CONTRATO AJ/CD/056-13
Abril de 2014
Reviso
04
03
02
01
00
PAVESYS ENGENHARIA
Descrio
Reviso
Reviso
Reviso
Reviso
Emisso Inicial
Data
11/04/2014
21/03/2014
21/02/2014
12/02/2014
24/01/2014
Pgina 1
SUMRIO
1.
Apresentao ................................................................................................................... 4
2.
3.
4.
5.
Projeto de Pavimentao.................................................................................................. 8
5.1) Levantamentos de Campo ...................................................................................................... 8
5.1.1) Estudos de Trfego........................................................................................................... 8
5.1.2) Avaliao das Condies de Superfcie (LVC) ................................................................. 17
5.1.3) Levantamento Deflectomtrico (FWD) .......................................................................... 21
5.1.4) Levantamento de Irregularidade Longitudinal (IRI) e Transversal (ATR) ....................... 27
5.1.5) Levantamento das ocorrncias de pedreiras e usinas de asfalto .................................. 34
5.2) Projeto de Restaurao......................................................................................................... 37
5.2.1) Definio dos Segmentos Homogneos ........................................................................ 37
5.2.2) Diagnstico e Solues para restaurao dos pavimentos ............................................ 42
5.3) Especificaes Tcnicas e Recomendaes .......................................................................... 63
6.
7.
PAVESYS ENGENHARIA
Pgina 2
8.
Quantitativos ................................................................................................................. 99
9.
PAVESYS ENGENHARIA
Pgina 3
1. Apresentao
Neste relatrio de projeto (Volume 1), a Pavesys Engenharia apresenta o projeto
executivo de restaurao dos pavimentos da rodovia ERS-168 (Cdigo 168ERS0030),
no segmento entre a cidade de Bossoroca e o entroncamento com a BRS285(A)/ERS-165 (So Luiz Gonzaga) com extenso total de 36,17 km. Conforme
solicitado no Termo de Referncia DAER, nesta Fase A sero apresentadas as
solues de restaurao para restabelecer a funcionalidade dos dispositivos de
drenagem, a atualizao da sinalizao e restaurao dos pavimentos somente nos
segmentos considerados crticos, que totalizam neste trecho 11,97 km, conforme
Tabela 1.1.
Tabela 1.1 Segmentos Crticos (Fase A)
CDIGO S.R.E
168ERS0030
DESCRIO
km
incio
44.43
km fim
80.60
Extenso
(km)
36.17
km
incio
Segmentos Crticos
Extenso
km fim
(km)
45.43
46.50
51.60
52.80
53.50
56.60
71.40
72.80
75.40
80.60
11.97
33.1%
Pgina 4
PAVESYS ENGENHARIA
Pgina 5
3. Levantamento Cadastral
O trecho (Cdigo S.R.E. 168ERS0030) objeto deste relatrio inicia na cidade de
Bossoraca, e seu ponto final junto ao entroncamento com as rodovias BRS285(A)/ERS-165, que do acesso a So Luiz Gonzaga.
por pintura viria a cada 20 m no bordo externo da faixa do lado direito da pista.
Importante registrar que devido ao estado do corpo estradal e faixa de
domnio alguns dispositivos existentes podem no ter sidos cadastrados (drenagem).
Ou melhor: para que todos os dispositivos existentes ficassem visveis deveria ter sido
realizada roada e/ou limpeza prvias.
Equipamento
Para a execuo da pintura demarcatria, estaqueamento e elaborao de
cadastro a equipe de colaboradores da Consultora utilizou: a) Trenas de rodas, para
obter as distncias; b) Tinta de demarcao viria, para demarcao na pista; c)
Mquina fotogrfica, para registros da situao atual de alguns elementos da via; d)
GPS, para registro de pontos.
Metodologia
Para a execuo do estaqueamento e pintura demarcatria partiu-se do ponto
inicial correspondente ao S.R.E. (verificado in loco por tcnicos da Pavesys e do
DAER), neste caso o km 44,43. Deste ponto, com a utilizao de trena de rodas,
mediu-se mais 10,00 m para se obter o km 44,44. A partir da, at o ponto final, o
servio foi executado de 20,00 em 20,00 m.
No Anexo A apresentado o registro fotogrfico realizado durante o servio
de estaqueamento, onde foram registradas tambm as coordenadas geogrficas.
PAVESYS ENGENHARIA
Pgina 6
Espessura (cm)
TSD
2,0
20,0
23,0
PAVESYS ENGENHARIA
Pgina 7
5. Projeto de Pavimentao
Neste captulo esto apresentados os estudos desenvolvidos para gerar as solues
de restaurao dos pavimentos.
levantamento
deflectomtrico
com
FWD.
Ainda,
foram
realizados
PAVESYS ENGENHARIA
Pgina 8
Trecho:
Localidade:
Km:
Descrio:
Sentido:
Categoria/Horrio 06:00-07:00 07:00-08:00 08:00-09:00 09:00-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 19:00-20:00 20:00-21:00 21:00-22:00
Passeio
Total
Coletivo
0
Carga Leve
0
Carga Mdia
0
Carga Pesado
0
Carga Ultra-Pesado
0
Outros
(Motoci cl eta s , tra o
mec ni ca , tra o
a ni ma l e bi ci cl eta )
Total
PAVESYS ENGENHARIA
Pgina 9
Aps a coleta em campo dos dados classificados por categoria, foram somados os
sentidos crescente e decrescente para se determinar o Volume Dirio Mdio (VDM). A
Tabela 5.2 apresenta a planilha utilizada para o clculo do VDM.
Trecho:
Km:
Sentido:
Dia
da Dia
da
Contagem Semana
Data
Passeio
Coletivo
Leve
Carga
Pesada
Mdia
Total
Ultra-Pesada
Total
VDM
Meia Pista
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Determinao do Nmero N
PAVESYS ENGENHARIA
Pgina 10
Fator de Veculo
Coletivo
Carga Leve
Carga Mdia
Carga Pesada
Carga Ultrapesada
Valor
0,3450
0,0630
1,3710
4,9860
11,2050
Trecho:
Km:
Sentido:
TRFEGO E NMERO N
Ano
Passeio
Taxa
Coletivo
Taxa
Carga
Taxa
Total
N.N(10^6)
N Acum. (10^6)
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
PAVESYS ENGENHARIA
Pgina 11
168ERS0030
Trecho:
Localidade:
Km:
Data: 09/01/2014
Sentido:
Categoria/Horrio 06:00-07:00 07:00-08:00 08:00-09:00 09:00-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 19:00-20:00 20:00-21:00 21:00-22:00
Passeio
7
22
30
27
25
25
22
32
39
36
21
21
23
30
20
10
Total
390
Coletivo
1
11
Carga Leve
2
26
36
17
13
23
Carga Mdia
1
Carga Pesado
1
Carga Ultra-Pesado
1
Outros
(Motoci cl eta s , tra o
mec ni ca , tra o
a ni ma l e bi ci cl eta )
Total
14
25
40
PAVESYS ENGENHARIA
31
29
33
29
43
47
49
29
27
35
45
26
14
516
Pgina 12
Trecho:
Localidade:
168ERS0030
Km:
63
Data: 09/01/2014
Sentido:
Decrescente
Categoria/Horrio 06:00-07:00 07:00-08:00 08:00-09:00 09:00-10:00 10:00-11:00 11:00-12:00 12:00-13:00 13:00-14:00 14:00-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 19:00-20:00 20:00-21:00 21:00-22:00
Passeio
21
32
36
33
25
22
24
17
25
31
33
18
31
31
13
Total
10
402
Coletivo
1
Carga Leve
2
20
Carga Mdia
2
10
47
29
46
39
22
52
Carga Pesado
3
25
Carga Ultra-Pesado
1
Outros
(Motoci cl eta s , tra o
mec ni ca , tra o
a ni ma l e bi ci cl eta )
Total
27
PAVESYS ENGENHARIA
42
43
42
31
31
30
27
41
34
27
12
543
Pgina 13
Dia
da Dia
da
Contagem Semana
1 Dia
Total *
VDM
Meia Pista
Data
Passeio
Coletivo
Leve
Carga
Pesada
Mdia
Total
Ultra-Pesada
792
19
46
88
42
22
895
895
447
21
21
11
52
52
26
99
99
50
47
47
24
25
25
12
1.009,00
1140
1140
570
* Aps a coleta de campo dos volumes classificados por categorias, foram somados os
sentidos de ida e volta para cada dia e extrapolados de 16 para 24 horas, atravs do coeficiente (1,13).
PAVESYS ENGENHARIA
Pgina 14
Rodovia: 168ERS0030
Localidade:
Data: 09/01/2014
TRFEGO E NMERO N
Ano
Passeio
Taxa
Coletivo
Taxa
Carga
Taxa
Total
N.N
N Acum.
2015
2016
2017
2018
2019
2020
470
493
518
544
571
600
5%
5%
5%
5%
5%
5%
11
12
12
13
14
14
5%
5%
5%
5%
5%
5%
117
123
130
136
143
150
5%
5%
5%
5%
5%
5%
599
629
660
693
728
764
1,27E+05
1,33E+05
1,40E+05
1,47E+05
1,54E+05
1,62E+05
1,27E+05
2,60E+05
4,00E+05
5,47E+05
7,01E+05
8,63E+05
PAVESYS ENGENHARIA
Pgina 15
Localizao
Rodovia: ERS-168
Data: 09/01/2014
Trecho: 0030
Km Posto 63+000
Fotos do Trecho
OBS:
PAVESYS ENGENHARIA
Pgina 16
PAVESYS ENGENHARIA
Pgina 17
Figura 5.1 veculo utilizado no LVC (esq.) e detalhe do odmetro digital (dir.)
