Você está na página 1de 30

Fundação da banda de rodagem de concreto tipo retilínea

Project :
Client :
Engineer Checked Approved

Name Robert
Date 1/15/2024 11:29

Data Struktur : Pu

Ordem de projeto Mu
1 Dimensoes da coluna b = 100 mm b
h = 100 mm Muka Tanah
Tipo de coluna αs = 30
2 Dimensões da fundação B = 2.40 m ha
L = 2.40 m B=L
ht = 0.40 m
3 Concreto fc' = 20 Mpa ht
4 Aço fy' = 320 Mpa
5 Reforço D = 19
L
6 BJ Beton γc = 24 KN/m3
L
Data Tanah :

6 Daya dukung tanah σt = 105 Kpa


7 Berat tanah γt = 17.20 KN/m3
8 Tebal tanah diatas ha = 1.20 m
pondasi
h
B
Data Beban :
B=L
9 Beban P ultimate Pult = 384 KN
10 Beban M ultimate Mult = 18.25 KNm

Result
Cek Status Pondasi :

Tegangan yang terjadi pada tanah σmaks = 104.82767 < 105 OK!
σmin = 88.98566 < 105 OK!

Kontrol gaya geser 1 arah Ø.Vc = 422.617


Vu = 204.552 < 422.617 OK!

Kontrol gaya geser 2 arah Ø.Vc = 584.620


Vu = 541.493 < 584.620 OK!

Penulangan Pondasi
Arah X = Y D 19 - 219
Unit Conversion

1 Mpa = 1000 Kpa


= 101.972 t/m2
= 0.010 t/cm2
= 101971.621 kg/m2
= 10.197 kg/cm2
SKEMA HITUNGAN PONDASI

Data : tebal fondasi (ht, d, ds), mutu bahan


Mutu Bahan (Fc, Fy)
Beban (Pu, Mu)
Daya dukung tanah (σt)

Penentuan Dimensi Pondasi

Pult Mu,x Mu,y


σ = + + + q ≤ σt
B x L 1/6 B x L 2
1/6 B x L 2

Menghitung tegangan tanah didasar fondasi

Pult Mu,x Mu,y


σmaks = + + + q ≤ σt
B x L 1/6 B x L 2
1/6 B x L 2

Pult Mu,x Mu,y


σmin = - - + q ≤ σt
B x L 1/6 B x L 2
1/6 B x L 2

Kontrol gaya geser 1 arah

σmaks + σa
Vu = a x B
2
Dimana
L - a x σmaks - σmin
σa = σmin +
L
fc'
Vc = x B x d
6
Syarat :

Vu ≤ Ø Vc dengan Ø = 0.75
Kontrol gaya geser 2 arah

σmaks +
Vu = B2 - b + d h + d x
2

Dipilih nilai Vc terkecil dari :

2 fc' bo d
Vc1 = 1 + x
βc 6

αs d fc' bo d
Vc2 = 2 + x
bo 12

1
Vc3 = x fc' bo d
3
Syarat :

Vu ≤ Ø Vc dengan Ø = 0.75

Hitung Penulangan Fondasi

1) ds = 75 + D + D/2
dimana
d = h - ds

2) σx = σmin + B - x x σmaks - σmin

σmaks - σx
3) Mu = 0.5 σx x 2 + x 2
3
Mu
4) K = , b = 1000
Ø x b x d2

382.5 x 0.85 x 600 + fy - 225 x β1


5) Kmaks =
600 + fy 2

2 x K
6) a' = 1 - 1 - d
0.85 x fc'

0.85 x fc' x a x b
7) As(1) =
fy

8) fc' ≤ 31.36 Mpa


maka

1.4 x b x d
As(2) ≥ Pilih "As" yang
fy terbesar

fc' > 31.36 Mpa


maka

fc' x b x d
As(3) =
4 fy

9) Jarak tulangan

0.25 x phi x D 2
s = S
As terpilih
Pilih "s" yang
s ≤ 2 x ht terkecil

s ≤ 450

Cek Kuat Dukung Fondasi

Pu = Ø x 0.85 x fc' x A ..... ( Ø = 0,7 )

Syarat : Pult ≤ Pu

Referensi : Asroni, A., Buku Kolom Fondasi & Balok T Beton Bertulang,
Notasi :

σ = Tegangan yang terjadi pada dasar fondasi ...........


