Você está na página 1de 105
C_ BILL OF QUANTITIES. vie vii, vil, 2 PREAMBLE TO BILL OF QUANTITIES General Directions In this Bill of Quantities the sub-headings and item descriptions identify the work covered by the respective items but the nature and extent of the work to be performed is to be ascertained by reference to the Drawings, Specifications, ‘Schedules and Conditions of Sub-Contract as the case may be read in conjunction with various measurement preambles and clauses contained within the Sub- Contract and the Sub-Contractor is to satisfy himself as to what is required and allow accordingly. The rates and prices entered in the Bill of Quantities shall be deemed to be full Inclusive value of the work covered by the several items including the following unless expressly stated otherwise:- Labour and all costs in connection therewith, ‘The manufacture, supply and where required the design of materials, goods and equipment storage and all costs in connection therewith including waste and delivery to Site. Plant and all costs in connection therewith. Fixing, erection, installing, testing and commissioning of materials, goods and ‘equipment and the provision of records. All Temporary Works, including offices and stores and their subsequent removal from site. ‘The effect on the phasing of the Works of altemations or additions to existing services of Public Utilities and others to the extent that such work is set forth or implied in the documents on which the tender is based. All general obligations, liabilities and risks involved in the execution of the Works set forth or implied in the documents on which the tender is based. Establishment charges, overheads and profits. Measurement ‘The Measurement of work shall be computed net from the Drawings untess stated otherwise in these preambles. The Sub-Contractor shall allow in the rales and prices for waste overbreak and working space including all necessary backfiling in appropriate approved material, ce Unpriced items. tems against which no price or rate is entered by the contractor shall be deemed to be covered by the other rates and prices in the Bill of Quantities (Contract Sum). Similarly items which are specified in the drawing or specification but not itemized ‘on the Bill of Quantities by the contractor shall be deemed to be covered by other rates and prices in the Bill of Quantities (Contract Sum) Private and Public Utilities The information in the Sub-Contract as to the whereabouts of Publicly Owned existing services and mains is believed to be correct but the Services Sub- Contractor shall not be relieved of his obligations under relevant Clause in the Conditions of Sub-Contract agreement. The Sub-Contractor shall allow in the rates and prices for taking measures for the support and full protection of pipes, cables and other apparatus during the progress of the Works and for keeping the Engineer informed of all arrangements he makes with the owners of privately owned services and Public Utilities as appropriate and for ensuring that no existing mains and services are interrupted without the written consent of the appropriate authority. Phasing Sequence |. The Sub-Contractor shall allow in the rates and prices generally Operations and unless expressly stated otherwise for the cost of any Methods of restrictions imposed on the programming of the Works by the