Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
1.1 INSTALAES PROVISRIAS
1.1.1 S74209.001 UN PLACA DE OBRA EM CHAPA GALVANIZADA
1 375.70 375.70
1.1.2 SIN12895 UN CAPACETE 12 9.55 114.60
1.1.3 SIN12893 UN BOTA DE COURO 12 27.10 325.20
1.1.4 SIN12892 UN LUVA DE RASPA 12 7.25 87.00
1.1.5 M00001 UN CINTO TRAVA QUEDA DE SEGURANCA 12 30.00 360.00
1.1.6 M00002 UN OCULOS DE SEGURANCA 12 2.60 31.20
1.1.7 M00004 UN UNIFORME 12 58.00 696.00
1.2 SERVIOS PERMANENTES
1.2.1 M01.00.201 M PLOTAGEM E REPRODUES DIVERSAS 5 10.00 50.00
1.2.2 M01.00.202 UN ANOTAO DE RESPONSABILIDADE
TNICA 3 90.00 270.00
1.2.3 EM05.060.010_0un Fotografia colorida 10X15CM 50 1.00 50.00
1.2.4 SEGURANA DE TRABLAHO
1.2.4.1 M00007 UN PPRA 1 380.00 380.00
1.2.4.2 M00006 UN PCMSO 1 380.00 380.00
1.2.4.3 M00005 UN PCMAT 12 23.00 276.00
1.2.4.4 M00008 UN PPP 12 40.00 480.00
1.2.5 M01.00.204 UN MOBILIZAAO DE DESMOBILIZAO 2 1,381.16 2,762.32
1.2.6 68541_1 MS LIMPEZA 1 783.93 783.93
Total oramento parcial n 1 SERVIOS GERAIS : 7,421.95
Oramento parcial n 2 SERVIOS PRELIMINARES
Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
2.1 DEMOLIO E REMOO
2.1.1 S85378 M2 DEMOLICAO DE ALVENARIA DE TIJOLO
MACICO 1/2 VEZ, COM REMOCAO (PARA
PASSAGENS) 1 43.19 43.19
2.1.2 S85371 M DEMOLIO PISO CARPETE 140 5.53 774.20
2.1.3 S85367 M DEMOLIO PISO BANHEIROS 35 28.74 1,005.90
2.1.4 S73896.001 M DEMOLIO AZULEJO BANHEIRO 90 109.54 9,858.60
2.1.5 S85362 M RETIRADA DE DIVISRIA DE MRMORE 9 23.61 212.49
2.1.6 S72235 M DEMOLIO DE FORRO (GERAL) 840 11.80 9,912.00
2.1.7 S85333 UN DEMOLIO E RETIRADA APAR.SANIT. 2 34.92 69.84
2.1.8 S85374 UN RETIRADA DE DISPOSITIVOS APAR.SANIT.
2 19.67 39.34
2.1.9 S85407 M REMOO FIAO ELTRICA 100 19.23 1,923.00
2.1.10 S85416 UN REMOO DE TOMADAS E
INTERRUPTORES 4 25.98 103.92
2.1.11 S72142 UN RETIRADA DE PORTA (POR FOLHA) 10 21.01 210.10
2.1.12 M02.00.201 M RETIRADA DE BANCADA 2.5 94.17 235.43
2.1.13 M02.00.202 UN RETIRADA ESPELHO 2 14.17 28.34
2.1.14 M02.02.201 CJ DESMONTAGEM E MONTAGEM DAS MESAS
COM REMOO (T1 E T2) 2 2,000.00 4,000.00
2.2 LOCAO DE EQUIP E ANDAIME
2.2.1 S72209 M CARGA MANUAL E REMOO DE ENTULHO
COM TRANSPORTE 30 15.00 450.00
2.2.2 SIN73875.001 M/M ALUGUEL ANDAIME FACHADEIRO 3 903.50 2,710.50
2.2.3 SIN23412_1 M TAPUME DE CHAPA DE MADEIRA
COMPENSADA (6MM) - PINTURA A CAL 30 43.50 1,305.00
Total oramento parcial n 2 SERVIOS PRELIMINARES : 32,881.85
Oramento parcial n 3 INSTALAES ELTRICAS
Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
3.1 SINAPI CJ FORN/ASSENT. ELETRODUTO PVC ROSC. 1
POL 1 7,022.84 7,022.84
3.2 S73860.008 m Cabo com isolamento termoplstico, bitola de
2,5mm, 450/750v 5,100.00 2.57 13,107.00
3.3 S73860.009 m Cabo com isolamento termoplstico, bitola de
4mm, 450/750v 1,230.00 3.61 4,440.30
3.4 S73860.010 m Cabo com isolamento termoplstico, bitola de
6mm, 450/750v 10 4.88 48.80
3.5 FORN/INSTAL FIO ISOLADO PVC 750V 10MM2
3.5.1 24210_1 M FIO ISOLADO PVC 750V 10 MM2 35 7.57 264.95
3.6 S73860.012 m Cabo com isolamento termoplstico, bitola de
16mm, 450/750v 35 11.35 397.25
3.7 S73860.13 m Cabo com isolamento termoplstico, bitola de
