 16a 380 V ex nid 2938/1971 simb.7045 1 buc 1.00 0 0 7/16/2020 7/16/2020
0004.1.5.4 7349003-Tablou distributie tip inchis c2s stas 5358-56 2 buc 1.00 0 0 7/16/2020 7/17/2020
0004.1.5. YC01-Diferenta pret material 1 lei 1,500.00 0 0 7/16/2020 7/16/2020
0004.1.5.43 RPCA01A1-Sapatura de pamânt in spatii limitate sub 1,00 m latime si 1,55 7 279.00 mc 90.00 0 0 7/20/2020 7/24/2020
0004.1.5.39 W1R06A1-Electrod din teava de otel de doi toli si jumatatepentru lega 3 2 31.17 m 36.00 1.44 0 0 7/27/2020 7/29/2020
0004.1.5.37 EG08C1-Conducta de legare la pamînt, a instalatiei de paratrasnet sau 5 6 202.80 m 120.00 0 0 7/29/2020 8/4/2020
0004.1.5.48 IZD10A-Vopsirea anticoroziva cu pensula de mana a, confectiilor si cons 2 1 0.19 tona 0.03 0 0 8/4/2020 8/5/2020
0004.1.5.52 W1P08A-Verificarea prizelor de pamant pentru lucrari de instalatii elect 2 1 1.80 buc 1.00 0 0 8/4/2020 8/5/2020
0004.1.5.47 W2H07A1-Profil tip...m pentru 1 cablu de 1kv strat protector cu folii d 2 1 0.22 m 5.00 0 0 8/5/2020 8/6/2020
0004.1.5.44 ACE08A1-Umplutura in sant. la cond. de alim. cu apa si canalizare cu 2 1 5.49 mc 9.00 0 0 8/5/2020 8/6/2020
0004.1.5.46 TSD01C1-Imprastierea cu lopata a pamant. afinat,strat uniform 10-30 2 3 38.70 mc 90.00 0 0 8/5/2020 8/6/2020
0004.1.5.45 TSD04C1-Compactarea cu maiul de mana a umpluturilor executate in sa 3 3 59.94 mc 81.00 0 0 8/5/2020 8/7/2020
0004.1.5.40 W1MN06A#-Piesa de separatie pentru priza de pamânt... - montare - 2 1 0.90 buc 3.00 0 0 8/10/2020 8/11/2020
0004.1.5.38 EB08B1-Conducta de otel, pentru legarea la pamînt sau la nul, a rece 4 1 13.80 m 20.00 0 0 8/10/2020 8/13/2020
0004.1.5.41 EB09A1-Piesa flexibila, pentru racordarea suplimentara a receptoarel 2 1 0.42 buc 1.00 0 0 8/13/2020 8/14/2020
0004.1.5.53 EG01I1-Tija de captare, pentru instalatii de paratrasnete, tija fiind de 3 1 9.63 buc 1.00 0 0 8/17/2020 8/19/2020
0004.1.5.55 YC01-Diferenta pret material lei PREVECTRON 2 lei 3,500.00 0 0 8/17/2020 8/18/2020
0004.1.5.42 EG07A1-Conducta de coborîre, montata pe ziduri si cosuri de beton s 4 2 30.50 m 50.00 0 0 8/18/2020 8/21/2020
0004.1.5.54 EG11B1-Piesa pentru racordarea conductei instalatiilor de paratrasnet l 2 1 0.47 buc 1.00 0 0 8/21/2020 8/24/2020
0004.1.5.49 EH01A1-Încercarea cablurilor de energie electrica, de maximum 1 kV 2 2 12.32 buc 16.00 4.00 0 0 8/24/2020 8/25/2020
0004.1.5.18 EE12G1-Corp de iluminat, pentru lampi fluorescente tubulare etans, mo 5 1 18.60 buc 30.00 0 0 8/24/2020 8/28/2020
0004.1.5.19 EE12G1-Corp de iluminat, pentru lampi fluorescente tubulare etans, mo 3 1 3.10 buc 5.00 0 0 8/27/2020 8/31/2020
0004.1.5.20 EE12G1-Corp de iluminat, pentru lampi fluorescente tubulare etans, mo 3 1 2.48 buc 4.00 0 0 8/31/2020 9/2/2020
0004.1.5.21 EE12G1-Corp de iluminat, pentru lampi fluorescente tubulare etans, mo 3 1 4.34 buc 7.00 0 0 9/3/2020 9/7/2020
0004.1.5.22 EE12G1-Corp de iluminat, pentru lampi fluorescente tubulare etans, mo 4 1 2.48 buc 4.00 0 0 9/7/2020 9/10/2020
0004.1.5.23 EE12G1-Corp de iluminat, pentru lampi fluorescente tubulare etans, mo 5 1 2.48 buc 4.00 0 0 9/9/2020 9/15/2020
0004.1.5.24 EE07C2-Plafoniera metalica, cu glob de sticla având diametrul globulu 2 1 1.35 buc 5.00 0 0 9/14/2020 9/15/2020
0004.1.5.25 EE10K1-Corpuri de iluminat speciale monobloc pentru iluminatul de sigu 3 1 4.80 buc 6.00 0 0 9/14/2020 9/16/2020
0004.1.5.34 ED12A1-Aparat de semnalizare si accesorii pentru semnalizare acusti 2 1 0.26 buc 1.00 0 0 9/15/2020 9/16/2020
0004.1.5.50 TRB05A29-Transportul materialelor prin purtat direct.materiale...inc 108 1 41.02 tona 7.00 0 0 4/20/2020 9/16/2020
0004.1.5.51 TRA02A20-Transportul rutier al materialelor,semifabricatelor cu autoc 107 tona 7.00 0 0 4/20/2020 9/15/2020
0004.1.6 Sistematizare verticala 32 240.10 buc 1.00 71.74 0 0 7/13/2020 8/25/2020
0004.1.6.1 TSC01A1-Scarificarea mecanica a terenului,cu :...buldozer pe senile 5 100 mp 1.58 1 0.13 0 0 7/13/2020 7/17/2020
