CRONOGRAMA FSICO-FINANCEIRO
DISCRIMINAO
01. SERVIOS PRELIMINARES E GERAIS
02. INSTALAES DO CANTEIRO
03. MOVIMENTO DE TERRA
04. INFRA-ESTRUTURA
05. SUPERESTRUTURA
06. DEMOLIES E REMOES
07. PAREDES E PAINIS
08. COBERTURA
09. IMPERMEABILIZAO
10. REVESTIMENTOS DE PAREDES
11. PORTAS, ESQUADRIAS E VIDROS
12. PISOS
13. RODAPS, SOLEIRAS E PEITORIS
14. FORROS, DIVISRIAS E PISOS FALSOS
15. CARPINTARIA E MARCENARIA
16. SERRALHERIA
17. PINTURA
18. INSTALAES ELTRICAS
19. INSTALAES ESPECIAIS CABEAMENTO ESTRUTURADO
INSTALAES ESPECIAIS - AR CONDICIONADO E
VENTILAO MECNICA
INSTALAES ESPECIAIS PREVENO E COMBATE A
21.
INCNDIO
INSTALAES ESPECIAIS CONTROLE DE ACESSO E
22.
CFTV
20.
TOTAL DO
ITEM
11.33
564,090.69
0.78
38,752.63
0.03
1,632.00
1.16
57,757.52
17.16
854,516.12
0.03
1,682.27
1.41
70,229.29
1.38
68,708.46
1.12
55,971.45
4.07
202,588.79
3.53
175,814.62
6.84
340,793.13
0.69
34,216.66
9.70
483,222.29
0.30
14,820.72
1.96
97,654.20
1.01
50,369.35
13.90
692,206.75
2.14
106,643.40
11.44
569,696.82
1.56
77,885.45
0.75
37,233.86
0.81
40,294.33
0.43
21,378.45
0.76
37,906.01
4.69
233,356.81
0.25
12,667.41
0.31
15,492.02
0.10
5,051.88
0.36
17,744.64
100.00
4,980,378.01
6,225,472.51
-----
UNID.
1 MS
2 MS
3 MS
4 MS
5 MS
6 MS
7 MS
8 MS
9 MS
10 MS
11 MS
12 MS
13 MS
14 MS
15 MS
16 MS
17 MS
18 MS
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
%
R$
R$
%
R$
12.00
67,690.88
100.00
38,752.63
100.00
1,632.00
10.00
5,775.75
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
5.00
28,204.53
8.00
45,127.25
90.00
51,981.77
10.00
85,451.61
25.00
213,629.03
25.00
213,629.03
20.00
170,903.22
20.00
170,903.22
16.00
269.16
84.00
1,413.11
20.00
14,045.86
10.00
5,597.15
20.00
11,194.29
20.00
14,045.86
10.00
5,597.15
30.00
21,068.79
20.00
11,194.29
10.00
20,258.88
10.00
34,079.31
20.00
14,045.86
50.00
34,354.23
20.00
11,194.29
10.00
20,258.88
20.00
35,162.92
10.00
34,079.31
5.00
34,610.34
5.00
5,332.17
10.00
2,137.84
15.00
5,585.08
25.00
10,073.58
10.00
2,137.84
5.00
34,610.34
5.00
5,332.17
15.00
11,682.82
15.00
5,585.08
25.00
10,073.58
10.00
2,137.84
10.00
7,022.93
50.00
34,354.23
20.00
11,194.29
10.00
20,258.88
20.00
35,162.92
10.00
34,079.31
10.00
69,220.67
10.00
10,664.34
20.00
15,577.09
15.00
5,585.08
25.00
10,073.58
20.00
4,275.69
10.00
20,258.88
20.00
35,162.92
20.00
68,158.63
10.00
20,258.88
20.00
35,162.92
20.00
68,158.63
50.00
17,108.33
5.00
24,161.11
10.00
69,220.67
10.00
10,664.34
10.00
56,969.68
20.00
15,577.09
10.00
69,220.67
10.00
10,664.34
10.00
56,969.68
20.00
15,577.09
25.00
5,344.61
25.00
5,344.61
20.00
40,517.76
20.00
35,162.92
30.00
102,237.94
50.00
17,108.33
15.00
72,483.34
10.00
69,220.67
10.00
10,664.34
10.00
56,969.68
20.00
40,517.76
35.00
169,127.80
20.00
138,441.35
20.00
21,328.68
20.00
113,939.36
2.50
443.62
3.45
171,678.67
214,598.34
5.75
357,803.40
2.50
443.62
5.09
253,471.47
316,839.34
10.84
674,642.74
2.50
443.62
4.98
247,874.33
309,842.91
15.81
984,485.65
2.50
443.62
4.97
247,676.55
309,595.68
20.79
1,294,081.33
2.50
443.62
5.02
249,814.39
312,267.99
25.80
1,606,349.32
2.50
443.62
2.79
138,909.12
173,636.40
28.59
1,779,985.72
Joo Pessoa/PB,
2.50
443.62
4.28
213,086.16
266,357.70
32.87
2,046,343.42
2.50
443.62
5.74
286,117.17
357,646.46
38.62
2,403,989.89
2.50
443.62
6.22
310,004.98
387,506.22
44.84
2,791,496.11
2.50
443.62
7.05
351,274.42
439,093.03
51.89
3,230,589.14
20.00
96,644.46
50.00
7,410.36
20.00
10,073.87
30.00
207,662.02
30.00
31,993.02
20.00
113,939.36
20.00
19,530.84
30.00
15,110.80
80.00
78,123.36
30.00
15,110.80
20.00
113,939.36
10.00
56,969.68
25.00
120,805.57
50.00
7,410.36
20.00
10,073.87
25.00
19,471.36
55.00
20,478.62
25.00
10,073.58
15.00
35,003.52
2.50
443.62
2.30
114,564.04
143,205.06
2.30
143,205.06
10.00
20,258.88
2.50
443.62
8.69
433,013.14
541,266.43
60.59
3,771,855.57
/2008
3.00
532.34
10.99
547,095.35
683,869.18
71.57
4,455,724.75
15.00
35,003.52
15.00
35,003.52
3.00
532.34
8.99
447,667.55
559,584.44
80.56
5,015,309.19
100.00
5,051.88
3.00
532.34
4.36
217,373.28
271,716.60
84.93
5,287,025.79
50.00
18,953.00
15.00
35,003.52
3.00
532.34
4.68
232,897.24
291,121.55
89.60
5,578,147.34
50.00
18,953.00
20.00
46,671.36
20.00
3,098.40
20.00
46,671.36
100.00
12,667.41
80.00
12,393.62
3.00
532.34
4.25
211,588.33
264,485.41
93.85
5,842,632.75
55.00
9,759.55
6.15
306,271.81
382,839.76
100.00
6,225,472.51
TOTAL
100.00
564,090.69
100.00
38,752.63
100.00
1,632.00
100.00
57,757.52
100.00
854,516.12
100.00
1,682.27
100.00
70,229.29
100.00
68,708.46
100.00
55,971.45
100.00
202,588.79
100.00
175,814.62
100.00
340,793.13
100.00
34,216.66
100.00
483,222.29
100.00
14,820.72
100.00
97,654.20
100.00
50,369.35
100.00
692,206.75
100.00
106,643.40
100.00
569,696.82
100.00
77,885.45
100.00
37,233.86
100.00
40,294.33
100.00
21,378.45
100.00
37,906.01
100.00
233,356.81
100.00
12,667.41
100.00
15,492.02
100.00
5,051.88
100.00
17,744.64
100.00
4,980,378.01
6,225,472.51
-----
PODER JUDICIRIO
JUSTIA FEDERAL NA PARABA
SEO DE LI CI TAES E CONTRATOS
EDI TAL DE LI CI TAO MODALIDADE CONCORRNCIA - N 01/2008
ANEXO I X ORAMENTOS ESTIMADOS EM PLANILHAS DE QUANTI TATIVOS E PREOS UNI TRIOS, COMPOSIO UNI TRIA
DE CUSTOS E TABELA ABC
PLANILHA ORAMENTRIA
DISCRIMINAO
ITEM
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
01.
3,196.00
0.00
2.99
2.99
9,556.04
M2
3,196.00
0.00
6.01
6.01
19,207.96
UNID
150.00
0.00
4.95
4.95
742.50
01.02.01 ENGENHEIRO
01.02.02 MESTRE DE OBRAS
MS
18.00
8,291.70
0.00
8,291.70
149,250.60
MS
18.00
5,527.80
0.00
5,527.80
99,500.40
01.02.03 ENCARREGADO
01.02.04 APONTADOR
MS
18.00
2,763.00
0.00
2,763.00
49,734.00
MS
18.00
1,381.95
0.00
1,381.95
24,875.10
01.02.05 ALMOXARIFE
01.02.06 VIGIA
MS
18.00
1,842.60
0.00
1,842.60
33,166.80
MS
18.00
1,381.95
0.00
1,381.95
24,875.10
MS
18.00
921.03
0.00
921.03
16,578.54
01.03.01 FERRAMENTAS
01.03.02 EQUIPAMENTOS DE PROTEO INDIVIDUAL
MS
18.00
0.00
577.45
577.45
10,394.05
CJ
40.00
0.00
164.32
164.32
6,572.84
VB
1.00
0.00
1,200.00
1,200.00
1,200.00
MS
18.00
0.00
179.18
179.18
3,225.24
MS
6.00
0.00
6,667.92
6,667.92
40,007.52
900.00
0.00
10.56
10.56
9,504.00
MS
18.00
0.00
120.00
120.00
2,160.00
MS
18.00
0.00
500.00
500.00
9,000.00
MS
18.00
0.00
200.00
200.00
3,600.00
MS
18.00
0.00
200.00
200.00
3,600.00
MS
18.00
0.00
80.00
80.00
1,440.00
13,500.00
0.00
3.40
3.40
45,900.00
04.
05.
M2
150.00
58.62
104.60
163.22
24,482.59
VB
1.00
0.00
4,510.56
4,510.56
4,510.56
UNID
1.00
0.00
300.00
300.00
300.00
M2
90.00
9.96
15.20
25.16
2,264.47
M2
1,200.00
4.04
0.00
4.04
4,845.00
M2
1,200.00
1.26
0.69
1.96
MOVIMENTO DE TERRA
03.01. PREPARO DO TERRENO
03.01.01 NIVELAMENTO
INFRA-ESTRUTURA
04.01.01 ESCAVAO DE TUBULES
2,350.01
1,632.00
M3
120.00
13.60
0.00
13.60
1,632.00
M3
78.24
125.20
0.00
125.20
57,757.52
9,795.65
KG
4,764.40
0.63
3.74
4.36
20,791.84
KG
493.10
0.83
3.85
4.68
2,308.89
M3
103.13
15.03
201.98
217.01
22,380.04
112.68
9.80
12.22
22.02
M2
SUPER-ESTRUTURA
07.
38,752.63
06.
564,090.69
M2
01.01.02 AS BUILT
COPIAS XEROGRAFICAS, PLOTAGENS E
01.01.03 RECONHECIMENTO DE FIRMAS
01.02. ADMINISTRAO DA OBRA
03.
TOTAL DO ITEM
TOTAL UNITRIO
02.
MATERIAL
DEMOLIES E REMOES
06.01.01 REMOO DE POSTE DE ILUMINAO
DEMOLIO DE ALVENARIA COM ESQUADRIA
06.01.02
DEMOLIO DE DIVISRIA COMUM COM
06.01.03 ESQUADRIA
06.01.04 DEMOLIO DE MURO EM ALVENARIA
KG
5,427.70
0.83
3.85
4.68
25,414.66
KG
98,627.60
0.63
3.74
4.36
430,410.85
M2
6,782.47
9.80
12.22
22.02
149,343.21
M3
971.80
15.03
213.15
228.18
221,745.32
KG
4,953.89
1.56
4.01
5.57
27,602.08
UNID
4.00
29.16
0.00
29.16
1,682.27
116.64
M2
6.00
14.39
0.00
14.39
86.35
M2
6.00
6.70
0.00
6.70
40.18
M2
100.00
14.39
0.00
14.39
1,439.10
PAREDES E PAINIS
PAREDES DE ALVENARIA DE TIJOLO
07.01. CERMICO
PAREDE DE ALVENARIA DE BLOCO CERMICO
07.01.01 - VEZ
PAREDE DE ALVENARIA DE BLOCO CERMICO
07.01.02 1 VEZ
2,481.10
854,516.12
70,229.29
M2
1,187.00
11.35
9.32
20.66
24,525.58
M2
1,600.00
17.17
11.40
28.56
45,703.71
2 de 82
DISCRIMINAO
ITEM
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
08.01. TELHAS
08.01.01 TELHA TERMO ACSTICA COM PINTURA
68,708.46
M2
540.50
2.17
90.65
92.82
50,168.89
08.01.02 ALGEROZ
08.01.03 CALHA
285.00
4.90
22.69
27.59
7,864.26
84.00
9.80
4.36
14.16
1,189.18
08.01.04 CLARABIA
IMPERMEABILIZAO
M2
44.00
4.90
210.69
215.59
10.
TOTAL DO ITEM
TOTAL UNITRIO
COBERTURA
08.
09.
MATERIAL
M2
605.00
3.22
4.28
7.50
4,539.80
M2
605.00
25.83
19.94
45.77
27,692.25
M2
50.00
4.40
6.27
10.67
533.60
M2
186.00
4.40
12.78
17.18
3,194.55
M2
236.00
1.18
12.08
13.26
3,128.65
M2
334.00
6.91
13.69
20.60
6,879.73
M2
605.00
6.14
4.45
10.58
6,403.47
M2
420.00
4.40
4.17
8.57
3,599.40
202,588.79
M2
2,787.00
0.97
1.16
2.13
5,947.40
M2
2,787.00
7.91
2.13
10.04
27,979.14
M2
98.00
5.35
29.34
34.69
3,399.67
M2
1,145.00
9.17
56.77
65.94
75,503.02
45.69
51.04
15,107.54
19,433.10
49,963.02
M2
296.00
5.35
M2
380.75
5.35
45.69
51.04
M2
221.00
11.61
214.47
226.08
M2
40.00
7.64
123.76
131.40
11.
9,486.13
55,971.45
5,255.90
175,814.62
UNID
35.00
33.65
382.17
415.82
14,553.66
UNID
2.00
40.11
821.02
861.13
1,722.26
UNID
8.00
34.24
502.11
536.35
4,290.76
M2
247.00
30.38
151.16
181.54
44,841.49
11.02.02
M2
51.00
30.38
151.16
181.54
9,258.77
UNID
7.00
32.28
682.11
714.39
5,000.70
UNID
7.00
43.78
954.73
998.51
6,989.60
M2
186.00
30.54
140.46
171.00
31,806.74
M2
46.10
8.40
133.95
142.35
6,562.34
M2
298.00
8.40
85.00
93.40
27,833.20
M2
51.00
3.98
29.00
32.98
1,681.98
3 de 82
DISCRIMINAO
ITEM
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
14.
TOTAL DO ITEM
TOTAL UNITRIO
UNID
40.00
8.40
39.72
48.12
1,924.80
UNID
8.00
8.40
93.89
102.29
818.32
UNID
52.00
60.00
120.00
180.00
9,360.00
UNID
2.00
80.00
380.00
460.00
920.00
UNID
44.00
7.50
135.00
142.50
6,270.00
UNID
8.00
7.50
240.00
247.50
PISOS
12.
13.
MATERIAL
CHAPIM
DE
GRANITO
ARABESBO
,
ACABAMENTO POLIDO , 2mm DE ESPESSURA
13.01.07 ,25cm DE LARGURA
FORROS, DIVISRIAS E PISOS FALSOS
14.01. FORROS
FORRO ACSTICO ECOMIN-AMF REMOVVEL E
MODULADO DE FIBRA MINERAL, PLACAS DE
62,5 X 125 MM, ESPESSURA DE 13mm, COR
14.01.01 BRANCO.
FORRO EM GESSO ACARTONADO COM
14.01.02 TABICA
RECUPERAO DE FORRO EM GESSO - ED.
SEDE
14.01.03
14.02. DIVISRIAS REMOVVEIS
1,980.00
340,793.13
976.80
3.71
3.91
7.62
7,439.35
27.56
27.65
224.86
252.51
6,959.04
M2
192.50
3.05
35.29
38.33
7,379.28
M2
976.80
3.75
43.03
46.78
45,698.53
M2
461.00
5.35
41.05
46.40
21,389.80
M2
47.60
13.34
127.70
141.04
6,713.34
M2
261.00
13.34
127.70
141.04
36,810.53
M2
245.00
13.34
127.70
141.04
34,553.94
M2
41.50
13.34
127.70
141.04
5,853.01
M2
927.30
1.88
137.42
139.30
129,171.22
M2
275.60
1.66
101.66
103.32
28,475.68
M2
21.20
12.98
195.00
207.98
4,409.18
UNID
25.00
0.97
6.50
7.47
186.80
UNID
770.00
0.97
6.50
7.47
5,753.44
M2
M3
34,216.66
1,125.30
11.34
8.99
20.33
22,871.99
70.00
11.34
18.05
29.39
2,057.09
23.20
11.34
18.05
29.39
681.78
7.60
11.34
18.05
29.39
223.34
2.40
11.34
18.05
29.39
70.53
16.00
11.35
30.05
41.40
662.39
184.83
11.34
30.05
41.39
7,649.55
483,222.29
M2
491.00
9.80
45.00
54.80
26,906.80
M2
1,340.00
6.50
30.00
36.50
48,910.00
M2
15.00
6.50
30.00
36.50
547.50
4 de 82
DISCRIMINAO
ITEM
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
15.
16.
9.77
240.00
249.77
219,396.21
M2
34.50
8.18
135.00
143.18
4,939.57
M2
50.00
9.77
135.00
144.77
7,238.40
M2
927.30
9.03
180.00
189.03
175,283.81
14,820.72
M2
5.80
44.49
215.00
259.49
3.20
7.84
273.32
281.16
899.71
10.50
7.84
273.32
281.16
2,952.18
8.60
7.84
273.32
281.16
2,417.98
UNID
1.00
156.80
6,889.00
7,045.80
17.01. EMASSAMENTO
17.01.01 EMASSAMENTO COM MASSA PVA
17.01.02 EMASSAMENTO COM MASSA ACRILICA
17.02. PINTURA
17.02.01 PINTURA PVA PARA FORRO
PINTURA ACRLICA SOBRE MASSA PVA,
ACABAMENTO ACETINADO, COR BRANCO
NEVE
17.02.02
PINTURA ACRLICA COM MASSA PVA
TEXTURIZADA, COM ACABAMENTO
17.02.03 ACETINADO, COR BRANCO NEVE
17.02.04
1,505.06
7,045.80
97,654.20
124.00
16.22
428.95
445.17
UNID
22.00
19.44
230.00
249.44
5,487.68
132.00
9.87
171.00
180.87
23,874.84
M2
26.50
9.87
171.00
180.87
4,793.06
M2
37.00
9.87
171.00
180.87
6,692.19
UNID
7.00
33.00
123.19
156.19
1,093.33
UNID
9.00
1.94
55.00
56.94
M2
PINTURA
17.
18.
878.40
15.02. DIVERSOS
15.02.01 BALCAO COM VIDRO TIPO A
TOTAL DO ITEM
TOTAL UNITRIO
M2
15.01. ARMRIOS
15.01.01 ARMARIO EM MDF
MATERIAL
55,200.61
512.50
50,369.35
M2
1,340.00
3.16
2.82
5.98
8,016.42
M2
2,047.00
3.16
2.35
5.51
11,277.74
M2
1,340.00
3.73
3.64
7.36
9,868.03
M2
2,047.00
3.73
4.37
8.10
16,579.06
M2
200.00
3.73
4.37
8.10
1,619.84
M2
156.00
2.52
6.51
9.03
1,408.26
1.00
300.00
1,300.00
1,600.00
VB
1,600.00
692,206.75
1.00
200.00
400.00
600.00
600.00
UNID
840.00
0.08
0.50
0.58
487.20
UNID
840.00
0.08
0.60
0.68
571.20
UNID
500.00
0.08
0.95
1.03
515.00
UNID
360.00
0.00
0.05
0.05
18.00
MTS
3,000.00
0.49
12.46
12.95
38,850.00
MTS
1,000.00
0.49
1.94
2.43
2,428.00
MTS
100.00
0.88
3.37
4.25
425.25
MTS
100.00
0.98
5.18
6.16
615.65
MTS
300.00
1.18
7.76
8.94
2,680.65
MTS
100.00
1.47
11.97
13.44
1,344.00
VB
5 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
MTS
100.00
1.47
15.76
17.23
1,723.05
MTS
100.00
1.96
21.35
23.31
2,330.65
MTS
100.00
1.96
29.83
31.79
3,179.05
MTS
100.00
2.45
41.79
44.24
4,424.00
MTS
200.00
3.68
48.29
51.97
10,394.70
MTS
100.00
2.94
75.17
78.11
7,810.95
MTS
600.00
3.43
101.81
105.24
63,142.80
MTS
17,000.00
0.49
2.10
2.59
44,050.40
MTS
9,000.00
1.37
1.22
2.60
23,364.00
MTS
21.00
1.18
10.38
11.56
242.68
MTS
18.00
1.47
25.63
27.10
487.80
MTS
21.00
1.96
42.35
44.31
930.51
UNID
450.00
0.40
3.88
4.28
1,927.53
UNID
60.00
2.65
10.40
13.05
782.76
UNID
500.00
2.45
2.90
5.35
2,675.00
UNID
35.00
2.74
9.04
11.78
412.44
UNID
200.00
2.47
1.79
4.26
851.54
UNID
15.00
11.74
7.86
19.60
293.93
UNID
49.00
1.96
295.74
297.70
14,587.30
UNID
2.00
1.96
346.30
348.26
696.52
UNID
4.00
1.96
425.00
426.96
1,707.84
UNID
17.00
2.94
6.20
9.14
155.38
UNID
61.00
2.94
6.80
9.74
594.14
UNID
5.00
8.82
41.22
50.04
250.20
UNID
2.00
9.31
75.00
84.31
168.62
UNID
10.00
9.80
82.09
91.89
918.90
UNID
2.00
19.60
151.31
170.91
341.82
UNID
6.00
35.46
218.97
254.43
1,526.56
UNID
2.00
19.60
1,520.00
1,539.60
3,079.20
6 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
18.01.53
HASTE PARA ATERRAMETO COBREADA DE
5/8" X 2.400 MM, INCLUSIVE CONECTOR GTDU,
18.01.54 INSTALADA CFE ESPECIFICAES.
INSTALAO DE CAIXA EM ALVENARIA NAS
DIMENSES
40X40X40
CM,
COM
ACABAMENTO
INTERNO
18.01.55
INSTALAO DE CAIXA EM ALVENARIA NAS
DIMENSES
100X100X80
CM,
COM
ACABAMENTO
INTERNO
18.01.56
INTERRUPTOR DE EMBUTIR 2 TECLAS
SIMPLES (TENSO: 250 V / CORRENTE
18.01.57 ELTRICA: 10 A)
INTERRUPTOR DE EMBUTIR 3 TECLAS
SIMPLES (TENSO: 250 V / CORRENTE
18.01.58 ELTRICA: 10 A)
INTERRUPTOR DE EMBUTIR 1 TECLA SIMPLES
(TENSO: 250 V / CORRENTE ELTRICA: 10 A)
18.01.59
INTERRUPTOR DE EMBUTIR THREE-WAY
(TENSO: 250 V / CORRENTE ELTRICA: 10 A)
18.01.60
18.01.61 TERMINAL DE FECHAMENTO DE 100 X 50 MM
LMPADA FLUORESCENTE COMPACTA DE
18.01.64 18W
REFLETOR EM ALUMINIO ANODIZADO ALTO
BRILHO,
COM
DIFUSOR
EM
VIDRO
TEMPERADO
TRANSPARENTE,
PARA
LMPADA MASTER COLOUR PAR 30-35 / 75W,
COMPLETA, INCLUINDO: LMPADA MASTER
COLOUR PAR 30-35 DE 75W, BOCAL E DEMAIS
ITENS NECESSRIOS AO SEU PERFEITO
FUNCIONAMENTO E FIXAO,
18.01.65
LUMINARIA DO TIPO ORNAMENTAL ESPECIAL,
QUADRADA, COM ESPELHO TRANSPARENTE
DE VIDRO E CORPO DE FERRO GALVANIZADO,
NAS DIMENSES 40 X 30 CM
18.01.67
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
2.00
19.60
2,650.00
2,669.60
5,339.20
300.00
13.03
23.08
36.11
10,834.20
500.00
0.78
4.04
4.82
2,412.00
UNID
1,000.00
1.00
4.23
5.23
5,232.50
UNID
30.00
1.47
9.42
10.89
326.79
UNID
4.00
1.96
21.04
23.00
91.98
UNID
40.00
2.45
37.36
39.81
1,592.24
UNID
700.00
4.80
1.84
6.64
4,649.40
UNID
12.00
5.59
4.28
9.87
118.39
UNID
12.00
3.57
29.15
32.72
392.64
UNID
12.00
6.08
23.34
29.42
352.99
UNID
65.00
2.30
11.70
14.00
909.83
UNID
120.00
0.53
0.75
1.28
154.00
UNID
12.00
7.62
56.14
63.76
765.13
UNID
40.00
212.72
101.93
314.65
12,585.97
UNID
6.00
62.25
679.33
741.59
4,449.52
UNID
10.00
6.27
7.30
13.57
135.72
UNID
10.00
8.23
18.09
26.32
263.22
UNID
95.00
3.76
4.86
8.62
819.36
UNID
10.00
2.45
12.50
14.95
149.48
UNID
20.00
0.49
1.50
1.99
39.80
UNID
5.00
4.60
11.50
16.10
80.50
UNID
18.00
21.46
267.54
289.00
5,202.04
UNID
11.00
11.66
348.99
360.65
3,967.19
UNID
420.00
10.94
202.77
213.71
89,758.20
UNID
7 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
28.00
8.21
186.92
195.13
5,463.50
UNID
5.00
16.76
97.50
114.26
571.29
UNID
2.00
1,200.00
49,250.00
50,450.00
100,900.00
UNID
2.00
4.53
200.00
204.53
409.06
18.01.73
UNID
11.00
32.25
4,000.15
4,032.40
44,356.40
UNID
3,000.00
1.57
0.62
2.19
6,564.00
UNID
480.00
0.94
1.12
2.06
987.22
UNID
360.00
0.94
1.39
2.33
837.61
UNID
1,200.00
0.66
0.72
1.38
1,659.84
UNID
1.00
58.80
712.65
771.45
771.45
UNID
4.00
49.00
424.99
473.99
1,895.96
UNID
1.00
53.90
563.02
616.92
616.92
UNID
1.00
39.20
338.17
377.37
377.37
UNID
2.00
34.30
289.94
324.24
648.48
UNID
250.00
0.09
2.85
2.94
733.75
UNID
180.00
16.66
1.40
18.06
3,250.80
UNID
180.00
0.98
1.13
2.11
379.80
UNID
20.00
2.45
15.60
18.05
361.00
18.01.91
UNID
10.00
0.73
11.62
12.35
123.49
UNID
90.00
2.94
6.56
9.50
855.00
UNID
500.00
3.43
15.55
18.98
9,490.00
UNID
21.00
3.23
1.76
4.99
104.87
18.01.79
8 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
50.00
0.20
0.42
0.62
30.80
UNID
120.00
0.25
0.64
0.89
107.38
UNID
30.00
0.29
0.93
1.22
36.72
UNID
24.00
0.29
1.35
1.64
39.46
UNID
24.00
0.49
0.99
1.48
35.52
UNID
24.00
0.59
0.96
1.55
37.15
UNID
21.00
0.69
1.12
1.81
37.93
1.72
2.11
44.35
54.05
UNID
21.00
0.39
UNID
21.00
0.78
1.79
2.57
UNID
18.00
0.98
2.55
3.53
63.54
UNID
18.00
1.18
4.22
5.40
97.13
UNID
27.00
1.27
5.00
6.27
169.40
UNID
21.00
1.37
6.00
7.37
154.81
UNID
12.00
4.41
18.35
22.76
273.12
UNID
250.00
1.96
2.46
4.42
1,105.00
UNID
150.00
2.16
8.92
11.08
1,662.00
UNID
1.00
419.35
2,000.00
2,419.35
2,419.35
300.00
5.88
101.81
107.69
32,306.40
150.00
2.94
48.29
51.23
7,684.43
80.00
1.76
17.36
19.12
1,529.92
UNID
12.00
11.45
165.78
177.23
2,126.73
UNID
1.00
37.24
1,800.00
1,837.24
1,837.24
UNID
12.00
3.23
1.76
4.99
59.93
UNID
2.00
19.60
2,650.00
2,669.60
5,339.20
6.00
3.92
20.36
24.28
145.68
UNID
2.00
1.95
490.58
492.53
985.06
UNID
2.00
1.95
150.00
151.95
303.90
UNID
6.00
4.20
6.98
11.18
67.08
UNID
3.00
4.35
14.50
18.85
56.55
UNID
24.00
7.62
56.14
63.76
1,530.27
UNID
6.00
1.86
3.59
5.45
32.71
KG
5.00
21.56
10.56
32.12
160.60
UNID
50.00
0.94
0.09
1.03
51.34
UNID
9.00
0.67
0.28
0.95
8.51
UNID
40.00
0.94
0.65
1.59
63.47
UNID
18.00
0.80
0.45
1.25
22.42
UNID
3.00
54.47
133.03
187.50
562.50
UNID
3.00
2.03
15.00
17.03
51.08
UNID
50.00
0.66
0.72
1.38
69.16
UNID
18.00
0.59
1.36
1.95
35.06
UNID
40.00
0.84
0.95
1.79
71.55
UNID
18.00
4.90
8.30
13.20
237.60
UNID
36.00
1.37
6.00
7.37
265.39
18.02.10
18.02.11
9 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
13.00
1.27
5.00
6.27
81.56
UNID
1.00
964.00
30,000.00
30,964.00
30,964.00
UNID
3.00
3.43
0.65
4.08
12.24
40.23
UNID
36.00
0.44
0.68
1.12
KG
15.00
6.78
22.50
29.28
439.20
286.86
KG
15.00
1.76
17.36
19.12
UNID
3.00
11.45
165.78
177.23
531.68
UNID
3.00
105.05
263.28
368.33
1,104.98
UNID
15.00
1.08
3.50
4.58
68.67
UNID
3.00
3.23
1.76
4.99
14.98
UNID
3.00
5.57
18.50
24.07
72.21
KG
2.00
7.50
25.00
32.50
65.01
KG
2.00
6.47
21.63
28.10
56.20
72.66
PARA
KG
2.00
8.33
28.00
36.33
UNID
3.00
3.15
10.50
13.65
40.94
UNID
3.00
9.58
32.20
41.78
125.33
UNID
3.00
7.62
56.14
63.76
191.28
UNID
3.00
19.17
66.40
85.57
256.70
UNID
3.00
3.15
10.50
13.65
40.94
UNID
3.00
1.96
6.26
8.22
24.66
UNID
2.00
0.98
2.76
3.74
7.48
UNID
6.00
1.47
5.10
6.57
39.42
UNID
4.00
0.69
0.85
1.54
6.14
UNID
3.00
75.02
245.00
320.02
960.06
UNID
3.00
2.81
9.50
12.31
36.93
UNID
18.00
0.88
2.52
3.40
61.24
169.20
18.04.05
2
3
1.00
39.20
130.00
169.20
35.00
1.00
4.23
5.23
183.14
UNID
110.00
0.98
7.03
8.01
881.10
UNID
90.00
0.98
7.85
8.83
794.70
UNID
15.00
1.70
5.68
7.38
110.76
UNID
30.00
1.59
10.53
12.12
363.69
59.76
UNID
12.00
0.98
4.00
4.98
UNID
32.00
8.05
22.48
30.53
976.80
UNID
32.00
10.83
7.46
18.28
585.06
UNID
5.00
3.92
60.00
63.92
319.60
UNID
50.00
4.90
8.30
13.20
660.00
UNID
21.00
4.90
8.30
13.20
277.20
250.00
1.67
13.33
15.00
3,749.00
200.00
1.76
17.36
19.12
3,824.80
50.00
1.96
42.35
44.31
2,215.50
UD
1.00
24.50
189.50
214.00
214.00
UNID
45.00
4.92
16.50
21.42
963.98
UNID
1.00
8.82
28.00
36.82
36.82
UNID
1.00
78.40
60.00
138.40
138.40
UNID
6.00
1.47
5.80
7.27
43.62
UNID
6.00
1.47
6.80
8.27
49.62
UNID
40.00
5.49
18.50
23.99
959.52
UNID
3.00
7.84
95.00
102.84
308.52
UNID
1.00
12.74
42.00
54.74
54.74
UNID
1.00
2.65
8.50
11.15
11.15
10 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
19.
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
1.00
6.86
21.50
28.36
28.36
UNID
60.00
5.49
18.50
23.99
1,439.28
VB
1.00
0.00
350.00
350.00
350.00
UNID
2.00
3.49
95.00
98.49
196.97
12.00
8.63
47.45
56.08
672.93
12.00
10.83
7.46
18.28
219.40
18.00
2.18
9.53
11.71
210.72
106,643.40
60.00
19.99
44.68
64.67
3,880.04
6.00
10.89
39.00
49.89
299.36
6.00
12.74
42.00
54.74
328.44
30.00
2.94
9.50
12.44
373.20
36.00
1.67
5.50
7.17
257.98
90.00
1.29
2.08
3.37
303.71
3.00
14.70
48.00
62.70
188.10
72.00
0.85
2.26
3.11
223.89
432.00
0.59
1.36
1.95
841.54
35.19
UNID
72.00
0.22
0.27
0.49
UNID
72.00
0.27
0.90
1.17
84.49
UNID
120.00
0.63
1.56
2.19
263.23
UNID
200.00
1.47
2.71
4.18
836.00
120.00
13.03
23.08
36.11
4,333.68
UNID
1.00
11.56
38.00
49.56
49.56
UNID
1.00
11.76
38.00
49.76
49.76
UNID
60.00
2.45
8.00
10.45
627.00
UNID
120.00
6.57
4.90
11.47
1,375.92
UNID
20.00
1.05
3.50
4.55
90.93
UNID
1.00
1.65
5.50
7.15
7.15
UNID
240.00
0.85
2.26
3.11
746.31
UNID
1,440.00
0.59
1.36
1.95
2,805.12
UNID
240.00
0.22
0.27
0.49
117.31
UNID
240.00
0.27
0.90
1.17
281.64
UNID
240.00
0.63
1.56
2.19
526.46
UNID
15.00
1.47
2.71
4.18
62.70
UNID
4.00
7.35
25.00
32.35
129.40
UNID
4.00
2.45
15.60
18.05
72.20
600.00
1.00
4.23
5.23
3,139.50
195.00
1.47
9.42
10.89
2,124.14
200.00
0.59
5.17
5.76
1,152.69
15.00
1.18
14.53
15.71
235.59
UNID
50.00
6.86
22.50
29.36
1,468.00
11 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
350.00
1.65
5.50
7.15
2,500.76
UNID
120.00
0.25
0.90
1.15
137.40
UNID
120.00
0.16
0.37
0.53
64.09
UNID
350.00
1.35
4.50
5.85
2,048.26
UNID
12.00
14.70
1,435.02
1,449.72
17,396.64
UNID
600.00
0.45
1.50
1.95
1,167.88
UNID
1.00
85.75
285.00
370.75
370.75
UNID
1.00
721.28
2,400.00
3,121.28
3,121.28
UNID
120.00
0.22
0.90
1.12
133.98
UNID
40.00
1.64
65.00
66.64
2,665.64
UNID
2.00
1.09
45.00
46.09
92.19
UNID
12.00
15.32
150.00
165.32
1,983.79
UNID
350.00
3.15
10.50
13.65
4,776.59
UNID
900.00
0.44
0.31
0.75
670.77
UNID
150.00
1.96
6.50
8.46
1,268.35
UNID
150.00
2.12
7.00
9.12
1,367.52
14,000.00
0.45
1.50
1.95
27,300.00
150.00
1.65
5.50
7.15
1,071.96
4.00
176.40
560.00
736.40
2,945.60
100.00
0.87
4.64
5.51
550.70
UNID
300.00
0.13
0.40
0.53
158.97
UNID
600.00
0.09
0.30
0.39
231.96
RL
12.00
2.35
7.50
9.85
118.22
UNID
150.00
0.18
0.60
0.78
116.63
UNID
300.00
0.04
0.08
0.12
36.99
RL
8.00
25.98
82.00
107.98
863.84
UNID
4.00
62.72
206.00
268.72
1,074.88
UNID
100.00
0.87
2.80
3.67
366.60
UNID
4.00
13.92
45.00
58.92
235.66
UNID
60.00
0.37
1.20
1.57
94.08
1.96
6.00
7.96
2,388.00
223.79
111.74
335.53
19.01.45
20.
UNID
COM
20.01 EQUIPAMENTOS
UNIDADE CONDENSADORA DE FLUXO DE
REFRIGERANTE VARIVEL REFERNCIA MAP 20.01.01 AP0801H
UNIDADE CONDENSADORA DE FLUXO DE
REFRIGERANTE VARIVEL REFERNCIA MAP 20.01.02 AP1001H
UNIDADE CONDENSADORA DE FLUXO DE
REFRIGERANTE VARIVEL REFERNCIA MAP 20.01.03 AP1201H
UNIDADE EVAPORADORA DE FLUXO DE
REFRIGERANTE VARIVEL, HI WALL DE 7000
20.01.04 BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE
REFRIGERANTE VARIVEL, HI WALL DE 9000
20.01.05 BTUS/H
2,013.16
569,696.82
UNID
1.00
1,000.00
15,530.00
16,530.00
16,530.00
UNID
12.00
1,500.00
18,450.00
19,950.00
239,400.00
UNID
1.00
1,800.00
21,300.00
23,100.00
23,100.00
UNID
3.00
285.00
950.00
1,235.00
3,705.00
UNID
1.00
350.00
1,170.00
1,520.00
1,520.00
12 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
3.00
400.00
1,318.00
1,718.00
5,154.00
UNID
1.00
450.00
1,530.00
1,980.00
1,980.00
UNID
1.00
500.00
1,890.00
2,390.00
2,390.00
UNID
1.00
567.00
1,890.00
2,457.00
2,457.00
UNID
1.00
620.00
2,085.00
2,705.00
2,705.00
UNID
2.00
550.00
1,810.00
2,360.00
4,720.00
UNID
1.00
435.00
1,450.00
1,885.00
1,885.00
UNID
3.00
570.00
1,900.00
2,470.00
7,410.00
UNID
10.00
750.00
2,350.00
3,100.00
31,000.00
UNID
8.00
750.00
2,485.00
3,235.00
25,880.00
UNID
21.00
600.00
2,030.00
2,630.00
55,230.00
UNID
1.00
343.00
980.00
1,323.00
1,323.00
UNID
2.00
203.00
580.00
783.00
1,566.00
UNID
10.00
50.00
150.00
200.00
2,000.00
UNID
4.00
85.00
230.00
315.00
1,260.00
UNID
1.00
518.00
1,480.00
1,998.00
1,998.00
UNID
1.00
430.00
1,230.00
1,660.00
1,660.00
UNID
2.00
64.00
185.00
249.00
498.00
UNID
1.00
367.00
1,050.00
1,417.00
1,417.00
UNID
1.00
258.00
735.00
993.00
993.00
UNID
1.00
650.00
1,830.00
2,480.00
2,480.00
UNID
1.00
586.00
1,675.00
2,261.00
2,261.00
VB
1.00
3,000.00
1,000.00
4,000.00
4,000.00
4.00
200.00
350.00
550.00
2,200.00
1.00
800.00
1,380.00
2,180.00
2,180.00
1,100.00
1,600.00
1,600.00
CJ
VB
VB
1.00
500.00
UNID
4.00
50.00
230.00
280.00
1,120.00
VB
1.00
550.00
3,000.00
3,550.00
3,550.00
13 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
VB
1.00
800.00
1,530.00
2,330.00
2,330.00
UNID
50.00
29.40
125.00
154.40
7,720.00
UNID
10.00
34.73
138.00
172.73
1,727.33
UNID
1.00
55.08
186.00
241.08
241.08
45.00
10.88
45.79
56.67
2,550.05
105.00
7.84
32.72
40.56
4,259.22
54.00
8.13
28.80
36.93
1,994.30
108.00
7.25
24.86
32.11
3,467.90
76.00
6.08
17.16
23.24
1,766.06
230.00
4.90
12.46
17.36
3,991.65
70.00
3.23
9.83
13.07
914.76
172.00
2.94
7.87
10.81
1,858.60
30.00
2.94
6.83
9.77
292.97
VB
1.00
240.00
800.00
1,040.00
1,040.00
VB
1.00
141.50
1,415.00
1,556.50
1,556.50
UNID
52.00
17.51
158.00
175.51
9,126.62
UNID
1.00
28.52
282.00
310.52
310.52
VB
1.00
121.40
1,214.00
1,335.40
1,335.40
UNID
2.00
41.80
418.00
459.80
919.60
50.00
1.20
12.00
13.20
660.00
UNID
1.00
15.00
182.30
197.30
197.30
UNID
19.00
15.62
45.00
60.62
1,151.78
UNID
32.00
15.62
52.00
67.62
2,163.84
UNID
23.00
15.40
68.00
83.40
1,918.20
UNID
8.00
15.62
98.00
113.62
908.96
UNID
30.00
15.62
70.00
85.62
2,568.60
UNID
2.00
15.62
70.00
85.62
171.24
UNID
1.00
15.62
86.00
101.62
101.62
UNID
1.00
15.62
92.00
107.62
107.62
UNID
2.00
15.62
118.00
133.62
267.24
UNID
4.00
15.00
185.00
200.00
800.00
UNID
4.00
15.00
232.00
247.00
988.00
14 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
21.
