Orcamento Meta DEL LAGO

Você também pode gostar

Fazer download em xlsx, pdf ou txt
Fazer download em xlsx, pdf ou txt
Você está na página 1de 26

ORÇAMENTO OBRA DEL LAGO PORTICO 1

CUSTO DIRETO

1 TRIBUTOS

0 TRIBUTOS

1 TRIBUTOS

2 ENCARGOS
4 FUNDAÇÃO
5 ESTRUTURA
6 ALVENARIAS/ PAREDES E PAINÉIS
7 ESQUADRIAS DE MADEIRA E FERRAGENS
8 ESQUADRIAS METÁLICAS E PVC
9 IMPERMEABILIZAÇÕES / COBERTURAS E TRATAMENTOS
10 REVESTIMENTOS INTERNOS
11 REVESTIMENTOS EXTERNOS
12 PISOS E RODAPÉS
13 PINTURA
14 PORCELANATO
15 LOUÇAS / METAIS E COMPLEMENTOS SANITÁRIOS
16 INSTALAÇÕES
17 SERVIÇOS COMPLEMENTARES
18 ELEVADORES
19 MÁRMORES E GRANITOS
20 LIMPEZA, RASPAGEM E CALAFATE
22 PROJETOS /LEGALIZ. / CONSULT./ SERV. TÉCNICOS E PRELIMINAREs
23 INSTALAÇÕES PROV./ IMPLANTAÇÃO DE CANTEIRO/ PROTEÇÕES
24 MÁQUINAS / EQUIPAMENTOS E FERRAMENTAS
25 ADMINISTRAÇÃO E OPERAÇÃO DE CANTEIRO
26 DESPESAS DE INCORPORAÇÃO
TOTAL

1 TRIBUTOS
2 ENCARGOS
O1

3,869,177.19 74%

- 0%

- 0%
66,659.84 1%
1,068,777.61 20%
173,686.96 3%
71,724.78 1%
650,291.92 12%
48,381.64 1%
93,900.97 2%
55,857.52 1%
60,807.09 1%
83,425.33 2%
218,561.15 4%
80,696.98 2%
803,686.90 15%
29,641.11 1%
124,738.50 2%
122,798.14 2%
8,128.24 0%
297,296.25 6%
127,934.35 2%
61,270.00 1%
551,311.10 11%
69,926.70 1%
5,228,429.23