0004.1.6.2 DA06A1-Strat de agregate naturale cilindrate (balast), avand functia de 5 2 73.31 mc 63.20 2 11.12 0 0 7/20/2020 7/24/2020
0004.1.6.3 DA12B1-Strat de fundatie sau reprofilare din piatra sparta pentru dr 5 1 28.44 mc 47.40 3 14.93 0 0 7/27/2020 7/31/2020
0004.1.6.4 TRA01A20-Transportul rutier al...materialelor,semifabricatelor cu aut 15 tona 244.32 0 0 7/13/2020 7/31/2020
0004.1.6.13 DE10A1-Borduri prefabricate din beton pentru trotuare 20 x 25cm,pe 4 2 42.78 m 73.00 0 0 8/3/2020 8/6/2020
0004.1.6.14 TRA01A25-Transportul rutier al...materialelor,semifabricatelor cu aut 4 tona 8.03 0 0 8/3/2020 8/6/2020
0004.1.6.15 DE16B1-Montarea la rigole santuri a elementelor prefabricate din bet 3 1 3.07 buc 16.00 0.96 0 0 8/5/2020 8/7/2020
0004.1.6.16 2800430-Dala prefabricata pentru rigola 50x33x10 2 buc 16.11 0 0 8/5/2020 8/6/2020
0004.1.6.17 TRA01A30-Transportul rutier al...materialelor,semifabricatelor cu aut 2 tona 1.00 0 0 8/5/2020 8/6/2020
0004.1.6.5 DB01B1-Curatirea mecanica in vederea aplicarii imbracamintilor sau t 3 mp 316.00 0.35 0 0 8/6/2020 8/10/2020
0004.1.6.6 DB02C1-Amorsarea suprafetelor straturilor de baza sau a imbracamintilo2 1 10.43 100 mp 3.16 0 0 8/10/2020 8/11/2020
0004.1.6.7 DB14A1-Strat de baza din mixturi asfaltice executat la cald cu aste 4 2 35.05 tona 44.94 5.84 0 0 8/11/2020 8/14/2020
0004.1.6.8 DZ12B1-Prepararea mixturilor asfaltice pentru straturi de baza, execut 4 1 5.39 tona 44.94 11.32 0 0 8/11/2020 8/14/2020
0004.1.6.9 DB16H1-Imbracaminte de beton asfaltic cu agregate marunte executat 4 1 16.43 mp 316.00 5.02 0 0 8/17/2020 8/20/2020
0004.1.6.10 DZ14A1-Prepararea betonului asfaltic fin, bogat in criblura, executat la 4 2 24.95 tona 29.70 22.04 0 0 8/17/2020 8/20/2020
0004.1.6.11 TRA01A20-Transportul rutier al...materialelor,semifabricatelor cu aut 8 tona 74.64 0 0 8/10/2020 8/19/2020
0004.1.6.12 DF16A1-Marcaje rutiere longitudinale, simple sau duble, cu intreruper 3 1 0.24 km 0.07 0.02 0 0 8/21/2020 8/25/2020
4.1 Lista echipamente
Radiatoare din otel,TERMICE 9 la 90/70 grdC):_x000D_
tip panou nr. randuri x inaltime x lungime ( putere termica buc 1.00 0 0 7/23/2020 7/26/2020
0004.1. 22/ 600/ 600 ( 1354 W ) 1
Radiatoare din otel, tip panou nr. randuri x inaltime x lungime ( putere termica la 90/70 grdC):_x000D_ buc 1.00 0 0 7/23/2020 7/24/2020
0004.1. 22/ 600/ 1600 ( 3611 W ) 1
Radiatoare din otel, tip panou nr. randuri x inaltime x lungime ( putere termica la 90/70 grdC):_x000D_ buc 5.00 0 0 7/23/2020 7/24/2020
0004.1. 22/ 600/ 1400
Radiatoare din( otel,
3160tipWpanou) 2 la 90/70 grdC):_x000D_
nr. randuri x inaltime x lungime ( putere termica buc 2.00 0 0 7/23/2020 7/26/2020
0004.1. 22/ 600/ 800din
Radiatoare ( 1806 W )panou nr. randuri x inaltime x lungime ( putere termica
otel, tip 2 la 90/70 grdC):_x000D_ buc 1.00 0 0 7/23/2020 7/26/2020
0004.1. 22/ 600/ 400din
Radiatoare ( 903
otel,Wtip) panou nr. randuri x inaltime x lungime ( putere termica
2 la 90/70 grdC):_x000D_ buc 2.00 0 0 7/23/2020 7/26/2020
0004.1. 22/ 600/ 500din
Radiatoare ( 1128 W )panou nr. randuri x inaltime x lungime ( putere termica
otel, tip 2 la 90/70 grdC):_x000D_ buc 1.00 0 0 7/23/2020 7/27/2020
0004.1. 22/ 600/ 700din
Radiatoare ( 1580 W )panou nr. randuri x inaltime x lungime ( putere termica
otel, tip 2 la 90/70 grdC):_x000D_ buc 1.00 0 0 7/23/2020 7/27/2020
0004.1. 22/ 600/ 1200
supapa ( 2708 Wincorporata_x000D_
de siguranta ) 2 buc 2.00 0 0 7/23/2020 7/27/2020
0004.1.  tablou de automatizare standard care conţine: buton pornit / oprit, buton2de selectare a regimului de funcţionare (antiinghet-
buc iarna-vara),
1.00 termostat reglabil pentru încalzire şi apa calda
0 menajera,
0 manometru,
8/3/2020
avertizor
8/5/2020
luminos pentru arzator, led de semnalizare a functionarii pentru regimul de incalzire si pentru preparare apa calda m
TOTAL VALOARE (fara TVA) 5.05 %

