CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)
1.00 ADMINISTRAO DA OBRA 186,912.63
1.01 TAXAS E IMPOSTOS 2,521.69
01/0020 - COMP 1.01.01 ART DO CONTRATO UND. 1.00 250.00 326.75 326.75
SOOBB -1.13 1.01.02 ALVAR PARA CONSTRUO M2 436.20 3.85 5.03 2,194.94
1.02 ADMINISTRAO LOCAL 166,982.07
2706 - SINAPI 1.02.01 ENGENHEIRO OU ARQUITETO AUXILIAR/JUNIOR (220H/MS) MS 6.00 11,496.44 15,025.84 90,155.06
4069 - SINAPI 1.02.02 MESTRE DE OBRA (200H/MS) MS 6.00 5,567.70 7,276.98 43,661.87

0253 - SINAPI 1.02.03 ALMOXARIFE (200H/MS) MS 6.00 2,147.27 2,806.48 16,838.88

10508 - SINAPI 1.02.04 VIGILANTE NOTURNO (240H/MS) MS 6.00 2,081.90 2,721.04 16,326.26
1.03 FERRAMENTAS E EQUIPAMENTOS 17,083.27
01/0027 - COMP 1.03.01 CONJUNTO DE EPI'S(40UND/MS) MS 6.00 2,178.43 2,847.21 17,083.27
1.04 CAPACITAO DE FUNCIONRIOS 325.60
05936 - ORSE 1.04.01 TCNICO DE SEGURANA DO TRABALHO SENIOR (INS.DIV.) H 20.00 12.46 16.28 325.60
2.00 SERVIOS PRELIMINARES 23,694.72
2.01 PLACA DE OBRA EM CHAPA DE ACO GALVANIZADO M2 6.00 209.20 273.42 1,640.52
74209/001 - SINAPI

2.02 TAPUME DE CHAPA DE MADEIRA COMPENSADA (6 MM) - PINTURA A CAL - M2 376.80 31.48 41.14 15,501.93
74220/001 - SINAPI APROVEITAMENTO 2 X

BARRACO DE OBRA PARA ALOJAMENTO/ESCRITORIO, PISO EM PINHO 3A.


73805/001 - SINAPI 2.03 PAREDES EM COMPENSADP 10MM, COBERTURA EM TELHA AMIANTO 6 MM, M2 30.00 167.11 218.41 6,552.26
INCLUSO INSTALAES ELETRICAS E ESQUADRIAS
3.00 MOVIMENTO DE TERRA 58,947.89

73948/016 - SINAPI 3.01 LIMPEZA MANUAL DO TERRENO (C/ RASPAGEM SUPERFICIAL) M2 2,002.00 1.63 2.14 4,276.08

79484 - SINAPI 3.02 ATERRO MECANIZADO COMPACTADO C/EMPRESTIMO M3 313.50 23.85 31.17 9,771.58
79472 - SINAPI 3.03 REGULARIZACAO DE SUPERFICIES EM TERRA COM MOTONIVELADORA M2 2,002.00 0.25 0.32 646.38

73992/001 - SINAPI 3.04 LOCAO CONVENCIONAL DE OBRA, ATRAVS DE GABARITO DE TBUAS CORRIDAS M2 503.50 5.80 7.58 3,814.02
PONTALETADAS A CADA 1,50M

79517/001 - SINAPI 3.05 ESCAVACAO MANUAL EM SOLO-PROF. ATE 1,50 M M3 133.87 13.14 17.17 2,299.13

73904/001 - SINAPI 3.06 ATERRO APILOADO(MANUAL) EM CAMADAS DE 20 CM COM MATERIAL DE M3 283.53 68.31 89.29 25,315.20
EMPRSTIMO
5622 - SINAPI 3.07 REGULARIZACAO E COMPACTACAO MANUAL DE TERRENO COM SOQUETE M2 503.50 2.17 2.83 1,425.57

72885 - SINAPI 3.08 TRANSPORTE COMERCIAL COM CAMINHAO BASCULANTE 6 M3, RODOVIA EM M3 730.90 1.07 1.40 1,025.63
LEITO NATURAL
72896 - SINAPI 3.09 CARGA MANUAL DE TERRA EM CAMINHAO BASCULANTE 6 M3 M3 730.90 10.86 14.19 10,374.29
4.00 INFRA-ESTRUTURA 96,579.95
CONCRETO USINADO BOMBEADO FCK=25MPA, INCLUSIVE LANCAMENTO E
74138/003 - SINAPI 4.01 ADENSAMENTO, PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO M3 6.50 373.29 487.89 3,171.30
RESINADO 12 MM

CONCRETO ARMADO FCK=15MPA FABRICADO NA OBRA, ADENSADO E LANADO,


03/0012 - COMP / 4.02 M3 2.52 1,356.50 1,772.95 4,459.22
PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO RESINADO 12MM (03
6457 - ORSE USOS)

74115/001 - SINAPI 4.03 EXECUO DE LASTRO EM CONCRETO (1:2,5:6), PREPARO MANUAL M3 8.97 276.60 361.51 3,242.42

5970 - SINAPI 4.04 FORMA TABUA PARA CONCRETO EM FUNDACAO, C/ REAPROVEITAMENTO 2X M2 475.89 32.58 42.58 20,264.11

74254/002 - SINAPI 4.05 ARMACAO ACO CA-50, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ KG 239.00 5.62 7.35 1,757.01
CORTE(PERDA DE 10%) / DOBRA / COLOCAO.

73942/002 - SINAPI 4.06 ARMACAO DE ACO CA-60 DIAM. 3,4 A 6,0 MM - FORNECIMENTO / CORTE KG 76.00 6.00 7.85 596.46
( C/PERDA DE 10%) / DOBRA / COLOCAO

73935/001 - SINAPI 4.07 EMBASAMENTO EM ALVENARIA DE TIJOLO CERAMICO FURADO 10X20X20CM, 1/2 M3 35.19 27.51 35.95 1,265.16
VEZ, ASSENTADO EM ARGAMASSA TRACO 1:4 (CIMENTO E AREIA), E=1CM

73928/001 - SINAPI 4.08 CHAPISCO EM PAREDES TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 0,5CM, M2 282.68 3.02 3.95 1,116.28
PREPARO MANUAL

5982- SINAPI 4.09 REBOCO PAULISTA (MASSA UNICA) TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA), M2 195.20 13.29 17.37 3,391.15
ESPESSURA 1,5CM, PREPARO MECANICO DA ARGAMASSA

5990- SINAPI 4.10 EMBOCO TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA), ESPESSURA 2,0CM, M2 87.48 16.66 21.77 1,457.03
PREPARO MECANICO DA ARGAMASSA

73361 - SINAPI 4.11 CONCRETO CICLOPICO FCK=10MPA 30% PEDRA DE MAO INCLUSIVE LANCAMENTO M3 98.68 276.35 361.19 35,642.16

83534 - SINAPI 4.12 LASTRO DE CONCRETO, PREPARO MECANICO, INCLUSO ADITIVO M3 30.31 510.33 667.00 20,217.66
IMPERMEABILIZANTE
__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 1/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)

5.00 SUPER-ESTRUTURA 64,907.66


5.01 ESTRUTURAS EM CONCRETO ARMADO 63,326.96

74138/003 - SINAPI 5.01.01 CONCRETO USINADO BOMBEADO FCK=25MPA, INCLUSIVE LANCAMENTO E M3 24.50 373.29 487.89 11,953.37
ADENSAMENTO
CONCRETO ARMADO FCK=15MPA FABRICADO NA OBRA, ADENSADO E LANADO,
03/0012 - COMP / 5.01.02 PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO RESINADO 12MM (03 M3 5.72 1,356.50 1,772.95 10,137.07
6457 - ORSE
USOS)

FORMA PARA ESTRUTURAS DE CONCRETO (PILAR, VIGA E LAJE) EM CHAPA DE


84215 - SINAPI 5.01.03 MADEIRA COMPENSADA RESINADA, DE 1,10 X 2,20, ESPESSURA = 12 MM, 03 M2 333.00 28.34 37.04 12,335.34
UTILIZACOES. (FABRICACAO, MONTAGEM E DESMONTAGEM)

73942/002 - SINAPI 5.01.04 ARMACAO DE ACO CA-60 DIAM. 3,4 A 6,0 MM - FORNECIMENTO / CORTE KG 387.00 6.00 7.85 3,037.26
( C/PERDA DE 10%) / DOBRA / COLOCAO

74254/002 - SINAPI 5.01.05 ARMACAO ACO CA-50/60, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ KG 2,034.00 5.62 7.35 14,952.92
CORTE(PERDA DE 10%) / DOBRA / COLOCAO.

74254/001 - SINAPI 5.01.06 ARMACAO ACO CA-50 DIAM.16,0 (5/8) 25,0MM (1) - FORNECIMENTO/ KG 1,680.00 4.97 6.49 10,911.00
CORTE(PERDA DE 10%) / DOBRA / COLOCAO.
5.02 LAJES PR FABRICADAS 1,580.70
LAJE PR-FABRICADA TRELIADA PARA PISO OU COBERTURA, INTEREIXO 38CM,
03/0001 - COMP / 5.02.01 H=12CM, EL. ENCHIMENTO EM EPS H=8CM, INCLUSIVE ESCORAMENTO EM M2 15.39 78.58 102.71 1,580.70
7393 - ORSE
MADEIRA E CAPEAMENTO 4CM.
6.00 FECHAMENTOS 58,354.21

73982/001 - SINAPI 6.01 ALVENARIA EM TIJOLO CERMICO FURADO 10X20X20 CM, 1/2 VEZ, ASSENTADO M2 1,577.69 25.34 33.12 52,251.35
EM ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA), JUNTAS 12MM

04/0005 - COMP/ 6.02 COBOG DE CIMENTO E AREIA, 10X15X15 CM M2 6.66 48.98 64.02 426.34
8963 - ORSE

VERGAS E CONTRAVERGAS 10X10CM EM CONCRETO PR-MOLDADO FCK=20MPA


74200/001 - SINAPI 6.03 (PREPARO COM BETONEIRA) AO CA60, BITOLA FINA, INCLUSIVE FORMAS TABUA M 123.30 10.91 14.26 1,757.76
3A.

0188 - ORSE 6.04 PAREDE DE GESSO ACARTONADO, DRY-WALL D 100/75/60 2 ST 12,5MM SISTEMAS M 42.08 71.26 93.14 3,918.76
LAFARGE GYPSUM (OU SIMILAR)
7.00 COBERTA 119,934.12
05/0002 - COMP/ 7.01 CALHA EM ALVENARIA / CONCRETO, IMPERMEABILIZADA C/ MANTA ASFLTICA M2 30.71 134.05 175.21 5,381.02
0298 - ORSE
68058 - SINAPI 7.02 RUFO EM CONCRETO ARMADO, LARGURA 40CM E ESPESSURA 7CM M 146.03 43.41 56.74 8,285.46

ESTRUTURA METALICA EM TESOURAS OU TRELICAS, VAO LIVRE DE 12M,


72110 - SINAPI 7.03 FORNECIMENTO E MONTAGEM, NAO SENDO CONSIDERADOS OS FECHAMENTOS M2 337.92 50.16 65.55 22,152.31
METLICOS, AS COLUNAS, OS SERVICOS GERAIS EM ALVENARIA E CONCRETO, AS
TELHAS DE COBERTURA E A PINTURA DE ACABAMENTO

6067 - SINAPI 7.04 PINTURA ESMALTE BRILHANTE (2 DEMAOS) SOBRE SUPERFICIE METALICA, M2 439.30 18.32 23.94 10,517.63
INCLUSIVE PROTECAO COM ZARCAO (1 DEMAO)

05/0005 - COMP 7.05 TELHAMENTO COM TELHA DE ALUMNIO(TERMOACUSTICA) ACABAMENTO M2 337.92 69.23 90.48 30,574.30
PINTADO NAS DUAS FACES (INTERNA BRANCA)

12/0002 - COMP 7.06 FORRO MODULAR PARA PLACAS 1,25 X 0,62 M COM ESTRUTURA DE FIXAO EM M2 395.32 83.27 108.83 43,023.39
PERFIS T
8.00 INSTALAES HIDRO-SANITRIAS 95,335.64
8.01 INSTALAES HIDRULICAS 22,926.40

75030/001 - SINAPI 8.01.01 TUBO PVC SOLDAVEL AGUA FRIA DN 25MM, INCLUSIVE CONEXOES - M 96.67 10.88 14.22 1,374.52
FORNECIMENTO E INSTALAO

74175/001 - SINAPI 8.01.02 REGISTRO GAVETA 1" COM CANOPLA ACABAMENTO CROMADO SIMPLES - UN 12.00 65.28 85.32 1,023.89
FORNECIMENTO E INSTALACAO
07/0068 COMP / 8.01.03 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 2 1/2"INCLUSIVE CONEXES, M 23.60 53.16 69.48 1,639.70
SINAPI FORNECIMENTO E INSTALAO
07/0067 - COMP / 8.01.04 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 2" INCLUSIVE CONEXES, M 42.70 30.28 39.58 1,689.91
SINAPI FORNECIMENTO E INSTALAO
07/0066 - COMP 8.01.05 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 1 1/2"INCLUSIVE CONEXES, M 27.40 22.89 29.92 819.67
/SINAPI FORNECIMENTO E INSTALAO
07/0064 - COMP/ 8.01.06 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 1" INCLUSIVE CONEXES, M 9.25 17.78 23.23 214.92
SINAPI FORNECIMENTO E INSTALAO
07/0073 - COMP / 8.01.07 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 3"INCLUSIVE CONEXES, M 1.20 64.50 84.31 101.17
SINAPI FORNECIMENTO E INSTALAO
07/0069 - COMP / 8.01.08 REGISTRO TIPO ESFERA EM PVC COM BORBOLETA, D= 2 1/2" UN 2.00 40.72 53.22 106.45
8323 - ORSE

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 2/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)
07/0070 - COMP/ 8.01.09 REGISTRO TIPO ESFERA EM PVC COM BORBOLETA, D= 1 1/2" UN 1.00 36.61 47.85 47.85
3203 - ORSE
07/0008 - COMP/
8.01.10 TORNEIRA DE PRESSO, FABRIMAR, SRIE ACQUAPRESS, REF 1180-BIO OU SIMILAR UN 13.00 187.51 245.07 3,185.91
4273 - ORSE

73949/003 - SINAPI 8.01.11 TORNEIRA CROMADA LONGA 1/2" OU 3/4" DE PAREDE PARA PIA DE COZINHA COM UN 4.00 106.04 138.60 554.39
AREJADOR, PADRAO MEDIO - FORNECIMENTO E INSTALACAO

07/0040 - COMP/ 8.01.12 DUCHA HIGINICA COM REGISTRO, LINHA ASPEN, REF. 1984 DA DECA OU SIMILAR UN 17.00 66.61 87.06 1,480.07
8211 - ORSE
07/0010 - COMP / 8.01.13 TORNEIRA DE BIA P/CAIXA D'AGUA D = 1" (DECA OU SIMILAR) UN 4.00 52.83 69.04 276.18
1446 - ORSE
83454 - SINAPI 8.01.14 CHAVE DE BOIA AUTOMATICA UN 2.00 49.07 64.14 128.28

07/0054 - COMP 8.01.15 CUBA DE AO INOX, DIMENSES 30 X 47CM, PARA INSTALAO EM BANCADA, C/ UN 1.00 166.31 217.37 217.37
VLVULA CROMADA , SIFO CROMADO E ENGATE DE PLSTICO OU SIMILARES

07/0034 - COMP / 8.01.16 CUBA DE EMBUTIR, CIRCULAR, LINHA CARRARA L41, DECA OU SIMILAR, INCLUSIVE UN 14.00 220.41 288.07 4,033.04
3670 - ORSE SIFO CROMADO, VLVULA CROMADA PARA PIA E ENGATE CROMADO

LAVATRIO LOUA (DECA-LINHA VOGUE PLUS CONFORTO, REF L-510 OU SIMILAR)


07/0051 - COMP / 8.01.17 COM COLUNA SUSPENSA, (DECA, LINHA VOGUE PLUS CONFORTO, REF. C-510 OU UN 3.00 466.07 609.16 1,827.47
7759 - ORSE SIMILAR), C/ SIFO CROMADO, VLVULA CROMADA, ENGATE CROMADO,
EXCLUSIVE TORNEIRA

9535 - SINAPI 8.01.18 CHUVEIRO ELETRICO COMUM CORPO PLASTICO TIPO DUCHA, FORNECIMENTO E UN 3.00 30.37 39.69 119.06
INSTALACAO
TANQUE DE AO INOX POLIDO, DIMENSES 52X54X30 CM, PARA INSTALAO EM
07/0055 - COMP 8.01.19 BANCADA, C/ VLVULA CROMADA , SIFO CROMADO , ENGATE DE PLSTICO OU UN 1.00 230.25 300.94 300.94
SIMILARES

73949/001 - SINAPI 8.01.20 TORNEIRA CROMADA 1/2" OU 3/4" PARA JARDIM OU TANQUE, PADRAO ALTO - UN 3.00 63.78 83.36 250.09
FORNECIMENTO E INSTALACAO
07/0052 - COMP / 8.01.21 TORNEIRA DE MESA COM FECHAMENTO AUTOMTICO, LINHA LINK, DECA, REF. UN 3.00 361.84 472.93 1,418.79
7612 - ORSE 1172 C OU SIMILAR

13/0017 - COMP 8.01.22 PORTA PAPEL HIGIENICO, LINHA DOMUS, REF. 102 C40, DA MEBER OU SIMILAR UN 16.00 47.81 62.49 999.80

13/0024 - COMP/ 8.01.23 SABONETEIRA EM PLSTICO ABS, PARA SABONETE LQUIDO, DA JSN, REF. J7 OU UN 7.00 41.07 53.68 375.78
7609 - ORSE SIMILAR
13/0016 - COMP / 8.01.24 DISPENSER PARA TOALHAS INTERFOLHADAS, PROLIM, LINHA TOILET PLUS REF UN 7.00 72.95 95.35 667.42
4373 - ORSE 04305 OU SIMILAR
13/0025 - COMP/ 8.01.25 CABIDE EM AO INOX, DECA 2060 C40, ACABAMENTO CROMADO OU SIMILAR UN 1.00 56.42 73.74 73.74
3708 - ORSE
8.02 INSTALAES SANITRIAS E DRENAGEM 41,674.23

74165/004 - SINAPI 8.02.01 TUBO PVC ESGOTO PREDIAL DN 100MM, INCLUSIVE CONEXOES - FORNECIMENTO E M 70.06 33.83 44.22 3,098.10
INSTALAO

74165/003 - SINAPI 8.02.02 TUBO PVC ESGOTO PREDIAL DN 75MM, INCLUSIVE CONEXOES - FORNECIMENTO E M 64.90 31.50 41.17 2,671.66
INSTALAO

74165/002 - SINAPI 8.02.03 TUBO PVC ESGOTO PREDIAL DN 50MM, INCLUSIVE CONEXOES - FORNECIMENTO E M 0.45 23.22 30.35 13.66
INSTALAO

74165/001 - SINAPI 8.02.04 TUBO DE PVC ESGOTO PREDIAL DN 40 MM, INCLUSIVE CONEXES - M 64.99 16.77 21.92 1,424.44
FORNECIMENTO E INSTALAO
07/0032 - COMP / 8.02.05 RALO HEMISFRICO EM FERRO FUNDIDO TIPO ABACAXI, DN=150MM UN 5.00 50.60 66.14 330.69
7752 - ORSE
07/0013 - COMP / 8.02.06 SIFAO PARA LAVATRIO EM PVC, ASTRA SC5, 1 1/2" X 40 MM, ACABAMENTO UN 13.00 39.74 51.94 675.28
3673 - ORSE CROMADO OU SIMILAR
07/0019 - COMP 8.02.07 CAIXA DE INSPENO EM PVC 300 MM UN 13.00 178.08 232.75 3,025.77
07/0060 - COMP 8.02.08 CAIXA DE GORDURA EM PVC 300MM,MULTIPLA UN 2.00 117.63 153.75 307.50

07/0015 - COMP 8.02.09 CX. SIFONADA EM PVC, 100X150X50MM, ACABAMENTO BRANCO, C/ GRELHA E UN 13.00 16.73 21.87 284.29
PORTA GRELHA

74014/001 - SINAPI 8.02.10 VLVULA EM METAL CROMADO 3.1/2" X 1.1/2" , TIPO AMERICAMA - UN 19.00 35.51 46.41 881.72
FORNECIMENTO E INSTALAO
BACIA SANITARIA C/ CAIXA DE DESC.ACOPL. , LINHA THEMA ECOFUSH, 3/6 LT,
07/0057 - COMP / 8.02.11 INCEPA OU SIMILAR, INCL. ASSENTO INCEPA THEMA 25987 OU SIMILAR, CONJ. DE UN 15.00 603.92 789.33 11,839.93
7710 - ORSE
FIX, ANEL DE VED. E ENG. PLSTICO

BACIA SANITARIA C/ CAIXA DE DESC.ACOPL. HANDICAPPED (P/ DEFICIENTE), LINHA


07/0048 - COMP / 8.02.12 STYLUS EXCELLENCE, 54359/54510, CELITE OU SIMILAR, INCL. ASSENTO CELITE UN 3.00 612.16 800.10 2,400.29
7789 - ORSE STYLUS EXCELLENCE 54981 OU SIMILAR, CONJ. DE FIX. DECA S-10, ANEL DE VED. E
ENG. PLSTICO OU SIMILAR

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 3/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)
MICTORIO DE LOUCA BRANCA C/SIFAO INTEGRADO E MED 33X28X53CM
73947/005 - SINAPI 8.02.13 FERRAGENS EM METAL CROMADO REGISTRO DE PRESSAO 1416 DE 1/2" E TUBO DE UN 4.00 171.12 223.65 894.60
LIGACAO DE 1/2" - FORNECIMENTO
07/0027 - COMP / 8.02.14 RALO SIFONADO EM PVC D = 100MM, SADA 40MM, COM GRELHA ACABAMENTO UN 4.00 14.69 19.20 76.79
1703 - ORSE BRANCO

CONJUNTO MOTO-BOMBA COM MOTOR DE 1/2 CV, MONOFSICO CENTRFUGA,


07/0071 - COMP/ 8.02.15 SUCO=3/4", RECALQUE=3/4", PR. MX. 23 MCA, ALT. SUCO 8 MCA. FAIXAS UN 2.00 650.95 850.80 1,701.60
2646 - ORSE HM(M) - Q (M3/H): (20 - 2,1)(170 - 2,9)(14 - 3,4)(11 - 3,9)(8 - 4,3)(5 - 4,7),
INCLUSIVE CHAVE DE PARTIDA DIRETA

M8 8.02.16 BOTIJO D'AGUA FORTELEV 5000L UN 1.00 3,248.75 4,246.12 4,246.12

M74 8.02.17 FILTRO WFF 150 UN 1.00 1,979.00 2,586.55 2,586.55

07/0072 - COMP / 8.02.18 CAIXA D'AGUA DE FIBRA DE VIDRO - INSTALADA, EXCETO BASE DE APOIO, CAP. UN 2.00 590.44 771.71 1,543.41
05048 - ORSE 1500 LITROS

72290 - SINAPI 8.02.19 CAIXA DE INSPEO 90X90X80CM EM ALVENARIA - EXECUO UN 9.00 232.49 303.87 2,734.83

07/0002 - COMP 8.02.20 CAIXA DE BRITA D=60CM E H = 60CM UN 4.00 130.34 170.35 681.40

03/0015 - COMP/ 8.02.21 TAMPA DE INSPEO EM CHAPA METLICA DE AO 1/4", DIM: 1,00X1,00 M, UN 1.00 195.56 255.60 255.60
5971 - ORSE INCLUSIVE PINTURA E CADEADO
8.03 TANQUE SPTICO, SUMIDOURO E CAIXA DE DISTRIBUIO 30,735.02

6519 - SINAPI 8.03.01 ALVENARIA EM TIJOLO CERAMICO MACICO 5X10X20CM 1 VEZ (ESPESSURA 20CM), M2 81.03 103.23 134.92 10,933.31
ASSENTADO COM ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA)

73965/011 - SINAPI 8.03.02 ESCAVACAO MANUAL DE VALA EM MATERIAL DE 1A CATEGORIA DE 1,5 ATE 3M M3 187.61 29.58 38.66 7,252.56
EXCLUINDO ESGOTAMENTO / ESCORAMENTO
CONCRETO ARMADO FCK=15MPA FABRICADO NA OBRA, ADENSADO E LANADO,
03/0012 - COMP / 8.03.03 PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO RESINADO 12MM (03 M3 4.72 1,356.50 1,772.95 8,365.83
6457 - ORSE USOS) [PARA TAMPAS] INCLUSO ARMAAO

73928/001 - SINAPI 8.03.04 CHAPISCO EM PAREDES TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 0,5CM, M2 162.07 3.02 3.95 640.00
PREPARO MANUAL

5982 - SINAPI 8.03.05 REBOCO PAULISTA (MASSA UNICA) TRACO 1:2:8 (CIMENTO, CAL E AREIA), M2 162.07 13.29 17.37 2,815.59
ESPESSURA 2,0CM, PREPARO MECANICO

74164/004 - SINAPI 8.03.06 LASTRO DE BRITA N 3 (ESPESSURAS: SUMIDOURO 30CM) M3 0.45 107.91 141.04 63.47

LAJE PR-FABRICADA TRELIADA PARA PISO OU COBERTURA, INTEREIXO 38CM,


03/0001 - COMP / 8.03.07 H=12CM, EL. ENCHIMENTO EM EPS H=8CM, INCLUSIVE ESCORAMENTO EM M2 5.60 78.58 102.71 575.17
7393 - ORSE MADEIRA E CAPEAMENTO 4CM.
03/0016 - COMP/ 8.03.08 TAMPA DE INSPEO EM CHAPA METLICA DE 3/8", INCLUSIVE TRATAMENTO E M2 0.28 241.60 315.77 89.08
4117 - ORSE PINTURA EM ESMALTE OU LEO
9.00 INSTALAES CONTRA INCNDIO E PNICO 6,739.92
9.01 PINTURA (SINALIZAO) 571.80

73916/003 - SINAPI 9.01.01 SINALIZAO DE EMERGNCIA UN 23.00 19.02 24.86 571.80

9.02 EQUIPAMENTOS FIXOS 6,168.12

73775/001 - SINAPI 9.02.01 EXTINTOR INCENDIO TP PO QUIMICO 4KG FORNECIMENTO E COLOCACAO UN 4.00 107.56 140.58 562.34

72554 - SINAPI 9.02.02 EXTINTOR DE CO2 6KG - FORNECIMENTO E INSTALACAO UN 2.00 409.89 535.73 1,071.45

73775/002 - SINAPI 9.02.03 EXTINTOR INCENDIO AGUA-PRESSURIZADA 10L INCL SUPORTE PAREDE CARGA UN 2.00 122.23 159.76 319.52
COMPLETA FORNECIMENTO E COLOCACAO
15/0016 - COMP/ 9.02.04 EXTINTOR DE P QUMICO SECO (PQS), CAPACIDADE 12KG UN 1.00 173.30 226.51 226.51
8751 - ORSE
15/0001 - COMP/ 9.02.05 DETECTOR TERMOVELOCIMTRICO UN 2.00 98.71 129.01 258.02
1506 - ORSE
15/0002 - COMP/ 9.02.06 DETECTOR DE FUMAA UN 1.00 109.09 142.58 142.58
1507 - ORSE

9.02.07 PORTA-CORTA FOGO 1,60x2,10m (P-90), DUAS FOLHAS, COM BATENTES E UN 1.00 1,246.99 1,629.82 1,629.82
06/0049 - COMP/ TCPO
FERRAGENS(CASA DO GERADOR)
15/0003 - COMP / 9.02.08 ACIONADOR MANUAL (BOTOEIRA) TIPO QUEBRA-VIDRO, P/INSTAL. INCENDIO UN 2.00 74.76 97.72 195.44
7861 - ORSE
08/0001 - COMP/ 9.02.09 LUMINRIA DE EMERGNCIA 20W UN 16.00 45.84 59.92 958.67
559 - ORSE

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 4/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)
15/0015 - COMP/ 9.02.10 CENTRAL DE ALARME E DETECO DE INCENDIO, CAPACIDADE: 2 BATERIAS, 8 UN 1.00 335.87 438.98 438.98
8058 - ORSE LAOS, COM 2 LINHAS, MOD.VR-8L, VERIN OU SIMILAR
15/0004 - COMP/
9.02.11 SIRENE DE INCNDIO, MODELO 5992, TENSO 24VCC, DA SETON OU SIMILAR M 3.00 93.04 121.60 364.79
8503 - ORSE
10.0 INSTALAES ELTRICAS 125,640.95
10.01 SUBESTAO E GERADOR 16,225.73

09/0003 - COMP 10.01.01 FORNECIMENTO E INSTALAO DE SUBSTAO AREA 75KVA EM ESTRUTURAS VB 1.00 12,414.48 16,225.73 16,225.73
(CE2.3 - E1) PADRO ELETROBRS
EMERGENCIAL (STAND-BY) DE 55KVA E POTNCIA CONTNUA (PRIME) DE 50KVA,
M69 10.01.02 FATOR DE POTNCIA 0,8, TRIFSICO, 380/220V, 60HZ, 1800RPM, DOTADO DE UN 1.00 - - -
PAINEL DE COMANDO E CONTROLE AUTOMTICO, MICROPROCESSADO, DIGITAL,
10.02 QUADROS ELTRICOS E ACESSRIOS (CONFORME QUADROS DE CARGAS E ESP. 3,699.33
TCNICAS)
QUADRO DE DISTRIBUICAO DE ENERGIA DE EMBUTIR, EM CHAPA METALICA, PARA
74131/007 - SINAPI 10.02.01 40 DISJUNTORES TERMOMAGNETICOS MONOPOLARES, COM BARRAMENTO UN 2.00 413.10 539.92 1,079.85
TRIFASICO E NEUTRO, FORNECIMENTO E INSTALACAO

QUADRO DE DISTRIBUICAO DE ENERGIA DE EMBUTIR, EM CHAPA METALICA, PARA


74131/005 - SINAPI 10.02.02 24 DISJUNTORES TERMOMAGNETICOS MONOPOLARES, COM BARRAMENTO UN 3.00 259.31 338.91 1,016.74
TRIFASICO E NEUTRO, FORNECIMENTO E INSTALACAO

QUADRO DE COMANDO PARA 2 BOMBAS DE RECALQUES DE 1/3 A 2 CV, TRIFSICA,


08/0134 - COMP / 10.02.03 220 VOLTS, COM CHAVE SELETORA, ACIONAMENTO MANUAL/AUTOMTICO, REL UN 1.00 1,226.27 1,602.74 1,602.74
7826 - ORSE DE SOBRECARGA E CONTATORA
10.03 CONDUTORES ELTRICOS E ACESSRIOS 26,869.66

73860/007 - SINAPI 10.03.01 CABO DE COBRE ISOLADO PVC 450/750V 1,5MM2 RESISTENTE A CHAMA - M 123.00 1.52 1.99 244.39
FORNECIMENTO E INSTALACAO

73860/008 - SINAPI 10.03.02 CABO DE COBRE ISOLADO PVC RESISTENTE A CHAMA 450/750 V 2,5 MM2 M 3,600.00 2.00 2.62 9,432.75
FORNECIMENTO E INSTALACAO

73860/009 - SINAPI 10.03.03 CABO DE COBRE ISOLADO PVC RESISTENTE A CHAMA 450/750 V 4 MM2 M 825.00 2.98 3.90 3,216.90
FORNECIMENTO E INSTALACAO

83418 - SINAPI 10.03.04 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 4 MM ANTI-CHAMA - M 246.00 3.48 4.55 1,118.07
FORNECIMENTO E INSTALAO

83419 - SINAPI 10.03.05 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 6 MM ANTI-CHAMA - M 38.00 4.22 5.51 209.52
FORNECIMENTO E INSTALAO

83420 - SINAPI 10.03.06 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 10 MM ANTI-CHAMA - M 317.00 5.94 7.76 2,460.33
FORNECIMENTO E INSTALAO

83421 - SINAPI 10.03.07 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/1KV 25MM2 ANTI-CHAMA - M 235.00 12.77 16.69 3,922.24
FORNECIMENTO E INSTALACAO

83424 - SINAPI 10.03.08 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 50 MM ANTI-CHAMA - M 196.00 22.05 28.82 5,649.17
FORNECIMENTO E INSTALAO

73768/012 - SINAPI 10.03.09 CABO TELEFONICO CCI-50 4 PARES (USO INTERNO) - FORNECIMENTO E INSTALACAO M 103.00 1.24 1.63 167.56

08/0101 - COMP 10.03.10 FORNECIMENTO E INSTALAO DE FIO DE AO INOX DE 0,60mm ROLO COM 400M. UN 2.00 66.03 86.31 172.61
FORNECIMENTO E INSTALAO

08/0102 - COMP 10.03.11 CABO DE ALTA TENSO FLEXVEL COMPOSTO POR FIOS ESTANHADOS DE 04MM. M 17.00 12.43 16.24 276.13
FORNECIMENTO E INSTALAO
10.04 ELETRODUTOS, ELETROCALHAS E ACESSRIOS 28,261.97

74252/001 - SINAPI 10.04.01 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 25MM (1") INCL CONEXOES, M 437.33 8.98 11.74 5,132.09
FORNECIMENTO E INSTALACAO

83407 - SINAPI 10.04.02 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 32MM (1 1/4") INCL CONEXOES, M 43.07 13.41 17.52 754.67
FORNECIMENTO E INTALAO

55865 - SINAPI 10.04.03 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 40MM (1 1/2") INCL CONEXOES, M 105.00 14.61 19.10 2,005.39
FORNECIMENTO E INSTALACAO

55866 - SINAPI 10.04.04 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 50MM (2"), INCL CONEXOES, M 129.30 16.34 21.36 2,761.73
FORNECIMENTO E INSTALACAO

83408 - SINAPI 10.04.05 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 60MM (2 1/2") INCL CONEXOES, M 12.00 26.97 35.25 423.06
FORNECIMENTO E INSTALACAO

72935 - SINAPI 10.04.06 ELETRODUTO DE PVC FLEXIVEL CORRUGADO DN 25MM (1") FORNECIMENTO E M 174.00 4.43 5.79 1,006.91
INSTALACAO

72936 - SINAPI 10.04.07 ELETRODUTO DE PVC FLEXIVEL CORRUGADO DN32 MM (1 1/4") FORNECIMENTO E M 40.00 6.14 8.02 320.88
INSTALACAO
ELETRODUTO METALICO FLEXIVEL DN 25MM FABRICADO COM FITA DE ACO
72925 - SINAPI 10.04.08 ZINCADO, REVESTIDO EXTERNAMENTE COM PVC PRETO, INCLUSIVE CONEXOES, M 110.00 10.07 13.16 1,447.94
FORNECIMENTO E INSTALACAO

08/0107 - COMP 10.04.09 FORNECIMENTO E INSTALAO DE ELETROCALHA METLICA 50 X 50 X 3000 MM UN 45.00 74.25 97.05 4,367.12
(REF. VALEMAM OU SIMILAR)

08/0123 - COMP 10.04.10 SUPORTE OMEGA 50X50MM UN 126.00 5.40 7.05 888.74

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 5/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)

08/0108 - COMP 10.04.11 FORNECIMENTO E INSTALAO DE ELETROCALHA PERFURADA 38 X 38 X 3000 MM M 191.00 17.86 23.35 4,459.07
(REF. MOPA OU SIMILAR)

08/0123 - COMP 10.04.12 SUPORTE OMEGA 38X38MM UN 176.00 7.96 10.41 1,831.51

08/0127 - COMP 10.04.13 FORNECIMENTO E INSTALAO DE ELETROCALHA METLICA 100 X 100 X 3000 MM UN 8.00 107.89 141.01 1,128.06
(REF. MOPA OU SIMILAR) (INCLUSIVE CONEXES) (EXCLUSO SUPORTES)

08/0128 - COMP 10.04.14 SUPORTE OMEGA 100X100MM UN 22.00 8.91 11.65 256.26

08/0129 - COMP 10.04.15 FIXAO DE ELETROCALHAS COM VERGALHO (TIRANTE) COM ROSCA TOTAL UN 88.00 12.86 16.80 1,478.54
1/4"X1000MM (MARVITEC REF. 1431 OU SIMILAR)
10.05 TOMADAS, INTERRUPTORES E ACESSRIOS 1,776.33
08/0109 - COMP / 10.05.01 INTERRUPTOR 01 SEO, COM CAIXA PVC 4"X2" UN 15.00 12.76 16.68 250.16
0470 - ORSE
08/0008 - COMP/ 10.05.02 INTERRUPTOR 02 SEES SIMPLES UN 1.00 7.47 9.76 9.76
3402 - ORSE
08/0007 - COMP/ 10.05.03 INTERRUPTOR 01 SEO PARALELA, DE EMBUTIR, COM CAIXA PVC 4"X2" UN 10.00 14.39 18.81 188.13
0476 - ORSE
08/0110 - COMP/ 10.05.04 INTERRUPTOR PARA CHUVEIRO, BIPOLAR SIMPLES, 25A, REF.2516, SILENTOQUE, UN 1.00 28.82 37.66 37.66
7810 - ORSE PIAL OU SIMILAR, INCLUSIVE CAIXA PVC 4X2 E PLACA
08/0111 - COMP/ 10.05.05 INTERRUPTOR 01 SEO SIMPLES, DE EMBUTIR, COM PLACA, CONJUGADO COM UN 4.00 17.13 22.39 89.56
3729 - ORSE TOMADA 2P+T, ABNT, 10A, INCLUSIVE CAIXA PVC 4X2