0%
- 0%
ORÇAMENTO OBRA DEL LAGO PORTICO 1

ORÇAMENTO ANALÍTICO
1 Descrição Unidade

OBRA Descrição Unidade

ID Descrição Unidade Coef Qtd

OBRA CUSTO DIRETO


3.1 MOVIMENTO DE TERRA
3.1.1 MOBILIZAÇÃO DE EQUIPAMENTO VB 1.00 1.00
3.1.2 DESMONTE DE ROCHA M3 1.00 30.00
3.3 SERVIÇOES PRELIMINARES
3.3.1 SONDAGEM VB 1.00 1.00
3.3.2 TOPOGRAFIA VB 1.00 1.00
3.3.3 TOPOGRAFIA PÓS DEMOLIÇÃO VB 1.00 3.00
3.3.4 PROJETO PARA SISTEMA DE DRENAGEM VB 1.00 1.00
3.3.5 VISTORIA CAUTELAR DE VIZINHANÇA VB 1.00 1.00
3.3.6 TAPUME VB 1.00 1.00
PROJETO DE FUNDAÇÃOES VB 1.00 1.00
PROJETO E ISTALAÇÃO DE CANTEIRO VB 1.00 1.00
DEMOLIÇÕES COM RETIRADA DE RESIDUOS VB 1.00 1.00
REMOÇÕES DAS PALMEIRAS VB 1.00 50.00
REMOÇÕES DOS POSTES VB 1.00 30.00
REFAZER O MURO VB 1.00 1.00
4 FUNDAÇÃO
4.1 FUNDAÇÃO - MO
4.1.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MO M3 1.00 80.00
4.1.2 ARMAÇÃO PARA BLOCOS DE FUNDAÇÃO - MO KG 1.00 20,000.00
4.1.3 FORMAS PARA BLOCOS DE FUNDAÇÃO - MO M2 1.00 120.00
4.2 FUNDAÇÃO - MAT
4.2.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MAT M3 1.10 80.00
4.2.2 CONCRETO PARA LASTRO M3 1.10 12.00
4.2.3 TAXA DE BOMBEAMENTO M3 1.10 92.00
5.1 ESTRUTURA METÁLICA
5.1.1 ESTRUTURA METÁLICA KG 1.00 32,000.00
5.1.2 CONCRETO PARA SUPRA-ESTRUTURA FCK 35 - MO M3 1.00 99.14
5.1.3 CONCRETO PARA SUPRA-ESTRUTURA FCK 35 - MAT M3 1.05 99.14
5.1.4 TAXA DE BOMBEAMENTO M3 1.00 99.14
5.1.7 PINTURA INTUMESCENTE KG 1.00 32,000.00
6.2.1 BLOCO CERAMICO 9CM UN 11.88 4,720.90
ID Descrição Unidade Qtd
OBRA CUSTO DIRETO
6.2.2 ALVENARIA EM BLOCO DE CONCRETO (ARGAMASSA PRONTA) - MAT M2 1.00 160.02
6.2.2 BLOCO CONCRETO 9CM UN 11.88 -
6.2.2 BLOCO CONCRETO 14CM UN 11.88 1,900.99
6.2.2 TELA ARAME SOLDADO P/ AMARRAÇÃO 7,5CM PÇ 0.50 80.01
6.2.2 QUALIMASSA 50KG SC 0.59 94.41
6.3 DIVERSOS - ALVENARIAS
6.3.1 VERGAS / PILARETES / CINTAS - MAT M3 1.00 2.02
6.3.1 CIMENTO PORTLAND CPIII 40 RS (SACO 50KG) SC 6.55 13.24
6.3.1 PEDRA BRITADA Nº 2 M³ 0.62 1.25
6.3.1 AREIA MÉDIA LAVADA M³ 0.62 1.25
6.3.1 AÇO CA50 DIAM 6,3MM KG 3.00 6.07
6.4 VEDAÇÃO DIVERSA
6.4.1 PAREDE 1 ST/ 1 ST 95/70/600 MS + LÃ DE PET 50mm M2 1.00 165.64
6.4.2 PAREDE 1 ST/ 1 RU 95/70/400 MS + LÃ DE PET 50mm M2 1.00 198.43
6.4.3 PAREDE 1 ST/ 1 ST 95/70/600 MS + LÃ DE PET 50mm M2 1.00 69.70
6.4.4 PAREDE 1RU/1RU .../48+48/400 MS + 1 X LÃ DE PET 50MM M2 1.00 11.90
6.4.5 REVESTIMENTO 1RU 60,5/48/400 MS + LÃ DE PET 50MM) M2 1.00 10.62
6.4.6 REVESTIMENTO 1RU 60,5/48/400 MS + LÃ DE PET 50MM) ML 1.00 21.01
6.4.7 SEPTO 1ST/1ST 95/70/600 MS + LÃ DE PET 50MM (H=40CM) ML 1.00 3.70
6.4.8 CANTONEIRA PERFURADA PARA PROTEÇÃO DE ARESTAS VIVAS C/ 3,00M PÇ 1.00 41.00
6.4.9 REFORÇO PARA VÃOS DE PORTA < 1,00M (4 MONTANTES + 1/2 GUIA DE 70MM) UNID 1.00 32.00
6.4.10 REFORÇO PARA CHUVEIRO (2 MONTANTES DE 48MM) UNID 1.00 4.00
6.4.11 REFORÇO PARA CHUVEIRO (2 MONTANTES DE 70MM) UNID 1.00 6.00
6.4.12 FAIXA EM GESSO ACARTONADO 1ST (12,5MM) PARA ARREMATE DE TOPO DE ML 1.00 5.86
PAREDE
6.4.13 FAIXA EM GESSO ACARTONADO 1RU (12,5MM) PARA ARREMATE DE TOPO DE ML 1.00 24.24
PARED
6.4.14 SUPORTE DE CARGA 400MM PÇ 1.00 61.00
6.4.15 SUPORTE DE CARGA 600MM PÇ 1.00 4.00
7 ESQUADRIAS DE MADEIRA E FERRAGENS
7.1 ESQUADRIAS DE MADEIRA - PORTA PRONTA
7.1.1 KIT PORTA PRONTA ABRIR - MD01 - 0,60x2,10m (MAT) UNID 1.00 17.00
7.1.2 KIT PORTA PRONTA CORRER - MD01a - 0,65x2,10m (MAT) UNID 1.00 2.00
7.1.3 KIT PORTA PRONTA ABRIR - MD02 - 0,70x2,10m (MAT) UNID 1.00 13.00
7.1.4 KIT PORTA PRONTA ABRIR - MD05 - 0,70x2,10m (MAT) UNID 1.00 2.00
7.1.5 KIT PORTA PRONTA CORRER - MD06 - 0,70x2,10m (MAT) UNID 1.00 1.00
7.1.6 INSTALAÇÃO DE PORTA PRONTA DE ABRIR (MO) UNID 1.00 32.00
7.1.7 INSTALAÇÃO DE PORTA PRONTA DE CORRER (MO) UNID 1.00 3.00
7.1.8 PORTA MARCENARIA ABRIR - MD03 - 0,55x2,50m (MAT/MO) UNID 1.00 1.00
7.1.9 PORTA MACIÇA PIVOTANTE - MD04 - 0,80x2,06m (MAT/MO) UNID 1.00 4.00
7.1.10 PORTA MARCENARIA ABRIR - MD07 - 3,32x2,40m (MAT/MO) UNID 1.00 1.00
7.2 RODAPÉS EM MADEIRA
7.2.1 RODAPÉ EM MDF - MO M 1.00 323.20
7.2.2 RODAPÉ EM MDF - MAT M 1.05 323.20
7.3 FERRAGENS
7.3.1 FERRAGENS BRANCAS E FECHADURAS - MAT UNID 1.00 41.00
8 ESQUADRIAS METÁLICAS E PVC
8.1 ESQUADRIAS EM ALUMÍNIO
8.1.1 ESQUADRIAS EM ALUMÍNIO E VIDROS VB 1.00 1.00
8.1.2 CHUMBAÇÃO DE ESQUADRIAS DE ALUMÍNIO - MAT M2 1.00 70.00
8.1.3 RALOS SEKAPISO M 1.00 35.00
8.1.4 GRELHA DE GÁS VB 1.00 1.00
