This study comprises the development of a standard method for performing the test
called "end to end" for protection of Transmission Lines of interconnected power
systems.
In most electric utilities, preventive maintenance of the protection system of basic
network is performed usually at every four years. Considering this long time lapse
between maintenance, it is evident that commissioning should be performed in
extensive and complex way in order to cover the majority of situations that a power
system may be subjected. This results in an increase of protection system reliability.
The use of a standardized methodology for end-to-end testing accomplishes this
need. This test methodology consists in the simultaneous application of simulated
fault voltages and currents in the protective relays of both sides of the line. This way,
not only the protective relays are tested but also the pilot protection systems. The
objective of this work is to developed this test methodology and describe a standard
procedure that can be used by all maintenance teams of a power utility. With this
procedure, the system is also subjected with situations closer to the reality, thus
resulting in an increase of reliabitliy.
1. INTRODUÇÃO...................................................................................................... . 14
3. METODOLOGIA .....................................................................................................33
7. CONCLUSÃO . ........................................................................................................63
8. REFERÊNCIAS......................................................................................................65
14
1. INTRODUÇÃO
2. REVISÃO BIBLIOGRÁFICA
(1)
(2)
E definindo que:
(3)
24
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
25
(13)
(14)
(15)
Neste tipo de falta Ifb, Ifc e Vfa, são todos iguais a zero, e Ia¹, Ia² e Ia 0 são
iguais e diferentes de zero. Com isso pode-se calcular a corrente de falta através da
equação (16):
(16)
Neste tipo de falta Ifc, Va e Vb, são todos iguais a zero, e Va¹, Va² e Va 0
são iguais e diferentes de zero. Com isso se pode calcular a corrente de falta através
da equação (17):
-17
(18)
Neste tipo de falta Va, Vb e Vc são iguais a zero no ponto da falta, assim
como as tensões Va¹, Va² e Va0 , e o somatório das correntes Ia, Ib e Ic. . Cabe
salientar que a impedância Zf (impedância causada na aparição do arco elétrico,
entre o ponto de falta e terra) deve ser considerada como nula. Como as três
tensões de sequência são nulas, conclui-se que os modelos de sequências
encontram-se curto circuitados. Pelo fato deste tipo de falta se caracterizar pelo
equilíbrio no ato da ocorrência, somente o modelo de sequência positiva encontra-se
ativa (ZANETTA JUNIOR, 2006). Com isso se pode calcular a corrente de curto
circuito através da equação (19).
(19)
Pelo fato de ser menos complexo, e com isso, ter o menor custo de
aquisição, este equipamento caracteriza-se por ter sua aplicação mais complicada,
pelo fato de não possuir elemento direcional, com isso sua aplicação em sistema
anel não é possível (CAMINHA, 1977).
Nos sistemas de transmissão este modelo é utilizado com a função
direcional habilitada em série, a qual tem como princípio básico de funcionamento
determinar o sentido em que a corrente de falta esta fluindo, verificando se está sob
a sua área de proteção, e determinar se deve ou não realizar a abertura do
Disjuntor. (COURY, OLESKOVICZ e GIOVANINI, 2007).
próximo a um dos terminais de uma LT, o relé deste atua instantaneamente, já o relé
do outro extremo deve esperar o tempo da zona de atuação, que no caso é
dispensável. Então esse método, agiliza este processo, fazendo com que o relé que
se encontra distante de tal anomalia atue instantaneamente, através do recebimento
de um sinal de comando permissivo de abertura do disjuntor de seu extremo, o qual
é enviado, através do fio piloto (ou fibra ótica), pelo relé que está próximo da falta
(COURY, OLESKOVICZ e GIOVANINI, 2007).
3. METODOLOGIA
local pelo operador, via botoeira. Salienta-se que este equipamento tem por objetivo
substituir o DJ real. A Figura 18 mostra o referido simulador.
3.5.4. Notebooks
Foram realizados ensaios entre SE’s, com esta nova metodologia para
testar sua eficiência e grau de abrangência, tal procedimento foi realizado em duas
frentes de trabalho. A primeira em uma LT de 525kV (119,6km), entre SE’s de
concessionárias diferentes, no caso FURNAS, Figura 24, a qual observa-se o
Técnico conectando o notebook com o relé da proteção secundária, e COPEL,
Figura 25, a qual verifica-se os notebooks conectados na fonte de ensaio e no relé
de proteção secundária.