Betonist nr muncitori 2 2 2 2 1 1 1 2
Diferenta pret manopera lei nr muncitori
Dulgher constructii nr muncitori 1 1 1 2 2 2
Electrician constructii nr muncitori
Faiantar nr muncitori
Fierar beton nr muncitori 2 2 3 3 3 3
Fierar betonist nr muncitori
Instalator alimentare cu apa nr muncitori
Instalator electrician nr muncitori
Instalator incalzire nr muncitori
Instalator sanitar nr muncitori
Ipsosar nr muncitori
Lacatus constructii metalice nr muncitori
Lacatus mecanic intretinere-reparatii nr muncitori
Montator constructii metalice nr muncitori
Montator c-tii metalice nr muncitori
Mozaicar nr muncitori
Muncitor deservire constructii masini nr muncitori 1 1 1 1 1 1 1 1 1 1 1
Muncitor deservire constructii montaj nr muncitori 1 1 1 1 1
Muncitor deservire constructii-montaj nr muncitori 3 3 3 3 3 1 1 1 2 2 3
Muncitor deservire c-tii.montaj nr muncitori 1 1 1 1 1 1 1
Muncitor incarcare-descarcare materiale nr muncitori 1 1 1 1 1 1 1 1 1 1 1
Muncitor necalificat nr muncitori
Parchetar nr muncitori
Pavator nr muncitori
Sapator nr muncitori 2 4 4 4 4 4 4 4 4 3
Sudor electric nr muncitori
Sudor electric-b nr muncitori
Sudor gaze-b nr muncitori
Tamplar nr muncitori
Tinichigiu sant. nr muncitori
Tinichigiu santier nr muncitori
Vopsitor nr muncitori
Vopsitor industrial nr muncitori
Vopsitor industrial-b nr muncitori
Zidar nr muncitori
Zugrav vopsitor nr muncitori
Total nr muncitori 5 7 9 11 12 13 14 14 16 16 17
Valori totale pe luna nr muncitori 17
luna 2 luna 3 luna 4
februarie martie aprilie
28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7

