Escolar Documentos
Profissional Documentos
Cultura Documentos
ALA
MB
CIR RA
DO
DO CU
LAÇ
RA A Ã
MB RN O IN
ALA TE TE
O IN RN
A
ÇÃ
U LA
C IRC
STB-2
7
CM
INV1 - TE2
ACESSO À
UFV
SE
SAÍDA
PROJEÇÃO
CAIXA
-CM01
DA
SAÍDA
TE2
PROJEÇÃO
CAIXA
-CM01.1
DA
TE1
FRONTAL
ENTRADA
50
INV2 - TE2
7.1
INV3 - TE2
AL
AM
CIR
BR
CU
AD
LAÇ
O
ÃO
IN
CIR
TE
CU
RN
LA
A
ÇÃ
O
IN
TE
R
INV4 - TE2
NA
..\OneDrive - Energisa\Área de Trabalho\PROJETOS\PROJETOS\ATUAIS\SANTA BÁRBARA\ufv CASIMIRO DE ABREU_transparent_mosaic
ES
ACESSO ENTRE
7
TR
CIRCULAÇÃO INTERNA
TE1
APP ALAMBRADO USINAS
AD
TE2
A
CIRCULAÇÃO INTERNA
7
DE
TE
X
RR
A
INV1 - TE1
AL
X X STB-1
AM
BR
AD
O
X X
X
X
X ALA INV2 - TE1
X MB
CIR X RA
X DO 7.5
DXO CU X 7
A LAÇ
BR NA ÃO
AL
INV3 - TE1
CIR
X
AMX
AM
ER INT
CU
BR
L
AL NT
AD
AÇ
ER
O
Ã
OI
INV4 - TE1
O
X
IN
NA
TE
RN
ÇÃ
A
X
LA
X
CU
6
CIRCULAÇÃO INTERNA
X
CIR
X ALAMBRADO
6
X X
X X
X
6.6
01
X
CIRCULAÇÃO INTERNA
X X
ALAMBRADO
X
X X
X
X
X
X
X
X STB-2 02 X
X
X
X X
S03 DOCUMENTOS DE REFERÊNCIA
7
CM
X
X
03
X
X
X
X
SM-FV-STB-ELF-675
INV1 - TE2 SIMULAÇÃO DE GERAÇÃO DE ENERGIA
ACESSO À
X
X
UFV SE 04 RG-FV-STB-CIV-160
DO
X
VE CHO
X
5
LO
E
S02
TR
SAÍDA
DA
X
SAÍDA
TE2
.7 -CM01.1
DA
CAIXA
PROJEÇÃO
LO-FV-STB-ELF-690
X
POSTE DE ANCORAGEM
TE1
AL
FRONT
ENTRADA
X
191713 m E
X
ENVELOPADO
7506726 m S LO-FV-STB-MEC-500
TRECHO
X
ARRANJO ESTRUTURAL - GERAL
X
EN TR
S01
VE EC
LO H 06
X
PA O
POSTE DE DERIVAÇÃO - ENEL DO
24K
X
X
191711 m E
07
X
7506724 m S
X
NOTA GERAL:
X
X
COORDENADAS SE - STB
X
ÁREA DA UFV = 3,66 HA
X
7.1
24K
08
X
X
X
7506728 m S
INV3 - TE2
X
AL
ÁREA ARRENDADA = 4,23 HA
AM
X
CI
RC
09
BR X
X
AD
X
LA
O
ÇÃ
X
X
O
X
IN
C
10
X
IR
03 - CABINE DE MONITORAMENTO DESTINADO À CENTRAL DA CFTV, BEM COMO INSTALAÇÃO DE EQUIPAMENTOS DA ESTAÇÃO
TE
C
X
X
RN
U
A
Ç
X
ÃO
X
04 - PARA VER DETALHE DAS VALAS DOS CABOS SOB VIAS DE CIRCULAÇÃO INTERNA E PARA VER DETALHE DE ENCAMINHAMENTO
11
X
IN
X
X
INV4 - TE2
X
N
A
05 - O ALAMBRADO DEVERÁ SER SECCIONADO E ATERRADO DE ACORDO COM A NORMA DA CEMIG. PARA MAIS DETALHES SOBRE O
X
X
12 SECCIONAMENTO VER PRANCHA: AB-FV-STB-ELA-842 E AB-FV-STB-CIV-141.
X
X
06 - DEVIDO A DIMENSÃO DOS CABOS DOS MÓDULOS SER PEQUENA (+/-120CM), UTILIZAR A LIGAÇÃO DE STRINGS NO MODELO
X
LEAP-FROG COM ROTAÇÃO DE MÓDULOS NAS MESAS COM 2 STRINGS E LIGAÇÃO TIPO CROSS COM ROTAÇÃO DE MÓDULOS NAS
X
X
13 MESAS COM APENAS 1 STRING. PARA MAIS DETALHES VER PRANCHA: AB-FV-STB-ELF-790.
X
X
07 - O SECCIONAMENTO DO ALAMBRADO DEVERÁ SER FEITO A CADA 200M, PARTINDO DO PONTO S01 LOCADO EM PLANTA, NO
X
S06
ES
SENTIDO HORÁRIO.
X
X
7
X
PRÓXIMO A SUBESTAÇÃO, ENTRE O POSTE DE DERIVAÇÃO E A SUBESTAÇÃO, DEVE SER FEITO O SECCIONAMENO DE 7,5M PARA
TR
X
AD
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
A
X
CIRCULAÇÃO INTERNA
7
DE
X
TR
EN E
TE
VE CHO
X
LO
PA
X DO
X
RR
X
14
X
A
X
INV1 - TE1
X
STB-1
X
15
X
LEGENDA
X
X
X
16
X
LEGENDA DE CABOS
X
INV2 - TE1 LEGENDA GERAL
X
X
17
X
X
X
X
18
X
ELETRODUTOS DE CABOS CC
MÓDULO FOTOVOLTAICO
X
ELETRODUTOS DE CABOS DE COMUNICAÇÃO
X
TE1
AL
X
AM
19
X
BR
SAÍDA CABOS DE
COMUNICAÇÃO
X
X
1
7.
O
S04
CABINE DE SECSIONAMENTO (CS)
20
X
X
AL
CABINE DE MEDIÇÃO (SE)
CI
SAÍDA
X
X
AM
ENTRADA
R
CU
BR
21
X
LA
A
TRAFO AUXILIAR (T.AUX)
SECUN.
AUXILIAR
TRAFO
DO
PRIMÁRIO
ÇÃ
INV4 - TE1
O
X
X
TRAFO DE ATERRAMENTO (T.AT)
IN
3H 2H 1H
0X
3X 2X 1X
TE
22
X
RN
X
ALAMBRADO
A
X
X
PÓRTICOS
23
X
X
CIRCULAÇÃO INTERNA
7
S05
X
X X X X X X X X X X X X X X X X
ALAMBRADO
24
X
1
X
7.
DADOS TÉCNICOS GERAIS DO PROJETO
X
X
25
X
X
CONSTRUÇÕES
X
X
FAIXA DE SE
RVIDÃO 26
X
X
X
7
X
CIRCULAÇÃO INTERNA
7.5
X
X X X X X X X X X X X X X X X X X X X
ALAMBRADO
REDE ELÉTR
ICA
7.5
ESTRADA DE
TERRA
FAIXA DE SE
RVIDÃO
04 ADIÇÃO DE ESTRUTURA METÁLICA E AFASTAMENTO ENTRE MESAS LARA FREIRE LARA FREIRE LETÍCIA LETÍCIA 17/03/2022
03 ADIÇÃO DE ALAMBRADO EM POSTE DE ANCORAGEM E AJUSTE DO DA SE MARCELO C. LARA FREIRE LETÍCIA LETÍCIA 09/03/2022
02 REPOSICIONAMENTO DOS QDBT's E AJUSTES DOS CS's E TE's MARCELO C. LARA FREIRE LETÍCIA LETÍCIA 04/03/2022
01/01 R04
FORMATO A1 594 x 841