Escolar Documentos
Profissional Documentos
Cultura Documentos
HF 8.67 M
3% HF= 0.26
SECCION 2
HF 10.77 M
3% HF= 0.32
SECCION 3
HF 9.41 M
3% HF= 0.28
SECCION 4
HF 28.42 M
3% HF= 0.85
SECCION 5
HF 11.73 M
3% HF= 0.35
Hp = 315.923924
3050.66971733638
HPb = 371.68 Hp
CALCULO HIDRAULICO, FINCA SAN MIGUEL NORTE DISEÑO DE RIEGO
TIPO DISTRIBUCION 10X10
SECCION 1 GPM M3/HR LPS AREA/ASPERSOR 0.01
2395.42 544.00 151.11 ASP/RAMAL 10
2395.41 544.00 151.11 AREA/RAMAL 0.1
2395.42 544.00 151.11 AREA/VALVULA 2
# RAMALES/VALVULA 20
# ASP TOTALES/VALVULA 200
PERDIDAS POR FRICCION # ASP/HA 100
Unidad RAMALES/Ha 10
Q 544.00 M 3 / HR CAUDAL CAUDAL/ASPERSOR (LTS/HR) 340.00
C 130 CONSTANTE CAUDAL/ASPERSOR (GPM) 1.50
D 381.00 mm DIAMETRO 15 CAUDAL TOTAL/VALVULA (GPM) 299.43
L 1300 m LONGITUD 217 TUBOS CAUDAL TOTAL/HA (GPM) 149.71
# VALVULAS/TURNO 8
HF = 1.13E+09 (Q/C) 1.852 D -4.872 L CAUDAL TOTAL/TURNO (GPM) 2395.42
1131000000 14.1679193 2.6652228E-13 1300
HF 5.55 M
3% HF= 0.17
SECCION 2
HF 7.03 M
3% HF= 0.21
SECCION 3
HF 6.22 M
3% HF= 0.19
SECCION 4
HF 19.01 M
3% HF= 0.57
SECCION 5
HF 8.00 M
3% HF= 0.24
Hp = 185.082636
HPb = 217.74 Hp
CALCULO HIDRAULICO, FINCA 08 CABLES 35 VALVULAS 5 A 8
HF 0.01 M
3% HF= 0.00
SECCION 2
HF 0.31 M
3% HF= 0.01
SECCION 3
HF 0.89 M
3% HF= 0.03
SECCION 4
HF 0.01 M
3% HF= 0.00
SECCION 5
HF 0.49 M
3% HF= 0.01
SECCION 6
HF 0.08 M
3% HF= 0.00
SECCION 7
HF 0.02 M
3% HF= 0.00
Hp = 40.354456
HPb = 47.48 Hp
VALVULA 5
3% HF= 0.00
VALVULA 5_1
HF 1.16 M
3% HF= 0.03
VALVULA 5_2
HF 3.64 M
3% HF= 0.11
HT2= 3.75 5.34 PSI
VALVULA 5_3
HF 52.45 M
3% HF= 1.57
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
ca del terreno
n del aspersor (30 psi)
PSI
1499.11816578483
TUBOS
TUBOS
TUBOS
TUBOS
CALCULO HIDRAULICO BOMBEO 1, FINCA SAN MIGUEL SUR
HF 0.55 M
3% HF= 0.02
SECCION 2
HF 0.20 M
3% HF= 0.01
SECCION 3
HF 0.09 M
3% HF= 0.00
SECCION 4
HF 1.52 M
3% HF= 0.05
SECCION 5
HF 1.32 M
3% HF= 0.04
SECCION 6
HF 15.25 M
3% HF= 0.46
HS = 2m Altura Succión
Hsf = 0.5 m Perdida dentro de la bomba
Hg = 1.5 m Diferencia Geodesica del terreno
Hop = 25 m Presion de operación del aspersor (35 psi)
Hp = 63.82686
HPb = 75.09 Hp
SUR DISEÑO DE RIEGO
TIPO DISTRIBUCION 10X10
AREA/ASPERSOR 0.01
ASP/RAMAL 10
AREA/RAMAL 0.1
AREA/VALVULA 2
# RAMALES/VALVULA 20
# ASP TOTALES/VALVULA 200
# ASP/HA 100
RAMALES/Ha 10