c=3, manopera [85.75 ora]


zile, NrMunc=2, manopera [37.13 ora]
d=9 zile, NrMunc=2, manopera [95.93 ora]
d=10 zile, NrMunc=3, manopera [189.95 ora]
d=11 zile, NrMunc=1, manopera [84.15 ora]
d=11 zile, NrMunc=1, manopera [0 ora]
d=9 zile, NrMunc=1, manopera [19.82 ora]
d=10 zile, NrMunc=2, manopera [89.27 ora]
100.00 % d=7 zile, NrMunc=2, manopera [71.25 ora]
9.09 % d=11 zile, NrMunc=1, manopera [35.64 ora]
9.09 % d=11 zile, NrMunc=1, manopera [0.74 ora]
9.09 % d=11 zile, NrMunc=1, manopera [78 ora]
9.09 % d=11 zile, NrMunc=1, manopera [17.04 ora]
% 18.18 % d=11 zile, NrMunc=1, manopera [33.2 ora]
73 % 27.27 % d=11 zile, NrMunc=2, manopera [107.91 ora]
63.64 % 36.36 % d=11 zile, NrMunc=2, manopera [164.3 ora]
54.55 % 45.45 % d=11 zile, NrMunc=1, manopera [7.25 ora]
45.45 % 54.55 % d=11 zile, NrMunc=2, manopera [131.67 ora]
36.36 % 63.64 % d=11 zile, NrMunc=1, manopera [3.38 ora]
36.36 % 63.64 % d=11 zile, NrMunc=1, manopera [5.06 ora]
36.36 % 63.64 % d=11 zile, NrMunc=1, manopera [41.55 ora]
27.27 % 72.73 % d=11 zile, NrMunc=0
27.27 % 72.73 % d=11 zile, NrMunc=1, manopera [0.21 ora]
27.27 % 72.73 % d=11 zile, NrMunc=1, manopera [28.16 ora]
25.00 % 75.00 % d=12 zile, NrMunc=1, manopera [33.1 ora]
100.00 % d=5 zile, NrMunc=7, manopera [215.8 ora]
### d=3 zile, NrMunc=1, manopera [4.55 ora]
### d=3 zile, NrMunc=4, manopera [56.62 ora]
100.00 % d=3 zile, NrMunc=1, manopera [5.43 ora]
100.00 % d=2 zile, NrMunc=11, manopera [84.47 ora]
100.00 % d=6 zile, NrMunc=5, manopera [164 ora]
100.00 % d=6 zile, NrMunc=7, manopera [277.76 ora]
100.00 % d=6 zile, NrMunc=8, manopera [306.25 ora]
100.00 % d=6 zile, NrMunc=30, manopera [1,399.98 ora]
100.00 % d=6 zile, NrMunc=3, manopera [113.72 ora]
16.13 % 70.97 % 12.90 % d=31 zile, NrMunc=11, manopera [2,623.98 ora]
100.00 % d=5 zile, NrMunc=3, manopera [90 ora]
100.00 % d=5 zile, NrMunc=3, manopera [68.4 ora]
100.00 % d=5 zile, NrMunc=2, manopera [45.1 ora]
100.00 % d=5 zile, NrMunc=1, manopera [17.08 ora]
22.22 % 77.78 % d=27 zile, NrMunc=2, manopera [264.33 ora]
22.22 % 77.78 % d=27 zile, NrMunc=1, manopera [35.5 ora]
27.59 % 72.41 % d=29 zile, NrMunc=1, manopera [184.45 ora]
27.59 % 72.41 % d=29 zile, NrMunc=2, manopera [245.63 ora]
18.52 % 81.48 % d=27 zile, NrMunc=8, manopera [1,698.2 ora]
26.67 % 73.33 % d=30 zile, NrMunc=1, manopera [34.16 ora]
26.67 % 73.33 % d=30 zile, NrMunc=0
26.67 % 73.33 % d=30 zile, NrMunc=1, manopera [30.03 ora]
26.67 % 73.33 % d=30 zile, NrMunc=0
16.13 % 70.97 % 12.90 % d=31 zile, NrMunc=1, manopera [182.68 ora]
16.13 % 70.97 % 12.90 % d=31 zile, NrMunc=0
### d=2 zile, NrMunc=3, manopera [19.76 ora]
100.00 % d=4 zile, NrMunc=8, manopera [170.5 ora]
100.00 % d=6 zile, NrMunc=9, manopera [332.35 ora]
30.30 % 33.33 % 21.21 % d=66 zile, NrMunc=0

