GLOG – BE QUADRO DE DISPONIBILIDADE DIÁRIA 20 DE MARÇO 11:00 Z

H CÉL. / HORAS TÉRMINO PRÓXIMA INSPEÇÃO DURAÇÃO DA


ANV SITUAÇÃO OBSERVAÇÃO INÍCIO
POUSO DISP. PREVISTO (DATA PREVISTA) PRÓX. INSP.
C-97 10.478:30 ANV REALIZANDO INSP. PROG. 4Y E 22-2L (29/04/23) – (H) 02 DIAS
67:40 II 06/03/23 05/04/23
2017 7.840 PINTURA DAS SEMI ASAS. Y (07/03/24) – (C) 16 DIAS
C-95BM 19.249:45 65-H1 (28/07/23) – (H) 02 DIAS
100:15 II ANV REALIZ. INSP. PROG. 3-8S + 27M 28/11/22 24/04/23
2300 19.832 3-A (26/12/23) – (C) 20 DIAS
C-95CM 11.597:30 20-H2 (24/06/23) – (H) 05 DIAS
102:30 DI ------------------ -------- -------------
2340 11.779 18-M (16/12/23) – (C) 15 DIAS
04 DIAS APÓS 65-H1 (03/08/23) – (H) 02 DIAS
C-95BM 19.182:50 03 AIFP (ESTIMADA DE CHEGADA DO
150:00 IS 01/02/23 CHEGADA
2344 16.920 MATERIAL EM 10/04/23) 9-A (26/08/23) – (C) 75 DIAS
DOS ITENS
ID 5-15-0A+BM100 (20/07/23) – (H)
30 DIAS APÓS 02 DIAS
C-98A 12.355:50 31 AIFP (ESTIMADA DE CHEGADA DO
82:50 IS 23/08/19 CHEGADA ID 5-15-03 (28/03/23) – (C) 03DIAS
2726 11.620 MATERIAL EM 10/05/23)
DOS ITENS INSP2 - 12M (01/04/23) – (C) 01 DIA
ID5-15-06 (1600H) + 3800FH (26/03/23) - (H) 03 DIAS
C-98A 6.610:45 14:25 DI ------------------ -------- ------------- ID 5-15-12 (09/04/23) – (C) 01 DIAS
2728 6.683 INSP2 - 12M (12/08/23) – (C) 01 DIA
ID 5-15-06 +1600FH (30/07/23) – (H) 03 DIAS
C-98A 5.997:55 ANV COM HORA DE CÉLULA RESTRITA
39:15 DI -------- ------------- ID 5-15-02/10/11/12/21/22 (23/03/23) – (C) 09 DIAS
2729 6.625 A 6006:05, DEVIDO À BLEED DO MOTOR
INSP2-12M (25/04/23) – (C) 01 DIA
ID5-15-0A+ 1200FH (17/04/23) – (H) 04 DIAS
C-98A 5.158:55 50:40 DI ------------------ -------- ------------- 5-15-07/08 (11/08/23) (C) 03 DIAS
2731 4.037 INSP 1 - 30M (17/06/23) – (C) 01 DIA
07 DIAS APÓS ID5-15-0A + 600FH (14/06/23) – (H) 02 DIAS
C-98A 2.914:10 04 AIFP (ESTIMADA DE CHEGADA DO
72:10 IS 14/02/23 CHEGADA ID5-15-01/02/07/09/10/11/20/21/22 (12/11/23) – (C) 16 DIAS
2739 3.829 MATERIAL EM 31/03/23)
DOS ITENS INSP2-12M (14/04/23) – (C) 01 DIA
P-95BM 13.924:15 06 AIFP (ESTIMADA DE CHEGADA DO
06 DIAS APÓS 24-H2 (25/05/23) – (H) 05 DIAS
150:00 IS 01/02/23 CHEGADA
7100 11.246 MATERIAL EM 10/04/23)
DOS ITENS 6-A (02/09/23) – (C) 20 DIAS
ANV COM HORA DE CÉLULA RESTRITA 2-6S (15/04/23) – (H) 60 DIAS
P-95BM 10.720:15 A 10.824:25, DEVIDO À CT DISK DO
77:50 DO -------- -------------
7105 8055 MOTOR ESQUERDO. 18-M (14/06/23) – (C) 15 DIAS
(S1 INOPERANTE)
40 DIAS APÓS 25-H1 (29/10/24) – (H) 02 DIAS
P-95BM 7.194:55 19 AIFP (ESTIMADA DE CHEGADA DO
150:00 IS 06/01/20 CHEGADA
7109 4.979 MATERIAL EM 10/07/23) 3-A (07/05/23) – (C) 20 DIAS
DOS ITENS
DI- disponível / DO – disponível não completamente operacional / IS – indisponível por suprimento / II - indisponível por inspeção programada / IN – indisponível por manutenção não programada/ ITR -
indisponível por transporte. OBS: Os PJT’s C-95/P-95 admitem uma flexibilidade de ±50h ou 30d nas inspeções, de acordo com BT AF 04-1056 C-95 156. H – HORÁRIA / C – CALENDÁRICA