Construction various Clauses in the Specifications dealing with phasing sequence of operations or methods of construction. Noise Vibration ‘The Sub-Contractor shall allow in his rates generally for the cost and Pollution of any restrictions imposed on the Works and their execution by any requirements for bidding and/or limiting noise vibration and pollution. Quantities . The quantities set out in the Bill of Quantities are the estimated of the work but they are not to be taken as the actual and correct quantities of the Works to be executed by the Sub-Contractor in futfilment of his obligations under the Sub-Contract. ‘Small Quantities . A proportion of the work will be in small quantities with restricted working and in narrow widths and unless otherwise stated the Sub-Contractor shall allow in the rates and prices for such works for all cutting and working around obstructions. Trials and Tests ‘The Sub-Contractor shall allow in the rates and prices for carrying out all triais ‘sampling and tests necessary whether indicated or otherwise in order to ensure compliance with the requirements of the Specifications except where separately itemized in the Bill of Quantities. Phraseology 10. Difference in the method of billings and in the phraseology used in various parts of the Bills of Quantities will not be recognized as a basis of any claim for an increase in the Price. Provisional 44.ltems marked "PROVISIONAL" or/and ‘CONTINGENCY’ in the Bill of Items Quantities shall only be executed at the discretion of the Engineer either in whole or not at all Approval 12. It is to be understood that where a material or operation is specified as being “approved” the approval is that is that of the Engineer. Headings 413. Where headings are used in the Bill of Quantities where appropriate they are to be considered as part of items descriptions. Dayworks 14, Where rates and prices for Dayworks are specified and quoted, they shall be applicable for all work carried out under Dayworks at any time up to the date of the Maintenance Certificate. The percentage additions inserted by the Sub-Contractor will be addition to the matters itemized be deemed to cover all possible additions in costs of the Sub-Contractor of work carried out under Dayworks and no further increases will be admitted on any grounds or cause whatsoever. Where basic rates are inserted in the Appendix to the Dayworks they will be deemed to be those which the Sub-Contractor has used in determining his unit rates inserted elsewhere in the Bill of Quantities. Lighting Columns 15, The items for lighting columns shall also include for excavation, upholding the sides and keeping the earthwork free of water, backfiling and compaction and the supply and installation of an equipment board complete with MCCBs, MCBs, fuses, fuse units, intemal wiring using PVC/PVC cable, terminals and gland separate wiring between each lantern and fuse/MCB units, the connection at both ends and the earth connection and disposal of surplus material. Lanterns. 