Escolar Documentos
Profissional Documentos
Cultura Documentos
Preço Base Saneago (2012)
Preço Base Saneago (2012)
CONSTRUO CIVIL
SANEAGO_12-2
BDI = 0,00%
SANEAGO_12-2
ITEM
I
I.01
DISCRIMINAO
UN
PREO
OBRAS LOCALIZADAS
SERVIOS PRELIMINARES
I.01.1
102,38
I.01.2
141,11
I.01.3
266,26
I.01.4
6,95
I.01.5
5,06
I.01.6
46,57
I.01.7
6,15
I.01.8
0,66
I.01.9
0,23
I.01.10
35,48
I.01.11
19,54
I.01.12
ABERTURA POO PARA CISTERNA TERRENO COMPACTO COM DN 1.0 M COM PROFUNDIDADE DE 15 A 20M
67,30
I.01.13
ABERTURA POO PARA CISTERNA TERRENO COMPACTO COM DN 1.0 M COM PROFUNDIDADE DE10 A 15M
53,84
I.01.14
ABERTURA POO PARA CISTERNA TERRENO COMPACTO COM DN 1.0 M COM PROFUNDIDADE DE 5 A 10M
40,38
I.01.15
ABERTURA POO PARA CISTERNA TERRENO COMPACTO COM DN 1.0 M COM PROFUNDIDADE DE 5 M
33,65
I.01.16
UN
I.01.17
6,53
I.01.18
UN
13,56
I.01.19
LIMPEZA DE FAIXA
0,23
I.01.20
UN
135,93
I.01.21
I.01.22
CERCA FIXA
UN
130,40
I.01.23
UN
10,79
I.01.24
UN
19,31
I.01.25
LANTERNA DE SINALIZAO
UN
25,00
I.01.26
UN
273,95
I.01.27
PASSADIO DE MADEIRA
31,77
I.01.28
PASSADIO METLICO
KG
10,91
I.02
2.160,23
36,64
MOVIMENTO DE TERRA
I.02.1
36,66
I.02.2
22,12
I.02.3
5,97
I.02.4
22,12
I.02.5
3,16
71,40
I.03
I.03.1
FUNDAES
ESCAVAO PARA TUBULO
Pgina 2 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
1.055,80
I.03.2
I.03.3
16,44
I.03.4
38,15
I.03.5
49,73
I.03.6
220,49
I.03.7
285,61
I.03.8
67,97
I.03.9
115,86
I.04
UN
PREO
I.04.1
13,91
I.04.2
22,25
I.04.3
27,80
I.04.4
61,50
M2
67,00
I.04.7
I.04.8
I.04.5
I.04.6
62,71
24,03
CIMBRAMENTO METLICO
27,24
I.04.9
ARMADURA DE AO EM BARRAS
KG
4,62
I.04.10
299,66
I.04.11
316,43
I.04.12
325,51
I.04.13
331,48
I.04.14
343,95
I.04.15
366,70
I.04.16
14,14
I.04.17
CONFECO DE SARJETA
I.04.18
I.04.19
I.04.20
I.04.21
I.04.22
I.04.23
I.04.24
I.04.25
I.04.26
I.04.27
I.05
APLICAO E
APLICAO E
APLICAO E
APLICAO E
APLICAO E
MICROSSLICA
MICROSSLICA
MICROSSLICA
MICROSSLICA
MICROSSLICA
23,32
299,72
320,12
335,42
344,09
372,40
332,60
357,11
419,09
392,04
427,20
Pgina 3 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
PREO
I.05.1
241,13
I.05.2
211,74
I.05.3
GABIO T.CX.#8X10 D.T. ARAME 2.4MM REV. ZN/AL C/PVC - H=0,5M (2X)
288,74
230,61
255,15
I.05.4
I.05.5
I.06
GABIO TIPO CAIXA # 8X10 DUPLA TORO COM ARAME 2.4 MM REVESTIDO ZINCO/ALUMNIO COM PVC H=1,0M
CONCRETO CICLPICO TRAO 1:3:6 COM 30% PEDRA DE MO
ALVENARIA DE ELEVAO
I.06.1
76,77
I.06.2
82,24
I.06.3
35,62
I.06.4
40,93
I.06.5
50,54
I.06.6
55,14
I.06.7
33,47
I.06.8
37,94
I.06.9
93,12
I.07
REVESTIMENTOS
I.07.1
3,11
I.07.2
14,61
I.07.3
17,07
I.07.4
18,23
I.07.5
19,71
