M/O
2.2 M3
8 HORA
0.28 R/REAL
TRANSPORTE
1 8 M3
X 1 M3
0.125
RIOSTRA 2.2 m3
%
TABLAS 8.40 8.40 = 6.56 1.15
4.00 2.00 0.16 1.28
mas uno
8.00 1.00 9.000 pedazos 0.50 2.00 9.00
CUARTON 9.00 9.00 = 7.03 1.15
4.00 2.00 0.16 1.28
mas uno
8.00 1.00 9.00 pedazos 0.25 2.25 ml
TIRA 2.25 2.25 = 1.76 1.15
4.00 2.00 0.16 1.28
HIERROS #
ml espacios mas uno cantidad #
sentido y 4.00 0.00 u 0.00 4.00 pedazos
estribos 3.95 0.15 26 u 1.00 27 estribos
estribos 0.00 0.20 0.00 u 0.00 0.00 estribos
estribos 0.00 0.15 0.00 u 0.00 0.00 estribos
27 total de estribos
CANTIDAD ML TOTAL
MULTIPLICACION 4.00 3.95 15.80 VARILLAS ML 12 mm
MULTIPLICACION 27 0.70 19.13 ESTRIBOS ML 8mm
MM KG/ml ml kg % V-HA
5 0.187
8 0.395 19.13 7.5577 1.05 7.9 0.16
10 0.617
10 0.617
12 0.888 15.80 14.03 1.05 14.7 0.16
14 1.208
16 1.578
peso del hierro calculado
ALAMBRE
KG/M3 %
PESO 141.67 7.084 KG/M3
Pilaretes 27 ML
ALTURA 1.8 ML
ml
volumen 0.15 0.1 1 0.015 m3/ml
volumen 0.15 0.1 1.8 0.027 m3
total de ml de pilaretes es 15 1.80 27 ml
altura del pìlarete es 1.8 ml
volumen total de pilarete 0.027 15 0.405 m3
# pilarete ancho altura
tabla columna
0.1 0.15 0.10 0.15 0.500 0.20 1.80 4.50
TIRA
altura espacio mas un pedazos lados pedazos longitud
1.80 0.40 4.50 1.00 5.50 2.00 11.00 0.40
MANO DE OBRA
M /O 2DO. METODO
ML 27.00 ml
RENDIMIENTO 9.35 HORA
R/ REAL 2.89
EQUIPOS
transporte
1 27.0
x 1
0.0370
JARDINERA 1.8 M2
AREA
2 0.6 = 1.2 M2
0.5 0.6 = 0.3 M2
0.5 0.6 = 0.3 M2
TOTAL 1.8 M2
BLOQUEDA RENDIMIENTO
1M2 ENTREA 12.50 bloques
VO= SENTIDO VERTICAL = 3ML PESO ESPECIFICO DE LA ARENA 1,10
VO= SENTIDO HORIZONTAL = 5ML ml E= pared E=mortero
TOTAL 8.00 ml V 8.00 0.10 0.015
E= 1,5CM A M ES = 0.015
E= PARED 10CM = 0.10
1 SC ES 50KG X8SC ES = 400KG X 10% = 440KG
DESARROLLO
CEMENTO
v kg
440 0.012 50 0.1056 0.0053 0.1109 M3/M2
ARENA
1.10 0.012 0.0132 0.00264 0.0158 M3/M2
AGUA
0.29 0.012 0.0035 0.00104 0.00452 M3/M2
MANO DE OBRA
M /O 2DO. METODO
M2 1.80 m2
RENDIMIENTO 0.90 HORA
R/ REAL 2.00
EQUIPOS
transporte
1 1.80
x 1
0.5556
transporte
1 1.00
x 1
1.0000
rendimiento
lavarropa 1 u
M/O
1 U
0.5 HORA
2 R /REAL transporte
1 1.00
x 1
1.0000
base de lavarropa 1.5 1.5 2.25 m2
180 KG/CM2
CEMENTO 6.00 saco
ARENA 0.57 m3
PIEDRA 1.02 m3
AGUA 0.168 m3
m2 m2 espesor
volumen 1 1 0.08 0.08 m3/m2 nota: este volumen se va en 1 m2
CONVERSION DE VOLUMEN DE AGREGADOS A M2
CEMENTO
6 SC 1 M3 0.48 SC 1 m2
X 0.08 M3
0.48 SC
ARENA
0.57 m3 1 m3 0.0456 m3 1 m2
x 0.08 m3
0.0456 m3
PIEDRA
1.02 M3 1 M3 0.0816 M3 1 m2
X 0.08
0.0816 M3
AGUA
0.168 m3 1 m3 0.01344 m3 1 m2
x 0.08 m3
0.01344 m3
MANO DE OBRA
transporte
1 2.25
AREA 2.25 x 1
HORA 2 0.44
R/REAL 1.125 M2/HORA
area 0.2 0.2 0.04 m2
volumen 0.2 0.2 4 0.16 m3
volumen total de riostra 55 0.2 0.2 =
ML H= ANCHO
7.547
0.2
ml 4ml
8.086
M /O 2DO. METODO
2.021 VOLUMEN 2.200 m3 el volumen total de riostra
RENDIMIENTO 10.60 HORA
R/ REAL 0.208
1.217
longitud
EQUIPÒ
concretera y vibrador transporte
1 2.2 m3 1 2.2
tal de estribos x 1 m3 x 1
0.455 0.455
RENDIMIENTO
49.60 kg/m3
92.07 kg/m3
141.67 kg/m3
0.351 u/ml
dimension de estribo
0.1
0.1
0.05
0.05
total 0.3 cm
0.138 kg/ml
ENLUCIDO JARD
1:03
CEMENTO 0.185 KG/M2
ARENA 0.0264 M3/M2
AGUA 0.00754 M3/M2
ARENA 1,10
volumen del mortero en pared AREA EN UNA CARA
0.012 m3/m2 2 0.6 =
0.5 0.6 =
0.5 0.6 =
TOTAL
MANO DE OBRA
M /O 2DO. METODO
M2 1.80 m2
RENDIMIENTO 1.00 HORA
R/ REAL 1.80
transporte
1
x
0.56
maximix 174.47
MANO DE OBRA
AREA 174.47
lumen se va en 1 m2 HORA 40
R/REAL 4.36 M2/HORA
BLOQUEDA
nota: se tomo de una riostra 1M2 ENTREA 12.50
2.2 m3 VO= SENTIDO VERTICAL = 3ML
VO= SENTIDO HORIZONTAL = 5ML
TOTAL 8.00
E= 1,5CM A M ES = 0,015
nota distancia de cada cuarton es a 0,50cm E= PARED 10CM = 0,10
CEMENT. 8 50
DESARROLLO
CEMENTO
v
440 0.012 5.28
ARENA
1.10 0.012
AGUA
0.29 0.012
CHICOTES
MANO DE OBRA
M /O 2DO. METODO
M2 99.00 m2
RENDIMIEN 34.605 HORA
R/ REAL 2.86
EQUIPOS
TRANSPORTE
1 99
x 1
0.010
ENLUCIDO CEMENT. 8
E=2CM 0,02M3/M2
PROPORCION 1:03
CEMENTO
440.00 0.02 8.80
ARENA
1.10 0.02 0.0220
RENDIMIENTO AGUA
SC 1 ML 0.29 0.02 0.0058
RENDIMIENTO
m3 1 ml
RENDIMIENTO
M3 1 ML MANO DE OBRA
M /O 2DO. METODO
RENDIMIENTO M2 99.00 m2
m3 1 ml RENDIMIEN 24.00 HORA
R/ REAL 4.13
CAMINERA 10.07
1:2.5:4.5
180 KG/CM2
CEMENTO 6.00
ARENA 0.57
PIEDRA 2.000
AGUA 0.168
m2
volumen 1
CONV
CEMENTO
6 SC
X
0.48 SC
ARENA
0.57 m3
x
0.0456 m3
PIEDRA
2 M3
X
0.16 M3
AGUA
0.168 m3
x
0.01344 m3
MALLAS
area de plancha
malla 1
15
MANO DE OBRA
M /O 2DO. METODO
M2 10.07
RENDIMIENT 4.00
R/ REAL 2.52
EQUIPOS
compactador pequeño
1 10.07
x 1
0.0993
1.2 M2
0.3 M2
0.3 M2
1.8 M2
1.80 m2
1 m2
volumen
M/O 166.78
conversiòn
8 VIAJE m3
16 HORA 5.0034
0.50 R / REAL x
0.03
M/O
166.78
16
10.42
M2
transporte
1 174.47
x 1
0.0057
PARED CERRAMIENTO 99 m2
bloques
PESO ESPECIFICO DE LA ARENA 1,10
ml E= pared E=mortero volumne del mortero en pared
ML V 8.00 0.10 0.015 0.012 m3/m2
400 10 40 440 KG
kg %
50 0.1056 0.0053 0.1109 M3/M2 rendimiento
1.80 = 7.20 M2
1.80 0.40 4.50 2.00 = 9.00 CHICOTES
CM KG/ml AREA % TOTAL
0.4 0.187 7.20 0.0935 0.005 0.0982 KG/m2
NSPORTE
m2
m2
%
50.00 KG 0.176 0.0088 0.185 KG/m2
M2
4.6 0.6 = 2.76 M2
4.6 0.6 = 2.76 M2
4.55 1= 4.55 M2
80 KG/CM2 TOTAL 10.07 M2
saco
m3 0,52 X 10% SALE 0,57
m3 0,94X10% SALE 1,02
m3
m2 espesor
1 0.08 0.08 m3/m2 nota: este volumen se va en 1 m2
CONVERSION DE VOLUMEN DE AGREGADOS A M2
1 M3 0.48 SC 1 m2
0.08 M3
1 m3 0.0456 m3 1 m2
0.08 m3
1 M3 0.16 M3 1 m2
0.08
1 m3 0.01344 m3 1 m2
0.08 m3
6.25 2.4 15 m2
so en calculo 1 1 1 m2
%
1 = 0.07 1.05 0.070 u /m2
15
DO. METODO
m2
HORA
transporte
1 10.0700
x 1
0.0993
UNIDAD
ML H M2
1.00 0.07 0.07 M2/ML
ENLUCIDO
M2/ML m2 M2/ML
CEMENTO 0.185 0.07 1 0.01295 CEMENTO
ARENA 0.02640 0.07 1 0.00185 ARENA
AGUA 0.00754 0.07 1 0.000528 AGUA
MANO DE OBRA
M /O 2DO. METODO
M2 3.00 ml
RENDIMIENTO 0.50 HORA
R/ REAL 6.000
transporte
1 3.00 m2
x 1 m2
0.3333
m3
0.03 5.0034 conversiòn
m2
m2 166.78 5.0034 m3
166.78 x 8 m3
1 m2 266.67
m3/m2 rendimiento TRANSPORTE
volqueta
1 266.67 m2
x 1 m2
M2 0.004
HORA
R / REAL
pared lateral
ml altura tramo
4 1.8 10 = 72 m2
3.75 1.8 4 = 27 m2
total 99 m2
pared posterior
3.75 1.8 4 = 27 m2
total 99.00 m2
transporte
99.00 m2
1 m2
ENCILLA DE 3 LINEAS 3 ml
REGLA DE TRES
REGLA DE TRES
REGLA DE TRES
Carpinteria Metalica 1.00 puerta
Pasamano Metalicos
Carpinteria de Madera
equipos
transporte
1 1.00 PUERTA
x 1 u
1.0000
rendimiento 1 puerta
RENDIMIENTO
DE CADA INSUMO x puerta
JG DE BATIENTE 1 U LAUREL
JAMBA PARA PUERTA 1 U LAUREL
POLVO MINERAL COLOR CAFÉ O CAOBA 1 LIBRA
POLVO DE TIZA 1 LIBRA M /O
COLA BLANCA 1 LITRO U
MASILLA PLASTICA 1 LIBRA RENDIMIENTO
LIJA # 180 1 PLIEGO R/ REAL
GUAYPE 1 LIBRA calculo para rendimiento en m
ALTO SOLIDO 1 LITRO personal
DILUYENTE 1 GALON Maestro
LACA COLOR CAFÉ 1 LITRO Cerrajero
BISAGRA FRANK DE 3 1/2" 1.5 jg Ayudante
CERRADURA POMO # 838359 STANLEY 1 u
CERRADURA POMO BAÑO 1 u
TORNILLO TRIPA DE PATO 3" 12 u
TACOS FISCHER # 10 12 u
CINTA MASKETING 1 u
equipos
transporte
1 4.00 PUERTA
x 1 PUERTA
0.2500
rendimiento 1 puerta
RENDIMIENTO
DE CADA INSUMO x puerta
JG DE BATIENTE 1 U LAUREL
JAMBA PARA PUERTA 1 U LAUREL
POLVO MINERAL COLOR CAFÉ O CAOBA 1 LIBRA
POLVO DE TIZA 1 LIBRA M /O
COLA BLANCA 1 LITRO U
MASILLA PLASTICA 1 LIBRA RENDIMIENTO
LIJA # 180 1 PLIEGO R/ REAL
GUAYPE 1 LIBRA calculo para rendimiento en m
ALTO SOLIDO 1 LITRO personal
DILUYENTE 1 GALON Maestro
LACA COLOR CAFÉ 1 LITRO Cerrajero
BISAGRA FRANK DE 3 1/2" 1.5 jg Ayudante
CERRADURA POMO # 838359 STANLEY 1 u
CERRADURA PESTILLO MUERTO 1 u
TORNILLO TRIPA DE PATO 3" 12 u
TACOS FISCHER # 10 12 u
CINTA MASKETING 1 u
equipos
transporte
1 4.00 PUERTA
x 1 PUERTA
0.2500
rendimiento 1 puerta
RENDIMIENTO
DE CADA INSUMO x puerta
JG DE BATIENTE 1 U LAUREL
JAMBA PARA PUERTA 1 U LAUREL
POLVO MINERAL COLOR CAFÉ O CAOBA 1 LIBRA
POLVO DE TIZA 1 LIBRA
COLA BLANCA 1 LITRO
MASILLA PLASTICA 1 LIBRA M /O
LIJA # 180 1 PLIEGO U
GUAYPE 1 LIBRA RENDIMIENTO
ALTO SOLIDO 1 LITRO R/ REAL
DILUYENTE 1 GALON calculo para rendimiento en m
LACA COLOR CAFÉ 1 LITRO personal
BISAGRA FRANK DE 3 1/2" 1.5 jg Maestro
CERRADURA POMO # 838359 STANLEY 1 u Cerrajero
CERRADURA PESTILLO MUERTO 1 u Ayudante
TORNILLO TRIPA DE PATO 3" 12 u
TACOS FISCHER # 10 12 u
CINTA MASKETING 1 u
equipos
transporte
1 1.00 PUERTA
x 1 u
1.0000
Nota: esto rubros sacado es cuando se tenga que uno mismo fabricarla
PUERTA TAMBORADAS
CUARTON BATIENTE
EJ: DE UNA PUERTA DE 0,90 X 2,00
0.9 0.9 2 2 0.9 6.7 ml
TUMBADOS
PERFILES
m2 ml
0.7442 3.66
1 x
4.9 ml/m2
conversion
perfil ml
1 6
x 4.9
0.82
nota: como 4,9 ml esta en 1m2 entonce 0,82 perfil es 1m2
1.00 P
4
16 HORAS
1 HORA
2DO. METODO
4.00 u
16.00 HORA
0.250
culo para rendimiento en m/o tiempo
cantidad s / diario j/r subtotal rendimiento subtotal volumen
1 45.67 5.71 260.77 16.00 16.30 4.000
1 3.58 3.58 12.81 16.00 0.80 4.000
1 3.10 3.10 9.62297984 16.00 0.60 4.000
1 PUERTA
4.00 PUERTA
0.308 M2
RENDIMIENTO
3.05 U Batiente/puerta 3.05 CUARTON
2.23 U Batiente/Batiente 2.23 CUARTON
TOTAL 5.27 CUARTON BATIENTE
JAMBA
NOTA: PARA LA JAMBA EN UN CUARTON BATIENTE DE 14CM X 2,2M Y 5CM DE ESPESOR
SALE 8 JAMBA DE 5CM X 2,2 M X 1CM DE ESPESOR SIENDO CEPILLADO EL CUARTON
Y EN UNA PUERTA DE 0,90 X2 ,00 M SE VAN 2,5 JAMBAS EN CADA CARA QUE SERIA
5 JAMBAS POR PUERTA
ENTONCE DE ACUERDO AL NUMERO DE JAMBAS QUE SE VA EN EL CUARTON SACAMOS
EL RENDIMIENTO DEL CUARTON
RENDIMEINTO DEL CUARTON PARA LA JAMBA
1 CUARTON 8 JAMBAS
X 5 JAMBAS
0.625 CUARTON
O. METODO
m2
HORA 62.49
4 horas
1 horas
1er metodo
subtotal rendimiento/ real
65.19 260.77 0.250
25.62 102.49 0.2500
19.25 76.9838387 0.250
4 horas
1 horas
1er metodo
subtotal rendimiento/ real
65.19 260.77 0.250
25.62 102.49 0.2500
19.25 76.9838387 0.250
4 horas
1 horas
1er metodo
subtotal rendimiento/ real
65.19 260.77 0.250
25.62 102.49 0.2500
19.25 76.9838387 0.250
4 HORAS
X HORAS
16 HORAS
4 PUERTAS
X
0.25
1er metodo
subtotal rendimiento/ real
65.19 260.77 0.250
3.20 12.81 0.2500
2.41 9.62297984 0.250
4 HORAS
X
16 HORAS
4 PUERTAS
X
0.25
1er metodo
subtotal rendimiento/ real
65.19 260.77 0.250
25.62 102.49 0.2500
19.25 76.9838387 0.250
4 horas
1 horas
1er metodo
subtotal rendimiento/ real
65.19 260.77 0.250
25.62 102.49 0.2500
19.25 76.9838387 0.250
UARTON BATIENTE
5CM DE ESPESOR
O EL CUARTON
RA QUE SERIA
UARTON SACAMOS
ALUMINIO Y VIDRIO
Dormitorios y baños 17 m2 17
IMPERMEABILIZACION
Tinas de baño 5 m2
Sika top 107 seal
viene en unidades de 5 kg. Y de 25 kg.
kilos m2
2 1 rendimiento
2 kg/m2
equipos
transporte
1 5.00 m2
x 1 m2
0.2000
JARDINERA 2 M2
kilos m2
2 1 rendimiento
2 kg/m2
equipos
transporte
1 2.00 m2
x 1 m2
0.5000
equipos
transporte
1 5.00 m2
x 1 m2
0.20
4.84 M2 12.1 ML
1 M2 X
2.5 ML
conversíón
galon m2
1 6
x 1
0.167 rendimineto
0.167 galon/m2
donde se relaciona
el m2 que da 2,5 ml con el rendimiento de la conversion
0.167 galon 2.5 ml
x 1 ml
0.067
rendimiento
0.067 galon/ml
equipos
transporte
1 12.10 ML
x 1 ML
0.083
M /O 2DO. METODO 17.00
U 17.00 m2 x
RENDIMIENTO 40.00 HORA 0.43
R/ REAL 0.43
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal
Maestro 0.1 45.67 5.71 26.08 40.00 0.65
Ventanero 1 28.63 3.58 102.49 40.00 2.56
Ayudante 1 24.82 3.10 76.983839 40.00 1.92
17.00
9.67
NOTA
Sika fill viene en galon de 4kilos y balde de 20kg.
este producto se pone despues de aplicar sika emulsion dspues de 5 diaS
kilos o galon m2
4 6
1er metodo
volumen subtotal rendimiento/ real
17.000 11.08 26.08 0.425
17.000 43.56 102.49 0.4250
17.000 32.72 76.983839 0.425
m2 40 horas
m2 x
22.75
m2 22.75 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
9.670 11.08 26.08 0.425
9.670 43.56 102.49 0.4250
9.670 32.72 76.983839 0.425
m2 2 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
5.000 65.19 26.08 2.500
5.000 0.00 0.00 #DIV/0!
5.000 192.46 76.983839 2.500
M2 2 HORAS
M2 X HORAS
0.8
m2 0.8 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
2.000 0.00 0.00 #DIV/0!
2.000 0.00 0.00 #DIV/0!
2.000 0.00 0 #DIV/0!
m2 4 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
5.000 32.60 26.08 1.250
5.000 0.00 0.00 #DIV/0!
5.000 96.23 76.983839 1.250
ml 2 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
12.100 157.76 26.08 6.050
12.100 0.00 0.00 #DIV/0!
12.100 465.75 76.983839 6.050
PINTURAS
OBRA GRIS
equipos
transporte
1 449.85 m2
x 1 m2
0.0022
equipos
transporte
1 51.32 m2
x 1 m2
0.0195
equipos
transporte
1 198.21 m2
x 1 m2
0.0050
equipos
transporte
1 198.21 m2
x 1 m2
0.0050
equipos
transporte
1 122.20 m2
x 1 m2
0.0082
EQUIPAMIENTO
Cubierta 141.21 m2
m2 %
141.21 0.05 7.06 galones
conversión
galon m2
7.06 141.21
x 1
0.05 rendimiento
0.050 galon/m2
equipos
transporte
1 141.21 m2
x 1 m2
0.0071
Pintura
Pintura de caucho interior 2 manos
Pared 449.85 m2
m2 %
449.85 0.05 22.4925 galones
conversión
galon m2
22.4925 449.85
x 1
0.05 rendimiento
0.050 galon/m2
equipos
transporte
1 449.85 m2
x 1 m2
0.0022
m2 %
198.21 0.05 9.9105 galones
conversión
galon m2
9.9105 198.21
x 1
0.05 rendimiento
0.050 galon/m2
equipos
transporte
1 198.21 m2
x 1 m2
0.0050
m2 %
51.32 0.05 2.57 galones
conversión
galon m2
2.57 51.32
x 1
0.05 rendimiento
0.050 galon/m2
equipos
transporte
1 51.32 m2
x 1 m2
0.019
m2 %
122.2 0.05 6.11 galones
conversión
galon m2
6.11 122.2
x 1
0.05 rendimiento
0.050 galon/m2
equipos
transporte
1 122.20 m2
x 1 m2
0.0082
galones villa
4 1 rendimiento
4 galon/villa
equipos
transporte
1 1.00 villa
x 1 villa
1.0000
M /O 2DO. METODO 449.85 m2
U 449.85 m2 x
RENDIMIENT 56.00 HORA 8.03
R/ REAL 8.03
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.3 45.67 5.71 78.23 56.00 1.40 449.850
Pintor 1 28.63 3.58 102.49 56.00 1.83 449.850
Ayudante 1 24.82 3.10 76.9838387 56.00 1.37 449.850
449.85 m2
51.32 m2
198.21 m2
122.2
449.85 m2
51.32
1er metodo
subtotal rendimiento/ real
628.43 78.23 8.03
823.30 102.49 8.03
618.41 76.9838387 8.033
56 horas
x
6.39
6.39 horas
1 horas
1er metodo
subtotal rendimiento/ real
628.43 78.23 8.033
823.30 102.49 8.0330
618.41 76.9838387 8.033
24 horas
1 horas
1er metodo
subtotal rendimiento/ real
215.36 26.08 8.259
846.43 102.49 8.2588
635.79 76.9838387 8.259
24 horas
1 horas
1er metodo
subtotal rendimiento/ real
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0 #DIV/0!
24 horas
x
14.80
14.80 horas
1 horas
1er metodo
subtotal rendimiento/ real
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0 #DIV/0!
40 horas
1 horas
1er metodo
subtotal rendimiento/ real
92.06 26.08 3.53
361.81 102.49 3.5303
271.77 76.9838387 3.530
100 horas
1 horas
1er metodo
subtotal rendimiento/ real
117.31 26.08 4.499
922.09 204.98 4.4985
346.31 76.9838387 4.499
60 horas
1 horas
1er metodo
subtotal rendimiento/ real
86.14 26.08 3.304
677.14 204.98 3.3035
0.00 0 #DIV/0!
100 horas
x
11.41
11.41 horas
1 horas
1er metodo
subtotal rendimiento/ real
117.31 26.08 4.499
922.09 204.98 4.4985
0.00 0 #DIV/0!
16 horas
1 horas
1er metodo
subtotal rendimiento/ real
199.16 26.08 7.64
1565.52 204.98 7.64
0.00 0.00 #DIV/0!
8 horas
1 horas
1er metodo
subtotal rendimiento/ real
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0 #DIV/0!
REVESTIMIENTO
PARED CANTIDAD
Ceramica de 20x30 74.58 m2
dimension
baño de empleada 8.99 m2 25x33
baño de visita 5.59 m2 25x33
baño master 22 m2 25x33
Baño (dormitorio 2) 13 m2 25x33
Baño (dormitorio 3) 15 m2 25x33
lavanderia 6 m2 25x33
cocina 4 m2 30x45
total 74.58 m2
m2 m2 m2 rendimiento
74.58 1.02 73.12 caja 74.58 0.98039216
equipos
transporte
1 74.58 m2
x 1 m2
0.0134
Binda standard saco de 20 kilos
kilos
1 saco 4 m2
x 1 m2 rendimiento
0.25 0.25 sc/m2
CENEFA 23.26 ML
BAÑOS
CONVERSION cenefa 0.2 ml
Cenefa de 7x20cm graiman
1 ml 5 u
0.2 ml
rendimiento
5 pieza/ml
equipos
transporte
1 23.26 ml
x 1 ml
0.0430
CONVERSION
De Area de m2 a ml
m2 ml
cenefa 0.070 23.26 1.63 m2
m2 ml
1.63 23.26
1 x
14.28571 ml
aquí nos sale que en 1m2 se va 12,5 ml
1 saco 8 m2
x 1 m2 rendimiento
0.125 0.125 sco/m2
1caja = 1.12 m2
m2 m2 m2 rendimiento
16.23 1.12 14.49 caja 16.23 0.89
equipos
transporte
1 16.23 m2
x 1 m2
0.062
PISO
PORCELANATO 50X50 148 m2
m2 m2 m2 rendimiento
148 1.75 84.57 caja 148 0.57
equipos
transporte
1 148.00 m2
x 1 m2
0.007
ESCALERA
PORCELANATO 50X50
CANTIDAD
Escalera 8.62 m2 entra en 15.25 ml
conversion 1 caja = 1.75
m2 ml m2 ml
8.62 15.25 1 1.77
1 x 1.75 x
1.77 ml = 1m2 3.10 ml
caja ml
1 3.10
x 1 rendimineto
0.323 0.323 caja/ml
equipos
transporte
1 15.25 ml
x 1 ml
0.07
RASTRERA
PORCELANATO 7X50
CANTIDAD
Rastrera 6.84 m2 entre en 97.94 ml
conversion 1caja = 1.75
m2 ml m2 ml
6.84 97.94 1 14.32
1 x 1.75 x
14.32 ml = 1m2 25.1 ml
caja ml
1 25.1
x 1 rendimineto
0.0399 0.0399 caja/ml
MESON
plancha ml
2.38 5.71
x 1
0.42 rendimiento
0.42 plcha/ml
equipos
transporte
1 5.71 ml
x 1 ml
0.1751
CANTIDAD
FACHADA ( PLAQUETA ) 20.95 M2
Fachaleta
Plaqueta natural gres 10x 30 cm alfadomus
area de palqueta 0.030 m2
conversion
1 m2 33.33 m2
0.03 m2
rendimiento
33.33 pieza/m2
equipos
transporte
1 20.95 m2
x 1 m2
0.0477
Binda fix (3mm)
porcelana funda de 2 kilos
1 saco 8 m2
x 1 m2 rendimiento
0.125 0.125 funda/m2
Piso entrada
Grano lavado 2 m2
grano # 3 lavado
4 saco 4 m2
x 1 m2
1
rendimiento
1 saco/m2
MANO DE OBRA
equipos
transporte
1 2.00 m2
x 1 m2
1
MANO DE OBRA
cja/m2
Binda fix (3mm)
porcelana funda de 2 kilos
1 funda 8 m2
x 1 m2 rendimiento
0.125 0.125 fda/m2
MANO DE OBRA
de acuerdo a una tabla de sika el saco de pegar ceramica sale de la sigiuente manera:
funda ml
0.125 14.2857143
x 1
0.00875 rendimiento 0.0088 funda/ml
MANO DE OBRA
MANO DE OBRA
1 M2 0.5 HORA
X 1 HORAS
2
2 m2 1 hora
Nota: este calculo de regla de tres se lo hace cuando se tiene con mas m2
2.00 m2 1 horas
X m2 1 hora
2.00
1er metodo
subtotal volumen subtotal rendimiento/ real
26.08 2.000 52.15 26.08 2.000
102.49 2.000 204.98 102.49 2.0000
38.49 2.000 76.98 38.491919349 2.000
m2 40 horas 48
1 horas
1er metodo
volumen subtotal rendimiento/ real
74.580 243.10 130.38 1.86
74.580 191.09 102.49 1.86
74.580 143.54 76.9838387 1.86
ml 8 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
23.260 75.82 26.08 2.908
23.260 297.99 102.49 2.9075
23.260 223.83 76.9838387 2.908
m2 8.00 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
16.230 52.90 26.08 2.029
16.230 207.92 102.49 2.029
16.230 156.18 76.9838387 2.029
1 funda 8 m2
x 1 m2 rendimiento
0.125 0.125 sco/m2
16.23 8.00
148 X
m2 73.0 horas 73.0
1 horas
1er metodo
volumen subtotal rendimiento/ real
148.000 20.89 10.30 2.029
148.000 201.71 99.43 2.0288
148.000 49.05 24.1795 2.029
ml 8 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
15.250 49.71 26.08 1.906
15.250 195.37 102.49 1.9063
15.250 146.75 76.9838387 1.906
ml 34 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
97.940 29.67 10.30 2.881
97.940 143.21 49.71 2.8806
97.940 69.65 24.1795 2.881
ml 16 horas
1 horas
1er metodo
volumen subtotal rendimiento/ real
5.710 9.31 26.08 0.357
5.710 36.58 102.49 0.3569
5.710 27.47 76.9838387 0.357
m2 16 horas 24
1 horas
1er metodo
volumen subtotal rendimiento/ real
20.950 34.14 26.08 1.309
20.950 134.20 102.49 1.3094
20.950 100.80 76.9838387 1.309
esponja gris
4 m2
1 m2
PASANTE DE TUBOS CANTIDAD UNIDAD
tuberia pasantes
0.200 3
x 1
0.067 tbr/pasantes 4" DESAGUE
tuberia
0.27 4
x 1
0.0667 tbr/pasantes 2" DESAGUE
tuberia de agua
0.17 5.0 PASANTE
x 1.0
0.0333 tbr/pasantes 1/2" AA.PP
ejemplo
1
x
0.67
transporte
1 13.00 puntos
x 1 puntos
0.0769
ejemplo
1
x
0.67
transporte
1 6.00 puntos
x 1 puntos
0.1667
PUNTOS EN PISO Y PAREDES BANOS
Redes planta baja cantidad
tuberia de 2" 9.00 ml
Redes planta alta cantidad
tuberia de 2" 4 ml
total 13.00 ml
equipos transporte
1 19.00 PTS
x 1 PTS
0.0526
tuberia de 4" 4 ml
codo de 4" 2 u
yee de 4"
union de 4"
equipos transporte
1 4.00 ml
x 1 ml
0.2500
tuberia de 4" 6 ml
codo de 4" 2 u
equipos transporte
1 6.00 ml
x 1 ml
0.1667
equipos transporte
1 4.32 m3
x 1 m3
0.2315
equipos transporte
1 24.00 ml
x 1 ml
0.0417
PUNTOS (PARED )
20
PLANTA BAJA
AGUA FRIA
Redes planta baja PUNTOS CANTIDAD
tuberia de 3/4" 0.00 0.00
tuberia de 1/2" 10.00 13.00
reductor de 3/4" a 1/2"
codo de 3/4"
codo de 1/2"
permatex
teflon
tee de 1/2"
llave de paso 1/2"
neplo de 1/2" 5cm
tapon macho de 1/2"
tapon hembra de 1/2"
neplo perdido de 1/2"
tee 3/4"
union de 1/2"
union de 3/4"
neplo de 3/4" perdido
neplo de 3/4 de 5 cm
PAREDES
MANO DE OBRA
M /O 2DO. METODO
ptos 10.00 puntos
RENDIMIENTO 16.00 HORA
R/ REAL 0.63
calculo para rendimiento en m/o
personal cantidad s / diario j/r
Maestro 0.5 45.67 5.71
Gafitero 1 28.63 3.58
Ayudante 1 24.82 3.10
equipos transporte
1 10.00 puntos
x 1 ml
0.100
tuberia de 3/4" 0 ml
tuberia de 1/2" 13.00 ml
reductor de 3/4" a 1/2"
codo de 3/4"
codo de 1/2"
permatex
teflon
tee DE 1/2"
union de 1/2" polimex
PAREDES
MANO DE OBRA
M /O 2DO. METODO
M2 6.00 PUNTOS
RENDIMIENTO 7.38 HORA
R/ REAL 0.81
calculo para rendimiento en m/o
personal cantidad s / diario j/r
Maestro 0.1 45.67 5.71
Gafitero 1 28.63 3.58
Ayudante 1 24.82 3.10
equipos transporte
1 6.00 puntos
x 1 puntos
0.1667
PRUEBA DE PRESION
30 puntos
tapón macho
equipos transporte
1 30.00 puntos
x 1 punto
0.0333
cantidad unidad
bomba de 1/2 h.p 1 1
Tanque de presion 1 1
equipos transporte
1 1
x 1
1
CALENTADOR DE AGUA
calentador de agua 1 U
equipos transporte
1 1
Punto de cisterna 1
equipos transporte
1 1
x 1
1.00
LAVAMANOS CON PEDESTAL Y SOBREPUESTO
cantidad
LAVAMANO BLANCO 1
LAVAMANO COLOR SUAVE 3
LAMANO COLOR FUERTE 1
equipos transporte
1 5
x 1
0.20
INODORO 5 U
cantidad
INODORO BLANCO 1
INODORO COLOR SUAVE 3
INODORO COLOR FUERTE 1
equipos transporte
1 5
x 1
0.20
BIDET 2 U
cantidad
BIDET COLOR SUAVE 1
BIDET COLOR SUAVE 1
equipos transporte
1 2
x 1
0.50
TINA 1U
cantidad
TINA COLOR SUAVE 1
TINA COLOR SUAVE 1
equipos transporte
1 1
x 1
1.00
TINAS
HIDROMASAJE 1 U
cantidad
TINA COLOR SUAVE 1
equipos transporte
1 1
x 1
1.00
GRIFERIA
Mezcladora ducha 2
cantidad
Mezcladora ducha y tina 1
Mezcladora ducha y tina 1
equipos transporte
1 2
x 1
0.50
GRIFERIA
Ducha mono comando
Ducha sencilla
cantidad
Griferia ducha 1
Griferia ducha /tina 1
equipos transporte
1 4
x 1
0.25
cantidad
Griferia lavamano 1
Griferia lavamano visita 1
Griferia lavamano 1
Griferia lavamano 1
equipos transporte
1 3
x 1
0.33
cantidad
Griferia fregadero 1
Sifon de 11/2" 1
Sifon de 11/2" 1
Desague de 1 1/2" 1
Desague de 1 1/2" 1
equipos transporte
1 1
x 1
1.00
cantidad
Lavadero 1
equipos transporte
1 1
x 1
1.00
Juego de accesorios de baños 5
cantidad
baño master 1
baño 2 1
baño3 1
baño4 1
Baño visita 1
equipos transporte
1 5
x 1
0.20
cantidad
llave de manguera 1
sifon de 2" 1
desague de 2" 1
equipos transporte
1 1
x 1
1.00
cantidad
llave de manguera 2
equipos transporte
1 2
x 1
0.50
INSTA.SANITARIA OBRA GRIS
total 12 pasantes
# material
3 ml 0.20 tbr/ml
3 ml 0.27 tbr/ml
6 ml 0.17 tbr/ml
equipos
transporte
1 12.00 pasantes
x 1 pasantes
0.0833
REDES CONTRAPISOS
# regla
PUNTOS material cantidad unidad de tres
10.00 2 tubo 10.00 puntos
3.00 0.67 tubo 3.00 puntos
3.00 puntos
3.00 puntos
3.00 puntos
3.00 puntos
10.00 puntos
10.00 puntos
0.00 puntos
13.00 puntos
3.00 puntos
10.00 puntos
REDES LOSA
4" ejemplo
tubo 3 ml 1 tubo 3
2 ml x 1
tubo 0.33 tubo
# regla
PUNTOS material cantidad unidad de tres
4.00 0.33 tubo 4.00 puntos
2.00 0.67 tubo 2.00 puntos
2.00 puntos
2.00 puntos
2.00 puntos
2.00 puntos
4.00 puntos
4.00 puntos
0.00 puntos
6.00 puntos
2.00 puntos
4.00 puntos
PAREDES
puntos 19 general
CONVERSION RENDIMIENTO
5 PTS 1.00 CD/PTS
5 PTS 0.20 YEE/PTS
5 PTS 0.20 CD/PTS
5 PTS 0.80 YEE/PTS
5 PTS 0.20 TEE/PTS
5 PTS 0.40 TEE/PTS
5 PTS 1.20 UNION/PTS
14 PTS 1.29 CD/PTS
14 PTS 0.29 CD/PTS
14 PTS 0.14 YEE/PTS
19 PTS 0.03 KLP/PTS
14 PTS 0.21 UNION/PTS
14 PTS 0.14 TEE/PTS
ml
# ML rendimiento
3 ml 1.3 4 0.333 tbr/ml
2 4 0.5 cd/ml
1 4 0.25 yee/ml
1 4 0.25 union/ml
ml
# ML RENDIMIENTO
3 ml 2 6 0.333 tbr/ml
2 6 0.333 cd/ml
M3
m3
compactador pequeño
1 dia 4.32 m3
x 1 m3
0.2315 rendimiento
ml
# ML RENDIMIENTO
3 ml 8 24 0.333 tbr/ml
4 24.00 0.1667 union/ml
1 24.00 0.0417 plg/ml
# regla
13.00 puntos material cantidad unidad de tres
ml 3.00 0.83 tubo 3.00
ml 10.00 2.33 tubo 10.00
5.00 3.00 puntos
3.00 10.00 puntos
3.00 3.00 puntos
3.00 3.00 puntos
3.00 10.00 puntos
4.00 3.00 puntos
4.00 10.00 puntos
2.00 3.00 puntos
2.00 10.00 puntos
2.00 10.00 puntos
1 10.00 puntos
1 13.00 puntos
4 13.00 puntos
# regla
6.00 puntos material cantidad unidad de tres
ml 4.00 0.83 tubo 4.00
ml 2.00 0.50 tubo 2.00
3.00 4.00 puntos
1.00 2.00 puntos
3.00 4.00 puntos
2.00 2.00 puntos
2.00 4.00 puntos
2.00 4.00 puntos
2.00 2.00 puntos
1.00 2.00 puntos
2.00 4.00 puntos
1.00 6.00 puntos
2 6.00 puntos
TOS (PARED )
10.00 PUNTOS
tiempo
subtotal rendimiento subtotal volumen subtotal
130.38 16.00 8.15 10.000 81.49 130.38
102.49 16.00 6.41 10.000 64.06 102.49
76.9838386981 16.00 4.81 10.000 48.11 76.9838387
AGUA CALIENTE C
# regla
13.00 puntos material cantidad unidad de tres
ml 3.00 0.50 tubo 3.00
ml 10.00 2.33 tubo 10.00
2.00 3.00 puntos
3.00 10.00 puntos
3.00 3.00 puntos
1.50 3.00 puntos
3.00 10.00 puntos
1.00 3.00 puntos
1.00 10.00 puntos
0.50 3.00 puntos
1.00 3.00 puntos
2.00 10.00 puntos
1 10.00 puntos
1 13.00 puntos
4 13.00 puntos
1 3.00 puntos
AGUA CALIEN
# regla
6.00 puntos material cantidad unidad de tres
ml 4.00 0.83 tubo 4.00
ml 2.00 0.50 tubo 2.00
2.00 4.00 puntos
3.00 2.00 puntos
3.00 4.00 puntos
1.50 4.00 puntos
3.00 2.00 puntos
1.00 4.00 puntos
1.00 2.00 puntos
0.50 4.00 puntos
1.00 4.00 puntos
2.00 2.00 puntos
1 2.00 puntos
1 6.00 puntos
4 6.00 puntos
1 4.00 puntos
PUNTOS
tiempo
subtotal rendimiento subtotal volumen subtotal
26.08 7.38 3.53 6.000 21.19 26.08
102.49 7.38 13.88 6.000 83.27 102.49
76.9838386981 7.38 10.42 6.000 62.55 76.9838387
tuberia # material ml rendimiento
6 ml 1 6.00 0.17 tbr/ml
6 ML 0 0.00 #DIV/0! tbr/ml
1 0.00 #DIV/0! codo/ml
1 0.00 #DIV/0! union/ml
2.00 6.00 0.3333 codo/ml
1.00 6.00 0.1667 union/ml
1.00 6.00 0.1667 nudo/ml
1.000 6.00 0.1667 permatex/ml
3.00000 6.00 0.5 teflon/ml
1 6.00 0.1667
1 6.00 0.1667 CPRTA/ML
TAPON
# material PUNTOS rendimiento
30 30 1 tapon/puntos
EQUIPAMIENTO
E AGUA 1 U
rendimiento
1
1
1 U
rendimiento
u
cantidad unidad rendimiento
1 1 1.00
1 1 1.00
1 1 1.00
1 1 1.00
unidad rendimiento
5 0.20
5 0.60
5 0.20
unidad rendimiento
5 0.20
5 0.6
5 0.20
unidad rendimiento
2 0.5
2 0.5
unidad rendimiento
1 1
1 1
unidad rendimiento
1 1
jgo
unidad rendimiento
2 0.5 master
2 0.5 hijo
4 jgo
unidad rendimiento
4 0.25 hijo
4 0.25 master
3 jgo
unidad rendimiento
3 0.33
3 0.33
3 0.33
3 0.33
ra de 6" codigo : 7107-50 1 JGO
JGO
unidad rendimiento
1 1
1 1
1 1
1 1
1 1
u GLOBAL
unidad rendimiento
1 1
jgo
unidad rendimiento
5 0.20
5 0.20
5 0.20
5 0.20
5 0.20
unidad rendimiento
1 1
1 1
1 1
unidad rendimiento
2 1
MANO DE OBRA
M /O 2DO. METODO
U 12.00 PASANTE
RENDIMIENTO 0.50 HORA
R/ REAL 24.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 0.50
Gafitero 1 28.63 3.58 102.49 0.50
Ayudante 1 24.82 3.10 76.9838386981 0.50
ml
ml
RENDIMIENTO
0.20 tub/pts
0.22 tub/pts
0.00 cd/pts MANO DE OBRA
