Escolar Documentos
Profissional Documentos
Cultura Documentos
MASCHINEN GMBH
ESTROMAT 850
Operators Manual
CONTENTS Page
List of contents..................................................................................................................... 2
Preface................................................................................................................................. 3
- General ................................................................................................................... 6
- Staff selection and qualification .............................................................................. 6
- Safety instructions for certain operating phases..................................................... 7
- Special work while using the machine .................................................................... 7
- References to special types of danger ................................................................... 7
- Machines for mobile use......................................................................................... 8
- Regulations for pressure vessel ............................................................................. 8
Description ........................................................................................................................... 9
Date: 17.05.2004
ESTROMAT 850, Operating instructions page 3 of 24
PREFACE
Before starting your new ESTROMAT 850, please read the operating and safety instructions
carefully and familiarize yourself with all functions, safety devices and perfect handling of the
machine.
The ESTROMAT 850 has been designed according to latest engineering standards and has
been assembled and subjected carefully to exhaustive functional checks.
However, careful maintenance and correct operation is essential for long life and constant
readiness of your ESTROMAT 850.
Please send the completed guarantee claim card which was handed over to you at
completion of purchase to the manufacturer in order to obtain benefit of the full guarantee.
In case of faults, need of spare parts or customer service requests, please address to your
UELZENER dealer or directly to the manufacturer
To protect you from loss of guarantee and damage due to faulty or unsuitable spare parts,
please use original UELZENER wear and spare parts only.
These operating instructions should make it easier for you to get to know the machine and to
make use of it according to the regulations. The operating instructions contain important
information on operating the machine safely, correctly and economically. Observance of
these notes helps you to avoid danger, to reduce repair costs and downtimes and to increase
the reliability and lifetime of the machine.
The operating instructions have to be available constantly at the place where the machine is
in use.
The operating instructions and in particular the general safety regulations have to be read
and observed by every person who is authorized to work with/on the machine, e. g.
Apart from the operating instructions and the mandatory regulations on accident prevention
applying in the user country and at the place of use, the recognized technical rules for
working safely and correctly must also be complied with, e. g. in Germany the
"Sicherheitsregeln für Mörtelpumpen und Mörtelspritzmaschinen des Fachausschusses BAU
(FA-BAU) der Bauberufsgenossenschaft" (Safety rules for mortar pumps and mortar spraying
machines of the Building Technical Committee (FA-BAU) of the Building Trade Association).
We wish you success and best results with your new UELZENER machine.
Your
The following terms or symbols are used for particularly important statements in the
operating instructions:
WARNING:
- Do not operate the machine before the operator's manual has been read!
The machine has been built according to latest engineering standards and recognized safety
engineering rules. Nevertheless danger to life of the user or third persons or impairments of
the machine and other material values can arise in its use. (1.2.1)
Use the machine only in a technical perfect condition as well as in accordance with
regulations. Please be conscious of safety and danger observing carefully the operating
instructions! Rectify (or have rectified) without delay in particular faults which can impair
safety! (1.2.2)
The machine is designed primarily for mixing and conveying refractory materials. Any other
use such as for conveying molding sand or concrete is not considered to be in accordance
with the regulations. The manufacturer/supplier is not liable for any damage resulting from
improper use. In this case the user alone bears all risks.
Use according to regulations also implies compliance with operating instructions, inspection
and maintenance conditions. (1.2.3)
ESTROMAT 850, Operating instructions page 5 of 24
General
Keep the operating instructions constantly at the place of use of the machine (in the tool
compartment or the container provided for them!) (1.3.1)
Give and observe generally legal and other mandatory regulations on accident prevention and
environment protection supplementary to the operating instructions! (1.3.2)
Check safety and danger conscious work of the staff in regard to the operating instructions at
least occasionally! (1.3.5)
Use personal protection equipment, if necessary or required by safety regulations! (1.3.7)
Observe all safety and danger instructions on the machine! (1.3.8)
Keep all safety and danger instructions at/on the machine in legible condition! (1.3.9)
In case of relevant safety changes of the machine or of its operating behaviour, stop the
machine immediately and report the fault to the responsible department/person! (1.3.10)
Do not perform any modifications, attachments and conversions to the machine which could
impair safety without agreement of the supplier! This also applies for the installation and the
adjustment of safety devices and valves as well as for welding onto load-bearing parts.
(1.3.11)
Spare parts must correspond to the technical requirements determined by the manufacturer!