Mostra-se, por meio da Tabela 5.9, planilha exemplo aps processamento dos dados
do levantamento visual contnuo (LVC-Video).
Data:
COD_SRE:
Inicio
Fim
ICPF
Degrau
IGGE
IES
Cdigo Conceito
Observao
(cm) Conceito
PAVESYS ENGENHARIA
Pgina 18
Vdeo registro
Software
de
aquisio
de
dados
(imagens,
cadastro
de
defeitos,
PAVESYS ENGENHARIA
Pgina 19
PAVESYS ENGENHARIA
Pgina 20
PAVESYS ENGENHARIA
Pgina 21
PAVESYS ENGENHARIA
Pgina 22
especificaes D-4694/96 e D
PAVESYS ENGENHARIA
Pgina 23
Pavimento asfltico: 0; 20; 30; 45; 60; 90; 120 (em centmetros).
Pgina 24
PAVESYS ENGENHARIA
Pgina 25
Localizao
Km
Trecho:
Carga (Kgf)
Sentido:
Faixa:
DEFLEXO (1 x 10-2 mm)
Temperatura
PAVESYS ENGENHARIA
(20 cm )
(30 cm )
(45 cm )
(60 cm )
(90 cm )
Pav.
Data
Hora
Lat.
Long.
Observaes
(120 cm )
Pgina 26
PAVESYS ENGENHARIA
Pgina 27
PAVESYS ENGENHARIA
Pgina 28
Pgina 29
Caractersticas Tcnicas
-
PAVESYS ENGENHARIA
Pgina 30
PAVESYS ENGENHARIA
Pgina 31
Fim
(km)
PAVESYS ENGENHARIA
IRI
Mdio
Latitude
Longitude
Altitude
Pgina 32
Inicio
(km)
Fim
(km)
PAVESYS ENGENHARIA
ATR
Esq ATR Dir
(mm)
(mm)
Latitude
Longitude
Altitude
Pgina 33
PAVESYS ENGENHARIA
Pgina 34
Tabela 5.13 Resumo das Informaes dos possveis fornecedores e Distncias de Transporte
SERVIOS
MATERIAL
EMPRESA
TELEFONE
Asfaltos
ENDEREO
PRODUO DIRIA
750 ton
DISTNCIA DE TRANSPORTE
(km)
NP
P
TOTAL
5.15
242.85
248.00
500 ton
278.00
278.00
500 ton
366.00
366.00
750 ton
130.00
130.00
1.00
73.50
74.50
700 ton
4.46
109.54
114.00
MATERIAL
CAP-50/70 - RR-1C
RM-1C - CM-30
CAP-50/70 - RR-1C
RM-1C - CM-30
CAP-50/70 - RR-1C
RM-1C - CM-30
CAP-50/70 - RR-1C
RM-1C - CM-30
CAP-50/70 - RR-1C
RM-1C - CM-30
CAP-50/70 - RR-1C
RM-1C - CM-30
DISTNCIA DE TRANSPORTE
(km)
NP
P
TOTAL
5.15
LICENA DE
OPERAO
242.85
248.00
7398/2012-DL
0006/2012-DL
278.00
278.00
6870/2010-DL
366.00
366.00
4586/2010-DL
130.00
130.00
06073/2011-DL
1.00
73.50
74.50
00871/2014-DL
4.46
109.54
114.00
1499/2011-DL
OBSERVAES
* NP - No Pavimentada
* P - Pavimentada
PAVESYS ENGENHARIA
Pgina 35
Tabela 5.13 Resumo das Informaes dos possveis fornecedores e Distncias de Transporte (continuao)
SERVIOS
MATERIAL
EMPRESA
Diversos
Johrmann Minerao e Terraplanagem Ltda
Areia
ENDEREO
TELEFONE
PRODUO DIRIA
DISTNCIA DE TRANSPORTE
(km)
NP
P
TOTAL
3.00
128.00
131.00
1.40
101.60
103.00
3807/2010-DL
2000m
4.46
109.54
114.00
1499/2011-DL
1250 ton
130.00
130.00
5752/2012-DL
400m
87.50
87.50
7394/2012-DL
1200 ton
2.30
128.70
131.00
4600/2011-DL
100m
2.80
172.20
175.00
400m
1.00
73.50
74.50
4012/2008-DL
146.00
146.00
6335/2011-DL
306.15
307.00
06551/2011-DL
242.00
242.00
150m
400m
0.85
400m
500m
1.10
165.90
167.00
Em Processo
1000m
6.30
172.70
179.00
7362/2011-DL
Bossoroca - RS
15.80
15.80
Bossoroca - RS
15.80
15.80
Tubos de Concreto
Bossoroca - RS
15.80
15.80
Bossoroca - RS
15.80
15.80
Esteio- RS
505.00
505.00
Cerro Largo
57.20
57.20
25.00
25.00
LICENA DE
OPERAO
250m
Madeira
Fbrica de Ao em Esteio
DISTNCIA DE TRANSPORTE
(km)
NP
P
TOTAL
900 ton
Cimento
Ao
MATERIAL
OBSERVAES
Processo de
Renovao
* NP - No Pavimentada
* P - Pavimentada
PAVESYS ENGENHARIA
Pgina 36
168ERS0030
DESCRIO
km
incio
44.43
km fim
80.60
Extenso
(km)
36.17
km
incio
Segmentos Crticos
Extenso
km fim
(km)
45.43
46.50
51.60
52.80
53.50
56.60
71.40
72.80
75.40
80.60
11.97
33.1%
PAVESYS ENGENHARIA
Pgina 37
OT
BOM
BO
REGULAR
RE
R1
R2
RUIM
R3
R4
R4+R2
PSSIMO
PE
Segmentos
Crticos
PAVESYS ENGENHARIA
Pgina 38
PAVESYS ENGENHARIA
Pgina 39
Final (km)
45,6
45,8
46
46,2
46,4
51,8
52
52,2
52,4
52,6
52,8
53,6
53,8
54
54,2
54,4
54,6
54,8
55
55,2
55,4
55,6
55,8
56
56,2
56,4
56,6
71,6
71,8
72
72,2
72,4
TR
JE
A
M
A
A
A
A
B
B
B
B
B
B
B
A
M
M
PAVESYS ENGENHARIA
M
A
A
A
M
A
A
A
A
M
M
M
A
A
A
R
A
A
A
A
M
A
A
A
M
A
A
A
A
A
A
B
A
A
M
A
A
A
A
A
A
A
A
A
M
M
A
A
D
M
EX
M
M
A
M
M
A
M
B
A
B
B
M
M
A
A
A
M
M
M
M
A
M
A
M
M
B
IRI (m/km)
5,9
6,0
8,0
5,6
5,3
4,0
3,7
5,6
2,8
3,5
4,1
5,0
5,7
7,3
9,5
4,7
8,5
5,8
3,8
3,5
5,8
4,9
6,7
5,1
3,7
5,1
6,0
7,2
3,8
8,1
3,4
7,0
ATR (mm)
4,01
6,97
4,95
8,37
4,99
3,75
3,37
3,80
3,96
5,11
4,85
4,37
4,34
5,04
6,53
5,85
6,72
5,12
3,50
4,17
4,64
4,09
4,98
4,80
3,97
4,40
2,95
5,32
3,96
2,28
4,58
4,22
ICPF
4,5
8,5
5,2
7,5
6,4
5,1
4,3
5,1
5,6
5,0
4,3
6,0
7,1
5,8
6,3
3,4
3,9
4,6
4,5
3,8
6,1
4,0
4,5
2,7
3,8
3,6
3,8
4,8
2,8
4,3
1,8
4,2
OBS
2,8
2,8
2,8
2,8
2,6
2,8
2,8
3,2
3,3
3,8
2
3,1
2
2,3
2,1
2,3
2,8
2,7
2,6
3,1
2,8
2,8
3,2
2,8
2,2
2,4
2,3
2,7
2,4
2,1
2,2
2,3
Condio
R2
R2
R2
R2
R1
R2
R2
R2
BO
R2
R2
R2
R2
R2
R2
R1
R2
R2
R1
R2
R2
R2
R2
R2
R2
R2
R4+R2
R4+R2
R4
R4+R2
R4+R2
R4+R2
Pgina 40
Final (km)
72,6
72,8
75,6
75,8
76
76,2
76,4
76,6
76,8
77
77,2
77,4
77,6
77,8
78
78,2
78,4
78,6
78,8
79
79,2
79,4
79,6
79,8
80
80,2
80,4
80,6
TR
B
M
M
A
M
A
B
B
A
A
A
M
B
B
B
M
M
M
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
J
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
JE
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
R
A
B
B
B
A
A
A
A
A
A
A
M
A
A
A
A
A
A
B
M
A
B
B
M
M
A
M
M
D
B
EX
B
B
M
B
M
M
M
A
A
M
M
M
M
IRI (m/km)
3,0
7,3
4,0
5,7
4,6
6,5
6,4
8,4
9,9
6,3
6,2
8,0
9,5
8,4
4,4
3,3
6,0
4,2
3,2
5,0
3,8
3,2
4,3
3,7
5,2
8,3
5,2
5,2
ATR (mm)
2,09
4,09
3,36
7,57
8,46
4,31
4,77
7,20
5,25
5,13
3,73
5,03
4,54
4,85
7,20
5,44
3,88
9,36
3,19
3,36
5,56
6,80
4,11
4,72
8,81
4,22
3,89
2,24
ICPF
2,8
2,1
4,7
5,3
5,9
6,4
5,4
3,4
5,4
3,9
4,6
7,5
5,2
4,7
8,0
5,2
2,7
5,0
5,8
5,7
4,1
9,1
3,8
4,1
3,4
1,8
9,4
2,5
OBS
2,5
2,3
2,2
2
2,1
2,4
2,3
2,1
2,4
2,5
2,3
2,1
2,4
2,5
2,3
2,1
2
2,4
2,1
2,4
2,3
2
2,1
2,4
2
2,1
2,2
2,4
Condio
R4+R2
R4
R4
R4+R2
R4+R2
R4+R2
R4+R2
R4+R2
R4+R2
R4+R2
R4+R2
R4
R4+R2
R4+R2
R4+R2
R4+R2
R4+R2
R4+R2
R4
R4
R4+R2
R4
R4+R2
R4
R4+R2
R4+R2
R4
R4
PAVESYS ENGENHARIA
Pgina 41
Com base nas avaliaes realizadas e classificao indicada acima, possvel afirmar
que os segmentos crticos indicados foram assim classificados no somente em
funo da presena de trincamento severo (R4) ou associao de trincamento severo,
remendos e panelas (R4+R2), mas principalmente por representar hoje risco
segurana dos usurios. Na Figura 5.11 apresentado um resumo da classificao
dos segmentos indicados neste relatrio, onde possvel observar que grande parte
dos segmentos (94%) apresentam trincamento severo associado e remendos e
panelas.