25mm, 450/750v 5 12.45 62.25
3.8 S73860.022 m Cabo com isolamento termoplstico, bitola de
35mm, 450/750v 3 16.93 50.79
3.9 M03.00.001 PT PONTO TOMADA 2P UNIV 10A/250V
PISO/ELETR PVC 1/2" - 4X2"S/PLACA 180 93.66 16,858.80
3.10 S74130.001 UN DISJUNTOR TERMOMAGNETICO UNIPOLAR
10 A 30A X 240V-FORN/COLOC 40 9.42 376.80
3.11 S74130.002 un Disjuntor termomagntico unipolar, de 35 a 63a
- 240v 2 13.81 27.62
3.12 S74130.003 UN DISJUNTOR TERMOMAGNETICO BIPOLAR
10 A 50A X 240V-FORN/COLOC 30 52.20 1,566.00
3.13 S74130.004 UN DISJUNTOR TERMOMAGNETICO TRIPOLAR
10 A 50A X 240V-FORN/COLOC 14 64.83 907.62
3.14 S74130.005 un Disjuntor termomagntico, tripolar, de 60 a
100a - 240v 4 90.01 360.04
3.15 S74130.006 un Disjuntor termomagntico, tripolar, de 125 a
150a - 240v 1 225.69 225.69
3.16 M03.00.002 UN LUMINARIA SOBREPOR TP CALHA
C/REATOR PART CONVENC LAMP 4X40W
(FLUORE 170 211.39 35,936.30
3.17 C03.00.003 un Reator para lmpada fluorescente de 4X16w,
partida rpida 340 44.91 15,269.40
3.18 S83469 un Lmpada TUBULAR fluorescente de 40w 680 4.83 3,284.40
3.19 15.007.335_0 CJ Materiais para entrada de servio 1 2,762.97 2,762.97
3.20 M03.00.004 CJ SOQUETE 1,360.00 11.52 15,667.20
3.21 S74131.007 un Quadro de distribuio de energia de embutir
para instalao de at 40 disjuntores com
dispositivo para chave geral 4 1,569.22 6,276.88
3.22 M03.00.021 UN COFRE DE DERIVAO 4 2,560.00 10,240.00
3.23 M03.00.020 CJ ACESSRIOS DE FIXAO 2 5,000.00 10,000.00
3.24 M03.00.005 CJ ELETROCALHA 315 140.00 44,100.00
Total oramento parcial n 3 INSTALAES ELTRICAS : 189,253.90
Oramento parcial n 4 INSTALAES MECNICAS
Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
4.1 04.00.007 CJ TUBOS DE COBRE 1 177.58 177.58
4.2 M04.00.010 CJ ELTRICA DO AC 1 7,295.23 7,295.23
4.3 M04.01.001 UN DIFUSOR P/ INSUL. TAM.4 40 194.06 7,762.40
4.4 M04.01.003 UN DIFUSOR P; INSUL.TAM 3 12 157.10 1,885.20
4.5 M04.01.005 UN DUTO FLEXIVEL 150MM 40 93.57 3,742.80
4.6 M04.01.007 UN DUTO FLEXIVEL 180MM 50 122.44 6,122.00
4.7 M04.01.011 UN GRELHA 525X125MM 40 48.50 1,940.00
4.8 M04.01.013 UN GRELHA 525X165MM 5 49.25 246.25
4.9 S83637 M CHAPA GALVANIZADA 175 184.58 32,301.50
4.10 C04.01.017 M ISOPOR TIPO F1 180 114.82 20,667.60
4.11 S3410 KG COLA 5 14.11 70.55
4.12 M04.01.021 KG FREON-22 5 447.70 2,238.50
4.13 M04.01.023 CJ METARIAIS PARA FIXAO E SOLDA 1 3,256.19 3,256.19
4.14 S74061.001 M TUBO COBRE CLASSE E D= 15MM EXCL
CONEXOES EMENDAS ABERTURA E
FECHAME 200 18.91 3,782.00
Total oramento parcial n 4 INSTALAES MECNICAS : 91,487.80
Oramento parcial n 5 TELEFONIA E DADOS
Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
5.1 M03.00.005 CJ ELETROCALHA 150 679.74 101,961.00
5.2 S72309 CJ ELETRODUTO 1 14,994.30 14,994.30
5.3 05.00.002 CJ ACESSRIOS DE REDE 1 31,909.67 31,909.67
5.4 M05.00.005 UN CAIXA DE PASSAGEM PARA TELEFONE E
DADOS 1 1,006.27 1,006.27
5.5 M05.00.006 UN MATERIAL PARA ENTRADA EM SEIO E
ACESSRIOS 1 891.15 891.15
5.9 M05.00.017 M CABO FTP-5E 22,000.00 4.30 94,600.00
5.10 05.00.021 CJ BRAADEIRAS E ANILHAS 6 643.08 3,858.48
5.11 05.00.020 UN RACK ABERTO PADRO 19" 44U 1 2,660.50 2,660.50
