Você está na página 1de 14

CUADRO DE RESUMEN DE METRADOS- PAVIMENTO

OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
ITEM PARTIDAS UND TOTAL
01 OBRAS PROVISIONALES
01.01 CARTEL PARA OBRA DE 7.20x3.60 m. (GIGANTOGRAFIA) c/bast.madera de 2"x2" und 6.00
01.02 CILINDROS DE ALMACENAMIENTO DE AGUA und 44.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS A OBRA VJE 2.00
01.04 TRANSPORTE DE MATERIALES Ton 2,217.00
01.05 EXCAVACION DE ZANJA P/DRENAJE AUXILIAR M3 381.72
01.06 SUMINISTRO E INSTALACION PROVISIONAL DE TUBERIA PVC UF Ø 160mm, drenaje residual M 3,180.96
01.07 CONEXION DOMICILIARIA PROVISIONAL CON TUBERIA Ø 160 mm., drenaje residual UND 459.00
01.08 SUMINISTRO E INST. PROVISIONAL DE TUBERIA PVC SAP Ø 1/2", red agua potable M 4,810.80
01.09 CONEXION DOMICILIARIA PROVISIONAL DE AGUA POTABLE Ø 1/2" PTO 460.00
02 PAVIMENTACION
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 m3 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### 29.70
CUADRO DE RESUMEN DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### 18.00
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
04.01.09.03.01 SUMINISTRO E INSTALACION DE SUMIDERO PARA DRENAJE PLUVIAL ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
CUADRO DE RESUMEN DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
CUADRO DE RESUMEN DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
CUADRO DE RESUMEN DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
CUADRO DE RESUMEN DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
02.05 SECTOR 05: NAUTA
02.05.01 TRABAJOS PRELIMINARES
02.05.01.01 LIMPIEZA DE TERRENO MANUAL, con herramientas manuales m2 8,677.69
02.05.01.02 TRAZO NIVELES Y REPLANTEO (con teodolito o nivel) m2 8,677.69
02.05.01.03 REUBICACION DE POSTES DE MORTERO und 1.00
02.05.01.04 DEMOLICION DE VEREDAS EXISTENTES M2. 4,057.28
02.05.01.05 DEMOLICION DE PAVIMENTO RIGIDO E=0.20m M2. 2,945.63
02.05.01.06 ACARREO DE MATERIAL PRODUCTO DE LA DEMOLICION M3. 994.85
02.05.01.07 BOMBEO DE AGUAS PLUVIALES C/MOTOBOMBA M3 405.00
02.05.02 MOVIMIENTO DE TIERRA
02.05.02.01 CORTES Y EXCAVACIONES
02.05.02.01.01 CORTE DE TERRENO A NIVEL DE SUB RASANTE, CON MAQUINARIA M3. 1,417.01
02.05.02.01.02 CORTE DE TERRENO A NIVEL DE SOBRE EXCAVACION, CON MAQUINARIA M3. 1,134.99
02.05.02.02 NIVELACIONES
02.05.02.02.01 CONFORMACION A NIVEL DE SUB RASANTE, CON MAQUINARIA m2 8,677.69
02.05.02.03 RELLENOS
02.05.02.03.01 RELLENO EN SOBRE EXCAVACION DEBAJO DE SUB RASANTE CON MATERIAL DE PRESTAMO m3 914.59
02.05.02.03.02 SUB RASANTE MEJORADA CON MATERIAL DE PRESTAMO m3 481.86
02.05.02.04 ELIMINACIONES
02.05.02.04.01 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUINA m3 3,190.00
02.05.03 MORTERO SIMPLE
02.05.03.01 SOLADO MEZCLA 1:8 e=2" vaceado con carretilla m2 4,011.31
02.05.04 PAVIMENTO RIGIDO
02.05.04.01 LOSA DE RODADURA, MORTERO f`c=210 Kg/cm2 e=0.20 m m3 413.19
02.05.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE RODADURA, en damero m2 158.75
02.05.04.03 SOPORTE P/ PASADORES DE FIERRO LISO Ø 1/4" EN JUNTAS DE CONTRACCION KG 164.16
02.05.04.04 PASADORES DE FIERRO LISO Ø 5/8" kg 1,440.96
02.05.04.05 PASADORES DE FIERRO CORRUGADO DE 1/2" kg 465.12
02.05.04.06 ESPIGA DE FIJACION DE TUBO DE PVC Ø 3/4" PARA JUNTA DE DILATACION und 912.00
02.05.04.07 CURADO DE LOSAS DE RODADURA m2 90.00
02.05.05 JUNTAS
02.05.05.01 ASERRADA DE JUNTAS DE CONTRACCION m 858.00
CUADRO DE RESUMEN DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
02.05.05.02 RELLENO DE JUNTA DE DILATACION DE 1"x 2" CON MORTERO ASFALTICO Y TECKNOPORT 1"x 6" m 375.60
02.05.05.03 RELLENO DE JUNTA DE CONTRACCION DE 1"x 2" CON MORTERO ASFALTICO m 858.00
02.05.05.04 RELLENO DE JUNTA DE ARTICULACION LONGITUDINAL DE 1"x 2" @ 3.00m m 364.14
