Você está na página 1de 1

LEGENDA DA PLANTA: LEGENDA DO PERFIL:

PAVIMENTO ASFÁLTICO A SER IMPLANTADO TERRENO NATURAL


EST.1034+2.00(BR-163) À EST.1037+12.00(BR.163)
BSTC Ø0.60 - VER DESENHO: PAVIMENTO ASFÁLTICO A SER REGULARIZADO GREIDE PROJETADO
VBR-163PA-636+015-PDA-EXE-DE-H2-003
EST.100+0.00 EST.1039+19.00 PAVIMENTO RÍGIDO A SER IMPLANTADO
EST.1035+16.00 DSS04 (R.100) (BR-163) GREIDE RESULTANTE
(BR-163) C=35.00 BOCA DE BUEIRO
FECHADA PASSEIO A SER IMPLANTADO
EST.1034+2.00 EST.1037+1.50 F=79.73
(BR-163) EST.1036+6.50
EST.1035+12.50 (BR-163)
(BR-163) CAIXA COLETORA EXISTENTE BUEIRO PROJETADO
DSS04 (BR-163)
DSS04 CAIXA COLETORA SIMPLES BUEIRO EXISTENTE
C=7.00
EST.102+8.00 C=42.50 EST.1037+12.00 BSTC Ø0.60 PA-2
EST.103+15.195 R.100) (BR-163) C=10.50 i=0.35% BOCA DE LOBO SIMPLES BUEIRO EXISTENTE A SER REMOVIDO
(R.100)P.B. EST.101+12.50 GÁRGULA SIMPLES
R.100) EST.1037+18.00 DISPOSITIVO EXISTENTE A SER UTILIZADO
EST.103+15.50 BR-163) EST.1040+10.00
(R.100)
GÁRGULA SIMPLES (BR-163) SAÍDA DE BUEIRO TIPO ESCADA DISPOSITIVO EXISTENTE A SER REMOVIDO
GÁRGULA SIMPLES DAR03 C=12.00 BOCA DE BUEIRO
DAR03 C=2.00 DISSIPADOR
FECHADA DESCIDA D'ÁGUA TIPO RÁPIDO VALETA DE PÉ DE ATERRO EM CONCRETO
DISSIPADOR EST.100+19.50 F=79.69
DE ENERGIA
DE ENERGIA R.100) DEB01 BOCA DE SAÍDA PARA BUEIRO CANALETA RETANGULAR COM GRELHA
DEB01 GÁRGULA SIMPLES EST.1038+12.00 SARJETA DE CORTE EM GRAMA
CP-01 DAR03 C=2.00 (BR-163) DISSIPADOR DE ENERGIA
DISSIPADOR EDA01 EST.1040+19.00
DE ENERGIA DAR03 (BR-163)BSD03 CAIXA DE PASSAGEM PARA DRENO SARJETA DE CORTE EM CONCRETO
EST.104+17.926 FAIXA DE DOMÍNIO
DEB01 C=4.00
79,883
81,420 80,263
81,460SINOP R.100)P.A. 81,570
80,645
81,460 80,395 81,620 81,650
+6,37 +12,87
81,719
81,657
81,610
BOCA DE SAÍDA PARA DRENO SARJETA PROTEÇÃO DE ATERRO
80,509 80,444 81,670
80,402 1,50 81,710
80,496 81,640 81,610 81,484
1,20 80,664 81,630
80,919 81,172 81,180
80,870
79,864 80,185
80,303
5,00 RAMO 100 3,60 2,0% 100 80,350
79,790 74,980 74,386 73,650 ARRASAMENTO DRENO DE PAVIMENTO
VBR-163PA-636+015-PDA-EXE-DE-H2-001

