Sumário

1. OBJETIVO................................................................................................................................................................. 3
2. NORMAS E PROCEDIMENTOS UTILIZADOS NA INSPEÇÃO............................................................................3
3. TIPO DE INSPEÇÃO DE SEGURANÇA.................................................................................................................. 3
4. DATA DE REALIZAÇÃO........................................................................................................................................... 3
5. ITEM A SER INSPECIONADO................................................................................................................................ 3
6. IDENTIFICAÇÃO E ORIENTAÇÃO DO ITEM INSPECIONADO..........................................................................4
6.1. TUBULAÇÕES PRINCIPAIS DO SISTEMA:......................................................................................................4
6.1.1. RAMIFICAÇÕES DA TUBULAÇÃO PRINCIPAL:..........................................................................................5
6.2. CARACTERISITCA TÉCNICAS E OPERACIONAIS DO SISTEMA:................................................................6
7. TIPOS DE ANÁLISE DE DOCUMENTAÇÃO..........................................................................................................6
7.1. CHECK LIST......................................................................................................................................................... 6
8. EXAMES REALIZADOS............................................................................................................................................ 7
8.1. INSPEÇÃO VISUAL.............................................................................................................................................. 7
8.2. ENSAIOS NÃO DESTRUTIVOS EXECUTADOS................................................................................................8
9. DISPOSITIVOS DE SEGURANÇA.......................................................................................................................... 8
9.1. Válvulas de Segurança...................................................................................................................................... 8
9.2. Indicadores de Pressão..................................................................................................................................... 9
10. NÃO CONFORMIDADE........................................................................................................................................ 9
11. RECOMENDAÇÕES.............................................................................................................................................. 9
12. PARECER CONCLUSIVO................................................................................................................................... 10
13. DATA(S) PRÓXIMA(S) INSPEÇÃO(ÕES).......................................................................................................10
14. ASSINATURA E IDENTIFICAÇÃO DO INSPETOR E PH...............................................................................10
15. ANEXOS.............................................................................................................................................................. 10
Página 3 de 11

Relatório de Inspeção em Tubulação

Empresa: Cervejaria Equatorial


Endereço: Bairro:
Cidade: Estado:
CNPJ: I.E.:

1.OBJETIVO
Inspeção para realização de testes com a tubulação em operação.
Inspeção com finalidade de adequação a Norma Regulamentadora 13.

2.NORMAS E PROCEDIMENTOS UTILIZADOS NA INSPEÇÃO


 NR-13 Caldeiras, Vasos de Pressão e Tubulação.
 PRT-042 Procedimento de Inspeção em Tubulações Industriais
 ABNT NBR ISO 15649:2004
 ABNT NBR 5580:2013
 ABNT NBR 13193:1994
 API570

3.TIPO DE INSPEÇÃO DE SEGURANÇA


De acordo com a Norma Regulamentadora NR-13 - Portaria MTE n.º 594, de 28 de
abril de 2014, foi realizada inspeção do tipo:

☐Inicial ☐ Periódica ☒ Inspeção Periódica inicial ☐ Extraordinária


Sendo Extraordinária, qual o motivo?

4.DATA DE REALIZAÇÃO

Iniciada em: 08/08/2016

Concluída em: 20/08/2016

5.ITEM A SER INSPECIONADO

☐ Linha ☐ Tubulação ☒ Sistema de Tubulação


Definições
Página 4 de 11

a) Linha: Trecho de tubulação individualizado entre dois pontos definidos e que obedece a
uma única especificação de materiais, produtos transportados, pressão e temperatura de
projeto.

b) Tubulações: Conjunto de linhas, incluindo seus acessórios, projetadas por códigos


específicos, destinadas ao transporte de fluidos entre equipamentos de uma mesma
unidade de uma empresa dotada de caldeiras e vasos de pressão.

c) Sistemas de Tubulações: Conjunto integrado de linhas e tubulações que exerce uma


função de processo, ou que foram agrupadas para fins de inspeção, com características
técnicas e de processo semelhantes.