02.05.06 VEREDAS
02.05.06.01 MOVIMIENTO DE TIERRA
02.05.06.01.01 EXCAVACION DE ZANJA MANUAL m3 345.75
02.05.06.01.02 NIVELACION REGLADO Y APISONADO MANUAL M2. 1,430.68
02.05.06.01.03 CAPA ANTICONTAMINANTE DE ARENA m3 143.07
02.05.06.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUINA m3 414.90
02.05.06.02 MORTERO SIMPLE
02.05.06.02.01 MORTERO f'c = 175 Kg/cm2 EN VEREDAS M3. 202.68
02.05.06.02.02 ENCOFRADO Y DESENCOFRADO (Veredas) M2. 572.41
02.05.06.03 VARIOS
02.05.06.03.01 CURADO DE VEREDA con material de prestamo m2 1,430.68
02.05.06.03.02 RELLENO DE JUNTA DE CONSTRUCCION O AISLAMIENTO DE 1"x4" ml 477.60
02.05.07 SARDINELES Y CUNETAS
02.05.07.01 MOVIMIENTO DE TIERRA
02.05.07.01.01 EXCAVACION DE ZANJA MANUAL m3 36.80
02.05.07.01.02 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUINA m3 44.16
02.05.07.02 MORTERO ARMADO
02.05.07.02.01 MORTERO f'c=175 Kg/cm2 PARA SARDINELES y CUNETAS m3 196.25
02.05.07.02.02 ENCOFRADO Y DESENCOFRADO (sardinel y cunetas) M2. 1,962.48
02.05.07.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 (Ø 3/8") Incluye Colocado +5% Desperdicios kg 7,336.11
02.05.07.03 VARIOS
02.05.07.03.01 TARRAJEO PULIDO EN ESTRUCTURAS Mortero 1:5 e = 1.5 cm M2. 940.36
02.05.07.03.02 RELLENO DE JUNTA DE CONSTRUCCION O AISLAMIENTO DE 1"x4" m 109.20
02.05.08 SUMIDEROS
02.05.08.01 MOVIMIENTO DE TIERRA
02.05.08.01.01 EXCAVACION DE ZANJA MANUAL m3 43.31
02.05.08.01.02 REFINE Y NIVELACION DE ZANJA m2 28.88
02.05.08.01.03 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUINA m3 56.31
02.05.08.02 MORTERO SIMPLE
02.05.08.02.01 SOLADO MEZCLA 1:8 e=2" vaceado con carretilla m2 17.60
02.05.08.03 MORTERO ARMADO
02.05.08.03.01 SUMINISTRO E INSTALACION DE SUMIDERO PARA DRENAJE PLUVIAL und 55.00
02.05.08.03.02 DADO DE MORTERO f'c=175 Kg/cm2 m3 4.46
02.05.08.03.03 ENCOFRADO Y DESENCOFRADO (dados) M2. 26.40
02.05.08.04 VARIOS
02.05.08.04.01 SUMINISTRO E INSTALACION DE TUBERIAS ISO 4435 - UF DN= 160 mm. CONEXION DE SUMIDERO und 55.00
02.05.09 SEÑALIZACION
02.05.09.01 SEÑALIZACION HORIZONTAL
02.05.09.01.01 PINTADO DE PAVIMENTOS ( LINEA DISCONTINUA ) m 1,035.00
02.05.09.01.02 PINTADO DE PAVIMENTOS ( SIMBOLOS Y LETRAS ) m2 546.15
02.05.09.01.03 PINTADO DE SARDINELES ML. 1,635.40
02.05.09.02 SEÑALIZACION VERTICAL
02.05.09.02.01 SEÑALES PREVENTIVAS und 68.00
02.05.10 OBRAS DE JARDINERIA
02.05.10.01 SEMBRADO DE GRASS m2 10,732.59
02.05.10.02 SEMBRADO DE PLANTAS ORNAMENTALES und 722.00
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
CUADRO DE RESUMEN DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509
Err:509 Err:509 ### Err:509
03 LIMPIEZA FINAL DE OBRA
03.01 LIMPIEZA FINAL DE OBRA m2 49,072.63
03.02 PLACA RECORDATORIA DE BRONCE DE 0.40 x 0.60m, Incluye base de mortero armado UND 1.00
HOJA DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA CIUDAD DE IQUITOS, DISTRITO DE
IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
ITEM PARTIDAS UND CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL
01 OBRAS PROVISIONALES
460.00 460.00
02 PAVIMENTACION
02.05 SECTOR 05: NAUTA
02.05.01 TRABAJOS PRELIMINARES
02.05.01.01 LIMPIEZA DE TERRENO MANUAL, con herramientas manuales m2 8,677.69
SECTOR 05:. NAUTA 2,740.81
psj. Brasilia (Tramo III) entre Av. San Antonio - Ca. Pablo Rosell 1.00 297.75 6.00 1,786.50
psj. Breña (Tramo II) entre Av. San Antonio - Psj Melanie 1.00 249.51 4.50 1,122.80
psj. K (Tramo III) entre Av San Antonio - Jr. Arequipa 1.00 128.10 6.00 768.62
psj. Romulo Espinal (Tramo II) entre ca. Cuzco 1.00 45.89 5.60 256.98
02.05.01.02 TRAZO NIVELES Y REPLANTEO (con teodolito o nivel) m2 area= 8,677.69
Viene del Item 04.05.01.01 LIMPIEZA DE TERRENO MANUAL, con herramientas manuales 1.00 8,677.69 8,677.69

