Você está na página 1de 8

TANCAGEM DE DIESEL - CAUÊ

Dz = 52.00 mcA

TRECHO vazão Dimensões da Tubulação L.Real QUANT. PEÇAS P/ COMPRIMENTO SINGULAR L.Singular v Re D/k f L.Total Dp

SAÍDA TUB.
CURVA 90º

CURVA 45º

REDUÇÃO
ENT. TUB.
nom. DIÂM. ESCOLH IDO Sche-

T RAMAL
T RETO
V. BOR.
V. GAV.

V. GLO.

V. RET.

V. ESF.
NÓi m3/h (POL) INT. (m) dule (M) (M) (M/S) (M) (MCA)

01-02 50.4 4 0.15405 ST 90.0 2 1 10.2 0.75 115711 3349 0.0280 100.17 0.52
02-03 50.4 4 0.12819 ST 120.0 4 2 1 1 3 2 42.3 1.08 139050 2787 0.0280 162.30 2.13
03-04 50.4 4 0.12819 ST 11.0 1 1 1 1 18.5 1.08 139050 2787 0.0280 29.46 0.39
04-05 50.4 4 0.12819 ST 7.5 1 1.9 1.08 139050 2787 0.0280 9.42 0.12
05-06 50.4 4 0.12819 ST 16.0 1 3.8 1.08 139050 2787 0.0280 19.85 0.26
06-07 50.4 4 0.12819 ST 10.0 1 1 2.7 1.08 139050 2787 0.0280 12.69 0.17
07-08 50.4 4 0.12819 ST 23.0 1 1 4.5 1.08 139050 2787 0.0280 27.49 0.36
08-09 50.4 4 0.12819 ST 21.0 1 1.9 1.08 139050 2787 0.0280 22.92 0.30
09-10 50.4 4 0.12819 ST 15.5 1 1.9 1.08 139050 2787 0.0280 17.42 0.23
10-11 50.4 4 0.12819 ST 2.5 1 3.8 1.08 139050 2787 0.0280 6.35 0.08
11-12 50.4 4 0.12819 ST 0.0 1 1 6.4 1.08 139050 2787 0.0280 6.41 0.08
12-13 50.4 4 0.12819 ST 8.5 1 1.9 1.08 139050 2787 0.0280 10.42 0.14
13-14 50.4 4 0.12819 ST 23.0 1 1 6.4 1.08 139050 2787 0.0280 29.41 0.39
14-15 50.4 4 0.12819 ST 0.0 1.08 139050 2787 0.0280 0.00 0.00
15-16 50.4 4 0.12819 ST 0.0 1.08 139050 2787 0.0280 0.00 0.00

14-15 70.2 6 0.15405 ST 1 1 7.7 1.05 161170 3349 0.0280 7.70 0.08
PERDA DE CARGA TOTAL (mca) H = 5.16
ALTURA MANOMÉTRICA TOTAL (mca) AMT = 57.16
-

CÁLCULO DA POTÊNCIA NO EIXO :

VAZÃO ADOTADA (m3/h): 50.40 Amt= Pc suc + Pc Rec + Dg + Pc mang + Pc esg + Pc st + P proj (mca)

05/11/2024 16:19:06 1
ALTURA MANOMÉTRICA (mca): 57.16 Pc suc perda de carga na sucção 1.08
DENSIDADE DO FLUIDO (kgf/m3): 1,000.00 Pc rec perda de carga no recalque 1.71
RENDIMENTO TOTAL: 0.65 Dg desnível geométrico -5.00
Pc mang perda de carga na mangueira 3.00
N = 16.42 CV Pc esg perda de carga no esguicho 4.20

05/11/2024 16:19:06 2
PROJETO DE PREVENÇÃO E COMBATE A INCÊNDIO

OBRA : _________________________ CLIENTE :_____________________________

MEMORIAL DE CÁLCULOS DO SISTEMA DE HIDRANTES

I - Hidrantes mais Desfavoráveis

1 - HIDRANTE HI-I

a - Pressão necessária no requinte : h1 = 54.0 mca


b - Vazão no requinte com a pressão necessária:
Q= 0.00423 m3/s = 254.00 l/min
c - Requinte : 13 mm

