Você está na página 1de 2

RELEASE DE MERCADO

1T24
10 DE ABRIL/2024
A NEOENERGIA S.A. (B3: NEOE3), DIVULGA AS INFORMAÇÕES PRÉVIAS E NÃO AUDITADAS REFERENTES AO MERCADO DE ENERGIA
ELÉTRICA DO PRIMEIRO TRIMESTRE (1T24) DOS SEGMENTOS DE ATUAÇÃO DA COMPANHIA, QUE INTEGRAM O RELATÓRIO “IBE-
WATCH FACT SHEET” DIVULGADO PELO SEU CONTROLADOR IBERDROLA S.A..

DISTRIBUIÇÃO
ENERGIA INJETADA (GWh)
1T24
Total

SIN + Sistema Isolado 6.961 5.489 4.763 1.708 1.891 20.812

Energia Injetada pela GD 418 250 322 197 104 1.290

ENERGIA INJETADA TOTAL 7.379 5.739 5.085 1.905 1.995 22.102

% ano anterior 7,6% 9,9% 8,7% 8,6% 4,0% 8,2%

ENERGIA DISTRIBUÍDA (GWh)


1T24
Total

Energia Distribuída 5.730 5.064 3.763 1.549 1.688 17.794

Energia de Compensação GD 342 225 290 170 97 1.124

ENERGIA DISTRIBUÍDA TOTAL 6.072 5.289 4.053 1.719 1.786 18.918

% ano anterior 8,2% 12,3% 6,3% 6,4% 6,0% 8,5%

NOTA: Neoenergia Coelba, Neoenergia Cosern e Neoenergia Elektro com mercados ajustados recompensando migrações de GD nas RTP de 2023.

A Energia Injetada apresentou crescimento de 8,2% no 1T24 vs. 1T23.


A Energia Distribuída apresentou crescimento de 8,5% no 1T24 vs. 1T23.
Segue abaixo a performance por segmento (1T24 vs. 1T23):
Neoenergia Coelba: residencial (+5,4%); industrial (+4,6%); comercial (+2,3%); rural (+25,2%) e Outros Poder Público (+5,2%).

Neoenergia Elektro: residencial (+13,3%); industrial (+8,8%); comercial (+10,1%); rural (+21,9%) e Outros Poder Público (+5,6%).

Neoenergia Pernambuco: residencial (+6,8%); industrial (-4,2%); comercial (+3,3%); rural (+0,8%) e Outros Poder Público (+5,0%).

Neoenergia Cosern: residencial (+6,1%); industrial (+2,0%); comercial (+1,1%); rural (-6,4%) e Outros Poder Público (+2,7%).

Neoenergia Brasília: residencial (+4,4%); industrial (-3,6%); comercial (+5,6%); rural (0,0%) e Outros Poder Público (+1,9%).

GERAÇÃO
Energia Gerada vs. 1T23 Capacidade
1T24 1T23
(GWh) (¹) % Instalada (MW) (¹)

Hidráulicas 2.238 4.037 (44,6%) 2.159


Eólicas 775 882 (12,2%) 1.554
Solar 65 61 5,9% 149 (²)

FOTO: Complexo Chafariz - PB


Termopernambuco 61 - N/A 533
FOTO: UHE Itapebi - BA

TOTAL 3.138 4.979 (37,0%) 4.395


(1)
Considera a participação da Neoenergia
(2)
Capacidade solar em MWp

HÍDRICA EÓLICA
Menor geração no 1T24 se comparado ao 1T23, em função Menor geração no 1T24 em função da menor eolicidade no
da permuta de ativos com Eletrobras. período.

