Project : AMCC BUILDING Reference No.

: SO-G-21-005
Location : 1125 Makati Avenue, Makati City Date : 9/27/2022
Owner : ATRIUM MAKATI CONDOMINIUM CORP
Subject : Construction Schedule - Phase 1
CONSTRUCTION SCHEDULE - PHASE 1
Item No. Description of Works PHASE 1
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7
Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4 Wk 1 Wk 2 Wk 3 Wk 4
A. GENERAL REQUIREMENTS

1.10 Mobilization and Demobilization


1.20 Contractors' All Risk Insurance
1.30 Building Permits
1.40 Temporary Facilities / Utilities
1.50 Provision for Scaffoldings
Safety Occupational Hazards - Complete supply of Safety and Health,
1.60
and Security Requirements for the Construction
Occupational Safety and Health (PPE & COVID-19 Safety
1.70
Requirements)
1.80 Complete As- Built Drawings
1.90 Clearing, Cleaning and Hauling of Debris
1.10 Handling of Materials

B STRUCTURAL/RETROFITTING WORKS

1.0 ENLARGEMENT OF EXISTNG STRUCTURE

1.1 Chipping Works B-Z1 B-Z2 G-Z1 G-Z2 2-Z1 2-Z2 3-Z1 3-Z2 4-Z1 4-Z2 5-Z1 5-Z2 6-Z1 6-Z2 7-Z1 7-Z2 8-Z1 8-Z2 MEZZ. R.D
1.2 Enlargement of Column and Shear Wall
1.2.1 Concrete Forms and Accessories B-Z1 B-Z2 G-Z1 G-Z2 2-Z1 2-Z2 3-Z1 3-Z2 4-Z1 4-Z2 5-Z1 5-Z2 6-Z1 6-Z2 7-Z1 7-Z2 8-Z1 8-Z2 MEZZ. R.D

1.2.2 Concrete Reinforcement B-Z1 B-Z2 G-Z1 G-Z2 2-Z1 2-Z2 3-Z1 3-Z2 4-Z1 4-Z2 5-Z1 5-Z2 6-Z1 6-Z2 7-Z1 7-Z2 8-Z1 8-Z2 MEZZ. R.D

1.2.3 Cast-in-Place Concrete B-Z1 B-Z2 G-Z1 G-Z2 2-Z1 2-Z2 3-Z1 3-Z2 4-Z1 4-Z2 5-Z1 5-Z2 6-Z1 6-Z2 7-Z1 7-Z2 8-Z1 8-Z2 MEZZ. R.D

2.0 FIBER REINFORCED POLYMER SYSTEM

2.1 Beam Flexure FRP Fiber 600c B-Z1 B-Z2 G-Z1 G-Z2 2-Z1 2-Z2 3-Z1 3-Z2 4-Z1 4-Z2 5-Z1 5-Z2 6-Z1 6-Z2 7-Z1 7-Z2 8-Z1 8-Z2 MEZZ. R.D
2.2 Beam Shear FRP Fiber 600c B-Z1 B-Z2 G-Z1 G-Z2 2-Z1 2-Z2 3-Z1 3-Z2 4-Z1 4-Z2 5-Z1 5-Z2 6-Z1 6-Z2 7-Z1 7-Z2 8-Z1 8-Z2 MEZZ. R.D
2.3 Structural Adhesive B-Z1 B-Z2 G-Z1 G-Z2 2-Z1 2-Z2 3-Z1 3-Z2 4-Z1 4-Z2 5-Z1 5-Z2 6-Z1 6-Z2 7-Z1 7-Z2 8-Z1 8-Z2 MEZZ. R.D