R1
R2
R4+R2
R4
5.63%
25.35%
30.99%
38.03%
PAVESYS ENGENHARIA
Pgina 42
Km 45+440
Km 52+350
PAVESYS ENGENHARIA
Pgina 43
Km 54+740
Km 72+020
PAVESYS ENGENHARIA
Pgina 44
Km 77+800
Figura 5.12 Registro Fotogrfico
Conforme orientao do DAER, as solues de restaurao foram definidas a
partir da aplicao do catlogo de solues do DAER (Figuras 5.13 e 5.14).
PAVESYS ENGENHARIA
Pgina 45
PAVESYS ENGENHARIA
Pgina 46
PAVESYS ENGENHARIA
Pgina 47
PAVESYS ENGENHARIA
Pgina 48
Final
(km)
45,8
46,8
53,2
54,2
55
56,4
72,4
73,8
77,4
80,6
Extenso
VDMc
NpUSACE
(km)
(vec. com. / dia) (PP = 10 anos)
0,799
145
8,639E+05
1
145
8,639E+05
1,799
145
8,639E+05
1
145
8,639E+05
0,799
145
8,639E+05
1,4
145
8,639E+05
1
145
8,639E+05
1,4
145
8,639E+05
2,2
145
8,639E+05
3,199
145
8,639E+05
PAVESYS ENGENHARIA
Classificao
R2
R2
R2
R2
R2
R2
R4
R4
R4
R4
Catlogo
R + REP + CBUQ
R + REP + CBUQ
R + CBUQ
R + REP + CBUQ
R + REP + CBUQ
R + REP + CBUQ
R + REP + CBUQ
R + MRAF
R + REP + CBUQ
R + REP + CBUQ
HR_CBUQ/MRAF
(cm)
4
4
4
4
4
4
4
1,5
4
4
Adotada
RECON + CBUQ
R + REP + CBUQ
R + CBUQ
RECON + CBUQ
R + REP + CBUQ
R + REP + CBUQ
R + REP + CBUQ
R + REP + MRAF
RECON + CBUQ
R + REP+ CBUQ
HR_CBUQ/MRAF
(cm)
4
6
4
4
6
6
4
1,5
4
6
Pgina 49
PAVESYS ENGENHARIA
Pgina 50
PAVESYS ENGENHARIA
Pgina 51
N.
1
2
3
4
5
6
7
Segmento Homogneo
Extenso
km inicio km fim
(km)
45.430
46.100
0.67
46.100
46.500
0.40
51.600
52.800
1.20
53.500
53.720
0.22
53.720
55.000
1.28
55.000
56.400
1.40
56.400
56.600
0.20
VDM
NpUSACE
(vec.com./dia)
(PP = 6 anos)
150
150
150
150
150
150
150
8.63E+05
8.63E+05
8.63E+05
8.63E+05
8.63E+05
8.63E+05
8.63E+05
Parmetros
IRI mdio
Classificao
(m/km)
R2
6.65
R2
5.25
R2
3.93
R2
5.36
R2
6.62
R2
4.96
R4
6.01
Soluo
ATR
caract
8.7
8.9
5.9
5.4
7.5
6.0
4.5
Deflexes
caract
80.9
70.8
77.1
56.2
89.5
82.4
95.5
Dadm
(PRO-11)
(PRO-11)
92.3
92.3
92.3
92.3
92.3
92.3
92.3
-2
-5
-3
-9
-1
-2
1
71.400
72.400
1.00
150
8.63E+05
R4
5.89
6.8
79.0
92.3
-3
72.400
72.800
0.40
150
8.63E+05
R4
5.17
5.5
68.5
92.3
-5
10
75.400
76.400
1.00
150
8.63E+05
R4
5.45
9.7
73.6
92.3
-4
11
76.400
78.000
1.60
150
8.63E+05
R4
7.63
7.9
80.3
92.3
-2
12
78.000
78.330
0.33
150
8.63E+05
R4
4.66
7.4
84.6
92.3
-2
13
78.330
78.560
0.23
150
8.63E+05
R4
4.22
13.8
68.2
92.3
-5
14
78.560
80.600
2.04
150
8.63E+05
R4
4.71
7.5
79.3
92.3
-3
LEG.:
Pista
Catlogo
R + REP + CBUQ 4
R + REP + CBUQ 4
R + CBUQ 4
R + REP + CBUQ 4
R + REP + CBUQ 4
R + REP + CBUQ 4
R+REP+CBUQ4
R+(FRES+REC)Desc
y%x+CBUQ4
R+(FRES+REC)Desc
y%x+CBUQ4
R+(FRES+REC)Desc
y%x+CBUQ4
R+(FRES+REC)Desc
y%x+CBUQ4
R+(FRES+REC)Desc
y%x+CBUQ4
R+(FRES+REC)Desc
y%x+CBUQ3
R+(FRES+REC)Desc
y%x+CBUQ4
Adotada
RECON + CBUQ5
R + REP + CBUQ4
R + REP + CBUQ4
RECON + CBUQ5
R + REP + CBUQ4
R + REP + CBUQ4
R + REP + CBUQ4
Acostamento
HR
H2
CBUQ5
20
REP2,5
REP2,5
CBUQ5
20
REP2,5
REP2,5
REP2,5
-
PMF5,5
PMF5,5
PMF3,5
RECON + CBUQ5
CBUQ5
20
PMF3,5
RECON + CBUQ5
CBUQ5
20
PMF3,5
MR - Manuteno Rotineira.
(FRES+REC) Desc y%x - Fresagem Descontnua e Recomposio de CBUQ - na % de rea y% - espessura x (cm)
RECIC - Reciclagem de Base com recicladora, e do revestimento existente e adio de brita e de cimento.
(FRES+REC) Cont x - Fresagem Contnua (toda rea do segmento) e Recomposio de CBUQ - espessura x (cm)
REEST - Reestabilizao de base com escarificao da base e revestimento existente e adio de brita.
PAVESYS ENGENHARIA
Pgina 52
CLASSIF.:
Km:
CLASSIF.: R2
FAIXA DE TRFEGO: D1
DATA DO LEVANTAMENTO: 2013
Km:
46+000
46
200
CLASSIF.:
Km:
CLASSIF.:
Km:
DEFLEXO
120,0
80,0
40,0
0,0
TRILHA DE
RODA
9,0
6,0
3,0
0,0
CLASSIFICA
O DOS
SEGMENTOS
20,0
10,0
0,0
IES
IRI
12,0
10,0
8,0
6,0
4,0
2,0
0,0
44
200
400
600
800
45
200
400
R2
44
200
SH
IRI MD.
ATR CAR.
DEF. CAR.
SOLUO
(Pista)
SOLUO
(Acost)
PAVESYS ENGENHARIA
400
600
800
45
200
400
600
800
R2
600
R2
800
R2
46
400
R1
200
600
800
47
200
400
600
800
48
200
400
600
800
600
800
47
200
400
600
800
48
200
400
600
800
R1
400
1
6,7
8,7
80,9
2
5,3
8,9
70,8
RECON + CBUQ5
R + REP + CBUQ4
RECON + CBUQ5
REP2,5
Pgina 53
CLASSIF.:
Km:
CLASSIF.:
FAIXA DE TRFEGO: D1
DATA DO LEVANTAMENTO: 2013
Km:
CLASSIF.: R2
Km:
52+600
200
400
CLASSIF.: R2
Km:
53+800
400
600
DEFLEXO
120,0
80,0
40,0
0,0
20,0
10,0
0,0
12,0
9,0
6,0
3,0
0,0
CLASSIFICA
O DOS
SEGMENTOS
IES
TRILHA DE
RODA
IRI
12,0
10,0
8,0
6,0
4,0
2,0
0,0
49
200
400
600
800
50
200
400
600
800
51
200
400
600
R2
49
SH
IRI MD.