02.05.01.03 REUBICACION DE POSTES DE MORTERO und 1.00


MEJORAM. VIAS CA. NAUTA
psj. Breña Breña Tramo 2 prog. 0+145 - izquierda 1.00 1.00

02.05.01.04 DEMOLICION DE VEREDAS EXISTENTES M2. 1.00 area= 4,057.28


MEJORAM. VIAS CA. NAUTA
Psj. Brasilia tramo 3 1.00 121.84 121.84
Psj. Brasilia tramo 4 1.00 64.34 64.34
m2 e=0.10 m m3
calculo para acarreo en M3 1.00 4,057.28 0.10 405.73

02.05.01.05 DEMOLICION DE PAVIMENTO RIGIDO E=0.20m M2. area= 2,945.63


MEJORAM. VIAS CA. NAUTA
intersecion de la ca. Cusco tramo I y ca. Nauta tramo II] 1.00 147.85 147.85
intersecion de la ca. Union tramo II y ca. Pantoja 1.00 8.14 8.14

MEJORAM. VIAS - REPOSICION PAVIMENTO


Ca. Las Castañas (entre Ca. Yavari / Av. San Antonio) 1.00 387.45 7.20 2,789.64

m2 e=0.20 m m3
calculo para acarreo en M3 1.00 2,945.63 0.20 589.13

02.05.01.06 ACARREO DE MATERIAL PRODUCTO DE LA DEMOLICION M3. 994.85


viene del item 04.05.01.04 DEMOLICION DE VEREDAS EXISTENTES 1.00 405.73 405.73
viene del item 04.05.01.05 DEMOLICION DE PAVIMENTO RIGIDO E=0.20m 1.00 589.13 589.13

02.05.01.07 BOMBEO DE AGUAS PLUVIALES C/MOTOBOMBA M3 405.00


1.00 405.00 405.00
1.5 m3 al dia x 540 dias calendarios
es igual a =810 m3
entre 2
es igual a= 405 m3