TOTAL DO ITEM
TOTAL UNITRIO
KG
775.00
4.49
5.37
9.86
7,639.95
KG
585.00
4.49
6.50
10.99
6,427.98
KG
400.00
4.49
6.50
10.99
4,395.20
M2
320.00
7.16
9.50
16.66
5,332.48
M2
1.00
3.50
22.50
26.00
26.00
UN
1.00
6.37
62.00
68.37
68.37
5.00
5.57
20.00
25.57
127.86
VB
1.00
200.00
700.00
900.00
900.00
VB
1.00
1,000.02
2,000.00
3,000.02
3,000.02
1.00
1,200.00
24,000.00
25,200.00
25,200.00
VB
INSTALAES ESPECIAIS - PREVENO E COMBATE A INCNDIO
77,885.45
34.00
1.47
138.75
140.22
4,767.48
14.00
1.47
490.58
492.05
6,888.70
23.00
1.47
150.00
151.47
3,483.81
12.00
17.44
187.50
204.94
2,459.22
2.00
357.36
3,250.00
3,607.36
7,214.72
2.00
1,857.50
13,000.00
14,857.50
29,715.00
22.00
1.47
27.97
29.44
647.68
75.00
1.47
23.88
25.35
1,901.25
22.
MATERIAL
145.00
1.47
18.90
20.37
2,953.65
4.00
13.83
267.04
280.87
1,123.50
9.00
11.76
156.51
168.27
1,514.43
19.00
11.76
115.83
127.59
2,424.21
5.00
11.76
590.44
602.20
3,011.00
3.00
11.76
470.38
482.14
1,446.42
3.00
11.76
195.00
206.76
620.28
12.00
11.76
122.00
133.76
1,605.12
12.00
4.47
138.83
143.30
1,719.56
12.00
40.34
290.00
330.34
3,964.08
1.00
40.34
385.00
425.34
425.34
37,233.86
180.00
3.92
4.69
8.61
1,549.80
50.00
4.70
9.64
14.34
717.20
UNID
20.00
2.94
8.58
11.52
230.40
VB
1.00
0.00
500.00
500.00
500.00
500.00
0.00
0.24
0.24
120.00
UNID
80.00
14.70
13.20
27.90
2,232.00
UNID
20.00
0.49
3.20
3.69
73.80
UNID
1.00
68.60
825.00
893.60
893.60
UNID
20.00
0.27
8.50
8.77
175.42
UNID
2.00
3.60
12.00
15.60
31.20
UNID
2.04
49.00
65.00
114.00
232.56
UNID
2.00
4.90
35.00
39.90
79.80
UNID
1.00
9.80
98.15
107.95
107.95
800.00
0.10
1.43
1.53
1,222.40
15 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
23.
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
230.00
0.98
4.83
5.82
1,337.54
UNID
1.00
615.35
2,600.00
3,215.35
3,215.35
UNID
1.00
98.00
395.00
493.00
493.00
UNID
1.00
14.70
1,250.00
1,264.70
1,264.70
UNID
20.00
115.50
385.00
500.50
10,010.00
UNID
1.00
980.00
4,200.00
5,180.00
5,180.00
800.00
0.98
1.95
2.93
2,344.00
UNID
40.00
1.47
6.50
7.97
318.80
UNID
20.00
1.96
8.60
10.56
211.20
UNID
1.00
4.90
85.00
89.90
89.90
UNID
20.00
36.84
125.00
161.84
3,236.80
UNID
20.00
11.97
48.00
59.97
1,199.30
UNID
1.00
32.14
135.00
167.14
167.14
40,294.33
UNID
1.00
589.44
1,760.00
2,349.44
2,349.44
UNID
1.00
221.04
685.00
906.04
906.04
UNID
50.00
30.70
98.00
128.70
6,435.00
819.20
UNID
1.00
184.20
635.00
819.20
UNID
5.00
7.37
24.50
31.87
159.34
50.00
0.59
2.50
3.09
154.32
UNID
80.00
1.84
4.65
6.49
519.36
UNID
20.00
8.28
28.00
36.28
725.58
UNID
1.00
429.80
1,350.00
1,779.80
1,779.80
UNID
8.00
36.84
125.00
161.84
1,294.72
UNID
50.00
1.84
4.50
6.34
317.10
UNID
21.00
4.80
1.84
6.64
139.48
UNID
2.00
5.10
2.85
7.95
15.89
UNID
6.00
5.59
4.28
9.87
59.20
350.00
1.00
4.23
5.23
1,831.38
70.00
1.00
6.77
7.77
543.80
60.00
1.47
9.42
10.89
653.58
UNID
1.00
7.57
26.50
34.07
34.07
3,700.00
1.10
1.80
2.90
10,734.81
UNID
15.00
2.67
1.36
4.03
60.51
UNID
60.00
7.37
23.50
30.87
1,852.08
16 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
120.00
1.08
0.87
1.95
233.76
UNID
21.00
1.27
1.84
3.11
65.39
UNID
18.00
2.25
2.97
5.22
94.03
UNID
7.00
73.68
250.00
323.68
2,265.76
3,016.80
UNID
60.00
12.28
38.00
50.28
UNID
50.00
14.74
48.00
62.74
3,136.80
UNID
1.00
22.10
75.00
97.10
97.10
24.
21,378.45
24.01. ESGOTO
TUBO PVC BRANCO P/ESGOTO D=40MM (1
24.01.01 1/2') C/ ACESSRIOS
TUBO PVC BRANCO P/ESGOTO D=50MM (2') C/
24.01.02 ACESSRIOS
TUBO PVC BRANCO P/ESGOTO D=100MM (4')
24.01.03 C/ ACESSRIO
CAIXA SIFONADA PVC MONTADA C/ GRELHA E
24.01.04 PORTA GRELHA 150X150X50MM
CAIXA RETENTORA DE GORDURA EM PVC C/
24.01.05 CESTA DE LIMPEZA
CAIXA DE INSPECAO EM ALVENARIA DE 1
24.01.06 TIJOLO 40X40X60CM
24.01.07 TAMPA FERRO FUNIDIDO T-33
24.02. GUA FRIA
TUBO PVC SOLD. MARROM INCL.CONEXOES
24.02.01 D=20MM(1/2')
TUBO PVC SOLD. MARROM INCL.CONEXOES
24.02.02 D=25MM(3/4')
TUBO PVC SOLD. MARROM INCL.CONEXOES
24.02.03 D=32MM(1')
24.02.04 REGISTRO DE GAVETA BRUTO D=15MM (1/2')
24.02.05 REGISTRO DE GAVETA BRUTO D=20MM (3/4')
24.02.06 REGISTRO DE GAVETA BRUTO D=25MM (1' )
UNIDADE DE TRATAMENTO DE GUA DE
24.02.07 REUSO
BOMBA MARCA IMBIL mod. EBW 2,7m/h 28,5
24.02.08 mca 0,75cv/380V/3F/60Hz
24.03. GUAS PLUVIAIS
TUBO PVC BRANCO D=100MM (4') C/
24.03.01 ACESSRIOS
TUBO PVC BRANCO D=150MM (4') C/
24.03.02 ACESSRIOS
CAIXA DE INSPECAO EM ALVENARIA DE 1
24.03.03 TIJOLO 40X40X60CM
24.03.04 TAMPA FERRO FUNIDIDO T-33
51.00
1.18
2.40
3.58
182.38
240.00
1.47
4.54
6.01
1,442.40
370.00
1.96
6.95
8.91
3,296.70
UNID
36.00
2.94
11.89
14.83
533.88
UNID
2.00
6.54
95.38
101.92
203.84
UNID
8.00
19.60
60.93
80.53
644.24
UNID
8.00
1.96
55.00
56.96
455.68
267.00
0.98
1.37
2.35
627.45
108.00
0.98
1.86
2.84
306.72
234.00
1.47
4.24
5.71
1,336.14
UNID
20.00
4.90
11.29
16.19
323.80
UNID
45.00
5.39
13.68
19.07
858.15
UNID
20.00
6.37
19.95
26.32
526.40
UNID
1.00
343.00
3,500.00
3,843.00
3,843.00
UNID
4.00
9.80
500.00
509.80
2,039.20
UNID
72.00
2.45
8.51
10.96
789.12
UNID
77.00
2.94
37.51
40.45
3,114.65
UNID
6.00
24.56
60.93
85.49
512.94
UNID
6.00
1.96
55.00
56.96
341.76
37,906.01
25.01. LOUAS E METAIS
BACIAS COM CAIXA ACOPLADA LINHA
AZALA, REF. 91606-CELITE (OU
25.01.01 EQUIVALENTE)
BACIA CONVENCIONAL LINHA CONFORTO, DA
25.01.02 DECA
25.01.03 MICTRIO - FAB. CELITE (OU EQUIVALENTE)
CUBAS DE APOIO RETANGULAR
ACABAMENTO GE 17 BRANCO SERIE TRIO
25.01.04 DECA, (OU EQUIVALENTE SUPERIOR)
LAVATRIO COM COLUNA SUSPENSA LINHA
CONFORTO REF.:L51, FAB. DECA (OU
25.01.05 EQUIVALENTE
CUBA EM INOX COM VLVULA TRAMONTINA
25.02.06 OU EQUIVALENTE SUPERIOR
MISTURADOR FABRIMAR MONOCOMANDO
PARA LAVATORIO EXTENSO 165mm-LOFT
25.02.07 REF:2877
TORNEIRA LINHA PRESSMATIC BENEFIT .
25.02.08 REF.:CHROME(00185106)
TORNEIRA SADA LATERAL DE BANCADA/
25.02.09 FABRIMAR LINHA PRATIKA, REF:1167
VLVULA DE DESCARGA LINHA BENEFIT25.02.10 REF.:00185106
DUCHAS HIGINICA FABRIMAR
ACQUAJET,REF: 2195,MANGUEIRA METLICA
25.02.11 (OU EQUIVALENT)
25.02. ACESSRIOS
SABONETEIRAS ACRLICAS,COD. 30175801,
SISTEMA GRANEL KIMBERLY-CLARK ( OU
25.02.01 EQUIVALENTE)
UNID
30.00
29.40
140.13
169.53
5,085.83
UNID
7.00
29.40
277.03
306.43
2,144.99
UNID
6.00
29.40
90.45
119.85
719.09
UNID
33.00
14.70
194.22
208.92
6,894.28
UNID
7.00
14.70
229.92
244.62
1,712.32
1,144.84
UNID
5.00
29.40
199.57
228.97
UNID
33.00
16.76
152.20
168.96
5,575.75
UNID
7.00
4.90
28.06
32.96
230.69
UNID
5.00
6.37
135.04
141.41
707.05
UNID
7.00
15.99
136.65
152.64
1,068.49
UNID
37.00
4.90
80.04
84.94
3,142.75
UNID
34.00
4.25
60.00
64.25
2,184.50
17 de 82
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
28.00
2.55
59.00
61.55
1,723.40
19.80
8.40
39.72
48.12
952.78
3.15
8.40
39.72
48.12
151.58
UNID
37.00
4.25
35.00
39.25
1,452.25
UNID
37.00
2.55
39.00
41.55
1,537.35
UNID
8.00
5.59
179.17
184.76
26.
1,478.08
233,356.81
26.01. EQUIPAMENTOS
ELEVADOR TIPO THYSSENKRUPP, LINHA
FREQUENCIDYNE, 90 M/MIN, OU
EQUIVALENTE, DE ACORDO COM
ESPECIFICAES DE PROJETO COM KIT DE
26.01.01 TRAO E CABINE
UNID
2.00
2,500.00
76,000.00
78,500.00
26.02. ACESSRIOS
26.02.01 PAINEL DE CHAMADA DA CABINE
157,000.00
UNID
2.00
501.10
1,350.00
1,851.10
3,702.20
UNID
6.00
501.10
1,318.00
1,819.10
10,914.60
VB
1.00
1,237.90
1,550.00
2,787.90
2,787.90
UNID
2.00
6.76
7.86
14.62
29.24
UNID
2.00
194.10
415.00
609.10
1,218.20
26.02.06 ENCODER
26.02.07 LIMITADOR DE VELOCIDADES
UNID
2.00
869.50
1,814.00
2,683.50
5,367.00
UNID
2.00
219.26
1,850.00
2,069.26
4,138.51
UNID
2.00
158.45
870.00
1,028.45
2,056.90
UNID
2.00
501.10
1,900.00
2,401.10
4,802.20
UNID
2.00
706.69
2,350.00
3,056.69
6,113.38
VB
1.00
501.10
1,250.00
1,751.10
1,751.10
UNID
2.00
331.11
850.00
1,181.11
2,362.22
VB
1.00
500.00
1,500.00
2,000.00
2,000.00
VB
1.00
500.00
850.00
1,350.00
1,350.00
UNID
2.00
200.06
550.00
750.06
1,500.11
UNID
2.00
150.85
450.00
600.85
1,201.70
UNID
2.00
252.98
550.00
802.98
1,605.96
UNID
4.00
150.85
415.00
565.85
2,263.39
VB
1.00
1,200.21
3,850.00
5,050.21
5,050.21
UNID
2.00
400.35
800.00
1,200.35
2,400.70
UNID
2.00
200.06
550.00
750.06
1,500.11
VB
1.00
200.29
500.00
700.29
700.29
VB
1.00
350.20
575.00
925.20
925.20
VB
1.00
500.60
1,250.00
1,750.60
1,750.60
VB
1.00
1,500.04
2,330.00
3,830.04
3,830.04
VB
1.00
450.03
1,585.00
2,035.03
2,035.03
UM
1.00
1,000.02
2,000.00
3,000.02
27.
3,000.02
12,667.41
71.00
2.13
15.00
17.13
1,215.88
UNID
8.00
2.13
15.00
17.13
137.00
UNID
13.00
2.13
20.00
22.13
287.63
27.01.04
UNID
14.00
6.38
25.00
31.38
439.25
UNID
6.00
12.75
175.00
187.75
1,126.50
UNID
5.00
6.38
25.00
31.38
156.88
UNID
1.00
6.38
25.00
31.38
31.38
UNID
5.00
3.19
35.00
38.19
190.94
UNID
5.00
3.19
35.00
38.19
190.94
UNID
3.00
3.19
35.00
38.19
114.56
UNID
3.00
3.19
35.00
38.19
114.56
UNID
7.00
3.19
35.00
38.19
267.31
UNID
4.00
6.38
25.00
31.38
125.50
UNID
8.00
3.19
35.00
38.19
305.50
UNID
48.00
6.38
25.00
31.38
1,506.00
UNID
18 de 82
DISCRIMINAO
ITEM
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
UNID
1.00
21.25
620.00
641.25
641.25
UNID
1.00
21.25
620.00
641.25
641.25
UNID
1.00
21.25
620.00
641.25
641.25
UNID
2.00
74.38
225.00
299.38
598.75
UNID
14.00
2.55
20.00
22.55
315.70
UNID
86.00
7.23
25.00
32.23
2,771.35
UNID
2.00
7.65
250.00
257.65
515.30
UNID
4.00
3.19
80.00
83.19
28.
DE
0,15M
28.03.05
28.03.06
28.03.07
28.03.08
28.03.09
28.03.10
28.03.11
28.03.12
28.03.13
28.04.
M2
260.00
0.26
0.00
0.26
66.30
M3
39.00
5.10
37.83
42.93
1,674.27
M3
55.00
5.10
28.34
33.44
1,839.20
UNID
8.00
0.00
25.00
25.00
200.00
M2
44.00
0.00
1.00
1.00
44.00
UNID
10.00
0.00
60.00
60.00
600.00
M2
33.00
0.00
1.50
1.50
49.50
UNID
19.00
0.00
35.00
35.00
665.00
M2
9.00
0.00
1.50
1.50
13.50
UNID
9.00
0.00
15.00
15.00
135.00
UNID
9.00
0.00
35.00
35.00
315.00
UNID
2.00
0.00
45.00
45.00
90.00
UNID
3.00
0.00
180.00
180.00
540.00
UNID
61.00
0.00
35.00
35.00
2,135.00
M2
75.00
0.82
4.36
5.18
388.50
VB
1.00
1,200.00
0.00
1,200.00
1,200.00
130.00
2.93
12.50
15.43
2,005.90
UNID
3.00
0.00
83.00
83.00
249.00
SACOS
85.00
2.10
36.51
38.61
3,281.85
DE
332.75
15,492.02
29.
FORNECIMENTO
E
INSTALAO
28.04.01 DE:DELIMITADOR DE CANTEIROS
FORNECIMENTO DE PEDRAS NATURAIS
28.04.02 TAMANHO GRANDE
FORNECIMENTO E INSTALAO DE: SEIXOS
28.04.03 ROLADOS
DIVERSOS
M2
28.65
19.44
156.89
176.33
30.
5,051.88
5,051.88
M3
120.00
69.57
0.00
69.57
17,744.64
8,348.40
M2
3,196.00
2.94
0.00
2.94
9,396.24
TOTAL
4,980,378.01
BDI (25%)
1,245,094.50
6,225,472.51
Esta planilha oramentria referencial e orientativa, lembrando que so prioritrias as informaes contidas nos projetos e memoriais tcnicos. Servios no constantes nesta planilha,
variaes de quantitativo e/ou outras divergncias no serviro como justificativa para possveis aditivos aps a contratao, devendo haver questionamento da LICITANTE junto
CONTRATANTE dentro do prazo previsto no processo licitatrio.
CLCULO DO BDI
ITEM
DISCRIMINAO
A LUCRO
B ADMINISTRAO CENTRAL
B.1 ENTIDADE DE CLASSE
UNID
%
PARCIAL
TOTAL
7.50
7.50
%
%
4.30
0.17
19 de 82
DISCRIMINAO
ITEM
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
TOTAL DO ITEM
TOTAL UNITRIO
B.2 TREINAMENTO
B.3 DEPRECIAO
0.15
0.35
0.80
1.00
0.84
0.46
0.53
0.64
0.64
5.00
5.00
E COFINS
F PIS
3.00
3.00
0.65
0.65
G RISCOS E IMPREVISTOS
FRMULA P/ CLCULO DO BDI
1.20
1.20
20 de 82
PODER JU DICIRIO
JU STIA FEDERAL NA PARABA
SEO DE LI CI TAES E CONTRA TOS
EDI TAL DE LI CI TAO M ODALIDADE CONCORRNCIA - N 01/2008
ANEXO I X ORAMENTOS ESTIM ADOS EM PLANILHAS DE QU ANTI TA TIVOS E PREOS U NI TRIOS, COM POSIO U NI TRIA
DE CU STOS E TABELA ABC
UNIDADE
M2
M2
QUANTIDADE
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
2.99
2.99
Materiais
Mo de obra
Total da composio
AS BUILT
AS BUILT
M2
M2
1.00
6.01
UN
UN
1.00
4.95
ENGENHEIRO
ENGENHEIRO
ms
ms
1.00
8291.70
MESTRE DE OBRAS
MESTRE DE OBRAS
ms
ms
1.00
5527.80
ENCARREGADO
FEITOR/ENCARREGADO
ms
ms
1.00
2763.00
APONTADOR
APONTADOR
ms
ms
1.00
1381.95
ALMOXARIFE
ALMOXARIFE
ms
ms
1.00
1842.60
VIGIA NOTURNO
SERVENTE C/ ADICIONAL DE PERICULOSIDADE (30%)
ms
ms
1.00
1381.95
AUXILIAR DE ADMINISTRAO
AUXILIAR DE ADMINISTRAO
ms
ms
1.00
921.03
FERRAMENTAS
VASSOURA PIAAVA QUADRADA GRANDE
MARTELO TIPO UNHA 8''
SERROTE DE AO 22''
CABO DE NYLON ENTRELAADO 3/4''
CARRINHO DE MO CHAPA DE AO RODA C/ CMARA
P QUADRADA COM CABO
TALHADEIRA DE AO 24cm
CHAVE DE FENDA 1/8'' x 5''
ENXADO 3 LIBRAS COM CABO
FOICE DE AO COM CABO
PONTEIRO DE AO PARA DESBASTE 10'' x 3/4''
CORDA DE 1/2'' SIZAL - ROLO DE 10m
CAVADEIRA ARTICULADA COM 2 CABOS
DESEMPENADEIRA DE AO LISA/DENTADA
ENXADA 2.1/2'' COM CABO
GARFO 10 DENTES COM CABO
MARRETA DE AO OITAVADO COM CABO - 1KG
PICARETA DE AO CARBONO FORJADO 6 LIBRAS
FIO DE PRUMO N3
ESCADA PINTOR MADEIRA 6 DEGRAUS
METRO ARTICULADO AMARELO 2,0m COM 6 RGUAS DE MADEIRA
ms
UN
UN
UN
M
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
0.64
1.77
2.86
2.40
3.72
0.17
0.23
0.17
3.45
1.86
1.22
1.70
1.11
1.18
1.78
1.48
0.20
0.76
1.80
1.20
0.06
11.88
5.05
19.34
0.83
82.52
12.44
6.90
3.50
3.58
8.07
6.76
2.72
9.72
3.89
19.34
16.23
12.54
6.63
6.71
48.60
12.93
CJ
UN
PR
UN
PR
UN
CJ
UN
PR
UN
1.00
0.80
0.20
0.50
0.10
1.00
0.50
1.00
0.10
4.61
3.85
23.37
18.00
5.27
120.00
13.70
13.08
25.00
VB
VB
1.00
1200.00
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
00012895
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
00012893
NO CONSTA
R$ 4.61
R$ 13.08
164.32
0.00
164.32
1200.00
Materiais
Mo de obra
Total da composio
NO CONSTA
577.45
0.00
577.45
4.61
3.08
4.67
9.00
0.53
120.00
6.85
13.08
2.50
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
921.03
921.03
7.58
8.92
55.35
1.99
306.81
2.07
1.57
0.58
12.34
14.98
8.23
4.62
10.80
4.58
34.33
24.02
2.51
5.05
12.06
58.32
0.75
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
1381.95
1381.95
921.03
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
1842.60
1842.60
1381.95
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
1381.95
1381.95
1842.60
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
2763.00
2763.00
1381.95
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
5527.80
5527.80
2763.00
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
8291.70
8291.70
5527.80
Materiais
Mo de obra
Total da composio
NO CONSTA
4.95
0.00
4.95
8291.70
Materiais
Mo de obra
Total da composio
NO CONSTA
6.01
0.00
6.01
4.95
Materiais
Mo de obra
Total da composio
PREO SINAPI
2.99
0.00
2.99
6.01
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
NO CONSTA
1200.00
0.00
1200.00
21 de 82
ITEM / DESCRIO
ALUGUEL MENSAL RELGIO DE PONTO
ALUGUEL MENSAL RELOGIO DE PONTO
UNIDADE
ms
ms
QUANTIDADE
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
179.18
179.18
Materiais
Mo de obra
Total da composio
ms
ms
1.00
6667.92
HI
H
UN
UN
UN
1.00
0.00
0.00
0.00
4.25
780.00
780.00
780.00
ms
ms
1.00
120.00
ms
ms
1.00
700.00
CONSUMO DE TELEFONE
CONSUMO DE TELEFONE
ms
ms
1.00
200.00
MATERIAL DE ESCRITRIO
MATERIAL DE ESCRITRIO
ms
ms
1.00
80.00
TRANSPORTE DE FUNCIONRIOS
TRANSPORTE
UN
UN
1.00
3.40
BARRACO DE OBRA
TABUA DE PINHO DE 1'X12' DE 3A.CONSTRUCAO
PONTALETE DE PINHO DE 3X3' DE 2A.
PREGO 17X21 GALVANIZADO
RIPA MADEIRA DE LEI DE 5X2CM
TELHA ONDULADA DE FIBROCIMENTO E=6MM
COMPENSADO RESINADO FENLICO 12MM 1,10X2,20M
FECHADURA PADRO POPULAR ALIANA PORTA INTERNA
DOBRADICA DE FERRO PARA PORTA INTERNA
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
SERVENTE
AJUDANTE
M2
M2
M
KG
M
M2
M2
UN
UN
H
H
H
H
6.10
9.86
0.25
4.50
1.00
1.00
0.09
0.48
2.50
4.00
2.50
4.00
3.95
3.59
6.27
2.80
13.92
15.00
12.42
1.90
5.47
4.33
4.25
4.25
VB
VB
1.00
4510.56
UN
UN
1.00
300.00
M2
H
H
M
M2
KG
M
1.20
0.80
0.25
1.05
0.04
1.15
5.47
4.25
3.59
8.00
5.17
4.95
M2
H
0.95
4.25
M2
H
H
M
M2
KG
KG
0.13
0.13
0.04
0.09
0.01
0.02
5.47
4.25
3.59
3.37
5.17
9.29
M3
H
3.20
4.25
NO CONSTA
NO CONSTA
00001214
00006111
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.25
00006111
R$ 4.25
00001214
00006111
NO CONSTA
NO CONSTA
NO CONSTA
00000344
R$ 5.47
R$ 4.25
00006111
R$ 4.25
15.20
9.96
25.16
0.00
4.04
4.04
R$ 9.29
0.69
1.26
1.96
13.60
Materiais
Mo de obra
R$ 5.47
R$ 4.33
R$ 4.25
R$ 4.25
300.00
0.00
300.00
0.71
0.55
0.14
0.30
0.06
0.19
Materiais
Mo de obra
Total da composio
R$ 6.27
R$ 13.92
4510.56
0.00
4510.56
4.04
Materiais
Mo de obra
Total da composio
LOCACAO DA OBRA
CARPINTEIRO
SERVENTE
PONTALETE DE PINHO DE 3'X3' DE 3A.CONSTRUCAO
TABUA DE PINHO 1'X9' DE 3A. CONSTRUCAO
PREGO - PRECO MEDIO DAS BITOLAS
ARAME GALVANIZADO N.16 BWG
NO CONSTA
NO CONSTA
00005068
NO CONSTA
00007194
NO CONSTA
NO CONSTA
NO CONSTA
00001214
00006117
00006111
00006115
104.60
58.62
163.22
6.56
3.40
0.90
8.40
0.21
5.69
Materiais
Mo de obra
Total da composio
LIMPEZA DO TERRENO
SERVENTE
NO CONSTA
300.00
Materiais
Mo de obra
Total da composio
NO CONSTA
4510.56
Materiais
Mo de obra
Total da composio
PLACA DA OBRA
PLACA DA OBRA
NO CONSTA
3.40
0.00
3.40
24.10
35.40
1.57
12.60
13.92
15.00
1.11
0.91
13.68
17.32
10.63
17.00
Materiais
Mo de obra
Total da composio
NO CONSTA
80.00
0.00
80.00
3.40
Materiais
Mo de obra
Total da composio
NO CONSTA
200.00
0.00
200.00
80.00
Materiais
Mo de obra
Total da composio
R$ 4.25
700.00
0.00
700.00
200.00
Materiais
Mo de obra
Total da composio
00006115
NO CONSTA
NO CONSTA
NO CONSTA
120.00
0.00
120.00
700.00
Materiais
Mo de obra
Total da composio
NO CONSTA
0.00
4.25
4.25
120.00
Materiais
Mo de obra
Total da composio
NO CONSTA
6667.92
0.00
6667.92
4.25
0.00
0.00
0.00
Materiais
Mo de obra
Total da composio
PREO SINAPI
179.18
0.00
179.18
6667.92
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
0.00
13.60
22 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Total da composio
M3
H
H
10.00
10.00
8.27
4.25
82.70
42.50
Materiais
Mo de obra
Total da composio
KG
H
H
KG
KG
0.06
0.06
1.00
0.02
5.47
4.95
3.58
7.94
KG
H
H
KG
KG
0.08
0.08
1.00
0.02
5.47
4.95
3.69
7.94
M3
M3
1.05
192.36
M2
H
H
M
M2
M
KG
1.00
1.00
1.50
0.50
0.50
0.20
5.47
4.33
3.59
8.00
3.60
5.17
M3
M3
1.05
203.00
KG
H
H
KG
KG
0.15
0.15
1.00
0.02
5.47
4.95
3.85
7.94
UN
H
H
3.00
3.00
4.25
5.47
M2
H
H
0.30
3.00
5.47
4.25
REMOO DE DIVISRIAS
AJUDANTE
MONTADOR
M2
H
H
0.25
0.70
4.50
7.96
M2
H
H
UN
KG
0.98
1.41
25.00
12.80
5.47
4.25
0.26
0.22
M2
H
H
KG
UN
1.71
1.84
12.80
33.00
5.47
4.25
0.22
0.26
R$ 5.47
R$ 4.33
NO CONSTA
00000378
NO CONSTA
NO CONSTA
00000337
R$ 5.47
00006111
00004750
R$ 4.25
R$ 5.47
00004750
00006111
R$ 5.47
R$ 4.25
00006115
00002700
R$ 4.25
R$ 7.96
00004750
00006111
00007271
NO CONSTA
R$ 5.47
R$ 4.25
R$ 0.26
00004750
00006111
R$ 5.47
R$ 4.25
NO CONSTA
R$ 0.26
00007271
11.40
17.17
28.56
M2
H
H
0.22
0.22
5.47
4.40
1.20
0.97
00012869
NO CONSTA
M2
KG
1.06
0.00
84.50
7.00
89.57
0.03
NO CONSTA
NO CONSTA
UN
1.50
0.25
0.38
NO CONSTA
UN
1.50
0.45
0.68
NO CONSTA
Materiais
Mo de obra
Total da composio
R$ 7.94
9.32
11.35
20.66
9.33
7.84
2.82
8.58
Materiais
Mo de obra
Total da composio
00001214
00006117
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
0.00
6.70
6.70
5.37
5.98
6.50
2.82
Materiais
Mo de obra
Total da composio
R$ 192.36
0.00
14.39
14.39
1.13
5.57
Materiais
Mo de obra
Total da composio
00001524
0.00
29.16
29.16
1.64
12.75
Materiais
Mo de obra
Total da composio
00000337
R$ 5.47
NO CONSTA
NO CONSTA
R$ 7.94
4.01
1.56
5.57
12.75
16.41
Materiais
Mo de obra
Total da composio
00000378
R$ 7.94
213.15
0.00
213.15
0.82
0.74
3.85
0.16
Materiais
Mo de obra
Total da composio
R$ 5.47
12.22
9.80
22.02
213.15
Materiais
Mo de obra
Total da composio
00000378
NO CONSTA
NO CONSTA
00000337
201.98
0.00
201.98
5.47
4.33
5.39
4.00
1.80
1.03
Materiais
Mo de obra
Total da composio
R$ 8.27
R$ 4.25
3.85
0.83
4.68
201.98
Materiais
Mo de obra
Total da composio
00004752
00006111
3.74
0.63
4.36
0.44
0.40
3.69
0.16
Materiais
Mo de obra
Total da composio
PREO SINAPI
0.00
125.20
125.20
0.33
0.30
3.58
0.16
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
13.60
R$ 5.47
90.65
2.17
92.82
23 de 82
ITEM / DESCRIO
CALHA DE CHAPA GALVANIZADA 26 DESENVOLVIMENTO 33CM
ENCANADOR
AJUDANTE DE ENCANADOR
REBITES
PREGO 15X15
CHAPA GALVANIZADA N.26. DESENV 0.33M
SOLDA 70X30
UNIDADE
M
H
H
KG
KG
M
KG
QUANTIDADE
1.00
1.00
0.03
0.07
1.03
0.03
CUSTO UNITRIO
RESUMO COMPOSIO
5.47
4.33
7.38
6.75
3.39
5.71
5.47
4.33
0.22
0.47
3.49
0.17
Materiais
Mo de obra
Total da composio
CLARABIA
ENCANADOR
AJUDANTE DE ENCANADOR
REBITES
PREGO 15X15
CLARABIA
M
H
H
KG
KG
M2
0.50
0.50
0.03
0.07
1.00
5.47
4.33
7.38
6.75
210.00
ALGEROZ
ENCANADOR
AJUDANTE DE ENCANADOR
REBITES
PREGO 15X15
ALGEROZ
M
H
H
KG
KG
M
0.50
0.50
0.03
0.07
1.00
5.47
4.33
7.38
6.75
22.00
IMPERMANTAPRIMER
APLICADOR IMPERMEABILIZACAO
AJUDANTE DE APLICADOR DE IMPERMEABILIZACAO
PINTOR
TRINCHA 2'
IMPERMANTA PRIMER DA DENVER
M2
H
H
H
UN
L
0.40
0.10
0.40
0.08
0.40
6.82
4.95
5.47
2.36
4.76
M2
L
H
H
M3
KG
M2
1.60
2.05
2.30
0.07
10.29
1.00
4.76
4.95
6.82
28.34
0.33
7.00
PRES SBS
APLICADOR IMPERMEABILIZACAO
AJUDANTE DE APLICADOR DE IMPERMEABILIZACAO
DENVERPREN SBS
M2
H
H
KG
0.50
0.20
1.40
6.82
4.95
4.48
DENVERTEC 540
APLICADOR IMPERMEABILIZACAO
AJUDANTE DE APLICADOR DE IMPERMEABILIZACAO
DENVERTEC 540
M2
H
H
KG
0.50
0.20
3.50
6.82
4.95
3.65
VU DE POLIESTER
APLICADOR IMPERMEABILIZACAO
AJUDANTE DE APLICADOR DE IMPERMEABILIZACAO
VEU DE POLIESTER
M2
H
H
M2
0.10
0.10
1.00
6.82
4.95
12.08
M2
H
H
1.00
0.65
0.50
13.69
6.82
4.95
M2
H
H
KG
M3
M2
0.50
0.80
9.45
0.04
1.15
5.47
4.25
0.33
28.34
0.27
M2
H
H
KG
0.50
0.20
3.00
6.82
4.95
1.39
NO CONSTA
NO CONSTA
NO CONSTA
00000370
00001379
NO CONSTA
R$ 28.34
R$ 0.33
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
M2
H
H
KG
M3
0.10
0.10
2.92
0.01
5.47
4.25
0.33
28.34
M2
H
H
KG
0.70
0.96
2.24
5.47
4.25
0.17
NO CONSTA
NO CONSTA
NO CONSTA
00004750
00006111
00001379
00000370
NO CONSTA
R$ 5.47
R$ 4.25
R$ 0.33
R$ 28.34
4.45
6.14
10.58
3.41
0.99
4.17
NO CONSTA
NO CONSTA
NO CONSTA
4.17
4.40
8.57
0.55
0.43
0.96
0.20
Materiais
Mo de obra
Total da composio
R$ 5.47
13.69
6.91
20.60
2.74
3.40
3.12
1.02
0.31
Materiais
Mo de obra
Total da composio
CHAPISCO COM ARGAMASSA DE CIMENTO E AREIA 1:3 E=5MM
PEDREIRO
SERVENTE
CIMENTO PORTLAND
AREIA MEDIA
NO CONSTA
NO CONSTA
00004783
NO CONSTA
NO CONSTA
12.08
1.18
13.26
13.69
4.43
2.48
Materiais
Mo de obra
Total da composio
DENVERTEC 100
APLICADOR IMPERMEABILIZACAO
AJUDANTE DE APLICADOR DE IMPERMEABILIZACAO
DENVERTEC 100
R$ 6.75
M2
Materiais
Mo de obra
Total da composio
PROTECAO DE SUPERFICIES IMPERMEABILIZADAS
PEDREIRO
SERVENTE
CIMENTO PORTLAND
AREIA MEDIA
PAPEL KRAFT BETUMADO DUPLO
R$ 5.47
R$ 4.33
12.78
4.40
17.18
0.68
0.50
12.08
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
00020247
NO CONSTA
R$ 6.75
6.27
4.40
10.67
3.41
0.99
12.78
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
19.94
25.83
45.77
3.41
0.99
6.27
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
00020247
NO CONSTA
R$ 6.75
4.28
3.22
7.50
7.62
10.15
15.69
1.93
3.40
7.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
22.69
4.90
27.59
2.73
0.50
2.19
0.19
1.90
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
00020247
NO CONSTA
NO CONSTA
210.69
4.90
215.59
2.74
2.17
0.22
0.47
22.00
Materiais
Mo de obra
Total da composio
PREO SINAPI
4.36
9.80
14.16
2.74
2.17
0.22
0.47
210.00
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
00004750
00006111
00001379
00000370
R$ 5.47
R$ 4.25
R$ 0.33
R$ 28.34
00004750
00006111
00001107
R$ 5.47
R$ 4.25
R$ 0.17
1.16
0.97
2.13
3.83
4.08
0.38
24 de 82
ITEM / DESCRIO
CIMENTO PORTLAND
AREIA MEDIA
UNIDADE
KG
M3
QUANTIDADE
3.24
0.02
CUSTO UNITRIO
RESUMO COMPOSIO
0.33
28.34
1.07
0.68
Materiais
Mo de obra
Total da composio
M2
H
H
KG
KG
M2
0.55
0.55
0.75
4.50
1.05
5.47
4.25
0.33
0.18
26.94
M2
H
H
KG
KG
L
KG
0.90
1.00
5.00
3.00
0.10
0.05
5.47
4.25
0.18
1.02
3.50
2.77
M2
1.00
52.32
M2
H
H
KG
KG
M2
0.55
0.55
0.75
4.50
1.05
M2
H
H
KG
KG
M2
0.55
0.55
0.75
4.50
1.05
5.47
4.25
0.33
0.18
42.51
M2
M2
H
H
KG
1.02
1.50
0.80
5.00
5.47
4.25
0.33
0.18
42.51
M2
M2
H
H
KG
1.02
1.00
0.51
4.00
208.60
5.47
4.25
0.34
UN
H
H
H
H
KG
KG
M3
UN
UN
KG
UN
M2
UN
2.50
2.50
0.80
0.80
1.72
1.72
0.01
6.00
8.00
0.20
1.00
4.00
1.00
120.00
5.47
4.25
0.34
UN
H
H
H
H
KG
KG
M3
UN
UN
KG
UN
M2
UN
3.20
3.20
0.90
0.90
1.90
1.90
0.01
12.00
8.00
0.20
2.00
8.00
2.00
5.47
4.33
6.62
4.82
0.31
0.35
28.88
4.30
0.11
5.17
190.00
25.00
63.00
UN
H
H
H
H
KG
KG
M3
UN
UN
2.70
2.70
0.80
0.80
1.72
1.72
0.01
6.00
8.00
5.47
4.33
5.47
4.25
0.30
0.33
28.34
4.30
0.11
5.17
220.00
25.00
63.00
5.47
4.33
5.47
4.25
0.30
0.33
28.34
4.30
0.11
R$ 5.47
R$ 4.25
R$ 0.33
R$ 0.18
00004760
00006111
00001379
00001381
NO CONSTA
R$ 5.47
R$ 4.25
R$ 0.33
R$ 0.18
NO CONSTA
00004750
00006111
NO CONSTA
R$ 5.47
R$ 4.25
NO CONSTA
00004750
00006111
NO CONSTA
R$ 5.47
R$ 4.25
123.76
7.64
131.40
13.68
10.83
5.30
3.86
0.53
0.60
0.32
25.80
0.88
1.03
190.00
100.00
63.00
00001214
00006117
00004750
00006111
00001106
00001379
00000370
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
00001214
00006117
00004750
00006111
00001106
00001379
00000370
R$ 5.47
R$ 4.33
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
00001214
00006117
00004750
00006111
00001106
00001379
00000370
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
382.17
33.65
415.82
17.50
13.86
4.92
3.83
0.57
0.63
0.31
51.60
0.88
1.03
440.00
200.00
126.00
Materiais
Mo de obra
Total da composio
00004760
00006111
00001379
00001381
NO CONSTA
R$ 2.08
R$ 2.77
214.47
11.61
226.08
122.40
5.47
2.17
1.36
Materiais
Mo de obra
Total da composio
PORTA DE MADEIRA SARRAFEADA SEMI-OCA 2x0,90x2,10m, COM REVESTIMENTO EM
FOLHAS DE MADEIRA FREIJ
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
CAL HIDRATADA
CIMENTO PORTLAND
AREIA MEDIA
TACO PARA FIXACAO DE BATENTE/RODAPE
PARAFUSO PARA MADEIRA DE 80MM
PREGO - PRECO MEDIO DAS BITOLAS
PORTA SARRAFEADA DE MADEIRA 0.90X2.10M
MADEIRA COMPENSADA DE PINHO 8MM
BATENTE DE PEROBA PARA PORTA 1FL.
R$ 5.47
R$ 4.25
R$ 0.18
45.69
5.35
51.04
212.77
8.21
3.40
1.70
Materiais
Mo de obra
Total da composio
PORTA DE MADEIRA SARRAFEADA SEMI-OCA 0,80x2,10m, COM REVESTIMENTO EM
FOLHAS DE MADEIRA FREIJ
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
CAL HIDRATADA
CIMENTO PORTLAND
AREIA MEDIA
TACO PARA FIXACAO DE BATENTE/RODAPE
PARAFUSO PARA MADEIRA DE 80MM
PREGO - PRECO MEDIO DAS BITOLAS
PORTA SARRAFEADA DE MADEIRA 0.80X2.10M
MADEIRA COMPENSADA DE PINHO 8MM
BATENTE DE PEROBA PARA PORTA 1FL.
00004751
00006111
00001381
NO CONSTA
00000003
00000007
45.69
5.35
51.04
3.01
2.34
0.25
0.81
44.64
Materiais
Mo de obra
Total da composio
REVESTIMENTO EM GRANITO ARABESCO
REVESTIMENTO EM GRANITO ARABESCO
PEDREIRO
SERVENTE
ARGAMASSA COLANTE PRE-MISTURADA
R$ 5.47
R$ 4.25
R$ 0.33
R$ 0.18
56.77
9.17
65.94
3.01
2.34
0.25
0.81
44.64
Materiais
Mo de obra
Total da composio
PISO EM MRMORE BRANCO POLIDO C/ INSERT METALICOS
PISO EM MRMORE BRANCO POLIDO C/ INSERT METALICOS
PEDREIRO
SERVENTE
ARGAMASSA COLANTE PRE-MISTURADA
00004760
00006111
00001379
00001381
NO CONSTA
52.32
Materiais
Mo de obra
Total da composio
PORCELANATO 45x45cm PORTINARI COR BEGE CLARO
LADRILHISTA
SERVENTE
CIMENTO PORTLAND
CIMENTO COLANTE
PORCELANATO 45x45cm PORTINARI COR BEGE
R$ 0.33
R$ 28.34
29.34
5.35
34.69
4.92
4.25
0.90
3.06
0.35
0.14
Materiais
Mo de obra
Total da composio
PORCELANATO 45x45cm PORTINARI COR MARROM
LADRILHISTA
SERVENTE
CIMENTO PORTLAND
CIMENTO COLANTE
PORCELANATO 45x45cm PORTINARI COR MARROM
PREO SINAPI
00001379
00000370
2.13
7.91
10.04
3.01
2.34
0.25
0.81
28.29
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
821.02
40.11
861.13
14.77
11.69
4.38
3.40
0.52
0.57
0.31
25.80
0.88
25 de 82
ITEM / DESCRIO
PREGO - PRECO MEDIO DAS BITOLAS
PORTA SARRAFEADA DE MADEIRA 1.20X2.10M
MADEIRA COMPENSADA DE PINHO 8MM
BATENTE DE PEROBA PARA PORTA 1FL.