6.IDENTIFICAÇÃO E ORIENTAÇÃO DO ITEM INSPECIONADO

6.1. TUBULAÇÕES PRINCIPAIS DO SISTEMA:

Local de Instalação Local de Instalação Categoria Tubulação


(Tubulação Principal) (Vaso de Origem) do Vaso Crítica

EQ-01410-TUB NH3 01-AAPG141001 EQ-01410-TQ SEPAR OLEO 09 II

EQ-01410-TUB NH3 02-AAPG141008 EQ-01410-TQ SEPAR OLEO 04 III

EQ-01410-TUB NH3 03-AAPG141009 EQ-01410-TQ SEPAR OLEO 03 III

EQ-01410-TUB NH3 04-AAPL141010 EQ-01410-TQ SEPAR OLEO 09 II

EQ-01410-TUB NH3 05-AAPL141011 EQ-01410-TQ SEPAR OLEO 08 II

EQ-01410-TUB NH3 06-ABPG141014 EQ-01410-TQ SEPAR OLEO 08 II

EQ-01410-TUB NH3 07-ABPL141023 EQ-01410-TQ SEPAR NH3 09 II

EQ-01410-TUB NH3 08-ABPL141025 EQ-01410-TQ SEPAR NH3 09 II

EQ-01410-TUB NH3 09-ABPL141027 EQ-01410-TQ SEPAR NH3 08 II

EQ-01410-TUB NH3 10-ABPG141028 EQ-01410-TQ SEPAR NH3 08 II

EQ-01410-TUB NH3 11-ABPG141029 EQ-01410-TQ SEPAR NH3 09 II

EQ-01410-TUB NH3 12-ABPG141030 EQ-01410-TQ SEPAR NH3 09 II

EQ-01410-TUB NH3 13-ABPG141031 EQ-01410-TQ SEPAR NH3 08 II

EQ-01410-TUB NH3 14-ABPG141032 EQ-01410-TQ SEPAR NH3 08 II

EQ-01410-TUB NH3 15-AV141139 EQ-01410-TQ SEPAR NH3 08 II

6.1.1. RAMIFICAÇÕES DA TUBULAÇÃO PRINCIPAL:

Local de Instalação Local de Instalação Categoria Tubulação


(Ramificações) (Tubulação de Origem) do Vaso Crítica

EQ-01410-TUB NH3 01-AAPG141002 EQ-01410-TUB NH3 01-AAPG141001 II


Página 5 de 11

EQ-01410-TUB NH3 01-AAPG141003 EQ-01410-TUB NH3 01-AAPG141001 II

EQ-01410-TUB NH3 01-AAPG141004 EQ-01410-TUB NH3 01-AAPG141001 II

EQ-01410-TUB NH3 01-AAPG141005 EQ-01410-TUB NH3 01-AAPG141001 II

EQ-01410-TUB NH3 01-AAPG141006 EQ-01410-TUB NH3 01-AAPG141001 III

EQ-01410-TUB NH3 01-AAPG141007 EQ-01410-TUB NH3 01-AAPG141001 III

EQ-01410-TUB NH3 01-AV141138 EQ-01410-TUB NH3 01-AAPG141001 II

EQ-01410-TUB NH3 04-AAPL141012 EQ-01410-TUB NH3 04-AAPL141010 II

EQ-01410-TUB NH3 05-AAPL141013 EQ-01410-TUB NH3 05-AAPL141011 II

EQ-01410-TUB NH3 06-ABPG141015 EQ-01410-TUB NH3 06-ABPG141014 II X

EQ-01410-TUB NH3 06-ABPG141016 EQ-01410-TUB NH3 06-ABPG141014 II X

EQ-01410-TUB NH3 06-ABPG141017 EQ-01410-TUB NH3 06-ABPG141014 III

EQ-01410-TUB NH3 06-ABPG141018 EQ-01410-TUB NH3 06-ABPG141014 III

EQ-01410-TUB NH3 06-ABPG141019 EQ-01410-TUB NH3 06-ABPG141014 II

EQ-01410-TUB NH3 06-ABPG141020 EQ-01410-TUB NH3 06-ABPG141014 II

EQ-01410-TUB NH3 06-ABPG141021 EQ-01410-TUB NH3 06-ABPG141014 II

EQ-01410-TUB NH3 06-ABPG141022 EQ-01410-TUB NH3 06-ABPG141014 II

EQ-01410-TUB NH3 07-ABPL141024 EQ-01410-TUB NH3 07-ABPL141023 II

EQ-01410-TUB NH3 08-ABPL141026 EQ-01410-TUB NH3 08-ABPL141025 II