This is always guaranteed by original spare parts! (1.3.12)
Normal Operation
Ensure that the machine only is operated in a safe and good condition! (1.5.1.2)
Before starting work, familiarize yourself with the working environment. The working
environment includes for instance obstructions in the working and traffic area, load bearing
capacity of the ground and necessary safety barriers which separate the site from the public
traffic area. (1.5.1.4)
In case of breakdowns stop and secure the machine immediately! Ensure that faults will be
removed without delay! (1.5.1.4.)
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 6 of 24
Strictly observe guidelines regarding setting, maintenance, inspection work as well as deadlines
mentioned in the operating instructions including information on the exchange of parts of the
equipment! Only skilled staff is allowed to do this work! (1.5.2.1)
To avoid danger, fasten single parts and large subassemblies carefully to hoists in case of
exchange! Only use suitable and technically perfect hoists as well as load suspension gear
with sufficient load capacity! Do not stay or work beneath hanging loads! (1.5.2.6)
Only experienced persons should be allowed to sling loads and instruct crane drivers! This
person has to be in the sight of the crane driver or has to be in speech contact with him!
(1.5.2.7)
Specified intervals for recurrent tests/inspections or periods stated in the operating instructions
must be strictly observed! (1.3.15)
Appropriate workshop equipment is absolutely necessary for maintenance and repair work!
(1.3.16)
Electric System
Work on electric systems or plants may only be done by an electrician or by instructed persons
under guidance or supervision of an electrician according to the electro technical rules!
(1.6.1.2)
Test/Inspect the electric equipment of the machine regularly! Remove defects such as loose
connections or scorched cables immediately! (1.6.1.4)
Pneumatic System
Only skilled persons with special knowledge and experience in hydraulics are allowed to work
on the hydraulic equipment! (1.6.3.1)
Check all lines, hoses and screw fittings regularly for leaks and externally detectable damage!
Remove damage without delay! (1.6.3.2)
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 7 of 24
Isolate the machine from any external power supply even on minor change of location! Connect
the machine to the power supply properly before putting it into operation again! (1.7.8)
When loading, only use hoists and load suspension gear with sufficient load capacity! (1.7.1)
When putting the machine into operation again, only proceed according to operating
instructions! (1.7.9)
The ESTROMAT 260-600 is equipped with legal authorized safety devices for pressure
vessels.
The vessel has been subjected to a construction and pressure test in accordance with the
regulations for pressure vessels. Before first start-up of the machine, it is necessary to notify the
supervisory organization.
According to the currently valid regulations for pressure vessels, the vessel has to be subjected
to an internal test every 2 years and to a pressure test by an expert every 5 years.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 8 of 24
DESCRIPTION
The ESTROMAT 850 has been designed especially for processing dry refractory building
materials.
- frame
- vessel
- mixer with drive
- air armature
- water tank with armature
- electric control
The right water quantity for one mixture flows via the water armature in the water tank. From
there water is added, if required, via a ball valve R 2" to the refractory material.
The mixing vessel is air tightly closed by a cover with an eccentric lever. After closing the air
valve, open the main air valve. In the mid position of both valves for upper air and accelerator,
slug conveying starts and blows vessel content through conveying hose in approx. 2-3 min. to
the site.
As special equipment we offer a small compressed air ball vibrator for the charging hopper.
When required this vibrator will be operated through a ball valve to facilitate the dropping of dry
material from charging hopper into vessel.
As further additional equipment, we have a heatable water tank which heats the water for the
material mixture. Due to the heating of the water, in case of low outdoor temperature, several
refractory materials can be mixed much easier. The heating power/water heating can be directly
adjusted at a heat valve at the heaters. The heating is turned on at a separate control box
situated on the left side below water tank.
A fully automatic central lubricating system lubricates the two mixing shaft bearings every 3
hours or at every re-starting. The level control in the grease container has to be checked
manually.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 9 of 24
The blow back device is useful for mixing quality and to prevent stoppers at vessel outlet.
Unmixed material which is placed at vessel outlet during filling of vessel will be removed and
fed into the vessel.
Before filling the vessel, the vessel outlet is closed by a squeeze valve. The squeeze valve
should only be admitted with 2 bar, as otherwise the rubber sleeve will be destroyed. Air is
permanently blown into the vessel outlet through a by-pass line (optional) with adjustable air
capacity. This prevents that the dry material gets stuck into the vessel outlet during mixing.