ATR CAR.
DEF. CAR.
SOLUO
(Pista)
SOLUO
(Acost)
PAVESYS ENGENHARIA
200
400
600
800
50
200
400
600
800
51
200
400
600
800
R2
800
52
R2
52
BO
200
R2
400
3
3,9
5,9
77,1
600
800
53
200
R2
600
R2
800
53
200
400
R2
600
4
5,4
5,4
56,2
800
R2
800
5
6,6
7,5
89,5
R + REP + CBUQ4
REP2,5
CBUQ4
Pgina 54
CLASSIF.: R2
Km:
55+000
800
55
CLASSIF.: R2
FAIXA DE TRFEGO: D1
DATA DO LEVANTAMENTO: 2013
Km:
56+000
56
200
CLASSIF.:
Km:
CLASSIF.:
Km:
DEFLEXO
120,0
80,0
40,0
0,0
20,0
10,0
0,0
12,0
9,0
6,0
3,0
0,0
CLASSIFICA
O DOS
SEGMENTOS
IES
TRILHA DE
RODA
IRI
12,0
10,0
8,0
6,0
4,0
2,0
0,0
54
R2
54
SH
IRI MD.
ATR CAR.
DEF. CAR.
SOLUO
(Pista)
SOLUO
(Acost)
PAVESYS ENGENHARIA
200
R1
200
400
R2
400
600
R2
600
R1
800
R2
55
200
R2
200
400
R2
400
600
R2
600
800
R2
800
R2
56
R2
200
400
600
800
57
200
400
600
800
58
200
400
600
800
600
800
57
200
400
600
800
58
200
400
600
800
R4+R2
400
5
6,6
7,5
89,5
6
5,0
6,0
82,4
7
6,0
4,5
95,5
R + REP + CBUQ4
R + REP + CBUQ4
R + REP +
CBUQ4
REP2,5
REP2,5
REP2,5
Pgina 55
CLASSIF.:
Km:
CLASSIF.:
FAIXA DE TRFEGO: D1
DATA DO LEVANTAMENTO: 2013
Km:
CLASSIF.: R4+R2
Km:
71+800
200
400
CLASSIF.:
Km:
DEFLEXO
120,0
80,0
40,0
0,0
20,0
10,0
0,0
12,0
9,0
6,0
3,0
0,0
CLASSIFICA
O DOS
SEGMENTOS
IES
TRILHA DE
RODA
IRI
12,0
10,0
8,0
6,0
4,0
2,0
0,0
69
200
400
600
800
70
200
400
600
800
71
200
400
R4+R2
69
SH
IRI MD.
ATR CAR.
DEF. CAR.
SOLUO
(Pista)
SOLUO
(Acost)
PAVESYS ENGENHARIA
200
400
600
800
70
200
400
600
800
71
200
400
600
R4
600
800
72
600
72
200
400
800
73
200
400
600
800
800
73
200
400
600
800
R4
600
8
5,9
6,8
79,0
9
5,2
5,5
68,5
FRES4+ REP +
CBUQ4
PMF5,5
PMF5,5
Pgina 56
CLASSIF.:
Km:
CLASSIF.: R4+R2
FAIXA DE TRFEGO: D1
DATA DO LEVANTAMENTO: 2013
Km:
76+000
76
200
CLASSIF.: R4+R2
Km:
77+000
200
400
CLASSIF.: R4+R2
Km:
78+000
400
600
DEFLEXO
120,0
80,0
40,0
0,0
20,0
10,0
0,0
12,0
9,0
6,0
3,0
0,0
CLASSIFICA
O DOS
SEGMENTOS
IES
TRILHA DE
RODA
IRI
12,0
10,0
8,0
6,0
4,0
2,0
0,0
74
200
400
600
800
75
200
400
R4
74
SH
IRI MD.
ATR CAR.
DEF. CAR.
SOLUO
(Pista)
SOLUO
(Acost)
PAVESYS ENGENHARIA
200
400
600
800
75
200
400
600
800
400
600
800
77
800
76
200
400
600
800
77
R4
200
600
800
78
200
600
800
78
200
400
800
R4
600
R4
800
10
5,5
9,7
73,6
11
7,6
7,9
80,3
12
4,7
7,4
84,6
13
4,2
13,8
68,2
14
4,7
7,5
79,3
RECON + CBUQ5
FRES4+ REP +
CBUQ4
RECON +
CB UQ5
FRES4+ REP +
CBUQ4
PMF3,5
RECON +
CB UQ5
PMF3,5
PMF3,5
RECON + CBUQ5
Pgina 57
CLASSIF.: R4+R2
Km:
79+000
800
80
CLASSIF.: R4
FAIXA DE TRFEGO: D1
DATA DO LEVANTAMENTO: 2013
Km:
80+200
CLASSIF.:
Km:
CLASSIF.:
Km:
DEFLEXO
120,0
80,0
40,0
0,0
20,0
10,0
0,0
12,0
9,0
6,0
3,0
0,0
CLASSIFICA
O DOS
SEGMENTOS
IES
TRILHA DE
RODA
IRI
12,0
10,0
8,0
6,0
4,0
2,0
0,0
79
R4+R2
79
SH
IRI MD.
ATR CAR.
DEF. CAR.
SOLUO
(Pista)
SOLUO
(Acost)
PAVESYS ENGENHARIA
200
R4
200
400
600
R4+R2
400
R4
600
R4+R2 R4+R2
800
80
200
R4
200
400
600
800
81
200
400
600
800
82
200
400
600
800
83
200
400
600
800
600
800
81
200
400
600
800
82
200
400
600
800
83
200
400
600
800
R4
400
14
4,7
7,5
79,3
FRES4+ REP + CBUQ4
PMF3,5
Pgina 58
consistiro
de remoo
parcial
do
pavimento
(camadas
de
PAVESYS ENGENHARIA
Pgina 59
km incio
km fim
(1/2/3/4/A)
Comprimento
(m) *
Largura
(m) *
rea
(m2) *
44,670
44,680
10,0
1,8
18,0
RS
44,730
44,740
10,0
1,8
18,0
RSS
44,790
44,800
10,0
1,8
18,0
RSS
44,860
44,870
10,0
1,8
18,0
RSS
44,870
44,880
10,0
1,8
18,0
RS
45,360
45,370
10,0
3,6
36,0
RSS
45,360
45,370
10,0
3,6
36,0
RS
46,410
46,440
30,0
1,8
54,0
RSS
n.
Localizao
Faixa
Tipo de Interveno
(RS / RSS / RP)
46,890
46,910
20,0
1,8
36,0
RSS
10
47,180
47,210
30,0
1,8
54,0
RSS
11
47,270
47,310
40,0
1,8
72,0
RSS
12
47,340
47,360
20,0
1,8
36,0
RSS
13
47,370
47,400
30,0
3,6
108,0
RSS
14
47,540
47,550
10,0
1,8
18,0
RS
15
47,550
47,580
30,0
3,6
108,0
RSS
16
47,670
47,700
30,0
1,8
54,0
RSS
17
47,710
47,740
30,0
1,8
54,0
RSS
18
47,870
47,900
30,0
1,8
54,0
RSS
19
48,200
48,220
20,0
1,8
36,0
RSS
20
49,520
49,530
10,0
1,8
18,0
RS
21
50,010
50,030
20,0
1,8
36,0
RS
22
50,380
50,410
30,0
3,6
108,0
RSS
23
50,420
50,430
10,0
1,8
18,0
RS
24
50,920
50,930
10,0
1,8
18,0
RS
25
50,940
50,970
30,0
1,8
54,0
RSS
26
51,020
51,050
30,0
3,6
108,0
RSS
27
51,090
51,140
50,0
3,6
180,0
RSS
28
51,090
51,140
50,0
1,8
90,0
RS
29
51,200
51,240
40,0
3,6
144,0
RSS
30
55,300
55,340
1e2
40,0
7,2
288,0
RSS
31
55,750
55,780
1e2
30,0
7,2
216,0
RSS
32
56,500
56,550
1e2
50,0
7,2
360,0
RP
33
56,600
56,650
50,0
3,6
180,0
RS
34
57,190
57,220
30,0
1,8
54,0
RS
35
57,210
57,240
30,0
1,8
54,0
RSS
36
57,260
57,270
10,0
1,8
18,0
RSS
37
57,300
57,310
10,0
1,8
18,0
RSS
38
57,360
57,370
10,0
3,6
36,0
RS
39
57,420
57,430
10,0
1,8
18,0
RS
40
57,510
57,520
10,0
1,8
18,0
RS
41
57,780
57,810
30,0
3,6
108,0
RSS
42
43
44
45
58,030
58,030
58,190
58,720
58,080
58,040
58,200
58,760
1
2
1
2
50,0
10,0
10,0
1,8
1,8
1,8
90,0
18,0
18,0
RS
RSS
RSS
40,0
3,6
144,0
RSS
46
58,880
58,930
50,0
1,8
90,0
RSS
47
58,990
59,040
50,0
1,8
90,0
RSS
48
59,080
59,100
20,0
3,6
72,0
RS
49
59,160
59,180
20,0
1,8
36,0
RSS
50
59,210
59,230
20,0
3,6
72,0
RSS
51
59,240
59,260
20,0
1,8
36,0
RSS
52
59,300
59,310
10,0
1,8
18,0
RSS
53
59,300
59,310
10,0
1,8
18,0
RS
54
61,240
61,290
50,0
3,6
180,0
RSS
55
61,240
61,290
50,0
3,6
180,0
RSS
PAVESYS ENGENHARIA
Pgina 60
km incio
km fim
(1/2/3/4/A)
Comprimento
(m) *
Largura
(m) *
rea
(m2) *
Tipo de Interveno
(RS / RSS / RP)
56
63,280
63,290
10,0
1,8
18,0
RS
57
64,010
64,020
10,0
1,8
18,0
RS
58
65,400
65,430
30,0
3,6
108,0
RSS
59
67,180
67,210
30,0
3,6
108,0
RSS
60
68,020
68,030
10,0
1,8
18,0
RS
61
68,100
68,140
1e2
40,0
7,2
288,0
RSS
62
68,240
68,250
10,0
1,8
18,0
RS
63
68,360
68,370
10,0
1,8
18,0
RS
64
70,230
70,250
20,0
1,8
36,0
RSS
65
70,540
70,550
10,0
1,8
18,0
RS
66
70,990
71,040
50,0
3,6
180,0
RSS
67
72,960
72,970
10,0
1,8
18,0
RS
68
73,180
73,200
20,0
3,6
72,0
RS
69
73,640
73,670
30,0
3,6
108,0
RS
70
73,710
73,740
30,0
3,6
108,0
RSS
71
73,790
73,800
10,0
1,8
18,0
RS
72
73,850
73,890
40,0
3,6
144,0
RSS
73
73,850
73,870
20,0
3,6
72,0
RSS
74
73,910
73,930
20,0
3,6
72,0
RS
75
73,940
73,950
10,0
1,8
18,0
RS
76
74,350
74,360
10,0
3,6
36,0
RS
77
74,430
74,450
20,0
1,8
36,0
RS
78
74,870
74,890
20,0
3,6
72,0
RSS
79
75,100
75,130
80
75,100
75,130
30,0
30,0
3,6
3,6
108,0
108,0
RSS
RS
n.