0.00
0.00 M /O 2DO. METODO
0.00 yee 4-2/pts pts 13.00
0.00 cd/pts RENDIMIENTO 2
0.00 cd/pts R/ REAL 6.5
0.00
0.00 kp/pts
0.00 u/pts
0.00 u/pts
2"
ml
ml
RENDIMIENTO
0.08 tub/pts
0.33 tub/pts
0.00 cd/pts MANO DE OBRA
0.00
0.00 M /O 2DO. METODO
0.00 yee 4-2/pts pts 6.00
0.00 cd/pts RENDIMIENTO 0.92
0.00 cd/pts R/ REAL 6.50
0.00
0.00 kp/pts
0.00 u/pts
0.00 u/pts
MANO DE OBRA
M /O 2DO. METODO
ml 19.00 Puntos
RENDIMIENTO 16.00 HORA
R/ REAL 1.188
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.5 45.67 5.71 130.38 16.00
Electrico 1 28.63 3.58 102.49 16.00
Ayudante 1 24.82 3.10 76.983838698102 16.00
MANO DE OBRA
M /O 2DO. METODO
ml 4.00 ml
RENDIMIENTO 0.50 HORA
R/ REAL 8.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.5 45.67 5.71 130.38 0.50
Electrico 1 28.63 3.58 102.49 0.50
Ayudante 1 24.82 3.10 76.983838698102 0.50
MANO DE OBRA
M /O 2DO. METODO
M2 6.00 Puntos
RENDIMIENTO 0.75 HORA
R/ REAL 8.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.5 45.67 5.71 130.38 0.75
Electrico 1 28.63 3.58 102.49 0.75
Ayudante 1 24.82 3.10 76.983838698102 0.75
MANO DE OBRA
M /O 2DO. METODO
4.32 m3
RENDIMIENTO 4.00 HORA
R/ REAL 1.080
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 4.00
Electrico 1 28.63 3.58 102.49 4.00
Ayudante 1 24.82 3.10 76.983838698102 4.00
MANO DE OBRA
M /O 2DO. METODO
24.00 ml
RENDIMIENTO 4.00 HORA
R/ REAL 6.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 4.00
Electrico 1 28.63 3.58 102.49 4.00
Ayudante 1 24.82 3.10 76.983838698102 4.00
3/4"
6 ml
14.00 ml
RENDIMIENTO
puntos 0.28 tub/pts
puntos 0.233 tub/pts
1.67 cd/pts MANO DE OBRA
0.30 cd/pts
1.00 npl/pts M /O 2DO. METODO
1.00 te/pts pts 13.00
0.30 te/pts RENDIMIENTO 4.00
1.33 u/pts R/ REAL 3.25
0.40 u/pts
0.67 te/pts
0.20 te/pts transporte
0.20 n/pts 1 13.00
0.1 npl/pts x 1
0.08 per/pts 0.0769
0.31 teflon/pts
3/4"
6 ml
3.00 ml
RENDIMIENTO
puntos 0.2083 tub/pts
puntos 0.250 tub/pts
0.75 cd/pts MANO DE OBRA
0.50 cd/pts
0.75 npl/pts M /O 2DO. METODO
1.00 te/pts pts 6.00
0.50 te/pts RENDIMIENTO 1.8460
0.50 u/pts R/ REAL 3.25
1.00 u/pts
0.50 te/pts
0.50 te/pts transporte
0.17 n/pts 1 6.00
0.33 npl/pts x 1
0.1667
PUNTOS (PARED )
M /O 2DO. METODO
ptos 4.00 puntos
1er metodo RENDIMIENTO 6.4 HORA
rendimiento/ real R/ REAL 0.63
0.625 calculo para rendimiento en m/o
0.6250 personal cantidad s / diario
0.625 Maestro 45.67 45.67
Gafitero 28.63 28.63
Ayudante 24.82 24.82
equipos transporte
1.000 4.00
x 1
0.250
3/4"
6 ml
14.00 ml
RENDIMIENTO
puntos 0.17 tub/pts
puntos 0.233 tub/pts
0.67 cd/pts MANO DE OBRA
0.30 cd/pts
1.00 npl/pts M /O 2DO. METODO
0.50 te/pts pts 13.00
0.30 te/pts RENDIMIENTO 4.00
0.33 u/pts R/ REAL 3.25
0.10 u/pts
0.17 te/pts
0.33 npl/pts transporte
0.20 n/pts 1 13.00
0.1 npl/pts x 1
0.08 per/pts 0.0769
0.31 teflon/pts
0.33 teflon/pts
3/4"
6 ml
3.00 ml
RENDIMIENTO
puntos 0.21 tub/pts
puntos 0.250 tub/pts
0.50 cd/pts MANO DE OBRA
1.50 cd/pts
0.75 npl/pts M /O 2DO. METODO
0.38 te/pts pts 6.00
1.50 te/pts RENDIMIENTO 1.85
0.25 u/pts R/ REAL 3.25
0.50 u/pts
0.13 te/pts
0.25 npl/pts transporte
1.00 n/pts 1 6.00
0.5 npl/pts x 1
0.17 per/pts 0.1667
0.67 teflon/pts
0.25 teflon/pts
AGUA CALIENTE PLANTA ALTA 4
REDES PLANTA ALTA CANTIDAD UNIDAD TUBERIA
tuberia de 3/4" 0 ml 6
tuberia de 1/2" 13.00 ml 6
reductor de 3/4" a 1/2"
codo de 3/4"
codo de 1/2"
TEE 1/2"
teflon
permatex
union de 1/2" polimex
PAREDES
MANO DE OBRA
M /O 2DO. METODO
M2 4.00 ml
1er metodo RENDIMIENTO 4.92 HORA
rendimiento/ real R/ REAL 0.81
0.813 calculo para rendimiento en m/o
0.8125 personal cantidad s / diario
0.813 Maestro 0.1 0
Gafitero 1 0.00
Ayudante 1 0.00
equipos transporte
1.000 4.00
x 1
0.2500
MANO DE OBRA
M /O 2DO. METODO
M2 6.00 ml
RENDIMIENTO 1.41 HORA
R/ REAL 4.3
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 1.41
Gafitero 1 28.63 3.58 102.49 1.41
Ayudante 1 24.82 3.10 76.9838386981 1.41
MANO DE OBRA
M /O 2DO. METODO
30.00 GBL
RENDIMIENTO 8.00 HORA
R/ REAL 3.750
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 8.00
Gafitero 1 28.63 3.58 102.49 8.00
Ayudante 1 24.82 3.10 76.9838386981 8.00
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 1.00 global
R/ REAL 1.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 1.00
Gafitero 1 28.63 3.58 102.49 1.00
Ayudante 1 24.82 3.10 76.9838386981 1.00
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 1.000 global
R/ REAL 1.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 1.00
Gafitero 1 3.58 3.58 12.81 1.00
Ayudante 1 24.82 3.10 76.9838386981 1.00
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 1.00 global
R/ REAL 1.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 1.00
Gafitero 1 28.63 3.58 102.49 1.00
Ayudante 1 24.82 3.10 76.9838386981 1.00
MANO DE OBRA
M /O 2DO. METODO
5.00 u
RENDIMIENTO 5.00 HORA 8
R/ REAL 1.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 5.00
Gafitero 1 28.63 3.58 102.49 5.00
Ayudante 1 24.82 3.10 76.983838698102 5.00
MANO DE OBRA
M /O 2DO. METODO
5.00 u 3
RENDIMIENTO 5.00 HORA 8
R/ REAL 1.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 5.00
Gafitero 1 28.63 3.58 102.49 5.00
Ayudante 1 24.82 3.10 76.9838386981 5.00
MANO DE OBRA
M /O 2DO. METODO
2.00 u
RENDIMIENTO 2.00 HORA
R/ REAL 1.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 2.00
Gafitero 1 28.63 3.58 102.49 2.00
Ayudante 1 24.82 3.10 76.983838698102 2.00
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 3.00 HORA
R/ REAL 0.33
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 3.00
Gafitero 1 28.63 3.58 102.49 3.00
Ayudante 1 24.82 3.10 76.983838698102 3.00
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 3.00 HORA
R/ REAL 0.33
MANO DE OBRA 2
X
1.00
M /O 2DO. METODO
2.00 u
RENDIMIENTO 2.00 HORA
R/ REAL 1.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 2.00
Gafitero 1 28.63 3.58 102.49 2.00
Ayudante 1 24.82 3.10 76.983838698102 2.00
MANO DE OBRA
M /O 2DO. METODO 4
4.00 u x
RENDIMIENTO 4.00 hora 1.00
R/ REAL 1.00
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 4.00
Gafitero 1 28.63 3.58 102.49 4.00
Ayudante 1 24.82 3.10 76.9838386981 4.00
MANO DE OBRA
3
M /O 2DO. METODO X
3.00 u 1.00
RENDIMIENTO 3.00 HORA
R/ REAL 1.00
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 1 45.67 5.71 260.77 3.00
Gafitero 1 28.63 3.58 102.49 3.00
Ayudante 1 24.82 3.10 76.983838698102 3.00
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 1.00 HORA GLOBAL
R/ REAL 1.000
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 0.45 HORA
R/ REAL 2.222
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 0.45
Gafitero 1 28.63 3.58 102.49 0.45
Ayudante 1 24.82 3.10 76.983838698102 0.45
MANO DE OBRA
M /O 2DO. METODO
5.00 u
RENDIMIENTO 2.25 HORA
R/ REAL 2.222
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento
Maestro 0.1 45.67 5.71 26.08 2.25
Gafitero 1 28.63 3.58 102.49 2.25
Ayudante 1 24.82 3.10 76.9838386981 2.25
MANO DE OBRA
M /O 2DO. METODO
1.00 u
RENDIMIENTO 0.45 HORA
R/ REAL 2.222
MANO DE OBRA
M /O 2DO. METODO
2.00 u
RENDIMIENTO 0.30 HORA
R/ REAL 6.667
12.00 PASANTE 0.5 horas
x 1 horas
24.00
1er metodo
subtotal PASANTE subtotal rendimiento/ real
52.15 12.000 625.84 26.08 24.000
204.98 12.000 2459.73 102.49 24.0000
153.97 12.000 1847.61 76.983838698102 24.000
19.00 Puntos 16 horas
x 1 horas
1.19
1er metodo
subtotal volumen subtotal rendimiento/ real
8.15 19.000 154.83 130.38 1.188
6.41 19.000 121.71 102.49 1.1875
4.81 19.000 91.42 76.9838386981014 1.188
4.00 ml 0.5 horas
x 1 horas
8.00
1er metodo
subtotal volumen subtotal rendimiento/ real
260.77 4.000 1043.07 130.38 8.000
204.98 4.000 819.91 102.49 8.0000
153.97 4.000 615.87 76.9838386981014 8.000
1er metodo
subtotal volumen subtotal rendimiento/ real
173.85 6.000 1043.07 130.38 8.000
136.65 6.000 819.91 102.49 8.0000
102.65 6.000 615.87 76.9838386981014 8.000
4.32 m3 4 horas
x 1 horas
1.08
1er metodo
subtotal volumen subtotal rendimiento/ real
6.52 4.320 28.16 26.08 1.080
25.62 4.320 110.69 102.49 1.0800
19.25 4.320 83.14 76.9838386981014 1.080
24.00 ml 4 horas
x 1 horas
6.00
1er metodo
subtotal UNIDAD subtotal rendimiento/ real
6.52 24.000 156.46 26.08 6.000
25.62 24.000 614.93 102.49 6.0000
19.25 24.000 461.90 76.9838386981014 6.000
DO. METODO
HORA
puntos
puntos
DO. METODO
puntos
puntos
0.63 pts 1
4 x
6.4
4.00 PUNTOS 6.4
x 1
0.63
tiempo
j/r subtotal rendimiento subtotal volumen subtotal
5.71 11910.39 6.40 1861.00 4.000 7443.99
3.58 2934.68 6.40 458.54 4.000 1834.17
3.10 1910.4881 6.40 298.51 4.000 1194.06
puntos
puntos
DO. METODO
HORA
puntos
puntos
DO. METODO
HORA
puntos
puntos
PUNTOS
UNIDAD MATERIAL PUNTOS RENDIMIENTO
0
4
ml 0 0 #DIV/0! tbr/ptos
ml 2.17 4.00 0.542 tbr/pts
1.00 4.00 0.250 reductor/pts
0.00 0 0.000 cdo/pts
6.00 4.00 1.500 cdo/pts
2.00 4.00 0.500 tee/pts
1.00 4.00 0.250 teflon/pts
1 4.00 0.250 prtx/pts
2 4.00 0.500 union/pts
tiempo
j/r subtotal rendimiento subtotal volumen subtotal
5.71 0.00 4.92 0.00 4.000 0.00
3.58 0.00 4.92 0.00 4.000 0.00
3.10 0 4.92 0.00 4.000 0.00
puntos
puntos
1er metodo
subtotal volumen subtotal rendimiento/ real
18.49 6.000 110.97 26.08 4.255
72.69 6.000 436.12 102.49 4.2553
54.60 6.000 327.59 76.983838698102 4.255
1er metodo
subtotal volumen subtotal rendimiento/ real
3.26 30.000 97.79 26.08 3.750
12.81 30.000 384.33 102.49 3.7500
9.62 30.000 288.69 76.983838698102 3.750
1er metodo
subtotal u subtotal rendimiento/ real
260.77 1.000 260.77 260.77 1.000
102.49 1.000 102.49 102.49 1.0000
76.98 1.000 76.98 76.983838698102 1.000
1er metodo
subtotal global subtotal rendimiento/ real
260.77 1.000 260.77 260.77 1.000
12.81 1.000 12.81 12.81 1.0000
76.98 1.000 76.98 76.983838698102 1.000
1er metodo
subtotal global subtotal rendimiento/ real
260.77 1.000 260.77 260.77 1.000
102.49 1.000 102.49 102.49 1.0000
76.98 1.000 76.98 76.983838698102 1.000
1er metodo
subtotal volumen subtotal rendimiento/ real
52.15 5.000 260.77 260.77 1.000
20.50 5.000 102.49 102.49 1.0000
15.40 5.000 76.98 76.9838386981014 1.000
1er metodo
subtotal volumen subtotal rendimiento/ real
52.15 5.000 260.77 260.77 1.000
20.50 5.000 102.49 102.49 1.0000
15.40 5.000 76.98 76.983838698102 1.000
1er metodo
subtotal U subtotal rendimiento/ real
130.38 2.000 260.77 260.77 1.000
51.24 2.000 102.49 102.49 1.0000
38.49 2.000 76.98 76.9838386981014 1.000
1er metodo
subtotal volumen subtotal rendimiento/ real
86.92 1.000 86.92 260.77 0.333
34.16 1.000 34.16 102.49 0.3333
25.66 1.000 25.66 76.9838386981014 0.333
U 2 HORA
1 HORA
1er metodo
subtotal volumen subtotal rendimiento/ real
13.04 2.000 26.08 26.08 1.000
51.24 2.000 102.49 102.49 1.0000
38.49 2.000 76.98 76.9838386981014 1.000
jgo 4 hora
1 hora
1er metodo
subtotal volumen subtotal rendimiento/ real
65.19 4.000 260.77 260.77 1.000
25.62 4.000 102.49 102.49 1.0000
19.25 4.000 76.98 76.983838698102 1.000
JGO 3 HORA
1 HORA
1er metodo
subtotal volumen subtotal rendimiento/ real
86.92 3.000 260.77 260.77 1.000
34.16 3.000 102.49 102.49 1.0000
25.66 3.000 76.98 76.9838386981014 1.000
1er metodo
subtotal volumen subtotal rendimiento/ real
57.95 1.000 57.95 26.08 2.222
227.75 1.000 227.75 102.49 2.2222
171.08 1.000 171.08 76.9838386981014 2.222
1er metodo
subtotal volumen subtotal rendimiento/ real
11.59 5.000 57.95 26.08 2.222
45.55 5.000 227.75 102.49 2.2222
34.22 5.000 171.08 76.983838698102 2.222
horas
horas
horas
1er metodo
rendimiento/ real
11910.39 0.625
2934.68 0.6250
1910.4881 0.625
horas
horas
horas
1er metodo
rendimiento/ real
0.00 #DIV/0!
0.00 #DIV/0!
0 #DIV/0!
PUNTO ELECTRICOS OBRA GRIS
tuberias de 1/2
ml ml ptos ptos
163.00 3 54.33 u 1.00 33.00
caja octogonal grande de 1/2
cantidad pts pts rendiminetos
33 1 33.00 1 cj/pts
codo de 1/2
cantidad pts pts rendiminetos
26 1 33.00 0.78787879 cd/pts
conectores 1/2
cantidad pts pts rendiminetos
66 1 33.00 2 ctrs/pts
union de 1/2
cantidad pts pts rendiminetos
12 1 33.00 0.36 union/pts
caja rectangular
cantidad pts pts rendiminetos
33 1 33.00 1 cj/pts
CONMUTACION 2 PTS
5 ml 3 ml 1.67
tuberias de 1/2
seser pts pts rendiminetos
1.67 1 2.00 0.83 TBR/pts
codo de 1/2
cantidad pts pts rendiminetos
1 1 2.00 0.50 cd/pts
conectores 1/2
cantidad pts pts rendiminetos
4 1 2.00 2 ctrs/pts
caja rectangular
cantidad pts pts rendiminetos
2 1 2.00 1 cj/pts
TIMBRE 2 PTS
10 ml 3 ml 3.3
tuberias de 1/2
cantidad pts pts rendiminetos
3.33 1 2.00 1.67 TBR/pts
codo de 1/2
cantidad pts pts rendiminetos
2 1 2.00 1.00 cd/pts
conectores 1/2
cantidad pts pts rendiminetos
2 1 2.00 1 ctrs/pts
caja rectangular
cantidad pts pts rendiminetos
2 1 2.00 1 cj/pts
ACOMETIDA Y PUNTO DE TELEFONO 5 PTS
39 ml 3 ml 13
tuberias de 1/2
cantidad pts pts rendiminetos
13 1 5.00 2.60 TBR/pts
codo de 1/2
cantidad pts pts rendiminetos
3 1 5.00 0.60 cd/pts
conectores 1/2
cantidad pts pts rendiminetos
4 1 5.00 0.8 ctrs/pts
caja rectangular
cantidad pts pts rendiminetos
2 1 5.00 0.4 cj/pts
39 ml 3 ml 13
tuberias de 1/2
cantidad pts pts rendiminetos
13 1 4.00 3.25 TBR/pts
codo de 1/2
cantidad pts pts rendiminetos
2 1 4.00 0.50 cd/pts
conectores 1/2
cantidad pts pts rendiminetos
8 1 4.00 2 ctrs/pts
caja rectangular
cantidad pts pts rendiminetos
4 1 4.00 1 cj/pts
codo de 3/4
cantidad pts pts rendiminetos
2 1 4.00 0.5 cd/pts
equipos
transporte
1 12.00 ml
x 1 ml
0.0833
equipos
transporte
1 1.00 panel
equipos
transporte
1 362.00 ml
x 1 ml
0.0028
EQUIPAMIENTO
planta baja planta alta total
punto de luz 25.00 8.00 33.00 PUNTOS
toma 110 v 20 9.00 29.00 PUNTOS
toma 220v 5 8.00 13.00 PUNTOS
conmutacion 1.00 1.00 2.00 PUNTOS
timbre 1.00 1.00 2.00 PUNTOS
telefono 3.00 2.00 5.00 PUNTOS
televisión 2.00 2.00 4.00 PUNTOS
breakers 24.00 0.00 24.00 PUNTOS
MEDIDOR
DINDONG
CABLES EN ML.
Conmutacion 5.00 2 10.00 ml
Timbre 10.00 2 20.00 ml
Cable de telefono 30.00 1 30.00 ml
Cable de television 30.00 1 30.00 ml
acometida te. 9.00 1 9.00 ml
acometida t.v 9.00 1 9.00 ml
acometida 12.00 1 12.00 ml
cable # 12 163.00 2 326.00 ml
cable # 12 123.00 2 246.00 ml
cable # 12 61.00 2 122.00 ml
LUZ
NOTA: COMO TENEMOS TRES TIPOS DE INTERRUPTORES
Interruptores de luz
cantidad puntos Rendimiento
28.00 33.00 0.848 simple I/P
3.00 33.00 0.091 doble I/P
2.00 33.00 0.061 triple I/P
LO MISMO SE HACE CON LAS BAQUELITAS
cantidad puntos Rendimiento
28.00 33.00 0.848 simple
3.00 33.00 0.091 doble
2.00 33.00 0.061 triple
tornillos # 8 x 2 1/2" tripa de pato
tornillos puntos Rendimiento
66.00 33.00 2.00 TRLO/PTO
CABLE
ROLLO ML ML
1.00 326.00 100.00 3.26 ROLLO
ROLLO PUNTOS PUNTOS Rendimiento
3.26 1 33.00 0.099 R/PTOS
CABLE
ROLLO ML ML
1.00 20.00 100 0.200 U
ROLLO PUNTOS PUNTOS Rendimiento
0.200 1.00 2.00 0.10 U
TELEFONO 5.00 punto
TOMA DE TELEFONO
cantidad puntos Rendimiento
5.00 5.00 1.0000 sencillo T/P
LO MISMO SE HACE CON LAS BAQUELITAS
Rendimiento
5.00 5.00 1.0000 simple
tornillos # 8 x 2 1/2" tripa de pato
Rendimiento
10.00 5.00 2.00
CABLE
ROLLO ML ML
1.00 30.00 100 0.30 U
ROLLO PUNTOS PUNTOS Rendimiento
0.30 1 5.00 0.06 U
Toma de televisión
cantidad puntos Rendimiento
4.00 4.00 1.0000 sencillo T/P
LO MISMO SE HACE CON LAS BAQUELITAS
Rendimiento
4.00 4.00 1.0000 simple
tornillos # 8 x 2 1/2" tripa de pato
Rendimiento
8.00 4.00 2.00
CABLE
ROLLO ML ML
1.00 30.00 100 0.30 U
ROLLO PUNTOS PUNTOS
0.30 1 4.00 0.075 U
breaker
Armada de panel de breaker de 24 u. 24.00
breaker 1PX20A 9 U 24
breaker 1PX70A 1 U 24
breaker 2PX20A 8 U 24
breaker 2PX30A 6 U 24
equipos
transporte
1 24.00 breaker
X 1
0.04
TELEFONO
Acometida de telefono 9.00 ml
Cable
1.00 ml Rendimiento
CABLE
ROLLO ML ML
1.00 9.00 100 0.090 rllo/ml
rollo ml
0.090 9
x 1
0.01 rllo/ml Rendimiento
TELEVISION
Acometida de television 9 ml
Cable
1.00 ml Rendimiento
CABLE
ROLLO ML ML
1.00 9 100 0.090 rll/ml
rrollo ml ml
0.09 1.00 9.00 0.01 rllo/ml
rrollo ml ml
1.00 12.00 100.00 0.12 rllo/ml
rrollo ml ml
0.12 1 12 0.01 rllo/ml
equipos
transporte
1 1.00 socket Rendimiento
Prueba Elec
1 villa
P.B PA
25.00 8.00
rendiminetos
1.65 TBR/PTS
M /O
PTS 33.00
RENDIMIENTO 12 hrs
R/ REAL 2.75
EQUIPOS
Transporte
1 33.00
x 1
0.03
P.B. P.A
20 9
M /O
PTS 29.00
RENDIMIENTO 10.55 hrs
R/ REAL 2.75
EQUIPOS
Transporte
1 29.00
x 1
0.03
P.B. P.A.
5 8
M /O
PTS 13.00
RENDIMIENTO 4.727 hrs
R/ REAL 2.75
EQUIPOS
Transporte
1 13.00
x 1
0.08
P.B. P.A.
1 1
M /O
PTS 2.00
RENDIMIENTO 0.727 hrs
R/ REAL 2.75
EQUIPOS
Transporte
1 2.00
x 1
0.50
P.B. P.A.
1 1 SUMA DE DUCTO ELECTRICO
M /O 362.00 ML
PTS 2.00
RENDIMIENTO 0.73 hrs
R/ REAL 2.75
EQUIPOS
Transporte
1 2.00
x 1
0.50
P.B. P.A.
3 2 CANTIDADES
M /O 30 9
PTS 5.00
RENDIMIENTO 0.5
R/ REAL 10.00
EQUIPOS
Transporte
1 5.00
x 1
0.20
9 ml 3 ml 3
Acometidad tuberias de 3/4 conectores 3/4
cantidad pts pts rendiminetos cantidad pts pts
3 1 5.00 0.60 TBR/pts 1 1 5.00
M /O
PTS 4.00
RENDIMIENTO 0.4
R/ REAL 10.00
EQUIPOS
Transporte
1 4.00
x 1
0.25
9 ML 3 ML 3
Acometidad tuberias de 3/4
cantidad pts pts rendiminetos
3 1 4.00 0.75 TBR/pts
BREAKER
24 U MANO DE OBRA
Rendimiento
M /O
U
RENDIMIENTO
R/ REAL
calculo para rendimiento en m/o
personal
Maestro
Electrico
Ayudante
RENDIMIENTO
R/ REAL
calculo para rendimiento en m/o
personal
Maestro
Electrico
Ayudante
MANO DE OBRA
Rendimiento
Rendimiento M /O
Rendimiento M2
Rendimiento RENDIMIENTO
R/ REAL
calculo para rendimiento en m/o
personal
Maestro
Electrico
Ayudante
luz 2 652 ml
toma 120v 2 492 ml
toma 240v 2 244 ml
33.00 puntos
MANO DE OBRA
M /O
equipos
transporte RENDIMIENTO
1 33.00 puntos R/ REAL
x 1 puntos
0.030
CINTA AISLANTE
ROLLO PTO
1 33.00
X 1
0.03030303 R/PTO
Rendimiento
MANO DE OBRA
equipos
transporte M /O
1 29.00 puntos M2
x 1 puntos RENDIMIENTO
0.0345 R/ REAL
CINTA AISLANTE
ROLLO PTO
1 29.00
X 1
0.03448276 R/PTO
Rendimiento
#12
MANO DE OBRA
equipos
transporte M /O
1 13.00 puntos M2
x 1 puntos RENDIMIENTO
0.0769 R/ REAL
CINTA AISLANTE
ROLLO PTO
1 13.00
X 1
Rendimiento 0.07692308 R/PTO
#12
Rendimiento
#14
CINTA AISLANTE
ROLLO PTO
1 2.00
X 1
0.5 R/PTO
equipos
transporte MANO DE OBRA
1 2.00 puntos
x 1 puntos M /O
0.5000 M2
RENDIMIENTO
R/ REAL
CINTA AISLANTE
ROLLO PTO
1 2.00
X 1
0.5 R/PTO
Rendimiento
ESTO SALE PARA UN PUNTO
equipos MANO DE OBRA
transporte
1 5.00 puntos M /O
x 1 puntos M2
0.2000 RENDIMIENTO
R/ REAL
CINTA AISLANTE
ROLLO PTO
1 5.00
X 1
Rendimiento 0.2 R/PTO
MANO DE OBRA
equipos
transporte M /O
1 4.00 puntos M2
x 1 puntos RENDIMIENTO
0.2500 R/ REAL
CINTA AISLANTE
ROLLO PTO
1 4.00
X 1
0.25 R/PTO
MANO DE OBRA
Rendimiento global
M /O
M2
RENDIMIENTO
R/ REAL
Rendimiento calculo para rendimiento en m/o
personal
Maestro
Electrico
Ayudante
MANO DE OBRA
M /O
M2
Prueba Electrica RENDIMIENTO
R/ REAL
calculo para rendimiento en m/o
personal
Maestro
Electrico
Ayudante
rendiminetos
0.2 ctrs/pts
MANO DE OBRA 12 ml
2DO. METODO 12.00 ml 0.5 horas
12.00 ml x 1 horas
0.50 HORA 24.00
24.00
o para rendimiento en m/o tiempo
cantidad s / diario j/r subtotal rendimiento subtotal ml subtotal
1 45.67 5.71 260.77 0.50 521.54 12.000 6258.43 260.77
1 28.63 3.58 102.49 0.50 204.98 12.000 2459.73 102.49
1 24.82 3.10 76.98384 0.50 153.97 12.000 1847.61 76.98384
prueba galvanizada
1 modulo medidor
2DO. METODO
1.00 modulo
2.00 HORA
0.500
para rendimiento en m/o tiempo
cantidad s / diario j/r subtotal rendimiento subtotal volumen subtotal
1 45.67 5.71 260.77 2.00 130.38 1.000 130.38 260.77
1 28.63 3.58 102.49 2.00 51.24 1.000 51.24 102.49
1 24.82 3.10 76.983839 2.00 38.49 1.000 38.49 76.98384
33.00 puntos
2.00 puntos
24.00 breaker
2DO. METODO
12.00 ml
3.00 HORA
4.000
2DO. METODO
1.00 base socket
1.00 global
1.000
para rendimiento en m/o tiempo
cantidad s / diario j/r subtotal rendimiento subtotal volumen subtotal
1 45.67 5.71 260.77 1.00 260.77 1.000 260.77 260.77
1 28.63 3.58 102.49 1.00 102.49 1.000 102.49 102.49
1 24.82 3.10 76.983839 1.00 76.98 1.000 76.98 76.98384
O DE OBRA 1 villa
1er metodo
rendimiento/ real
1.000
1.0000
1.000
1er metodo
rendimiento/ real
90.500
90.500
90.500
1er metodo
rendimiento/ real
1
1
1
hporas
horas
1er metodo
rendimiento/ real
6.000
6.0000
6.000
1er metodo
rendimiento/ real
1.000
1.0000
1.000
1er metodo
rendimiento/ real
0.500
0.500
0.500
CUBIERTAS
CALCULO DE ESTRUCTURA DE CUBIERTA PARA PLACA P7-111
NOTA: tomamos como referencia una plancha de 8 pies su dimensión son 2,44x1,11
entonce realizamos los siguiente: 2.44 1.11 2.71
en una plancha van 3 pedazos de correa lo multiplicamos x 1,11= 3,33 ml. nota: lo multplicamos por 1 po
SENTIDO HORIZONTAL
PROCEDIMIENTO
3.00 PEDAZOS 1.11 ML 3.33 ML
AREA DE PLANCHA 2.71 M2
ml m2 m2 ML/M2
3.33 1.00 2.71 1.2295 ml/m2 REGLA DE TRES
SENTIDO VERTICAL
PROCEDIMIENTO canal de 100x50x2mm
tomamos como referencia una medida de 8ml del ancho de la casa por el largo de la placa que es 2,44ml
8.00 2.44 19.52 M2
en esta area referencial se van 3 pedazos x 2,44 que seria igual a 7,32ml
ml m2 m2 ML CAJETIN ML/M2
7.32 1 19.52 0.375000 ml/m2 2.00 0.75
RESUMEN
Rendimiento
SOLDADURA
NOTA: En 1 kg se va 37,4 unidades
Rendimiento: Según soldador en 1 m2 en obra se va 17 unidades
CONVERSION DE UNIDADES A KILOS
KG U U Rendimiento
1.00 17 37.4 0.4545 KG./m2 REGLA DE TRES
para su calculo hacemos los siguiente: como la correa en sentido horizontal salio 3,00ml X 8ml = 24 ML
y en el sentido vertical nos salio 7,32 en una area de referencia y como es cajetin lo duplimos ej: 7,32 + 7,32 = 14,64 ml
entonces sacamos el area de correras:
H= DE CORREA lados
sentido horizontal 24.00 0.08 = 1.92 2.00
sentido vertical 14.64 0.10 = 1.46 2.00
%
lt
6.77 m2 0.33840 GALON/M2 4.00
galon m2 m2 rendimineto
0.33840 1.00 6.77 0.05 GALON/M2
MANO DE OBRA
M /O 2DO. METODO
M2 132.68 m2
RENDIMIENTO 48.00 HORA
R/ REAL 2.764
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal
Maestro 0.1 0 5.71 0.00 48.00 0.00
Soldador 1 0.00 3.58 0.00 48.00 0.00
Ayudante 2 0.00 3.10 0 48.00 0.00
EQUIPOS
transporte
1 132.68 m2
x 1 m2
0.0075
MANO DE OBRA
M /O 2DO. METODO
M2 132.68 m2
RENDIMIENTO 48.00 HORA
R/ REAL 2.764
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal
Maestro 0.1 26.89 3.83 10.30 48.00 0.21
Techador 1 18.76 2.65 49.71 48.00 1.04
Ayudante 2 13.07 1.85 48.359 48.00 1.01
EQUIPOS
transporte
1 132.68 m2
x 1 m2
0.0075
CUMBRERO
NOTA: PARA EL CABALLETE Y LA CHOVA TOMAMOS TODA EL AREA DE LA CUBIERTA Y SACAMOS
CUANTO METRO LINEALES EXISTE
AREA DE CUBIETA 132,68M2 EN ESTA AREA SALEN 38.00 ml
CABALLETE
CABALLETE ML
1 0.85
X 1
1.18 CB/ML
ROLLO
ROLLO ML
1 10
X 1
0.1 ROLLO/ML
MANO DE OBRA
M /O 2DO. METODO
M2 38.00 ML
RENDIMIENTO 16.00 HORA
R/ REAL 2.38
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal
Maestro 0.1 0 5.71 0.00 16.00 0.00
Techador 1 0.00 3.58 0.00 16.00 0.00
Ayudante 1 0.00 3.10 0 16.00 0.00
EQUIPOS
transporte
1 38.00 ml
x 1 ml
0.0263
ML LIBRA
6 1
1.00 X
0.167 LBRA/ML
MANO DE OBRA
EQUIPOS
transporte
1 132.68 m2
x 1 m2
0.0075
CHOVA ALUMBAND
1ROLLO VIENE 50CM X 10ML 5M2
sacamos el rendimiento
1.00 rollo 10.00 ml
x 1.00 ml
0.10 rollo/ml rendimiento CHOVA
longitud de placa es
CUMBRERO PARA PLACA P7
dimension 34cmx 17cm conversion para numero de placa
rendimiento 3 c/ml ml ml
1 0.34
MANO DE OBRA
M /O 2DO. METODO
M2 38.00 ml
RENDIMIENTO 16.00 HORA
R/ REAL 2.38
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal
Maestro 0.1 0 5.71 0.00 16.00 0.00
Techador 1 0.00 3.58 0.00 16.00 0.00
Ayudante 1 0.00 3.10 0 16.00 0.00
EQUIPOS
transporte
1 38.00 ml
x 1 ml
0.0263
Area de Cubierta 132.68 m2
M2 TECHO FUERTE
ota: lo multplicamos por 1 por que es el util del ancho de la placa TOMAMOS UNA DE 14 PIES
SENTIDO HORIZONTAL
PROCEDIMIENTO
5.00 PEDAZOS
AREA DE PLANCHA
ml m2
4.25 1.00
SENTIDO VERTICAL
PROCEDIMIENTO
tomamos como referencia una medida de 8ml
8.00 4.20
3 PEDAZOS
ml m2
REGLA DE TRES 12.60 1
RESUMEN
CONVERSION A NUMERO DE CORREA
# correa ML ML de correa Rendimiento
1 1.230 6.00 0.205 C / M2 sentido horizontal
1 0.75 6.00 0.125 C / M2 sentido vertical
SOLDADURA
NOTA: En 1 kg se va 37,4 unidades
Rendimiento
Según soldador en 1 m2 en
: CONVERSION DE UNID
KG U
1.00 17
MANO DE OBRA
M /O 2DO. METODO
M2 132.68
RENDIMIENTO 54.37
R/ REAL 2.440
1er metodo calculo para rendimiento en m/o
volumen subtotal rendimiento/ real personal cantidad
132.680 0.00 0.00 #DIV/0! Maestro 0.1
132.680 0.00 0.00 #DIV/0! Soldador 1
132.680 0.00 0 #DIV/0! Ayudante 2
EQUIPOS
M2 PLANCHA
tenemos que 1 m2 = 0,369 unidad de plancha 1.00 1
MANO DE OBRA
M /O 2DO. METODO
M2 132.68
RENDIMIENTO 48.00
R/ REAL 2.764
1er metodo calculo para rendimiento en m/o
volumen subtotal rendimiento/ real personal cantidad
132.680 28.47 10.30 2.764 Maestro 0.1
132.680 137.42 49.71 2.7642 Techador 1
132.680 133.67 48.359 2.764 Ayudante 1
EQUIPOS
CUMBRER
O
Y SACAMOS NOTA: PARA EL CABALLETE Y LA CHO
caballete universal es de 1,21cmx0,39cm de ancho= 0,4719m2 CUANTO METRO LINEALES EXISTE
AREA DE CUBIETA
CABALLETE
PLACA ML
1 0.85
X 1
1.18 PLC/ML
ROLLO
ROLLO ML
1 10
X 1
0.1 ROLLO/ML
MANO DE OBRA
M /O 2DO. METODO
M2 38.00
RENDIMIENTO 16.00
R/ REAL 2.375
1er metodo calculo para rendimiento en m/o
volumen subtotal rendimiento/ real personal cantidad
38.000 0.00 0.00 #DIV/0! Maestro 0.1
38.000 0.00 0.00 #DIV/0! Techador 1
38.000 0.00 0 #DIV/0! Ayudante 1
EQUIPOS
dimension 35 cm x 26 cm
rendimiento 13
textura lisa
ML LIBRA
6 1
1.00 X
0.167
MANO DE OBRA
M /O 2DO. METODO
M2 32 horas M2 132.68
1 horas RENDIMIENTO 32.00
R/ REAL 4.146
calculo para rendimiento en m/o
1er metodo personal cantidad
volumen subtotal rendimiento/ real Maestro 0.1
132.680 0.00 0.00 #DIV/0! Techador 1
132.680 0.00 0.00 #DIV/0! Ayudante 2
132.680 0.00 0 #DIV/0!
EQUIPOS
AREA DE CUBIETA
CHOVA ALUMBAND
1ROLLO VIENE 50CM X 10ML
sacamos el rendimiento
1.00 rollo
x
0.10 rollo/ml
0.34 cm
CUMBRERO PARA PLACA P7
a numero de placa dimension 0.35
rendimiento 3
3 u/ml rendimiento
MANO DE OBRA
M /O 2DO. METODO
M2 38.00
RENDIMIENTO 8.00
R/ REAL 4.75
1er metodo calculo para rendimiento en m/o
volumen subtotal rendimiento/ real personal cantidad
38.000 0.00 0.00 #DIV/0! Maestro 0.1
38.000 0.00 0.00 #DIV/0! Techador 1
38.000 0.00 0 #DIV/0! Ayudante 1
EQUIPOS
CORREAS CALCULOS DE CUBIERTA PARA TECHO GALVANIZADO
0.85 ML 4.25 ML
3.57 M2
m2 ML/M2
3.57 1.190 ML/M2 REGLA DE TRES
n 1 kg se va 37,4 unidades
egún soldador en 1 m2 en obra se va 17 unidades
CONVERSION DE UNIDADES A
KILOS
U Rendimiento
37.4 0.4545 KG./m2 REGLA DE TRES
transporte
1 132.68 m2
x 1 m2
0.0075
3.57 M2
Rendimiento
M2 U /M2
3.57 0.280 P7/M2 tenemos que 1 m2 = 0,280 unidad de plancha
transporte
1 132.68 m2
x 1 m2
0.0075
transporte
1 38.00 m2
x 1 m2
0.0263
3.57 M2
5 cm x 26 cm dimension 35 cm x 26 cm
c/m2 rendimiento 13 c/m2
textura lisa
pendiente minimo 45 grado
BRE CALIBRE # 18
LBRA/ML
DO. METODO 132.68 M2 32 horas
m2 x 1 horas
HORA 4.15
transporte
1 132.68 m2
x 1 m2
0.0075
LUMBAND
IENE 50CM X 10ML 5M2
os el rendimiento
10.00 ml
1.00 ml
rendimiento CHOVA
DO. METODO
ml
HORA
DE CORREA
Rendimiento
0.1984 C / M2
0.125 C / M2
ML
ENDIMIENTO
LT./M2
1er metodo
rendimiento/ real
2.440
2.4403
2.440
nidad de plancha
1er metodo
rendimiento/ real
2.764
2.7642
2.764
0.34 m2
1er metodo
rendimiento/ real
#DIV/0!
