3.0 Fundação
3.1 ESCAVAÇÃO M³ 3,38 (0,50*0,50*0,50)*4+(8,0
3.2 LASTRO M² 10,6 (0,50*0,50)*4+(8,0+8,0+
3.3 FÔRMA M² 23,2 (0,50*0,50)*4*4+(8,0+8
3.4 FERRAGEM KG 80 OBS: DADOS INFORMAD
3.5 CONCRETO M³ 3,38 (0,50*0,50*0,50)*4+(8,0
4.0 SUPERESTRUTURA
4.1 FÔRMA M² 11,52 (0,20*3*4*4)+(8,0+8,0+
4.2 FERRAGENS kg 200 OBS: DADOS INFORMAD
4.3 CONCRETO M³ 2,4 (0,20*0,20*3)*4+(0,30*
5.0 COBERTURA
5.1 ESTRUTURA DA COBERTURA M² 81 (9,00*9,00)
5.2 TELHA M² 81 (9,00*9,00)
5.3 CUMEEIRA M 9 (0,50+8,00+0,50)
7.0 REVESTIMENTO
7.1 CHAPISCO M² 208,22 (104,11*2)
7.2 EMBOÇO M² 208,22 (104,11*2)
7.3 REBOCO M² 160,22 208,22-(1,50*32)
7.4 REVESTIMENTO DE PAREDE CERÂMICO M² 46,65 (32)*1,5-(0,90*1,50)
8.0 PISO
11.0 FORRO
11.1 ESTRUTURA DO FORRO M² 64 (8,00*8,00)
11.2 FORRO M² 64 (8,00*8,00)
12.0 PINTURA
13.0 ENCERRAMENTO
13.1 LIMPEZA DA OBRA M² 64 (8,00*8,00)
(0,50*0,50*0,50)*4+(8,0+8,0+8,0+8,0)*0,30*0,30
(0,50*0,50)*4+(8,0+8,0+8,0+8,0)*0,30
(0,50*0,50)*4*4+(8,0+8,0+8,0+8,0)*0,30*2
OBS: DADOS INFORMADOS NO PROJETO
(0,50*0,50*0,50)*4+(8,0+8,0+8,0+8,0)*0,30*0,30
(0,20*3*4*4)+(8,0+8,0+8,0+8,0)*0,30*0,20
OBS: DADOS INFORMADOS NO PROJETO
(0,20*0,20*3)*4+(0,30*0,20*8)*4
(8,00+0,50+0,50)*(8,00*0,30)
(32)*3-(0,90*2,10)-(6,00*1,0)+((8,0*2,0)/2)*2
(8,00+8,00+8,00+8,00)*1,5-(0,90*0,60)-(6,00*1,00)+(8,00+8,00+8,00+8,00)*3-(0,90*2,10)-(6,00*1,00)+((8,00*2,00)/2)*2
(8,00+8,00+8,00+8,00)*1,5-(0,90*0,60)-(6,00*1,00)+(8,00+8,00+8,00+8,00)*3-(0,90*2,10)-(6,00*1,00)+((8,00*2,00)/2)*2
(8,00+8,00+8,00+8,00)*1,5-(0,90*0,60)-(6,00*1,00)+(8,00+8,00+8,00+8,00)*3-(0,90*2,10)-(6,00*1,00)+((8,00*2,00)/2)*2
00)+((8,00*2,00)/2)*2
00)+((8,00*2,00)/2)*2
00)+((8,00*2,00)/2)*2