Total oramento parcial n 5 TELEFONIA E DADOS : 251,881.37
Oramento parcial n 6 INSTALAES HIDROSSANITRIAS
Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
6.1 S74165.004 M FORN./ASSENTAM. TUBO PVC BRANCO
ESGOTO DN 50 COM CONEXOES 2 48.26 96.52
6.2 M06.00.001 UN INSTAL/ASSENT BACIA TURCA C/3M TUBO
PVC 50MM 2M TUBO PVC 100 CONEXOE
2 287.43 574.86
6.3 S73797.001 UN FORN/ASSENT. REGISTRO GAVETA
CANOPLA CROMADA 3/4" 2 115.62 231.24
6.4 M06.00.002 UN RALO SIFONADO CO INSTALACAO 4 14.30 57.20
6.5 M06.00.003 UN BARRA APOIO DEF. FSICO 4 680.34 2,721.36
6.6 M06.00.006 UN SABONETEIRA P/SABAO LIQUIDO 2 30.38 60.76
6.7 M06.00.005 UN PORTA PAPEL TOALHA 2 45.98 91.96
6.8 M06.00.007 UN PORTA PAPEL HIGIENICO 2 29.48 58.96
6.9 M06.00.008 UN TORNEIRA PRESSAO CROMADA 1/2"
P/LAVATORIO C/RABICHO CROMADO 2 91.63 183.26
6.10 M06.00.010 UN TORNEIRA PRESSAO CROMADA 3/4"
P/JARDIM 2 29.12 58.24
6.11 S40729 UN INSTALACAO VALVULA DESCARGA
CROMADA LISA C/REGISTRO 2 161.23 322.46
6.12 S85095 UN DUCHINHA MANUAL C/REGISTRO DE
PRESSAO 1/2" MANGUEIRA CROMADA
SUPORTE 2 68.87 137.74
Total oramento parcial n 6 INSTALAES HIDROSSANITRIAS : 4,594.56
Oramento parcial n 7 ARQUITETURA
Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
7.1 M07.00.001 M PISO ELEVADO
REFERNCIA: RELUMA RE-25/600. 630 251.39 158,375.70
7.2 M07.00.002 M REVESTIMENTO REFERNCIA: GERFLOR
LINHA SAGA 2 COR BARMA SWEET.
150 211.39 31,708.50
7.3 M07.00.016 M PISO CERMICO 31X31CM 35 77.29 2,705.15
7.4 M07.00.012 M REVESTIMENTO CERMICO 20X20CM 90 51.39 4,625.10
7.5 C07.00.018 M SOLEIRA 6 106.45 638.70
7.6 S83738 M IMPERMEABILIZAO MANTA 4MM 50 56.04 2,802.00
7.7 S74000.001 M IMPERMEABILIZAO COM ARGAMASSA 90 39.48 3,553.20
7.8 S79627 M DIVISRIA EM GRANITO CINZA CORUMB 7 443.50 3,104.50
7.9 MER07.00.003 CJ DIVISRIAS (VER JUST. DE PREOS) 1 296,380.00 296,380.00
7.10 M07.00.009 UN DIVISRIA E PORTA EM TS 2 500.00 1,000.00
7.11 M07.00.010 UN PORTA DAS DIVISRIAS 25 1,000.00 25,000.00
7.12 M07.00.011 UN PORTAS CORREDOR 4 1,410.00 5,640.00
7.13 M07.00.023 UN PORTA COM CHAPA XADREZ E BARRA DE
APOIO 4 1,610.00 6,440.00
7.14 M07.00.019 UN PORTA EM VIDRO TEMPERADO COMPLETA
E COLOCADA 1 1,265.00 1,265.00
7.15 M07.00.026 M LIXAMENTO DAS PAREDES PARA APLAINAR
SUPERFCIES EMASSADAS 400 3.74 1,496.00
7.16 S73954.001 M PINTURA LATEX ACRILICA PAREDE
EXTERNA 3 DEMAOS 400 13.21 5,284.00
7.17 MER07.00.008 M FORRO MODULADO 800.00 70.00 56,000.00
7.18 S74126.001 M BANCADA EM GRANITO CINZA CORUMB 2.5 259.36 648.40
7.19 M07.00.027 CJ GUARDA CORPO FERRO LANCES 3,00 A
4,00M H=1,00M COM GRADE DE 21 BARRA
1 2,300.00 2,300.00
7.20 S73792.001 M FORRO EM GESSO 40.00 58.08 2,323.20
7.20 M07.00.027 UN BALCO PARA ATENDIMENTO T3 E T4 1.00 8,500.00 8,500.00
7.20 M07.00.201 CJ DIVISORIAS NICHO DO RACK 19" -
PROTECAO DO RACK DO 7 ANDAR 1.00 8,008.00 8,008.00
Total oramento parcial n 7 ARQUITETURA : 627,797.45
Oramento parcial n 8 SERVIOS COMPLEMENTARES
Num. Cdigo Un Denominao Quantidade Preo (R$) Total (R$)
8.1 S9537 M LIMPEZA FINAL DA OBRA 1,780.00 1.72 3,061.60
Total oramento parcial n 8 SERVIOS COMPLEMENTARES : 3,061.60