#DIV/0!
#DIV/0!
1er metodo
rendimiento/ real
#DIV/0!
#DIV/0!
#DIV/0!
1er metodo
rendimiento/ real
#DIV/0!
#DIV/0!
#DIV/0!
CONTRAPISO espesor del contrapiso E=0,08cm
180 KG/CM2
CEMENTO 6.00 saco
ARENA 0.57 m3
PIEDRA 1.02 m3 total de m2 de contrapiso 123.15 m2
AGUA 0.168 m3
m2 m2 espesor
volumen 1 1 0.08 0.08 m3/m2 nota: este volumen se va en 1 m2
CONVERSION DE VOLUMEN DE AGREGADOS A M2
CEMENTO
6 SC 1 M3 0.48 SC 1 m2
X 0.08 M3
0.48 SC
ARENA
0.57 m3 1 m3 0.0456 m3 1 m2
x 0.08 m3
0.0456 m3
PIEDRA
1.02 M3 1 M3 0.0816 M3 1 m2
X 0.08
0.0816 M3
AGUA
0.168 m3 1 m3 0.01344 m3 1 m2
x 0.08 m3
0.01344 m3
MALLAS
area de plancha 6.25 2.4 15 m2
MANO DE OBRA
M /O 2DO. METODO
M2 123.15 m2
RENDIMIENTO 16.00 HORA
R/ REAL 7.6969
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 16.00 0.64 123.150
Carpintero 1 18.76 2.65 49.71 16.00 3.11 123.150
Fierrero 1 18.76 2.65 49.71 16.00 3.11 123.150
Albañil 1 18.76 2.65 49.71 16.00 3.11 123.150
Jornalero 6 13.07 2.03 159.1926 16.00 9.95 123.150
EQUIPOS
compactador pequeño transporte
1 123.15 1 123.1500 M2
x 1 x 1 M2
0.0081 0.0081
0.4
2,5ml ancho de
ML muro
DOSIFICACION 1:3 ( 280KG /CM2) V 15 0.2
% nota: este volumen lo saque como se lo hace en pared y
CEMENTO 8.8 1.05 9.24 con relación al area que se tomo como calculo 2,5x0,4
ARENA 1.1 1.2 1.32 que es el volumen del mortero aparente en esa area
AGUA 0.29 1.3 0.377
CEMENTO
9.24 SC 1 M3 0.4158 SC 1 m2
X 0.045 M3
0.4158 SC
ARENA
1.32 M3 1 M3 0.0594 m3 1 m2
X 0.045 M3
0.0594
AGUA 0.016965 m3 1 m2
0.377 M3 1 M3
X 0.045 M3
0.016965
MANO DE OBRA
m2
M /O 2DO. METODO 16.66
M2 16.66 m2 x
RENDIMIENTO 8.00 HORA 2.0825
R/ REAL 2.0825
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 8.00 1.29 16.660
Carpintero 0 18.76 2.65 0.00 8.00 0.00 16.660
Fierrero 0 18.76 2.65 0.00 8.00 0.00 16.660
Albañil 1 18.76 2.65 49.71 8.00 6.21 16.660
Jornalero 2 13.07 2.03 53.0642 8.00 6.63 16.660
EQUIPOS
transporte
1 16.66
x 1
0.0600
CEMENTO
7.21 SC 1 M3 1.442 SC 1 m2
X 0.2 M3
1.442 SC
ARENA
0.55 M3 1 M3 0.11 m3 1 m2
X 0.2 M3
0.11
PIEDRA
0.88 M3 1 M3 0.1056 m3 1 m2
X 0.120
0.1056
AGUA 0.0559 m3 1 m2
0.2795 M3 1 M3
X 0.2 M3
0.0559
TABLAS subtotal 1
%
1.00 1.00 = 0.13 1.15
4.00 2.00 1.0000 8.00
CUARTON pedazos pedazos
vertical 2.66 1 2.66 diagonal 4 0.3
vertical 2.66 1.000 2.66
6.52 6.52 = 0.82 1.15
4.00 2.00 1.0000 8.00
ml uso volumen
pedazos
TIRAS 2.66 0.35 0.93
CLAVOS tablas 60
cuarton/tabls 20 tiras-tablas 6
MANO DE OBRA
M /O 2DO. METODO
M2 12.67 m2
RENDIMIENTO 8.00 HORA
R/ REAL 1.5838
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 8.00 1.29 12.670
Carpintero 1 18.76 2.65 49.71 8.00 6.21 12.670
Fierrero 1 18.76 2.65 49.71 8.00 6.21 12.670
Albañil 1 18.76 2.65 49.71 8.00 6.21 12.670
Jornalero 5 13.07 2.03 132.6605 8.00 16.58 12.670
EQUIPOS
transporte
1 12.67
x 1
0.0789
MANO DE OBRA
M /O 2DO. METODO
M2 137.32 m2
RENDIMIENTO 48.00 HORA
R/ REAL 2.86
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 48.00 0.21 137.320
Carpintero 0 18.76 2.65 0.00 48.00 0.00 137.320
Fierrero 0 18.76 2.65 0.00 48.00 0.00 137.320
Albañil 1 18.76 2.65 49.71 48.00 1.04 137.320
Jornalero 1 13.07 2.03 26.5321 48.00 0.55 137.320
EQUIPOS
transporte
1 137.32
x 1
0.0073
MANO DE OBRA
M /O 2DO. METODO
M2 189.53 m2
RENDIMIENTO 72.00 HORA
R/ REAL 2.63
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 72.00 0.14 189.530
Carpintero 0 18.76 2.65 0.00 72.00 0.00 189.530
Fierrero 0 18.76 2.65 0.00 72.00 0.00 189.530
Albañil 1 18.76 2.65 49.71 72.00 0.69 189.530
Jornalero 1 13.07 2.03 26.5321 72.00 0.37 189.530
EQUIPOS
transporte
1 189.53 m2
x 1 m2
0.0053
MANO DE OBRA
M /O 2DO. METODO
M2 449.85 m2
RENDIMIENTO 96.00 HORA
R/ REAL 4.69
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 0 5.71 0.00 96.00 0.00 449.851
Carpintero 0 0.00 3.58 0.00 96.00 0.00 449.851
Fierrero 0 0.00 3.58 0.00 96.00 0.00 449.851
Albañil 3 0.00 3.58 0.00 96.00 0.00 449.851
Jornalero 2 0.00 3.10 0 96.00 0.00 449.851
EQUIPOS
transporte
1 449.85 m2
x 1 m2
0.0022
ENLUCIDO EXTERIOR
219.16 M2 CAÑAS
m3/m2 nota. Se toma como referncia un andamio de 10x 1m=10m2
CEMENTO 0.185 donde ese andamio nos sale 8 cañas x 6ml= 48 ml
ARENA 0.026 48 = 48
AGUA 0.00754 6 2 10 120
ml uso m2
TABLON
como el ancho del andamio es de 1ml y el tablon mide 4ml nos sale 5 tablones con relacion al ancho
4 m2 5.00 tablon
1 m2 x divide 2 usos
1.2500 2.00 0.625 u/m2
MANO DE OBRA
M /O 2DO. METODO
M2 219.16 m2
RENDIMIENTO 48.00 HORA
R/ REAL 4.57
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 48.00 0.21 219.160
Carpintero 0 18.76 2.65 0.00 48.00 0.00 219.160
Fierrero 0 18.76 2.65 0.00 48.00 0.00 219.160
Albañil 3 18.76 2.65 149.14 48.00 3.11 219.160
Jornalero 2 13.07 2.03 53.0642 48.00 1.11 219.160
MANO DE OBRA
M /O 2DO. METODO
M2 51.32 m2
RENDIMIENTO 32.00 HORA
R/ REAL 1.604
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 0 5.71 0.00 32.00 0.00 51.320
Carpintero 0 0.00 3.58 0.00 32.00 0.00 51.320
Fierrero 0 0.00 3.58 0.00 32.00 0.00 51.320
Albañil 2 0.00 3.58 0.00 32.00 0.00 51.320
Jornalero 1 0.00 3.10 0 32.00 0.00 51.320
EQUIPOS
transporte
1 51.32 m2
x 1 m2
0.0195
FILOS
124.95 ML
UNIDAD LADO
ML H M2 # DE FILO TOTAL
1.00 0.10 0.10 2.00 0.20 M2 / ML
ENLUCIDO
M2/ML m2 M2/ML
CEMENTO 0.185 0.20 1 0.03700 CEMENTO REGLA DE TRES
ARENA 0.02640 0.20 1 0.00528 ARENA REGLA DE TRES
AGUA 0.00754 0.20 1 0.001508 AGUA REGLA DE TRES
MANO DE OBRA
M /O 2DO. METODO
M2 124.95 ml
RENDIMIENTO 24.00 HORA
R/ REAL 5.206
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 0 5.71 0.00 24.00 0.00 124.950
Carpintero 0 0.00 3.58 0.00 24.00 0.00 124.950
Fierrero 0 0.00 3.58 0.00 24.00 0.00 124.950
Albañil 2 0.00 3.58 0.00 24.00 0.00 124.950
Jornalero 1 0.00 3.10 0 24.00 0.00 124.950
EQUIPOS
transporte
1 124.95 ml
x 1 ml
0.0080
EQUIPOS
transporte
1 22.05 ml
x 1 ml
0.0454
M /O 2DO. METODO
M2 12.26 ml
RENDIMIENTO 1.00 HORA
R/ REAL 12.26
calculo para rendimiento en m/o
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 0 5.71 0.00 1.00 0.00 12.260
Carpintero 0 0.00 3.58 0.00 1.00 0.00 12.260
Fierrero 0 0.00 3.58 0.00 1.00 0.00 12.260
Albañil 1 0.00 3.58 0.00 1.00 0.00 12.260
Jornalero 0.5 0.00 3.10 0 1.00 0.00 12.260
EQUIPOS
transporte
1 12.26 ml
x 1 ml
0.0816
GOTEROS 10
M2/M3 M2/ML
CEMENTO 0.185 0.06 0.0111 EN 1ML
ARENA 0.0264 0.06 0.001584
AGUA 0.00754 0.06 0.0004524
MANO DE OBRA
M /O 2DO. METODO
M2 10.00 ml
RENDIMIENTO 2.50 HORA
R/ REAL 4.000
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 0 5.71 0.00 2.50 0.00 10.000
Carpintero 0 0.00 3.58 0.00 2.50 0.00 10.000
Fierrero 0 0.00 3.58 0.00 2.50 0.00 10.000
Albañil 1 0.00 3.58 0.00 2.50 0.00 10.000
Jornalero 0.5 0.00 3.10 0 2.50 0.00 10.000
EQUIPOS
transporte
1 10.00 ml
x 1 ml
0.1000
CAJA DE REGIST
CAJA DE REGISTRO 0,60X0,60X0,30
BLOQUEDA LADOS
0.60 0.30 4.00 0.72
1M2 12.50 BLOQUES 0.72
RESUMEN
men se va en 1 m2 NOTA: LOS VALORES DE CEMENTO,ARENA, Y AGUA son DE UN 1M2 COMO YA LO T
DIRECTAMENTE POR EL AREA DE UNA CAJA QUE ES 0,72M2 Y
MORTERO M2 M3/M2
0.1109 SC 0.72 1.00
0.0158 M3/M2 0.72 1.00
0.00452 M3/M2 0.72 1.00
ENLUCIDO se hace una conversion de los valores de agregados que es po
CEMENTO 0.185 0.72 M2
ARENA 0.02640 0.72 M3/M2
AGUA 0.00754 0.72 M3/M2
HIMBER 0.60 0.60 0.03
CEMENTO 0.185 0.0108 0.001998
ARENA 0.02640 0.0108 0.000285
AGUA 0.00754 0.0108 0.0000814
TAPA DE CAJA 180 kg/cm2 1:2.5:4.5
0.6 0.60000 0.0500 0.01800
CEMENTO 6 0.0180 0.10800
ARENA 0.57 0.018000 0.01026
PIEDRA 1.02 0.0180 0.01836
AGUA 0.168 0.0180 0.00302
HIERRO
4 0.60 2.0 4.8
KG ML
8 MM 0.395 4.80 1.90
RESUMEN
u /m2 SUMANDO
CEMENTO 0.3230 KG 1CAJA
ARENA 0.0409 M3 1CAJA
AGUA 0.0118 M3 1CAJA
PIEDRA 0.0184 M3 1CAJA
HIERRO 8mm 1.90 KG 1CAJA
BLOQUES 9.00 U 1CAJA
MANO DE OBRA
EQUIPOS
transporte
1
x
0.2500
ara su calculo
FOR
2,63ML
LADRILLO 0,10X0,07= 0,007 M2
AREA FORRO DE BAJANTES
ML ancho AREA UNIDAD
E=mortero 1.00 0.15 0.15 M2
en m3 total # LADRILLO
0.015 0.045 m3/m2 M2 M2 CANTIDAD UNIDAD
como se lo hace en pared y salio 15 ml 0.15 0.007 21.43 U
e tomo como calculo 2,5x0,4= 1m2 MORTERO
o aparente en esa area M3/M2 M2/ML m2
0.1109 SC 0.15 1.00
0.0158 M3/M2 0.15 1.00
0.00452 M3/M2 0.15 1.00
ENLUCIDO
M2/ML
CEMENTO 0.185 0.15 1.00
ARENA 0.02640 0.15 1.00
AGUA 0.00754 0.15 1
RESUMEN
1ML UNIDAD
# DE LADRILLO 42.86 U
CEMENTO 0.0888 SC
ARENA 0.0127 M3
AGUA 0.00362 M3
MANO DE OBRA
M /O 2DO. METODO
8 horas M2 3.10 ml
1 horas RENDIMIENTO 2.00 HORA
R/ REAL 1.5500
calculo para rendimiento en m/o
1er metodo personal cantidad s / diario j/r
subtotal rendimiento/ real Maestro 0.1 26.89 3.83
21.45 10.30 2.0825 Carpintero 0 18.76 2.65
0.00 0.00 #DIV/0! Fierrero 0 18.76 2.65
0.00 0.00 #DIV/0! Albañil 1 18.76 2.65
103.53 49.71 2.083 Jornalero 0.5 13.07 2.03
110.51 53.0642 2.083
EQUIPOS
transporte
1
x
0.3226
M
BLOQUES
1M2 12.5 BLOQUES
ara su calculo AREA
ML ALTURA AREA
2.00 0.20 0.40 M2/ML
MURO
0,40 M2/ML
2ML
MANO DE OBRA
EQUIPOS
transporte
1
x
0.1653
PAT
ml 4 U
BLOQUES
0.14 u/m2 1M2 12.5 BLOQUES
ML
total 0.60 0.90 0.54 M2
1.2 6.52
0.60
ENLUCIDO
2 caras
CEMENTO 0.185 0.54 2.00
0.134 u/m2 ARENA 0.02640 0.54 2.00
AGUA 0.00754 0.54 2.0000
SUMANDO
86 MANO DE OBRA
PATA
4 U
BLOQUES
1M2 12.5 BLOQUES
AREA DE PATA
137.32 m2 0.60 0.90 0.54 M2
MANO DE OBRA
M /O 2DO. METODO
ml 1.80 ml
E 0,40 CM (para reducir a m2) RENDIMIENTO 1.50 HORA
R/ REAL 1.200
TOTAL calculo para rendimiento en m/o
0.1091 KG/m2 personal cantidad s / diario j/r
Maestro 0.1 0 5.71
Carpintero 0 0.00 3.58
Fierrero 0 0.00 3.58
Albañil 1 0.00 3.58
Jornalero 0.5 0.00 3.10
EQUIPOS
1er metodo transporte
subtotal rendimiento/ real 1
29.46 10.30 2.8608 x
0.00 0.00 #DIV/0! 0.5556
0.00 0.00 #DIV/0!
142.22 49.71 2.8608
75.90 26.5321 2.8608
ml ML
AREA 0.60 1.00 0.60
ANCHO E= ML
VOLUMEN 0.60 0.05 1.00
1 M3
60KG/CM2 1:3.5:7.9 V M3
CEMENTO 4.00 0.03 1.000
ARENA 0.448 0.030 1.000
189.53 m2 PIEDRA 1.011 0.030 1.000
AGUA 0.104 0.030 1.000
EQUIPOS
E 0,40 CM (para reducir a m2) transporte
1
TOTAL rendimiento x
0.1091 KG/m2 0.0943
1er metodo
subtotal rendimiento/ real
27.11 10.30 2.63
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
130.87 49.71 2.632
69.84 26.5321 2.632
M2
KG
M3/M2
KG/m2
56,40 MLML
LADRILLO 0.14 0.07 0.00980
ML H AREA UNIDAD
1.00 0.10 0.10 m2/ml
1.00 0.10 0.10 m2/ml
1.00 0.10 0.10 m2/ml
TOTAL 0.30 m2/ml
# LADRILLO
M2 M2 CANTIDAD UNIDAD
0.10 0.0098 10.20 U
MORTERO
M3/M2
1er metodo 0.1109 SC 0.10 1.00
subtotal rendimiento/ real 0.0158 M3/M2 0.10 1.00
0.00 0.00 #DIV/0! 0.00452 M3/M2 0.10 1.00
0.00 0.00 #DIV/0! ENLUCIDO
0.00 0.00 #DIV/0! ml
0.00 0.00 #DIV/0! CEMENTO 0.185 0.30 1.00
0.00 0 #DIV/0! ARENA 0.02640 0.30 1.00
AGUA 0.00754 0.30 1
RESUMEN
1ML UNIDAD
# DE LADRILLO 10.20 U
CEMENTO 0.0666 SC
ARENA 0.0095 M3
AGUA 0.00271 M3
MANO DE OBRA
M /O 2DO. METODO
ml 56.40 ml
RENDIMIENTO 16.00 HORA
= 0.4 u /m2 R/ REAL 3.525
calculo para rendimiento en m/o
personal cantidad s / diario j/r
Maestro 0.1 0 5.71
Carpintero 0 0.00 3.58
m Fierrero 0 0.00 3.58
Albañil 1 0.00 3.58
Jornalero 0.5 0.00 3.10
EQUIPOS
transporte
1
x
0.0177
1er metodo
subtotal rendimiento/ real
47.02 10.30 4.57 129,5ML
0.00 0.00 #DIV/0! AREA
0.00 0.00 #DIV/0! ML
680.96 149.14 4.566 1 0.1 0.1 M2
242.28 53.0642 4.566
ENLUCIDO
n 10m2 que son sogas de 10 unidades M3/M2 m2/ml M2
CEMENTO 0.185 0.10 1
10 m2 ARENA 0.02640 0.10 1
1 m2 AGUA 0.00754 0.1 1
EQUIPOS
transporte
1
x
0.0077
1er metodo
subtotal rendimiento/ real
0.00 0.00 #DIV/0! 69,30ML
0.00 0.00 #DIV/0! LADRILLO 0.14 0.07 0.0098
0.00 0.00 #DIV/0! AREA
0.00 0.00 #DIV/0! ML H AREA UNIDAD
0.00 0 #DIV/0! 1.00 0.10 0.10 M2
1.00 0.10 0.10 M2
1.00 0.10 0.10 M2
TOTAL 0.30 M2
# LADRILLO
M2 M2 CANTIDAD UNIDAD
0.100 0.0098 10.20 M2
MORTERO
m3/m2 M2/ML m2
0.1109 SC 0.10 1.00
0.0158 M3/M2 0.10 1
0.00452 M3/M2 0.10 1.00
ENLUCIDO
M2/ML m2
CEMENTO 0.185 0.30 1
ARENA 0.02640 0.30 1
AGUA 0.00754 0.30 1
RESUMEN
1ML UNIDAD
# DE LADRILLO 10.20 U EN 1ML
CEMENTO 0.0666 SC EN 1ML
ARENA 0.0095 M3 EN 1ML
AGUA 0.00271 M3 EN 1ML
MANO DE OBRA
M /O 2DO. METODO
ml 69.30 ml
1er metodo RENDIMIENTO 24.00 HORA
subtotal rendimiento/ real R/ REAL 2.888
0.00 0.00 #DIV/0! calculo para rendimiento en m/o
0.00 0.00 #DIV/0! personal cantidad s / diario j/r
0.00 0.00 #DIV/0! Maestro 0.1 0 5.71
0.00 0.00 #DIV/0! Carpintero 0 0.00 3.58
0.00 0 #DIV/0! Fierrero 0 0.00 3.58
Albañil 1 0.00 3.58
Jornalero 0.5 0.00 3.10
EQUIPOS
transporte
1
x
0.0144
ml
69,30ML
AREA
ML m2
1.00 0.08 0.08 EN 1ML
1.00 0.30 0.30
1er metodo TOTAL 0.38 M2/ML
subtotal rendimiento/ real ENLUCIDO
0.00 0.00 #DIV/0! m2 M2/ML m2
0.00 0.00 #DIV/0! CEMENTO 0.185 0.3800 1.00
0.00 0.00 #DIV/0! ARENA 0.02640 0.3800 1.00
0.00 0.00 #DIV/0! AGUA 0.00754 0.3800 1.00
0.00 0 #DIV/0!
MANO DE OBRA
M /O 2DO. METODO
ml 69.30 ml
RENDIMIENTO 32.00 HORA
R/ REAL 2.1656
calculo para rendimiento en m/o
personal cantidad s / diario j/r
Maestro 0.1 0 5.71
Carpintero 0 0.00 3.58
ml Fierrero 0 0.00 3.58
Albañil 1 0.00 3.58
Jornalero 1 0.00 3.10
EQUIPOS
transporte
1
1er metodo x
subtotal rendimiento/ real 0.0144
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0! 20 ml
0.00 0 #DIV/0!
UNIDAD
ML H M2
1.00 0.20 0.20 M2/ML
ENLUCIDO
M2/ML m2
CEMENTO 0.185 0.20 1
ARENA 0.02640 0.20 1
AGUA 0.00754 0.20 1
ml
MANO DE OBRA
M /O 2DO. METODO
M2 20.00 ml
RENDIMIENTO 8.00 HORA
R/ REAL 2.500
calculo para rendimiento en m/o
personal cantidad s / diario j/r
Maestro 0.1 0 5.71
Carpintero 0 0.00 3.58
Fierrero 0 0.00 3.58
Albañil 2 0.00 3.58
Jornalero 1 0.00 3.10
EQUIPOS
transporte
1er metodo 1
subtotal rendimiento/ real x
0.00 0.00 #DIV/0! 0.0500
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0.00 #DIV/0!
0.00 0 #DIV/0!
ML
40
MANO DE OBRA
M /O 2DO. METODO
M2 40.00 ml
RENDIMIENTO 4.00 HORA
R/ REAL 10.000
calculo para rendimiento en m/o
personal cantidad s / diario j/r
Maestro 0.1 0 5.71
Carpintero 0 0.00 3.58
Fierrero 0 0.00 3.58
Albañil 2 0.00 3.58
Jornalero 1 0.00 3.10
EQUIPOS
transporte
1
x
0.0250
CAJA DE REGISTRO
total de caja 4.00 caja
M2 RENDIMIENTO
M2 9.00 BLOQUES 1CAJA
M3
KG
M3
M3
M3
ML
KG 1CJA
Rendimiento
4.00
1
FORRO DE BAJANTES
total de ml 3.10
X0,07= 0,007 M2 NOTA. PRIMER METODO DE CONVERSION
PORQUE LO HAGO CON LA UNIDAD= 1ML
LADO TOTAL
2.00 0.300 M2
LADO TOTAL
2 42.86 U
LADOS ML(M3/M2) ML
0.016635 2.00 0.033270 CEMENTO sc/ml
0.002370 2.00 0.00474 ARENA m3/ml
0.000678 2.00 0.001356 AGUA m3/ml
M2/ML ML(M3/M2) ML
0.03 2.0000 0.0555 CEMENTO sc/ml
0.00 2.0000 0.0079 ARENA m3/ml
0.00 2.0000 0.0023 AGUA m3/ml
1er metodo
subtotal rendimiento subtotal volumen subtotal rendimiento/ real
10.30 2.00 5.15 3.100 15.96 10.30 1.5500
0.00 2.00 0.00 3.100 0.00 0.00 #DIV/0!
0.00 2.00 0.00 3.100 0.00 0.00 #DIV/0!
49.71 2.00 24.86 3.100 77.06 49.71 1.5500
13.26605 2.00 6.63 3.100 20.56 13.26605 1.5500
2do metodo
3.10 ml 2 hora
3.10 x 1 hora
1 1.55
MUROS DE TINA
total de muro 6.05 ml
# DE BLOQUES
# AREA M2
M2/ML 12.5 0.40 1 5.00 BLOQUES
REGLA DE
0.2 RESUMEN 1 - ML 2- ML TRES
CEMENTO 0.0665 1.0 2.00 0.0333 sc/ml
ARENA 0.00950 1.0 2.00 0.004752 m3/ml
AGUA 0.002714 1.0 2.00 0.001357 m3/ml
BLOQUES 5.00 1.00 2.00 2.5 m3/ml
6.05 ml 2 hora
x 1 hora
3.025
6.05
1
PATAS DE MESONES ML
total de mesones 3.6 ml
# DE BLOQUES
# AREA M2
12.5 0.54 1 6.75 BLOQUES
REGLA DE
RESUMEN UNIDAD 1 - ML 0,6 - ML TRES
CEMENTO 0.2663 1.0 0.60 0.4439 sc/ml
ARENA 0.03802 1.0 0.60 0.0634 m3/ml
AGUA 0.010858 1.0 0.60 0.0181 m3/ml
BLOQUES 6.75 1.00 0.60 11.25 m3/ml
3.6 ml 3 hora
x 1 hora
1.200
3.60
1
PATAS DE LAVARROPAS ML
total de lavarropas 1.8 ml
# DE BLOQUES
# AREA M2
12.5 0.54 1 6.75 BLOQUES
REGLA DE
RESUMEN UNIDAD 1 - ML 0,6- ML TRES
CEMENTO 0.266 1.0 0.60 0.4439 sc/ml
ARENA 0.038 1.0 0.60 0.0634 m3/ml
AGUA 0.011 1.0 0.60 0.0181 m3/ml
BLOQUES 6.75 1.00 0.60 11.25 u/ml
0.20 cemento sc/m2 sumamos cuadro de mortero y cuadro de enlucido
0.028512 arena m3/m2 para el resumen y pasarlo a ml
0.008143 agua m3/m2
1.80
1
m2
0.030 m3
10.61
1
m2
EN 1ML
M2/ML
0.01109 CEMENTO REGLA DE TRES
0.00158 ARENA REGLA DE TRES
0.00045 AGUA REGLA DE TRES
M2/ML
0.05550 CEMENTO REGLA DE TRES
0.007920 ARENA REGLA DE TRES
0.002262 AGUA REGLA DE TRES
56.40
1
EN 1ML
M2/ML
0.01850 REGLA DE TRES EN 1ML
0.00264 REGLA DE TRES EN 1ML
0.000754 REGLA DE TRES EN 1ML
129.50 ml 40 hora
x 1 hora
3.2375
129.50
1
m2
EN 1ML
M2/ML
0.01109 CEMENTO REGLA DE TRES
0.00158 ARENA REGLA DE TRES
0.000452 AGUA REGLA DE TRES
M2/ML
0.05550 CEMENTO REGLA DE TRES
0.00792 ARENA REGLA DE TRES
0.00226 AGUA REGLA DE TRES
tiempo 1er metodo
subtotal rendimiento subtotal volumen subtotal rendimiento/ real
0.00 24.00 0.00 69.300 0.00 0.00 #DIV/0!
0.00 24.00 0.00 69.300 0.00 0.00 #DIV/0!
0.00 24.00 0.00 69.300 0.00 0.00 #DIV/0!
0.00 24.00 0.00 69.300 0.00 0.00 #DIV/0!
0 24.00 0.00 69.300 0.00 0 #DIV/0!
69.30
1
ALEROS DE ENLUCIDO
69.30 ml
69.30
1
MOLDURAS SENCILLA DE 3 LINEAS 20 ml
M2/ML
0.03700 CEMENTO REGLA DE TRES
0.00528 ARENA REGLA DE TRES
0.001508 AGUA REGLA DE TRES
20.00 ml
1 m2ml
13.481 m2
22.1 ml ahora en ml
m2 1 rollo 22.1 ml
m2 x 1 ml
0.045 rollo/ml
tiempo 1er metodo
subtotal rendimiento subtotal volumen subtotal rendimiento/ real
0.00 4.00 0.00 40.000 0.00 0.00 #DIV/0!
0.00 4.00 0.00 40.000 0.00 0.00 #DIV/0!
0.00 4.00 0.00 40.000 0.00 0.00 #DIV/0!
0.00 4.00 0.00 40.000 0.00 0.00 #DIV/0!
0 4.00 0.00 40.000 0.00 0 #DIV/0!