A segunda frente de trabalho foi no vão curto (1,6km) entre a UHE Gov.
Ney Aminthas de Barros Braga (SEGREDO) Figura 26, onde se observa os Técnicos
fazendo análise dos resultados obtidos no ensaio, e a Subestação SGD 525kV,
Figura 27, onde se vê as conexões de cabos de ensaios nos relés de proteção.
Salienta-se também que no canto inferior à direita, dessas figuras citadas acima,
encontra-se as antenas de GPS instaladas para realizar a sincronização das fontes
de ensaios.
41
4. DESENVOLVIMENTO DO PROCEDIMENTO
=>SER
CIRCUITO CEL 3 230KV - RELE P Date: 02/01/2013 Time: 09:55:10.517
SE CASCAVEL OESTE 525KV Serial Number: 2004222237
# DATE TIME ELEMENT STATE
22 02/01/2013 09:52:51.010 21G1 ASSERTED
21 02/01/2013 09:52:51.010 21G2 ASSERTED
20 02/01/2013 09:52:51.014 KEY - ENVIA POTT ASSERTED
19 02/01/2013 09:52:51.014 OUT211 – 85TX ASSERTED
18 02/01/2013 09:52:51.014 OUT312 – 85TX RDP ASSERTED
17 02/01/2013 09:52:51.018 IN307 - 85RX ASSERTED
16 02/01/2013 09:52:51.018 OUT313 – 85RX RDP ASSERTED
15 02/01/2013 09:52:51.018 OUT101 – TRIP A ASSERTED
14 02/01/2013 09:52:51.018 OUT102 - TRIP B ASSERTED
13 02/01/2013 09:52:51.018 OUT103 - TRIP C ASSERTED
12 02/01/2013 09:52:51.018 OUT105 – RT GERAL ASSERTED
12 02/01/2013 09:52:51.058 DJ 52–27 Aberto ASSERTED
11 02/01/2013 09:52:59.789 21G1 DEASSERTED
10 02/01/2013 09:52:59.789 21G2 DEASSERTED
9 02/01/2013 09:52:59.789 KEY - ENVIA POTT DEASSERTED
8 02/01/2013 09:52:59.789 OUT211 – 85TX DEASSERTED
7 02/01/2013 09:52:59.789 OUT312 – 85TX RDP DEASSERTED
6 02/01/2013 09:52:59.797 IN307 - 85RX DEASSERTED
5 02/01/2013 09:52:59.797 OUT313 – 85RX RDP DEASSERTED
4 02/01/2013 09:52:59.797 OUT101 – TRIP A DEASSERTED
3 02/01/2013 09:52:59.797 OUT102 - TRIP B DEASSERTED
2 02/01/2013 09:52:59.797 OUT103 - TRIP C DEASSERTED
1 02/01/2013 09:52:59.793 OUT105 – RT GERAL DEASSERTED
=>
SE CEL
Falta fase ‘A’ para terra, 10% da LT do Terminal SE CVO.