I.07.6
16,86
I.07.7
14,52
I.07.8
14,52
I.07.9
17,15
I.07.10
15,72
I.07.11
54,48
I.07.12
59,30
I.07.13
21,39
I.08
COBERTURA
I.08.1
COBERTURA COM TELHA CERMICA TIPO PLAN, INCLUINDO ESTRUTURA DE MADEIRA DE LEI
94,19
I.08.2
90,47
I.08.3
67,74
I.08.4
69,47
I.08.5
27,86
I.08.6
46,63
I.09
ESQUADRIAS
I.09.1
UN
342,38
I.09.2
ESQUADRIA MADEIRA CEDRO, BATENTE PEROBA PARA PINTURA VERNIZ, DIMENSES: 0,7X2,1M
UN
342,38
I.09.3
ESQUADRIA MADEIRA CEDRO, BATENTE PEROBA PARA PINTURA VERNIZ, DIMENSES: 0,8X2,1M
UN
348,32
Pgina 4 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
PREO
I.09.4
ESQUADRIA MADEIRA CEDRO, BATENTE PEROBA PARA PINTURA A OLEO, DIMENSES: 0,6X2,1M
UN
251,94
I.09.5
ESQUADRIA MADEIRA CEDRO, BATENTE PEROBA PARA PINTURA A OLEO, DIMENSES: 0,7X2,1M
UN
251,94
I.09.6
ESQUADRIA MADEIRA CEDRO, BATENTE PEROBA PARA PINTURA A OLEO, DIMENSES: 0,8X2,1M
UN
251,94
I.09.7
188,79
I.09.8
222,37
I.09.9
206,93
I.09.10
246,46
I.09.11
70,33
I.10
PAVIMENTAES
I.10.1
262,93
I.10.2
17,60
I.10.3
23,14
I.10.4
28,28
I.10.5
PISO CERMICO 20 X 20 CM
27,68
I.10.6
PISO CERMICO 20 X 10 CM
27,87
I.10.7
34,87
I.10.8
43,82
I.10.9
PEDRA PORTUGUESA
37,19
I.10.10
65,24
I.10.11
69,48
I.10.12
8,96
I.10.13
9,92
I.10.14
14,93
I.10.15
11,56
I.10.16
28,59
I.11
PINTURA
I.11.1
3,38
I.11.2
2,51
I.11.3
4,41
I.11.4
10,79
I.11.5
20,68
I.11.6
16,51
I.11.7
16,03
I.11.8
78,64
I.11.9
67,71
I.11.10
10,94
I.11.11
8,91
I.11.12
12,00
I.11.13
11,30
222,58
I.12
I.12.1
Pgina 5 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
PREO
I.12.2
LASTRO DE BRITA
97,91
I.12.3
LASTRO DE AREIA.
90,32
I.12.4
78,83
I.12.5
1.731,74
I.12.6
UN
192,50
I.12.7
UN
120,96
I.12.8
UN
471,52
I.12.9
UN
303,31
I.12.10
TAMPA METLICA PARA CAIXA DE PROTEO DE POO, DIMENSES: 2,15 X 1,5 M (INCLUINDO PINTURA)
UN
712,90
I.12.11
TAMPA METLICA PARA CAIXA DE REGISTROS, DIMENSES: 1,32 X 1,15M (INCLUINDO PINTURA)
UN
335,55
I.12.12
I.12.13
37,12
UN
90,00
I.12.14
VIDROS
48,00
I.12.15
93,41
I.12.16
19,10
I.12.17
9,26
I.12.18
3,42
I.12.19
16,32
I.12.20
3,16
I.12.21
REPOSIO DE CALCADA
20,84
37,35
24,36
I.12.24
23,53
I.12.25
12,02
I.12.26
13,06
I.12.27
13,37
I.12.28
70,47
I.12.29
9,91
I.12.30
UN
11,80
I.12.31
4,60
I.12.32
6,51
I.12.33
61,43
I.12.34
I.12.35
UN
I.12.36
UN
416,25
I.12.37
UN
1.665,00
I.12.38
UN
1.998,00
I.12.39
277,50
I.12.40
6,38
I.12.41
10,07
I.12.42
0,95
I.12.43
0,06
I.12.44
0,61
I.12.22
I.12.23
Pgina 6 de 12
89,45
499,50
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
PREO
I.12.45
UN
116,59
I.12.46
UN
90,87
I.12.47
66,54
I.12.49
30,92
I.12.50
124,70
I.13
DIVERSOS