4.0 EARTHWORKS B-Z1 B-Z2

C. ARCHITECTURAL WORKS

BASEMENT

1.0 DEMOLITION WORKS B-Z1 B-Z2

2.0 RESTORATION WORKS B-Z1 B-Z2

3.00 DOORS AND WINDOWS B-Z1 B-Z2

GROUND FLOOR

1.0 DEMOLITION WORKS G-Z1 G-Z2

2.0 RESTORATION WORKS G-Z1 G-Z2

3.00 DOORS AND WINDOWS G-Z1 G-Z2

4.00 PIPE CHASE CLADDING WORKS G-Z1 G-Z2

SECOND FLOOR

1.0 DEMOLITION WORKS 2-Z1 2-Z1

2.0 RESTORATION WORKS 2-Z1 2-Z2

3.00 DOORS AND WINDOWS 2-Z1 2-Z2

THIRD FLOOR

1.0 DEMOLITION WORKS 3-Z1 3-Z1

2.0 RESTORATION WORKS 3-Z1 3-Z2

3.00 DOORS AND WINDOWS 3-Z1 3-Z2

D. PLUMBING/ SANITARY WORKS

Basement

22.1 Storm Drainage System B-Z1 B-Z2

22.2 Sewer and Vent System B-Z1 B-Z2

22.3 Water Supply System B-Z1 B-Z2

Ground Floor

22.1 Storm Drainage System G-Z1 G-Z2

22.2 Sewer and Vent System G-Z1 G-Z2

22.3 Water Supply System G-Z1 G-Z2


``
2nd Floor

22.1 Storm Drainage System 2-Z1 2-Z2

22.2 Sewer and Vent System 2-Z1 2-Z2

22.3 Water Supply System 2-Z1 2-Z2

3rd Floor

22.1 Storm Drainage System 3-Z1 3-Z2

22.2 Sewer and Vent System 3-Z1 3-Z2

22.3 Water Supply System 3-Z1 3-Z2

4th Floor

22.1 Storm Drainage System 4-Z1 4-Z2

22.2 Sewer and Vent System 4-Z1 4-Z2

22.3 Water Supply System 4-Z1 4-Z2

5th Floor

22.1 Storm Drainage System 5-Z1 5-Z2

22.2 Sewer and Vent System 5-Z1 5-Z2

22.3 Water Supply System 5-Z1 5-Z2

6th Floor

22.1 Storm Drainage System 6-Z1 6-Z2

22.2 Sewer and Vent System 6-Z1 6-Z2

22.3 Water Supply System 6-Z1 6-Z2

7th Floor

22.1 Storm Drainage System 7-Z1 7-Z2

22.2 Sewer and Vent System 7-Z1 7-Z2

22.3 Water Supply System 7-Z1 7-Z2

8th Floor

22.1 Storm Drainage System 8-Z1 8-Z2

22.2 Sewer and Vent System 8-Z1 8-Z2

22.3 Water Supply System 8-Z1 8-Z2

Penthouse 1

22.1 Storm Drainage System P-1

22.2 Sewer and Vent System P-1

22.3 Water Supply System P-1

Penthouse 2

22.2 Sewer and Vent System P-2

22.3 Water Supply System P-2

Penthouse 3
P-3
22.1 Storm Drainage System
P-3
22.2 Sewer and Vent System
P-3
22.3 Water Supply System

Roofdeck

22.1 Storm Drainage System RD-1

LEGEND:
B-Z1: BASEMENT LEVEL- ZONE 1 (GL A-G / 1-8) 6-Z1:SIXTH FLOOR - ZONE 1 (GL A-G / 1-8)
B-Z2: BASEMENT LEVEL- ZONE 2 (GL G-N / 1-8) 6-Z2: SIXTH FLOOR- ZONE 2 (GL G-N / 1-8)
G-Z1: GROUND FLOOR - ZONE 1 (GL A-G / 1-8) 7-Z1: SEVENTH FLOOR - ZONE 1 (GL A-G / 1-8)
G-Z2: GROUND FLOOR - ZONE 2 (GL G-N / 1-8) 7-Z2: SEVENTH FLOOR - ZONE 2 (GL G-N / 1-8)
2-Z1: SECOND FLOOR - ZONE 1 (GL A-G / 1-8) 8-Z1: EIGHT FLOOR - ZONE 1 (GL A-G / 1-8)
2-Z2: SECOND FLOOR - ZONE 2 (GL G-N / 1-8) 8-Z2: EIGHT FLOOR - ZONE 2 (GL G-N / 1-8)
3-Z1: THIRD FLOOR - ZONE 1 (GL A-G / 1-8) P-1: PENTHOUSE 1
3-Z2: THIRD FLOOR - ZONE 2 (GL G-N / 1-8) P-2: PENTHOUSE 2
4-Z1: FOURTH FLOOR - ZONE 1 (GL A-G / 1-8) P-3: PENTHOUSE 3
4-Z2: FOURTH FLOOR - ZONE 2 (GL G-N / 1-8) RD-1: ROOF DECK
5-Z1: FIFTH FLOOR - ZONE 1 (GL A-G / 1-8) GL: GRID LINE
5-Z2: FIFTH FLOOR- ZONE 2 (GL G-N / 1-8)

Page 1 of 1