40.00 ml
1 ml
PESO ESPECIFICO DE LA ARENA 1,10
ml E= pared E=mortero
V 4.80 0.10 0.015 0.0072 m3/m2
DESARROLLO MORTERO
CEMENTO
v kg
440 0.0072 50 0.0634 0.0032 0.0665 M3/M2
ARENA
1.10 0.0072 0.00792 0.00158 0.0095 M3/M2
AGUA
0.29 0.0072 0.002088 0.00063 0.00271 M3/M2
MORTERO
CEMENTO
v kg
440 0.0072 50 0.0634 0.0032 0.0665 M3/M2
ARENA
1.10 0.0072 0.00792 0.00158 0.0095 M3/M2
AGUA
0.29 0.0072 0.002088 0.00063 0.00271 M3/M2
MORTERO
CEMENTO
v kg
440 0.0072 50 0.0634 0.0032 0.066528 M3/M2
ARENA
1.10 0.0072 0.00792 0.00158 0.0095 M3/M2
AGUA
0.29 0.0072 0.002088 0.00063 0.00271 M3/M2
H1 0.05
0.288 0.01666667 1.48 0.057600
H2 0.20 0.288 0.01666667 1.48 0.240
0.288 0.01666667 1.72
0.288 0.02866667
1.2 0.317 m3
L A E /M2 1.2 0.2 4
Volumen total de 5 plintos 0.317 5 1.583 m3
h=
CUARTON 12 pedazo 0.4 4.8 ml
%
4.80 4.80 = 1.89 1.15
4.00 2.00 0.317 2.53
ml uso volumen
u longitud u longitud
TABLAS 2 tabla 1.2 2.4 ml 2 1.25
TOTAL DE ML 4.90 %
4.90 4.90 = 1.93421 1.15
4.00 2.00 0.317 2.53
ml uso volumen
CLAVOS
en este plinto se van 40 clavos
kg/m3
Alambre 58.69
M /O 2DO. METODO
VOLUMEN 1.583 m3 el volumen es el total de los 5 plintos
RENDIMIENTO 8 HORA
R/ REAL 0.198
calculo para rendimiento en m/o costo/trabaj tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 8.00 1.29 1.583
Carpintero 2 18.76 2.65 99.43 8.00 12.43 1.583
Fierrero 2 18.76 2.65 99.43 8.00 12.43 1.583
Albañil 2 18.76 2.65 99.43 8.00 12.43 1.583
Jornalero 6 13.07 1.85 145.077 8 18.13 1.583
VOLUMEN TOTAL nota: se tomo una dimension de una zapata para el calculo que es 3,50ml
ZAPATAS 5.56 M3 v 0.15 0.2 3.5 0.105
0.15 v 0.5 0.15 3.5 0.26
0.2 subtotal 0.37
HIERROS
ml espacios mas uno cantidad #
ZAPATA S /Y 3.45 0.20 17.25 pedazos 1.00 18.25 pedazos
ZAPATA S/X 0.45 0.13 3 pedazos 1.00 4 pedazos
viga zapata 3.45 0.15 23.00 estribos 1.00 24.00 estribos
viga zapata 5.00 U
CANTIDAD ML TOTAL
MULTIPLICACION S -X 18.25 0.45 8.21 VARILLAS ML 10MM
MULTIPLICACION S- Y 4 3.45 15.39 VARILLA ML 10MM
MULTIPLICACION 24.00 0.80 19.20 ESTRIBOS ML 8MM
MULTIPLICACION 5.00 3.45 17.25 VARILLA ML 12MM
MM KG/ml ml kg %
5 0.187
8 0.395 19.20 7.58 1.05 7.963 0.3675
10 0.617 8.21 5.07 1.05 5.320 0.3675
10 0.617 15.39 9.50 1.05 9.972 0.3675
12 0.888 17.25 15.32 1.05 16.084 0.3675
14 1.208
16 1.578
TOTAL TOTAL
ALAMBRE
KG/M3 %
PESO 107.05 5.352 KG/M3
M /O 2DO. METODO
VOLUMEN 5.560 m3 volumen total de zapata
RENDIMIENTO 24.00 HORA
R/ REAL 0.232
calculo para rendimiento en m/o c / trabajo tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 45.67 5.71 26.08 24.00 1.09 5.560
Carpintero 2 28.63 3.58 204.98 24.00 8.54 5.560
Fierrero 2 28.63 3.58 204.98 24.00 8.54 5.560
Albañil 2 28.63 3.58 204.98 24.00 8.54 5.560
Jornalero 6 24.82 3.10 461.90303 24.00 19.25 5.560
EQUIPÒ
concretera y vibrador transporte
1 5.56 m3 1 5.56
x 1 m3 x 1
0.180 0.180
columnas p.a
area 0.2 0.2 0.04 m2
volumen 0.2 0.25 2.5 0.125 m3
total de volumen de columnas 1.31 m3
ancho altura
tabla columna
0.25 0.25 0.20 0.20 0.900 0.20 2.50 11.25
TIRA
altura espacio mas uno pedazos lados pedazos longitud
2.50 0.40 6.25 1.00 7.25 2.00 14.50 0.40
MM KG/ml ml kg % v-h
5 0.187
8 0.395 16.40 6.476 1.05 6.80 0.125 54.40
10 0.617
10 0.617
12 0.888 10.80 9.6 1.05 10.07 0.125 80.56
14 1.208
16 1.578
total 134.96
ALAMBRE
KG/M3 %
PESO 134.96 6.748 KG/M3
MANO DE OBRA
M /O 2DO. METODO
VOLUMEN 1.310 m3 el volumen total de columna
RENDIMIENTO 9.11 HORA
R/ REAL 0.144
calculo para rendimiento en m/o tiempo
personal cantidad s / diario j/r subtotal rendimiento subtotal volumen
Maestro 0.1 26.89 3.83 10.30 9.11 1.13 1.310
Carpintero 2 18.76 2.65 99.43 9.11 10.91 1.310
Fierrero 2 18.76 2.65 99.43 9.11 10.91 1.310
Albañil 2 18.76 2.65 99.43 9.11 10.91 1.310
Jornalero 6 13.07 1.85 145.077 9.11 15.92 1.310
EQUIPÒ
concretera y vibrador transporte
1 1.31 m3 1 1.31
x 1 m3 x 1
0.763 0.763
ESCALERA
volumen hormigon total
zapata de escalera 1.1 0.6 0.15 0.099 m3
viga de zapata 1.1 0.3 0.2 0.066 m3
subtotal 0.165 m3
rampa 1er tramo 1.905 1.1 0.12 0.251
rampa 2do tramo 1.516 1.1 0.12 0.200
subtotal 0.452 m3
descanso 1er tramo 1.1 1.2 0.12 0.16
descanso 2do tramo 1.1 1.2 0.12 0.16
altura muro del descanso 1.2 0.54 0.1 0.06
subtotal 0.38 m3
escalones
1er tramo 0.18 0.3 1.1 5 = 0.1485 m3
2
total
sumando 0.165 0.452 0.38 0.3861 0.218 1.60 m3 volumen total del hormigo
TABLAS
rampa 1.905 1.1 2.0955 m2 1er tramo canestillo 1.1
1.516 1.1 1.6676 m2 2do tramo
descanso 1.1 1.2 1.32 m2 1er tramo
1.1 1.2 1.32 m2 2do tramo lateral 1.905
0.54 1.2 0.648 m2 altura 1.516
subtotal 7.0511 m2 0.867
CAÑAS
rampa 1er tramo 1.905 1.1 2.10 m2
rampa 2do tramo 1.516 1.1 1.67 m2
descanso 1er tramo 1.1 1.2 1.32 m2
descanso 2do tramo 1.1 1.2 1.32 m2
6.40 M2
area divide/cañas divide/cañas
1m2 4 cañas 6.40 25.6124 2 12.81 2
#
clavos 12.81 2 25.6124 clavos
HIERROS
ml espacio cantidad mas uno = longitud
rampa 1er tramo 1.1 0.2 5.5 1 6.5 3.71
rampa 1er tramo 1.1 0.2 5.5 1 6.5 3.57
rampa 2do tramo 1.1 0.2 5.5 1 6.5 4.068
rampa 2do tramo 1.1 0.2 5.5 1 6.5 4
descanso 1er tramo 1.2 0.2 6 1 7 1.1
descanso 2do tramo 1.2 0.2 6 1 7 1.1
altura del descanso 1.2 0.2 6 1 7 0.54
subtotal
MM KG/ml ml kg % v-h.a
5 0.187
8 0.395 104.54 41.294 1.05 43.36 1.60 27.06
10 0.617 118.94 73.387 1.05 77.06 1.60 48.10
10 0.617 0.000 1.05 0.00 1.60 0.00
12 0.888 10.00 8.9 1.05 9.32 1.60 5.82
14 1.208 0 0.0 1.05 0.00 1.60 0.00
16 1.578 0.0 1.05 0.00 1.60 0.00
total 80.98
ALAMBRE
KG/M3 %
PESO 80.98 4.049 KG/M3
MANO DE OBRA
EQUIPOS
concrtetera/vibrador y winche transporte
1 JOR 1.60 M3 1 1.60
X 1 M3 X 1
0.62419167 0.6241917
CISTERNA
volumen general # de muros
1er muro 1.5 0.14 2 2 0.84
2da muro 1.5 0.14 2.72 2 1.1424
3er contrapiso 1.72 2.72 0.14 0.65
4rto loseta 2 3 0.1 0.6
subtotal 3.24 m3
CUARTON
ml ( perimetral) espacio mas uno = longitud total ml
10 0.6 1 17.66667 1.5 26.5
loseta cuarton 38.5 ml
3 0.6 1 6 2 12
CUARTON 38.50 38.50 = 1.49 1.15
4.00 2.00 3.24 25.90
CAÑAS
4rto loseta 2 3 6.00 m2
6.00 M2
area divide/cañas cañas divide/cañas
1m2 4 cañas 6.00 24 2 12.00 2
#
espacio #
log/cuarton divide clavos # cuarton cantidad
longitud 2 0.3 6.67 clavos 3.00 20.00 clavos
log/cuarton divide # cuarton cantidad
longitud 1.5 0.3 5 clavos 6.63 33.13 clavos
CLAVOS cañas # de clavos
clavos en cañas 6 2 12 clavos
sumando 106.25 12 118.25 clavos
HIERROS
ml espacio cantidad mas uno = caras =
1er muro guias 1.5 0.3 5 1 6.00 2 12.0
2da muro guias 1.5 0.3 5 1 6.00 2 12.0
1er muro 10 0.25 40 1 41.00 2 82.0
2da muros 10 0.25 40 1 41.00 2 82.0
3er contrapiso 3 0.25 12 1 13.00 2 26.0
3er contrapiso 2 0.25 8 1 9.00 2 18.0
MM KG/ml ml kg % v-h.a
10 0.617 592.00 365.264 1.05 383.53 3.24 118.47
10 0.617 0.000 0 0.00 1.60 0.00
12 0.888 170.00 151.0 1.05 158.51 3.24 48.96
total 167.43
ALAMBRE
KG/M3 %
PESO 167.43 8.372 KG/M3
MANO DE OBRA
EQUIPOS
concrtetera/vibrador y winche transporte
1 JOR 3.237 M3 1 3.237
X 1 M3 X 1
0.309 0.309
PILAR DE MEDIDOR
volumen 2.44 0.46 0.2 0.22448 M3 por 1 pilar
volumen total 0.224 1 pilares 0.224 M3
area del pilar
area del pilar # lados
2.44 0.46 2 2.2448 m2 3.2208 m2 area del pilar
2.44 0.2 2 0.976 m2
area de plywood 2.44 1.2200 2.9768 m2
Cuarton
8 cuarton 0.46 3.68 ml
10 cuarton 0.2 2 ml
total 5.68 ml
%
Cuarton 5.68 5.68 = 3.163 1.15
4 2 0.22448 1.79584
CLAVOS
plywood 97
cuarton 76
total 173 clavos
%
clavos 173 173 = 2.165 1.15
178 2 0.22448 79.91488
CANTIDAD ML TOTAL
MULTIPLICACION 4.00 3.20 12.80 VARILLAS ML 10mm
MULTIPLICACION 1.0 2.74 2.74 VARILLAS ML 8mm
MULTIPLICACION 13.7 1.12 15.34 ESTRIBOS ML 5mm
MM KG/ml ml kg % v-h
5 0.187 15.34 2.869328 1.05 3.0127944 0.22448 13.42
8 0.395 2.74 1.082 1.05 1.14 0.22448 5.06
10 0.617 12.80 7.898 1.05 8.29 0.22448 36.94
10 0.617
12 0.888
14 1.208
16 1.578
total 55.42
ALAMBRE
KG/M3 % Rendimiento m/o de un pilar
PESO 55.42 2.771 KG/M3 electrico 0.1
hierro 0.5
carpintero 0.5
instalacion 0.1
h.s-vaciado 0.15
MANO DE OBRA zanja 0.15
1.5
EQUIPOS
transporte concretera/vibrador
1 0.22 1 0.22
x 1 x 1
4.4547 4.4547
+ RAIZ ( L X L X L1 X L1 )
0.05 1.2 1.2 0.2 0.2 1.2 1.2 0.2 0.2
3
0.96 = 3.03
0.317
EQUIPO
0.632
TRANSPORTE
Rendimiento
Flete de carro 10 dolares 1
x
0.632
lumen de hormigon
REPLANTILLO #
Area 1.2 1.2 5 7.2
% V 1 1 0.05 0.05
2.93 kg/m3 AREA TOTAL 29.66 M2
1er metodo 2DO. METODO
subtotal rendimiento/ real M /O
2.04 10.30 0.198 AREA 29.660
19.68 99.43 0.198 RENDIMIEN 8.0 HORA
19.68 99.43 0.198 R/ REAL 3.7 m2/hora
19.68 99.43 0.198 calculo para rendimiento en m/o
28.71 145.077 0.198 personal cantidad s / diario j/r subtotal
Maestro 0.1 26.89 3.83 10.30
Albañil 1 18.76 2.65 49.71
el calculo que es 3,50ml Jornalero 3 13.07 1.85 72.54
AGREGADOS
m3 1:03:06 120/KG/CM2
cemento 1 0.032 0.032
ml arena 3 0.032 0.096
ml piedra 6 0.032 0.192
ml tablas 0.32
coeficiente de reducción 0.63
6.06 u/m3 0.2016
RIOSTRA
total 0.25 0.25 4 4
4.00
TABLAS 8.50 8.50
4.00 2.00 0.160 1.28
1.565 u/m3 # pedazo mas uno
8.00 1.00 9.000 pedazos
total CUARTON 9.00 9.00
32 204 4.00 2.00 0.160 1.28
mas uno
8.00 1.00 9.00 pedazos
1.64 kg/m3 TIRA 2.25 2.25
4.00 2.00 0.160 1.28
tabla tablas 12 =
cuarton tablas 54.000
10MM CLAVOS 66.00 66.00
10MM 178.00 2.00 0.160 56.96
8MM
12MM HIERROS #
ml espacios
sentido y 4.00 0.00 u
0.15 estribos 3.95 0.15 26 u
0.2 estribos 0.00 0.20 0.00 u
estribos 0.00 0.15 0.00 u
0.15
0.5
CANTIDAD ML TOTAL
MULTIPLICACION 4.00 3.95 15.80
21.67 MULTIPLICACION 27 0.70 19.13
14.48
27.13 MM KG/ml ml kg
43.77 5 0.187
8 0.395 19.13 7.5576667
10 0.617 0.00 0
107.05 kg/m3 10 0.617
12 0.888 15.80 14.0304
14 1.208
16 1.578
ALAMBRE
KG/M3 %
PESO 141.67 7.084 KG/M3
MANO DE OBRA
4.8 ml LOSA
area 4 3.5 14 m2
5.520 u/m3 volumen 4 3.5 0.2 2.80
area total 51.32 m2
volumen total losa 10.264 m3
TABLAS
area 4.5 5 22.5 m2
5.8 ml canestillo 4 4 3.5 3.5
sumando 22.5 3 25.5 m2
6.670 u/m3 entablado lateral total
CUARTONES
debajo de la losa mas uno
4.5 0.5 9 1 10
1.982 kg/m3 5 0.5 10 1 11
cuarton en canestillo
espacio mas uno
4.00 0.50 8.00 1.000 9.00
3.5 0.5 7 1 8.00
diametro sumando u longitud
12mm 18.00 16.00 34.00 0.2 6.8
8mm cuarton acostado
8mm 3.5 3.5 4 4 15
8mm cuarton diagonal
8mm espacio mas uno
4 0.5 8 1 9
3.5 0.5 7 1 8
sumando u longitud
18 16 34 0.7 23.8
CLAVOS
en canestillo pedazos clavos total
tabla cuarton 34.00 2 68
diagonal cuarton 34 4 136
ml espacios
cuarton tablas 15 0.1 150
1er metodo total 354
subtotal rendimiento/ real cuarton en losa
1.48 10.30 0.144 # tabla clavos # cuarton
14.29 99.43 0.144 cuarton tablas 25 2 10
14.29 99.43 0.144 cuarton - cuarton 10 2
14.29 99.43 0.144 cañas
20.85 145.077 0.144 total
CAÑAS area
1m2 4 cañas 22.5 90
#
clavos 45 2 90
MANO DE OBRA
M /O 2DO. METODO
VOLUMEN 10.264 m3
RENDIMIENT 48.00 HORA
R/ REAL 0.214 MALLAS
area de plancha
volumen de losa en calculo
area de losa en calculo
malla 14
15
VIGA DE AMARRE
area 0.2 0.2 0.04
volumen 0.25 0.15 4
total del volumen de viga de amarre=
HIERRO
7.414 u/M3 viga v1
longitud pata pata # /varillas
4 0.15 0.15 4
subtotal 0 0 0 0
5.291 ml
3.0074 ml refuerzos
4.4352 ml v1 0 ml sumando
4.08 ml v2 0 ml 0
4.08 ml
20.89 ml estribos
v1
1.875 u/m3 longitud divide # / viga
4 3 1.33
1.33 0.15 8.89 1
1.33 0.2 6.67 1
1.33 0.15 8.89 1
sumando
0.517 u/m3 v1 longitud # estribos
0.6 27.4 16.47
sumando
14 mm 0.0
12mm 0
10mm 17.2
8mm 16.47
cañas
6.4031 MM KG/ml ml kg
5 0.187
8 0.395 16.47 6.504
10 0.617 17.2 10.612
1.83851 u/m3 10 0.617 0.000
12 0.888 0.00 0.0
14 1.208 0 0.0
16 1.578 0.0
clavos
ALAMBRE
KG/M3 %
PESO 119.82 5.991 KG/M3
M /O 2DO. METODO
VOLUMEN 2.60 m3
RENDIMIENTO 32.00 HORA
R/ REAL 0.081
0.226 kg/m3 calculo para rendimiento en m/o
personal cantidad s / diario
Maestro 0.1 26.89
Carpintero 1 18.76
ml Fierrero 1 18.76
24.12 Albañil 1 18.76
23.21 Jornalero 5 13.07
26.44
26.00 CAÑAS
7.70 1m2 4 cañas
7.70
3.78 clavos 1.2
118.94 ml ( de 10mm )
CANAS 1.20
ml lados ml 2.50
21.505 2 43.01 ml
20.735 2 41.47 ml
subtotal 84.48 ml(de 8mm )
Dinteles
unidad diametro volumen 0.15 0.1
ml 12 mm volumen 0.15 0.1
ml de dinteles total 18.200
volumen total de dintel 18.200
distancia de dintel 2.85
10 ml
118.94 ml 0 0.15 0.10
104.54 ml
TABLAS 5.70
4.00 2.00
CUARTON
distancia espacio
2.90 0.50 5.80
kg/m3 TIRA
distancia espacio
2.90 0.50 5.80
kg/m3
TIRA 1.02
4.00 2.00
CAÑAS
1m2 4 cañas
CANTIDAD
MULTIPLICACION 2.00
M3 MULTIPLICACION 20.0
M3
MM KG/ml ml
5 0.187
8 0.395 2.40
10 0.617 5.70
10 0.617
12 0.888 0.00
14 1.208
16 1.578
ALAMBRE
12 KG/M3 %
18 PESO 109.66 5.483
6
36 m2
MANO DE OBRA
7.993 u/M3
M /O 2DO. METODO
VOLUMEN 18.20 ml
RENDIMIENTO 1.60 HORA
R/ REAL 11.4000
calculo para rendimiento en m/o
personal cantidad s / diario
1.710 u/m3 Maestro 0.1 26.89
Carpintero 1 18.76
Fierrero 1 18.76
Albañil 1 18.76
Jornalero 1 13.07
6 cañas EQUIPOS
0.853 u/m3
largo/cuarton
ml cantidad
4 6.6 cuartones Antepecho
4 3.0 cuartones viguetas
volumen 0.2 0.1
volumen 0.2 0.1
caras ml de viguetas total 37.6
2 40.0 clavos loseta cuarton volumen total de viguetas 37.6
distancia referencial en ml
caras
2 66.3 clavos cuarton tablas
subtotal 106.25 clavos 0.00 0.20 0.00
TABLAS 5.70
4.00 2.00
0.108 kg/m3
CUARTON
distancia espacio
2.90 0.50 5.80
longitud ml
10 120 CUARTON 4.08
10 120 4.00 2.00
1.5 123
1.5 123 TIRA
2 52 distancia espacio
3 54 2.90 0.50 5.80
subtotal 592 ml( 10 mm )
longitud ml TIRA 2.04
2 84 4.00 2.00
3 86
subtotal 170 ml(12mm) CAÑAS
1m2 4 cañas
1m3
kg/m3 clavos 0
HIERRO
# y
ml espacios
horizontal 2.00
vinchas 2.85 0.15
0 0 0.2
0 0 0.15
adro de rendimiento
8 hora CANTIDAD
x MULTIPLICACION 2.00
8.63 hora MULTIPLICACION 20.0
1er metodo
subtotal rendimiento/ real MM KG/ml ml
2.08 10.30 0.202 5 0.187
20.12 99.43 0.202 8 0.395 3.40
20.12 99.43 0.202 10 0.617 5.70
20.12 99.43 0.202 10 0.617
29.35 145.077 0.202 12 0.888 0.00
14 1.208
16 1.578
M3 ALAMBRE
M3 KG/M3 %
PESO 89.52 4.476
MANO DE OBRA
1 pilar
M /O 2DO. METODO
ml 37.60 ml
RENDIMIENTO 4.06 HORA
R/ REAL 9.2625
calculo para rendimiento en m/o
personal cantidad s / diario
Maestro 0.1 26.89
Carpintero 1 18.76
Fierrero 1 18.76
2.77 u/m3 Albañil 1 18.76
Jornalero 3 13.07
EQUIPOS
3.64 u/m3
ALEROS
VILLA
volumen 0.4 0.08
volumen 0.4 0.08
ml de aleros total 69.3
2.49 u/m3 volumen total de aleros 69.3
distancia referencial de alero
0 0.00 0.00
CUARTON 6.32
4.00 2.00
CAÑAS
1m2 4 cañas
kg/m3
clavos 55.44
CAÑAS 55.44
endimiento m/o de un pilar 2.50
hora
hora HIERRO
hora espacios
hora varillas ml #
hora eje y 2.00
hora m3 eje x 7.4 0.2
hora 0 0 0.2
0 0 0.15
m3 1.5 hora
x CANTIDAD
1.5 hora MULTIPLICACION 2.00
MULTIPLICACION 38.0
1er metodo
subtotal rendimiento/ real
0.00 0.00 #DIV/0! MM KG/ml ml
0.00 0.00 #DIV/0! 5 0.187
0.00 0.00 #DIV/0! 8 0.395 15.20
0.00 0.00 #DIV/0! 10 0.617 14.80
0.00 0.00 #DIV/0! 10 0.617
0.00 0.00 #DIV/0! 12 0.888 0.00
14 1.208
16 1.578
ALAMBRE
KG/M3 %
PESO 67.11 3.356
MANO DE OBRA
M /O 2DO. METODO
ML 69.30 ml
RENDIMIENTO 32.00 HORA
R/ REAL 2.1656
calculo para rendimiento en m/o
personal cantidad s / diario
Maestro 0.1 26.89
Carpintero 1 18.76
Fierrero 1 18.76
Albañil 1 18.76
Jornalero 3 13.07
EQUIPOS
MESON
volumen 0.6 0.05
volumen 0.6 0.05
ml deL meson total 4.8
volumen total de meson 4.8
distancia de ml referencial 2
ancho de meson 0.6
0 0.00 0.00
TABLAS 6.00
4.00 2.00
longitud uso
CUARTON
distancia espacio
2.00 0.50 4.00
CUARTON 3.00
4.00 2.00
TIRA 3.20
4.00 2.00
CAÑAS
1m2 4 cañas
clavos 1.2
CAÑAS 1.20
2.50
HIERRO
espacios
varillas ml
eje y 0.60 0.15
eje x 2 0.15
0 0 0.2
0 0 0.15
CANTIDAD
MULTIPLICACION 5.00
MULTIPLICACION 14.3
MM KG/ml ml
5 0.187
8 0.395 0.00
10 0.617 18.60
10 0.617
12 0.888 0.00
14 1.208
16 1.578
ALAMBRE
kg/ml %
PESO 200.83 10.042
MANO DE OBRA
M /O 2DO. METODO
ML 4.80 ml
RENDIMIENTO 4.00 HORA
R/ REAL 1.2000
calculo para rendimiento en m/o
personal cantidad s / diario
Maestro 0.1 26.89
Carpintero 0.5 18.76
Fierrero 0.5 18.76
Albañil 1 18.76
Jornalero 0.5 13.07
EQUIPOS
0.63 1.15 0.73 u/m3
m3
horas
8 3.125 c/hora
8 2.5
h/m3
Rendimiento
DIA 1.5833 m3
1 m3
ds/m3 nota: este vale para el analisis porque se paga por dia la alquilada
Rendimiento
carro 1.58 m3
1 m3
t/m3
NOTA: EL AREA TOTAL ES 29,66M2 PERO TOMAMOS COMO EJ: UNA AREA DE 1,2 X 1,2 X 5 PLINTOS = 7,2 M2
m2
M3/M2 EN 1M2 NOS SALE 0,05M3 este valor es para sacar despues una conversión
Rendimiento CONCRETERA
1 29.66 m2 1 29.6600 M2
x 1 m2 X 1.000 M2
0.0337
0.0337 c/m2
agua
# cemento litros
1 = 4.96 sc 28 1.00 sc
0.2016 x 4.96 sc
138.88
VARILLAS ML 12 mm
ESTRIBOS ML 8mm
h= un tercio
HIERRO 3 3
lados pedazos longitud #
2.00 17.00 0.40 6.8 ml ml espacios
vertical 4.00
= 5.67 1.15 6.517 u/m3 estribos 1 0.15
estribos 1 0.2
estribos 1 0.15
42
56 CANTIDAD
98 clavos MULTIPLICACION 4.00
MULTIPLICACION 21.3
= 1.84 1.05 1.927 kg/m3
EQUIPÒ
concretera y vibrador
1 2.30
x 1
0.435
tal de columna
HORMIGON ARMADO
ml
5 50 ml cuarton volumen de losa / calculo 4
4.5 49.5 ml cuarton volumen del vacio de bloques
CLAVOS
cuarton madera
# / viga total unidad diametro tiras madera
1 17.2 ml 10mm
0 0 ml
CLAVOS
unidad diametro
ml 12mm HIERRO
vertical
# / estribos mas uno vinchas
1 0
8.9 9.9 0
6.7 7.7
8.9 9.9
27.4 MULTIPLICACION
MULTIPLICACION
ml 8mm
equipos MM
concretera/vibrador 5
1 JOR 2.599 M3 8
X 1 M3 10
0.3848 10
12
14
% v-h.a 1 m3 16
area divide/cañas
0.6 2.4 2 1.2 cañas
# clavos
2 2.4 clavos
ml CONVERSION DE VOLUME
1 0.015 m3/ml
2.85 0.0428 m3 CEMENTO
ml 0.15 ARENA
0.15 0.1 0.273 m3 PIEDRA
ml 2.85 AGUA
ancho altura
tabla dintel CEMENTO
0.15 0.400 0.20 2.85 5.70 ML 8.24
X
5.70 5.70 = 0.250 1.15 0.288 u/ml 0.1236
2.85 22.80 ARENA
0.55
x
mas uno pedazos lados pedazos longitud 0.00825
1.00 6.80 2.00 13.60 0.20 2.72 ml PIEDRA
0.88
2.72 2.72 = 0.12 1.15 0.137 u/ml X
2.85 22.80 0.0132
AGUA
0.29
mas uno pedazos lados pedazos longitud x
1.00 6.80 1.00 6.80 0.15 1.0 ml 0.00435
2
#
mas uno cantidad varillas diametro CONVERSION DE M3 A ML DEL HIERRO
0.00 u 0.00 2.00 10mm
19.00 u 1 20.0 u 8mm 0.04275 m3 2.85
0.00 u 0 0.0 u 8mm 1 m3 x
0.00 u 0 0.0 u 8mm 66.67
total 20.0 u 8mm HIERRO DE 8MM
ML TOTAL 23.28 KG 66.67
2.85 5.70 VARILLASML 10mm X 1
0.12 2.40 VINCHA ML 8mm 0.349 kg/ml
HIERRO DE 10MM
86.38 KG 66.67
kg % v-h X 1.00
1.296 kg/ml
0.948 1.05 1.00 0.04275 23.28 kg/m3
3.517 1.05 3.69 0.0428 86.38 kg/m3 ALAMBRE RECOCIDO
5.483 KG 66.67
0.0 1.05 0.00 0.04275 0.00 kg/m3 X 1
0.0822 kg/ml
KG/M3
transporte
1 18.20
x 1
0.0549
ml CONVERSION DE VOLUME
1 0.02 m3/ml
2.85 0.057 m3 CEMENTO
ml 0.2 ARENA
0.2 0.1 0.752 m3 PIEDRA
2.85 ml 2.85 AGUA
ancho altura
tabla viguetas CEMENTO
0.20 0.400 0.20 2.85 5.70 ML 8.24
X
5.70 5.70 = 0.25 1.15 0.288 u/ml 0.1648
2.85 22.80 ARENA
0.55
x
mas uno pedazos lados pedazos longitud 0.011
1.00 6.80 2.00 13.60 0.30 4.08 ml PIEDRA
0.88
4.08 4.08 = 0.18 1.15 0.206 u/ml X
2.85 22.80 0.0176
AGUA
0.29
mas uno pedazos lados pedazos longitud x
1.00 6.80 2.00 13.60 0.15 2.0 ml 0.0058
area divide/cañas
0 0 2 0 cañas CLAVOS
# clavos cuarton madera
2 0 clavos tira madera
#
mas uno cantidad varillas diametro CONVERSION DE M3 A ML DEL HIERRO
0.00 u 0.00 2.00 10mm
19.00 u 1 20.0 u 8mm 0.05700 m3 2.85
0.00 u 0 0.0 u 8mm 1 m3 x
0.00 u 0 0.0 u 8mm 50.00
total 20.0 u 8mm HIERRO DE 8MM
ML TOTAL 24.74 KG 50.00
2.85 5.70 VARILLASML 10mm X 1
0.17 3.40 VINCHA ML 8mm 0.495 kg/ml
HIERRO DE 10MM
64.79 KG 50.00
kg % v-h 1 m3 X 1.00
1.296 kg/ml
1.343 1.05 1.41 0.057 24.74 kg/m3
3.517 1.05 3.69 0.05700 64.79 kg/m3 ALAMBRE RECOCIDO
4.476 KG 50.00
0.0 1.05 0.00 0.057 0.00 kg/m3 X 1
0.0895 kg/ml
KG/M3
tiempo 1er metodo
j/r subtotal rendimiento subtotal volumen subtotal rendimiento/ real
3.83 10.30 4.06 2.54 37.600 95.39 10.30 9.2625
2.65 49.71 4.06 12.25 37.600 460.48 49.71 9.263
2.65 49.71 4.06 12.25 37.600 460.48 49.71 9.263
2.65 49.71 4.06 12.25 37.600 460.48 49.71 9.263
1.85 72.5385 4.06 17.87 37.600 671.89 72.5385 9.263
transporte concretera
1 37.60 1 37.60
x 1 x 1
0.0266 0.0266
ml CONVERSION DE VOLUME
1 0.032 m3/ml
7.4 0.237 m3 CEMENTO
ml ARENA
0.4 0.08 2.2176 m3 PIEDRA
7.4 ml AGUA
ancho ancho distancia
aleros tabla aleros CEMENTO
0.40 0.400 0.20 7.40 14.80 ML 8.24
X
14.80 14.80 = 0.25 1.15 0.288 u/ml 0.26368
7.4 59.20 ARENA
0.55
x
mas uno pedazos lados pedazos longitud 0.0176
1.00 15.80 1.00 15.80 0.40 6.32 ml PIEDRA
0.88
6.32 6.32 = 0.11 1.15 0.123 u/ml X
7.4 59.20 0.02816
AGUA
va alrededor del alero sobre la medida que tomamos de 7,4 ml 0.29
8.2 ml x
0.00928
area divide/cañas
27.72 110.88 2 55.44 cañas CLAVOS
# clavos cuarton madera
2 110.88 clavos tira madera
#
mas uno cantidad varillas diametro CONVERSION DE M3 A ML DEL HIERRO
0.00 u 0.00 2.00 10mm
37.00 u 1 38.0 u 8mm 0.237 m3 7.4
0.00 u 0 0.0 u 8mm 1 m3 x
0.00 u 0 0.0 u 8mm 31.25
total 38.0 u 8mm HIERRO DE 8MM
ML TOTAL 26.62 KG 31.25
7.40 14.80 EJE Y ML 10mm X 1
0.40 15.20 EJE X ML 8mm 0.852 kg/ml
HIERRO DE 10MM
40.49 KG 31.25
kg % v-h 1m3 X 1.00
1.296 kg/ml
6.004 1.05 6.30 0.237 26.62 kg/m3
9.132 1.05 9.59 0.237 40.49 kg/m3 ALAMBRE RECOCIDO
3.356 KG 31.25
0.0 1.05 0.00 0.237 0.00 kg/m3 X 1
0.1074 kg/ml
KG/M3
transporte concretera/vibrador
1 69.30 1 69.30
x 1 x 1
0.0144 0.0144
ml CONVERSION DE VOLUME
1 0.03 m3/ml
2 0.06 m3 REFERENCIAL CEMENTO
ml ARENA
0.6 0.05 0.144 m3 PIEDRA
ml AGUA
ml ancho ancho
tabla meson CEMENTO
2.00 2.000 0.20 0.60 6.00 ML 8.24
X
6.00 6.00 = 0.375 1.15 0.431 u/ml 0.2472
2.0 16.00 ARENA
ml 0.55
x
mas uno pedazos lados pedazos longitud 0.0165
1.00 5.00 1.00 5.00 0.60 3.00 ml PIEDRA
0.88
3.00 3.00 = 0.19 1.15 0.216 u/ml X
2.0 16.00 0.0264
AGUA
va alrededor del meson sobre la medida que tomamos de 2 ml 0.29
3.2 ml x
0.0087
area divide/cañas
1.2 4.8 4 1.2 cañas CLAVOS
# clavos cuarton madera
2 2.4 clavos tira madera
#
mas uno cantidad varillas diametro CONVERSION DE M3 A ML DEL HIERRO
4.00 u 1.00 5.00 10mm
13.33 u 1 14.3 u 10mm
0.00 u 0 0.0 u 8mm 0.06 m3 2
0.00 u 0 0.0 u 8mm 1 m3 x
33.33
ML TOTAL
2.00 10.00 EJE Y ML 10mm
0.60 8.60 EJE X ML 10mm
total 18.60 ml HIERRO DE 10MM
200.83 KG 33.33
kg % v-h 1m3 X 1.00
6.025 kg/ml
0.000 1.05 0.00 0.06 0.00 kg/m3
11.476 1.05 12.05 0.06 200.83 kg/m3 ALAMBRE RECOCIDO
10.042 KG 33.33
0.0 1.05 0.00 0.06 0.00 kg/m3 X 1
0.3013 kg/ml
KG/M3
transporte
1 4.80
x 1
0.2083
X 5 PLINTOS = 7,2 M2
m2
0.16 m3 nota: se tomo de una riostra
ota. Total de volumen de riostras
transporte
1 1.66
x 1
0.602
0.05 m2
3 0.15 m3
2.3 m3 0.2
ancho altura
0.3 tabla columna
0.3 0.30 0.20 0.20 1.000 0.20 3.00 15.00
transporte
m3 1 2.3
m3 x 1
0.435
V2 0.5 m
V2 V1 0.4 m
espacios cantidad
15.79 7 110.53 bloques
bloque/m3 rendimiento
v2
# / viga # / estribos mas uno longitud divide # / viga # / estribos mas uno
1 3.5 3 1.1667 1
2 17.8 18.8 1.167 0.15 7.8 2 15.56 16.56
2 13.3 14.3 1.167 0.2 5.8 2 11.67 12.67
2 17.8 18.8 1.167 0.15 7.8 2 15.56 16.56
sumando 51.9 sumando 46.8
v2 longitud # estribos
67.46 ml 1.4 46.78 65.49 ml
65.49 132.94 ml 8mm
longitud
0.15 18 ml 8 mm
kg % v-h.a
KG/M3
ml encofrado de pilarete
0.15 0.1 1 0.015 m3/ml
0.15 0.1 2.1 0.03150 m3
tal de ml de pilaretes es 11 2.10 23.1 ml 0.1
altura del pìlarete es 2.1 ml
olumen total de pilarete 0.03150 11 0.3465 ml
# pilarete ancho altura 0.15
tabla columna
0.15 0.15 0.10 0.400 0.20 2.10 4.20 ML
# de varilla vertical 2
#y #
ml espacios mas uno cantidad varillas diametro
2.00 0.00 u 0.00 2.00 10mm
2.1 0.15 14.00 u 1 15.0 u 8mm
0 0.2 0.00 u 0 0.0 u 8mm
0 0.15 0.00 u 0 0.0 u 8mm
total 15.0 u 8mm
CANTIDAD ML TOTAL
ULTIPLICACION 2.00 2.10 4.20 VARILLAS ML 10mm
ULTIPLICACION 15.0 0.07 1.05 VINCHA ML 8mm
KG/ml ml kg % v-h
0.187
0.395 1.05 0.415 1.05 0.44 0.0315 13.83 kg/m3
0.617 4.20 2.591 1.05 2.72 0.0315 86.38 kg/m3
0.617
0.888 0.00 0.0 1.05 0.00 0.0315 0.00 kg/m3
1.208
1.578
total 100.21 kg/m3
KG/M3 %
100.21 5.010 KG/M3
ANO DE OBRA
2DO. METODO
23.10 ml los metro lineal del pilarete 46,20
8.00 HORA
2.89
alculo para rendimiento en m/o tiempo
cantidad s / diario j/r subtotal rendimiento subtotal ML subtotal rendimiento/ real
0.1 0 5.71 0.00 8.00 0.00 23.100 0.00 0.00
1 0.00 3.58 0.00 8.00 0.00 23.100 0.00 0.00
1 0.00 3.58 0.00 8.00 0.00 23.100 0.00 0.00
1 0.00 3.58 0.00 8.00 0.00 23.100 0.00 0.00
1 0.00 3.10 0 8.00 0.00 23.100 0.00 0
transporte
1 23.1
x 1
0.0433
SC 1 M3 0.1236 SC 1 ML
0.015 M3
SC
m3 1 m3 0.00825 m3 1 ml
0.015 m3
m3
M3 1 M3 0.0132 M3 1 ML
0.015
M3
m3 1 m3 0.00435 m3 1 ml
0.015 m3
m3
DEL HIERRO
ml
ml
ML
ML
ML
ML
ML
ML
m3 1 m3 0.011 m3 1 ml
0.02 m3
m3
M3 1 M3 0.0176 M3 1 ML
0.02
M3
m3 1 m3 0.0058 m3 1 ml
0.02 m3
m3
lados
cantidad pedazos caras
3 6 2 36
2 6 2 24
total 60 clavos
DEL HIERRO
ml
ml
ML
ML
ML
ML
ML
ML
ONVERSION DE VOLUMEN DE AGREGADOS A ML
210 KG/CM2
8.24 SACO
0.55 M3
0.88 M3
0.29 M3
SC 1 M3 0.26368 SC 1 ML
0.032 M3
SC
m3 1 m3 0.0176 m3 1 ml
0.032 m3
m3
M3 1 M3 0.02816 M3 1 ML
0.032
M3
m3 1 m3 0.00928 m3 1 ml
0.032 m3
m3
lados
cantidad pedazos caras
3 15.80 1 47.4
8 0 0 8
total 55.4 clavos
DEL HIERRO
ml
ml
ML
ML
ML
ML
ML
ML
ONVERSION DE VOLUMEN DE AGREGADOS A ML
210 KG/CM2
8.24 SACO
0.55 M3
0.88 M3
0.29 M3
SC 1 M3 0.25 SC 1 ML
0.03 M3
SC
m3 1 m3 0.017 m3 1 ml
0.03 m3
m3
M3 1 M3 0.026 M3 1 ML
0.03
M3
m3 1 m3 0.0087 m3 1 ml
0.03 m3
m3
abajo
cantidad pedazos caras
3 5.00 1 15
8 0 0 8
total 23 clavos
DEL HIERRO
ml
ml
ML
ML
ML
ML
ML
14.375 u/M3
5.6 ml
5.367 u/m3
kg % v-h
KG/M3
cañas
sentido x 5 ml
sentido y 4.5 ml
5 ML
EQUIPOS
concrtetera/vibrador y winche transporte
1 JOR 5.76 M3 1 5.76 M3
X 1 M3 X 1 M3
0.1735909 0.1736
# /varillas # / viga
7 2 4.2 ml
sumando 8.4 ml 14 mm
sentido x
para un futuro este cuadro
estribos
v1 v2
longitud divide # / viga # / estri mas uno longitud divide
4 3 1.33 1 3.5 3
1.33 0.15 8.89 2 17.8 18.8 1.167 0.15
1.33 0.2 6.67 2 13.3 14.3 1.167 0.2
1.33 0.15 8.89 2 17.8 18.8 1.167 0.15
sumando 51.9
v1 longitud # estribos v2 longitud
sentido y
para un futuro este cuadro
estribos
v1 v2
longitud divide # / viga # / estri mas uno longitud divide
4 3 1.33 1 3.5 3
1.33 0.15 8.89 2 17.8 18.8 1.167 0.15
1.33 0.2 6.67 2 13.3 14.3 1.167 0.2
1.33 0.15 8.89 2 17.8 18.8 1.167 0.15
sumando 51.9
v1 longitud # estribos v2 longitud
sentido y
para un futuro este cuadro
estribos
v1 v2
longitud divide # / viga # / estri mas uno longitud divide
4 3 1.33 1 3.5 3
1.33 0.15 8.89 2 17.8 18.8 1.167 0.15
1.33 0.2 6.67 2 13.3 14.3 1.167 0.2
1.33 0.15 8.89 2 17.8 18.8 1.167 0.15
sumando 51.9
v1 longitud # estribos v2 longitud
ENCOFRADOS METALICOS
SU VALOR POR ALQUILER ES DE 4,80 EL M2 PERO PARA EL CALCULO LO HACEMOS EN M3
1.25 0.2 1.00 m3
1 0.2 0.20 jg/m3 resumen
M2 M3 M3 0,20 m3 es 1 juegos
FRADO) O M2 1 1.00 0.20 5.00 JG/M3 REGLA DE TRES 1 m3 es 5 juegos
m3 $ m2 m2
0.2 24 DLRS M3 4.8 5 1 24
EDE SER M2 O JUEGO Ej.
Rendimiento
5 m2/m3
CEMENTO
8.24 SC 1 M3 0.1236 SC 1 ML
X 0.015 M3
0.124 SC
ARENA
0.55 m3 1 m3 0.0083 m3 1 ml
x 0.015 m3
0.00825 m3
PIEDRA
0.88 M3 1 M3 0.0132 M3 1 ML
X 0.015
0.0132 M3
AGUA
0.29 m3 1 m3 0.0044 m3 1 ml
x 0.015 m3
0.0044 m3
dimension de estribo
0.07 cm
0.03150 m3 2.1 ml
1 m3 x
66.6667 ml
HIERRO DE 8MM
13.83 KG 66.6667 ML
X 1 ML
0.207375 kg/ml
HIERRO DE 10MM
86.38 KG 66.6667 ML
X 1 ML
1.2957 kg/ml
ALAMBRE RECOCIDO
5.010 KG 66.6667 ML
X 1 ML
0.0751538 kg/ml
1er metodo
rendimiento/ real
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
sentido x
sentido x para un futuro este cuadro
ara un futuro este cuadro
estribos
v1
# / viga # / estribos mas uno longitud divide
1.1667 1 4 3 1.33
7.8 2 15.56 16.56 1.33 0.15 8.89
5.8 2 11.67 12.67 1.33 0.2 6.67
7.8 2 15.56 16.56 1.33 0.15 8.89
sumando 46.8
# estribos v1 longitud # estribos
sentido y
sentido y para un futuro este cuadro
ara un futuro este cuadro
estribos
v1
# / viga # / estribos mas uno longitud divide
1.1667 1 4 3 1.33
7.8 2 15.56 16.56 1.33 0.15 8.89
5.8 2 11.67 12.67 1.33 0.2 6.67
7.8 2 15.56 16.56 1.33 0.15 8.89
sumando 46.8
# estribos v1 longitud # estribos
sentido y
sentido y para un futuro este cuadro
ara un futuro este cuadro
estribos
v1
# / viga # / estribos mas uno longitud divide
1.1667 1 4 3 1.33
7.8 2 15.56 16.56 1.33 0.15 8.89
5.8 2 11.67 12.67 1.33 0.2 6.67
7.8 2 15.56 16.56 1.33 0.15 8.89
sumando 46.8
# estribos v1 longitud # estribos
20 m3 es 1 juegos 1 m2 es 1 juegos
m3 es 5 juegos 5 m2 es 5 juegos
dlrs
sentido x
para un futuro este cuadro
v2
# / viga # / estribos mas uno longitud divide # / viga # / estribos
1 3.5 3 1.1667
2 17.8 18.8 1.167 0.15 7.8 2 15.56
2 13.3 14.3 1.167 0.2 5.8 2 11.67
2 17.8 18.8 1.167 0.15 7.8 2 15.56
sumando 51.9 sumando
v2 longitud # estribos
sentido y
para un futuro este cuadro
v2
# / viga # / estribos mas uno longitud divide # / viga # / estribos
1 3.5 3 1.1667
2 17.8 18.8 1.167 0.15 7.8 2 15.56
2 13.3 14.3 1.167 0.2 5.8 2 11.67
2 17.8 18.8 1.167 0.15 7.8 2 15.56
sumando 51.9 sumando
v2 longitud # estribos
sentido y
para un futuro este cuadro
v2
# / viga # / estribos mas uno longitud divide # / viga # / estribos
1 3.5 3 1.1667
2 17.8 18.8 1.167 0.15 7.8 2 15.56
2 13.3 14.3 1.167 0.2 5.8 2 11.67
2 17.8 18.8 1.167 0.15 7.8 2 15.56
sumando 51.9 sumando
v2 longitud # estribos
mas uno
1
16.56
12.67
16.56
46.8
mas uno
1
16.56
12.67
16.56
46.8
mas uno
1
16.56
12.67
16.56
46.8
TRAZADO Y REPLANTEO 123.15 M2
ml
CUARTON 36 pedazo 0.8 28.8
PIOLA NOTA: SE TOMA UNA CANTIDAD PROMEDIO SOBRE EL TOTAL DEL AREA EJ: 150 ML DE
1 MASO DE PIOLA ES 100ML HACEMOS UNA REGLA DE TRES
maso area maso/m2 %
1.5 123.15 0.01218027 1.03 0.013 maso/m2
M /O 2do METODO
AREA 123.15 M2
TRABAJO 4 HORA
RENDIMIENTO 30.79 m2/hora
calculo para rendimiento en m/o
personal cantidad s / diario j/r subtotal rendimiento subtotal
Maestro 0.1 45.67 5.71 26.08 4.000 6.52
carpintero 1 28.63 3.58 102.49 4.000 25.62
Jornalero 2 24.82 3.10 153.97 4.000 38.49
TRANSPORTE
1 FLETE 123.15 m2
x 1 m2
kg m2
1.49184 300 0.0049728 kg / m2 material para los hitos varilla de 12mm
CAL PIOLA
1 KILOS 2,2 LIBRAS
en 8 libras tenemos 3,63 kilos maso
kilos area rendimineto % KILOS 1.5
3.636 300.00 0.01 1.03 0.0125 CAL/M2
M /O 2do METODO
Area 300
Hora 4
Rendimiento 75 m2/hra
Equipo TRANSPORTE
ELECTRICO
MEDIDOR PROVISIONAL 1 GLOBAL
M/O
1 GLOBAL
1 HORA
1 R/REAL
TRANSPORTE
1 1 RENDIMIENTO
AGUA POTABLE
MEDIDOR PROVISIONAL 1 GLOBAL
M/O
1 GLOBAL
1 HORA
1 R/REAL
TRANSPORTE
1 1 RENDIMIENTO
EXCAVACION
ZAPATA H=
% 4 0.4 0.65 1.04
1.15 0.034 u/m2 8 0.5 0.65 2.6
8 0.5 0.65 2.6
8 0.5 0.65 2.6
10 0.4 0.65 2.6
10 0.5 0.65 3.25
% 7 0.5 0.65 2.275
1.15 0.011 u/m2 16.97
RELLENO EQUIPO
volumen de excavacion 23.8
volumen interior (contrapiso) 24.63
1.05 0.0026 kg/m2
total de relleno 48.45
volumen de excavacion para relleno
zapata plinto
1 KILOS 2,2 LIBRAS 16.97 1.404 23.8 m3
en 8 libras tenemos 3,63 kilos volumen interior contrapiso para relleno
area rendimineto % KILOS 123.15 0.2 24.63 m3
123.15 0.03 1.03 0.0304
calculo para rendimiento en m/o
AL DEL AREA EJ: 150 ML DE PIOLA personal cantidad s / diario j/r
1 150 100 1.5 Maestro 0.1 0 5.71
Jornalero 5 13.07 3.10
rendimiento
4.5 M3
8 horas
0.5625 M3/HORA
arilla de 12mm
area maso/m2 %
300 0.005 1.03 0.005 maso/m2 rendimiento
300 M2
1 M2
EQUIPO retroexca. volquetas
1 retroexca. 20.87 m3 1 8.00
x 1 m3 x 1
0.1250
0.0479 rendimiento
# PLINTO
PLINTO 0.6 0.6 0.65 6 1.404 M3
2 4.5 m3
volquetas
1 8 m3
x 1 m3
0.13
4
3.5 3
3.5
3
4
4
3
LIMPIEZA 300
m3 Transporte
m3 TERRENO 300 M2 1
AREA 300 M2 x
TRABAJO 8 HORA 0.0033
RENDIMIENTO 37.5 NUMERO DE VIAJE
TRANSPORTE
1 carro 15 ml
x 1 ml
0.0667
CASETA O BODEGA
AREA DE PISO 16 M2
TABLAS
pared posterior 14 m2 AREA DE U NA TABLA
pared lateral 13 m2 4 0.2 0.8
pàred lateral 13 m2
pared frontal 12 m2
piso 16 m2
total 68 m2
68 = 68 = 2.125
0.8 2.5 16 32
area uso area
CUARTONES D E CHANUL 2"X 3" X4 ML
cubierta 12 ml
pared posterior 26 ML
pared lateral 22.27 ML
pàred lateral 22.27 ML
pared frontal 19 ML
piso 12 ML
TOTAL 113.54 ML
CLAVOS
CUARTONES 72 U
TABLAS 720 U
TOTAL 792 U
M /O 2DO. METODO
M2 16
RENDIMIENTO 8
R/ REAL 2.0
transporte
1 16
x 1
0.0625
M2 DESBROCE DEL TERRENO
nota: en el cerramiento tenemos 4m de altura x 1ml seria 4m2, esto se hace para indicar que en 1ml = 4m2
M2 1ml = 4m2
% conversión de m2 a ml
1.15 0.5750 4 1 2.30 u/ml regla de tres
u m2 m2
conversión de m2 a ml
1.15 0.341 4 1 1.365 u/ml regla de tres
u m2 m2
conversión de m2 a ml
1.05 0.0358 kg/m2 4 1 0.143 kg/ml
m2 m2
1ml = 3m2
conversión de m2 a ml
2do metodo
ML 15 1.88 ML / HRS
HORAS 8
CASETA O BODEGA
CUBIERTA
AREA 4 4
Area de plancha de zinc de 10 pies
# de plancha 1 =
3.38
%
1.15 2.44 U/M2
TIRAS
cubierta 20 ml
20 20
4 2 16 128
%
% 0.15625 1.15
1.15 1.020 U/ML
%
1.05 0.146 U/M2
regla de tres
16 m2
3.38 m2
0.2959 u/m2
0.15625
0.180 u/m2
PRECIOS DE MATERIALES PRECIO DE MAQ
actualizado
AGREGADOS UNIDAD PRECIO EN DUDA
2/6/2023
ARENA CORRIENTE M3 12.18 RETROEXCAVADORA
ARENA GRUESA M3 13.75 CONCRETERA
CASCAJO MEDIANO M3 8.75 10.17 COMPACTADOR
PIEDRA # 3/4" M3 18.13 VOLQUETA DESALOJO
PIEDRA CHISPA M3 16.25 18.66 VIBRADOR
PIEDRA BASE M3 9.00 15.26 WINCHE
CICLOPEO GRUESO M3 10.00
SACO
IMPERMEABILIZANTE PARA CISTERNA SIKA MONO TOP 144 (SACO DE 10 KILOS )
ELECTRICO -CUBIERTA ALUMINIO Y VIDRIO - PUERTAS METALICAS- PUERTAS DE MADERA UNIDAD PRECIO
TRANSPORTE FLETE 10.00 VIAJE
TRANSPORTE FLETE 5.00 VIAJE VENTANA A/ VIDRIO DE 4 MM CORREDIZA M2 70.00
TRANSPORTE FLETE 3.00 VIAJE PUERTA A /. DE 6MM M2 80.00
PUERTA METALICA PARA COCINA DE 0,80 X 2,00 M U 120.00
GAFITERIA PUERTA METALICA PARA CERRAMIENTO 0,70 X 2,00 M U 100.00
PUERTA DE MADERA PARA COCINA MODELO FRANCESA 113 /VIDRIO U 100.00
TRANSPORTE FLETE 5.00 VIAJE PUERTA DE MADERA PARA PUERTA PRINCIPAL ROBLE 0,90 X 2,00 M U 95.00
TRANSPORTE FLETE 3.00 VIAJE PUERTA DE MADERA PARA DORMITORIOS TAMBORADA HDF U 42.39
PUERTA DE MADERA PARA BAÑOS TAMBORADA HDF U 41.83
U
REVESTIMIENTO Y PINTURAS-IMPERMEABILIZACION TUMBADO UNIDAD PRECIO
TRANSPORTE FLETE 5.00 VIAJE TUMBADO DE YESO TIPO LOSA INCLUIDO CON PERFIL M2 12.00
TRANSPORTE FLETE 3.00 VIAJE
m
SENCILLO S/PLACA EAGLE
PTOR DOBLE S/PLACA EAGLE
PTOR TRIPLE S/PLACA EAGLE
ENCILLO DE CONMUTACION EAGLE
PTOR SENCILLO DE TIMBRE
RIENTE SENCILLO DE TELEFONO
RIENTE DE TELEVISOR 110 V
ENTE SENCILLO S/PLACA EAGLE
IENTE DOBLE S/PLACA EAGLE
ENTE 240 V. POLARIZADO EAGLE
22.00
65.00
15.50
27.00
15.00
80.64
CENTRO DE ANALISIS DE COSTOS
PLANIFICACION DE LOS MATERIALES
2.1 PROPORCION 1: 2
2.2 PROPORCION 1: 3
2.3 PROPORCION 1: 1: 4
2.4 PROPORCION 1: 1: 6
CANT.