83540 - SINAPI 10.05.06 TOMADA DE EMBUTIR 2P+T 10A/250V C/ PLACA - FORNECIMENTO E INSTALACAO UN 47.00 9.32 12.18 572.56

83555 - SINAPI 10.05.07 TOMADA DUPLA DE EMBUTIR 2X2P+T 10A/250V C/ PLACA - FORNECIMENTO E UN 5.00 16.47 21.52 107.60
INSTALACAO

83566 -SINAPI 10.05.08 TOMADA DE EMBUTIR 2P+T 20A/250V C/ PLACA - FORNECIMENTO E INSTALACO UN 5.00 16.70 21.83 109.15

83540 - SINAPI 10.05.09 TOMADA DE EMBUTIR 2P+T 10A/250V C/ PLACA - FORNECIMENTO E UN 2.00 9.32 12.18 24.36
INSTALACAO(REDE ESTABILIZADA)

83555 - SINAPI 10.05.10 TOMADA DUPLA DE EMBUTIR 2X2P+T 10A/250V C/ PLACA - FORNECIMENTO E UN 18.00 16.47 21.52 387.37
INSTALACAO(REDE ESTABILIZADA)
10.06 CAIXAS DE PASSAGEM (CONFORME ESP. TCNICAS) 3,669.06
08/0112 - COMP/ 10.06.01 CAIXA DE PASSAGEM 20X20X12CM, EM CHAPA AO GALVANIZADO EMBUTIDA UN 6.00 27.16 35.50 213.02
650 - ORSE
08/0113 - COMP/ 10.06.02 CAIXA DE PASSAGEM 15X15CM EM CHAPA DE AO GALVANIZADO - UN 12.00 13.11 17.14 205.64
665 - ORSE FORNECIMENTO (EMBUTIR)
08/0114 - COMP/ 10.06.03 CAIXA DE PASSAGEM EM PVC TIPO AQUATIC, 100X100X50MM(EMBUTIR) UN 23.00 24.57 32.11 738.60
8699 - ORSE
83387 - SINAPI 10.06.04 CAIXA DE PASSAGEM PVC 4X2" - FORNECIMENTO E INSTALACAO UN 29.00 4.59 6.00 173.94
QUADRO DE DISTRIBUICAO PARA TELEFONE N.3, 40X40X12CM EM CHAPA
83370 - SINAPI 10.06.05 METALICA, DE EMBUTIR, SEM ACESSORIOS, PADRAO TELEBRAS, FORNECIMENTO E UN 1.00 112.36 146.86 146.86
INSTALACAO

73749/001 - SINAPI 10.06.06 CAIXA ENTERRADA PARA INSTALACOES TELEFONICAS TIPO R1 0,60X0,35X0,50M UN 4.00 110.23 144.07 576.30
EM BLOCOS DE CONCRETO ESTRUTURAL

83450 - SINAPI 10.06.07 CAIXA DE PASSAGEM EM ALVENARIA NO PISO 80X80X62cm FUNDO BRITA COM UN 1.00 263.81 344.80 344.80
TAMPA

83449 - SINAPI 10.06.08 CAIXA DE PASSAGEM EM ALVENARIA NO PISO 60X60X70cm FUNDO BRITA COM UN 3.00 221.20 289.10 867.31
TAMPA

83446 - SINAPI 10.06.09 CAIXA DE PASSAGEM EM ALVENARIA NO PISO 30X30X40cm COM TAMPA E DRENO UN 2.00 93.13 121.72 243.44
BRITA

83443 - SINAPI 10.06.10 CAIXA DE PASSAGEM EM ALVENARIA NO PISO 20X20X25cm FUNDO BRITA COM UN 4.00 30.44 39.79 159.15
TAMPA
10.07 ATERRAMENTO - SPDA 20,290.75
72254 - SINAPI 10.07.01 CABO DE COBRE N, BITOLA 50MM M 216.00 25.53 33.37 7,207.34
72253 - SINAPI 10.07.02 CABO DE COBRE N 35MM M 180.00 19.07 24.92 4,486.15
72251 - SINAPI 10.07.03 CABO DE COBRE N, BITOLA 16MM M 65.00 9.06 11.85 770.04
68069 - SINAPI 10.07.04 HASTE COPPERWELD 5/8 X 3,0M COM CONECTOR UN 32.00 26.23 34.29 1,097.16
13294 - SINAPI 10.07.05 PARAFUSO SEXTAVADO ROSCA SOBERBA ZINCADO 3/8" X 80MM UN 200.00 1.00 1.30 260.78

09722/ORSE 10.07.06 CORPO DA CAIXA DE INSPEO EM PVC P/ATERRAMENTO D=300MM, REDONDA, UN 21.00 13.55 17.71 371.87
H=300MM, REF: TEL-552 OU SIMILAR (SPDA)
08/0098 - COMP 10.07.07 SERVIO DE SOLDA EXOTERMICA UN 1.00 1,560.57 2,039.67 2,039.67
08/0033 - COMP/ 10.07.08 CAIXA DE EQUALIZAO P/ATERRAMENTO 20X20X10CM DE SOBREPOR P/11 UN 1.00 149.66 195.61 195.61
09051 - ORSE TERMINAIS DE PRESSO C/BARRAMENTO
72315 - SINAPI 10.07.09 TERMINAL AREO EM AO GALVANIZADO COM BASE DE FIXAO H=30CM UN 30.00 16.79 21.94 658.28

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 6/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)

72262 - SINAPI 10.07.10 TERMINAL OU CONECTOR DE PRESSAO - PARA CABO 35MM2 - FORNECIMENTO E UN 200.00 9.69 12.67 2,533.28
INSTALACAO
M26 10.07.11 PRESILHA PARA CABO UN 200.00 2.57 3.35 670.57
10.08 DISPOSITIVOS DE PROTEO 3,483.95

08/0118 - COMP 10.08.01 DISJUNTOR TERMOMAGNETICO TRIPOLAR 125 A, PADRO DIN (EUROPEU - LINHA UN 2.00 201.27 263.06 526.13
BRANCA), 10kA

08/0078 - COMP 10.08.02 DISJUNTOR TERMOMAGNETICO TRIPOLAR PADRAO DIN (EUROPEU) 10 A 50A UN 8.00 66.71 87.19 697.50
240V, FORNECIMENTO E INSTALACAO

08/0079 - COMP 10.08.03 DISJUNTOR TERMOMAGNETICO TRIPOLAR PADRAO DIN (EUROPEU) 60 A 100A UN 3.00 89.05 116.38 349.15
240V, FORNECIMENTO E INSTALACAO

08/0077 - COMP 10.08.04 DISJUNTOR TERMOMAGNETICO MONOPOLAR 10 A 30A, PADRO DIN (LINHA UN 54.00 13.24 17.30 934.11
BRANCA), CORRENTE DE INTERRUPO 5kA, REF.: SIEMENS 5 SX1 OU SIMILAR.

08/0125 - COMP 10.08.05 DISJUNTOR MONOPOLAR 32 A, PADRO DIN (LINHA BRANCA), CURVA DE DISPARO UN 6.00 13.56 17.72 106.32
C, CORRENTE DE INTERRUPO 5KA, REF.: SIEMENS 5 SX1 OU SIMILAR.

08/0080 - COMP / 10.08.06 DISJUNTOR BIPOLAR DR 25 A - DISPOSITIVO RESIDUAL DIFERENCIAL, TIPO AC, UN 4.00 96.65 126.32 505.27
07996 - ORSE 30MA, REF.5SM1 314-OMB, SIEMENS OU SIMILAR

08/0126 - COMP / 10.08.07 DISJUNTOR BIPOLAR DR 40 A - DISPOSITIVO RESIDUAL DIFERENCIAL, TIPO AC, UN 1.00 120.33 157.27 157.27
08077- ORSE 30MA, REF.5SM1 314-OMB, SIEMENS OU SIMILAR

08/0002 - COMP 10.08.08 DISPOSITIVO DE PROTEO CONTRA SURTO DE TENSO DPS 40kA - 440V UN 2.00 79.65 104.10 208.20
-09042 - ORSE

10.09 EQUIPAMENTOS DE ILUMINAO 9,696.69


08/0014 - COMP/ 10.09.01 LUMINRIA DE EMBUTIR COM ALETAS, PARA LMPADA FLUORESCENTE, 2 X 32W, UN 44.00 102.86 134.44 5,915.26
7327 - ORSE REF. TBS020232CI00, DA PHILIPS, COMPLETA
LUMINRIA CILNDRICA DE SOBREPOR EM ALUMNIO PINTADO EM MARROM
08/0046 - COMP / 10.09.02 PADRO LUMINI,REF. T069, DA LUMINI, INCLUSO DUAS LMPADAS UN 2.00 176.31 230.44 460.88
07268 - ORSE FLUOCOMPACTAS DE 20W, TEMP. COR 2700K
08/0124 - COMP/ 10.09.03 LUMINRIA DE SOBREPOR COM ALETAS, PARA LMPADA FLUORESCENTE UN 6.00 158.32 206.92 1,241.53
7599 - ORSE COMPACTA, 2 X 26W, REF. C-2313, DA LUSTRES PROJETO OU SIMILAR
08/0130 - COMP 10.09.04 FORNECIMENTO E INSTAO - LUMINARIA ESPETO PARA JARDIM PAR 40W UN 9.00 117.83 154.01 1,386.08
08/0121 - COMP / 10.09.05 REFLETOR PARA LMPADA DE 150 A 500W UN 9.00 21.79 28.47 256.27
8739 - ORSE

73831/008 - SINAPI 10.09.06 LAMPADA DE VAPOR DE SODIO DE 250WX220V - FORNECIMENTO E INSTALACAO UN 9.00 37.12 48.52 436.66

10.10 CABEAMENTO ESTRUTURADO 11,667.50


08/0085 - COMP/ 10.10.01 FORNECIMENTO E LANAMENTO DE CABO UTP 4 PARES CAT.6 M 1,234.50 3.99 5.22 6,438.64
7138 - ORSE
08/0132 - COMP 10.10.02 CABO DE FIBRA PTICA DE 12 VIAS M 50.46 5.00 6.53 329.60
08/0032 - COMP/ 10.10.03 PATH CORDS DE 1.50 M COM CONECTOR RJ-45 MACHO UN 96.00 8.34 10.90 1,046.69
9534 - ORSE
08/0072 - COMP/ 10.10.04 TOMADA PARA LGICA, COM CAIXA PVC, EMBUTIDA UN 28.00 34.76 45.44 1,272.25
796 - ORSE
08/0027 - COMP/ 10.10.05 TOMADA DUPLA PARA LGICA RJ45, 4"X4", EMBUTIR, COMPLETA UN 10.00 76.15 99.53 995.31
7792 - ORSE
08/0106 - COMP 10.10.06 FORNECIMENTO E INSTALAO DE REGUA 8 TOMADAS PARA RACK 19" UN 1.00 74.01 96.74 96.74
7304 - ORSE 10.10.07 PATH PANEL 24 PORTAS CAT 6E UN 3.00 - - -
7867 - ORSE 10.10.08 SWITCH 24 PORTAS 10/100 MBPS - FORNECIMENTO UN 3.00 - - -

M71 10.10.09 NO BREAK DE GRANDE PORTE 10KVA (1000VA) SMS 24677 SINUS DUBLE II BLACK UN 1.00 - - -
16 BATERIAS LCD | USS10000TI
08/0131 - COMP / 10.10.10 FORNECIMENTO E INSTALAO DE RACK DE PISO 19" X 24U X 700MM UN 1.00 - - -
8683 - ORSE
M19 10.10.11 DISTRIBUIDOR OPTICO UN 3.00 285.04 372.54 1,117.62

08/0133 - SINAPI 10.10.12 FORNECIMENTO E MONTAGEM DE GUIA DE CABOS HORIZONTAIS FECHADO DE UN 14.00 20.26 26.48 370.65
CORPO DE AO SAE 1020, PROF=40MM
M39 10.10.13 PABX IP 2 ENTROCAMENTOS 48RAMAIS UN 2.00 - - -
10.11 APARELHOS ELETRNICOS E ACESSRIOS 3,201.54
08/0069 - COMP 10.11.01 FORNECIMENTO E INSTALAO DE MESA DE SOM COM 6 CANAIS UN 1.00 - - -
08/0070 - COMP 10.11.02 FORNECIMENTO E INSTALAO DE AMPLIFICADOR 800WRMS UN 1.00 - - -
08/0071 - COMP 10.11.03 FORNECIMENTO E INSTALAO DE CAIXA DE SOM ACUSTICA 150 W UN 3.00 - - -
08/0084 - COMP 10.11.04 CABO PARALELO 2X2,5MM2 PARA SOM, FORNECIMENTO E INSTALAO M 25.00 13.67 17.87 446.74
08/0095 - COMP/ 10.11.05 PONTO EMBUTIDO TOMADA P/ TV A CABO, C/ ELETRODUTO CONDULETE PVC UN 1.00 77.22 100.92 100.92
0789 - ORSE RGIDO 3/4" S/ FIAO, EXCLUSIVE TOMADA (789/ORSE)
M16 10.11.06 SENSOR INFRAVERMELHO INTERNO UN 23.00 31.00 40.52 931.89
__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 7/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)
M6 10.11.07 SIRENE ELETRNICA DE 20W UN 1.00 12.90 16.86 16.86
M17 10.11.08 RECEPTOR 2 CANAIS 433MHZ MULTIFUNCIONAL REPTOR ECP UN 1.00 160.00 209.12 209.12
M5 10.11.09 CENTRAL DE CHOQUE PARA CERCA ELTRICA DE 8000V UN 1.00 187.00 244.41 244.41
M4 10.11.10 CENTRAL DE ALARME PARA 10 ZONAS UN 1.00 350.00 457.45 457.45
M15 10.11.11 TECLADO DIGITAL PARA ACIONAMENTO DO ALARME UN 1.00 85.00 111.10 111.10

08/0103 - COMP 10.11.12 FORNECIMENTO E INSTALAO DE HASTE DE CERCA ELTRICA, EM ALUMNIO UN 57.00 9.17 11.98 683.05
CHATO, C/ 04 ISOLADORES
M70 10.11.13 CAMERA IP 1MP DOME IR 15MT 4MM UN 9.00 - - -
11.00 APARELHOS MECNICOS E ACESSRIOS 21,291.45
4133-ORSE 11.01 INSTALAO DE CONDICIONADOR DE AR TIPO SPLIT/ HI-WALL/ 9000 BTU/H C/ UN 3.00 490.00 640.43 1,921.29
COMPRESSOR ROTATIVO

04134-ORSE 11.02 INSTALAO DE CONDICIONADOR DE AR TIPO SPLIT/ HI-WALL/ 12000 BTU/H C/ UN 3.00 610.00 797.27 2,391.81
COMPRESSOR ROTATIVO

04137/ORSE 11.03 INSTALAO DE CONDICIONADOR DE AR TIPO SPLIT/ HI-WALL/ 18000 BTU/H C/ UN 1.00 660.00 862.62 862.62
COMPRESSOR ROTATIVO

04469 - ORSE 11.04 INSTALAO DE AR CONDICIONADO TIPO SPLIT/ HI-WALL/ 22000 BTU/H UN 3.00 660.00 862.62 2,587.86
C/COMPRESSOR ROTATIVO

04141/ORSE 11.05 INSTALAO DE AR CONDICIONADO TIPO SPLIT/ HI-WALL/ 30000 BTU/H UN 2.00 710.00 927.97 1,855.94
C/COMPRESSOR ROTATIVO

14/0024 - COMP 11.06 FORNECIMENTO E INSTALAO DE CAIXA DE PASSAGEM POLAR PARA UN 12.00 35.91 46.93 563.21
EVAPORADORA MOD CPP005U 39 x 22 x 6 cm
04001 - ORSE 11.07 CABO DE COBRE PP CORDPLAST 4 X 2,5 MM2, 450/750V - FORNECIMENTO M 200.00 5.05 6.60 1,320.07

REDE FRIGORIGENA COM TUBOS DE COBRE DE 1/2" SEM COSTURA, ISOLAMENTO


09782 - ORSE 11.08 TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE M 50.00 33.20 43.39 2,169.62
GS FREON R-22 - FORNECIMENTO E INSTALAO

REDE FRIGORIGENA COM TUBOS DE COBRE DE 3/4" SEM COSTURA, ISOLAMENTO


09783 - ORSE 11.09 TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE M 40.00 64.90 84.82 3,392.97
GS FREON R-22 - FORNECIMENTO E INSTALAO

REDE FRIGORIGENA COM TUBOS DE COBRE DE 3/8" SEM COSTURA, ISOLAMENTO


09781 - ORSE 11.10 TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE M 30.00 24.38 31.86 955.94
GS FREON R-22 - FORNECIMENTO E INSTALAO

REDE FRIGORIGENA COM TUBOS DE COBRE DE 7/8" SEM COSTURA, ISOLAMENTO


09784 - ORSE 11.11 TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE M 20.00 69.60 90.97 1,819.34
GS FREON R-22 - FORNECIMENTO E INSTALAO

REDE FRIGORIGENA COM TUBOS DE COBRE DE 1/4" SEM COSTURA, ISOLAMENTO


09780 - ORSE 11.12 TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE M 60.00 18.50 24.18 1,450.77
GS FREON R-22 - FORNECIMENTO E INSTALAO

12.00 IMPERMEABILIZAO 12,444.41

73920/001 - SINAPI 12.01 REGULARIZACAO DE PISO/BASE EM ARGAMASSA TRACO 1:3 (CIMENTO E AREIA), M2 157.62 9.81 12.82 2,019.92
ESPESSURA 2,0CM, PREPARO MANUAL
IMPERMEABILIZACAO DE SUPERFICIE COM MANTA ASFALTICA PROTEGIDA COM
73753/001 - SINAPI 12.02 FILME DE ALUMINIO GOFRADO (DE ESPESSURA 0,8MM), INCLUSA APLICACAO DE M2 157.62 50.60 66.14 10,424.49
EMULSAO ASFALTICA, E=3MM
13.00 ESQUADRIAS 73,709.38
13.01 ESQUADRIAS DE MADEIRA 22,223.05

73910/005 - SINAPI 13.01.01 PORTA DE MADEIRA COMPENSADA LISA PARA PINTURA, 80 X 210 X 3,5CM, UN 17.00 247.37 323.32 5,496.38
INCLUSO ADUELA 2A, ALIZAR 2A E DOBRADIA

73910/007 - SINAPI 13.01.02 PORTA DE MADEIRA COMPENSADA LISA PARA PINTURA, 90 X 210 X 3,5CM, UN 4.00 229.50 299.96 1,199.83
INCLUSO ADUELA 2A, ALIZAR 2A E DOBRADIA
7101 - SINAPI 13.01.03 LAMINADO MELAMINICO LISO BRANCO M2 72.24 25.31 33.08 2,389.82

06/0018 - COMP/ PORTA EM MADEIRA COMPENSADA (CANELA), LISA, SEMI-CA, 0.60 X 1.60 M,
13.01.04 REVESTIDA C/FRMICA, INCLUSIVE FERRAGENS, EXCLUSIVE BATENTES, PARA USO UN 13.00 435.99 569.84 7,407.91
4307 - ORSE
EM DIVISRIAS GRANITO OU MARMORE
06/0048 - COMP/ 13.01.05 MOLA HIDRULICA PARA PORTA DE MADEIRA (BRASIL OU SIMILAR) UN 21.00 167.57 219.02 4,599.36
1778 - ORSE
PORTA EM MADEIRA COMPENSADA (CANELA), LISA, SEMI-CA, 0.80 X 1.60 M,
06/0028 - COMP/ 13.01.06 REVESTIDA C/FRMICA, INCLUSIVE FERRAGENS, EXCLUSIVE BATENTES, PARA USO UN 2.00 432.19 564.87 1,129.74
8382 - ORSE
EM DIVISRIAS GRANITO OU MARMORE
13.02 ESQUADRIAS DE ALUMNIO 25,997.86
06/0045 - COMP / 13.02.01 PERFIL DE ALUMINIO TIPO (I,T,U) M 20.00 17.44 22.80 455.99
8972 - ORSE
06/0046 - COMP/ 13.02.02 PORTA EM ALUMINIO, DE CORRER OU ABRIR, TIPO MOLDURA/VENEZIANA, COM M2 14.25 229.46 299.91 4,273.69
1836 - ORSE FERRAGENS, EXCLUSIVE VIDROS, COR PRETA

74067/004 - SINAPI 13.02.03 JANELA DE CORRER EM ALUMINIO, VENEZIANA, SEM BANDEIRA M2 25.31 465.95 608.99 15,413.63

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 8/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)

73809/1 - SINAPI 13.02.04 JANELA DE ALUMINIO, TIPO MAXIMAR, CONVENCIONAL, INCLUSO GUARNIES E M2 4.00 212.02 277.11 1,108.44
VIDRO FANTASIA
06/0053 - COMP/ JANELA DE ALUMINIO ANOD. NATURAL, COR FOSCA, FIXA, TIPO BICO DE
13.02.05 M2 10.20 356.01 465.30 4,746.11
9839 - ORSE PAPAGAIO, REF. J3, EXCLUSIVE VIDROS
13.03 ESQUADRIAS EM FERRO 19,435.63

06/0011 - COMP 13.03.01 GRADIL C/ PAINEL ELETROSOLDADO GALVANIZADO REVESTIDO EM NYLON COM M2 65.33 227.62 297.50 19,435.63
BASE CHUMBADA, NYLOFOR 3D OU SIMILAR
13.04 VIDROS 6,052.85
72117 - SINAPI 13.04.01 VIDRO LISO COMUM TRANSPARENTE, ESPESSURA 4MM M2 36.13 61.91 80.92 2,923.50
04263/ORSE 13.04.02 VIDRO TEMPERADO 10 MM, FUM, TIPO PIVOTANTE , COM FERRAGENS M2 9.00 266.03 347.71 3,129.35

14.00 REVESTIMENTOS 83,057.38

73928/001 - SINAPI 14.01 CHAPISCO EM PAREDES TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 0,5CM, M2 2,761.06 3.02 3.95 10,903.24
PREPARO MANUAL

5990 - SINAPI 14.02 EMBOCO TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA), ESPESSURA 2,0CM, M2 423.19 16.66 21.77 9,212.38
PREPARO MECANICO DA ARGAMASSA

5982 - SINAPI 14.03 REBOCO PAULISTA (MASSA UNICA) TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA), M2 2,376.02 13.29 17.37 41,278.26
ESPESSURA 1,5CM, PREPARO MECANICO DA ARGAMASSA

5975 - SINAPI 14.04 CHAPISCO TRACO 1:3 (TETOS) (CIMENTO E AREIA MEDIA), ESPESSURA 0,5CM, M3 105.62 3.54 4.63 489.22
PREPARO MECANICO DA ARGAMASSA

5995 - SINAPI 14.05 REBOCO ARGAMASSA TRACO 1:4,5 (TETOS) (CAL E AREIA FINA), ESPESSURA 0,5CM, M2 105.62 9.56 12.49 1,319.46
PREPPARO MECANICO DA ARGAMASSA
14.06 REVESTIMENTO CERMICO EM PAREDES 19,854.81
PASTILHA CERAMICA ESMALTADA, 5 X 5 CM, MARCA ATLAS, LINHA ENGENHARIA,
12/0066 - COMP/ 14.06.01 REF.AREIA -M4330, APLICADA COM ARGAMASSA INDUSTRIALIZADA AC-II, M2 38.48 103.25 134.95 5,192.76
9804 - ORSE
REJUNTADA, EXCLUSIVE EMBOO (OU SIMILAR)

REVESTIMENTO CERMICO PARA PISO OU PAREDE, 10x10 CM, ELIANE, LINHA


12/0014 - COMP/ 14.06.02 ARQUITETURAL NEVE, PEI-3, APLICADO COM ARGAMASSA INSDUSTRIALIZADA AC- M2 349.01 32.14 42.01 14,662.05
3573 - ORSE I, REJUNTADO, EXCLUSIVE REGULARIZAO DE BASE OU EMBOO.

15.00 PISOS 78,712.30

73920/001 - SINAPI 15.01.01 REGULARIZACAO DE PISO/BASE EM ARGAMASSA TRACO 1:3 (CIMENTO E AREIA), M2 433.02 9.81 12.82 5,549.34
ESPESSURA 2,0CM, PREPARO MANUAL

73850/001 - SINAPI 15.01.02 RODAPE EM GRANILITE, ALTURA 10CM M 260.45 12.63 16.50 4,298.36

84191 - SINAPI 15.01.03 PISO EM GRANILITE ESPESSURA 8 MM, INCLUSO JUNTAS DE DILATACAO PLASTICAS M2 308.10 40.93 53.50 16,482.75

REVESTIMENTO PARA PISO OU PAREDE EM GRANITO CINZA ANDORINHA, POLIDO,


12/0070 - COMP 15.01.04 E = 2CM, APLICADO COM ARGAMASSA INDUSTRIALIZADA AC-I, REJUNTADO, M 34.60 143.09 187.02 6,470.75
EXCLUSIVE EMBOO

73675 - SINAPI 15.01.05 PISO DE CONCRETO ACABAMENTO RSTICO ESPESSURA 7CM COM JUNTAS EM M 54.68 42.29 55.27 3,022.31
MADEIRA
12/0027 - COMP 15.01.06 SOLEIRA EM GRANITO CINZA ANDORINHA, L = 15 CM, E = 2 CM M 18.90 31.65 41.36 781.79
15.02 REVESTIMENTO CERMICO EM PISO 3,835.06

REVESTIMENTO CERMICO PARA PISO OU PAREDE, 41 X 41 CM, ELIANE, LINHA


12/0012 - COMP/ 15.02.01 CARGO PLUS BONE, APLICADO COM ARGAMASSA INDUSTRIALIZADA AC-III, M2 90.32 42.46 55.50 3,835.06
5059- ORSE
REJUNTADO, EXCLUSIVE REGULARIZAO DE BASE OU EMBOO

15.03 PAVIMENTAO E MEIO FIO 38,271.94

72967 - SINAPI 15.03.01 MEIO-FIO DE CONCRETO PRE-MOLDADO 12X30 CM, SOBRE BASE DE CONCRETO M 258.13 19.73 25.79 5,093.93
SIMPLES E REJUNTADO COM ARGAMASSA, TRAO 1:3 (CIMENTO E AREIA)

74147/001 - SINAPI 15.03.02 PISO EM BLOCO SEXTAVADO 30X30CM, ESPESSURA 8CM, ASSENTADO SOBRE M2 789.70 36.88 48.21 29,126.99
COLCHAO DE AREIA ESPESSURA 6CM
12/0077 - COMP/ 15.03.03 PISO EM BLOCO DE CONCRETO, INTERTRAVADO, COLORIDO, FCK=35MPA, P/ M2 42.24 95.90 125.35 4,051.03
9114 - ORSE TRFEGO MDIO, 10x20x8CM, ASSENTADO SOBRE COLCHO DE AREIA.
16.00 PAISAGISMO 8,754.91
12/0010 - COMP 16.01 GRAMA ESMERALDA EM PLACAS, FORNECIMENTO E PLANTIO M2 135.15 15.28 19.97 2,698.71
12/0018 - COMP 16.02 FORNECIMENTO E ESPALHAMENTO DE TERRA VEGETAL PREPARADA M3 20.27 50.11 65.49 1,327.70
12/0020 - COMP/ 16.03 CASCALHO (PIARRA BRANCA) APLICADO M3 1.00 36.48 47.69 47.69
75 - ORSE
12/0021 - COMP/ 16.04 LIMITADOR DE GRAMA COM BORDA FINA, L=12,5CM M 23.00 6.53 8.53 196.22
7657/ORSE
359 - SINAPI 16.05 ARVORE REGIONAL MAIOR QUE 2M, TIPO NEEM UN 2.00 57.01 74.51 149.02
M41 16.06 PALMEIRA CICA MEDIO UN 4.00 80.00 104.56 418.24
M42 16.07 PALMEIRA CICA PEQUENA UN 5.00 60.00 78.42 392.10
M47 16.08 MUDAS DE LAMBORI ROXO OU TREPADEIRA UN 192.00 0.60 0.78 150.57
__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 9/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)
M72 16.09 BRASILEIRINHO 1,20M (H) UN 5.00 15.00 19.61 98.03
M73 16.10 PALMEIRA GARRAFA2,5M (H) UN 2.00 450.00 588.15 1,176.30
M48 16.11 MOREIA BICOLOR UN 49.00 20.00 26.14 1,280.86
M40 16.12 XORA-CHINESA UN 9.00 3.00 3.92 35.29
M45 16.13 PALMEIRA PATA DE ELEFANTE 1,50M (H) UN 3.00 50.00 65.35 196.05
M46 16.14 PALMEIRA ARECA 3,0M (H) UN 18.00 25.00 32.68 588.15
17.00 PINTURAS 43,735.54

74134/002 - SINAPI 17.01 EMASSAMENTO COM MASSA ACRILICA, DUAS DEMAOS M2 1,980.08 8.75 11.44 22,646.18

73954/002 - SINAPI 17.02 PINTURA LATEX ACRILICA SEMI-BRILHO AMBIENTES INTERNOS/EXTERNOS, DUAS M2 1,281.39 5.83 7.62 9,770.20
DEMAOS - COR BRANCA

74065/001 - SINAPI 17.03 PINTURA ESMALTE FOSCO PARA MADEIRA, DUAS DEMAOS, INCLUSO M2 97.12 11.71 15.30 1,485.84
APARELHAMENTO COM FUNDO NIVELADOR BRANCO

72947 - SINAPI 17.04 SINALIZACAO HORIZONTAL COM TINTA RETRORREFLETIVA A BASE DE RESINA M2 36.92 13.19 17.24 636.43
ACRILICA COM MICROESFERAS DE VIDRO

12/0071 - COMP 17.05 PINTURA DE ACABAMENTO COM APLICAO DE 02 DEMOS DE TINTA M2 698.69 10.07 13.16 9,196.89
PERMACRIL, IBRATIM OU SIMILAR, INCLUSIVE LIXAMENTO
18.00 ELEMENTOS DECORATIVOS 63,950.59
18.01 BANCADAS DE GRANITO E RODAMO 2,947.64

07/0049 - COMP / 18.01.01 BANCADA EM GRANITO CINZA ANDORINHA, E = 2,5CM, LARG=0,60 PARA PIA OU M2 10.18 154.09 201.40 2,050.21
5051 - ORSE LAVATRIO

13/0037 - COMP/ 18.01.02 TESTEIRA EM GRANITO CINZA ANDORINHA, H=10CM, ESP.:2 CM, APLICADO COM M 19.09 22.11 28.90 551.66
9719 - ORSE ARGAMASSA INDUSTRIALIZADA AC-I

07/0053 - COMP/ 18.01.03 RODAMEIO EM GRANITO PRETO, LARG=8 CM, ESP=2 CM, PARA ACABAMENTOS M 12.64 20.93 27.36 345.77
4790 - ORSE
18.02 DIVISRIAS 21,949.67

12/0013 - COMP 18.02.01 DIVISRIA EM GRANITO PRETO 2CM, INCLUSIVE MONTAGEM COM FERRAGENS M2 46.46 349.32 456.56 21,209.55

06/0047 - COMP 18.02.02 BOX EM VIDRO TEMPERADO 8MM TIPO BLINDEX M 3.15 179.77 234.96 740.12
18.03 PLACA E BARRAS 23,959.05
02390/ORSE 18.03.01 BARRA DE APOIO EM AO INOX POLIDO, L=90CM, D=38.1 MM UN 6.00 154.35 201.74 1,210.41
13/0036 - COMP 18.03.02 BARRA DE APOIO EM TUBO GALVANIZADO, D=1 1/2", INCLUSIVE PINTURA M 12.85 42.23 55.19 709.25
13/0004 - COMP / 18.03.03 CORRIMO EM AO INOX =1 1/2", h=90cm M 26.17 542.35 708.85 18,550.64
8759 - ORSE

74125/002 - SINAPI 18.03.04 ESPELHO CRISTAL ESPESSURA 4MM, COM MOLDURA EM ALUMINIO E M2 11.24 237.48 310.39 3,488.74
COMPENSADO 6MM PLASTIFICADO COLADO
18.04 BASE E MASTROS PARA BANDEIRA E LETREIRO 8,884.54

02423/ORSE 18.04.01 MASTRO TRIPLO EM TUBO DE FERRO GALVANIZADO TELESCPICO PARA UN 1.00 4,275.18 5,587.66 5,587.66
BANDEIRA, ALT: 7 M (3Mx2' + 4M x 1 1/2')
13/0008 - COMP / 18.04.02 BASE PARA FIXAO DE MASTRO TRIPLO UN 1.00 360.48 471.15 471.15
2437 - ORSE

M34 18.04.03 CONFECO DE LETRAS EM CHAPA GALVANIZADA N22 PINTADA COM TINTA UN 12.00 63.00 82.34 988.09
AUTOMOTIVA MED 22CM DE ALTURA (MAISCULAS)

M35 18.04.04 CONFECO DE LETRAS EM CHAPA GALVANIZADA N22 PINTADA COM TINTA UN 37.00 38.00 49.67 1,837.64
AUTOMOTIVA MED 12CM DE ALTURA (MINSCULAS)
18.05 ACESSIBILIDADE PARA DEFICIENTES 6,209.69
PAVIMENTAO COM PISO TATIL DIRECIONAL E/OU ALERTA, EM BORRACHA,
12/0035 - COMP/ 18.05.01 P/DEFICIENTES VISUAIS, DIMENSES 25X25CM, APLICADO, REJUNTADO, EXCLUSIVE M2 5.45 168.00 219.58 1,196.69
7323 - ORSE
REGULARIZAO DE BASE

PAVIMENTAO COM PISO TATIL DIRECIONAL E/OU ALERTA, DE CONCRETO, NA


12/0072 - COMP / 18.05.02 COR NATURAL, P/DEFICIENTES VISUAIS, DIMENSES 25X25CM, APLICADO COM M2 31.44 67.27 87.92 2,764.26
9418 - ORSE ARGAMASSA INDUSTRIALIZADA AC-III, REJUNTADO, EXCLUSIVE REGULARIZAO
DE BASE

13/0009 - COMP/ 18.05.03 SINALIZAO PARA DEFICIENTES - ANEL DE BORRACHA PARA GUIA DE DEFICIENTE UN 6.00 22.96 30.01 180.05
7318 - ORSE EM CORRIMO
MAPA TTIL EM ACRLICO MEDINDO 70 X 50CM, COM SUPORTE EM CHAPA EM
13/0026 - COMP/ 18.05.04 FERRO 1" E TUBO DE FERRO GALVANIZADO =4", PINTADOS E PLACA EM GRANITO UN 1.00 1,361.27 1,779.18 1,779.18
8804 - ORSE CINZA ANDORINHA

73908/001 - SINAPI 18.05.05 CANTONEIRA DE ALUMINIO 2X2, PARA PROTECAO DE QUINA DE PAREDE M 10.00 22.15 28.95 289.50

19.0 SERVIOS COMPLEMENTARES 610.02


9537 - SINAPI 19.01 LIMPEZA FINAL DA OBRA M2 436.20 1.07 1.40 610.02

TOTAL DO ORAMENTO R$ 1,223,313.67

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 10/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
TRT - CORURIPE/AL
PLANILHA DE PREOS PARA A CONSTRUO

PLANILHA ORAMENTRIA
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCALIDADE: CORURIPE - ALAGOAS
BDI = 30,70%
CDIGO ITEM ESPECIFICAO UNID QUANT UNIT(R$) UNIT(R$) TOTAL(R$)

TOTAL COM BDI (R$) R$ 1,223,313.67


BDI DE 30,70%
TOTAL SEM BDI (R$) R$ 935,970.67
HUM MILHO, DUZENTOS E VINTE E TRS MIL, TREZENTOS E TREZE REAIS E SESSENTA E SETE CENTAVOS

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenheria Ltda - EPP 11/88
Engenheiro Civil Av. Pref. Moacir Cavalcante, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
Localizao: Tipo de obra/servio
CORURIPE - AL Construo Civil

CRONOGRAMA FISICO FINANCEIR


Item Discriminao dos servios Peso (%) Valor das Ms 01 Ms 02
obras/servios
Valor R$ % Valor R$ %
(R$)

Materiais e servios
1 Administrao da obra 15.28% 186,912.63 37,382.53 20% 29,906.02 16%
2 Servios Preliminares
demoliese retiradas 1.94% 23,694.72 23,694.72 100% - 0%
3 Movimento de Terra 4.82% 58,947.89 58,947.89 100%
4 Infra-Estrutura 7.89% 96,579.95 28,973.99 30% 57,947.97 60%
5 Super-Estrutura 5.31% 64,907.66 32,453.83 50%
6 Fechamentos 4.77% 58,354.21 - 0%
7 Coberta 9.80% 119,934.12
8 Instalaes Hidro-Sanitrias 7.79% 95,335.64 19,067.13 20%
9 Instalaes Contra Incndio e
Pnico 0.55% 6,739.92
10 Instalaes Eltricas 10.27% 125,640.95 6,282.05 5% 12,564.10 10%
11 Aparelhos Mecnicos e
Acessrios 1.74% 21,291.45 - 0%
12 Tratamentos 1.02% 12,444.41 - 0%
13 Esquadrias 6.03% 73,709.38
14 Revestimentos 6.79% 83,057.38
15 Pisos 6.43% 78,712.30 - 0%
16 PAISAGISMO 0.72% 8,754.91
17 Pinturas 3.58% 43,735.54
18 Elementos Decorativos 5.23% 63,950.59
19 Servios Complementares 0.05% 610.02