EQ-01410-TUB NH3 13-ABPG141033 EQ-01410-TUB NH3 13-ABPG141031 II

EQ-01410-TUB NH3 14-ABPG141034 EQ-01410-TUB NH3 14-ABPG141032 II

EQ-01410-TUB NH3 15-AV141140 EQ-01410-TUB NH3 15-AV141139 III

6.2. CARACTERISITCA TÉCNICAS E OPERACIONAIS DO SISTEMA:

Fluido Transportado: NH3


Classe do Fluido (conforme NR-13): Classe A
Código de Projeto (adotado): ASME B31.3
Material Construtivo (adotado): AÇO CARBONO A-106
PMTA Adotada (kgf/cm²): 21
Faixa de Pressão de Operação (kgf/cm²): -6 ~ 12
Faixa da Temperatura de Operação (°C): 10 ~ 30
Página 6 de 11

Ano de Início de Operação (Adotada): 2002

7.TIPOS DE ANÁLISE DE DOCUMENTAÇÃO

7.1. CHECK LIST

7.1.1. Relatório de inspeção anterior: ☐ SIM ☒ NÃO


Comentários: Inspeção Inicial

7.1.2. Data book / Prontuário: ☒ SIM ☐ NÃO


Comentários:

7.1.3. Memorial de cálculo: ☒ SIM ☐ NÃO


Comentários:

7.1.4. Fluxograma de engenharia: ☒ SIM ☐ NÃO


Comentários:

7.1.5. Plano de inspeção: ☒ SIM ☐ NÃO


Comentários:

7.1.6. Programa de inspeção: ☒ SIM ☐ NÃO


Comentários:

7.1.7. Possui PAR: ☐ SIM ☒ NÃO


Comentários:

8.EXAMES REALIZADOS

8.1. INSPEÇÃO VISUAL

8.1.1. Identificação (Tag) dos itens inspecionados: ☒ OK ☐ NOK ☐ NA


Comentários:

8.1.2. Sinalização adequada conforme NR-26: ☒ OK ☐ NOK ☐ NA


Comentários:

8.1.3. Estado da pintura: ☒ OK ☐ NOK ☐ NA


Comentários: Linhas em local aberto necessitam de pintura.

8.1.4. Revestimento térmico (isolamento): ☒ OK ☐ NOK ☐


NA
Comentários: Manter revestimento preservado.

8.1.5. Conexões roscadas: ☒ OK ☐ NOK ☐ NA


Página 7 de 11

Comentários: Manter conexões preservadas

8.1.6. Conexões soldadas: ☒ OK ☐ NOK ☐ NA


Comentários: Manter conexões pintadas e preservadas

8.1.7. Conexões flangeadas: ☒ OK ☐ NOK ☐ NA


Comentários: Manter flanges pintados e preservados

8.1.8. Suportação: ☒ OK ☐ NOK ☐ NA


Comentários: Manter suportes pintados

8.1.9. Periféricos (válvulas / purgador / bombas): ☒ OK ☐ NOK ☐ NA


Comentários: Manter acessórios preservados

8.1.10. Aterramento: ☒ OK ☐ NOK ☐ NA


Comentários:

8.1.11. Vibração: ☒ OK ☐ NOK ☐ NA


Comentários:

8.1.12. Vazamentos: ☒ OK ☐ NOK ☐ NA


Comentários:

1.1.1. Outros:______________________________ ☒ OK ☐ NOK ☐ NA


Comentários:

8.1.13. Conclusões Inspeção Visual

A Tubulação do sistema de NH3 01 – COMPRESSOR FRIO encontra-se em perfeito estado de


conservação e operação, exceto algumas linhas externas com a pintura deteriorada, foram
realizados diversos ensaios não destrutivos e nada que comprometa a sua utilização foi
encontrado.