=>
CIRCUITO CVO 3 230KV - RELE P Date: 02/01/2013 Time: 09:52:51.010
SE CASCAVEL 230KV Serial Number: 2004222243
Event: AG T Location: 10.17 Time Source: OTHER
Event Number: 10187 Shot 1P: 0 Shot 3P: 0 Freq: 60.00 Group: 1
Targets: COMM FASE_A TERRA
Breaker 1: OPEN Trip Time: 09:52:51.010
Breaker 2: NA
PreFault: IA IB IC IG 3I2 VA VB VC V1mem
MAG(A/kV) 3005 2999 3018 39 13 132.911 132.919 132.941 132.925
ANG(DEG) -179.7 60.0 -60.2 -98.6 -22.2 0.0 -120.0 120.0 0.0
Fault:
MAG(A/kV) 2982 65 64 3012 3017 22.584 126.254 128.428 119.101
ANG(DEG) -97.9 -73.2 -73.4 -96.9 -98.4 -5.0 -115.5 115.1 -0.9
54
=>SER
CIRCUITO CVO 3 230KV - RELE P Date: 02/01/2013 Time: 09:54:19.205
SE CASCAVEL 230KV Serial Number: 2004222243
# DATE TIME ELEMENT STATE
20 02/01/2013 09:52:51.012 21G2 ASSERTED
19 02/01/2013 09:52:51.018 IN307 – 85RX ASSERTED
18 02/01/2013 09:52:51.018 OUT312 – 85RX RDP ASSERTED
17 02/01/2013 09:52:51.018 KEY - ENVIA POTT ASSERTED
16 02/01/2013 09:52:51.018 OUT211 - 85TX ASSERTED
15 02/01/2013 09:52:51.018 OUT313 – 85TX RDP ASSERTED
14 02/01/2013 09:52:51.018 OUT101 – TRIP A ASSERTED
13 02/01/2013 09:52:51.018 OUT102 - TRIP B ASSERTED
12 02/01/2013 09:52:51.018 OUT103 - TRIP C ASSERTED
11 02/01/2013 09:52:51.018 OUT105 – RT GERAL ASSERTED
12 02/01/2013 09:52:51.060 DJ 52–214 Aberto ASSERTED
10 02/01/2013 09:52:59.789 21G2 DEASSERTED
9 02/01/2013 09:52:59.789 IN307 – 85RX DEASSERTED
8 02/01/2013 09:52:59.789 OUT312 – 85RX RDP DEASSERTED
7 02/01/2013 09:52:59.789 KEY - ENVIA POTT DEASSERTED
6 02/01/2013 09:52:59.793 OUT211 - 85TX DEASSERTED
5 02/01/2013 09:52:59.793 OUT313 – 85TX RDP DEASSERTED
4 02/01/2013 09:52:59.793 OUT101 – TRIP A DEASSERTED
3 02/01/2013 09:52:59.793 OUT102 - TRIP B DEASSERTED
2 02/01/2013 09:52:59.793 OUT103 - TRIP C DEASSERTED
1 02/01/2013 09:52:59.793 OUT105 – RT GERAL DEASSERTED
=>
ENVIA POTT), visto que é este terminal observa que a falta se encontra
na sua 1° zona, onde esta unidade se manifesta através de uma saída
55
SE CEL SE CVO
Tipo de
Grandeza Valores Valores
Falta
Primário Secundário Primário Secundário
Ia 2982<-97,6°A 4,97<-97,6°A 19990,2<-94,8°A 33,32<-94,8ª
Ib 64,5<-73,2°A 0,11<-73,2°A 64,5<-73,2°A 0,11<-73,2°A
1߶-T Ic 64,5<-73,2°A 0,11<-73,2°A 64,5<-73,2°A 0,11<-73,2°A
(A-T) Va 0,17<-5°pu 11,29<-5°V 0,12<-7,6°pu 8,03<-7,6°V
Vb 0,95<-115,5°pu 63,08<-115,5°V 0,96<-116,5°pu 63,41<-116,5°V
Vc 0,97<115,1°pu 64,14<115,1°V 0,98<115,9°pu 64,80<115,9°V
Ia 2546,4<-53,30°A 4,24<-53,30°A 16661,1<-56,4°A 27,77<-56,4°A
Ib 2546,4<126,70°A 4,24<126,70°A 16661,1<123,6°A 27,77<123,6°A
2 ߶ Ic 0<0°A 0<0°A 0<0°A 0<0°A
(AB) Va 0,51<-49,40°pu 34,06<-49,40°V 0,51<-52,3°pu 33,99<-52,3°pu
Vb 0,51<-70,90°pu 33,53<-70,90°V 0,5<-68°pu 33,06<-68°pu
Vc 1<120°pu 66,40<120°V 1<120°pu 66,40<120°pu
Ia 3006,7<96,5°A 5,01<96,5°A 20012,6<92,6°A 33,35<92,6°A
Ib 2916,3<-22,1°A 4,86<-22,1°A 19255<-23,8°A 32,09<-23,8°A
2 ߶-T Ic 66,8<-132°A 0,11<-132°A 66,8<48°A 0,11<48°A
(AB-T) Va 0,15<-25,3°pu 9,76<-25,3°V 0,11<-27,2°pu 7,04<-27,2°V
Vb 0,16<-103,6°pu 10,29<-103,6°V 0,11<-106,9°pu 7,30<-106,9°V
Vc 0,91<119,3°pu 60,15<119,3°V 0,92<119,2pu 61,35<119,2V
Ia 2940,4<-83,3°A 4,90<-83,3°A 19238,6<-86,4°A 32,06<-86,4°A
Ib 2940,4<-23,3°A 4,90<-23,3°A 19238,6<-26,4°A 32,06<-26,4°A
Ic 2940,4<-143,3°A 4,90<-143,3°A 19238,6<-146,4°A 32,06<-146,4°A
3 ߶
Va 0,11<-2,7°pu 7,30<-2,7°V 0,08<-5,8°pu 5,31<-5,8°pu
Vb 0,11<-122,7°pu 7,30<-122,7°V 0,08<-125,8°pu 5,31<-125,8°pu
Vc 0,11<117,3°pu 7,30<117,3°V 0,08<114,2°pu 5,31<114,2°pu
Fonte: Autoria Própria.