8.2 ESQUADRIAS EM FERRO
8.2.1 ESQUADRIAS EM FERRO - MO/MAT VB 1.00 1.00
8.2.2 PORTA CORTA FOGO - MO UNID 1.00 2.00
8.2.3 PORTA CORTA FOGO - MAT UNID 1.00 2.00
9 IMPERMEABILIZAÇÕES / COBERTURAS E TRATAMENTOS
9.1 IMPERMEABILIZAÇÕES
9.1.1 PREPARO DE SUPERFÍCIE M2 1.00 45.04
9.1.2 RECUPERAÇÃO DE SUBSTRATO M2 1.00 45.04
9.1.3 IMPERMEABILIZAÇÃO COM EPOXI BICOMPONENTE ISENTO DE SOLVENTES, M2 1.00 32.90
ESPESSUR
9.1.4 ARGAMASSA DE REGULARIZAÇÃO M2 1.00 237.89
9.1.5 MANTA 3MM - MO/MAT M2 1.00 237.89
9.1.6 MEMBRANA M2 1.00 54.58
9.1.7 PROTEÇÃO MECÂNICA DE PISO E RODAPÉS: CHAPISCO + TELA GALVANIZADA M2 1.00 237.89
9.1.8 ARGAMASSA DE PROTEÇÃO MECÂNICA M2 1.00 237.89
9.1.9 PINTURA DE BASE BETUMINOSA (ANTI-RAÍZ) M2 1.00 8.31
9.2 TRATAMENTOS
9.2.1 TRATAMENTO EM RALOS E VASOS EM EPOXI UNID 1.00 46.00
10 REVESTIMENTOS INTERNOS
10.1 REVESTIMENTOS INTERNOS EM MASSA - MO
10.1.1 CHAPISCO INTERNO ROLADO SOBRE ESTRUTURA (ARGAMASSA PRONTA) - MO M2 1.00 758.17
10.1.2 EMBOÇO PAULISTA (ARGAMASSA PRONTA) - MO M2 0.90 758.17
10.1.3 EMBOÇO PAULISTA (ARGAMASSA PRONTA) - FAIXA - MO M 0.33 758.17
10.2 REVESTIMENTOS INTERNOS EM MASSA - MAT
10.2.1 CHAPISCO FIXO M2 0.32 758.17
10.2.2 CHAPISCO INTERNO ROLADO SOBRE ESTRUTURA (ARGAMASSA PRONTA) - MAT M2 0.74 758.17
10.2.3 EMBOÇO PAULISTA (ARGAMASSA PRONTA) - MAT M2 1.05 758.17
10.3 REVESTIMENTOS EM GESSO
10.3.1 ESTUQUE EM GESSO (PAREDES / TETOS) M2 0.90 972.89
10.3.2 ESTUQUE EM GESSO (PAREDES / TETOS) - FAIXA M2 0.33 972.89
10.4 FORROS EM GESSO
10.4.1 FORRO EM GESSO (PLACAS) M2 1.00 648.62
11 REVESTIMENTOS EXTERNOS
11.1 REVESTIMENTOS EXTERNOS EM MASSA - MO
11.1.1 CHAPISCO EXTERNO (ARGAMASSA PRONTA) - MO M2 1.00 644.00
11.1.2 EMBOÇO PAULISTA EXTERNO (ARGAMASSA PRONTA) - MO M2 1.00 644.00
11.2 REVESTIMENTOS EXTERNOS EM MASSA - MAT
11.2.1 TELA DE POLIETILENO EXTRUDADO 20cm X 50m ROLO 0.02 13.00
11.2.2 CHAPISCO EXTERNO (ARGAMASSA PRONTA) - MAT M2 1.05 644.00
11.2.3 EMBOÇO PAULISTA EXTERNO (ARGAMASSA PRONTA) - MAT M2 1.05 644.00
11.3 DIVERSOS - REVESTIMENTOS EXTERNOS
11.3.1 LIMPEZA DE FACHADA VB 1.00 1.00
11.3.2 RUFO - MO M 1.00 9.00
11.3.3 RUFO - MAT M 1.00 9.00
12 PISOS E RODAPÉS
12.1 CONTRAPISO / REGULARIZAÇÕES - MO
12.1.1 CONTRAPISO (ARGAMASSA PRONTA) - MO M2 1.00 752.62
12.1.2 CONTRAPISO PARA ESCADAS - MO VÃO 1.00 5.00
12.1.3 CONTRAPISO QUEIMADO C/ TELA (ARGAMASSA PRONTA) - MO M2 1.00 36.81
12.2 CONTRAPISO / REGULARIZAÇÕES - MAT
12.2.1 BARRICA DE RHODOPAS 50KG KG 0.30 797.62
12.2.2 CONTRAPISO (ARGAMASSA PRONTA) - MAT M2 1.05 760.81
12.2.3 CONTRAPISO QUEIMADO C/ TELA (ARGAMASSA PRONTA) - MAT M2 1.05 36.81
13 PINTURA
13.1 PINTURA PVA
13.1.1 PINTURA PVA M2 1.00 1,692.57
13.2 PINTURA ACRÍLICA
13.2.1 PINTURA ACRÍLICA M2 1.00 218.63
13.3 PINTURAS ESPECIAIS
13.3.1 PINTURA TEXTURIZADA ROLADA (fachada fundos e prismas) M2 1.00 547.40
13.3.2 PINTURA EMALUX M2 1.00 227.62
13.3.3 PINTURA DE PCF UNID 1.00 3.00
13.3.4 PINTURA ÓLEO SOBRE ESQUADRIAS METÁLICAS M 1.00 43.00
13.3.5 PINTURA TEXTURIZADA IBRATIN / CIMENTICIA M2 1.00 96.60
13.3.6 PINTURA DEMARCAÇÃO DE VAGAS UNID 1.00 3.00
13.3.7 PINTURA TUBULAÇÃO APARENTE VB 1.00 1.00
13.3.8 PINTURA TAMPÕES UNID 1.00 3.00
14 ACABAMENTOS
14.1 PORCELANATO - MO
14.1.1 PISO PORCELANATO - MO M2 1.00 758.08
14.1.2 PAREDE PORCELANATO - MO M2 1.00 714.34
14.2 PORCELANATO - MAT
14.2.1 PISO PORCELANATO - MAT M2 1.00 758.08
14.2.1 PORCELANATO PIETRA DI FIRENZE 60X60 M2 1.05 299.27
14.2.1 PORCELANATO PIETRA DI FIRENZE 90X90 M2 1.10 268.58
14.2.1 PORCELANATO MINERAL NUDE 60X60 M2 1.05 190.23
14.2.2 PAREDE PORCELANATO - MAT M2 1.00 714.34
14.2.2 PORCELANATO CETIM BIANCO M2 1.05 714.34
14.2.3 ARGAMASSA COLANTE M2 1.00 1,472.42
14.2.4 REJUNTE M2 1.00 1,472.42
14.2.5 NIVELADORES / ESPAÇADORES VB 1.00 1.00
14.3 ACABAMENTOS ESPECIAIS
14.3.1 TRATAMENTO EM MEIA ESQUADRIA UNID. 1.00 14.00
15 LOUÇAS / METAIS E COMPLEMENTOS SANITÁRIOS
15.1 LOUÇAS
15.1.1 LOUÇAS VB 1.00 1.00
15.2 METAIS SANITÁRIOS
15.2.1 METAIS VB 1.00 1.00
16 INSTALAÇÕES
16.1 INSTALAÇÕES PREDIAIS
16.1.1 INSTALAÇÕES PREDIAIS - GLOBAL - (MO/MT) VB 1.00 1.00
16.1.2 AC E EXAUSTÃO VB 1.00 1.00
16.2 DIVERSOS - INSTALAÇÕES
16.2.1 INSTALAÇÃO DE PC VB 1.00 1.00
16.2.2 CAIXA D'ÁGUA DE PVC UNID 1.00 1.00
16.2.3 CHUMBAÇÕES E ARREMATES - MAT VB 1.00 1.00
16.3 INSTALAÇÕES ESPECIAIS
16.3.1 CABEAMENTO TELEFÔNICO - MO / MAT VB 1.00 1.00