16. The items for lanterns shall also include for detachable control gear, terminals and internal wiring and fixings. In the case of other lanterns the items shall include for the mounting brackets with clamps, MCCBs, MCB, fuse, fuse unit, equipment board and all terminations. Cable 17. The items for cable shall also include for running in ducts, glands and termination and connection of the armoring to the earth studs. NAIKTARAF BLOK A DAN 8 HOSPITAL TAIPING [SUNWARY OF MECHANICAL & ELECTRICAL SERVICES BLL DESCRIPTION TOTAL AMOUNT Re A [evecrrical services 8 [compound LicHTING SERVICES c_ fretepHone services 0 fir services. TRUNKING @ conoUrT £ _[ucHTNNG PROTECTION 8 EARTHING SYSTEM F easvsten 6 Joctvs.caro access system H_ [coup AND Hot waTeR SYSTEM 1 [sanrrary sysrent J |aiRconomiontne AND MECHANICAL VENTILATION SYSTEM K [FIRE PROTECTION system IMEDICAL GAS SYSTEM [RO WATER SySTEM IHosprraL EQUIPMENT oze InuRSE GALL SYSTEM luLreHeDa PROJECTION SYSTEM a |uarvsysrem R_[isoLaTion Room sysTEM SUMMARY OF ME WORKS & SERVICES (RM) Signature Contractor Stamp Date: Z BO NE SUMMARY -1 LUAICTARAF BLOK A DAN 8 HOSPITAL TAIPRIG Hox ego o dlr, spy tn and comma io seve oct margaret conple electie evi stain teh aan occa uh be Spots, ncaa gs ad ay ees snd ‘Wor ary om has bone nk nto Schsle o Prss. te cost wi sha bo soared have bea eed ne pices or unp sam of ober tome, p Gckedae Pca al ico rb recs hastng, can of sactie Spurn, chon ard mai gota vga Sala “Th lel amour nated fra apy tan cerns tegen of ware cue venetian te ape re akon Soo a OR = }wores: he aeration ee ceatton wats dace ore ate geeraty |rossureastunp sus toms Rhee pract appesinas [rues are gen orto cpt ranre as ecand of fron requrea [ne wpprng wots dese nr he gsnry Ineasred eating sun tere Ware procs. apse wri gearless se exten of ae regu hove contact st easy mea of he act itor Joqted ant a bl remnants te oo Sin [stoner be ert organs of kode dl, At |osvera, 11 o-oo brag a Operation & Haltonence [seus cacn eres syam mas ew dtl copy (CO. astecaD ona et accents sot be compe hardcover ing inthe acon ines na xed Pm) |ooroxinaieo Sep, 442 [soo rwéeowoing brain, Cabo & Prod ata |eorosmsto'sa) 813 [up anda emergency tre excpe and room sgnages. Le ‘Manoj Dlrang Maru Tapa Kaberaran “nk 8m Stns Gensey six Pap Hose Rest ‘14 [Romain ecvery oe connotea, eceg, at. punting a wa, et casey liaison papowes oma a mcnzeary se cng and make geet logon Etec he ers Prog Botha fr enpnent atc [crm wih ure of eal autores, son] um OME BILAN -14 reas escrapnow No RATE uur] ary jxores : | aterton and drction ers deirdre ina goreraly focasued as np um ens Yer gractest approx fasts re aon tome spect natu end oxen Be [reronioa [io uraradrg wos desorbed ron ae gery fsnate aa enema Wher prec! prox fares regen oto of pst nae ardoendat he [roe romuoa Honor, ho contacter a eae knee eth achat qos Jeeures an has ul ararstne en tea one ftsoeer wl be esta a grron ct rte os 2 |.ocaL aumionmes 1 funing wn tan aubaresfresing, commesoang ane lsmacing of eco supp ssn of rut, fos nd ast hess as pa aoc evens The eae! Jecnraarc ae espost tote ih a elon auteens fr at mato redo ho extra wndeetoud avr) [sro athe ao, coo etaing error bere |srneramet oes ors, erage fre saperilon lt sto, recta he ent sre ard wraepamen fr ir, sccoptarc teats necensry. 11 |sutmisson decumont fac tation sed toy |rnspecaon and stra xpos whch sat ec As ul [renege ot ron, chest ond oh rned Soames | aststan Keston Oan Kastan Pekaxen, OSH [opromate to). 