02.05.02 MOVIMIENTO DE TIERRA


02.05.02.01 CORTES Y EXCAVACIONES
02.05.02.01.01 CORTE DE TERRENO A NIVEL DE SUB RASANTE, CON MAQUINARIA M3. 1,417.01
(ver planilla de metrado de movimiento de tierra) VOLUMEN= 1,417.01 1,417.01
(de excavacion de sub razante)

02.05.02.01.02 CORTE DE TERRENO A NIVEL DE SOBRE EXCAVACION, CON MAQUINARIA M3. 1,134.99
(ver planilla de metrado de movimiento de tierra) VOLUMEN= 1,134.99 1,134.99
(de sobre-excavacion)

02.05.02.02 NIVELACIONES
02.05.02.02.01 CONFORMACION A NIVEL DE SUB RASANTE, CON MAQUINARIA m2 area= 8,677.69
Area de Pavimentacion 1.00 8,677.69 8,677.69
Area de Bocacalles 1.00 0.00 0.00
SECTOR 05:. NAUTA

02.05.02.03 RELLENOS
02.05.02.03.01 RELLENO EN SOBRE EXCAVACION DEBAJO DE SUB RASANTE CON MATE m3 914.59
(ver planilla de metrado de movimiento de tierra) VOLUMEN= 914.59 914.59
(de sobre-excavacion)

02.05.02.03.02 SUB RASANTE MEJORADA CON MATERIAL DE PRESTAMO m3 481.86


(ver planilla de metrado de movimiento de tierra) VOLUMEN= 481.86 481.86
(de Excv. De sub Razante)

02.05.02.04 ELIMINACIONES
02.05.02.04.01 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUIN m3
Viene del Item 04.05.02.01.01 CORTE DE TERRENO A NIVEL DE SUB RASANTE, CON
3,190.00
1.25 1,417.01 1,771.26
MAQUINARIA
viene del Item 04.05.02.01.02 CORTE DE TERRENO A NIVEL DE SOBRE EXCAVACION, CON 1.25 1,134.99 1,418.74
MAQUINARIA

02.05.03 MORTERO SIMPLE


02.05.03.01 SOLADO MEZCLA 1:8 e=2" vaceado con carretilla m2 4,011.31
EN PAVIMENTOS:
psj. Brasilia (Tramo III) entre Av. San Antonio - Ca. Pablo Rosell 1.00 297.75 6.00 1,786.50
psj. Breña (Tramo II) entre Av. San Antonio - Psj Melanie 1.00 249.51 4.50 1,122.80
psj. K (Tramo III) entre Av San Antonio - Jr. Arequipa 1.00 128.10 6.00 768.60
psj. Romulo Espinal (Tramo II) entre ca. Cuzco 1.00 45.89 5.60 256.98
EN MARTILLOS:
SECTOR 05:. NAUTA
psj. Brasilia (Tramo III) entre Av. San Antonio - Ca. Pablo Rosell 1.00 76.43 76.43
psj. K (Tramo III) entre Av San Antonio - Jr. Arequipa 1.00 0.00 0.00

02.05.04 PAVIMENTO RIGIDO


02.05.04.01 LOSA DE RODADURA, MORTERO f`c=210 Kg/cm2 e=0.20 m m3 413.19
Viene del Item. 04.05.02.02.01 CONFORMACION A NIVEL DE SUB RASANTE, CON
MAQUINARIA
Psj. Brasilia tramo III. 1.00 101.53 6.00 0.20 121.84
uñas para pavimentos area de uña
long. De sardineles 2.00 101.53 0.07 14.21
Psj. Brasilia tramo IV 1.00 90.00 6.00 0.20 108.00
uñas para pavimentos area de uña
long. De sardineles 2.00 90.00 0.07 12.60
Psj. Breña tramo II. 1.00 128.47 6.00 0.20 154.16
uñas para pavimentos area de uña
long. De sardineles 2.00 17.00 0.07 2.38
02.05.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE RODADURA, en damero m2 158.75
JUNTAS DE ARTICULACIÓN
psj. Breña (Tramo II) entre Av. San Antonio - Psj Melanie 1.00 128.47 0.20 25.69
psj. Romulo Espinal (Tramo II) entre ca. Cuzco 1.00 44.14 0.20 8.83
Psj. Brasilia tramo III 1.00 101.53 0.20 20.31
Psj. Brasilia tramo IV 1.00 90.00 0.20 18.00
LONG. TOTAL 364.14