17 SERVIÇOS COMPLEMENTARES
17.1 PAVIMENTAÇÃO
17.1.1 REBAIXAMENTO DE MEIO FIO VB 1.00 1.00
17.1.2 MEIO FIO M 1.00 10.10
17.1.3 PEDRA PORTUGUESA (MO/MAT) M2 1.00 10.00
17.2 DEMAIS SERVIÇOS
17.2.1 DUPLICADOR DE VAGAS VB 1.00 1.00
18 ELEVADORES
18.1 ELEVADORES
18.1.1 ELEVADORES VB 1.00 1.00
18.1.2 CHUMBAÇÃO DE MARCO DOS ELEVADORES - MO UNID 1.00 5.00
18.1.3 CHUMBAÇÃO DE MARCO DOS ELEVADORES - MAT UNID 1.00 5.00
19 MÁRMORES E GRANITOS
19.1 MÁRMORES E GRANITOS
19.1.1 MÁRMORES / GRANITOS - GLOBAL - MO VB 1.00 1.00
19.1.2 MÁRMORES / GRANITOS - GLOBAL - MAT VB 1.00 1.00
20 LIMPEZA, RASPAGEM E CALAFATE
20.1 LIMPEZA
20.1.1 CALAFATE E LIMPEZA VB 1.00 1.00
ID Descrição Unidade Coef Qtd
OBRA FUNDO MOBILIÁRIO
21 DESPESAS COM FUNDO PARA MOBILIÁRIOS E EQUIPAMENTOS PARTES COMUNS
21.1.1 PAISAGISMO VB 1.00 1.00
21.1.2 MARCENARIA VB 1.00 1.00
21.1.3 AUTOMAÇÃO VB 1.00 1.00
21.1.4 INTERFONIA VB 1.00 1.00
21.1.5 DUPLICADOR DE VAGAS VB 1.00 2.00
21.1.6 COMUNICAÇÃO VISUAL VB 1.00 1.00
ID Descrição Unidade Coef Qtd
OBRA CUSTO INDIRETO
22 PROJETOS /LEGALIZ. / CONSULT./ SERV. TÉCNICOS E PRELIMINAREs
22.1 PROJETOS
22.1.1 PROJETO EXECUTIVO ARQUITETÔNICO M2 1.00 900.86
22.1.2 PROJETO ESTRUTURAL VB 1.00 1.00
22.1.4 PROJETO DE PROTEÇÃO PASSIVA VB 1.00 1.00
22.1.5 PROJETO DE DRENAGEM VB 1.00 1.00
22.1.6 PROJETO DE INSTALAÇÕES VB 1.00 1.00
22.1.7 PROJETO INSTALAÇÃO CONTRA INCÊNDIO VB 1.00 1.00
22.1.8 PROJETO DE AR CONDICIONADO E EXAUSTÃO MECÂNICA VB 1.00 1.00
22.1.9 PROJETO DE ANCORAGEM VB 1.00 1.00
22.1.10 PROJETO DE DRYWALL VB 1.00 1.00
22.1.11 PROJETO DE DECORAÇÃO VB 1.00 1.00
22.2 CONSULTORIAS
22.2.1 CONSULTORIA DE ESQUADRIA DE ALUMÍNIO VB 1.00 1.00
22.3 SERVIÇOS TECNICOS
22.3.1 CONTROLE TECNOLOGICO DO CONCRETO CP 1.00 75.00
23 INSTALAÇÕES PROV./ IMPLANTAÇÃO DE CANTEIRO/ PROTEÇÕES
23.1 SERVIÇOS EXTRAS
23.1.1 RECOMPOSIÇÕES EM VIZINHOS VB 1.00 1.00
23.2 INSTALAÇÕES PROVISORIAS
23.2.1 INSTALAÇÕES PROVIS. ELET VB 1.00 1.00
23.2.2 INSTALAÇÕES PROVIS. HID. VB 1.00 1.00
23.2.3 INSTALAÇÕES PROVIS. ESG. VB 1.00 1.00
23.2.4 INSTALAÇÕES PROVIS. INCEN. VB 1.00 1.00
23.2.5 MONITORAMENTO CFTV PROVISÓRIO VB 1.00 1.00
23.3 IMPLANTAÇÃO DE CANTEIRO
23.3.1 LOCAÇÃO DE OBRA / TOPOGRAFIA M 1.00 60.00
23.3.2 PLACA CET-RIO VB 1.00 1.00
23.3.3 TAPUME M 1.00 111.10
23.3.4 BEBEDOURO VB 1.00 1.00
23.3.5 PLACAS DE OBRA VB 1.00 1.00
23.3.6 BARRACAO DE OBRAS VB 1.00 1.00
23.4 PROTEÇÕES
23.4.1 PROTEÇÃO COLETIVA M 1.00 118.00
23.4.2 PROTEÇÃO EM TELA EM NYLON P/ FACHADAS - MAT (ROLO 3x100m) ROLO 1.00 1.00
23.4.3 PROTEÇÃO PARA PISOS - MAT M2 1.05 706.88
24 MÁQUINAS / EQUIPAMENTOS E FERRAMENTAS
24.1 MÁQUINAS
24.1.1 MÁQUINAS / EQUIPAMENTOS DE OBRA (DIVERSOS) MÊS 1.00 8.00
24.1.2 MANUTENÇAO DE EQUIPAMENTOS MÊS 1.00 8.00
24.2 FERRAMENTAS
24.2.1 FERRAMENTAS VB 1.00 22.00
24.3 ANDAIMES / JAHUS
24.3.1 ANDAIMES SUSPENSO LEVE VB 1.00 8.00
25 ADMINISTRAÇÃO E OPERAÇÃO DE CANTEIRO
25.1 ADMINISTRAÇÃO / PRODUÇÃO
25.1.1 SERVIÇOS ADMINISTRATIVO FIXO MÊS 1.00 22.00
25.1.2 VIGIA MÊS 1.00 22.00
25.1.3 EQUIPE PRODUÇÃO (ENCARREGADO / SERVENTE / CARPINTEIRO / ELETRICISTA / MÊS 1.00 22.00
BOM
25.1.4 VT E VR (PRODUÇÃO) MÊS 1.00 22.00
25.2 CONTAS
25.2.1 CONSUMO DE LUZ MÊS 1.00 22.00
25.2.2 CONSUMO DE ÁGUA MÊS 1.00 22.00
25.3 CONTAS DIVERSAS
25.3.1 PROVEDOR INTERNET + TELEFONE MÊS 1.00 22.00
25.4 CONSUMOS DIVERSOS
25.4.1 CÓPIAS MÊS 1.00 22.00
25.4.2 CAIXINHA DE OBRA MÊS 1.00 22.00
25.4.3 MATERIAL DE CONSUMO DE ESCRITORIO MÊS 1.00 22.00
25.4.4 MATERIAL DE MANUTENÇÃO INSTALAÇÕES PROVISÓRIAS MÊS 1.00 22.00
25.4.5 RETIRADA DE ENTULHO UNID 1.00 96.00
25.4.6 FRETES E CARRETOS VB 1.00 2.00
25.4.7 COMPUTADOR / IMPRESSORA / TELEFONE MÊS 1.00 22.00
25.5 HIGIENE E SEGURAÇA DO TRABALHO
25.5.1 UNIFORME / EPI / SEGURANÇA DO TRABALHO MÊS 1.00 22.00
25.5.2 DEDETIZAÇÃO / DESRATIAÇÃO DURANTE A OBRA VB 1.00 1.00
25.5.3 MEDICAMENTOS DE EMERGÊNCIA VB 1.00 1.00
25.5.4 HIGIENE / LIMPEZA (MATERIAL DE CONSUMO) MÊS 1.00 22.00
26 DESPESAS DE INCORPORAÇÃO ( CND, LD, SEGURO E CONTABILIDADE)
26.1 DESPESAS DE INCORPORAÇÃO ( CND, LD E SEGURO)
26.1.1 CND / LICENÇAS VB 1.00 1.00
26.1.2 CARTÓRIO VB 1.00 1.00
26.1.3 SEGUROS VB 1.00 1.00
26.2 CONTABILIDADE
26.2.1 CONTABILIDADE VB 1.00 22.00
ID Descrição Unidade Coef Qtd
OBRA EVENTUAIS
27 EVENTUAIS
27.1 EVENTUAIS
27.1.1 EVENTUAIS VB 0.03 1.00
O1