CAUDAL/ASPERSOR (LTS/HR) 340.00
CAUDAL/ASPERSOR (GPM) 1.50
CAUDAL TOTAL/VALVULA (GPM) 299.43
TUBOS CAUDAL TOTAL/HA (GPM) 149.71
# VALVULAS/TURNO 4
CAUDAL TOTAL/TURNO (GPM) 1197.71
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
ca del terreno
n del aspersor (35 psi)
PSI
CALCULO HIDRAULICO BOMBEO 1, FINCA SAN MIGUEL SUR
HF 0.78 M
3% HF= 0.02
SECCION 2
HF 0.29 M
3% HF= 0.01
SECCION 3
GPM M3/HR LPS
356.81 81.03 22.51
356.81 81.03 22.51
356.81 81.03 22.51
HF 0.13 M
3% HF= 0.00
SECCION 4
HF 2.14 M
3% HF= 0.06
SECCION 5
HF 1.85 M
3% HF= 0.06
SECCION 6
HF 21.25 M
3% HF= 0.64
HS = 2m Altura Succión
Hsf = 0.5 m Perdida dentro de la bomba
Hg = 1.5 m Diferencia Geodesica del terreno
Hop = 25 m Presion de operación del aspersor (35 psi)
CDT = 55.88 Metros de Carga 79.46
Hp = 89.206308
HPb = 104.95 Hp
SUR DISEÑO DE RIEGO (NELSON FLOW CONTROL)
TIPO DISTRIBUCION 6x5
AREA/ASPERSOR 0.003
ASP/RAMAL 20
AREA/RAMAL 0.06
AREA/VALVULA 2.16
# RAMALES/VALVULA 36
# ASP TOTALES/VALVULA 720
# ASP/HA 333
RAMALES/Ha 17
CAUDAL/ASPERSOR (LTS/HR) 91.00
CAUDAL/ASPERSOR (GPM) 0.40
CAUDAL TOTAL/VALVULA (GPM) 288.51
TUBOS CAUDAL TOTAL/HA (GPM) 133.57
# VALVULAS/TURNO 4
INTENSIDAD DE RIEGO (MM/HR) 3.03
EFICIENCIA DE RIEGO 0.8
CAUDAL BRUTO/TURNO (GPM) 1154.03
CAUDAL NETO/TURNO (GPM) 1442.54
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
ca del terreno
n del aspersor (35 psi)
PSI
DISEÑO DE RIEGO (AQUAMASTER)
TIPO DISTRIBUCION 6x7.4
AREA/ASPERSOR 0.00444
ASP/RAMAL 14
AREA/RAMAL 0.06
AREA/VALVULA 2.16
# RAMALES/VALVULA 36
# ASP TOTALES/VALVULA 486
# ASP/HA 225
RAMALES/Ha 17
CAUDAL/ASPERSOR (LTS/HR) 160.00
CAUDAL/ASPERSOR (GPM) 0.70
CAUDAL TOTAL/VALVULA (GPM) 342.75
CAUDAL TOTAL/HA (GPM) 158.68
# VALVULAS/TURNO 4
INTENSIDAD DE RIEGO (MM/HR) 3.60
EFICIENCIA DE RIEGO 0.8
CAUDAL BRUTO/TURNO (GPM) 1370.99
CAUDAL NETO/TURNO (GPM) 1713.73
CALCULO HIDRAULICO BOMBEO 1, FINCA PRIMAVERA
HF 2.30 M
3% HF= 0.07
SECCION 2
HF 0.84 M
3% HF= 0.03
SECCION 3
GPM M3/HR LPS
634.97 144.20 40.06
634.97 144.20 40.06
634.97 144.20 40.06
HF 0.38 M
3% HF= 0.01
SECCION 4
HF 6.19 M
3% HF= 0.19
SECCION 5
HF 5.25 M
3% HF= 0.16
SECCION 6
HF 59.32 M
3% HF= 1.78
HS = 2m Altura Succión
Hsf = 0.5 m Perdida dentro de la bomba
Hg = 1.5 m Diferencia Geodesica del terreno
Hop = 25 m Presion de operación del aspersor (35 psi)