58
SE CEL SE CVO
Tipo de
Grandeza Valores Valores
Falta
Primário Secundário Primário Secundário
Ia 93,6<-66,1°A 0,16<-66,1°A 93,6<66,1°A 0,16<66,1°A
Ib 7476,2<-157,5°A 12,46<-157,5°A 10707<-203,4°A 17,85<-203,4°A
1߶-T Ic 93,6<-66,1°A 0,16<-66,1°A 93,6<66,1°A 0,16<66,1°A
(B-T) Va 1,01<-1,5°pu 66,73<-1,5°V 0,98<-3,8°pu 64,74<-3,8°V
Vb 0,22<124,8°pu 14,47<-124,8°V 0,34<-125,9°pu 22,38<-125,9°V
Vc 0,97<120,6°pu 64,67<120,6°V 0,96<123,3°pu 63,67<123,3°V
Ia 0<0°A 0<0°A 0<0°A 0<0°A
Ib 6695,4<-173,9°A 11,16<-173,9°A 9738,4<-175,7°A 16,23<-175,7°A
2 ߶ Ic 6695,4<6,1°A 11,16<6,1°A 9738,4<4,3°A 16,23<4,3°A
(BC) Va 1<0°pu 1<0°pu 1<0°pu 66,4<0°V
Vb 0,53<-164,7°pu 35,0<-164,7°pu 0,56<-158,7°pu 36,92<-158,7°V
Vc 0,51<164,2°pu 33,93<164,2°pu 0,52<157,3°pu 34,72<157,3°V
Ia 89,8<-124,4°A 0,15<-124,4°A 89,8<-124,1°A 0,15<-124,1°A
Ib 7757,1<-145°A 12,93<-145°A 11330,5<-147,1°A 18,88<-147,1°A
2 ߶-T Ic 7460,3<-21,7°A 12,43<-21,7°A 10646<-22,3°A 17,74<-22,3°A
(BC-T) Va 0,98<-1°pu 65,13<-1°V 0,93<-1°pu 0,93<-1°V
Vb 0,19<-138,3°pu 12,68<-138,3°V 0,3<-142,5°pu 0,3<-142,5°V
Vc 0,2<130,1°pu 13,08<130,1°V 0,3<131,5°pu 0,3<131,5°V
Ia 7731,1<-84°A 12,89<-84°A 11244<-85,7°A 18,74<-85,7°A
Ib 7731,1<156,1°A 12,89<156,1°A 11244,9<154,3°A 18,74<154,3°A
Ic 7731,1<36°A 12,89<36°A 11244,9<34,3°A 18,74<34,3°A
3 ߶
Va 0,16<-3,3°pu 10,69<-3,3°V 0,23<-5°pu 15,54<-5°V
Vb 0,16<-123,3°pu 10,69<-123,3°V 0,23<-125°pu 15,54<-125°V
Vc 0,16<116,7°pu 10,69<116,7°V 0,23<115°pu 15,54<115°V
Fonte: Autoria Própria.
59
6. AVALIAÇÃO FINANCEIRA
7. CONCLUSÃO
8. REFERÊNCIAS
GRAINGER, Jonh J.; STEVENSON, Willian D. Power System Analysis. New York:
McGraw-Hill, 1994.