Total simples 100.00% 1,223,313.67 155,281.16 12.69% 151,939.05 12.42%


Total acumulado 1,223,313.67 - 155,281.16 12.69% 307,220.21 25.11%

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenharia Ltda - EPP 12/88
Eng. Civil Av. Pref. Moacir Cavvalcante de Albuquerque, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
Agente Financeiro:

Nome do empreendimento: Valor da Obra:


TRIBUNAL REGIONAL DO TRABALHO - 19REGIO VT- R$1,223,313.67
CORURIPE / AL

A FISICO FINANCEIRO
Ms 03 Ms 04 Ms 05 Ms 06
Valor R$ % Valor R$ % Valor R$ % Valor R$ %

29,906.02 16% 29,906.02 16% 29,906.02 16% 29,906.02 16%

- 0% - 0% - -

9,658.00 10%
32,453.83 50% -
11,670.84 20% 17,506.26 30% 29,177.10 50%
- 0% 59,967.06 50% 59,967.06 50%
38,134.26 40% 38,134.26 40%

- 0% 6,739.92 100%
18,846.14 15% 25,128.19 20% 37,692.29 30% 25,128.19 20%

10,645.72 50% 10,645.72 50%


12,444.41 100%
- 0% 14,741.88 20% 29,483.75 40% 29,483.75 40%
20,764.34 25% 20,764.34 25% 20,764.34 25% 20,764.34 25%
23,613.69 30% 23,613.69 30% 15,742.46 20% 15,742.46 20%
8,754.91 100%
- 0% 26,241.33 60% 17,494.22 40%
63,950.59 100%
610.02 100%

185,047.12 15.13% 229,761.70 18.78% 272,064.49 22.24% 229,220.15 18.74%


492,267.33 40.24% 722,029.03 59.02% 994,093.51 81.26% 1,223,313.67 100.00%

__________________________ __________________________
David Lima Ferreira Passos Planergy Engenharia Ltda - EPP 13/88
Eng. Civil Av. Pref. Moacir Cavvalcante de Albuquerque, 265B, So Miguel dos Campos/AL
CREA 20038834-7/AL CNPJ.: 08.611.602/0001-97
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

1 ADMINISTRAO DA OBRA

1.1 TAXAS E IMPOSTOS

1.01.01 ART DO CONTRATO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
A.R.T. DA OBRA 1.0000 m 250.00 250.00 250.00
Sub-Total 250.00

Equipamento
- -
Sub-Total -

Mo de obra
-
-
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 250.00

1.01.02 ALVAR PARA CONSTRUO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
ALVAR PARA CONSTRUO 1.00 m 3.85 3.85 3.85
Sub-Total 3.85

Equipamento
- -
Sub-Total -

Mo de obra
-
-
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 3.85

1.02 ADMINISTRAO LOCAL

1.02.01 ENGENHEIRO OU ARQUITETO AUXILIAR/JUNIOR (220H/MS)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
2706 ENGENHEIRO OU ARQUITETO / JUNIOR DE OBRA 1.0000 ms 5,350.96 5,350.96 5,350.96
- -
Leis Sociais 114.84% 6,145.04
Sub-Total 11,496.00

Preo Total TOTAL GERAL R$ 11,496.00

1.02.02 MESTRE DE OBRA (200H/MS)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
4069 MESTRE DE OBRAS 1.0000 ms 2,591.56 2,591.56 2,591.56
- -
Leis Sociais 114.84% 2,976.14
Sub-Total 5,567.70

Preo Total TOTAL GERAL R$ 5,567.70

1.02.03 ALMOXARIFE (200H/MS)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
253 ALMOXARIFE 1.0000 ms 999.48 999.48 999.48
- -
Leis Sociais 114.84% 1,147.80
Sub-Total 2,147.27

Preo Total TOTAL GERAL R$ 2,147.27

1.02.04 VIGILANTE NOTURNO (240H/MS)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
10508 VIGIA NOTURNO ADICIONAL 30% 1.0000 ms 969.05 969.05 969.05
- -
Leis Sociais 114.84% 1,112.85
Sub-Total 2,081.90

14/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Preo Total TOTAL GERAL R$ 2,081.90

15/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

1.03 FERRAMENTAS E EQUIPAMENTOS


1.03.01 CONJUNTO DE EPI'S(40UND/MS)
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CONJUNTO DE EPI'S(40UND/MS) 1.0000 und 2,178.43 2,178.43 2,178.43
0.00 -
Sub-Total 2,178.43

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 2,178.43

1.04 CAPACITAO DE FUNCIONRIOS


1.04.01 TCNICO DE SEGURANA DO TRABALHO SENIOR (INS.DIV)
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
07495/ORSE TCNICO DE SEGURANA DO TRABALHO SENIOR (INS.DIV) 1.0000 h 12.46 12.46 12.46
- -
Leis Sociais 114.84% -
Sub-Total 12.46

Preo Total TOTAL GERAL R$ 12.46

2 SERVIOS PRELIMINARES
2.01 PLACA DE OBRA EM CHAPA DE ACO GALVANIZADO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CONCRETO NAO ESTRUTURAL, CONSUMO 150KG/M3, PREPARO COM BETONEIRA, SEM LANCAMENTO 0.0100 m 236.00 2.36 2.36
PECA DE MADEIRA LEI NATIVA/REGIONAL 2,5 X 7,5 CM (1 X 3") NAO APARELHADA 1.0000 m 3.62 3.62 3.62
PLACA DE OBRA (IDENTIFICACAO) PARA CONSTRUCAO CIVIL EM CHAPA GALVANIZADA NUM 22 (NAO INCLUI
1.0000 m 158.99 158.99 158.99
COLOCACAO)
PREGO POLIDO COM CABECA 18 X 30 0.1100 kg 7.86 0.86 0.86
PECA DE MADEIRA NATIVA / REGIONAL 7,5 X 7,5CM (3X3) NAO APARELHADA (P/FORMA) 4.0000 m 4.91 19.63 19.63
Sub-Total 185.46

Equipamento
- -
Sub-Total -

Mo de obra
Carpinteiro 1.0000 h 4.61 4.61 4.61
Servente 2.0000 h 3.22 6.44 6.44
Leis Sociais 114.84% 12.69
Sub-Total 23.74

Preo Total TOTAL GERAL R$ 209.20

2.02 TAPUME DE CHAPA DE MADEIRA COMPENSADA, E= 6MM, COM PINTURA A CAL E REAPROVEITAMENTO DE 2X
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1106 CAL HIDRATADA, DE 1A. QUALIDADE, PARA ARGAMASSA 0.60 KG 0.90 0.54 0.54
5333 OLEO DE LINHACA 0.02 L 15.23 0.34 0.34
5061 PREGO POLIDO COM CABECA 18 X 27 0.15 KG 8.50 1.28 1.28
1351 CHAPA MADEIRA COMPENSADA RESINADA 2,2 X 1,1 M X 6MM P/ FORMA CONCRETO 0.23 UN 19.00 4.32 4.32
4491 PECA DE MADEIRA NATIVA / REGIONAL 7,5 X 7,5CM (3X3) NAO APARELHADA (P/FORMA) 1.58 M 4.76 7.53 7.53
- -
- -
Sub-Total 14.01

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0,9500000 h 3.22 3.06 3.06
1213 CARPINTEIRO DE FORMAS 0,8000000 h 4.61 3.69 3.69
4783 PINTOR 0,3000000 h 4.61 1.38 1.38
Leis Sociais 114.84% 9.34
Sub-Total 17.47

Preo Total TOTAL GERAL R$ 31.48

2.03 BARRACAO DE OBRA PARA ALOJAMENTO/ESCRITORIO, PISO EM PINHO 3A, PAREDES EM COMPENSADO 10MM, COBERTURA EM TELHA AMIANTO 6MM, INCLUSO INSTALACOES ELETRICAS E ESQUADRIAS
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
PREGO POLIDO COM CABECA 18 X 30 0.100 kg 7.91 0.79 0.79
PINHO DE TERCEIRA 1" X 12" E 1" X 9" 1.020 m 24.82 25.32 25.32
CHAPA MADEIRA COMPENSADA PLASTIFICADA 2,2 X 1,1M X 10MM P/ FORMA CONCRETO 0.386 m 19.83 7.65 7.65
TELHA FIBROCIMENTO ONDULADA 6MM - 2,44 X 1,10M 0.143 m 18.74 2.68 2.68
VIDRO LISO INCOLOR 3MM - SEM COLOCACAO 0.023 m 40.00 0.92 0.92
PORTA MADEIRA COMPENSADA LISA PARA PINTURA 80 X 210 X 3,5CM 0.012 und 55.65 0.64 0.64
TABUA MADEIRA 3A QUALIDADE 2,5 X 23,0CM (1 X 9") NAO APARELHADA 0.250 m 5.52 1.38 1.38
CANTONEIRA ACO ABAS IGUAIS (QUALQUER BITOLA) E = 1/8" 0.303 kg 3.42 1.04 1.04
PARAFUSO ROSCA SOBERBA ZINCADO CAB CHATA FENDA SIMPLES 3,8 X 30MM (1.1/4") 1.280 und 0.14 0.18 0.18
DOBRADICA FERRO POLIDO OU GALV 3 X 3" E=2MM PINO SOLTO OU REVERSIVEL SEM ANEIS 0.035 und 5.14 0.18 0.18
FECHADURA SOBREPOR FERRO PINTADO CHAVE GRANDE 0.006 und 8.57 0.05 0.05
FIO/CORDAO COBRE ISOLADO PARALELO OU TORCIDO 2 X 2,5MM2, TIPO PLASTIFLEX PIRELLI OU EQUIV 0.536 m 2.21 1.18 1.18
INTERRUPTOR SOBREPOR 1 TECLA SIMPLES, TIPO SILENTOQUE PIAL OU EQUIV 0.012 und 4.03 0.05 0.05
TOMADA SOBREPOR 2P UNIVERSAL 10A/250V, TIPO SILENTOQUE PIAL OU EQUIV 0.006 und 9.12 0.05 0.05
BOCAL/SOQUETE/RECEPTACULO DE PORCELANA 0.046 und 2.01 0.09 0.09
GLOBO ESFERICO DE VIDRO LISO TAMANHO MEDIO 0.046 und 10.41 0.48 0.48
FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M 0.024 und 1.13 0.03 0.03
DISJUNTOR TERMOMAGNETICO MONOPOLAR 30A 0.006 und 7.56 0.04 0.04
PECA DE MADEIRA NATIVA/REGIONAL 7,5 X 12,50 CM (3X5") NAO APARELHADA (P/FORMA) 0.700 m 9.88 6.92 6.92
PECA DE MADEIRA NATIVA / REGIONAL 7,5 X 7,5CM (3X3) NAO APARELHADA (P/FORMA) 0.900 m 5.41 4.87 4.87
CADEADO LATAO CROMADO H = 35MM / 5 PINOS / HASTE CROMADA H = 30MM 0.006 und 16.42 0.10 0.10
PORTA CADEADO ZINCADO OXIDADO PRETO 0.006 und 4.92 0.03 0.03
CONJUNTO ARRUELAS DE VEDACAO 5/16" P/ TELHA FIBROCIMENTO (UMA ARRUELA METALICA E UMA ARRULA PVC -
0.214 cj 0.10 0.02 0.02
CONICAS)
CONCRETO FCK=15MPA, PREPARO COM BETONEIRA, SEM LANCAMENTO 0.015 m 298.17 4.47 4.47
LANCAMENTO/APLICACAO MANUAL DE CONCRETO EM ESTRUTURAS 0.015 m 105.28 1.58 1.58
- -

16/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Equipamento Sub-Total 60.74


- -
Sub-Total -

Mo de obra
Auxiliar de Serralheiro 0.0700 h 3.53 0.25 0.25
Eletricista 0.30 h 5.82 1.75 1.75
Carpinteiro 6.0000 h 4.61 27.66 27.66
Servente 6.0480 h 3.23 19.54 19.54
Serralheiro 0.07 h 4.61 0.32 0.32
- -
Leis Sociais 114.84% 56.86
Sub-Total 106.37

Preo Total TOTAL GERAL R$ 167.11

3 MOVIMENTO DE TERRA
3.01 LIMPEZA MANUAL DO TERRENO (C/ RASPAGEM SUPERFICIAL)
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.2350 h 3.22 0.76 0.76
- -
Leis Sociais 114.84% 0.87
Sub-Total 1.63

Preo Total TOTAL GERAL R$ 1.63

3.02 ATERRO MECANIZADO COMPACTADO C/ EMPRESTIMO


CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Material
368 AREIA P/ ATERRO - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 1.1500 m 18.84 21.67 21.67
Sub-Total 21.67

Equipamento

4091 0.0050 h 132.71 0.66 0.66


MOTONIVELADORA COM POTENCIA DE 140 A 155 HP (LOCACAO COM OPERADOR, COMBUSTIVEL E MANUTENCAO)
7642 TRATOR DE PNEUS ATE 75HP (INCL MANUT/OPERACAO) 0.0100 h 41.98 0.42 0.42
CAMINHAO PIPA COM BARRA ESPARGIDORA E CAPACIDADE DE *6000* LITROS (LOCACAO COM OPERADOR,
1147 0.0100 h 55.58 0.56 0.56
COMBUSTIVEL E MANUTENCAO)
ROLO COMPACTADOR DE PNEUS, PRESSAO VARIAVEL, AUTOPROPELIDO 145HP, PESO VAZIO/C/ LASTRO 9,8/27 T, P/
6063 0.0050 h 87.13 0.44 0.44
SELAGEM ASFALTICA, TIPO DYNAPAC CP-27 OU EQUIV (INCL MANUTENCAO/OPERACAO)
Sub-Total 2.08

Mo de obra
6111 SERVENTE 0.0150 h 3.22 0.05 0.05
- -
Leis Sociais 114.84% 0.06
Sub-Total 0.10

Preo Total TOTAL GERAL R$ 23.85

3.03 REGULARIZAO DE SUPERFICIES EM TERRA COM MOTONIVELDORA


CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
4092 0.0030 H 84.00 0.25 0.25
MOTONIVELADORA COM POTENCIA DE 140 A 155 HP (LOCACAO COM OPERADOR, COMBUSTIVEL E MANUTENCAO)
- -
Sub-Total 0.25

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 0.25

3.04 LOCAO CONVENCIONAL DE OBRA, ATRAVS DE GABARITO DE TBUAS CORRIDAS PONTALETADAS A CADA 1,50M
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M 0.0200 kg 6.85 0.14 0.14
PECA DE MADEIRA NATIVA / REGIONAL 7,5 X 7,5CM (3X3) NAO APARELHADA (P/FORMA) 0.3600 m 4.98 1.79 1.79
PREGO POLIDO COM CABECA 18 X 27 0.0100 kg 7.21 0.07 0.07
TABUA MADEIRA 3A QUALIDADE 2,5 X 23,0CM (1 X 9") NAO APARELHADA 0.3160 m 6.72 2.12 2.12
Sub-Total 4.12

Equipamento
- -
Sub-Total -

Mo de obra
Carpinteiro 0.1000 h 4.61 0.46 0.46
Servente 0.0990 h 3.22 0.32 0.32
Leis Sociais 114.84% 0.90
Sub-Total 1.68

Preo Total TOTAL GERAL R$ 5.80

3.05 ESCAVACAO MANUAL EM SOLO-PROF. ATE 1,50 M


CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 1.9000 h 3.22 6.12 6.12
- -
Leis Sociais 114.84% 7.03
Sub-Total 13.14

17/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Preo Total TOTAL GERAL R$ 13.14


3.06 ATERRO APILOADO(MANUAL) EM CAMADAS DE 20 CM COM MATERIAL DE EMPRSTIMO
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 9.8740 h 3.22 31.79 31.79
- -
Leis Sociais 114.84% 36.51
Sub-Total 68.31

Preo Total TOTAL GERAL R$ 68.31

3.07 REGULARIZACAO E COMPACTACAO MANUAL DE TERRENO COM SOQUETE


CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.3140 h 3.22 1.01 1.01
- -
Leis Sociais 114.84% 1.16
Sub-Total 2.17

Preo Total TOTAL GERAL R$ 2.17

3.08 TRANSPORTE COMERCIAL COM CAMINHAO BASCULANTE 6 M3, RODOVIA EM LEITO NATURAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
4750 Caminho basculante, capacidade para 6,0 m (inclusive motorista) - VOLKSWAGEN VW-13.150 T 0.9800 h 1.10 1.07 1.07
Sub-Total 1.07

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 1.07

3.09 CARGA MANUAL DE TERRA EM CAMINHAO BASCULANTE 6 M3

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
Sub-Total -

Equipamento
5961 CAMINHAO BASCULANTE, 162HP, 6M3 - 12T (VU=5ANOS) - CHI DIURNO 1.0350 CHI 8.35 8.64 8.64
Sub-Total 8.64

Mo de obra
6111 SERVENTE 0.6000 h 3.22 1.93 1.93
- -
Leis Sociais 114.84% 2.22
Sub-Total 2.22

Preo Total TOTAL GERAL R$ 10.86

4 INFRA-ESTRUTURA

4.01 CONCRETO USINADO BOMBEADO FCK=25MPA, INCLUSIVE LANCAMENTO E ADENSAMENTO, PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO 12 MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1527 CONCRETO USINADO BOMBEADO FCK = 25,0 MPA 1.0500 m 336.23 353.04 353.04
Sub-Total 353.04

Equipamento
10485 VIBRADOR DE IMERSAO Cl MOTOR ELETRICO 2HP MONOFASICO QUALQUER DIAM C/ MANGOTE 0.3000 h 1.50 0.45 0.45
Sub-Total 0.45

Mo de obra
6111 SERVENTE 1.6000 h 3.22 5.15 5.15
4750 PEDREIRO 0.6000 h 4.61 2.77 2.77
378 ARMADOR 0.6000 h 4.61 2.77 2.77
1213 CARPINTEIRO DE FORMAS 0.6000 h 4.61 2.77 2.77
Leis Sociais 114.84% 6.35
Sub-Total 19.80

Preo Total TOTAL GERAL R$ 373.29

4.02 CONCRETO ARMADO FCK=15MPA FABRICADO NA OBRA, ADENSADO E LANADO, PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO RESINADO 12MM (03 USOS)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
73406 CONCRETO FCK=15MPA (1:2,5:3) , INCLUIDO PREPARO MECANICO, LANCAMENTO E ADENSAMENTO. 1.0000 m3 359.90 359.90 359.90
FORMA EM CHAPA DE MADEIRA COMPENSADA RESINADA 12 MM, PARA ESTRUTURAS DE CONCRETO REAPR. 3X
74075/002 10.0000 m2 56.00 560.00 560.00
(CORTE/MONTAGEM/ESCORAMENTO/DESFORMA).
74254/002 ARMACAO ACO CA-50, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ CORTE(PERDA DE 10%) / DOBRA / COLOCAO. 80.0000 kg 5.46 436.60 436.60
- -
Sub-Total 1,356.50

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -

18/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Leis Sociais 114.84% -


Sub-Total -

Preo Total TOTAL GERAL R$ 1,356.50

19/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

4.03 EXECUO DE LASTRO EM CONCRETO (1:2,5:6), PREPARO MANUAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Concreto simples fabricado na obra (1:2:6), preparo manual 1.00 M3 187.61 187.61 187.61
- -
Sub-Total 187.61

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 2.0000 h 4.61 9.22 9.22
6111 SERVENTE 10.0000 h 3.22 32.20 32.20
Leis Sociais 114.84% 47.57
Sub-Total 88.99

Preo Total TOTAL GERAL R$ 276.60

4.04 FORMA TABUA PARA CONCRETO EM FUNDACAO, C/ REAPROVEITAMENTO 2X

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
5061 PREGO POLIDO COM CABECA 18 X 27 0.1500 kg 7.92 1.19 1.19
4491 PECA DE MADEIRA NATIVA / REGIONAL 7,5 X 7,5CM (3X3) NAO APARELHADA (P/FORMA) 0.5700 m 4.81 2.74 2.74
6189 TABUA MADEIRA 2A QUALIDADE 2,5 X 30,0CM (1 X 12") NO APARELHADA 1.5850 m 6.72 10.65 10.65
4506 PECA DE MADEIRANATIVA/REGIONAL 2,5 X 10CM (1X4") NAO APARELHADA (SARRAFO P/FORMA) 0.2700 m 2.23 0.60 0.60
Sub-Total 15.18

Equipamento
- -
Sub-Total -

Mo de obra
1213 CARPINTEIRO DE FORMAS 1.0000 h 4.61 4.61 4.61
6117 AJUDANTE DE CARPINTEIRO 1.0000 h 3.49 3.49 3.49
Leis Sociais 114.84% 9.30
Sub-Total 17.40

Preo Total TOTAL GERAL R$ 32.58

4.05 ARMACAO ACO CA-50, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ CORTE(PERDA DE 10%) / DOBRA / COLOCAO.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
ACO CA-50 3/8" (9,52 MM) 1.1000 kg 2.65 2.92 2.92
ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M 0.0300 kg 3.76 0.11 0.11
- -
- -
Sub-Total 3.03

Equipamento
- -
Sub-Total -

Mo de obra
Armador 0.1488 h 4.61 0.69 0.69
Auxiliar de Armador 0.1489 h 3.49 0.52 0.52
Leis Sociais 114.84% 1.38
Sub-Total 2.59

Preo Total TOTAL GERAL R$ 5.62

4.06 ARMACAO DE ACO CA-60 DIAM. 3,4 A 6,0 MM - FORNECIMENTO / CORTE ( C/PERDA DE 10%) / DOBRA / COLOCAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
337 ARAME PRETO RECOZIDO, PARA ARMACAO DE FERRAGEM, N. 18, D = 1,25 MM (0,01 KGM) 0.0200 kg 10.00 0.20 0.20
39 ACO CA-60 - 5,0MM 1.1000 kg 3.74 4.12 4.12
- -
- -
Sub-Total 4.32

Equipamento
- -
Sub-Total -

Mo de obra
378 ARMADOR 0.1000 h 4.61 0.46 0.46
6111 SERVENTE 0.1000 h 3.22 0.32 0.32
Leis Sociais 114.84% 0.90
Sub-Total 1.68

Preo Total TOTAL GERAL R$ 6.00

4.07 EMBASAMENTO EM ALVENARIA DE TIJOLO CERAMICO FURADO 10X20X20CM, 1/2 VEZ, ASSENTADO EM ARGAMASSA TRACO 1:4 (CIMENTO E AREIA), E=1CM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7271 BLOCO CERAMICO VEDAcAO 8 FUROS - 9 X 19 X 19 CM 24.0000 UN 0.32 7.70 7.70
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0100 M3 299.40 2.99 2.99
- -
- -
Sub-Total 10.69

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 1.0000 h 4.61 4.61 4.61
6111 SERVENTE 1.0000 h 3.22 3.22 3.22
Leis Sociais 114.84% 8.99
Sub-Total 16.82

Preo Total TOTAL GERAL R$ 27.51

4.08 CHAPISCO EM PAREDES TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 0,5CM, PREPARO MANUAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0048 M3 280.00 1.34 1.34
- -
- -

20/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
- -
- -
- -
- -
Sub-Total 1.34

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 0.1000 h 4.61 0.46 0.46
6111 SERVENTE 0.1000 h 3.22 0.32 0.32
Leis Sociais 114.84% 0.90
Sub-Total 1.68

Preo Total TOTAL GERAL R$ 3.02

4.09 REBOCO PAULISTA (MASSA UNICA) TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA) , ESPESSURA 0,5CM, PREPARO MECANICO DA ARGAMASSA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO 0.0150 M3 326.00 4.88 4.88
- -
- -
- -
- -
- -
Sub-Total 4.88

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.5000 h 4.61 2.31 2.31
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 4.50
Sub-Total 8.41

Preo Total TOTAL GERAL R$ 13.29

4.10 EMBOCO TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA), ESPESSURA 2,0CM, PREPARO MECANICO DA ARGAMASSA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO 0.0200 M3 326.00 6.52 6.52
- -
Sub-Total 6.52

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 0.6050 h 4.61 2.79 2.79
6111 SERVENTE 0.6000 h 3.22 1.93 1.93
Leis Sociais 114.84% 5.42
Sub-Total 10.14

Preo Total TOTAL GERAL R$ 16.66

4.11 CONCRETO CICLOPICO C/CONC DOS RAC 10 MPA 30% PED DE MAO INCLTRANSP HORIZ C/CARRINHOS ATE 20M E COLOCACAO.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Areia grossa AC - (areia comercial) 0.44 m 36.75 16.02 16.02
Brita 2 - (19,0 a 25,0 mm) 0.62 m 32.00 19.68 19.68
Cimento cp - 320 50 kg 238.14 Kg 0.34 82.09 82.09
Pedra de mo grantica 0.5000 m 91.61 45.81 45.81
Sub-Total 163.60

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 2.0000 h 4.61 9.22 9.22
6111 SERVENTE 16.0000 h 3.22 51.52 51.52
Leis Sociais 85.62% 52.01
Sub-Total 112.75

Preo Total TOTAL GERAL R$ 276.35

4.12 LASTRO DE CONCRETO, PREPARO MECANICO, INCLUSO ADITIVO IMPERMEABILIZANTE

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
5652 CONCRETO NAO ESTRUTURAL, CONSUMO 150KG/M3, PREPARO COM BETONEIRA, SEM LANCAMENTO 1.00 M3 180.49 180.49 180.49
7325 ADITIVO IMPERMEABILIZANTE PARA CONCRETO E ARGAMASSA 20.00 KG 7.95 158.93 158.93
- -
Sub-Total 339.42

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 8.3300 h 4.61 38.40 38.40
6111 SERVENTE 16.6700 h 3.22 53.68 53.68
Leis Sociais 85.62% 78.84
Sub-Total 170.92

Preo Total TOTAL GERAL R$ 510.33

5 SUPER-ESTRUTURA
5.01 ESTRUTURAS EM CONCRETO ARMADO
5.01.01 CONCRETO USINADO BOMBEADO FCK=25MPA, INCLUSIVE LANCAMENTO E ADENSAMENTO, PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO 12 MM

21/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1527 CONCRETO USINADO BOMBEADO FCK = 25,0 MPA 1.0500 m 336.23 353.04 353.04
Sub-Total 353.04

Equipamento
10485 VIBRADOR DE IMERSAO Cl MOTOR ELETRICO 2HP MONOFASICO QUALQUER DIAM C/ MANGOTE 0.3000 h 1.50 0.45 0.45
Sub-Total 0.45

Mo de obra
6111 SERVENTE 1.6000 h 3.22 5.15 5.15
4750 PEDREIRO 0.6000 h 4.61 2.77 2.77
378 ARMADOR 0.6000 h 4.61 2.77 2.77
1213 CARPINTEIRO DE FORMAS 0.6000 h 4.61 2.77 2.77
Leis Sociais 114.84% 6.35
Sub-Total 19.80

Preo Total TOTAL GERAL R$ 373.29

5.01.02 CONCRETO ARMADO FCK=15MPA FABRICADO NA OBRA, ADENSADO E LANADO, PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO RESINADO 12MM (03 USOS) [PARA TAMPAS]

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Ao ca-50 6,3 a 12,5 mm 90.0000 kg 5.02 451.62 451.62
Arame galvanizado sem revestimento, 14bwg (2,1 mm) - 0,026kg/m 2.5000 kg 10.22 25.54 25.54
Arame recozido 18 bwg - 1,25mm (9,6g/m) 2.0000 kg 8.00 16.00 16.00
Areia grossa (AC - areia comercial ) 1.0000 m 52.64 52.64 52.64
Brita 1 (9,5 a 19,0 mm) 0.3000 m 54.36 16.31 16.31
Brita 2 (19,0 a 25,0 mm) 0.7000 m 52.50 36.75 36.75
Cimento cp - 320 (50 kg) 300.0000 kg 0.46 138.00 138.00
Compensado resinado 12mm - Madeirit ou similar 2.6000 m 15.19 39.49 39.49
Desmoldante desmol (vedacit) ou separol (sika) - p/ formas de madeira - ou similar 0.1500 l 6.67 1.00 1.00
Madeira mista serrada - pinho 3 (tbua/sarrafo) 2,2 x 10,0cm - 0,0022 m3/m 10.0000 m 5.19 51.90 51.90
Madeira mista serrada (barrote) 6 x 6cm - 0,0036 m3/m (angelim, louro) 2.0000 m 4.25 8.50 8.50
Pregos 16x24 4.0000 kg 7.52 30.08 30.08
VIBRADOR DE IMERSAO, DIAMETRO DE 25 MM, COM MOTOR A GASOLINA DE 3,5 HP 0.0000 und 2,878.39 0.06 0.06
GASOLINA COMUM 0.0688 l 2.90 0.20 0.20
Sub-Total 868.09

Equipamento
- -
Sub-Total -

Mo de obra
Armador 10.0000 h 4.61 46.10 46.10
Carpinteiro 17.0000 h 4.61 78.37 78.37
Pedreiro 0.7409 h 4.61 3.42 3.42
Servente 42.0000 h 3.22 135.24 135.24
Leis Sociais 85.62% 225.29
Sub-Total 488.41

Preo Total TOTAL GERAL R$ 1,356.50

5.01.03 FORMA PARA ESTRUTURAS DE CONCRETO (PILAR, VIGA E LAJE) EM CHAPA DE MADEIRA COMPENSADA RESINADA, DE 1,10 X 2,20, ESPESSURA = 12 MM, 03 UTILIZACOES.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1357 CHAPA MADEIRA COMPENSADA RESINADA 2,2 X 1,1 M(12MM) P/ FORMA CONCRETO 0.1742 UN 10.57 1.84 1.84
4491 PECA DE MADEIRA NATIVA / REGIONAL 7,5 X 7,5CM (3X3) NAO APARELHADA (P/FORMA) 1.0400 M 6.36 6.61 6.61
5068 PREGO POLIDO COM CABECA 17 X 21 0.2700 KG 7.86 2.12 2.12
2692 DESMOLDANTE PARA FORMA DE MADEIRA 0.0060 L 672.15 4.03 4.03
4506 PECA DE MADEIRANATIVA/REGIONAL 2,5 X 10CM (1X4") NAO APARELHADA (SARRAFO P/FORMA) 0.5500 M 3.75 2.06 2.06
6189 TABUA MADEIRA 2A QUALIDADE 2,5 X 30,0CM (1 X 12") NO APARELHADA 0.3100 M 7.73 2.40 2.40
Sub-Total 19.06

Equipamento
- -
Sub-Total -

Mo de obra
1213 CARPITEIRO DE FORMAS 0.9100 H 4.61 4.20 4.20
6117 AJUDANTE DE CARPINTEIRO 0.2300 H 3.49 0.80 0.80
Leis Sociais 85.62% 4.28
Sub-Total 9.28

Preo Total TOTAL GERAL R$ 28.34

5.01.04 ARMACAO DE ACO CA-60 DIAM. 3,4 A 6,0 MM - FORNECIMENTO / CORTE ( C/PERDA DE 10%) / DOBRA / COLOCAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
337 ARAME PRETO RECOZIDO, PARA ARMACAO DE FERRAGEM, N. 18, D = 1,25 MM (0,01 KGM) 0.0200 kg 10.00 0.20 0.20
39 ACO CA-60 - 5,0MM 1.1000 kg 3.74 4.12 4.12
- -
- -
Sub-Total 4.32

Equipamento
- -
Sub-Total -

Mo de obra
378 Armador 0.1000 h 4.61 0.46 0.46
6111 SERVENTE 0.1000 h 3.22 0.32 0.32
Leis Sociais 114.84% 0.90
Sub-Total 1.68

Preo Total TOTAL GERAL R$ 6.00

5.01.05 ARMACAO ACO CA-50/60, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ CORTE(PERDA DE 10%) / DOBRA / COLOCAO.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
ACO CA-50 3/8" (9,52 MM) 1.1000 kg 2.62 2.88 2.88
ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/M 0.0300 kg 4.95 0.15 0.15
- -
Sub-Total 3.03

Equipamento
- -
Sub-Total -

Mo de obra
Armador 0.1488 h 4.61 0.69 0.69
Auxiliar de Armador 0.1489 h 3.49 0.52 0.52
Leis Sociais 114.84% 1.38

22/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Sub-Total 2.59

Preo Total TOTAL GERAL R$ 5.62

23/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

5.01.06 ARMACAO ACO CA-50 DIAM.16,0 (5/8) 25,0MM (1) - FORNECIMENTO/ CORTE(PERDA DE 10%) / DOBRA / COLOCAO.
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
337 ARAME PRETO RECOZIDO, PARA ARMACAO DE FERRAGEM, N. 18, D = 1,25 MM (0,01 KGM) 0.0300 kg 10.00 0.30 0.30
30 ACO CA-50 3/4" (19,05 MM) 1.1000 kg 3.29 3.62 3.62
- -
Sub-Total 3.92

Equipamento
- -
Sub-Total -

Mo de obra
378 Armador 0.0700 h 4.61 0.32 0.32
6114 Auxiliar de Armador 0.0700 h 3.49 0.24 0.24
Leis Sociais 85.62% 0.49
Sub-Total 1.05

Preo Total TOTAL GERAL R$ 4.97

5.02 LAJES PR FABRICADAS


5.02.01 LAJE PR-FABRICADA TRELIADA PARA PISO OU COBERTURA, INTEREIXO 38CM, H=12CM, EL. ENCHIMENTO EM EPS H=8CM, INCLUSIVE ESCORAMENTO EM MADEIRA E CAPEAMENTO 4CM.
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
01286/ORSE Laje pr-fabricada treliada para piso ou cobertura, h=12cm, el. enchimento em bloco EPS, h=8cm 1.0000 m 29.00 29.00 29.00
01569/ORSE Madeira mista serrada (barrote) 6 x 6cm - 0,0036 m3/m (angelim, louro) 1.7100 m 4.81 8.23 8.23
01573/ORSE Madeira mista serrada (tbua) 2,2 x 22cm - 0,00484 m3/m 0.5600 m 4.95 2.77 2.77
5075 PREGO DE ACO 18 X 30 0.0300 kg 7.26 0.22 0.22
06995/ORSE Madeira mista serrada (sarrafo) 2,2 x 5,5cm - 0,00121 m/m 0.9700 m 3.20 3.10 3.10
4718 PEDRA BRITADA - POSTO PEDREIRA / FORNECEDOR 0.0440 M3 95.00 4.18 4.18
1379 CIMENTO PORTLAND COMUM CP I- 32 15.0000 KG 0.46 6.90 6.90
370 AREIA MEDIA - POSTO DE JAZIDA / FORNECEDOR (SEM FRETE) 0.0490 M3 52.50 2.57 2.57
ARMACAO ACO CA-50/60, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ CORTE(PERDA DE 10%) / DOBRA /
74254/002 COLOCAO. 1.8900 KG 7.16 13.53 13.53
Sub-Total 70.50

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 1.8800 h 3.22 6.05 6.05
4750 PEDREIRO 0.4400 h 4.61 2.03 2.03
- -
- -
Leis Sociais 114.84% -
Sub-Total 8.08

Preo Total TOTAL GERAL R$ 78.58

6.00 LAJES PR FABRICADAS


6.01 ALVENARIA EM TIJOLO CERMICO FURADO 10X20X20 CM, 1/2 VEZ, ASSENTADO EM ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA), JUNTAS 12MM
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO 0.0110 M3 326.00 3.59 3.59
7271 BLOCO CERAMICO VEDAQAO 8 FUROS - 9 X 19 X 19 CM 24.0000 UN 0.40 9.60 9.60
Sub-Total 13.19

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.7540 H 3.22 2.43 2.43
4750 PEDREIRO 0.7000 H 4.61 3.23 3.23
Leis Sociais 114.84% 6.49
Sub-Total 12.15

Preo Total TOTAL GERAL R$ 25.34

6.02 ALVENARIA EM TIJOLO CERMICO FURADO 10X20X20 CM, 1/2 VEZ, ASSENTADO EM ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA), JUNTAS 12MM
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
9253/ORSE Cobogo cimento tipo "fachada" 10x15x15cm 41.0000 un 0.64 26.19 26.19
6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO 0.0080 M3 372.05 2.98 2.98
Sub-Total 29.17

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 2.0000 H 4.61 9.22 9.22
Leis Sociais 114.84% 10.59
Sub-Total 19.81

Preo Total TOTAL GERAL R$ 48.98

6.03 VERGAS E CONTRAVERGAS 10X10CM EM CONCRETO PR-MOLDADO FCK=20MPA (PREPARO COM BETONEIRA) AO CA60, BITOLA FINA, INCLUSIVE FORMAS TABUA 3A.
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
5069 PREGO POLIDO COM CABECA 17 X 27 0.0100 KG 7.86 0.08 0.08
73942/1 ARMACAO DE ACO CA-60 DIAM.7,0 A 8,0MM - FORNECIMENTO / CORTE (C/ PERDA DE 10%) / DOBRA / COLOCACAO. 0.7200 KG 5.56 4.01 4.01
73972/2 CONCRETO FCK=20MPA, VIRADO EM BETONEIRA, SEM LANCAMENTO 0.0100 M3 239.03 2.39 2.39
6189 TABUA MADEIRA 2A QUALIDADE 2,5 X 30,0CM (1 X 12") NO APARELHADA 0.2219 M 9.70 2.15 2.15
Sub-Total 8.63

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.0600 H 3.22 0.19 0.19
4750 PEDREIRO 0.0750 H 4.61 0.35 0.35
1213 CARPINTEIRO DE FORMAS 0.0200 H 4.61 0.09 0.09
6117 AJUDANTE DE CARPINTEIRO 0.1230 H 3.49 0.43 0.43
Leis Sociais 114.84% 1.22
Sub-Total 2.28