CDT = 105.16 Metros de Carga 149.53
Hp = 300.821
HPb = 353.91 Hp
A DISEÑO DE RIEGO (NELSON R10)
TIPO DISTRIBUCION 10x12
AREA/ASPERSOR 0.012
ASP/RAMAL 8
AREA/RAMAL 0.1
AREA/VALVULA 2.2
# RAMALES/VALVULA 22
# ASP TOTALES/VALVULA 183
# ASP/HA 83
RAMALES/Ha 10
CAUDAL/ASPERSOR (LTS/HR) 340.20
CAUDAL/ASPERSOR (GPM) 1.50
CAUDAL TOTAL/VALVULA (GPM) 274.64
TUBOS CAUDAL TOTAL/HA (GPM) 124.83
# VALVULAS/TURNO 8
INTENSIDAD DE RIEGO (MM/HR) 2.84
EFICIENCIA DE RIEGO 0.85
CAUDAL BRUTO/TURNO (GPM) 2197.09
CAUDAL NETO/TURNO (GPM) 2584.82
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
ca del terreno
n del aspersor (35 psi)
PSI
DISEÑO DE RIEGO (AQUAMASTER)
TIPO DISTRIBUCION 5x8
AREA/ASPERSOR 0.004
ASP/RAMAL 13
AREA/RAMAL 0.05
AREA/VALVULA 2.2
# RAMALES/VALVULA 44
# ASP TOTALES/VALVULA 550
# ASP/HA 250
RAMALES/Ha 20
CAUDAL/ASPERSOR (LTS/HR) 160.00
CAUDAL/ASPERSOR (GPM) 0.70
CAUDAL TOTAL/VALVULA (GPM) 387.49
CAUDAL TOTAL/HA (GPM) 176.13
# VALVULAS/TURNO 8
INTENSIDAD DE RIEGO (MM/HR) 4.00
EFICIENCIA DE RIEGO 0.85
CAUDAL BRUTO/TURNO (GPM) 3099.96
CAUDAL NETO/TURNO (GPM) 3647.01
CALCULO HIDRAULICO BOMBEO 1, FINCA PRIMAVERA
HF 1.75 M
3% HF= 0.05
SECCION 2
HF 0.64 M
3% HF= 0.02
SECCION 3
GPM M3/HR LPS
549.52 124.80 34.67
549.51 124.80 34.67
549.52 124.80 34.67
HF 0.29 M
3% HF= 0.01
SECCION 4
HF 4.74 M
3% HF= 0.14
SECCION 5
HF 4.04 M
3% HF= 0.12
SECCION 6
HF 45.95 M
3% HF= 1.38
HS = 2m Altura Succión
Hsf = 0.5 m Perdida dentro de la bomba
Hg = 1.5 m Diferencia Geodesica del terreno
Hop = 25 m Presion de operación del aspersor (35 psi)
CDT = 87.79 Metros de Carga 124.84
Hp = 216.89216
HPb = 255.17 Hp
A DISEÑO DE RIEGO (NELSON R10)
TIPO DISTRIBUCION 12x9
AREA/ASPERSOR 0.0108
ASP/RAMAL 11
AREA/RAMAL 0.12
AREA/VALVULA 2.28
# RAMALES/VALVULA 19
# ASP TOTALES/VALVULA 211
# ASP/HA 93
RAMALES/Ha 8
CAUDAL/ASPERSOR (LTS/HR) 340.20
CAUDAL/ASPERSOR (GPM) 1.50
CAUDAL TOTAL/VALVULA (GPM) 316.25
TUBOS CAUDAL TOTAL/HA (GPM) 138.71
# VALVULAS/TURNO 6
INTENSIDAD DE RIEGO (MM/HR) 3.15
EFICIENCIA DE RIEGO 0.85
CAUDAL BRUTO/TURNO (GPM) 1897.49
CAUDAL NETO/TURNO (GPM) 2232.34
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
ca del terreno
n del aspersor (35 psi)
PSI
DISEÑO DE RIEGO (AQUAMASTER)
TIPO DISTRIBUCION 6x7
AREA/ASPERSOR 0.0042
ASP/RAMAL 14
AREA/RAMAL 0.06
AREA/VALVULA 2.28