1» ite Pertandran Tang Approanatet Lt) © [baonan Bota On Penycarat, BONA (Aprotate t) 4 {urna Teoage, ST (Arosiata 4) ‘Aa fuawsunron eqano 131 1000 1 Male Sut Bows ¥AS8 TYPE 280 0A ACR, fucces, c¥70c, crs. cspacan Bank, Ar Cenarsaton st, Anmeter,Vlnaer,Pover Facer Maat sul, Jppovedab, nna bos eartarg we. Rowen eg I eammecong (or Drown Sod Speco. fssroneate 1 Ns) ‘822 [sana Tew wa Sate Goad M9 TYPE 28 cv OKA ACB lucas F100, CTs. Capac ark. At Cencoeston Heat, Anetra, Power Far Moro su lprona et clo bone, ering ce, Asst og [exmurssaing. (As Per raung Sed Speen. [eronte ta) 1A32 |tatal-canger eg, stines, min cite bom Jarning ane CPR Sagram (Arete a) 18.24 robber Mot (mm THK: 10}, Lang Lar of SE) [store os} | ane BLL A214 ‘CARRIED FORWARD Tost Aon ass Aas naz ao aso juores: frm ater and dameten were deertad heroin ao gerry Jrasewed astro sum tons Where paca, aprons (nis re goo rasp aio deen he fret regares Ine wpedg wars deserted nro ao gery Ineaews a inp sun ens Whee poctea, apo fans ro goon heat opel ates exten the feet ees Irons, inact il aay hse of he aa quertos feted ata ll mann on los ans [ubieovetbe snot er gsrane a tone {sbetng anaeaties eprom | Se) kaon x soon (i x tone (0) et Poh Iemoral Heay Oy Con gpa 1 Mos) Iconic orting see cv copper taps, hoay dy RE Ia chemb rcorve ag, ee we cab lace pongo went che (Apposnato 11) I toonm camer last ip frcomng cae |erca, As prong poteaon. porate 24a Ix toa gemeter lace‘ er incringcatio sea Ae pr eau epectcaon (prota 2 een Iowan 1 ces" ppo forcing cable [sea Ae para wpctaton (ipprnains0 Mala) {caso teerche HS 00m per dea frneg ond eens freatn and contin of tos ue tary [cpio ost msg ssovanse 9.0, arson BO, fxg tonanoo conta coproenave, arsporton loa! opesitae ang ta (Apri ta) om oo eOMNE BLL I-14 rae DesctPrion rear | to amour usr] ary 10 eu a [sup oar om Juores: [re stration a demotion os desta ret are gory |neasred es up sn tems. ner aca. approcnse lene are entero pc mare exo ho requre. Ine wparaana works doscoed tre mae gery Jneesod as ump sun Rms Wr preci opps [meso en er tas of pai nae ad ond of De fro reaurea howe, he contact sal ete Hine of hn tal son lege ante ull Sanson sea wo cane Iinsoner lt eeraesopnrecef toe la, ‘Aa [sup-surenpoaRp ano pssrmBUTON BOARD suey atta oon stb are, re ot jacods, Roce, wos, bistar tran! bck anten [seen oer accesses spr spetestbn ae erntngs ‘Ast [econ Tews8-40 (apronate os) em ‘42 |200n TPN SS.At prseate Hos) tom Aas fosan tenesi.a2 porn t on ‘44 [zone TPN 68.43 (perenne 1 Hs) om ‘4s [2008 TPN 888.56 eprom Nos) or 146 oon 1PNS80-84 (opr Nos) am ‘Aart |pt04 Tew 980-02 (print Hes) om ‘Aas {oson rH 558.65 (apprninate 1 Nos) on ‘AA [2008 TPH SSD.AINE print Noe) on A430 [000 TPNSSE.ASE Approx t Noa) im ‘nat fonk TPN 853.68 (Aprons Hee) om ‘nau2 [1508 te OST E(k A) Aprons No) om ‘Ad [1506 79H OB. E (ak) Aprile Hor) to ‘A414 [tone TPH S38-AG E ype 1 Nos) om ‘nas [toon Ten 588.A1 © (ryprsinate tHe} et ‘Aas 004 TPH S8H-ARE Apron Nos ‘en ‘x47 [00a 7 888.80 & prorat t Hes) or ‘A448 {1000 TPH 880-01 © prota Nor) i 1438 |100n Pw 890-82 pprodate 1 Nos) te ‘5420 ftooa Ten 588-°RE Popoxnat 4 Hos) ee PaMNELL AM a a3 Asa pare pu luores: Ine steer on deneitn wore deste hore ar gees Inosered ar bp sm tame Wire paca, apron {mtn ao gon olen fect ert rote. Io uparaang wots desctbes arn aegeneraly Ines a unp Sun ams. Woere pacts, apse [umnts ary instr spec nt at orl De fr sore. Ionovr ne aac at sayin othe acu guts fogred aetna ut merit on aoa > ae foisevr bs ont origotance of oneage dl, leo TN De ppm 0 Nos) loa TN08 pronto 47 Nos) Jeon TEN S86-A0 UPS (Aprxiate 4 Noe) IN TPN SSG UPS (gps Ns) foams eating pen cw coger