4.1 HORMIGONES
CARRETILLA - PALA - BALDE
TANQUE - PARIHUELAS - BURRAS- ANDAMIOS
4.2 ENCOFRADOS
CIERRAS ELECTRICAS- TALADROS
4.3 ACEROS
CIZALLAS, MESAS
ANDAMIO
SE CONSIDERA DEL 3 AL 10% COMO HERRAMIENTA MENOR DEL COSTO DE LA MANO DE OBRA
5 ACERO ESTRUCTURAL
1 GRUPOS DE TRABAJO
G2 REPLANTILLO Y CONTRAPISO
G2 = 1 ALBAÑIL + 1 JORNALEROS
G5 HORMIGONES
G5 = 1 ALBAÑIL + 6 JORNALEROS
TRAZADO G3 m2
EXCAVACION G1 m3
RELLENO COMPACTO CON ZAPITO G1 m3
REPLANTILLO e -5 G2 m2
CONTRAPISO e- 10 G2 m2
HORMIGON:
CIMIENTOS G5 m3
VERTICALES G5 m3
HORIZONTALES G5 m3
ENCOFRADO:
CIMIENTOS G3 m2
VERTICALES G3 m2
HORIZONTALES G3 m2
HIERRO:
CIMIENTOS G3 Kg
VERTICALES G3 Kg
HORIZONTALES G3 Kg
BOQUE :
E = 7 CMS G4 m2
E = 9 CMS G4 m2
ENLUCIDOS :
ENLUCIDO INTERIOR E = 2 CMS. G4 m2
ENLUCIDO EXTERIOR E = 2 CMS. G4 m2
CAJONETAS :
BLOQUE DE CAJONETA 40X40 G1 und
O DE ANALISIS DE COSTOS
ATERIALES
DESPERDICIOS
10%
10%
15%
15%
15%
15%
DESPERDICIOS
5%
RENDIMIENTO
80.00
3.00
3.00
16.00
12.00
3.00
2.80
3.20
12.00
11.00
10.00
170.00
160.00
150.00
10.00
9.00
10.00
9.00
40.00
CALCULO PARA F.S.R
PARA OFICIAL
% %
ALIMENTACION 7.5 100 0.075 460
TRANSPORTE 5 100 0.05 460
DECIMO TERCERO 460 84.06 34.50 23 433.44
DECIMO CUARTO 460
$ MESES TOTAL
SUELDO BASICO ANUAL 460 12 5520.00
SUELDO ANUAL 433.44 12 5201.28
TOTAL GANADO ACTUAL 5201.28 460.00 433.44
MESES DIAS HORAS
SUELDO POR HORA 6094.72 12 30 8
F.S.R
SUELDO JORNADA REAL 6094.72 12 30 1.47
F.S.R
COSTO HORA-REAL CON BENEFICIO 2.12 1.47 3.10
% %
ALIMENTACION 7.5 100 0.075 850
TRANSPORTE 5 100 0.05 850
DECIMO TERCERO 850 158.78 63.75 42.5 797.47
DECIMO CUARTO 850
$ MESES TOTAL
SUELDO BASICO ANUAL 450 12 5400.00
SUELDO ANUAL 797.47 12 9569.64
TOTAL GANADO ACTUAL 9569.64 850 797.47
MESES DIAS HORAS
SUELDO POR HORA 11217.11 12 30 8
F.S.R
SUELDO JORNADA REAL 11217.11 12 30 1.47
COSTO HORA CON BENEFICIO 3.89 1.47 5.71
s por compañía)
que es real en obra) nota: en la parte de vacaciones el 50% se didvide por el 100% = 0,5 y se multiplica por el sueldo basico en e
y se suma con lo del IESS,SECAP, IECE Y FONDO DE RESERVA. En el caso que la compañía quiera
42.075 el valor de vacaciones para su calculo.
2.25
2.25
37.49
84.06
0
84.06
34.5 OBSEVARCION
23 en aliminetacion se pone el 7,5%
si queremos considerarla
y un 5% en transporte luego esto
se lo sumaria al decimo tercero
6094.72
2.25
2.25
37.485
84.06
0
84.06
39 OBSEVARCION
26 en aliminetacion se pone el 7,5%
si queremos considerarla
y un 5% en transporte luego esto
se lo sumaria al decimo tercero
7032.22
79.475
4.25
4.25
70.805
158.78
0
158.78
63.75 OBSEVARCION
42.5 en aliminetacion se pone el 7,5%
si queremos considerarla
y un 5% en transporte luego esto
se lo sumaria al decimo tercero
11217.11
F.S.R
carnaval
s.santa
F.S.R
F.S.R
COSTOS UNITARIOS/POR LA UNIDAD
CODIGO CONCEPTO Unidad Material Mano/Obra Equipo
0.1 PRELIMINARES
0.1-1 Caseta de guardian y bodega (incl. Piso de madera) m2 24.92 6.32 0.316
0.1-2 Instalación provisional electrica Global 39.04 12.39 0.62
0.1-3 Instalación provisional de agua Global 41.00 12.39 0.62
0.1-5 Limpieza de Terreno acarreo y desalojo m2 0.00 0.18 0.009
0.1-6 Trazado y replanteo edificación m2 0.23 0.31 0.015
SUBTOTAL PRELIMINARES 105.19 31.59 1.58
0.2 OBRA DE SEGURIDAD
0.2-1 Cerramiento y paso cubierto ml 21.89 5.09 0.25
SUBTOTAL OBRA DE SEGURIDAD 21.89 5.09 0.254
0.3 EXCAVACION Y RELLENO
0.3-1 Excavación de cimiento a maquina (H= 0,65 ) m3 0 5.56 1.96
0.3-2 Excavación de cisterna (h=2,00 mano) m3 0 12.04 0.60
0.3-3 Relleno compactado m3 8.75 5.88 1.46
SUBTOTAL EXCAVACION Y RELLENO 8.75 23.487656635 4.0163944529
0.4 ESTRUCTURA GENERAL H.A.
0.4-1 Replantillo m2 5.05 4.25 2.44
0.4-2 Vigas - Zapata m3 242.99 154.46 19.61
0.4-3 Plintos m3 137.67 162.72 49.88
0.4-4 Riostras m3 329.40 232.81 51.46
0.4-5 Pilares P.B m3 363.14 248.93 36.06
0.4-6 Pilares P.A m3 355.17 248.93 62.90
0.4-7 Losa (e=20cm )(51,32 m2) m3 423.48 167.35 31.99
0.4-8 Escalera m3 255.06 178.69 50.19
0.4-9 Estructura de cisterna m3 372.58 128.50 26.84
0.4-10 Vigas de Cubierta m3 343.32 320.16 41.44
0.4-11 Pilaretes ml 7.20 4.005 0.200
0.4-12 Dinteles ml 5.760 1.014 0.051
0.4-13 Viguetas de antepecho ml 6.64 2.14 0.11
0.4-14 Aleros (h.a ) ml 16.292 10.574 1.483
0.4-15 Pilares para medidores m3 257.18 120.21 148.12
0.4-16 Meson de cocina ml 14.70 9.64 0.48
SUBTOTAL ESTRUCTURA GENERAL H.A. 3135.632077 1994.385533 523.2676074
0.5 HORMIGON SIMPLE
0.5-1 Contrapiso (180 kg/cm2 )e=0,08cm m2 10.02 3.28 0.793
SUBTOTAL HORMIGON SIMPLE 10.023908 3.283954051 0.792689704
0.6 MUROS
0.6-1 Muros de piedra base ( h= 0,40cm ) m2 5.834 4.972 0.249
SUBTOTAL MUROS 5.834 4.972 0.249
0.7 ALBAÑILERIA
0.7-1 Mamposteria P.B. (1,5) m2 5.681 3.786 0.189
0.7-2 Mamposteria P.A. (1,5) m2 5.681 4.11 0.206
0.7-3 Cajas de registro U 8.467 19.07 0.95359991
0.7-4 forro de bajantes ml 5.15 5.15 0.258
0.7-5 Muros de tina ml 1.22 2.64 0.13
0.7-6 Patas de mesones ml 8.36 6.65 0.33
0.7-7 Patas de lavarropas ml 8.3559 6.65 0.3327
0.7-8 Socalos bajo closet y meson de cocina ml 1.629 3.595 0.180
0.7-9 Taco enlucido (1,7) ml 1.666 1.860 0.093
0.7-10 Cuadrada de boquetes (1,3) ml 0.179 2.47 0.123
0.7-11 Amurado o remate de cubierta (incl. Canalon ) (1) ml 1.666 2.765 0.138
0.7-12 Aleros de villas (enlucido ) ml 0.682 5.002 0.250
0.7-13 Enlucido interior (incl. rampa de escalera ) (1,8) m2 1.793 4.501 0.225
0.7-14 Enlucido exterior (2) m2 13.62 4.62 0.23
0.7-15 Enlucido de tumbado m2 5.32 6.754 0.338
0.7-16 Enlucido de filos (0,8) ml 0.36 1.10 0.05
0.7-17 Rayas o canales en fachadas (1) ml 0.036 0.517 0.026
0.7-18 Rayas en paredes para ceramica ml 0.00 0.47 0.02
0.7-19 Goteros ml 0.11 1.43 0.07
0.7-20 Molduras sencilla de tres lineas ml 0.36 2.28 0.11
0.7-21 Malla de enlucido union mamposteria y estructura h.a ml 1.19 0.57 0.03
0.7-22 Nivelacion de piso con maximix m2 5.00 1.66 0.08
SUBTOTAL 71.51 85.99 4.30
0.8 CUBIERTAS
0.8-1 Estructura de cubierta metalica m2 13.28 3.75 0.19
0.8-2 Instalación de caballete y chova en cubierta ml 0.00 0.000 0.00
0.8-3 Instalación de teja ondulada de 8 pies de p7 -111 m2 6.06 3.746 0.19
0.8-4 Instalacion de cumbrero de tejas p7 de 34 x 17 cm ml 6.90 3.054 0.15
0.8-5 Instalacion de tejas curva sobre plancha p7-111 m2 11.65 2.50 0.12
SUBTOTAL 37.89 7.49 0.65
0.9 INSTALACION ELECTRICAS O/G
0.9-1 Punto de Luz P.B.y P.A. (TUBERIAS) PTS 4.7 3.47 0.173
0.9-2 Punto de tomacorriente de 120v Planta Baja y Planta Alta PTS 6.399 3.47 0.173
0.9-3 Punto de tomacorriente de 220v Planta Baja y Planta Alta PTS 7.592 3.47 0.173
0.9-6 Acometida ducto (interior de panel a medidor) ML 2.608 0.397 0.020
0.9-7 Punto en conmutacion PTS 2.60 3.47 0.17
0.9-8 Punto en timbre PTS 3.15 3.47 0.173
0.9-9 Punto y acometida de telefono PTS 5.28 0.95 0.048
0.9-10 Punto y acometida de televisiön PTS 7.591 0.95 0.048
0.9-11 Caja de panel (para breaker) ( villa ) GBL 59 12.39 0.62
0.9-12 prueba galvanizada ( villa ) ML 0.129 0.14 0.0068
0.9-13 Instalación modulo de medidor ( villa ) GBL 82.45 24.78 1.24
SUBTOTAL OBRA GRIS 181.51 56.95 2.85
0.10 INSTALACION SANITARIA O/G
0.10-1 Cimentación (pasante ) AA SS Y AA.PP pasantes 1.78 0.39 0.02
0.10-2 AA.SS-- contrapiso- - Redes PUNTOS 4.55 1.47 0.07
0.10-3 AA.SS-- losa- Redes PUNTOS 5.31 1.47 0.07
0.10-4 Puntos de AASS. P.B Y P.A. PUNTOS 31.90 8.03 0.40
0.10-5 Bajantes de AA.SS. ML 9.57 1.19 0.06
0.10-6 Bajantes de Aguas lluvias ML 6.45 1.19 0.06
0.10-7 Excavación y relleno de AA.SS en redes M3 0.00 8.83 5.53
0.10-8 Instalación de AA.SS exterior con (acometida ) ML 5.98 1.07 5.15
0.10-9 Redes de AA.PP. -contrapiso -Agua Fria PUNTOS 12.94 2.46 0.12
0.10-10 Redes de AA.PP. losa- Agua Fria PUNTOS 11.48 2.46 0.12
0.10-11 Puntos de AA.PP Fria en planta baja (pared ) PUNTOS 14.29 12.78 0.64
0.10-12 Puntos de AA.PP Fria en planta alta (pared) PUNTOS 18.93 12.78 0.64
0.10-13 Agua caliente -contrapiso- redes PUNTOS 8.50 2.46 0.12
0.10-14 Agua caliente -losa - redes PUNTOS 14.27 2.23 0.11
0.10-15 Puntos de AA.PP Caliente en pared planta baja PUNTOS 6.37 9.83 0.49
0.10-16 Puntos de AA.PP Caliente en pared planta alta PUNTOS 9.58 9.83 0.49
0.10-17 Redes AA.-PP. Acometida ML 4.25 1.88 0.09
0.10-18 Prueba de presión PUNTOS 0.44 1.59 0.08
SUBTOTAL 166.58 81.91 14.28
0.11 EQUIPAMIENTO DE REVESTIMIENTO 1ERA ETAPA
0.11-1 Ceramica para pared de 20x30cm graiman m2 12.68 4.50 0.23
0.11-2 Cenefa de 7x 20cm graiman m2 6.91 1.82 0.09
0.11-3 Porcelanato piso sala-comedor antideslizante 50x50 m2 13.86 4.70 0.24
0.11-4 Ceramica cocina 0,40x0,40 rustico graiman ( piso ) m2 14.51 4.70 0.24
0.11-5 Porcelanato escalera 50x50 ml 7.83 4.40 0.22
0.11-6 Rastrera 7x50cm ml 0.97 1.84 0.09
0.11-7 Meson de granito natural shimp yellow ml 37.50 19.18 0.96
0.11-8 Plaquetas o fachaleta de arcillia 10x30cm alfadomus m2 23.00 4.35 0.22
0.11-9 Piso ingreso grano # 3 lavado m2 4.35 2.85 0.14
SUBTOTAL 121.61 48.34 2.42
0.12 EQUIPAMIENTO DE PINTURAS 1ERA ETAPA
0.12-1 Empaste Interior de Pared m2 1.56 1.04 0.05
0.12-2 Empaste de Tumbado (losa) m2 0.72 1.04 0.05
0.12-3 Sellado de Pared Exterior m2 1.75 0.88 0.04
0.12-4 Pared de Cerramiento Blanqueado m2 0.25 0.88 0.04
SUBTOTAL 4.28 3.85 0.19
0.13 EQUIPAMIENTO ALUMINIO Y VIDRIO 1ERA ETAPA
0.13-1 Ventana de aluminio y vidrio ( 6mm ) m2 70.00 17.06 0.85
0.13-2 Puerta de aluminio y vidrio m2 80.00 17.06 0.85
SUBTOTAL 150.00 34.13 1.71
0.14 EQUIPAMIENTO IMPERMEABILIZACION 1ERA ETAPA
0.14-1 Tinas de baños m2 6.80 3.52 0.18
0.14-2 Canal de Aleros ml 0.49 1.46 0.07
0.14-3 Impermeabilización Cubierta de losa m2 2.60 4.77 0.24
0.14-4 Impermeabilización Jardinera m2 6.80 2.38 0.12
SUBTOTAL 16.68 12.13 0.61
0.15 EQUIPAMIENTO PUERTAS METALICAS 1ERA ETAPA
0.15-1 Puerta para Cocina metalica con textura y lisa u 120.00 51.47 2.57
0.15-2 Puerta para Cerramiento metalicas lisa ambas caras u 100.00 51.47 2.57
SUBTOTAL 220.00 102.94 5.15
0.16 EQUIPAMIENTO TUMBADO 1ERA ETAPA
0.16-1 Tumbado de yeso tipo losa m2 16.12 8.32 0.42
SUBTOTAL 16.12 8.32 0.42
0.17 EQUIPAMIENTO PUERTAS DE MADERA1 Y 2 ETAPA
0.17-1 Puerta Principal Seike u 227.72 51.48 2.57
0.17-2 Puerta de dormitorioTamboradas hdf prensada u 138.25 51.48 2.57
0.17-3 Puerta de baños baños prensada u 137.69 51.48 2.57
0.17-4 Puerta para Cocina vidrio francesa u 195.86 51.48 2.57
SUBTOTAL EQUIPAMIENTO PUERTAS DE MADERA 699.52 205.92 10.30
0.18 EQUIPAMIENTO DE PINTURAS 2DA ETAPA
0.18-1 Pinturas para Interior pared latex m2 0.76 1.61 0.08
0.18-2 Pinturas para Losa latex m2 0.30 1.61 0.08
0.18-3 Pinturas para exterior pared Elastomerica m2 1.13 2.20 0.11
0.18-4 Pinturas para cerramiento exterior pared latex m2 0.76 0.95 0.05
0.18-5 Pintura para Cubierta m2 1.04 2.05 0.10
0.18-6 Pintura para Resane de Villa villa 60.60 58.02 2.90
SUBTOTAL EQUIPAMIENTO PINTURAS 64.57 66.44 3.32
0.19 EQUIPAMIENTO ELECTRICO 2 ETAPA
0.19-1 Puntos de luz/interruptor puntos 7.21 5.27 0.26
0.19-2 Puntos de tomacorriente de 120 v puntos 8.26 5.27 0.26
0.19-3 Puntos de tomacorrientes de 240v. puntos 7.93 5.27 0.26
0.19-4 Puntos de conmutación puntos 6.58 5.27 0.26
0.19-5 Punto de timbre puntos 26.55 5.27 0.26
0.19-6 Punto de telefono puntos 7.15 5.27 0.26
0.19-7 Punto de televisión puntos 6.52 5.27 0.26
0.19-8 Armada de panel para breaker de 24 U 9.43 2.07 0.10
0.19-9 Acometida de telefono ml 0.5856 1.45 0.07
0.19-20 Acometida de television ml 0.38 1.45 0.07
0.19-21 Acometida ( panel a medidor-cableado ) ml 4.16 3.10 0.15
0.19-22 Armada del medidor( base socket ) global 31.92 12.39 0.62
0.19-23 Prueba electrica general villa 0.00 24.78 1.24
SUBTOTAL EQUIPAMIENTO ELECTRICO 116.672 82.16 4.11
0.20 EQUIPAMIENTO PIEZAS SANITARIO 2DA ETAPA
0.20-1 Bomba de agua 1/2 h.p. con tanque de presión u 268.10 15.97 0.80
0.20-2 Calentador de agua de 20 galones global 249.00 15.97 0.80
0.20-3 Instalación de accesorios de cisterna PTS 66.30 12.39 0.62
0.20-4 Lavamanos con pedestal aspio plus u 54.03 12.39 0.62
0.20-5 Inodoro avanti pl. bone color suave f.v. incluido accesorio u 82.09 12.39 0.62
0.20-6 Bidet colores suave inc. Accesorios u 105.00 12.39 0.62
0.20-7 Tina de baño confort 1,70x86 x40 ( fv aerea andina ) u 200.00 37.17 1.86
0.20-8 Mezcladora de A/ fria y caliente sobrepuesto ducha y tina jgo 77.00 9.54 0.48
0.20-9 Griferia para ducha monocomando linea zoe (keramicos) jgo 67.50 9.54 0.48
0.20-10 Griferia para lavamanos monocomando jgo 98.34 9.54 0.48
0.20-11 Griferia de fregadero modelo pico alto kansas jgo 127.79 9.54 0.48
0.20-12 Griferia para lavanderia u 14.00 1.43 0.07
0.20-13 Fregadero de cocina de 2 pozos teka (1,20x0,50). U 117.00 4.29 0.21
0.20-14 Juego de accesorio de baños jgo 59.74 4.29 0.21
0.20-16 Griferia para Lavarropa de granito grande u 19.00 4.29 0.21
SUBTOTAL EQUIPAMIENTO SANITARIO 3604.89 171.12 8.56
OBRA EXTERIOR
0.21 CERRAMIENTO DE PARED H = 1,80 ML
0.21-1 Excavacion para cerramiento a mano m3 0.00 24.64 1.23
0.21-2 Riostra para cerramiento m3 328.96 155.20 30.67
0.21-3 Pilaretes para cerramiento ml 9.99 3.75 0.19
0.21-4 Pared de Cerramiento bloqueada m2 5.67 3.79 0.19
0.21-5 Pared de cerramiento enlucido una cara m2 1.79 2.63 0.13
SUBTOTAL CERRAMIENTO DE PARED 346.42 190.00 32.41
0.22 CAMINERAS EN INGRESO
0.22-1 Camineras en el ingreso ( 180 kg cm2 ) E= 0,08cm m2 11.45 10.46 0.52
SUBTOTAL EN CAMINERAS DE INGRESO 11.45 10.46 0.52
0.23 JARDINERA
0.23-1 Mamposteria de jardinera m2 5.58 7.26 0.36
0.23-2 Enlucido de jardinera m2 1.79 6.02 0.30
0.23-4 Moldura de 3lineas jardinera ml 0.13 1.81 0.09
SUBTOTAL DE JARDINERA 7.50 15.09 0.75
0.24 VARIOS
0.24-1 Limpieza de villa Villa 23.50 142.96 7.15
0.24-2 Desalojo Viaje 0.00 8.49 0.42
0.24-3 Piedra chispa en terreno m2 0.49 0.65 0.03
0.24-4 Instalacion de lavarropa u 55.00 6.20 0.31
0.24-5 Base de lavarropa m2 0.000 0.00 0.000
78.99 158.29 7.91
0.21
3.75 29.62 3.55 33.17 5.33 0.64 39.14 0.21-1
6.82 521.65 62.60 584.25 93.90 11.27 689.42 0.21-2
0.56 14.49 1.74 16.23 2.61 0.31 19.15 0.21-3
0.15 9.80 1.18 10.97 1.76 0.21 12.95 0.21-4
0.10 4.65 0.56 5.21 0.84 0.10 6.15 0.21-5
11.38 580.21 69.63 649.83 104.44 12.53 766.80
0.22
1.49 23.92 2.87 26.79 4.31 0.52 31.61 0.22-1
1.49 23.92 2.87 26.79 4.31 0.52 31.61
0.23
2.78 15.98 1.92 17.89 2.88 0.35 21.12 0.23-1
2.78 10.90 1.31 12.20 1.96 0.24 14.40 0.23-2
1.67 3.69 0.44 4.13 0.66 0.08 4.88 0.23-4
7.22 30.56 3.67 34.23 5.50 0.66 40.39
0.24
3.00 176.61 21.19 197.80 31.79 3.81 233.41 0.24-1
30.00 38.91 4.67 43.58 7.00 0.84 51.43 0.24-2
0.06 1.23 0.15 1.37 0.22 0.03 1.62 0.24-3
5.00 66.51 7.98 74.49 11.97 1.44 87.89 0.24-4
0.00 0.00 0.00 0.00 0.000 0.00 - 0.24-5
38.06 283.25 33.99 317.24 50.99 6.12 374.35
0.21
7.82 73.0 11.73 1.41 86.12 0.21-1
137.72 1285.4 206.57 24.79 1516.71 0.21-2
46.95 438.2 70.42 8.45 517.02 0.21-3
116.39 1086.3 174.59 20.95 1281.86 0.21-4
55.25 515.7 82.88 9.95 608.54 0.21-5
364.13 3398.5 546.19 65.54 4010.25
0.22
28.91 269.8 43.36 5.20 318.36 0.22-1
28.91 269.8 43.360 5.203 318.36
0.23
3.45 32.2 5.18 0.62 38.01 0.23-1
2.35 22.0 3.53 0.42 25.92 0.23-2
1.33 12.4 1.99 0.24 14.63 0.23-4
7.13 66.6 10.699 1.284 78.55
0.24
21.19 197.8 31.79 3.81 233.41 0.24-1
37.36 348.7 56.03 6.72 411.41 0.24-2
24.54 229.0 36.81 4.42 270.28 0.24-3
7.98 74.5 11.97 1.44 87.89 0.24-4
0.00 0.0 0.000 0.00 0.00 0.24-5
91.07 850.0 136.606 16.393 1002.991
SOLO SUMANDO
M/O CST/DIRECTO
CST/ DIRECTO CST/INDIRECT
SIN IVA
25284.459 223.485 M2
174.47
144.922
PRESUPUESTO CON COSTO DIRECTO E INDIRECTO E IVA DESGLOSADO
CST / INDTO
AREA CON IVA
PLANTA BAJA 123.15 15351.849
PLANTA ALTA 51.32 174.47
TOTAL 174.47 M2 87.99 M2 ( M O )
DESGLOSADO GENERAL COSTO DIRECTO E INDIRECTO CON IVA
COSTO DIRECTO CON IVA 85,288.05
AREA DE CONSTRUCCION 174.47 RESUMIDO
SUBTOTAL 488.84 DLR/M2 100639.90 VALOR
COSTO INDIRECTO CON IVA 87.99 174.47 M2
TOTAL CON IVA 576.83 DLR/M2 576.83 DLR/M2
PRESUPUESTO CON COSTO DIRECTO Y COSTO INDIRECTO E IVA INCLUIDO
PRESUPUESTO
CODIGO CONCEPTO Unidad Cantidad Costo Unitario Total
0.1 PRELIMINARES
0.1-1 Caseta de guardian y bodega (incl. Piso de madera) m2 16.00 42.12 673.86
0.1-2 Instalación provisional electrica Global 1.00 75.40 75.40
0.1-3 Instalación provisional de agua Global 1.00 77.99 77.99
0.1-5 Limpieza de Terreno,acarreo y desalojo m2 300.00 0.52 154.51
0.1-6 Trazado y replanteo m2 123.15 0.78 96.46
SUBTOTAL PRELIMINARES 1078.21
0.2 OBRA DE SEGURIDAD
0.2-1 Cerramiento y paso cubierto ml 15 37.30 559.54
SUBTOTAL OBRA DE SEGURIDAD 559.54
0.3 EXCAVACION Y RELLENO
0.3-1 Excavación de cimiento m3 20.868 14.89 310.70
0.3-2 Excavación de cisterna (h=2 mano) m3 4.5 21.67 97.52
0.3-3 Relleno compactado m3 49.3 22.09 1088.69
SUBTOTAL EXCAVACION Y RELLENO 1496.90
0.4 ESTRUCTURA GENERAL H.A.
0.4-1 Replantillo m2 29.66 15.96 473.30
0.4-2 Vigas - Zapata m3 5.56 554.76 3084.49
0.4-3 Plintos m3 1.58 475.44 752.77
0.4-4 Riostras m3 1.66 822.96 1366.12
0.4-5 Pilares P.B m3 2.3 865.19 1989.94
0.4-6 Pilares P.A m3 1.31 896.64 1174.60
0.4-7 Losa (e=20cm ) (51,32 m2) m3 10.264 827.70 8495.55
0.4-8 Escalera m3 1.602 651.96 1044.49
0.4-9 Estructura de cisterna (e=0,15-h1,50) m3 3.237 703.83 2278.55
0.4-10 Vigas de Cubierta m3 2.599 939.26 2440.90
0.4-11 Pilaretes ml 23.1 15.64 361.27
0.4-12 Dinteles ml 18.2 9.75 177.37
0.4-13 Viguetas de antepecho ml 37.6 12.27 461.40
0.4-14 Aleros (h.a ) ml 69.3 37.75 2616.13
0.4-15 Pilares para medidores ml 0.22 782.83 175.73
0.4-16 Mesones de cocina ml 4.8 36.93 177.27
SUBTOTAL 27069.90
0.5 HORMIGON SIMPLE
0.5-1 Contrapiso (180 kg/cm2 )e=0,08cm m2 123.15 18.80 2314.76
SUBTOTAL 2314.76
0.6 MUROS
0.6-1 Muros de piedra base ( h= 0,40cm ) m2 16.66 15.80 263.23
SUBTOTAL 263.23
0.7 ALBAÑILERIA
0.7-1 Mamposteria P.B. m2 137.32 12.91 1772.27
0.7-2 Mamposteria P.A. m2 189.53 13.32 2524.99
0.7-3 Cajas de registro U 4 42.61 170.45
0.7-4 forro de bajantes ml 3.1 16.08 49.86
0.7-5 Muros de tina ml 6.05 6.37 38.55
0.7-6 Patas de mesones ml 3.6 22.11 79.60
0.7-7 Patas de lavarropas ml 1.8 23.95 43.11
0.7-8 Socalos bajo closet y meson de cocina ml 10.61 8.39 88.99
0.7-9 Taco enlucido ml 56.4 4.90 276.41
0.7-10 Cuadrada de boquetes ml 129.5 3.71 480.54
0.7-11 Amurado o remate de cubierta (incl. Canalon ) ml 69.3 6.13 425.15
0.7-12 Aleros de villas (enlucido ) ml 69.3 8.03 556.65
0.7-13 Enlucido interior (incl. rampa de escalera ) m2 449.85 8.65 3888.99
0.7-14 Enlucido exterior m2 219.16 24.51 5370.54
0.7-15 Enlucido de tumbado m2 51.32 16.78 861.39
0.7-16 Enlucido de filos ml 124.95 2.05 255.75
0.7-17 Rayas o canales en fachadas ml 22.05 1.06 23.48
0.7-18 Rayas en paredes para ceramica ml 12.26 0.65 7.91
0.7-19 Goteros ml 10 2.78 27.81
0.7-20 Molduras sencillas de tres lineas ml 20 3.97 79.39
0.7-21 Malla de enlucido union mamposteria y estructura h.a global 40 2.52 100.93
0.7-22 Nivelacion de piso con maximix m2 174.47 9.14 1595.10
SUBTOTAL 18717.84
0.8 CUBIERTAS
0.8-1 Estructura de cubierta metalica m2 132.68 22.84 3030.69
0.8-2 Instalación de caballete y chova en cubierta m2 38.00 - 0.00
0.8-3 Instalación de placa ondulada p7 -111 m2 132.68 13.31 1766.01
0.8-4 Instalacion de cumbrero de tejas p7 de 34 x17 cm ml 38.00 13.53 514.01
0.8-5 Instalacion de tejas sobre plancha p7-111 m2 132.68 18.97 2516.42
SUBTOTAL 7827.12
0.9 INSTALACION ELECTRICAS O/G
0.9-1 Punto de Luz P.B.y P.A. (TUBERIAS) pts 33 11.24 371.00
0.9-2 Punto de tomacorriente de 120v Planta Baja y Planta Alta pts 29 13.50 391.41
0.9-3 Punto de tomacorriente de 220v Planta Baja y Planta Alta pts 13 15.35 199.60
0.9-6 Acometida (interior o exterior de panela medidor ) ml 12 4.33 51.95
0.9-7 Punto en conmutacion pts 2 11.55 23.10
0.9-8 Punto en timbre pts 2 12.28 24.55
0.9-9 Punto y Acometida de telefono pts 5 9.62 48.09
0.9-10 Punto y Acometida de televisiön pts 4 13.01 52.03
0.9-11 Caja de panel (para breaker) glb 1 99.13 99.13
0.9-12 prueba galvanizada glb 362 0.37 134.23
0.9-13 Instalación modulo de medidor glb 1 147.32 147.32
SUBTOTAL 1542.43
0.10 INSTALACION SANITARIA O/G
0.10-1 Cimentación (pasante ) AA SS Y AA.PP PASANTES 12.00 3.43 41.20
0.10-2 AA.SS-- contrapiso- - Redes PUNTOS 13.00 8.55 111.17
0.10-3 AA.SS-- losa- Redes PUNTOS 6.00 10.15 60.93
0.10-4 Puntos de AASS. P.B Y P.A. PUNTOS 19.00 53.65 1019.34
0.10-5 Bajantes de AA.SS. ML 4.00 15.95 63.79
0.10-6 Bajantes de Aguas lluvias ML 6.00 10.84 65.06
0.10-7 Excavación y relleno de AA.SS en redes M3 4.32 18.98 82.01
0.10-8 Instalación de AA.SS exterior con (acometida ) ML 24.00 16.29 390.90
0.10-9 Redes de AA.PP. -contrapiso -Agua Fria PUNTOS 13.00 21.02 273.21
0.10-10 Redes de AA.PP. losa- Agua Fria ml 6.00 19.69 118.13
0.10-11 Puntos de AA.PP Fria en pared planta baja PUNTOS 10.00 37.28 372.79
0.10-12 Puntos de AA.PP Fria en pared planta alta PUNTOS 4.00 44.40 177.61
0.10-13 Agua caliente -contrapiso-losa - redes PUNTOS 13.00 15.15 196.94
0.10-14 Agua caliente -losa - redes PUNTOS 6.00 23.06 138.35
0.10-15 Puntos de AA.PP Caliente en pared planta baja PUNTOS 6.00 23.15 138.93
0.10-16 Puntos de AA.PP Caliente en pared planta alta PUNTOS 4.00 27.95 111.80
0.10-17 Redes AA.-PP. Acometida ML 6.00 9.32 55.93
0.10-18 Prueba de presión y estanquidad (global ) PUNTOS 30.00 2.92 87.54
SUBTOTAL 3505.62
0.11 REVESTIMIENTO O/G
0.11-1 Ceramica para pared de 20x30cm graiman m2 74.58 23.09 1722.25
0.11-2 Cenefa de 7x 20cm graiman m2 23.26 11.83 275.14
0.11-3 Porcelanato piso sala-comedor antideslizante 50x50 m2 148 24.88 3682.87
0.11-4 Ceramica cocina 0,40x0,40 rustico graiman ( piso ) m2 16.23 26.10 423.67
0.11-5 Porcelanato escalera 50x50 ml 15.25 16.90 257.69
0.11-6 Rastrera 7x50cm ml 97.94 3.90 381.58
0.11-7 Meson de granito natural shimp yellow ml 5.71 77.33 441.53
0.11-8 Plaquetas o fachaleta de arcillia 10x30cm alfadomus m2 20.95 36.76 770.07
0.11-9 Piso ingreso grano # 3 lavado m2 2 13.00 26.00
SUBTOTAL 7980.79
0.12 PINTURAS O/G
0.12-1 Empaste Interior de Pared m2 449.85 3.52 1585.21
0.12-2 Empaste de Tumbado (losa) m2 51.32 2.47 126.92
0.12-3 Sellado de Pared Exterior m2 198.21 3.55 703.23
0.12-4 Pared de Cerramiento Blanqueado m2 122.2 1.58 193.25
SUBTOTAL 2608.61
0.13 ALUMINIO Y VIDRIO O/G
0.13-1 Ventana de aluminio y vidrio ( 6mm ) 17 116.58 1981.87
0.13-2 Puerta de aluminio y vidrio 9.67 130.09 1257.98
SUBTOTAL 3239.85
0.14 IMPERMEABILIZACIO O/G
0.14-1 Tinas de baños 5 14.67 73.35
0.14-2 Canal de Aleros 0 2.99 0.00
0.14-3 Impermeabilización Cubierta de losa 0 10.84 0.00
0.14-4 Impermeabilización Jardinera 2 14.28 28.55
SUBTOTAL 101.91
0.15 PUERTAS METALICAS O/G
0.15-1 Puerta para Cocina metalica con textura y lisa u 1 236.63 236.63
0.15-2 Puerta para Cerramiento metalicas lisa ambas caras u 1 210.19 210.19
SUBTOTAL 446.82
0.16 TUMBADOS O/G
0.16-1 Tumbado de yeso tipo losa m2 119.1 32.92 3920.22
SUBTOTAL 3920.22
0.17 EQUIPAMIENTO PUERTAS DE MADERA
0.17-1 Puerta Principal Seike u 1.00 379.00 379.00
0.17-2 Puerta de dormitorioTamboradas hdf prensada u 4.00 255.80 1023.20
0.17-3 Puerta de baños baños prensada u 4.00 255.06 1020.24
0.17-4 Puerta para Cocina vidrio francesa u 0.00 336.89 0.00
SUBTOTAL EQUIPAMIENTO PUERTAS DE MADERA 2422.45
0.18 EQUIPAMIENTO DE PINTURAS
0.18-1 Pinturas para Interior pared latex m2 449.85 3.25 1463.34
0.18-2 Pinturas para Losa latex m2 51.32 2.70 138.80
0.18-3 Pinturas para exterior pared Elastomerica m2 198.21 4.55 902.49
0.18-4 Pinturas para cerramiento exterior pared latex m2 122.2 2.35 287.32
0.18-5 Pintura para Cubierta m2 141.21 4.25 600.33
0.18-6 Pintura para Resane de Villa villa 1 164.56 164.56
SUBTOTAL EQUIPAMIENTO PINTURA 3556.85
0.19 Equipamiento general electrico
0.19-1 Puntos de luz/interrupto puntos 33.00 17.05 562.80
0.19-2 Puntos de tomacorriente de 120 v puntos 29.00 18.47 535.51
0.19-3 Puntos de tomacorrientes de 240v. puntos 13.00 18.31 238.04
0.19-4 Puntos de conmutación puntos 2.00 19.32 38.63
0.19-5 Punto de timbre puntos 2.00 45.72 91.43
0.19-6 Punto de telefono puntos 5.00 18.09 90.46
0.19-7 Punto de televisión puntos 4.00 17.58 70.33
0.19-8 Armada de panel para breaker de 24 global 24.00 15.60 374.34
0.19-9 Acometida de telefono ml 9.00 3.23 29.04
0.19-20 Acometida de television ml 9.00 2.95 26.55
0.19-21 Acometida ( panel a medidor-cableado ) ml 12.00 10.35 124.14
0.19-22 Armada del medidor( base socket ) global 1.00 63.34 63.34
0.19-23 Prueba electrica general Villa 1.00 34.39 34.39
SUBTOTAL EQUIPAMIENTO ELECTRICO 2279.01
0.20 Equipamiento piezas Sanitario
0.20-1 Bomba de agua 1/2 h.p. con tanque de presión u 1.00 383.09 383.09
0.20-2 Calentador de agua de 60 galones villa 1.00 357.85 357.85
0.20-3 Instalación de accesorios de cisterna u 1.00 111.42 111.42
0.20-4 Lavamanos con pedestal aspio plus u 5.00 89.93 449.64
0.20-5 Inodoro avanti pl. bone color suave f.v. incluido accesorio u 5.00 127.01 635.03
0.20-6 Bidet colores suave inc. Accesorios u 2.00 159.27 318.53
0.20-7 Tina de baño confort 1,70x86 x40 ( fv aerea andina ) u 1.00 322.51 322.51
0.20-8 Mezcladora de A/ fria y caliente sobrepuesto ducha y tina jgo 0.00 118.29 0.00
0.20-9 Griferia para ducha monocomando linea zoe (keramicos) jgo 4.00 104.09 416.37
0.20-10 Griferia para lavamanos monocomando jgo 3.00 145.40 436.21
0.20-11 Griferia de fregadero modelo pico alto kansas jgo 1.00 188.73 188.73
0.20-12 Griferia para lavanderia u 2.00 22.47 44.94
0.20-13 Fregadero de cocina de 2 pozos teka (1,20x0,50). villa 1.00 167.19 167.19
0.20-14 Juego de accesorio de baños jgo 5.00 86.23 431.16
0.20-16 Griferia para Lavarropa de granito grande u 1.00 35.03 35.03
SUBTOTAL EQUIPAMIENTO SANITARIO 4297.69
OBRA EXTERIOR
0.21 CERRAMIENTO DE PARED H= 1,80 ML
0.21-1 Excavacion para cerramiento a mano m3 2.20 39.14 86.12
0.21-2 Riostra para cerramiento m3 2.20 689.42 1516.71
0.21-3 Pilaretes para cerramiento ml 27.00 19.15 517.02
0.21-4 Pared de Cerramiento bloqueada m2 99.00 12.95 1281.86
0.21-5 Pared de cerramiento enlucido una cara m2 99.00 6.15 608.54
SUBTOTAL CERRAMIENTO DE PARED 4010.25
0.22 CAMINERAS EN INGRESO
0.22-1 Camineras en el ingreso ( 180 kg cm2 ) E= 0,08cm m2 10.07 31.61 318.36
SUBTOTAL EN CAMINERAS DE INGRESO 318.36
0.23 JARDINERA
0.23-1 Mamposteria de jardinera m2 1.80 21.12 38.01
0.23-2 Enlucido de jardinera m2 1.80 14.40 25.92
0.23-4 Moldura de 3lineas jardinera m2 3.00 4.88 14.63
SUBTOTAL DE JARDINERA 78.55
0.24 VARIOS
0.24-1 Limpieza de villa Villa 1.00 233.41 233.41
0.24-2 Desalojo Viaje 8.00 51.43 411.41
0.24-3 Piedra chispa en terreno m2 166.78 1.62 270.28
0.24-4 Instalacion de lavarropa U 1.00 87.89 87.89
0.24-5 Base de lavarropa m2 2.25 - 0.00
SUBTOTAL EN VARIOS 1002.99
TOTAL 100639.90
CONCEPTO MES 1
CODIGO OBRA GRIS PRESUPUESTO S1 S2 S3
horas 0.1 PRELIMINARES 815.84 815.84
8 0.1-1 Caseta de guardian y bodega (incl. Piso de madera) 509.88 509.88
1 0.1-2 Instalación provisional electrica 57.05 57.05
1 0.1-3 Instalación provisional de agua 59.01 59.01
8 0.1-5 Limpieza de Terreno,acarreo y desalojo 116.91 116.91
4 0.1-6 Trazado y replanteo 72.98 72.98
22
Horas 0.2 OBRA DE SEGURIDAD 423.38 423.38
8 0.2-1 Cerramiento y paso cubierto 423.38 423.38
8
horas 0.3 EXCAVACION Y RELLENO 1132.64 73.79 784.27 274.59
16 0.3-1 Excavación de cimiento 235.09 235.09
8 0.3-2 Excavación de cisterna (h=2 mano) 73.79 73.79
32 0.3-3 Relleno compactado 823.76 549.18 274.59
56
Horas 0.4 ESTRUCTURA GENERAL H.A. 20482.67 3261.63
8 0.4-1 Replantillo 358.13 358.13
24.00 0.4-2 Vigas - Zapata 2333.90 2333.90
8 0.4-3 Plintos 569.59 569.59
12.00 0.4-4 Riostras 1033.69
16.00 0.4-5 Pilares P.B 1505.71
9.11 0.4-6 Pilares P.A 888.77
48.00 0.4-7 Losa (e=20cm ) (51,32 m2) 6428.23
8.00 0.4-8 Escalera 790.32
16.00 0.4-9 Estructura de cisterna (e=0,15-h1,50) 1724.09
32.00 0.4-10 Vigas de Cubierta 1846.92
8.00 0.4-11 Pilaretes 273.36
1.60 0.4-12 Dinteles 134.21
4.06 0.4-13 Viguetas de antepecho 349.12
32.00 0.4-14 Aleros (h.a ) 1979.52
1.50 0.4-15 Pilares para medidores 132.97
4.00 0.4-16 Mesones de cocina 134.13
232.27
Horas l.k, l 652 HORMIGON SIMPLE 1751.48
16.00 0.5-1 Contrapiso (180 kg/cm2 )e=0,08cm 1751.48
16.00
