Consolidado Concretos 200723
Consolidado Concretos 200723
Cantidad
Descripción
Contractual Homologada PH Ejecutada día Acumulada Total a facturar Por ejecutar
Fosos Auger 126 24 24 102
Pilotes (Und) Cámaras 26 0 26
Zanja 394 16 1 9 25 369
Cruce Vía Perimetral 14.11 14.11 14.11 0
Canal la Villa y el Tabú 141.66 0 141.66
Canal Salin Bechara 50 0 50
Canal Libano 40 0 40
Auger Boring (m) Canal San Martín 60 0 60
Canal Amador y Cortes 70.25 0 70.25
Canal Barcelona 46 0 46
Canal San Pablo 50 0 50
Canal Ma. Auxiliadora 60.5 60.5 60.5 0
Excavación 1388.6 51.19 51.19 1337.41
ZCA (m) Concretos 1388.6 51.19 51.19 1337.41
Rellenos 1388.6 51.19 51.19 1337.41
Excavación 3 0 3
Cajas (Und) Concreto 3 0 3
Rellenos 3 0 3
RESUMEN DIARIO DE ACTIVIDADES CONCRETO
Peso camisas
Cantidad Volumen teórico Volumen % de acero (Kg)
Descripción
Contractual Ejecutados Por ejecutar (m3) Comprado (m3) Sobreexcavación
Pilotes (Und) 499 368 131 1947.03 2615.5 34.33% 78277.85
Fecha de Longitud
Consecutivo Identificación Longitud UNITARIOS
vaciado camisa
9 274A 17-Jul 18 9.6 5.09 7 1.91
13 272A 19-Jul 17.9 9.6 5.06 7 1.94
23 271A 2-Aug 18 14.4 5.09 6.5 1.41
26 271B 5-Aug 18 9.6 5.09 6.75 1.66
27 183B 5-Aug 17.9 9.6 5.06 8.5 3.44
31 272B 8-Aug 18 14.4 5.09 6.75 1.66
32 183A 8-Aug 17.9 9.6 5.06 6.5 1.44
33 273B 9-Aug 18 9.6 5.09 6.75 1.66
36 182B 10-Aug 17.9 9.6 5.06 6.5 1.44
37 180B 12-Aug 17.9 9.6 5.06 8.5 3.44
38 181B 12-Aug 17.9 9.6 5.06 8.5 3.44
43 273A 15-Aug 18 16.8 5.09 6.75 1.66
47 182A 17-Aug 17.9 9.6 5.06 6.5 1.44
62 181A 29-Aug 17.9 9.6 5.06 7 1.94
71 180A 31-Aug 17.9 9.6 5.06 7 1.94
220 86B 26-Nov 18.4 9.6 5.2 6.75 1.55
221 84B 26-Nov 18.4 9.6 5.2 6.75 1.55
222 86A 27-Nov 18.5 9.6 5.23 6.75 1.52
223 84A 27-Nov 18.4 9.6 5.2 6.75 1.55
224 85B 27-Nov 18.4 9.6 5.2 6.75 1.55
225 85A 28-Nov 18.5 9.6 5.23 6.75 1.52
226 83B 28-Nov 18.4 9.6 5.2 6.75 1.55
227 82A 28-Nov 18.4 9.6 5.2 7 1.8
230 82B 29-Nov 18.5 9.6 5.23 6.75 1.52
231 83A 29-Nov 18.5 9.6 5.23 6.75 1.52
Sobrevolumen 34%
RIOS ACUMULADOS Ubicación
37.52% 45.57 60.00 14.43 31.67% Caja
38.34% 65.81 88.00 22.19 33.72% Caja
27.70% 121.67 162.75 41.08 33.76% Caja
32.61% 136.94 183 46.06 33.64% Caja
67.98% 142 191.5 49.5 34.86% Caja
32.61% 162.33 217.75 55.42 34.14% Caja
28.46% 167.39 224.25 56.86 33.97% Caja
32.61% 172.48 231 58.52 33.93% Caja
28.46% 187.69 251 63.31 33.73% Caja
67.98% 197.3 266 68.7 34.82% Caja
67.98% 202.36 274.5 72.14 35.65% Caja
32.61% 227.78 308.25 80.47 35.33% Caja
28.46% 248.02 334.25 86.23 34.77% Caja
38.34% 326.31 440.5 114.19 34.99% Caja
38.34% 373.06 503.5 130.44 34.96% Caja
29.81% 1146.91 1568.25 421.34 36.74% Caja
29.81% 1152.11 1575 422.89 36.71% Caja
29.06% 1157.34 1581.75 424.41 36.67% Caja
29.81% 1162.54 1588.5 425.96 36.64% Caja
29.81% 1167.74 1595.25 427.51 36.61% Caja
29.06% 1172.97 1602 429.03 36.58% Caja
29.81% 1178.17 1608.75 430.58 36.55% Caja
34.62% 1183.37 1615.75 432.38 36.54% Caja
29.06% 1199.12 1636.25 437.13 36.45% Caja
29.06% 1204.35 1643 438.65 36.42% Caja
El pedido fue de 8 m3, se emplearon 1,25 m3 para solado.
