Você está na página 1de 1

Quadro de Cargas (QD.

GERAL)
Circuito Descrição Esquema Método Tensão Pot. total. Pot. total. Fases Pot. - R Pot. - S Pot. - T FCT FCA In' Ip Seção Ic Disj dV parc dV total Status
de inst. (V) (VA) (W) (W) (W) (W) (A) (A) (mm2) (A) (A) (%) (%)
1 IP4 F+N D 220 V 800 736 R 736 1.00 0.80 4,18 3.35 2.5 24.0 10 0.00 2.29 OK

2 IP5 F+N+T D 220 V 1000 920 S 920 1.00 0.80 5.23 4.18 2.5 24.0 10 0.00 3.77 OK
3 IP6 F+N+T D 220 V 600 552 T 552 1.00 0.80 3.14 2.51 2.5 24.0 10 0.00 2.11 OK
4 QUADRO 1 3F+N+T D 380/220V 5100 4692 R+S+T 2156 1104 1288 1.00 0.80 15.44 12.35 10.0 50.0 40 0.00 0.11 OK CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO
TOTAL 7500 14143 R+S+T 5329 4501 4169 1.00 0.80 27.99 22.39 10.0 50.0 50 0.00 1.55 OK
( AL AO QD GERAL) ( 1 AO QD GERAL)
DISTÂNCIA = 4,50m CABO: 10mm2-PVC-70ºC(450/750V) DISTÂNCIA = 16,3m CABO: 2.5mm2-PVC-70ºC(450/750V)
CORRENTE = 13,92A CORRENTE = 3,75A
Quadro de Cargas (QD. 01) V/Akm= 3,63 V/Akm= 14,3
Circuito Descrição Esquema Método Tensão Pot. total. Pot. total. Fases Pot. - R Pot. - S Pot. - T FCT FCA In' Ip Seção Ic Disj dV parc dV total Status
de inst. (V) (VA) (W) (W) (W) (W) (A) (A) (mm2) (A) (A) (%) (%)
D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km
1 IP1 F+N D 220 V 1300 1196 R 1196 1.00 1.00 5.43 5.43 2.5 24.0 10 0.00 3.10 OK D V = 3,63 x 13,92 x 0,0045 = 0,23V D V = 14,3 x 3,75 x 0,0163 = 0,87 V
D V % = (0,23x 100)/220 = 0,10% D V % = (0,87x 100)/220 = 0,40%
2 IP2 F+N D 220 V 1200 1104 S 1104 0.95 1.00 5.28 5.02 4.0 24.0 10 0.00 2.55 OK
3 IP3 F+N D 220 V 1200 1104 T 0.95 1.00 5.28 5.02 4.0 24.0 10 0.00 1.75 OK
4 TS F+N+T B1 220 V 1200 960 R 960 1.00 0.80 5.45 4.36 2.5 24.0 10 0.00 0.31 OK
TS-A F+N+T B1 220 V 600 480 R 480 1.00 0.80 2.73 2.18 2.5 24.0 0.00 0.21 OK
TS-B F+N+T B1 220 V 600 480 R 480 1.00 0.80 2.73 2.18 2.5 24.0 0.00 0.10 OK
5 IS F+N+T B1 220 V 200 184 T 184 1.00 0.80 1.1 0.84 2.5 24.0 10 0.00 0.06 OK
CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO
IS-A F+N+T B1 220 V 100 92 T 92 1.00 0.65 0.525 0.42 2.5 24.0 0.00 0.05 OK
IS-B F+N+T B1 220 V 100 92 T 92 1.00 0.65 0.525 0.42 2.5 24.0 0.00 0.01 OK ( 3 AO QD GERAL) ( 2 AO QD GERAL)
DISTÂNCIA = 9,70m CABO: 2.5mm2-PVC-70ºC(450/750V) DISTÂNCIA = 7,85m CABO: 2.5mm2-PVC-70ºC(450/750V)
CORRENTE = 2,75A CORRENTE = 10,90A
V/Akm= 14,3 V/Akm= 14,3