Localizao
Faixa
1.350,0
4.158,0
360,0
PAVESYS ENGENHARIA
Pgina 61
Localizao
km incio
44.590
45.000
45.000
46.660
46.780
47.040
47.780
49.020
49.020
49.180
49.560
49.900
50.460
50.780
51.140
51.270
51.510
57.020
58.040
59.380
74.750
km fim
44.650
45.090
45.090
46.720
46.850
47.120
47.880
49.080
49.080
49.810
49.630
50.000
50.650
50.890
51.440
51.340
51.600
57.110
58.120
59.700
74.810
PAVESYS ENGENHARIA
Faixa
(1/2/3/4/A)
2
1
2
2
2
2
2
2
1
2
1
2
2
2
2
1
2
2
2
2
1
Comprimento
(m) *
Largura
(m) *
rea
(m2) *
60.0
90.0
90.0
60.0
70.0
80.0
100.0
60.0
60.0
630.0
70.0
100.0
190.0
110.0
300.0
70.0
90.0
90.0
80.0
320.0
60.0
1.8
3.6
3.6
3.6
3.6
3.6
1.8
3.6
3.6
1.8
3.6
1.8
1.8
1.8
3.6
3.6
3.6
3.6
3.6
3.6
1.8
108.0
324.0
324.0
216.0
252.0
288.0
180.0
216.0
216.0
1134.0
252.0
180.0
342.0
198.0
1080.0
252.0
324.0
324.0
288.0
1152.0
108.0
Soluo
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
(20cm
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
BG +
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
4cm
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
CBUQ)
Pgina 62
PAVESYS ENGENHARIA
Pgina 63
PAVESYS ENGENHARIA
Pgina 64
CDIGO
ORAM.
DISCRIMINAO
UNID.
SERVIOS
MAT. ASF.
E CIM.
SERVIOS
MAT. ASF.
E CIM.
11.97
km
MAT. ASF.
E CIM.
kmf-P
8.96
883
897
7998
9200
8657
8004
8003
PINTURA DE LIGAO
CONCRETO BETUMINOSO USINADO QUENTE P/ RESTAURAO, RECAPEAMENTO
REPERFILAGEM - exclusive asfalto e transporte
TRANSPORTE MASSA ASFALTICA QUENTE
CAP-50/70
RR 1C
TRANSPORTE DE ASFALTO QUENTE
TRANSPORTE DE ASFALTO FRIO
m2
3,600.00
3,780.00
33,868.80
m3
90.00
94.50
846.72
m3
T
T
T
T
90.00
94.50
m2
3,600.00
3,780.00
33,868.80
m3
144.00
151.20
1,354.75
m3
T
T
T
T
144.00
151.20
12.96
1.80
12.96
1.80
846.72
13.61
1.89
13.61
1.89
121.93
16.93
121.93
16.93
883
7998
9200
8657
8004
8003
PINTURA DE LIGAO
CONCRETO BETUMINOSO USINADO QUENTE P/ RESTAURAO, RECAPEAMENTO
REPERFILAGEM - exclusive asfalto e transporte
TRANSPORTE MASSA ASFALTICA QUENTE
CAP-50/70
RR 1C
TRANSPORTE DE ASFALTO QUENTE
TRANSPORTE DE ASFALTO FRIO
918
897
20.74
1.80
20.74
1.80
1,354.75
21.77
1.89
21.77
1.89
195.08
16.93
195.08
16.93
kmf-P
m2
3,600.00
3,780.00
9.54
36,061.20
m2
3,600.00
3,780.00
36,061.20
m3
90.00
94.50
901.53
m3
T
T
T
T
90.00
94.50
PINTURA DE LIGAO
CONCRETO BETUMINOSO USINADO QUENTE P/ RESTAURAO, RECAPEAMENTO
REPERFILAGEM - exclusive asfalto e transporte
TRANSPORTE MASSA ASFALTICA QUENTE
CAP-50/70
RR 1C
TRANSPORTE DE ASFALTO QUENTE
TRANSPORTE DE ASFALTO FRIO
m2
3,600.00
3,780.00
36,061.20
m3
144.00
151.20
1,442.45
m3
T
T
T
T
144.00
151.20
kmf-P
m3
m3
m3
m2
t
t
m2
t
t
7998
9200
8004
6510
6520
6530
8657
9200
8004
8003
REPAROS NO PAVIMENTO
REMENDOS SUPERFICIAIS
REMENDOS SUBSUPERFICIAIS
REMENDOS PROFUNDOS
RR 1C
CAP 50/70
TRANSPORTE DE ASFALTO QUENTE
TRANSPORTE DE ASFALTO FRIO
883
897
7998
9200
8657
8004
8003
PINTURA DE LIGAO
CONCRETO BETUMINOSO USINADO QUENTE P/ RESTAURAO, RECAPEAMENTO
REPERFILAGEM - exclusive asfalto e transporte
TRANSPORTE MASSA ASFALTICA QUENTE
CAP-50/70
RR 1C
TRANSPORTE DE ASFALTO QUENTE
TRANSPORTE DE ASFALTO FRIO
12.96
1.80
12.96
1.80
901.53
13.61
1.89
13.61
1.89
129.82
18.03
129.82
18.03
883
897
7998
9200
8657
8004
8003
546
861
8010
881
9201
883
8657
897
PAVESYS ENGENHARIA
20.74
1.80
20.74
1.80
900.00
720.00
720.00
3,600.00
4.32
4.32
3,600.00
4.54
4.54
3,780.00
1.80
1.80
24.68
24.68
20,563.20
1.89
1.89
180.00
189.00
m3
t
t
180.00
189.00
25.92
25.92
207.71
18.03
207.71
18.03
5.44
5,140.80
4,112.64
4,112.64
20,563.20
945.00
756.00
756.00
3,780.00
m3
m3
m3
m3
m3
T
T
T
T
1,442.45
21.77
1.89
21.77
1.89
10.28
10.28
1,028.16
1,028.16
27.22
27.22
148.06
148.06
56.70
1,047.82
166.32
3.08
35.49
35.49
3.08
Pgina 65
CDIGO
ORAM.
UNID.
SERVIOS
MAT. ASF.
E CIM.
SERVIOS
MAT. ASF.
E CIM.
11.97
km
MAT. ASF.
E CIM.
