Hidrantesanalisados
Pea Pavimento Nvelgeomtrico(m) Vazo(l/s) Presso(m.c.a.)

IncndioHidrantemangueira1.1/215m
Hidranteanalisado 4pavimento 13.45 2.96 11.53
esguichoregulvel1.1/216mm
IncndioHidrantemangueira1.1/215m
HIDRANTE4 Tipo2 10.75 3.20 13.49
esguichoregulvel1.1/216mm

Processodeclculo:HazenWilliams

Tomadadgua:
2.1/2"x2.1/2"3CVR135(BombaHidrulicaIncndio)
Nvelgeomtrico:14.75m
Pressonasada:16.30m.c.a.

Trechoderecalque
Vazo Veloc. Comprimento(m) J Perda Altura Desnvel Presses(m.c.a.)
Trecho
(l/s) (mm) (m/s) Conduto Equiv. Total (m/m) (m.c.a.) (m) (m) Disp. Jusante
12 6.16 65 1.86 0.20 0.00 0.20 0.0681 0.01 14.75 0.20 16.10 16.09
23 6.16 65 1.86 0.30 0.01 0.31 0.0681 0.02 14.95 0.30 15.79 15.77
34 6.16 65 1.86 0.60 2.40 3.00 0.0681 0.20 15.25 0.00 15.77 15.56
45 6.16 65 1.86 0.32 3.40 3.72 0.0681 0.25 15.25 0.32 15.88 15.63
56 6.16 65 1.86 0.18 0.40 0.58 0.0681 0.04 14.93 0.18 15.81 15.77
67 6.16 65 1.86 0.55 3.40 3.95 0.0681 0.27 14.75 0.00 15.77 15.50
78 6.16 65 1.86 2.12 2.40 4.52 0.0681 0.31 14.75 0.00 15.50 15.19
89 6.16 65 1.86 0.49 5.20 5.69 0.0681 0.39 14.75 0.00 15.19 14.81
910 6.16 65 1.86 0.10 2.40 2.50 0.0681 0.17 14.75 0.10 14.91 14.74
1011 6.16 65 1.86 1.20 0.01 1.21 0.0681 0.08 14.65 1.20 15.94 15.85
1112 2.96 65 0.89 0.20 3.40 3.60 0.0175 0.06 13.45 0.00 15.85 15.79
1213 2.96 65 0.89 0.00 10.90 10.90 0.0175 4.26 13.45 0.00 15.79 11.53

Trechodesuco
Vazo Veloc. Comprimento(m) J Perda Altura Desnvel Presses(m.c.a.)
Trecho
(l/s) (mm) (m/s) Conduto Equiv. Total (m/m) (m.c.a.) (m) (m) Disp. Jusante
12 6.16 65 1.86 0.62 1.90 2.52 0.0681 0.17 14.75 0.00 17.30 17.12
23 6.16 65 1.86 0.42 0.00 0.42 0.0681 0.03 14.75 0.00 17.12 17.09
34 6.16 65 1.86 0.25 0.40 0.65 0.0681 0.04 14.75 0.00 17.09 17.05
45 6.16 65 1.86 0.34 3.40 3.74 0.0681 0.26 14.75 0.00 17.05 16.80
56 6.16 65 1.86 0.39 3.40 3.79 0.0681 0.26 14.75 0.00 16.80 16.54
67 6.16 65 1.86 0.21 0.40 0.61 0.0681 0.04 14.75 0.00 16.54 16.50
78 6.16 65 1.86 0.13 2.40 2.53 0.0681 0.17 14.75 0.00 16.50 16.32
89 6.16 65 1.86 0.30 0.01 0.31 0.0681 0.02 14.75 0.00 16.32 16.30
910 6.16 65 1.86 0.00 0.00 0.00 0.0681 0.00 14.75 0.00 16.30 16.30
Alturamanomtrica(m.c.a.)
Recalque Suco Vazodeprojeto(l/s) NPSHdisponvel(mca) NPSHrequerido(mca) Potnciaterica(CV)
Total
Altura Perda Mangueira Esguicho Altura Perda
1.30 2.00 2.96 1.11 0.00 0.99 17.30 6.16 9.10 2.78 3.13

Trechoderecalque
Conexes Lequivalente(m)
Material Grupo Item Quant. Unitria Total
BH 2.1/2"x2.1/2" 3CVR135 1 0.00 0.00

FG Junop/unio 2.1/2" 1 0.01 0.01

FG Cotovelo90 2.1/2" 3 2.40 7.20

FG Te 2.1/2" 3 3.40 10.20

FG Registrobrutodegavetaindustrial 2.1/2" 1 0.40 0.40

FG VlvuladeRetenoHorizontal 2.1/2" 1 5.20 5.20

FG Luva 2.1/2" 1 0.01 0.01

Hidrantemangueira1.1/215m esguichoregulvel1.1/216mm 1 10.90 10.90


Trechodesuco
Conexes Lequivalente(m)
Material Grupo Item Quant. Unitria Total
FG Tomadadguap/caixadeconcreto150mm 2.1/2" 1 1.90 1.90

FG Flangesextavado 2.1/2" 1 0.00 0.00

FG Registrobrutodegavetaindustrial 2.1/2" 2 0.40 0.80

FG Te 2.1/2" 2 3.40 6.80

FG Cotovelo90 2.1/2" 1 2.40 2.40

FG Junop/unio 2.1/2" 1 0.01 0.01