UNIDADE
KG
UN
M2
UN
QUANTIDADE
0.20
1.00
4.00
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
5.17
310.00
25.00
63.00
Materiais
Mo de obra
Total da composio
M2
H
H
KG
M3
M2
4.00
2.00
2.67
0.01
1.00
5.47
4.25
0.33
28.34
150.00
UN
H
H
H
H
KG
KG
M3
UN
UN
KG
UN
M2
UN
UN
2.50
2.50
0.80
0.80
1.72
1.72
0.01
6.00
8.00
0.20
1.00
4.00
1.00
1.00
5.47
4.33
5.47
4.25
0.30
0.33
28.34
4.30
0.11
5.17
190.00
25.00
63.00
120.00
UN
1.00
180.00
Materiais
Mo de obra
Total da composio
950.79
950.79
NO CONSTA
M2
M
M
M2
H
H
8.00
0.93
1.00
4.00
2.00
15.00
16.00
5.60
5.47
4.33
M2
M2
M2
1.00
1.00
133.95
8.40
M2
M2
M2
1.00
1.00
M2
H
M2
0.50
1.00
NO CONSTA
NO CONSTA
NO CONSTA
00006110
00006117
00010502
NO CONSTA
85.00
8.40
93.40
3.98
29.00
00002701
NO CONSTA
1.00
39.72
39.72
NO CONSTA
1.00
8.40
8.40
NO CONSTA
93.89
8.40
UN
UN
UN
1.00
1.00
UN
UN
UN
1.00
1.00
39.72
8.40
48.12
93.89
8.40
120.00
60.00
R$ 93.89
NO CONSTA
NO CONSTA
120.00
60.00
180.00
380.00
80.00
Materiais
Mo de obra
Total da composio
00010506
NO CONSTA
93.89
8.40
102.29
120.00
60.00
380.00
80.00
R$ 7.96
29.00
3.98
32.98
M2
1.00
1.00
R$ 133.95
NO CONSTA
NO CONSTA
M2
M2
M2
M2
M2
R$ 5.47
R$ 4.33
133.95
8.40
142.35
85.00
8.40
7.96
29.00
R$ 28.34
140.46
30.54
171.00
133.95
8.40
85.00
8.40
R$ 5.47
R$ 5.47
R$ 4.33
R$ 4.25
R$ 0.33
954.73
43.78
998.51
120.00
14.86
5.60
21.88
8.66
Materiais
Mo de obra
Total da composio
MOLA DE PISO BTS75 DA DORMA
MOLA DE PISO BTS 75 R DA DORMA.
MO DE OBRA PARA INSTALAO DE MOLA DE PISO 75V DORMA
NO CONSTA
682.11
32.28
714.39
1.00
Materiais
Mo de obra
Total da composio
MOLA AEREA MA 200 DORMA
MOLA AEREA MA 200 DORMA
MO DE OBRA PARA MONTAGEM MOLA AEREA
180.00
UN
Materiais
Mo de obra
Total da composio
VIDRO CRISTAL TEMPERADO INCOLOR 8mm
VIDRO CRISTAL TEMPERADO INCOLOR 8mm
MO DE OBRA PARA INSTALAO DE VIDRO TEMPERADO E OU LAMINADO
R$ 5.47
R$ 4.33
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
00004750
00006110
00006117
00006111
00001379
NO CONSTA
00000370
Materiais
Mo de obra
Total da composio
ESPELHO CRISTAL PRATA E=5mm
ESPELHO CRISTAL PRATA E=5MM
00001214
00006117
00004750
00006111
00001106
00001379
00000370
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
21.88
2.74
2.17
17.00
2.87
0.56
0.51
Materiais
Mo de obra
Total da composio
APLICAO DE PELCULA CONFORME MODELO EXISTENTE
MONTADOR
APLICAO DE PELCULA CONFORME MODELO EXISTENTE
13.68
10.83
4.38
3.40
0.52
0.57
0.31
25.80
0.88
1.03
190.00
100.00
63.00
120.00
151.16
30.38
181.54
5.47
5.47
4.33
4.25
0.33
29.64
28.34
Materiais
Mo de obra
Total da composio
VIDRO LAMINADO BRONZE 8MM
VIDRO LAMINADO BRONZE 8MM
MO DE OBRA PARA INSTALAO DE VIDRO TEMPERADO E OU LAMINADO
R$ 5.47
R$ 4.25
R$ 0.33
R$ 28.34
4.00
0.50
0.50
4.00
8.70
0.02
0.02
Materiais
Mo de obra
Total da composio
VIDRO TEMPERADO CRISTAL 10MM
VIDRO TEMPERADO CRISTAL 10MM
MO DE OBRA PARA INSTALAO DE VIDRO TEMPERADO E OU LAMINADO
00006110
00006111
00001379
00000370
NO CONSTA
UN
H
H
H
H
KG
M3
M3
Materiais
Mo de obra
Total da composio
PREO SINAPI
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
502.11
34.24
536.35
21.88
8.50
0.88
0.28
150.00
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
1.03
310.00
100.00
63.00
NO CONSTA
NO CONSTA
380.00
80.00
460.00
26 de 82
ITEM / DESCRIO
CONJUNTO DE FERRAGENS PARA PORTAS DE MADEIRA
CONJUNTO DE FERRAGENS PARA PORTA DE MADEIRA LINHA RQUITETO DA
LA FONTE
MO DE OBRA PARA MONTAGEM DE FERRAGENS PARA PORTA
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
UN
UN
1.00
0.50
135.00
15.00
135.00
7.50
Materiais
Mo de obra
Total da composio
UN
UN
UN
1.00
0.50
240.00
15.00
M2
H
H
KG
M3
0.25
0.55
8.76
0.04
5.47
4.25
0.33
28.34
M3
M3
H
H
1.00
3.50
2.00
224.86
5.47
4.25
M2
KG
M3
M3
M3
H
KG
10.00
0.06
0.03
0.05
0.55
1.00
0.33
28.34
29.64
44.00
6.82
35.00
M2
H
H
M3
M3
H
M2
0.23
0.46
0.01
0.05
0.03
1.00
4.74
4.25
28.34
28.34
5.93
33.73
M2
H
H
KG
KG
M3
M2
KG
0.55
0.55
1.83
10.65
0.03
1.00
0.45
5.47
4.25
0.30
0.33
28.34
35.59
1.22
M2
M
H
H
KG
1.05
1.70
0.95
5.00
120.00
5.47
4.25
0.34
M2
H
H
KG
M2
0.17
0.17
0.14
1.05
6.82
4.25
3.32
130.43
M2
H
H
KG
M2
0.15
0.15
0.35
1.00
6.82
4.25
3.32
100.50
M2
M2
1.00
195.00
UN
UN
H
H
1.00
0.10
0.10
6.50
5.47
4.25
UN
UN
H
H
1.00
0.10
0.10
6.50
5.47
4.25
00004760
00006111
00001106
00001379
00000370
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
NO CONSTA
00004750
00006111
NO CONSTA
R$ 5.47
R$ 4.25
NO CONSTA
00006111
NO CONSTA
NO CONSTA
R$ 4.25
NO CONSTA
00006111
NO CONSTA
NO CONSTA
R$ 4.25
NO CONSTA
NO CONSTA
00004750
00006111
R$ 5.47
R$ 4.25
NO CONSTA
00004750
00006111
R$ 5.47
R$ 4.25
6.50
0.97
7.47
6.50
0.55
0.43
Materiais
Mo de obra
R$ 4.74
R$ 4.25
R$ 28.34
R$ 28.34
195.00
0.00
195.00
6.50
0.55
0.43
Materiais
Mo de obra
Total da composio
00004739
00006111
00000366
00000370
NO CONSTA
NO CONSTA
101.66
1.66
103.32
195.00
Materiais
Mo de obra
Total da composio
R$ 0.33
R$ 28.34
137.42
1.88
139.30
1.02
0.64
1.16
100.50
Materiais
Mo de obra
Total da composio
00001379
00000370
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
127.70
13.34
141.04
1.16
0.72
0.46
136.95
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.25
41.05
5.35
46.40
126.00
9.30
4.04
1.70
Materiais
Mo de obra
Total da composio
NO CONSTA
00004750
00006111
35.29
3.05
38.33
3.01
2.34
0.55
3.51
0.85
35.59
0.55
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.25
R$ 0.33
R$ 28.34
43.03
3.75
46.78
1.09
1.96
0.14
1.42
0.18
33.73
Materiais
Mo de obra
Total da composio
00004750
00006111
00001379
00000370
224.86
27.65
252.51
3.30
1.64
0.89
2.20
3.75
35.00
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
3.91
3.71
7.62
224.86
19.15
8.50
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
240.00
7.50
247.50
1.37
2.34
2.89
1.02
Materiais
Mo de obra
Total da composio
PREO SINAPI
135.00
7.50
142.50
240.00
7.50
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
UN
6.50
0.97
27 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Total da composio
M
M
H
H
M3
KG
0.07
0.17
0.17
0.00
1.46
120.00
5.47
5.15
53.00
0.33
8.40
0.93
0.88
0.11
0.48
Materiais
Mo de obra
Total da composio
M
M
H
H
KG
0.15
1.43
0.83
0.15
120.00
5.47
4.25
0.33
M
M
H
H
KG
0.25
1.43
0.83
0.15
120.00
5.47
4.25
0.33
M
M
H
H
KG
0.25
1.43
0.83
0.15
120.00
5.47
4.25
0.33
M2
M2
1.00
1.00
45.00
9.80
NO CONSTA
NO CONSTA
45.00
9.80
54.80
6.50
6.50
NO CONSTA
30.00
NO CONSTA
30.00
6.50
36.50
M2
M2
1.00
6.50
6.50
NO CONSTA
M2
1.00
30.00
30.00
NO CONSTA
M2
H
H
M2
0.80
0.80
1.00
4.25
7.96
240.00
M2
H
H
0.80
0.60
4.25
7.96
M2
1.00
165.00
M2
H
H
0.80
0.80
4.25
7.96
M2
1.00
135.00
30.00
6.50
36.50
3.40
6.37
240.00
00006115
00002701
NO CONSTA
R$ 4.25
R$ 7.96
00006115
00002701
R$ 4.25
R$ 7.96
240.00
9.77
249.77
0.00
3.40
4.78
165.00
NO CONSTA
165.00
8.18
173.18
3.40
6.37
135.00
00006115
00002701
R$ 4.25
R$ 7.96
NO CONSTA
135.00
9.77
144.77
M2
M2
H
H
1.00
1.00
0.60
180.00
4.25
7.96
180.00
4.25
4.78
M2
H
H
H
H
M2
0.90
0.80
0.80
6.00
1.00
4.33
5.47
4.25
5.47
215.00
UN
H
H
M2
M2
M2
16.00
16.00
8.50
20.00
20.00
5.47
4.33
226.47
140.00
41.50
NO CONSTA
00006115
00002701
R$ 4.25
R$ 7.96
180.00
9.03
189.03
3.90
4.38
3.40
32.82
215.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.25
R$ 0.33
30.00
Materiais
Mo de obra
Total da composio
ARMARIO EM MDF COM REVESTIMENTO EM LAMINADO MELAMINICO
AJUDANTE DE CARPINTEIRO
PEDREIRO
SERVENTE
MARCENEIRO 1 CLASSE
ARMRIO EM MDF, 18mm
NO CONSTA
00004755
00006115
00001379
1.00
Materiais
Mo de obra
Total da composio
PISO ELEVADO COM ENCHIMENTO EM CONCRETO CELULAR E REVESTIMENTO EM
LAMINADO MELAMNICO
PISO ELEVADO COM ENCHIMENTO EM CONCRETO CELULAR E
REVESTIMENTO EM LAMINADO MELAMNICO
AJUDANTE
MONTADOR
R$ 5.47
R$ 4.25
R$ 0.33
1.00
Materiais
Mo de obra
Total da composio
DIVISRIA COMUM EM MONTANTES SIMPLES, CONFORME EXISTENTE NO ED. SEDE
AJUDANTE
MONTADOR
DIVISRIA COMUM EM MONTANTES SIMPLES, CONFORME EXISTENTE NO ED.
SEDE
NO CONSTA
00004755
00006115
00001379
M2
Materiais
Mo de obra
Total da composio
DIVISORIA EM GRANITO ARABESCO POLIDO, INCLUINDO FERRAGENS E=30MM
AJUDANTE
MONTADOR
DIVISORIA EM GRANITO ARABESCO POLIDO, INCLUINDO FERRAGENS
E=30MM
R$ 5.47
R$ 4.25
R$ 0.33
M2
M2
Materiais
Mo de obra
Total da composio
DIVISRIA ESPECIAL MODELO M92 MOVINORD, PISO AO TETO
AJUDANTE
MONTADOR
DIVISRIA ESPECIAL MODELO M92 MOVINORD, PISO AO TETO
NO CONSTA
00004755
00006115
00001379
30.05
11.34
41.39
45.00
9.80
Materiais
Mo de obra
Total da composio
RECUPERAO DE FORRO EM GESSO, CONFORME EXISTENTE NO ED. SEDE
COLOCADOR FORRO DE GESSO
R$ 0.33
M2
Materiais
Mo de obra
Total da composio
FORRO DE GESSO ACARTONADO TIPO FGE
COLOCADOR FORRO DE GESSO
FORRO DE GESSO ACARTONADO FGE, INCLUINDO ACABAMENTOS E DEMAIS
ACESSRIOS
R$ 5.47
30.05
11.35
41.40
30.00
7.81
3.53
0.05
Materiais
Mo de obra
Total da composio
NO CONSTA
00004755
NO CONSTA
NO CONSTA
00001379
18.05
11.34
29.39
30.00
7.82
3.53
0.05
Materiais
Mo de obra
Total da composio
PREO SINAPI
8.99
1.81
10.79
18.00
7.81
3.53
0.05
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
7.47
00006117
00004750
00006111
00012868
NO CONSTA
R$ 4.33
R$ 5.47
R$ 4.25
R$ 5.47
00001214
00006117
00011796
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
R$ 226.47
215.00
44.49
259.49
87.52
69.28
1925.00
2800.00
830.00
28 de 82
ITEM / DESCRIO
RODAP DE AO INOX, 15 CM.
COLA PARA MADEIRA
UNIDADE
M
KG
QUANTIDADE
6.00
5.00
CUSTO UNITRIO
RESUMO COMPOSIO
215.50
8.20
Materiais
Mo de obra
Total da composio
M
H
H
M2
M2
M
KG
M2
0.80
0.80
0.50
0.50
0.50
0.10
0.50
5.47
4.33
140.00
41.50
215.50
8.20
148.00
M2
M
H
H
H
M
M2
KG
M3
UN
15.00
1.20
1.20
0.80
15.00
1.00
1.20
0.03
25.00
15.59
5.47
4.40
5.47
12.30
5.60
0.33
28.34
0.15
UN
UN
H
H
1.00
2.00
2.00
230.00
5.47
4.25
M
ML
H
H
1.00
1.00
1.00
171.00
5.47
4.40
M
ML
H
H
1.00
1.00
1.00
171.00
5.47
4.40
CORRIMO DE ALUMNIO
H
H
1.00
1.00
5.47
4.40
ML
1.00
171.00
Materiais
Mo de obra
Total da composio
CJ
UN
PR
1.00
1.00
123.19
33.00
UN
H
H
UN
0.20
0.20
1.00
5.47
4.25
55.00
M2
H
H
UN
KG
0.32
0.32
0.40
0.85
5.47
4.40
0.26
3.20
M2
H
H
UN
KG
0.32
0.32
0.40
0.70
5.47
4.40
0.26
3.21
M2
H
H
L
L
0.40
0.35
0.35
0.12
5.47
4.40
8.74
4.81
R$ 5.47
M2
H
H
L
L
0.40
0.35
0.35
0.12
NO CONSTA
5.47
4.40
10.84
4.81
NO CONSTA
NO CONSTA
123.19
33.00
156.19
00004750
00006111
NO CONSTA
R$ 5.47
R$ 4.25
00004783
NO CONSTA
00003290
NO CONSTA
R$ 5.47
00004783
R$ 5.47
NO CONSTA
R$ 0.26
NO CONSTA
55.00
1.94
56.94
R$ 0.26
2.82
3.16
5.98
00003290
2.35
3.16
5.51
00004783
NO CONSTA
00007345
00006085
R$ 5.47
R$ 8.74
R$ 4.81
3.64
3.73
7.36
2.19
1.54
3.79
0.58
Materiais
Mo de obra
R$ 5.47
171.00
9.87
180.87
2.19
1.54
3.06
0.58
Materiais
Mo de obra
Total da composio
NO CONSTA
00006110
NO CONSTA
171.00
1.75
1.41
0.10
2.25
Materiais
Mo de obra
Total da composio
R$ 5.47
00006110
NO CONSTA
1.75
1.41
0.10
2.72
Materiais
Mo de obra
Total da composio
NO CONSTA
00006110
NO CONSTA
5.47
4.40
1.09
0.85
55.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.25
171.00
9.87
180.87
123.19
33.00
Materiais
Mo de obra
Total da composio
NO CONSTA
00002696
00006115
R$ 5.47
SERRALHEIRO
AJUDANTE DE SERRALHEIRO
R$ 0.33
R$ 28.34
R$ 0.15
R$ 5.47
171.00
9.87
180.87
171.00
5.47
4.40
Materiais
Mo de obra
Total da composio
NO CONSTA
00006110
NO CONSTA
00004783
NO CONSTA
NO CONSTA
00001379
00000370
00007270
230.00
19.44
249.44
171.00
5.47
4.40
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
428.95
16.22
445.17
230.00
10.94
8.50
Materiais
Mo de obra
Total da composio
00001214
00006117
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
273.32
7.84
281.16
233.85
6.56
5.28
4.38
184.50
5.60
0.40
0.85
3.75
Materiais
Mo de obra
Total da composio
PREO SINAPI
NO CONSTA
NO CONSTA
6889.00
156.80
7045.80
4.38
3.46
70.00
20.75
107.75
0.82
74.00
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
1293.00
41.00
00004783
NO CONSTA
00007356
00006085
R$ 5.47
R$ 10.84
R$ 4.81
4.37
3.73
29 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Total da composio
M2
H
H
L
L
KG
0.30
0.20
0.51
0.19
0.02
5.47
4.40
10.84
4.81
3.20
1.64
0.88
5.53
0.91
0.06
Materiais
Mo de obra
Total da composio
M2
H
H
L
L
UN
0.13
0.13
0.16
0.05
0.12
5.47
4.40
96.00
7.25
2.36
M
H
H
M
0.05
0.05
1.00
5.47
4.33
12.46
M
H
H
M
0.05
0.05
1.02
5.47
4.33
1.90
M
H
H
M
0.09
0.09
1.05
5.47
4.33
3.21
M
H
H
M
0.10
0.10
1.05
5.47
4.33
4.93
M
H
H
M
0.12
0.12
1.05
5.47
4.33
7.39
M
H
H
M
0.15
0.15
1.05
5.47
4.33
11.40
M
H
H
M
0.15
0.15
1.05
5.47
4.33
15.01
M
H
H
M
0.20
0.20
1.05
5.47
4.33
20.33
M
H
H
M
0.20
0.20
1.05
5.47
4.33
28.41
M
H
H
M
0.25
0.25
1.05
5.47
4.33
39.80
M
H
H
M
0.30
0.30
1.05
7.13
5.15
45.99
M
H
H
M
0.30
0.30
1.05
5.47
4.33
71.59
00002436
00006113
00001020
R$ 5.47
R$ 4.33
R$ 4.93
00002436
00006113
00000995
R$ 5.47
R$ 4.33
R$ 7.39
00002436
00006113
00000996
R$ 5.47
R$ 4.33
R$ 11.40
00002436
00006113
00001019
R$ 5.47
R$ 4.33
R$ 15.01
00002436
00006113
00001018
R$ 5.47
R$ 4.33
R$ 20.33
00002436
00006113
00000977
R$ 5.47
R$ 4.33
R$ 28.41
00002436
00006113
00000998
R$ 5.47
R$ 4.33
R$ 39.80
00002436
00006113
00001017
R$ 5.47
R$ 4.33
R$ 45.99
00002436
00006113
00001000
R$ 5.47
R$ 4.33
R$ 71.59
41.79
2.45
44.24
2.14
1.55
48.29
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 3.21
29.83
1.96
31.79
1.37
1.08
41.79
Materiais
Mo de obra
Total da composio
00002436
00006113
00000994
21.35
1.96
23.31
1.09
0.87
29.83
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
15.76
1.47
17.23
1.09
0.87
21.35
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
11.97
1.47
13.44
0.82
0.65
15.76
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
7.76
1.18
8.94
0.82
0.65
11.97
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
5.18
0.98
6.16
0.66
0.52
7.76
Materiais
Mo de obra
Total da composio
R$ 5.47
3.37
0.88
4.25
0.55
0.43
5.18
Materiais
Mo de obra
Total da composio
00004783
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
1.94
0.49
2.43
0.49
0.39
3.37
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 10.84
R$ 4.81
12.46
0.49
12.95
0.27
0.22
1.94
Materiais
Mo de obra
Total da composio
00004783
NO CONSTA
00007356
00006085
NO CONSTA
16.01
1.26
17.27
0.27
0.22
12.46
Materiais
Mo de obra
Total da composio
PREO SINAPI
6.51
2.52
9.03
0.70
0.56
15.36
0.36
0.28
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
8.10
48.29
3.68
51.97
1.64
1.30
75.17
30 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Materiais
Mo de obra
Total da composio
CABO SINTENAX FLEX, 0,6/1,0kV, SEO NOMINAL 240,00 mm
ELETRICISTA
AJUDANTE DE ELETRICISTA
CABO DE 240 MM2 (ISOL.PVC ANTICHAMA 0,6/1kV)
M
H
H
M
0.35
0.35
1.05
5.47
4.33
96.96
M
H
H
M
0.05
0.05
1.02
5.47
4.33
2.06
M
H
H
M
0.14
0.14
1.02
5.47
4.33
1.20
M
H
H
M
0.12
0.12
1.00
5.47
4.33
10.38
M
H
H
M
0.15
0.15
1.00
5.47
4.33
25.63
M
H
H
M
0.20
0.20
1.00
5.47
4.33
42.35
M
H
H
M
0.17
0.17
1.00
5.47
4.33
13.33
M
H
H
M
0.18
0.18
1.00
5.47
4.33
17.36
UNID
H
H
UNID
1.04
1.33
1.00
5.47
4.33
165.78
M
H
H
0.57
0.25
5.47
4.33
1.00
6.98
Materiais
Mo de obra
Total da composio
UNID
H
H
UNID
0.56
0.30
1.00
5.47
4.33
14.50
KG
H
H
KG
2.20
2.20
1.00
5.47
4.33
10.56
M
H
H
M
0.22
0.19
1.00
R$ 5.47
R$ 4.33
R$ 25.63
00002436
00006113
00000866
R$ 5.47
R$ 4.33
R$ 42.35
00002436
00006113
00000863
R$ 5.47
R$ 4.33
R$ 13.33
00002436
00006113
00000867
R$ 5.47
R$ 4.33
R$ 17.36
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
3.12
1.08
00002436
00006113
R$ 5.47
R$ 4.33
6.98
NO CONSTA
25.63
1.47
27.10
42.35
1.96
44.31
13.33
1.67
15.00
17.36
1.76
19.12
165.78
11.45
177.23
6.98
4.20
11.18
5.47
4.33
15.00
R$ 5.47
R$ 4.33
R$ 17.36
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
10.56
21.56
32.12
1.20
0.82
15.00
Materiais
Mo de obra
Total da composio
00002436
00006113
00000867
14.50
4.35
18.85
12.03
9.53
10.56
Materiais
Mo de obra
Total da composio
00002436
00006113
00000864
10.38
1.18
11.56
3.05
1.30
14.50
Materiais
Mo de obra
Total da composio
MASSA DE CALAFETAR
ISOLADOR EM OBRAS
AJUDANTE DE ISOLADOR
MASSA DE CALAFETAR
R$ 5.47
R$ 4.33
R$ 10.38
5.69
5.76
165.78
Materiais
Mo de obra
Total da composio
FITA ADESIVA PLSTICA PARA BAIXA TENSO BASE DE PVC PARA 750 V, ROLO DE 20
MTS
ELETRICISTA
AJUDANTE DE ELETRICISTA
FITA ADESIVA PLSTICA PARA BAIXA TENSO BASE DE PVC PARA 750 V,
ROLO DE 20 MTS
00002436
00006113
00000868
1.22
1.37
2.60
0.98
0.78
17.36
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 1.20
0.93
0.74
13.33
Materiais
Mo de obra
Total da composio
00002436
00006113
00000984
2.10
0.49
2.59
1.09
0.87
42.35
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 2.06
0.82
0.65
25.63
Materiais
Mo de obra
Total da composio
00002436
00006113
00000981
101.81
3.43
105.24
0.66
0.52
10.38
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 96.96
0.77
0.61
1.22
Materiais
Mo de obra
Total da composio
00002436
00006113
00001015
75.17
2.94
78.11
0.27
0.22
2.10
Materiais
Mo de obra
Total da composio
PREO SINAPI
1.91
1.52
101.81
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
15.00
2.03
17.03
31 de 82
ITEM / DESCRIO
UNIDADE
M
H
H
M
QUANTIDADE
0.05
0.09
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
5.47
4.33
0.72
M
H
H
M
0.06
0.06
1.00
5.47
4.33
1.36
M
H
H
M
0.09
0.08
1.00
5.47
4.33
0.95
M
H
H
M
0.20
0.20
1.00
5.47
4.33
6.26
M
H
H
M
0.10
0.10
1.00
5.47
4.33
2.76
M
H
H
M
0.15
0.15
1.00
5.47
4.33
5.10
M
H
H
M
0.07
0.07
1.00
5.47
4.33
0.85
UN
H
H
UN
UN
0.05
0.03
1.00
1.00
5.47
4.33
2.20
1.68
UN
H
H
1.70
1.70
5.47
4.33
UN
1.00
1.40
Materiais
Mo de obra
Total da composio
UN
H
H
0.10
0.10
5.47
4.33
UN
1.00
1.13
Materiais
Mo de obra
Total da composio
UN
H
H
UN
0.30
0.30
1.00
5.47
4.33
6.56
UN
H
H
UN
0.33
0.33
1.00
5.47
4.33
1.76
UN
H
H
UN
0.20
0.20
1.00
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
9.30
7.36
00002436
00006113
R$ 5.47
R$ 4.33
1.40
NO CONSTA
6.26
1.96
8.22
2.76
0.98
3.74
5.10
1.47
6.57
0.85
0.69
1.54
3.88
0.40
4.28
1.40
16.66
18.06
0.55
0.43
00002436
00006113
1.13
NO CONSTA
5.47
4.33
2.46
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
6.56
2.94
9.50
1.76
3.23
4.99
1.09
0.87
2.46
Materiais
R$ 5.47
R$ 4.33
1.13
0.98
2.11
1.81
1.43
1.76
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1.64
1.30
6.56
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
0.95
0.84
1.79
0.27
0.13
2.20
1.68
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
0.38
0.30
0.85
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
1.36
0.59
1.95
0.82
0.65
5.10
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
0.55
0.43
2.76
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
0.72
0.66
1.38
1.09
0.87
6.26
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
0.49
0.35
0.95
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
0.33
0.26
1.36
Materiais
Mo de obra
Total da composio
PREO SINAPI
0.27
0.39
0.72
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
2.46
32 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Mo de obra
Total da composio
UN
H
H
UN
0.15
0.15
1.00
5.47
4.33
2.71
0.82
0.65
2.71
Materiais
Mo de obra
Total da composio
M
H
H
M
UN
UN
UN
UN
0.08
0.08
1.05
0.20
0.20
0.30
0.30
5.47
4.33
1.60
4.50
1.20
0.69
0.54
M
H
H
M
UN
UN
UN
UN
0.08
0.13
1.05
0.20
0.20
0.30
0.30
5.47
4.33
2.42
4.50
1.84
0.87
0.54
M
H
H
M
UN
UN
UN
UN
0.08
0.13
1.05
0.20
0.20
0.30
0.30
5.47
4.33
4.48
4.50
2.25
1.84
0.54
M
H
H
M
UN
UN
UN
UN
0.15
0.15
1.05
0.20
0.30
0.30
0.30
5.47
4.33
5.76
4.50
4.28
2.97
1.00
M
H
H
M
UN
UN
UN
UN
0.20
0.20
1.05
0.20
0.30
0.30
0.30
5.47
4.33
14.56
4.50
4.88
9.84
1.44
M
H
H
M
UN
UN
UN
UN
0.25
0.25
1.05
0.20
0.30
0.30
0.30
5.47
4.33
22.18
4.50
23.34
19.11
1.44
M
H
H
UN
0.16
0.16
1.00
5.47
4.33
0.62
M
H
H
UN
0.19
0.19
1.00
5.47
4.33
3.59
M
H
H
UN
0.11
0.11
1.00
5.47
4.33
0.87
M
H
H
UN
0.13
0.13
1.00
5.47
4.33
1.84
M
H
0.23
5.47
00002436
00006113
00002681
NO CONSTA
00001876
00001894
00000396
R$ 5.47
R$ 4.33
R$ 5.76
00002436
00006113
00002686
NO CONSTA
00001877
00001896
0000398
R$ 5.47
R$ 4.33
R$ 14.56
00002436
00006113
00002683
NO CONSTA
00001878
00001895
0000398
R$ 5.47
R$ 4.33
R$ 22.18
00002436
00006113
00002481
R$ 5.47
R$ 4.33
R$ 0.62
00002436
00006113
00003910
R$ 5.47
R$ 4.33
R$ 3.59
00002436
00006113
00001901
R$ 5.47
R$ 4.33
R$ 0.87
00002436
00006113
00001983
R$ 5.47
R$ 4.33
R$ 1.84
00002436
R$ 5.47
R$ 4.88
R$ 1.84
R$ 0.76
R$ 4.28
R$ 2.97
R$ 1.00
R$ 12.24
R$ 9.84
R$ 1.44
R$ 23.34
R$ 19.11
R$ 1.44
0.87
1.08
1.95
0.71
0.56
1.84
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 4.48
3.59
1.86
5.45
0.60
0.48
0.87
Materiais
Mo de obra
Total da composio
00002436
00006113
00002680
NO CONSTA
00001881
00001893
00000394
R$ 1.84
R$ 0.87
R$ 0.76
0.62
1.57
2.19
1.04
0.82
3.59
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 2.42
37.36
2.45
39.81
0.88
0.69
0.62
Materiais
Mo de obra
Total da composio
00002436
00006113
00002685
NO CONSTA
00001884
00001892
00000394
R$ 1.20
R$ 0.69
R$ 0.54
21.04
1.96
23.00
1.37
1.08
23.29
0.90
7.00
5.73
0.43
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 1.60
9.42
1.47
10.89
1.09
0.87
15.29
0.90
1.46
2.95
0.43
Materiais
Mo de obra
Total da composio
00002436
00006113
00002674
NO CONSTA
00001879
00001891
0000400
6.77
1.00
7.77
0.82
0.65
6.05
0.90
1.28
0.89
0.30
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
4.23
1.00
5.23
0.44
0.56
4.70
0.90
0.45
0.55
0.16
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
3.19
0.78
3.97
0.44
0.56
2.54
0.90
0.37
0.26
0.16
Materiais
Mo de obra
Total da composio
PREO SINAPI
2.71
1.47
4.18
0.44
0.35
1.68
0.90
0.24
0.21
0.16
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
1.96
4.42
1.84
1.27
3.11
1.26
33 de 82
ITEM / DESCRIO
AJUDANTE DE ELETRICISTA
LUVA DE PVC RGIDO BITOLA 50 MM
UNIDADE
H
UN
QUANTIDADE
0.23
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
4.33
2.97
1.00
2.97
Materiais
Mo de obra
Total da composio
M
M
H
H
1.00
0.08
0.08
4.04
5.47
4.33
UN
UN
H
H
1.00
0.49
0.49
1.84
5.47
4.33
UN
UN
H
H
1.00
0.52
0.52
2.85
5.47
4.33
UN
UN
H
H
1.00
0.57
0.57
4.28
5.47
4.33
UN
UN
H
H
1.00
0.59
0.59
12.24
5.47
4.33
UN
UN
H
H
1.00
0.62
0.62
23.34
5.47
4.33
UN
UN
H
1.00
0.42
11.70
5.47
M
M
H
H
1.00
0.30
0.30
14.40
4.33
5.47
UN
UN
H
H
1.00
0.05
0.06
0.75
5.47
4.33
UN
H
H
1.00
0.57
1.04
56.14
5.47
4.33
UN
UN
H
H
1.00
0.35
0.35
0.65
5.47
4.33
KG
KG
H
H
1.00
0.73
0.65
22.50
5.47
4.33
00001878
00002436
00006113
R$ 23.34
R$ 5.47
R$ 4.33
NO CONSTA
00002436
R$ 5.47
NO CONSTA
00006113
00002436
R$ 4.33
R$ 5.47
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
UN
UN
H
H
1.00
12.08
9.00
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
0.65
3.43
4.08
22.50
3.97
2.81
263.28
5.47
4.33
22.50
6.78
29.28
263.28
66.08
38.97
Materiais
Mo de obra
Total da composio
R$ 12.24
R$ 5.47
R$ 4.33
56.14
7.62
63.76
0.65
1.91
1.52
Materiais
Mo de obra
Total da composio
CHAVE FACA UNIPOLAR - 15KV - 400A
CHAVE FACA UNIPOLAR - 15KV - 400A
ELETRICISTA
AJUDANTE DE ELETRICISTA
00001877
00002436
00006113
0.75
0.53
1.28
56.14
3.12
4.50
Materiais
Mo de obra
Total da composio
CABO DE ALUMNIO 2 CAA - SPARROW
CABO DE ALUMNIO 2 CAA - SPARROW
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 4.28
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
ALA PREF. 4542 PARA CABO 2 CA/CAA
ALA PREF. 4542 PARA CABO 2 CA/CAA
ELETRICISTA
AJUDANTE DE ELETRICISTA
00001876
00002436
00006113
14.40
2.94
17.34
0.75
0.27
0.26
Materiais
Mo de obra
Total da composio
R$ 2.85
R$ 5.47
R$ 4.33
11.70
2.30
14.00
14.40
1.30
1.64
Materiais
Mo de obra
Total da composio
00001875
00002436
00006113
23.34
6.08
29.42
11.70
2.30
Materiais
Mo de obra
Total da composio
R$ 1.84
R$ 5.47
R$ 4.33
12.24
5.78
18.02
23.34
3.39
2.68
Materiais
Mo de obra
Total da composio
00001884
00002436
00006113
4.28
5.59
9.87
12.24
3.23
2.55
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
2.85
5.10
7.95
4.28
3.12
2.47
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
1.84
4.80
6.64
2.85
2.84
2.25
Materiais
Mo de obra
Total da composio
R$ 4.33
R$ 2.97
4.04
0.78
4.82
1.84
2.68
2.12
Materiais
Mo de obra
Total da composio
PREO SINAPI
00006113
00001994
2.97
2.25
5.22
4.04
0.44
0.35
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
263.28
105.05
368.33
UN
34 de 82
ITEM / DESCRIO
CONECTOR DE COMPRESSO TIPO H PARA CABO AL
ELETRICISTA
AJUDANTE DE ELETRICISTA
UNIDADE
UN
H
H
QUANTIDADE
1.00
0.11
0.11
CUSTO UNITRIO
RESUMO COMPOSIO
3.50
5.47
4.33
3.50
0.60
0.48
Materiais
Mo de obra
Total da composio
UN
UN
H
H
1.00
0.58
0.56
18.50
5.47
4.33
KG
KG
H
H
1.00
0.77
0.76
25.00
5.47
4.33
KG
KG
H
H
1.00
0.66
0.66
21.63
5.47
4.33
KG
KG
H
H
1.00
0.85
0.85
28.00
5.47
4.33
UN
UN
H
H
1.00
0.33
0.31
10.50
5.47
4.33
UN
UN
H
H
1.00
0.98
0.98
32.20
5.47
4.33
UN
UN
H
H
1.00
2.00
1.90
66.40
5.47
4.33
UN
UN
H
H
1.00
0.33
0.31
10.50
5.47
4.33
UN
UN
H
H
1.00
7.66
7.65
245.00
5.47
4.33
UN
UN
H
H
1.00
0.30
0.27
9.50
5.47
4.33
UN
UN
H
H
1.00
0.09
0.09
2.52
5.47
4.33
UN
UN
H
H
1.00
4.00
4.00
130.00
5.47
4.33
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
2.52
0.88
3.40
130.00
21.88
17.32
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
9.50
2.81
12.31
2.52
0.49
0.39
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
245.00
75.02
320.02
9.50
1.64
1.17
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
10.50
3.15
13.65
245.00
41.89
33.12
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
66.40
19.17
85.57
10.50
1.81
1.34
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
32.20
9.58
41.78
66.40
10.94
8.23
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
10.50
3.15
13.65
32.20
5.33
4.24
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
28.00
8.33
36.33
10.50
1.81
1.34
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
21.63
6.47
28.10
28.00
4.65
3.68
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
25.00
7.50
32.50
21.63
3.61
2.86
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
18.50
5.57
24.07
25.00
4.21
3.29
Materiais
Mo de obra
Total da composio
PREO SINAPI
NO CONSTA
00002436
00006113
3.50
1.08
4.58
18.50
3.15
2.42
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
130.00
39.20
169.20
UN
UN
H
H
1.00
0.50
0.50
16.50
5.47
4.33
16.50
2.76
2.17
35 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Materiais
Mo de obra
Total da composio
UN
H
H
1.00
0.90
0.90
28.00
5.47
4.33
SUPORTE DO SINALIZADOR
ELETRICISTA
AJUDANTE DE ELETRICISTA
UN
H
H
1.00
0.56
0.56
18.50
5.47
4.33
UN
H
H
1.00
1.30
1.30
42.00
5.47
4.33
UN
H
H
1.00
0.27
0.27
8.50
5.47
4.33
UN
H
H
1.00
0.70
0.70
21.50
5.47
4.33
R$ 5.47
R$ 4.33
21.50
6.86
28.36
VB
VB
1.00
350.00
350.00
NO CONSTA
350.00
350.00
UN
UN
H
H
1.00
0.75
0.75
25.00
5.47
4.33
25.00
4.10
3.25
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
25.00
7.35
32.35
UN
UN
H
H
1.00
0.70
0.70
22.50
5.47
4.33
22.50
3.83
3.03
22.50
6.86
29.36
UN
UN
H
H
1.00
0.18
0.15
5.50
5.47
4.33
5.50
1.00
0.65
5.50
1.65
7.15
UN
UN
H
H
1.00
0.03
0.03
0.90
5.47
4.33
0.90
0.14
0.11
0.90
0.25
1.15
UN
UN
H
H
1.00
0.13
0.14
4.50
5.47
4.33
4.50
0.73
0.62
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
8.50
2.65
11.15
21.50
3.83
3.03
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
42.00
12.74
54.74
8.50
1.48
1.17
Materiais
Mo de obra
Total da composio
CAIXA DE LIGAO DE PVC PARA ELETRODUTO DE EMBUTIR (COMPRIMENTO: 4 " /
LARGURA: 4 " / PROFUNIDIDADE: 46 MM)
CAIXA DE LIGAO DE PVC PARA ELETRODUTO DE EMBUTIR
(COMPRIMENTO: 4 " / LARGURA: 4 " / PROFUNIDIDADE: 46 MM)
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
18.50
5.49
23.99
42.00
7.11
5.63
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
28.00
8.82
36.82
18.50
3.06
2.42
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
SUPORTE DO SINALIZADOR
NO CONSTA
00002436
00006113
16.50
4.92
21.42
28.00
4.92
3.90
Materiais
Mo de obra
Total da composio
PREO SINAPI
UN
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
4.50
1.35
5.85
UN
36 de 82
ITEM / DESCRIO
ABRAADEIRA, TIPO TMC 25MM
ELETRICISTA
AJUDANTE DE ELETRICISTA
UNIDADE
UN
H
H
QUANTIDADE
1.00
0.05
0.05
CUSTO UNITRIO
RESUMO COMPOSIO
1.50
5.47
4.33
1.50
0.25
0.19
Materiais
Mo de obra
Total da composio
UN
H
H
1.00
8.75
8.75
285.00
5.47
4.33
UN
H
H
1.00
73.60
73.60
2400.00
5.47
4.33
UN
H
H
1.00
0.33
0.31
10.50
5.47
4.33
UN
H
H
1.00
0.20
0.20
6.50
5.47
4.33
UN
H
H
1.00
0.22
0.22
7.00
5.47
4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00006113
R$ 4.33
NO CONSTA
00006113
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
7.00
2.12
9.12
M
M
H
H
1.00
0.05
0.05
1.50
5.47
4.33
1.50
0.25
0.20
1.50
0.45
1.95
M
H
H
1.00
0.17
0.17
5.50
5.47
4.33
5.50
0.92
0.73
UN
UN
H
H
1.00
18.00
18.00
560.00
5.47
4.33
5.50
1.65
7.15
560.00
98.46
77.94
560.00
176.40
736.40
UN
UN
H
1.00
0.03
0.40
4.33
0.40
0.13
0.40
0.13
0.53
UN
UN
H
1.00
0.02
0.30
4.33
0.30
0.09
0.30
0.09
0.39
RL
RL
H
H
1.00
0.24
0.24
7.50
5.47
4.33
7.50
1.31
1.04
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
6.50
1.96
8.46
7.00
1.18
0.94
Materiais
Mo de obra
Total da composio
VELCRO PRETO OU AZUL
NO CONSTA
00002436
00006113
UN
Materiais
Mo de obra
Total da composio
ANILHAS MARCA HELLERMAN PARA CABOS UTP 4 PARES
R$ 5.47
R$ 4.33
10.50
3.15
13.65
6.50
1.09
0.86
Materiais
Mo de obra
Total da composio
CONES DE IDENTIFICAO VERDE
NO CONSTA
00002436
00006113
UN
Materiais
Mo de obra
Total da composio
FUSO DE CABOS PTICOS
FUSO DE CABOS PTICOS
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
2400.00
721.28
3121.28
10.50
1.81
1.34
Materiais
Mo de obra
Total da composio
CABO PTICO TOTALMENTE DIELTRICO COM UNIDADE BSICA RESISTENTE
PENETRAO DE UMIDADE E REVESTIMENTO EXTERNO EM MATERIAL TERMOPLSTICO.