Horas 0.6 MUROS 199.17 199.17
8.00 0.6-1 Muros de piedra base ( h= 0,40cm ) 199.17 199.17
16.00
Horas 0.7 ALBAÑILERIA 14163.02
48.00 0.7-1 Mamposteria P.B. 1341.00
72.00 0.7-2 Mamposteria P.A. 1910.56
8.00 0.7-3 Cajas de registro 128.97
2.00 0.7-4 forro de bajantes 37.72
2.00 0.7-5 Muros de tina 29.17
3.00 0.7-6 Patas de mesones 60.23
1.50 0.7-7 Patas de lavarropas 32.62
4.00 0.7-8 Socalos bajo closet y meson de cocina 67.33
16.00 0.7-9 Taco enlucido 209.15
40.00 0.7-10 Cuadrada de boquetes 363.61
24.00 0.7-11 Amurado o remate de cubierta (incl. Canalon ) 321.70
32.00 0.7-12 Aleros de villas (enlucido ) 421.20
96.00 0.7-13 Enlucido interior (incl. rampa de escalera ) 2942.64
48.00 0.7-14 Enlucido exterior 4063.66
32.00 0.7-15 Enlucido de tumbado 651.78
24.00 0.7-16 Enlucido de filos 193.52
2.00 0.7-17 Rayas o canales en fachadas 17.76
1.00 0.7-18 Rayas en paredes para ceramica 5.99
2.50 0.7-19 Goteros 21.04
8.00 0.7-20 Molduras sencillas de tres lineas 60.07
4.00 0.7-21 Malla de enlucido union mamposteria y estructura h.a 76.37
40 0.7-22 Nivelacion de piso con maximix 1206.95
510.00
Horas 0.8 CUBIERTAS 5922.46
48.00 0.8-1 Estructura de cubierta metalica 2293.20
0.8-2 Instalación de caballete y chova en cubierta 0.00
48.00 0.8-3 Instalación de placa ondulada p7 -111 1336.26
16.00 0.8-4 Instalacion de cumbrero de tejas p7 de 34 x17 cm 388.93
32.00 0.8-5 Instalacion de tejas sobre plancha p7-111 1904.07
144.00
Horas 0.9 INSTALACION ELECTRICAS O/G 1167.09
12.00 0.9-1 Punto de Luz P.B.y P.A. (TUBERIAS) 280.72
10.55 0.9-2 Punto de tomacorriente de 120v Planta Baja y Planta Alta 296.16
4.73 0.9-3 Punto de tomacorriente de 220v Planta Baja y Planta Alta 151.03
0.50 0.9-6 Acometida (interior o exterior de panel a medidor ) 39.31
0.73 0.9-7 Punto en conmutacion (tuberias) 17.48
0.73 0.9-8 Punto en timbre 18.58
0.50 0.9-9 Punto y Acometida de telefono 36.39
0.40 0.9-10 Punto y Acometida de televisiön 39.37
1.00 0.9-11 Caja de panel (para breaker) 75.01
4.00 0.9-12 prueba galvanizada 101.57
2.00 0.9-13 Instalación modulo de medidor 111.47
37.13
Horas 0.10 INSTALACION SANITARIA O/G 2209.15 31.18
0.50 0.10-1 Cimentación (pasante ) AA SS Y AA.PP 31.18 31.18
2.00 0.10-2 AA.SS-- contrapiso- - Redes 84.11
0.92 0.10-3 AA.SS-- losa- Redes 46.10
16.00 0.10-4 Puntos de AASS. P.B Y P.A (PAREDES) 771.29
0.50 0.10-5 Bajantes de AA.SS. 48.27
0.75 0.10-6 Bajantes de Aguas lluvias 49.23
4.00 0.10-7 Excavación y relleno de AA.SS en redes 62.05
4.00 0.10-8 Instalación de AA.SS exterior con (acometida ) 295.77
4.00 0.10-9 Redes de AA.PP. -contrapiso -Agua Fria 206.72
1.85 0.10-10 Redes de AA.PP. losa- Agua Fria 89.38
16.00 0.10-11 Puntos de AA.PP Fria en pared planta baja 282.07
6.40 0.10-12 Puntos de AA.PP Fria en pared planta alta 134.39
0.10-13 Agua caliente -contrapiso-losa - redes
0.10-14 Agua caliente -losa - redes
0.10-15 Puntos de AA.PP Caliente en pared planta baja
0.10-16 Puntos de AA.PP Caliente en pared planta alta
1.41 0.10-17 Redes AA.-PP. Acometida 42.32
8.00 0.10-18 Prueba de presión y estanquidad (global ) 66.24
66.33
Horas 0.11 REVESTIMIENTO O/G 6038.74
40.00 0.11-1 Ceramica para pared de 20x30cm graiman 1303.15
8.00 0.11-2 Cenefa de 7x 20cm graiman 208.18
72.95 0.11-3 Porcelanato piso sala-comedor antideslizante 50x50 2786.67
8.00 0.11-4 Ceramica cocina 0,40x0,40 rustico graiman ( piso ) 320.57
8.00 0.11-5 Porcelanato escalera 50x50 194.98
34.00 0.11-6 Rastrera 7x50cm 288.73
16.00 0.11-7 Meson de granito natural shimp yellow 334.09
16.00 0.11-8 Plaquetas o fachaleta de arcillia 10x30cm alfadomus 582.68
1.00 0.11-9 Piso ingreso grano # 3 lavado 19.68
203.95
Horas 0.12 PINTURAS O/G 1973.83
56.00 0.12-1 Empaste Interior de Pared 1199.47
6.39 0.12-2 Empaste de Tumbado (losa) 96.03
24.00 0.12-3 Sellado de Pared Exterior 532.10
14.80 0.12-4 Pared de Cerramiento Blanqueado 146.22
101.19
Horas 0.13 ALUMINIO Y VIDRIO O/G 2451.46
40.00 0.13-1 Ventana de aluminio y vidrio ( 6mm ) 1499.60
22.75 0.13-2 Puerta de aluminio y vidrio 951.86
62.75
Horas 0.14 IMPERMEABILIZACIO O/G 77.11
2.00 0.14-1 Tinas de baños 55.50
0.14-2 Canal de Aleros
0.14-3 Impermeabilización Cubierta de losa
0.80 0.14-4 Impermeabilización Jardinera 21.60
2.80
Horas 0.15 PUERTAS METALICAS O/G 338.09
4.00 0.15-1 Puerta para Cocina metalica con textura y lisa 179.04
4.00 0.15-2 Puerta para Cerramiento metalicas lisa ambas caras 159.04
8.00
Horas 0.16 TUMBADOS O/G 2966.27
80.00 0.16-1 Tumbado de yeso tipo losa 2966.27
80.00
Horas 0.17 EQUIPAMIENTO PUERTAS DE MADERA 1832.97
4.00 0.17-1 Puerta Principal Seike 286.77
16.00 0.17-2 Puerta de dormitorioTamboradas hdf prensada 774.22
16.00 0.17-3 Puerta de baños baños prensada 771.98
0.17-4 Puerta para Cocina vidrio francesa
36.00
Horas 0.18 EQUIPAMIENTO DE PINTURAS 2691.32
100.00 0.18-1 Pinturas para Interior pared latex 1107.25
11.41 0.18-2 Pinturas para Losa latex 105.02
60.00 0.18-3 Pinturas para exterior pared Elastomerica 682.88
16.00 0.18-4 Pinturas para cerramiento exterior pared latex 217.40
40.00 0.18-5 Pintura para Cubierta 454.24
8.00 0.18-6 Pintura para Resane de Villa 124.52
235.41
Horas 0.19 EQUIPAMIENTO GENERAL ELECTRICO 1724.43
24.00 0.19-1 Puntos de luz/interrupto 425.84
21.09 0.19-2 Puntos de tomacorriente de 120 v 405.20
9.45 0.19-3 Puntos de tomacorrientes de 240v. 180.12
1.45 0.19-4 Puntos de conmutación 29.23
1.45 0.19-5 Punto de timbre 69.18
3.64 0.19-6 Punto de telefono 68.45
2.91 0.19-7 Punto de televisión 53.21
4.00 0.19-8 Armada de panel para breaker de 24 283.25
1.80 0.19-9 Acometida de telefono 21.98
1.80 0.19-20 Acometida de television 20.09
3.00 0.19-21 Acometida ( panel a medidor-cableado ) 93.93
1.00 0.19-22 Armada del medidor( base socket ) 47.93
2.00 0.19-23 Prueba electrica general 26.02
77.60
Horas 0.20 EQUIPAMIENTO DE PIEZAS SANITARIO 2496.07
1.00 0.20-1 Bomba de agua 1/2 h.p. con tanque de presión 289.87
0.20-2 Calentador de agua de 60 galones
1.00 0.20-3 Instalación de accesorios de cisterna 84.31
5.00 0.20-4 Lavamanos con pedestal aspio plus 340.22
5.00 0.20-5 Inodoro avanti pl. bone color suave f.v. incluido accesorio 480.50
0.20-6 Bidet colores suave inc. Accesorios
0.20-7 Tina de baño confort 1,70x86 x40 ( fv aerea andina )
0.20-8 Mezcladora de A/ fria y caliente sobrepuesto ducha y tina
4.00 0.20-9 Griferia para ducha monocomando linea zoe (keramicos) 315.05
3.00 0.20-10 Griferia para lavamanos monocomando 330.06
1.00 0.20-11 Griferia de fregadero modelo pico alto kansas 142.80
0.30 0.20-12 Griferia para lavanderia 34.00
0.45 0.20-13 Fregadero de cocina de 2 pozos teka (1,20x0,50). 126.51
2.25 0.20-14 Juego de accesorio de baños 326.24
0.45 0.20-16 Griferia para Lavarropa de granito grande 26.51
23.45
OBRA EXTERIOR
Horas 0.21 CERRAMIENTO DE PARED H= 1,80 ML 3034.39
8 0.21-1 Excavacion para cerramiento a mano 65.16
10.60 0.21-2 Riostra para cerramiento 1147.63
9.35 0.21-3 Pilaretes para cerramiento 391.21
34.61 0.21-4 Pared de Cerramiento bloqueada 969.93
24.00 0.21-5 Pared de cerramiento enlucido una cara 460.46
86.558
Horas 0.22 CAMINERAS EN INGRESO 240.89
4.00 0.22-1 Camineras en el ingreso ( 180 kg cm2 ) E= 0,08cm 240.89
4.00
Horas 0.23 JARDINERA 59.44
0.90 0.23-1 Mamposteria de jardinera 28.76
1.00 0.23-2 Enlucido de jardinera 19.61
0.50 0.23-4 Moldura de 3lineas jardinera 11.07
2.40
Horas 0.24 VARIOS 758.92
24.00 0.24-1 Limpieza de villa 176.61
16 0.24-2 Desalojo 311.30
16.00 0.24-3 Piedra chispa en terreno 204.51
0.5 0.24-4 Instalacion de lavarropa 66.51
0.24-5 Base de lavarropa
56.50
0.25 COSTO PARCIAL PROYECTO 74950.81 1313.00 983.44 3567.39
0.26 SUPERVISION TECNICA 13491.15 236.34 177.02 642.13
0.27 IVA 12% 10613.03 185.92 139.26 505.14
0.28 COSTO TOTAL DEL PROYECTO 99054.99 13380.71
ACUMULADO(COSTO,SUPERVISION E IVA) 1735.27 1299.72 4714.66 5631.07
% PARCIAL 1.75 1.31 4.76 5.68
% PARCIAL ACUMULADO 1.75 3.06 7.82 13.51
CRONOGRAMA VALORADO
1033.69
1505.71
888.77
4285.49 2142.74
790.32
1724.09
923.46 923.46
273.36
134.21
349.12
989.76 989.76
132.97
134.13
1167.66 583.83
1167.66 583.83
84.11
46.10
771.29
48.27
24.61 24.61
62.05
295.77
206.72
89.38
282.07
134.39
4260.79 5163.09 5098.30 2095.74 2129.34 2337.79 1202.04 1412.60 2781.38 2574.19 2770.58 2949.46
766.94 929.36 917.69 377.23 383.28 420.80 216.37 254.27 500.65 463.35 498.70 530.90
603.33 731.09 721.92 296.76 301.51 331.03 170.21 200.02 393.84 364.50 392.31 417.64
19145.32 10221.01 17958.10
6823.54 6737.92 2769.73 2814.13 3089.62 1588.62 1866.89 3675.88 3402.04 3661.59 3898.00 6996.46
6.89 6.80 2.80 2.84 3.11909775 1.60 1.88470182 3.71094536 3.43 3.70 3.94 7.06
20.40 27.20 30.00 32.84 35.96 37.56 39.44 43.15 46.59 50.29 54.22 61.28
MES 5 MES 6
TOTAL AVANCE %
S4 S1 S2 S3 S4 S1 S2 S3 S4
815.84
1.09
423.38
0.56
1132.64
1.51
20482.67
27.33
1751.48
2.34
199.172742939
0.27
32.62
67.33
209.15
145.44 145.44 72.72
321.70
18.90
210.60 210.60
17.76
5.99
21.04
60.07
76.37
1206.95
5922.46
7.90
7.90
1167.09034576
1.56
2.95
42.32
66.24
1393.34 1393.34 1383.57 1128.018 477.191 263.287 6038.74
868.77 434.38
208.18
1393.34 1393.34
320.57
194.98 8.06
96.242 96.242 96.242
167.04 167.04
194.228 194.228 194.228
19.68
77.11 77.11
55.50
0.10
21.60
2.45
143.39 143.39
387.11 387.11
2.45
385.99 385.99
2496.07 2496.07
289.87
84.31
340.22
480.50
3.33
3.33
315.05
330.06
142.80
34.00
126.51
326.24
26.51
240.89 240.890611265
240.89 0.32
59.44 59.437712256
28.76
19.61 0.08
11.07
5293.93 5883.96 8718.45 8412.07 2850.45 2168.39 371.99 612.43 74950.81 100
952.91 1059.11 1569.32 1514.17 513.08 390.31 66.96 110.24 13491.15
749.62 833.17 1234.53 1191.15 403.62 307.04 52.67 86.72 10613.03
34183.10 4166.75 99054.99
7776.24 11522.31 11117.39 3767.16 2865.74 491.62 809.38 99,054.99
7.85 11.63 11.22 3.80 2.89 0.50 0.82
69.13 80.77 91.99 95.79 98.69 99.18 100.00
EJECUTADO
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO LOSA 48.00 HORAS
ESPECIFICACION 1:2:3 210KG/CM2 # villas 5.76 v / hormigon
UNIDAD M3 10.264 m3(v / losa)
A.- MATERIALES UN CANTIDAD PRECIO UNITARIO SUBTOTAL INSUMO
CEMENTO SC 8.24 7.86 64.77 47.47
ARENA GRUESA M3 0.55 13.75 7.5625 3.17
PIEDRA 3/4 M3 0.88 18.13 15.9544 5.07
AGUA M3 0.286 2.50 0.715 1.65
ENCOFRADO METALICOS ( m2/m3 ) m2 5.00 4.80 24 51.32
ENCOFRADO PLYWOOD 15 MM UN 0 0.00
TABLAS DE 2,5 CM UN 6.546 0.00 0.00 67.19
CUARTON ENCOFRADO UN 7.449 4.00 29.80 76.46
TIRAS ENCOFRADO UN 0.719 3.66 2.631 7.38
CLAVOS DE 2 1/2 " KG 0.643 1.98 1.27 6.60
CAÑAS UN 7.393 2.44 18.04 75.88
BLOQUE DE LOSA 39X19X15 UN 39.47 0.50 19.74 405.16
MALLA DE 5MM 15X15 UN 0.35 58.73 20.56 3.59
HIERRO DE 8 MM KG 39.84 0.9634038 38.38 229.49
HIERRO DE 10 MM KG 20.53 1.146 23.53 118.27
HIERRO DE 12 MM KG 9.49 1.08275 10.28 54.69
HIERRO DE 14 MM KG 91.53 1.104 101.05 527.26
PLASTOCRETE 161 HE KG 4 2.63 10.50 23.04
ALAMBRE GALVANIZADO # 14 (44 KG) KG 8.07 2.42 19.50 82.82
ALAMBRE RECOCIDO # 18 KG 8.07 1.89 15.21 46.49
VALORES
TOTAL (A ) 423.48 4346.6
B.- EQUIPO N.- COSTO RENDIMIENTO SUBTOTAL
HERRAMIENTA MENOR 5% 8.37
CONCRETERA (X DIA) 1 31.90 0.1736 5.54
VIBRADOR (X DIA) 1 34.20 0.1736 5.94
WINCHE (CON OPERADOR) (XDIA) 1 70.00 0.1736 12.15
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
COMPACTADOR PEQUEÑO (X DIA) 1 22.40 0.00812
CONCRETERA (X DIA) 1 31.90 0.0140
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 15.00 0.00812
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 15.00 0.0600
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
COMPACTADOR PEQUEÑO (X DIA) 0 20 0.0081
CONCRETERA (X DIA) 31.90 20 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 15.00 0.079
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.3226
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
COMPACTADOR PEQUEÑO (X DIA) 0 20 0.0081
(X DIA) 0 20 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.278
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0 0 0.0081
0 0 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 10.00 0.094
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0 20 0.0081
0 20 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.0177
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0 20 0.0081
0 20 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.014
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 10.00 0.0022
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0 20 0.0081
0 20 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 15.00 0.0195
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0 20 0.0081
0 20 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.0454
TOTAL ( D )
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.1
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
COMPACTADOR PEQUEÑO (X DIA) 0 20 0.0081
(X DIA) 0 20 0.014
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.025
TOTAL ( D )
10.024
SUBTOTAL B.- EQUIPO N.- COSTO
0.164 HERRAMIENTA MENOR 5%
0.18
0.4466
0.793
3.284 404.42
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.1218 FLETE DE CARRO 15.00
0.12180268 15.00
5.834
SUBTOTAL B.- EQUIPO N.- COSTO
0.249 HERRAMIENTA MENOR 5%
0.249
4.972
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.9004 FLETE DE CARRO 15.00
0.900
18.07
SUBTOTAL
1.184
COSTO DIRECTO A+B+C+D
IVA 12%
1.184 SUBTOTAL
DIRECCION TECNICA 10%
47.21 ADMINISTRACION 5%
5.666 IMPREVISTO 3%
52.880 FINANCIAMIENTO 0%
4.721 TOTAL COSTO INDIRECTO
2.361 PRECIO UNITARIO
1.416
8.499
61.38 777.66
5.147 15.96
SUBTOTAL B.- EQUIPO N.- COSTO
0.258 HERRAMIENTA MENOR 5%
0.258 0.798
5.152 15.97
SUBTOTAL D.- TRANSPORTE N.- COSTO
1.613 FLETE DE CARRO 5.00
1.613 5.00
8.36
SUBTOTAL B.- EQUIPO N.- COSTO
0.333 HERRAMIENTA MENOR 5%
0 0 20
0 0 20
0.333
6.65 23.95
SUBTOTAL D.- TRANSPORTE N.- COSTO
1.389 FLETE DE CARRO 5.00
1.39
1.629
SUBTOTAL B.- EQUIPO N.- COSTO
0.180 HERRAMIENTA MENOR 5%
0
0
0.180
3.595 38.14
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.94250707 FLETE DE CARRO
0.943
1.666
SUBTOTAL B.- EQUIPO N.- COSTO
0.093 HERRAMIENTA MENOR 5%
0 0 20
0 0 20
0.093
1.860 104.92
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.089 FLETE DE CARRO 5.00
0.089
1.666
SUBTOTAL B.- EQUIPO N.- COSTO
0.138 HERRAMIENTA MENOR 5%
0 0 20
0 0 20
0.138
2.765
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.07215007 FLETE DE CARRO 10.00
0.07215007
1.793
SUBTOTAL B.- EQUIPO N.- COSTO
0.225 HERRAMIENTA MENOR 5%
0 20
0 20
0.225
4.501
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.02222959 FLETE DE CARRO 15.00
0.02222959
5.32
SUBTOTAL B.- EQUIPO N.- COSTO
0.338 HERRAMIENTA MENOR 5%
0 20
0 20
0.338
6.754 346.61
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.2923 FLETE DE CARRO 5.00
0.292
0.000 0.003
0.036
SUBTOTAL B.- EQUIPO N.- COSTO
0.026 HERRAMIENTA MENOR 5%
0 0 20
0 0 20
0.026 0.570
0.517 11.40
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.227 FLETE DE CARRO 0
0.227 5.00
0.071
1.425 14.25
SUBTOTAL D.- TRANSPORTE N.- COSTO
0.5 FLETE DE CARRO 5.00
0.5
4.00 HORA
40.00 ML
SUBTOTAL
1.186 1.810 rollo
0.000
0.000
0.000
0.000
1.186
SUBTOTAL
0.029
0
0
0.029
SUBTOTAL
0.057
0.155
0.358
0.000
0.570 22.80
SUBTOTAL
0.125
0.125
1.91
0.229
2.138
0.191
0.095
0.057
0.34
2.48 99.28
S UNITARIOS
48.00 HORA
137.32 M2 INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 0.872 15.226 CEMENTO
12.18 0.193 2.175 ARENA GRUESA
18.13 0 0.000 PIEDRA 3/4
2.50 0.011 0.621 AGUA
0.36 4.5 1716.500 MALLA 5MM DE 15X15
0.96 0.105 14.979 BLOQUE 7CM - 9 CM
ARENA CORRIENTE
TOTAL (A ) 5.681 HIERRO (CHICOTE ) 5MM
RENDIMIENTO SUBTOTAL
0.189
TOTAL ( B ) 0.189
RENDIMIENTO SUBTOTAL
2.86 0.200
2.86 1.084
2.86 2.502
2.86 0.000
2.86 0.000
TOTAL ( C) 3.786
RENDIMIENTO SUBTOTAL
0.0073 0.11
TOTAL ( D ) 0.109
9.77
1.172
10.937
0.977
0.488
0.293
1.758
12.695 1743.31
S UNITARIOS
72.00 HORA
189.53 M2
PRECIO UNITARIO SUBTOTAL INSUMO
7.86 0.872 21.015 DESCRIPCIÓN
12.18 0.193 3.002 CEMENTO
0.000 ARENA CORRIENTE
2.50 0.011 0.857 PIEDRA 3/4
0.36 4.5 2369.125 AGUA
0.96 0.105 20.675 PIEDRA BASE
BLOQUE 7CM - 9 CM
TOTAL (A ) 5.681 HIERRO DE 5,5 MM
RENDIMIENTO SUBTOTAL
0.206
TOTAL ( B ) 0.206
RENDIMIENTO SUBTOTAL
2.63 0.217
2.63 1.178
2.63 2.719
2.63 0.000
2.63 0.000
TOTAL ( C) 4.115
RENDIMIENTO SUBTOTAL
0.0053 0.0791
TOTAL ( D ) 0.0791
10.08
1.210
11.290
1.008
0.504
0.302
1.814
13.105 2483.72
S UNITARIOS
8.00 HORA
4.00 U INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 2.539 1.292 CEMENTO
12.18 0.499 0.164 ARENA CORRIENTE
18.13 0.3328668 0.073 PIEDRA CICLOPEO GRUESO
2.50 0.029 0.047 AGUA
0.36 3.24 36.000 CLAVOS DE 2 1 /2" X 8
0.96 1.827 7.584 BLOQUE 7CM - 9 CM
HIERRO DE 5,5 MM
TOTAL (A ) 8.467 TABLAS DE 1" X 4ML
RENDIMIENTO SUBTOTAL CUARTON DE 2" X 3" X 4ML
0.954 TIRAS DE 1" X 4 ML
0.0081 0 PIEDRA 3/4"
0.014 0
TOTAL ( B ) 0.954
RENDIMIENTO SUBTOTAL
0.5 5.709
0.5 6.204
0.5 7.159
0.5 0.000
0.5 0.000
TOTAL ( C) 19.072
RENDIMIENTO SUBTOTAL
0.25 3.75
TOTAL ( D ) 3.75
32.24
3.869
36.111
3.224
1.612
0.967
5.804
41.915 167.66
S UNITARIOS
2.00 HORA
6.05 ML INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 0.261 0.201 CEMENTO
12.18 0.058 0.029 ARENA CORRIENTE
0.000
2.50 0.003 0.008 AGUA
0.36 0.9 15.125 LADRILLO
BLOQUE 7CM - 9 CM
RENDIMIENTO SUBTOTAL
3.025 0.944
3.025 0.513
3.025 1.183
3.025 0.000
3.025 0.000
4.82
0.578
5.399
0.482
0.241
0.145
0.868
6.27 37.92
S UNITARIOS
1.50 HORA
1.80 ML INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 3.489 0.799 CEMENTO
12.18 0.772 0.114 ARENA CORRIENTE
0.000
2.50 0.045 0.033 AGUA
0.36 4.05 20.250
0.000 BLOQUE 7CM - 9 CM
TOTAL (A ) 8.356
RENDIMIENTO SUBTOTAL
0.333
0.0081 0
0.014 0
TOTAL ( B ) 0.333
RENDIMIENTO SUBTOTAL
1.2 2.379
1.2 1.293
1.2 2.983
3.025 0.000
3.025 0.000
TOTAL ( D ) 2.78
18.12
2.174
20.295
1.812
0.906
0.544
3.26
23.56 42.40
S UNITARIOS
HORA
U INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
0.000 0.000 CEMENTO
0.000 ARENA GRUESA
0.000 PIEDRA 3/4"
0.000 AGUA
0.000
0.000
TOTAL (A ) 0.000
RENDIMIENTO SUBTOTAL
0.000
TOTAL ( B ) 0.000
RENDIMIENTO SUBTOTAL
TOTAL ( C) 0.00
RENDIMIENTO SUBTOTAL
0 0
TOTAL ( D ) 0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.00
0.00 0.00
S UNITARIOS
40.00 HORA
129.50 ML INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 0.145 2.396 CEMENTO
12.18 0.032 0.342 ARENA CORRIENTE
0.000
2.50 0.002 0.098 AGUA
0.000 LADRILLO 10 X 0,07 CM
0.000
TOTAL (A ) 0.179
RENDIMIENTO SUBTOTAL
0.123
0.0081 0
0.014 0
TOTAL ( B ) 0.123
RENDIMIENTO SUBTOTAL
3.2375 0.882
3.2375 0.479
3.2375 1.106
3.025 0.000
3.025 0.000
TOTAL ( C) 2.466
RENDIMIENTO SUBTOTAL
0.00772 0.03861004
TOTAL ( D ) 0.03861004
2.81
0.337
3.145
0.281
0.140
0.084
0.51
3.65 472.69
S UNITARIOS
32.00 HORA
69.30 ML INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 0.553 4.872 CEMENTO
12.18 0.122 0.695 ARENA CORRIENTE
0.000
2.50 0.007 0.199 AGUA
0.000 LADRILLO 10 X 0,07 CM
0.000
TOTAL (A ) 0.682
RENDIMIENTO SUBTOTAL
0.250
0.0081 0
0.014 0
TOTAL ( B ) 0.250
RENDIMIENTO SUBTOTAL
2.165625 0.264
2.165625 1.432
2.165625 3.306
3.025 0.000
3.025 0.000
TOTAL ( C) 5.002
RENDIMIENTO SUBTOTAL
0.014 0.144
TOTAL ( D ) 0.1443
6.08
0.729
6.807
0.608
0.304
0.182
1.09
7.90 547.56
S UNITARIOS
48.00 HORA
219.16 M2 INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 1.454 40.545 CEMENTO
12.18 0.322 5.786 ARENA CORRIENTE
TOTAL ( B ) 0.231
RENDIMIENTO SUBTOTAL
4.57 0.125
4.57 1.359
4.57 3.136
4.566 0.000
4.566 0.000
TOTAL ( C) 4.620
RENDIMIENTO SUBTOTAL
0.00456 0.0684
TOTAL ( D ) 0.0684
18.54
2.225
20.767
1.854
0.927
0.556
3.34
24.10 5282.76
S UNITARIOS
24.00 HORA
124.95 ML INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 0.291 4.623 CEMENTO
12.18 0.064 0.660 ARENA CORRIENTE
0.000
2.50 0.004 0.188 AGUA
0.000
TABLAS
TOTAL (A ) 0.359
RENDIMIENTO SUBTOTAL
0.055
0.0081 0
0.014 0
TOTAL ( B ) 0.055
RENDIMIENTO SUBTOTAL
5.206 0.110
5.206 0.298
5.206 0.687
5.206 0.000
5.206 0.000
TOTAL ( D ) 0.040
1.55
0.186
1.735
0.155
0.077
0.046
0.28
2.01 251.57
S UNITARIOS
1.00 HORA
12.26 ML INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
0.000 CEMENTO
0.000 ARENA CORRIENTE
0.000 AGUA
TOTAL (A ) 0.000
RENDIMIENTO SUBTOTAL
0.023
0.0081 0
0.014 0
RENDIMIENTO SUBTOTAL
12.26 0.047
12.26 0.127
12.26 0.292
0.49
0.059
0.547
0.049
0.024
0.015
0.09
0.63 7.78
S UNITARIOS
8.00 HORA
20.00 ML INSUMO
PRECIO UNITARIO SUBTOTAL DESCRIPCIÓN
7.86 0.291 0.740 CEMENTO
12.18 0.064 0.106 ARENA CORRIENTE
TOTAL ( B ) 0.114
RENDIMIENTO SUBTOTAL
2.5 0.228
2.5 0.620
2.5 1.432
2.5 0.000
TOTAL ( D ) 0.25
3.00
0.360
3.364
0.300
0.150
0.090
0.54
3.90 78.09
INSUMO
DESCRIPCIÓN
CEMENTO
ARENA GRUESA
PIEDRA 3/4
AGUA
TABLAS DE 2,5 CM ENCOFRADO
CUARTON ENCOFRADO
TIRAS ENCOFRADO
CLAVOS DE 2 1/2 " X9MM
PLASTOCRETE 161 HE
ALAMBRE RECOCIDO # 18
ALAMBRE GALVANIZADO # 14
CAL ( 25 KG)
PIOLA (MASO )
CUARTON DE CHANUL
PLANCHAS DE ZINC 10 PIES
HIERRO DE 8MM
HIERRO DE 10 MM
HIERRO DE 12 MM
CAÑAS
HIERRO DE 14 MM
BLOQUE DE LOSA 39X19X15
MALLA DE 5MM 15X15
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
74.34 74.34 SACO
5.62 5.62 M3
10.05 10.05 M3
2.28 8 0.285 TANQUE
8.62 8.621 U
1716.50 1716.50 U
2.18 2.18 M3
14.98 45.36 0.33 QUINTAL
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
27.94 27.94 SACO
3.99 3.99 M3
0.00 0.00 M3
1.14 8 0.143 TANQUE
3.33 3.332 U
2369.13 2369.13 U
20.67 45.36 0.46 QUINTAL
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
19.56 19.56 SACO
0.16 0.16 M3
1.52 1.52 M3
0.76 8 0.094 TANQUE
3.21 30 0.107 CAJA DE (30 KG)
36.00 36.00 U
7.58 45.36 0.17 QUINTAL
1.82 1.82 U
11.87 11.875 U
1.70 1.696 U
0.07 0.073 M3
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
0.48 0.48 SACO
0.07 0.07 M3
0.00 M3
0.02 8 0.002 TANQUE
132.87 132.866 U
15.13 15.13 U
45.36 0.00 QUINTAL
0.00 U
0.000 U
0.000 U
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
2.40 2.40 SACO
0.34 0.34 M3
0.00 M3
0.10 8 0.012 TANQUE
0.000 U
60.75 60.75 U
45.36 0.00 QUINTAL
0.00 U
0.000 U
0.000 U
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
1.27 1.27 SACO
0.14 0.14 M3
0.32 0.32 M3
0.03 8 0.004 TANQUE
0.00 U
45.36 0.00 QUINTAL
0.00 U
0.000 U
0.000 U
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
6.15 6.15 SACO
0.88 0.88 M3
0.00 M3
0.25 8 0.031 TANQUE
575.51 575.510 U
0.00 U
45.36 0.00 QUINTAL
0.00 U
0.000 U
0.000 U
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
9.49 9.49 SACO
1.35 1.35 M3
0.00 M3
0.39 8 0.048 TANQUE
707.14 707.143 U
0.00 U
45.36 0.00 QUINTAL
0.00 U
0.000 U
0.000 U
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
123.68 123.68 SACO
17.66 17.66 M3
0.00 M3
5.04 8 0.631 TANQUE
0.000 U
136.98 136.98 U
87.66 87.66 U
10.96 10.96 MOÑO
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
14.12 14.12 SACO
2.01 2.01 M3
0.00 M3
0.58 8 0.072 TANQUE
0.000 U
36.89 36.89 U
0.00 U
0.00 MOÑO
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
0.08 0.08 SACO
0.01 0.01 M3
0.00 M3
0.0033 8 0.000 TANQUE
0.000 U
0.00 U
0.00 U
0.00 MOÑO
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
0.85 0.85 SACO
0.12 0.12 M3
0.00 M3
0.0347 8 0.004 TANQUE
0.000 U
0.00 U
0.00 U
0.00 MOÑO
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
0.00 SACO
1.81 1.81 ROLLO (10 UN)
0.00 M3
8 0.000 TANQUE
0.000 U
0.00 U
0.00 U
0.00 MOÑO
ESUMEN DE INFRAESTRUCTURA INSUMOS
MO POR PARTE
251.01 SACO
16.97 M3
27.43 M3
1.085 TANQUE
348.039 U
234.16 U
91.37 U
1.53 CAJA (30 KG)
13.423 GALON ( 4KG)
9.127 ROLLO
3.000 ROLLO
0.150 SACO
1.545 MASO
16.32 U
18.04 U
19.639 QUINTAL
23.846 QUINTAL
20.619 QUINTAL
328.92 U
11.624 QUINTAL
405.16 U
3.59 U
RESUMEN DE INSUMO POR PARTE
TABLON 136.98 U
CAÑA 87.66 U
SOGAS ( 10 UNIDADES ) 10.96 MOÑO
PIEDRA 3/4" 10.444 M3
RESUMEN DE INSUMO POR PARTE
TABLON 136.98 U
CAÑA 87.66 U
SOGAS ( 10 UNIDADES ) 10.96 MOÑO
PIEDRA 3/4" 10.444 M3
RESUMEN DE INSUMO POR PARTE
TABLON 136.98 U
CAÑA 87.66 U
SOGAS ( 10 UNIDADES ) 10.96 MOÑO
PIEDRA 3/4" 10.444 M3
TABLON 136.98 U
CAÑA 87.66 U
SOGAS ( 10 UNIDADES ) 10.96 MOÑO
PIEDRA 3/4" 10.444 M3
TABLON 136.98 U
CAÑA 87.66 U
SOGAS ( 10 UNIDADES ) 10.96 MOÑO
MALLA PARA ENLUCIR 0,61 X2,21 ML 1.81 ROLLO (10 UN)
PIEDRA 3/4" 10.444 M3
ANALISIS
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO PUNTO DE LUZ PB Y PA
ESPECIFICACION
UNIDAD PUNTOS
A.- MATERIALES UN CANTIDAD
Tuberia de 1/2" pesada PTS 1.65
Caja octogonal grande de 1/2 PTS 1.00
Union de 1/2" pesada PTS 0.36
Conector de 1/2 PTS 2.00
Codo de 1/2" pesada PTS 0.79
Caja rectangular de 1/2" PTS 1.00
ANA
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO Puntos de Luz Interruptor
ESPECIFICACION
UNIDAD puntos
A.- MATERIALES UN CANTIDAD
Interruptor sencillo ticino c/baquelita un 0.848
Interruptor doble ticino c/baquelita un 0.091
Interruptor triple c/baquelita un 0.061
Placa baquelita sencillo UN 0.000
Placa baquelita doble UN 0.000
Placa baquelita triple UN 0.000
Tornillos # 8 x 2 1/2" tripa pato UN 2.00
Cable # 12 rollo 0.099
Cinta aislante de ( 20 m) rollo 0.030
valor
TOTAL (A ) 13.28 1761.3
RENDIMIENTO SUBTOTAL B.- EQUIPO
0.18729653 HERRAMIENTA MENOR
0.014 0
0.014 0
TOTAL ( B ) 0.19
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
2.764 0.207 MAESTRO SECAP
2.764 2.245 AYUDANTE
2.764 1.295 TECHADOR
TOTAL ( D ) 0.07536931
valores
TOTAL (A ) 4.714 155.6
RENDIMIENTO SUBTOTAL B.- EQUIPO
0.173 HERRAMIENTA MENOR
0.014 0
0.014 0
TOTAL ( B ) 0.1734
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
2.75 1.038 MAESTRO ELECTRICISTA SECAP
2.75 1.128 AYUDANTE
2.75 1.302 ELECTRICISTA
TOTAL ( D ) 0.152
TOTAL (A ) 7.592
RENDIMIENTO SUBTOTAL B.- EQUIPO
0.173 HERRAMIENTA MENOR
0.014 0
0.014 0
TOTAL ( B ) 0.1734
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
2.75 1.038 MAESTRO ELECTRICISTA SECAP
2.75 1.128 AYUDANTE
2.75 1.301 ELECTRICISTA
TOTAL ( C) 3.467 45
RENDIMIENTO SUBTOTAL D.- TRANSPORTE
0.0769 0.385
TOTAL ( D ) 0.385
TOTAL ( B ) 0.0000
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
MAESTRO ELECTRICISTA SECAP
AYUDANTE
ELECTRICISTA
TOTAL ( D ) 0
ANALISIS DE PREC
PROYECTO
RUBRO Punto de Timbre
0.73 HORAS ESPECIFICACION
2 PTS UNIDAD ml
PRECIO UNITARIO SUBTOTAL cantidad A.- MATERIALES
1.01 0.84 1.7 tuberia Tuberia de 1/2"
0.30 0.15 1.0 codo Codo de 1/2"
0.73 0.73 2.0 caja rcgl Caja rectangular profunda de 1/2"
0.44 0.88 4.0 contrs Conectores de 1/2"
ANALISIS DE PREC
PROYECTO
RUBRO Punto y Acometida de
0.50 HORAS ESPECIFICACION
5 PTS UNIDAD ml
PRECIO UNITARIO SUBTOTAL PTOS TOTAL A.- MATERIALES
1.01 2.621 5.0 13.0 Tuberia de 1/2"
0.30 0.18 5.0 3.0 Codo de 1/2"
1.40 0.560 5.0 2.0 Cja rectangular profunda de 4x4
0.73 0.292 5.0 2.0 Caja rectangular profunda de 1/2"
0.44 0.352 5.0 4.0 Conectores de 1/2"
1.99 1.194 5.0 3.0 Tuberia de 3/4" Acometida p.v.c
0.39 0.078 5.0 1.0 Codo de 3/4" p.v.c
TOTAL (A ) 5.28
RENDIMIENTO SUBTOTAL B.- EQUIPO
0.048 HERRAMIENTA MENOR
0.014 0
0.014 0
TOTAL ( B ) 0.048
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
10.00 0.285 MAESTRO ELECTRICISTA SECAP
10.00 0.310 AYUDANTE
10.00 0.358 ELECTRICISTA
TOTAL ( D ) 1
ANALISIS DE PREC
PROYECTO
RUBRO prueba Galvanizada
1.00 HORAS ESPECIFICACION
1.00 caja UNIDAD Global
PRECIO UNITARIO SUBTOTAL cantidad A.- MATERIALES
59.00 59 1.00 panel Alambre # 18(20 kg )
TOTAL (A ) 59.000
RENDIMIENTO SUBTOTAL B.- EQUIPO
0.620 HERRAMIENTA MENOR
0.014 0
0.014 0
TOTAL ( B ) 0.6195
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
1 5.709 MAESTRO ELECTRICISTA SECAP
1 3.102 AYUDANTE
1 3.579 ELECTRICISTA
TOTAL ( D ) 3
2.00 HORAS
1.00 modulo/villa
PRECIO UNITARIO SUBTOTAL cantidad DESCRIPCION
40.00 40 1.00 modulo
9.65 9.65 1.00 tuberia MODULO PARA MEDIDOR DE 1/16"
12.80 12.8 1.00 codo TUBERIA DE 1 1/4" METALICA
20.00 20 1 CODO REVERSIBLE DE 1 1/4"
TOTAL (A ) 82.450 BASE SOCKET MONOFASICO
RENDIMIENTO SUBTOTAL
1.239
0.014 0
0.014 0
RESUMEN DE INSUMOS ELECTRICO
TOTAL ( B ) 1.2391 DESCRIPCION
RENDIMIENTO SUBTOTAL
0.5 11.419 TUBERIA DE 1/2" PESADA
0.5 6.204 TUBERIA DE 3/4" PESADA
0.5 7.159 UNION DE 1/2" PESADA
UNION DE 3/4" PESADA
TOTAL ( C) 24.78 24.78 CODO DE 1/2" PESADA
RENDIMIENTO SUBTOTAL CODO DE 3/4" PESADA
1 3 CONECTORES DE 1/2"
CONECTORES DE 3/4"
TOTAL ( D ) 3 CAJA RECTANGULARES DE 1/2" PLST.
