Você está na página 1de 5

TES 8% 0.

08
M1 4 TRIMESTRES M2 2 SEMESTRES
TET 0.02

TET 4% 0.04 FORMULA


M1 4 TRIMESTREM2 24 QUICENAS (1+J/m1)^(m1/m2)-1
TASA 0.16 (1+(0.16/4)^(4/24)-1
0.00655819

JT

COMPROBACION
CAPITAL 4000 CAPITAL
TIEMPO 8 TRIMESTRES TIEMPO
TASA IC 0.04 TET TASA
4000(1+0.04)^8
5474.27
TASA Q 0.14 JB 0.14122977 100
M1 24 QUINCENAS M2 6 BIMESTRE
TEQ 0.00583333 TEB 0.0235383

(1+(0.14/24)^(24/6)-1
0.0235383

COMPROBACION
CAPITAL 3000 CAPITAL 3000
TIEMPO 144 TIEMPO 36
TASA 0.00583333 TASA 0.0235383
3000(1+0.0058333)^144 3000(1+0.0235383)^36
6932.12 6932.16

TASA M 0.2 JT 0.20335185 100


M1 12 M2 4 TRIMESTRES
TEM 0.01666667 TET 0.05083796

(1+(0.1666667/14)^(12/4)-1
0.05083796

COMPROBACION
CAPITAL 10000 CAPITAL 10000
TIEMPO 60 TIEMPO 20
TASA 0.01666667 TASA 0.05083796
10000(1+0.01666667)^60 10000(1+0.05083796)^20
26959.7 26959.69
FORMULA
(1+J/m1)^(m1/m2)-1
(1+(0.08/4))^(4/2)-1 COMPROBACION
0.0404 CAPITAL 4000
100 TIEMPO 8 TRIMESTRES
4.04 TES TASA 0.02

M=C(1+i)^n
4000(1+0.02)^8
MONTO 4686.63

CAPITAL 4000
TIEMPO 4
TASA 0.0404
MONTO 4000(1+0.0404)^4
4686.63

1+J/m1)^(m1/m2)-1
1+(0.16/4)^(4/24)-1
100 0.655819 TEQ

0.15739656

4000
48 QUINCENAS
0.00655819
4000(1+0.00655819)^48
5474.27
14.1229771

20.3351852

0000(1+0.05083796)^20

Você também pode gostar