UNITARIOS ACUM
Fecha de
Consecutivo Identificación Volumen Volumen Sobre % Sobre Volumen
vaciado
teórico empleado volumen volumen teórico
1 267 20-Sep 2.4 2.5 0.1 4.17% 2.4
2 269 20-Sep 2.4 2.5 0.1 4.17% 4.8
3 243 23-Sep 2.4 2.5 0.1 4.17% 7.2
4 244 23-Sep 2.4 2.5 0.1 4.17% 9.6
5 240 24-Sep 2.4 2.5 0.1 4.17% 12
6 241 24-Sep 2.4 2.5 0.1 4.17% 14.4
7 266 26-Sep 3.3 3.5 0.2 6.06% 17.7
8 268 26-Sep 3.3 3.5 0.2 6.06% 21
9 270 27-Sep 3.5 3.75 0.25 7.14% 24.5
10 237 2-Oct 2.4 2.5 0.1 4.17% 26.9
11 238 2-Oct 2.4 2.5 0.1 4.17% 29.3
12 239' 2-Oct 2.4 2.5 0.1 4.17% 31.7
13 239'' 11-Oct 2.4 2.5 0.1 4.17% 34.1
14 242 11-Oct 2.4 3.5 1.1 45.83% 36.5
15 171 22-Oct 2.4 2.5 0.1 4.17% 38.9
16 172 22-Oct 2.4 2.5 0.1 4.17% 41.3
17 173 22-Oct 2.4 2.5 0.1 4.17% 43.7
18 174 22-Oct 2.4 2.5 0.1 4.17% 46.1
19 175 25-Oct 2.4 2.5 0.1 4.17% 48.5
20 176 25-Oct 2.4 2.5 0.1 4.17% 50.9
21 177 28-Oct 2.4 2.5 0.1 4.17% 53.3
22 178 29-Oct 2.4 3 0.6 25.00% 55.7
23 179 31-Oct 2.4 2.5 0.1 4.17% 58.1
24 188 27-Nov 2.4 2.5 0.1 4.17% 60.5
25 189 27-Nov 2.4 2.5 0.1 4.17% 62.9
26 186 30-Nov 3.2 3.25 0.05 1.56% 66.1
27 187 30-Nov 3.2 3.25 0.05 1.56% 69.3
28 214 3-Dec 2.4 2.5 0.1 4.17% 71.7
29 215 3-Dec 2.4 2.5 0.1 4.17% 74.1
30 216 3-Dec 2.4 2.5 0.1 4.17% 76.5
31 217 6-Dec 2.4 2.5 0.1 4.17% 78.9
32 218 6-Dec 2.4 2.5 0.1 4.17% 81.3
33 162 11-Dec 2.4 2.5 0.1 4.17% 83.7
34 163 11-Dec 2.4 2.5 0.1 4.17% 86.1
35 160 13-Dec 2.4 2.5 0.1 4.17% 88.5
36 161 13-Dec 2.4 2.5 0.1 4.17% 90.9
37 185 14-Dec 2.4 2.5 0.1 4.17% 93.3
38 223 14-Dec 2.4 2.5 0.1 4.17% 95.7
39 224 14-Dec 2.4 2.5 0.1 4.17% 98.1
40 158 17-Dec 2.4 2.5 0.1 4.17% 100.5
41 159 17-Dec 2.4 2.5 0.1 4.17% 102.9
42 221 17-Dec 2.4 2.5 0.1 4.17% 105.3
43 222 17-Dec 2.4 2.5 0.1 4.17% 107.7
44 220 19-Dec 2.4 2.5 0.1 4.17% 110.1
45 156 19-Dec 2.4 2.5 0.1 4.17% 112.5
46 157 19-Dec 2.4 2.5 0.1 4.17% 114.9
47 184 20-Dec 2.4 2.5 0.1 4.17% 117.3
48 219 20-Dec 2.4 2.5 0.1 4.17% 119.7
49 155 28-Dec 2.4 2.5 0.1 4.17% 122.1
50 198 3-Jan 2.4 2.5 0.1 4.17% 124.5
51 199 3-Jan 2.4 2.5 0.1 4.17% 126.9
52 200 4-Jan 2.4 2.5 0.1 4.17% 129.3
53 201 4-Jan 2.4 2.5 0.1 4.17% 131.7
54 153 7-Jan 2.4 2.5 0.1 4.17% 134.1
55 154 7-Jan 2.4 2.5 0.1 4.17% 136.5
56 202 8-Jan 2.4 2.5 0.1 4.17% 138.9
57 213 9-Jan 2.4 2.5 0.1 4.17% 141.3
58 212 10-Jan 2.4 2.5 0.1 4.17% 143.7
59 197 11-Jan 2.4 2.5 0.1 4.17% 146.1
60 152 13-Jan 2.4 2.5 0.1 4.17% 148.5
61 203 13-Jan 2.4 2.5 0.1 4.17% 150.9
62 210 13-Jan 2.4 2.5 0.1 4.17% 153.3
63 211 13-Jan 2.4 2.5 0.1 4.17% 155.7