I.13.1
25,50
I.13.2
27,01
I.13.3
MANTA BUTLICA
33,00
I.13.4
150,80
I.13.5
TAMPONAMENTO
4,40
I.13.6
UN
346,52
I.13.7
391,07
I.13.8
UN
79,00
I.13.9
617,50
I.13.10
107,62
5,01
4,04
6,26
5,07
6,33
6,05
4,88
7,56
6,11
8,38
6,02
4,86
7,53
6,08
II
II.01
II.01.1
II.01.2
II.01.3
II.01.4
II.01.5
II.01.6
II.01.7
II.01.8
II.01.9
II.01.10
II.01.11
II.01.12
II.01.13
II.01.14
II.01.15
II.01.18
OBRAS LINEARES
MOVIMENTO DE TERRA
ESCAVAO MECANIZADA (COM RETROESCAVADEIRA) EM VALAS COM MATERIAL DE 1 CATEGORIA
PROFUNDIDADE AT 2,0 M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE 1 CATEGORIA
PROFUNDIDADE AT 2,0 M
ESCAVAO MECANIZADA (COM RETROESCAVADEIRA) EM VALAS COM MATERIAL DE 1 CATEGORIA
PROFUNDIDADE DE 2,0 A 4,0M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE 1 CATEGORIA
PROFUNDIDADE DE 2,0 A 4,0M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE 1 CATEGORIA
PROFUNDIDADE DE 4,0 A 6,0M
ESCAVAO MECANIZADA (COM RETROESCAVADEIRA) EM VALAS COM MATERIAL DE 2 CATEGORIA
PROFUNDIDADE AT 2,0 M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE 2 CATEGORIA
PROFUNDIDADE AT 2,0 M
ESCAVAO MECANIZADA (COM RETROESCAVADEIRA) EM VALAS COM MATERIAL DE 2 CATEGORIA
PROFUNDIDADE DE 2,0 A 4,0M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE 2 CATEGORIA
PROFUNDIDADE DE 2,0 A 4,0 M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE 2 CATEGORIA
PROFUNDIDADE DE 4,0 A 6,0 M
ESCAVAO MECANIZADA (COM RETROESCAVADEIRA) EM VALAS COM MATERIAL DE SOLO MOLE
PROFUNDIDADE AT 2,0 M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE SOLO MOLE
PROFUNDIDADE AT 2,0 M
ESCAVAO MECANIZADA (COM RETROESCAVADEIRA) EM VALAS COM MATERIAL DE SOLO MOLE
PROFUNDIDADE DE 2,0 A 4,0 M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE SOLO MOLE
PROFUNDIDADE DE 2,0 A 4,0 M
ESCAVAO MECANIZADA (COM ESCAVADEIRA HIDRULICA) EM VALAS COM MATERIAL DE SOLO MOLE
PROFUNDIDADE DE 4,0 A 6,0 M
ESCAVAO MANUAL EM VALAS COM MATERIAL DE 1 CATEGORIA - PROFUNDIDADE AT 2,0M
Pgina 7 de 12
7,60
21,01
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
PREO
II.01.19
25,66
II.01.20
29,27
II.01.21
44,54
70,01
87,02
71,96
86,14
II.01.26
ESCAVAO MANUAL EM VALAS COM MATERIAL DE 3 CATEGORIA SEM USO DE EXPLOSIVO COM UTILIZAO
DE COMPRESSOR E ROMPEDOR - PROFUNDIDADE AT 2,0M
ESCAVAO MANUAL EM VALAS COM MATERIAL DE 3 CATEGORIA SEM USO DE EXPLOSIVO COM UTILIZAO
DE COMPRESSOR E ROMPEDOR - PROFUNDIDADE DE 2,0 A 4,0M
ESCAVAO MANUAL EM VALAS COM MATERIAL DE 3 CATEGORIA, PERFURAO COM PERFURATRIZ MANUAL
E USO DE EXPLOSIVO - PROFUNDIDADE AT 2,0 M