After vessel filling (mixing process is still running), vessel cover has to be closed while air relief
valve has to stay opened. Add compressed air into accelerator for a short while (approx. 3
sec.), so that unmixed material will be blown back from vessel outlet into vessel. This procedure
guarantees a continuous mixture of the whole material and avoids material stoppers.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 10 of 24
*) depending on mixture, conveying distance, compressed air connection and run of conveying hose
line as well as on diameter of conveying hose
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 11 of 24
Set up of machine
1. Machine must be set up horizontal and secured against tilting, as close as possible to the
place of material use. If necessary, suitable timber beams (no stones or iron plates) have
to be placed underneath skid frame of machine in order to guarantee that machine stands
stable.
2. Connect power supply cable (see Technical Data) to machine and socket. Socket should
be fused with (see Technical Data) slow blow.
3. Connect power supply cable. Adjust correct direction of rotation of mixer shaft using
reversing switch (looking on motor fan hood: clockwise).
Red signal lamp : wrong direction of rotation
Green signal lamp : ready for operation
4. Connect compressed air hose R 1 1/2" free of bends to inlet coupling of air armature.
Compressed air connection required: min. pressure of 6 bar,
max. of 8 bar
min. quantity of 5 m3/min.
5. Connect water supply. Connect water hose DN 25 free of bends to water armature.
Water pressure required : min. of 3 bar
Required water quantity is adjusted at black outer ring of water meter.
6. Run mortar conveying line. It is absolutely necessary that mortar conveying line runs free
of bends, on the shortest way to place of use. Pay attention to perfect cleanliness of
couplings when connecting hoses.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 12 of 24
Further checks:
The air vibrator is switched on and off at the ball valve 1/2" situated in front of the air armature
of the vessel.
The heating is switched on with a main switch at a separate control box, connection 516/6h. A
green signal lamp indicates that the heating is switched on. The higher the heat valve at the
heating is adjusted (adjustment value at works: 60• C• ), the faster the water is heated for the
next batch.
The automatic lubricating unit is controlled by a time lag relay (K2T). The bearings of the mixing
shaft are greased all 3 hours (adjustment at works). Observe that the tank of the unit is always
filled with lubricants.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 13 of 24
5. Fill vessel with dry material and water. We recommend filling vessel in the following
sequence:
50 % of dry refractory material
100 % of required water
50 % of dry refractory material
During filling process water must run from tank into vessel.
6. Test material consistency visually. Mixing process ends after approx. 3 minutes.
7. Swivel charging funnel away, close vessel cover and lock eccentric cover lever.
9. Open main air valve completely and lower air valve one half.
10. Immediately afterwards, open upper air valve until material is conveyed. Observe vessel
pressure!
11. If vessel pressure rises above 6 bar, close upper air valve a little bit. If vessel pressure
drops during vessel emptying below 2 bar, close lower air valve until required vessel
pressure is reached. During conveying process, pressure of vessel is between 2,5 and 6
bar, depending on conveying distance.
12. If vessel pressure drops below 1 bar towards the end of material conveying, close main air
valve slowly and terminate material conveying.
NOTE: There is a risk of material segregation towards the end of conveying process
because of high conveying speed. Therefore, never blow conveying line
completely empty (required for cleaning only).
13. Open air release valve on vessel cover and let residual pressure escape.
NOTE: When vessel cover is opened, moisture mist can rise. This does not imply a
fault!
15. To carry on work act like described in Item 4 etc. From now on conveying is controlled by
the main valve only. If conveying line is rerouted or consistency of material is changed,
upper and lower air has to be readjusted as described above.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 14 of 24
5. Close vessel outlet by turning the red-marked air valve of blow back device, open before
the main air valve. Details concerning blow back device: look page 9 "blow back device".
6. Fill vessel with dry material and water. We recommend filling vessel in the following
sequence:
50 % of dry refractory material
100 % of required water
50 % of dry refractory material
During filling process water should run from tank into vessel.
7. Test material consistency visually. Mixing process ends after approx. 3 minutes.
8. Open lower air valve of accelerator for a short while to effect blowing back of material into
vessel.
9. Swivel charging funnel away, close vessel cover and lock eccentric cover lever.
11. Open vessel outlet (squeeze valve) by turning red lever of ball valve of blow back device.
13. Open upper air valve immediately afterwards until material is conveyed. Observe vessel
pressure!
14. If vessel pressure rises above 6 bar, close upper air valve a little bit. If vessel pressure
drops during vessel emptying below 2 bar, close lower air valve until required vessel
pressure of 2,5 - 6 bar (according to conveying distance) is reached.
15. If vessel pressure drops below 1 bar towards the end of material conveying, close main air
valve or upper and lower air valve slowly and terminate material conveying.