64 151 14-Jan 2.4 2.5 0.1 4.17% 158.1
65 209 14-Jan 2.4 2.5 0.1 4.17% 160.5
66 204 15-Jan 2.4 2.5 0.1 4.17% 162.9
67 205 17-Jan 2.4 2.5 0.1 4.17% 165.3
68 206 18-Jan 2.4 2.5 0.1 4.17% 167.7
69 150 20-Jan 2.4 2.5 0.1 4.17% 170.1
70 208 20-Jan 2.4 2.5 0.1 4.17% 172.5
71 149 21-Jan 2.4 2.5 0.1 4.17% 174.9
72 207 23-Jan 2.4 2.5 0.1 4.17% 177.3
73 148 27-Jan 2.4 2.5 0.1 4.17% 179.7
74 39 29-Jan 2.4 2.5 0.1 4.17% 182.1
75 146 29-Jan 2.4 2.5 0.1 4.17% 184.5
76 147 29-Jan 2.4 2.5 0.1 4.17% 186.9
77 40 30-Jan 2.4 2.5 0.1 4.17% 189.3
78 51 31-Jan 2.4 2.5 0.1 4.17% 191.7
79 52 31-Jan 2.4 2.5 0.1 4.17% 194.1
80 145 1-Feb 2.4 2.5 0.1 4.17% 196.5
81 53 3-Feb 2.4 2.5 0.1 4.17% 198.9
82 41 4-Feb 2.4 2.5 0.1 4.17% 201.3
83 42 4-Feb 2.4 2.5 0.1 4.17% 203.7
84 54 4-Feb 2.4 2.5 0.1 4.17% 206.1
85 144 4-Feb 2.4 2.5 0.1 4.17% 208.5
86 43 5-Feb 2.4 2.5 0.1 4.17% 210.9
87 55 5-Feb 2.4 2.5 0.1 4.17% 213.3
88 143 7-Feb 2.4 2.5 0.1 4.17% 215.7
89 56 8-Feb 2.4 2.5 0.1 4.17% 218.1
90 45 11-Feb 2.4 2.5 0.1 4.17% 220.5
91 142 11-Feb 2.4 2.5 0.1 4.17% 222.9
92 44 12-Feb 2.4 2.5 0.1 4.17% 225.3
93 46 12-Feb 2.4 2.5 0.1 4.17% 227.7
94 57 12-Feb 2.4 2.5 0.1 4.17% 230.1
95 141 12-Feb 2.4 2.5 0.1 4.17% 232.5
96 50 13-Feb 2.4 2.5 0.1 4.17% 234.9
97 58 13-Feb 2.4 2.5 0.1 4.17% 237.3
98 140 15-Feb 2.4 2.5 0.1 4.17% 239.7
99 139 17-Feb 2.4 2.5 0.1 4.17% 242.1
100 49 18-Feb 2.4 2.5 0.1 4.17% 244.5
101 137 19-Feb 2.4 2.5 0.1 4.17% 246.9
102 138 19-Feb 2.4 2.5 0.1 4.17% 249.3
103 47 19-Feb 2.4 2.5 0.1 4.17% 251.7
104 59 19-Feb 2.4 2.5 0.1 4.17% 254.1
105 48 20-Feb 2.4 2.5 0.1 4.17% 256.5
106 136 20-Feb 2.4 2.5 0.1 4.17% 258.9
107 135 21-Feb 2.4 2.5 0.1 4.17% 261.3
108 60 21-Feb 2.4 2.5 0.1 4.17% 263.7
109 38 24-Feb 2.4 2.5 0.1 4.17% 266.1
110 134 24-Feb 2.4 2.5 0.1 4.17% 268.5
111 61 24-Feb 2.4 2.5 0.1 4.17% 270.9
112 133 25-Feb 2.4 2.5 0.1 4.17% 273.3
113 37 25-Feb 2.4 2.5 0.1 4.17% 275.7
114 62 26-Feb 2.4 2.5 0.1 4.17% 278.1
115 36 27-Feb 2.4 2.5 0.1 4.17% 280.5
116 132 28-Feb 2.4 2.5 0.1 4.17% 282.9
117 35 29-Feb 2.4 2.5 0.1 4.17% 285.3
118 63 2-Mar 2.4 2.5 0.1 4.17% 287.7
119 131 2-Mar 2.4 2.5 0.1 4.17% 290.1
120 130 3-Mar 2.4 2.5 0.1 4.17% 292.5
121 30 4-Mar 2.4 2.5 0.1 4.17% 294.9
122 29 5-Mar 2.4 2.5 0.1 4.17% 297.3
123 31 6-Mar 2.4 2.5 0.1 4.17% 299.7
124 32 11-Mar 2.4 2.5 0.1 4.17% 302.1
125 33 12-Mar 2.4 2.5 0.1 4.17% 304.5
126 34 14-Mar 2.4 2.5 0.1 4.17% 306.9
0 0.00%
0 0.00%
0 0.00%
0 0.00%
0 0.00%
0 0.00%
306.9 321.25 4.68%