80,363 80,343 1,50


80,408 1,20 79,060 76,130

5,00
80,279 81,171

0,5%
72,160

5,00
80,244 81,151 81,329 81,222 77,190
MFC01 81,167 78,220
80,890 72,574
69,248
70,600 PONTO ALTO (P.A.)
0,50
1,50 C=240.00 81,042 80,273 78,749 ENCHIMENTO
2,40
1,20
78,457
69,070 EST.1055+3.00
105 72,372
72,998 70,592 67,640 (BR-163)BSD03 BSTC = BUEIRO SIMPLES TUBULAR DE CONCRETO PONTO BAIXO (P.B.)
1,50 81,213 68,643
DSS04 79,224 77,277 83,159
2,00% C=22.50
0,50
81,043
80,738 78,078
66,020
64,878 64,530
BTTC = BUEIRO TRIPLO TUBULAR DE CONCRETO
80,582 80,149 63,000
62,619
80,665 80,618 80,353 DSS04 14,75
80,302
CP-01 71,723 70,175
67,315 A.S.U. = A SER UTILIZADOA.S.R. = A SER REMOVIDO
80,788 DSS04 80,025 76,541 65,618 61,530
81,239 1030 80,371 80,571 14,75 60,044
81,335 81,528 ep% 81,348 81,392 C=15.50 81,439 1035 C=11.50
81,024 80,693 81,289 80,493 14,75 62,681
70,047
66,810 58,426
60,060
81,338 81,367 81,440 81,462 81,389 81,067DSS04 80,462 76,464 74,427 69,216 66,722
81,458 81,400 81,377 80,153 77,853 77,016 73,216
81,501 81,520 81,574 81,338 1040 81,257
81,492 81,266 C=17.00
81,429 81,463 81,580 81,607 81,557 81,180 80,749 14,75 71,389 62,314 60,414
81,534 80,179
DSS04 81,575 81,623DSS04 81,654 DSS04 81,667 EST.1036+4.50 81,427 79,604 1045 78,731
78,795 77,845 +16,29 64,919
81,279 81,322 81,714 77,982 76,736 75,854
81,149 81,193
81,329
C=17.50
16,10 DSS04
81,378 81,404C=20.00 81,488 C=11.00 (BR-163) CP-0181,639 81,634 81,609 DSS04 81,617 81,135
76,890 75,954 74,659
74,716 73,160
66,874
1,20 61,655 59,358
59,099
81,205 2,00% 81,269 81,312
81,459 81,442 81,460 DSS04 80,866 80,328 1050 73,295 71,701 70,40770,280
C=17.50 CP-01 81,387
18,75 MFC0181,358 MFC01
81,323 81,449 81,425 C=12.50 81,270 81,022 79,755 78,984
71,905
70,424 68,682 67,089 64,204 58,597
81,333 81,341 81,338 18,75
81,290 C=19.00 80,746 80,269 78,165 77,116
68,810 7,20
67,250
67,269 65,691
77,625 C=16.50 C=16.50 80,916 80,615 15,23
80,138
79,688 78,912 76,037
74,918
3,60 65,770 62,593
79,560 78,047 77,198 73,521 62,694 60,979 59,537
78,791 75,979 2,50 72,046 70,591 61,096
77,507 78,817 77,909 76,920 74,773 69,036 1055
0,50 75,942 73,543 71,919 67,528
77,878 0,50 74,683
+15,47 70,519 65,912
+15,36 1,50 79,617 80,448 73,537 71,855 68,966 64,360 62,857
MFC01 79,538 78,386 70,464 67,443 61,391
EST.1031+4.00(BR-163) 77,793 77,949 78,414 +15,36 77,837 76,956 73,760 72,612 68,804 65,820 59,895
+15,36 80,644 77,108 71,450 67,304 64,232 62,779
80,329 80,125 79,768 C=22.00 77,035 75,396 65,755
EDA01/DAR03 C=4.50 79,752
79,887
MFC01 78,855 79,047 +15,36
80,785 69,567 64,134 61,332
62,737SANTARÉM 59,830
80,663 67,768 67,149
81,46080,091 MFC01 FAIXA DE DOMÍNIO 61,245 59,732
81,420 80,316
DISSIPADOR 81,460
80,056 79,928
81,570 80,027 81,620 DSS04
C=16.00 77,221 79,445 65,392
C=22.00 MFC01
79,526 78,965 78,425 78,293 78,505 78,525 78,879 79,429 80,012 EST.1042+4.00 STC01 78,315
77,190 77,810
77,193 63,379
DE ENERGIA C=23.00 81,650 EST.1035+7.00 80,126 80,569
80,408 80,541
81,033 78,220 76,130 76,961
C=22.00 81,670 EST.1037+0.00 (BR-163) C=41.00 79,060 74,980 62,259
60,414
DEB01 EST.1034+10.00 (BR-163) EDA01 81,710
(BR-163) EDA0181,640 EST.1038+11.50(BR-163) 79,790 73,650 76,299 59,000
EST.1031+18.00 80,350 EST.1051+5.50
72,160 75,767
(BR-163) CP-01 (BR-163) EDA01 DAR03 C=5.00 DAR03 C=5.00 81,630 GÁRGULA SIMPLES 80,870
81,180 EST.1041+12.50 (BR-163)BSD03 70,600
EST.1032+6.00 78,226
81,610 DAR03 C=3.50
81,610
78,613 EST.1044+5.00 69,070
DISSIPADOR
BSD03 (BR-163) EDA01 DAR03 C=5.00 DISSIPADOR
DISSIPADOR
(BR-163)BSD03 (BR-163) 67,640
75,411
DISSIPADOR DE ENERGIA DE ENERGIA 66,020
DAR03 C=3.50 DE ENERGIA
74,912
73,393
DE ENERGIA DEB01 DEB01 64,530
EST.1032+6.00(BR-163) DISSIPADOR DEB01 EST.1041+11.00 73,144
DE ENERGIA DEB01
EDA01/DAR03 C=4.00 (BR-163) CP-01 63,000 71,972
DISSIPADOR DEB01 EST.1036+3.00 EST.1037+15.50(BR-163) EST.1039+6.00
61,530
DE ENERGIA EST.1034+11.00 (BR-163) EDA01 GÁRGULA SIMPLES (BR-163) CP-01 70,674
60,060
DEB01 (BR-163) CP-01 DAR03 C=5.50 DAR03 C=3.50
DISSIPADOR DISSIPADOR DSS04
DE ENERGIA DE ENERGIA C=15.00
DEB01 DEB01