JUNTAS DE DILATACIÓN
psj. Brasilia (Tramo III) entre Av. San Antonio - Ca. Pablo Rosell 33.00 6.00 0.20 39.60
psj. Breña (Tramo II) entre Av. San Antonio - Psj Melanie 12.00 4.50 0.20 10.80
psj. Romulo Espinal (Tramo II) entre ca. Cuzco 6.00 5.60 0.20 6.72
Psj. Brasilia tramo IV 24.00 6.00 0.20 28.80
02.05.04.03 SOPORTE P/ PASADORES DE FIERRO LISO Ø 1/4" EN JUNTAS DE CONTRACC KG 164.16
JUNTAS DE DILATACIÓN # veces cant long m/kg
psj. Brasilia (Tramo III) 2.00 792.00 0.18 0.25 71.28
ca. Breña (Tramo II) 2.00 288.00 0.18 0.25 25.92
psj. Romulo Espinal (Tramo II) 2.00 144.00 0.18 0.25 12.96
Psj. Brasilia tramo IV 2.00 600.00 0.18 0.25 54.00
psdr total= 1,824.00

02.05.04.04 PASADORES DE FIERRO LISO Ø 5/8" kg 1,440.96


JUNTAS DE DILATACIÓN # veces cant long kg/m
Viene del Item. SOPORTE P/ PASADORES DE FIERRO
cant. Total de pasador 1.00 1,824.00 0.50 1.58 1,440.96
HOJA DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA CIUDAD DE IQUITOS, DISTRITO DE
IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
ITEM PARTIDAS UND CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL
02.05.04.05 PASADORES DE FIERRO CORRUGADO DE 1/2" kg 465.12
Viene del Item 04.05.04.03 SOPORTE P/ PASADORES DE FIERRO LISO Ø 1/4" EN JUNTAS DE
# veces cant long kg/m
CONTRACCION
Longitud de juntas de Articulacion entre espacio del pasador 1.00 912.00 0.50 1.02 465.12

02.05.04.06 ESPIGA DE FIJACION DE TUBO DE PVC Ø 3/4" PARA JUNTA DE DILATACION und 912.00
JUNTAS DE DILATACIÓN # veces cant long

cant. Total de pasador 1.00 1,824.00 0.50 912.00

02.05.04.07 CURADO DE LOSAS DE RODADURA m2 90.00


Viene del Item. 04.05.02.02.01 CONFORMACION A NIVEL DE SUB RASANTE, CON
area=
MAQUINARIA
Area de pavimento 1.00 0.00 0.00
Area de bocacalles 1.00 90.00 90.00
02.05.05 JUNTAS
02.05.05.01 ASERRADA DE JUNTAS DE CONTRACCION m 858.00
JUNTAS DE CONTRACCION
Psj. Brasilia Tramo IV 29.00 6.00 174.00
Psj. Brasilia Tramo III 58.00 6.00 348.00
Ca Breña Tramo II 56.00 4.50 252.00
psj. Romulo Espinal (Tramo II) 15.00 5.60 84.00
lng. Totl 858.00
02.05.05.02 RELLENO DE JUNTA DE DILATACION DE 1"x 2" CON MORTERO ASFALTICO Y m 375.60

JUNTAS DE DILATACIÓN
Psj. Brasilia Tramo III 15.00 6.00 90.00
Psj. Brasilia Tramo IV 33.00 6.00 198.00
Ca Breña Tramo II 12.00 4.50 54.00
psj. Romulo Espinal (Tramo II) 6.00 5.60 33.60

02.05.05.03 RELLENO DE JUNTA DE CONTRACCION DE 1"x 2" CON MORTERO ASFALTICO m 858.00
Viene del Item 04.05.05.01 ASERRADA DE JUNTAS DE CONTRACCION
long. Total de aserrada de jntas de contraccion 1.00 858.00 858.00