Preo Total TOTAL GERAL R$ 10.91

24/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

6.04 PAREDE DE GESSO ACARTONADO, DRY-WALL D 100/75/60 2 ST 12,5MM SISTEMAS LAFARGE GYPSUM (OU SIMILAR)
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00037/ORSE Parede de gesso acartonado - dry - wall d 100/75/60 2 st 12,5mm sistemas lafarge gypsum ou similar 1.0000 m 71.26 71.26 71.26
- -
- -
- -
Sub-Total 71.26

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 71.26

7.00 COBERTA

7.01 CALHA EM ALVENARIA / CONCRETO, IMPERMEABILIZADA C/ MANTA ASFLTICA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
74075/002 Forma plana para estruturas, em compensado resinado de 12mm, 03 usos, inclusive escoramento 0.3000 m2 60.30 18.09 18.09
73406 CONCRETO FCK=15MPA (1:2,5:3) , INCLUIDO PREPARO MECANICO, LANCAMENTO E ADENSAMENTO. 0.0300 m3 359.90 10.80 10.80
74254/002 Ao CA - 50 6,3 a 12,5mm, inclusive corte, dobragem, montagem e colocacao de ferragens nas formas, para superestruturas e 2.4000 kg 7.91 18.98 18.98
ALVENARIA DE TIJOLO MACICO APARENTE 5,5X11X23CM A CHATO (ESPESSURA 11CM), ASSENT. COM ARGAMASSA
546 0.6000 m2 50.42 30.25 30.25
1:1:6 (CIMENTO, CAL E AREIA), ESP. JUNTA 1CM
Impermeabilizao c/manta asfltica 3mm, classe 2, estrudada c/reforo de no tecido de polister, inclusive aplicao de 1
73753/001 0.9000 m2 62.14 55.93 55.93
demo de primer e proteo mecnica trao 1:3
Sub-Total 134.05

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 134.05

7.02 RUFO EM CONCRETO ARMADO, LARGURA 40CM E ESPESSURA 7CM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
34 ACO CA-50 3/8" (9,52 MM) 1.9300 KG 3.54 6.83 6.83
337 ARAME PRETO RECOZIDO, PARA ARMACAO DE FERRAGEM, N. 18, D = 1,25 MM (0,01 KGM) 0.0500 KG 6.80 0.34 0.34
367 AREIA GROSSA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0180 M3 38.00 0.68 0.68
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 9.7200 KG 0.46 4.47 4.47
4491 PECA DE MADEIRA NATIVA / REGIONAL 7,5 X 7,5CM (3X3) NAO APARELHADA (P/FORMA) 1.0000 M 5.41 5.41 5.41
4718 PEDRA BRITADA N. 2 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0240 M3 100.00 2.40 2.40
5064 PREGO POLIDO COM CABECA 2 1/2 X 10 0.0670 KG 8.50 0.57 0.57
6189 TABUA MADEIRA 2A QUALIDADE 2,5 X 30,0CM (1 X 12") NO APARELHADA 0.9540 M 4.63 4.42 4.42
4502 PECA DE MADEIRA NATIVA/REGIONAL 2,5 X 5CM (1X2") NAO APARELHADA (SARRAFO P/FORMA) 0.5140 M 1.90 0.98 0.98
Sub-Total 26.10

Equipamento
- -
Sub-Total -

Mo de obra
378 ARMADOR 0.2350 H 4.61 1.08 1.08
4750 PEDREIRO 0.1400 H 4.61 0.65 0.65
6111 SERVENTE 1.2430 H 3.22 4.00 4.00
1213 CARPINTEIRO DE FORMAS 0.5050 H 4.61 2.33 2.33
Leis Sociais 114.84% 9.26
Sub-Total 17.31

Preo Total TOTAL GERAL R$ 43.41

ESTRUTURA METALICA EM TESOURAS OU TRELICAS, VAO LIVRE DE 12M, FORNECIMENTO E MONTAGEM, NAO SENDO CONSIDERADOS OS FECHAMENTOS METLICOS, AS COLUNAS, OS SERVICOS GERAIS EM
7.03
ALVENARIA E CONCRETO, AS TELHAS DE COBERTURA E A PINTURA DE ACABAMENTO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10966 PERFIL ACO ESTRUTURAL "U" - 6" X 2" (QUALQUER ESPESSURA) 10.0000 KG 1.83 18.30 18.30
Sub-Total 18.30

Equipamento
- -
Sub-Total -

Mo de obra
2700 Montador 2.0416 H 6.16 12.58 12.58
6111 SERVENTE 0.7000 H 3.22 2.25 2.25
Leis Sociais 114.84% 17.03
Sub-Total 31.86

Preo Total TOTAL GERAL R$ 50.16

7.04 PINTURA ESMALTE BRILHANTE (2 DEMAOS) SOBRE SUPERFICIE METALICA, INCLUSIVE PROTECAO COM ZARCAO (1 DEMAO)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3768 LIXA P/ FERRO 0.8300 UN 1.62 1.34 1.34
5318 SOLVENTE DILUENTE A BASE DE AGUARRAS 0.0800 L 9.87 0.79 0.79
7294 TINTA ESMALTE SINTETICO ALTO BRILHO 0.0900 GL 19.20 1.73 1.73
7308 FUNDO ANTICORROSIVO TIPO ZARCAO OU EQUIV 0.1000 GL 18.43 1.84 1.84
Sub-Total 5.70

Equipamento
- -
Sub-Total -

Mo de obra
4783 PINTOR 0.7500 H 4.61 3.46 3.46
6111 SERVENTE 0.7500 H 3.22 2.42 2.42
- -
- -
Leis Sociais 114.84% 6.74
25/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Sub-Total 12.62

Preo Total TOTAL GERAL R$ 18.32

26/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

7.05 TELHAMENTO COM TELHA DE ALUMNIO(TERMOACUSTICA) ACABAMENTO PINTADO NAS DUAS FACES (INTERNA BRANCA)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
09466/ORSE Telha trapezoidal termoacstica em alumnio cor branca, e= 0,5mm, poliuretano e=30 mm com filme, isoeste ou similar 1.0500 M2 61.45 64.52 64.52
7696/ORSE Massa 3M p/calafetao 0.0040 kg 83.16 0.33 0.33
4299 PARAFUSO ZINCADO ROSCA SOBERBA 5/16" X 110MM P/ TELHA FIBROCIMENTO) 0.8200 UM 0.83 0.68 0.68
- -
Sub-Total 65.53

Equipamento
- -
Sub-Total -

Mo de obra
1213 Carpinteiro 0.2200 H 4.61 1.01 1.01
6111 Servente 0.2200 H 3.22 0.71 0.71
- -
- -
Leis Sociais 114.84% 1.98
Sub-Total 3.70

Preo Total TOTAL GERAL R$ 69.23

7.06 FORRO MODULAR PARA PLACAS 1,25 X 0,62 M COM ESTRUTURA DE FIXAO EM PERFIS T

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
4949/ORSE forro de pvc Metabil ou similar, em placas 1,25 x 0,625, cor branca 1.2500 UND 50.64 63.30 63.30
9261/ORSE Perfil de aluminio tipo (I, T, U) 1.3310 M 9.95 13.24 13.24
Sub-Total 76.54

Equipamento
- -
Sub-Total -

Mo de obra
1214 CARPINTEIRO DE ESQUADRIA 0.4000 H 4.61 1.84 1.84
6111 SERVENTE 0.4000 H 3.22 1.29 1.29
Leis Sociais 114.84% 3.60
Sub-Total 6.73

Preo Total TOTAL GERAL R$ 83.27

8.00 INSTALAES HIDRO-SANITRIAS

8.01.01 TUBO PVC SOLDAVEL AGUA FRIA DN 25MM, INCLUSIVE CONEXOES - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
ADESIVO PVC FRASCO C/ 850G 0.0032 und 26.83 0.09 0.09
TUBO PVC SOLDAVEL EB-892 P/AGUA FRIA PREDIAL DN 25MM 2.0000 m 2.00 4.00 4.00
SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0030 und 31.78 0.10 0.10
- -
- -
Sub-Total 4.19

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.3500 h 5.82 2.04 2.04
6111 Servente 0.3340 h 3.22 1.08 1.08
Leis Sociais 114.84% 3.57
Sub-Total 6.69

Preo Total TOTAL GERAL R$ 10.88

8.01.02 REGISTRO GAVETA 1" COM CANOPLA ACABAMENTO CROMADO SIMPLES - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
FITA VEDA ROSCA EM ROLOS 18MMX10M 0.1700 und 1.73 0.29 0.29
REGISTRO GAVETA 1" REF 1509-C - C/ CANOPLA ACAB CROMADO SIMPLES 1.0000 und 57.68 57.68 57.68
- -
- -
- -
Sub-Total 57.97

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.6100 h 5.82 3.55 3.55
6111 Servente 0.1200 h 3.22 0.39 0.39
Leis Sociais 85.62% 3.37
Sub-Total 7.31

Preo Total TOTAL GERAL R$ 65.28

8.01.03 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 2 1/2"INCLUSIVE CONEXES, FORNECIMENTO E INSTALAO
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
9863 TUBO PVC ROSCAVEL EB-892 P/ AGUA FRIA PREDIAL 2 1/2" 1.4000 M 26.81 37.53 37.53
122 ADESIVO PVC FRASCO C/ 850G 0.0022 UND 28.46 0.06 0.06
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0008 UND 33.71 0.03 0.03
- -
- -
Sub-Total 37.62

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.8000 h 5.82 4.66 4.66
6111 Servente 0.8000 h 3.22 2.58 2.58
Leis Sociais 114.84% 8.31
Sub-Total 15.54

Preo Total TOTAL GERAL R$ 53.16

8.01.04 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 2" INCLUSIVE CONEXES, FORNECIMENTO E INSTALAO
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
27/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

9860 TUBO PVC ROSCAVEL EB-892 P/ AGUA FRIA PREDIAL 2" 1.4000 M 13.26 18.56 18.56
122 ADESIVO PVC FRASCO C/ 850G 0.0017 UND 28.46 0.05 0.05
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0007 UND 33.71 0.02 0.02
- -

28/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Sub-Total 18.63

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.6000 h 5.82 3.49 3.49
6111 Servente 0.6000 h 3.22 1.93 1.93
Leis Sociais 114.84% 6.23
Sub-Total 11.65

Preo Total TOTAL GERAL R$ 30.28

8.01.05 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 1 1/2"INCLUSIVE CONEXES, FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
9862 TUBO PVC ROSCAVEL EB-892 P/ AGUA FRIA PREDIAL 1 1/2" 1.5000 M 8.75 13.13 13.13
122 ADESIVO PVC FRASCO C/ 850G 0.0012 UND 28.46 0.03 0.03
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0005 UND 33.71 0.02 0.02
- -
- -
Sub-Total 13.18

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 22.89

8.01.06 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 1" INCLUSIVE CONEXES, FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
9866 TUBO PVC ROSCAVEL EB-892 P/ AGUA FRIA PREDIAL 1" 1.6000 M 6.24 9.98 9.98
122 ADESIVO PVC FRASCO C/ 850G 0.0008 UND 28.46 0.02 0.02
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0003 UND 33.71 0.01 0.01
- -
- -
Sub-Total 10.01

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.4000 h 5.82 2.33 2.33
6111 Servente 0.4000 h 3.22 1.29 1.29
Leis Sociais 114.84% 4.15
Sub-Total 7.77

Preo Total TOTAL GERAL R$ 17.78

8.01.07 TUBO PVC ROSCAVEL P/ AGUA FRIA PREDIAL 3"INCLUSIVE CONEXES, FORNECIMENTO E INSTALAO
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
9857 TUBO PVC ROSCAVEL EB-892 P/ AGUA FRIA PREDIAL 3" 1.4000 M 34.91 48.87 48.87
122 ADESIVO PVC FRASCO C/ 850G 0.0022 UND 28.46 0.06 0.06
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0008 UND 33.71 0.03 0.03
- -
- -
Sub-Total 48.96

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.8000 h 5.82 4.66 4.66
6111 Servente 0.8000 h 3.22 2.58 2.58
Leis Sociais 114.84% 8.31
Sub-Total 15.54

Preo Total TOTAL GERAL R$ 64.50

8.01.08 REGISTRO TIPO ESFERA EM PVC COM BORBOLETA, D= 2 1/2"


CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 1.8800 m 1.83 3.44 3.44
08517/ORSE Registro PVC esfera c/borboleta d = 2 1/2" 1.0000 un 26.65 26.65 26.65
- -
- -
- -
Sub-Total 30.09

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.8500 h 5.82 4.95 4.95
- -
Leis Sociais 114.84% 5.68
Sub-Total 10.63

Preo Total TOTAL GERAL R$ 40.72

8.01.09 REGISTRO TIPO ESFERA EM PVC COM BORBOLETA, D= 1 1/2"


CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 1.4000 m 1.83 2.56 2.56
11672 REGISTRO PVC ESFERA VS ROSCAVEL DN 1 1/2" 1.0000 un 22.40 22.40 22.40
- -
- -
- -
Sub-Total 24.96

Equipamento
- -
Sub-Total -

Mo de obra
29/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

2696 Encanador hidrulico 0.6000 h 5.82 3.49 3.49


6111 Servente 0.6000 h 3.22 1.93 1.93
Leis Sociais 114.84% 6.23
Sub-Total 11.65

Preo Total TOTAL GERAL R$ 36.61


8.01.10 TORNEIRA DE PRESSO, FABRIMAR, SRIE ACQUAPRESS, REF 1180-BIO OU SIMILAR
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 0.3500 m 0.18 0.06 0.06
03351/ORSE Torneira de presso, Fabrimar, srie acquapress, ref 1180-BIO ou similar 1.0000 Un 180.85 180.85 180.85
- -
- -
- -
Sub-Total 180.91

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.3400 h 5.82 1.98 1.98
6111 Servente 0.3400 h 3.22 1.09 1.09
Leis Sociais 114.84% 3.53
Sub-Total 6.60

Preo Total TOTAL GERAL R$ 187.51

8.01.11 TORNEIRA CROMADA LONGA 1/2" OU 3/4" DE PAREDE PARA PIA DE COZINHA COM AREJADOR, PADRAO MEDIO - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 0.3000 m 0.18 0.05 0.05
11775 TORNEIRA CROMADA 1/2" OU 3/4" REF 1157 P/ PIA COZ - C/ AREJADOR - PADRAO MEDIO 1.0031 um 95.62 95.92 95.92
- -
- -
- -
Sub-Total 95.97

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.5000 h 5.82 2.91 2.91
246 Auxiliar de encanador 0.5000 h 3.55 1.78 1.78
Leis Sociais 114.84% 5.38
Sub-Total 10.07

Preo Total TOTAL GERAL R$ 106.04

8.01.12 DUCHA HIGINICA COM REGISTRO, LINHA ASPEN, REF. 1984 DA DECA OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 3.2000 m 0.18 0.58 0.58
1370 DUCHA HIGIENICA COM MANGUEIRA PLASTICA E REGISTRO 1/2 - LINHA POPULAR 1.0000 und 51.65 51.65 51.65
- -
- -
- -
Sub-Total 52.23

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 1.1500 h 5.82 6.69 6.69
- -
Leis Sociais 114.84% 7.69
Sub-Total 14.38

Preo Total TOTAL GERAL R$ 66.61

8.01.13 TORNEIRA DE BIA P/CAIXA D'AGUA D = 1" (DECA OU SIMILAR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 0.6000 m 0.18 0.11 0.11
11825 TORNEIRA DE BOIA REAL 1" C/ BALAO PLASTICO 1.0000 und 46.12 46.12 46.12
- -
- -
- -
Sub-Total 46.23

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.3400 h 5.82 1.98 1.98
6111 Servente 0.3400 h 3.22 1.09 1.09
Leis Sociais 114.84% 3.53
Sub-Total 6.60

Preo Total TOTAL GERAL R$ 52.83

8.01.14 CHAVE DE BOIA AUTOMATICA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
12332 AUTOMATICO DE BOIA INFERIOR 10A/250V 1.0000 CJ 32.72 32.72 32.72
3146 FITA VEDA ROSCA EM ROLOS 18MMX1OM 0.1500 UN 2.00 0.30 0.30
- -
- -
- -
Sub-Total 33.02

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.8000 h 5.82 4.66 4.66
247 AUXILIAR DE ELETRICISTA 0.8000 h 3.52 2.82 2.82
Leis Sociais 114.84% 8.58
Sub-Total 16.05

Preo Total TOTAL GERAL R$ 49.07


30/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

8.01.15 CUBA DE AO INOX, DIMENSES 30 X 47CM, PARA INSTALAO EM BANCADA, C/ VLVULA CROMADA , SIFO CROMADO E ENGATE DE PLSTICO OU SIMILARES

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1747 CUBA ACO INOXIDAVEL NUM 2 (56,5X33,0X11,5) CM 1.0000 und 47.20 47.20 47.20
6141 ENGATE OU RABICHO FLEXIVEL PLASTICO (PVC OU ABS) BRANCO 1/2" X 30CM 1.0000 und 4.18 4.18 4.18
6136 SIFAO EM METAL CROMADO 1 1/2 X 1 1/2" 1.0000 und 54.60 54.60 54.60
6157 VALVULA EM METAL CROMADO TIPO AMERICANA 3.1/2" X 1.1/2" P/ PIA DE COZINHA 1.0000 und 31.20 31.20 31.20
- -
Sub-Total 137.18

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 1.5000 h 5.82 8.73 8.73
6111 Servente 1.5000 h 3.22 4.83 4.83
Leis Sociais 114.84% 15.57
Sub-Total 29.13

Preo Total TOTAL GERAL R$ 166.31

8.01.16 CUBA DE EMBUTIR, CIRCULAR, LINHA CARRARA L41, DECA OU SIMILAR, INCLUSIVE SIFO CROMADO, VLVULA CROMADA PARA PIA E ENGATE CROMADO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6157 VALVULA EM METAL CROMADO TIPO AMERICANA 3.1/2" X 1.1/2" P/ PIA DE COZINHA 1.0000 und 31.20 31.20 31.20
6137 SIFAO EM METAL CROMADO 1 X 1 1/2" 1.0000 und 54.60 54.60 54.60
00897/ORSE Ligao cromado p/ lavatrio 1/2" x 30cm ref.4606 (deca ou similar) 1.0000 und 45.79 45.79 45.79
COTAAO Cuba de embutir, circular, ref: L41, DECA ou similar 1.0000 und 49.98 49.98 49.98
- -
Sub-Total 181.57

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 2.0000 h 5.82 11.64 11.64
6111 Servente 2.0000 h 3.22 6.44 6.44
Leis Sociais 114.84% 20.76
Sub-Total 38.84

Preo Total TOTAL GERAL R$ 220.41

LAVATRIO LOUA (DECA-LINHA VOGUE PLUS CONFORTO, REF L-510 OU SIMILAR) COM COLUNA SUSPENSA, (DECA, LINHA VOGUE PLUS CONFORTO, REF. C-510 OU SIMILAR), C/ SIFO CROMADO, VLVULA CROMADA,
8.01.17
ENGATE CROMADO, EXCLUSIVE TORNEIRA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00897/ORSE Ligao cromado p/ lavatrio 1/2" x 30cm ref.4606 (deca ou similar) 1.0000 und 44.34 44.34 44.34
00982/ORSE Fixao p/ lavatrio - parafusos (deca - ref: sp-7 ou similar) 1.0000 cj 4.47 4.47 4.47
6137 SIFAO EM METAL CROMADO 1 X 1 1/2" 1.0000 und 46.41 46.41 46.41
6154 VALVULA EM PLASTICO CROMADO 1" S/UNHO C/LADRAO P/LAVATORIO 1.0000 und 4.64 4.64 4.64
03590/ORSE Lavatrio loua, ref: L-510, Vogue Plus Conforto(45.5 x 35.5 cm), DECA ou similar 1.0000 und 221.86 221.86 221.86
7388/ORSE Coluna suspensa de loua para lavatrio, linha Vogue Plus Conforto, ref: C-510, DECA ou similar 1.0000 und 95.80 95.80 95.80
Sub-Total 417.52

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 2.5000 h 5.82 14.55 14.55
6111 Servente 2.5000 h 3.22 8.05 8.05
Leis Sociais 114.84% 25.95
Sub-Total 48.55

Preo Total TOTAL GERAL R$ 466.07

8.01.18 CHUVEIRO ELETRICO COMUM CORPO PLASTICO TIPO DUCHA, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1368 CHUVEIRO ELETRICO COMUM PLASTICO TP DUCHA 110/220V 1.0000 UN 22.58 22.58 22.58
3148 FITA VEDA ROSCA EM ROLOS 18MMX50M 0.0100 UN 8.72 0.09 0.09
- -
- -
- -
Sub-Total 22.67

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.4500 h 5.82 2.62 2.62
6111 Servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 4.12
Sub-Total 7.70

Preo Total TOTAL GERAL R$ 30.37

8.01.19 TANQUE DE AO INOX POLIDO, DIMENSES 52X54X30 CM, PARA INSTALAO EM BANCADA, C/ VLVULA CROMADA , SIFO CROMADO , ENGATE DE PLSTICO OU SIMILARES

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
02095/ORSE Tanque em ao inox (52x54x30)cm 1.0000 und 72.91 72.91 72.91
6141 ENGATE OU RABICHO FLEXIVEL PLASTICO (PVC OU ABS) BRANCO 1/2" X 30CM 2.0000 und 2.05 4.10 4.10
6136 SIFAO EM METAL CROMADO 1 1/2 X 1 1/2" 3.0000 und 20.00 60.00 60.00
6157 VALVULA EM METAL CROMADO TIPO AMERICANA 3.1/2" X 1.1/2" P/ PIA DE COZINHA 4.0000 und 16.03 64.11 64.11
- -
- -
Sub-Total 201.12

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 1.5000 h 5.82 8.73 8.73
6111 Servente 1.5000 h 3.22 4.83 4.83
Leis Sociais 114.84% 15.57
Sub-Total 29.13

Preo Total TOTAL GERAL R$ 230.25

8.01.20 TORNEIRA CROMADA 1/2" OU 3/4" PARA JARDIM OU TANQUE, PADRAO ALTO - FORNECIMENTO E INSTALACAO
31/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 0.0200 m 1.90 0.04 0.04
11762 TORNEIRA CROMADA 1/2" OU 3/4" REF 1153 P/ JARDIM/TANQUE - PADRAO ALTO 1.0000 und 53.67 53.67 53.67
- -
Sub-Total 53.71

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.5000 h 5.82 2.91 2.91
246 Auxiliar de encanador 0.5000 h 3.55 1.78 1.78
Leis Sociais 114.84% 5.38
Sub-Total 10.07

Preo Total TOTAL GERAL R$ 63.78

32/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

8.01.21 TORNEIRA DE MESA COM FECHAMENTO AUTOMTICO, LINHA LINK, DECA, REF. 1172 C OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 0.3200 und 0.18 0.06 0.06
07076/ORSE Torneira de mesa com fechamento automtico, linha Link, DECA, ref. 1172 C ou similar 1.0000 und 355.18 355.18 355.18
- -
Sub-Total 355.24

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.3400 h 5.82 1.98 1.98
6111 Servente 0.3400 h 3.22 1.09 1.09
Leis Sociais 114.84% 3.53
Sub-Total 6.60

Preo Total TOTAL GERAL R$ 361.84

8.01.22 PORTA PAPEL HIGIENICO, LINHA DOMUS, REF. 102 C40, DA MEBER OU SIMILAR
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
07075 / ORSE Porta-papel higinico, linha Domus, ref. 102 C40, da Meber ou similar 1.00 UND 44.84 44.84 44.84
- -
Sub-Total 44.84

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.3000 H 4.61 1.38 1.38
- -
Leis Sociais 114.84% 1.59
Sub-Total 2.97

Preo Total TOTAL GERAL R$ 47.81

8.01.23 SABONETEIRA EM PLSTICO ABS, PARA SABONETE LQUIDO, DA JSN, REF. J7 OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
07073/ORSE Saboneteira em plstico ABS, para sabonete lquido, da JSN, ref. J7 ou similar 1.0000 und 34.14 34.14 34.14
- -
Sub-Total 34.14

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.7000 h 4.61 3.23 3.23
- -
Leis Sociais 114.84% 3.71
Sub-Total 6.93

Preo Total TOTAL GERAL R$ 41.07

8.01.24 DISPENSER PARA TOALHAS INTERFOLHADAS, PROLIM, LINHA TOILET PLUS REF 04305 OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
03569 / ORSE Dispenser para toalhas interfolhadas, Prolim, linha Toilet Plus ref 04305 ou similar 1.0000 und 71.07 71.07 71.07
- -
- -
- -
- -
- -
Sub-Total 71.07

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador 0.1500 h 5.82 0.87 0.87
- -
Leis Sociais 114.84% 1.00
Sub-Total 1.88

Preo Total TOTAL GERAL R$ 72.95

8.01.25 CABIDE EM AO INOX, DECA 2060 C40, ACABAMENTO CROMADO OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2899/ORSE Cabide em ao inox, DECA 2060 C40, acabamento cromado ou similar 1.0000 und 49.49 49.49 49.49
- -
- -
- -
- -
- -
Sub-Total 49.49

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.7000 h 4.61 3.23 3.23
- -
Leis Sociais 114.84% 3.71
Sub-Total 6.93

Preo Total TOTAL GERAL R$ 56.42

8.02 INSTALAES SANITRIAS E DRENAGEM

8.02.01 TUBO PVC ESGOTO PREDIAL DN 100MM, INCLUSIVE CONEXOES - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
122 ADESIVO PVC FRASCO C/ 850G 0.0083 UN 26.83 0.22 0.22
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0130 UN 31.78 0.41 0.41

33/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

9836 TUBO PVC SERIE NORMAL - ESGOTO PREDIAL DN 100MM - NBR 5688 1.2498 M 9.01 11.26 11.26
- -
- -
- -
Sub-Total 11.89

Equipamento
- -

34/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Sub-Total -

Mo de obra
2696 ENCANADOR OU BOMBEIRO HIDRAULICO 1.0900 h 5.82 6.34 6.34
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICO 1.0900 h 3.55 3.87 3.87
Leis Sociais 114.84% 11.73
Sub-Total 21.94

Preo Total TOTAL GERAL R$ 33.83

8.02.02 TUBO PVC ESGOTO PREDIAL DN 75MM, INCLUSIVE CONEXOES - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
122 ADESIVO PVC FRASCO C/ 850G 0.0057 UN 26.83 0.15 0.15
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0087 UN 31.78 0.28 0.28
9837 1.3470 M 7.37 9.93 9.93
TUBO PVC SERIE NORMAL - ESGOTO PREDIAL DN 75MM - NBR 5688
- -
- -
- -
Sub-Total 10.36

Equipamento
- -
Sub-Total -

Mo de obra
2696 ENCANADOR OU BOMBEIRO HIDRAULICO 1.0500 h 5.82 6.11 6.11
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICO 1.0500 h 3.55 3.73 3.73
Leis Sociais 114.84% 11.30
Sub-Total 21.14

Preo Total TOTAL GERAL R$ 31.50

8.02.03 TUBO PVC ESGOTO PREDIAL DN 50MM, INCLUSIVE CONEXOES - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
122 ADESIVO PVC FRASCO C/ 850G 0.0025 UN 26.83 0.07 0.07
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0037 UN 31.78 0.12 0.12
9838 TUBO PVC SERIE NORMAL - ESGOTO PREDIAL DN 50MM - NBR 5688 1.3430 M 5.90 7.93 7.93
- -
- -
- -
Sub-Total 8.12

Equipamento
- -
Sub-Total -

Mo de obra
2696 ENCANADOR OU BOMBEIRO HIDRAULICO 0.7500 h 5.82 4.37 4.37
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICO 0.7500 h 3.55 2.66 2.66
Leis Sociais 114.84% 8.07
Sub-Total 15.10

Preo Total TOTAL GERAL R$ 23.22

8.02.04 TUBO PVC ESGOTO PREDIAL DN 40MM, INCLUSIVE CONEXOES - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
122 ADESIVO PVC FRASCO C/ 850G 0.0050 UN 26.83 0.13 0.13
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3 0.0075 UN 31.78 0.24 0.24
9835 TUBO PVC SERIE NORMAL - ESGOTO PREDIAL DN 40MM - NBR 5688 1.4470 M 2.99 4.32 4.32
- -
- -
- -
Sub-Total 4.69

Equipamento
- -
Sub-Total -

Mo de obra
2696 ENCANADOR OU BOMBEIRO HIDRAULICO 0.6000 h 5.82 3.49 3.49
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICO 0.6000 h 3.55 2.13 2.13
Leis Sociais 114.84% 6.46
Sub-Total 12.08

Preo Total TOTAL GERAL R$ 16.77

8.02.05 RALO HEMISFRICO EM FERRO FUNDIDO TIPO ABACAXI, DN=150MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
11709 RALO SEMI-ESFERICO FOFO TP ABACAXI D = 150MM P/ LAJES, CALHAS ETC 1.0000 un 40.89 40.89 40.89
- -
- -
- -
- -
- -
Sub-Total 40.89

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 50.60

8.02.06 SIFAO PARA LAVATRIO EM PVC, ASTRA SC5, 1 1/2" X 40 MM, ACABAMENTO CROMADO OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3146 Fita veda rosca 18mm 0.5000 m 0.18 0.09 0.09
02906/ORSE Sifao para lavatrio em PVC, 1 1/2" x 40 mm, ASTRA SC5, acabamento cromado ou similar 1.0000 UN 29.94 29.94 29.94
- -
- -
- -
- -
Sub-Total 30.03

35/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61

36/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Leis Sociais 114.84% 5.19


Sub-Total 9.71

Preo Total TOTAL GERAL R$ 39.74

8.02.07 CAIXA DE INSPEO EM PVC 300MM,MULTIPLA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
04408 - ORSE Corpo da caixa de inspeo 300mm em pvc, akros ou similar 1.0000 un 90.23 90.23 90.23
04411- ORSE Conjunto porta tampa / tampa p/caixa de inspeo 300mm em pvc, akros ou similar 1.0000 un 68.82 68.82 68.82
- -
Sub-Total 159.05

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.9800 h 5.82 5.70 5.70
6111 Servente 0.9800 h 3.22 3.16 3.16
Leis Sociais 114.84% 10.17
Sub-Total 19.03

Preo Total TOTAL GERAL R$ 178.08

8.02.08 CAIXA DE GORDURA EM PVC 300MM,MULTIPLAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
02574/ORSE Caixa de gordura em pvc (mltipla) com cesta de limpeza 1.0000 un 98.60 98.60 98.60
- -
Sub-Total 98.60

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.9800 h 5.82 5.70 5.70
6111 Servente 0.9800 h 3.22 3.16 3.16
Leis Sociais 114.84% 10.17
Sub-Total 19.03

Preo Total TOTAL GERAL R$ 117.63

8.02.09 CX. SIFONADA EM PVC, 100X150X50MM, ACABAMENTO BRANCO, C/ GRELHA E PORTA GRELHA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
03348 -ORSE Caixa sifonada completa em pvc, c/grelha e porta grelha, 100 x 150 x 50 mm 1.0000 und 7.02 7.02 7.02
- -
- -
- -
- -
- -
Sub-Total 7.02

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 16.73

8.02.10 VLVULA EM METAL CROMADO 3.1/2" X 1.1/2" , TIPO AMERICAMA - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6157 VALVULA EM METAL CROMADO TIPO AMERICANA 3.1/2" X 1.1/2" P/ PIA DE COZINHA 1.0000 UN 24.84 24.84 24.84
3146 FITA VEDA ROSCA EM ROLOS 16MMX1OM 0.1458 UN 31.78 4.63 4.63
- -
Sub-Total 29.47

Equipamento
- -
Sub-Total -

Mo de obra
2696 ENCANADOR OU BOMBEIRO HIDRAULICO 0.3000 h 5.82 1.75 1.75
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICO 0.3000 h 3.55 1.07 1.07
Leis Sociais 114.84% 3.23
Sub-Total 6.04

Preo Total TOTAL GERAL R$ 35.51

8.02.11 BACIA SANITARIA C/ CAIXA DE DESC.ACOPL. , LINHA THEMA ECOFUSH, 3/6 LT, INCEPA OU SIMILAR, INCL. ASSENTO INCEPA THEMA 25987 OU SIMILAR, CONJ. DE FIX, ANEL DE VED. E ENG. PLSTICO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6138 VEDACAO PVC 100 MM P/SAIDA VASO SANITARIO TIPO EG-27 TIGRE OU SIMILAR 1.0000 un 2.39 2.39 2.39
4384 PARAFUSO NIQUELADO P/ FIXAR PECA SANITARIA - INCL PORCA CEGA, ARRUELA E BUCHA NYLON S-10 1.0000 cj 6.69 6.69 6.69
6141 ENGATE OU RABICHO FLEXIVEL PLASTICO (PVC OU ABS) BRANCO 1/2" X 30CM 1.0000 un 2.05 2.05 2.05
3146 Fita veda rosca 18mm 0.6000 m 0.18 0.11 0.11
07283/ORSE Bacia sanitria com caixa de descarga acoplada, linha thema ecoflush, 3/6 lt, ref. 25353/25570, INCEPA ou similar 1.0000 un 482.13 482.13 482.13
07284/ORSE Assento para bacia sanitria, INCEPA, Linha thema, ref. 25987 (ou similar) 1.0000 un 62.00 62.00 62.00
Sub-Total 555.37

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 2.5000 h 5.82 14.55 14.55
6111 Servente 2.5000 h 3.22 8.05 8.05
Leis Sociais 114.84% 25.95
Sub-Total 48.55

Preo Total TOTAL GERAL R$ 603.92

BACIA SANITARIA C/ CAIXA DE DESC.ACOPL. HANDICAPPED (P/ DEFICIENTE), LINHA STYLUS EXCELLENCE, 54359/54510, CELITE OU SIMILAR, INCL. ASSENTO CELITE STYLUS EXCELLENCE 54981 OU SIMILAR, CONJ. DE
8.02.12
FIX. DECA S-10, ANEL DE VED. E ENG. PLSTICO OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

37/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Material
6138 VEDACAO PVC 100 MM P/SAIDA VASO SANITARIO TIPO EG-27 TIGRE OU SIMILAR 1.0000 un 2.87 2.87 2.87
4384 PARAFUSO NIQUELADO P/ FIXAR PECA SANITARIA - INCL PORCA CEGA, ARRUELA E BUCHA NYLON S-10 1.0000 cj 7.00 7.00 7.00

38/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

6141 ENGATE OU RABICHO FLEXIVEL PLASTICO (PVC OU ABS) BRANCO 1/2" X 30CM 1.0000 un 2.05 2.05 2.05
3146 Fita veda rosca 18mm 0.6000 m 1.83 1.10 1.10
06974/ORSE Assento para bacia sanitria, linha stylus excellence, ref. 54981, CELITE ou similar 1.0000 un 60.36 60.36 60.36
Bacia sanitria conv.handicapped (para deficientes fsicos) p/caixa acoplada, linha stylus excellence ref. 54359, na cor branca,
07482/ORSE 1.0000 un 291.63 291.63 291.63
CELITE ou similar
Caixa de descarga para acoplar em bacia sanitria handicapped (para deficientes fsicos), linha stylus excellence ref. 54510,
07483/ORSE 198.60 198.60 198.60
branca, CELITE ou similar 1.0000 un
- -
- Sub-Total 563.61

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 2.5000 h 5.82 14.55 14.55
6111 Servente 2.5000 h 3.22 8.05 8.05
Leis Sociais 114.84% 25.95
Sub-Total 48.55

Preo Total TOTAL GERAL R$ 612.16

8.02.13 MICTORIO DE LOUCA BRANCA C/SIFAO INTEGRADO E MED 33X28X53CM FERRAGENS EM METAL CROMADO REGISTRO DE PRESSAO 1416 DE 1/2" E TUBO DE LIGACAO DE 1/2" - FORNECIMENTO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Material
3146 FITA VEDA ROSCA EM ROLOS 18MMX10M 0.0760 und 2.00 0.15 0.15
10432 MICTORIO SIFONADO LOUCA BRANCA C/PERTENCES 1.0000 und 48.70 48.70 48.70
6021 REGISTRO PRESSAO 1/2" REF 1416 - C/ CANOPLA ACAB CROMADO SIMPLES 1.0000 und 42.45 42.45 42.45
4351 PARAFUSO NIQUELADO P/ FIXAR PECA SANITARIA - INCL PORCA CEGA, ARRUELA E BUCHA DE NYLON S-8 2.0000 und 1.82 3.64 3.64
11683 ENGATE OU RABICHO FLEXIVEL EM METAL CROMADO 1/2" 1.0000 und 18.13 18.13 18.13
- -
Sub-Total 113.07

Equipamento
- -
Sub-Total -

Mo de obra
2696 ENCANADOR OU BOMBEIRO HIDRAULICO 3.0000 h 5.22 15.66 15.66
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICO 3.2000 h 3.55 11.36 11.36
Leis Sociais 114.84% 31.03
Sub-Total 58.05

Preo Total TOTAL GERAL R$ 171.12

8.02.14 RALO SIFONADO EM PVC D = 100MM, SADA 40MM, COM GRELHA ACABAMENTO BRANCO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
11742 RALO SIFONADO PVC CILINDRICO 100X40MM C/GRELHA REDONDA BRANCA 1.0000 UND 4.98 4.98 4.98
- -
- -
- -
- -
- -
Sub-Total 4.98

