Você está na página 1de 3

Folha/Sheet: Página 1 de 3

RELATÓRIO DE INSPEÇÃO
Revisão/Revision: 0
LÍQUIDOS PENETRANTES Data/Date: 15 A 18/02/2021
Penetrant Liquid Examination Report No do Relatório/Report Nr: 0182/2021

CLIENTE EQUIPAMENTO COMPONENTE DESENHO REFERÊNCIA


Client Equipment Component Ref. Dwg.
RMF CALDEIRARIA TUBULAÇÕES INTERNAS – SOLDAS DOS
VER RELAÇÃO
MANUTENÇÃO E MONTAGEM FILTRAGEM / TANCAGEM SPOOLS

PROCED. NORMA DE CRITÉRIO DE


FABRICANTE SPOOL TEMPERATURA
INSPEÇÃO REFERÊNCIA ACEITAÇÃO
Spool Manufacture Temperature
Work Instruction Standard Acceptance std.
RMF CALDEIRARIA
MANUTENÇÃO E RC-LP-002 REV. 03 ASME SEC. V ASME SEC. VIII DIV. 1 AP. 8 AMBIENTE
MONTAGEM

REMOVEDOR/LOTE/VALIDADE PENETRANTE/LOTE/VALIDADE REVELADOR/LOTE/VALIDADE


Remover/Date/Lote Penetrating/Date/Lote Developer/Date/Lote

ÁGUA VP 30 / LT-19-0614 / VAL. 08-2021 D70 / LT-19-0599 / 08-2021

TIPO DE REMOÇÃO MÉTODO CONDIÇÃO SUPERFICIAL MATERIAL


Type of removal Method Surf. Condition Material
TIPO II
VISÍVEL COLORIDO ESCOVADA AÇO CARBONO
(ÁGUA)

DESCONTINUIDADE/Discontinuity
IDENTIFICAÇÃO
Identification NÚMERO TIPO POSIÇÃO DIMENSÃO LAUDO
Number Results
type Position (mm) Dimension (mm)
- - - - - AP

OBSERVAÇÕES/Remarks

 PARA VER DETALHES DIMENSIONAIS DAS PEÇAS, CONSULTAR O DESENHO;


 QUANTIDADE DE JUNTAS INSPECIONADAS: 26 JUNTAS (100%) ;
 SEGUE ANEXO FOTOS DE ALGUMAS JUNTAS;
 PARA IDENTIFICAR ITENS INSPECIONADOS, VER RELAÇÃO EM ANEXO.
 OBRA: GERDAU;
 PROJETO: MINA MIGUEL BURNIER-FILTRAGEM DE REJEITOS.

LAUDO/Results: APROVADO

LEGENDA/Legend
REC - Recomendação de Exame DB - Dobra TT - Trinca Transversal
Complementar TL - Trinca Longitudinal MO - Mordedura
AP – Aprovado PO - Porosidade SP - Sobreposição
RP – Reprovado

INSPETOR/Inspec CLIENTE/Client FISCALIZAÇÃO/Inspection

ELSON ALVES MARTINS


NIVEL II-ASNT-LP-PM-UT-END 013
Folha/Sheet: Página 2 de 3
RELATÓRIO DE INSPEÇÃO
Revisão/Revision: 0
LÍQUIDOS PENETRANTES Data/Date: 15 A 18/02/2021
Penetrant Liquid Examination Report No do Relatório/Report Nr: 0182/2021

RELAÇÃO DE SPOOLS INSPECIONADOS:

SINETE
ITEM NUMERO DO SPOOL JUNTA DIÂMENTRO ESPESSURA
R E A
01 09-P-4039-01A J6 10” 9,27 21 20 20

02 09-P-4041-02 J6B 10” 9,27 21 13 13

03 09-P-4039-01B J10B 10” 8,0 21 18 18

04 09-P-4039-01B J9 10” 8,0 21 18 18

05 09-P-4039-01B J8 10” 8,0 21 18 18

06 09-P-4056-10 J19 12” 9,27 30 18 18

07 09-P-4056-10 J20 12” 9,27 30 18 18

08 09-P-4056-10 J21 12” 9,27 30 18 18

09 09-P-4030-02 J4A 5” 6,0 01 01 01

10 09-P-4030-02 J4 5” 6,0 01 01 01

11 09-P-4079-04 J10 4” 6,0 01 01 01

12 09-P-4062-02A J7A 10” 9,27 01 01 01

13 09-P-4031-07 J22A 8” 8,0 21 01 01

14 09-P-4067-05 J10 10” 9,27 13 13 13

15 09-P-4067-05 J11 10” 9,27 - 13 13

16 09-P-4064-11 J28 14” 9,27 - 13 13

17 09-P-4064-11 J27 14” 9,27 - 14 14

18 09-P-4034-09 J16 14” 9,27 21 18 18

19 09-P-4034-09 J17 14” 9,27 21 18 18

20 09-P-4056-03 J8 14” 9,27 - 13 13

21 09-P-4034-03 J23 14” 9,27 21 14 14

22 09-P-4034-03 J24 14” 9,27 21 14 14

23 09-P-4034-03 J25 14” 9,27 - 14 14

24 09-P-4064-04 J6 14” 9,27 - 18 18

25 09-P-4064-04 J7 14” 9,27 - 18 18

26 09-P-4056-08 J14 14” 9,27 30 13 13

- - - - - - -

LEGENDA/Legend: R = Raiz
E = Enchimento A = Acabamento

INSPETOR/Inspec CLIENTE/Client FISCALIZAÇÃO/Inspection

ELSON ALVES MARTINS


NIVEL II-ASNT-LP-PM-UT-END 013
Folha/Sheet: Página 3 de 3
RELATÓRIO DE INSPEÇÃO
Revisão/Revision: 0
LÍQUIDOS PENETRANTES Data/Date: 15 A 18/02/2021
Penetrant Liquid Examination Report No do Relatório/Report Nr: 0182/2021

REGISTRO FOTOGRÁFICO

Foto 01: Aplicação do Liquido Penetrante. Foto 02: Aplicação do Revelador.

Foto 03: Aplicação do Liquido Penetrante. Foto 04: Aplicação do Revelador.

INSPETOR/Inspec CLIENTE/Client FISCALIZAÇÃO/Inspection

ELSON ALVES MARTINS


NIVEL II-ASNT-LP-PM-UT-END 013

Você também pode gostar