ae, teary ly lasts chonber nd engravenbag, le Tha work sbal fre pongo he ean chamber fsouaron, sre ana mnie ening eter at neces loon Pw scLaTORFOR ARCOND COMPRESSOR laroracnat 2Ros) ison tPw scLAatOR (pyeninst Nos} faa TPNISOLATOR (Agro 205) fo Tew tsoLTOR peo 20 Non) | BOWNEBLL AN ‘CARRIED FORWARD LC woe vescreonion pate | Toianount war | ary aa EE luores: Jneasuedas np sun toms Ware pace, open Joven aro gun eon af pec nou andoten of freee I woraday wos dese re agra jnwastedes ump sun tenn Weer pace. aprox [tie a ea rte sped ature an nord ts feorcreuten Jeet antn at rerio on nc as |taisbevr tbs one ertgarance ot kone ta, 86 |am susan caps an cotta reuse ot cab mcr, tn uke juror tons, treat upp ns earth entry fro rector ccacearat a po pocoton ono. lca un 4xac sont sa mLPEISWAPVG Cele [stats ound opie eer 482 [csorg site 2<4C 185MM YAIS Cate cone Cai [a Gena proxate (20M) 262 [casing ung 140 120M Sa XLFEISWNEVE Cele [str round prema 100 Mey 164 [eating wing 146 sah Ga xLPEZSWAPVC ostle at Goma prexinas thd ‘A065 Joana wing 4x16 tana PC Caio tx rox $a CP cabled i Oieied Tong [repre entiten 1A. |cobing ng Ax 16 oh Ga PC Cable sx nied Sa C> cantata Gears Tkng |rroirate Rte, 07 [esting ung Anse 7M Sa PVE Cate | MeanaeSa cP con alin Gabaron Teng {roprenatseo user 1x88 |csttng wing 4x16 ena sa PUG Cate fa xa Sa CP Cable ts aie Trang [rpsenate 0 to 80 | cessing usng 146 thts Ga XLPEISWNPVE Cte [sian and eposate 150 te) 0:10 |cotng ving 1x40 28860 NLPERAPVC Cable jac ecru Approinate 60a A611 |oating usm 4x tcamae sa pve cate jee tows a Co Cais aa aka! Teng [npronmae <0 tse) ‘12 [casing using 4x 16 rH PE Cate J x eata Sa CP cables Ma Ying lnreonateteDsite, lee stration a amlon wots deste ati ar gen |onavr th coat sha sty isa othe al qe {soup oar tom PaMNE RIL A= 14 ‘CARRIED FORWARD Ld No nex besorIPrion ant ais ans juores: Ie stscan end dation ws decadron ao gory [reseed as hanp un lone, hem prio proximal [sas ra lar tome spc ate eter the freon Ira arog wore desta in are general Jnwseure stp sin ane Where acta apse [aut re en rH spc tied ert is [oorcrnutes, Hose, he contador hl snes fh cl sins. feud and a bul nants te aso cans [steve ilo edad race of anode fwau cancun {Wig shin, pone sear ond ptt n soca igh epact UPVC cmt lve emery iat ane aie lencoasd Si Pe jeg eating ening 2 LAr PE cable + [etna CP.Caw TOA Ach mourted en way enchant eet. (pponmal 240 Nor) jing otng pttushy 2x 1.Samz PV cai = fx tna CPE ave 1A eh moured muy oe ans fscasaes. Approinae SO Nos) [sing af emrgany fa pl using 2x12 PVG cae + He timnd CC cu acseuntes Agpounae St Hot [cae kero pat ws 2 m2 PC cat [sxtéame Cc a ancesunen (eprom Nex) [ing cating fn pt ing 2x1 PVC cain + fe tsm2 PVC CEC ev ropa p, fm oo, 1A ash Imcsted och ad accents. Approninae "92 No) Iaseg cay Vue pet ug 2x 2smmz PVG cto + xine PUC GPC rect toting ry Mower eons 10 Noe) [omar eur pie te 21 Sm PVC ata + [cremnd cfc ow WN bash eed elon cnd aceon, |pronmate 14 Ne) |enrgr 13a S80 usta 2x 25nn2PyG cae {xed C6 cw Oh tWeh meno veh socket ett. [acest 77 Nes) |auieg 13 980 uy 2x 252 FC eto x2 toma O20 beaut SA ash uted Jewcy neat ute RCD Ka eassty emacs, aeons 76s) of sco pontng 25 denz PVC catia + Haz °C chr neon doa pale eh [epoca 12 es) [go surorous Dro Ar, ODA pot ug 22 JPuceaia «3 1smna PUCCRC, doco tptODR [orotate 1 Hes) Rate vunr| ary “ott Ament SOMMER 14 ‘CARRLED FORWARD

Você também pode gostar