7998
9200
8004
894
7998
885
883
9205
8657
8003
kmf-A
m3
m3
m2
m2
ton
ton
ton
894
7998
885
883
9205
8657
8003
kmf-A
m3
m3
m2
m2
ton
ton
ton
kmf-A
m2
1,000.00
1,050.00
8.960
9,408.00
m3
25.00
26.25
235.20
m3
T
T
T
T
25.00
26.25
kmf-A
m3
m3
m3
m2
t
t
m2
t
t
kmf-A
m3
m3
m3
m2
t
t
m2
t
t
546
861
8010
881
9201
883
8657
8091
669.76
558.13
558.13
2,790.65
2.78
1,955.02
1,629.18
1,629.18
8,145.90
703.24
586.04
586.04
2,930.18
3.35
3.35
2,790.65
3.52
3.52
2,930.18
1.40
1.40
9.78
9.78
8,145.90
1.47
1.47
111.63
117.21
111.63
117.21
16.07
16.07
4.07
4.07
325.84
325.84
16.88
16.88
46.92
46.92
883
897
7998
9200
8657
8004
8003
546
861
8010
881
9201
883
8657
897
7998
9200
8004
546
861
8010
881
9201
883
8657
897
7998
9200
8004
PAVESYS ENGENHARIA
82.50
82.50
1,500.00
1,500.00
2.800
242.55
242.55
4,410.00
4,410.00
86.62
86.62
1,575.00
1,575.00
9.09
1.80
10.89
52.50
52.50
1,500.00
1,500.00
9.55
1.89
11.44
6.740
371.54
371.54
10,615.50
10,615.50
55.12
55.12
1,575.00
1,575.00
5.79
1.80
7.59
6.07
1.89
7.96
3.60
0.50
3.60
0.50
250.00
200.00
200.00
1,000.00
1.20
1.20
235.20
1.26
1.26
0.50
0.50
50.00
52.50
m3
t
t
50.00
52.50
7.20
7.20
0.93
0.93
93.45
93.45
7.56
7.56
1.80
1.80
13.46
13.46
3.66
1,441.13
1,152.90
1,152.90
5,764.50
393.75
315.00
315.00
1,575.00
1.89
1.89
1,575.00
0.75
0.75
6.92
6.92
5,764.50
0.79
0.79
m3
75.00
78.75
m3
t
t
75.00
78.75
10.80
10.80
2.24
2.24
1,869.00
0.53
0.53
m3
1,500.00
33.87
4.70
33.87
4.70
1.78
467.25
373.80
373.80
1,869.00
1,050.00
375.00
300.00
300.00
1,500.00
40.944
12.739
53.683
3.78
0.53
3.78
0.53
262.50
210.00
210.00
1,050.00
1,000.00
26.729
5.292
32.021
2.88
2.88
288.23
288.23
11.34
11.34
41.50
41.50
Pgina 66
6. Projeto de Drenagem
6.1)Estudos Hidrolgicos
Os trabalhos dos Estudos Hidrolgicos basearam-se, no Manual de Hidrologia Bsica
do DNIT, no Manual de Drenagem de Rodovias do DNIT e no lbum de Projetos Tipo
de Dispositivos de Drenagem do DAER/RS.
Os Estudos Hidrolgicos tm como finalidade principal a avaliao das precipitaes e
intensidades mximas de chuva, de forma a fornecer subsdios para a definio da
vazo mxima, a qual possibilitar a determinao da seo de vazo da obra
hidrulica necessria.
Para tornar possvel a seleo do tipo de dispositivo a empregar, buscou-se apoio nos
cadastros, alm de consulta a mapas, cartas topogrficas e observaes in loco.
6.1.1) Climatologia
O estudo da climatologia da rea do projeto, o qual avaliou as condies de
temperatura, evaporao, insolao, umidade relativa, etc., observou-se basicamente
definir as caractersticas da regio.
Foram coletados dados de meteorologia e pluviometria junto ao INMET, ANA e CEEE.
Esta regio apresenta segundo a classificao de Kppen, um clima do tipo
mesotrmico mido, Cfa, com vero quente de temperaturas mdias prximas a 22C
e chuvas bem distribudas ao longo do ano, com precipitaes de no mnimo 60 mm
no ms mais seco. A mdia anual de chuvas situa-se na faixa entre 1.650 mm a 1.750
mm. Geadas acontecem no perodo mais frio, de julho a agosto, somando um total de
10 a 20 ocorrncias por ano.
Temperatura
As normais climatolgicas para o perodo de 1961 a 1990 indicam que a temperatura
mdia anual se situa entre 18C e 20C. A temperatura mnima anual se situa entre
14C a 16C. A temperatura mxima anual varia de 25C a 27C, com picos nos
meses de vero.
PAVESYS ENGENHARIA
Pgina 67
Evaporao
Os valores de evaporao anuais mdios obtidos variaram de 800 mm a 1.200 mm.
PAVESYS ENGENHARIA
Pgina 68
Insolao
A insolao controlada pela variao de nebulosidade, obtendo-se valores mdios
entre 2.200 a 2.400 horas de sol por ano.
Umidade Relativa
Os dados obtidos indicam que a mdia dos valores da umidade relativa do ar gira em
torno de 70 a 75%.
PAVESYS ENGENHARIA
Pgina 69
Relevo
O relevo de So Luiz Gonzaga varia de plano a levemente ondulado, o que
caracterstico da homogeneidade das Regies Geomorfolgicas Planalto das Misses
e Planalto da Campanha. Os tipos de relevo predominantes esto assim
caracterizados 60% suave ondulado, 30% ondulado e 5% forte ondulado.
Vegetao:
A vegetao da regio de So Luiz Gonzaga se origina de florestas subtropicais
localizadas s margens dos rios e riachos, bem como atravs de capes em campo
aberto.
Pgina 70
Dados da Estao
Cdigo
02855007
Nome
Cdigo Adicional
Bacia
Sub-bacia
Rio
Estado
Municpio
Responsvel
ANA
Operadora
CPRM
Latitude
-28:29:33
Longitude
-55:13:51
Altitude (m)
200
Precipitao (mm)
73,4
65,8
49,0
48,9
51,4
51,9
49,9
50,3
47,8
50,7
45,7
37,7
Meses
PAVESYS ENGENHARIA
Pgina 71
230,2
Precipitao (mm)
217,7
200,0
157,5
150,0
142,6
150,0
137,9
134,8
149,8
147,8
142,9
145,6
107,2
100,0
50,0
0,0
Jan Fev Mar Abr Mai Jun
Meses
N de Dias de Chuva
12
10
8
9
8
8
7
8
7
4
2
0
Jan Fev Mar Abr
Mai Jun
Jul
Ago Set
Meses
PAVESYS ENGENHARIA
Pgina 72
ANO
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
PAVESYS ENGENHARIA
Pgina 73
P=
K=
PAVESYS ENGENHARIA
Pgina 74
Perodo de Observao:
1983-2012
Valores
Observados
ano
Prec.
1983
94,40
1984
73,80
1985
147,40
1986
93,40
1987
136,20
1988
79,20
1989
95,80
1990
97,80
1991
78,80
1992
120,20
1993
129,80
1994
129,40
1995
80,20
1996
80,20
1997
141,60
1998
89,60
1999
69,10
2000
87,10
2001
120,30
2002
95,60
2003
125,20
2004
96,30
2005
103,40
2006
99,85
2007
144,50
2008
116,40
2009
103,40
2010
82,10
2011
156,00
2012
101,20
2
r =
n=
mx =
min =
med =
s=
a=
m=
Hiprbole
n
Tr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31,00
15,50
10,33
7,75
6,20
5,17
4,43
3,88
3,44
3,10
2,82
2,58
2,38
2,21
2,07
1,94
1,82
1,72
1,63
1,55
1,48
1,41
1,35
1,29
1,24
1,19
1,15
1,11
1,07
1,03
30
156,0
69,1
105,6
24,2
Precipitaes
obser
calcul
Gumbel
difer
observ.
156,00
147,40
144,50
141,60
136,20
129,80
129,40
125,20
120,30
120,20
116,40
103,40
103,40
101,20
99,85
97,80
96,30
95,80
95,60
94,40
93,40
89,60
87,10
82,10
80,20
80,20
79,20
78,80
73,80
69,10
ANLISE ESTATSTICA
-
Precipitaes
calcul.