RASO
R$ 5.126.257,35

Valor Previsto

3,869,177.19
59,462.50
16,000.00 16,000.00
1,448.75 43,462.50
921,000.00
40,000.00 40,000.00
5,000.00 5,000.00
5,000.00 15,000.00
12,000.00 12,000.00
10,000.00 10,000.00
112,000.00 112,000.00
18,000.00 18,000.00
82,000.00 82,000.00
142,000.00 142,000.00
4,000.00 200,000.00
600.00 18,000.00
267,000.00 267,000.00
1,261,177.61
116,000.00
120.00 9600.00
4.00 80,000.00
220.00 26,400.00
76,400.00
750.00 60,000.00
600.00 7200.00
100.00 9200.00
1,068,777.61
23.75 760,000.00
36.90 3,658.27
375.00 37,177.50
35.00 3,469.90
3.50 112,000.00
1.61 7,600.65
Valor 23,452.94
792.59
40.27 6,443.72
2.09 -
2.59 4,923.57
1.30 104.01
15.00 1,416.14
664.33
328.55 664.33
26.00 344.35
126.00 157.96
90.00 112.83
8.11 49.20
67,738.01
107.35 17,781.45
114.00 22,621.02
107.35 7,482.30
142.50 1,695.75
90.25 958.46
90.25 1,896.15
107.35 397.20
42.75 1,752.75
190.00 6,080.00
76.00 304.00
95.00 570.00
38.00 222.68
42.75 1,036.26
76.00 4,636.00
76.00 304.00
71,724.78
49,299.74
525.93 8,940.80
845.29 1,690.58
529.39 6,882.04
529.39 1,058.78
845.29 845.29
84.55 2,705.60
407.55 1,222.65
3,021.00 3,021.00
1,900.00 7,600.00
15,333.00 15,333.00
11,605.14
10.98 3,548.74
23.74 8,056.41
10,819.90
263.90 10,819.90
650,291.92
616,245.92
608,818.52 608,818.52
30.37 2,125.90
122.90 4,301.50
1,000.00 1,000.00
34,046.00
32,623.00 32,623.00
161.50 323.00
550.00 1,100.00
48,381.64
47,415.64
14.00 630.57
14.00 630.57
92.00 3,026.43
25.75 6,125.67
90.29 21,479.09
81.00 4,420.98
20.09 4,779.21
25.75 6,125.67
23.76 197.45
966.00
21.00 966.00
93,900.97
32,625.49
8.63 6,543.04
32.25 22,006.00
16.13 4,076.45
8,203.63
2.70 644.83
1.85 1,030.93
8.20 6,527.88
27,799.90
26.64 23,324.07
13.80 4,475.83
25,271.95
38.96 25,271.95
55,857.52
44,397.36
15.05 9,692.20
53.89 34,705.16
7,640.81
65.00 845.00
1.85 1,250.97
8.20 5,544.84
3,819.35
3,000.00 3,000.00
34.14 307.26
56.90 512.09
60,807.09
33,147.22
32.25 24,272.00
1,500.00 7,500.00
37.36 1,375.22
27,659.87
8.50 2,033.06
29.60 23,645.97
51.25 1,980.84
83,425.33
43,837.49
25.90 43,837.49
6,755.67
30.90 6,755.67
32,832.18
30.90 16,914.66
30.90 7,033.58
140.00 420.00
27.00 1,161.00
30.90 2,984.94
65.00 195.00
3,973.00 3,973.00
50.00 150.00
218,561.15
59,368.10
40.32 30,565.79
40.32 28,802.31
150,793.06
106.13 80,458.04
81.41 25,581.75
110.70 32,704.99
111.00 22,171.31
59.94 42,820.93
57.09 42,820.93
9.50 13,988.02
5.00 7,362.12
6,163.95 6,163.95
8,400.00
600.00 8,400.00
80,696.98
31,689.40
31,689.40 31,689.40
49,007.58
49,007.58 49,007.58
803,686.90
784,511.90
727,688.60 727,688.60
56,823.30 56,823.30
15,175.00
9,975.00 9,975.00
2,700.00 2,700.00
2,500.00 2,500.00
4,000.00
4,000.00 4,000.00
29,641.11
9,691.11
1,200.00 1,200.00
438.26 4,426.43
406.47 4,064.68
19,950.00
19,950.00 19,950.00
124,738.50
124,738.50
123,338.50 123,338.50
130.00 650.00
150.00 750.00
122,798.14
122,798.14
40,932.71 40,932.71
81,865.43 81,865.43
8,128.24
8,128.24
8,128.24 8,128.24
Valor Previsto
102,171.88
102,171.88
10,000.00 10,000.00
10,000.00 10,000.00
25,097.80 25,097.80
4,791.08 4,791.08
19,950.00 39,900.00
8,600.00 8,600.00
Valor Previsto
1,107,738.39
297,296.25
278,850.00
106.56 96,000.00
67,700.00 67,700.00
5,500.00 5,500.00
5,000.00 5,000.00
31,000.00 31,000.00
6,000.00 6,000.00
6,000.00 6,000.00
5,000.00 5,000.00
16,650.00 16,650.00
40,000.00 40,000.00
15,000.00
15,000.00 15,000.00
3,446.25
45.95 3,446.25
127,934.35
10,000.00
10,000.00 10,000.00
20,115.00
7,000.00 7,000.00
6,000.00 6,000.00
2,000.00 2,000.00
2,000.00 2,000.00
3,115.00 3,115.00
77,454.00
93.45 5,607.00
1,700.00 1,700.00
190.00 21,109.00
1,600.00 1,600.00
3,000.00 3,000.00
37,000.00 37,000.00
20,365.35
120.00 14,160.00
750.00 750.00
7.35 5,455.35
61,270.00
19,910.00
2,262.50 18,100.00
226.25 1,810.00
4,400.00
200.00 4,400.00
36,960.00
4,620.00 36,960.00
551,311.10
388,031.10
7,200.00 158,400.00
1,351.22 29,726.84
6,032.23 132,709.06
3,054.33 67,195.20
51,700.00
850.00 18,700.00
1,500.00 33,000.00
2,640.00
120.00 2,640.00
49,240.00
300.00 6,600.00
200.00 4,400.00
110.00 2,420.00
100.00 2,200.00
280.00 26,880.00
1,500.00 3,000.00
170.00 3,740.00
59,700.00
2,500.00 55,000.00
2,200.00 2,200.00
300.00 300.00
100.00 2,200.00
69,926.70
43,526.70
36,966.70 36,966.70
1,600.00 1,600.00
4,960.00 4,960.00
26,400.00
1,200.00 26,400.00
Valor Previsto
149,341.77
149,341.77
149,341.77
149,341.77 149,341.77
ORÇAMENTO OBRA DEL LAGO PORTICO 1

ORÇAMENTO ANALÍTICO
ID Descrição Unidade Coef Qtd Valor Previsto

OBRA CUSTO TOTAL R$ 6,395,328.00

1 ADMINISTRAÇÃO/SERVIÇOS PRELIMINARES R$ 2,186,756.00


1.1 STAFF VB 1.00 1.00 252,000.00 R$ 252,000.00
1.2 DESPESAS INICIAIS DE MOBILIZAÇÃO VB 1.00 1.00 40,000.00 R$ 40,000.00
1.3 SONDAGEM VB 1.00 1.00 40,000.00 R$ 40,000.00
1.4 TOPOGRAFIA VB 1.00 1.00 5,000.00 R$ 5,000.00
1.5 TOPOGRAFIA PÓS DEMOLIÇÃO VB 1.00 3.00 5,000.00 R$ 15,000.00
1.6 PROJETO PARA SISTEMA DE DRENAGEM VB 1.00 1.00 12,000.00 R$ 12,000.00
1.7 VISTORIA CAUTELAR DE VIZINHANÇA VB 1.00 1.00 10,000.00 R$ 10,000.00
1.8 FORNECIMENTO E INSTALAÇÃO DE TAPUME VB 1.00 1.00 112,000.00 R$ 112,000.00
1.9 PROJETO DE FUNDAÇÃOES VB 1.00 1.00 18,000.00 R$ 18,000.00
1.10 PROJETO, INSTALAÇÃO E MANUTENÇÃO DE CANTEIRO VB 1.00 1.00 181,000.00 R$ 181,000.00
1.11 DEMOLIÇÕES COM RETIRADA DE RESIDUOS VB 1.00 1.00 220,000.00 R$ 220,000.00
1.12 REMOÇÕES DAS PALMEIRAS VB 1.00 50.00 2,500.00 R$ 125,000.00
1.13 REALOÇÕES DAS PALMEIRAS VB 1.00 50.00 4,000.00 R$ 200,000.00
1.14 REMOÇÕES DOS POSTES VB 1.00 30.00 2,000.00 R$ 60,000.00
1.15 REALOCAÇÃO DOS POSTES VB 1.00 30.00 1,200.00 R$ 36,000.00
1.16 DEMOLIÇÃO E REPAROS DOS MUROS E GRADES VB 1.00 1.00 571,000.00 R$ 571,000.00
1.17 SISTEMA AUTOMATIZADO FURA PNEUS VB 1.00 1.00 60,000.00 R$ 60,000.00
1.18 CONTROLE TECNOLOGICO DO CONCRETO CP 1.00 200.00 100.00 R$ 20,000.00
1.19 SEGURO VB 1.00 1.00 18,000.00 R$ 18,000.00
1.20 UNIFORME, EPI, BEBEDOURO E CAIXA PEQUENO VB 1.00 1.00 46,430.00 R$ 46,430.00
1.21 LIMPEZA FINAL DE OBRA VB 1.00 1.00 25,326.00 R$ 25,326.00
1.22 GARANTIAS E INCIDENTES EVENTUAIS VB 1.00 1.00 120,000.00 R$ 120,000.00