Oramento de execuo material Valor (R$)


1 SERVIOS GERAIS . 7,421.95
2 SERVIOS PRELIMINARES . 32,881.85
3 INSTALAES ELTRICAS . 189,253.90
4 INSTALAES MECNICAS . 91,487.80
5 TELEFONIA E DADOS . 251,881.37
6 INSTALAES HIDROSSANITRIAS . 4,594.56
7 ARQUITETURA . 627,797.45
8 SERVIOS COMPLEMENTARES . 3,061.60
Subtotal (antes do BDI) 1,208,380.48
BDI (25,7%) 310,553.78
Total (aps a aplicao do BDI) 1,518,934.26
SUPERINTENDNCIA DE SEGUROS PRIVADOS
PREGO ELETRNICO N 30/2013
COMPOSIO DO BDI

NOME DA EMPRESA:
CNPJ:
Data da Proposta:

A - LUCRO/BONIFICAO 0.00%
B - DESPESAS INDIRETAS (EXCLUDAS AS DESPESAS FINANCEIRAS 0.00%
B.1 - ADMINISTRAO CENTRAL 0.00%
B.2 - SEGURO 0.00%
B.3 - GARANTIA 0.00%
B.4 - RISCO 0.00%
C - DESPESAS FINANCEIRAS 0.00%
D - TOTAL DOS TRIBUTOS 0.00%
D.1 - PIS 0.00%
D.2 - ISS 0.00%
D.3 - COFINS 0.00%
TOTAL DA TAXA DE BDI 0.00%

Frmula:

(1 A)(1 B)(1 C)
BDI 1
(1 D)

Onde:

A = Taxa representativa do lucro/bonificao;


B = Taxa referente ao somatrio das despesas indiretas, exceto tributos e despesas financeiras;
C = Taxa representativa das despesas financeiras;
D = Taxa representativa da incidncia de tributos.

Você também pode gostar