COM DUAS FIBRAS.
CABO PTICO TOTALMENTE DIELTRICO COM UNIDADE BSICA RESISTENTE
PENETRAO DE UMIDADE E REVESTIMENTO EXTERNO EM MATERIAL
TERMOPLSTICO. COM DUAS FIBRAS.
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
UN
Materiais
Mo de obra
Total da composio
CABO DE PARES TRANADOS TIPO UTP CATEGORIA 5E 350 MHZ , 4 PARES,FABRICANTE
FURUKAWA OU EQUIVALENTE TCNICO.
CABO DE PARES TRANADOS TIPO UTP CATEGORIA 5E 350 MHZ , 4
PARES,FABRICANTE FURUKAWA OU EQUIVALENTE TCNICO.
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
285.00
85.75
370.75
2400.00
402.59
318.69
Materiais
Mo de obra
Total da composio
ADAPTER CABLE M8V CATEGORIA 5E , PINAGEM T568A COM 2,5 M, FABRICANTE
FURUKAWA OU EQUIVALENTE TCNICO
ADAPTER CABLE M8V CATEGORIA 5E , PINAGEM T568A COM 2,5 M,
FABRICANTE FURUKAWA OU EQUIVALENTE TCNICO
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
UN
Materiais
Mo de obra
Total da composio
PATCH CABLE M8V CATEGORIA 5E , PINAGEM T568A DE 1,5MTS, AZUL,FABRICANTE
FURUKAWA OU EQUIVALENTE TCNICO.
PATCH CABLE M8V CATEGORIA 5E , PINAGEM T568A DE 1,5MTS,
AZUL,FABRICANTE FURUKAWA OU EQUIVALENTE TCNICO.
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
1.50
0.45
1.95
285.00
47.86
37.89
Materiais
Mo de obra
Total da composio
CONECTOR FEMEA RJ 45 - CATEGORIA 5E, PINAGEM T568A ,FABRICANTE FURUKAWA OU
EQUIVALENTE TCNICO.
CONECTOR FEMEA RJ 45 - CATEGORIA 5E, PINAGEM T568A ,FABRICANTE
FURUKAWA OU EQUIVALENTE TCNICO.
ELETRICISTA
AJUDANTE DE ELETRICISTA
PREO SINAPI
NO CONSTA
00002436
00006113
UN
Materiais
Mo de obra
Total da composio
FORNECIMENTO E INSTALAO DEGABINETE RACK 19" DE 44 U X 470 MM PARA
FECHADO, COM PORTAS DE VIDRO E SUPORTES VERTICAIS PASSA CABO LATERAIS E
SUPERIOR FABRICAO CEMAR OU EQUIVALENTE TCNICO.
FORNECIMENTO E INSTALAO DEGABINETE RACK 19" DE 44 U X 470 MM
PARA FECHADO, COM PORTAS DE VIDRO E SUPORTES VERTICAIS PASSA
CABO LATERAIS E SUPERIOR E DEMAIS ITENS NECESSRIOS A SUA
PEREFEITA INSTALO E FUNCIONAMENTO. FABRICAO CEMAR OU
EQUIVALENTE TCNICO.
ELETRICISTA
AJUDANTE DE ELETRICISTA
CDIGO SINAPI
7.50
2.35
9.85
UN
37 de 82
ITEM / DESCRIO
PORCA GAIOLA COM PARAFUSOS
AJUDANTE DE ELETRICISTA
UNIDADE
UN
H
QUANTIDADE
1.00
0.04
CUSTO UNITRIO
RESUMO COMPOSIO
0.60
4.33
0.60
0.18
Materiais
Mo de obra
Total da composio
UN
H
1.00
0.01
0.08
4.33
1.00
6.00
6.00
82.00
5.47
4.33
UN
H
H
1.00
6.40
6.40
206.00
5.47
4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00006113
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00006113
R$ 4.33
206.00
62.72
268.72
UN
UN
H
1.00
0.20
2.80
4.33
2.80
0.87
2.80
0.87
3.67
UN
UN
H
H
1.00
1.42
1.42
45.00
5.47
4.33
45.00
7.77
6.15
45.00
13.92
58.92
UN
UN
H
UN
H
H
KG
KG
M3
M3
M3
M2
M
KG
UN
KG
UN
H
H
KG
KG
M3
M3
M3
M2
M
KG
UN
KG
UN
H
H
H
H
H
H
M3
M3
KG
KG
KG
KG
M
M
KG
KG
UN
1.00
0.09
16.36
31.60
9.73
54.00
0.04
0.85
0.20
0.20
0.15
3.86
180.00
0.07
15.89
29.60
8.73
53.00
0.03
0.75
0.19
0.19
0.10
3.76
160.00
0.05
7.90
4.48
11.95
10.70
17.53
7.90
0.44
0.68
0.15
16.00
7.00
53.00
18.84
32.97
1.88
284.17
133.92
1.20
4.33
1.20
0.37
Materiais
Mo de obra
Total da composio
1.20
0.37
1.57
00004750
00006111
00001106
00001379
NO CONSTA
NO CONSTA
00000370
NO CONSTA
NO CONSTA
NO CONSTA
00007270
00000337
Materiais
Mo de obra
Total da composio
89.49
134.30
2.92
17.82
1.19
37.40
5.67
2.61
0.54
14.24
28.80
0.56
111.74
223.79
335.53
00004750
00006111
00001106
00001379
NO CONSTA
NO CONSTA
00000370
NO CONSTA
NO CONSTA
NO CONSTA
00007270
00000337
Materiais
Mo de obra
Total da composio
86.92
125.80
2.62
17.49
0.74
33.00
5.38
2.48
0.35
13.87
25.60
0.40
101.93
212.72
314.65
43.21
19.04
51.74
58.53
75.90
34.21
12.76
46.92
0.63
80.64
33.39
284.61
108.33
57.70
12.39
93.78
21.43
00000378
NO CONSTA
NO CONSTA
00001213
00006117
00006114
00000367
00004718
NO CONSTA
00000033
00000034
00000032
NO CONSTA
NO CONSTA
00005067
00001379
00007270
5.47
4.25
0.30
0.33
29.64
44.00
28.34
13.03
3.60
3.69
0.16
7.94
5.47
4.25
0.30
0.33
29.64
44.00
28.34
13.03
3.60
3.69
0.16
7.94
5.47
4.25
4.33
5.47
4.33
4.33
29.00
69.00
4.20
5.04
4.77
5.37
5.75
1.75
6.59
0.33
0.16
UN
UN
H
H
1.00
0.05
0.05
1.50
5.47
4.33
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
R$ 0.16
R$ 7.94
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
R$ 0.16
R$ 7.94
R$ 5.47
R$ 5.47
R$ 4.33
R$ 4.33
R$ 29.00
R$ 29.00
R$ 5.04
R$ 4.77
R$ 5.37
R$ 6.59
R$ 0.33
R$ 0.16
679.33
62.25
741.59
1.50
0.27
0.22
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
82.00
25.98
107.98
206.00
35.01
27.71
Materiais
Mo de obra
Total da composio
TERMINAL DE FECHAMENTO 100x50mm
TERMINAL DE FECHAMENTO 100X50MM
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
UN
Materiais
Mo de obra
Total da composio
ANEIS GUIAS COM SAPATA NMERO 4
R$ 4.33
0.08
0.04
0.12
82.00
32.82
25.98
Materiais
Mo de obra
Total da composio
BLOCO DE PROTEO 10 PARES COM PROTETORES
NO CONSTA
00006113
RL
RL
H
H
Materiais
Mo de obra
Total da composio
FIO FDG 050X02 PTXBR BRASFIO
R$ 4.33
0.60
0.18
0.78
0.08
0.04
Materiais
Mo de obra
Total da composio
BLOCO BAGOA DE 10P-M10B
PREO SINAPI
NO CONSTA
00006113
UN
Materiais
Mo de obra
Total da composio
ETIQUETA BROTHER BRANCA COM 12MM LARGURA
CDIGO SINAPI
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
1.50
0.49
1.99
UN
38 de 82
ITEM / DESCRIO
T HORIZONTAL 90 PARA ELETROCALHA 100X50MM COM TA PA
ELETRICISTA
AJUDANTE
UNIDADE
UN
H
H
QUANTIDADE
1.00
0.25
0.25
CUSTO UNITRIO
RESUMO COMPOSIO
15.60
5.47
4.33
15.60
1.37
1.08
Materiais
Mo de obra
Total da composio
UN
UN
H
H
1.00
0.07
0.08
11.62
5.47
4.33
UN
UN
H
H
1.00
0.09
0.10
10.69
5.47
4.33
UN
UN
H
H
1.00
1.20
1.00
39.00
5.47
4.33
UN
H
H
1.00
1.30
1.30
42.00
5.47
4.33
UN
H
H
1.00
1.20
1.20
38.00
5.47
4.33
UN
H
H
1.00
0.01
0.01
2.85
5.47
4.33
UN
H
H
1.00
0.11
0.11
3.50
5.47
4.33
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
3.50
1.05
4.55
UN
UN
H
H
1.00
0.17
0.17
5.50
5.47
4.33
5.50
0.92
0.73
5.50
1.65
7.15
UN
UN
H
H
1.00
0.30
0.30
9.50
5.47
4.33
9.50
1.64
1.30
9.50
2.94
12.44
UN
UN
H
H
1.00
1.18
1.18
38.00
5.47
4.33
38.00
6.45
5.11
38.00
11.56
49.56
UN
UN
H
H
1.00
0.25
0.25
8.00
5.47
4.33
8.00
1.37
1.08
8.00
2.45
10.45
UN
UN
H
H
1.00
0.17
0.17
4.90
5.47
4.33
4.90
0.93
0.74
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
2.85
0.09
2.94
3.50
0.57
0.47
Materiais
Mo de obra
Total da composio
SUPORTE VERTICAL 100 X 100 MM GALVANIZADA A FOGO CONFORME NBR 6323
SUPORTE VERTICAL 100 X 100 MM GALVANIZADA A FOGO CONFORME NBR
6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
JUNO INTEGRAL DE 100 X 100 MM GALVANIZADA A FOGO CONFORME NBR 6323
JUNO INTEGRAL DE 100 X 100 MM GALVANIZADA A FOGO CONFORME NBR
6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
38.00
11.76
49.76
2.85
0.05
0.03
Materiais
Mo de obra
Total da composio
CURVA HORIZONTAL 90 DE 100 X 100 MM GALVANIZADA A FOGO CONFORME NBR 6323
CURVA HORIZONTAL 90 DE 100 X 100 MM GALVANIZADA A FOGO CONFORME
NBR 6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
JUNO INTEGRAL DE 150 X 100 MM GALVANIZADA A FOGO CONFORME NBR 6323
JUNO INTEGRAL DE 150 X 100 MM GALVANIZADA A FOGO CONFORME NBR
6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
42.00
12.74
54.74
38.00
6.56
5.20
Materiais
Mo de obra
Total da composio
SADA HORIZONTAL P/ ELETRODUTO 50MM GALVANIZADA A FOGO CONFORME NBR 6323
SADA HORIZONTAL P/ ELETRODUTO 50MM GALVANIZADA A FOGO
CONFORME NBR 6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
SADA HORIZONTAL P/ ELETRODUTO 25MM GALVANIZADA A FOGO CONFORME NBR 6323
SADA HORIZONTAL P/ ELETRODUTO 25MM GALVANIZADA A FOGO
CONFORME NBR 6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
39.00
10.89
49.89
42.00
7.11
5.63
Materiais
Mo de obra
Total da composio
SADA HORIZONTAL ELETROCALHA P/ ELETRODUTO 3/4''
R$ 5.47
R$ 4.33
UN
Materiais
Mo de obra
Total da composio
CURVA DE INVERSO 90 DE 100 X 100 MM GALVANIZADA A FOGO CONFORME NBR 6323
CURVA DE INVERSO 90 DE 100 X 100 MM GALVANIZADA A FOGO
CONFORME NBR 6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
10.69
0.93
11.62
39.00
6.56
4.33
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
11.62
0.73
12.35
10.69
0.49
0.43
Materiais
Mo de obra
Total da composio
PREO SINAPI
NO CONSTA
00002436
00006113
15.60
2.45
18.05
11.62
0.38
0.35
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
4.90
1.67
6.57
UN
39 de 82
ITEM / DESCRIO
SUPORTE VERTICAL 150 X 100 MM GALVANIZADA A FOGO CONFORME NBR
6323
ELETRICISTA
AJUDANTE DE ELETRICISTA
UNIDADE
UN
H
H
QUANTIDADE
1.00
0.17
0.17
CUSTO UNITRIO
RESUMO COMPOSIO
5.50
5.47
4.33
UN
H
H
1.00
1.50
1.50
48.00
5.47
4.33
UN
UN
H
H
1.00
0.20
0.25
6.78
5.47
4.33
UN
UN
H
H
1.00
0.20
0.25
9.53
5.47
4.33
UN
H
H
0.27
0.27
5.47
4.33
UN
1.00
10.40
UN
H
H
0.28
0.28
5.47
4.33
UN
1.00
9.04
Materiais
Mo de obra
Total da composio
UN
H
H
UN
0.25
0.25
1.00
5.47
4.33
2.90
UN
H
H
0.25
0.11
7.96
4.33
UN
1.00
1.79
Materiais
Mo de obra
Total da composio
UN
H
H
1.33
1.03
5.47
4.33
UN
1.00
7.86
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1.48
1.17
00002436
00006113
R$ 5.47
R$ 4.33
10.40
NO CONSTA
9.53
2.18
11.71
10.40
2.65
13.05
1.53
1.21
00002436
00006113
9.04
NO CONSTA
00002436
00006113
NO CONSTA
1.97
0.49
NO CONSTA
NO CONSTA
1.79
NO CONSTA
1.79
2.47
4.26
7.28
4.46
00002436
00006113
7.86
NO CONSTA
UN
UN
UN
UN
1.00
1.00
1.00
1.00
633.84
46.26
17.84
14.71
633.84
46.26
17.84
14.71
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
5.47
4.33
346.18
46.26
17.84
14.71
UN
H
H
UN
UN
UN
UN
5.50
5.50
1.00
1.00
1.00
1.00
UN
H
H
UN
4.00
4.00
1.00
5.47
4.33
259.36
R$ 5.47
R$ 4.33
712.65
58.80
771.45
27.35
21.65
346.18
46.26
17.84
14.71
5.47
4.33
484.21
46.26
17.84
14.71
R$ 5.47
R$ 4.33
7.86
11.74
19.60
00002436
00006113
5.00
5.00
1.00
1.00
1.00
1.00
R$ 5.47
R$ 4.33
2.90
2.45
5.35
32.82
25.98
UN
H
H
UN
UN
UN
UN
R$ 5.47
R$ 4.33
9.04
2.74
11.78
5.47
4.33
00002436
00006113
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
424.99
49.00
473.99
30.09
23.82
484.21
46.26
17.84
14.71
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
6.78
2.18
8.96
6.00
6.00
Materiais
Mo de obra
Total da composio
QUADRO DE DISTRIB.TRIFSICO.EMBUT.AT 1000X600X250MM
ELETRICISTA
AJUDANTE DE ELETRICISTA
QUADRO DE DISTRIB.TRIFSICO.EMBUT.AT 1000X600X250MM
BARRAMENTO PRINCIPAL P/QL
BARRAMENTO NEUTRO P/QL
BARRAMENTO TERRA P/QL
R$ 5.47
R$ 4.33
UN
H
H
Materiais
Mo de obra
Total da composio
QUADRO DE DISTRIB.DE TRIFSICO .EMBUT.AT 800X200X600MM
ELETRICISTA
AJUDANTE DE ELETRICISTA
QUADRO DE DISTRIB.DE TRIFSICO .EMBUT.AT 800X200X600MM
BARRAMENTO PRINCIPAL P/QL
BARRAMENTO NEUTRO P/QL
BARRAMENTO TERRA P/QL
NO CONSTA
00002436
00006113
48.00
14.70
62.70
1.37
1.08
2.90
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
9.53
1.09
1.08
Materiais
Mo de obra
Total da composio
CAIXA ESTAMPADA EM CHAPA DE AO COM PINTURA EPOXI DE SOBREPOR ( 15 X 15 X 8
CM )
ELETRICISTA
AJUDANTE DE ELETRICISTA
CAIXA ESTAMPADA EM CHAPA DE AO ESMALTADA DE SOBREPOR ( 15 X 15
X 8 CM )
NO CONSTA
00002436
00006113
5.50
1.67
7.17
6.78
1.09
1.08
Materiais
Mo de obra
Total da composio
CAIXA DE PASSAGEM EM CHAPA DE AO COM TAMPA APARAFUSADA (100X100X80MM)
ELETRICISTA
AJUDANTE DE ELETRICISTA
CAIXA DE PASSAGEM EM CHAPA DE AO COM TAMPA APARAFUSADA
(100X100X80MM)
R$ 5.47
R$ 4.33
48.00
8.21
6.50
Materiais
Mo de obra
Total da composio
CAIXA DE DERIVAO 15X15CM REVESTIDA EM EPOXI
CAIXA DE DERIVAO 15x15xm REVESTIDA EM EPOXI
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00006113
UN
Materiais
Mo de obra
Total da composio
CAIXA DE DERIVAO 10X10CM REVESTIDA EM EPOXI
CAIXA DE DERIVAO 10x10cm REVESTIDA EM EPOXI
ELETRICISTA
AJUDANTE DE ELETRICISTA
PREO SINAPI
5.50
0.93
0.74
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
563.02
53.90
616.92
21.88
17.32
259.36
40 de 82
ITEM / DESCRIO
BARRAMENTO PRINCIPAL P/QL
BARRAMENTO NEUTRO P/QL
BARRAMENTO TERRA P/QL
UNIDADE
UN
UN
UN
QUANTIDADE
1.00
1.00
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
46.26
17.84
14.71
Materiais
Mo de obra
Total da composio
UN
H
H
UN
UN
UN
UN
3.50
3.50
1.00
1.00
1.00
1.00
UN
H
H
UN
UN
0.39
0.37
1.00
1.00
5.47
4.33
211.13
46.26
17.84
14.71
19.15
15.16
211.13
46.26
17.84
14.71
UN
H
H
UN
UN
0.64
0.64
1.00
1.00
5.47
4.33
3.45
1.41
2.15
1.62
3.45
1.41
UN
H
H
UN
UN
UN
0.84
0.84
1.00
1.00
1.00
5.47
4.33
5.89
1.41
3.50
2.77
5.89
1.41
UN
H
H
UN
UN
UN
0.25
0.25
1.20
1.00
1.00
5.47
4.33
12.66
2.20
3.23
4.59
3.64
12.66
2.20
3.23
5.47
4.33
5.89
2.20
3.23
UN
H
H
0.20
0.20
5.47
4.33
UN
1.00
295.74
1.37
1.08
7.07
2.20
3.23
UN
H
H
0.20
0.20
5.47
4.33
UN
1.00
346.30
1.09
0.87
295.74
UN
H
H
0.20
0.20
5.47
4.33
UN
1.00
425.00
UN
H
H
UN
346.30
UN
H
H
UN
425.00
0.30
0.30
1.00
5.47
4.33
6.20
UN
H
H
UN
0.30
0.30
1.00
5.47
4.33
6.80
UN
H
H
UN
R$ 5.47
R$ 4.33
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
0.90
0.90
1.00
5.47
4.33
41.22
0.95
0.95
1.00
5.47
4.33
75.00
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
0002369
R$ 5.47
R$ 4.33
R$ 6.20
00002436
00006113
00014544
R$ 5.47
R$ 4.33
R$ 6.80
00002436
00006113
00002384
R$ 5.47
R$ 4.33
R$ 41.22
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
6.20
2.94
9.14
1.64
1.30
6.80
6.80
2.94
9.74
4.92
3.90
41.22
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
NO CONSTA
NO CONSTA
425.00
1.96
426.96
1.64
1.30
6.20
Materiais
Mo de obra
Total da composio
DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUICAO 32A
ELETRICISTA
AJUDANTE DE ELETRICISTA
DISJUNTOR TRIPOLAR 32A
R$ 5.47
R$ 4.33
346.30
1.96
348.26
1.09
0.87
Materiais
Mo de obra
Total da composio
DISJUNTOR MONOPOLAR EM QUADRO DE DISTRIBUICAO 25A
ELETRICISTA
AJUDANTE DE ELETRICISTA
DISJUNTOR MONOPOLAR 25A
00002436
00006113
NO CONSTA
NO CONSTA
NO CONSTA
295.74
1.96
297.70
1.09
0.87
Materiais
Mo de obra
Total da composio
DISJUNTOR MONOPOLAR EM QUADRO DE DISTRIBUICAO 16A
ELETRICISTA
AJUDANTE DE ELETRICISTA
DISJUNTOR MONOPOLAR 16A
R$ 5.47
R$ 4.33
0.00
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
NO CONSTA
12.50
2.45
14.95
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 3.45
18.09
8.23
26.32
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
NO CONSTA
7.30
6.27
13.57
Materiais
Mo de obra
Total da composio
INTERRUPTOR DE LUZ, DE EMBUTIR EM ALVENARIA EM CAIXA 4x2'' - PARALELO TIPO
THREE-WAY
ELETRICISTA
AJUDANTE DE ELETRICISTA
INTERRUPTOR DUAS TECLAS SIMPLES 10A.250V
CAIXA DE DERIVAO EM PVC 4X2'
ESPELHO EM PVC PARA INTERRUPTOR DE DUAS TECLAS PAR LELO
R$ 5.47
R$ 4.33
4.86
3.76
8.62
Materiais
Mo de obra
Total da composio
INTERRUPTOR.TRS TECLA SIMPLES, EMBUTIDO EM ALVENRIA EM CAIXA 4x2''.
ELETRICISTA
AJUDANTE DE ELETRICISTA
INTERRUPTOR 3 TECLAS SIMPLES
CAIXA DE DERIVAO EM PVC 4X2'
ESPELHO EM PVC PARA INTERRUPTOR DE DUAS TECLAS PAR LELO
00002436
00006113
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
289.94
34.30
324.24
Materiais
Mo de obra
Total da composio
INTERRUPTOR, DUAS TECLAS SIMPLES, EMBUTIDO EM ALVENARIA EM CAIXA 4x2''.
ELETRICISTA
AJUDANTE DE ELETRICISTA
INTERRUPTOR DUAS TECLAS SIMPLES 10A.250V
CAIXA ESTAMPADA 4'X2'-CHAPA 18
PREO SINAPI
NO CONSTA
NO CONSTA
NO CONSTA
338.17
39.20
377.37
Materiais
Mo de obra
Total da composio
INTERRUPTOR UMA TECLA SIMPLES, EMBUTIDO EM ALVENARIA EM CAIXA 4x2''.
ELETRICISTA
AJUDANTE DE ELETRICISTA
INTERRUPTOR 1 TECLA SIMPLES
CAIXA ESTAMPADA 4'X2'-CHAPA 18
CDIGO SINAPI
46.26
17.84
14.71
41.22
8.82
50.04
5.20
4.11
75.00
41 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Materiais
Mo de obra
Total da composio
DISJUNTOR TRIPOLAR COMPACTO ACIONAM.NA PORTA DO QUADRO 60A
ELETRICISTA
AJUDANTE DE ELETRICISTA
DISJUNTOR TIPO COMPACTO 60A
UN
H
H
UN
1.00
1.00
1.00
5.47
4.33
82.09
UN
H
H
UN
2.00
2.00
1.00
5.47
4.33
151.31
UN
H
H
UN
2.00
2.00
1.00
5.47
4.33
2650.00
UN
H
H
UN
2.00
2.00
1.00
5.47
4.33
1520.00
UN
H
H
UN
3.62
3.62
1.00
5.47
4.33
218.97
M
M
H
H
1.00
1.33
1.33
23.08
5.47
4.33
M
H
H
1.00
1.77
2.38
44.68
5.47
4.33
1.00
1.00
49250.00
1200.00
UN
UN
1.00
200.00
UN
UN
UN
UN
H
H
UN
UN
1.00
1.00
1.00
2.09
2.09
1.00
1.00
3000.70
878.82
30.67
4.33
5.47
34.41
55.55
UN
H
H
UN
UN
0.80
0.80
1.00
1.00
5.47
4.33
230.95
35.39
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
UN
UN
H
1.00
0.08
0.68
5.47
UN
UN
H
1.00
0.04
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
00006113
00002436
00012216
NO CONSTA
R$ 4.33
R$ 5.47
R$ 34.41
00002436
00006113
NO CONSTA
00003751
R$ 5.47
R$ 4.33
R$ 35.39
00003380
00002436
R$ 22.48
R$ 5.47
00003380
00002436
R$ 22.48
R$ 5.47
266.34
7.84
274.18
0.68
0.44
0.27
5.47
NO CONSTA
NO CONSTA
4000.15
20.48
4020.63
4.38
3.46
230.95
35.39
0.68
0.44
1.12
0.27
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
200.00
0.00
200.00
3000.70
878.82
30.67
9.05
11.43
34.41
55.55
Materiais
Mo de obra
Total da composio
ARRUELA LISA GALVANIZADA 3/8"
ARRUELA LISA GALVANIZADA 3/8"
ELETRICISTA
R$ 5.47
R$ 4.33
49250.00
1200.00
50450.00
200.00
Materiais
Mo de obra
Total da composio
ARRUELA QUADRADA DE 38MM COM FURO 18MM
ARRUELA QUADRADA DE 38MM COM FURO 18MM
ELETRICISTA
00002436
00006113
NO CONSTA
44.68
19.99
64.67
49250.00
1200.00
Materiais
Mo de obra
Total da composio
LUMINARIA REFLETORA INTERNA SIMPLES C/OU S/VIDRO
ELETRICISTA
AJUDANTE DE ELETRICISTA
LUMINARIA REFLETORA SIMPLES COM VIDRO
LAMPADA VAPOR DE MERCURIO 400W/220V
R$ 5.47
R$ 4.33
UN
UN
UN
Materiais
Mo de obra
Total da composio
POSTE RETO ZINCADO E PINTADO NA COR BRANCA 3,00M E LUMINARIA EM VAPOR DE
SDIO
POSTE RETO ZINCADO E PINTADO NA COR BRANCA 3,00M
PROJETOR PETALA VAPOR SDIO
RELE FOTO ELETRICO PARA LMPADA DE VAPOR SDIO
AJUDANTE DE ELETRICISTA
ELETRICISTA
LMPADA VAPOR DE SDIO DE 150W
REATOR PARA LMPADA VAPOR DE SDIO DE 150W
00002436
00006113
NO CONSTA
23.08
13.03
36.11
44.68
9.68
10.31
Materiais
Mo de obra
Total da composio
CHAVE ROTATIVA 60A CONFORME PROJETO
CHAVE ROTATIVA 60A CONFORME PROJETO
R$ 5.47
R$ 4.33
Materiais
Mo de obra
Total da composio
NO BREAK 30KVA ENTRADA E SADA TRIFSICAS AUTONOMIA 30 MIN. BATERIAS
SELADAS
NO BREAK 30KVA ENTRADA E SADA TRIFSICAS AUTONOMIA 30 MIN.
BATERIAS SELADAS
MO DE OBRA PARA INSTALAO DE NO BREAK
00002436
00006113
NO CONSTA
218.97
35.46
254.43
23.08
7.28
5.76
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1520.00
19.60
1539.60
19.79
15.67
218.97
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
2650.00
19.60
2669.60
10.94
8.66
1520.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
151.31
19.60
170.91
10.94
8.66
2650.00
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
82.09
9.80
91.89
10.94
8.66
151.31
Materiais
Mo de obra
Total da composio
PREO SINAPI
75.00
9.31
84.31
5.47
4.33
82.09
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
0.27
0.22
0.49
UN
42 de 82
ITEM / DESCRIO
ARRUELA DE PRESSO GALVANIZADA 3/8"
ELETRICISTA
UNIDADE
UN
H
QUANTIDADE
1.00
0.05
CUSTO UNITRIO
RESUMO COMPOSIO
0.90
5.47
0.90
0.27
Materiais
Mo de obra
Total da composio
UN
UN
H
1.00
0.03
0.37
5.47
UN
UN
H
H
1.00
0.60
1.10
22.48
5.47
4.33
UN
H
H
UN
0.02
0.02
1.00
5.47
4.33
0.42
UN
H
H
UN
0.03
0.03
1.00
5.47
4.33
0.64
UN
H
H
UN
0.03
0.03
1.00
5.47
4.33
0.93
UN
H
H
UN
0.03
0.03
1.00
5.47
4.33
1.35
UN
H
H
UN
0.04
0.04
1.00
5.47
4.33
1.72
UN
H
H
UN
0.05
0.05
1.00
5.47
4.33
0.99
UN
H
H
UN
0.06
0.06
1.00
5.47
4.33
0.96
UN
H
H
UN
0.07
0.07
1.00
5.47
4.33
1.12
UN
H
H
UN
0.08
0.08
1.00
5.47
4.33
1.79
UN
H
H
UN
0.10
0.10
1.00
5.47
4.33
2.55
UN
H
H
UN
0.12
0.12
1.00
5.47
4.33
4.22
R$ 5.47
R$ 4.33
R$ 0.93
00002436
00006113
00001574
R$ 5.47
R$ 4.33
R$ 0.80
00002436
00006113
00001578
R$ 5.47
R$ 4.33
R$ 1.72
00002436
00006113
00001575
R$ 5.47
R$ 4.33
R$ 0.99
00002436
00006113
00001576
R$ 5.47
R$ 4.33
R$ 0.96
00002436
00006113
00001577
R$ 5.47
R$ 4.33
R$ 1.12
00002436
00006113
00001579
R$ 5.47
R$ 4.33
R$ 1.79
00002436
00006113
00001580
R$ 5.47
R$ 4.33
R$ 2.55
00002436
00006113
00001581
R$ 5.47
R$ 4.33
R$ 4.22
1.79
0.78
2.57
0.55
0.43
2.55
Materiais
Mo de obra
Total da composio
00002436
00006113
00001573
1.12
0.69
1.81
0.44
0.35
1.79
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 0.64
0.96
0.59
1.55
0.38
0.30
1.12
Materiais
Mo de obra
Total da composio
00002436
00006113
00001571
0.99
0.49
1.48
0.33
0.26
0.96
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 0.42
1.72
0.39
2.11
0.27
0.22
0.99
Materiais
Mo de obra
Total da composio
00002436
00006113
00001570
1.35
0.29
1.64
0.22
0.17
1.72
Materiais
Mo de obra
Total da composio
R$ 22.48
R$ 5.47
R$ 4.33
0.93
0.29
1.22
0.16
0.13
1.35
Materiais
Mo de obra
Total da composio
00003380
00002436
00006113
0.64
0.25
0.89
0.16
0.13
0.93
Materiais
Mo de obra
Total da composio
R$ 22.48
R$ 5.47
0.42
0.20
0.62
0.14
0.11
0.64
Materiais
Mo de obra
Total da composio
00003380
00002436
22.48
8.05
30.53
0.11
0.09
0.42
Materiais
Mo de obra
Total da composio
R$ 22.48
R$ 5.47
0.37
0.16
0.53
22.48
3.28
4.76
Materiais
Mo de obra
Total da composio
PREO SINAPI
00003380
00002436
0.90
0.27
1.17
0.37
0.16
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
2.55
0.98
3.53
0.66
0.52
4.22
43 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Materiais
Mo de obra
Total da composio
TERMINAL DE COMPRESSO EM LATO PARA CABO 150MM2
ELETRICISTA
AJUDANTE DE ELETRICISTA
TERMINAL DE COMPRESSO EM LATO PARA CABO 150MM2
UN
H
H
UN
0.13
0.13
1.00
UN
H
H
UN
0.14
0.14
1.00
5.47
4.33
5.00
0.71
0.56
5.00
UN
H
H
H
H
H
H
KG
KG
M3
M3
M3
M2
M
KG
UN
KG
0.61
0.61
0.12
0.12
2.91
5.31
5.46
26.18
0.01
0.03
0.11
0.10
0.03
1.32
100.80
0.02
5.47
4.33
6.00
0.77
0.61
6.00
5.47
4.33
5.47
4.95
5.47
4.25
0.30
0.33
29.64
44.00
28.34
13.03
3.60
3.69
0.16
7.94
UN
H
H
H
H
H
H
KG
KG
M3
M3
M3
M2
M
KG
UN
KG
1.96
1.96
0.41
0.41
5.41
10.92
9.83
60.70
0.03
0.09
0.23
0.32
0.10
4.27
181.40
0.07
5.47
4.33
5.47
4.95
5.47
4.25
0.30
0.33
29.64
44.00
28.34
13.03
3.60
3.69
0.16
7.94
Total da composio
LMPADA FLUORESCENTE COMPACTA DE 18W
AJUDANTE DE ELETRICISTA
ELETRICISTA
LMPADA FLUORESCENTE COMPACTA DE 18W
UN
H
H
UN
0.62
0.35
1.00
4.33
5.47
11.50
00001213
00006117
00000378
NO CONSTA
00004750
00006111
00001106
00001379
NO CONSTA
NO CONSTA
00000370
NO CONSTA
NO CONSTA
NO CONSTA
00007270
00000337
252.00
252.00
NO CONSTA
1.00
33.52
130.75
10.94
11.34
27.16
NO CONSTA
00002436
NO CONSTA
NO CONSTA
33.52
NO CONSTA
115.00
5.47
115.00
8.21
NO CONSTA
00002436
UN
UN
2.00
4.00
5.62
6.79
11.24
27.16
NO CONSTA
NO CONSTA
UN
1.00
33.52
33.52
NO CONSTA
4.25
5.47
159.00
90.00
UN
1.00
99.99
Materiais
R$ 0.16
R$ 7.94
R$ 5.47
202.77
10.94
213.71
1.00
1.50
1.20
1.20
1.00
1.00
R$ 28.34
267.54
21.46
289.00
UN
UN
H
UN
H
H
UN
UN
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 4.33
R$ 5.47
1.00
UN
R$ 5.47
R$ 4.33
R$ 5.47
11.50
4.60
16.10
UN
130.75
5.47
5.67
6.79
R$ 0.16
R$ 7.94
R$ 4.33
R$ 5.47
00006113
00002436
NO CONSTA
NO CONSTA
1.00
2.00
2.00
4.00
R$ 28.34
00006113
00002436
NO CONSTA
9.48
11.98
14.50
1.04
UN
UN
H
UN
UN
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
#REF!