2 FUNDAÇÃO R$ 1,331,200.00
2.1 FUNDAÇÃO - MO R$ 374,000.00
2.1.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MO M3 1.00 240.00 120.00 R$ 28,800.00
2.1.2 ARMAÇÃO PARA BLOCOS DE FUNDAÇÃO - MO KG 1.00 72,000.00 4.00 R$ 288,000.00
2.1.3 FORMAS PARA BLOCOS DE FUNDAÇÃO - MO M2 1.00 260.00 220.00 R$ 57,200.00
2.2 FUNDAÇÃO - MAT R$ 957,200.00
2.2.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MAT M3 1.10 240.00 850.00 R$ 204,000.00
2.2.2 CONCRETO PARA LASTRO M3 1.10 60.00 600.00 R$ 36,000.00
2.2.3 TAXA DE BOMBEAMENTO M3 1.10 300.00 100.00 R$ 30,000.00
2.2.4 AÇO KG 1.00 90,000.00 7.00 R$ 630,000.00
2.2.5 FORMAS (PREGOS+ COMPENSADO+CAIBROS+ TABUAS) M2 1.00 260.00 220.00 R$ 57,200.00

3 PAVIMENT., IRRIGAÇÃO, ILUM. E DRENAGEM R$ 1,716,252.00


3.1 REBAIXAMENTO DE MEIO FIO VB 1.00 1.00 5,252.00 R$ 5,252.00
3.2 MEIO FIO M 1.00 200.00 750.00 R$ 150,000.00
3.3 INTERTRAVADO 16 FACES (MO/MAT) M2 1.00 2000.00 600.00 R$ 1,200,000.00
3.4 CBUQ M2 1.00 1000.00 300.00 R$ 300,000.00
3.5 IRRIGAÇÃO VB 1.00 1.00 25,000.00 R$ 25,000.00
3.6 ILUMINAÇÃO VB 1.00 1.00 36,000.00 R$ 36,000.00

4 LAGO - RECONSTR. E IMPERMEABILIZAÇÃO R$ 82,000.00


4.1 REFAZER O LAGO CONFORME PROJETO VB 1.00 1.00 82,000.00 R$ 82,000.00

5 CONSTRUÇÃO R$ 1,079,120.00
5.1 PORTICO VB 1.00 1.00 560,000.00 R$ 560,000.00
5.2 TOTEM VB 1.00 1.00 182,000.00 R$ 182,000.00
5.3 CABINE VB 1.00 36.00 5,000.00 R$ 180,000.00
5.4 INFRA VB 1.00 1.00 52,000.00 R$ 52,000.00
5.5 INSTALAÇÕES VB 1.00 1.00 47,000.00 R$ 47,000.00
5.6 ILUMINAÇÃO VB 1.00 1.00 58,120.00 R$ 58,120.00

R$ 7,994,160.00
ITENS EXCLUSOS DO ORÇAMENTO
PAISAGISMO

AUTOMAÇÃO

COMUNICAÇÃO VISUAL

INSTALAÇÕES ESPECIAIS DE CONTROLE DE ACESSO COMO CARTRACA, MONITORAMENTO, INTERFONIA, COMANDO DE VOZ E ETC...

TESTES , ENSAIOS E TREINAMENTOS


EQUIPAMENTOS DE COMANDO ELETRO ELETRONICO E TAMBEM DE QUALQUER NATUREAZA OPERACIONAL
DECORAÇÃO
LEGALIZAÇÕES
AGUA E ENERGIA FORNECIDOS PELO CONDOMINIO
EXECUÇÃO DE QUALQUER ESTRUTURA METÁLICA

obs. O escopo é limitado as informaçõe e projetos apresentados para o certame, alterações nas
quantidades e nas especificações implicará em um aditivo contratual