### d=3 zile, NrMunc=2, manopera [24.75 ora]


### d=3 zile, NrMunc=8, manopera [173.24 ora]
100.00 % d=4 zile, NrMunc=5, manopera [143.78 or
100.00 % d=4 zile, NrMunc=2, manopera [44.06 ora
100.00 % d=4 zile, NrMunc=1, manopera [22.13 ora
######d=2 zile, NrMunc=16, manopera [254.
100.00 % d=2 zile, NrMunc=3, manope
100.00 %

8.57 % 20.00 %
8.57 % 20.00 %
8.57 % 20.00 %
8.57 % 20.00 %
8.57 % 20.00 %
8.57 % 20.00 %
90.00 % ###d=10 zile, NrMunc=2, manopera [106
100.00 % d=4 zile, NrMunc=2, m
8.33 % 19.44 %
8.41 % 19.63 %
13.63 % 14.60 % 8.41 %

2 2 2 2 1 1 1 1 1 1 3 3 3 3 3 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 1 1 3 3 3 2 2 2 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 9 1 1 1 1 5 5 5 5 6 6 6 6 6 7 9 9 8 7 7 7 7 3 3

3 3 3 3 3 2 2 6 6 6 6 7 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 7 7 7 7 7

6 6 6 6 6 6 2 2 2 2 2 2 2 2 2 3 2 2 2

1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 1 1 1 1 1 1 4 4 4 4 4 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 5 5 5 5 5 5 4 4 4 4
1 1 1 1 1 1 1 1 1 1 1 1 1 1

3 1 1 1 1 1 1 1 1 1 1 1 1

3 3 3 3
11 11 11 11

1 1 1 1 1 1 1 1 1 6 6 6 6 11 6 30 32 32 32 36 36 7 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 1
16 16
16 14 13 13 10 9 9 7 6 11 8 12 12 15 22 54 59 59 60 73 64 28 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 24 16 16 16 17 8 6 6 6 8 8 8 8 8 12 14 14 13 5 12 12 12 28 25 26 23 23 21
73 26 28
luna 5 luna 6 luna 7 luna 8
mai iunie iulie august
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
e, NrMunc=5, manopera [143.78 ora]
e, NrMunc=2, manopera [44.06 ora]
e, NrMunc=1, manopera [22.13 ora]
zile, NrMunc=16, manopera [254.89 ora]
d=2 zile, NrMunc=3, manopera [35.42 ora]
100.00 % d=6 zile, NrMunc=18, manopera [818.8 ora]
### d=3 zile, NrMunc=3, manopera [59.48 ora]
100.00 % d=3 zile, NrMunc=10, manopera [234.55 ora]
100.00 % d=4 zile, NrMunc=11, manopera [333.64 ora]
100.00 % d=5 zile, NrMunc=2, manopera [48.9 ora]
100.00 % d=5 zile, NrMunc=1, manopera [30 ora]
100.00 % d=4 zile, NrMunc=1, manopera [12.81 ora]
### d=2 zile, NrMunc=6, manopera [92.4 ora]
### d=2 zile, NrMunc=2, manopera [17.39 ora]
28.57 % 71.43 % d=7 zile, NrMunc=3, manopera [132.48 ora]
100.00 % d=7 zile, NrMunc=2, manopera [104.88 ora]
### d=3 zile, NrMunc=2, manopera [29.19 ora]
### d=3 zile, NrMunc=3, manopera [49.4 ora]
### d=3 zile, NrMunc=3, manopera [62.94 ora]
### d=3 zile, NrMunc=3, manopera [65.73 ora]
100.00 % d=3 zile, NrMunc=3, manopera [52.44 ora]
100.00 % d=11 zile, NrMunc=7, manopera [550.55 ora]
100.00 % d=7 zile, NrMunc=7, manopera [375.05 ora]
100.00 % d=8 zile, NrMunc=1, manopera [58.5 ora]
100.00 % d=8 zile, NrMunc=0
100.00 % d=6 zile, NrMunc=2, manopera [94.6 ora]
100.00 % d=5 zile, NrMunc=1, manopera [22.4 ora]
100.00 % d=5 zile, NrMunc=6, manopera [226.1 ora]
50.00 % 50.00 % d=10 zile, NrMunc=13, manopera [966 ora]
50.00 % 50.00 % d=10 zile, NrMunc=1, manopera [18.11 ora]
50.00 % 50.00 % d=10 zile, NrMunc=0
100.00 %
100.00 % d=5 zile, NrMunc=4, man
62.50 %

% 20.95 % 21.90 % 20.00 %


% 20.95 % 21.90 % 20.00 %
% 20.95 % 21.90 % 20.00 %
% 20.95 % 21.90 % 20.00 %
% 20.95 % 21.90 % 20.00 %
% 20.95 % 21.90 % 20.00 %