02.05.05.04 RELLENO DE JUNTA DE ARTICULACION LONGITUDINAL DE 1"x 2" @ 3.00m m 364.14


Viene del Item 04.05.04.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE RODADURA, en
damero
long. Total de junta de articulacion 1.00 364.14 364.14

02.05.06 VEREDAS
02.05.06.01 MOVIMIENTO DE TIERRA
02.05.06.01.01 EXCAVACION DE ZANJA MANUAL m3 345.75
Veredas LADO DERECHO
SECTOR 05:. NAUTA
psj. Brasilia (Tramo III) 1.00 139.24 1.20 0.20 33.42
psj. Brasilia (Tramo IV) 1.00 264.17 1.20 0.20 63.40
psj. Breña (Tramo II) 1.00 138.80 1.20 0.20 33.31
psj. Romulo Espinal (Tramo II) 1.00 45.86 1.20 0.20 11.01

Veredas LADO IZQUIERDO


SECTOR 05:. NAUTA
psj. Brasilia (Tramo III) 1.00 147.34 1.20 0.20 35.36
psj. Brasilia (Tramo IV) 1.00 273.65 1.20 0.20 65.68
psj. Breña (Tramo II) 1.00 137.21 1.20 0.20 32.93
psj. Romulo Espinal (Tramo II) 1.00 45.96 1.20 0.20 11.03
long= 1,192.23

long= area de uña=


Uñas 1.00 1,192.23 0.05 59.61
02.05.06.01.02 NIVELACION REGLADO Y APISONADO MANUAL M2. long= 1,430.68
Veredas 1.00 1,192.23 1.20 1,430.68
area=

02.05.06.01.03 CAPA ANTICONTAMINANTE DE ARENA m3 143.07


Viene del Item. 04.05.06.01.02 NIVELACION REGLADO Y APISONADO MANUAL area=
area total de veredas y martillos por altura 1,430.68 0.10 143.07

02.05.06.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUIN m3 414.90


Viene del Item. 04.05.06.01.01 EXCAVACION DE ZANJA MANUAL 1.00 1.20 345.75 414.90

02.05.06.02 MORTERO SIMPLE


02.05.06.02.01 MORTERO f'c = 175 Kg/cm2 EN VEREDAS M3. 202.68

Veredas long=
Veredas 1.00 1,192.23 1.20 0.10 143.07
long= area de uña=
Uñas 1.00 1,192.23 0.05 59.61

02.05.06.02.02 ENCOFRADO Y DESENCOFRADO (Veredas) M2. 572.41

veredas de ancho=1.20 m long=


Longitud total de veredas 2.00 1,192.23 0.20 476.89
Transversales 398.00 1.20 0.20 95.52

02.05.06.03 VARIOS
02.05.06.03.01 CURADO DE VEREDA con material de prestamo m2 1,430.68
Viene del Item 04.05.06.01.02 NIVELACION REGLADO Y APISONADO MANUAL
area total de verdas y martillos 1.00 1,430.68 1,430.68

02.05.06.03.02 RELLENO DE JUNTA DE CONSTRUCCION O AISLAMIENTO DE 1"x4" ml 477.60

Transversales 398.00 1.20 477.60

02.05.07 SARDINELES Y CUNETAS


02.05.07.01 MOVIMIENTO DE TIERRA
02.05.07.01.01 EXCAVACION DE ZANJA MANUAL m3 long. Sardi. 36.80
TOTAL LONG. SARDINEL: 1,635.40
SECTOR 05:. NAUTA
psj. Brasilia (Tramo III) 1.00 147.17 0.15 0.15 3.31
1.00 148.63 0.15 0.15 3.34
psj. Brasilia (Tramo IV) 1.00 363.75 0.15 0.15 8.18
1.00 364.66 0.15 0.15 8.20
psj. Breña (Tramo II) 1.00 261.78 0.15 0.15 5.89
1.00 257.60 0.15 0.15 5.80
psj. Romulo Espinal (Tramo II) 1.00 45.97 0.15 0.15 1.03
1.00 45.84 0.15 0.15 1.03