SOLAR TÉRMICA
Maior geração no 1T24 em No 1T24 a Termopernambuco
razão da entrada completa gerou 61 GWh de energia,
em operação do Complexo enquanto no ano anterior não
Solar Luzia. houve geração. O resultado segue
preservado pelos contratos de
venda e sua estrutura de custos.
FOTO: Complexo Solar Luzia - PB FOTO: UTE Termopernambuco - PE

RELAÇÕES COM INVESTIDORES


Site: ri.neoenergia.com
E-mail: ri@neoenergia.com
Telefone: (21) 3235 - 9828
MARKET RELEASE
1Q24
APRIL 10TH/2024
NEOENERGIA S.A. (B3: NEOE3) DISCLOSES PRIOR AND UNAUDITED MARKET INFORMATION OF ITS FIRST QUARTER (1Q24)
REGARDING THE ELECTRICITY MARKET FOR THE COMPANY'S SEGMENTS, THAT INTEGRATES THE “IBE-WATCH FACT SHEET”
REPORT RELEASED BY ITS SHAREHOLDER IBERDROLA S.A..

DISTRIBUTION
INJECTED ENERGY (GWh)
1Q24
Total

SIN + Isolated Systems 6,961 5,489 4,763 1,708 1,891 20,812

DG Injected Energy 418 250 322 197 104 1,290

TOTAL INJECTED ENERGY 7,379 5,739 5,085 1,905 1,995 22,102

% previous year 7.6% 9.9% 8.7% 8.6% 4.0% 8.2%

DISTRIBUTED ENERGY (GWh)


1Q24
Total

Distributed Energy 5,730 5,064 3,763 1,549 1,688 17,794

DG Compensation Energy 342 225 290 170 97 1,124

TOTAL DISTRIBUTED ENERGY 6,072 5,289 4,053 1,719 1,786 18,918

% previous year 8.2% 12.3% 6.3% 6.4% 6.0% 8.5%

NOTE: Neoenergia Coelba, Neoenergia Cosern and Neoenergia Elektro with markets adjusted in the 2023 RTP offseting DG migrations.

Injected Energy increased 8.2% in 1Q24 vs. 1Q23.


Distributed Energy increased 8.5% in 1Q24 vs. 1Q23.
See below the performance by segment (1Q24 vs. 1Q23):
Neoenergia Coelba: residential (+5.4%); industrial (+4.6%); commercial (+2.3%); rural (+25.2%) and Others Public Power (+5.2%).

Neoenergia Elektro: residential (+13.3%); industrial (+8.8%); commercial (+10.1%); rural (+21.9%) and Others Public Power (+5.6%).

Neoenergia Pernambuco: residential (+6.8%); industrial (-4.2%); commercial (+3.3%); rural (+0.8%) and Others Public Power (+5.0%).

Neoenergia Cosern: residential (+6.1%); industrial (+2.0%); commercial (+1.1%); rural (-6.4%) and Others Public Power (+2.7%).

Neoenergia Brasília: residential (+4.4%); industrial (-3.6%); commercial (+5.6%); rural (0.0%) and Others Public Power (+1.9%).

GENERATION
Generated Energy vs. 1Q23 Installed Capacity
1Q24 1Q23
(GWh) (¹) % (MW) (¹)

Hydro 2,238 4,037 (44.6%) 2,159


Wind 775 882 (12.2%) 1,554
Solar 65 61 5.9% 149 (²)

PHOTO: Chafariz Complex - PB


Termopernambuco 61 - N/A 533
PHOTO: UHE Itapebi - BA

TOTAL 3,138 4,979 (37.0%) 4,395


(¹)
Considers Neoenergia's shares
(2)
Solar Installed Capacity in MWp

HYDRO WIND
Lower generation in 1Q24 compared to 1Q23, due to the Lower generation in 1Q24 due to lower winds in the period.
asset swap agreement with Eletrobras.

SOLAR THERMO
Higher generation in 1Q24 Termopernambuco generated 61
due to the complete start of GWh in 1Q24, while in the previous
operation of Luzia Solar year there was no generation. The
Complex. result continues to be preserved
by sales contracts and its cost
structure.
PHOTO: Luzia Solar Complex- PB PHOTO: UTE Termopernambuco - PE

INVESTORS RELATIONS
Website: ri.neoenergia.com
E-mail: ri@neoenergia.com
Phone: +55 (21) 3235 - 9828

Você também pode gostar