Escolar Documentos
Profissional Documentos
Cultura Documentos
Faculdade de Tecnologia
Departamento de Engenharia Civil e Ambiental
TOPICOS ESPECIAIS EM
GEOTECNIA – ANÁLISE
QUANTITATIVA DO RISCO
Elemento exposto
10 anos
Valor US$50.000
Exercício 2
Elementos expostos
10 anos
Exercício 3
Elemento exposto
Valor US$50.000
50 anos
10 anos
2 anos
Ameaça (P)
C ($)
Na realidade...
Elemento exposto:
Quantidade? Valor?
Intensidade da
ameaça?
Probabilidade?
6,5m
5,4m
0m
Four alternatives:
1. Do nothing. Pay for flood damages as they occur.
RISK-BASED DESIGN DECISION MAKING
6,5m
5,4m
0m
Four alternatives:
1. Do nothing. Pay for flood damages as they occur.
2. Floodproof individual buildings threatened by the
floods: rising houses & sealing basements.
RISK-BASED DESIGN DECISION MAKING
8,4m
Levee
5,4m
0m
Four alternatives:
• Do nothing. Pay for flood damages as they occur.
• Floodproof individual buildings threatened by the
floods: rising houses & sealing basements.
• Construct a levee to protect against 5,4m flood.
RISK-BASED DESIGN DECISION MAKING
9,5m
Levee
6,5m
0m
Four alternatives:
1. Do nothing. Pay for flood damages as they occur.
2. Floodproof individual buildings threatened by the
floods: rising houses & sealing basements.
3. Construct a levee to protect against 5,4m flood.
4. Construct a levee to protect against 6,5m flood.
The hazard.
1. The 5,4m flood: l=1/100 per year. Includes:
• 100 years return period storm
• Climate effects (ocean rising)
• Crustal subsidence
• High tide.
2. The 6,5m flood includes all the considerations before and THE
HIGHEST ASTRONOMICAL TIDE with a return period of 1,5 years
and last 12h.
1 1
l 9 x10 6
100 1,5 x365 x 2
RISK-BASED DESIGN DECISION MAKING
9,5m
Levee
6,5m
5,4m
0m