Escolar Documentos
Profissional Documentos
Cultura Documentos
Pluvial
03 VAGAS CLIENTES
AP-2 AP-3
Joelho 90- desce
ESTACIONAMENTO
24 VAGAS ESTACIONAMENTO
(PAVER) SEMI-NOVOS
05 VAGAS (PAVER) CV-...
AP-4 AP-5
A
indicada
AP-...
ESTACIONAMENTO ...
ESTOQUE SEMI-NOVOS
I = 5%
I = 5%
02 VAGAS CLIENTES
12 VAGAS
Tubo que desce
(PAVER)
AP-6 AP-7
D ESTACIONAMENTO
(PAVER)
I = 5%
AP-11 AP-17
AP-16 100 mm
CARIMBOS:
I = 5%
AP-18
100 mm
I = 5%
PROJETO:
ESGOTO E PLUVIAL
HYUNDAI
AP-19
100 mm
DATA: ESC:
I = 5%
CNPJ:39.308.431/0001-55 | (48) 99640-1845 01/MAI/21 1/50
contato@soleer.eng.br | www.soleer.eng.br
I = 5%
Mariane Sartor Batista Gabriel Hahn Monteiro Lufchitz
Engenheira Civil CPF: 059.794.509-80
AP-21 AP-22
AP-20 100 mm CV-6 100 mm
AP-24 CREA-SC 177742-6
100mm CV-5 50 mm 100 mm
50 mm
DESENHO:
COBERTURA PRANCHA:
ESCALA: 1/100
Mat. 14.499 (L-01, Q-07), Mat. 14.500 (L-02, Q-07), P. Mat. (L-3-U), Mat. 26.533 (L-03, Q-07)
03/05
Mat. 26.534 (L-04, Q-07), P. Mat. 26.535 (L-05, Q-07).