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 14.69

CONJUNTO MOTO-BOMBA COM MOTOR DE 1/2 CV, MONOFSICO CENTRFUGA, SUCO=3/4", RECALQUE=3/4", PR. MX. 23 MCA, ALT. SUCO 8 MCA. FAIXAS HM(M) - Q (M3/H): (20 - 2,1)(170 - 2,9)(14 - 3,4)(11 - 3,9)(8 - 4,3)
8.02.15
(5 - 4,7), INCLUSIVE CHAVE DE PARTIDA DIRETA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
0591 - ORSE Chave magntica p/motor 3cv-220v 1.0000 m 82.10 82.10 82.10
11672 Conjunto moto-bomba schneider bc-98 ou similar, motor 1/2 cv, monofsico, hm = 5 a 20 m, q = 2,1 a 4,7 m3/h 1.0000 un 530.01 530.01 530.01
- -
- -
- -
- -
Sub-Total 612.11

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 2.0000 h 5.82 11.64 11.64
6111 Servente 2.0000 h 3.22 6.44 6.44
Leis Sociais 114.84% 20.76
Sub-Total 38.84

Preo Total TOTAL GERAL R$ 650.95

8.02.16 BOTIJO D'AGUA FORTELEV 5000L

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
BOTIJO D'AGUA FORTELEV 5000L 1.0000 und 3,248.75 3,248.75 3,248.75
- -
Sub-Total 3,248.75

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 3,248.75

39/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

8.02.17 FILTRO WFF 150

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
FILTRO WFF 150 1.0000 und 1,979.00 1,979.00 1,979.00
- -
Sub-Total 1,979.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 1,979.00

8.02.18 CAIXA D'AGUA DE FIBRA DE VIDRO - INSTALADA, EXCETO BASE DE APOIO, CAP. 1500 LITROS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
11869 CAIXA D'AGUA FIBRA DE VIDRO 1500L 1.0000 UNID 392.48 392.48 392.48
95 ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 20MM X 1/2" 1.0000 UNID 8.93 8.93 8.93
96 ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 25MM X 3/4" 1.0000 UNID 11.03 11.03 11.03
99 ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 50MM X 11/2" 1.0000 UNID 26.44 26.44 26.44
3146 FITA VEDA ROSCA EM ROLOS 18MMX10M 0.3300 UNID 1.83 0.60 0.60
1610 MASSA PRONTA P/ VEDACAO TP CARBOLASTICO CINZA DA OTTO BAUMGART OU MARCA EQUIVALENTE 0.1000 KG 14.12 1.41 1.41
Sub-Total 440.89

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 7.7000 H 3.22 24.79 24.79
2696 ENCANADOR OU BOMBEIRO HIDRAULICO 7.7000 H 5.82 44.81 44.81
Leis Sociais 114.84% 79.94
Sub-Total 149.55

Preo Total TOTAL GERAL R$ 590.44

8.02.19 CAIXA DE INSPEO 90X90X80CM EM ALVENARIA - EXECUO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
31 ACO CA-50 1/2" (12,70 MM) 3.3000 KG 3.85 12.71 12.71
370 AREIA MEDIA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.2950 M3 45.00 13.28 13.28
4721 PEDRA BRITADA N. 1 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.2580 M3 103.53 26.71 26.71
1382 CIMENTO PORTLAND POZOLANICO CP IV- 32 2.1100 50KG 23.91 50.45 50.45
7271 BLOCO CERAMICO VEDAcAO 8 FUROS - 9 X 19 X 19 CM 80.0000 UN 0.37 29.60 29.60
- -
Sub-Total 132.75

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 4.1000 H 4.61 18.90 18.90
6111 SERVENTE 8.5480 H 3.22 27.52 27.52
Leis Sociais 114.84% 53.32
Sub-Total 99.74

Preo Total TOTAL GERAL R$ 232.49

8.02.20 CAIXA DE BRITA 600

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
170 - ORSE Anel pr-moldado concreto d= 600mm, alt= 200mm 1.0000 UNID 54.43 54.43 54.43
4718 PEDRA BRITADA N. 2 OU 25 MM - POSTO PEDREIRA / FORNECEDOR 0.2901 M3 151.65 43.99 43.99
ESCAVAO MANUAL DE VALA EM MATERIAL DE 1A CATEGORIA ATE 1,5M , EXCLUINDO
73965/010 0.2900 M3 62.35 18.08 18.08
ESGOTAMENTO/ESCORAMENTO
- -
Sub-Total 116.50

Equipamento
- -
Sub-Total -

Mo de obra
- -
6111 Servente 2.0000 h 3.22 6.44 6.44
Leis Sociais 114.84% 7.40
Sub-Total 13.84

Preo Total TOTAL GERAL R$ 130.34

8.02.21 TAMPA DE INSPEO EM CHAPA METALICA DE AO 1/4", DIM: 1,00X1,00M, INCLUSIVE PINTURA E CADEADO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
22 ACO CA-25 1/4" (6,35 MM) 1.0800 kg 4.49 4.85 4.85
3335 MAQUINA P/ SOLDA ELETRICA TIPO BAMBINA TIG 30 AC/DC DA BAMBOZZI OU EQUIV 0.4000 h 1.17 0.47 0.47
555 BARRA FERRO RETANGULAR CHATA 1 X 1/4" - (1,2265KG/M) 1.4986 m 5.07 7.60 7.60
563 BARRA FERRO RETANGULAR CHATA 3/8 X 1 1/2" - (2,84KG/M) 0.6270 m 11.37 7.13 7.13
00426/ORSE Cadeado mdio 35 x 33mm (papaiz - ref. cr35 ou similar) 1.0000 un 15.95 15.95 15.95
4777 CANTONEIRA ACO ABAS IGUAIS (QUALQUER BITOLA) E = 1/4" 0.3480 kg 3.11 1.08 1.08
1319 Chapa ao grossa preta 1/8"(3,00mm), 24,75 kg/m2 27.5200 kg 2.36 64.86 64.86
10997 ELETRODO AWS E-7018 (OK 48.04; WI 718) D=4MM (SOLDA ELETRICA) 0.2000 kg 17.02 3.40 3.40
3768 Lixa p/ ferro 0.6300 fl 1.59 1.00 1.00
3767 Lixa p/ madeira n 100 0.5250 fl 0.35 0.18 0.18
7311 TINTA ESMALTE SINTETICO ACETINADO 0.3780 l 20.94 7.92 7.92
7307 FUNDO ANTICORROSIVO TIPO ZARCAO OU EQUIV 0.2100 l 18.43 3.87 3.87
Sub-Total 118.31

Equipamento
- -
Sub-Total -

Mo de obra
4783 PINTOR 2.1000 h 4.61 9.68 9.68
00068/ORSE Servente 3.2600 h 3.22 10.50 10.50
6160 Soldador 3.0000 h 5.26 15.78 15.78
Leis Sociais 114.84% 41.29
Sub-Total 77.25
40/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Preo Total TOTAL GERAL R$ 195.56

41/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

8.03 TANQUE SPTICO, SUMIDOURO E CAIXA DE DISTRIBUIO


8.03.01 ALVENARIA EM TIJOLO CERAMICO MACICO 5X10X20CM 1 VEZ (ESPESSURA 20CM), ASSENTADO COM ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
370 AREIA MEDIA - POSTO JAZIDA/ FORNECEDOR (SEM FRETE) 0.0681 M3 42.00 2.86 2.86
1106 CAL HIDRATADA, DE 1A. QUALIDADE, PARA ARGAMASSA 10.2000 KG 0.60 6.12 6.12
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 10.2000 KG 0.30 3.05 3.05
7255 TIJOLO MACICO DE BARRO COZIDO, DE '5,5 X 10,5 X 22,0* CM 0.1400 MIL 389.34 54.51 54.51
- -
- -
Sub-Total 66.54

Equipamento
10532 BETONEIRA DE 320 A 600 LITROS COM CARREGADOR E MOTOR ELETRICO TRIFASICO (LOCACAO) 0.2249 H 1.26 0.28 0.28
Sub-Total 0.28

Mo de obra
4750 Pedreiro 2.0000 h 4.61 9.22 9.22
6111 Servente 2.4000 h 3.22 7.73 7.73
Leis Sociais 114.84% 19.46
Sub-Total 36.41

Preo Total TOTAL GERAL R$ 103.23

8.03.02 ESCAVACAO MANUAL DE VALA EM MATERIAL DE 1A CATEGORIA ATE 1,5M EXCLUINDO ESGOTAMENTO / ESCORAMENTO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
6111 Servente 4.2760 h 3.22 13.77 13.77
Leis Sociais 114.84% 15.81
Sub-Total 29.58

Preo Total TOTAL GERAL R$ 29.58


8.03.03 CONCRETO ARMADO FCK=15MPA FABRICADO NA OBRA, ADENSADO E LANADO, PARA USO GERAL, COM FORMAS PLANAS EM COMPENSADO RESINADO 12MM (03 USOS) [PARA TAMPAS]

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Ao ca-50 6,3 a 12,5 mm 90.0000 kg 4.16 374.72 374.72
Arame galvanizado sem revestimento, 14bwg (2,1 mm) - 0,026kg/m 2.5000 kg 10.22 25.54 25.54
Arame recozido 18 bwg - 1,25mm (9,6g/m) 2.0000 kg 8.00 16.00 16.00
Areia grossa (AC - areia comercial ) 1.0000 m 52.64 52.64 52.64
Brita 1 (9,5 a 19,0 mm) 0.3000 m 54.36 16.31 16.31
Brita 2 (19,0 a 25,0 mm) 0.7000 m 52.50 36.75 36.75
Cimento cp - 320 (50 kg) 300.0000 kg 0.46 138.00 138.00
Compensado resinado 12mm - Madeirit ou similar 2.6000 m 15.19 39.49 39.49
Desmoldante desmol (vedacit) ou separol (sika) - p/ formas de madeira - ou similar 0.1500 l 6.67 1.00 1.00
Madeira mista serrada - pinho 3 (tbua/sarrafo) 2,2 x 10,0cm - 0,0022 m3/m 10.0000 m 5.19 51.90 51.90
Madeira mista serrada (barrote) 6 x 6cm - 0,0036 m3/m (angelim, louro) 2.0000 m 4.25 8.50 8.50
Pregos 16x24 4.0000 kg 7.52 30.08 30.08
VIBRADOR DE IMERSAO, DIAMETRO DE 25 MM, COM MOTOR A GASOLINA DE 3,5 HP 0.0000 und 2,878.39 0.06 0.06
GASOLINA COMUM 0.0688 l 2.90 0.20 0.20
Sub-Total 791.19

Equipamento
- -
Sub-Total -

Mo de obra
Armador 10.0000 h 4.61 46.10 46.10
Carpinteiro 17.0000 h 4.61 78.37 78.37
Pedreiro 0.7409 h 4.61 3.42 3.42
Servente 42.0000 h 3.22 135.24 135.24
Leis Sociais 114.84% 302.18
Sub-Total 565.31

Preo Total TOTAL GERAL R$ 1,356.50

8.03.04 CHAPISCO EM PAREDES TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 0,5CM, PREPARO MANUAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0048 M3 280.00 1.34 1.34
- -
- -
- -
- -
- -
- -
- -
Sub-Total 1.34

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 0.1000 h 4.61 0.46 0.46
6111 SERVENTE 0.1000 h 3.22 0.32 0.32
Leis Sociais 114.84% 0.90
Sub-Total 1.68

Preo Total TOTAL GERAL R$ 3.02


8.03.05 REBOCO PAULISTA (MASSA UNICA) TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA) , ESPESSURA 1,5CM, PREPARO MECANICO DA ARGAMASSA
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO 0.0150 M3 370.00 5.55 5.55
- -
Sub-Total 5.55

Equipamento
42/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
Sub-Total -

Mo de obra
4750 Pedreiro 1.0000 h 4.61 4.61 4.61
6111 Servente 0.9720 h 3.22 3.13 3.13
Leis Sociais 114.84% - -

43/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

-
Sub-Total 7.74
Preo Total
TOTAL GERAL R$ 13.29
8.03.06 LASTRO DE BRITA N 3 (ESPESSURAS: SUMIDOURO 30CM)
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
4718 PEDRA BRITADA N. 2 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 1.0500 M3 89.59 94.07 94.07
- -
- -
- -
- -
- -
Sub-Total 94.07

Equipamento
- -
Sub-Total -

Mo de obra
- -
6111 Servente 2.0000 h 3.22 6.44 6.44
Leis Sociais 114.84% 7.40
Sub-Total 13.84

Preo Total TOTAL GERAL R$ 107.91

8.03.07 LAJE PR-FABRICADA TRELIADA PARA PISO OU COBERTURA, INTEREIXO 38CM, H=12CM, EL. ENCHIMENTO EM EPS H=8CM, INCLUSIVE ESCORAMENTO EM MADEIRA E CAPEAMENTO 4CM.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
01286/ORSE Laje pr-fabricada treliada para piso ou cobertura, h=12cm, el. enchimento em bloco EPS, h=8cm 1.0000 m 34.16 34.16 34.16
01569/ORSE Madeira mista serrada (barrote) 6 x 6cm - 0,0036 m3/m (angelim, louro) 1.7100 m 4.25 7.27 7.27
01573/ORSE Madeira mista serrada (tbua) 2,2 x 22cm - 0,00484 m3/m 0.5600 m 4.24 2.37 2.37
5075 PREGO DE ACO 18 X 30 0.0300 kg 7.26 0.22 0.22
06995/ORSE Madeira mista serrada (sarrafo) 2,2 x 5,5cm - 0,00121 m/m 0.9700 m 1.69 1.64 1.64
4718 PEDRA BRITADA - POSTO PEDREIRA / FORNECEDOR 0.0440 M3 95.00 4.18 4.18
1379 CIMENTO PORTLAND COMUM CP I- 32 15.0000 KG 0.46 6.90 6.90
370 AREIA MEDIA - POSTO DE JAZIDA / FORNECEDOR (SEM FRETE) 0.0490 M3 52.50 2.57 2.57
ARMACAO ACO CA-50/60, DIAM. 6,3 (1/4) 12,5MM(1/2) -FORNECIMENTO/ CORTE(PERDA DE 10%) / DOBRA /
74254/002 1.8900 KG 5.92 11.19 11.19
COLOCAO.
Sub-Total 70.50

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 1.8800 h 3.22 6.05 6.05
4750 PEDREIRO 0.4400 h 4.61 2.03 2.03
- -
- -
Leis Sociais 114.84% -
Sub-Total 8.08

Preo Total TOTAL GERAL R$ 78.58

8.03.08 TAMPA DE INSPEO EM CHAPA METLICA DE 3/8", INCLUSIVE TRATAMENTO E PINTURA EM ESMALTE OU LEO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1332 CHAPA ACO GROSSA PRETA 3/8"(9,53MM) 74,695KG/M2 74.6950 kg 2.45 182.91 182.91
3768 Lixa p/ ferro 0.6000 fl 1.59 0.95 0.95
3767 Lixa p/ madeira n 100 0.5000 fl 0.35 0.18 0.18
7311 TINTA ESMALTE SINTETICO ACETINADO 0.3600 l 20.94 7.54 7.54
7307 FUNDO ANTICORROSIVO TIPO ZARCAO OU EQUIV 0.2000 l 18.43 3.69 3.69
- -
Sub-Total 195.27

Equipamento
- -
Sub-Total -

Mo de obra
4783 PINTOR 2.0000 h 4.61 9.22 9.22
00068/ORSE Servente 2.2000 h 3.22 7.08 7.08
6160 Soldador 1.0000 h 5.26 5.26 5.26
Leis Sociais 114.84% 24.76
Sub-Total 46.33

Preo Total TOTAL GERAL R$ 241.60

9.00 INSTALAES CONTRA INCNDIO E PNICO

9.01 PINTURA (SINALIZAO)

9.01.01 SINALIZAO DE EMERGNCIA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10850 PLACA DE NUMERACAO DE CHAPA GALVANIZADA NUM 18 12 X 18CM 0.4400 UN 36.39 16.01 16.01
11950 BUCHA NYLON S-6 C/ PARAFUSO ACO ZINC CAB CHATA ROSCA SOBERBA 4,2 X 45MM 2.0000 UN 0.12 0.24 0.24
- -
- -
- -
- -
Sub-Total 16.25

Equipamento
- -
Sub-Total -

Mo de obra
6111 Servente 0.4000 h 3.22 1.29 1.29
- -
Leis Sociais 114.84% 1.48
Sub-Total 2.77

Preo Total TOTAL GERAL R$ 19.02

9.02 EQUIPAMENTOS FIXOS

9.02.01 EXTINTOR INCENDIO TP PO QUIMICO 4KG FORNECIMENTO E COLOCACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10891 EXTINTOR DE INCENDIO C/ CARGA DE PO QUIMICO SECO PQS4KG 1.0000 UN 103.80 103.80 103.80

44/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
Sub-Total 103.80

Equipamento
- -
Sub-Total -

Mo de obra

45/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

4750 Pedreiro 0.2000 h 4.61 0.92 0.92


6111 Servente 0.2570 h 3.22 0.83 0.83
Leis Sociais 114.84% 2.01
Sub-Total 3.76

Preo Total TOTAL GERAL R$ 107.56

9.02.02 EXTINTOR DE CO2 6KG - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
4350 BUCHA NYLON S-8 C/ PARAF ROSCA SOBERBA ACO ZINCADO CAB CHATA FENDA SIMPLES 4,8 X 75MM 1.0000 UN 0.44 0.44 0.44
10889 EXTINTOR DE INCENDIO C/ CARGA GAS CARBONICO CO2 6KG 1.0000 UN 403.62 403.62 403.62
- -
Sub-Total 404.06

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.3000 h 5.82 1.75 1.75
6111 Servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 3.11
Sub-Total 5.83

Preo Total TOTAL GERAL R$ 409.89

9.02.03 EXTINTOR INCENDIO AGUA-PRESSURIZADA 10L INCL SUPORTE PAREDE CARGA COMPLETA FORNECIMENTO E COLOCACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10886 EXTINTOR DE INCENDIO C/ CARGA DE AGUA PRESSURIZADA AP 1 OL 1.0000 UN 113.83 113.83 113.83
- -
Sub-Total 113.83

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.5000 h 4.61 2.31 2.31
6111 Servente 0.4990 h 3.22 1.61 1.61
Leis Sociais 114.84% 4.49
Sub-Total 8.40

Preo Total TOTAL GERAL R$ 122.23

9.02.04 EXTINTOR DE P QUMICO SECO (PQS), CAPACIDADE 12 KG

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10890 EXTINTOR DE INCENDIO C/ CARGA DE PO QUIMICO SECO PQS 12KG 1.0000 UN 163.59 163.59 163.59
- -
Sub-Total 163.59

Equipamento
- -
Sub-Total -

Mo de obra
2696 Encanador hidrulico 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 173.30

9.02.05 DETECTOR TERMOVELOCIMETRICO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
0818 - ORSE Detector termovelocimtrico 1.0000 UN 89.00 89.00 89.00
- -
Sub-Total 89.00

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 98.71

9.02.06 DETECTOR DE FUMAA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
0816 - ORSE Detector de fumaa 1.0000 UN 99.38 99.38 99.38
- -
Sub-Total 99.38

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.5000 h 5.82 2.91 2.91
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 109.09

9.02.07 PORTA CORTA-FOGO 1,60 X 2,10 M (P-90), DUAS FOLHAS, COM BATENTES E FERRAGENS (12.004.000033.SER / TCPO)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
370 Areia lavada tipo mdia 0.0289 M 45.00 1.30 1.30
4721 Pedra brita n 1 - posto pedreira/fornecedor (sem frete) 0.0317 M 103.53 3.28 3.28
04.002.000002.
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa) 14.2000 KG 0.42 5.98 5.98
MAT / TCPO

46/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

01.012.000003.
Porta corta-fogo , colocada dupla (isolao: 90 min / largura: 1,60 m / altura: 2,10 m) 1.0000 UN 1216.15 1,216.15 1,216.15
SET / TCPO
- -
Sub-Total 1,226.71

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 1.0000 h 4.61 4.61 4.61
6111 SERVENTE 1.5000 h 3.22 4.83 4.83
Leis Sociais 114.84% 10.84
Sub-Total 20.28

Preo Total TOTAL GERAL R$ 1,246.99

9.02.08 ACIONADOR MANUAL (BOTOEIRA) TIPO QUEBRA-VIDRO, P/INSTAL. INCENDIO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
07611/ORSE Acionador manual (botoeira) tipo quebra-vidro, p/incendio 1.0000 und 65.05 65.05 65.05
- -
Sub-Total 65.05

Equipamento
- -
Sub-Total -

Mo de obra
00052/ORSE Eletricista 0.5000 h 5.82 2.91 2.91
00068/ORSE Servente 0.5000 h 3.22 1.61 1.61
- -
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 74.76

9.02.09 LUMINRIA DE EMERGNCIA 20W

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
01353/ORSE Luminria de emergncia 20w 1.0000 UN 39.59 39.59 39.59
- -
Sub-Total 39.59

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.5000 h 5.82 2.91 2.91
- -
Leis Sociais 114.84% 3.34
Sub-Total 6.25

Preo Total TOTAL GERAL R$ 45.84

9.02.10 CENTRAL DE ALARME E DETECO DE INCENDIO, CAPACIDADE: 2 BATERIAS, 8 LAOS, COM 2 LINHAS, MOD.VR-8L, VERIN OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CENTRAL DE ALARME E DETECO DE INCENDIO, CAPACIDADE: 2 BATERIAS, 8 LAOS, COM 2 LINHAS, MOD.VR-8L,
07627 -ORSE 1.0000 UN 323.37 323.37 323.37
VERIN OU SIMILAR
- -
Sub-Total 323.37

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 1.0000 h 5.82 5.82 5.82
- -
Leis Sociais 114.84% 6.68
Sub-Total 12.50

Preo Total TOTAL GERAL R$ 335.87

9.02.11 SIRENE DE INCNDIO, MODELO 5992, TENSO 24VCC, DA SETON OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
08840/ORSE Sirene de incndio, modelo 5992, tenso 24vcc, da SETON ou similar 1.0000 UN 79.44 79.44 79.44
- -
Sub-Total 79.44

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.7000 h 5.82 4.07 4.07
6111 Servente 0.7000 h 3.22 2.25 2.25
Leis Sociais 114.84% 7.27
Sub-Total 13.60

Preo Total TOTAL GERAL R$ 93.04

10.0 INSTALAES ELTRICAS


10.01 SUBESTAO E GERADOR
10.01.01 FORNECIMENTO E INSTALAO DE SUBSTAO AREA 75KVA EM ESTRUTURAS (CE2.3 - E1) PADRO ELETROBRS
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
02942 -ORSE POSTE DE CONCRETO DUPLO T (DT) 11/600 - FORNECIMENTO 1.0000 UN 850.00 850.00 850.00
73965/011 -
ESCAVACAO MANUAL DE VALA EM MATERIAL DE 1A CATEGORIA DE 1,5 ATE 3M E 1.1214 M3 26.97 30.24 30.24
SINAPI
03053 - ORSE TRANSPORTE E INSTALAO DE POSTE DE CONCRETO ARMADO DT OU CIRCULAR DE 9 A 12M 1.0000 UN 484.48 484.48 484.48
02960 - ORSE FORNECIMENTO DE TRANSFORMADOR TRIFSICO C/ DERIV. 75 KVA 13800/380/220V 1.0000 UN 9,733.53 9,733.53 9,733.53
02990 -ORSE MO-DE-OBRA PARA IMPLANTAO DE TRANSFORMADOR TRIFSICO DE 15 A 112,5KVA 1.0000 UN 449.81 449.81 449.81
4337 - SINAPI PORCA ZINCADA QUADRADA 16 MM 3.0000 UN 0.46 1.38 1.38
11837 - SINAPI GRAMPO LINHA VIVA, DE ALUMINIO CABO PRINCIPAL ( 10 - 120MM2) DERIVACAO (10 - 70MM2) 2.0000 UN 30.24 60.48 60.48
0379 -SINAPI ARRUELA QUADRADA ACO GALV D = 38MM ESP= 3MM DFURO= 18 MM 3.0000 UN 0.80 2.40 2.40
68069 - SINAPI HASTE DE TERRA , D=5/8"X3000MM. COPPERWELD 1.0000 UN 27.73 27.73 27.73
04136 - ORSE MANILHA SAPATILHA PREFORMADA, FORNECIMENTO 3.0000 UN 10.30 30.90 30.90
432 - SINAPI PARAFUSO M16 (ROSCA MAQUINA D=16MM) X 250MM CAB QUADRADA - ZINCAGEM A FOGO 2.0000 UN 3.05 6.10 6.10
431 - SINAPI PARAFUSO M16 (ROSCA MAQUINA D=16MM) X 200MM CAB QUADRADA 1.0000 UN 2.59 2.59 2.59

47/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

402 - SINAPI GANCHO SUSPENSAO OLHAL EM ACO GALV, ESPESSURA 16MM, ABERTURA 21MM 1.0000 UN 7.91 7.91 7.91
421 - SINAPI PORCA OLHAL ACO P/ PARAFUSO C/ DIAM NOMINAL DE 16MM 3.0000 UN 5.00 15.00 15.00
7581 - SINAPI SAPATILHA EM ACO GALV P/ CABOS DN ATE 5/8" 1.0000 UN 1.39 1.39 1.39
04634 / ORSE BRAO TIPO "C" , P/ REDE COMPACTA 1.0000 UN 95.19 95.19 95.19
M35 CONTONEIRA AUXILIAR P/BRAO TIPO "C" 1.0000 UN 66.00 66.00 66.00
442 - SINAPI PARAFUSO FRANCES M16(D=16MM) X 45MM CAB ABAULADA - ZINCAGEM A FOGO 2.0000 UN 1.44 2.88 2.88
1672 / ORSE PARAFUSO CABEA ABAULADA 16X70MM 1.0000 UN 5.60 5.60 5.60
M36 MANILHA TORCIDA COM PINO 3/8" 1.0000 UN 67.00 67.00 67.00
3406 - SINAPI FORNECIMENTO DE ISOLADOR DE PINO DE PORCELANA P/ 15 KV 3.0000 UN 12.00 36.00 36.00
03245 - ORSE CONECTOR ESTRIBO PRESSO PARA CABO AL 4 CAA 4.0000 UN 13.00 52.00 52.00
1550 - SINAPI CONECTOR PARAFUSO FENDIDO 25 MM - FORNECIMENTO 1.0000 UN 3.87 3.87 3.87
72252 - SINAPI CABO DE COBRE N SEO # 25MM2 12.0000 M 15.30 183.60 183.60
0155 / ORSE ALA PREFORMADA 9,5MM 1.0000 M 8.20 8.20 8.20
03857 - ORSE GRAMPO DE ANCORAGEM, REF. GAD-1002N 3.0000 UN 63.40 190.20 190.20
Sub-Total 12,414.48

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 12,414.48

GRUPO DIESEL GERADOR, MARCA HEIMER, ABERTO, NA CAPACIDADE DE POTNCIA EMERGENCIAL (STAND-BY) DE 55KVA E POTNCIA CONTNUA (PRIME) DE 50KVA, FATOR DE POTNCIA 0,8, TRIFSICO, 380/220V,
10.01.02
60HZ, 1800RPM, DOTADO DE PAINEL DE COMANDO E CONTROLE AUTOMTICO, MICROPROCESSADO, DIGITAL, CONFORME ESPECIFICADO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.02 QUADROS ELTRICOS E ACESSRIOS (CONFORME QUADROS DE CARGAS E ESP. TCNICAS)

10.02.01 QUADRO DE DISTRIBUICAO DE ENERGIA DE EMBUTIR, EM CHAPA METALICA, PARA 40 DISJUNTORES TERMOMAGNETICOS MONOPOLARES, COM BARRAMENTO TRIFASICO E NEUTRO, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
QUADRO DE DISTRIBUICAO DE SOBREPOR C/ BARRAMENTO TRIFASICO P/ 40 DISJUNTORES UNIPOLARES, EM CHAPA
12038 1.0000 UN 362.93 362.93 362.93
DE ACO GALV
- -
- -
- -
- -
- -
Sub-Total 362.93

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 2.5000 h 5.82 14.55 14.55
247 AUXILIAR DE ELETRICISTA 2.5000 h 3.52 8.80 8.80
Leis Sociais 114.84% 26.82
Sub-Total 50.17

Preo Total TOTAL GERAL R$ 413.10

10.02.02 QUADRO DE DISTRIBUICAO DE ENERGIA DE EMBUTIR, EM CHAPA METALICA, PARA 24 DISJUNTORES TERMOMAGNETICOS MONOPOLARES, COM BARRAMENTO TRIFASICO E NEUTRO, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
QUADRO DE DISTRIBUICAO DE EMBUTIR C/ BARRAMENTO TRIFASICO P/ 24 DISJUNTORES UNIPOLARES EM CHAPA DE
12039 1.0000 UN 199.11 199.11 199.11
ACO GALV
- -
- -
- -
- -
- -
Sub-Total 199.11

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 3.0000 h 5.82 17.46 17.46
247 AUXILIAR DE ELETRICISTA 3.0000 h 3.52 10.56 10.56
Leis Sociais 114.84% 32.18
Sub-Total 60.20

Preo Total TOTAL GERAL R$ 259.31

10.02.03 QUADRO DE COMANDO PARA 2 BOMBAS DE RECALQUES DE 1/3 A 2 CV, TRIFSICA, 220 VOLTS, COM CHAVE SELETORA, ACIONAMENTO MANUAL/AUTOMTICO, REL DE SOBRECARGA E CONTATORA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
485/ORSE Caixa de passagem 30x30cm, em chapa de ao galvanizado p/eletrica 1.0000 UN 36.00 36.00 36.00
589/ORSE Chave liga-desliga 3x30a 1.0000 UN 24.70 24.70 24.70
Quadro de comando para 2 bombas de recalques de 1/3 a 2 cv, trifsica, 220 volts, com chave seletora, acionamento
7538/ORSE 1.0000 UN 1,126.73 1,126.73 1,126.73
manual/automtico, rel de sobrecarga e contatora
- -
- -
- -
Sub-Total 1,187.43

Equipamento
- -
Sub-Total -
48/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Mo de obra
2436 Eletricista 2.0000 h 5.82 11.64 11.64
6111 servente 2.0000 h 3.22 6.44 6.44
Leis Sociais 114.84% 20.76
Sub-Total 38.84

Preo Total TOTAL GERAL R$ 1,226.27

10.03 CONDUTORES ELTRICOS E ACESSRIOS

10.03.01 CABO DE COBRE ISOLADO PVC 450/750V 1,5MM2 RESISTENTE A CHAMA - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
983 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 450/750V 1,5MM2, TP PIRASTIC PIRELLI OU EQUIV 1.0000 m 0.94 0.94 0.94
21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M 0.0112 und 1.12 0.01 0.01
- -
- -
- -
- -
Sub-Total 0.95

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0300 h 5.82 0.17 0.17
6111 servente 0.0280 h 3.22 0.09 0.09
Leis Sociais 114.84% 0.30
Sub-Total 0.57

Preo Total TOTAL GERAL R$ 1.52

10.03.02 CABO DE COBRE ISOLADO PVC RESISTENTE A CHAMA 450/750 V 2,5 MM2 FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
984 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 450/750V 2,5MM2, TP PIRASTIC PIRELLI OU EQUIV 1.0000 M 1.02 1.02 1.02
21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M 0.0112 UN 1.13 0.01 0.01
- -
- -
- -
- -
Sub-Total 1.03

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0500 h 5.82 0.29 0.29
6111 SERVENTE 0.0500 h 3.22 0.16 0.16
Leis Sociais 114.84% 0.52
Sub-Total 0.97

Preo Total TOTAL GERAL R$ 2.00

10.03.03 CABO DE COBRE ISOLADO PVC RESISTENTE A CHAMA 450/750 V 4 MM2 FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
981 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 450/750V 4MM2, FLEXIVEL, TP FORESPLAST ALCOA OU EQUIV 1.0000 M 1.79 1.79 1.79
21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M 0.0112 UN 1.13 0.01 0.01
- -
- -
- -
- -
Sub-Total 1.80

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0610 h 5.82 0.36 0.36
6111 SERVENTE 0.0610 h 3.22 0.20 0.20
Leis Sociais 114.84% 0.63
Sub-Total 1.18

Preo Total TOTAL GERAL R$ 2.98

10.03.04 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 4 MM ANTI-CHAMA - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1021 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 0,6/1 KV 4MM2 (1 CONDUTOR) TP SINTENAX PIRELLI OU EQUIV 1.0000 m 2.27 2.27 2.27
21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M 0.0056 und 1.12 0.01 0.01
- -
- -
- -
- -
Sub-Total 2.28

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0600 h 5.82 0.35 0.35
247 AUXILIAR DE ELETRICISTA 0.0600 h 3.52 0.21 0.21
Leis Sociais 114.84% 0.64
Sub-Total 1.20

Preo Total TOTAL GERAL R$ 3.48

10.03.05 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 6 MM ANTI-CHAMA - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
994 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 0,6/1 KV 6MM2 (1 CONDUTOR) TP SINTENAX PIRELLI OU EQUIV 1.0000 m 3.01 3.01 3.01
21127 FITA ISOLANTE ADESIVA ANTI-CHAMA EM ROLOS 19MM X 5M 0.0056 und 1.12 0.01 0.01
- -
- -
- -
- -
Sub-Total 3.02

49/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0600 h 5.82 0.35 0.35
247 AUXILIAR DE ELETRICISTA 0.0600 h 3.52 0.21 0.21
Leis Sociais 114.84% 0.64
Sub-Total 1.20

Preo Total TOTAL GERAL R$ 4.22

10.03.06 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 10 MM ANTI-CHAMA - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1020 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 0,6/1 KV 10MM2 (1 CONDUTOR) TP SINTENAX PIRELLI OU EQUIV 1.0000 m 4.54 4.54 4.54
- -
- -
- -
- -
- -
Sub-Total 4.54

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0700 h 5.82 0.41 0.41
247 AUXILIAR DE ELETRICISTA 0.0700 h 3.52 0.25 0.25
Leis Sociais 114.84% 0.75
Sub-Total 1.40

Preo Total TOTAL GERAL R$ 5.94

10.03.07 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/1KV 25MM2 ANTI-CHAMA - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
995 CABO DE COBRE ISOLAMENTO ANTI-CHAMA 0,6/1 KV 16MM2 (1 CONDUTOR) TP SINTENAX PIRELLI OU EQUIV 1.0000 m 10.96 10.96 10.96
- -
- -
- -
- -
- -
Sub-Total 10.96

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0900 h 5.82 0.52 0.52
247 AUXILIAR DE ELETRICISTA 0.0900 h 3.52 0.32 0.32
Leis Sociais 114.84% 0.97
Sub-Total 1.81

Preo Total TOTAL GERAL R$ 12.77

10.03.08 CABO DE COBRE ISOLAMENTO TERMOPLASTICO 0,6/ 1 KV 50 MM ANTI-CHAMA - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CABO DE COBRE ISOLAMENTO ANTI-CHAMA 0,6/1 KV 50MM2 (1 CONDUTOR) TP SINTENAX PIRELLI OU EQUIV 75 A 500
1018 1.0000 m 18.04 18.04 18.04
E PN-16 DN 75 A 400
- -
- -
- -
- -
- -
Sub-Total 18.04

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.2000 h 5.82 1.16 1.16
247 AUXILIAR DE ELETRICISTA 0.2000 h 3.52 0.70 0.70
Leis Sociais 114.84% 2.15
Sub-Total 4.01

Preo Total TOTAL GERAL R$ 22.05

10.03.09 CABO TELEFONICO CCI-50 4 PARES (USO INTERNO) - FORNECIMENTO E INSTALACO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
11904 CABO TELEFONICO S/ BLINDAGEM INT CCI 4 PARES 1.0000 M 0.73 0.73 0.73
- -
- -
- -
- -
- -
Sub-Total 0.73

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0240 h 5.82 0.14 0.14
6111 SERVENTE 0.0300 h 3.22 0.10 0.10
Leis Sociais 114.84% 0.27
Sub-Total 0.51

Preo Total TOTAL GERAL R$ 1.24

10.03.10 FORNECIMENTO E INSTALAO DE FIO DE AO INOX DE 0,60mm ROLO COM 400M - FORNECIMENTO E INSTALACO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M1 FIO DE AO INOX DE 0,60mm ROLO COM 400M 1.0000 und 28.53 28.53 28.53
- -
- -
- -
- -
50/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
Sub-Total 28.53

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 3.00 h 5.82 17.45 17.45
- -
Leis Sociais 114.84% 20.04
Sub-Total 37.50

Preo Total TOTAL GERAL R$ 66.03

10.03.11 CABO DE ALTA TENSO FLEXVEL COMPOSTO POR FIOS ESTANHADOS DE 04MM. - FORNECIMENTO E INSTALACO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M2 CABO DE ALTA TENSO FLEXVEL COMPOSTO POR FIOS ESTANHADOS DE 04MM. 1.0000 m 0.68 0.68 0.68
- -
- -
- -
- -
- -
Sub-Total 0.68

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.9400 h 5.82 5.47 5.47
- -
Leis Sociais 114.84% 6.28
Sub-Total 11.75

Preo Total TOTAL GERAL R$ 12.43

10.04 ELETRODUTOS, ELETROCALHAS E ACESSRIOS

10.04.01 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 25MM (1") INCL CONEXOES, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2685 ELETRODUTO DE PVC ROSCAVEL DE 1" (25 MM), SEM LUVA 1.1000 M 2.69 2.96 2.96
- -
- -
- -
- -
- -
Sub-Total 2.96

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3000 h 5.82 1.75 1.75
247 AUXILIAR DE ELETRICISTA 0.3000 h 3.52 1.06 1.06
Leis Sociais 114.84% 3.22
Sub-Total 6.02