# RAMALES/VALVULA 38
# ASP TOTALES/VALVULA 543
# ASP/HA 238
RAMALES/Ha 17
CAUDAL/ASPERSOR (LTS/HR) 160.00
CAUDAL/ASPERSOR (GPM) 0.70
CAUDAL TOTAL/VALVULA (GPM) 382.46
CAUDAL TOTAL/HA (GPM) 167.75
# VALVULAS/TURNO 6
INTENSIDAD DE RIEGO (MM/HR) 3.81
EFICIENCIA DE RIEGO 0.85
CAUDAL BRUTO/TURNO (GPM) 2294.77
CAUDAL NETO/TURNO (GPM) 2699.73
CALCULO HIDRAULICO NELSON, FINCA NUEVA ESPERANZA
HF 0.36 M
3% HF= 0.01
SECCION 2
HF 0.65 M
3% HF= 0.02
SECCION 3
GPM M3/HR LPS
1748.94 397.18 110.33
1748.94 397.18 110.33
1748.94 397.18 110.33
HF 0.68 M
3% HF= 0.02
SECCION 4
HF 1.64 M
3% HF= 0.05
SECCION 5
HF 4.79 M
3% HF= 0.14
SECCION 6
HF 2.10 M
3% HF= 0.06
SECCION 7
HF 1.70 M
3% HF= 0.05
SECCION 8
HF 3.76 M
3% HF= 0.11
HS = 2m Altura Succión
Hsf = 0.5 m Perdida dentro de la bomba
Hg = 1m Diferencia Geodesica del terreno
Hop = 25 m Presion de operación del aspersor (35 psi)
Hp = 174.11027
HPb = 204.84 Hp
NZA DISEÑO DE RIEGO (NELSON R10)
TIPO DISTRIBUCION 10x10
AREA/ASPERSOR 0.01
ASP/RAMAL 10
AREA/RAMAL 0.1
AREA/VALVULA 2.5
# RAMALES/VALVULA 25
# ASP TOTALES/VALVULA 250
# ASP/HA 100
RAMALES/Ha 10
CAUDAL/ASPERSOR (LTS/HR) 340.20
CAUDAL/ASPERSOR (GPM) 1.50
CAUDAL TOTAL/VALVULA (GPM) 374.50
TUBOS CAUDAL TOTAL/HA (GPM) 149.80
# VALVULAS/TURNO 8
INTENSIDAD DE RIEGO (MM/HR) 3.78
EFICIENCIA DE RIEGO 0.85
CAUDAL BRUTO/TURNO (GPM) 2996.04
CAUDAL NETO/TURNO (GPM) 3524.75
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
TUBOS
ca del terreno
n del aspersor (35 psi)
PSI
DISEÑO DE RIEGO (AQUAMASTER) CALCULO HIDRAULICO AQUAMASTER,
TIPO DISTRIBUCION 5x8
AREA/ASPERSOR 0.004 SECCION 1 GPM
ASP/RAMAL 13 4403.35
AREA/RAMAL 0.05 4403.33
AREA/VALVULA 2.5 4403.35
# RAMALES/VALVULA 50
# ASP TOTALES/VALVULA 625
# ASP/HA 250 PERDIDAS PO
RAMALES/Ha 20
CAUDAL/ASPERSOR (LTS/HR) 160.00 Q
CAUDAL/ASPERSOR (GPM) 0.70 C
CAUDAL TOTAL/VALVULA (GPM) 440.33 D
CAUDAL TOTAL/HA (GPM) 176.13 L
# VALVULAS/TURNO 8
INTENSIDAD DE RIEGO (MM/HR) 4.32 HF =
EFICIENCIA DE RIEGO 0.8
CAUDAL BRUTO/TURNO (GPM) 3522.68
CAUDAL NETO/TURNO (GPM) 4403.35 HF
3% HF=
HT1=
SECCION 2
GPM
2198.63
2198.62
2198.63
PERDIDAS PO
Q
C
D
L
HF =
HF
3% HF=
HT2=
SECCION 3
GPM
2181.39
2181.39
2181.39
PERDIDAS PO
Q
C
D
L
HF =
HF
3% HF=
HT3=
SECCION 4
GPM
2169.88
2169.87
2169.88
PERDIDAS PO
Q
C
D
L
HF =
HF
3% HF=
HT4=
SECCION 5
GPM
2150.63
2150.63
2150.63
PERDIDAS PO
Q
C
D
L
HF =
HF
3% HF=