4.33
5.47
14.50
1.04
Materiais
Mo de obra
Total da composio
LUMINARIA TIPO ORNAMENTAL COMPLETA
AJUDANTE
ELETRICISTA
LUMINARIA TIPO ORNAMENTAL COMPLETA
LMPADA DE VAPOR METLICO 150W 220V
REATOR PARA LMPADA DE VAPOR METLICO DE 150W 220V EQUIPADO
COM CAPACITOR PARA CORRAO DO FATOR DE POTNCIA (>0,92)
R$ 5.47
R$ 4.33
R$ 5.47
2.19
2.19
1.00
1.00
Materiais
Mo de obra
Total da composio
LUMINARIA DE EMBUTIR COMPLETA 2X16W/220V
LUMINARIA DE EMBUTIR COMPLETA 2X16W/220V
ELETRICISTA
00001213
00006117
00000378
NO CONSTA
00004750
00006111
00001106
00001379
NO CONSTA
NO CONSTA
00000370
NO CONSTA
NO CONSTA
NO CONSTA
00007270
00000337
UN
H
H
UN
UN
Materiais
Mo de obra
Total da composio
LUMINARIA DE EMBUTIR COMPLETA 2X32W/220V
LUMINARIA DE EMBUTIR COMPLETA 2X32W/220V
ELETRICISTA
LAMPADA FLUORESCENTE TUBULAR DE 32W OSRAM OU SIMILAR
SOQUETE COM RABICHO/TOMADINHA PARA LMPADA FLUORESCENTE
REATOR ELETRONICO DE PARTIDA INSTANTANEA 2X32W ALTO FATOR DE
POTENCIA PHILIPS, OSRAM, INTRAL
R$ 5.47
R$ 4.33
R$ 4.22
84.26
99.52
183.78
2.68
1.91
11.50
Materiais
Mo de obra
Total da composio
00002436
00006113
00001581
37.53
45.59
83.12
10.72
8.49
2.26
2.04
29.60
46.41
2.95
20.03
0.95
3.87
6.55
4.22
0.35
15.75
29.02
0.57
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 4.22
6.00
1.37
7.37
3.31
2.62
0.63
0.57
15.90
22.56
1.64
8.64
0.30
1.41
2.98
1.30
0.11
4.86
16.13
0.17
Materiais
Mo de obra
Total da composio
00002436
00006113
00001581
5.00
1.27
6.27
Materiais
Mo de obra
Total da composio
CAIXA DE INSPECAO EM ALVENARIA DE 1/2 TIJOLO 40X40X60CM
CARPINTEIRO
AJUDANTE DE CARPINTEIRO
FERREIRO
AJUDANTE DE FERREIRO
PEDREIRO
SERVENTE
CAL HIDRATADA
CIMENTO PORTLAND
BRITA 1
BRITA 2
AREIA MEDIA
CHAPA COMPENSADA RESINADA 12MM
TABUA DE PINHO DE 1' / 12' DE 3A. CONSTRUCAO
ACO CA-60-B CMD BITOLAS
TIJOLO COMUM
ARAME RECOZIDO N.18 BWG
PREO SINAPI
4.22
1.18
5.40
Materiais
Mo de obra
Total da composio
TERMINAL DE COMPRESSO EM LATO PARA CABO 240MM2
ELETRICISTA
AJUDANTE DE ELETRICISTA
TERMINAL DE COMPRESSO EM LATO PARA CABO 240MM2
CDIGO SINAPI
R$ 5.47
186.92
8.21
195.13
5.10
6.56
159.00
90.00
00006115
00002436
NO CONSTA
NO CONSTA
99.99
NO CONSTA
R$ 4.25
R$ 5.47
348.99
44 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Mo de obra
Total da composio
UN
H
H
UN
UN
UN
1.71
1.71
1.00
1.00
1.00
4.33
5.47
87.00
1.04
10.50
7.40
9.35
87.00
1.04
10.50
Materiais
Mo de obra
Total da composio
UN
H
H
UN
0.25
0.22
1.00
5.47
4.33
8.58
UN
H
H
UN
0.35
0.35
1.00
5.47
4.33
15.55
UN
H
H
UN
0.45
0.45
1.00
5.47
4.33
18.35
UN
H
H
UN
0.21
0.21
1.00
5.47
4.33
9.50
UN
H
H
M
0.22
0.22
1.15
5.47
4.33
7.76
UN
H
H
UN
45.00
40.00
1.00
5.47
4.33
2000.00
M
H
H
M
L
UN
L
H
0.34
0.34
1.05
0.01
0.50
0.01
0.10
5.47
4.33
3.99
12.65
1.15
6.00
5.47
UN
H
H
UN
0.10
0.09
1.00
5.47
4.33
1.12
UN
H
H
UN
0.10
0.02
1.00
5.47
4.33
1.56
UN
H
H
UN
0.09
0.08
1.00
5.47
4.33
2.26
UN
H
H
UN
0.10
0.09
1.00
5.47
4.33
1.39
UN
H
H
UN
0.10
0.09
1.00
5.47
4.33
0.09
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
00021128
NO CONSTA
00003768
NO CONSTA
00004783
R$ 5.47
R$ 4.33
R$ 3.99
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
R$ 1.15
R$ 5.47
1.39
0.94
2.33
0.55
0.39
0.09
Materiais
R$ 5.47
R$ 4.33
2.26
0.85
3.11
0.55
0.39
1.39
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
1.56
0.63
2.19
0.50
0.35
2.26
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1.12
0.94
2.06
0.55
0.09
1.56
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
4.95
3.88
8.83
0.55
0.39
1.12
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
2000.00
419.35
2419.35
1.86
1.47
4.19
0.13
0.58
0.06
0.55
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
8.92
2.16
11.08
246.15
173.20
2000.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 8.58
9.50
2.06
11.56
1.20
0.95
8.92
Materiais
Mo de obra
Total da composio
00002436
00006113
00007529
18.35
4.41
22.76
1.15
0.91
9.50
Materiais
Mo de obra
Total da composio
R$ 4.33
R$ 5.47
15.55
3.43
18.98
2.46
1.95
18.35
Materiais
Mo de obra
Total da composio
00006113
00002436
NO CONSTA
NO CONSTA
NO CONSTA
8.58
2.31
10.89
1.91
1.52
15.55
Materiais
Mo de obra
Total da composio
PREO SINAPI
97.50
16.76
114.26
1.34
0.97
8.58
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
11.66
360.65
0.09
45 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Mo de obra
Total da composio
UN
H
H
UN
0.09
0.04
1.00
5.47
4.33
0.28
0.49
0.17
0.28
Materiais
Mo de obra
Total da composio
UN
H
H
UN
0.10
0.09
1.00
5.47
4.33
0.65
UN
H
H
UN
0.09
0.07
1.00
5.47
4.33
0.45
UN
H
H
UN
0.80
0.80
1.00
5.47
4.33
95.00
UN
H
H
UN
6.00
5.00
1.00
5.47
4.33
133.03
UN
UN
H
H
1.00
0.50
0.50
8.30
5.47
4.33
UN
H
H
UN
0.04
0.40
1.00
5.47
4.33
490.58
UN
H
H
UN
0.04
0.40
1.00
5.47
4.33
150.00
UN
H
H
UN
3.80
3.80
1.00
5.47
4.33
1800.00
M
H
H
M
0.60
0.60
1.05
5.47
4.33
96.96
M
H
H
M
0.30
0.30
1.05
5.47
4.33
45.99
UN
H
H
H
UN
40.00
40.00
40.00
1.00
5.47
4.33
14.30
30000.00
VB
VB
1.00
5000.00
M
H
H
M
0.12
0.12
1.00
5.47
4.33
13.33
R$ 5.47
R$ 4.33
00002696
00006116
00010889
R$ 5.47
R$ 4.33
R$ 490.58
00002696
00006116
00010892
R$ 5.47
R$ 4.33
R$ 150.00
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
0001015
R$ 5.47
R$ 4.33
R$ 96.96
00002436
00006113
0001017
R$ 5.47
R$ 4.33
R$ 45.99
00002436
00006113
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
NO CONSTA
5000.00
0.00
5000.00
0.66
0.52
13.33
Materiais
NO CONSTA
00002436
00006113
30000.00
964.00
30964.00
5000.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 133.03
48.29
2.94
51.23
218.80
173.20
572.00
30000.00
Materiais
Mo de obra
Total da composio
00002436
00006113
00004276
101.81
5.88
107.69
1.64
1.30
48.29
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1800.00
37.24
1837.24
3.28
2.60
101.81
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
150.00
1.95
151.95
20.79
16.45
1800.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
490.58
1.95
492.53
0.22
1.73
150.00
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
8.30
4.90
13.20
0.22
1.73
490.58
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
133.03
54.47
187.50
8.30
2.74
2.17
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
95.00
7.84
102.84
32.82
21.65
133.03
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
0.45
0.80
1.25
4.38
3.46
95.00
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
0.65
0.94
1.59
0.49
0.30
0.45
Materiais
Mo de obra
Total da composio
PREO SINAPI
0.28
0.67
0.95
0.55
0.39
0.65
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
0.94
1.03
00002436
00006113
00000863
R$ 5.47
R$ 4.33
R$ 13.33
13.33
46 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Mo de obra
Total da composio
UN
H
H
M
8.00
8.00
1.00
5.47
4.33
60.00
43.76
34.64
60.00
Materiais
Mo de obra
Total da composio
UN
H
H
UN
0.80
0.80
1.00
5.47
4.33
95.00
UN
UN
H
H
1.00
0.15
0.15
5.80
4.33
5.47
UN
UN
H
H
1.00
0.15
0.15
6.80
4.33
5.47
UN
H
H
UN
UN
1.50
1.50
1.00
1.00
5.47
4.33
37.63
5.90
UN
UN
H
H
1.00
0.10
0.10
7.03
5.47
4.33
UN
UN
H
H
1.00
0.10
0.10
7.85
5.47
4.33
UN
H
H
UN
0.15
0.15
1.00
5.47
5.15
10.53
UN
UN
H
H
1.00
0.10
0.10
4.00
5.47
4.33
UN
H
H
UN
0.40
0.40
1.00
5.47
4.33
60.00
UN
UN
H
H
1.00
2.50
2.50
189.50
5.47
4.33
UN
UN
H
H
1.00
0.40
0.30
95.00
5.47
4.33
UN
H
H
H
H
H
H
KG
KG
M3
M3
M2
0.01
0.01
0.01
0.01
0.68
1.13
15.00
30.00
0.09
0.01
0.10
5.47
4.33
5.47
4.95
5.47
4.25
0.30
0.33
44.00
28.34
13.03
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
00002436
00006113
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
189.50
24.50
214.00
95.00
2.19
1.30
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
NO CONSTA
60.00
3.92
63.92
189.50
13.68
10.83
Materiais
Mo de obra
Total da composio
R$ 4.33
R$ 5.47
4.00
0.98
4.98
2.19
1.73
60.00
Materiais
Mo de obra
Total da composio
NO CONSTA
00006113
00002436
10.53
1.59
12.12
4.00
0.55
0.43
Materiais
Mo de obra
Total da composio
R$ 4.33
R$ 5.47
7.85
0.98
8.83
0.82
0.77
10.53
Materiais
Mo de obra
Total da composio
NO CONSTA
00006113
00002436
7.03
0.98
8.01
7.85
0.55
0.43
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
43.53
14.70
58.23
7.03
0.55
0.43
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
6.80
1.47
8.27
8.21
6.50
37.63
5.90
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
5.80
1.47
7.27
6.80
0.65
0.82
Materiais
Mo de obra
Total da composio
00002436
00006113
NO CONSTA
95.00
7.84
102.84
5.80
0.65
0.82
Materiais
Mo de obra
Total da composio
PREO SINAPI
60.00
78.40
138.40
4.38
3.46
95.00
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
1.18
14.51
95.00
3.49
98.49
0.03
0.02
0.03
0.02
3.74
4.79
4.50
9.90
3.87
0.28
1.30
00001213
00006117
00000378
NO CONSTA
00004750
00006111
00001106
00001379
NO CONSTA
00000370
NO CONSTA
R$ 5.47
R$ 4.33
R$ 5.47
R$ 5.47
R$ 4.25
R$ 0.30
R$ 0.33
R$ 28.34
47 de 82
ITEM / DESCRIO
TABUA DE PINHO DE 1' / 12' DE 3A. CONSTRUCAO
ACO CA-60-B CMD BITOLAS
TIJOLO COMUM
ARAME RECOZIDO N.18 BWG
TAMPO T-16 P/ CAIXA DE PASSAGEM
UNIDADE
M
KG
UN
KG
UN
QUANTIDADE
0.03
1.32
50.00
0.02
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
3.60
3.69
0.16
7.94
14.45
Materiais
Mo de obra
Total da composio
UN
H
UN
2.50
1.10
4.33
6.78
ANIS GUIA
AJUDANTE DE ELETRICISTA
UN
H
H
UN
1.00
1.20
1.20
1.00
480.00
5.15
7.13
55.00
UN
UN
H
1.00
0.05
0.90
4.33
UN
UN
H
1.00
0.30
65.00
5.47
UN
UN
H
1.00
0.70
12.00
5.47
UN
UN
H
1.00
0.20
45.00
5.47
UN
UN
H
H
1.00
10.00
8.00
VB
1.00
500.00
UN
UN
H
1.00
2.80
150.00
5.47
UN
UN
H
H
1.00
1.50
1.50
1435.02
5.47
4.33
UN
UN
H
1.00
1.00
35.00
5.47
R$ 5.47
NO CONSTA
00002436
R$ 5.47
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
M
H
H
M
UN
UN
UN
UN
0.08
0.08
1.05
0.20
0.20
0.30
0.30
7.13
5.15
2.86
4.50
2.16
0.94
0.72
M
H
H
0.06
0.06
5.47
4.33
NO CONSTA
NO CONSTA
00002436
R$ 5.47
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
R$ 5.47
150.00
15.32
165.32
1435.02
14.70
1449.72
35.00
5.47
35.00
5.47
40.47
0.57
0.41
3.00
0.90
0.43
0.28
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
500.00
1435.02
8.21
6.50
Materiais
Mo de obra
Total da composio
ELETRODUTO PVC ROSC. 1' C/ ACESSRIOS E CONEXES
ELETRICISTA
AJUDANTE DE ELETRICISTA
ELETRODUTO DE PVC RIGIDO 1'
TIRANTE DE COM ARAME GALVANIZAO #10
CURVA DE PVC RIGIDO PARA ELETRODUTO DE 1'
LUVA PVC 1' - ELE
ABRAADEIRA TIPO ''D''
R$ 5.47
500.00
150.00
15.32
Materiais
Mo de obra
Total da composio
KIT DE FIXAO C/ 50 PORCAS GAIOLA/PARAFUSO
KIT DE FIXAO C/ 50 PORCAS GAIOLA/PARAFUSO
ELETRICISTA
NO CONSTA
00002436
1100.00
89.34
1189.34
500.00
Materiais
Mo de obra
Total da composio
SWITCH 24 PORTAS PADRO RACK (GERENCIVEL)
SWITCH 24 PORTAS PADRO RACK
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 4.33
VB
Materiais
Mo de obra
Total da composio
NO CONSTA
00006113
45.00
1.09
46.09
1100.00
54.70
34.64
Materiais
Mo de obra
Total da composio
R$ 4.33
R$ 5.47
12.00
3.83
15.83
45.00
1.09
1100.00
5.47
4.33
NO CONSTA
00006113
00002436
NO CONSTA
65.00
1.64
66.64
12.00
3.83
Materiais
Mo de obra
Total da composio
R$ 4.25
0.90
0.22
1.12
65.00
1.64
Materiais
Mo de obra
Total da composio
RGUA DE TOMADAS
RGUA DE TOMADAS
ELETRICISTA
00006111
NO CONSTA
535.00
14.74
549.74
0.90
0.22
Materiais
Mo de obra
Total da composio
ORGANIZADORES DE CABO
ORGANIZADORES DE CABO
ELETRICISTA
R$ 0.16
R$ 7.94
7.46
10.83
18.28
480.00
6.18
8.56
55.00
Materiais
Mo de obra
Total da composio
BANDEJA PADRO 19''
BANDEJA VENTILAO
ELETRICISTA
PREO SINAPI
UN
Materiais
Mo de obra
Total da composio
ANIS GUIA
NO CONSTA
NO CONSTA
00007270
00000337
NO CONSTA
47.45
8.63
56.08
10.83
7.46
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
0.11
4.86
8.00
0.17
14.45
00002436
00006113
00002685
NO CONSTA
00001880
00002474
00000393
R$ 5.47
R$ 4.33
R$ 2.42
00002436
00006113
R$ 5.47
R$ 4.33
R$ 2.16
R$ 0.94
R$ 0.72
4.83
0.98
5.82
0.33
0.26
48 de 82
ITEM / DESCRIO
ELETRODUTO FLEXIVEL COM ALMA DE AO REVESTIDO EM PVC 1''
UNIDADE
M
QUANTIDADE
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
5.17
Materiais
Mo de obra
Total da composio
M
H
H
M
0.12
0.12
1.00
5.47
4.33
14.53
M
H
H
0.40
0.40
5.47
4.33
1.00
4.69
Materiais
Mo de obra
Total da composio
M
H
H
0.48
0.48
5.47
4.33
1.00
9.64
Materiais
Mo de obra
Total da composio
M
H
H
M
0.40
0.40
1.00
5.47
4.33
20.36
UN
UN
H
H
1.00
0.11
0.16
2.08
5.47
4.33
M
M
H
H
1.00
0.24
0.24
18.25
5.47
4.33
UN
H
H
UN
0.10
0.10
1.00
5.47
4.33
16.85
UN
UN
H
H
1.00
0.05
0.05
0.75
5.47
4.33
UN
UN
H
H
1.00
0.25
0.25
22.30
5.47
4.25
UN
H
H
UN
0.28
0.28
1.00
5.47
4.33
13.50
UN
UN
H
H
1.00
0.04
0.05
0.31
5.47
4.33
UN
UN
H
H
1.00
0.20
0.20
8.00
5.47
4.33
M
H
H
M
0.10
0.10
1.05
R$ 4.69
2.63
2.08
00002436
00006113
R$ 5.47
R$ 4.33
9.64
00021130
R$ 9.64
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
9.64
4.70
14.34
20.36
3.92
24.28
5.47
4.33
1.20
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
18.25
2.35
20.60
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
16.85
0.98
17.83
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006115
R$ 5.47
R$ 4.25
0.75
0.49
1.24
22.30
2.43
24.73
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
13.50
2.74
16.24
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00006113
R$ 5.47
R$ 4.33
0.31
0.44
0.75
8.00
1.96
9.96
0.55
0.43
1.26
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
2.08
1.29
3.37
8.00
1.09
0.87
Materiais
Mo de obra
Total da composio
00021136
4.69
3.92
8.61
0.31
0.22
0.22
Materiais
Mo de obra
Total da composio
4.69
1.53
1.21
13.50
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
22.30
1.37
1.06
Materiais
Mo de obra
Total da composio
00002436
00006113
0.75
0.27
0.22
Materiais
Mo de obra
Total da composio
2.19
1.73
14.53
1.18
15.71
0.55
0.43
16.85
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 14.53
18.25
1.31
1.04
Materiais
Mo de obra
Total da composio
00002436
00006113
00002503
2.08
0.60
0.69
Materiais
Mo de obra
Total da composio
R$ 5.17
5.17
0.59
5.76
2.19
1.73
20.36
Materiais
Mo de obra
Total da composio
PREO SINAPI
00002504
0.66
0.52
14.53
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
5.17
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
1.26
0.98
2.24
49 de 82
ITEM / DESCRIO
CABO FIBRA OPTICA OM3 4 FIBRAS
ELETRICISTA
AJUDANTE DE ELETRICISTA
CABO FIBRA OPTICA OM3 4 FIBRAS
UNIDADE
M
H
H
M
M
M
H
UN
H
H
UN
QUANTIDADE
0.02
0.02
1.00
1.02
0.20
0.12
0.12
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
5.47
4.33
12.00
0.11
0.09
12.00
UN
H
H
UN
0.12
0.12
1.00
UN
H
H
UN
0.20
0.20
1.00
NO CONSTA
00006113
Materiais
Mo de obra
Total da composio
0.66
0.52
6.30
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
5.47
4.33
6.30
7.13
5.15
7.20
5.47
4.33
6.00
UN
UN
1.00
1.00
15530.00
1000.00
15530.00
1000.00
UN
UN
1.00
1.50
18450.00
1000.00
UN
UN
1.00
1.80
21300.00
1000.00
NO CONSTA
NO CONSTA
21300.00
1800.00
23100.00
UN
UN
UN
1.00
0.29
950.00
1000.00
950.00
285.00
NO CONSTA
NO CONSTA
950.00
285.00
1235.00
UN
UN
UN
1.00
0.35
1170.00
1000.00
1170.00
350.00
NO CONSTA
NO CONSTA
1170.00
350.00
1520.00
UN
UN
UN
1.00
0.40
1318.00
1000.00
1318.00
400.00
NO CONSTA
NO CONSTA
1318.00
400.00
1718.00
UN
UN
UN
1.00
0.45
1530.00
1000.00
1530.00
450.00
NO CONSTA
NO CONSTA
1530.00
450.00
1980.00
UN
UN
UN
1.00
0.50
1680.00
1000.00
1680.00
500.00
Materiais
Mo de obra
Total da composio
18450.00
1500.00
19950.00
21300.00
1800.00
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL SOB O TETO
18.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL SOB O
TETO 18.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL SOB O TETO
15.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL SOB O
TETO 15.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
15530.00
1000.00
16530.00
18450.00
1500.00
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL HIGH WALL
12.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL HIGH
WALL 12.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL HIGH WALL
9.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL HIGH
WALL 9.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
6.00
1.96
7.96
UN
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL HIGH WALL
7.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL HIGH
WALL 7.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
7.20
1.47
8.67
1.09
0.87
6.00
Materiais
Mo de obra
Total da composio
UNIDADE CONDENSADORA DE FLUXO DE REFRIGERANTE VARIVEL REFERNCIA MAP AP1201H
UNIDADE CONDENSADORA DE FLUXO DE REFRIGERANTE VARIVEL
REFERNCIA MAP - AP1201H
MO DE OBRA AR CONDICIONADO AT 10TR
R$ 4.33
6.30
1.18
7.48
0.86
0.62
7.20
Materiais
Mo de obra
Total da composio
UNIDADE CONDENSADORA DE FLUXO DE REFRIGERANTE VARIVEL REFERNCIA MAP AP1001H
UNIDADE CONDENSADORA DE FLUXO DE REFRIGERANTE VARIVEL
REFERNCIA MAP - AP1001H
MO DE OBRA AR CONDICIONADO AT 10TR
R$ 5.47
R$ 4.33
4.64
0.87
0.00
4.64
0.87
5.51
4.55
4.33
Materiais
Mo de obra
Total da composio
UNIDADE CONDENSADORA DE FLUXO DE REFRIGERANTE VARIVEL REFERNCIA MAP AP0801H
UNIDADE CONDENSADORA DE FLUXO DE REFRIGERANTE VARIVEL
REFERNCIA MAP - AP0801H
MO DE OBRA AR CONDICIONADO AT 10TR
00002436
00006113
NO CONSTA
12.00
0.20
12.20
Materiais
Mo de obra
Total da composio
CERTIFICAO DO CABEAMENTO ESTRUTURADO
ELETRICISTA
AJUDANTE DE ELETRICISTA
CERTIFICAO DO CABEAMENTO ESTRUTURADO
PREO SINAPI
Materiais
Mo de obra
Total da composio
Materiais
Mo de obra
Total da composio
LINE CORD EM CABO EXTRA UTP CATEGORIA 5E
ELETRICISTA
AJUDANTE DE ELETRICISTA
LINE CORD EM CABO EXTRA UTP CATEGORIA 5E
CDIGO SINAPI
NO CONSTA
NO CONSTA
1680.00
500.00
2180.00
UN
50 de 82
ITEM / DESCRIO
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL SOB O
TETO 24.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
UNIDADE
UN
UN
QUANTIDADE
1.00
0.58
CUSTO UNITRIO
RESUMO COMPOSIO
1890.00
1000.00
1890.00
580.00
Materiais
Mo de obra
Total da composio
UN
UN
1.00
0.62
2085.00
1000.00
UN
UN
1.00
0.55
1810.00
1000.00
UN
UN
1.00
0.44
1450.00
1000.00
UN
UN
1.00
0.57
1900.00
1000.00
UN
UN
1.00
0.75
2350.00
1000.00
UN
UN
1.00
0.75
2485.00
1000.00
2350.00
750.00
3100.00
2485.00
750.00
NO CONSTA
NO CONSTA
2485.00
750.00
3235.00
UN
UN
UN
1.00
0.60
2030.00
1000.00
2030.00
600.00
NO CONSTA
NO CONSTA
2030.00
600.00
2630.00
UN
UN
UN
1.00
0.34
980.00
1000.00
980.00
343.00
NO CONSTA
NO CONSTA
980.00
343.00
1323.00
UN
UN
UN
1.00
0.20
580.00
1000.00
580.00
203.00
NO CONSTA
NO CONSTA
580.00
203.00
783.00
UN
UN
UN
1.00
0.05
150.00
1000.00
150.00
50.00
NO CONSTA
NO CONSTA
150.00
50.00
200.00
UN
UN
UN
1.00
0.09
230.00
1000.00
230.00
85.00
NO CONSTA
NO CONSTA
230.00
85.00
315.00
UN
UN
UN
1.00
0.52
1480.00
1000.00
1480.00
518.00
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 1650 M/H, 12 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 1650 M/H, 12 MM C.A. INCLUINDO QUADRO DE
FORA E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
1900.00
570.00
2470.00
2350.00
750.00
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 200 M/H, 2 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 200 M/H, 2 MM C.A. INCLUINDO QUADRO DE FORA
E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 100 M/H, TIPO VENTOKIT, INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 100 M/H, TIPO VENTOKIT, INCLUINDO QUADRO DE
FORA E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
1450.00
435.00
1885.00
1900.00
570.00
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 150 M/H, 6 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 150 M/H, 6 MM C.A. INCLUINDO QUADRO DE FORA
E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 750 M/H, 8 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 750 M/H, 8 MM C.A. INCLUINDO QUADRO DE FORA
E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
1810.00
550.00
2360.00
1450.00
435.00
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE 4 VIAS
24.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE
4 VIAS 24.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE 4 VIAS
36.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE
4 VIAS 36.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
2085.00
620.00
2705.00
1810.00
550.00
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE 4 VIAS
30.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE
4 VIAS 30.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE 4 VIAS
15.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE
4 VIAS 15.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
NO CONSTA
NO CONSTA
1890.00
580.00
2470.00
2085.00
620.00
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE 4 VIAS
12.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE
4 VIAS 12.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
PREO SINAPI
UN
Materiais
Mo de obra
Total da composio
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE 1 VIA
18.000BTUS/H
UNIDADE EVAPORADORA DE FLUXO DE REFRIGERANTE VARIVEL CASSETE
1 VIA 18.000BTUS/H
MO DE OBRA AR CONDICIONADO AT 10TR
CDIGO SINAPI
NO CONSTA
NO CONSTA
1480.00
518.00
1998.00
UN
51 de 82
ITEM / DESCRIO
EXAUSTOR DE AR VAZO 1150 M/H, 10 MM C.A. INCLUINDO QUADRO DE
FORA E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
UNIDADE
UN
UN
QUANTIDADE
1.00
0.43
CUSTO UNITRIO
RESUMO COMPOSIO
1230.00
1000.00
1230.00
430.00
Materiais
Mo de obra
Total da composio
UN
UN
1.00
0.06
185.00
1000.00
UN
UN
1.00
0.37
1050.00
1000.00
UN
UN
1.00
0.26
735.00
1000.00
UN
UN
1.00
0.65
1830.00
1000.00
UN
UN
1.00
0.59
1675.00
1000.00
VB
1.00
4000.00
1675.00
586.00
2261.00
4000.00
CJ
CJ
UN
1.00
1.00
350.00
200.00
NO CONSTA
4000.00
0.00
4000.00
350.00
200.00
NO CONSTA
NO CONSTA
350.00
200.00
550.00
VB
VB
UN
1.00
1.00
1380.00
800.00
1380.00
800.00
NO CONSTA
NO CONSTA
1380.00
800.00
2180.00
VB
VB
UN
1.00
1.00
1100.00
500.00
1100.00
500.00
UN
UN
1.00
280.00
VB
VB
1.00
3550.00
NO CONSTA
NO CONSTA
1100.00
500.00
1600.00
280.00
NO CONSTA
280.00
0.00
280.00
3550.00
NO CONSTA
3550.00
0.00
3550.00
VB
VB
1.00
2330.00
2330.00
Materiais
Mo de obra
Total da composio
CANTONEIRAS # 26
CANTONEIRAS # 26
DUTEIRO
AJUDANTE DE DUTEIRO
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
INTERLIGAES ELTRICAS - ELETRODUTO RGIDO EM AO GALVANIZADO LAMINADO A
FOGO, ELETRODUTO EM ELEMENTO FLEXVEL, BORNES, CONECTORES, DENTRE
OUTROS.
INTERLIGAES ELTRICAS - ELETRODUTO RGIDO EM AO GALVANIZADO
LAMINADO A FOGO, ELETRODUTO EM ELEMENTO FLEXVEL, BORNES,
CONECTORES, DENTRE OUTROS.
1830.00
650.00
2480.00
1675.00
586.00
Materiais
Mo de obra
Total da composio
INTERLIGAES ELTRICAS - CABEAMENTO
INTERLIGAES ELTRICAS - CABEAMENTO
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
QUADRO ELTRICO DE FORA E COMANDO
QUADRO ELTRICO DE FORA E COMANDO
735.00
258.00
993.00
1830.00
650.00
Materiais
Mo de obra
Total da composio
CANTONEIRAS DE SUSTENTAO PARA DUTOS C/ CONJUNTO DE FIXAO
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
1050.00
367.00
1417.00
735.00
258.00
Materiais
Mo de obra
Total da composio
BASE EM ALVENARIA PARA CONDENSADORES
BASE EM ALVENARIA PARA CONDENSADORES
MO DE OBRA BASE ALVENARIA
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
185.00
64.00
249.00
1050.00
367.00
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 2050 M/H, 8 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 2050 M/H, 8 MM C.A. INCLUINDO QUADRO DE
FORA E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
NO CONSTA
NO CONSTA
UN
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 2550 M/H, 12 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 2550 M/H, 12 MM C.A. INCLUINDO QUADRO DE
FORA E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
NO CONSTA
NO CONSTA
1230.00
430.00
1660.00
185.00
64.00
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 600 M/H, 6 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 600 M/H, 6 MM C.A. INCLUINDO QUADRO DE FORA
E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
PREO SINAPI
UN
Materiais
Mo de obra
Total da composio
EXAUSTOR DE AR VAZO 1150 M/H, 2 MM C.A. INCLUINDO QUADRO DE FORA E
COMANDO ELTRICO
EXAUSTOR DE AR VAZO 1150 M/H, 2 MM C.A. INCLUINDO QUADRO DE
FORA E COMANDO ELTRICO
MO DE OBRA EXAUSTOR
CDIGO SINAPI
KG
KG
H
H
1.00
0.40
0.40
6.50
6.82
4.40
6.50
2.73
1.76
Materiais
Mo de obra
Total da composio
NO CONSTA
2330.00
0.00
2330.00
NO CONSTA
NO CONSTA
NO CONSTA
6.50
4.49
10.99
52 de 82
ITEM / DESCRIO
CHAPA DE AO GALVANIZADO # 24
CHAPA DE AO GALVANIZADO # 24
DUTEIRO
AJUDANTE DE DUTEIRO
UNIDADE
KG
KG
H
H
QUANTIDADE
1.00
0.40
0.40
CUSTO UNITRIO
RESUMO COMPOSIO
6.50
6.82
4.40
6.50
2.73
1.76
Materiais
Mo de obra
Total da composio
CHAPA DE AO GALVANIZADO # 26
CHAPA DE AO GALVANIZADO # 26
DUTEIRO
AJUDANTE DE DUTEIRO
KG
KG
H
H
1.00
0.40
0.40
5.37
6.82
4.40
M
M
H
1.00
0.70
20.00
7.96
M
M2
H
1.00
0.90
9.50
7.96
1415.00
1415.00
NO CONSTA
141.50
141.50
NO CONSTA
UN
1214.00
1214.00
NO CONSTA
1.00
121.40
121.40
NO CONSTA
1.00
418.00
418.00
NO CONSTA
UN
1.00
41.80
41.80
NO CONSTA
UN
1.00
12.00
12.00
NO CONSTA
UN
1.00
1.20
1.20
NO CONSTA
1.00
185.00
185.00
NO CONSTA
UN
1.00
15.00
15.00
NO CONSTA
1.00
232.00
232.00
NO CONSTA
UN
1.00
15.00
15.00
NO CONSTA
M
M
H
1.00
0.51
22.50
6.82
M
M
H
1.00
0.80
VB
VB
H
H
1.00
15.00
22.21
VB
VB
UNID
1.00
1.00
62.00
7.96
700.00
6.82
4.40
UNID
UNID
1.00
158.00
NO CONSTA
NO CONSTA
62.00
6.37
68.37
700.00
102.30
97.70
24000.00
1200.00
NO CONSTA
NO CONSTA
22.50
3.50
26.00
62.00
6.37
NO CONSTA
NO CONSTA
NO CONSTA
700.00
200.00
900.00
24000.00
1200.00
Materiais
Mo de obra
Total da composio
232.00
15.00
247.00
22.50
3.50
Materiais
Mo de obra
Total da composio
EXECUO DE REDE DE DRENOS
EXECUO DE REDE DE DRENOS
MO DE OBRA PARAEXECUO DE REDE DE DRENOS
185.00
15.00
200.00
UN
UN
Materiais
Mo de obra
Total da composio
COLA PARA DUTO
COLA PARA DUTO
DUTEIRO
AJUDANTE DE DUTEIRO
12.00
1.20
13.20
UN
UN
Materiais
Mo de obra
Total da composio
CAIXA PLENO
CAIXA PLENO
MONTADOR
418.00
41.80
459.80
UN
Materiais
Mo de obra
Total da composio
LONA ENCERADA
LONA ENCERADA
DUTEIRO
1214.00
121.40
1335.40
UN
UN
Materiais
Mo de obra
Total da composio
TOMADA DE AR EXTERIOR MOD. AWG
TOMADA DE AR EXTERIOR MOD. AWG
1415.00
141.50
1556.50
1.00
Materiais
Mo de obra
Total da composio
DAMPER CONTROLADOR DE VAZO MOD. JN-B
DAMPER CONTROLADOR DE VAZO MOD. JN-B
MO DE OBRA PARA INSTALAO DE DAMPER CONTROLADOR DE VAZO
MOD. JN-B
R$ 7.96
9.50
7.16
16.66
1.00
Materiais
Mo de obra
Total da composio
CABOS ENTRE UNIDADES EXTERNAS (BLINDADOS) C/ CAIXAS DE PASSAGEM
NO CONSTA
00002700
1.00
Materiais
Mo de obra
Total da composio
SENSOR DE GS COM ATUADOR PARA EXAUSTOR TIPO VENTOKIT
SENSOR DE GS COM ATUADOR PARA EXAUSTOR TIPO VENTOKIT
MO DE OBRA PARA MO DE OBRA PARA INSTALAO DE SENSOR DE GS
COM ATUADOR PARA EXAUSTOR TIPO VENTOKIT
R$ 7.96
UN
VB
VB
R$ 5.37
NO CONSTA
00002700
M
M
Materiais
Mo de obra
Total da composio
VLVULAS DE COMANDO
VLVULAS DE COMANDO
MO DE OBRA PARA MO DE OBRA PARA INSTALAO DE VLVULAS DE
COMANDO
00011051
NO CONSTA
NO CONSTA
20.00
5.57
25.57
9.50
7.16
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
5.37
4.49
9.86
20.00
5.57
Materiais
Mo de obra
Total da composio
PREO SINAPI
6.50
4.49
10.99
5.37
2.73
1.76
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
NO CONSTA
NO CONSTA
24000.00
1200.00
25200.00
158.00
NO CONSTA
53 de 82
ITEM / DESCRIO
MONTADOR
UNIDADE
H
QUANTIDADE
2.20
CUSTO UNITRIO
RESUMO COMPOSIO
7.96
17.51
Materiais
Mo de obra
Total da composio
UNID
UNID
H
1.00
4.00
282.00
7.13
UN
UN
H
H
1.00
0.20
0.05
45.00
77.00
4.40
UN
UN
H
H
1.00
0.20
0.05
52.00
77.00
4.40
UN
UN
H
H
1.00
0.20
0.05
68.00
77.00
4.40
UN
UN
H
H
1.00
0.20
0.05
98.00
77.00
4.40
UN
UN
H
H
1.00
0.20
0.05
70.00
77.00
4.40
UN
UN
H
H
1.00
0.20
0.05
86.00
77.00
4.40
UN
UN
H
H
1.00
0.20
0.05
92.00
77.00
4.40
UN
UN
H
H
1.00
0.20
0.05
118.00
77.00
4.40
UN
UN
UN
1.00
1.00
182.30
15.00
M
H
H
M
M
1.11
1.11
1.30
2.07
5.47
4.33
35.00
0.14
M
H
H
M
M
0.80
0.80
1.30
1.60
5.47
4.33
25.00
0.14
M
H
H
M
M
0.83
0.83
1.30
1.41
5.47
4.33
22.00
0.14
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
00002696
00006116
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
45.79
10.88
56.67
4.38
3.46
32.50
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
197.30
0.00
197.30
6.07
4.81
45.50
0.29
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
118.00
15.62
133.62
182.30
15.00
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
92.00
15.62
107.62
118.00
15.40
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
86.00
15.62
101.62
92.00
15.40
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
70.00
15.62
85.62
86.00
15.40
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
98.00
15.62
113.62
70.00
15.40
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
68.00
15.62
83.62
98.00
15.40
0.22
Materiais
Mo de obra
Total da composio
R$ 7.96
52.00
15.62
67.62
68.00
15.40
0.22
Materiais
Mo de obra
Total da composio
NO CONSTA
00002700
45.00
15.62
60.62
52.00
15.40
0.22
Materiais
Mo de obra
Total da composio
R$ 7.96
282.00
28.52
310.52
45.00
15.40
0.22
Materiais
Mo de obra
Total da composio
PREO SINAPI
00002700
158.00
17.51
175.51
282.00
28.52
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
32.72
7.84
40.56
4.54
3.59
28.60
0.20
54 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Materiais
Mo de obra
Total da composio
M
H
H
M
M
0.62
0.62
1.30
0.94
5.47
4.33
13.10
0.14
M
H
H
M
M
0.50
0.50
1.30
0.75
5.47
4.33
9.50
0.14
M
H
H
M
M
0.33
0.33
1.30
0.60
5.47
4.33
7.50
0.14
M
H
H
M
M
0.30
0.30
1.30
0.47
5.47
4.33
6.00
0.14
M
H
H
M
M
0.30
0.30
1.30
0.47
5.47
4.33
5.20
0.14
UN
H
H
UN
3.00
3.00
1.00
5.47
4.33
125.00
UN
H
H
UN
3.50
3.60
1.00
5.47
4.33
138.00
UN
H
H
UN
5.62
5.62
1.00
5.47
4.33
186.00
vb
1.00
1040.00
UN
H
H
UN
0.15
0.15
1.00
5.47
4.33
490.58
UN
H
H
UN
0.15
0.15
1.00
00002696
00006116
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
00010889
R$ 5.47
R$ 4.33
R$ 490.58
00002696
00006116
00010886
R$ 5.47
R$ 4.33
R$ 138.75
186.00
55.08
241.08
1040.00
0.00
1040.00
0.82
0.65
490.58
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1040.00
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
NO CONSTA
138.00
34.73
172.73
30.74
24.33
186.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
125.00
29.40
154.40
19.15
15.59
138.00
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
NO CONSTA
6.83
2.94
9.77
16.41
12.99
125.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
7.87
2.94
10.81
1.64
1.30
6.76
0.07
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
NO CONSTA
9.83
3.23
13.07
1.64
1.30
7.80
0.07
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
12.46
4.90
17.36
1.81
1.43
9.75
0.08
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
NO CONSTA
17.16
6.08
23.24
2.74
2.17
12.35
0.11
Materiais
Mo de obra
Total da composio
PREO SINAPI
24.86
7.25
32.11
3.39
2.68
17.03
0.13
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
28.80
8.13
36.93
5.47
4.33
138.75
490.58
1.47
492.05
0.82
0.65
138.75
Materiais
138.75
55 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Mo de obra
Total da composio
UN
H
H
UN
0.15
0.15
1.00
5.47
4.33
150.00
0.82
0.65
150.00
Materiais
Mo de obra
Total da composio
UN
H
H
UN
2.00
1.50
1.00
5.47
4.33
187.50
CONJUNTO MOTOR BOMBA MARCA IMBIL MOD. ITAP 40-120 12,0M/H 24,0MCA
2,0CV/380V/3F/60HZ
CONJUNTO MOTOR BOMBA MARCA IMBIL MOD. ITAP 40-120 12,0M/H 24,0MCA
2,0CV/380V/3F/60HZ
ENCANADOR
AJUDANTE DE ENCANADOR
P
H
H
1.00
40.00
32.00
3250.00
5.47
4.33
Materiais
Mo de obra
Total da composio
M
M
H
H
1.00
0.15
0.15
27.97
5.47
4.33
M
M
H
H
1.00
0.15
0.15
23.88
5.47
4.33
M
M
H
H
1.00
0.15
0.15
18.90
5.47
4.33
1.00
1.50
1.30
267.04
5.47
4.33
P
P
H
H
1.00
1.20
1.20
156.51
5.47
4.33
P
P
H
H
1.00
1.20
1.20
115.83
5.47
4.33
P
P
H
H
1.00
1.20
1.20
590.44
5.47
4.33
P
P
H
H
1.00
1.20
1.20
470.38
5.47
4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
00006027
00002696
00006116
R$ 267.04
R$ 5.47
R$ 4.33
00006012
00002696
00006116
R$ 156.51
R$ 5.47
R$ 4.33
00006011
00002696
00006116
R$ 115.83
R$ 5.47
R$ 4.33
00010343
00002696
00006116
R$ 590.44
R$ 5.47
R$ 4.33
00010311
00002696
00006116
R$ 470.38
R$ 5.47
R$ 4.33
P
P
1.00
195.00
156.51
11.76
168.27
115.83
11.76
127.59
590.44
11.76
602.20
470.38
6.56
5.20
Materiais
Mo de obra
Total da composio
VLVULA DE RETENO 70
VLVULA DE RETENO 70
R$ 5.47
R$ 4.33
267.04
13.83
280.87
590.44
6.56
5.20
Materiais
Mo de obra
Total da composio
VLVULA DE RETENO 80
VLVULA DE RETENO 80
ENCANADOR
AJUDANTE DE ENCANADOR
NO CONSTA
00002696
00006116
18.90
1.47
20.37
115.83
6.56
5.20
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
23.88
1.47
25.35
156.51
6.56
5.20
Materiais
Mo de obra
Total da composio
REGISTRO GAVETA 65
REGISTRO GAVETA 65
ENCANADOR
AJUDANTE DE ENCANADOR
NO CONSTA
00002696
00006116
27.97
1.47
29.44
267.04
8.21
5.63
Materiais
Mo de obra
Total da composio
REGISTRO GAVETA 80
REGISTRO GAVETA 80
ENCANADOR
AJUDANTE DE ENCANADOR
R$ 5.47
R$ 4.33
R$ 187.50
13000.00
1857.50
14857.50
18.90
0.82
0.65
Materiais
Mo de obra
Total da composio
P
P
H
H
13000.00
1641.00
216.50
23.88
0.82
0.65
Materiais
Mo de obra
Total da composio
00002696
00006116
00021029
3250.00
357.36
3607.36
27.97
0.82
0.65
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
R$ 150.00
187.50
17.44
204.94
3250.00
218.80
138.56
00002696
00006116
00010892
Materiais
Mo de obra
Total da composio
PREO SINAPI
150.00
1.47
151.47
10.94
6.50
187.50
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
1.47
140.22
470.38
11.76
482.14
195.00
NO CONSTA
56 de 82
ITEM / DESCRIO
ENCANADOR
AJUDANTE DE ENCANADOR
UNIDADE
H
H
QUANTIDADE
1.20
1.20
CUSTO UNITRIO
RESUMO COMPOSIO
5.47
4.33
6.56
5.20
Materiais
Mo de obra
Total da composio
VLVULA ANGULAR 70
VLVULA ANGULAR 70
ENCANADOR
AJUDANTE DE ENCANADOR
P
P
H
H
1.00
1.20
1.20
122.00
5.47
4.33
ESGUICHO 1/2
ESGUICHO 1/2
ENCANADOR
AJUDANTE DE ENCANADOR
P
P
H
H
1.00
0.50
0.40
138.83
5.47
4.33
P
P
H
H
1.00
5.00
3.00
290.00
5.47
4.33
P
P
H
H
1.00
5.00
3.00
385.00
5.47
4.33
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
290.00
40.34
330.34
385.00
27.35
12.99
Materiais
Mo de obra
Total da composio
NO CONSTA
00002696
00006116
138.83
4.47
143.30
290.00
27.35
12.99
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
122.00
11.76
133.76
138.83
2.74
1.73
Materiais
Mo de obra
Total da composio
PREO SINAPI
00002696
00006116
195.00
11.76
206.76
122.00
6.56
5.20
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
385.00
40.34
425.34
M
M
1.00
0.24
CONDULETE DE ALUMNIO 25MM TIPOS "E", "C", "LL", "LB", "LR", "T" E "X"
CONDULETE DE ALUMNIO 25MM TIPOS "E", "C", "LL", "LB", "LR", "T" E "X"
ELETRICISTA
AJUDANTE DE ELETRICISTA
UNID
1.00
UNID
H
H
1.00
1.50
1.50
13.20
5.47
4.33
UNID
UNID
H
H
1.00
0.05
0.05
3.20
5.47
4.33
UNID
UNID
H
H
1.00
7.00
7.00
825.00
5.47
4.33
ADAPTADOR F / RCA
ADAPTADOR F / RCA
ELETRICISTA
AJUDANTE DE ELETRICISTA
UNID
UNID
H
H
1.00
0.01
0.05
8.50
5.47
4.33
ORGANIZADORES DE CABO
ORGANIZADORES DE CABO
ELETRICISTA
AJUDANTE DE ELETRICISTA
UNID
UNID
H
H
1.00
0.50
0.20
12.00
5.47
4.33
UNID
UNID
H
H
1.00
5.00
5.00
65.00
5.47
4.33
UNID
UNID
H
H
1.00
0.50
0.50
35.00
5.47
4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
65.00
49.00
114.00
35.00
2.74
2.17
Materiais
Mo de obra
R$ 5.47
R$ 4.33
12.00
3.60
15.60
65.00
27.35
21.65
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00026049
8.50
0.27
8.77
12.00
2.74
0.87
Materiais
Mo de obra
Total da composio
R$ 13.20
R$ 5.47
R$ 4.33
825.00
68.60
893.60
8.50
0.05
0.22
Materiais
Mo de obra
Total da composio
00002581
00002436
00026049
3.20
0.49
3.69
825.00
38.29
30.31
Materiais
Mo de obra
Total da composio
R$ 0.24
13.20
14.70
27.90
3.20
0.27
0.22
Materiais
Mo de obra
Total da composio
0000343
0.24
0.00
0.24
13.20
8.21
6.50
Materiais
Mo de obra
Total da composio
8.58
2.94
11.52
0.24
Materiais
Mo de obra
Total da composio
R$ 8.58
R$ 5.47
R$ 4.33
35.00
4.90
57 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Total da composio
UNID
UNID
H
H
1.00
1.00
1.00
98.15
5.47
4.33
98.15
5.47
4.33
Materiais
Mo de obra
Total da composio
M
H
H
1.00
0.01
0.01
1.43
5.47
4.33
UNID
H
H
1.00
65.00
60.00
2600.00
5.47
4.33
UNID
H
H
1.00
10.00
10.00
395.00
5.47
4.33
UNID
UNID
H
H
1.00
1.50
1.50
1250.00
5.47
4.33
UNID
H
H
1.00
10.00
10.00
385.00
5.47
4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
NO CONSTA
00002436
00026049
R$ 5.47
R$ 4.33
385.00
98.00
483.00
UNID
UNID
H
H
1.00
100.00
100.00
4200.00
5.47
4.33
4200.00
547.00
433.00
4200.00
980.00
5180.00
UNID
H
H
1.00
0.10
0.10
1.95
5.47
4.33
1.95
0.55
0.43
UNID
UNID
H
H
1.00
0.15
0.15
6.50
5.47
4.33
UNID
UNID
H
H
1.00
0.20
0.20
UNID
UNID
H
H
1.00
0.50
0.50
UNID
UNID
1.00
8.60
5.47
4.33
6.50
1.47
7.97
8.60
1.09
0.87
85.00
5.47
4.33
125.00
1.95
0.98
2.93
6.50
0.82
0.65
8.60
1.96
10.56
85.00
2.74
2.17
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1250.00
14.70
1264.70
385.00
54.70
43.30
Materiais
Mo de obra
Total da composio
KIT VENTILAO PARA RACK
KIT VENTILAO PARA RACK
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00026049
UNID
Materiais
Mo de obra
Total da composio
CONECTOR TIPO F
CONECTOR TIPO F
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
395.00
98.00
493.00
1250.00
8.21
6.50
Materiais
Mo de obra
Total da composio
CONECTOR BNC
CONECTOR BNC
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00026049
2600.00
615.35
3215.35
395.00
54.70
43.30
Materiais
Mo de obra
Total da composio
CABO COAXIAL RG 59, IMPEDANCIA DE 75 OHMS, CONDUTOR FIO DE COBRE NU,
BLINDAGEM EM TRANA FORMADA POR FIOS DE COBRE, MALHA DE 90%, ISOLAMENTO
INTERNO EM POLIETILENO COMPACTO, CAPA EXTERNA DE PVC.