02.05.07.01.02 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUIN m3 44.16


1.00 1.20 36.80 44.16

02.05.07.02 MORTERO ARMADO


02.05.07.02.01 MORTERO f'c=175 Kg/cm2 PARA SARDINELES y CUNETAS m3 196.25
long. Sardi. Área Sard.
TOTAL LONG. SARDINEL 1.00 1,635.40 0.12 m2 196.25

02.05.07.02.02 ENCOFRADO Y DESENCOFRADO (sardinel y cunetas) M2. long. Sardi. 1,962.48

TOTAL LONG. SARDINEL 2.00 1,635.40 0.60 1,962.48

02.05.07.02.03 ACERO DE REFUERZO F'Y=4200 KG/CM2 (Ø 3/8") Incluye Colocado +5% Despe kg 7,336.11
Viene del Item 06.01.02.02 (EN SARDINEL) # veces cant long m/kg
refuerzo vertical @ 0.30m 1.00 5,453.00 0.82 0.58 2,593.45
refuerzo horizontal @ 0.20m 1.00 5.00 1,635.40 0.58 4,742.66

02.05.07.03 VARIOS
02.05.07.03.01 TARRAJEO PULIDO EN ESTRUCTURAS Mortero 1:5 e = 1.5 cm M2. 940.36
long. Sardi. anch. Tarraj
HOJA DE METRADOS- PAVIMENTO
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA CIUDAD DE IQUITOS, DISTRITO DE
IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA: OCTUBRE 2020
ITEM PARTIDAS UND CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL
TOTAL LONG. SARDINEL 1.00 1,635.40 0.575 940.36

02.05.07.03.02 RELLENO DE JUNTA DE CONSTRUCCION O AISLAMIENTO DE 1"x4" m 109.20

TOTAL LONG. SARDINEL @ 9.00m 1.00 182.00 0.60 109.20

02.05.08 SUMIDEROS
02.05.08.01 MOVIMIENTO DE TIERRA
02.05.08.01.01 EXCAVACION DE ZANJA MANUAL m3 43.31
SECTOR 05:. NAUTA
psj. Brasilia (Tramo III) 10.00 1.05 0.50 1.50 7.88
psj. Brasilia (Tramo IV) 25.00 1.05 0.50 1.50 19.69
psj. Breña (Tramo II) 16.00 1.05 0.50 1.50 12.60
psj. Romulo Espinal (Tramo II) 4.00 1.05 0.50 1.50 3.15
total= 55.00

02.05.08.01.02 REFINE Y NIVELACION DE ZANJA m2 28.88


cant. Sum=
55.00 1.05 0.50 28.88

02.05.08.01.03 ELIMINACION DE MATERIAL EXCEDENTE A DISTANCIA = 5 kM CON MAQUIN m3 56.31


volumen de corte 1.00 1.30 43.31 56.31

02.05.08.02 MORTERO SIMPLE


02.05.08.02.01 SOLADO MEZCLA 1:8 e=2" vaceado con carretilla m2 17.60
cant. Sum=
55.00 0.64 0.50 17.60

02.05.08.03 MORTERO ARMADO


02.05.08.03.01 SUMINISTRO E INSTALACION DE SUMIDERO PARA DRENAJE PLUVIAL und 55.00
cant. Sum=
55.00 55.00

02.05.08.03.02 DADO DE MORTERO f'c=175 Kg/cm2 m3 4.46


cant. Sum=
55.00 0.45 0.45 0.40 4.46

02.05.08.03.03 ENCOFRADO Y DESENCOFRADO (dados) M2. 26.40


cant. Sum= perimt.=
55.00 1.20 0.40 26.40

02.05.08.04 VARIOS
02.05.08.04.01 SUMINISTRO E INSTALACION DE TUBERIAS ISO 4435 - UF DN= 160 mm. und 55.00
cant. Sum=
55.00 55.00
PLANILLA DE METRADOS MOV. TIERRA SUB RASANTE
OBRA
MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA CIUDAD DE
IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA AGOSTO, 2020

MOVIMIENTO DE TIERRA TOTAL VOL.