NOTE: There is a risk of material segregation towards the end of conveying process
because of high conveying speed. Therefore, never blow conveying line
completely empty (required for cleaning only).
16. Open air release valve on vessel cover and let residual pressure escape.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 15 of 24
NOTE: When vessel cover is opened, moisture mist can rise. This does not imply a
fault!
19. To carry on work act like described in Item 4 etc. From now on conveying is controlled by
the main valve only. If conveying line is rerouted or consistency of material is changed,
upper and lower air have to be readjusted as described above.
WORK BREAKS
Mixing vessel and conveying line have to be emptied completely before work breaks in order to
avoid faults when restarting.
In addition, clean off mortar stuck to mixing vessel and conveying line before long breaks.
CAUTION: Always disconnect power supply cable before cleaning the vessel with
water. Never put your hand or any objects in the vessel while machine is
running. Risk of injuries!!!
To clean the conveying line, disconnect hose at machine, put a sponge ball into conveying line
and reconnect hose. Then fill vessel with water, close vessel cover, open main valve, upper air
valve and lower air valve. The sponge ball pushes water and dirt out off the hose just like a
piston.
CAUTION: Water, mortar residues as well as sponge ball emerge from end of hose with
considerable speed!
CAUTION: Even trained staff working every day on the machine has to read and
observe daily the "operating instructions in brief" because of safety reasons!
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 16 of 24
ENTER 0043.0
0–9 …
1.1 ź (centric key) for example. 004<0>0 change digit (YES / NO)
1.2 Ÿ (left key) for example 0040.9 ľ set numeric value (0-9)
2. ENTER
Enter enable OK J/N J = YES
3. ENTER
Enter start f. example 0029.0
0040.9 water dosing running
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 17 of 24
WARNING: During all work on the machine, ensure that power supply cable is disconnected
from socket connection. Work on the electrical equipment may only be performed
by electricians!
DAILY WORK
WEEKLY WORK
1. The two lubricating nipples of eccentric cover lever have to be greased weekly!
2. Check mixing chamber for wear and change mixing blades/arms, flat seals etc., if
necessary.
MONTHLY WORK
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 18 of 24
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 19 of 24
ESTROMAT 850
Operating instructions in brief
SET UP OF MACHINE
1. Choose shortest way for material conveying and run as far as possible vertically upwards
from machine. Secure hose well with hose hooks.
5. Connect power supply cable. Adjust correct direction of rotation of mixer shaft on reversing
switch (looking on motor fan hood: clockwise)
Red signal lamp : wrong direction of rotation
Green signal lamp : ready for operation
7. Adjust wanted water quantity by turning water meter needle. The set quantity flows into
tank by pushing "AUTO ON". Water inflow can be stopped by pushing "AUTO OFF
MANUAL". Pushing this button longer, water is still allowed to flow in.
11. Close cover and eccentric lever. Close air release valve.
During conveying
If vessel pressure remains below 2 bar, close lower air valve partially, until 2,5 - 6 bar
(depending on conveying distance) vessel pressure is reached. If vessel pressure rises above 6
bar, close upper air valve partially.
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
ESTROMAT 850, Operating instructions page 20 of 24
End of conveying
Grease at least daily the 2 bearing lubricating nipples and lubricating nipple on eccentric cover.
For operation check, let safety valve blow off once daily by turning valve head.
After the end of work, thoroughly clean the machine and remove mortar residues.
Check space between blade and vessel wall: up to 10 mm grain size approx.
13 mm space, larger grain size approx. 20 mm space.