CABO COAXIAL RG 59, IMPEDANCIA DE 75 OHMS, CONDUTOR FIO DE COBRE
NU, BLINDAGEM EM TRANA FORMADA POR FIOS DE COBRE, MALHA DE
90%, ISOLAMENTO INTERNO EM POLIETILENO COMPACTO, CAPA EXTERNA
DE PVC.
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 1.43
R$ 5.47
R$ 4.33
UNID
Materiais
Mo de obra
Total da composio
MULTIPLEXADOR COLOR DUPLEX PARA 16 CMERAS COM FUNES: FREESER,
ALARME, SEQUENCIAL, SAIDA MONITOR E VER.
MULTIPLEXADOR COLOR DUPLEX PARA 16 CMERAS COM FUNES:
FREESER, ALARME, SEQUENCIAL, SAIDA MONITOR E VER.
ELETRICISTA
AJUDANTE DE ELETRICISTA
00001014
00002436
00026049
1.43
0.10
1.53
2600.00
355.55
259.80
Materiais
Mo de obra
Total da composio
CMERA COLOR DIGITAL DAY NIGHT - CCD 1/3 - 480 LINHAS DE RESOLUO MINIMO 1,0
LUX, 24 VAC.
CMERA COLOR DIGITAL DAY NIGHT - CCD 1/3 - 480 LINHAS DE RESOLUO
MINIMO 1,0 LUX, 24 VAC.
ELETRICISTA
AJUDANTE DE ELETRICISTA
R$ 5.47
R$ 4.33
UNID
Materiais
Mo de obra
Total da composio
MONITOR 19" LCD COLOR 350 LINHAS, 90 A 260 VCA (FREE VOLTAGE) .
MONITOR 19" LCD COLOR 350 LINHAS, 90 A 260 VCA (FREE VOLTAGE) .
ELETRICISTA
AJUDANTE DE ELETRICISTA
NO CONSTA
00002436
00026049
98.15
9.80
107.95
1.43
0.05
0.04
Materiais
Mo de obra
Total da composio
TECLADO DE COMANDO DOS GRAVADORES VIDEO DIGITAL COM INTERLIGAO AO GVD
VIA CABO UTP .
TECLADO DE COMANDO DOS GRAVADORES VIDEO DIGITAL COM
INTERLIGAO AO GVD VIA CABO UTP .
ELETRICISTA
AJUDANTE DE ELETRICISTA
PREO SINAPI
Materiais
Mo de obra
Total da composio
GRAVADOR DE VIDEO DIGITAL (DVR), HD 250GB, COM ENTRADA PARA 20 CAMERAS, COM
ENTRADAS E SADAS PARA PROCESSAMENTO DE ALARMES, CONFIGURAVEIS. COM
ENTRADAS E SAIDAS DE VIDEO COM CONECTORES EM BNC, COM ENTRADA MODULAR
EM RJ45J COM 8 PINOS, COM SISTEMAS NTSC/PAL, TCP/IP.
GRAVADOR DE VIDEO DIGITAL (DVR), HD 250GB, COM ENTRADA PARA 20
CAMERAS, COM ENTRADAS E SADAS PARA PROCESSAMENTO DE
ALARMES, CONFIGURAVEIS. COM ENTRADAS E SAIDAS DE VIDEO COM
CONECTORES EM BNC, COM ENTRADA MODULAR EM RJ45J COM 8 PINOS,
COM SISTEMAS NTSC/PAL, TCP/IP.
ELETRICISTA
AJUDANTE DE ELETRICISTA
CDIGO SINAPI
39.90
85.00
4.90
89.90
125.00
58 de 82
ITEM / DESCRIO
ELETRICISTA
AJUDANTE DE ELETRICISTA
UNIDADE
H
H
QUANTIDADE
3.00
3.00
CUSTO UNITRIO
RESUMO COMPOSIO
7.13
5.15
Materiais
Mo de obra
Total da composio
UNID
UNID
H
H
1.00
1.00
1.50
48.00
5.47
4.33
UNID
UNID
H
H
1.00
3.50
3.00
135.00
5.47
4.33
UNID
H
H
1.00
48.00
48.00
1760.00
7.13
5.15
UNID
H
H
1.00
18.00
18.00
685.00
7.13
5.15
UNID
UNID
H
H
1.00
2.50
2.50
98.00
7.13
5.15
UNID
H
H
1.00
15.00
15.00
635.00
7.13
5.15
UNID
UNID
H
H
1.00
0.60
0.60
24.50
7.13
5.15
M
M
H
H
1.00
0.01
0.10
2.50
7.13
5.15
UNID
UNID
H
H
1.00
0.15
0.15
UNID
UNID
H
H
1.00
0.80
0.50
UNID
UNID
H
H
1.00
35.00
35.00
UNID
UNID
H
H
1.00
3.00
3.00
125.00
7.13
5.15
UNID
UNID
H
H
1.00
0.15
0.15
4.50
7.13
5.15
NO CONSTA
NO CONSTA
NO CONSTA
125.00
36.84
161.84
4.50
1.07
0.77
Materiais
NO CONSTA
NO CONSTA
NO CONSTA
1350.00
429.80
1779.80
125.00
21.39
15.45
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
28.00
8.28
36.28
1350.00
249.55
180.25
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
4.65
1.84
6.49
28.00
5.70
2.58
1350.00
7.13
5.15
NO CONSTA
NO CONSTA
NO CONSTA
2.50
0.59
3.09
4.65
1.07
0.77
28.00
7.13
5.15
NO CONSTA
NO CONSTA
NO CONSTA
24.50
7.37
31.87
2.50
0.07
0.52
4.65
7.13
5.15
NO CONSTA
NO CONSTA
NO CONSTA
635.00
184.20
819.20
24.50
4.28
3.09
Materiais
Mo de obra
Total da composio
CD PLAYER COM CARROSSEL PARA 12 CDS
CD PLAYER COM CARROSSEL PARA 12 CDS
TCNICO
AJUDANTE DE TCNICO
98.00
30.70
128.70
635.00
106.95
77.25
Materiais
Mo de obra
Total da composio
CAIXAS ACSTICAS DE 20X15X15CM
CAIXAS ACSTICAS DE 20X15X15CM
TCNICO
AJUDANTE DE TCNICO
NO CONSTA
NO CONSTA
NO CONSTA
UNID
Materiais
Mo de obra
Total da composio
CAIXA DE PVC 10X10 CM
CAIXA DE PVC 10X10 CM
TCNICO
AJUDANTE DE TCNICO
NO CONSTA
NO CONSTA
NO CONSTA
685.00
221.04
906.04
98.00
17.83
12.88
Materiais
Mo de obra
Total da composio
CABO COAXIAL BLINDADO E BALANCEADO MARCA SANTO NGELO
CABO COAXIAL BLINDADO E BALANCEADO MARCA SANTO NGELO
TCNICO
AJUDANTE DE TCNICO
NO CONSTA
NO CONSTA
NO CONSTA
1760.00
589.44
2349.44
685.00
128.34
92.70
Materiais
Mo de obra
Total da composio
BASTES DE SILICONE
BASTES DE SILICONE
TCNICO
AJUDANTE DE TCNICO
R$ 5.47
R$ 4.33
UNID
Materiais
Mo de obra
Total da composio
ARMARIO DE 80X80X50 CM, PARA INSTALAO DOS EQUIPAMENTOS ATIVOS
NO CONSTA
00002436
00026049
135.00
32.14
167.14
1760.00
342.24
247.20
Materiais
Mo de obra
Total da composio
ALTO FALANTES DE 8 FULL RANGE 70 WATTS
ALTO FALANTES DE 8 FULL RANGE 70 WATTS
TCNICO
AJUDANTE DE TCNICO
R$ 5.47
R$ 4.33
UNID
Materiais
Mo de obra
Total da composio
MISTURADOR DE UDIO DE 12 CANAIS COM DUPLO MASTER E CHAVEAMENTO A 1 KHZ,
RESPOSTA DE FREQNCIA DE 50HZ A 13 KHZ, SEM CABO .
MISTURADOR DE UDIO DE 12 CANAIS COM DUPLO MASTER E
CHAVEAMENTO A 1 KHZ, RESPOSTA DE FREQNCIA DE 50HZ A 13 KHZ,
SEM CABO .
TCNICO
AJUDANTE DE TCNICO
NO CONSTA
00002436
00026049
48.00
11.97
59.97
135.00
19.15
12.99
Materiais
Mo de obra
Total da composio
PREO SINAPI
125.00
36.84
161.84
48.00
5.47
6.50
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
21.39
15.45
NO CONSTA
NO CONSTA
NO CONSTA
4.50
59 de 82
ITEM / DESCRIO
UNIDADE
QUANTIDADE
CUSTO UNITRIO
RESUMO COMPOSIO
Mo de obra
Total da composio
UNID
UNID
H
H
1.00
0.70
0.50
26.50
7.13
5.15
26.50
4.99
2.58
Materiais
Mo de obra
Total da composio
CABO DE COBRE FLEXIVEL PARALELO, POLARIZADO 2X2,5 MM, NAS CORES VERMELHA
E PRETA.
CABO DE COBRE FLEXIVEL PARALELO, POLARIZADO 2X2,5 MM, NAS CORES
VERMELHA E PRETA.
TCNICO
AJUDANTE DE TCNICO
M
H
H
1.00
0.01
0.20
1.80
7.13
5.15
UNID
UNID
H
H
1.00
0.05
0.45
1.36
7.13
5.15
UNID
UNID
H
H
1.00
0.60
0.60
23.50
7.13
5.15
UNID
H
H
1.00
6.00
6.00
250.00
7.13
5.15
UNID
UNID
H
H
1.00
1.00
1.00
38.00
7.13
5.15
UNID
UNID
H
H
1.00
1.20
1.20
48.00
7.13
5.15
UNID
H
H
1.00
1.80
1.80
75.00
7.13
5.15
M
M
H
H
1.00
0.12
0.12
2.40
5.47
4.33
M
M
H
H
1.00
0.15
0.15
4.54
5.47
4.33
M
M
H
H
1.00
0.20
0.20
R$ 2.40
R$ 5.47
R$ 4.33
00009838
00002696
00006116
R$ 4.54
R$ 5.47
R$ 4.33
00009836
00002696
00006116
R$ 6.95
R$ 5.47
R$ 4.33
00011712
00002696
00006116
R$ 15.00
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
4.54
1.47
6.01
6.95
1.09
0.87
6.95
1.96
8.91
UNID
UNID
H
H
1.00
0.30
0.30
11.89
5.47
4.33
11.89
1.64
1.30
UNID
UNID
H
H
1.00
0.80
0.50
95.38
5.47
4.33
11.89
2.94
14.83
95.38
4.38
2.17
Materiais
Mo de obra
Total da composio
00009835
00002696
00006116
2.40
1.18
3.58
4.54
0.82
0.65
6.95
5.47
4.33
NO CONSTA
NO CONSTA
NO CONSTA
75.00
22.10
97.10
2.40
0.66
0.52
Materiais
Mo de obra
Total da composio
CAIXA RETENTORA DE GORDURA EM PVC C/ CESTA DE LIMPEZA
CAIXA RETENTORA DE GORDURA EM PVC C/ CESTA DE LIMPEZA
ENCANADOR
AJUDANTE DE ENCANADOR
48.00
14.74
62.74
75.00
12.83
9.27
Materiais
Mo de obra
Total da composio
CAIXA SIFONADA PVC MONTADA C/ GRELHA E PORTA GRELHA 150X150X50MM
CAIXA SIFONADA PVC MONTADA C/ GRELHA E PORTA GRELHA
150X150X50MM
ENCANADOR
AJUDANTE DE ENCANADOR
NO CONSTA
NO CONSTA
NO CONSTA
UNID
Materiais
Mo de obra
Total da composio
TUBO PVC BRANCO P/ESGOTO D=100MM (4') C/ ACESSRIO
TUBO PVC BRANCO P/ESGOTO D=100MM (4') C/ ACESSRIO
ENCANADOR
AJUDANTE DE ENCANADOR
NO CONSTA
NO CONSTA
NO CONSTA
38.00
12.28
50.28
48.00
8.56
6.18
Materiais
Mo de obra
Total da composio
TUBO PVC BRANCO P/ESGOTO D=50MM (2') C/ ACESSRIOS
TUBO PVC BRANCO P/ESGOTO D=50MM (2') C/ ACESSRIOS
ENCANADOR
AJUDANTE DE ENCANADOR
NO CONSTA
NO CONSTA
NO CONSTA
250.00
73.68
323.68
38.00
7.13
5.15
Materiais
Mo de obra
Total da composio
TUBO PVC BRANCO P/ESGOTO D=40MM (1 1/2') C/ ACESSRIOS
TUBO PVC BRANCO P/ESGOTO D=40MM (1 1/2') C/ ACESSRIOS
ENCANADOR
AJUDANTE DE ENCANADOR
NO CONSTA
NO CONSTA
NO CONSTA
23.50
7.37
30.87
250.00
42.78
30.90
Materiais
Mo de obra
Total da composio
TRANSFORMADORES TRONCO DE PAS 2/1000W 4/8Z 210V - W RMS 1000W.
R$ 1.36
UNID
Materiais
Mo de obra
Total da composio
TRANSFORMADORES DE LINHA DE PAS 2/70W 4/8Z 210V - W RMS 70W.
TRANSFORMADORES DE LINHA DE PAS 2/70W 4/8Z 210V - W RMS 70W.
TCNICO
AJUDANTE DE TCNICO
00000404
NO CONSTA
NO CONSTA
1.36
2.67
4.03
23.50
4.28
3.09
Materiais
Mo de obra
Total da composio
POTNCIOMETROS DE FIO DE 20 OHMS COM HASTE PLSTICA.
POTNCIOMETROS DE FIO DE 20 OHMS COM HASTE PLSTICA.
TCNICO
AJUDANTE DE TCNICO
NO CONSTA
NO CONSTA
NO CONSTA
1.80
1.10
2.90
1.36
0.36
2.32
Materiais
Mo de obra
Total da composio
MICROPHONES LESON SM- 58 PLUS- 300 OHMS SENSIBILIDADE 55 DB A 1 KHZ.,
RESPOSTA DE FREQNCIA DE 50HZ A 13 KHZ, SEM CABO .
MICROPHONES LESON SM- 58 PLUS- 300 OHMS SENSIBILIDADE 55 DB A 1
KHZ., RESPOSTA DE FREQNCIA DE 50HZ A 13 KHZ, SEM CABO .
TCNICO
AJUDANTE DE TCNICO
NO CONSTA
NO CONSTA
NO CONSTA
26.50
7.57
34.07
1.80
0.07
1.03
Materiais
Mo de obra
Total da composio
KNOBS COM PARAFUSO PARA POTENCIOMENTRO.
KNOBS COM PARAFUSO PARA POTENCIOMENTRO.
TCNICO
AJUDANTE DE TCNICO
PREO SINAPI
Materiais
Mo de obra
Total da composio
FITAS ISOLANTES 3M.
FITAS ISOLANTES 3M.
TCNICO
AJUDANTE DE TCNICO
CDIGO SINAPI
1.84
6.34
95.38
6.54
101.92
UNID
60 de 82
ITEM / DESCRIO
CAIXA DE INSPECAO EM ALVENARIA DE 1 TIJOLO 40X40X60CM
ENCANADOR
AJUDANTE DE ENCANADOR
UNIDADE
UNID
H
H
QUANTIDADE
1.00
2.00
2.00
CUSTO UNITRIO
RESUMO COMPOSIO
60.93
5.47
4.33
60.93
10.94
8.66
Materiais
Mo de obra
Total da composio
UNID
UNID
H
H
1.00
0.20
0.20
55.00
5.47
4.33
M
M
H
H
1.00
0.10
0.10
1.37
5.47
4.33
M
M
H
H
1.00
0.10
0.10
1.86
5.47
4.33
M
M
H
H
1.00
0.15
0.15
4.24
5.47
4.33
UNID
UNID
H
H
1.00
0.50
0.50
11.29
5.47
4.33
UNID
UNID
H
H
1.00
0.55
0.55
13.68
5.47
4.33
UNID
UNID
H
H
1.00
0.65
0.65
19.95
5.47
4.33
UNID
UNID
H
H
1.00
35.00
35.00
3500.00
5.47
4.33
UNID
UNID
H
H
1.00
1.00
1.00
500.00
5.47
4.33
UNID
UNID
H
H
1.00
0.25
0.25
8.51
5.47
4.33
UNID
UNID
H
H
1.00
0.30
0.30
37.51
5.47
4.33
00006020
00002696
00006116
R$ 11.29
R$ 5.47
R$ 4.33
00006016
00002696
00006116
R$ 13.68
R$ 5.47
R$ 4.33
00006019
00002696
00006116
R$ 19.95
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
NO CONSTA
00002696
00006116
R$ 5.47
R$ 4.33
8.51
2.45
10.96
37.51
1.64
1.30
Materiais
Mo de obra
Total da composio
R$ 4.24
R$ 5.47
R$ 4.33
500.00
9.80
509.80
8.51
1.37
1.08
Materiais
Mo de obra
Total da composio
00009869
00002696
00006116
3500.00
343.00
3843.00
500.00
5.47
4.33
Materiais
Mo de obra
Total da composio
R$ 1.86
R$ 5.47
R$ 4.33
19.95
6.37
26.32
3500.00
191.45
151.55
Materiais
Mo de obra
Total da composio
00009868
00002696
00006116
13.68
5.39
19.07
19.95
3.56
2.81
Materiais
Mo de obra
Total da composio
R$ 1.37
R$ 5.47
R$ 4.33
11.29
4.90
16.19
13.68
3.01
2.38
Materiais
Mo de obra
Total da composio
00009867
00002696
00006116
4.24
1.47
5.71
11.29
2.74
2.17
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
1.86
0.98
2.84
4.24
0.82
0.65
Materiais
Mo de obra
Total da composio
NO CONSTA
00002696
00006116
1.37
0.98
2.35
1.86
0.55
0.43
Materiais
Mo de obra
Total da composio
R$ 60.93
R$ 5.47
R$ 4.33
55.00
1.96
56.96
1.37
0.55
0.43
Materiais
Mo de obra
Total da composio
PREO SINAPI
00003279
00002696
00006116
60.93
19.60
80.53
55.00
1.09
0.87
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
37.51
2.94
40.45
61 de 82
ITEM / DESCRIO
UNIDADE
UNID
UNID
H
H
QUANTIDADE
1.00
2.00
2.00
CUSTO UNITRIO
RESUMO COMPOSIO
60.93
7.13
5.15
60.93
14.26
10.30
Materiais
Mo de obra
Total da composio
UN
H
H
UN
UN
KG
UN
UN
UN
UN
UN
UN
3.00
3.00
2.00
2.00
0.25
1.00
1.00
1.00
1.00
1.00
1.00
5.47
4.33
0.36
0.95
2.27
3.08
9.61
1.20
0.95
9.00
113.10
UN
H
H
UN
UN
KG
UN
UN
UN
UN
UN
UN
3.00
3.00
2.00
2.00
0.25
1.00
1.00
1.00
1.00
1.00
1.00
5.47
4.33
0.36
0.95
2.27
3.08
250.00
9.61
1.20
0.95
9.00
UN
H
H
UN
UN
UN
UN
M
3.00
3.00
2.00
2.00
1.00
1.00
0.56
5.47
4.33
0.36
0.95
67.75
20.00
0.14
CHUVEIRO LORENZETTI
ENCANADOR
AJUDANTE DE ENCANADOR
REGISTRO DE PRESSO COM ACABAMENTO CROMADO 1/2"
CHUVEIRO ELTRICOLORENZETTI
FITA DE VEDACAO
UN
H
H
UN
UN
M
0.57
0.57
1.00
1.00
0.60
5.47
4.33
38.50
140.59
0.14
UN
H
H
UN
UN
UN
M
UN
1.50
1.50
1.00
1.00
1.00
0.84
1.00
5.47
4.33
15.86
46.10
12.14
0.14
120.00
UN
H
H
UN
UN
UN
M
3.00
3.00
1.00
1.00
1.00
1.13
5.47
4.33
18.00
29.41
152.00
0.14
UN
H
H
UN
UN
M
1.50
1.50
1.00
2.00
1.12
5.47
4.33
215.00
7.38
0.14
UN
H
H
UN
M
1.57
1.71
1.00
0.21
5.47
4.33
136.62
0.14
1.71
1.71
5.47
4.33
9.35
7.40
UN
M
1.00
0.60
152.12
0.14
152.12
0.08
UN
H
0.65
5.47
00002696
00006116
NO CONSTA
NO CONSTA
00010498
00003520
NO CONSTA
NO CONSTA
00000301
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
NO CONSTA
00010430
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
R$ 2.27
R$ 3.08
R$ 1.20
R$ 67.75
00002696
00006116
NO CONSTA
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
00006137
00011683
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
R$ 46.10
R$ 12.14
00002696
00006116
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
NO CONSTA
NO CONSTA
R$ 5.47
R$ 4.33
00002696
00006116
R$ 5.47
R$ 4.33
136.65
15.99
152.64
UN
H
H
Materiais
Mo de obra
Total da composio
R$ 113.10
229.92
14.70
244.62
8.59
7.40
136.62
0.03
Materiais
Mo de obra
Total da composio
R$ 1.20
199.57
29.40
228.97
8.21
6.50
215.00
14.76
0.16
Materiais
Mo de obra
Total da composio
R$ 2.27
R$ 3.08
194.22
14.70
208.92
16.41
12.99
18.00
29.41
152.00
0.16
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
179.17
5.59
184.76
8.21
6.50
15.86
46.10
12.14
0.12
120.00
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
NO CONSTA
00010498
00003520
NO CONSTA
00000301
NO CONSTA
NO CONSTA
00010422
90.45
29.40
119.85
3.12
2.47
38.50
140.59
0.08
Materiais
Mo de obra
Total da composio
R$ 60.93
R$ 5.47
R$ 4.33
277.03
29.40
306.43
16.41
12.99
0.72
1.90
67.75
20.00
0.08
Materiais
Mo de obra
Total da composio
00003279
00002696
00006116
140.13
29.40
169.53
16.41
12.99
0.72
1.90
0.57
3.08
250.00
9.61
1.20
0.95
9.00
Materiais
Mo de obra
Total da composio
PREO SINAPI
60.93
24.56
85.49
16.41
12.99
0.72
1.90
0.57
3.08
9.61
1.20
0.95
9.00
113.10
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
NO CONSTA
NO CONSTA
152.20
16.76
168.96
3.56
00002696
R$ 5.47
62 de 82
ITEM / DESCRIO
AJUDANTE DE ENCANADOR
FITA DE VEDACAO
TORNEIRA DE MESA BICA MVEL
UNIDADE
H
M
UN
QUANTIDADE
0.65
0.28
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
4.33
0.14
135.00
2.81
0.04
135.00
Materiais
Mo de obra
Total da composio
UN
H
H
UN
M
0.50
0.50
1.00
0.40
5.47
4.33
28.00
0.14
UN
H
H
UN
M
0.50
0.50
1.00
0.28
5.47
4.33
80.00
0.14
UN
H
UN
1.00
1.00
4.25
35.00
TOALHEIRO BOBINA
SERVENTE
TOALHEIRO BOBINA
UN
H
UN
0.60
1.00
4.25
59.00
UN
H
UN
1.00
1.00
4.25
60.00
UN
UN
H
1.00
0.60
39.00
4.25
UNID
1.00
78500.00
UNID
UNID
H
H
1.00
45.00
35.00
1350.00
7.13
5.15
UNID
UNID
H
H
1.00
45.00
35.00
1318.00
7.13
5.15
VB
VB
H
H
1.00
105.00
95.00
1550.00
7.13
5.15
UN
H
H
UN
0.69
0.69
1.00
5.47
4.33
7.86
AJUDANTE DE TCNICO
TCNICO
ENCODER
UNID
H
H
10.00
20.00
5.15
7.13
UNID
1.00
415.00
UNID
H
H
UNID
65.00
75.00
1.00
5.15
7.13
1814.00
NO CONSTA
00006111
R$ 4.25
UNID
H
13.50
5.15
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
NO CONSTA
00002436
00006113
NO CONSTA
R$ 5.47
R$ 4.33
7.86
6.76
14.62
51.50
142.60
NO CONSTA
NO CONSTA
415.00
NO CONSTA
415.00
194.10
609.10
334.75
534.75
1814.00
Materiais
Mo de obra
Total da composio
LIMITADOR DE VELOCIDADES
AJUDANTE DE TCNICO
R$ 4.25
1550.00
1237.90
2787.90
3.77
2.99
7.86
Materiais
Mo de obra
Total da composio
ENCODER
00006111
NO CONSTA
1318.00
501.10
1819.10
1550.00
748.65
489.25
Materiais
Mo de obra
Total da composio
CHAVE DE EMERGNCIA + LUMINRIA
AJUDANTE DE TCNICO
TCNICO
CHAVE DE EMERGNCIA + LUMINRIA E DEMAIS ITENS NECESSRIO A SUA
PERFEITA E INSTALAO E FUNCIONAMENTO.
R$ 4.25
1350.00
501.10
1851.10
1318.00
320.85
180.25
Materiais
Mo de obra
Total da composio
TOMADA UNIVERSAL 2P+T 12A 250V
ELETRICISTA
AJUDANTE DE ELETRICISTA
TOMADA UNIVERSAL 2P+T
00006111
NO CONSTA
78500.00
0.00
78500.00
1350.00
320.85
180.25
Materiais
Mo de obra
Total da composio
CABOS DE COMANDO
CABOS DE COMANDO
TCNICO
AJUDANTE DE TCNICO
R$ 4.25
39.00
2.55
41.55
78500.00
Materiais
Mo de obra
Total da composio
PAINEL DE CHAMADAS DOS PAVIMENTOS
PAINEL DE CHAMADAS DOS PAVIMENTOS COMPLETO
TCNICO
AJUDANTE DE TCNICO
00006111
NO CONSTA
UNID
Materiais
Mo de obra
Total da composio
PAINEL DE CHAMADA DA CABINE
PAINEL DE CHAMADA DA CABINE COMPLETO
TCNICO
AJUDANTE DE TCNICO
R$ 5.47
R$ 4.33
60.00
4.25
64.25
39.00
2.55
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
NO CONSTA
59.00
2.55
61.55
4.25
60.00
Materiais
Mo de obra
Total da composio
R$ 5.47
R$ 4.33
35.00
4.25
39.25
2.55
59.00
Materiais
Mo de obra
Total da composio
00002696
00006116
NO CONSTA
NO CONSTA
80.04
4.90
84.94
4.25
35.00
Materiais
Mo de obra
Total da composio
R$ 4.33
28.06
4.90
32.96
2.74
2.17
80.00
0.04
Materiais
Mo de obra
Total da composio
PREO SINAPI
00006116
NO CONSTA
NO CONSTA
135.04
6.37
141.41
2.74
2.17
28.00
0.06
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
NO CONSTA
NO CONSTA
NO CONSTA
1814.00
869.50
2683.50
69.53
NO CONSTA
63 de 82
ITEM / DESCRIO
TCNICO
LIMITADOR DE VELOCIDADES
UNIDADE
H
UNID
QUANTIDADE
21.00
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
7.13
1850.00
Materiais
Mo de obra
Total da composio
OPERADOR DE PORTA
AJUDANTE DE TCNICO
TCNICO
OPERADOR DE PORTA
UNID
H
H
UNID
10.00
15.00
1.00
5.15
7.13
870.00
UNID
H
H
UNID
35.00
45.00
1.00
5.15
7.13
1900.00
QUADRO DE DISTRIBUIO
AJUDANTE DE TCNICO
TCNICO
QUADRO DE DISTRIBUIO - COMPLETO
UNID
H
H
UNID
50.00
63.00
1.00
5.15
7.13
2350.00
PAINEL DE EMERGNCIA
AJUDANTE DE TCNICO
TCNICO
PAINEL DE EMERGNCIA
UNID
H
H
UNID
35.00
45.00
1.00
5.15
7.13
1250.00
UNID
H
H
1.00
38.00
29.00
850.00
5.47
4.25
VB
VB
H
H
1.00
56.70
44.67
1500.00
5.47
4.25
VB
VB
H
H
1.00
56.70
44.67
850.00
5.47
4.25
UNID
H
H
1.00
17.80
15.07
550.00
4.50
7.96
UNID
H
H
UNID
16.00
9.60
1.00
5.15
7.13
450.00
UNID
H
H
32.00
18.00
5.47
4.33
UNID
1.00
550.00
UNID
H
H
UNID
16.00
9.60
1.00
5.15
7.13
415.00
R$ 5.47
R$ 4.25
NO CONSTA
00006115
00002700
R$ 4.25
R$ 7.96
UNID
H
H
126.80
117.00
5.47
4.33
UNID
1.00
3850.00
UNID
H
H
42.50
39.50
5.47
4.25
NO CONSTA
NO CONSTA
NO CONSTA
450.00
150.85
600.85
175.04
77.94
00002436
00006113
550.00
NO CONSTA
R$ 5.47
R$ 4.33
550.00
252.98
802.98
82.40
68.45
415.00
Materiais
Mo de obra
Total da composio
REGULARIZAO DAS PAREDES DA CAIXA DE CORRIDA
PEDREIRO
SERVENTE
NO CONSTA
00004750
00006111
550.00
200.06
750.06
82.40
68.45
450.00
Materiais
Mo de obra
Total da composio
QUADROS ELTRICOS E INSTALAES ELTRICAS
ELETRICISTA
AJUDANTE DE ELETRICISTA
QUADROS ELTRICOS E INSTALAES ELTRICAS E DEMAIS ITENS
NECESSRIOS A SUA PERFEITA EXECUO
R$ 5.47
R$ 4.25
850.00
500.00
1350.00
550.00
80.10
119.96
Materiais
Mo de obra
Total da composio
GANCHOS PARA EQUIPAMENTO
AJUDANTE DE TCNICO
TCNICO
GANCHOS PARA EQUIPAMENTO
NO CONSTA
00004750
00006111
UNID
Materiais
Mo de obra
Total da composio
ILUMINAO, ILUMINAO DE EMERGNCIA, INSTALAES ELTRICAS PARA
ILUMINAO
ELETRICISTA
AJUDANTE DE ELETRICISTA
ILUMINAO, ILUMINAO DE EMERGNCIA, INSTALAES ELTRICAS
PARA ILUMINAO E DEMAIS ITENS NECESSRIOS A SUA PERFEITA
INSTALAO, FIXAO EFUNCIONAMENTO.
R$ 5.47
R$ 4.25
1500.00
500.00
2000.00
850.00
310.15
189.85
Materiais
Mo de obra
Total da composio
EXAUSTOR PARA VENTILAO
AJUDANTE DE TCNICO
TCNICO
EXAUSTOR PARA VENTILAO
NO CONSTA
00004750
00006111
850.00
331.11
1181.11
1500.00
310.15
189.85
Materiais
Mo de obra
Total da composio
1250.00
501.10
1751.10
850.00
207.86
123.25
Materiais
Mo de obra
Total da composio
PISO ANTI-DERRAPANTE
PISO ANTI-DERRAPANTE
PEDREIRO
SERVENTE
NO CONSTA
NO CONSTA
NO CONSTA
UNID
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
2350.00
706.69
3056.69
180.25
320.85
1250.00
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
1900.00
501.10
2401.10
257.50
449.19
2350.00
Materiais
Mo de obra
Total da composio
NO CONSTA
NO CONSTA
NO CONSTA
870.00
158.45
1028.45
180.25
320.85
1900.00
Materiais
Mo de obra
Total da composio
PREO SINAPI
NO CONSTA
NO CONSTA
1850.00
219.26
2069.26
51.50
106.95
870.00
Materiais
Mo de obra
Total da composio
QUADRO DE COMANDO
AJUDANTE DE TCNICO
TCNICO
QUADRO DE COMANDO COMPLETA
CDIGO SINAPI
149.73
1850.00
NO CONSTA
NO CONSTA
NO CONSTA
415.00
150.85
565.85
693.60
506.61
00002436
00006113
3850.00
NO CONSTA
R$ 5.47
R$ 4.33
3850.00
1200.21
5050.21
232.48
167.88
00004750
00006111
R$ 5.47
R$ 4.25
64 de 82
ITEM / DESCRIO
REGULARIZAO DAS PAREDES DA CAIXA DE CORRIDA
UNIDADE
UNID
QUANTIDADE
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
800.00
Materiais
Mo de obra
Total da composio
UNID
UNID
H
H
1.00
17.80
15.07
550.00
4.50
7.96
VB
H
H
1.00
24.90
14.80
500.00
5.47
4.33
VB
H
H
1.00
37.90
33.00
575.00
5.47
4.33
VB
VB
H
H
1.00
53.60
47.90
1250.00
5.47
4.33
VB
H
H
1.00
156.90
148.22
2330.00
5.47
4.33
VB
VB
H
H
1.00
49.20
41.78
1585.00
5.47
4.33
UNID
UNID
H
H
1.00
73.64
84.00
2000.00
4.50
7.96
UNID
UNID
H
1.00
0.50
15.00
4.25
UNID
UNID
H
1.00
0.50
20.00
4.25
UNID
UNID
H
1.00
1.50
25.00
4.25
R$ 5.47
R$ 4.33
NO CONSTA
00006115
00002700
R$ 4.25
R$ 7.96
NO CONSTA
00006111
R$ 4.25
NO CONSTA
00006111
R$ 4.25
NO CONSTA
00006111
R$ 4.25
UNID
UNID
H
1.00
3.00
NO CONSTA
00006111
R$ 4.25
UNID
UNID
H
1.00
0.75
NO CONSTA
00006111
R$ 4.25
UNID
UNID
H
1.00
0.75
NO CONSTA
00006111
R$ 4.25
20.00
2.13
22.13
25.00
6.38
175.00
4.25
25.00
6.38
31.38
175.00
12.75
35.00
4.25
175.00
12.75
187.75
35.00
3.19
80.00
4.25
35.00
3.19
38.19
80.00
3.19
Materiais
Mo de obra
Total da composio
TOTEM ESTACIONAMENTO
NO CONSTA
00002436
00006113
15.00
2.13
17.13
20.00
2.13
Materiais
Mo de obra
Total da composio
PLACA DE SINALIZAO TIPO 6
PLACA DE SINALIZAO TIPO 6
SERVENTE
R$ 5.47
R$ 4.33
2000.00
1000.02
3000.02
15.00
2.13
Materiais
Mo de obra
Total da composio
PLACA DE SINALIZAO TIPO 5
PLACA DE SINALIZAO TIPO 5
SERVENTE
NO CONSTA
00002436
00006113
1585.00
450.03
2000.00
331.38
668.64
Materiais
Mo de obra
Total da composio
PLACA DE SINALIZAO TIPO 4
PLACA DE SINALIZAO TIPO 4
SERVENTE
R$ 5.47
R$ 4.33
2330.00
1500.04
3830.04
1585.00
269.12
180.91
Materiais
Mo de obra
Total da composio
PLACA DE SINALIZAO TIPO 3
PLACA DE SINALIZAO TIPO 3
SERVENTE
NO CONSTA
00002436
00006113
1250.00
500.60
1750.60
2330.00
858.24
641.79
Materiais
Mo de obra
Total da composio
PLACA DE SINALIZAO TIPO 2
PLACA DE SINALIZAO TIPO 2
SERVENTE
R$ 5.47
R$ 4.33
VB
Materiais
Mo de obra
Total da composio
PLACA DE SINALIZAO TIPO 1
PLACA DE SINALIZAO TIPO1
SERVENTE
NO CONSTA
00002436
00006113
575.00
350.20
925.20
1250.00
293.19
207.41
Materiais
Mo de obra
R$ 5.47
R$ 4.33
500.00
200.29
700.29
575.00
207.31
142.89
Materiais
Mo de obra
Total da composio
NO CONSTA
00002436
00006113
VB
Materiais
Mo de obra
Total da composio
R$ 4.25
R$ 7.96
550.00
200.06
750.06
500.00
136.20
64.08
Materiais
Mo de obra
Total da composio
NO CONSTA
00006115
00002700
VB
Materiais
Mo de obra
Total da composio
PREO SINAPI
NO CONSTA
800.00
400.35
1200.35
550.00
80.10
119.96
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
800.00
80.00
3.19
83.19
UNID
65 de 82
ITEM / DESCRIO
TOTEM ESTACIONAMENTO
SERVENTE
UNIDADE
UNID
H
QUANTIDADE
1.00
5.00
CUSTO UNITRIO
RESUMO COMPOSIO
620.00
4.25
620.00
21.25
Materiais
Mo de obra
Total da composio
UNID
UNID
H
1.00
5.00
620.00
4.25
UNID
UNID
H
1.00
5.00
620.00
4.25
UNID
H
1.00
1.80
250.00
4.25
UNID
H
1.00
17.50
225.00
4.25
1.00
0.60
20.00
4.25
1.00
1.70
25.00
4.25
UNID
UNID
H
1.00
0.75
80.00
4.25
M2
H
0.06
4.25
M3
M3
H
1.00
1.20
37.83
4.25
M3
M3
H
1.00
1.20
28.34
4.25
R$ 4.25
NO CONSTA
00006111
R$ 4.25
00006111
R$ 4.25
NO CONSTA
00006111
R$ 4.25
00000370
00006111
R$ 28.34
R$ 4.25
37.83
5.10
42.93
28.34
5.10
28.34
5.10
33.44
UNID
UNID
1.00
25.00
25.00
M2
M2
1.00
1.00
M2
M2
NO CONSTA
1.00
0.00
1.00
UNID
UNID
NO CONSTA
25.00
0.00
25.00
1.00
NO CONSTA
1.00
60.00
60.00
1.00
1.50
60.00
0.00
60.00
1.50
Materiais
Mo de obra
Total da composio
NO CONSTA
00006111
0.00
0.26
0.26
37.83
5.10
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: CLOROFITO (CHLOROPHYTUM COMOSUM)
FORNECIMENTO DE: CLOROFITO (CHLOROPHYTUM COMOSUM)
R$ 4.25
80.00
3.19
83.19
0.26
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: DRACENA TRICOLOR (MUDA FORMADA +/- 1,00M) (DRACAENA
MARGINATA)
FORNECIMENTO DE: DRACENA TRICOLOR (MUDA FORMADA +/- 1,00M)
(DRACAENA MARGINATA)
NO CONSTA
00006111
25.00
7.23
32.23
80.00
3.19
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: GRAMA PRETA (OPHIOPOGON JAPONICUS)
FORNECIMENTO DE: GRAMA PRETA (OPHIOPOGON JAPONICUS)
R$ 4.25
20.00
2.55
22.55
25.00
7.23
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: AGAVE DRAGO (MUDA FORMADA +/- 0,50M) (AGAVE ATTENUATA)
FORNECIMENTO DE: AGAVE DRAGO (MUDA FORMADA +/- 0,50M) (AGAVE
ATTENUATA)
NO CONSTA
00006111
UNID
Materiais
Mo de obra
Total da composio
AREIA (ESPALHAR NOS LOCAIS SOB O SEIXO)
AREIA (ESPALHAR NOS LOCAIS SOB O SEIXO)
SERVENTE
R$ 4.25
225.00
74.38
299.38
20.00
2.55
Materiais
Mo de obra
Total da composio
SUBSTRATO (CAMADA DE 0,15M DE PROFUNIDIDADE)
SUBSTRATO (CAMADA DE 0,15M DE PROFUNIDIDADE)
SERVENTE
NO CONSTA
00006111
UNID
Materiais
Mo de obra
Total da composio
LIMPEZA INICIAL DA REA
SERVENTE
R$ 4.25
250.00
7.65
257.65
225.00
74.38
Materiais
Mo de obra
Total da composio
ASSENTO PREFERENCIAL
ASSENTO PREFERENCIAL
SERVENTE
NO CONSTA
00006111
UNID
Materiais
Mo de obra
Total da composio
CELA BRAILLE PARA PORTAS NA PAREDE
CELA BRAILLE PARA PORTAS NA PAREDE
SERVENTE
R$ 4.25
620.00
21.25
641.25
250.00
7.65
Materiais
Mo de obra
Total da composio
ANEL E CELA EM BRAILLE PARA CORRIMO
ANEL EM BRAILLE PARA CORRIMO
SERVENTE
NO CONSTA
00006111
UNID
Materiais
Mo de obra
Total da composio
R$ 4.25
620.00
21.25
641.25
620.00
21.25
Materiais
Mo de obra
Total da composio
PREO SINAPI
NO CONSTA
00006111
620.00
21.25
641.25
620.00
21.25
Materiais
Mo de obra
Total da composio
CDIGO SINAPI
NO CONSTA
1.50
0.00
1.50
UNID
66 de 82
ITEM / DESCRIO
UNIDADE
UNID
QUANTIDADE
1.00
CUSTO UNITRIO
RESUMO COMPOSIO
35.00
35.00
Materiais
Mo de obra
Total da composio
M2
1.00
1.50
UNID
UNID
1.00
15.00
UNID
UNID
1.00
35.00
UNID
UNID
1.00
UNID
1.00
180.00
180.00
UNID
UNID
1.00
35.00
M2
UNID
1.00
4.36
VB
VB
1.00
1200.00
M
M
1.00
12.50
UNID
UNID
1.00
83.00
SACOS
SACOS
1.00
36.51
BANCADA DE GRANITO
PEDREIRO
SERVENTE
CIMENTO PORTLAND
AREIA MEDIA
BANCADA EM GRANITO
M2
H
H
KG
M3
M2
2.00
2.00
2.27
0.01
1.30
5.47
4.25
0.33
28.34
120.00
REMOO DE ENTULHO
REMOO DE ENTULHO
M2
M2
1.00
69.57
LIMPEZA GERAL
LIMPEZA FINAL
M2
M2
1.00
2.94
R$ 5.47
R$ 4.25
R$ 0.33
R$ 28.34
NO CONSTA
0.00
69.57
69.57
2.94
Materiais
Mo de obra
Total da composio
00004750
00006111
00001379
00000370
NO CONSTA
156.89
19.44
176.33
69.57
Materiais
Mo de obra
Total da composio
NO CONSTA
36.51
0.00
36.51
10.94
8.50
0.75
0.14
156.00
Materiais
Mo de obra
Total da composio
NO CONSTA
83.00
0.00
83.00
36.51
Materiais
Mo de obra
Total da composio
NO CONSTA
12.50
0.00
12.50
83.00
Materiais
Mo de obra
Total da composio
NO CONSTA
1200.00
0.00
1200.00
12.50
Materiais
Mo de obra
Total da composio
NO CONSTA
4.36
0.00
4.36
1200.00
Materiais
Mo de obra
Total da composio
NO CONSTA
35.00
0.00
35.00
4.36
Materiais
Mo de obra
Total da composio
NO CONSTA
180.00
0.00
180.00
35.00
Materiais
Mo de obra
Total da composio
NO CONSTA
45.00
0.00
45.00
UNID
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: NANDINA (MUDA 1,20M) (NANDINA DOMESTICA)
FORNECIMENTO DE: NANDINA (MUDA 1,20M) (NANDINA DOMESTICA)
NO CONSTA
35.00
0.00
35.00
45.00
Materiais
Mo de obra
Total da composio
NO CONSTA
15.00
0.00
15.00
35.00
45.00
NO CONSTA
1.50
0.00
1.50
15.00
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: IP AMARELO (TABEBUIA CHRYSOTRICHA)
FORNECIMENTO DE: IP AMARELO (TABEBUIA CHRYSOTRICHA)
NO CONSTA
35.00
0.00
35.00
1.50
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: HELICNIA (HELICONIA ROSTRATA)
FORNECIMENTO DE: HELICNIA (HELICONIA ROSTRATA)
PREO SINAPI
M2
Materiais
Mo de obra
Total da composio
FORNECIMENTO DE: MORIA BICOLOR (DIETES BICOLOR)
FORNECIMENTO DE: MORIA BICOLOR (DIETES BICOLOR)
CDIGO SINAPI
NO CONSTA
0.00
2.94
2.94
67 de 82
TABELA ABC
PODER JUDICIRIO
JUSTIA FEDERAL NA PARABA
SEO DE LI CI TAES E CONTRATOS
EDI TAL DE LI CI TAO M ODALIDADE CONCORRNCIA - N 01/2008
ANEXO I X ORAMENTOS ESTIM ADOS EM PLANILHAS DE QUANTI TATIVOS E PREOS UNI TRIOS, COM POSIO UNI TRIA
DE CUSTOS E TABELA ABC
TABELA ABC
ITEM
DISCRIMINAO
UNID
CUSTO UNITRIO
QUANT
MO-DE-OBRA
MATERIAL
%
INCID.