ACUMULADOS
Volumen Sobre % Sobre
empleado volumen volumen
2.50 0.10 4.17%
5.00 0.20 4.17%
7.50 0.30 4.17%
10.00 0.40 4.17%
12.50 0.50 4.17%
15.00 0.60 4.17%
18.50 0.80 4.52%
22.00 1.00 4.76%
25.75 1.25 5.10%
28.25 1.35 5.02%
30.75 1.45 4.95%
33.25 1.55 4.89%
35.75 1.65 4.84%
39.25 2.75 7.53%
41.75 2.85 7.33%
44.25 2.95 7.14%
46.75 3.05 6.98%
49.25 3.15 6.83%
51.75 3.25 6.70%
54.25 3.35 6.58%
56.75 3.45 6.47%
59.75 4.05 7.27%
62.25 4.15 7.14%
64.75 4.25 7.02%
67.25 4.35 6.92%
70.50 4.40 6.66%
73.75 4.45 6.42%
76.25 4.55 6.35%
78.75 4.65 6.28%
81.25 4.75 6.21%
83.75 4.85 6.15%
86.25 4.95 6.09%
88.75 5.05 6.03%
91.25 5.15 5.98%
93.75 5.25 5.93%
96.25 5.35 5.89%
98.75 5.45 5.84%
101.25 5.55 5.80%
103.75 5.65 5.76%
106.25 5.75 5.72%
108.75 5.85 5.69%
111.25 5.95 5.65%
113.75 6.05 5.62%
116.25 6.15 5.59%
118.75 6.25 5.56%
121.25 6.35 5.53%
123.75 6.45 5.50%
126.25 6.55 5.47%
128.75 6.65 5.45%
131.25 6.75 5.42%
133.75 6.85 5.40%
136.25 6.95 5.38%
138.75 7.05 5.35%
141.25 7.15 5.33%
143.75 7.25 5.31%
146.25 7.35 5.29%
148.75 7.45 5.27%
151.25 7.55 5.25%
153.75 7.65 5.24%
156.25 7.75 5.22%
158.75 7.85 5.20%
161.25 7.95 5.19%
163.75 8.05 5.17%
166.25 8.15 5.15%
168.75 8.25 5.14%
171.25 8.35 5.13%
173.75 8.45 5.11%
176.25 8.55 5.10%
178.75 8.65 5.09%
181.25 8.75 5.07%
183.75 8.85 5.06%
186.25 8.95 5.05%
188.75 9.05 5.04%
191.25 9.15 5.02%
193.75 9.25 5.01%
196.25 9.35 5.00%
198.75 9.45 4.99%
201.25 9.55 4.98%
203.75 9.65 4.97%
206.25 9.75 4.96%
208.75 9.85 4.95%
211.25 9.95 4.94%
213.75 10.05 4.93%
216.25 10.15 4.92%
218.75 10.25 4.92%
221.25 10.35 4.91%
223.75 10.45 4.90%
226.25 10.55 4.89%
228.75 10.65 4.88%
231.25 10.75 4.88%
233.75 10.85 4.87%
236.25 10.95 4.86%
238.75 11.05 4.85%
241.25 11.15 4.85%
243.75 11.25 4.84%
246.25 11.35 4.83%
248.75 11.45 4.83%
251.25 11.55 4.82%
253.75 11.65 4.81%
256.25 11.75 4.81%
258.75 11.85 4.80%
261.25 11.95 4.79%
263.75 12.05 4.79%
266.25 12.15 4.78%
268.75 12.25 4.78%
271.25 12.35 4.77%
273.75 12.45 4.76%
276.25 12.55 4.76%
278.75 12.65 4.75%
281.25 12.75 4.75%
283.75 12.85 4.74%
286.25 12.95 4.74%
288.75 13.05 4.73%
291.25 13.15 4.73%
293.75 13.25 4.72%
296.25 13.35 4.72%
298.75 13.45 4.71%
301.25 13.55 4.71%
303.75 13.65 4.71%
306.25 13.75 4.70%
308.75 13.85 4.70%
311.25 13.95 4.69%
313.75 14.05 4.69%
316.25 14.15 4.68%
318.75 14.25 4.68%
321.25 14.35 4.68%
Observaciones
El pedido fue de 4,75 m3 del cual se utilizó el restante para solado de vigas cabezal y foso en canal San Pablo.
