GRFICO DE GANTT PARA ACOMPANHAMENTO DE PROJETOS

Tarefa 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Data Incio 1/1/1998 05/01/98 13/01/98 26/01/98 16/02/98 19/02/98 25/02/98 27/02/98 04/03/98 10/03/98 17/03/98 18/03/98 Dia da Semana jue lun mar lun lun jue mi vie mi mar mar mi Durao Dias teis 2 5 9 15 3 4 2 3 4 5 1 1 Durao Data Final Dias Reais Projetada 2 1/2/1998 8 1/9/1998 11 1/21/1998 19 2/9/1998 3 2/18/1998 6 2/22/1998 2 2/26/1998 5 3/1/1998 6 3/7/1998 7 3/14/1998 1 3/17/1998 1 3/18/1998

Encontro de Planejamento Desenvolvimento do Questionrio impresin recibimiento de reportes tabla de datos analisis de datos elaboracion de relatorio distribucion preliminar recibimiento de comentarios finalizacion de relatorio distribucion resultado de evaluacion

FERIADOS 1/6/1998

PROJETOS
Data Final Real 1/2/1998 1/12/1998 1/23/1998 2/13/1998 2/18/1998 2/24/1998 2/26/1998 3/3/1998 3/9/1998 3/16/1998 3/17/1998 3/18/1998

Data de Incio 35796 Trmino do Encontro de Planejamento 35872 grfico


Desenvolvimento do Questionrio impresin recibimiento de reportes tabla de datos analisis de datos elaboracion de relatorio distribucion preliminar recibimiento de comentarios finalizacion de relatorio distribucion resultado de evaluacion

29/12

30/12

31/12

2/1

3/1

4/1

5/1

6/1

7/1

8/1

1/1

8/1
9/1 10/1 11/1 12/1 13/1 14/1 15/1 16/1 17/1 18/1 19/1 20/1 21/1 22/1 23/1 24/1

25/1
26/1 27/1 28/1 29/1 30/1 31/1 1/2 2/2 3/2 4/2 5/2 6/2 7/2

6/2 7/2 8/2 9/2 10/2 11/2 12/2 13/2 14/2 15/2 16/2

17/2
18/2 19/2 20/2 21/2 22/2 23/2 24/2 25/2 26/2 27/2 28/2 1/3 2/3 3/3 4/3 5/3

6/3
7/3 8/3

Project Schedule

t Schedule

8/3 9/3 10/3 11/3 12/3

13/3
14/3 15/3 16/3 17/3 18/3 19/3 20/3 21/3 22/3 23/3 24/3 25/3 26/3 27/3 28/3 29/3

30/3
31/3 1/4 2/4 3/4 4/4 5/4 6/4

6/4
7/4 8/4 9/4 10/4 11/4 12/4 13/4 14/4 15/4

As instrues esto em Ings, no original. Sero oportunamente vertidas para o Portugus para melhor compreenso. Notar o funcionamento da funo workday, que determina se o dia ou no til a partir de uma lista de feriados colocada manualmente Em caso de dvida, mande um e-mail para mim. Aldo Cosentino INSTRUCTIONS 1. Start with a new workbook and enter your task data as in Sheet1. Column A contains the task descriptions, column B contains the beginning date for each task, and column C contains the number of days to complete the task. Column D contains formulas thhat determine the ending day for each task. For example, the formula in cell D2 is =B2-C2-1. Column D isnt really necessary (and is not used in the chart), but including it will tell you e 2. Create a stacked horizontal chart from the data in A2:C13. The Chart Wizard will probably guess these series incorrectly, so youll need to set the category axis labels and data series manually. The category (x) axis labels should be range A2:A13, the Series 1 data should be B2:B13, and Series 2 data should be C2:C13. 3. Remove the charts legend and adjust the height of the chart so that all of the category axis labels are visible (or, change the font to a smaller size). 4. Access the Format Axis dialog box for the horizontal (value) axis. Set the Minimum and Maximum values to correspond to the earliest and latest dates in your project. Note that you can enter actual dates into this dialog box. To display the dates at weekly intervals, set the Minimum to a Monday, the Maximum to a Sunday, and the Major Unit to 7. 5. Select the data series that corresponds to the data in Column B and access the Format Data Series dialog box. Set Borders to None and Area to None. This essentially makes the first data series invisible and makes the chart resemble a Gantt chart. 6. Apply other formatting as desired. For example, you may want to add gridlines and a title. Youll be able to adjust your project schedule and the chart will update automatically. However, if you use dates outside of the original date range, youll need to change the scaling for the horizontal (value) axis.