6
2 #REF!
ORÇAMENTO OBRA DEL LAGO MENSAGERIA
ORÇAMENTO ANALÍTICO

ID Descrição Unidade Coef Qtd Valor Previsto

OBRA CUSTO TOTAL R$ 2,765,328.00

1 ADMINISTRAÇÃO/SERVIÇOS PRELIMINARES R$ 824,756.00


1.1 STAFF VB 1.00 1.00 136,000.00 R$ 136,000.00

1.2 DESPESAS INICIAIS DE MOBILIZAÇÃO VB 1.00 1.00 40,000.00 R$ 40,000.00

1.3 SONDAGEM VB 1.00 1.00 40,000.00 R$ 40,000.00

1.4 TOPOGRAFIA VB 1.00 1.00 5,000.00 R$ 5,000.00

1.5 TOPOGRAFIA PÓS DEMOLIÇÃO VB 1.00 3.00 5,000.00 R$ 15,000.00

1.6 PROJETO PARA SISTEMA DE DRENAGEM VB 1.00 1.00 12,000.00 R$ 12,000.00

1.7 VISTORIA CAUTELAR DE VIZINHANÇA VB 1.00 1.00 10,000.00 R$ 10,000.00

1.8 FORNECIMENTO E INSTALAÇÃO DE TAPUME VB 1.00 1.00 60,000.00 R$ 60,000.00

1.9 PROJETO DE FUNDAÇÃOES VB 1.00 1.00 18,000.00 R$ 18,000.00

1.10 PROJETO, INSTALAÇÃO E MANUTENÇÃO DE CANTEIRO VB 1.00 1.00 30,000.00 R$ 30,000.00

1.11 DEMOLIÇÕES COM RETIRADA DE RESIDUOS VB 1.00 1.00 20,000.00 R$ 20,000.00

1.12 REMOÇÕES DAS PALMEIRAS VB 1.00 30.00 2,500.00 R$ 75,000.00

1.13 REALOÇÕES DAS PALMEIRAS VB 1.00 30.00 4,000.00 R$ 120,000.00

1.14 REMOÇÕES DOS POSTES VB 1.00 20.00 2,000.00 R$ 40,000.00

1.15 REALOCAÇÃO DOS POSTES VB 1.00 20.00 1,200.00 R$ 24,000.00

1.16 DEMOLIÇÃO E REPAROS DOS MUROS E GRADES VB 1.00 1.00 R$ -

1.17 SISTEMA AUTOMATIZADO FURA PNEUS VB 1.00 1.00 R$ -

1.18 CONTROLE TECNOLOGICO DO CONCRETO CP 1.00 100.00 100.00 R$ 10,000.00

1.19 SEGURO VB 1.00 1.00 18,000.00 R$ 18,000.00

1.20 UNIFORME, EPI, BEBEDOURO E CAIXA PEQUENO VB 1.00 1.00 46,430.00 R$ 46,430.00

1.21 LIMPEZA FINAL DE OBRA VB 1.00 1.00 25,326.00 R$ 25,326.00

1.22 GARANTIAS E INCIDENTES EVENTUAIS VB 1.00 1.00 80,000.00 R$ 80,000.00

2 FUNDAÇÃO R$ 1,331,200.00
2.1 FUNDAÇÃO - MO R$ 374,000.00

2.1.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MO M3 1.00 240.00 120.00 R$ 28,800.00

2.1.2 ARMAÇÃO PARA BLOCOS DE FUNDAÇÃO - MO KG 1.00 72,000.00 4.00 R$ 288,000.00

2.1.3 FORMAS PARA BLOCOS DE FUNDAÇÃO - MO M2 1.00 260.00 220.00 R$ 57,200.00

2.2 FUNDAÇÃO - MAT R$ 957,200.00

2.2.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MAT M3 1.10 240.00 850.00 R$ 204,000.00

2.2.2 CONCRETO PARA LASTRO M3 1.10 60.00 600.00 R$ 36,000.00

2.2.3 TAXA DE BOMBEAMENTO M3 1.10 300.00 100.00 R$ 30,000.00

2.2.4 AÇO KG 1.00 90,000.00 7.00 R$ 630,000.00

2.2.5 FORMAS (PREGOS+ COMPENSADO+CAIBROS+ TABUAS) M2 1.00 260.00 220.00 R$ 57,200.00

3 PAVIMENT., IRRIGAÇÃO, ILUM. E DRENAGEM R$ 493,252.00


3.1 REBAIXAMENTO DE MEIO FIO VB 1.00 1.00 5,252.00 R$ 5,252.00

3.2 MEIO FIO M 1.00 20.00 750.00 R$ 15,000.00

3.3 INTERTRAVADO 16 FACES (MO/MAT) M2 1.00 500.00 600.00 R$ 300,000.00

3.4 CBUQ M2 1.00 500.00 300.00 R$ 150,000.00

3.5 IRRIGAÇÃO VB 1.00 1.00 10,000.00 R$ 10,000.00

3.6 ILUMINAÇÃO VB 1.00 1.00 13,000.00 R$ 13,000.00

4 LAGO - RECONSTR. E IMPERMEABILIZAÇÃO R$ -


4.1 REFAZER O LAGO CONFORME PROJETO VB 1.00 1.00 82,000.00
5 CONSTRUÇÃO R$ 116,120.00
5.1 PORTICO VB 1.00 1.00 560,000.00

5.2 TOTEM VB 1.00 1.00 15,000.00 R$ 15,000.00

5.3 CABINE VB 1.00 12.00 3,000.00 R$ 36,000.00

5.4 INFRA VB 1.00 1.00 22,000.00 R$ 22,000.00

5.5 INSTALAÇÕES VB 1.00 1.00 25,000.00 R$ 25,000.00

5.6 ILUMINAÇÃO VB 1.00 1.00 18,120.00 R$ 18,120.00

R$ 1,030,945.00
ITENS EXCLUSOS DO ORÇAMENTO
PAISAGISMO

AUTOMAÇÃO

COMUNICAÇÃO VISUAL

INSTALAÇÕES ESPECIAIS DE CONTROLE DE ACESSO COMO CARTRACA, MONITORAMENTO, INTERFONIA, COMANDO DE VOZ E ETC...

TESTES , ENSAIOS E TREINAMENTOS

EQUIPAMENTOS DE COMANDO ELETRO ELETRONICO E TAMBEM DE QUALQUER NATUREAZA OPERACIONAL

DECORAÇÃO

LEGALIZAÇÕES

AGUA E ENERGIA FORNECIDOS PELO CONDOMINIO

EXECUÇÃO DE QUALQUER ESTRUTURA METÁLICA

obs. O escopo é limitado as informaçõe e projetos apresentados para o certame, alterações nas
quantidades e nas especificações implicará em um aditivo contratual

6 2 #REF!
ORÇAMENTO OBRA DEL LAGO PORTARIA 2
ORÇAMENTO ANALÍTICO

ID Descrição Unidade Coef Qtd Valor Previsto

OBRA CUSTO TOTAL R$ 6,395,328.00

1 ADMINISTRAÇÃO/SERVIÇOS PRELIMINARES R$ 2,186,756.00


1.1 STAFF VB 1.00 1.00 252,000.00 R$ 252,000.00

1.2 DESPESAS INICIAIS DE MOBILIZAÇÃO VB 1.00 1.00 40,000.00 R$ 40,000.00

1.3 SONDAGEM VB 1.00 1.00 40,000.00 R$ 40,000.00

1.4 TOPOGRAFIA VB 1.00 1.00 5,000.00 R$ 5,000.00

1.5 TOPOGRAFIA PÓS DEMOLIÇÃO VB 1.00 3.00 5,000.00 R$ 15,000.00

1.6 PROJETO PARA SISTEMA DE DRENAGEM VB 1.00 1.00 12,000.00 R$ 12,000.00

1.7 VISTORIA CAUTELAR DE VIZINHANÇA VB 1.00 1.00 10,000.00 R$ 10,000.00

1.8 FORNECIMENTO E INSTALAÇÃO DE TAPUME VB 1.00 1.00 112,000.00 R$ 112,000.00

1.9 PROJETO DE FUNDAÇÃOES VB 1.00 1.00 18,000.00 R$ 18,000.00

1.10 PROJETO, INSTALAÇÃO E MANUTENÇÃO DE CANTEIRO VB 1.00 1.00 181,000.00 R$ 181,000.00

1.11 DEMOLIÇÕES COM RETIRADA DE RESIDUOS VB 1.00 1.00 220,000.00 R$ 220,000.00

1.12 REMOÇÕES DAS PALMEIRAS VB 1.00 50.00 2,500.00 R$ 125,000.00

1.13 REALOÇÕES DAS PALMEIRAS VB 1.00 50.00 4,000.00 R$ 200,000.00

1.14 REMOÇÕES DOS POSTES VB 1.00 30.00 2,000.00 R$ 60,000.00

1.15 REALOCAÇÃO DOS POSTES VB 1.00 30.00 1,200.00 R$ 36,000.00

1.16 DEMOLIÇÃO E REPAROS DOS MUROS E GRADES VB 1.00 1.00 571,000.00 R$ 571,000.00

1.17 SISTEMA AUTOMATIZADO FURA PNEUS VB 1.00 1.00 60,000.00 R$ 60,000.00

1.18 CONTROLE TECNOLOGICO DO CONCRETO CP 1.00 200.00 100.00 R$ 20,000.00

1.19 SEGURO VB 1.00 1.00 18,000.00 R$ 18,000.00

1.20 UNIFORME, EPI, BEBEDOURO E CAIXA PEQUENO VB 1.00 1.00 46,430.00 R$ 46,430.00

1.21 LIMPEZA FINAL DE OBRA VB 1.00 1.00 25,326.00 R$ 25,326.00

1.22 GARANTIAS E INCIDENTES EVENTUAIS VB 1.00 1.00 120,000.00 R$ 120,000.00

2 FUNDAÇÃO R$ 1,331,200.00
2.1 FUNDAÇÃO - MO R$ 374,000.00

2.1.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MO M3 1.00 240.00 120.00 R$ 28,800.00

