PLANILHA DE VERIFICAÇÃO HIDRÁULICA ESA - Engenharia Sanitária e Ambiental

Calculado:

Verificado:

TAXA VAZAO (L/s) COTAS PROF Y/D


TRECHO EXTENSÃO (L/s.m) TRECHO MONTANTE JUSANTE DIAM. DECLIV. TERRENO COLETOR COLETOR PV Q Y/D Y/D
INICIAL INICIAL INICIAL INICIAL (mm) (m/m) MONT. MONT. MONT. DE proj > <= INICIAL
(m) SATUR. SATUR. SATUR. SATUR. JUSANTE JUSANTE JUSANTE JUS. 0,30 0,30 SATUR.
TL1-TIL01 153.74 0.0020 0.31 0.00 0.31 152.8 459.760 457.650 2.11 1.50 0.28 0.25 0.25
153.74 0.0063 0.97 0.00 0.97 152.8 0.0045 459.200 456.960 2.24 1.50 0.28 0.25 0.25
TIL01-TIL04 65.95 0.0020 0.13 11.85 11.98 152.8 459.200 456.960 2.24 11.98 0.41 0.39 0.41
65.95 0.0063 0.42 15.82 16.24 152.8 0.0453 456.380 453.970 2.41 16.24 0.48 0.45 0.48
TL4-TIL4 153.99 0.0020 0.31 0.00 0.31 152.8 456.770 454.660 2.11 1.50 0.28 0.25 0.25
153.99 0.0063 0.97 0.00 0.97 152.8 0.0045 456.380 453.970 2.41 1.50 0.28 0.25 0.25

Página 1 de 2
anitária e Ambiental
data

VELOC. TEN. TRAT.


ANGULO RAIO (m/s) (Pa) OBSERVAÇÃO
TETA HIDR. INICIAL VEL.CRIT.
(m) SATUR. (m/s)
2.1020 0.0225 0.41 1.01 ok
2.1020 0.0225 0.41 2.82 Y/D<0,75
2.7671 0.0332 1.69 15.03 ok
3.0761 0.0374 1.83 3.63 Y/D<0,75
2.1025 0.0225 0.41 1.01 ok
2.1025 0.0225 0.41 2.82 Y/D<0,75