8.2. ENSAIOS NÃO DESTRUTIVOS EXECUTADOS

8.2.1. Medição de Espessura: ☒ OK ☐ NOK ☐ NA


Comentários:

8.2.2. Ultrassom ☐ OK ☐ NOK ☒ NA


Comentários:

8.2.3. Liquido Penetrante: ☐ OK ☐ NOK ☒ NA


Comentários:

8.2.4. Partícula Magnética: ☐ OK ☐ NOK ☒ NA


Comentários:
Página 8 de 11

9.DISPOSITIVOS DE SEGURANÇA

9.1. Válvulas de Segurança

Existentes: ☒ SIM ☐ NÃO


Quantidade: 14

Local de Instalação (Vaso ou tubulação) 4º Nível da PSV (TAG) Calibrado?


EQ-01410-TUB NH3 06-ABPG141019 PSV SEM TAG NÃO

EQ-01410-TUB NH3 06-ABPG141019 PSV SEM TAG NÃO

TQ141201 PSV SEM TAG NÃO

TQ141201 PSV SEM TAG NÃO

EQ-01410-TUB NH3 01-AAPG141001 PSV141201 SIM

EQ-01410-TUB NH3 01-AAPG141001 PSV141202 SIM

EQ-01410-TUB NH3 06-ABPG141020 PSV SEM TAG NÃO

EQ-01410-TUB NH3 06-ABPG141020 PSV SEM TAG NÃO

TQ141101 PSV SEM TAG NÃO

TQ141101 PSV SEM TAG NÃO

EQ-01410-TUB NH3 01-AAPG141002 PSV141101 SIM

EQ-01410-TUB NH3 01-AAPG141002 PSV141102 SIM

TQ141010 PSV SEM TAG NÃO

TQ141010 PSV SEM TAG NÃO


9.2. Indicadores de Pressão

Existentes: ☒ SIM ☐ NÃO


Quantidade: 3

Local de Instalação (Vaso ou tubulação) 4º Nível da PI/PT (TAG) Calibrado?


EQ-01410-TUB NH3 13-ABPG141033 PI141204 SIM

EQ-01410-TUB NH3 02-AAPG141008 PT141208 SIM

EQ-01410-TUB NH3 14-ABPG141034 PI141104 SIM

10. NÃO CONFORMIDADE

No Sistema de NH3 01 – COMPRESSOR FRIO em questão foram encontradas as seguintes


“Não Conformidade”:
Página 9 de 11

 Possui válvulas de segurança não calibradas e sem identificação.


 Linhas necessitando de pintura.

11. RECOMENDAÇÕES

 Manter os instrumentos de controle e segurança pertinentes à segurança do sistema


calibrados e conservados.
 Identificar todos os instrumentos através de TAG’s.
 Manter pintura das linhas em bom estado de conservação.

12. PARECER CONCLUSIVO

A presente inspeção de segurança, realizada em, 20/08/2016 em obediência Portaria n°


594 de 28 de Abril 2014 NR-13 e alterações, descreve as condições de operação e segurança
da Tubulação, observada neste relatório e determina que o Sistema de Tubulação descrita
acima esta:

☒ APROVADO ☐ APROVADO C/ RESTRIÇÃO ☐ REPROVADO ☐ CONDENADO

13. DATA(S) PRÓXIMA(S) INSPEÇÃO(ÕES)

A próxima inspeção Visual deve ser realizada no prazo máximo até:

20/08/2020

14. ASSINATURA E IDENTIFICAÇÃO DO INSPETOR E PH

Inspetor Responsável Eng° Mecânico e Segurança do Trabalho

15. ANEXOS
15.1. Anexo A – Fotos.
15.2. Certificado de calibração dos Dispositivos instalados na Linha Critica
Página 10 de 11

15.3. ART

ANEXO A - FOTOS

Foto 01 Foto 02
EQ-01410-TUB NH3 06-ABPG141015 EQ-01410-TUB NH3 06-ABPG141016

Foto 03 Foto 04
EQ-01410-TUB NH3 06-ABPG141015 EQ-01410-TUB NH3 06-
ABPG141016
Página 11 de 11

Foto 05 Foto 06
EQ-01410-TUB NH3 06-ABPG141015 EQ-01410-TUB NH3 06-ABPG141016