CORTE DE TERRENO A NIVEL DE SUB RASANTE, CON MAQUINARIA 1,417.01
SUB RASANTE MEJORADA CON MATERIAL DE PRESTAMO 481.86

CORTE DE TERRENO 1,417.01


SECTOR 05 - CA. NAUTA SUB RASANTE 481.86

MOV. TIERR EXC. SUB RAZ.. 12


PLANILLA DE METRADOS MOV. TIERRA SUB RASANTE
OBRA
MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA CIUDAD DE
IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA AGOSTO, 2020

AREA M2 VOL. M3
PROG. DIST.
AC AR VC VR
PSJE. BRASILIA TRAMO III (AV SAN ANTONIO/CA PABLO ROSSEL)
0 + 000.00 0.00 3.95 1.59 0.00 0.00
0 + 020.00 20.00 3.92 1.59 78.70 31.80
0 + 040.00 20.00 3.56 1.59 74.80 31.80
0 + 060.00 20.00 3.90 1.6 74.60 31.90
0 + 080.00 20.00 4.82 1.6 87.20 32.00
0 + 100.00 20.00 7.17 1.6 119.90 32.00
0 + 120.00 20.00 5.75 2.04 129.20 36.40
0 + 140.00 20.00 3.17 1.6 89.20 36.40
0 + 160.00 20.00 4.34 1.6 75.10 32.00
0 + 180.00 20.00 5.91 1.6 102.50 32.00
0 + 200.00 20.00 5.05 1.6 109.60 32.00
0 + 220.00 20.00 3.89 1.6 89.40 32.00
0 + 240.00 20.00 6.10 1.59 99.90 31.90
0 + 260.00 20.00 6.38 1.6 124.80 31.90
0 + 280.00 20.00 3.99 1.69 103.70 32.90
0 + 297.75 17.75 2.59 1.11 58.41 24.86
TOTAL 1,417.01 481.86

MOV. TIERR EXC. SUB RAZ.. 13


PLANILLA DE METRADOS MOV. TIERRA DE SOBRE EXCAVACION
OBRA MEJORAMIENTO DE LAS VIAS DE INTERCONEXIÓN EN EL AMBITO DEL AA.HH. SAN ANTONIO - ZONA NORTE DE LA
CIUDAD DE IQUITOS, DISTRITO DE IQUITOS - PROVINCIA DE MAYNAS - DEPARTAMENTO DE LORETO
FECHA AGOSTO, 2020
MOVIMIENTO DE TIERRA TOTAL VOL.
CORTE DE TERRENO A NIVEL DE SOBRE EXCAVACION, CON MAQUINARIA 1,134.99
CORTE DE TERRENO A NIVEL DE SOBRE EXCAVACION, MANUAL #REF!
RELLENO EN SOBRE EXCAVACION DEBAJO DE SUB RAZANTE CON MATERIAL DE PRESTAMO 914.59

CORTE SOBRE EXCAVACION 1,134.99


SECTOR 05 - CA. NAUTA RELLENO DE SOBRE EXCAVACION 914.59
AREA M2 VOL. M3
PROG. DIST.
AC AR VC VR
PSJE. BRASILIA TRAMO III (AV SAN ANTONIO/CA PABLO ROSSEL)
0 + 000.00 0.00 4.14 3.26 0.00 0.00
0 + 020.00 20.00 4.01 3.16 81.50 64.20
0 + 040.00 20.00 4.48 3.53 84.90 66.90
0 + 060.00 20.00 4.08 3.21 85.60 67.40
0 + 080.00 20.00 3.29 2.59 73.70 58.00
0 + 100.00 20.00 0.91 0.72 42.00 33.10
0 + 120.00 20.00 4.29 3.52 52.00 42.40
0 + 140.00 20.00 8.10 6.5 123.90 100.20
0 + 160.00 20.00 4.21 3.32 123.10 98.20
0 + 180.00 20.00 2.23 1.76 64.40 50.80
0 + 200.00 20.00 3.25 2.56 54.80 43.20
0 + 220.00 20.00 4.87 4.41 81.20 69.70
0 + 240.00 20.00 1.97 1.97 68.40 63.80
0 + 260.00 20.00 4.15 3.26 61.20 52.30
0 + 280.00 20.00 3.82 2.82 79.70 60.80
0 + 297.75 17.75 2.78 2.09 58.59 43.59
TOTAL 1,134.99 914.59