2.1.2 ARMAÇÃO PARA BLOCOS DE FUNDAÇÃO - MO KG 1.00 72,000.00 4.00 R$ 288,000.00

2.1.3 FORMAS PARA BLOCOS DE FUNDAÇÃO - MO M2 1.00 260.00 220.00 R$ 57,200.00

2.2 FUNDAÇÃO - MAT R$ 957,200.00

2.2.1 CONCRETO PARA BLOCOS DE FUNDAÇÃO - MAT M3 1.10 240.00 850.00 R$ 204,000.00

2.2.2 CONCRETO PARA LASTRO M3 1.10 60.00 600.00 R$ 36,000.00

2.2.3 TAXA DE BOMBEAMENTO M3 1.10 300.00 100.00 R$ 30,000.00

2.2.4 AÇO KG 1.00 90,000.00 7.00 R$ 630,000.00

2.2.5 FORMAS (PREGOS+ COMPENSADO+CAIBROS+ TABUAS) M2 1.00 260.00 220.00 R$ 57,200.00

3 PAVIMENT., IRRIGAÇÃO, ILUM. E DRENAGEM R$ 1,716,252.00


3.1 REBAIXAMENTO DE MEIO FIO VB 1.00 1.00 5,252.00 R$ 5,252.00

3.2 MEIO FIO M 1.00 200.00 750.00 R$ 150,000.00

3.3 INTERTRAVADO 16 FACES (MO/MAT) M2 1.00 2000.00 600.00 R$ 1,200,000.00

3.4 CBUQ M2 1.00 1000.00 300.00 R$ 300,000.00

3.5 IRRIGAÇÃO VB 1.00 1.00 25,000.00 R$ 25,000.00

3.6 ILUMINAÇÃO VB 1.00 1.00 36,000.00 R$ 36,000.00

4 LAGO - RECONSTR. E IMPERMEABILIZAÇÃO R$ 82,000.00


4.1 REFAZER O LAGO CONFORME PROJETO VB 1.00 1.00 82,000.00 R$ 82,000.00
5 CONSTRUÇÃO R$ 1,079,120.00
5.1 PORTICO VB 1.00 1.00 560,000.00 R$ 560,000.00

5.2 TOTEM VB 1.00 1.00 182,000.00 R$ 182,000.00

5.3 CABINE VB 1.00 36.00 5,000.00 R$ 180,000.00

5.4 INFRA VB 1.00 1.00 52,000.00 R$ 52,000.00

5.5 INSTALAÇÕES VB 1.00 1.00 47,000.00 R$ 47,000.00

5.6 ILUMINAÇÃO VB 1.00 1.00 58,120.00 R$ 58,120.00

R$ 2,362,000.00
ITENS EXCLUSOS DO ORÇAMENTO
PAISAGISMO

AUTOMAÇÃO

COMUNICAÇÃO VISUAL

INSTALAÇÕES ESPECIAIS DE CONTROLE DE ACESSO COMO CARTRACA, MONITORAMENTO, INTERFONIA, COMANDO DE VOZ E ETC...

TESTES , ENSAIOS E TREINAMENTOS

EQUIPAMENTOS DE COMANDO ELETRO ELETRONICO E TAMBEM DE QUALQUER NATUREAZA OPERACIONAL

DECORAÇÃO

LEGALIZAÇÕES

AGUA E ENERGIA FORNECIDOS PELO CONDOMINIO

EXECUÇÃO DE QUALQUER ESTRUTURA METÁLICA

obs. O escopo é limitado as informaçõe e projetos apresentados para o certame, alterações nas
quantidades e nas especificações implicará em um aditivo contratual

6 2 #REF!
0.3
0.9
0.9
mob R$ 1,500.00 0.9
furo 1 R$ 1,600.00 0.3
R$ 31,587.50 R$ 0.700 R$ 16,500.00 furo 2 R$ 1,000.00 4
R$ 34,746.25 R$ 1,900.00
projeto estrutura 1 R$ 6,000.00
projeto estrutura 2 R$ 4,500.00
projeto eletrica 1 R$ 1,500.00
R$ 13,537.50 0.30 R$ 7,250.00 projeto eletrica 2 R$ 750.00
R$ 14,891.25 projeto agua 1 R$ 1,000.00
projeto agua 2 R$ 1,000.00
projeto esgoto 1 R$ 1,000.00
R$ 49,637.50 projeto esgoto 2 R$ 1,000.00
projeto infra 1 R$ 500.00
projeto infra 2 R$ 500.00
R$ 23,750.00
52% R$ 36,100.00
25% R$ 45,125.00
suportes rodas bicicletario 24,00 peças 740 1050.8
guarda corpo bicletario 3 peças 1,70m x 1,10m 1665 2380.95
2.9

R$ 2,405.00 R$ 3,431.75
R$ 1,026.75

pequeno 350 12
calha 1 1200
manta 4 1200
proteção mecanica 1 2000
reforço 1 15000

eu 30%
imposto

R$ 12,350.00
R$ 1,366.04
R$ 2,976.19 R$ 992.06

R$ 4,342.23 R$ 1,937.23
R$ 910.48

R$ 4,200.00
R$ 1,200.00
R$ 4,800.00
R$ 2,000.00
R$ 15,000.00

R$ 27,200.00
R$ 35,360.00 R$ 8,160.00
R$ 44,200.00
Etapa 1- Isolamentos e proteções
Etapa 2 - Remoção das bancada da cozinha e tanque e dos armários embutidos;
Etapa 3 - Demolições da parede do banheiro, da parede da copa (tijolo de vidro), dos sóculos do piso sob
cozinha,
Etapa 4 -geladeira
Demoliçãoe demais
do piso existentes. Demolição
com rebaixamento do do teto de gesso;
contrapiso;
Etapa 5 - Remanejamento e adaptações das instalações hidráulicas, elétricas e de esgoto;
Etapa 6 - Execução do teto de gesso acartonado;
Etapa 7 - Execução do piso de porcelanato;
Etapa 8 - Instalação da bancada de granito, tanque, lavatório, acoplamento das instalações e testes;
Etapa 9 – Pintura e limpeza.
Etapa 10 – Marcenaria e moveis planejados
R$ 1,323.00
R$ 3,800.00
R$ 3,400.00
R$ 3,400.00
R$ 3,300.00
R$ 9,500.00

R$ 1,812.00
R$ 3,600.00

R$ 30,135.00
R$ 3,500.00

R$ 33,635.00