σt = Daya dukung tanah ...........
Pult = Beban axial terfaktor pada kolom...........
B,L = Panjang dan lebar fondasi
Mu,x = Momen terfaktor kolom searah sumbu X ...........
Mu,y = Momen terfaktor kolom searah sumbu Y ...........
q = Beban terbagi rata akibat beban sendiri fondasi
ditambah beban tanah diatas fondasi ...........
ht = Tebal fondasi ≥ 150 mm
(lihat pasal 17.7 SNI 03-2847-2002)
ha = Tebal tanah diatas fondasi ...........
γc = Berat per volume beton ...........
γt = Berat per volume tanah ...........
Vu = Gaya geser pons terfaktor...........
Vc = Gaya geser yang sanggup ditahan oleh beton...........
Ø = Faktor keamanan = 0,7 (lihat SNI)
βc = Rasio dari sisi panjang terhadap sisi pendek pada
kolom, daerah beban terpusat / atau daerah reaksi
bo = Keliling penampang krisis dari fondasi ...........
αs = Suatu konstanta yang digunakan untuk menghitung
Vc , yang nilai tergantung pada letak fondasi,
40 = Kolom dalam
30 = Kolom tepi
20 = Kolom sudut
σmin = Tegangan tanah minimum ...........
σmaks = Tegangan tanah maksimum ...........
σa = Tegangan tanah sejarak "a" dari tepi fondasi ..........
σx = Tegangan tanah sejarak "x" dari tepi fondasi ..........
a = Jarak dari area bidang yang menerima tekanan
keatas dari tanah (area keruntuhan)
fc' = Kuat tekan beton ...........
fy = Mutu beton ...........
ds = decking
minimal = 75 mm (berhubungan dengan tanah)
D = Diameter tulangan ...........
a' = Tinggi blok tegangan beton teka persegi ekivalen
Mu = Momen yang terjadi padafondasi
K, Kmaks = Faktor momen pikul
s = Jarak tulangan ...........
As = Luas besi tulangan yang dibutuhkan ...........
σmin

fc'
ilih "As" yang

ilih "s" yang


(Kpa) atau KN/m2
(Kpa) atau KN/m2
KN
m
KNm
KNm

(KN/m2)
mm

mm
KN/m3
KN/m3
KN
KN

mm

(Kpa) atau KN/m2


(Kpa) atau KN/m2
(Kpa) atau KN/m2
(Kpa) atau KN/m2
mm

Mpa
Mpa
mm

mm
mm

mm
mm2
Program Hitung Pondasi Tapak

Job Title
0
Client. 0

Analisa

q = Berat Fondasi + Berat Tanah


= ht x γc + ha x γt
= 0.40 x 24 + 1.20 x 17.20
= 30.24 KN/m2

Cek Fondasi Terhadap Tegangan Izin Tanah

Tegangan yang terjadi pada tanah

Pult Mult
σmaks = + + q
B x L 1/6 B x L2

384 18.25
= + + 30.24
2.40 x 2.40 1/6 2.40 x 2.40 2

= 66.666667 + 7.921 + 30.24

= 104.828 ≤ 105 Save!

Pult Mult
σmin = - + q
B x L 1/6 B x L2

384 18.25
= - + 30.24
2.40 x 2.40 1/6 2.40 x 2.40 2

= 66.666667 - 7.921 + 30.24

= 88.986 ≤ 105 Save!

Kontrol Tegangan Geser 1 Arah

0.10
ds = 75 + D/2
= 75 + 9.50
= 85.00 mm

d = ht - ds
= 400 - 85.00
0.40 = 315.00

L = 2.40 a = B/2 - b/2


= 1200 - 50
2.40 = 835.00 mm
= 0.835 m

σa = σmin + B

= 88.986 + 2.40
2.40
0.1 = 99.316 KN/m2

Gaya tekan ke atas dari tanah (Vu)

Vu = a x B
0.1
= 0.835 x 2.40

= 204.552 KN
0.10 0.315 0.835 Gaya geser yang dapat ditahan oleh beton (Ø.Vc)

Ø.Vc = Ø x

= 0.75 x

0.315
= 422.617 KN
2.40
Ø.Vc = 422.617 >

σmin σa σmaks
88.986 99.316 104.828

Kontrol Tegangan Geser 2 Arah (Geser Pons)

Dimensi Kolom, b = 100


h = 100

b + d = 100.00 + 315.00 = 415.00


h + d = 100 + 315.00 = 415.00

Gaya Tekan Ke Atas (Geser Pons)

Vu = B2 - b + d x h + d

104.828 + 88.986
= 2.40 2 - 0.415 x 0.415 x
2
= 541.49265

hk 100
βc = = = 1.000
Bk 100

bo = 2 x bk + d + hk + d

bo = 2 x 100 + 315.00 + 100 + 315.00

= 1660 mm

Gaya geser yang ditahan oleh beton


Vc1 = 1 +
0.158

0.10
Vc1 = 1 +
0.158
Vc1 = 1169239.945
= 1169.240

0.992 0.158 0.10 0.158 0.9925

Vc2 = 2 +

Vc2 = 2 +
0.315

0.085 Vc2 = 1304242.550


2.40 = 1304.243
1
Vc3 = x fc'
3
1
σmin Vc3 = x 20
88.986 σmaks 3
104.828
= 779493.29696 N
= 779.493 KN

Jadi

Vc1 = 1169.240
Vc2 = 1304.243 Diambil yang terkecil
Vc3 = 779.493

Vc = 779.493 KN
Ø.Vc = 0.75 x 779.493
= 584.620 KN

Ø.Vc = 584.620 > Vu = 541.493 ......... Save!