2 - HIDRANTE HI-2

a - Pressão necessária no requinte : h2 = 52.0 mca


b - Vazão no requinte com a pressão necessária:
Q= 0.00415 m3/s = 275.00 l/min
c - Requinte : 13 mm

3 - DESNÍVEL ENTRE BOMBA E HI-1 = 0.00

4- DESNÍVEL ENTRE HI-1 E HI-2 = 0.00

II - Perdas de Cargas

1 - POR TRECHOS

DIÂMETRO VAZÃO COMPRIM. COMP. COMP. PERDA PERDA


TRECHO EQUIV TOTAL UNIT. TOTAL OBS
(mm) (l / min) (m) (m) (m) (m / m) (mca)
AB 102.26 529.00 130.00 12.10 142.10 0.0136 1.9299 J1
BC 102.26 254.00 0.20 14.30 14.50 0.0035 0.0507 J2
BD 102.26 275.00 10.00 15.60 25.60 0.0040 0.1036 J3
MANG.
HI-1 38 254.00 15 - 15.00 0.3232 4.8480 J4
MANG.
HI-2 38 275.00 20 - 15.00 0.3112 4.6685 J5
ESG.
HI-1 38X13 254.00 - - - 2.1384 2.1384 J6
ESG. 38X13 275.00 - - - 2.0592 2.0592 J7
HI-2

2 - PERDA TOTAL

a - Até HI-1 : hf1 = J1 + J2 + J4 + J6 = 8.9670


b - Até HI-2 : hf2 = J1 + J3 + J5 + J7 = 8.7612

III - Dimensionamento da Bomba de Reforço:

1 - Altura manométrica

Hman = h1 + hf1 +/- desnivel = 62.97 mca


Hman ~ 63.0 mca

2 - Vazão

Q= 529.00 l/min = 0.00882 m3/s

3 - Potência = 12.3433
Potência ~ 15.0 CV

IV - Pressões e Vazões Finais

1 - NO HIDRANTE MAIS DESFAVORÁVEL

a - Pressão residual
h = Hman - hf1 +/- desnível = 54.03 mca

b - Vazão real no requinte


Q = 0.00423 m3/s = 253.99 l/min
c- Velocidade V= 0.515 m/s
2 - NO HIDRANTE MAIS PRÓXIMO AO ANTERIOR

a - Pressão residual
h = Hman - hf2 +/- desnível total = 54.24 mca

b - Vazão real no requinte


Q = 0.00424 m3/s = 254.47 l/min
c- Velocidade V= 0.52 m/s

RESPONSÁVEL TÉCNICO
CREA : _______ / D-MG.
altura (m) 9
diâmetro (m) 7.76
volume (m3) 425
tempo mín. p/
incêndio (h) 1
A costado (m2) 219.41
Vazão
1) resfriamento do tanque em chamas
2) aplicação de espuma tanque vertical + aplicação de espuma na bacia de contenção

resfriamento do tanque em chamas


2 Lpm por m2 da área do costado
438.82 Lpm
49.96 m3
Aplicação de espuma
tanque em chamas
4,1 Lpm por m2
tempo mínimo 30 min
193.91 Lpm
Qtd. LGE (L) 174.52

bacia de contenção
200 Lpm
tempo mínimo 10 min
Qtd. LGE (L) 60

LGE total (L) 234.52

Vazão 393.91 Lpm

Vazão total 832.73 Lpm


Amt= Pc suc + Pc Rec + Dg + Pc mang + Pc esg + Pc st + P proj (mca)
Pc suc perda de carga na sucção 0.72
Pc rec perda de carga no recalque 1.16
Dg desnível geométrico -5.00
Pc mang perda de carga na mangueira 0.77
Pc esg perda de carga no esguicho (19 mm) 4.20
Pc st perdas de carga na saída da tubulação 0.04
P proj pressão de projeto 52.00

Pc suc 0.007147 m/m


L (m) 100.17
Pc suc 0.715865 mca
Pc rec 0.007147 m/m
L (m) 162.3
Pc rec 1.159877 mca
Pc mang 2.57289 mca/100m
L (m) 30
Pc mang 0.771867 mca
Pc esg mca
D (m) 0.154
Q (m3/s) 0.014
Q (m3/s) 0.00417

Q (L/min)/100 2.5

Você também pode gostar