Faults
J:\GL\TechDokumente\TECH5\260-600\BA-FRZ.wpd
F1 P2
125A aM A +24V=
1 3 5
Q2
SO
NOT-AUS
PKZM0-0,6 Emergency-stop
0,5A Arret de urgence
2 4 6
F4
2 4 6
K3M T2 2A
S1 L1 L2 L3
125A 1 3 5 1 3 1 3 220 V
Wendeschalter 24V
Reverse switch 1 3 5 K1M P1 =
Inverseur de courant 2 4 6 2 4 2 4
Inversor de corriente K5M M169x2
Hauptschalter
2 4 6 Main switch
Interrupteur principal
Interruptor principal 0V=
Q1 F2
150A 1 3 5 P3-100
PE
L1 L2 L3 N PE
X1 1 2 3 4 5 6 7 8
5125/9h
Einspeisung
Power supply
Alimentation
Alimentacion U1 V1 W1 W2 U2 V2
220V ±5 % 3 N PE AC 50/60 Hz M1
+
U1 W2
V1
M U2
W1
3 V2 3x
95
S3
H1 Aus 22
OFF
F2 96 Arret
H2 K Paro 13 13
N
S2 K1M
T1 T2 A2 Ein 14 14
On
11 Marche
P1 Marcha
44 14 44 17 17 13
12 14 K9
7 8
14 12
K1M K3M K5M K1T K1T K5M
43 13 43 18 28 14
11
22 22
Sensor de temperatur
Temperatur sensor
K5M 21
K3M 21
Sondes PTC
Thermofilter
H1 H2 H7
A1 A1 A1 A1
* Option
rot gruen rot h
red green red K1T K1M K3M K5M weiss
rouge vert rouge white
ETR4-51 A2 A2 A2 A2 blanc
rojo verde rojo
0V 7 sec. blanco 0V=
Compteur d´heures de
Betriebsstundenzähler
Moteur en marche
Motor in operation
Working hour meter
Motor en Marcha
functionnement
sens de rotation incorrect
Motor laueft
Reloj horario
Wrong sens of rotation
Reja Habierta
Grille ouvert
En Marcha
Sieb offen
Giro falso
Marche
Bl. 2/3
2012
Gez.
Tag
12.06
Name
Funke Artikel Nr. UELZENER MASCHINEN GMBH E 850
Gepr.
Norm.
850.55.001.8 Sulzbach / Ts Gr. 55 Pos. 001
Datum Name Art der Aenderung
Schaltplan 220 V/60Hz
Rev. A
Rev. B Wiring diagram
C-3070q
Rev. C Schema electrique CAD: M:\. \E850\Elektro\..\C-3070i.dft
Rev. D Esquema electrico Urspr. C-3070e2.dft
Rev. E Ers.fuer
Rev. F Freimasstoleranz Das Urheberrecht an dieser Zeichnung verbleibt bei uns. Ers.durch
1:1
Diese Zeichnung darf weder kopiert noch Dritten zugaenglich
Rev. G gemacht oder anderwertig missbrauchlich benutzt werden. Massstab
24V=
Wasser-
vorlauf
8025 S8 13
10
12 13
14
Rel 1
8
*
7
6
P2 A1
5
4
H8
10 11
3
Rel 2
Ajouter de la graisse
15
2
A2
K2T
1
SENSOR
Refill grease
16
Fettmangel
4 3 2 1
9 10 11 12 13 14 15 16 17 18 23 24
1 2 3 4 5 6
Klemmkasten
Terminal box
boîte de bornes ** Option für
Maschine mit
Hebelsieb
1 2 1 3
1 2
Schwarz
Braun
Blau
1 2 3
Y5
Y2
L L
Magnetventil Schmierung Fettmangelschalter Bilomatic
Solenoid lubrific Switch Lack of Lubricant Bilomatic
Electrovanne pour lubrification
P3 valvula electromagnetica de engrase
Hall Sensor 8030 Wasser Naeherungsschalter am Sieb Näherungsschalter am Trichter Nur bei Maschinen mit Zentralschmierung
PNP Ausgang Water Limit switch at sieve Limit switch at funnel Only for mashines with lubrification
PNP exit Dïeau Detecteur de proximite Detecteur de proximite trémie Machines avec graissage central
Detector de proximacion Detector de proximacion Unicamente para maguinas con engrase central
PNP Agua
24V
Blatt 3/3
2012
Gez.
Tag
12.06.
Name
Funke Artikel Nr. UELZENER MASCHINEN GMBH E850
Gepr.
Norm.
850.55.001.8 Sulzbach / Ts Gr. 55 Pos. 001
Datum Name Art der Änderung
Schaltplan 220V/60Hz
Rev. A
Rev. B
C-3070q
Rev. C
Wiring diagram CAD: M:\. \E850\Elektro\..\C-3070i.dft
Rev. D Schema electrique Urspr. C-3070e3.dft
Rev. E Esquema electrico Ers.für
Tolerierung nach Allgemeintoleranzen Das Urheberrecht an dieser Zeichnung verbleibt bei uns. Ers.durch
Diese Zeichnung darf weder kopiert noch Dritten zugaenglich
DIN ISO 8015 DIN 7168-m T S, DIN 8570 T1 B / T3 F gemacht oder anderwertig missbrauchlich benutzt werden. Maßstab
UELZENER
MASCHINEN GmbH
e-mail: contact@uelzener-ums.de
Internet: www.uelzener-ums.de