Peso 2.

4 Tn/m3

a 0.5 m
Columnas
b 0.35 m

Vigas b 0.35 m
Principales h 0.65 m

Vigas b 0.25 m
secundarias h 0.25 m

Losa h 0.2 m

Area tributaria
Piso Columna N veces Longitud (m)
x (m) y (m) Area (m2)

C-1 1 4 1.75 7 3
C-2 1 4 1.75 7 3
C-3 2 4 1.75 7 3
C-4 2 4 1.75 7 3
C-5 2 8 1.75 14 3
5
C-6 2 8 1.75 14 3
C-7 2 4 3.5 14 3
C-8 2 6 3.5 21 3
C-9 2 8 3.5 28 3
C-10 2 8 3.5 28 3
C-1 1 4 1.75 7 3
C-2 1 4 1.75 7 3
C-3 2 4 1.75 7 3
C-4 2 4 1.75 7 3
C-5 2 8 1.75 14 3
4
C-6 2 8 1.75 14 3
C-7 2 4 3.5 14 3
C-8 2 6 3.5 21 3
C-9 2 8 3.5 28 3
C-10 2 8 3.5 28 3
C-1 1 4 1.75 7 3
C-2 1 4 1.75 7 3
C-3 2 4 1.75 7 3
C-4 2 4 1.75 7 3
C-5 2 8 1.75 14 3
3
C-6 2 8 1.75 14 3
C-7 2 4 3.5 14 3
3

C-8 2 6 3.5 21 3
C-9 2 8 3.5 28 3
C-10 2 8 3.5 28 3
C-1 1 4 1.75 7 3
C-2 1 4 1.75 7 3
C-3 2 4 1.75 7 3
C-4 2 4 1.75 7 3
C-5 2 8 1.75 14 3
2
C-6 2 8 1.75 14 3
C-7 2 4 3.5 14 3
C-8 2 6 3.5 21 3
C-9 2 8 3.5 28 3
C-10 2 8 3.5 28 3
C-1 1 4 1.75 7 6.4
C-2 1 4 1.75 7 6.4
C-3 2 4 1.75 7 6.4
C-4 2 4 1.75 7 6.4
C-5 2 8 1.75 14 6.4
1
C-6 2 8 1.75 14 6.4
C-7 2 4 3.5 14 6.4
C-8 2 6 3.5 21 6.4
C-9 2 8 3.5 28 6.4
C-10 2 8 3.5 28 6.4

Area tributaria
Piso Columna N veces Longitud (m)
x (m) y (m) Area (m2)

C-1 1 4 1.75 7 18.4


C-2 1 4 1.75 7 18.4
C-3 2 4 1.75 7 18.4
C-4 2 4 1.75 7 18.4
C-5 2 8 1.75 14 18.4
T
C-6 2 8 1.75 14 18.4
C-7 2 4 3.5 14 18.4
C-8 2 6 3.5 21 18.4
C-9 2 8 3.5 28 18.4
C-10 2 8 3.5 28 18.4

DIMENSIONAMIENTO DE ZAPATA:

PARCIAL
C.M C.V
TIPO P.V.P P.V.S P.P.C P.V.P P.V.S
C-1 28.42 -1.13358 0 5.25 0
C-2 28.42 1.3125 7.476 5.25 0
C-3 28.42 1.3125 7.476 5.25 0
C-4 28.42 1.3125 7.476 5.25 0
C-5 56.84 1.3125 0 10.5 0
C-6 56.84 1.3125 7.476 10.5 0
C-7 45.92 -2.079 0 10.5 0
C-8 73.2 2.625 7.476 15.75 0
C-9 97.6 2.625 7.476 21 0
C-10 91.84 2.625 7.476 21 0

(_+_+_)/ /=/
=2.8

a= 0.5
b= 0.35

A= 88.79649782 91.748079 91.748079 91.748079


B= 126.8521397 131.068684 131.068684 131.068684
C-1
A 105 105 105 105
B 150 150 150 150
A= 113.3942707 116.295099 116.295099 116.573367
B= 161.9918153 166.135855 166.135855 166.533382
C-2
A 120 120 120 120
B 165 165 180 180
A= 113.3942707 116.295099 116.573367 116.573367
B= 161.9918153 166.135855 166.533382 166.533382
C-3
A 120 120 120 120
B 165 180 180 180
A= 113.3942707 116.295099 116.573367 116.573367
B= 161.9918153 166.135855 166.533382 166.533382
C-4
A 120 120 120 120
B 165 180 180 180
A= 132.529018 135.790095 136.177274 136.177274
B= 189.3271686 193.985851 194.538963 194.538963
C-5
A 135 150 150 150
C-5