%
ACUM.
98,627.60
0.63
3.74
4.36
430,410.85
1 0.15601
8.64
8.64213
UNID
12.00
1,500.00
18,450.00
19,950.00
239,400.00
0.31
4.81
13.45
M3
971.80
15.03
213.15
228.18
221,745.32
0.47
4.45
17.90
M2
878.40
9.77
240.00
249.77
219,396.21
0.62
4.41
22.31
M2
927.30
9.03
180.00
189.03
175,283.81
0.78
3.52
25.83
2.00
KG
UNID
2,500.00
76,000.00
78,500.00
157,000.00
0.94
3.15
28.98
M2
6,782.47
9.80
12.22
22.02
149,343.21
1.09
3.00
31.98
MS
18.00
8,291.70
0.00
8,291.70
149,250.60
1.25
3.00
34.97
M2
927.30
1.88
137.42
139.30
129,171.22
1.40
2.59
37.57
UNID
2.00
1,200.00
49,250.00
50,450.00
100,900.00
10
1.56
2.03
39.59
MS
18.00
5,527.80
0.00
5,527.80
99,500.40
11
1.72
2.00
41.59
UNID
M2
MTS
202.77
213.71
89,758.20
12
1.87
1.80
43.39
9.17
56.77
65.94
75,503.02
13
2.03
1.52
44.91
600.00
3.43
101.81
105.24
63,142.80
14
2.18
1.27
46.18
21.00
600.00
2,030.00
2,630.00
55,230.00
15
2.34
1.11
47.29
124.00
16.22
428.95
445.17
55,200.61
16
2.50
1.11
48.39
540.50
2.17
90.65
92.82
50,168.89
17
2.65
1.01
49.40
M2
221.00
11.61
214.47
226.08
49,963.02
18
2.81
1.00
50.41
MS
18.00
2,763.00
0.00
2,763.00
49,734.00
19
2.96
1.00
51.40
1,340.00
6.50
30.00
36.50
48,910.00
20
3.12
0.98
52.39
UNID
13,500.00
0.00
3.40
3.40
45,900.00
21
3.28
0.92
53.31
M2
1,600.00
17.17
11.40
28.56
45,703.71
22
3.43
0.92
54.23
976.80
3.75
43.03
46.78
45,698.53
23
3.59
0.92
55.14
30.38
151.16
181.54
44,841.49
24
3.74
0.90
56.04
4,000.15
4,032.40
44,356.40
25
3.90
0.89
56.93
M2
M2
M2
CABO ISOLADO EM PVC 450/750V - 70C BAIXA TENSAO (SEO TRANSVERSAL: 4,00
MM / ENCORDOAMENTO: CLASSE 2)(CORES
18.01.19 VERMELHA, AZUL E VERDE)
01.03.05 ALUGUEL MENSAL DE GRUA BASICA
M2
M2
247.00
UNID
11.00
32.25
MTS
17,000.00
0.49
2.10
2.59
44,050.40
26
4.06
0.88
57.82
MS
6.00
0.00
6,667.92
6,667.92
40,007.52
27
4.21
0.80
58.62
MTS
3,000.00
0.49
12.46
12.95
38,850.00
28
4.37
0.78
59.40
M2
261.00
13.34
127.70
141.04
36,810.53
29
4.52
0.74
60.14
M2
245.00
13.34
127.70
141.04
34,553.94
30
4.68
0.69
60.83
MS
18.00
1,842.60
0.00
1,842.60
33,166.80
31
4.84
0.67
61.50
5.88
101.81
107.69
32,306.40
32
4.99
0.65
62.15
30.54
140.46
171.00
31,806.74
33
5.15
0.64
62.79
M2
10.94
UNID
18.01.73
420.00
1,145.00
300.00
186.00
UNID
10.00
750.00
2,350.00
3,100.00
31,000.00
34
5.30
0.62
63.41
UNID
1.00
964.00
30,000.00
30,964.00
30,964.00
35
5.46
0.62
64.03
68/82
TABELA ABC
CONJUNTO MOTOR BOMBA MARCA SHNEIDER
MOD. NDA 1,2M/H 28,0MCA
0,72CV/380V/3F/60HZ INCLUINDO
PRESSOSTATOS ,VALVULAS, MANOMETROS,
21.01.06 ETC.
PISO EM PVC MANTA, REF. FORBO, LINHA
SMARAGD - 6614; (POR CIMA DE PISO
12.05.02 CIMENTADO COM PINTURA);
10.01.02 EMBOO
VIDROS LAMINADO COM BRONZE COR
11.04.02 CRISTAL, ESPESSURA 08 mm
MANTA ELASTICA 4MM TIPO III C/PROTEO
09.01.02 TRMICA
05.02.01 AO PARA ESTRUTURA METLICA
CABO DE PARES TRANADOS TIPO UTP
CATEGORIA
5E
350
MHZ
,
4
PARES,FABRICANTE
FURUKAWA
OU
19.01.50 EQUIVALENTE TCNICO.
FORRO ACSTICO ECOMIN-AMF REMOVVEL E
MODULADO DE FIBRA MINERAL, PLACAS DE
62,5 X 125 MM, ESPESSURA DE 13mm, COR
14.01.01 BRANCO.
UNIDADE EVAPORADORA DE FLUXO DE
REFRIGERANTE VARIVEL, CASSETE 4 VIA
20.01.15 36.000 BTUS/H
05.01.01 ARMAO DE AO CA-60
20.09.02 EXECUO DE REDE DE DRENOS
01.02.06 VIGIA
01.02.04 APONTADOR
PAREDE DE ALVENARIA DE BLOCO CERMICO
07.01.01 - VEZ
BARRACAO DE MADEIRA COM MOBILIRIO E
02.01.01 SANITRIOS
16.02.02 CORRIMO EM AO INOX
CABO ISOLADO EM PVC 450/750V - 70C BAIXA TENSAO (SEO TRANSVERSAL: 2,5
MM / ENCORDOAMENTO: CLASSE 2)(CORES
18.01.20 VERMELHA, AZUL E AMARELO)
UNIDADE CONDENSADORA DE FLUXO DE
REFRIGERANTE VARIVEL REFERNCIA MAP 20.01.03 AP1201H
RODAP
EM
GRANITO
ARABESCO,
ACABAMENTO POLIDO, 2mm DE ESPESSURA,
13.01.01 7cm DE ALTURA;
CONCRETO Fck = 20MPa
04.01.04
PISO EM CERMICA, TIPO A, PEI V, COR BEGE,
DIMENSO 20x20cm, EQUIVALENTE A
12.03.01 EXISTENTE NO ED. SEDE JF/CG
04.01.02 ARMAO DE AO CA-50
PORCELANATO POLIDO, PORTINARI, COR
10.02.04 BEGE CLARO, DIMENSES 45x45 cm
01.01.02 AS BUILT
SWITCH 19" GERENCIVEL 24 PORTAS
19.01.38 10BASE-T/100BASE-TX 10/100MBPS
PINTURA ACRLICA SOBRE MASSA PVA,
ACABAMENTO ACETINADO, COR BRANCO
17.02.02 NEVE
01.02.07 AUXILIAR ADMINISTRATIVO
UNIDADE CONDENSADORA DE FLUXO DE
REFRIGERANTE VARIVEL REFERNCIA MAP 20.01.01 AP0801H
PORCELANATO POLIDO, PORTINARI, COR
10.02.03 MARROM, DIMENSES 45x45 cm
INTERRUPTOR DIFERENCIAL RESIDUAL DR
BIPOLAR
CORRENTE
RESIDUAL
30MA,
18.01.30 CORRENTE NOMINAL DE 25A
2.00
1,857.50
13,000.00
14,857.50
29,715.00
36
5.62
0.60
64.63
M2
275.60
1.66
101.66
103.32
28,475.68
37
5.77
0.57
65.20
M2
2,787.00
7.91
2.13
10.04
27,979.14
38
5.93
0.56
65.76
8.40
85.00
93.40
27,833.20
39
6.08
0.56
66.32
605.00
25.83
19.94
45.77
27,692.25
40
6.24
0.56
66.88
KG
4,953.89
1.56
4.01
5.57
27,602.08
41
6.40
0.55
67.43
14,000.00
0.45
1.50
1.95
27,300.00
42
6.55
0.55
67.98
M2
491.00
9.80
45.00
54.80
26,906.80
43
6.71
0.54
68.52
8.00
750.00
2,485.00
3,235.00
25,880.00
44
6.86
0.52
69.04
5,427.70
0.83
3.85
4.68
25,414.66
45
7.02
0.51
69.55
25,200.00
M2
M2
UNID
KG
VB
1.00
1,200.00
24,000.00
25,200.00
46
7.18
0.51
70.06
MS
18.00
1,381.95
0.00
1,381.95
24,875.10
47
7.33
0.50
70.55
MS
18.00
1,381.95
0.00
1,381.95
24,875.10
48
7.49
0.50
71.05
M2
1,187.00
11.35
9.32
20.66
24,525.58
49
7.64
0.49
71.55
M2
150.00
58.62
104.60
163.22
24,482.59
50
7.80
0.49
72.04
132.00
9.87
171.00
180.87
23,874.84
51
7.96
0.48
72.52
MTS
9,000.00
1.37
1.22
2.60
23,364.00
52
8.11
0.47
72.99
UNID
1.00
1,800.00
21,300.00
23,100.00
23,100.00
53
8.27
0.46
73.45
1,125.30
11.34
8.99
20.33
22,871.99
54
8.42
0.46
73.91
M3
103.13
15.03
201.98
217.01
22,380.04
55
8.58
0.45
74.36
461.00
5.35
41.05
46.40
21,389.80
56
8.74
0.43
74.79
KG
4,764.40
0.63
3.74
4.36
20,791.84
57
8.89
0.42
75.21
M2
M2
380.75
5.35
45.69
51.04
19,433.10
58
9.05
0.39
75.60
3,196.00
0.00
6.01
6.01
19,207.96
59
9.20
0.39
75.98
12.00
14.70
1,435.02
1,449.72
17,396.64
60
9.36
0.35
76.33
2,047.00
3.73
4.37
8.10
16,579.06
61
9.52
0.33
76.66
18.00
921.03
0.00
921.03
16,578.54
62
9.67
0.33
77.00
M2
UNID
M2
MS
M2
18.01.55
UNID
UNID
1,000.00
15,530.00
16,530.00
16,530.00
63
9.83
0.33
77.33
5.35
45.69
51.04
15,107.54
64
9.98
0.30
77.63
49.00
1.96
295.74
297.70
14,587.30
65
10.14
0.29
77.93
33.65
382.17
415.82
14,553.66
66
10.30
0.29
78.22
UNID
UNID
1.00
296.00
UNID
298.00
35.00
314.65
12,585.97
67
10.45
0.25
78.47
2,047.00
3.16
2.35
5.51
11,277.74
68
10.61
0.23
78.70
6.00
501.10
1,318.00
1,819.10
10,914.60
69
10.76
0.22
78.92
300.00
13.03
23.08
36.11
10,834.20
70
10.92
0.22
79.13
3,700.00
1.10
1.80
2.90
10,734.81
71
11.08
0.22
79.35
MTS
200.00
3.68
48.29
51.97
10,394.70
72
11.23
0.21
79.56
MS
18.00
0.00
577.45
577.45
10,394.05
73
11.39
0.21
79.77
20.00
M2
40.00
212.72
101.93
115.50
385.00
500.50
10,010.00
74
11.54
0.20
79.97
1,340.00
3.73
3.64
7.36
9,868.03
75
11.70
0.20
80.17
M3
78.24
125.20
0.00
125.20
9,795.65
76
11.86
0.20
80.36
01.01.01
M2
3,196.00
0.00
2.99
2.99
9,556.04
77
12.01
0.19
80.55
900.00
0.00
10.56
10.56
9,504.00
78
12.17
0.19
80.74
UNID
500.00
3.43
15.55
18.98
9,490.00
79
12.32
0.19
80.94
M2
44.00
4.90
210.69
215.59
9,486.13
80
12.48
0.19
81.13
M2
3,196.00
2.94
0.00
2.94
9,396.24
81
12.64
0.19
81.31
UNID
M2
CLARABIA
08.01.04
LIMPEZA FINAL DA OBRA
30.01.02
11.05.01 MOLA AEREA
JANELA BAIXA, ESQUADRIA EM PERFIL DE
11.02.02
ALUMNIO, ANODIZADO MARROM, CONFORME
CONTROLE REMOTO SIMPLES PARA
20.06.02 UNIDADES VRF
UNID
52.00
60.00
120.00
180.00
9,360.00
82
12.79
0.19
81.50
M2
51.00
30.38
151.16
181.54
9,258.77
83
12.95
0.19
81.69
17.51
158.00
175.51
9,126.62
84
13.10
0.18
81.87
UNID
52.00
69/82
TABELA ABC
CONSUMO DE ENERGIA ELETRICA
MS
01.4.01
18.00
0.00
500.00
500.00
9,000.00
85
13.26
0.18
82.05
0.00
REMOO DE ENTULHO
30.01.01
21.01.05
120.00
69.57
69.57
8,348.40
86
13.42
0.17
82.22
M2
1,340.00
3.16
2.82
5.98
8,016.42
87
13.57
0.16
82.38
285.00
4.90
22.69
27.59
7,864.26
88
13.73
0.16
82.54
M3
MTS
100.00
2.94
75.17
78.11
7,810.95
89
13.88
0.16
82.70
UNID
50.00
29.40
125.00
154.40
7,720.00
90
14.04
0.16
82.85
150.00
2.94
48.29
51.23
7,684.43
91
14.20
0.15
83.01
184.83
11.34
30.05
41.39
7,649.55
92
14.35
0.15
83.16
KG
775.00
4.49
5.37
9.86
7,639.95
93
14.51
0.15
83.31
976.80
3.71
3.91
7.62
7,439.35
94
14.66
0.15
83.46
M2
3.00
570.00
1,900.00
2,470.00
7,410.00
95
14.82
0.15
83.61
M2
192.50
3.05
35.29
38.33
7,379.28
96
14.98
0.15
83.76
M2
50.00
9.77
135.00
144.77
7,238.40
97
15.13
0.15
83.90
2.00
357.36
3,250.00
3,607.36
7,214.72
98
15.29
0.14
84.05
UNID
1.00
156.80
6,889.00
7,045.80
7,045.80
99
15.44
0.14
84.19
UNID
BALCAO DA RECEPO
15.02.04
PORTA CONTA FOGO METLICA - BARRA
ANTIPNICO - ACABAMENTO EM PINTURA
11.03.02 SOBRE FUNIDO PRIMER NA COR VERMELHA
DIMENSO 90X210cm
12.01.02 ENCHIMENTO COM CONCRETO CELULAR
CUBAS DE APOIO RETANGULAR
ACABAMENTO GE 17 BRANCO SERIE TRIO
25.01.04 DECA, (OU EQUIVALENTE SUPERIOR)
21.01.02 EXTINTOR DE GS CARBNICO 6,0 KG
IMPERMEABILIZAO DE PISO EM GRANITO C/
09.01.06 MEMBRANA
PISO EM GRANITO ARABESCO, ACABAMENTO
NATURAL, 2mm DE ESPESSURA, DIMENSO
12.04.01 500X500mm
16.02.04 GUARDA-CORPO EM AO INOX COM VIDRO
01.03.02 EQUIPAMENTOS DE PROTEO INDIVIDUAL
18.01.75 LUVA SEM ROSCA, TAMANHO NOMINAL 3/4"
43.78
954.73
998.51
6,989.60
100
15.60
0.14
84.33
M3
27.56
27.65
224.86
252.51
6,959.04
101
15.76
0.14
84.47
UNID
33.00
14.70
194.22
208.92
6,894.28
102
15.91
0.14
84.61
14.00
1.47
490.58
492.05
6,888.70
103
16.07
0.14
84.75
M2
334.00
6.91
13.69
20.60
6,879.73
104
16.22
0.14
84.88
M2
47.60
13.34
127.70
141.04
6,713.34
105
16.38
0.13
85.02
M2
37.00
9.87
171.00
180.87
6,692.19
106
16.54
0.13
85.15
CJ
40.00
0.00
164.32
164.32
6,572.84
107
16.69
0.13
85.29
3,000.00
1.57
0.62
2.19
6,564.00
108
16.85
0.13
85.42
8.40
133.95
142.35
6,562.34
109
17.00
0.13
85.55
UNID
UNID
7.00
M2
46.10
UNID
50.00
30.70
98.00
128.70
6,435.00
110
17.16
0.13
85.68
KG
585.00
4.49
6.50
10.99
6,427.98
111
17.32
0.13
85.81
605.00
6.14
4.45
10.58
6,403.47
112
17.47
0.13
85.94
7.50
135.00
142.50
6,270.00
113
17.63
0.13
86.06
2.00
706.69
2,350.00
3,056.69
6,113.38
114
17.78
0.12
86.19
2,787.00
0.97
1.16
2.13
5,947.40
115
17.94
0.12
86.30
11.05.03
M2
CONJUNTO DE FERRAGEM PARA PORTA DE
MADEIRA (FECHADURA, MAANETAE
DOBRADIAS )
UNID
44.00
QUADRO DE DISTRIBUIO
26.02.10
UNID
CHAPISCO
10.01.01
M2
41.50
13.34
127.70
141.04
5,853.01
116
18.10
0.12
86.42
UNID
770.00
0.97
6.50
7.47
5,753.44
117
18.25
0.12
86.54
UNID
33.00
16.76
152.20
168.96
5,575.75
118
18.41
0.11
86.65
UNID
22.00
19.44
230.00
249.44
5,487.68
119
18.56
0.11
86.76
UNID
28.00
8.21
186.92
195.13
5,463.50
120
18.72
0.11
86.87
UNID
2.00
869.50
1,814.00
2,683.50
5,367.00
121
18.88
0.11
86.98
UNID
2.00
19.60
2,650.00
2,669.60
5,339.20
122
19.03
0.11
87.08
UNID
2.00
19.60
2,650.00
2,669.60
5,339.20
123
19.19
0.11
87.19
320.00
7.16
9.50
16.66
5,332.48
124
19.34
0.11
87.30
40.00
7.64
123.76
131.40
5,255.90
125
19.50
0.11
87.40
UNID
1,000.00
1.00
4.23
5.23
5,232.50
126
19.66
0.11
87.51
UNID
18.00
21.46
267.54
289.00
5,202.04
127
19.81
0.10
87.61
M2
M2
M2
70/82
TABELA ABC
MULTIPLEXADOR COLOR DUPLEX PARA 16
CMERAS
COM
FUNES:
FREESER,
ALARME, SEQUENCIAL, SAIDA MONITOR E
22.01.20 VER.
UNIDADE EVAPORADORA DE FLUXO DE
REFRIGERANTE VARIVEL, HI WALL DE 12000
20.01.06 BTUS/H
BACIAS COM CAIXA ACOPLADA LINHA
AZALA, REF. 91606-CELITE (OU
25.01.01 EQUIVALENTE)
29.01.01 BANCADA DE GRANITO
QUADROS ELTRICOS E INSTALAES
26.03.09 ELTRICAS
PORTA DE MADEIRA SARRAFEADA MACIA
DE 35mm , REVESTIDA COM FOLHAS DE
MADEIRA TIPO FREIJ E=3mm, DOBRADIAS
TIPO LAFONTE REF. 485 (4X3. 1/2") E
FECHADURA/MAANETA TIPO ALAVANCA
REF. LAFONTE - ALUMNIO, Ref. 602-INTERNAAee (056), COM MOLA AREA: PNE DIMENSO
80X210CM
11.03.01
DIVISRIA EM GRANITO ARABESCO,
ESPESSURA 30mm, ACABAMENTO POLIDO,
14.02.02 INCLUIDO FERRAGENS
02.02.03 LIMPEZA DO TRRENO
26.02.09 QUADRO DE COMANDO
GUARDA-CORPO EM AO INOX COM BARRAS
16.02.03 VERTICAIS
CONECTOR FEMEA RJ 45 - CATEGORIA 5E,
PINAGEM T568A ,FABRICANTE FURUKAWA OU
19.01.46 EQUIVALENTE TCNICO.
EXTINTOR DE GUA PRESSURIZADA 10
21.01.01 LITROS
UNIDADE EVAPORADORA DE FLUXO DE
20.01.11
REFRIGERANTE VARIVEL, CASSETE 1 VIA
CURVA DE PVC, CLASSE "A", COM TAMANHO
18.01.48 NOMINAL 25MM.
09.01.01 IMPERMANTAPRIMER
LIGAES PROVISORIAS
02.01.02 (GUA/ESGOTO/ENERGIA)
INSTALAO DE CAIXA EM ALVENARIA NAS
DIMENSES
100X100X80
CM,
COM
18.01.56 ACABAMENTO INTERNO
CABO ISOLADO EM PVC 0,6/1 KV - 70C UNIPOLAR BAIXA TENSO (SEO
TRANSVERSAL: 95,00 MM /
18.01.15 ENCORDOAMENTO: CLASSE 2)
12.05.03 RAMPA DE ACESSO AO PISO ELEVADO
20.08.03 CANTONEIRAS # 26
ELETROCALHA PERFURADA COM ABAS 100 X
50 X 3000 MM GALVANIZADA A FOGO
19.01.14 CONFORME NBR 6323 EM CHAPA #18
PORTA DE MADEIRA SARRAFEADA MACIA
DE 35mm, REVESTIDA EM AMBAS AS FACES
COM FOLHAS DE MADEIRA TIPO FREIJ COM
11.01.01
FRISOS DIMENSO 120X210cm
TUBULAO EM COBRE, RGIDO, PRPRIA
PARA INSTALAES DE CLIMATIZAO, DE 1.
20.05.05 3/8", INCLUINDO CURVAS, ACESSRIOS,
SUPORTES E FIXAES NECESSRIOS A
26.02.07 LIMITADOR DE VELOCIDADES
UNID
1.00
980.00
4,200.00
5,180.00
5,180.00
128
19.97
0.10
87.72
UNID
3.00
400.00
1,318.00
1,718.00
5,154.00
129
20.12
0.10
87.82
UNID
30.00
29.40
140.13
169.53
5,085.83
130
20.28
0.10
87.92
M2
28.65
19.44
156.89
176.33
5,051.88
131
20.44
0.10
88.02
VB
1.00
1,200.21
3,850.00
5,050.21
5,050.21
132
20.59
0.10
88.13
32.28
682.11
714.39
5,000.70
133
20.75
0.10
88.23
UNID
7.00
M2
34.50
143.18
4,939.57
134
20.90
0.10
88.33
M2
1,200.00
4.04
0.00
4.04
4,845.00
135
21.06
0.10
88.42
2.00
501.10
1,900.00
2,401.10
4,802.20
136
21.22
0.10
88.52
26.50
9.87
171.00
180.87
4,793.06
137
21.37
0.10
88.62
UNID
350.00
3.15
10.50
13.65
4,776.59
138
21.53
0.10
88.71
34.00
1.47
138.75
140.22
4,767.48
139
21.68
0.10
88.81
UNID
2.00
550.00
1,810.00
2,360.00
4,720.00
140
21.84
0.09
88.90
UNID
700.00
4.80
1.84
6.64
4,649.40
141
22.00
0.09
89.00
M2
605.00
3.22
4.28
7.50
4,539.80
142
22.15
0.09
89.09
VB
1.00
0.00
4,510.56
4,510.56
4,510.56
143
22.31
0.09
89.18
UNID
6.00
62.25
679.33
741.59
4,449.52
144
22.46
0.09
89.27
MTS
100.00
UNID
M2
8.18
135.00
2.45
41.79
44.24
4,424.00
145
22.62
0.09
89.36
21.20
12.98
195.00
207.98
4,409.18
146
22.78
0.09
89.44
KG
400.00
4.49
6.50
10.99
4,395.20
147
22.93
0.09
89.53
120.00
13.03
23.08
36.11
4,333.68
148
23.09
0.09
89.62
34.24
502.11
536.35
4,290.76
149
23.24
0.09
89.71
M2
UNID
8.00
105.00
7.84
32.72
40.56
4,259.22
150
23.40
0.09
89.79
UNID
2.00
219.26
1,850.00
2,069.26
4,138.51
151
23.56
0.08
89.87
VB
1.00
3,000.00
1,000.00
4,000.00
4,000.00
152
23.71
0.08
89.95
230.00
4.90
12.46
17.36
3,991.65
153
23.87
0.08
90.03
UNID
11.00
11.66
348.99
360.65
3,967.19
154
24.02
0.08
90.11
12.00
40.34
290.00
330.34
3,964.08
155
24.18
0.08
90.19
18.01.67
21.01.18 CAIXA DE HIDRANTE 600X900X180
ELETROCALHA PERFURADA COM ABAS 150 X
100 X 3000 MM GALVANIZADA A FOGO
19.01.01 CONFORME NBR 6323 EM CHAPA #18
60.00
19.99
44.68
64.67
3,880.04
156
24.34
0.08
90.27
UNID
1.00
343.00
3,500.00
3,843.00
3,843.00
157
24.49
0.08
90.35
VB
1.00
1,500.04
2,330.00
3,830.04
3,830.04
158
24.65
0.08
90.43
200.00
1.76
17.36
19.12
3,824.80
159
24.80
0.08
90.50
250.00
1.67
13.33
15.00
3,749.00
160
24.96
0.08
90.58
UNID
3.00
285.00
950.00
1,235.00
3,705.00
161
25.12
0.07
90.65
UNID
2.00
501.10
1,350.00
1,851.10
3,702.20
162
25.27
0.07
90.73
MS
18.00
0.00
200.00
200.00
3,600.00
163
25.43
0.07
90.80
MS
18.00
0.00
200.00
200.00
3,600.00
164
25.59
0.07
90.87
M2
420.00
4.40
4.17
8.57
3,599.40
165
25.74
0.07
90.94
VB
1.00
550.00
3,000.00
3,550.00
3,550.00
166
25.90
0.07
91.01
23.00
1.47
150.00
151.47
3,483.81
167
26.05
0.07
91.08
108.00
7.25
24.86
32.11
3,467.90
168
26.21
0.07
91.15
M2
98.00
5.35
29.34
34.69
3,399.67
169
26.37
0.07
91.22
370.00
1.96
6.95
8.91
3,296.70
170
26.52
0.07
91.29
SACOS
85.00
2.10
36.51
38.61
3,281.85
171
26.68
0.07
91.35
UNID
180.00
16.66
1.40
18.06
3,250.80
172
26.83
0.07
91.42
UNID
20.00
36.84
125.00
161.84
3,236.80
173
26.99
0.06
91.48
71/82
TABELA ABC
01.03.04 ALUGUEL MENSAL RELOGIO DE PONTO
GRAVADOR DE VIDEO DIGITAL (DVR), HD
250GB, COM ENTRADA PARA 20 CAMERAS,
COM
ENTRADAS
E
SADAS
PARA
PROCESSAMENTO
DE
ALARMES,
CONFIGURAVEIS. COM ENTRADAS E SAIDAS
DE VIDEO COM CONECTORES EM BNC, COM
ENTRADA MODULAR EM RJ45J COM 8 PINOS,
COM SISTEMAS NTSC/PAL, TCP/IP.
22.01.16
09.01.04 DENVERTEC 540
CABO ISOLADO EM PVC 0,6/1 KV - 70C UNIPOLAR BAIXA TENSO (SEO
TRANSVERSAL: 70,00 MM /
18.01.14 ENCORDOAMENTO: CLASSE 2)
DUCHAS HIGINICA FABRIMAR
ACQUAJET,REF: 2195,MANGUEIRA METLICA
25.02.11 (OU EQUIVALENT)
ELETRODUTO DE PVC, CLASSE "A", COM
19.01.29 TAMANHO NOMINAL 25MM.
TRANSFORMADORES DE LINHA DE PAS 2/70W
23.01.27 4/8Z 210V - W RMS 70W.
09.01.05 VU DE POLIESTER
19.01.41
MS
18.00
0.00
179.18
179.18
3,225.24
174
27.15
0.06
91.55
1.00
615.35
2,600.00
3,215.35
3,215.35
175
27.30
0.06
91.61
M2
186.00
4.40
12.78
17.18
3,194.55
176
27.46
0.06
91.68
MTS
100.00
1.96
29.83
31.79
3,179.05
177
27.61
0.06
91.74
UNID
37.00
4.90
80.04
84.94
3,142.75
178
27.77
0.06
91.81
600.00
1.00
4.23
5.23
3,139.50
179
27.93
0.06
91.87
UNID
50.00
14.74
48.00
62.74
3,136.80
180
28.08
0.06
91.93
236.00
1.18
12.08
13.26
3,128.65
181
28.24
0.06
91.99
UNID
1.00
721.28
2,400.00
3,121.28
3,121.28
182
28.39
0.06
92.06
UNID
77.00
2.94
37.51
40.45
3,114.65
183
28.55
0.06
92.12
UNID
2.00
19.60
1,520.00
1,539.60
3,079.20
184
28.71
0.06
92.18
UNID
60.00
12.28
38.00
50.28
3,016.80
185
28.86
0.06
92.24
5.00
11.76
590.44
602.20
3,011.00
186
29.02
0.06
92.30
VB
1.00
1,000.02
2,000.00
3,000.02
3,000.02
187
29.17
0.06
92.36
UM
1.00
1,000.02
2,000.00
3,000.02
3,000.02
188
29.33
0.06
92.42
145.00
1.47
18.90
20.37
2,953.65
189
29.49
0.06
92.48
10.50
7.84
273.32
281.16
2,952.18
190
29.64
0.06
92.54
UNID
4.00
176.40
560.00
736.40
2,945.60
191
29.80
0.06
92.60
UNID
1,440.00
0.59
1.36
1.95
2,805.12
192
29.95
0.06
92.66
VB
1.00
1,237.90
1,550.00
2,787.90
2,787.90
193
30.11
0.06
92.71
UNID
86.00
7.23
25.00
32.23
2,771.35
194
30.27
0.06
92.77
UNID
1.00
620.00
2,085.00
2,705.00
2,705.00
195
30.42
0.05
92.82
UNID
M2
MTS
300.00
1.18
7.76
8.94
2,680.65
196
30.58
0.05
92.88
UNID
500.00
2.45
2.90
5.35
2,675.00
197
30.73
0.05
92.93
UNID
40.00
1.64
66.64
2,665.64
198
30.89
0.05
92.98
UNID
30.00
15.62
65.00
70.00
85.62
2,568.60
199
31.05
0.05
93.04
45.00
10.88
45.79
56.67
2,550.05
200
31.20
0.05
93.09
UNID
350.00
1.65
5.50
7.15
2,500.76
201
31.36
0.05
93.14
M2
112.68
9.80
12.22
22.02
2,481.10
202
31.51
0.05
93.19
UNID
1.00
650.00
1,830.00
2,480.00
2,480.00
203
31.67
0.05
93.24
12.00
17.44
187.50
204.94
2,459.22
204
31.83
0.05
93.29
UNID
1.00
567.00
1,890.00
2,457.00
2,457.00
205
31.98
0.05
93.33
MTS
1,000.00
0.49
1.94
2.43
2,428.00
206
32.14
0.05
93.38
19.00
11.76
115.83
127.59
2,424.21
207
32.29
0.05
93.43
1.00
8.60
419.35
2,000.00
2,419.35
2,419.35
208
32.45
0.05
93.48
7.84
273.32
281.16
2,417.98
209
32.61
0.05
93.53
500.00
0.78
4.04
4.82
2,412.00
210
32.76
0.05
93.58
2.00
400.35
800.00
1,200.35
2,400.70
211
32.92
0.05
93.63
UNID
1.00
500.00
1,890.00
2,390.00
2,390.00
212
33.07
0.05
93.67
UNID
300.00
1.96
6.00
7.96
2,388.00
213
33.23
0.05
93.72
UNID
2.00
331.11
850.00
1,181.11
2,362.22
214
33.39
0.05
93.77
1,200.00
1.26
0.69
1.96
2,350.01
215
33.54
0.05
93.82
1.00
589.44
1,760.00
2,349.44
2,349.44
216
33.70
0.05
93.86
800.00
0.98
1.95
2.93
2,344.00
217
33.85
0.05
93.91
UNID
M
M
UNID
M2
UNID
72/82
TABELA ABC
CABO ISOLADO EM PVC 0,6/1 KV - 70C UNIPOLAR BAIXA TENSO (SEO
TRANSVERSAL: 50,00 MM /
18.01.13 ENCORDOAMENTO: CLASSE 2)
INTERLIGAES ELTRICAS - ELETRODUTO
RGIDO EM AO GALVANIZADO LAMINADO A
FOGO, ELETRODUTO EM ELEMENTO
FLEXVEL, BORNES, CONECTORES, DENTRE
20.04.03 OUTROS.
04.01.03 ARMAO DE AO CA-60
MICROPHONES LESON SM- 58 PLUS- 300
OHMS SENSIBILIDADE 55 DB A 1 KHZ.,
RESPOSTA DE FREQNCIA DE 50HZ A 13
23.01.25 KHZ, SEM CABO .
100.00
1.96
21.35
23.31
2,330.65
218
34.01
0.05
93.96
VB
1.00
800.00
1,530.00
2,330.00
2,330.00
219
34.17
0.05
94.00
KG
493.10
0.83
3.85
4.68
2,308.89
220
34.32
0.05
94.05
MTS
7.00
73.68
250.00
323.68
2,265.76
221
34.48
0.05
94.10
90.00
9.96
15.20
25.16
2,264.47
222
34.63
0.05
94.14
4.00
150.85
415.00
565.85
2,263.39
223
34.79
0.05
94.19
UNID
1.00
586.00
1,675.00
2,261.00
2,261.00
224
34.95
0.05
94.23
UNID
80.00
14.70
13.20
27.90
2,232.00
225
35.10
0.04
94.28
UNID
M2
26.03.08
UNID
50.00
1.96
42.35
44.31
2,215.50
226
35.26
0.04
94.32
CJ
4.00
200.00
350.00
550.00
2,200.00
227
35.41
0.04
94.37
25.02.01
UNID
34.00
4.25
60.00
64.25
2,184.50
228
35.57
0.04
94.41
VB
1.00
800.00
2,180.00
229
35.73
0.04
94.45
32.00
15.62
1,380.00
52.00
2,180.00
UNID
67.62
2,163.84
230
35.88
0.04
94.50
MS
18.00
0.00
120.00
120.00
2,160.00
231
36.04
0.04
94.54
UNID
7.00
29.40
277.03
306.43
2,144.99
232
36.19
0.04
94.58
UNID
61.00
0.00
35.00
35.00
2,135.00
233
36.35
0.04
94.63
UNID
12.00
11.45
165.78
177.23
2,126.73
234
36.51
0.04
94.67
195.00
1.47
9.42
10.89
2,124.14
235
36.66
0.04
94.71
70.00
11.34
18.05
29.39
2,057.09
236
36.82
0.04
94.75
UNID
2.00
158.45
870.00
1,028.45
2,056.90
237
36.97
0.04
94.79
UNID
350.00
1.35
4.50
5.85
2,048.26
238
37.13
0.04
94.84
UNID
4.00
9.80
500.00
509.80
2,039.20
239
37.29
0.04
94.88
VB
1.00
450.03
1,585.00
2,035.03
2,035.03
240
37.44
0.04
94.92
UNID
6.00
223.79
111.74
335.53
2,013.16
241
37.60
0.04
94.96
130.00
2.93
12.50
15.43
2,005.90
242
37.75
0.04
95.00
UNID
10.00
50.00
150.00
200.00
2,000.00
243
37.91
0.04
95.04
VB
1.00
500.00
1,500.00
2,000.00
2,000.00
244
38.07
0.04
95.08
UNID
1.00
518.00
1,480.00
1,998.00
1,998.00
245
38.22
0.04
95.12
54.00
8.13
28.80
36.93
1,994.30
246
38.38
0.04
95.16
UNID
12.00
15.32
150.00
165.32
1,983.79
247
38.53
0.04
95.20
UNID
1.00
450.00
1,530.00
1,980.00
1,980.00
248
38.69
0.04
95.24
7.50
240.00
247.50
1,980.00
249
38.85
0.04
95.28
UNID
UNID
UNID
8.00
450.00
0.40
3.88
4.28
1,927.53
250
39.00
0.04
95.32
8.40
48.12
1,924.80
251
39.16
0.04
95.36
83.40
1,918.20
252
39.31
0.04
95.39
UNID
23.00
15.40
39.72
68.00
75.00
1.47
23.88
25.35
1,901.25
253
39.47
0.04
95.43
UNID
4.00
49.00
424.99
473.99
1,895.96
254
39.63
0.04
95.47
UNID
1.00
435.00
1,450.00
1,885.00
1,885.00
255
39.78
0.04
95.51
172.00
2.94
7.87
10.81
1,858.60
256
39.94
0.04
95.55
40.00
73/82
TABELA ABC
KNOBS COM PARAFUSO PARA
23.01.21 POTENCIOMENTRO.
AREIA (ESPALHAR NOS LOCAIS SOB O
28.02.02 SEIXO)
CHAVE
SECCIONADORA
TRIPOLAR,
COMANDO SIMULTNEO, USO INTERNO,
ACIONAMENTO
MANUAL
ATRAVS
DE
ALAVANCA DE MANOBRA, OPERAO SEM
CARGA, CORRENTE NOMINAL DE 400 A,
CLASSE 15KV.