El pedido para fondo fue de 4 m3, se emplearon 0,5 m3 en solado. En muro se pidieron 5 m3, de los cuales 1,4 m3 se emplear
El pedido para fondo fue de 3 m3 se emplearon 0,5 m3 en solado.
El pedido fue de 7,75 m3, de los cuales 5 m3 fueron para vigas cabezal, 2,45 m3 para fondo de viga u y 0,3 m3 para bordillo de
El pedido para fondo fue de 6 m3, se emplearon 2,5 en la viga cabezal 202, 2,45 m3 en la viga u y el resto en el solado de la vig
El pedido de fondo fueron 7,5 m3, de los cuales 2,5 se emplearon
en la viga cabezal 213. El pedido de muros del 198-201 fue de 5,5
m3 se emplearon 4,85 y 0,65 en solados.
El pedido para muro fue de 2,5 m3, se emplearon 0,5 m3 en solado.
El pedido para fondo fue de 9 m3, se emplearon 2 m3 en solados. El
pedido para muros fue de 5 m3, se emplea 1 m3 en solados.
El pedido para fondo fue de 6 m3 de los cuales 1 m3 se emplea en
solado. El pedido de muro fue de 6 m3, se emplearon 2,8 m3 en
solado.
Se emplearon 0,7 m3 en solado en la vaciada de fondo y 0,5 para solado en el vaciado del muro.
Para los muros de las v.u. 149-151 el pedido fue de 4 m3 se usaron 0,8 m3 en solado.
El pedido para muros 147-149 y 39-40 fue de 7 m3, se emplearon 2,05 m3 en solados.
El pedido fue de 5,75 m3 para viga cabezal y muro, se emplearon 1,65 m3 en solado.
El pedido fue de 7 m3, para viga cabezal y fondo, se emplearon 1 m3 en solados.
ue de 6,5 m3, se emplearon 1,5 m3 en solado. El pedido de muros fue de 4 m3, se emplearon 0,8 m3 en solado.
El pedido de fondo fue de 3 m3, se emplearon 0,5 m3 en atraques de tubería. El pedido muro fue de 3 m3, se emplearon 1,4 m
El pedido de fondo fue de 2,5 m3 se emplearon 0,75 m3 en solado.
El pedido de fondo fue de 4 m3, se emplearon 0,5 m3 en solado. El pedido de muro fue de 3 m3, se emplearon 1 m3 en solado
El pedido de fondo fue de 8 m3, se emplearon 1 m3 en atraques de
tubería, el pedido de muros fue de 5,75 m3 se emplearon 1,75 m3
en atraques de tubería.
cuales 1,4 m3 se emplearon en solado.
u y 0,3 m3 para bordillo de vigas cabezal y solado. El pedido de muros para 155-157 fue de 4 m3 de los cuales 0,7 m3 se emplearon en sola
resto en el solado de la viga cabezal 197.
traques de tubería. El total de pedido para vaciados del día fue de 15,5 m3, se emplearon 4,4 m3 en solados.
emplearon 1 m3 en solado.
m3 se emplearon en solado.
Identificación INSTALACIÓN DE ARENA INSTALACIÓN DE TUBERÍA
Consecutivo Longitud
Inicio Fin Fecha inicio Fecha fin Fecha inicio
El pedido fue de 7,5 m3, se emplearon 0,25 m3 en atraques de tubería para el tramo 208-212
El pedido fue de 4 m3, se emplearon 2,5 m3 en atraques de tubería para el tramo 208-212 y para fundir los muros faltantes de