B 195 195 195 195


A= 145.983854 149.543472 149.814051 149.814051
B= 208.5483628 213.633531 214.020073 214.020073
C-6
A 150 150 150 150
B 210 225 225 225
A= 114.5438835 118.069048 114.304418 114.304418
B= 163.6341193 168.670068 163.292026 163.292026
C-7
A 135
B 180
A= 165.5056683 169.450878 169.832859 169.832859
B= 236.436669 242.072683 242.61837 242.61837
C-8
A 165 180 180 180
B 240 240 240 240
A= 186.6417055 191.300549 191.300549 191.300549
B= 266.6310079 273.286498 273.286498 273.286498
C-9
A 195 195 195 195
B 270 270 270 270
A= 159.6410035 186.242047 187.499067 187.499067
B= 228.0585764 266.060067 267.85581 267.85581
C-10
A 165 195 195 195
B 240 270 270 270

VIGA DE CIMENTACION

_()=_ (/_ )

VIGA DE CIMENTACION EN EL EJE PRINCIPAL


bp= 45 45
hp= 109.429554 110
Seccin Cragas muertas
transversal Peso propio
(m2) (Tn) V.P. (tn/m) V.S. (Tn/m) Muro P (tn/m) Muros (Tn/m) Losa (Tn/m)
0.2375 1.71 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 0 1.75
0.175 1.26 0.546 0.15 0 0 1.75
0.175 1.26 0.546 0.15 0 0 1.75
0.175 1.26 0.546 0.15 0 0 1.75
0.2375 1.71 0.546 0.15 0 -0.34944 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 -0.336 1.75
0.175 1.26 0.546 0.15 0.18 0 1.75
0.175 1.26 0.546 0.15 0.18 0 1.75
0.175 1.26 0.546 0.15 0 0 1.75
0.2375 1.71 0.546 0.15 0 -0.34944 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 -0.336 1.75
0.175 1.26 0.546 0.15 0.18 0 1.75
0.175 1.26 0.546 0.15 0.18 0 1.75
0.175 1.26 0.546 0.15 0 0 1.75
0.2375 1.71 0.546 0.15 0 -0.34944 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 0 0.875
0.175 1.26 0.546 0.15 0 0 0.875
0.3 2.16 0.546 0.15 0 -0.336 1.75
0.175 1.26 0.546 0.15 0.18 0 1.75
0.175 1.26 0.546 0.15 0.18 0 1.75
0.175 1.26 0.546 0.15 0 0 1.75
0.2375 3.648 0.546 0.15 0 -0.34944 0.875
0.175 2.688 0.546 0.15 0 0 0.875
0.175 2.688 0.546 0.15 0 0 0.875
0.175 2.688 0.546 0.15 0 0 0.875
0.3 4.608 0.546 0.15 0 0 0.875
0.175 2.688 0.546 0.15 0 0 0.875
0.3 4.608 0.546 0.15 0 -0.336 1.75
0.175 2.688 0.546 0.15 0.18 0 1.75
0.175 2.688 0.546 0.15 0.18 0 1.75
0.175 2.688 0.546 0.15 0 0 1.75

Seccin Cragas muertas


transversal Peso propio
(m2) (Tn) V.P. (tn/m) V.S. (Tn/m) Muro P (tn/m) Muros (Tn/m) Losa (Tn/m)
10.488 2.73 0.75 0 -1.39776 4.375
0.175 7.728 2.73 0.75 0 0 4.375
0.175 7.728 2.73 0.75 0 0 4.375
0.175 7.728 2.73 0.75 0 0 4.375
13.248 2.73 0.75 0 0 4.375
0.175 7.728 2.73 0.75 0 0 4.375
13.248 2.73 0.75 0 -1.344 8.75
0.175 7.728 2.73 0.75 0.72 0 8.75
0.175 7.728 2.73 0.75 0.72 0 8.75
0.175 7.728 2.73 0.75 0 0 8.75