Hitungan Penulangan Fondasi

0.10 ds = 75 + 19
= 103.500 mm
≈ 0.105 m
1.15
1.20 d = ht - ds
= 0.40 - 0.105
= 0.295 m
0.40 0.295 = 295 mm
0.105
B h
2.40 x = -
2 2

2400 100
x = -
2 2
σmin σx σmaks x = 1150 mm
88.986 97.237 104.828 = 1.15 m

σx = σmin + B - x x σmaks - σmin B

σx = 88.986 + 2.40 - 1.15 x 104.828 - 88.986 2.40


`
= 97.237 KN/m3
σmaks - σx
Mu = 0.5 σx x 2 + x
3
104.828 - 97.237
= 0.5 97.237 1 2 + 1.15
3
= 67.644 KNm

Mu
K =
Ø x b x d 2

67644123.976
=
0.8 x 1000 x 295 2

= 0.972 Mpa
382.5 x 0.85 x 600 + fy - 225 x
Kmaks =
600 + fy 2

382.5 x 0.85 x 600 + 320 - 225 x


Kmaks =
600 + 320 2

= 5.599 Mpa

K < Kmaks
K = 0.972 < Kmaks = 5.599 ......... OK!

2 x K
a' = 1 - 1 - d
0.85 x fc'

2 x 0.972
= 1 - 1 - 295
0.85 x 20

= 17.372 mm

0.85 x fc' x a' x b


As(1) =
fy

0.85 x 20 x 17.372 x 1000


=
320
= 922.885 mm2

Jika
fc' ≤ 31.36 Mpa
maka
1.4 x b x d
As ≥ ........... (R.1)
fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

Jika
fc' > 31.36 Mpa
maka
fc' x b x d
As = ........... (R.2)
4 fy ....... SNI 03-2847-2002 (Pasal 12.5.1)

fc' = 20 < 31.36


maka yang dipakai adalah pers ..................... (R.1)
1.4 x b x d fc'
As(2) = ....... (R.1) As(2') =
fy

1.4 x 1000 x 295 0


= =
320

= 1290.625 mm2 ........... As dipakai = #DIV/0!

Dipilih yang terbesar dari As(1) dan As(2)......... Sehingga,

As(1) = 922.885 mm2


As = 1290.625 mm2
As(2) = 1290.625 mm2
Jarak tulangan,

0.25 x phi x D 2 x S
s =
As

0.25 x 3.14 x 19 2 x 1000


=
1290.625

= 219.572 mm

s ≤ 2 x ht
≤ 2 x 400
≤ 800

s ≤ 450 mm

Dipilih (s) yang terkecil = 219.572 mm

Jadi dipakai tulangan = D 19 - 219


Job No. Sheet No
1

Part
Ref
Enginner Robert Date
File Date/time 1/15/2024 11:29

≤ σt

≤ 105

≤ σt

≤ 105
- d
- 315.00

- a x σmaks - σmin b

- 0.835 x 104.828 - 88.986 2.40

x σmaks + σa 2

x 104.828 + 99.316 2
n (Ø.Vc)

fc'
x B x d
6
20
x 2.40 x 315.00
6

Vu = 204.552 ......... Save!

mm = 0.415 m
mm = 0.415 m

σmaks + σmin
x
2

2 fc' bo d
x
βc 6

2 20 1660 315.00
x
1.000 6

N
KN

αs d fc' bo d
x
bo 12

30 315.00 20 1660 315.00


x
1660 12

N
KN
bo d

1660 315.00

+ 9.5
2

2
β1 fc'

0.85 20
x b x d
....... (R.2)
4 fy

x 0 x 0

4 0

mm2 ........... As tidak Dipakai!


Job No. Sheet No
2
Program Hitung Pondasi Tapak
Part
Job Title Ref
0 Enginner Date
Client. 0 File Date/time 1/15/2024 11:29

Cek Panjang Penyaluran Tegangan Tulangan

9 x fy x α β x γ x λ
Panjang penyaluran tegangan (λ d) = db
c + Ktr
10 fc'
db

9 x 320 x 1 1 x 0.8 x 1
= 19
75 + 0
10 20
19

9 x 320 x 1 1 x 0.8 x 1
= 19

10 20 2.5

= 391.544 mm > 300 mm


≈ 392 mm

B Bk
Panjang Tersedia (λt) = - - 75
2 2

2400 100
= - - 75
2 2

= 1075

Panjang Tersedia (λt) > Panjang penyaluran tegangan (λ d)


1075 > 392 ....... OK!

Kuat Dukung Fondasi

Pu = Ø x 0.85 x fc' x A

= 0.7 x 0.85 x 20 x 10000

= 119000 N

= 119 KN

Pu,k = 384 KN

Pu = 119 > Pu,k = 384 ....... NOK!


SKSNI 03-2847-2002
Job No. Sheet No
3
Program Hitung Pondasi Tapak
Part
Job Title Ref
0 Enginner Date
Client. 0 File Date/time 1/15/2024 11:29

2.40

2.40

D 19 - 219

DETAIL PONDASI
Non Scale

100

D 19 - 219

400 295

105
2400

POTONGAN 1-1
Non Scale

SNI 03-2847-2002 (Pasal 17.4.3)

SNI 03-2847-2002 (Pasal 17.7)

SNI 03-2847-2002 (Pasal 9.7.1)

Você também pode gostar