difer
159,2
3,2
145,8
-1,6
137,8
-6,7
132,1
-9,5
127,5
-8,7
123,7
-6,1
120,4
-9,0
117,5
-7,7
114,9
-5,4
112,5
-7,7
110,3
-6,1
108,2
4,8
106,2
2,8
104,3
3,1
102,5
2,7
100,8
3,0
99,0
2,7
97,4
1,6
95,7
0,1
94,0
-0,4
92,4
-1,0
90,7
1,1
89,0
1,9
87,2
5,1
85,4
5,2
83,4
3,2
81,2
2,0
78,7
-0,1
75,7
1,9
71,4
2,3
0,986
k
2,21
1,66
1,33
1,09
0,90
0,75
0,61
0,49
0,38
0,29
0,19
0,11
0,03
-0,05
-0,13
-0,20
-0,27
-0,34
-0,41
-0,48
-0,55
-0,62
-0,69
-0,76
-0,84
-0,92
-1,01
-1,11
-1,24
-1,41
-
30
156,0
69,1
105,6
24,2
0,052981
94,71
PAVESYS ENGENHARIA
Pgina 75
P6 min
k1
P24h
100
P1h
k2
100
P 24 h
PAVESYS ENGENHARIA
Pgina 76
65
60
50
55
70
45
0
40
35
5
F
10
10
70
35
B
D
15
15
65
20
20
C
60
40
F
D
25
25
F
E
D
E
30
45
C
30
50
55
6 min - 24h
10
15
20
25
30
50
100
1000 10000 5 a 50
100
42,0
41,6
41,4
41,2
41,1
41,0
40,7
40,3
39,0
10,0
PAVESYS ENGENHARIA
37,8
11,2
Pgina 77
Tr
5 anos
10 anos
15 anos
20 anos
25 anos
50 anos
100 anos
Precipitao-Durao-Recorrncia
Precipitao (mm)
250
200
150
100
50
0
0,1
10
100
10 anos
PAVESYS ENGENHARIA
15 anos
20 anos
25 anos
50 anos
100 anos
Pgina 78
tc (h)
0,10
0,15
0,20
0,25
0,30
0,35
0,40
0,45
0,50
0,55
0,60
0,65
0,70
0,75
0,80
0,85
0,90
0,95
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
5,50
6,00
6,50
7,00
7,50
8,00
8,50
9,00
9,50
10,00
11,00
12,00
13,00
14,00
15,00
16,00
17,00
18,00
19,00
20,00
21,00
22,00
23,00
24,00
TR=10anos
P(mm)
I(mm/h)
18,5
184,7
25,2
167,8
30,3
151,7
34,6
138,3
38,2
127,2
41,3
118,0
44,1
110,2
46,6
103,5
48,9
97,7
51,0
92,7
52,9
88,2
54,7
84,2
56,4
80,6
58,0
77,3
59,5
74,4
60,9
71,7
62,3
69,2
63,5
66,9
64,8
64,8
74,7
49,8
82,1
41,1
88,0
35,2
92,9
31,0
97,1
27,7
100,8
25,2
104,1
23,1
107,1
21,4
109,9
20,0
112,4
18,7
114,7
17,6
116,9
16,7
118,9
15,9
120,8
15,1
122,6
14,4
124,3
13,8
126,0
13,3
127,5
12,7
130,4
11,9
133,1
11,1
135,5
10,4
137,8
9,8
140,0
9,3
142,0
8,9
143,9
8,5
145,7
8,1
147,4
7,8
149,0
7,5
150,6
7,2
152,1
6,9
153,5
6,7
154,9
6,5
PAVESYS ENGENHARIA
TR=15anos
P(mm)
I(mm/h)
19,5
195,5
26,6
177,6
32,1
160,6
36,6
146,4
40,4
134,7
43,7
124,9
46,7
116,6
49,3
109,6
51,7
103,4
53,9
98,1
56,0
93,3
57,9
89,1
59,7
85,3
61,4
81,8
62,9
78,7
64,5
75,8
65,9
73,2
67,2
70,8
68,5
68,5
79,1
52,7
86,9
43,5
93,1
37,3
98,3
32,8
102,8
29,4
106,7
26,7
110,2
24,5
113,4
22,7
116,3
21,1
118,9
19,8
121,4
18,7
123,7
17,7
125,8
16,8
127,8
16,0
129,8
15,3
131,6
14,6
133,3
14,0
134,9
13,5
138,0
12,5
140,8
11,7
143,4
11,0
145,8
10,4
148,1
9,9
150,3
9,4
152,3
9,0
154,2
8,6
156,0
8,2
157,7
7,9
159,4
7,6
161,0
7,3
162,5
7,1
163,9
6,8
TR=20anos
P(mm)
I(mm/h)
20,3
203,0
27,7
184,5
33,4
166,8
38,0
152,0
42,0
139,8
45,4
129,7
48,5
121,1
51,2
113,8
53,7
107,4
56,0
101,8
58,1
96,9
60,1
92,5
62,0
88,5
63,7
85,0
65,4
81,7
66,9
78,7
68,4
76,0
69,8
73,5
71,2
71,2
82,1
54,8
90,3
45,1
96,7
38,7
102,1
34,0
106,7
30,5
110,8
27,7
114,5
25,4
117,7
23,5
120,7
22,0
123,5
20,6
126,1
19,4
128,4
18,3
130,7
17,4
132,8
16,6
134,8
15,9
136,6
15,2
138,4
14,6
140,1
14,0
143,3
13,0
146,2
12,2
148,9
11,5
151,5
10,8
153,8
10,3
156,0
9,8
158,1
9,3
160,1
8,9
162,0
8,5
163,8
8,2
165,5
7,9
167,2
7,6
168,7
7,3
170,2
7,1
TR=50anos
P(mm)
I(mm/h)
22,7
226,7
30,9
206,0
37,2
186,2
42,4
169,7
46,8
156,2
50,7
144,8
54,1
135,3
57,2
127,1
60,0
120,0
62,5
113,7
64,9
108,2
67,1
103,3
69,2
98,9
71,2
94,9
73,0
91,2
74,7
87,9
76,4
84,9
78,0
82,1
79,5
79,5
91,7
61,2
100,8
50,4
108,0
43,2
114,0
38,0
119,2
34,1
123,7
30,9
127,8
28,4
131,5
26,3
134,8
24,5
137,9
23,0
140,8
21,7
143,4
20,5
145,9
19,5
148,3
18,5
150,5
17,7
152,6
17,0
154,6
16,3
156,5
15,6
160,0
14,5
163,3
13,6
166,3
12,8
169,1
12,1
171,8
11,5
174,3
10,9
176,6
10,4
178,8
9,9
180,9
9,5
182,9
9,1
184,8
8,8
186,7
8,5
188,4
8,2
190,1
7,9
TR=100anos
P(mm)
I(mm/h)
24,4
244,4
33,3
222,1
40,2
200,8
45,8
183,0
50,5
168,4
54,7
156,2
58,3
145,9
61,7
137,0
64,7
129,3
67,4
122,6
70,0
116,7
72,4
111,4
74,6
106,6
76,7
102,3
78,7
98,4
80,6
94,8
82,4
91,5
84,1
88,5
85,7
85,7
98,9
65,9
108,7
54,3
116,4
46,6
122,9
41,0
128,5
36,7
133,4
33,4
137,8
30,6
141,8
28,4
145,4
26,4
148,7
24,8
151,8
23,4
154,6
22,1
157,3
21,0
159,9
20,0
162,3
19,1
164,5
18,3
166,7
17,5
168,7
16,9
172,5
15,7
176,1
14,7
179,3
13,8
182,4
13,0
185,2
12,3
187,9
11,7
190,4
11,2
192,8
10,7
195,1
10,3
197,2
9,9
199,3
9,5
201,3
9,1
203,2
8,8
205,0
8,5
Pgina 79
CURVAS DE PRECIPITAO-DURAO-RECORRNCIA
250,0
TR=100ANOS
200,0
TR=50ANOS
TR=20ANOS
PRECIPITAO(mm)
TR=15ANOS
150,0
TR=10ANOS
100,0
50,0
0,0
0,00
5,00
10,00
15,00
20,00
25,00
30,00
DURAO (horas)
CURVAS DE INTENSIDADE-DURAAO-RECORRNCIA
250,0
INTENSIDADE DE PRECIPITAO(mm/h)
200,0
150,0
100,0
TR=100ANOS
TR=50ANOS
50,0
TR=20ANOS
TR=15ANOS
TR=10ANOS
0,0
0,00
5,00
10,00
15,00
20,00
25,00
DURAO (horas)
PAVESYS ENGENHARIA
Pgina 80
PAVESYS ENGENHARIA
Pgina 81
Dimensionamento Hidrulico
O dimensionamento hidrulico das obras compreende o estabelecimento da rea da
seo de vazo necessria ao escoamento da descarga calculada. Assim aps o
clculo da vazo da bacia contribuinte, estabelece-se a rea da seo de vazo
necessria referida descarga.
No dimensionamento da seo de vazo das estruturas de drenagem so utilizadas
basicamente a Equao da Continuidade, associada a Frmula de Manning, qual seja:
Q S
R 2/3 i 1/2
n
, onde:
PAVESYS ENGENHARIA
Pgina 82
Drenagem Superficial
Para que se proceda a captao e remoo das guas que por precipitao incidem
sobre a plataforma e adjacncias do corpo da via, alm dos dispositivos existentes,
foram indicados sarjetas de corte. Estes dispositivos constam do lbum de ProjetosTipo de Dispositivos de Drenagem do DAER.
Foi adotado o tipo STC-01, que deve ser implantadas a partir do bordo da camada do
pavimento, concordando com o bordo dos cortes, longitudinalmente a estes. As
sarjetas de corte projetadas para esta rodovia tero seo triangular e devero ser
revestidas de concreto.
prevista a limpeza de valetas e valetes existentes. Tambm prevista a limpeza de
sarjetas existentes (exceto numa extenso discriminada na nota de servio).
Drenagem Subsuperficial
Junto a algumas curvas cncavas, para a captao e remoo das guas que de
alguma forma visualmente atingiram a estrutura do pavimento, foi previsto drenos
subsuperficiais, que constam do lbum de Projetos-Tipo de Dispositivos de Drenagem
do DAER.
Foi projetado o tipo DSS-04, com bocas de sadas tipo BSD-03.
Drenagem profunda
Em alguns cortes onde h deformaes plsticas foram previstos alguns segmentos
de Valeto Lateral e outros de Dreno Profundo com Geocomposto, com bocas de
sadas tipo BSD-02.
PAVESYS ENGENHARIA
Pgina 83
Dissipadores de Energia
Os dissipadores de energia atendero a Especificao DAER-ES-D 06/91.
Valeto Lateral
Os valetes laterais atendero a Especificao DAER-ES-D 02/91.
PAVESYS ENGENHARIA
Pgina 84
7. Projeto de Sinalizao
7.1) Introduo
elaborao
do
projeto,
foram
consideradas
as
caractersticas
PAVESYS ENGENHARIA
Pgina 85
tambm
adequar
os
modelos
de
placa
aos
padres
Pgina 86
PAVESYS ENGENHARIA
Pgina 87
Indicao
A definio de altura das letras em funo da velocidade regulamentada na
via, e consequentemente da distncia de legibilidade. Para o dimensionamento das
PAVESYS ENGENHARIA
Pgina 88
PAVESYS ENGENHARIA
Pgina 89
PAVESYS ENGENHARIA
Pgina 90
Pgina 91
Tinta Provisria
A pintura provisria prevista aps a execuo da restaurao do pavimento
dever ser implantada imediatamente aps o trmino do servio, evitando-se que
segmentos rodovirios permaneam sem sinalizao horizontal.