100.00 % d=5 zile, NrMunc=1, manopera [6.64 ora]


100.00 % d=5 zile, NrMunc=2, manopera [50.42 ora]
100.00 % d=4 zile, NrMunc=2, manopera [47.26 ora]
100.00 % d=4 zile, NrMunc=1, manopera [2.78 ora]
### d=2 zile, NrMunc=1, manopera [0.75 ora]
### d=2 zile, NrMunc=1, manopera [4.91 ora]
### d=2 zile, NrMunc=1, manopera [4.91 ora]
### d=2 zile, NrMunc=1, manopera [4.91 ora]
### d=2 zile, NrMunc=1, manopera [0.66 ora]
### d=2 zile, NrMunc=1, manopera [1.5 ora]
### d=2 zile, NrMunc=0
80.00 % 20.00 % d=5 zile, NrMunc=1, manopera [1.08 ora]
60.00 % 40.00 % d=5 zile, NrMunc=1, manopera [1.02 ora]
60.00 % 40.00 % d=5 zile, NrMunc=1, manopera [1.02 ora]
60.00 % 40.00 % d=5 zile, NrMunc=1, manopera [1.02 ora]
100.00 % d=6 zile, NrMunc=3, manopera
100.00 %
100.00 %

100.00 % d=5 zile, NrMunc=1, manopera [10.8 ora]


100.00 % d=5 zile, NrMunc=3, manopera [65.2 ora]
100.00 % d=4 zile, NrMunc=3, manopera [54.4 ora]
### d=2 zile, NrMunc=1, manopera [7.1 ora]
100.00 % d=5 zile, NrMunc=1, manopera [10.08 ora]
100.00 % d=4 zile, NrMunc=1, manopera [22.68 ora]
100.00 % d=4 zile, NrMunc=1, manopera [1.65 ora]
### d=2 zile, NrMunc=1, manopera [2.94 ora]
### d=2 zile, NrMunc=1, manopera [2.44 ora]
### d=2 zile, NrMunc=1, manopera [1.12 ora]
### d=2 zile, NrMunc=1, manopera [2.61 ora]
### d=2 zile, NrMunc=1, manopera [3.06 ora]
### d=2 zile, NrMunc=1, manopera [3.06 ora]
### d=2 zile, NrMunc=1, manopera [0.62 ora]
### d=2 zile, NrMunc=1, manopera [1.62 ora]
### d=2 zile, NrMunc=1, manopera [1.75 ora]
### d=2 zile, NrMunc=1, manopera [0.36 ora]
### d=2 zile, NrMunc=1, manopera [1.24 ora]
### 60.00 % d=5 zile, NrMunc=1, manopera [8.58 ora]
###75.00 % d=4 zile, NrMunc=1, manopera [8.58 ora]
### d=2 zile, NrMunc=1, manopera [2.1 ora]
100.00 % d=5 zile, NrMunc=3, manopera [80.6 ora]
### d=2 zile, NrMunc=1, manopera [1.64 ora]
100.00 % d=4 zile, NrMunc=1, manopera [3.2 ora]
100.00 % d=6 zile, NrMunc=1, manopera [20.52 ora]
100.00 % d=5 zile, NrMunc=1, manopera [3.24 ora]
100.00 % d=5 zile, NrMunc=1, manopera [0.55 ora]
### d=3 zile, NrMunc=1, manopera [5.13 ora]
### d=2 zile, NrMunc=1, manopera [5.13 ora]
### d=3 zile, NrMunc=0
### d=3 zile, NrMunc=1, manopera
### d=3 zile, NrMunc=1, man
### d=3 zile, NrMunc=1, man

0 zile, NrMunc=2, manopera [106 ora]


