Escolar Documentos
Profissional Documentos
Cultura Documentos
1T24
10 DE ABRIL/2024
A NEOENERGIA S.A. (B3: NEOE3), DIVULGA AS INFORMAÇÕES PRÉVIAS E NÃO AUDITADAS REFERENTES AO MERCADO DE ENERGIA
ELÉTRICA DO PRIMEIRO TRIMESTRE (1T24) DOS SEGMENTOS DE ATUAÇÃO DA COMPANHIA, QUE INTEGRAM O RELATÓRIO “IBE-
WATCH FACT SHEET” DIVULGADO PELO SEU CONTROLADOR IBERDROLA S.A..
DISTRIBUIÇÃO
ENERGIA INJETADA (GWh)
1T24
Total
NOTA: Neoenergia Coelba, Neoenergia Cosern e Neoenergia Elektro com mercados ajustados recompensando migrações de GD nas RTP de 2023.
Neoenergia Elektro: residencial (+13,3%); industrial (+8,8%); comercial (+10,1%); rural (+21,9%) e Outros Poder Público (+5,6%).
Neoenergia Pernambuco: residencial (+6,8%); industrial (-4,2%); comercial (+3,3%); rural (+0,8%) e Outros Poder Público (+5,0%).
Neoenergia Cosern: residencial (+6,1%); industrial (+2,0%); comercial (+1,1%); rural (-6,4%) e Outros Poder Público (+2,7%).
Neoenergia Brasília: residencial (+4,4%); industrial (-3,6%); comercial (+5,6%); rural (0,0%) e Outros Poder Público (+1,9%).
GERAÇÃO
Energia Gerada vs. 1T23 Capacidade
1T24 1T23
(GWh) (¹) % Instalada (MW) (¹)
HÍDRICA EÓLICA
Menor geração no 1T24 se comparado ao 1T23, em função Menor geração no 1T24 em função da menor eolicidade no
da permuta de ativos com Eletrobras. período.
SOLAR TÉRMICA
Maior geração no 1T24 em No 1T24 a Termopernambuco
razão da entrada completa gerou 61 GWh de energia,
em operação do Complexo enquanto no ano anterior não
Solar Luzia. houve geração. O resultado segue
preservado pelos contratos de
venda e sua estrutura de custos.
FOTO: Complexo Solar Luzia - PB FOTO: UTE Termopernambuco - PE
DISTRIBUTION
INJECTED ENERGY (GWh)
1Q24
Total
NOTE: Neoenergia Coelba, Neoenergia Cosern and Neoenergia Elektro with markets adjusted in the 2023 RTP offseting DG migrations.
Neoenergia Elektro: residential (+13.3%); industrial (+8.8%); commercial (+10.1%); rural (+21.9%) and Others Public Power (+5.6%).
Neoenergia Pernambuco: residential (+6.8%); industrial (-4.2%); commercial (+3.3%); rural (+0.8%) and Others Public Power (+5.0%).
Neoenergia Cosern: residential (+6.1%); industrial (+2.0%); commercial (+1.1%); rural (-6.4%) and Others Public Power (+2.7%).
Neoenergia Brasília: residential (+4.4%); industrial (-3.6%); commercial (+5.6%); rural (0.0%) and Others Public Power (+1.9%).
GENERATION
Generated Energy vs. 1Q23 Installed Capacity
1Q24 1Q23
(GWh) (¹) % (MW) (¹)
HYDRO WIND
Lower generation in 1Q24 compared to 1Q23, due to the Lower generation in 1Q24 due to lower winds in the period.
asset swap agreement with Eletrobras.
SOLAR THERMO
Higher generation in 1Q24 Termopernambuco generated 61
due to the complete start of GWh in 1Q24, while in the previous
operation of Luzia Solar year there was no generation. The
Complex. result continues to be preserved
by sales contracts and its cost
structure.
PHOTO: Luzia Solar Complex- PB PHOTO: UTE Termopernambuco - PE
INVESTORS RELATIONS
Website: ri.neoenergia.com
E-mail: ri@neoenergia.com
Phone: +55 (21) 3235 - 9828