Preo Total TOTAL GERAL R$ 8.98

10.04.02 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 32MM (1 1/4") INCL CONEXOES, FORNECIMENTO E INTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2684 ELETRODUTO DE PVC ROSCAVEL DE 1 1/4" (32 MM), SEM LUVA 1.99 M 2.20 4.38 4.38
- -
- -
- -
- -
- -
Sub-Total 4.38

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.4500 h 5.82 2.62 2.62
247 AUXILIAR DE ELETRICISTA 0.4500 h 3.52 1.58 1.58
Leis Sociais 114.84% 4.83
Sub-Total 9.03

Preo Total TOTAL GERAL R$ 13.41

10.04.03 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 40MM (1 1/2") INCL CONEXOES, FORNECIMENTO E INTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2680 ELETRODUTO DE PVC ROSCAVEL DE 1 1/2" (38 MM), SEM LUVA 1.1000 M 5.07 5.58 5.58
- -
- -
- -
- -
- -
Sub-Total 5.58

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.4500 h 5.82 2.62 2.62
247 AUXILIAR DE ELETRICISTA 0.4500 h 3.52 1.58 1.58
Leis Sociais 114.84% 4.83
Sub-Total 9.03

Preo Total TOTAL GERAL R$ 14.61

10.04.04 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 50MM (2"), INCL CONEXOES, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2681 ELETRODUTO DE PVC ROSCAVEL DE 2" (50 MM), SEM LUVA 1.1000 m 6.64 7.31 7.31
- -
51/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
- -
- -
- -
Sub-Total 7.31

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.4500 h 5.82 2.62 2.62
247 AUXILIAR DE ELETRICISTA 0.4500 h 3.52 1.58 1.58
Leis Sociais 114.84% 4.83
Sub-Total 9.03

Preo Total TOTAL GERAL R$ 16.34

10.04.05 ELETRODUTO DE PVC RIGIDO ROSCAVEL DN 60MM (2 1/2") INCL CONEXOES, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2682 ELETRODUTO DE PVC ROSCAVEL DE 2 1/2" (63 MM), SEM LUVA 1.1000 m 13.57 14.93 14.93
- -
- -
- -
- -
- -
Sub-Total 14.93

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.6000 h 5.82 3.49 3.49
247 AUXILIAR DE ELETRICISTA 0.6000 h 3.52 2.11 2.11
Leis Sociais 114.84% 6.44
Sub-Total 12.04

Preo Total TOTAL GERAL R$ 26.97

10.04.06 ELETRODUTO DE PVC FLEXIVEL CORRUGADO DN 25MM (1") FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2688 ELETRODUTO PVC FLEXIVEL CORRUGADO 25MM TIPO TIGREFLEX OU EQUIV 1.0000 m 1.42 1.42 1.42
- -
- -
- -
- -
- -
Sub-Total 1.42

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.1500 h 5.82 0.87 0.87
247 AUXILIAR DE ELETRICISTA 0.1500 h 3.52 0.53 0.53
Leis Sociais 114.84% 1.61
Sub-Total 3.01

Preo Total TOTAL GERAL R$ 4.43

10.04.07 ELETRODUTO DE PVC FLEXIVEL CORRUGADO DN32 MM (1 1/4") FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2690 ELETRODUTO PVC FLEXIVEL CORRUGADO 32MM TIPO TIGREFLEX OU EQUIV 1.0000 m 2.13 2.13 2.13
- -
- -
- -
- -
- -
Sub-Total 2.13

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.2000 h 5.82 1.16 1.16
247 AUXILIAR DE ELETRICISTA 0.2000 h 3.52 0.70 0.70
Leis Sociais 114.84% 2.15
Sub-Total 4.01

Preo Total TOTAL GERAL R$ 6.14

10.04.08 ELETRODUTO METALICO FLEXIVEL DN 25MM FABRICADO COM FITA DE ACO ZINCADO, REVESTIDO EXTERNAMENTE COM PVC PRETO, INCLUSIVE CONEXOES, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2504 ELETRODUTO METALICO FLEXIVEL REV EXT PVC PRETO 25MM TIPO COPEX CU EQUIV 1.1000 m 6.42 7.06 7.06
- -
- -
- -
- -
- -
Sub-Total 7.06

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.1500 h 5.82 0.87 0.87
247 AUXILIAR DE ELETRICISTA 0.1500 h 3.52 0.53 0.53
Leis Sociais 114.84% 1.61
Sub-Total 3.01

Preo Total TOTAL GERAL R$ 10.07

10.04.09 FORNECIMENTO E INSTALAO DE ELETROCALHA METLICA 50 X 50 X 3000 MM (REF. VALEMAM OU SIMILAR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
0857/ORSE Eletrocalha metlica perfurada 50 x 50 x 3000 mm (ref. valemam ou similar) 1.9000 und 32.95 62.60 62.60
52/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
- -
- -
- -
- -
Sub-Total 62.60

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.6000 h 5.82 3.49 3.49
6111 servente 0.6000 h 3.22 1.93 1.93
Leis Sociais 114.84% 6.23
Sub-Total 11.65

Preo Total TOTAL GERAL R$ 74.25

10.04.10 SUPORTE OMEGA 50X50MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M60 Suporte omega 50x50mm 1.0000 und 1.52 1.52 1.52
- -
- -
- -
- -
- -
Sub-Total 1.52

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.2000 h 5.82 1.16 1.16
6111 servente 0.2000 h 3.22 0.64 0.64
Leis Sociais 114.84% 2.08
Sub-Total 3.88

Preo Total TOTAL GERAL R$ 5.40

10.04.11 FORNECIMENTO E INSTALAO DE ELETROCALHA PERFURADA 38 X 38 X 3000 MM (REF. MOPA OU SIMILAR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
04220- ORSE Eletrocalha metlica perfurada 38 x 38 x 3000 mm (ref. mopa ou similar) 1.9000 m 3.27 6.21 6.21
- -
- -
- -
- -
- -
Sub-Total 6.21

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.6000 h 5.82 3.49 3.49
6111 servente 0.6000 h 3.22 1.93 1.93
Leis Sociais 114.84% 6.23
Sub-Total 11.65

Preo Total TOTAL GERAL R$ 17.86

10.04.12 SUPORTE OMEGA 38X38MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M64 SUPORTE OMEGA 38X38MM 1.0000 und 4.08 4.08 4.08
- -
- -
- -
- -
- -
Sub-Total 4.08

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.2000 h 5.82 1.16 1.16
6111 servente 0.2000 h 3.22 0.64 0.64
Leis Sociais 114.84% 2.08
Sub-Total 3.88

Preo Total TOTAL GERAL R$ 7.96

10.04.13 FORNECIMENTO E INSTALAO DE ELETROCALHA METLICA 100 X 100 X 3000 MM (REF. MOPA OU SIMILAR) (INCLUSIVE CONEXES) (EXCLUSO SUPORTES)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
0857/ORSE Eletrocalha metlica perfurada 50 x 50 x 3000 mm (ref. valemam ou similar) 1.9000 und 44.52 84.58 84.58
- -
- -
- -
- -
- -
Sub-Total 84.58

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 1.2000 h 5.82 6.98 6.98
6111 servente 1.2000 h 3.22 3.86 3.86
Leis Sociais 114.84% 12.46
Sub-Total 23.31

Preo Total TOTAL GERAL R$ 107.89

10.04.14 SUPORTE OMEGA 100X100MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
53/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

M64 Suporte vertical 100 x 100 mm para fixao de eletrocalha metlica ( ref.: Mopa ou similar) 1.0000 und 5.03 5.03 5.03
- -
- -
- -
- -
- -
Sub-Total 5.03

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.2000 h 5.82 1.16 1.16
6111 servente 0.2000 h 3.22 0.64 0.64
Leis Sociais 114.84% 2.08
Sub-Total 3.88

Preo Total TOTAL GERAL R$ 8.91

10.04.15 FIXAO DE ELETROCALHAS COM VERGALHO (TIRANTE) COM ROSCA TOTAL 1/4"X1000MM (MARVITEC REF. 1431 OU SIMILAR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M64 Suporte vertical 100 x 100 mm para fixao de eletrocalha metlica ( ref.: Mopa ou similar) 1.0000 und 7.03 7.03 7.03
- -
- -
- -
- -
- -
Sub-Total 7.03

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.3000 h 5.82 1.75 1.75
6111 servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 3.11
Sub-Total 5.83

Preo Total TOTAL GERAL R$ 12.86

10.05 TOMADAS, INTERRUPTORES E ACESSRIOS

10.05.01 INTERRUPTOR 01 SEO, COM CAIXA PVC 4"X2"

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1872 CAIXA PVC 4" X 2" P/ ELETRODUTO " 1.0000 un 1.82 1.82 1.82
7555 INTERRUPTOR SIMPLES EMBUTIR 10A/250V C/PLACA, TIPO SILENTOQUE PIAL OU EQUIV 1.0000 un 4.78 4.78 4.78
- -
- -
- -
- -
Sub-Total 6.60

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.2100 h 5.82 1.22 1.22
4750 Pedreiro 0.2100 h 4.61 0.97 0.97
6111 servente 0.2100 h 3.22 0.68 0.68
Leis Sociais 114.84% 3.29
Sub-Total 6.16

Preo Total TOTAL GERAL R$ 12.76

10.05.02 INTERRUPTOR 02 SEES SIMPLES

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1119/ORSE Interruptor embutir 02 sees simples com placa 1.0000 und 4.56 4.56 4.56
- -
- -
- -
- -
- -
Sub-Total 4.56

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.1500 h 5.82 0.87 0.87
6111 servente 0.1500 h 3.22 0.48 0.48
Leis Sociais 114.84% 1.56
Sub-Total 2.91

Preo Total TOTAL GERAL R$ 7.47

10.05.03 INTERRUPTOR 01 SEO PARALELA, DE EMBUTIR, COM CAIXA PVC 4"X2"

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1872 CAIXA PVC 4" X 2" P/ ELETRODUTO " 1.0000 un 1.82 1.82 1.82
7557 INTERRUPTOR PARALELO EMBUTIR 10A/250V C/ PLACA, TIPO SILENTOQUE PIAL OU EQUIV 1.0000 un 6.41 6.41 6.41
- -
- -
- -
- -
Sub-Total 8.23

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.2100 h 5.82 1.22 1.22
4750 Pedreiro 0.2100 h 4.61 0.97 0.97
6111 servente 0.2100 h 3.22 0.68 0.68
Leis Sociais 114.84% 3.29
Sub-Total 6.16

Preo Total TOTAL GERAL R$ 14.39

54/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

10.05.04 INTERRUPTOR PARA CHUVEIRO, BIPOLAR SIMPLES, 25A, REF.2516, SILENTOQUE, PIAL OU SIMILAR, INCLUSIVE CAIXA PVC 4X2 E PLACA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1872 CAIXA PVC 4" X 2" P/ ELETRODUTO " 1.0000 un 1.82 1.82 1.82
04274/ORSE Interruptor p/chuveiro, bipolar simples, 25A, ref.2516, Linha Silentoque, Pial ou similar 1.0000 un 17.29 17.29 17.29
- -
- -
- -
- -
Sub-Total 19.11

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.5000 h 5.82 2.91 2.91
6111 servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 28.82

10.05.05 INTERRUPTOR 01 SEO SIMPLES, DE EMBUTIR, COM PLACA, CONJUGADO COM TOMADA 2P+T, ABNT, 10A, INCLUSIVE CAIXA PVC 4X2

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1872 CAIXA PVC 4" X 2" P/ ELETRODUTO " 1.0000 un 1.82 1.82 1.82
09102/ORSE Interruptor 01 seo simples, de embutir, com placa, conjugado com tomada 2p+t, ABNT, 10A 1.0000 un 5.60 5.60 5.60
- -
- -
- -
- -
Sub-Total 7.42

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.5000 h 5.82 2.91 2.91
6111 servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 5.19
Sub-Total 9.71

Preo Total TOTAL GERAL R$ 17.13

10.05.06 TOMADA DE EMBUTIR 2P+T 10A/250V C/ PLACA - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7528 TOMADA DE EMBUTIR, 2 P + T, UNIVERSAL, DE 10 A / 250 V, COM PLACA 1.0000 und 5.31 5.31 5.31
- -
- -
- -
- -
- -
Sub-Total 5.31

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.2000 h 5.82 1.16 1.16
247 AUXILIAR DE ELETRICISTA 0.2000 h 3.52 0.70 0.70
Leis Sociais 114.84% 2.15
Sub-Total 4.01

Preo Total TOTAL GERAL R$ 9.32

10.05.07 TOMADA DUPLA DE EMBUTIR 2X2P+T 10A/250V C/ PLACA - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7535 TOMADA DUPLA EMBUTIR 2 X 2P UNIVERSAL 10A/250V C/PLACA, TIPO SILENTOQUE PIAL OU EQUIV 1.0000 und 9.05 9.05 9.05
- -
- -
- -
- -
- -
Sub-Total 9.05

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3700 h 5.82 2.15 2.15
247 AUXILIAR DE ELETRICISTA 0.3700 h 3.52 1.30 1.30
Leis Sociais 114.84% 3.97
Sub-Total 7.42

Preo Total TOTAL GERAL R$ 16.47

10.05.08 TOMADA DE EMBUTIR 2P+T 20A/250V C/ PLACA - FORNECIMENTO E INSTALACO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7529 TOMADA EMBUTIR 2P + T 15A/250V C/PLACA, TIPO SILENTOQUE OU EQUIV 1.0000 und 12.69 12.69 12.69
- -
- -
- -
- -
- -
Sub-Total 12.69

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.2000 h 5.82 1.16 1.16
247 AUXILIAR DE ELETRICISTA 0.2000 h 3.52 0.70 0.70
Leis Sociais 114.84% 2.15
Sub-Total 4.01

Preo Total TOTAL GERAL R$ 16.70


55/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

10.05.09 TOMADA DE EMBUTIR 2P+T 10A/250V C/ PLACA - FORNECIMENTO E INSTALACAO(REDE ESTABILIZADA)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7528 TOMADA DE EMBUTIR, 2 P + T, UNIVERSAL, DE 10 A / 250 V, COM PLACA 1.0000 und 5.31 5.31 5.31
- -
- -
- -
- -
- -
Sub-Total 5.31

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.2000 h 5.82 1.16 1.16
247 AUXILIAR DE ELETRICISTA 0.2000 h 3.52 0.70 0.70
Leis Sociais 114.84% 2.15
Sub-Total 4.01

Preo Total TOTAL GERAL R$ 9.32

10.05.10 TOMADA DUPLA DE EMBUTIR 2X2P+T 10A/250V C/ PLACA - FORNECIMENTO E INSTALACAO(REDE ESTABILIZADA)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7535 TOMADA DUPLA EMBUTIR 2 X 2P UNIVERSAL 10A/250V C/PLACA, TIPO SILENTOQUE PIAL OU EQUIV 1.0000 und 9.05 9.05 9.05
- -
- -
- -
- -
- -
Sub-Total 9.05

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3700 h 5.82 2.15 2.15
247 AUXILIAR DE ELETRICISTA 0.3700 h 3.52 1.30 1.30
Leis Sociais 114.84% 3.97
Sub-Total 7.42

Preo Total TOTAL GERAL R$ 16.47

10.06 CAIXAS DE PASSAGEM (CONFORME ESP. TCNICAS)

10.06.01 CAIXA DE PASSAGEM 20X20X12CM, EM CHAPA AO GALVANIZADO EMBUTIDA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00445/ORSE Caixa de passagem 20x20x12cm, em chapa de ao galvanizado 1.0000 und 13.56 13.56 13.56
- -
- -
- -
- -
- -
Sub-Total 13.56

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.7000 h 5.82 4.07 4.07
6111 servente 0.7000 h 3.22 2.25 2.25
- -
Leis Sociais 114.84% 7.27
Sub-Total 13.60

Preo Total TOTAL GERAL R$ 27.16

10.06.02 CAIXA DE PASSAGEM 15X15CM EM CHAPA DE AO GALVANIZADO - FORNECIMENTO (EMBUTIR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00486/ORSE Caixa de passagem 15x15cm, em chapa de ao galvanizado, p/eletrica 1.0000 und 13.11 13.11 13.11
- -
- -
- -
- -
- -
Sub-Total 13.11

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 13.11

10.06.03 CAIXA DE PASSAGEM EM PVC TIPO AQUATIC, 100X100X50MM(EMBUTIR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
08958/ORSE Caixa de passagem aquatic 100x100x50mm 1.0000 und 15.83 15.83 15.83
- -
- -
- -
- -
- -
Sub-Total 15.83

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.4500 h 5.82 2.62 2.62
56/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

6111 servente 0.4500 h 3.22 1.45 1.45


- -
Leis Sociais 114.84% 4.67
Sub-Total 8.74

Preo Total TOTAL GERAL R$ 24.57

10.06.04 CAIXA DE PASSAGEM PVC 4X2" - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1872 CAIXA PVC 4"X 2" P/ ELETRODUTO " 1.0000 und 1.58 1.58 1.58
- -
- -
- -
- -
- -
Sub-Total 1.58

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.1500 h 5.82 0.87 0.87
247 AUXILIAR DE ELETRICISTA 0.1500 h 3.52 0.53 0.53
- -
Leis Sociais 114.84% 1.61
Sub-Total 3.01

Preo Total TOTAL GERAL R$ 4.59

10.06.05 QUADRO DE DISTRIBUICAO PARA TELEFONE N.3, 40X40X12CM EM CHAPA METALICA, DE EMBUTIR, SEM ACESSORIOS, PADRAO TELEBRAS, FORNECIMENTO E INSTALACO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1847 ARGAMASSA CIMENTO/AREIA GROSSA SEM PENEIRAR 1:3 PREPARO MANUAL 0.0035 M3 347.81 1.23 1.23
11251 CAIXA DE PASSAGEM N 3 PADRAO TELEBRAS DIM 40 X 40 X 12CM EM CHAPA DE ACO GALV 1.0000 UN 81.31 81.31 81.31
- -
- -
- -
- -
Sub-Total 82.54

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 1.7500 h 5.82 10.19 10.19
4750 PEDREIRO 0.4000 h 4.61 1.84 1.84
6111 SERVENTE 0.4000 h 3.22 1.29 1.29
247 AUXILIAR DE ELETRICISTA 1.7500 h 3.52 6.16 6.16
Leis Sociais 114.84% 22.37
Sub-Total 29.82

Preo Total TOTAL GERAL R$ 112.36

10.06.06 CAIXA ENTERRADA PARA INSTALACOES TELEFONICAS TIPO R1 0,60X0,35X0,50M EM BLOCOS DE CONCRETO ESTRUTURAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
73397 EMBOCO CIMENTO AREIA 1:4 ESP=1,5CM INCL CHAPISCO 1:3 E=9MM 0.9500 M2 19.47 18.50 18.50
32 ARAME PRETO RECOZIDO, PARA ARMACAO DE FERRAGEM, N. 18, D = 1,25 MM (0,01 KGM) 3.7800 KG 6.80 25.70 25.70
337 ACO CA-50 1/4" (6,35 MM) 0.1130 KG 3.99 0.45 0.45
ALVENARIA P/CX ENTERR ATE 0,80M C/BL CONC 1 OX2OX40CM C/ARGAMASSA 1:4 CIMENTO E AREIA E CONCRETO
73418 1.1500 M2 28.16 32.38 32.38
20MPA P/ENCHIMENTO DOS FUROS.
74007/2 FORMA TABUAS MADEIRA 3A P/ PECAS CONCRETO ARM, REAPR 2X, INCL MONTAGEM E DESMONTAGEM. 0.1400 M2 36.31 5.08 5.08
6042 CONCRETO NAO ESTRUTURAL, CONSUMO 210KG/M3, PREPARO COM BETONEIRA, SEM LANCAMENTO 0.0380 M3 257.31 9.78 9.78
6045 CONCRETO FCK=15MPA, PREPARO COM BETONEIRA, SEM LANCAMENTO 0.0220 M3 328.09 7.22 7.22
Sub-Total 99.11

Equipamento
- -
Sub-Total -

Mo de obra
378 ARMADOR 0.9200 h 4.61 4.24 4.24
4750 PEDREIRO 0.9200 h 4.61 4.24 4.24
6111 SERVENTE 0.2000 h 3.22 0.64 0.64
- -
Leis Sociais 114.84% 10.48
Sub-Total 11.12

Preo Total TOTAL GERAL R$ 110.23

10.06.07 CAIXA DE PASSAGEM EM ALVENARIA NO PISO 80X80X62cm FUNDO BRITA COM TAMPA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
370 AREIA MEDIA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.1700 M3 45.00 7.65 7.65
1106 CAL HIDRATADA, DE 1A. QUALIDADE, PARA ARGAMASSA 12.4000 KG 1.00 12.40 12.40
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 43.5000 KG 0.48 20.88 20.88
4722 PEDRA BRITADA N. 3 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0200 M3 90.03 1.80 1.80
7258 TIJOLO CERAMICO MACICO 5 X 10 X 20CM 230.0000 UN 0.58 133.81 133.81
1358 CHAPA MADEIRA COMPENSADA RESINADA 2,2 X 1,1 M X 17MM P/ FORMA CONCRETO 0.1600 M2 23.51 3.76 3.76
39 ACO CA-60 - 5,0MM 2.2400 KG 4.52 10.12 10.12
367 AREIA GROSSA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0202 M3 40.00 0.81 0.81
4718 PEDRA BRITADA N. 2 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0234 M3 121.60 2.84 2.84
Sub-Total 194.07

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 5.7000 h 4.61 26.28 26.28
6111 SERVENTE 10.7000 h 3.22 34.45 34.45
- -
- -
Leis Sociais 114.84% 69.74
Sub-Total 69.74

Preo Total TOTAL GERAL R$ 263.81

10.06.08 CAIXA DE PASSAGEM EM ALVENARIA NO PISO 60X60X70cm FUNDO BRITA COM TAMPA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
57/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

370 AREIA MEDIA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.1500 M3 42.00 6.30 6.30
1106 CAL HIDRATADA, DE 1A. QUALIDADE, PARA ARGAMASSA 11.0000 KG 0.97 10.67 10.67
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 34.6900 KG 0.46 15.96 15.96
4722 PEDRA BRITADA N. 3 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0120 M3 716.15 8.59 8.59
7258 TIJOLO CERAMICO MACICO 5 X 10 X 20CM 200.0000 UN 0.35 70.00 70.00
1358 CHAPA MADEIRA COMPENSADA RESINADA 2,2 X 1,1 M X 17MM P/ FORMA CONCRETO 0.1200 M2 28.00 3.36 3.36
39 ACO CA-60 - 5,0MM 1.2600 KG 4.04 5.09 5.09
367 AREIA GROSSA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0124 M3 38.00 0.47 0.47
4718 PEDRA BRITADA N. 2 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0131 M3 100.00 1.31 1.31
Sub-Total 121.75

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 4.5000 h 4.61 20.75 20.75
6111 servente 7.9340 h 3.22 25.55 25.55
Leis Sociais 114.84% 53.16
Sub-Total 99.45

Preo Total TOTAL GERAL R$ 221.20

10.06.09

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
39 ACO CA-60 - 5,0MM 2.1560 KG 4.52 9.75 9.75
370 AREIA MEDIA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0653 M3 45.00 2.94 2.94
1106 CAL HIDRATADA, DE 1A. QUALIDADE, PARA ARGAMASSA 3.0096 KG 1.00 3.01 3.01
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 18.5084 KG 0.48 8.88 8.88
4721 PEDRA BRITADA N. 1 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0365 M3 103.53 3.78 3.78
7258 TIJOLO CERAMICO MACICO 5 X 10 X 20CM 60.4800 UN 0.35 21.17 21.17
- -
- -
- -
Sub-Total 49.53

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 1.5000 h 4.61 6.92 6.92
6111 servente 4.1550 h 3.22 13.38 13.38
Leis Sociais 114.84% 23.31
Sub-Total 43.60

Preo Total TOTAL GERAL R$ 93.13

10.06.10

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
370 AREIA MEDIA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.2000 M3 45.00 9.00 9.00
1106 CAL HIDRATADA, DE 1A. QUALIDADE, PARA ARGAMASSA 1.6500 KG 1.00 1.65 1.65
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 4.6000 KG 0.48 2.21 2.21
4722 PEDRA BRITADA N. 3 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0030 M3 90.03 0.27 0.27
7258 TIJOLO CERAMICO MACICO 5 X 10 X 20CM 29.0000 UN 0.35 10.10 10.10
1358 CHAPA MADEIRA COMPENSADA RESINADA 2,2 X 1,1 M X 17MM P/ FORMA CONCRETO 0.0400 M2 23.51 0.94 0.94
39 ACO CA-60 - 5,0MM 0.1400 KG 4.52 0.63 0.63
367 AREIA GROSSA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0013 M3 40.00 0.05 0.05
4718 PEDRA BRITADA N. 2 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0015 M3 100.00 0.15 0.15
Sub-Total 25.00

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.2000 h 4.61 0.92 0.92
6111 servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 2.91
Sub-Total 5.44

Preo Total TOTAL GERAL R$ 30.44

10.07 ATERRAMENTO - SPDA

10.07.01 CABO DE COBRE N, BITOLA 50MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
867 CABO DE COBRE NU 50MM2 MEIO-DURO 0.9120 m 21.17 19.31 19.31
- -
- -
- -
- -
- -
Sub-Total 19.31

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3100 h 5.82 1.80 1.80
247 AUXILIAR DE ELETRICISTA 0.3100 h 3.52 1.09 1.09
Leis Sociais 114.84% 3.33
Sub-Total 6.22

Preo Total TOTAL GERAL R$ 25.53

10.07.02 CABO DE COBRE N 35MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
863 CABO DE COBRE NU 35MM2 MEIO-DURO 0.99 m 14.97 14.86 14.86
- -
- -
- -
- -
- -
Sub-Total 14.86

Equipamento
- -
Sub-Total -

Mo de obra
58/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

2436 ELETRICISTA 0.2100 h 5.82 1.22 1.22


247 AUXILIAR DE ELETRICISTA 0.2100 h 3.52 0.74 0.74
Leis Sociais 114.84% 2.25
Sub-Total 4.21

Preo Total TOTAL GERAL R$ 19.07


10.07.03 CABO DE COBRE N, BITOLA 16MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
857 CABO DE COBRE NU 16MM2 MEIO-DURO 1.02 m 6.33 6.45 6.45
- -
- -
- -
- -
- -
Sub-Total 6.45

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.1300 h 5.82 0.76 0.76
247 AUXILIAR DE ELETRICISTA 0.1300 h 3.52 0.46 0.46
Leis Sociais 114.84% 1.39
Sub-Total 2.61

Preo Total TOTAL GERAL R$ 9.06

10.07.04 HASTE COPPERWELD 5/8 X 3,0M COM CONECTOR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
HASTE DE ATERRAMENTO EM ACO, REVESTIDA COM BAIXA CAMADA DE COBRE, COM 3,00 M DE COMPRIMENTO E DN
3380 1.0000 und 18.20 18.20 18.20
= 5/8", COM CONECTOR TIPO GRAMPO
- -
- -
- -
- -
- -
Sub-Total 18.20

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.4000 h 5.82 2.33 2.33
247 AUXILIAR DE ELETRICISTA 0.4000 h 3.52 1.41 1.41
Leis Sociais 114.84% 4.29
Sub-Total 8.03

Preo Total TOTAL GERAL R$ 26.23


10.07.05 PARAFUSO SEXTAVADO ROSCA SOBERBA ZINCADO 3/8" X 80MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
PARAFUSO SEXTAVADO ROSCA SOBERBA ZINCADO 3/8" X 80MM 1.0000 und 1.00 1.00 1.00
- -
- -
- -
- -
- -
Sub-Total 1.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 1.00

10.07.06 CORPO DA CAIXA DE INSPEO EM PVC P/ATERRAMENTO D=300MM, REDONDA, H=300MM, REF: TEL-552 OU SIMILAR (SPDA)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material

CORPO DA CAIXA DE INSPEO EM PVC P/ATERRAMENTO D=300MM, REDONDA, H=300MM, REF: TEL-552 OU SIMILAR (SPDA) 1.0000 und 13.55 13.55 13.55

- -
- -
- -
- -
- -
Sub-Total 13.55

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 13.55

10.07.07 SERVIO DE SOLDA EXOTERMICA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M25 CARTUCHO PARA SOLDA EXOTRMICA 90 30.0000 und 7.95 238.64 238.64
10338 -ORSE MOLDE DE SOLDA EXOTRMICA TIPO "T" PARA CABO COBRE NU 35 MM 1.0000 UN 120.60 120.60 120.60
M24 MOLDE PARA SOLDA EXOTERMICA TIPO "X" PARA CABO 35 MM 1.0000 UN 174.00 174.00 174.00
09691 -ORSE MOLDE DE SOLDA EXOTRMICA 5/8 1.0000 UN 164.35 164.35 164.35
M23 ACENDEDOR IGNITOR PARA SOLDA EXOTRMICA COM 12 P 3.0000 UN 1.80 5.40 5.40
M22 ALICATE PARA MOLDE DE SOLDA EXOTRMICA COMPATVEL COM CADINHO DE GRAFITE 3.0000 UN 85.20 255.60 255.60
Sub-Total 958.59

Equipamento
- -
Sub-Total -

59/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Mo de obra
2436 ELETRICISTA 30.0000 h 5.82 174.60 174.60
247 AUXILIAR DE ELETRICISTA 30.0000 h 3.52 105.60 105.60
Leis Sociais 114.84% 321.78
Sub-Total 601.98

Preo Total TOTAL GERAL R$ 1,560.57

10.07.08 CAIXA DE EQUALIZAO P/ATERRAMENTO 20X20X10CM DE SOBREPOR P/11 TERMINAIS DE PRESSO C/BARRAMENTO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M48 Caixa de equalizao p/aterramento 20x20x10cm de sobrepor 1.0000 und 143.83 143.83 143.83
- -
- -
- -
- -
- -
Sub-Total 143.83

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3000 h 5.82 1.75 1.75
6111 servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 3.11
Sub-Total 5.83

Preo Total TOTAL GERAL R$ 149.66

10.07.09 TERMINAL AREO EM AO GALVANIZADO COM BASE DE FIXAO H=30CM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7571 TERMINAL AEREO EM ACO GALV DN 3/8", COMPRIM= 300MM C/ BASE DE FIXACAO HORIZONTAL 1.0000 und 6.76 6.76 6.76
- -
- -
- -
- -
- -
Sub-Total 6.76

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.5000 h 5.82 2.91 2.91
247 AUXILIAR DE ELETRICISTA 0.5000 h 3.52 1.76 1.76
Leis Sociais 114.84% 5.36
Sub-Total 10.03

Preo Total TOTAL GERAL R$ 16.79

10.07.10 TERMINAL OU CONECTOR DE PRESSAO - PARA CABO 35MM2 - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1537 TERMINAL A PRESSAO DE BRONZE P/ CABO A BARRA,CABO 25 A 35MM2 C/ 1 FURO DE FIXACAO 1.0000 und 3.67 3.67 3.67
- -
- -
- -
- -
- -
Sub-Total 3.67

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3000 h 5.82 1.75 1.75
247 AUXILIAR DE ELETRICISTA 0.3000 h 3.52 1.06 1.06
Leis Sociais 114.84% 3.22
Sub-Total 6.02

Preo Total TOTAL GERAL R$ 9.69

10.07.11 PRESILHA PARA CABO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M26 PRESILHA PARA CABO 1.0000 und 2.37 2.37 2.37
- -
- -
- -
- -
- -
Sub-Total 2.37

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.0100 h 5.82 0.06 0.06
247 AUXILIAR DE ELETRICISTA 0.0100 h 3.52 0.04 0.04
Leis Sociais 114.84% 0.11
Sub-Total 0.20

Preo Total TOTAL GERAL R$ 2.57

10.08 DISPOSITIVOS DE PROTEO

10.08.01 DISJUNTOR TERMOMAGNETICO TRIPOLAR 125 A, PADRO DIN (EUROPEU - LINHA BRANCA), 10kA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00830/ORSE Disjuntor tripolar 125 A, padro DIN (linha branca), corrente de interrupo 10KA, ref.: Siemens ou similar 1.0000 und 162.43 162.43 162.43
- -
- -
- -
- -
- -
Sub-Total 162.43

60/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 2.0000 h 5.82 11.64 11.64
6111 servente 2.0000 h 3.22 6.44 6.44
Leis Sociais 114.84% 20.76
Sub-Total 38.84

Preo Total TOTAL GERAL R$ 201.27

10.08.02 DISJUNTOR TERMOMAGNETICO TRIPOLAR PADRAO DIN (EUROPEU) 10 A 50A 240V, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2392 DISJUNTOR TERMOMAGNETICO TRIPOLAR 50A 1.0000 m 47.29 47.29 47.29
- -
- -
- -
- -
- -
Sub-Total 47.29

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 1.0000 h 5.82 5.82 5.82
6111 servente 1.0000 h 3.22 3.22 3.22
Leis Sociais 114.84% 10.38
Sub-Total 19.42

Preo Total TOTAL GERAL R$ 66.71

10.08.03 DISJUNTOR TERMOMAGNETICO TRIPOLAR PADRAO DIN (EUROPEU) 60 A 100A 240V, FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2373 DISJUNTOR TERMOMAGNETICO TRIPOLAR 100A 1.0000 m 69.63 69.63 69.63
- -
- -
- -
- -
- -
Sub-Total 69.63

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 1.0000 h 5.82 5.82 5.82
6111 servente 1.0000 h 3.22 3.22 3.22
Leis Sociais 114.84% 10.38
Sub-Total 19.42

Preo Total TOTAL GERAL R$ 89.05

10.08.04 DISJUNTOR TERMOMAGNETICO MONOPOLAR 10 A 30A, PADRO DIN (LINHA BRANCA), CORRENTE DE INTERRUPO 5kA, REF.: SIEMENS 5 SX1 OU SIMILAR.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2370 DISJUNTOR TERMOMAGNETICO MONOPOLAR 30A 1.0000 m 7.41 7.41 7.41
- -
- -
- -
- -
- -
Sub-Total 7.41

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3000 h 5.82 1.75 1.75
6111 servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 3.11
Sub-Total 5.83

Preo Total TOTAL GERAL R$ 13.24

10.08. 05 DISJUNTOR MONOPOLAR 32 A, PADRO DIN (LINHA BRANCA), CURVA DE DISPARO C, CORRENTE DE INTERRUPO 5KA, REF.: SIEMENS 5 SX1 OU SIMILAR.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
DISJUNTOR MONOPOLAR 32 A, PADRO DIN (LINHA BRANCA), CURVA DE DISPARO C, CORRENTE DE INTERRUPO
2370 1.0000 und 5.79 5.79 5.79
5KA, REF.: SIEMENS 5 SX1 OU SIMILAR.
- -
- -
- -
- -
- -
Sub-Total 5.79

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.4000 h 5.82 2.33 2.33
6111 servente 0.4000 h 3.22 1.29 1.29
Leis Sociais 114.84% 4.15
Sub-Total 7.77

Preo Total TOTAL GERAL R$ 13.56

10.08.06 DISJUNTOR BIPOLAR DR 25 A - DISPOSITIVO RESIDUAL DIFERENCIAL, TIPO AC, 30MA, REF.5SM1 314-OMB, SIEMENS OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
07943 - ORSE Disjuntor bipolar DR 25 A, dispositivo residual diferencial, tipo AC, 30mA 1.0000 und 88.62 88.62 88.62
- -
- -
- -
- -
- -
61/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Sub-Total 88.62

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.4000 h 5.82 2.33 2.33
6113 AJUDANTE DE ELETRICISTA 0.4000 h 3.52 1.41 1.41
Leis Sociais 114.84% 4.29
Sub-Total 8.03

Preo Total TOTAL GERAL R$ 96.65

10.08.07 DISJUNTOR BIPOLAR DR 40 A - DISPOSITIVO RESIDUAL DIFERENCIAL, TIPO AC, 30MA, REF.5SM1 314-OMB, SIEMENS OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3749 - ORSE Disjuntor bipolar DR 25 A, dispositivo residual diferencial, tipo AC, 30mA 1.0000 und 108.29 108.29 108.29
- -
- -
- -
- -
- -
Sub-Total 108.29

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.6000 h 5.82 3.49 3.49
6113 AJUDANTE DE ELETRICISTA 0.6000 h 3.52 2.11 2.11
Leis Sociais 114.84% 6.44
Sub-Total 12.04

Preo Total TOTAL GERAL R$ 120.33

10.08.08 DISPOSITIVO DE PROTEO CONTRA SURTO DE TENSO DPS 40KA - 440V

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
09332/ORSE Dispositivo de proteo contra surto de tenso DPS 40KA - 440v (para-raio) 1.0000 m 73.82 73.82 73.82
- -
- -
- -
- -
- -
Sub-Total 73.82

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3000 h 5.82 1.75 1.75
6111 servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 3.11
Sub-Total 5.83

Preo Total TOTAL GERAL R$ 79.65

10.09 DISPOSITIVOS DE PROTEO

10.09.01 LUMINRIA DE EMBUTIR COM ALETAS, PARA LMPADA FLUORESCENTE, 2 X 32W, REF. TBS020232CI00, DA PHILIPS, COMPLETA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
01299/ORSE Lmpada fluorescente 32 w (Sylvania ou similar) 2.0000 und 3.00 6.00 6.00
01909/ORSE Reator eletrnico alto fator de potncia = 0,95 p/ lmpada fuorescente 2 x 32 w 1.0000 und 26.25 26.25 26.25
Luminria de embutir com aletas, para lmpada fluorescente, 2 x 32w, ref. TBS020232CI00, da Philips, exclusive reator e
06844/ORSE 1.0000 und 62.84 62.84 62.84
lmpada
- -
- -
- -
Sub-Total 95.09