d=4 zile, NrMunc=2, manopera [42 ora]
100.00 % d=5 zile, NrMunc=1, manopera [1.76 ora]
100.00 % d=5 zile, NrMunc=4, manopera [143 ora]
100.00 % d=5 zile, NrMunc=6, manopera [220 ora]
### d=2 zile, NrMunc=2, manopera [29 ora]
80.00 % ###d=5 zile, NrMunc=1, manopera [5.94 ora]
100.00 % d=8 zile, NrMunc=3, manopera [188.6 ora]
100.00 % d=8 zile, NrMunc=4, manopera [253 ora]
### d=3 zile, NrMunc=1, manopera [24 ora]
100.00 % d=4 zile, NrMunc=1, manopera [32 ora]
### 60.00 % d=5 zile, NrMunc=1, manopera [9 ora]
###### d=3 zile, NrMunc=1, manopera [4.5 ora]
100.00 % d=3 zile, NrMunc=1, manopera [6.3 ora]
### d=2 zile, NrMunc=1, manopera [6.3 ora]
### d=3 zile, NrMunc=1, manopera [0.9 ora]
### d=3 zile, NrMunc=1, manopera [7.2 ora]
### d=2 zile, NrMunc=1, manopera [1.8 ora]
### d=2 zile, NrMunc=1, manopera [4.5 ora]
### d=2 zile, NrMunc=1, manopera [5 ora]
###d=1 zi, NrMunc=1, manopera [2.27 ora]
### d=2 zile, NrMunc=1, manopera [15.2 ora]
### d=2 zile, NrMunc=1, manopera [3.8 ora]
### d=2 zile, NrMunc=0
###d=1 zi, NrMunc=0
### d=2 zile, NrMunc=0
###d=1 zi, NrMunc=0
100.00 % d=5 zile, NrMunc=7, manopera [279 ora]
### d=3 zile, NrMunc=2, manopera [31.17 ora]
60.00 % 40.00 % d=5 zile, NrMunc=6, manopera [202.8 ora]
### d=2 zile, NrMunc=1, manopera [0.19 ora]
### d=2 zile, NrMunc=1, manopera [1.8 ora]
### d=2 zile, NrMunc=1, manopera [0.22 ora]
### d=2 zile, NrMunc=1, manopera [5.49 ora]
### d=2 zile, NrMunc=3, manopera [38.7 ora]
### d=3 zile, NrMunc=3, manopera [59.94 ora]
### d=2 zile, NrMunc=1, manopera [0.9
100.00 % d=4 zile, NrMunc=1, manope
### d=2 zile, NrMunc=1, man

% 20.37 % 21.30 % 19.44 %


% 20.56 % 21.50 % 19.63 %

100.00 % d=5 zile, NrMunc=0


100.00 % d=5 zile, NrMunc=2, manopera [73.31 ora]
100.00 % d=5 zile, NrMunc=1, manopera [28.44 ora]
100.00 % d=15 zile, NrMunc=0
100.00 % d=4 zile, NrMunc=2, manopera [42.78 ora]
100.00 % d=4 zile, NrMunc=0
### d=3 zile, NrMunc=1, manopera [3.07 ora]
### d=2 zile, NrMunc=0
### d=2 zile, NrMunc=0
100.00 % d=3 zile, NrMunc=0
### d=2 zile, NrMunc=1, manopera [10
100.00 % d=4 zile, NrMunc=2, man
100.00 % d=4 zile, NrMunc=1, man

100.00 %

###
###
###
###
###
###
###
###
###
12.68 % 8.29 % 7.85 % 27.28 %

9 10 10 1 1 6 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 2 1 1 1 1 1
3 3 3
1 1 1 1 1
1 1
1 1
1 1 1 4 4 10 10 10 6 6 2 2 1 1 1 4 3 3 3 3 3 3 7 4 4 4 4 4 4 4 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 2 2 2 2 2 2 2 2 2 1 1 1 2 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 1 1
1 1 2 2 4 4 4 3 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 7 7 7 7 7 7
1 1 1
1 1 1 1 1 1
1 1 1
1 1 1
1 1 3 3 3 3 3 2 2 2 3 3 3 3 3

1 1 1 1 2 4 4 3 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 2 3 3 3 1 1 1 1 1 2 2 2 2 3 3 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2
4 4
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 2 2 2 2
6 6 6 6 6
1 1 1 1 2 2 2 2 2 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 7 7 7 7 7 5 5 5 5 5 6 6 2
1 1 1 1 1 1 1 1 1 1
1 1 1
1 1
3 3 3 6 6 6 6 6 6 6 6 6 6 6
3 3
11 14 3 3

1 1
1 1
7 7 8 8 1 1 1 3 3 3 3 3 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 10 10 9 17 17 17 17
1 1 1 1 1 1 1 1
21 26 8 9 19 32 40 31 31 13 13 16 16 8 8 8 13 12 24 24 24 13 13 23 20 19 19 17 18 20 19 20 21 21 13 12 12 12 6 6 6 6 10 9 9 11 12 10 10 12 11 19 19 19 19 19 20 21 27 25 25 26 29 30 28 22 20 29 28 27 26
40 24 27 30
luna 8 luna 9
august septembrie
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Munc=13, manopera [966 ora]
Munc=1, manopera [18.11 ora]