ESCAVAO MANUAL EM VALAS COM MATERIAL DE 3 CATEGORIA, PERFURAO COM PERFURATRIZ MANUAL
E USO DE EXPLOSIVO - PROFUNDIDADE DE 2,0 A 4,0 M
ESCAVAO MANUAL EM VALAS COM MATERIAL DE BARRO - LAMA - PROFUNDIDADE AT 2,0M
25,22
II.01.27
ESCAVAO MANUAL EM VALAS COM MATERIAL DE BARRO - LAMA - PROFUNDIDADE DE 2,0 A 4,0M
30,79
II.01.28
0,60
II.01.29
0,60
II.01.30
0,34
II.01.31
1,62
II.01.32
10,74
II.01.33
3,95
II.01.34
2,13
II.01.35
0,56
II.01.36
4,62
II.01.37
5,97
II.01.38
REATERRO MECANIZADO COM COMPACTAO .MANUAL AT 20CM ACIMA GERATRIZ SUPERIOR DO TUBO
3,44
II.01.39
1,80
II.01.40
0,98
II.01.22
II.01.23
II.01.24
II.01.25
II.03
ESCORAMENTO DE VALAS
II.03.1
4,20
II.03.2
16,81
II.03.3
9,78
II.03.4
162,61
II.03.5
185,52
II.04
II.04.1
9,14
II.04.2
10,32
II.04.3
13,85
II.04.4
2,35
II.04.5
2,18
II.04.6
1,67
II.04.7
1,55
Pgina 8 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
II.04.8
2,35
II.04.9
2,18
II.04.10
3,53
3,28
MXKM
1,25
MXKM
1,61
MXKM
1,25
MXKM
1,25
II.04.11
II.04.12
II.04.13
II.04.14
II.04.15
II.05
PREO
II.05.1
0,85
II.05.2
0,94
II.05.3
1,01
II.05.4
2,46
II.05.5
2,65
II.05.6
4,36
II.05.7
5,99
II.05.8
1,72
II.05.9
2,16
II.05.10
2,74
II.05.11
3,68
II.05.12
5,72
II.05.13
8,80
II.05.14
10,45
II.05.15
12,22
II.05.16
13,24
II.05.17
17,75
II.05.18
21,43
II.05.19
26,96
II.05.20
32,67
II.05.21
29,36
II.05.22
35,84
II.05.23
45,48
II.05.24
4,82
II.05.25
10,52
II.05.26
13,18
II.05.27
12,74
II.05.28
13,57
II.05.29
15,48
II.05.30
23,74
II.05.31
30,96
Pgina 9 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
II.06
DISCRIMINAO
UN
PREO
II.06.1
20,78
II.06.2
PC
29,10
II.06.3
PC
14,27
II.06.4
PC
14,97
II.06.5
UN
212,36
1.288,45
II.07
CAIXAS
II.07.1
UN
II.07.2
UN
639,03
II.07.3
UN
1.475,91
II.07.4
UN
167,78
II.07.5
UN
577,82
II.07.6
UN
665,92
II.07.7
UN
481,06
II.07.8
UN
1.592,98
75,91
II.07.9
UN
II.07.10
UN
57,75
II.07.11
UN
184,56
II.07.12
UN
703,34
II.07.13
UN
370,56
II.07.14
UN
389,04
II.07.15
CAIXA ALVENARIA 1/2 VEZ PARA MACRO-MEDIDOR DIM. (1,50 X 2,20 X 1,20 M)
UN
1.036,23
II.07.16
CAIXA ALVENARIA TIJOLO MACIO 1/2 VEZ PARA PROTEO REGISTRO DESCARGA DE TUBULAO. DN 50,75
(1,10X0,80-H=1,15M)
UN
482,29
CAIXA ALVENARIA TIJOLO MACIO 1/2 VEZ PROTEO REGISTRO MANOBRA DN 50 A 100 (1,1X0,8-H=1,2M)
UN
502,62
II.07.17
UN
572,95
II.07.19
CAIXA ALVENARIA TIJOLO MACIO 1/2 VEZ PARA PROTEO REGISTRO MANOBRA DN150,200 (1,10X1,00H=1,20M)
CAIXA ALVENARIA TIJOLO MACIO 1/2 VEZ PROTEO VENTOSA DN 50 A 100 (1,10X0,80-H=1,25M)
UN
509,26
II.07.20
CAIXA ALVENARIA TIJOLO MACIO 1/2 VEZ PARA PROTEO VENTOSA DN 150,200 (1,10X1,00-H=1,25M)
UN
578,95