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.4000 h 5.82 2.33 2.33
6111 servente 0.4000 h 3.22 1.29 1.29
Leis Sociais 114.84% 4.15
Sub-Total 7.77

Preo Total TOTAL GERAL R$ 102.86

10.09.02 LUMINRIA CILNDRICA DE SOBREPOR EM ALUMNIO PINTADO EM MARROM PADRO LUMINI,REF. T069, DA LUMINI, INCLUSO DUAS LMPADAS FLUOCOMPACTAS DE 20W, TEMP. COR 2700K

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Luminria cilndrica de sobrepor em alumnio pintado em marrom padro lumini,ref. T069, da Lumini ou similar, incluise duas
06826/ORSE 1.0000 und 156.89 156.89 156.89
lmpadas fluocompactas de 20W, temp. cor 2700K
- -
- -
- -
- -
- -
Sub-Total 156.89

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 1.0000 h 5.82 5.82 5.82
6111 servente 1.0000 h 3.22 3.22 3.22
Leis Sociais 114.84% 10.38
Sub-Total 19.42

Preo Total TOTAL GERAL R$ 176.31

10.09.03 LUMINRIA DE SOBREPOR COM ALETAS, PARA LMPADA FLUORESCENTE COMPACTA, 2 X 26W, REF. C-2313, DA LUSTRES PROJETO OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material

62/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

7055/ORSE Luminria de sobrepor com aletas, para lmpada fluorescente compacta, 2 x 26w, ref. C-2313, da Lustres Projeto ou similar 1.0000 un 61.10 61.10 61.10
07060/ORSE Lampada fluorescente eletronica PL 26W /220V (compacta integrada) 2.0000 un 14.20 28.40 28.40
7064/ORSE Reator eletrnico para lmpada fluorescente compacta dupla de 26w 2.0000 un 24.70 49.40 49.40
- -
- -
- -
Sub-Total 138.90

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 1.0000 h 5.82 5.82 5.82
6111 servente 1.0000 h 3.22 3.22 3.22
Leis Sociais 114.84% 10.38
Sub-Total 19.42

Preo Total TOTAL GERAL R$ 158.32

10.09.04 FORNECIMENTO E INSTAO - LUMINARIA ESPETO PARA JARDIM PAR 40W

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M27 LUMINARIA ESPETO PARA JARDIM PAR 20W 1.0000 und 112.00 112.00 112.00
- -
- -
- -
- -
- -
Sub-Total 112.00

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.3000 h 5.82 1.75 1.75
6111 servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 3.11
Sub-Total 5.83

Preo Total TOTAL GERAL R$ 117.83

10.09.05 REFLETOR PARA LMPADA DE 150 A 500W

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
01691/ORSE Parafuso metal 2 1/2" x 12 p/ bucha s-10 2.0000 UND 0.35 0.70 0.70
08992/ORSE Refletor para lmpada de 150 a 500w 1.0000 UND 15.26 15.26 15.26
- -
- -
- -
- -
Sub-Total 15.96

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.3000 h 5.82 1.75 1.75
6111 servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 3.11
Sub-Total 5.83

Preo Total TOTAL GERAL R$ 21.79

10.09.06 LAMPADA DE VAPOR DE SODIO DE 250WX220V - FORNECIMENTO E INSTALACAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3757 LAMPADA VAPOR SODIO 250W 1.0000 und 34.62 34.62 34.62
- -
- -
- -
- -
- -
Sub-Total 34.62

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.2000 h 5.82 1.16 1.16
- -
Leis Sociais 114.84% 1.34
Sub-Total 2.50

Preo Total TOTAL GERAL R$ 37.12

10.10 CABEAMENTO ESTRUTURADO

10.10.01 FORNECIMENTO E LANAMENTO DE CABO UTP 4 PARES CAT 6

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
333 Arame galvanizado sem revestimento, 14bwg (2,1 mm) - 0,026kg/m 0.1000 kg 10.00 1.00 1.00
06477/ORSE Cabo UTP - 4 pares-categoria 6 (p/cabeam.estruturado) 1.0500 m 0.87 0.91 0.91
- -
- -
- -
- -
Sub-Total 1.91

Equipamento
- -
Sub-Total -

Mo de obra
6111 Servente 0.1050 h 3.22 0.34 0.34
00049/ORSE Cabista para instalao telefnica 0.1400 h 4.49 0.63 0.63
Leis Sociais 114.84% 1.11
Sub-Total 2.08

Preo Total TOTAL GERAL R$ 3.99

10.10.02 CABO DE FIBRA PTICA DE 12 VIAS


63/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M67 CABO OPTICO 12F - FURUKAWA OU SIMILAR 1.0000 und 3.34 3.34 3.34
- -
- -
- -
- -
- -
Sub-Total 3.34

Equipamento
- -
Sub-Total -

Mo de obra
0049/ORSE Cabista para instalao telefnica 0.1000 h 4.49 0.45 0.45
6111 servente 0.1000 h 3.22 0.32 0.32
Leis Sociais 114.84% 0.89
Sub-Total 1.66

Preo Total TOTAL GERAL R$ 5.00

10.10.03 PATH CORDS DE 1.50 M COM CONECTOR RJ-45 MACHO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
01709/ORSE Path cords de 1.50 m com conector rj-45 macho 1.0000 un 5.03 5.03 5.03
- -
- -
- -
- -
- -
- -
Sub-Total 5.03

Equipamento
- -
Sub-Total -

Mo de obra
6111 Servente 0.2000 h 3.22 0.64 0.64
00049/ORSE Cabista para instalao telefnica 0.2000 h 4.49 0.90 0.90
- -
- -
Leis Sociais 114.84% 1.77
Sub-Total 3.31

Preo Total TOTAL GERAL R$ 8.34

10.10.04 TOMADA PARA LGICA, COM CAIXA PVC, EMBUTIDA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
02242/ORSE TOMADA PARA LGICA, COM CAIXA PVC, EMBUTIDA 1.0000 und 23.11 23.11 23.11
- -
- -
- -
- -
- -
- -
Sub-Total 23.11

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.6000 h 5.82 3.49 3.49
6111 servente 0.6000 h 3.22 1.93 1.93
- -
- -
Leis Sociais 114.84% 6.23
Sub-Total 11.65

Preo Total TOTAL GERAL R$ 34.76

10.10.05 TOMADA DUPLA PARA LGICA RJ45, 4"X4", EMBUTIR, COMPLETA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
07485/ORSE Tomada dupla para lgica RJ45, 4"x4", embutir, completa 1.0000 und 62.55 62.55 62.55
- -
- -
- -
- -
- -
- -
Sub-Total 62.55

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.7000 h 5.82 4.07 4.07
6111 servente 0.7000 h 3.22 2.25 2.25
- -
- -
Leis Sociais 114.84% 7.27
Sub-Total 13.60

Preo Total TOTAL GERAL R$ 76.15

10.10.06 FORNECIMENTO E INSTALAO DE REGUA 8 TOMADAS PARA RACK 19"

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M20 CALHA 8NBR REGUA DE TOMADAS 19" - 8 SAIDAS 1.0000 und 71.12 71.12 71.12
- -
- -
- -
- -
- -
- -
Sub-Total 71.12

Equipamento
- -
64/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Sub-Total -

Mo de obra
00049/ORSE Cabista para instalao telefnica 0.3000 h 4.49 1.35 1.35
- -
- -
- -
Leis Sociais 114.84% 1.55
Sub-Total 2.89

Preo Total TOTAL GERAL R$ 74.01

10.10.07 PATH PANEL 24 PORTAS CAT 6E

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.10.08 SWITCH 24 PORTAS 10/100 MBPS - FORNECIMENTO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.10.09 NO BREAK DE GRANDE PORTE 10KVA (1000VA) SMS 24677 SINUS DUBLE II BLACK 16 BATERIAS LCD | USS10000TI

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.10.10 FORNECIMENTO E INSTALAO DE RACK DE PISO 19" X 24U X 700MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.10.11 DISTRIBUIDOR OPTICO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
DISTRIBUIDOR OPTICO 1.0000 und 285.04 285.04 285.04
- -
- -
- -
65/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
- -
Sub-Total 285.04

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 285.04

10.10.12 FORNECIMENTO E MONTAGEM DE GUIA DE CABOS HORIZONTAIS FECHADO DE CORPO DE AO SAE 1020, PROF=40MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1089/ORSE Guia de cabos fechado 19" (1,00 m) 1.0000 und 17.76 17.76 17.76
- -
- -
- -
- -
- -
Sub-Total 17.76

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.2000 h 5.82 1.16 1.16
- -
Leis Sociais 114.84% 1.34
Sub-Total 2.50

Preo Total TOTAL GERAL R$ 20.26

10.10.13 PABX IP 2 ENTROCAMENTOS 48RAMAIS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.11 APARELHOS ELETRNICOS E ACESSRIOS

10.11.01 FORNECIMENTO E INSTALAO DE MESA DE SOM COM 6 CANAIS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.11.02 FORNECIMENTO E INSTALAO DE AMPLIFICADOR 800WRMS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.11.03 FORNECIMENTO E INSTALAO DE CAIXA DE SOM ACUSTICA 150 W

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
- -
66/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

10.11.04 CABO PARALELO 2X2,5MM2 PARA SOM, FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
08331/ ORSE CABO PARALELO 2X2,5MM2 PARA SOM 1.0000 m 11.17 11.17 11.17
- -
- -
- -
- -
- -
Sub-Total 11.17

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 0.2000 h 5.82 1.16 1.16
- -
Leis Sociais 114.84% 1.34
Sub-Total 2.50

Preo Total TOTAL GERAL R$ 13.67

10.11.05 PONTO EMBUTIDO TOMADA P/ TV A CABO, C/ ELETRODUTO CONDULETE PVC RGIDO 3/4" S/ FIAO, EXCLUSIVE TOMADA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
337 Arame recozido 18 bwg - 1,25mm (9,6g/m) 0.0100 KG 9.75 0.10 0.10
2674 Eletroduto condulete pvc rgido, d= 3/4" 6.0000 M 2.94 17.64 17.64
2556 Caixa de ferro galvanizado de 4" x 2 " para eletroduto 1.0000 un 0.75 0.75 0.75
- -
- -
- -
Sub-Total 18.49

Equipamento
- -
Sub-Total -

Mo de obra
2436 Eletricista 3.5000 h 5.82 20.37 20.37
6111 Servente 3.5000 h 3.22 11.27 11.27
Leis Sociais 85.62% 27.09
Sub-Total 58.73

Preo Total TOTAL GERAL R$ 77.22

10.11.06 SENSOR INFRAVERMELHO INTERNO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
SENSOR INFRAVERMELHO INTERNO 1.0000 und 31.00 31.00 31.00
- -
- -
- -
- -
- -
Sub-Total 31.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 31.00

10.11.07 SIRENE ELETRNICA DE 20W

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
SIRENE ELETRNICA DE 20W 1.0000 UND 12.90 12.90 12.90
- -
- -
- -
- -
- -
Sub-Total 12.90

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 12.90

10.11.08 RECEPTOR 2 CANAIS 433MHZ MULTIFUNCIONAL REPTOR ECP

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
67/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

RECEPTOR 2 CANAIS 433MHZ MULTIFUNCIONAL REPTOR ECP 1.0000 und 160.00 160.00 160.00
- -
- -
- -
- -
- -
Sub-Total 160.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 160.00

10.11.09 CENTRAL DE CHOQUE PARA CERCA ELTRICA DE 8000V

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CENTRAL DE CHOQUE PARA CERCA ELTRICA DE 8000V 1.0000 und 187.00 187.00 187.00
- -
- -
- -
- -
- -
Sub-Total 187.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 187.00

10.11.10 CENTRAL DE ALARME PARA 10 ZONAS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CENTRAL DE ALARME PARA 10 ZONAS 1.0000 und 350.00 350.00 350.00
- -
- -
- -
- -
- -
Sub-Total 350.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 350.00

10.11.11 TECLADO DIGITAL PARA ACIONAMENTO DO ALARME

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
TECLADO DIGITAL PARA ACIONAMENTO DO ALARME 1.0000 und 85.00 85.00 85.00
- -
- -
- -
- -
- -
Sub-Total 85.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 85.00

10.11.12 FORNECIMENTO E INSTALAO DE HASTE DE CERCA ELTRICA, EM ALUMNIO CHATO, C/ 04 ISOLADORES

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
M3 HASTE DE CERCA ELTRICA, EM ALUMNIO CHATO, C/ 04 ISOLADORES 1.0000 und 5.42 5.42 5.42
- -
- -
- -
- -
- -
Sub-Total 5.42

Equipamento
- -
Sub-Total -

Mo de obra
2436 ELETRICISTA 0.3000 h 5.82 1.75 1.75
- -
Leis Sociais 114.84% 2.01
Sub-Total 3.75

Preo Total TOTAL GERAL R$ 9.17

10.11.13 CAMERA IP 1MP DOME IR 15MT 4MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

68/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Material
- -
- -
- -
- -
- -
- -
Sub-Total -

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ -

11.00 APARELHOS MECNICOS E ACESSRIOS

11.01 INSTALAO DE CONDICIONADOR DE AR TIPO SPLIT/ HI-WALL/ 9000 BTU/H C/ COMPRESSOR ROTATIVO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Servio terceirizado de Instalao de condicionador de ar tipo split,9000 btu's 1.0000 und 490.00 490.00 490.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 490.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 490.00

11.02 INSTALAO DE CONDICIONADOR DE AR TIPO SPLIT/ HI-WALL/ 12000 BTU/H C/ COMPRESSOR ROTATIVO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Servio terceirizado de Instalao de condicionador de ar tipo split,12000 btu's 1.0000 und 610.00 610.00 610.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 610.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 610.00

11.03 INSTALAO DE CONDICIONADOR DE AR TIPO SPLIT/ HI-WALL/ 18000 BTU/H C/ COMPRESSOR ROTATIVO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Servio terceirizado de Instalao de condicionador de ar tipo split,18000 btu's 1.0000 und 660.00 660.00 660.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 660.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 660.00

11.04 INSTALAO DE AR CONDICIONADO TIPO SPLIT/ HI-WALL/ 22000 BTU/H C/COMPRESSOR ROTATIVO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Servio terceirizado de Instalao de condicionador de ar tipo split,22000 btu's 1.0000 und 660.00 660.00 660.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 660.00

Equipamento

69/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 660.00

11.05 INSTALAO DE AR CONDICIONADO TIPO SPLIT/ HI-WALL/ 30000 BTU/H C/COMPRESSOR ROTATIVO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Servio terceirizado de Instalao de condicionador de ar tipo split,30000 btu's 1.0000 und 710.00 710.00 710.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 710.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 710.00

11.06 FORNECIMENTO E INSTALAO DE CAIXA DE PASSAGEM POLAR PARA EVAPORADORA MOD CPP005U 39 x 22 x 6 cm

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
m65 CAIXA DE PASSAGEM POLAR PARA EVAPORADORA MOD CPP005U 39 x 22 x 6 cm 1.0000 und 32.55 32.55 32.55
- -
- -
- -
- -
- -
- -
- -
Sub-Total 32.55

Equipamento
- -
Sub-Total -

Mo de obra
6111 Servente 0.2000 h 3.22 0.64 0.64
4750 PEDREIRO 0.2000 h 4.61 0.92 0.92
- -
Leis Sociais 114.84% 1.80
Sub-Total 3.36

Preo Total TOTAL GERAL R$ 35.91

11.07 CABO DE COBRE PP CORDPLAST 4 X 2,5 MM2, 450/750V - FORNECIMENTO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CABO DE COBRE PP CORDPLAST 4 X 2,5 MM2, 450/750V - FORNECIMENTO 1.0000 m 5.01 5.01 5.01
- -
- -
- -
- -
- -
- -
- -
Sub-Total 5.01

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 5.01

11.08 REDE FRIGORGENA COM TUBOS DE COBRE DE 1/2" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
TUBULAO FRIGORFICA EM COBRE FLEXVEL COM ISOLANTE TRMICO DE ESPUMA ELASTOMRICA, RECOBERTO
1.0000 m 33.20 33.20 33.20
COM PELCULA PROTETORA PE
- -
- -
- -
- -
- -
- -
- -
Sub-Total 33.20

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 33.20


70/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

11.09 REDE FRIGORGENA COM TUBOS DE COBRE DE 3/4" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
REDE FRIGORGENA COM TUBOS DE COBRE DE 3/4" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS,
1.0000 m 64.90 64.90 64.90
LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO
- -
- -
- -
- -
- -
- -
- -
Sub-Total 64.90

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 64.90

11.10 REDE FRIGORGENA COM TUBOS DE COBRE DE 3/8" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
REDE FRIGORGENA COM TUBOS DE COBRE DE 3/8" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS,
1.0000 m 24.38 24.38 24.38
LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO
- -
- -
- -
- -
- -
- -
- -
Sub-Total 24.38

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 24.38

11.11 REDE FRIGORGENA COM TUBOS DE COBRE DE 7/8" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
REDE FRIGORGENA COM TUBOS DE COBRE DE 7/8" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS,
1.0000 m 69.60 69.60 69.60
LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO
- -
- -
- -
- -
- -
- -
- -
Sub-Total 69.60

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 69.60

11.12 REDE FRIGORGENA COM TUBOS DE COBRE DE 1/4" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS, LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
REDE FRIGORGENA COM TUBOS DE COBRE DE 1/4" SEM COSTURA, ISOLAMENTO TRMICO, ABRAADEIRAS,
1.0000 m 18.50 18.50 18.50
LIMPEZA DO SISTEMA COM NITROGNIO, CARGA DE GS FREON R-22 - FORNECIMENTO E INSTALAO
- -
- -
- -
- -
- -
- -
- -
Sub-Total 18.50

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 18.50

12.00 IMPERMEABILIZAO

12.01 REGULARIZACAO DE PISO/BASE EM ARGAMASSA TRACO 1:3 (CIMENTO E AREIA), ESPESSURA 2,0CM, PREPARO MANUAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

71/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Material
4884 ARGAMASSA TRACO 1:3 (CIMENTO E AREIA), PREPARO MANUAL 0.0200 m 350.14 7.00 7.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 7.00

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.2140 h 4.61 0.99 0.99
6111 SERVENTE 0.1000 h 3.22 0.32 0.32
- -
Leis Sociais 114.84% 1.50
Sub-Total 2.81

Preo Total TOTAL GERAL R$ 9.81

12.02 IMPERMEABILIZACAO DE SUPERFICIE COM MANTA ASFALTICA PROTEGIDA COM FILME DE ALUMINIO GOFRADO (DE ESPESSURA 0,8MM), INCLUSA APLICACAO DE EMULSAO ASFALTICA, E=3MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
MANTA IMPERMEABILIZANTE A BASE DE ASFALTO MODIFICADO C/ ELASTOMEROS DESBS TIPO TORODIM ALUMINIO E
11621 1.1000 M2 31.34 34.47 34.47
= 3MM VIAPOL OU EQUIV
7331 EMULSAO ASFALTICA COM ELASTOMERO 0.1108 KG 8.91 0.99 0.99
- -
- -
- -
- -
- -
- -
Sub-Total 35.46

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.9000 h 3.22 2.90 2.90
12873 IMPERMEABILIZADOR 0.9000 h 4.61 4.15 4.15
- -
Leis Sociais 114.84% 8.09
Sub-Total 15.14

Preo Total TOTAL GERAL R$ 50.60

13.00 ESQUADRIAS

13.01 ESQUADRIAS DE MADEIRA

13.01.01 PORTA DE MADEIRA COMPENSADA LISA PARA PINTURA, 80 X 210 X 3,5CM, INCLUSO ADUELA 2A, ALIZAR 2A E DOBRADIA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10555 PORTA MADEIRA COMPENSADA LISA PARA PINTURA 80 X 210 X 3,5CM 1.0000 UN 55.65 55.65 55.65
4419 PECA DE MADEIRA DE LEI NATIVA/REGIONAL 10 X 10 X 3 CM P/ FIXACAO DE ESQUADRIAS OU RODAPE 4.0000 UN 1.10 4.40 4.40
ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 13 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRA
184 1.0000 JG 99.12 99.12 99.12
CEDRINHO/PINHO/CANELA OU SIMILAR
20247 PREGO DE ACO 15 X 15 C/ CABECA 0.3580 KG 8.99 3.22 3.22
20006 ALIZAR / GUARNICAO 5 X 2CM MADEIRA CEDRO/IMBUTA/JEQUITIBA OU SIMILAR 5.0000 M 6.22 31.10 31.10
2427 DOBRADICA LATAO CROMADO 3 X 3" SEM ANEIS 3.0000 UN 14.91 44.73 44.73
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0100 M3 301.07 3.01 3.01
4378 PARAFUSO ROSCA SOBERBA ACO ZINC CABECA CHATA FENDA SIMPLES 7 X 65MM 6.0000 UN 0.40 2.40 2.40
Sub-Total 243.63

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.1400 h 4.61 0.65 0.65
1214 CARPINTEIRO DE ESQUADRIA 0.1400 h 4.61 0.65 0.65
6111 SERVENTE 0.1400 h 3.22 0.45 0.45
Leis Sociais 114.84% 2.00
Sub-Total 3.74

Preo Total TOTAL GERAL R$ 247.37

13.01.02 PORTA DE MADEIRA COMPENSADA LISA PARA PINTURA, 90 X 210 X 3,5CM, INCLUSO ADUELA 2A, ALIZAR 2A E DOBRADIA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
4987 PORTA MADEIRA COMPENSADA LISA PARA PINTURA 90 X 210 X 3,5CM 1.0000 UN 53.98 53.98 53.98
4419 PECA DE MADEIRA DE LEI NATIVA/REGIONAL 10 X 10 X 3 CM P/ FIXACAO DE ESQUADRIAS OU RODAPE 4.0000 UN 0.58 2.32 2.32
ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 13 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRA
184 1.0000 JG 85.00 85.00 85.00
CEDRINHO/PINHO/CANELA OU SIMILAR
20247 PREGO DE ACO 15 X 15 C/ CABECA 0.3580 KG 8.99 3.22 3.22
20006 ALIZAR / GUARNICAO 5 X 2CM MADEIRA CEDRO/IMBUTA/JEQUITIBA OU SIMILAR 5.0000 M 6.22 31.10 31.10
2427 DOBRADICA LATAO CROMADO 3 X 3" SEM ANEIS 3.0000 UN 14.91 44.73 44.73
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0100 M3 301.07 3.01 3.01
4378 PARAFUSO ROSCA SOBERBA ACO ZINC CABECA CHATA FENDA SIMPLES 7 X 65MM 6.0000 UN 0.40 2.40 2.40
Sub-Total 225.76

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.1400 h 4.61 0.65 0.65
1214 CARPINTEIRO DE ESQUADRIA 0.1400 h 4.61 0.65 0.65
6111 SERVENTE 0.1400 h 3.22 0.45 0.45
Leis Sociais 114.84% 2.00
Sub-Total 3.74

Preo Total TOTAL GERAL R$ 229.50

13.01.02 LAMINADO MELAMINICO LISO BRANCO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1340 CHAPA LAMINADO MELAMINICO LISO FOSCO E = 1,3MM (1,25X3,08M) 1.0500 M2 18.01 18.91 18.91
1339 COLA FORMICA A BASE DE RESINAS SINTETICAS 0.9000 KG 4.40 3.96 3.96
- -
72/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
- -
- -
- -
- -
Sub-Total 22.87

Equipamento
- -
Sub-Total -

Mo de obra
- -
1214 CARPINTEIRO DE ESQUADRIA 0.1400 h 4.61 0.65 0.65
6117 AJUDANTE DE CARPINTEIRO 0.1400 h 3.49 0.49 0.49
Leis Sociais 114.84% 1.30
Sub-Total 2.44

Preo Total TOTAL GERAL R$ 25.31

13.01.03 PORTA EM MADEIRA COMPENSADA (CANELA), LISA, SEMI-CA, 0.60 X 1.60 M, REVESTIDA C/FRMICA, INCLUSIVE FERRAGENS, EXCLUSIVE BATENTES, PARA USO EM DIVISRIAS GRANITO OU MARMORE

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1339 COLA FORMICA A BASE DE RESINAS SINTETICAS 0.5000 kg 6.96 3.48 3.48
01013/ORSE Frmica texturizada e=1,3mm ou similar 2.0000 m2 21.37 42.74 42.74
03378/ORSE Dobradia para divisria mrmore ou granito com mola, incluisve parafuso lato, imab ref. DO0825G00 ou similar 2.0000 un 62.15 124.30 124.30
Fechadura (tarjeta) livre-ocupado p/divisria em mrmore ou granito, ref. TG0819 - IMAB ou similar, inclusive batente
03379/ORSE 1.0000 un 46.00 46.00 46.00
c/amortecedor ref.BT0830000-Imab e parafusos
03380/ORSE Batente (batedor) p/fechadura (tarjeta) livre-ocupado p/div.marmore ou granito, ref. BT0830 - IMAB ou similar 1.0000 un 34.84 34.84 34.84
03381/ORSE Parafuso em ao inox p/ batedor de fechadura (tarjeta) livre-ocupado p/div.marmore ou granito ref. PF0860 - IMAB ou similar 2.0000 un 4.99 9.98 9.98
01804/ORSE Porta madeira compensada (canela), lisa, semi-oca - 60 x 160 x 3,5cm 1.0000 un 99.90 99.90 99.90
- -
Sub-Total 361.24

Equipamento
- -
Sub-Total -

Mo de obra
1214 Carpinteiro 6.1500 h 4.61 28.35 28.35
6111 Servente 2.0000 h 3.22 6.44 6.44
- -
Leis Sociais 114.84% 39.95
Sub-Total 74.75

Preo Total TOTAL GERAL R$ 435.99

13.01.04 MOLA HIDRULICA PARA PORTA DE MADEIRA (BRASIL OU SIMILAR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
11560 MOLA FECHA PORTA P/ PORTA C/ LARGURA ATE 90CM 1.0000 kg 157.67 157.67 157.67
- -
- -
- -
- -
- -
- -
- -
Sub-Total 157.67

Equipamento
- -
Sub-Total -

Mo de obra
- -
1214 CARPINTEIRO DE ESQUADRIA 1.0000 h 4.61 4.61 4.61
- -
Leis Sociais 114.84% 5.29
Sub-Total 9.90

Preo Total TOTAL GERAL R$ 167.57

13.01.05 PORTA EM MADEIRA COMPENSADA (CANELA), LISA, SEMI-CA, 0.80 X 1.60 M, REVESTIDA C/FRMICA, INCLUSIVE FERRAGENS, EXCLUSIVE BATENTES, PARA USO EM DIVISRIAS GRANITO OU MARMORE

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1339 COLA FORMICA A BASE DE RESINAS SINTETICAS 0.6700 kg 6.96 4.66 4.66
1341 CHAPA LAMINADO MELAMINICO TEXTURIZADO E = 1,3MM (1,25X3,08M) 2.8800 m2 17.68 50.92 50.92
03378/ORSE Dobradia para divisria mrmore ou granito com mola, incluisve parafuso lato, imab ref. DO0825G00 ou similar 2.0000 un 75.88 151.76 151.76
Fechadura (tarjeta) livre-ocupado p/divisria em mrmore ou granito, ref. TG0819 - IMAB ou similar, inclusive batente
03379/ORSE 1.0000 un 41.45 41.45 41.45
c/amortecedor ref.BT0830000-Imab e parafusos
03380/ORSE Batente (batedor) p/fechadura (tarjeta) livre-ocupado p/div.marmore ou granito, ref. BT0830 - IMAB ou similar 1.0000 un 34.84 34.84 34.84
03381/ORSE Parafuso em ao inox p/ batedor de fechadura (tarjeta) livre-ocupado p/div.marmore ou granito ref. PF0860 - IMAB ou similar 2.0000 un 4.99 9.98 9.98
8644/ORSE Porta madeira compensada (canela), lisa, semi-oca - 80 x 180 x 3,5cm 1.0000 M2 77.67 77.67 77.67
- -
Sub-Total 371.28

Equipamento
- -
Sub-Total -

Mo de obra
- -
1214 CARPINTEIRO DE ESQUADRIA 6.1500 h 4.61 28.35 28.35
- -
Leis Sociais 114.84% 32.56
Sub-Total 60.91

Preo Total TOTAL GERAL R$ 432.19

13.02 ESQUADRIAS DE ALUMNIO

13.02.01 PERFIL DE ALUMINIO TIPO (I,T,U)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
09261/ORSE PERFIL DE ALUMINIO TIPO (I, T, U) 1.0000 m 15.08 15.08 15.08
- -
- -
- -
- -
- -
- -
- -
Sub-Total 15.08
73/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Equipamento
- -
Sub-Total -

Mo de obra
- -
6110 SERRALHEIRO 0.1400 h 4.61 0.65 0.65
6111 SERVENTE 0.1400 h 3.22 0.45 0.45
Leis Sociais 114.84% 1.26
Sub-Total 2.36

Preo Total TOTAL GERAL R$ 17.44

13.02.02 PORTA EM ALUMINIO, DE CORRER OU ABRIR, TIPO MOLDURA/VENEZIANA, COM FERRAGENS, EXCLUSIVE VIDROS, COR PRETA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
01800/ORSE Porta de alumnio, de correr ou abrir, cor preta, tipo moldura/veneziana 1.0000 m2 207.98 207.98 207.98
6011 ARGAMASSA TRACO 1:3 (CIMENTO E AREIA MEDIA PENEIRADA), PREPARO MECANICO 0.0030 m3 399.00 1.20 1.20
- -
- -
- -
- -
- -
- -
Sub-Total 209.18

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 1.0000 h 4.61 4.61 4.61
6111 SERVENTE 1.5000 h 3.22 4.83 4.83
Leis Sociais 114.84% 10.84
Sub-Total 20.28

Preo Total TOTAL GERAL R$ 229.46

13.02.03 JANELA DE CORRER EM ALUMINIO, VENEZIANA, SEM BANDEIRA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
595 JANELA ALUMINIO CORRER SERIE 25 VENEZIANA S/ BANDEIRA 160 X 110CM 1.0000 M2 435.16 435.16 435.16
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0060 M3 299.59 1.80 1.80
- -
- -
- -
- -
- -
- -
Sub-Total 436.96

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.5000 h 4.61 2.31 2.31
6110 SERRALHEIRO 1.1000 h 4.61 5.07 5.07
6111 SERVENTE 1.9000 h 3.22 6.12 6.12
Leis Sociais 114.84% 15.50
Sub-Total 28.99

Preo Total TOTAL GERAL R$ 465.95

13.02.04 JANELA DE ALUMINIO, TIPO MAXIMAR, CONVENCIONAL, INCLUSO GUARNIES E VIDRO FANTASIA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
367 AREIA GROSSA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0050 M3 40.00 0.20 0.20
601 JANELAALUMINIO MAXIM AR, SERIE 25, 90 X 110CM (INCLUSO GUARNI(cAO E VIDRO FANTASIA) 1.1000 M2 175.45 192.99 192.99
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 2.1200 KG 0.48 1.02 1.02
- -
- -
- -
- -
- -
Sub-Total 194.21

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 1.1000 h 4.61 5.07 5.07
6111 SERVENTE 1.0000 h 3.22 3.22 3.22
- -
Leis Sociais 114.84% 9.52
Sub-Total 17.81

Preo Total TOTAL GERAL R$ 212.02

13.02.05 JANELA DE ALUMINIO ANOD. NATURAL, COR FOSCA, FIXA, TIPO BICO DE PAPAGAIO, REF. J3, EXCLUSIVE VIDROS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10266/ORSE Janela de aluminio anod. natural, cor fosca, fixa, tipo Bico de Papagaio, ref.J3, exclusive vidros 1.0000 M2 310.53 310.53 310.53
370 Areia mdia (AC - areia comercial) 0.0054 M3 52.50 0.28 0.28
1379 Cimento cp - 320 (50 kg) 2.2610 KG 0.46 1.04 1.04
- -
- -
- -
- -
- -
Sub-Total 311.85

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 2.0000 h 4.61 9.22 9.22
6111 Servente 3.5200 h 3.22 11.33 11.33
- -
Leis Sociais 114.84% 23.60
Sub-Total 44.16

74/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Preo Total TOTAL GERAL R$ 356.01

13.03 ESQUADRIAS EM FERRO

13.03.01 GRADIL C/ PAINEL ELETROSOLDADO GALVANIZADO REVESTIDO EM NYLON COM BASE CHUMBADA, NYLOFOR 3D OU SIMILAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
74137/002 CONCRETO USINADO FCK=15MPA, INCLUSIVE LANCAMENTO E ADENSAMENTO 0.0782 m3 406.61 31.80 31.80
2890 - ORSE Gradil Nylofor 3D ou similar c/ painel eletrosoldado galvanizado revestido em nylon com base chumbada 1.0000 m 122.35 122.35 122.35
07935 - ORSE Poste de gradil Nylofor 3D, h=1,50m, seo de 4x6cm, pintura branca, Belgo ou similar 0.5825 p 94.46 55.02 55.02
- -
- -
- -
- -
- -
Sub-Total 209.17

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 1.0000 h 4.61 4.61 4.61
6111 Servente 1.2350 h 3.22 3.98 3.98
- -
Leis Sociais 114.84% 9.86
Sub-Total 18.45

Preo Total TOTAL GERAL R$ 227.62

13.04 VIDROS

13.04.01 VIDRO LISO COMUM TRANSPARENTE, ESPESSURA 4MM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10498 MASSA PARA VIDRO 1.6000 KG 2.67 4.27 4.27
10492 VIDRO LISO INCOLOR 4MM - SEM COLOCACAO 1.0000 M2 50.07 50.07 50.07
- -
- -
- -
- -
- -
- -
Sub-Total 54.34

Equipamento
- -
Sub-Total -

Mo de obra
- -
10489 VIDRACEIRO 0.4500 h 4.61 2.07 2.07
6111 SERVENTE 0.4500 h 3.22 1.45 1.45
Leis Sociais 114.84% 4.05
Sub-Total 7.57

Preo Total TOTAL GERAL R$ 61.91

13.04.02 VIDRO TEMPERADO 10 MM, FUM, TIPO PIVOTANTE , COM FERRAGENS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
03338/ORSE Vidro temperado 10mm, fum, tipo pivotante, com ferragens 1.0000 m 266.03 266.03 266.03
- -
- -
- -
- -
- -
- -
- -
Sub-Total 266.03

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 266.03

14.00 REVESTIMENTOS

14.01 CHAPISCO EM PAREDES TRACO 1:4 (CIMENTO E AREIA), ESPESSURA 0,5CM, PREPARO MANUAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0048 M3 280.00 1.34 1.34
- -
- -
- -
- -
- -
- -
- -
Sub-Total 1.34

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 0.1000 h 4.61 0.46 0.46
6111 SERVENTE 0.1000 h 3.22 0.32 0.32
Leis Sociais 114.84% 0.90
Sub-Total 1.68

Preo Total TOTAL GERAL R$ 3.02

14.02 EMBOCO TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA), ESPESSURA 2,0CM, PREPARO MECANICO DA ARGAMASSA

75/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO 0.0200 M3 328.50 6.57 6.57
- -
- -
- -
- -
- -
- -
- -
Sub-Total 6.57

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 0.6000 h 4.61 2.77 2.77
6111 SERVENTE 0.6000 h 3.22 1.93 1.93
Leis Sociais 114.84% 5.40
Sub-Total 10.09

Preo Total TOTAL GERAL R$ 16.66

14.03 REBOCO PAULISTA (MASSA UNICA) TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA) , ESPESSURA 0,5CM, PREPARO MECANICO DA ARGAMASSA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6028 ARGAMASSA TRACO 1:2:8 (CIMENTO, CAL E AREIA MEDIA NAO PENEIRADA), PREPARO MECANICO 0.0150 M3 328.50 4.92 4.92
- -
- -
- -
- -
- -
Sub-Total 4.92

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.4960 h 4.61 2.29 2.29
6111 Servente 0.5000 h 3.22 1.61 1.61
Leis Sociais 114.84% 4.47
Sub-Total 8.37

Preo Total TOTAL GERAL R$ 13.29

14.04 CHAPISCO EM TETOS TRACO 1:3 (CIMENTO E AREIA), ESPESSURA 0,5CM, PREPAR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6011 ARGAMASSA TRACO 1:3 (CIMENTO E AREIA MEDIA PENEIRADA), PREPARO MECANICO 0.0050 M3 704.00 3.52 3.52
- -
- -
- -
- -
- -
Sub-Total 3.52

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.0010 h 4.61 0.00 0.00
6111 Servente 0.0010 h 3.22 0.00 0.00
Leis Sociais 114.84% 0.01
Sub-Total 0.02

Preo Total TOTAL GERAL R$ 3.54

14.05 REBOCO ARGAMASSA TRACO 1:4,5 (TETOS) (CAL E AREIA FINA), ESPESSURA 0,5CM, PREPPARO MECANICO DA ARGAMASSA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
6025 ARGAMASSA TRACO 1:4,5 (CAL E AREIA MEDIA NO PENEIRADA), PREPARO MANUAL 0.0200 M3 269.28 5.39 5.39
- -
- -
- -
- -
- -
Sub-Total 5.39

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.2110 h 4.61 0.97 0.97
6111 Servente 0.3000 h 3.22 0.97 0.97
Leis Sociais 114.84% 2.23
Sub-Total 4.17