% d=16 zile, NrMunc=6, manopera [734.4 ora]


d=5 zile, NrMunc=4, manopera [133.12 ora]
50 % 37.50 % d=24 zile, NrMunc=14, manopera [1,780.8 ora]
### d=2 zile, NrMunc=4, manopera [50.7 ora]
100.00 % d=6 zile, NrMunc=2, manopera [69 ora]
100.00 % d=5 zile, NrMunc=1, manopera [4.2 ora]
###75.00 % d=4 zile, NrMunc=1, manopera [15.96 ora]
8.57 % d=105 zile, NrMunc=0
8.57 % d=105 zile, NrMunc=0
8.57 % d=105 zile, NrMunc=1, manopera [59.51 ora]
8.57 % d=105 zile, NrMunc=1, manopera [12.05 ora]
8.57 % d=105 zile, NrMunc=1, manopera [19.25 ora]
8.57 % d=105 zile, NrMunc=0
anopera [1.02 ora]
anopera [1.02 ora]
anopera [1.02 ora]
d=6 zile, NrMunc=3, manopera [95.75 ora]
100.00 % d=3 zile, NrMunc=1, manopera [6.84 ora]
100.00 % d=3 zile, NrMunc=1, manopera [6.84 ora]
### d=2 zile, NrMunc=0
### d=2 zile, NrMunc=0

manopera [5.13 ora]


unc=1, manopera [5.13 ora]

d=3 zile, NrMunc=1, manopera [4.86 ora]


d=3 zile, NrMunc=1, manopera [2.37 ora]
d=3 zile, NrMunc=1, manopera [2.37 ora]
100.00 % d=5 zile, NrMunc=1, manopera [6.09 ora]
### d=2 zile, NrMunc=1, manopera [0.84 ora]
### d=2 zile, NrMunc=1, manopera [1.23 ora]
### d=2 zile, NrMunc=1, manopera [1.53 ora]
### d=2 zile, NrMunc=1, manopera [2.94 ora]
### d=2 zile, NrMunc=1, manopera [1.23 ora]
###80.00 % d=5 zile, NrMunc=1, manopera [7.28 ora]
100.00 % d=2 zile, NrMunc=3, manopera [20.24 ora]
### d=2 zile, NrMunc=5, manopera [32.66 ora]
100.00 % d=4 zile, NrMunc=0, manopera [500 lei]
### d=2 zile, NrMunc=0
anopera [202.8 ora]
manopera [0.19 ora]
manopera [1.8 ora]
c=1, manopera [0.22 ora]
c=1, manopera [5.49 ora]
c=3, manopera [38.7 ora]
unc=3, manopera [59.94 ora]
d=2 zile, NrMunc=1, manopera [0.9 ora]
d=4 zile, NrMunc=1, manopera [13.8 ora]
d=2 zile, NrMunc=1, manopera [0.42 ora]
### d=3 zile, NrMunc=1, manopera [9.63 ora]
### d=2 zile, NrMunc=0
100.00 % d=4 zile, NrMunc=2, manopera [30.5 ora]
100.00 % d=2 zile, NrMunc=1, manopera [0.47 ora]
### d=2 zile, NrMunc=2, manopera [12.32 ora]
100.00 % d=5 zile, NrMunc=1, manopera [18.6 ora]
100.00 % d=3 zile, NrMunc=1, manopera [3.1 ora]
###### d=3 zile, NrMunc=1, manopera [2.48 ora]
100.00 % d=3 zile, NrMunc=1, manopera [4.34 ora]
100.00 % d=4 zile, NrMunc=1, manopera [2.48 ora]
100.00 % d=5 zile, NrMunc=1, manopera [2.48 ora]
### d=2 zile, NrMunc=1, manopera [1.35 ora]
### d=3 zile, NrMunc=1, manopera [4.8 ora]
### d=2 zile, NrMunc=1, manopera [0.26 ora]
11.11 % d=108 zile, NrMunc=1, manopera [41.02 ora]
10.28 % d=107 zile, NrMunc=0

c=2, manopera [42.78 ora]

unc=1, manopera [3.07 ora]


zile, NrMunc=0
d=2 zile, NrMunc=1, manopera [10.43 ora]
d=4 zile, NrMunc=2, manopera [35.05 ora]
d=4 zile, NrMunc=1, manopera [5.39 ora]
100.00 % d=4 zile, NrMunc=1, manopera [16.43 ora]
100.00 % d=4 zile, NrMunc=2, manopera [24.95 ora]
% d=8 zile, NrMunc=0
100.00 % d=3 zile, NrMunc=1, manopera [0.24 ora]

27.28 % 2.21 %

16 16 16 16

1 2 2 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 4 3

1 1 1 2 2 2 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2

1 1 1 1 1 1

1 1 1

4 4
1 1 1

14 14 14 14 14 14 14 14 14 14 14 9 9 9 9 9 9 9 9 9

28 28 26 24 23 25 25 23 21 21 21 15 15 15 15 17 32 29 29 29 2 2 2
30 32