As linhas de bordo, as linhas de continuidade e as linhas de diviso de fluxo
de mesmo sentido, sero na cor branca com largura 0,10 m. As linhas utilizadas para
diviso de fluxos de sentidos opostos, sero na cor amarela, com largura de 0,10 m.
As demarcaes tero as seguintes cadncias:
- Nas bordas da pista, onde est prevista pintura de linha contnua
branca no projeto final, a pintura provisria ter a cadncia 3,00 m x 6,00 m;
- No eixo da pista, a pintura ter cadncia 3,00 m x 13,00 m.
Ser utilizada tinta preta para recobrimento da sinalizao horizontal existente
no eixo.
7.4) Equipamentos
PAVESYS ENGENHARIA
Pgina 92
Tachas
So delineadores constitudos de superfcie refletoras aplicadas a suportes
com dimenses de 100 mm (97) x 100 mm, fixadas ao pavimento atravs colas
apropriadas, do tipo Epoxi.
- Cores:
As tachas sero em cor coerentes com a da Linha a que se est conjugando
e tero seus refletores nas seguintes cores:
Linhas de bordo: Bidirecional branco/vermelho;
Linhas do eixo: Bidirecional amarelo.
- Cadncias:
Em tangente: 16,00 m x 16,00 m;
Em curva: 8,00 m x 8,00 m;
Antes de O.A.E. (150 m): 4,00 m x 4,00 m.
Taches
So delineadores constitudos de superfcies refletoras aplicadas a suportes
com dimenses de 250 x 150mm, fixadas ao pavimento atravs de pinos e colas
apropriadas.
- Cores
PAVESYS ENGENHARIA
Pgina 93
- Cores:
Os refletivos prismticos sero na cor amarelo.
- Cadncias:
Refletivos monodirecionais de 4 em 4 m.
Balizadores
Os balizadores so dispositivos auxiliares de percurso, posicionados
lateralmente rodovia, dotados de unidade refletora capaz de refletir a luz de faris a
uma distncia de 300m de forma a indicar aos usurios o alinhamento da borda da via
em segmentos rurais. Os balizadores tm a forma circular de 100mm de dimetro e
altura de 1,00m, com pelcula refletiva nas cores branco/vermelhos.
Ser implantado no interior dos canteiros que formam as intersees e
retorno, seu posicionamento est indicado em planta.
Pgina 94
Especificaes de Servio
Generalidades
Os servios de sinalizao devero estar de acordo com os seguintes
documentos:
-Lei N 9.503 de 23.09.97 CONTRAN
-Resolues 160/04, 180/05, 561/80 e 236/07 CONTRAN;
-Manual de Sinalizao Rodoviria DAER/2006;
Sinalizao de Obras
Os sinais visam orientao dos usurios, informando-os sobre as condies
de trafego da rodovia nos locais onde possa existir perigo de acidentes e levando-os a
refletir da necessidade de dirigir seus veculos com maior precauo, atentos s
informaes contidas nos sinais do trecho que esta sendo percorrido.
A sinalizao de trechos em obra dever utilizar:
-Sinais de Regulamentao Especiais: usando para informar que o trnsito
proibido a partir de certo ponto da rodovia e para indicar o peso Maximo total
permitido, velocidade no trecho, sentido obrigatrio e reas que so proibidos parar e
estacionar.
PAVESYS ENGENHARIA
Pgina 95
PAVESYS ENGENHARIA
Pgina 96
PAVESYS ENGENHARIA
Pgina 97
Impantao
- Os componentes das defensas no podem apresentar arestas ou cantos
vivos voltados contra o fluxo do trfego. Os elementos de fixao devem estar atrs de
lminas e se, ainda, houver possibilidade de atingir pessoas ou veculos, devem ter
suas formas baixas e arredondadas.
- Os postes das defensas devem ser enterrados 1.100 mm em aterros
compactados, No caso de fixao em taludes, ou terrenos muito ondulados, os postes
devem ter comprimentos compatvel com esta exigncia.
- As defensas metlicas deve, ter os postes cravados no solo, por precesso
de percursso, assegurando um adequado atrito lateral.
- As lminas de uma defensa no podem ser instaladas a menos de 0,50 m
da borda da pista de rolamento.
- O incio da defensa, nos dois sentidos de trfego, dever formar um ngulo
de 20 com o alinhamento externo da pista e o ponto que dever ser protegido.
PAVESYS ENGENHARIA
Pgina 98
8. Quantitativos
Neste captulo so apresentados os quantitativos associados aos projetos de
pavimentao, drenagem e sinalizao, respectivamente.
Conforme solicitado pelo DAER, com relao ao projeto de sinalizao, so
apresentados somente os quantitativos relacionados sinalizao de obra/provisria.
O restante dos quantitativos sero apresentados na Fase B deste projeto.
Os quantitativos associados s solues adotadas so apresentados conforme
formato solicitado pelo DAER. Para compensar eventuais alteraes referente
intersees, tapers, superlarguras, solues de acostamentos em curvas e outros, os
quantitativos de km faixa foram majorados em 5%, conforme acordado com a
fiscalizao do DAER.
Foi previsto o servio Roada Mecnica na largura de 2,5 metros para cada
lado da via, a partir do bordo da faixa de acostamento, a fim de proporcionar maior
visibilidade da sinalizao vertical (por consequncia, maior segurana aos usurios),
limpeza e funcionamento adequado de todos os elementos de drenagem (bueiros,
valetas, sarjetas, etc.).
As estimativas de reparos localizados foram definidas com base nos
levantamentos realizados, considerando-se uma possvel evoluo dos defeitos entre
o projeto e a execuo da obra. Este procedimento no isenta a empresa responsvel
pela obra de realizar uma avaliao logo antes da execuo dos servios para
possveis ajustes.
PAVESYS ENGENHARIA
Pgina 99
QUADRO DE QUANTIDADES
RODOVIA: ERS-168
TRECHO: Bossoroca - Entr. BRS-285(A)/ERS-165 (So Luiz Gonzaga)
SRE: 168ERS0030
EXT.: 11,97 km
ITEM
CDIGO
1
1,1
1,2
1,3
1,4
1,5
1,6
1,7
1,8
1,9
1,10
1,11
1,12
1,13
1,14
1,15
DESCRIO
UNIDADE
QUANTIDADE
PAVIMENTAO
861
8010
881
918
883
885
897
8091
7999
894
7999
546
6510
6520
6530
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
7,268.52
7,268.52
36,342.60
36,061.20
200,636.10
15,025.50
6,190.48
325.84
6,516.32
614.09
614.09
9,004.19
56.70
1,047.82
166.32
Os valores das DMTs de pavimentao (considerando Fases A e B) esto apresentados no Volume 1 do projeto da Fase B.
2
2,1
2,2
2,3
2,4
2,5
2,6
2,7
2,8
2,9
2,10
2,11
2,12
2,13
2,14
2,15
2,16
2,17
2,18
2,19
2,20
2,21
2,22
2,23
2,24
2,25
DRENAGEM
9230
1030
1000
1060
1081
1083
2514
2514
2514
9214
9213
2274
3160
3180
129
131
9211
9210
1230
1260
1350
2370
2460
2500
2461
ha
m3
m3
m3
m3
m3
m
m
m
unid
unid
unid
m3
m3
m3
m3
m
m
m
m
m
m
unid
m
unid
6.28
70.00
4,380.00
43.00
1.00
21.00
1.00
145.00
1.00
3,390.00
10,050.00
350.00
2,950.00
7.00
30.00
6.00
SINALIZAO
SINALIZAO LINHA GERAL
3,1
7276
7283
7287
unid
unid
m
8.00
2.00
5.18
7288
unid
unid
unid
unid
m
6.00
6.00
8.00
2.00
20.84
7320
unid
36.00
Dispositivos de Canalizao
Cones
Luz Intermitente
Barreira Classe II (1,00 x 1,20)
Barreira Classe III (1,00 x 1,20)
unid
unid
m
m
32.00
10.00
125.00
9.00
77.24
3,1,1
3,1,2
3,1,3
7741
3,673.61
1,259.55
SINALIZAO INTERSEES
3,2
3,2,1
7276
7283
4
4,1
4,2
4,3
4,4
4,5
4,6
m
m
15.43
ton
ton
ton
ton
ton
ton
973.84
113.92
67.67
43.61
973.84
225.20
MATERIAIS ASFLTICOS
9174
9172
9169
9175
8004
8003
PAVESYS ENGENHARIA
Pgina 100
Anexo A Estaqueamento
PAVESYS ENGENHARIA
Pgina 101
Anexo B Sondagens
PAVESYS ENGENHARIA
Pgina 121
PAVESYS ENGENHARIA
Pgina 124
PAVESYS ENGENHARIA
Pgina 127
PAVESYS ENGENHARIA
Pgina 130
PAVESYS ENGENHARIA
Pgina 144
PAVESYS ENGENHARIA
Pgina 149
PAVESYS ENGENHARIA
Pgina 158
Anexo I ARTs
PAVESYS ENGENHARIA
Pgina 248
9. Termo de Encerramento
Este documento, contendo o Volume 1 (Relatrio de Projeto) est numerado
eletronicamente da pgina 1 a pgina 258.
PAVESYS ENGENHARIA
Pgina 258