Preo Total TOTAL GERAL R$ 9.56

14.06 REVESTIMENTO CERMICO EM PAREDES

14.06.01 PASTILHA CERAMICA ESMALTADA, 5 X 5 CM, MARCA ATLAS, LINHA ENGENHARIA, REF.AREIA -M4330, APLICADA COM ARGAMASSA INDUSTRIALIZADA AC-II, REJUNTADA, EXCLUSIVE EMBOO (OU SIMILAR)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2540 - ORSE Rejunte colorido flexivel para revestimentos cermicos 0.5400 kg 2.10 1.13 1.13
10218 - ORSE Pastilha em porcelana esmaltada, 5 x 5 cm, marca ATLAS, linha engenharia, ref.Areia - M-4330 ou similar 1.0503 m2 81.33 85.42 85.42
2684 - ORSE Argamassa industrializada votomassa, AC-II ou similar 3.7800 kg 1.04 3.93 3.93
- -
- -
- -
- -
- -
Sub-Total 90.48

Equipamento
- -
Sub-Total -

Mo de obra
- -
76/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

4750 PEDREIRO 0.6400 h 4.61 2.95 2.95


6111 SERVENTE 0.9300 h 3.22 2.99 2.99
Leis Sociais 114.84% 6.83
Sub-Total 12.77

Preo Total TOTAL GERAL R$ 103.25

REVESTIMENTO CERMICO PARA PISO OU PAREDE, 10x10 CM, ELIANE, LINHA ARQUITETURAL NEVE, PEI-3, APLICADO COM ARGAMASSA INSDUSTRIALIZADA AC-I, REJUNTADO, EXCLUSIVE REGULARIZAO DE BASE
14.06.02
OU EMBOO.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2540 - ORSE Rejunte colorido flexivel para revestimentos cermicos 0.3800 kg 2.10 0.80 0.80
2816/ORSE Cermica 10 x 10 cm, pei-3, eliane, linha arquitetural neve mesh ou similar 1.0500 m2 17.29 18.15 18.15
3406 - ORSE ARGAMASSA INDUSTRIALIZADA AC-I, VOTOMASSA OU SIMILAR 4.0000 kg 0.33 1.32 1.32
- -
- -
- -
- -
- -
Sub-Total 20.27

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.5000 h 4.61 2.31 2.31
6111 Servente 1.0000 h 3.22 3.22 3.22
- -
Leis Sociais 114.84% 6.34
Sub-Total 11.87

Preo Total TOTAL GERAL R$ 32.14

15.00 PISOS

15.01.01 REGULARIZACAO DE PISO/BASE EM ARGAMASSA TRACO 1:3 (CIMENTO E AREIA), ESPESSURA 2,0CM, PREPARO MANUAL

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
4884 ARGAMASSA TRACO 1:3 (CIMENTO E AREIA), PREPARO MANUAL 0.0200 m 322.50 6.45 6.45
- -
- -
- -
- -
- -
- -
- -
Sub-Total 6.45

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.2000 h 4.61 0.92 0.92
6111 SERVENTE 0.2000 h 3.22 0.64 0.64
- -
Leis Sociais 114.84% 1.80
Sub-Total 3.36

Preo Total TOTAL GERAL R$ 9.81

15.01.02 RODAPE EM GRANILITE, ALTURA 10CM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
370 AREIA MEDIA - POSTO JAZIDA/ FORNECEDOR (SEM FRETE) 0.0100 m 45.00 0.45 0.45
4787 GRANILHA DE MARMORE BRANCO 3.2000 kg 0.54 1.73 1.73
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 4.2000 kg 0.48 2.02 2.02
- -
- -
- -
- -
- -
Sub-Total 4.20

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.6000 h 3.22 1.93 1.93
4750 PEDREIRO 0.4320 h 4.61 1.99 1.99
- -
Leis Sociais 114.84% 4.51
Sub-Total 8.43

Preo Total TOTAL GERAL R$ 12.63

15.01.03 PISO EM GRANILITE ESPESSURA 8 MM, INCLUSO JUNTAS DE DILATACAO PLASTICAS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
73449 ARGAMASSA CIMENTO/AREIA 1:4 - PREPARO MANUAL - P 0.0200 m 299.59 5.99 5.99
3671 JUNTA PLASTICA DE DILATACAO, PARA PISOS, DE 3/4" X 1/8"(17X3 MM) 1.0000 m 0.72 0.72 0.72
4786 PISO EM GRANILITE, MARMORITE OU GRANITINA - ESP = 8 MM 1.0000 m 27.10 27.10 27.10
- -
- -
- -
- -
- -
Sub-Total 33.81

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.6000 h 3.22 1.93 1.93
4750 PEDREIRO 0.3000 h 4.61 1.38 1.38
- -
Leis Sociais 114.84% 3.81
Sub-Total 7.12

Preo Total TOTAL GERAL R$ 40.93

15.01.04 REVESTIMENTO PARA PISO OU PAREDE EM GRANITO CINZA ANDORINHA, POLIDO, E = 2CM, APLICADO COM ARGAMASSA INDUSTRIALIZADA AC-I, REJUNTADO, EXCLUSIVE EMBOO

77/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1380 CIMENTO BRANCO 0.3000 kg 1.53 0.46 0.46
10841 GRANITO CINZA POLIDO PARA PISO E = 2 CM 1.0500 m2 120.79 126.83 126.83
03406/ORSE Argamassa industrializada AC-I, Votomassa ou simila 4.5000 kg 0.30 1.35 1.35
- -
- -
- -
- -
- -
Sub-Total 128.64

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 1.0400 h 4.61 4.79 4.79
6111 SERVENTE 0.6000 h 3.22 1.93 1.93
Leis Sociais 114.84% 7.72
Sub-Total 14.45

Preo Total TOTAL GERAL R$ 143.09

15.01.05 PISO DE CONCRETO ACABAMENTO RSTICO ESPESSURA 7CM COM JUNTAS EM MADEIRA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
370 AREIA MEDIA - POSTO JAZIDA/ FORNECEDOR (SEM FRETE) 0.0438 M3 45.00 1.97 1.97
4505 PECA DE MADEIRA NATIVAIREGIONAL 1 X 7CM NO APARELHADA (P/FORMA) 1.4600 M 2.05 2.99 2.99
4718 PEDRA BRITADA N. 2 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0431 M3 100.00 4.31 4.31
4721 PEDRA BRITADA N. 1 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0184 M3 103.53 1.90 1.90
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 25.2600 KG 0.48 12.12 12.12
- -
- -
- -
Sub-Total 23.29

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 1.3150 h 3.22 4.23 4.23
4750 PEDREIRO 1.0000 h 4.61 4.61 4.61
- -
Leis Sociais 114.84% 10.16
Sub-Total 19.00

Preo Total TOTAL GERAL R$ 42.29

15.06 SOLEIRA EM GRANITO CINZA ANDORINHA, L = 15 CM, E = 2 CM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
1379 CIMENTO PORTLAND COMUM CP I- 32 1.4000 KG 0.46 0.64 0.64
370 AREIA MEDIA - POSTO DE JAZIDA / FORNECEDOR (SEM FRETE) 0.0023 M3 52.50 0.12 0.12
02030/ORSE Soleira granito polido cinza andorinha 15 x 2cm 1.0000 M 22.25 22.25 22.25
- -
- -
- -
- -
- -
Sub-Total 23.01

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.4320 h 4.61 1.99 1.99
6111 Servente 0.6300 h 3.22 2.03 2.03
- -
Leis Sociais 114.84% 4.62
Sub-Total 8.64

Preo Total TOTAL GERAL R$ 31.65

15.02 REVESTIMENTO CERMICO EM PISO

REVESTIMENTO CERMICO PARA PISO OU PAREDE, 41 X 41 CM, ELIANE, LINHA CARGO PLUS BONE, APLICADO COM ARGAMASSA INDUSTRIALIZADA AC-III, REJUNTADO, EXCLUSIVE REGULARIZAO DE BASE OU
15.02.01
EMBOO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2540 - ORSE Rejunte colorido flexivel para revestimentos cermicos 0.3800 kg 2.10 0.80 0.80
04984/ORSE Cermica 41 x 41 cm, pei-5, eliane, linha cargo plus bone ou similar 1.0500 m2 24.90 26.15 26.15
3374 - ORSE Argamassa industrializada votomassa, AC-III ou similar 4.0000 kg 1.47 5.88 5.88
- -
- -
- -
- -
- -
Sub-Total 32.83

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.5000 h 4.61 2.31 2.31
6111 Servente 0.6760 h 3.22 2.18 2.18
- -
Leis Sociais 114.84% 5.15
Sub-Total 9.63

Preo Total TOTAL GERAL R$ 42.46

15.03 REVESTIMENTO CERMICO EM PISO

15.03.01 MEIO-FIO DE CONCRETO PRE-MOLDADO 12X30 CM, SOBRE BASE DE CONCRETO SIMPLES E REJUNTADO COM ARGAMASSA, TRAO 1:3 (CIMENTO E AREIA)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
367 AREIA GROSSA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0041 M3 40.00 0.16 0.16
370 AREIA MEDIA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0011 M3 45.00 0.05 0.05
4721 PEDRA BRITADA N. 1 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0018 M3 103.53 0.19 0.19
4718 PEDRA BRITADA N. 2 - POSTO PEDREIRA / FORNECEDOR (SEM FRETE) 0.0038 M3 100.00 0.38 0.38
1379 CIMENTO PORTLAND COMPOSTO CP 11- 32 2.8182 KG 0.48 1.35 1.35
78/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

4059 MEIO-FIO OU GUIA DE CONCRETO PRI=-MOLDADO DE 30 X 15 X 12 CM E COMPRIMENTO DE 1,00 M 1.0000 M 12.88 12.88 12.88
- -
- -
Sub-Total 15.01

Equipamento
- -
Sub-Total -

Mo de obra
1214 CARPINTEIRO DE ESQUADRIA 0.0025 h 4.61 0.01 0.01
4750 PEDREIRO 0.1825 h 4.61 0.84 0.84
6111 SERVENTE 0.4173 h 3.22 1.34 1.34
Leis Sociais 114.84% 2.52
Sub-Total 4.72

Preo Total TOTAL GERAL R$ 19.73

15.03.02 PISO EM BLOCO SEXTAVADO 30X30CM, ESPESSURA 8CM, ASSENTADO SOBRE COLCHAO DE AREIA ESPESSURA 6CM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
367 AREIA GROSSA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0604 M3 40.00 2.42 2.42
BLOCO SEXTAVADO P/PAVIMENTACAO, EM CONCRETO COM 35 MPA (TIPO BLOKRET), DE 30 X 30 CM, E = 8,0 CM (NBR-
11117 12.0000 UN 2.54 30.45 30.45
9780 E 9781)
- -
- -
- -
- -
- -
- -
Sub-Total 32.87

Equipamento
- -
Sub-Total -

Mo de obra
6111 SERVENTE 0.3500 h 3.22 1.13 1.13
4750 PEDREIRO 0.1600 h 4.61 0.74 0.74
- -
Leis Sociais 114.84% 2.14
Sub-Total 4.01

Preo Total TOTAL GERAL R$ 36.88

15.03.03 PISO EM BLOCO DE CONCRETO, INTERTRAVADO, COLORIDO, FCK=35MPA, P/ TRFEGO MDIO, 10x20x8CM, ASSENTADO SOBRE COLCHO DE AREIA.

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
366 AREIA FINA - POSTO JAZIDA / FORNECEDOR (SEM FRETE) 0.0800 M3 40.00 3.20 3.20
1759/ORSE Piso em bloco de concreto, intertravado, colorido, fck=35mpa, p/ trfego mdio, e= 8 cm 1.0500 m2 77.62 81.50 81.50
- -
- -
- -
- -
- -
- -
Sub-Total 84.70

Equipamento
- -
Sub-Total -

Mo de obra
4759 Calceteiro 0.5000 h 3.99 2.00 2.00
6111 Servente 1.0000 h 3.22 3.22 3.22
- -
Leis Sociais 114.84% 5.99
Sub-Total 11.20

Preo Total TOTAL GERAL R$ 95.90

16.00 PISOS

16.01 GRAMA ESMERALDA EM PLACAS, FORNECIMENTO E PLANTIO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00140 - ORSE Adubo orgnico, cacau ou similar 0.0010 m3 101.13 0.10 0.10
3329 GRAMA ESMERALDA EM ROLO 0.4000 m2 11.25 4.50 4.50
7253 TERRA VEGETAL 0.0318 m3 63.71 2.03 2.03
03800 - ORSE Adubo mineral NPK (10-10-10) 0.0700 kg 0.94 0.07 0.07
- -
- -
- -
- -
Sub-Total 6.70

Equipamento
- -
Sub-Total -

Mo de obra
- -
25964 JARDINEIRO 0.3189 h 4.44 1.42 1.42
6111 Servente 0.8000 h 3.22 2.58 2.58
Leis Sociais 114.84% 4.58
Sub-Total 8.58

Preo Total TOTAL GERAL R$ 15.28

16.02 FORNECIMENTO E ESPALHAMENTO DE TERRA VEGETAL PREPARADA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00140 - ORSE Adubo orgnico, cacau ou similar 0.1000 m3 101.15 10.12 10.12
7253 TERRA VEGETAL 0.9000 m3 32.13 28.92 28.92
- -
- -
- -
- -
- -
- -
Sub-Total 39.04

Equipamento
- -
Sub-Total -
79/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Mo de obra
- -
- -
6111 Servente 1.6000 h 3.22 5.15 5.15
Leis Sociais 114.84% 5.92
Sub-Total 11.07

Preo Total TOTAL GERAL R$ 50.11

16.03 CASQUILHO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
4744 CASCALHO DE RIO 1.0000 M3 15.73 15.73 15.73
- -
- -
- -
- -
- -
- -
- -
Sub-Total 15.73

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
6111 Servente 3.0000 h 3.22 9.66 9.66
Leis Sociais 114.84% 11.09
Sub-Total 20.75

Preo Total TOTAL GERAL R$ 36.48

16.04 LIMITADOR DE GRAMA COM BORDA FINA, L=12,5CM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
07144/ORSE Limitador de grama com borda fina, l=12,5cm 1.0000 m 3.19 3.19 3.19
- -
- -
- -
- -
- -
- -
- -
Sub-Total 3.19

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
25964 JARDINEIRO 0.3500 h 4.44 1.55 1.55
Leis Sociais 114.84% 1.78
Sub-Total 3.34

Preo Total TOTAL GERAL R$ 6.53

16.05 ARVORE REGIONAL MAIOR QUE 2M, TIPO NEEM

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
ARVORE REGIONAL MAIOR QUE 2M, TIPO NEEM 1.0000 und 53.67 53.67 53.67
- -
- -
- -
- -
- -
- -
- -
Sub-Total 53.67

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
25964 JARDINEIRO 0.3500 h 4.44 1.55 1.55
Leis Sociais 114.84% 1.78
Sub-Total 3.34

Preo Total TOTAL GERAL R$ 57.01

16.06 PALMEIRA CICA MEDIO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
PALMEIRA CICA MEDIO 1.0000 und 80.00 80.00 80.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 80.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 80.00

16.07 PALMEIRA CICA PEQUENA

80/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
PALMEIRA CICA PEQUENA 1.0000 und 60.00 60.00 60.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 60.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 60.00


16.08 MUDAS DE LAMBORI ROXO OU TREPADEIRA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
MUDAS DE LAMBORI ROXO OU TREPADEIRA 1.0000 und 0.60 0.60 0.60
- -
- -
- -
- -
- -
- -
- -
Sub-Total 0.60

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 0.60

16.09 BRASILEIRINHO 1,20M (H)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
BRASILEIRINHO 1,20M (H) 1.0000 und 15.00 15.00 15.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 15.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 15.00

16.10 PALMEIRA GARRAFA2,5M (H)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
PALMEIRA GARRAFA2,5M (H) 1.0000 und 450.00 450.00 450.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 450.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 450.00

16.11 MOREIA BICOLOR

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
MOREIA BICOLOR 1.0000 und 20.00 20.00 20.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 20.00

81/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 20.00

16.12 XORA-CHINESA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
XORA-CHINESA 1.0000 und 3.00 3.00 3.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 3.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 3.00

16.13 PALMEIRA PATA DE ELEFANTE 1,50M (H)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
PALMEIRA PATA DE ELEFANTE 1,50M (H) 1.0000 und 50.00 50.00 50.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 50.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 50.00

16.14 PALMEIRA ARECA 3,0M (H)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
PALMEIRA ARECA 3,0M (H) 1.0000 und 25.00 25.00 25.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 25.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 25.00

17.00 PINTURAS

17.01 EMASSAMENTO COM MASSA ACRILICA, DUAS DEMAOS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
4056 MASSA ACRILICA P/ PAREDES INTERIOR/EXTERIOR 0.2000 L 18.05 3.61 3.61
3767 LIXA P/ PAREDE OU MADEIRA 0.5000 UN 0.37 0.19 0.19
- -
- -
- -
- -
- -
- -
Sub-Total 3.80

Equipamento
- -
Sub-Total -

Mo de obra
- -
4783 PINTOR 0.3250 h 4.61 1.50 1.50
6111 SERVENTE 0.2500 h 3.22 0.81 0.81
Leis Sociais 114.84% 2.65
82/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Sub-Total 4.95

Preo Total TOTAL GERAL R$ 8.75

17.02 PINTURA LATEX ACRILICA SEMI-BRILHO AMBIENTES INTERNOS/EXTERNOS, DUAS DEMAOS - COR BRANCA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
7356 TINTA LATEX ACRILICA 0.1628 L 10.40 1.69 1.69
3767 LIXA P/ PAREDE OU MADEIRA 0.2500 UN 0.37 0.09 0.09
- -
- -
- -
- -
- -
- -
Sub-Total 1.78

Equipamento
- -
Sub-Total -

Mo de obra
- -
4783 PINTOR 0.2690 h 4.61 1.24 1.24
6111 SERVENTE 0.2000 h 3.22 0.64 0.64
Leis Sociais 114.84% 2.16
Sub-Total 4.05

Preo Total TOTAL GERAL R$ 5.83

17.03 PINTURA ESMALTE FOSCO PARA MADEIRA, DUAS DEMAOS, INCLUSO APARELHAMENTO COM FUNDO NIVELADOR BRANCO FOSCO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3767 LIXA P/ PAREDE OU MADEIRA 0.4000 UN 0.37 0.15 0.15
5318 SOLVENTE DILUENTE A BASE DE AGUARRAS 0.0400 L 9.87 0.39 0.39
6086 FUNDO SINTETICO NIVELADOR BRANCO FOSCO PARA MADEIRA 0.0588 GL 35.00 2.06 2.06
7288 TINTA ESMALTE SINTETICO FOSCO 0.1600 L 20.00 3.20 3.20
- -
- -
- -
- -
Sub-Total 5.80

Equipamento
- -
Sub-Total -

Mo de obra
- -
4783 PINTOR 0.3520 h 4.61 1.62 1.62
6111 SERVENTE 0.3500 h 3.22 1.13 1.13
Leis Sociais 114.84% 3.16
Sub-Total 5.91

Preo Total TOTAL GERAL R$ 11.71

17.04 SINALIZACAO HORIZONTAL COM TINTA RETRORREFLETIVA A BASE DE RESINA ACRILICA COM MICROESFERAS DE VIDRO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
5318 SOLVENTE DILUENTE A BASE DE AGUARRAS 0.1300 l 9.98 1.30 1.30
7348 TINTA ACRILICA PARA PISO 0.0300 l 8.96 0.27 0.27
26032 TINTA RETRORREFLETIVAS A BASE DE RESINA ACRILICA COM MICROESFERA DE VIDRO, DB-800 COR BRANCA N 9,5 0.6000 l 17.70 10.62 10.62
- -
- -
- -
- -
- -
Sub-Total 12.19

Equipamento
CAMINHAO CARROCERIA ABERTA,EM MADEIRA, TOCO, 170CV - 11T (VU=6ANOS) - GUSTO HORARIO DE PRODUcAO
5824 0.0033 chp 98.52 0.33 0.33
DIURNA
73538 MAQUINA DE DEMARCAR FAIXAS AUTOPROP. - CHP 0.0033 chp 132.00 0.44 0.44
Sub-Total 0.77

Mo de obra
6111 SERVENTE 0.0333 h 3.22 0.11 0.11
- -
- -
Leis Sociais 114.84% 0.12
Sub-Total 0.23

Preo Total TOTAL GERAL R$ 13.19

17.05 PINTURA DE ACABAMENTO COM APLICAO DE 02 DEMOS DE TINTA PERMACRIL, IBRATIM OU SIMILAR, INCLUSIVE LIXAMENTO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
IBRATIM TINTA PERMACRYL FOSCO COR LAPAZ REF 830 0.1736 L 18.00 3.12 3.12
3767 LIXA P/ PAREDE OU MADEIRA 0.4000 UM 0.31 0.12 0.12
- -
- -
- -
- -
- -
- -
Sub-Total 3.24

Equipamento
- -
Sub-Total -

Mo de obra
- -
4783 PINTOR 0.4100 h 4.61 1.89 1.89
6111 SERVENTE 0.4000 h 3.22 1.29 1.29
Leis Sociais 114.84% 3.65
Sub-Total 6.83

Preo Total TOTAL GERAL R$ 10.07

18.00 ELEMENTOS DECORATIVOS

18.01 BANCADAS DE GRANITO E RODAMO

83/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

18.01.01 BANCADA EM GRANITO CINZA ANDORINHA, E = 2,5CM, LARG=0,60 PARA PIA OU LAVATRIO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
584 CANTONEIRA ALUMINIO ABAS IGUAIS 2" E = 1/8" 1.0000 m 13.45 13.45 13.45
11795 GRANITO CINZA POLIDO P/BANCADA E=2,5 CM 0.6000 m2 167.12 100.27 100.27
- -
- -
- -
- -
- -
- -
Sub-Total 113.72

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 2.4000 h 4.61 11.06 11.06
6111 Servente 2.4000 h 3.22 7.73 7.73
- -
Leis Sociais 114.84% 21.58
Sub-Total 40.37

Preo Total TOTAL GERAL R$ 154.09

18.01.02 TESTEIRA EM GRANITO CINZA ANDORINHA, H=10CM, ESP.:2 CM, APLICADO COM ARGAMASSA INDUSTRIALIZADA AC-I

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Argamassa industrializada AC-I, Votomassa ou similar 2.4400 kg 0.31 0.76 0.76
Testeira em granito preto, h=10cm, esp=2cm 1.0000 m 15.28 15.28 15.28
- -
- -
- -
- -
- -
- -
Sub-Total 16.04

Equipamento
- -
Sub-Total -

Mo de obra
Pedreiro 0.6000 h 4.61 2.77 2.77
Servente 0.0181 h 3.22 0.06 0.06
- -
Leis Sociais 114.84% 3.24
Sub-Total 6.07

Preo Total TOTAL GERAL R$ 22.11

18.01.03 RODAMEIO EM GRANITO PRETO, LARG=8 CM, ESP=2,5 CM, PARA ACABAMENTOS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Argamassa de cimento e areia trao t-1 (1:3) - 1 saco cimento 50kg / 3 padiolas areia dim. 0.35 x 0.45 x 0.23 m - Confeco 0.0016 m 273.74 0.44 0.44
mecnica e transporte
Rodameio em granito preto, larg=8 cm, esp= 2 cm 0.9470 m 14.17 13.42 13.42
- -
- -
- -
- -
- -
- -
Sub-Total 13.86

Equipamento
- -
Sub-Total -

Mo de obra
Pedreiro 0.4200 h 4.61 1.94 1.94
Servente 0.4200 h 3.22 1.35 1.35
- -
Leis Sociais 114.84% 3.78
Sub-Total 7.07

Preo Total TOTAL GERAL R$ 20.93

18.02 DIVISRIAS

18.02.01 DIVISRIA EM GRANITO PRETO 2CM, INCLUSIVE MONTAGEM COM FERRAGENS

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Cantoneira inox p/ fixao de divisrias em blindex/granito, c/ parafusos ou similar 2.6600 p 21.34 56.76 56.76
Granito preto, e=2cm, com polimento dos 2 lados 1.0032 m 251.39 252.19 252.19
- -
- -
- -
- -
- -
- -
Sub-Total 308.95

Equipamento
- -
Sub-Total -

Mo de obra
Pedreiro 2.4000 h 4.61 11.06 11.06
Servente 2.4000 h 3.22 7.73 7.73
- -
Leis Sociais 114.84% 21.58
Sub-Total 40.37

Preo Total TOTAL GERAL R$ 349.32

18.02.02 BOX EM VIDRO TEMPERADO 8MM TIPO BLINDEX

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material

84/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

10506 VIDRO TEMPERADO INCOLOR E=8MM, SEM COLOCAO 1.0000 M2 141.66 141.66 141.66
09261/ORSE PERFIL DE ALUMINIO TIPO (I, T, U) 2.5000 M 9.95 24.88 24.88
- -
- -
- -
- -
- -
- -
Sub-Total 166.54

Equipamento
- -
Sub-Total -

Mo de obra
2700 Montador 1.0000 h 6.16 6.16 6.16
- -
- -
Leis Sociais 114.84% 7.07
Sub-Total 13.23

Preo Total TOTAL GERAL R$ 179.77

18.03 PLACA E BARRAS


18.03.01 BARRA DE APOIO EM AO INOX POLIDO, L=90CM, D=38.1 MM
CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
02063/ORSE Barra de apoio (para deficientes) em ao inox polido, l=90 cm, d=38.1 mm 1.0000 und 154.35 154.35 154.35
- -
- -
- -
- -
- -
- -
- -
Sub-Total 154.35

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 154.35

18.03.02 BARRA DE APOIO EM TUBO GALVANIZADO, D=1 1/2", INCLUSIVE PINTURA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
21012 TUBO ACO GALV C/ COSTURA NBR 5580 CLASSE LEVE DN 40MM ( 1.1/2" ) E = 3,00MM - 3,48KG/M 1.0500 M 29.48 30.95 30.95

01903/ORSE ARGAMASSA DE CIMENTO E AREIA TRAO T-1 (1:3) - 1 SACO CIMENTO 50KG / 3 PADIOLAS AREIA DIM. 0.35 X 0.45 X 0.23 M - 0.0020 M3 278.68 0.56 0.56
CONFECO MECNICA E TRANSPORTE
PINTURA ESMALTE BRILHANTE (2 DEMAOS) SOBRE SUPERFICIE METALICA, INCLUSIVE PROTECAO COM ZARCAO (1 19.28
6067 0.1200 M2 2.31 2.31
DEMAO)
- -
- -
- -
- -
- -
Sub-Total 33.82

Equipamento
- -
Sub-Total -

Mo de obra
4750 Pedreiro 0.5000 h 4.61 2.31 2.31
6111 Servente 0.5000 h 3.22 1.61 1.61
- -
Leis Sociais 114.84% 4.50
Sub-Total 8.41

Preo Total TOTAL GERAL R$ 42.23

18.03.03 CORRIMO EM AO INOX =1 1/2", h=90cm

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
Corrimo em ao inox =1 1/2", duplo, h=90cm 1.0000 und 523.25 523.25 523.25
Parafuso de fixao com bucha plstica 8 mm 6.0000 cj 0.38 2.28 2.28
- -
- -
- -
- -
- -
- -
Sub-Total 525.53

Equipamento
- -
Sub-Total -

Mo de obra
Pedreiro 1.00 h 4.61 4.61 4.61
Servente 1.00 h 3.22 3.22 3.22
- -
Leis Sociais 114.84% 8.99
Sub-Total 16.82

Preo Total TOTAL GERAL R$ 542.35

18.03.04 ESPELHO CRISTAL ESPESSURA 4MM, COM MOLDURA EM ALUMINIO E COMPENSADO 6MM PLASTIFICADO COLADO (m)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material

0.1800 l 8.78 1.58 1.58


ADITIVO BASE DE EMULSO DE POLMERO SINTTICO PARA ARGAMASSA E CHAPISCO SIKAFIX SUPER OU EQUIVALENTE
CHAPA MADEIRA COMPENSADA PLASTIFICADA 2,2 X 1,1M X 6MM P/ FORMA CONCRETO 1.0500 und 36.53 38.36 38.36
ESPELHO CRISTAL E = 4 MM 1.0000 m 133.43 133.43 133.43

85/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

CANTONEIRA ALUMINIO ABAS DESIGUAIS 1 X 3/4" E = 1/8" 1.5400 kg 17.78 27.38 27.38
- -
- -
- -
- -
Sub-Total 200.75

Equipamento
- -
Sub-Total -

Mo de obra
Vidraceiro 2.20 h 4.61 10.14 10.14
Servente 2.16 h 3.22 6.96 6.96
- -
Leis Sociais 114.84% 19.63
Sub-Total 36.73

Preo Total TOTAL GERAL R$ 237.48

18.04 BASE E MASTROS PARA BANDEIRA E LETREIRO

18.04.01 MASTRO TRIPLO EM TUBO DE FERRO GALVANIZADO TELESCPICO PARA BANDEIRA, ALT: 7 M (3Mx2' + 4M x 1 1/2')

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
MASTRO TRIPLO EM TUBO DE FERRO GALVANIZADO TELESCPICO PARA BANDEIRA, ALT: 7 M (3Mx2' + 4M x 1 1/2') 1.0000 und 4,268.24 4,268.24 4,268.24
- -
- -
- -
- -
- -
- -
- -
Sub-Total 4,268.24

Equipamento
- -
Sub-Total -

Mo de obra
Servente 1.0000 h 3.23 3.23 3.23
- -
- -
Leis Sociais 114.84% 3.71
Sub-Total 6.94

Preo Total TOTAL GERAL R$ 4,275.18

18.04.02 BASE PARA FIXAO DE MASTRO TRIPLO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
00080/ORSE FORMA PLANA PARA FUNDAES, EM COMPENSADO RESINADO 12MM, 02 USOS 1.8900 m2 46.74 88.34 88.34
00125 - ORSE Concreto simples fck= 15 MPA (b1/b2), fabricado na obra, sem lanamento e adensamento 0.9100 m3 260.84 237.36 237.36
LANAMENTO DE CONCRETO USINADO, BOMBEADO, EM PEAS ARMADAS, INCLUSIVE COLOCAO, ADENSAMENTO 20.19
00128/ORSE 0.9100 m3 18.37 18.37
E ACABAMENTO
ESCAVACAO MANUAL DE VALA EM MATERIAL DE 1A CATEGORIA ATE 1,5M EXCLUINDO ESGOTAMENTO /
73965/010 0.3300 m3 24.21 7.99 7.99
ESCORAMENTO
- -
- -
- -
- -
Sub-Total 352.06

Equipamento
- -
Sub-Total -

Mo de obra
4750 PEDREIRO 0.5010 h 4.61 2.31 2.31
6111 Servente 0.5000 h 3.22 1.61 1.61
- -
Leis Sociais 114.84% 4.50
Sub-Total 8.42

Preo Total TOTAL GERAL R$ 360.48

18.04.03 CONFECO DE LETRAS EM CHAPA GALVANIZADA N22 PINTADA COM TINTA AUTOMOTIVA MED 22CM DE ALTURA (MAISCULAS)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CONFECO DE LETRAS EM CHAPA GALVANIZADA N22 PINTADA COM TINTA AUTOMOTIVA MED 22CM DE ALTURA 1.0000 und 63.00 63.00 63.00
(MAISCULAS)
- -
- -
- -
- -
- -
- -
- -
Sub-Total 63.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 63.00

18.04.04 CONFECO DE LETRAS EM CHAPA GALVANIZADA N22 PINTADA COM TINTA AUTOMOTIVA MED 12CM DE ALTURA (MINSCULAS)

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
CONFECO DE LETRAS EM CHAPA GALVANIZADA N22 PINTADA COM TINTA AUTOMOTIVA MED 12CM DE ALTURA 1.0000 und 38.00 38.00 38.00
(MINSCULAS)
- -
- -
- -

86/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

- -
- -
- -
- -
Sub-Total 38.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 38.00

18.05 ACESSIBILIDADE PARA DEFICIENTES

18.05.01 PAVIMENTAO COM PISO TATIL DIRECIONAL E/OU ALERTA, EM BORRACHA, P/DEFICIENTES VISUAIS, DIMENSES 25X25CM, APLICADO, REJUNTADO, EXCLUSIVE REGULARIZAO DE BASE

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
06893/ORSE Piso tctil direcional e/ou alerta, de borracha, dim 25x 25cm colorido - aplicado 1.0500 M2 160.00 168.00 168.00
- -
- -
- -
- -
- -
- -
- -
Sub-Total 168.00

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
- -
Leis Sociais 114.84% -
Sub-Total -

Preo Total TOTAL GERAL R$ 168.00

PAVIMENTAO COM PISO TATIL DIRECIONAL E/OU ALERTA, DE CONCRETO, NA COR NATURAL, P/DEFICIENTES VISUAIS, DIMENSES 25X25CM, APLICADO COM ARGAMASSA INDUSTRIALIZADA AC-II, REJUNTADO,
18.05.02
EXCLUSIVE REGULARIZAO DE BASE

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
2540 - ORSE Rejunte colorido flexivel para revestimentos cermicos 0.5200 kg 2.10 1.09 1.09
9758 - ORSE Piso tctil direcional e/ou alerta, de concreto, na cor natural, dim 25x25 cm - para deficiente visual 1.0500 m2 46.45 48.77 48.77
02684/ORSE Argamassa industrializada votomassa, AC-II ou similar 4.0000 kg 1.04 4.16 4.16
- -
- -
- -
- -
- -
Sub-Total 54.02

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 0.5000 h 4.61 2.31 2.31
6111 Servente 1.2000 h 3.22 3.86 3.86
Leis Sociais 114.84% 7.08
Sub-Total 13.25

Preo Total TOTAL GERAL R$ 67.27

18.05.03 SINALIZAO PARA DEFICIENTES - ANEL DE BORRACHA PARA GUIA DE DEFICIENTE EM CORRIMO

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
06890/ORSE Sinalizao para deficientes - anel de borracha para guia de deficiente em corrimo 1.0000 und 20.98 20.98 20.98
- -
- -
- -
- -
- -
- -
- -
Sub-Total 20.98

Equipamento
- -
Sub-Total -

Mo de obra
- -
4750 PEDREIRO 0.2000 h 4.61 0.92 0.92
- -
Leis Sociais 114.84% 1.06
Sub-Total 1.98

Preo Total TOTAL GERAL R$ 22.96

18.05.04 MAPA TTIL EM ACRLICO MEDINDO 70 X 50CM, COM SUPORTE EM CHAPA EM FERRO 1" E TUBO DE FERRO GALVANIZADO =4", PINTADOS E PLACA EM GRANITO CINZA ANDORINHA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
10997 ELETRODO AWS E-7018 (OK 48.04; WI 718) D=4MM (SOLDA ELETRICA) 0.5000 KG 15.70 7.85 7.85
11795 GRANITO CINZA POLIDO P/BANCADA E=2,5 CM 0.4844 M2 164.64 79.75 79.75
0436 PARAFUSO FRANCES M16(D=16MM) X 150MM CAB ABAULADA - ZINCAGEM A FOGO 4.0000 UND 1.68 6.72 6.72
1336 CHAPA ACO GROSSA PRETA 1"(25,40MM) 199,87KG/M2 0.4900 M2 611.87 299.82 299.82
07693 TUBO ACO GALV C/ COSTURA DIN 2440/NBR 5580 CLASSE MEDIA DN 4" (100MM) E = 4,50MM - 12,10KG/M 0.9000 M 81.29 73.16 73.16
9092/ORSE MAPA TTIL EM ACRLICO 70X50 1.0000 UND 846.53 846.53 846.53
7311 TINTA ESMALTE SINTETICO ACETINADO 0.2430 L 20.51 4.98 4.98
07307 FUNDO ANTICORROSIVO TIPO ZARCAO OU EQUIV 0.1350 L 18.05 2.44 2.44
3768 LIXA P/ FERRO 0.4050 FL 1.38 0.56 0.56
03767 LIXA P/ PAREDE OU MADEIRA 0.3400 FL 0.31 0.11 0.11
Sub-Total 1,321.92

87/88
RGO: TRT - Tribunal Regional do Trabalho
OBRA: CONSTRUO DO PREDIO DO TRT - CORURIPE
LOCAL: Coruripe/AL
TP N002/2013 DATA: 30/12/2013
COMPOSIES POR PREOS UNITRIOS
ITEM DESCRIO DOS SERVIOS Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total

Equipamento
- -
Sub-Total -

Mo de obra
4783 PINTOR 1.0000 h 4.61 4.61 4.61
6160 SOLDADOR 0.8100 h 5.26 4.26 4.26
4750 PEDREIRO 1.3500 h 4.61 6.22 6.22
6111 Servente 1.0000 h 3.22 3.22 3.22
Leis Sociais 114.84% 21.03
Sub-Total 39.35

Preo Total TOTAL GERAL R$ 1,361.27

18.05.05 CANTONEIRA DE ALUMINIO 2X2, PARA PROTECAO DE QUINA DE PAREDE

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
584 CANTONEIRA ALUMINIO ABAS IGUAIS 2" E = 1/8" 1.0000 m 13.45 13.45 13.45
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sub-Total 13.45

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
4760 AZULEJISTA OU LADRILHISTA 0.6000 h 4.61 2.77 2.77
6111 Servente 0.4000 h 3.22 1.29 1.29
Leis Sociais 114.84% 4.66
Sub-Total 8.71

Preo Total TOTAL GERAL R$ 22.15

19.00 SERVIOS COMPLEMENTARES

19.01 LIMPEZA FINAL DA OBRA

CDIGO Descrio Quant. Unidade Preo Unit. Custo Mat. Custo MDO Custo Equip. Custo Total
Material
3 ACIDO MURIATICO (SOLUCAO ACIDA) 0.0500 l 1.85 0.09 0.09
- -
- -
- -
- -
- -
- -
- -
Sub-Total 0.09

Equipamento
- -
Sub-Total -

Mo de obra
- -
- -
6111 Servente 0.1410 h 3.22 0.45 0.45
Leis Sociais 114.84% 0.52
Sub-Total 0.98

Preo Total TOTAL GERAL R$ 1.07