TOTAL 5100 4548 R+S+T 2156 1104 1288 1.00 0.80 14.95 11.96 10.0 50.0 30 0.00 0.78 OK
D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km
D V = 14,3 x 2,75 x 0,0097 = 0,38 V D V = 14,3 x 10,90 x 0,00785 = 1,22 V
D V % = (0,38x 100)/220 = 0,2% D V % = (1,22x 100)/220 = 0,60%

Quadro de Cargas (QD. GERAL) x 3


Circuito Descrição Esquema Método Tensão Pot. total. Pot. total. Fases Pot. - F Pot. - S Pot. - T FCT FCA In' Ip Seção Ic Disj dV parc dV total Status
de inst. (V) (VA) (W) (W) (W) (W) (A) (A) (mm2) (A) (A) (%) (%)
1 ILUMINAÇÃO F+N+T B1 220 V 720 662 F 147 1.00 0.80 3.75 3.00 2.5 24.0 10 0.00 0.40 OK

2 TOMADA 1 F+N+T B1 220 V 2400 1920 F 1920 1.00 0.80 10.9 8.72 2.5 24.0 10 0.00 0.60 OK
3 TOMADA 2 F+N+T B1 220 V 600 480 F 480 1.00 0.80 2.75 2.20 2.5 24.0 10 0.00 0.20 OK

TOTAL 3720 3062 F 3062 1.00 1.00 13.92 13.92 10.0 50.0 20 0.00 0.10 OK

Quadro de Demanda (AL1) QUIÓSQUE x 3


Potência Fator de
Demanda
Tipo de carga instalada demanda
(kVA)
(kVA) (%)
Iluminação e TUG's 3.06 24.00 0.73
TOTAL 0.73

REV 1 ATENDIMENTO À SOLICITAÇÕES TÉCNICAS 09/04/2019


CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO REV 2 ATENDIMENTO À SOLICITAÇÕES TÉCNICAS 16/04/2019
REV 3 ATENDIMENTO À SOLICITAÇÕES TÉCNICAS 02/07/2019
( AL AO QD GERAL) ( QD GERAL AO QD 1) ( QD CS MÁQ À BOMBA ) x 3 ( IP4 AO QD GERAL)
DISTÂNCIA = 33,5m CABO: 10mm2-PVC-70ºC(450/750V) DISTÂNCIA = 54,75m CABO: 10mm2-PVC-70ºC(450/750V) DISTÂNCIA = 4,00m CABO: 4.0mm2-PVC-70ºC(450/750V) DISTÂNCIA = 84,20m CABO: 2.5mm2-PVC-70ºC(450/750V)
CORRENTE = 48,50A CORRENTE = 14,95A CORRENTE = 5,89A CORRENTE = 4,18A APROVAÇÃO:
V/Akm= 3,63 V/Akm= 3,63 V/Akm= 8,96 V/Akm= 14,3

D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km DV = (V/A . Km) x A x Km


D V = 3,63 x 48,50 x 0,0335 = 5,90V D V = 3,63 x 14,95 x 0,05475 = 2,97V D V = 8,96 x 5,89 x 0,004 = 0,21V DV = 14,3 x 4,18 x 0,0842 = 5,03 V
D V % = (5,90x 100)/380 = 1,55% D V % = (2,97x 100)/380 = 0,78% D V % = (0,21x 100)/380 = 0,06% DV % = (5,03x 100)/220 = 2,29%

CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO
( QD GERAL AO QD CS MÁQ) ( IP1 AO QD 1) ( 5 AO QD CS MÁQ) ( IP5 AO QD GERAL)
DISTÂNCIA = 29,45m CABO: 10mm2-PVC-70ºC(450/750V) DISTÂNCIA = 87,74m CABO: 2.5mm2-PVC-70ºC(450/750V) DISTÂNCIA = 2,50m CABO: 2.5mm2-PVC-70ºC(450/750V)
DISTÂNCIA = 111,0m CABO: 2.5mm2-PVC-70ºC(450/750V)
CORRENTE = 28,80A CORRENTE = 5,43A CORRENTE = 0,42A
CORRENTE = 5,23A
V/Akm= 3,63 V/Akm= 14,3 V/Akm= 14,3
V/Akm= 14,3
CONVÊNIO: 870889/2018
D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km
DV = (V/A . Km) x A x Km
D V = 3,63 x 28,80 x 0,02945 = 3,10V D V = 14,3 x 5,43 x 0,08774 = 6,81V D V = 14,3 x 0,42 x 0,0025 = 0,02 V 8,30 V
DV = 14,3 x 5,23 x 0,111 =
D V % = (3,10x 100)/380 = 0,82% D V % = (6,81x 100)/220 = 3,10% D V % = (0,02x 100)/220 = 0,01%
DV % = (8,30x 100)/220 = 3,77% PROJETO ELÉTRICO
REFORMA PRAÇA SANTA BÁRBARA
CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO ENDEREÇO:

( IP2 AO QD 1) ( IP3 AO QD 1) ( IP6 AO QD GERAL) AV. OSVALDO CRUZ, ESQ. C/ RUA ATALIBA R. TÉLES, ESQ. C/ AV. RIO BRANCO, ESQ. C/ RUA JOSÉ SANTOS
( 1 AO QD CS MÁQ)
PROPRIETÁRIO:
DISTÂNCIA = 103,3m CABO: 2.5mm2-PVC-70ºC(450/750V)
DISTÂNCIA = 118,70m CABO: 4.0mm2-PVC-70ºC(450/750V) DISTÂNCIA = 81,24m CABO: 4.0mm2-PVC-70ºC(450/750V) DISTÂNCIA = 24,80m CABO: 2.5mm2-PVC-70ºC(450/750V)
CORRENTE = 3,14A
CORRENTE = 5,28A CORRENTE = 5,28A CORRENTE = 0,90A V/Akm= 14,3 PREFEITURA MUNICIPAL DE CROMÍNIA - GO
V/Akm= 8,96 V/Akm= 8,96 V/Akm= 14,3
RESPONSÁVEL TÉCNICO:
DV = (V/A . Km) x A x Km
D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km DV = 14,3 x 3,14 x 0,1033 = 4,64 V ENG° CIVIL GIVAGO ARAÚJO VALADARES CREA - GO 1015879675/D
D V = 8,96 x 5,28 x 0,1187 = 5,62V D V = 8,96 x 5,28 x 0,08124 = 3,84V D V = 14,3 x 0,90 x 0,0248 = 0,32 V
DV % = (4,64x 100)/220 = 2,11% AUTOR DO PROJETO:
D V % = (5,62x 100)/220 = 2,55% D V % = (3,84x 100)/220 = 1,75% D V % = (0,32x 100)/220 = 0,15%

ENG° CIVIL GIVAGO ARAÚJO VALADARES CREA - GO 1015879675/D

LOGO: CONTEÚDO: PRANCHA:


→ QUADRO DE CARGAS
CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO CÁLCULO DE QUEDA DE TENSÃO
→ QUADRO DE DEMANDAS
( TS AO QD 1) ( IS AO QD 1) ( 6 AO QD CS MÁQ) → CALCULO DE QUEDA DE TENSÃO

2/3
DISTÂNCIA = 8,80m CABO: 2.5mm2-PVC-70ºC(450/750V) DISTÂNCIA = 8,80m CABO: 2.5mm2-PVC-70ºC(450/750V) DISTÂNCIA = 2,10m CABO: 2.5mm2-PVC-70ºC(450/750V)
CORRENTE = 5,45A CORRENTE = 1,10A CORRENTE = 1,10A
V/Akm= 14,3 V/Akm= 14,3 V/Akm= 14,3

ÁREA:
D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km D V = (V/A . Km) x A x Km Área Total do Terreno: 7.478,998 m²
D V = 14,3 x 5,45 x 0,0088 = 0,68V D V = 14,3 x 1,10 x 0,0088 = 0,14V D V = 14,3 x 1,10 x 0,0021 = 0,03 V Área Pavimentada: 2.430,02 m²
D V % = (0,68x 100)/220 = 0,31% D V % = (0,14x 100)/220 = 0,06% D V % = (0,03x 100)/220 = 0,01% VALADARES Área Permeável: 4.023,23 m²
ENGENHARIA
DATA: ESCALA: DESENHO:
FONE: (62) 3636-8075
ABRIL /2019 INDICADA WESLEI RODRIGUES