HT5=
SECCION 6
GPM
1057.35
1057.34
1057.35
PERDIDAS PO
Q
C
D
L
HF =
HF
3% HF=
HT6=
SECCION 7
GPM
528.36
528.35
528.36
PERDIDAS PO
Q
C
D
L
HF =
HF
3% HF=
HT7=
SECCION 8
GPM
21.13
21.13
21.13
PERDIDAS PO
Q
C
D
L
HF =
HF
3% HF=
HT2=
HTOTALES
HS =
Hsf =
Hg =
Hop =
CDT =
Hp = CDT (M) X Q (lps)
76 x Ef. Bomba
Hp =
HPb = 250.85
RAULICO AQUAMASTER, FINCA NUEVA ESPERANZA
M3/HR LPS
1000.00 277.78
1000.00 277.78
1000.00 277.78
0.54 M
0.02
M3/HR LPS
499.31 138.70
499.31 138.70
499.31 138.70
0.98 M
0.03
1.02 M
0.03
M3/HR LPS
492.78 136.88
492.78 136.88
492.78 136.88
2.46 M
0.07
M3/HR LPS
488.41 135.67
488.41 135.67
488.41 135.67
7.17 M
0.22
M3/HR LPS
240.12 66.70
240.12 66.70
240.12 66.70
3.13 M
0.09
M3/HR LPS
119.99 33.33
119.99 33.33
119.99 33.33
PERDIDAS POR FRICCION
Unidad
119.989449 M 3 / HR CAUDAL
150 CONSTANTE
76.2 mm DIAMETRO 3
10 m LONGITUD 1 TUBOS
2.54 M
0.08
M3/HR LPS
4.80 1.33
4.80 1.33
4.80 1.33
2.80 M
0.08
2m Altura Succión
0.5 m Perdida dentro de la bomba
1m Diferencia Geodesica del terreno
19 m Presion de operación del aspersor (35 psi)
213.22208
Hp
CALCULO HIDRAULICO RIEGO POR GOTEO, AREA DE AGUACATE, FINCA EL LIMON
HF 0.14 M
3% HF= 0.00
SECCION 2
HF 0.46 M
3% HF= 0.01
SECCION 3
GPM M3/HR LPS
0.47 0.11 0.03
0.47 0.11 0.03
0.47 0.11 0.03
HF 0.06 M
3% HF= 0.00
HS = 0m Altura Succión
Hsf = 0m Perdida dentro de la bomba
Hg = 2m Diferencia Geodesica del terreno
Hop = 12 m Presion de operación del aspersor (17 psi)
Hp = 1.5498046
HPb = 1.82 Hp
INCA EL LIMON DISEÑO DE RIEGO POR GOTEO
PLANTACIÓN
ENTRE SURCOS (M) 6
ENTRE ARBOLES (M) 4
AREA/ARBOL (M2) 16
LONGITUD PROM/SURCO (M) 120
ARBOLES/SURCO 30
AREA/SURCO (M2) 480
ANCHO PROM POLIGONO (M) 150
TOTAL SURCOS 25
RIEGO
ENTRE LINEAS (M) 1
ENTRE EMISORES (M) 0.8
TUBOS AREA/EMISOR (M2) 0.8
NUMERO LINEAS/SURCO 4
NUMERO LINEAS TOTALES 100
EMISORES/LINEA 150
EMISORES/SURCO 600
EMISORES TOTALES 15000
CAUDAL/EMISOR (LTS/HR) 1.30
CAUDAL/EMISOR (GPM) 0.01
CAUDAL/LINEA (GPM) 0.86
CAUDAL/SURCO (GPM) 3.43
CAUDAL NETO/PARCELA (GPM) 85.87
INTENSIDAD DE RIEGO (MM/HR) 1.63
ETO MAX (mm/DIA) 6.00
Kc PROM CULTIVO 0.80
LAMINA REPOSICION DIARIA (mm) 5
TIEMPO DE RIEGO (HORAS) 3.0
TIEMPO DE RIEGO (MINUTOS) 177
EFICIENCIA DE RIEGO 90%
CAUDAL BRUTO/PARCELA (GPM) 95.41
TUBOS
TUBOS
ca del terreno
n del aspersor (17 psi)
PSI
Ingresar dato manual
No tocar