18.02.07
ELETRODUTO RGIDO DE SEO CIRCULAR,
DE PVC, ROSCVEL, CLASSE B, NO
PROPAGANTE CHAMA, TAMANHO NOMINAL
25MM, DE ACORDO COM AS NORMAS NBR
23.01.15 6150 E BS 4607
23.01.09 CD PLAYER COM CARROSSEL PARA 12 CDS
TUBULAO EM COBRE, RGIDO, PRPRIA
PARA INSTALAES DE CLIMATIZAO, DE
3/4", INCLUINDO CURVAS, ACESSRIOS,
SUPORTES E FIXAES NECESSRIOS A
20.05.08 INSTALAO
26.02.11 PAINEL DE EMERGNCIA
26.05.02 ACABAMENTO DAS GOLAS
20.05.02 JUNTA DE DERIVAO EM "T"
DISPENSER PARA TOALHA DE PAPEL
INTERFOLHADA CD. 30180225LALEKA
25.02.02 KIMBERLY-CLARK (OU EQUIVALENTE)
CABO ISOLADO EM PVC 0,6/1 KV - 70C UNIPOLAR BAIXA TENSO (SEO
TRANSVERSAL: 35,00 MM /
18.01.12 ENCORDOAMENTO: CLASSE 2)
PORTA DE MADEIRA SARRAFEADASEMI-OCA
DE 35mm , REVESTIDA EM AMBAS AS FACES
COM FOLHAS DE MADEIRA TIPO FREIJ
11.01.02 E=3mm, DIMENSO 2X (90X210)
21.01.17 ESGUICHO 1/2
LAVATRIO COM COLUNA SUSPENSA LINHA
CONFORTO REF.:L51, FAB. DECA (OU
25.01.05 EQUIVALENTE
INTERRUPTOR DIFERENCIAL RESIDUAL DR
TETRAPOLAR CORRENTE RESIDUAL 100MA,
18.01.32 CORRENTE NOMINAL 125A
PELICULA PARA VIDRO CONFORME MODELO
11.04.03 EXISTENTE
SUBSTRATO
(CAMADA
DE
0,15M
DE
28.02.01 PROFUNIDIDADE)
18.01.110 VERGALHO ROSCA TOTAL DE 1/4" X 3 M
EXAUSTOR DE AR VAZO 1150 M/H, 10 MM
C.A. INCLUINDO QUADRO DE FORA E
20.01.22 COMANDO ELTRICO
18.01.78 PORCA SEXTAVADA DE 1/4"
03.01.01 NIVELAMENTO
PINTURA ACRLICA COM MASSA PVA
TEXTURIZADA, COM ACABAMENTO
17.02.03 ACETINADO, COR BRANCO NEVE
UNID
60.00
7.37
23.50
30.87
1,852.08
257
40.09
0.04
95.58
M3
55.00
5.10
28.34
33.44
1,839.20
258
40.25
0.04
95.62
UNID
1.00
37.24
1,800.00
1,837.24
1,837.24
259
40.41
0.04
95.66
350.00
1.00
4.23
5.23
1,831.38
260
40.56
0.04
95.69
UNID
1.00
429.80
1,350.00
1,779.80
1,779.80
261
40.72
0.04
95.73
76.00
6.08
17.16
23.24
1,766.06
262
40.87
0.04
95.76
VB
1.00
501.10
1,250.00
1,751.10
1,751.10
263
41.03
0.04
95.80
VB
1.00
500.60
1,250.00
1,750.60
1,750.60
264
41.19
0.04
95.83
UNID
10.00
34.73
138.00
172.73
1,727.33
265
41.34
0.03
95.87
UNID
28.00
2.55
59.00
61.55
1,723.40
266
41.50
0.03
95.90
MTS
100.00
1.47
15.76
17.23
1,723.05
267
41.65
0.03
95.94
40.11
821.02
861.13
1,722.26
268
41.81
0.03
95.97
12.00
4.47
138.83
143.30
1,719.56
269
41.97
0.03
96.01
UNID
7.00
14.70
229.92
244.62
1,712.32
270
42.12
0.03
96.04
4.00
1.96
425.00
426.96
1,707.84
271
42.28
0.03
96.08
3.98
29.00
32.98
1,681.98
272
42.43
0.03
96.11
UNID
2.00
UNID
M2
51.00
M3
39.00
5.10
37.83
42.93
1,674.27
273
42.59
0.03
96.14
UNID
150.00
2.16
8.92
11.08
1,662.00
274
42.75
0.03
96.18
UNID
1.00
430.00
1,230.00
1,660.00
1,660.00
275
42.90
0.03
96.21
UNID
M3
1,200.00
120.00
0.66
0.72
1.38
1,659.84
276
43.06
0.03
96.24
13.60
0.00
13.60
1,632.00
277
43.21
0.03
96.28
200.00
3.73
4.37
8.10
1,619.84
278
43.37
0.03
96.31
UNID
2.00
252.98
550.00
802.98
1,605.96
279
43.53
0.03
96.34
12.00
11.76
122.00
133.76
1,605.12
280
43.68
0.03
96.37
VB
1.00
300.00
1,300.00
1,600.00
1,600.00
281
43.84
0.03
96.41
VB
1.00
500.00
1,100.00
1,600.00
1,600.00
282
43.99
0.03
96.44
UNID
40.00
2.45
37.36
39.81
1,592.24
283
44.15
0.03
96.47
UNID
2.00
203.00
580.00
783.00
1,566.00
284
44.31
0.03
96.50
VB
1.00
141.50
1,415.00
1,556.50
1,556.50
285
44.46
0.03
96.53
180.00
3.92
4.69
8.61
1,549.80
286
44.62
0.03
96.56
UNID
37.00
2.55
39.00
41.55
1,537.35
287
44.77
0.03
96.59
UNID
24.00
7.62
56.14
63.76
1,530.27
288
44.93
0.03
96.62
80.00
1.76
17.36
19.12
1,529.92
289
45.09
0.03
96.66
UNID
6.00
35.46
218.97
254.43
1,526.56
290
45.24
0.03
96.69
M2
22.01.01
1.00
350.00
1,170.00
1,520.00
1,520.00
291
45.40
0.03
96.72
9.00
11.76
156.51
168.27
1,514.43
292
45.55
0.03
96.75
UNID
M2
48.00
5.80
6.38
25.00
31.38
1,506.00
293
45.71
0.03
96.78
44.49
215.00
259.49
1,505.06
294
45.87
0.03
96.81
UNID
2.00
200.06
550.00
750.06
1,500.11
295
46.02
0.03
96.84
UNID
2.00
200.06
550.00
750.06
1,500.11
296
46.18
0.03
96.87
UNID
8.00
5.59
179.17
184.76
1,478.08
297
46.33
0.03
96.90
UNID
50.00
6.86
22.50
29.36
1,468.00
298
46.49
0.03
96.93
UNID
37.00
4.25
35.00
39.25
1,452.25
299
46.65
0.03
96.96
3.00
11.76
470.38
482.14
1,446.42
300
46.80
0.03
96.99
240.00
1.47
4.54
6.01
1,442.40
301
46.96
0.03
97.01
MS
18.00
0.00
80.00
80.00
1,440.00
302
47.11
0.03
97.04
UNID
60.00
5.49
18.50
23.99
1,439.28
303
47.27
0.03
97.07
M2
100.00
14.39
0.00
14.39
1,439.10
304
47.43
0.03
97.10
1.00
367.00
1,050.00
1,417.00
1,417.00
305
47.58
0.03
97.13
UNID
UNID
74/82
TABELA ABC
17.02.04
M2
156.00
2.52
6.51
9.03
1,408.26
306
47.74
0.03
97.16
UNID
120.00
6.57
4.90
11.47
1,375.92
307
47.89
0.03
97.19
UNID
150.00
2.12
7.00
9.12
1,367.52
308
48.05
0.03
97.21
1.00
500.00
850.00
1,350.00
1,350.00
309
48.21
0.03
97.24
MTS
100.00
1.47
11.97
13.44
1,344.00
310
48.36
0.03
97.27
230.00
0.98
4.83
5.82
1,337.54
311
48.52
0.03
97.29
234.00
1.47
4.24
5.71
1,336.14
312
48.67
0.03
97.32
VB
1.00
121.40
1,214.00
1,335.40
1,335.40
313
48.83
0.03
97.35
UNID
1.00
343.00
980.00
1,323.00
1,323.00
314
48.99
0.03
97.37
UNID
8.00
36.84
125.00
161.84
1,294.72
315
49.14
0.03
97.40
UNID
150.00
1.96
6.50
8.46
1,268.35
316
49.30
0.03
97.43
UNID
1.00
14.70
1,250.00
1,264.70
1,264.70
317
49.45
0.03
97.45
UNID
4.00
85.00
230.00
315.00
1,260.00
318
49.61
0.03
97.48
SUPORTE
VERTICAL
100 X
100 MM
GALVANIZADA A FOGO CONFORME NBR 6323
19.01.18
ADAPTER CABLE M8V CATEGORIA 5E ,
PINAGEM T568A COM 2,5 M, FABRICANTE
19.01.49 FURUKAWA OU EQUIVALENTE TCNICO.
26.03.04 PISO ANTI-DERRAPANTE
CABO ISOLADO EM PVC 0,6/1 KV - 70C UNIPOLAR BAIXA TENSO (SEO
TRANSVERSAL: 25,00 MM /
18.01.11 ENCORDOAMENTO: CLASSE 2)
ELETRODUTO RGIDO DE SEO CIRCULAR,
DE PVC, ROSCVEL, CLASSE B, NO
PROPAGANTE CHAMA, TAMANHO NOMINAL
25MM, DE ACORDO COM AS NORMAS NBR
22.01.15 6150 E BS 4608
TUBO PVC SOLD. MARROM INCL.CONEXOES
24.02.03 D=32MM(1')
20.06.04 VLVULAS DE COMANDO
EXAUSTOR DE AR VAZO 750 M/H, 8 MM C.A.
INCLUINDO QUADRO DE FORA E COMANDO
20.01.17 ELTRICO
23.01.10 COMPRESSOR DE VOZ CYGNUS
VB
800.00
0.10
1.43
1.53
1,222.40
319
49.77
0.02
97.50
UNID
2.00
194.10
415.00
609.10
1,218.20
320
49.92
0.02
97.53
UNID
71.00
2.13
15.00
17.13
1,215.88
321
50.08
0.02
97.55
UNID
2.00
150.85
450.00
600.85
1,201.70
322
50.23
0.02
97.57
VB
1.00
1,200.00
0.00
1,200.00
1,200.00
323
50.39
0.02
97.60
VB
1.00
0.00
1,200.00
1,200.00
1,200.00
324
50.55
0.02
97.62
UNID
20.00
11.97
48.00
59.97
1,199.30
325
50.70
0.02
97.65
84.00
9.80
4.36
14.16
1,189.18
326
50.86
0.02
97.67
UNID
600.00
0.45
1.50
1.95
1,167.88
327
51.01
0.02
97.69
200.00
0.59
5.76
1,152.69
328
51.17
0.02
97.72
UNID
19.00
15.62
5.17
45.00
60.62
1,151.78
329
51.33
0.02
97.74
UNID
5.00
29.40
199.57
228.97
1,144.84
330
51.48
0.02
97.76
UNID
6.00
12.75
175.00
187.75
1,126.50
331
51.64
0.02
97.79
4.00
13.83
267.04
280.87
1,123.50
332
51.79
0.02
97.81
UNID
4.00
50.00
230.00
280.00
1,120.00
333
51.95
0.02
97.83
1,105.00
25.02.03
18.01.23
26.05.01
250.00
1.96
2.46
334
52.11
0.02
97.85
UNID
3.00
105.05
263.28
368.33
1,104.98
335
52.26
0.02
97.87
UNID
7.00
33.00
123.19
156.19
1,093.33
336
52.42
0.02
97.90
UNID
4.00
62.72
206.00
268.72
1,074.88
337
52.57
0.02
97.92
150.00
1.65
5.50
7.15
1,071.96
338
52.73
0.02
97.94
UNID
7.00
15.99
136.65
152.64
1,068.49
339
52.89
0.02
97.96
VB
1.00
240.00
800.00
1,040.00
1,040.00
340
53.04
0.02
97.98
UNID
1.00
258.00
993.00
341
53.20
0.02
98.00
4.00
15.00
735.00
232.00
993.00
UNID
247.00
988.00
342
53.35
0.02
98.02
UNID
480.00
0.94
1.12
2.06
987.22
343
53.51
0.02
98.04
UNID
2.00
1.95
490.58
492.53
985.06
344
53.67
0.02
98.06
UNID
32.00
8.05
22.48
30.53
976.80
345
53.82
0.02
98.08
UNID
45.00
4.92
16.50
21.42
963.98
346
53.98
0.02
98.10
UNID
3.00
75.02
245.00
320.02
960.06
347
54.13
0.02
98.12
UNID
40.00
5.49
18.50
23.99
959.52
348
54.29
0.02
98.14
19.80
8.40
39.72
48.12
952.78
349
54.45
0.02
98.16
MTS
21.00
1.96
42.35
44.31
930.51
350
54.60
0.02
98.18
1.00
350.20
575.00
925.20
925.20
351
54.76
0.02
98.20
80.00
380.00
460.00
920.00
352
54.91
0.02
98.21
NAS
CONECTOR
REFORADO
EM
BRONZE
ESTANHADO PARA CONEXES ENTRE CABOS
18.04.16 DE 16MM A 70MM.
18.03.22 PRA-RAIO PARA 15KV - 6KA - POLIMRICO
18.04.21
UNID
4.42
VB
UNID
2.00
UNID
2.00
41.80
418.00
459.80
919.60
353
55.07
0.02
98.23
UNID
10.00
9.80
82.09
91.89
918.90
354
55.23
0.02
98.25
70.00
3.23
9.83
13.07
914.76
355
55.38
0.02
98.27
UNID
65.00
2.30
11.70
14.00
909.83
356
55.54
0.02
98.29
75/82
TABELA ABC
20.07.05 GRELHA MOD. VAT (825 X 165) MM
MISTURADOR DE UDIO DE 12 CANAIS COM
DUPLO MASTER E CHAVEAMENTO A 1 KHZ,
RESPOSTA DE FREQNCIA DE 50HZ A 13
23.01.02 KHZ, SEM CABO .
UNID
8.00
15.62
98.00
113.62
908.96
357
55.69
0.02
98.31
UNID
1.00
221.04
685.00
906.04
906.04
358
55.85
0.02
98.32
VB
M
1.00
3.20
200.00
700.00
900.00
900.00
359
56.01
0.02
98.34
7.84
273.32
281.16
899.71
360
56.16
0.02
98.36
UNID
1.00
68.60
825.00
893.60
893.60
361
56.32
0.02
98.38
UNID
110.00
0.98
7.03
8.01
881.10
362
56.47
0.02
98.40
RL
8.00
25.98
82.00
107.98
863.84
363
56.63
0.02
98.41
UNID
45.00
5.39
13.68
19.07
858.15
364
56.79
0.02
98.43
UNID
90.00
2.94
6.56
9.50
855.00
365
56.94
0.02
98.45
UNID
200.00
2.47
1.79
4.26
851.54
366
57.10
0.02
98.46
UNID
432.00
0.59
1.36
1.95
841.54
367
57.25
0.02
98.48
UNID
360.00
0.94
1.39
2.33
837.61
368
57.41
0.02
98.50
UNID
200.00
1.47
2.71
4.18
836.00
369
57.57
0.02
98.51
UNID
95.00
3.76
4.86
8.62
819.36
370
57.72
0.02
98.53
UNID
1.00
184.20
635.00
819.20
819.20
371
57.88
0.02
98.55
8.40
93.89
102.29
818.32
372
58.03
0.02
98.56
18.01.79
18.01.83
UNID
8.00
UNID
4.00
15.00
185.00
200.00
800.00
373
58.19
0.02
98.58
UNID
90.00
0.98
7.85
8.83
794.70
374
58.35
0.02
98.60
UNID
72.00
2.45
8.51
10.96
789.12
375
58.50
0.02
98.61
UNID
60.00
2.65
10.40
13.05
782.76
376
58.66
0.02
98.63
UNID
1.00
58.80
712.65
771.45
771.45
377
58.81
0.02
98.64
UNID
12.00
7.62
56.14
63.76
765.13
378
58.97
0.02
98.66
UNID
240.00
0.85
2.26
3.11
746.31
379
59.13
0.01
98.67
UNID
150.00
0.00
4.95
4.95
742.50
380
59.28
0.01
98.69
UNID
250.00
0.09
2.85
2.94
733.75
381
59.44
0.01
98.70
UNID
20.00
8.28
28.00
36.28
725.58
382
59.59
0.01
98.72
UNID
6.00
29.40
90.45
119.85
719.09
383
59.75
0.01
98.73
50.00
4.70
9.64
14.34
717.20
384
59.91
0.01
98.75
UNID
5.00
6.37
135.04
141.41
707.05
385
60.06
0.01
98.76
VB
1.00
200.29
500.00
700.29
700.29
386
60.22
0.01
98.77
UNID
2.00
1.96
346.30
348.26
696.52
387
60.37
0.01
98.79
23.20
11.34
18.05
29.39
681.78
388
60.53
0.01
98.80
UNID
12.00
8.63
47.45
56.08
672.93
389
60.69
0.01
98.82
UNID
900.00
0.44
0.31
0.75
670.77
390
60.84
0.01
98.83
UNID
19.00
0.00
35.00
35.00
665.00
391
61.00
0.01
98.84
16.00
11.35
30.05
41.40
662.39
392
61.15
0.01
98.86
50.00
1.20
12.00
13.20
660.00
393
61.31
0.01
98.87
UNID
50.00
4.90
8.30
13.20
660.00
394
61.47
0.01
98.88
60.00
1.47
9.42
10.89
653.58
395
61.62
0.01
98.90
UNID
2.00
34.30
289.94
324.24
648.48
396
61.78
0.01
98.91
22.00
1.47
27.97
29.44
647.68
397
61.93
0.01
98.92
UNID
8.00
19.60
60.93
80.53
644.24
398
62.09
0.01
98.93
UNID
1.00
21.25
620.00
641.25
641.25
399
62.25
0.01
98.95
UNID
1.00
21.25
620.00
641.25
641.25
400
62.40
0.01
98.96
UNID
1.00
21.25
620.00
641.25
641.25
401
62.56
0.01
98.97
267.00
0.98
1.37
2.35
627.45
402
62.71
0.01
98.99
UNID
60.00
2.45
8.00
10.45
627.00
403
62.87
0.01
99.00
3.00
11.76
195.00
206.76
620.28
404
63.03
0.01
99.01
76/82
TABELA ABC
18.01.81
UNID
1.00
53.90
563.02
616.92
616.92
405
63.18
0.01
99.02
MTS
100.00
0.98
5.18
6.16
615.65
406
63.34
0.01
99.04
VB
1.00
200.00
400.00
600.00
600.00
407
63.49
0.01
99.05
UNID
10.00
0.00
60.00
60.00
600.00
408
63.65
0.01
99.06
UNID
2.00
74.38
225.00
299.38
598.75
409
63.81
0.01
99.07
UNID
61.00
2.94
6.80
9.74
594.14
410
63.96
0.01
99.08
UNID
32.00
10.83
7.46
18.28
585.06
411
64.12
0.01
99.10
UNID
5.00
16.76
97.50
114.26
571.29
412
64.27
0.01
99.11
UNID
840.00
0.08
0.60
0.68
571.20
413
64.43
0.01
99.12
UNID
3.00
54.47
133.03
187.50
562.50
414
64.59
0.01
99.13
100.00
0.87
4.64
5.51
550.70
415
64.74
0.01
99.14
M2
15.00
6.50
30.00
36.50
547.50
416
64.90
0.01
99.15
70.00
1.00
6.77
7.77
543.80
417
65.05
0.01
99.16
UNID
3.00
0.00
180.00
180.00
540.00
418
65.21
0.01
99.17
UNID
36.00
2.94
11.89
14.83
533.88
419
65.37
0.01
99.18
M2
50.00
4.40
6.27
10.67
533.60
420
65.52
0.01
99.19
UNID
3.00
11.45
165.78
177.23
531.68
421
65.68
0.01
99.21
UNID
240.00
0.63
1.56
2.19
526.46
422
65.83
0.01
99.22
UNID
20.00
6.37
19.95
26.32
526.40
423
65.99
0.01
99.23
UNID
80.00
1.84
4.65
6.49
519.36
424
66.15
0.01
99.24
UNID
2.00
7.65
250.00
257.65
515.30
425
66.30
0.01
99.25
UNID
500.00
0.08
0.95
1.03
515.00
426
66.46
0.01
99.26
UNID
6.00
24.56
60.93
85.49
512.94
427
66.61
0.01
99.27
UNID
9.00
1.94
55.00
56.94
512.50
428
66.77
0.01
99.28
VB
1.00
0.00
500.00
500.00
500.00
429
66.93
0.01
99.29
UNID
2.00
64.00
185.00
249.00
498.00
430
67.08
0.01
99.30
UNID
1.00
98.00
395.00
493.00
493.00
431
67.24
0.01
99.31
MTS
18.00
1.47
25.63
27.10
487.80
432
67.39
0.01
99.32
UNID
840.00
0.08
0.50
0.58
487.20
433
67.55
0.01
99.33
UNID
8.00
1.96
55.00
56.96
455.68
434
67.71
0.01
99.34
UNID
14.00
6.38
25.00
31.38
439.25
435
67.86
0.01
99.35
KG
15.00
6.78
22.50
29.28
439.20
436
68.02
0.01
99.35
1.00
40.34
385.00
425.34
425.34
437
68.17
0.01
99.36
MTS
100.00
0.88
3.37
4.25
425.25
438
68.33
0.01
99.37
UNID
35.00
2.74
9.04
11.78
412.44
439
68.49
0.01
99.38
UNID
2.00
4.53
200.00
204.53
409.06
440
68.64
0.01
99.39
UNID
12.00
3.57
29.15
32.72
392.64
441
68.80
0.01
99.40
M2
75.00
0.82
4.36
5.18
388.50
442
68.95
0.01
99.40
UNID
180.00
0.98
1.13
2.11
379.80
443
69.11
0.01
99.41
UNID
1.00
39.20
338.17
377.37
377.37
444
69.27
0.01
99.42
UNID
30.00
2.94
9.50
12.44
373.20
445
69.42
0.01
99.43
UNID
1.00
85.75
285.00
370.75
370.75
446
69.58
0.01
99.43
UNID
100.00
0.87
2.80
3.67
366.60
447
69.73
0.01
99.44
UNID
30.00
1.59
10.53
12.12
363.69
448
69.89
0.01
99.45
UNID
20.00
2.45
15.60
18.05
361.00
449
70.05
0.01
99.46
UNID
12.00
6.08
23.34
29.42
352.99
450
70.20
0.01
99.46
VB
1.00
0.00
350.00
350.00
350.00
451
70.36
0.01
99.47
UNID
2.00
19.60
151.31
170.91
341.82
452
70.51
0.01
99.48
UNID
6.00
1.96
55.00
56.96
341.76
453
70.67
0.01
99.48
77/82
TABELA ABC
27.01.23 ASSENTO PREFERENCIAL
CURVA DE INVERSO 90 DE 150 X 100 MM
GALVANIZADA A FOGO CONFORME NBR 6323
19.01.03
ELETRODUTO DE PVC, CLASSE "A", COM
18.01.45 TAMANHO NOMINAL 50MM.
24.02.04 REGISTRO DE GAVETA BRUTO D=15MM (1/2')
UNID
4.00
3.19
80.00
83.19
332.75
454
70.83
0.01
99.49
UNID
6.00
12.74
42.00
54.74
328.44
455
70.98
0.01
99.50
UNID
30.00
1.47
9.42
10.89
326.79
456
71.14
0.01
99.50
UNID
20.00
4.90
11.29
16.19
323.80
457
71.29
0.01
99.51
UNID
5.00
3.92
60.00
63.92
319.60
458
71.45
0.01
99.52
318.80
459
71.61
0.01
99.52
UNID
40.00
1.47
6.50
7.97
UNID
50.00
1.84
4.50
6.34
317.10
460
71.76
0.01
99.53
UNID
14.00
2.55
20.00
22.55
315.70
461
71.92
0.01
99.54
UNID
9.00
0.00
35.00
35.00
315.00
462
72.07
0.01
99.54
UNID
1.00
28.52
282.00
310.52
310.52
463
72.23
0.01
99.55
UNID
3.00
7.84
95.00
102.84
308.52
464
72.39
0.01
99.55
108.00
0.98
1.86
2.84
306.72
465
72.54
0.01
99.56
UNID
8.00
3.19
35.00
38.19
305.50
466
72.70
0.01
99.57
UNID
2.00
1.95
150.00
151.95
303.90
467
72.85
0.01
99.57
19.01.06
UNID
90.00
1.29
2.08
3.37
303.71
468
73.01
0.01
99.58
UNID
1.00
0.00
300.00
300.00
300.00
469
73.17
0.01
99.59
UNID
6.00
10.89
39.00
49.89
299.36
470
73.32
0.01
99.59
18.01.29
UNID
15.00
11.74
7.86
19.60
293.93
471
73.48
0.01
99.60
30.00
2.94
6.83
9.77
292.97
472
73.63
0.01
99.60
UNID
13.00
2.13
20.00
22.13
287.63
473
73.79
0.01
99.61
KG
15.00
1.76
17.36
19.12
286.86
474
73.95
0.01
99.61
281.64
475
74.10
0.01
99.62
UNID
240.00
0.27
0.90
1.17
UNID
21.00
4.90
8.30
13.20
277.20
476
74.26
0.01
99.63
UNID
12.00
4.41
18.35
22.76
273.12
477
74.41
0.01
99.63
UNID
7.00
3.19
35.00
38.19
267.31
478
74.57
0.01
99.64
UNID
2.00
15.62
118.00
133.62
267.24
479
74.73
0.01
99.64
UNID
36.00
1.37
6.00
7.37
265.39
480
74.88
0.01
99.65
UNID
120.00
0.63
1.56
2.19
263.23
481
75.04
0.01
99.65
UNID
10.00
8.23
18.09
26.32
263.22
482
75.20
0.01
99.66
UNID
36.00
1.67
5.50
7.17
257.98
483
75.35
0.01
99.66
UNID
3.00
19.17
66.40
85.57
256.70
484
75.51
0.01
99.67
UNID
5.00
8.82
41.22
50.04
250.20
485
75.66
0.01
99.67
UNID
3.00
0.00
83.00
83.00
249.00
486
75.82
0.00
99.68
MTS
21.00
1.18
10.38
11.56
242.68
487
75.98
0.00
99.68
UNID
1.00
55.08
186.00
241.08
241.08
488
76.13
0.00
99.69
UNID
18.00
4.90
8.30
13.20
237.60
489
76.29
0.00
99.69
UNID
4.00
13.92
45.00
58.92
235.66
490
76.44
0.00
99.70
15.00
1.18
14.53
15.71
235.59
491
76.60
0.00
99.70
UNID
120.00
1.08
0.87
1.95
233.76
492
76.76
0.00
99.71
UNID
2.04
49.00
65.00
114.00
232.56
493
76.91
0.00
99.71
UNID
600.00
0.09
0.30
0.39
231.96
494
77.07
0.00
99.72
UNID
7.00
4.90
28.06
32.96
230.69
495
77.22
0.00
99.72
UNID
20.00
2.94
8.58
11.52
230.40
496
77.38
0.00
99.73
UNID
72.00
0.85
2.26
3.11
223.89
497
77.54
0.00
99.73
7.60
11.34
18.05
29.39
223.34
498
77.69
0.00
99.73
UNID
12.00
10.83
7.46
18.28
219.40
499
77.85
0.00
99.74
UD
1.00
24.50
189.50
214.00
214.00
500
78.00
0.00
99.74
UNID
20.00
1.96
8.60
10.56
211.20
501
78.16
0.00
99.75
UNID
18.00
2.18
9.53
11.71
210.72
502
78.32
0.00
99.75
UNID
2.00
6.54
95.38
101.92
203.84
503
78.47
0.00
99.76
UNID
8.00
0.00
25.00
25.00
200.00
504
78.63
0.00
99.76
UNID
1.00
15.00
182.30
197.30
197.30
505
78.78
0.00
99.76
UNID
2.00
3.49
95.00
98.49
196.97
506
78.94
0.00
99.77
UNID
3.00
7.62
56.14
63.76
191.28
507
79.10
0.00
99.77
UNID
5.00
3.19
35.00
38.19
190.94
508
79.25
0.00
99.78
UNID
5.00
3.19
35.00
38.19
190.94
509
79.41
0.00
99.78
UNID
3.00
14.70
48.00
62.70
188.10
510
79.56
0.00
99.78
UNID
25.00
0.97
6.50
7.47
186.80
511
79.72
0.00
99.79
78/82
TABELA ABC
ELETRODUTO RGIDO DE SEO CIRCULAR,
DE PVC, ROSCVEL, CLASSE B, NO
PROPAGANTE CHAMA, TAMANHO NOMINAL
25MM, DE ACORDO COM AS NORMAS NBR
18.04.01 6150 E BS 4607
TUBO PVC BRANCO P/ESGOTO D=40MM (1 1/2')
24.01.01 C/ ACESSRIOS
22.01.09 ADAPTADOR F / RCA
20.07.07 GRELHA MOD. VAT (325 X 325) MM
TERMINAL DE COMPRESSO PARA CABO 150
18.01.106 MM
SUPORTE L GALVANIZADA 1 1/2 X 1/4", FIXAR
18.03.25 PARA-RAIO
DISJUNTOR TRIPOLAR DE CAPACIDADE 50A,
18.01.36 CURVA C
FONTE DE ALIMENTAO DE 24 VOLTS AC 22.01.27 60 VA.
18.02.17 MASSA DE CALAFETAR
23.01.05 BASTES DE SILICONE
19.01.54 CONES DE IDENTIFICAO VERDE
27.01.06 PLACA DE COPA (PLACA TIPO 3)
DISJUNTOR MONOPOLAR DE CAPACIDADE
18.01.33 16A, CURVA B
TERMINAL DE COMPRESSO PARA CABO 240
18.01.107 MM
CABO COAXIAL BLINDADO E BALANCEADO
23.01.06 MARCA SANTO NGELO
JUNO INTEGRAL DE 100 X 50 MM
GALVANIZADA A FOGO CONFORME NBR 6323
18.01.53
ESPELHO TIPO CRISTAL 50x90CM (FORNECER
25.02.04 E INSTALAR 07 UNIDADES)
INTERRUPTOR DE EMBUTIR THREE-WAY
(TENSO: 250 V / CORRENTE ELTRICA: 10 A)
18.01.60
ELETRODUTO FERRO GALVANIZADO BITOLA
18.02.10 25MM
23.01.12 CURVA DE PVC RGIDO BITOLA 25 MM
MASTRO TELESCPIO 6M (3M X 2" + 3M X
18.04.18 1.1/2")
19.01.35 BUCHA DE ALUMNIO DE 25MM
PLACA DE SINALIZAO DESCIDA PELA
27.01.02 ESCADA N16 (PLACA TIPO 1)
INTERRUPTOR DE EMBUTIR 2 TECLAS
SIMPLES (TENSO: 250 V / CORRENTE
18.01.57 ELTRICA: 10 A)
FORNECIMENTO DE: MORIA BICOLOR
28.03.07 (DIETES BICOLOR)
GUIA DE CABOS HORIZONTAL DE 1U
19.01.42 FECHADO
REDUO CONCNTRICA DE 150X100 PARA
19.01.27 100X50
20.08.08 DUTO FLEXVEL
27.01.13 DEPENDNCIAS TCNICAS (PLACA TIPO 3)
18.03.14 GRAMPO DE LINHA VIVA PARA 6 A 2/0 AWG
35.00
1.00
4.23
5.23
183.14
512
79.88
0.00
99.79
51.00
1.18
2.40
3.58
182.38
513
80.03
0.00
99.79
UNID
20.00
0.27
175.42
514
80.19
0.00
99.80
2.00
15.62
8.50
70.00
8.77
UNID
85.62
171.24
515
80.34
0.00
99.80
UNID
27.00
1.27
5.00
6.27
169.40
516
80.50
0.00
99.80
1.00
39.20
130.00
169.20
169.20
517
80.66
0.00
99.81
UNID
2.00
9.31
75.00
84.31
168.62
518
80.81
0.00
99.81
UNID
1.00
32.14
135.00
167.14
167.14
519
80.97
0.00
99.81
KG
5.00
21.56
10.56
32.12
160.60
520
81.12
0.00
99.82
UNID
5.00
7.37
24.50
31.87
159.34
521
81.28
0.00
99.82
UNID
300.00
0.13
0.40
0.53
158.97
522
81.44
0.00
99.82
156.88
523
81.59
0.00
99.83
UNID
5.00
6.38
25.00
31.38
UNID
17.00
2.94
6.20
9.14
155.38
524
81.75
0.00
99.83
UNID
21.00
1.37
6.00
7.37
154.81
525
81.90
0.00
99.83
50.00
0.59
2.50
3.09
154.32
526
82.06
0.00
99.84
UNID
120.00
0.53
0.75
1.28
154.00
527
82.22
0.00
99.84
3.15
8.40
39.72
48.12
151.58
528
82.37
0.00
99.84
UNID
10.00
2.45
12.50
14.95
149.48
529
82.53
0.00
99.85
6.00
3.92
20.36
24.28
145.68
530
82.68
0.00
99.85
UNID
21.00
4.80
1.84
6.64
139.48
531
82.84
0.00
99.85
UNID
1.00
78.40
60.00
138.40
138.40
532
83.00
0.00
99.85
UNID
120.00
0.25
0.90
1.15
137.40
533
83.15
0.00
99.86
UNID
8.00
2.13
15.00
17.13
137.00
534
83.31
0.00
99.86
UNID
10.00
6.27
7.30
13.57
135.72
535
83.46
0.00
99.86
UNID
9.00
0.00
15.00
15.00
135.00
536
83.62
0.00
99.87
UNID
120.00
0.22
0.90
1.12
133.98
537
83.78
0.00
99.87
UNID
4.00
7.35
25.00
32.35
129.40
538
83.93
0.00
99.87
5.00
5.57
20.00
25.57
127.86
539
84.09
0.00
99.87
UNID
4.00
6.38
25.00
31.38
125.50
540
84.24
0.00
99.88
UNID
3.00
9.58
32.20
41.78
125.33
541
84.40
0.00
99.88
UNID
10.00
0.73
11.62
12.35
123.49
542
84.56
0.00
99.88
500.00
0.00
0.24
0.24
120.00
543
84.71
0.00
99.88
UNID
12.00
5.59
4.28
9.87
118.39
544
84.87
0.00
99.89
RL
12.00
2.35
7.50
9.85
118.22
545
85.02
0.00
99.89
UNID
240.00
0.22
0.27
0.49
117.31
546
85.18
0.00
99.89
UNID
4.00
29.16
0.00
29.16
116.64
547
85.34
0.00
99.89
116.63
548
85.49
0.00
99.89
UNID
150.00
0.18
0.60
0.78
UNID
3.00
3.19
35.00
38.19
114.56
549
85.65
0.00
99.90
UNID
3.00
3.19
35.00
38.19
114.56
550
85.80
0.00
99.90
UNID
15.00
1.70
5.68
7.38
110.76
551
85.96
0.00
99.90
UNID
1.00
9.80
107.95
552
86.12
0.00
99.90
UNID
1.00
15.62
98.15
92.00
107.95
107.62
107.62
553
86.27
0.00
99.91
UNID
120.00
0.25
0.64
0.89
107.38
554
86.43
0.00
99.91
UNID
21.00
3.23
104.87
555
86.58
0.00
99.91
UNID
1.00
15.62
1.76
86.00
4.99
101.62
101.62
556
86.74
0.00
99.91
UNID
18.00
1.18
4.22
5.40
97.13
557
86.90
0.00
99.91
UNID
1.00
22.10
75.00
97.10
97.10
558
87.05
0.00
99.92
UNID
60.00
0.37
1.20
1.57
94.08
559
87.21
0.00
99.92
UNID
18.00
2.25
2.97
5.22
94.03
560
87.36
0.00
99.92
UNID
2.00
1.09
45.00
46.09
92.19
561
87.52
0.00
99.92
UNID
4.00
1.96
21.04
23.00
91.98
562
87.68
0.00
99.92
19.01.19
UNID
20.00
1.05
3.50
4.55
90.93
563
87.83
0.00
99.93
UNID
2.00
0.00
45.00
45.00
90.00
564
87.99
0.00
99.93
UNID
1.00
4.90
85.00
89.90
89.90
565
88.14
0.00
99.93
M2
6.00
14.39
0.00
14.39
86.35
566
88.30
0.00
99.93
UNID
72.00
0.27
0.90
1.17
84.49
567
88.46
0.00
99.93
UNID
13.00
1.27
5.00
6.27
81.56
568
88.61
0.00
99.93
UNID
5.00
4.60
11.50
16.10
80.50
569
88.77
0.00
99.94
UNID
2.00
4.90
35.00
39.90
79.80
570
88.92
0.00
99.94
UNID
20.00
0.49
3.20
3.69
73.80
571
89.08
0.00
99.94
KG
2.00
8.33
28.00
36.33
72.66
572
89.24
0.00
99.94
UNID
3.00
5.57
18.50
24.07
72.21
573
89.39
0.00
99.94
79/82
TABELA ABC
T HORIZONTAL 100 X 50 MM GALVANIZADA A
FOGO CONFORME NBR 6323
19.01.28
UNID
4.00
2.45
15.60
18.05
72.20
574
89.55
0.00
99.94
UNID
40.00
0.84
0.95
1.79
71.55
575
89.70
0.00
99.94
2.40
11.34
18.05
29.39
70.53
576
89.86
0.00
99.95
UNID
50.00
0.66
0.72
1.38
69.16
577
90.02
0.00
99.95
UNID
15.00
1.08
3.50
4.58
68.67
578
90.17
0.00
99.95
UN
1.00
6.37
62.00
68.37
68.37
579
90.33
0.00
99.95
UNID
M2
6.00
4.20
6.98
11.18
67.08
580
90.48
0.00
99.95
260.00
0.26
0.00
0.26
66.30
581
90.64
0.00
99.95
UNID
21.00
1.27
1.84
3.11
65.39
582
90.80
0.00
99.95
KG
2.00
7.50
25.00
32.50
65.01
583
90.95
0.00
99.96
UNID
120.00
0.16
0.37
0.53
64.09
584
91.11
0.00
99.96
UNID
18.00
0.98
2.55
3.53
63.54
585
91.26
0.00
99.96
UNID
40.00
0.94
0.65
1.59
63.47
586
91.42
0.00
99.96
UNID
15.00
1.47
2.71
4.18
62.70
587
91.58
0.00
99.96
61.24
UNID
18.00
0.88
2.52
3.40
588
91.73
0.00
99.96
UNID
15.00
2.67
1.36
4.03
60.51
589
91.89
0.00
99.96
UNID
12.00
3.23
1.76
4.99
59.93
590
92.04
0.00
99.96
UNID
12.00
0.98
4.00
4.98
59.76
591
92.20
0.00
99.97
UNID
6.00
5.59
4.28
9.87
59.20
592
92.36
0.00
99.97
UNID
3.00
4.35
14.50
18.85
56.55
593
92.51
0.00
99.97
KG
2.00
6.47
21.63
28.10
56.20
594
92.67
0.00
99.97
UNID
1.00
12.74
42.00
54.74
54.74
595
92.82
0.00
99.97
UNID
21.00
0.78
1.79
2.57
54.05
596
92.98
0.00
99.97
UNID
50.00
0.94
0.09
1.03
51.34
597
93.14
0.00
99.97
UNID
3.00
2.03
15.00
17.03
51.08
598
93.29
0.00
99.97
UNID
1.00
11.76
38.00
49.76
49.76
599
93.45
0.00
99.97
UNID
6.00
1.47
6.80
8.27
49.62
600
93.60
0.00
99.97
UNID
1.00
11.56
38.00
49.56
49.56
601
93.76
0.00
99.98
M2
33.00
0.00
1.50
1.50
49.50
602
93.92
0.00
99.98
UNID
21.00
0.39
1.72
2.11
44.35
603
94.07
0.00
99.98
M2
44.00
0.00
1.00
1.00
44.00
604
94.23
0.00
99.98
UNID
6.00
1.47
5.80
7.27
43.62
605
94.38
0.00
99.98
UNID
3.00
3.15
10.50
13.65
40.94
606
94.54
0.00
99.98
UNID
3.00
3.15
10.50
13.65
40.94
607
94.70
0.00
99.98
UNID
36.00
0.44
0.68
1.12
40.23
608
94.85
0.00
99.98
M2
6.00
6.70
0.00
6.70
40.18
609
95.01
0.00
99.98
UNID
20.00
0.49
1.50
1.99
39.80
610
95.16
0.00
99.98
UNID
24.00
0.29
1.35
1.64
39.46
611
95.32
0.00
99.98
UNID
6.00
1.47
5.10
6.57
39.42
612
95.48
0.00
99.99
UNID
21.00
0.69
1.12
1.81
37.93
613
95.63
0.00
99.99
UNID
24.00
0.59
0.96
1.55
37.15
614
95.79
0.00
99.99
UNID
300.00
0.04
0.08
0.12
36.99
615
95.94
0.00
99.99
UNID
3.00
2.81
9.50
12.31
36.93
616
96.10
0.00
99.99
UNID
1.00
8.82
28.00
36.82
36.82
617
96.26
0.00
99.99
UNID
30.00
0.29
0.93
1.22
36.72
618
96.41
0.00
99.99
UNID
24.00
0.49
0.99
1.48
35.52
619
96.57
0.00
99.99
UNID
72.00
0.22
0.27
0.49
35.19
620
96.72
0.00
99.99
UNID
18.00
0.59
1.36
1.95
35.06
621
96.88
0.00
99.99
UNID
1.00
7.57
26.50
34.07
34.07
622
97.04
0.00
99.99
UNID
6.00
1.86
3.59
5.45
32.71
623
97.19
0.00
99.99
UNID
1.00
6.38
25.00
31.38
31.38
624
97.35
0.00
99.99
UNID
2.00
3.60
12.00
15.60
31.20
625
97.50
0.00
99.99
UNID
50.00
0.20
0.42
0.62
30.80
626
97.66
0.00
100.00
UNID
2.00
6.76
7.86
14.62
29.24
627
97.82
0.00
100.00
UNID
1.00
6.86
21.50
28.36
28.36
628
97.97
0.00
100.00
M2
1.00
3.50
22.50
26.00
26.00
629
98.13
0.00
100.00
UNID
3.00
1.96
6.26
8.22
24.66
630
98.28
0.00
100.00
UNID
18.00
0.80
0.45
1.25
22.42
631
98.44
0.00
100.00
UNID
360.00
0.00
0.05
0.05
18.00
632
98.60
0.00
100.00
UNID
2.00
5.10
2.85
7.95
15.89
633
98.75
0.00
100.00
UNID
3.00
3.23
1.76
4.99
14.98
634
98.91
0.00
100.00
M2
9.00
0.00
1.50
1.50
13.50
635
99.06
0.00
100.00
UNID
3.00
3.43
0.65
4.08
12.24
636
99.22
0.00
100.00
UNID
1.00
2.65
8.50
11.15
11.15
637
99.38
0.00
100.00
UNID
9.00
0.67
0.28
0.95
8.51
638
99.53
0.00
100.00
UNID
2.00
0.98
2.76
3.74
7.48
639
99.69
0.00
100.00
19.01.10
80/82
TABELA ABC
SADA HORIZONTAL P/ ELETRODUTO 50MM
GALVANIZADA A FOGO CONFORME NBR 6325
19.01.20
UNID
1.00
1.65
5.50
7.15
7.15
640
99.84
0.00
100.00
UNID
4.00
0.69
0.85
1.54
6.14
641
100.00
0.00
100.00
TOTAL
4,980,378.01
BDI (25%)
1,245,094.50
6,225,472.51
81/82
FONTES
PODER JUDICIRIO
JUSTIA FEDERAL NA PARABA
SEO DE LI CI TAES E CONTRATOS
EDI TAL DE LI CI TAO M ODALIDADE CONCORRNCIA - N 01/2008
ANEXO I X ORAMENTOS ESTIM ADOS EM PLANILHAS DE QUANTI TATIVOS E PREOS UNI TRIOS, COM POSIO UNI TRIA
DE CUSTOS E TABELA ABC
* INFORMATIVO SBC
* REVISTA PINI
* FORNECEDORES LOCAIS
* TABELA SINAPI
Pgina 82