CAJA RECTANGULARES DE 3/4" PLST.
111.470 CAJA OCTOGONAL PLASTIGAMA 1/2"
13.376 CAJA RECTANGULAR 4 X 4 PROFUNDA
124.847 TUBERIA DE 3/4" P.V.C. TELEVISION
11.147 CODO DE 3/4" P.V.C TELEVISION
5.574 CAJA DE BREAKER DE 12 - 24 GE
3.344 ALAMBRE GALVANIZADO # 18
2.408 MODULO PARA MEDIDOR DE 1/16"
22.472 TUBERIA DE 1 1/4" METALICA
147.32 147.32 CODO REVERSIBLE DE 1 1/4"
BASE SOCKET MONOFASICO
TOTAL ( B ) 0.2637
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
1.38 0.415 MAESTRO ELECTRICISTA SECAP
1.38 2.256 AYUDANTE
1.38 2.603 ELECTRICISTA
TOTAL ( D ) 0.152
ANALISIS DE PREC
PROYECTO
RUBRO Puntos de T
1.45 HORAS ESPECIFICACION TICINO
2.00 puntos UNIDAD puntos
PRECIO UNITARIO SUBTOTAL cantidad A.- MATERIALES
4.99 2.50 1.00 Tomacorriente sencillo de Telefono
0.00 0.000 0.00 Placa ticino de Telefono
0.25 0.25 2.00 Tornillos # 8 x 2 1/2" tripa pato
44.64 4.464 0.20 Alambre telefonico entorchado
19.00 19 2.00 Cinta aislante de ( 20 m )
0.69 0.345 1.00
TOTAL (A ) 26.55
RENDIMIENTO SUBTOTAL B.- EQUIPO
0.264 HERRAMIENTA MENOR
0.014 0
0.014 0
TOTAL ( B ) 0.2637
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
1.375 0.415 MAESTRO ELECTRICISTA SECAP
1.375 2.256 AYUDANTE
1.375 2.603 ELECTRICISTA
TOTAL ( D ) 2.5
ANALISIS DE PREC
PROYECTO
RUBRO Armada de Panel P
2.91 HORAS ESPECIFICACION 24 Breaker
4.00 puntos UNIDAD global
PRECIO UNITARIO SUBTOTAL cantidad total A.- MATERIALES
3.60 3.60 4.00 Breaker de 1px20A
0.00 0.000 0.00 Breaker de 2px70A
0.25 0.5 8.00 Breaker de 2px20A
29.90 2.2425 0.30 Breaker de 2px30A
0.69 0.1725 1.00
TOTAL (A ) 6.52
RENDIMIENTO SUBTOTAL B.- EQUIPO
0.264 HERRAMIENTA MENOR
0.014 0
0.014 0
TOTAL ( B ) 0.2637
RENDIMIENTO SUBTOTAL C.- MANO DE OBRA
1.38 0.415 MAESTRO ELECTRICISTA SECAP
1.38 2.256 AYUDANTE
1.38 2.603 ELECTRICISTA
TOTAL ( C) 5.27 21.1
RENDIMIENTO SUBTOTAL D.- TRANSPORTE
0.25 1.25 FLETE
TOTAL ( D ) 1.25
ANALISIS DE PREC
PROYECTO
RUBRO Acometida de
1.80 HORAS ESPECIFICACION
9.00 ml UNIDAD ml
PRECIO UNITARIO SUBTOTAL cantidad A.- MATERIALES
50.89 0.50890 0.09 rrollo Cable para television
0.69 0.07667 1.00 Cinta aislante de ( 20 m )
ANALISIS DE PREC
PROYECTO
RUBRO Armada de Socke
3.00 HORAS ESPECIFICACION
12.00 ml UNIDAD global
PRECIO UNITARIO SUBTOTAL cantidad A.- MATERIALES
240.00 2.40 0.12 rrollo Socket Monofasico 2P-4P
96.00 0.96 0.12 rrollo Varilla cooperweld de 5/8"x 6"
74.10 0.74 0.12 rrollo Cinta aislante de ( 20 m )
0.69 0.06 1.00
TOTAL (A ) 4.16
RENDIMIENTO SUBTOTAL
0.155
0.014 0 B.- EQUIPO
0.014 0 HERRAMIENTA MENOR
TOTAL ( B ) 0.1549
RENDIMIENTO SUBTOTAL
4 1.427
4 0.776 C.- MANO DE OBRA
4 0.895 MAESTRO ELECTRICISTA SECAP
AYUDANTE
TOTAL ( C) 3.10 37.2 ELECTRICISTA
RENDIMIENTO SUBTOTAL
0.083 0.417
D.- TRANSPORTE
TOTAL ( D ) 0.417 FLETE
7.828
0.939
8.767 COSTO DIRECTO A+B+C+D
0.783 IVA
0.391 SUBTOTAL
0.235 DIRECCION TECNICA
0.169 ADMINISTRACION
1.578 IMPREVISTO
10.35 124.14 FINANCIAMIENTO
TOTAL COSTO INDIRECTO
PRECIO UNITARIO
2.00 hora
1.00 villa
PRECIO UNITARIO SUBTOTAL cantidad total
0.00
TOTAL ( D ) 0 0.0
26.020
3.122
29.143
2.602
1.301
0.781
0.562
5.246
34.39 34.39
ANALISIS DE PRECIOS UNITARIOS
TOTAL (A ) 6.063
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.18729653
0 20 0.014 0
0 20 0.014 0
TOTAL ( B ) 0.1873
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.1 5.71 2.76417 0.207
2 3.10 2.76417 2.245
1 3.58 2.76417 1.295
TOTAL ( D ) 0.07536931
10.071 1336.26
12% 1.209
11.280
10% 1.007
5% 0.504
3% 0.302
0%
1.813
13.09 1737.143
ANALISIS DE PRECIOS UNITARIOS
CUBIERTA GALVANIZADA
DURA TECHO PLUS E=0,30 48 HORAS
132.68 M2
UN CANTIDAD PRECIO UNITARIO SUBTOTAL INSUMO
un 0.2801 17.44 4.88431373 37.17
un 2.6 0.14 0.35802 344.97
TOTAL (A ) 5.242 695.6
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.18729653
0 20 0.014 0
0 20 0.014 0
TOTAL ( B ) 0.1873
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.1 5.71 2.764 0.207
2 3.10 2.764 2.245
1 3.58 2.764 1.295
9.251
12% 1.110
10.361
10% 0.925
5% 0.463
3% 0.278
0%
1.665
12.026 1595.6
TOTAL ( B ) 0.1734
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.5 5.71 2.750 1.038
1 3.10 2.750 1.128
1 3.58 2.750 1.301
TOTAL ( D ) 0.172
10.213
12% 1.226
11.438
10% 1.021
5% 0.511
3% 0.306
0% 0.221
2.059
13.50 391.41
ANALISIS DE PRECIOS UNITARIOS
TOTAL (A )
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.000
0 20 0.014 0
0 20 0.014 0
TOTAL ( B ) 0.0000
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
TOTAL ( C) 0.000 0
N.- COSTO RENDIMIENTO SUBTOTAL
5.00 0.000 0
TOTAL ( D ) 0.000
0.000
12% 0.000
0.000
10% 0.000
5% 0.000
3% 0.000
0%
0.000
0.00 0.000
ANALISIS DE PRECIOS UNITARIOS
TOTAL (A ) 2.608
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.020
0 20 0.014 0
0 20 0.014 0
TOTAL ( B ) 0.020
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.5 5.71 24.00 0.119
1 3.10 24.00 0.129
1 3.58 24.00 0.149
TOTAL ( C) 0.397 5
N.- COSTO RENDIMIENTO SUBTOTAL
3.00 0.083 0.2500
TOTAL ( D ) 0.2500
3.276
12% 0.393
3.669
10% 0.328
5% 0.164
3% 0.098
iva 0.071
0.660
4.33 51.95
Punto de Timbre
0.73 HORAS
2 PTS
UN CANTIDAD PRECIO UNITARIO SUBTOTAL cantidad
un 1.667 1.01 1.680 3.3
un 1.00 0.30 0.3 2.0
UN 1.00 0.73 0.73 2.0
UN 1 0.44 0.44 2.0
TOTAL (A ) 3.150
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.173
20 0.014 0
20 0.014 0
TOTAL ( B ) 0.1733
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.5 5.71 2.75 1.038
1 3.10 2.75 1.128
1 3.58 2.75 1.301
TOTAL ( C) 3.466 7
N.- COSTO RENDIMIENTO SUBTOTAL
5.00 0.50 2.5
TOTAL ( D ) 2.5
9.290
12% 1.115
10.404
10% 0.929
5% 0.464
3% 0.279
iva 0.201
1.873
12.28 24.55
TOTAL (A ) 7.591
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.048
20 0.014 0
20 0.014 0
TOTAL ( B ) 0.0477
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.5 5.71 10.00 0.285
1 3.10 10.00 0.310
1 3.58 10.00 0.358
TOTAL ( D ) 1.250
9.842
12% 1.181
11.02
10% 0.984
5% 0.492
3% 0.295
IVA 0.213
1.9842
13.01 52.03
prueba Galvanizada
4.00 HORAS
362.00 ML
UN CANTIDAD PRECIO UNITARIO SUBTOTAL cantidad
rll/ml 0.00277 46.40 0.129 1.00
TOTAL (A ) 0.129
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.007
0 20 0.014 0
0 20 0.014 0
TOTAL ( B ) 0.01
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
1 5.71 90.50 0.063
1 3.10 90.50 0.034
1 3.58 90.50 0.040
TOTAL ( D ) 0.0083
0.281
12% 0.034
0.314
10% 0.028
5% 0.014
3% 0.008
0% 0.006
0.057
0.37 134.23
1 1 U
1 1 U
1 1 U
1.0 1 U
0 U
0 U
147 U
3 U
24 U
0 U
83 U
1 U
168 U
0 U
84 U
0 U
33 U
5.00 U
3.00 U
2 U
1 PANEL
1 ROLLO
1 U
1 U
1 U
1 U
TOTAL (A ) 8.26
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.264
0.014 0
0.014 0
TOTAL ( B ) 0.2637
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.1 5.71 1.38 0.415
1 3.10 1.38 2.256
1 3.58 1.38 2.603
TOTAL ( D ) 0.17241379
13.972
12% 1.677
15.649
10% 1.397
5% 0.699
3% 0.419
IVA 0.302
2.817
18.47 535.51
ANALISIS DE PRECIOS UNITARIOS
14.615
12% 1.754
16.369
10% 1.462
5% 0.731
3% 0.438
0% 0.316
2.946
19.32 38.63
Puntos de Telefono
TICINO 3.64 HORAS
puntos 5.00 puntos
UN CANTIDAD PRECIO UNITARIO SUBTOTAL cantidad
un 1 3.46 3.46 5.00
un 0 0.00 0.000 0.00
un 2.00 0.25 0.5 10.00
rllo 0.06 50.89 3.05 0.30
rollo 0.2 0.69 0.14 1.00
TOTAL (A ) 7.15
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.264
0.014 0
0.014 0
TOTAL ( B ) 0.2637
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
0.1 5.71 1.38 0.415
1 3.10 1.38 2.256
1 3.58 1.38 2.603
TOTAL ( D ) 1
13.690
12% 1.643
15.332
10% 1.369
5% 0.684
3% 0.411
0% 0.296
2.760
18.09 90.46
TOTAL ( B ) 0.1033
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
1 5.71 6.0 0.952
1 3.10 6 0.517
1 3.58 6 0.597
TOTAL ( C) 2.07 49.6
N.- COSTO RENDIMIENTO SUBTOTAL
5.00 0.04 0.208
TOTAL ( D ) 0.208
11.80
12% 1.416
13.218
10% 1.180
5% 0.590
3% 0.354
IVA 0.255
2.379
15.60 374.34
Acometida de televisión
1.80 HORAS
9.00 ml
UN CANTIDAD PRECIO UNITARIO SUBTOTAL cantidad
rrllo 0.01 29.90 0.30 0.09
rollo 0.11 0.69 0.08 1.00
TOTAL (A ) 31.92
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.620
0.014 0
0.014 0
TOTAL ( B ) 0.6195
N.- JORNAL REAL RENDIMIENTO SUBTOTAL
1 5.71 1 5.709
1 3.10 1 3.102
1 3.58 1 3.579
TOTAL ( D ) 3
47.930
12% 5.752
53.682
10% 4.793
5% 2.397
3% 1.438
IVA 1.035
9.663
63.34 63.34
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO CABALLETE Y CHOVA
ESPECIFICACION 16.00
UNIDAD M2 38.00
A.- MATERIALES UN CANTIDAD PRECIO UNITARIO SUBTOTAL
Caballete universal 1,21x0,39cnm un 1.18 8.00 9.412
Chova alumband rollo 0,50x10ml rllo 0.10 50.00 5
TOTAL (A ) 14.412
B.- EQUIPO N.- COSTO RENDIMIENTO SUBTOTAL
HERRAMIENTA MENOR 5% 0.15267965
0 20 0.014 0
0 20 0.014 0
TOTAL ( B ) 0.1527
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO SUBTOTAL
MAESTRO SECAP 0.1 5.71 2.38 0.240
AYUDANTE 1 3.10 2.38 1.306
TECHADOR 1 3.58 2.38 1.507
TOTAL ( C) 3.05
D.- TRANSPORTE N.- COSTO RENDIMIENTO SUBTOTAL
FLETE 5.00 0.0263 0.13157895
TOTAL ( D ) 0.13157895
TOTAL ( B ) 0.1527
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO SUBTOTAL
MAESTRO SECAP 0.1 5.71 2.375 0.240
AYUDANTE 1 3.10 2.375 1.306
TECHADOR 1 3.58 2.375 1.507
TOTAL ( C) 3.054
D.- TRANSPORTE N.- COSTO RENDIMIENTO SUBTOTAL
FLETE 5.00 0.0263 0.13
TOTAL ( D ) 0.13
total
41
15
58
8
29
total de cantidad
13.0
2.0
3.0
3.0
8.0
3
2
CAJA DE BREAKER DE 12 - 24 GE 1 1
ALAMBRE GALVANIZADO # 14 1 1
0
0
0
0
TUBERIA DE 40 MM 4.00 u
CODO DE 40 MM 1.00 u
DESCRIPCION CANTIDAD CONVERSION TOTAL
TOTAL (A ) 11.65
B.- EQUIPO N.- COSTO RENDIMIENTO SUBTOTAL
HERRAMIENTA MENOR 5% 0.125
0 20 0.014 0
0 20 0.014 0
TOTAL ( B ) 0.1249
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO SUBTOTAL
MAESTRO SECAP 0.1 5.71 4.146 0.138
AYUDANTE 2 3.10 4.146 1.496
TECHADOR 1 3.58 4.146 0.863
TOTAL ( D ) 0.07536931
TOTAL ( B ) 0.1249
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO SUBTOTAL
MAESTRO SECAP 0.1 5.71 4.14625 0.138
AYUDANTE 2 3.10 4.14625 1.496
TECHADOR 1 3.58 4.14625 0.863
UNIDAD
U
U
U
U
U
U
U
U
U
U
U
UNIDAD
U
U
U
U
U
U
U
U
U
U
U
UNIDAD
U
U
U
U
U
U
U
U
U
U
U
U
U
UNIDAD
U
U
U
U
U
U
U
U
U
U
U
U
U
UNIDAD
U
U
U
U
U
U
U
U
U
U
U
U
U
U
UNIDAD
PANEL
ROLLO
U
U
U
U
UNIDAD
U
U
U
U
U
U
U
ROLLO
ROLLO
U
U
U
U
UNIDAD
U
U
U
ROLLO
ROLLO
U
U
UNIDAD
U
U
U
ROLLO
ROLLO
U
U
U
U
UNIDAD
U
U
U
ROLLO
ROLLO
U
U
U
U
UNIDAD
ROLLO
ROLLO
ROLLO
UNIDAD
ROLLO
ROLLO
ROLLO
ROLLO
U
U
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO CUMBRERO DE TEJAS PARA P7
HORAS ESPECIFICACION
M2 UNIDAD M2
INSUMO A.- MATERIALES UN CANTIDAD PRECIO UNITARIO
2122.88
22.11 Cumbrero para placa p7 34 X17 CM UN 3 0.65
Chova alumband rollo 0,50x10ml rll 0.10 50.00
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0 20 0.014
0 20 0.014
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO SECAP 0.1 5.71 2.375
AYUDANTE 1 3.10 2.375
TECHADOR 1 3.58 2.375
331.34 TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 5.00 0.0263
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0 20 0.014
0 20 0.014
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO SECAP 0.1 5.71 4.750
AYUDANTE 2 3.10 4.750
TECHADOR 1 3.58 4.750
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 5.00 0.0263
TOTAL ( D )
3.05
SUBTOTAL
0.132
0.132
10.235
1.228
11.463
1.023
0.512
0.307
1.842
13.31 505.60
8.00 horas
38.00 ml INSUMO
SUBTOTAL INSUMO DESCRIPCIÓN
0 0.00 CORREA METALICA DE 80 X40X15X2MM
2.286 108.57 CANAL METALICO DE 100X50X2MM
5 3.80 SODADURA 60/11 ( KG VIENE 20 UNIDADES )
PINTURA ANTICORROSIVA GLIDDEN
FONDO PRAIMAN ( CONDOR ) COLOR GRIS
DIESEL
PLANCHA METALICA SUPER TECHO DE 14 PIES
GANCHO CON CAPUCHON -J-DE 4" O TIRAFONDO DE 3"
7.286 276.9 TEJAS "S" CURVAS SOBRE PLANCHA DE 35 X 26 CM
SUBTOTAL ALAMBRE DE COBRE E= 18
0.109 CUMBRERO DE TEJAS " S" CURVAS PARA PLANCHA BASE
0 CHOVA DE ALUMBAND DE 0,50CM X 10 ML
0 CABALLETE FIGO DE 0,85 X 0,40
CHOVA DE ALUMBAND DE 0,50CM X 10 ML
0.1090
SUBTOTAL
0.120
1.306
0.754
2.18 82.84
SUBTOTAL
0.132
0.132 5.0
9.706
1.165
10.871
0.971
0.485
0.291
1.747
12.62 479.48
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
27.19 27.19 U
16.59 16.59 CAJETIN
60.31 5 12.06 CAJA
6.63 6.634 GALON
6.63 6.634 GALON
6.63 6.634 GALON
48.96 48.96 U
97.92 97.92 U
2122.88 2122.880 U
22.11 22.113 LIBRA
111.76 111.765 U
3.80 3.80 ROLLO
44.71 44.71 U ESTOS SON
3.80 3.80 ROLLO OPCIONAL
INSUMO
CANTIDAD COVERSION TOTAL UNIDAD
26.33 26.33 U
16.59 16.59 CAJETIN
60.31 5 12.06 CAJA
6.63 6.634 GALON
6.63 6.634 GALON
6.63 6.634 GALON
37.17 37.17 U
344.97 344.97 U
1724.84 1724.840 U
22.11 22.113 LIBRA
108.57 108.571 U
3.80 3.80 ROLLO
44.71 44.71 U ESTOS SON
3.80 3.80 ROLLO OPCIONAL
RESUMEN DE ESTRUCTURA METALICA CON ETERNIT P7
2.598
0.312
2.910
0.260
0.130
0.078
0.056
0.524
% 0.0628518020195783 3.43 41.20
7.684
0.922
8.606
0.768
0.384
0.231
0.166
1.549 9.29
10.15 60.93
12.067
1.448
13.515
1.207
0.603
0.362
0.261
2.433
15.95 63.789
8.205
0.985
9.190
0.820
0.410
0.246
0.177
1.654
10.84 65.062
TOTAL (A ) 5.98
COSTO RENDIMIENTO SUBTOTAL
0.054
22 0.2315 5.093
20 0.014 0
TOTAL ( B ) 5.1466
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 6 0.476
3.10 6 0.000
3.58 6 0.597
TOTAL ( C) 1.072 25.7
COSTO RENDIMIENTO SUBTOTAL
3.00 0.04167 0.125
TOTAL ( D ) 0.125
12.324
1.479
13.803
1.232
0.616
0.370
0.266
2.485
16.29 390.895
28.207
3.385
31.592
2.821
1.410
0.846
0.609
5.687
37.28 372.787
17.520
2.102
19.622
1.752
0.876
0.526
0.378
3.532
23.15 138.93
ba de presión y estanquidad
8.00 HORAS
30.00 puntos
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1 0.44 0.44 30.00 tapones
TOTAL (A ) 0.44
COSTO RENDIMIENTO SUBTOTAL
0.079
0.2315 0
0.014 0
TOTAL ( B ) 0.079
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 3.75 0.761
3.10 3.75 0.827
3.58 3.75 0.000
TOTAL ( D ) 0.10
2.208
0.265
2.473
0.221
0.110
0.066
0.048
0.45
2.92 87.54
EQUIPAMIENTO
289.868
34.784
324.653
28.987
14.493
8.696
52.18
376.83 376.829
DE CISTERNA
1.00 GLOBAL
1.00 U
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1.00 24.90 24.90 1.00
1.00 14.00 14.00 1.00
1.00 1.77 1.77 1.00
1.00 25.63 25.63 1.00
84.310
10.117
94.427
8.431
4.216
2.529
15.18
109.60 109.60
TOTAL ( B ) 0.620
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 1 5.709
3.10 1 3.102
3.58 1 3.579
TOTAL ( D ) 1.00
96.100
11.532
107.632
9.610
4.805
2.883
17.30
124.93 624.65
SIS DE PRECIOS UNITARIOS
3.00 HORAS
1.00 U
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1.00 200.00 200.00 1.00 master
0.00 200.00 0.00 0.00 hijo
244.031
29.284
273.314
24.403
12.202
7.321
43.93
317.24 317.24
78.763
9.45
88.21
7.88
3.94
2.36
14.18
102.39 409.57
ORIO DE BAÑOS
2.25 HORAS
5.00 U
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
0.20 105.28 21.06 1.00
0.20 98.02 19.60 1.00
0.20 0.00 0.00 1.00
0.20 0.00 0.00 1.00
0.20 95.41 19.08 1
65.248
7.83
73.08
6.52
3.26
1.96
1.409
13.15
86.23 431.16
TOTAL (A ) 98.34
COSTO RENDIMIENTO SUBTOTAL
0.477
0.2315 0
0.014 0
TOTAL ( B ) 0.477
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 1.000 2.855
3.10 1.000 3.102
3.58 1.000 3.579
TOTAL ( D ) 1.67
110.019
13.20
123.22
11.00
5.50
3.30
19.80
143.03 429.08
26.506
3.18
29.69
2.65
1.33
0.80
4.77
34.46 34.46
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO AASS. Contrapiso ( redes )
ESPECIFICACION
UNIDAD PUNTOS
A.- MATERIALES UN
tuberia de 4" plastigama un
tuberia de 2" plastigama un
codo de 4" de 90 grado un
yee de 4" a 2" un
codo de 2" de 90 grado un
kalipega 1/2 litro 1/2 lt.
union de 4" un
unio de 2" un
un
NEPLO DE 1/2" DE 5CM PRESION A/C (PLSTGMA) un
TAPON MACHO DE 1/2" UN
TAPON HEMBRA DE 1/2" UN
UNION DE 1/2" ROSCABLE PRESION A/C (PLTGMA) UN
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
AGUA FRIA
DESCRIPCIÓN CANTIDAD COVERSION
TUBERIA DE 1/2" DE PRESION PARA A/F (PLTGMA)
TUBERIA DE 3/4" PRESION. PARA A/F (PLTGMA)
CODOS DE 1/2" ROSCABLE PARA A/F (PLTGMA)
CODOS DE 3/4" ROSCABLE PARA A/F (PLTGMA)
TEE DE 1/2" DE PRESION PARA A /F (PLTGMA)
TEE DE 3/4" DE PRESION PARA A /F (PLTGMA)
NEPLO PERDIDO DE 1/2" PRESION A/F (PLTGMA)
NEPLO PERDIDO DE 3/4" PRESION A/F (PLTGMA)
NEPLO DE 3/4" DE 5 CM DE PRESION A/F (PLTGMA)
UNION DE 1/2" ROSCABLE PRESION A/F (PLTGMA)
UNION DE 3/4" ROSCABLE PRESION A/F (PLTGMA)
NUDO DE 1/2" PRESION PARA A/F PLASTIGAMA
NUDO DE 3/4" PRESION PARA A/F PLASTIGAMA
REDUCTOR DE 3/4" A 1/2" PRESION A/F (PLSTGMA)
NEPLO DE 1/2" DE 5CM PRESION A/F (PLSTGMA)
TAPON MACHO DE 1/2" 0.00
TAPON HEMBRA DE 1/2" 30.00
PERMATEX GRANDE
TEFLON
KALIPEGA DE 1 LITRO
LLAVE DE COMPUERTA DE 1/2" RED WHITE
AGUA CALIENTE
TUBERIA DE 1/2" DE PRESION PARA A/C (PLTGMA)
TUBERIA DE 3/4" PRESION. PARA A/C (PLTGMA)
CODOS DE 1/2" ROSCABLE PARA A/C (PLTGMA)
CODOS DE 3/4" ROSCABLE PARA A/C (PLTGMA)
TEE DE 1/2" DE PRESION PARA A /C (PLTGMA)
TEE DE 3/4" DE PRESION PARA A /C(PLTGMA)
NEPLO PERDIDO DE 1/2" PRESION A/C (PLTGMA)
NEPLO PERDIDO DE 3/4" PRESION A/C (PLTGMA)
NEPLO DE 3/4" DE 5 CM DE PRESION A/C (PLTGMA)
UNION DE 1/2" ROSCABLE PRESION A/C (PLTGMA)
UNION DE 3/4" ROSCABLE PRESION A/C (PLTGMA)
NUDO DE 1/2" PRESION PARA A/F PLASTIGAMA
NUDO DE 3/4" PRESION PARA A/F PLASTIGAMA
REDUCTOR DE 3/4" A 1/2" PRESION A/C (PLSTGMA)
NEPLO DE 1/2" DE 5CM PRESION A/C (PLSTGMA)
TAPON MACHO DE 1/2"
TAPON HEMBRA DE 1/2"
PERMATEX GRANDE
TEFLON
S. Contrapiso ( redes )
2.00 HORAS
13.00 PUNTOS insumo
CANTIDAD PRECIO UNITARIO SUBTOTAL cantidades # material
0.222 14.19 3.15 3.00 0.67
0.200 6.96 1.39 10.00 2.00
0.00 5.17 0.00 0.00 0.00
0 5.60 0.00 0.00 0.00
0.00 3.00 0.00 0.00 0.00
0.00 8.00 0.00 0.00 0.00
0 3.00 0.00 0.00 0.00
0 1.19 0.00 0.00 0.00
6.470
0.776
7.247
0.647
0.324
0.194
0.140
1.304 16.96
8.55 111.17
ECIOS UNITARIOS
40.594
4.871
45.466
4.059
2.030
1.218
0.877
8.184
53.65 1019.342
ECIOS UNITARIOS
14.364
1.724
16.088
1.436
0.718
0.431
0.310
2.896
18.98 82.009
ECIOS UNITARIOS
Contrapiso
4.00 HORAS
13.00 PTS
CANTIDAD PRECIO UNITARIO SUBTOTAL cantidad # material
0.278 10.95 3.04 3.00 0.83
0.233 16.33 3.81 10.00 2.33
1.67 0.48 0.80 3.00 5.00
0.30 0.78 0.23 10.00 3.00
1.00 0.61 0.61 3.00 3.00
0.300 1.18 0.35 10.00 3.00
1.00 0.39 0.39 3.00 3.00
1.33 1.19 1.59 3.00 4.00
0.40 0.73 0.29 10.00 4.00
0.200 2.17 0.43 10.00 2.00
0.667 1.16 0.77 3.00 2.00
0.077 3.90 0.30 13.00 1.00
0.308 0.85 0.26 13.00 4.00
0.100 0.50 0.05 10.00 1.00
0.200 0.00 0.00 10.00 2.00
TOTAL (A ) 12.94
COSTO RENDIMIENTO SUBTOTAL
0.123
0 0 0
0 0 0
TOTAL ( B ) 0.123
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 3.250 0.878
3.10 3.250 0.477
3.58 3.250 1.101
TOTAL ( C) 2.46 31.9
COSTO RENDIMIENTO SUBTOTAL
5.00 0.0769 0.3846 5
TOTAL ( D ) 0.38
15.90
1.908
17.810
1.590
0.795
0.477
0.343
3.206
21.02 273.207
ECIOS UNITARIOS
puntos x tuberia 1/2" 4.00
puntos x tuberia 3/4" 0.00
PARED 6.40 HORAS
4.00 puntos
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
0.542 10.95 5.93 2.17
0.000 16.33 0.00 0.00
1.500 0.48 0.72 6.00
0.000 0.78 0.00 0.00
0.500 0.61 0.31 2.00
0.000 1.18 0.00 0.00
0.250 0.56 0.14 1.00
0.000 0.73 0.00 0.00
0.250 3.90 0.98 1.00
0.250 0.85 0.21 1.00
0.250 0.26 0.065 1.00
0.500 0.42 0.210 2.00
1.500 0.44 0.660 6.00
0.500 17.72 8.860 2.00
33.598
4.032
37.630
3.360
1.680
1.008
0.726
6.773
44.40 177.615
ECIOS UNITARIOS
TOTAL ( B ) 0.4914
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 0.81 3.513
3.10 0.81 1.909
3.58 0.81 4.405
TOTAL ( D ) 1.25
21.148
2.538
23.685
2.115
1.057
0.634
0.457
4.263
27.95 111.80
NSUMO
TOTAL UNIDAD
TOTAL UNIDAD
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.0 U
0.00 U
30.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
0 U
ECIOS UNITARIOS
1.000 GLOBAL
1.00 villa
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1 249.00 249.00 1.00
270.768
32.492
303.261
27.077
13.538
8.123
48.74
352.00 351.999
ECIOS UNITARIOS
PEDESTAL
5.00 HORAS
5.00 U
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
0.20 47.70 9.54 1.00
0.60 55.00 33.00 3.00
0.200 57.47 11.49 1.00
68.044
8.165
76.209
6.804
3.402
2.041
12.25
88.46 442.29
ECIOS UNITARIOS
TOTAL ( B ) 0.620
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 1.000 5.709
3.10 1.000 3.102
3.58 1.000 3.579
120.510
14.461
134.971
12.051
6.026
3.615
21.69
156.66 313.33
ECIOS UNITARIOS
89.508
10.74
100.25
8.95
4.48
2.69
1.933
18.04
118.29 236.59
ECIOS UNITARIOS
0.45 HORAS
1.00 U
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1.00 117.00 117.00 1.00
0.00
TOTAL (A ) 117.00 117.0
COSTO RENDIMIENTO SUBTOTAL
0.215
0.2315 0
0.014 0
126.506
15.18
141.69
12.65
6.33
3.80
2.733
25.50
167.19 167.19
ECIOS UNITARIOS
REGADERO O LAVAPLATOS
1.00 HORAS
1.00 JGO
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1.00 109.37 109.37 1.00
0.00
1.00 7.52 7.52 1.00
0.00
1 10.90 10.90 1
TOTAL (A ) 127.79
COSTO RENDIMIENTO SUBTOTAL
0.477
0.2315 0
0.014 0
TOTAL ( B ) 0.477
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 1.000 2.855
3.10 1.000 3.102
3.58 1.000 3.579
TOTAL ( D ) 5.00
142.803
17.14
159.94
14.28
7.14
4.28
25.70
185.64 185.64
ECIOS UNITARIOS
0.30 HORAS
2.00 U
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1.00 14.00 14.00 2.00
0.00
17.002
2.04
19.04
1.70
0.85
0.51
3.06
22.10 44.20
CALCULO PARA SACAR LAS CANTIDADES DE EXPLOSION DE INSUMO
INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
TOTAL UNIDAD
0.87 U
2.27 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.17 U
TOTAL UNIDAD
4.67 U
4.67 U
5.00 U
4.00 U
6.00 U
2.00 U
18.00 U
4.00 U
3.00 U
2.00 U
2.00 U
0.00 U
0.37 U
1.00 U
1.00 U
1.00 U
TOTAL UNIDAD
1.33 U
0.00 U
2.00 U
1.00 U
1.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
TOTAL UNIDAD
2.00 U
0.00 U
2.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
NITARIOS
1.85 HORAS
6.00 PUNTOS insumo
CANTIDAD PRECIO UNITARIO SUBTOTAL cantidades # material
0.2083 10.95 2.28 4.00 0.8
0.2500 16.33 4.08 2.00 0.50
0.7500 0.48 0.36 4.00 3.00
0.5000 0.78 0.39 2.00 1.00
0.7500 0.61 0.46 4.00 3.00
1.0000 1.18 1.18 2.00 2.00
0.5000 0.42 0.21 4.00 2.00
0.5000 0.56 0.28 4.00 2.0
1.0000 0.73 0.73 2.00 2.0
14.897
1.788
16.685
1.490
0.745
0.447
0.322
3.003
19.69 118.131
NITARIOS
puntos x tuberia 1/2" 3.00
puntos x tuberia 3/4" 10.00
4.00 HORAS
13.00 PUNTOS
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
0.167 10.95 1.83 0.50
0.233 16.33 3.81 2.33
0.667 0.48 0.32 2.00
0.300 0.78 0.23 3.00
0.500 0.61 0.31 1.50
0.300 0.58 0.17 3.00
0.100 0.58 0.06 1.00
0.333 0.56 0.19 1.00
0.10 0.73 0.07 1.00
0.167 1.16 0.19 0.50
0.200 2.17 0.434 2.00
0.333 0.42 0.140 1.00
0.100 0.39 0.039 0.30
0.308 0.85 0.262 4.00
0.077 3.90 0.300 0.00
0.100 0.58 0.058 1.00
0.333 0.26 0.087 1.00
TOTAL (A ) 8.50
COSTO RENDIMIENTO SUBTOTAL
0.123
22 0.2315 0
20 0.014 0
TOTAL ( B ) 0.123
JORNAL REA RENDIMIENTO SUBTOTAL
5.71 3.25 0.878
3.10 3.25 0.477
3.58 3.25 1.101
TOTAL ( D ) 0.38
11.463
1.376
12.838
1.146
0.573
0.344
0.248
2.311
15.15 196.94
NITARIOS
TOTAL (A ) 4.25
COSTO RENDIMIENTO SUBTOTAL
0.094
22 0.2315 0
20 0.014 0
TOTAL ( B ) 0.0938
JORNAL REA RENDIMIENTO SUBTOTAL
5.71 4.255 0.671
3.10 4.255 0.364
3.58 4.255 0.841
TOTAL ( D ) 0.83
7.054
0.846
7.900
0.705
0.353
0.212
0.152
1.422
9.32 55.932
TOTAL UNIDAD
TOTAL UNIDAD
1.00 U
1.00 U
1.00 U
0.00 U
TOTAL UNIDAD
TOTAL UNIDAD
1.00 U
1.00 U
1.00 U
1.00 U
1.00 U
3.00 U
1.00 U
TOTAL UNIDAD
TOTAL UNIDAD
1.00 U
3.00 U
2.00 U
1.00 U
NITARIOS
3.00 HORAS
1.00 U
CANTIDAD PRECIO UNITARIO SUBTOTAL # material
1.00 2,000.00 2000.00 1.00
0.00
2044.031
245.284
2289.314
204.403
102.202
61.321
367.93
2657.24 2657.24
TOTAL UNIDAD
TOTAL UNIDAD
1.00 U
1.00 U
1.00 U
TOTAL UNIDAD
TOTAL UNIDAD
1.00 U
1.00 U
1.00 U
1.00 U
1.00 U
TOTAL UNIDAD
TOTAL UNIDAD
0.00 U
1.00 U
2.00 U
1.00 U
1.00 U
1.00 U
TOTAL UNIDAD
TOTAL UNIDAD
3.00 U
1.00 U
1.00 U
INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
TUBERIA DE 4" PLASTIGAMA 8.00
UNION DE 4" 4.00
TUBERIA DE 1/2" DE PRESION PARA A/F (PLTGMA) 1.67
TUBERIA DE 3/4" PRESION. PARA A/F (PLTGMA) 2.83
CODOS DE 1/2" ROSCABLE PARA A/F (PLTGMA) 8.00
CODOS DE 3/4" ROSCABLE PARA A/F (PLTGMA) 4.00
TEE DE 1/2" DE PRESION PARA A /F (PLTGMA) 6.00
TEE DE 3/4" DE PRESION PARA A /F (PLTGMA) 5.00
NEPLO PERDIDO DE 1/2" PRESION A/F (PLTGMA) 5.00
NEPLO PERDIDO DE 3/4" PRESION A/F (PLTGMA) 2.00
NEPLO DE 3/4" DE 5 CM DE PRESION A/F (PLTGMA) 2.00
UNION DE 1/2" ROSCABLE PRESION A/F (PLTGMA) 6.00
UNION DE 3/4" ROSCABLE PRESION A/F (PLTGMA) 6.0
NUDO DE 1/2" PRESION PARA A/F PLASTIGAMA 4.00
NUDO DE 3/4" PRESION PARA A/F PLASTIGAMA 2.00
PERMATEX GRANDE 2.00
TEFLON 6.0