II.07.21
CAIXA ALVENARIA TIJOLO MACIO 1 VEZ PARA ESTAO PITOMTRICA DIM (1,60X1,40X1,50M) COM TAMPA DE
CONCRETO
UN
1.138,17
UN
916,09
UN
998,63
UN
1.062,96
UN
1.181,39
UN
1.281,90
UN
1.364,44
UN
1.464,96
II.07.18
II.08
II.08.1
II.08.2
II.08.3
II.08.4
II.08.5
II.08.6
II.08.7
POOS DE VISITA
POO DE VISITA EM ANIS DE CONCRETO DIMETROS
TAMPO DE CONCRETO, PROFUNDIDADE = 1,0 M
POO DE VISITA EM ANIS DE CONCRETO DIMETROS
TAMPO DE CONCRETO, PROFUNDIDADE = 1,5 M
POO DE VISITA EM ANIS DE CONCRETO DIMETROS
TAMPO DE CONCRETO, PROFUNDIDADE = 2,0 M
POO DE VISITA EM ANIS DE CONCRETO DIMETROS
TAMPO DE CONCRETO, PROFUNDIDADE = 2,5 M
POO DE VISITA EM ANIS DE CONCRETO DIMETROS
TAMPO DE CONCRETO, PROFUNDIDADE = 3,0 M
POO DE VISITA EM ANIS DE CONCRETO DIMETROS
TAMPO DE CONCRETO, PROFUNDIDADE = 3,5 M
POO DE VISITA EM ANIS DE CONCRETO DIMETROS
TAMPO DE CONCRETO, PROFUNDIDADE = 4,0 M
Pgina 10 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
II.08.8
UN
1.583,38
II.09
PREO
II.09.1
UN
7,59
II.09.2
UN
7,59
II.09.3
UN
9,03
II.09.4
UN
9,82
II.09.5
UN
11,65
II.09.6
UN
34,20
II.09.7
UN
41,06
II.09.8
0,96
II.09.9
2,39
II.09.10
2,53
II.09.11
4,19
II.09.12
UN
5,26
II.09.13
UN
5,32
II.09.14
UN
6,77
II.09.15
UN
6,86
II.09.16
UN
31,38
II.09.17
UN
206,22
II.09.18
UN
66,41
II.10
LIGAES DOMICILIARES
II.10.1
RAMAL DOMICILIAR PARA REDE COLETORA DE ESGOTOS EM PVC/PV (EXCLUSIVE MATERIAL HIDRULICO)
18,76
II.10.2
18,76
II.10.3
ENTUPIMENTO DE SUMIDOURO
18,96
II.10.4
ESGOTAMENTO DE SUMIDOURO
47,36
II.10.5
TRAVESSIA DE FOSSA
UN
144,35
II.10.6
II.10.7
II.10.8
II.10.9
II.10.10
II.11
LIGAO PREDIAL DE GUA EM REDE PVC - ASSENTAMENTO DE COLAR DE TOMADA, KIT CAVALETE E CAIXA
METLICA (S SERVIOS)
ASSENTAMENTO DE HIDRMETRO DE 1,5 M3/H (S SERVIO)
EXECUO DE MURETA EM ALVENARIA TIJOLO MACIO 1/2 VEZ, PARA PROTEO DE CAVALETE ENCOSTADO
NO MURO (0,90X0,60X0,15M)
EXECUO MURETA EM ALVENARIA TIJOLO MACIO 1 VEZ, PARA PROTEO DE CAVALETE COM
REVESTIMENTO TOTAL, ISOLADA (0,90X0,60X0,25M)
6,30
UN
11,69
UN
2,75
UN
37,06
UN
77,04
9,08
II.11.1
II.11.2
9,64
II.11.3
12,23
II.11.4
13,64
II.11.5
16,36
II.11.6
19,38
II.11.7
19,68
Pgina 11 de 12
BDI = 0,00%
SANEAGO_12-2
ITEM
DISCRIMINAO
UN
PREO
II.11.8
24,41
II.11.9
30,08
II.11.10
36,60
III
E.T.E. (LAGOAS)
III.01
MOVIMENTO DE TERRA
III.01.1
1,90
III.01.2
2,33
III.01.3
2,33
III.01.4
3,78
III.01.5
6,12
III.01.6
0,36
III.01.7
1,76
NOTA:
1-
No esto inclusos os custos inerentes a mo-de-obra tais como: transporte, alimentao, ferramentas e
EPI's. Estes devero constar na planilha oramentria como custo direto.
Pgina 12 de 12