EST.1038+11.50(BR-163)
GÁRGULA SIMPLES
DAR03 C=3.50
DISSIPADOR
DE ENERGIA
DEB01

PERFIL ALINHAMENTO - BR-163


90 75 90 75
PIV= EST.1034+15,360
COTA:81,647

PIV=EST.1041+2,000
COTA PIV=81,642
COTA PIV=81,642
EST.1037+15,360
EIXO DA PRAÇA

85 70 85 70
NOTAS

1- COTAS E DIMENSÕES EM METRO, EXCETO INDICAÇÃO CONTRÁRIA;


i=-
GREIDE PROJETADO 7, 2- PARA NOTAS GERAIS VER DESENHO VBR-163PA-636+0015-PDA-EXE-DE-H2-001.
GREIDE RESULTANTE 59
%

80 65 80 65
COTA: 81,644
PCV=EST.1038+8,640

k=38,134
PTV=EST.1043+15,360
COTA:80,146

e=0,373
Y=106,720

TERRENO NATURAL

k=31,474

75 60 75 60

i=-0,00% i=-2,80%
d=81.454m d=0.000m
70 55
81,641
81,426

81,504

81,572

81,594

81,605

81,647

81,646

81,645

81,644

81,626

81,513

81,296

80,973

80,546
81,61

77,61
81,44

81,64

81,64

81,62

80,02

69,70

68,22

65,13

63,63

62,13
81,28

81,38

81,53

81,58

81,63

81,65

81,66

81,33

80,98

80,56

79,36

78,56

76,56

75,45

74,18

72,76

71,24

66,69
COTAS
TERRENO/PROJETO

ESTAQUEAMENTO 1030 1035 1040 1045 1050 1055 1058

QUILOMETRAGEM

TANGENTE TANGENTE TANGENTE


PLANIMETRIA
L=231,326 R=2000,000 L=125,416 R=5000,000 L=275,678
D=51,218 D=113,846

Você também pode gostar