KALIPEGA DE 1 LITRO 1.00
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO Agua Caliente Losa
ESPECIFICACION PUNTOS
UNIDAD
A.- MATERIALES UN
tuberia de 1/2" ml
tuberia de 3/4" ml
codo de !/2" un
codo de 3/4" un
TEE DE 1/2" un
TEE 3/4" un
neplo de 3/4" de 5cm
uniones de 1/2" un
uniones de 3/4" un
nudo de 1/2" un
nudo de 3/4" un
neplo de 1/2" de 5 cm UN
neplo perdido de 1/2" un
teflon un
permatex grande un
reductoe de 3/4 a 1/2" un
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
AGUA FRIA
DESCRIPCIÓN CANTIDAD COVERSION
TUBERIA DE 1/2" DE PRESION PARA A/F (PLTGMA) 0.00
TUBERIA DE 3/4" PRESION. PARA A/F (PLTGMA) 1.00
CODOS DE 1/2" ROSCABLE PARA A/F (PLTGMA) 0.00
CODOS DE 3/4" ROSCABLE PARA A/F (PLTGMA) 2.00
TEE DE 1/2" DE PRESION PARA A /F (PLTGMA) 0.00
TEE DE 3/4" DE PRESION PARA A /F (PLTGMA) 0.00
NEPLO PERDIDO DE 1/2" PRESION A/F (PLTGMA)
NEPLO PERDIDO DE 3/4" PRESION A/F (PLTGMA)
NEPLO DE 3/4" DE 5 CM DE PRESION A/F (PLTGMA)
UNION DE 1/2" ROSCABLE PRESION A/F (PLTGMA) 0.00
UNION DE 3/4" ROSCABLE PRESION A/F (PLTGMA) 1.0
NUDO DE 1/2" PRESION PARA A/F PLASTIGAMA
NUDO DE 3/4" PRESION PARA A/F PLASTIGAMA 1.00
REDUCTOR DE 3/4" A 1/2" PRESION A/F (PLSTGMA) 1.00
NEPLO DE 1/2" DE 5CM PRESION A/F (PLSTGMA)
TAPON MACHO DE 1/2"
TAPON HEMBRA DE 1/2"
PERMATEX GRANDE
TEFLON 3.00
KALIPEGA DE 1 LITRO
LLAVE DE COMPUERTA DE 1/2" RED WHAITE 1.00
AGUA CALIENTE
TUBERIA DE 1/2" DE PRESION PARA A/F (PLTGMA) 4.3
TUBERIA DE 3/4" PRESION. PARA A/F (PLTGMA) 0.00
CODOS DE 1/2" ROSCABLE PARA A/F (PLTGMA) 18
CODOS DE 3/4" ROSCABLE PARA A/F (PLTGMA) 0.00
TEE DE 1/2" DE PRESION PARA A /F (PLTGMA) 5.00
TEE DE 3/4" DE PRESION PARA A /F (PLTGMA) 5.00
NEPLO PERDIDO DE 1/2" PRESION A/F (PLTGMA)
NEPLO PERDIDO DE 3/4" PRESION A/F (PLTGMA)
NEPLO DE 3/4" DE 5 CM DE PRESION A/F (PLTGMA)
UNION DE 1/2" ROSCABLE PRESION A/F (PLTGMA) 4.0
UNION DE 3/4" ROSCABLE PRESION A/F (PLTGMA)
NUDO DE 1/2" PRESION PARA A/F PLASTIGAMA
NUDO DE 3/4" PRESION PARA A/F PLASTIGAMA
REDUCTOR DE 3/4" A 1/2" PRESION A/F (PLSTGMA) 6.00
NEPLO DE 1/2" DE 5CM PRESION A/F (PLSTGMA) 4.0
TAPON MACHO DE 1/2" 8.0
TAPON HEMBRA DE 1/2" 8.0
PERMATEX GRANDE 2.0
TEFLON 2.00
KALIPEGA DE 1 LITRO
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION
TOTAL (A ) 14.27
COSTO RENDIMIENTO SUBTOTAL
0.112
22 0.2315 0
20 0.014 0
TOTAL ( B ) 0.112
JORNAL REAL RENDIMIENTO SUBTOTAL
5.71 3.3 0.176
3.10 3.3 0.954
3.58 3.3 1.101
TOTAL ( C) 2.23
COSTO RENDIMIENTO SUBTOTAL
5.00 0.167 0.833
TOTAL ( D ) 0.83
17.448
2.094
19.542
1.745
0.872
0.523
0.377
3.517
23.06
SUMO
TOTAL UNIDAD
TOTAL UNIDAD
0.00 U
1.00 U
0.00 U
2.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
0.00 U
1.00 U
0.00 U
1.00 U
1.00 U
0.0 U
0.00 U
0.00 U
0.00 U
3.00 U
0.00 U
1.00 U
4.33 U
0 U
18 U
0 U
5 U
5 U
0 U
0 U
0 U
4 U
0 U
0 U
0 U
6 U
4 U
8 U
8 U
2 U
2 U
0 U
SUMO
TOTAL UNIDAD
TOTAL UNIDAD
1.00 U
1.00 U
1.00 U
RESUMEN DE INSUMO POR PARTE
DESCRIPCIÓN CANTIDAD UNIDAD
HORAS
PUNTOS
# de material
0.83
0.50
2.00
3.00
1.50
3.00
0.00
1.00
1.00
0.50
2.00
1.00
3.00
4.00
1.00
1.00
13.4
138.35
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0.2315
0.014
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO 0.3 5.71 8.03
AYUDANTE 1 3.10 8.03
PINTOR 1 3.58 8.03
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 3.00 0.0022
TOTAL ( D )
1.56 702.9
SUBTOTAL
0.052
0
0
0.052 23.5
SUBTOTAL
0.213
0.386
0.446
1.04 470.1
SUBTOTAL
0.01
0.0067 3.0
2.666
0.320
2.986
0.267
0.133
0.080
0.058
0.54
3.52 1585.21
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO Ventana Aluminio y Vidrio
ESPECIFICACION
UNIDAD m2
A.- MATERIALES UN CANTIDAD PRECIO UNITARIO
Material de A / V 4 MM MTR 1 70.00
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0.2315
0.014
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO 0.1 5.71 0.43
AYUDANTE 1 3.10 0.43
VENTANERO 1 3.58 0.43
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 5.00 0.059
0.01
TOTAL ( D )
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO 1 5.71 2.5
AYUDANTE 1 3.10 2.5
0 3.58 2.5
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 3.00 0.2
0.01
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0.2315
0.014
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO 0.5 5.71 1.25
AYUDANTE 1 3.10 1.25
0 3.58 1.25
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 3.00 0.2
0.01
TOTAL ( D )
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO SOLDADOR 1 5.71 0.25
AYUDANTE 1 3.58 0.25
INSTALACION 1 3.58 0.25
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 5.00 1
0.01
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
0.2315
0.014
TOTAL ( B )
C.- MANO DE OBRA N.- JORNAL REAL RENDIMIENTO
MAESTRO 1 5.71 1.49
AYUDANTE 1 3.10 1.49
YESERO 1 3.58 1.49
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE 5.00 0.0084
0.01
TOTAL ( D )
TOTAL (B)
C.- MANO DE OBRA Nº JORNAL REAL RENDIMIENTO
MAESTRO CARPINTERO 1.0 5.71 0.2500
OFICIAL(LAQUEADOR) 1.0 3.58 0.2500
CERRAJERO 1.0 3.58 0.2500
TOTAL (C)
D.- TRANSPORTE Nº COSTO RENDIMIENTO
FLETE DE CARRO 5.00 1.0000
TOTAL (D)
COSTO DIRECTO (A + B + C + D)
I.V.A. 12.00%
SUBTOTAL
DIRECCION TECNICA 10.00%
ADMINISTRACION 5.00%
IMPREVISTOS 3.00%
FINANCIAMIENTO IVA
TOTAL COSTOS INDIRECTOS
PRECIO UNITARIO
ANALISIS DE PRECIOS UNITARIOS
PROYECTO: VIVIENDA TIPO
RUBRO: PUERTAS BAÑOS
ESPEC: TAMBORADAS HDF PRENSADAS SIMULA DOS PANELES
UNIDAD: global
A.- MATERIALES UN CANTIDAD PRECIO UNITARIO
PUERTA DE BAÑO 0,60X 2,00 UN 1 41.83
BATIENTE DE CEDRO 12 CM ANCHO JG 1.00 20.00
JAMBAS DE CEDRO JG 1.000 10.64
POLVO MINERAL COLOR CAFÉ O CAOBA LIBRA 1 2.00
POLVO DE TIZA LIBRA 1 0.70
COLA BLANCA LITRO 1 3.75
MASILLA PLASTICA LIBRA 1.0 3.70
LIJA # 180 UN 1 0.35
GUAYPE LIBRA 1 0.30
ALTO SOLIDO BRILLANTE LITRO 1 0.35
DILUYENTE GALON 1 15.12
LACA COLOR CAFÉ LITRO 1 7.17
BISAGRA FRANK DE 3 1/2" JG 2 3.29
CERRADURA POMO # 838359 STANLEY UN 1 23.00
TORNILLO TRIPA DE PATO 3" AVELLANADA UN 12 0.05
TACOS FISCHER # 10 UN 12 0.02
CINTA MASKETING UN 1 3.00
TOTAL (A)
B.- EQUIPO Nº COSTO RENDIMIENTO
HERRAMIENTA MENOR 5.00%
1
1
TOTAL (B)
C.- MANO DE OBRA Nº JORNAL REAL RENDIMIENTO
MAESTRO CARPINTERO 1.0 5.71 0.2500
OFICIAL(LAQUEADOR) 1.0 3.58 0.2500
CERRAJERO 1.0 3.58 0.2500
TOTAL (C)
D.- TRANSPORTE Nº COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.2500
TOTAL (D)
COSTO DIRECTO (A + B + C + D)
I.V.A. 12.00%
SUBTOTAL
DIRECCION TECNICA 10.00%
ADMINISTRACION 5.00%
IMPREVISTOS 3.00%
FINANCIAMIENTO IVA
TOTAL COSTOS INDIRECTOS
PRECIO UNITARIO
ALUMINIO Y VIDRIO
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO Puerta Aluminio y Vidrio
40.00 HORAS ESPECIFICACION
17.00 m2 UNIDAD m2
SUBTOTAL cantidades A.- MATERIALES UN
70.00 17.00 Material de A / V 5MM MTR
0.00
0.00
70.00 1190.0
SUBTOTAL B.- EQUIPO N.-
0.853 HERRAMIENTA MENOR 5%
0 COMPACTADOR PEQUEÑO (X DIA) 0
0 (X DIA) 0
0.853 14.5
SUBTOTAL C.- MANO DE OBRA N.-
1.343 MAESTRO 0.1
7.299 AYUDANTE 1
8.422 VENTANERO 1
17.06 290.1
SUBTOTAL D.- TRANSPORTE N.-
0.294 FLETE
0.294 5.0
IMPERMEABILIZACION
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO IMERMEABILIZACION ( canal de
2.00 HORAS ESPECIFICACION SIKA FILL 5
5.00 m2 UNIDAD ML
SUBTOTAL cantidades A.- MATERIALES UN
6.80 10.00 Sika fill 5 de 4 kilos (galon) gln
0.00
0.00
6.80 34.0
SUBTOTAL B.- EQUIPO N.-
0.176 HERRAMIENTA MENOR 5%
0
0
0.176 0.9
SUBTOTAL C.- MANO DE OBRA N.-
2.284 MAESTRO 1
1.241 AYUDANTE 1
0.000 0
3.52 17.6
SUBTOTAL D.- TRANSPORTE N.-
0.6 FLETE
0.6 3.0
2.60 13.0
SUBTOTAL B.- EQUIPO N.-
0.238 HERRAMIENTA MENOR 5%
0
0
0.24 1.2
SUBTOTAL C.- MANO DE OBRA N.-
2.284 MAESTRO 0.5
2.482 AYUDANTE 1
0.000 0
4.77 23.8
SUBTOTAL D.- TRANSPORTE N.-
0.6 FLETE
0.6 3.0
PUERTAS
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO PUERTA
4.00 HORAS ESPECIFICACION METALICA EN CERRAMINETO
1.00 u UNIDAD u
SUBTOTAL cantidades A.- MATERIALES UN
120.00 1.00 Puerta metalica doblada 0,70 X 2,00 M UN
0.00 una cara y la otra lisa
0.00 con chapa y batientes
fondeada con fondo praiman
120.00 120.0 y anticorrosivo
SUBTOTAL B.- EQUIPO N.-
2.574 HERRAMIENTA MENOR 5%
0 COMPACTADOR PEQUEÑO (X DIA) 0
0 (X DIA) 0
2.574 2.6
SUBTOTAL C.- MANO DE OBRA N.-
22.837 MAESTRO SOLDADOR 1
14.317 AYUDANTE 1
14.317 INSTALACION 1
51.47 51.5
SUBTOTAL D.- TRANSPORTE N.-
5 FLETE
5 5.0
80.00 HORAS
119.10 m2
SUBTOTAL cantidades
16.12 160.04
0.00
0.00
16.12 1920.5
SUBTOTAL
0.416
0
0
0.416 49.6
SUBTOTAL
3.835
2.084
2.404
8.32 991.3
SUBTOTAL
0.0420 5
0.04198153 5.0
24.906
2.989
27.894
2.491
1.245
0.747
0.538
5.021
32.92 3920.22
2.57
SUBTOTAL
22.84
14.32 C.- MANO DE OBRA Nº
14.32 MAESTRO CARPINTERO 1.0
OFICIAL(LAQUEADOR) 1.0
CERRAJERO 1.0
51.48 51.48
SUBTOTAL
5.00 5.00
D.- TRANSPORTE Nº
5.00 FLETE DE CARRO
286.77
34.41
321.19
28.68 COSTO DIRECTO (A + B + C + D)
14.34 I.V.A. 12.00%
8.60 SUBTOTAL
6.19 DIRECCION TECNICA 10.00%
57.81 ADMINISTRACION 5.00%
379.00 379.00 IMPREVISTOS 3.00%
FINANCIAMIENTO IVA
TOTAL COSTOS INDIRECTOS
PRECIO UNITARIO
2.57
SUBTOTAL C.- MANO DE OBRA Nº
22.84 MAESTRO CARPINTERO 1.0
14.32 OFICIAL(LAQUEADOR) 1.0
14.32 CERRAJERO 1.0
51.48
SUBTOTAL D.- TRANSPORTE Nº
1.25 5.00 FLETE DE CARRO
1.25
192.99 COSTO DIRECTO (A + B + C + D)
23.16 I.V.A. 12.00%
216.15 SUBTOTAL
19.30 DIRECCION TECNICA 10.00%
9.65 ADMINISTRACION 5.00%
5.79 IMPREVISTOS 3.00%
4.17 FINANCIAMIENTO IVA
38.91 TOTAL COSTOS INDIRECTOS
255.06 1,020.24 PRECIO UNITARIO
LISIS DE PRECIOS UNITARIOS
98.434
11.812
110.247
9.843
4.922
2.953
2.126
19.844
130.09 1257.98
2.265
0.272
2.537
0.227
0.113
0.068
0.049
0.457
2.99 36.22
MEABILIZACION ( JARDINERA)
0.80 HORAS
2.00 m2
CANTIDAD PRECIO UNITARIO SUBTOTAL cantidades
2 3.40 6.80 4.00
0.00
0.00
10.802
1.296
12.098
1.080
0.540
0.324
0.233
2.178
14.28 28.55
PUERTA
ALICA EN CERRAMINETO 4.00 HORAS
1.00 u
CANTIDAD PRECIO UNITARIO SUBTOTAL cantidades
1 100.00 100.00 1.00
0.00
0.00
159.045
19.085
178.130
15.904
7.952
4.771
3.435
32.063
210.19 210.19
DE PRECIOS UNITARIOS
VIVIENDA TIPO
PUERTAS de DORMITORIOS
MBORADAS HDF PRENSADAS SIMULA DOS PANELES 16.00 horas
4.00 PUERTAS
CANTIDAD PRECIO UNITARIO SUBTOTAL CANTIDAD
1 42.39 42.39 4
DE PRECIOS UNITARIOS
PUERTAS de COCINA
MODELO FRANCESA 113 CON VIDRIO 4.00 HORA
1.00 u
CANTIDAD PRECIO UNITARIO SUBTOTAL Insumos
1 100.00 100.00 1
1.00 20.00 20.00 1.00
1.000 10.64 10.64 1.00
1 2.00 2.00 1.00
1 0.70 0.70 1.00
1 3.75 3.75 1.00
1.0 3.70 3.70 1.00
1 0.35 0.35 1.00
1 0.30 0.30 1.00
1 0.35 0.35 1.00
1 15.12 15.12 1.00
1 7.17 7.17 1.00
2 3.29 4.94 1.50
1 23.00 23.00 1.00
12 0.05 0.60 12.00
12 0.02 0.24 12.00
1 3.00 3.00 1.00
TOTAL (A) 195.86
COSTO RENDIMIENTO SUBTOTAL
2.57
1 0.00
1 0.00
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION TOTAL UNIDAD
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION TOTAL UNIDAD
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD COVERSION TOTAL UNIDAD
AGUA M3
CUARTON ENCOFRADO UN
TIRAS ENCOFRADO UN
N CERRAMIENTO A MANO
8 HORAS
2.20 M3
CANTIDAD PRECIO UNITAR SUBTOTAL INSUMO
0.00
TOTAL (A ) 0.00
COSTO RENDIMIENTO SUBTOTAL
1.232
0 0
0
PRECIOS UNITARIOS
PROYECTO
PARA CERRAMIENTO RUBRO
10.60 HORAS ESPECIFICACION
volumen total de riostra 2.20 M3 UNIDAD
CANTIDAD PRECIO UNITAR SUBTOTAL INSUMO A.- MATERIALES
8.24 7.86 64.77 18.13 CEMENTO
0.55 13.75 7.5625 1.21 ARENA GRUESA
0.88 18.13 15.9544 1.94 PIEDRA 3/4
0.286 2.50 0.715 0.63 AGUA
7.55 4.90 36.98 16.60 TABLAS DE 2,5 CM ENCOFRADO
8.09 4.00 32.34 17.79 CUARTON ENCOFRANDO
2.02 3.66 7.399 4.45 TIRAS DE ENCOFRADO
1.22 1.98 2.41 2.68 CLAVOS DE 2 1/2 "
49.60 0.9634038 47.78 109.11 HIERRO DE 8 MM
0 0.00 HIERRO DE 10 MM
92.07 1.08275 99.69 202.56 HIERRO DE 12 MM
7.08 1.89 13.35 15.58 ALAMBRE RECOCIDO # 18
TOTAL (A ) 328.96
COSTO RENDIMIENTO SUBTOTAL B.- EQUIPO
7.760 HERRAMIENTA MENOR
28 0.4545 12.727 CONCRETERA
22.4 0.4545 10.182 VIBRADOR
TOTAL ( B ) 30.67
TOTAL ( D ) 6.82
521.65 COSTO DIRECTO A+B+C+D
62.60 IVA
584.25 SUBTOTAL
52.17 DIRECCION TECNICA
26.08 ADMINISTRACION
15.65 IMPREVISTO
11.27 FINANCIAMIENTO
105.17 TOTAL COSTO INDIRECTO
689 1516.71 PRECIO UNITARIO
PRECIOS UNITARIOS
PROYECTO
L CERRAMIENTO UNA CARA RUBRO
03 280 KG/CM2 24.00 HORA ESPECIFICACION
99.0 M2 UNIDAD
CANTIDAD PRECIO UNITAR SUBTOTAL A.- MATERIALES
0.1848 7.86 1.453 18.295 CEMENTO
0.0264 12.18 0.322 2.614 ARENA GRUESA
0.00754 2.5 0.019 0.746 PIEDRA 3/4
0.000 AGUA
0.000 MALLA 5MM DE 15X15
TOTAL ( B ) 0.131
TOTAL ( D ) 0.10
PRECIOS UNITARIOS
PROYECTO
JARDINERA RUBRO
M2 1.00 HORA ESPECIFICACION
1.8 M2 UNIDAD
CANTIDAD PRECIO UNITAR SUBTOTAL A.- MATERIALES
0.185 7.86 1.454 0.333 CEMENTO
0.0264 12.18 0.322 0.048 ARENA CORRIENTE
AGUA
0.00754 2.50 0.019 0.014
0.000
0.000
D.- TRANSPORTE
TOTAL ( C) 6.022 10.84 FLETE DE CARRO
COSTO RENDIMIENTO SUBTOTAL
5.00 0.5556 2.78
TOTAL ( D ) 2.78 5.00 COSTO DIRECTO A+B+C+D
IVA
10.90 SUBTOTAL
1.307 DIRECCION TECNICA
12.203 ADMINISTRACION
1.090 IMPREVISTO
0.545 FINANCIAMIENTO
0.327 TOTAL COSTO INDIRECTO
PRECIO UNITARIO
1.96
14.16 25.50
PRECIOS UNITARIOS
PROYECTO
RUBRO
16 HORAS ESPECIFICACION
8.00 VIAJES UNIDAD
CANTIDAD PRECIO UNITAR SUBTOTAL INSUMO A.- MATERIALES
0.00
35 1.0 0.00
PRECIOS UNITARIOS
PROYECTO
DE LAVARROPA RUBRO
0.5 HORAS ESPECIFICACION
1.00 U UNIDAD
CANTIDAD PRECIO UNITAR SUBTOTAL INSUMO A.- MATERIALES
1 55.00 55 1.00 CEMENTO
ARENA GRUESA
TOTAL (A ) 55.00 PIEDRA 3/4"
COSTO RENDIMIENTO SUBTOTAL AGUA
0.310
PRECIOS UNITARIOS
40 HORAS
174.47 M2
CANTIDAD PRECIO UNITAR SUBTOTAL INSUMO
1.000 5.00 5.00 174.47 SACOS
0.0000 0.00 0.00
0 0.00 0.00
0 0.00 0.00
VALOR
TOTAL (A ) 5.00 872.4
COSTO RENDIMIENTO SUBTOTAL
0.083
TOTAL ( B ) 0.083
TOTAL ( C) 1.66
COSTO RENDIMIENTO SUBTOTAL
30.00 0.0057 0.172
1.25
8.99 1569.03
ANALISIS DE PRECIOS UNITARIOS
TOTAL (A ) 9.99
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.188
(X DIA) 0 28 0.435 0
(X DIA) 0 22.4 0.435 0
TOTAL ( B ) 0.188
TOTAL ( D ) 0.556
14.49
12% 1.74
16.23
10% 1.45
5% 0.72
3% 0.43
IVA 0.31
2.921
19.15 517.02
CAMINERA EN INGRESO
180 KG /CM2 (1:2,5:4,5) 4.00 HORA
M2 10.07 M2
UN CANTIDAD PRECIO UNITARIO SUBTOTAL
SC 0.48 7.86 3.773 4.834
M3 0.0456 13.75 0.627 0.459
M3 0.16 18.13 2.901 1.611
M3 0.01344 2.50 0.034 0.135
UN 0.07 58.73 4.1111 0.705
TOTAL ( B ) 0.523
TOTAL ( C) 10.46
N.- COSTO RENDIMIENTO SUBTOTAL
15.00 0.10 1.49
TOTAL ( D ) 1.49
23.92
12% 2.871
26.792
10% 2.392
5% 1.196
3% 0.718
IVA 0.517
4.823
31.615 318.36
3.69
12% 0.443
4.132
10% 0.369
5% 0.184
3% 0.111
0%
0.66
4.80 14.39
TOTAL (A ) 0.488 81
N.- COSTO RENDIMIENTO SUBTOTAL
5% 0.032
(X DIA) 1 20 0.00000 0.00
TOTAL ( B ) 0.032
TOTAL ( C) 0.650
N.- COSTO RENDIMIENTO SUBTOTAL
15.00 0.004 0.0563
1.23
12% 0.147
1.373
10% 0.123
5% 0.061
3% 0.037
0%
0.221
1.594 265.86
BASE DE LAVARROPA
180 KG /CM2 (1:2,5:4,5) 2.00 HORA
M2 2.25 M2
UN CANTIDAD PRECIO UNITARIO SUBTOTAL
SC 0.48 7.86 3.773 1.08
M3 0.0456 13.75 0.627 0.1026
M3 0.0816 18.13 1.479408 0.1836
M3 0.01344 2.50 0.034 0.03024
TOTAL ( B ) 0.870
TOTAL ( D ) 2.22
17.48 39.3
12% 2.098
19.580
10% 1.748
5% 0.874
3% 0.524
0%
3.147
22.726 51.13
ANALISIS DE PRECIOS UNITARIOS
PROYECTO
RUBRO PARED DEL CERRAMIENTO
ESPECIFICACION 1:3 280 KG/CM2
UNIDAD M2
A.- MATERIALES UN CANTIDAD PRECIO UNITARI
CEMENTO SC 0.1109 7.86
ARENA CORRIENTE M3 0.0158 12.18
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 15.00 0.0101
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 5.00 0.5556
TOTAL ( D )
TOTAL (A )
B.- EQUIPO N.- COSTO RENDIMIENTO
HERRAMIENTA MENOR 5%
TOTAL ( B )
TOTAL ( C)
D.- TRANSPORTE N.- COSTO RENDIMIENTO
FLETE DE CARRO 3.00 1.00
TOTAL ( D )
SUBTOTAL
0.200 RESUMEN DE INSUMO DE VARIOS
1.084 DESCRIPCIÓN CANTIDAD
2.502
0.000 CEMENTO 32.44
0.000 ARENA GRUESA 1.43
PIEDRA 3/4 2.29
3.79 374.83 ARENA CORRIENTE 1.57
SUBTOTAL AGUA 0.15
0.1515 TABLAS DE 2,5 CM 26.31
CUARTON ENCOFRADO 25.72
TIRAS DE ENCOFRADO 13.93
0.1515 15.00 CLAVOS DE 2 1/2 " 0.21
HIERRO (CHICOTE ) 5MM 0.21
9.80 HIERRO DE 8 MM 2.94
1.176 HIERRO DE 10 MM 1.54
10.973 HIERRO DE 12 MM 4.47
0.980 ALAMBRE RECOCIDO # 18 1.01
0.490 BLOQUE 7CM - 9 CM 1237.50
0.294
0.212
1.975
12.95 1281.86
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD
0.90 HORA
1.80 M2 DESCRIPCIÓN CANTIDAD
SUBTOTAL CEMENTO 23.33
0.872 0.200 ARENA GRUESA 0.46
0.193 0.029 PIEDRA 3/4 1.61
0 0.000 ARENA CORRIENTE 2.64
0.011 0.008 AGUA 0.890
4.5 22.500 BLOQUE 7CM - 9 CM 22.500
0.000 MALLA 5MM DE 15X15 0.705
5.576
SUBTOTAL RESUMEN DE INSUMO DE VARIOS
0.363 DESCRIPCIÓN CANTIDAD
CEMENTO 55.77
ARENA GRUESA 1.89
0.363 PIEDRA 3/4 3.90
ARENA CORRIENTE 4.21
SUBTOTAL AGUA 0.26
2.855 TABLAS DE 2,5 CM 26.31
1.551 CUARTON ENCOFRADO 25.72
2.855 TIRAS DE ENCOFRADO 13.93
0.000 CLAVOS DE 2 1/2 " 0.21
0.000 HIERRO (CHICOTE ) 5MM 0.21
HIERRO DE 8 MM 2.94
7.26 13.07 HIERRO DE 10 MM 1.54
SUBTOTAL HIERRO DE 12 MM 4.47
2.778 ALAMBRE RECOCIDO # 18 1.01
BLOQUE 7CM - 9 CM 1260.00
MALLA 5MM DE 15X15 0.70
2.778
15.98
1.917
17.894
1.598
0.799
0.479
2.876
20.770 37.39
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD
24.00 HORA
1.00 VILLA DESCRIPCIÓN CANTIDAD
SUBTOTAL CEMENTO 0.37
2.000 1.000 ARENA CORRIENTE 0.05
5.000 1.000 AGUA 0.015
5 1.000 GUANTE 1.00
1.5 1.000 PINOKLIN 1.000
10 1.000 ESCOBA 1.000
TRAPEADOR 1.000
ACIDO MURIATICO 1.000
23.50 23.500
SUBTOTAL
7.148
RESUMEN DE INSUMO DE VARIOS
DESCRIPCIÓN CANTIDAD
31.79
229.59 229.59
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD
DESCRIPCIÓN CANTIDAD
CEMENTO 56.14
ARENA GRUESA 1.89
PIEDRA 3/4 3.90
ARENA CORRIENTE 4.26
AGUA 0.26
TABLAS DE 2,5 CM 26.31
CUARTON ENCOFRADO 25.72
TIRAS DE ENCOFRADO 13.93
CLAVOS DE 2 1/2 " 0.21
HIERRO (CHICOTE ) 5MM 0.21
HIERRO DE 8 MM 2.94
HIERRO DE 10 MM 1.54
HIERRO DE 12 MM 4.47
ALAMBRE RECOCIDO # 18 1.01
BLOQUE 7CM - 9 CM 1260.00
MALLA 5MM DE 15X15 0.70
GUANTE 1.00
PINOKLIN 1.00
ESCOBA 1.00
TRAPEADOR 1.00
ACIDO MURIATICO 1.00
PIEDRA CHISPA 5.00
EXPLOSION DE INSUMO
DESCRIPCIÓN CANTIDAD
DESCRIPCIÓN CANTIDAD
CEMENTO 1.08
ARENA GRUESA 0.10
AGUA 0.030
LAVARROPA GRANDE DE GRANITO 1.00
CEMENTO 57.22
ARENA GRUESA 1.99
PIEDRA 3/4 3.90
ARENA CORRIENTE 4.26
AGUA 0.27
TABLAS DE 2,5 CM 26.31
CUARTON ENCOFRADO 25.72
TIRAS DE ENCOFRADO 13.93
CLAVOS DE 2 1/2 " 0.21
HIERRO (CHICOTE ) 5MM 0.21
HIERRO DE 8 MM 2.94
HIERRO DE 10 MM 1.54
HIERRO DE 12 MM 4.47
ALAMBRE RECOCIDO # 18 1.01
BLOQUE 7CM - 9 CM 1260.00
MALLA 5MM DE 15X15 0.70
GUANTE 1.00
PINOKLIN 1.00
ESCOBA 1.00
TRAPEADOR 1.00
ACIDO MURIATICO 1.00
PIEDRA CHISPA 5.00
LAVARROPA GRANDE DE GRANITO 1.00
DESCRIPCION CANTIDAD
CEMENTO DE 50 KG 588.59
ARENA GRUESA 24.58
ARENA CORRIENTE 33.04
PIEDRA 3/4" 41.782
PIEDRA CHISPA 5.003
PIEDRA CICLOPEO GRUESO 1.52
AGUA ( TANQUERO DE 8 M3) 2.678
CUARTON DE CHANUL 16.32
TABLAS DE 1" X 4ML ENCOFRADO 413.053
CUARTON DE 2" X 3" X 4ML ENCFRADO 271.75
TIRAS DE 1" X 4 ML ENCOFRADO 107.00
TABLON 136.98
CAÑA 416.58
CAL ( 25 KG) 0.150
PIOLA (MASO ) 1.545
CLAVOS DE 2 1/2 " X9MM ( 30 KG ) 1.85
PLANCHAS DE ZINC 10 PIES 18.04
HIERRO DE 5,5 MM 1.17
HIERRO DE 8 MM 22.580
HIERRO DE 10 MM 25.388
HIERRO DE 12 MM 25.085
HIERRO DE 14 MM 11.624
ALAMBRE RECOCIDO # 18 ( 20 KG ) 10.142
ALAMBRE GALVANIZADO # 14 ( 44 KG ) 3.000
MALLA PARA ENLUCIR 0,61 X2,21 ML ( 10 UN ) 1.81
SOGAS ( 10 UNIDADES ) 10.96
BLOQUE DE LOSA 39X19X15 405.16
BLOQUE 7CM - 9 CM 5457.50
LADRILLO 0,10 X0,07 CM 1415.52
PLASTOCRETE 161 HE ( 4 KG) 13.423
MALLA DE 5MM 15X15 12.918
GUANTE 1.000
PINOKLIN 1.00
ESCOBA 1.00
TRAPEADOR 1.00
ACIDO MURIATICO 1.00
LAVARROPA GRANDE DE GRANITO 1.00
MAXIMIX SACO DE 40 KG 174.47
SION DE INSUMO
COVERSION TOTAL UNIDAD
IOS
UNIDAD
SACO
M3
M3
M3
TANQUE
U
U
U
CAJA (30 KG)
QUINTAL
QUINTAL
QUINTAL
QUINTAL
ROLLO
U
SION DE INSUMO
COVERSION TOTAL UNIDAD
IOS
UNIDAD
SACO
M3
M3
M3
TANQUE
U
U
U
CAJA (30 KG)
QUINTAL
QUINTAL
QUINTAL
QUINTAL
ROLLO
U
U
SION DE INSUMO
COVERSION TOTAL UNIDAD
IOS
UNIDAD
SACO
M3
M3
M3
TANQUE
U
U
U
CAJA (30 KG)
QUINTAL
QUINTAL
QUINTAL
QUINTAL
ROLLO
U
U
PAR
LITRO
U
U
GALON
SION DE INSUMO
COVERSION TOTAL UNIDAD
5.00 m3
OS
UNIDAD
SACO
M3
M3
M3
TANQUE
U
U
U
CAJA (30 KG)
QUINTAL
QUINTAL
QUINTAL
QUINTAL
ROLLO
U
U
PAR
LITRO
U
U
GALON
M3
SION DE INSUMO
COVERSION TOTAL UNIDAD
OS
UNIDAD
SACO
M3
M3
M3
TANQUE
U
U
U
CAJA (30 KG)
QUINTAL
QUINTAL
QUINTAL
QUINTAL
ROLLO
U
U
PAR
LITRO
U
U
GALON
M3
U
RIA Y VARIOS
UNIDAD
SACO
M3
M3
M3
M3
M3
TANQUERO
U
U
U
U
U
U
SACO
MASO
CAJA
U
QUINTAL
QUINTAL
QUINTAL
QUINTAL
QUINTAL
ROLLO
ROLLO
ROLLO
MOÑO
U
U
U
GALON
U
PAR
LITRO
U
U
GALON
U
SACO
EXPLOSION DE INSUMOS
INTERRUPTOR SENCILLO 28 U
INTERRUPTOR DOBLE 3 U
INTERRUPTOR TRIPLE 2 U
TORNILLOS # 8 X 2 1/2" TRIPA DE PATO 174.0 U
CABLE # 12 ( 100M ) 8.2 ROLLO
CINTA AISLANTE ( 20M ) 9 ROLLO
TOMACORRIENTE SENCILLO 8 U
TOMACORRIENTE DOBLE 21 U
TOMACORRIENTE 240 VOLTIO POLARIZADO 13 U
INTERRUPTOR DE CONMUTACION 2.0 U
INTERRUPTOR SENCILLO TIMBRE (TICINO) 1 U
DING DONG ( TICINO ) 2 U
TOMACORRIENTE SENCILLO PARA TELEFONO 5.0 U
ALAMBRE TELEFONICO ENTORCHADO 0.39 ROLLO
TOMACORRIENTE SENCILLO DE TELEVISION 4.00 U
CABLE PARA TELEVISOR 0.4 ROLLO
BREAKER DE 1 PX20A 9.00 U
BREAKER DE 2PX70A 1.0 U
BREAKER DE 2PX20A 8.0 U
BREAKER DE 2PX30A 6.00 U
CABLE # 4 0.12 ROLLO
CABLE # 8 0.12 ROLLO
CABLE # 10 0.1 ROLLO
SOCKET MONOFASICO 2P-4P 1.0 U
VARILLA COOPERWELD DE 5/8"X 6" 1.0 U
TUBERIA DE DESAGUE
TUBERIA DE 4" PLASTIGAMA 16.87 U
TUBERIA DE 2" PLASTIGAMA 6.93 U
CODO DE 4" DE 90 GRADO 9.00 U
YEE DE 4" A 2" 4.00 U
UNION DE 4" 11.00 U
CODO DE 4" DE 45 GRADO 1.00 U
TEE DE 4" 1.00 U
TEE DE 4" A 2" 2.00 U
YEE DE 4" 1.00 U
CODO DE 2" DE 90 GRADO 18.00 U
CDO DE 2" DE 45 GRADO 4.00 U
UNION DE 2" 3.00 U
TEE DE 2" 2.00 U
YEE DE 2" 2.00 U
TUBERIA PARA AGUA FRIA
TUBERIA DE 1/2" DE PRESION PARA A/F (PLTGMA) 6.17 U
TUBERIA DE 3/4" PRESION. PARA A/F (PLTGMA) 3.83 U
CODOS DE 1/2" ROSCABLE PARA A/F (PLTGMA) 36.00 U
CODOS DE 3/4" ROSCABLE PARA A/F (PLTGMA) 6.00 U
TEE DE 1/2" DE PRESION PARA A /F (PLTGMA) 11.00 U
TEE DE 3/4" DE PRESION PARA A /F (PLTGMA) 5.00 U
NEPLO PERDIDO DE 1/2" PRESION A/F (PLTGMA) 16.56 U
NEPLO PERDIDO DE 3/4" PRESION A/F (PLTGMA) 2.00 U
NEPLO DE 3/4" DE 5 CM DE PRESION A/F (PLTGMA) 2.00 U
UNION DE 1/2" ROSCABLE PRESION A/F (PLTGMA) 9.00 U
UNION DE 3/4" ROSCABLE PRESION A/F (PLTGMA) 7.00 U
NUDO DE 1/2" PRESION PARA A/F PLASTIGAMA 4.00 U
NUDO DE 3/4" PRESION PARA A/F PLASTIGAMA 3.00 U
REDUCTOR DE 3/4" A 1/2" PRESION A/F (PLSTGMA) 7.00 U
NEPLO DE 1/2" DE 5CM PRESION A/F (PLSTGMA) 4.0 U
TAPON MACHO DE 1/2" 17.00 U
TAPON HEMBRA DE 1/2" 47.00 U
PERMATEX GRANDE 4.00 U
TEFLON 11.00 U
KALIPEGA DE 1 LITRO 1.00 U
KALIPEGA DE 1/2 LITRO 1.37 U
LLAVE DE COMPUERTA DE 1/2" RED WHAITE 8.00 U
TUBERIA PARA AGUA CALIENTE
TUBERIA DE 1/2" DE PRESION PARA A/F (PLTGMA) 5.67 U
TUBERIA DE 3/4" PRESION. PARA A/F (PLTGMA) 2.83333333333 U
CODOS DE 1/2" ROSCABLE PARA A/F (PLTGMA) 22 U
CODOS DE 3/4" ROSCABLE PARA A/F (PLTGMA) 6 U
TEE DE 1/2" DE PRESION PARA A /F (PLTGMA) 8 U
TEE DE 3/4" DE PRESION PARA A /F (PLTGMA) 11 U
NEPLO PERDIDO DE 1/2" PRESION A/F (PLTGMA) 1 U
NEPLO PERDIDO DE 3/4" PRESION A/F (PLTGMA) 2 U
NEPLO DE 3/4" DE 5 CM DE PRESION A/F (PLTGMA) 2 U
UNION DE 1/2" ROSCABLE PRESION A/F (PLTGMA) 5 U
UNION DE 3/4" ROSCABLE PRESION A/F (PLTGMA) 4 U
NUDO DE 1/2" PRESION PARA A/F PLASTIGAMA 2 U
NUDO DE 3/4" PRESION PARA A/F PLASTIGAMA 3.3 U
REDUCTOR DE 3/4" A 1/2" PRESION A/F (PLSTGMA) 14 U
NEPLO DE 1/2" DE 5CM PRESION A/F (PLSTGMA) 5 U
TAPON MACHO DE 1/2" 10 U
TAPON HEMBRA DE 1/2" 9 U
PERMATEX GRANDE 2 U
TEFLON 2 U
ACUMULADO(COSTO,SUPERVISION E IVA)
% PARCIAL
% PARCIAL ACUMULADO
MES 1 MES 2
S1 S2 S3 S4 S1 S2 S3 S4
815.84
423.38
1167.66 583.83
199.17
849.14 424.57
MES 3 MES 4
S1 S2 S3 S4 S1 S2 S3 S4
256.66 120.97
1187.76 42.32
856.76
599.8383645
2118.76
2337.79 1202.04 1412.60 2781.38 2574.19 2770.58 2949.46 5293.93
420.80 216.37 254.27 500.65 463.35 498.70 530.90 952.91
331.03 170.21 200.02 393.84 364.50 392.31 417.64 749.62
10221.01 17958.10
66.24
899.7575467 951.8613212
77.11
179.04 159.04
847.504
916.48 916.48
2496.07
1927.31 953.59 153.49
240.89
59.44
271.01 487.91
99,054.99
CONCEPTO MES 1 ME
OBRA GRIS PRESUPUESTO S1 S2 S3 S4 S1
PRELIMINARES 815.84
MUROS 199.17
ALBAÑILERIA 14163.02
CUBIERTAS 5922.46
JARDINERA 59.44
VARIOS 758.92
MES 2 MES 3 M
S2 S3 S4 S1 S2 S3 S4 S1
MES 4 MES 5 ME
S2 S3 S4 S1 S2 S3 S4 S1
MES 6
AVANCE %EJECUTADO
S2 S3 S4
1.09
0.56
1.51
27.33
2.34
0.27
18.90
7.90
1.56
2.95
8.06
2.63
3.27
0.10
0.45
3.96
2.45
3.59
2.30
3.33
3.33
4.05
0.32
0.08
1.01
100