TOTAL

C.M C.V
27.28642 4.11642
37.2085 14.0385
37.2085 14.0385
37.2085 14.0385
58.1525 11.8125
65.6285 19.2885
43.841 8.421
83.301 25.851
107.701 31.101
101.941 31.101

91.748079 91.748079 91.748079 91.748079 91.748078999


131.068684 131.068684 131.068684 131.068684 131.0686842842
105 105 105 105 105
150 150 150 150 150
116.573367 116.573367 116.573367 116.573367 116.5733674559
166.533382 166.533382 166.533382 166.533382 166.5333820798
120 120 120 120 120
180 180 180 180 180
116.573367 116.573367 116.573367 116.573367 116.5733674559
166.533382 166.533382 166.533382 166.533382 166.5333820798
120 120 120 120 120
180 180 180 180 180
116.573367 116.573367 116.573367 116.573367 116.5733674559
166.533382 166.533382 166.533382 166.533382 166.5333820798
120 120 120 120 120
180 180 180 180 180
136.177274 136.177274 136.177274 136.177274 136.1772741686
194.538963 194.538963 194.538963 194.538963 194.5389630981
150 150 150 150 150
195 195 195 195 195
149.814051 149.814051 149.814051 149.814051 149.8140514104
214.020073 214.020073 214.020073 214.020073 214.0200734434
150 150 150 150 150
225 225 225 225 225
114.304418 114.304418 114.304418 114.304418 114.3044181123
163.292026 163.292026 163.292026 163.292026 163.2920258748

169.832859 169.832859 169.832859 169.832859 169.8328590114


242.61837 242.61837 242.61837 242.61837 242.6183700163
180 180 180 180 180
240 240 240 240 240
191.300549 191.300549 191.300549 191.300549 191.3005488753
273.286498 273.286498 273.286498 273.286498 273.2864983933
195 195 195 195 195
270 270 270 270 270
187.499067 187.499067 187.499067 187.499067 187.4990666643
267.85581 267.85581 267.85581 267.85581 267.8558095205
195 195 195 195 195
270 270 270 270 270
Cargas vivas
Total (Tn)
Total (Tn/m) Sobrecarga Total (tn)
(Tn/m)
3.281 0.2625 0.2625 3.5435
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
3.731 0.2625 0.2625 3.9935
2.831 0.2625 0.2625 3.0935
4.606 0.525 0.525 5.131
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
3.281 0.2625 0.2625 3.5435
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
3.731 0.2625 0.2625 3.9935
2.831 0.2625 0.2625 3.0935
4.606 0.525 0.525 5.131
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
3.281 0.2625 0.2625 3.5435
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
3.731 0.2625 0.2625 3.9935
2.831 0.2625 0.2625 3.0935
4.606 0.525 0.525 5.131
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
3.281 0.2625 0.2625 3.5435
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
2.831 0.2625 0.2625 3.0935
3.731 0.2625 0.2625 3.9935
2.831 0.2625 0.2625 3.0935
4.606 0.525 0.525 5.131
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
3.706 0.525 0.525 4.231
5.219 0.2625 0.2625 5.4815
4.259 0.2625 0.2625 4.5215
4.259 0.2625 0.2625 4.5215
4.259 0.2625 0.2625 4.5215
6.179 0.2625 0.2625 6.4415
4.259 0.2625 0.2625 4.5215
7.054 0.525 0.525 7.579
5.134 0.525 0.525 5.659
5.134 0.525 0.525 5.659
5.134 0.525 0.525 5.659

Cargas vivas
Total (Tn)
Total (Tn/m) Sobrecarga Total (tn)
(Tn/m)
18.343 1.3125 1.3125 19.6555
15.583 1.3125 1.3125 16.8955
15.583 1.3125 1.3125 16.8955
15.583 1.3125 1.3125 16.8955
21.103 1.3125 1.3125 22.4155
15.583 1.3125 1.3125 16.8955
25.478 2.625 2.625 28.103
19.958 2.625 2.625 22.583
19.958 2.625 2.625 22.583
19.958 2.625 2.625 22.583
CANCHAQUE
Z= 0.35
SUELO TIPO 3: BLANDO

S3= 1.2

Tp= 1.0
TL= 1.6

hn= 16m
Ct= 35

T= 0.45714286

C= 2.5
U= 1.3