Escolar Documentos
Profissional Documentos
Cultura Documentos
Estratégia Produção
Venda
Estoque
Venda
Estoque
Venda
Venda dos estoques
eed ou comercializar
Meses
Mês 15 Mês 16 Mês 17 Mês 18 Mês 19 Mês 20 Mês 21 Mês 22 Mês 23 Mês 24
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430
Mês 25 Mês 26 Mês 27 Mês 28 Mês 29 Mês 30 Mês 31 Mês 32 Mês 33 Mês 34
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430
TOTAL
241,400
170,000
72,420
482,800
68
796,620
ESTIMATIVA DE INVESTIMENTOS
EQUIPAMENTO Uni Quantidade Valor Unit TOTAL
Mobilização Equipamentos Móveis Uni 1 R$ 60,000.00 R$ 60,000.00
Carregadeira Case 2013 150 h h 200 R$ 140.00 R$ 28,000.00
Mobilização de Escavadeira 318D2L CAT ou similar com rompedor h 200 R$ 140.00 R$ 28,000.00
equipamentos móveis e
Pré Lavra Caminhão Mercedes Bens 27 Ton 2 Unid h 400 R$ 80.00 R$ 32,000.00
Caminhão Comboio Uni 0 R$ 120.00 R$ -
Motoniveladora Uni 50 R$ 150.00 R$ 7,500.00 Apoio Adminbistrativo Equipe Despesas Mês 1 Mês 2 TOTAL
Caminhão Pipa 20 mil lt Uni 50 R$ 80.00 R$ 4,000.00 3 pessoas (2 meses) Rodrigo R$ 4,000.00 R$ - R$ 4,000.00 R$ 4,000.00
SUBTOTAL 1 R$ 159,500.00 Aluguel casa R$ 1,200.00 Wanderson R$ 2,500.00 R$ 2,500.00 R$ 2,500.00
Alimentação R$ 3,600.00 Rafael R$ 5,000.00 R$ 5,000.00 R$ 5,000.00
Mobilização Planta de EQUIPAMENTO Uni Quantidade Valor Unit TOTAL Compra de eletro, cama, mesa, etc R$ 8,000.00 Jorge R$ 10,000.00 R$ 10,000.00 R$ 10,000.00
Britagem Mobilização Planta BSM Uni 1 R$ 120,000.00 R$ 120,000.00 R$ -
SUBTOTAL 2 R$ 120,000.00 R$ -
Locação carro R$ 4,000.00 Edmilson R$ 10,000.00 R$ 10,000.00 R$ 10,000.00
SERVIÇO Uni Quantidade Valor Unit TOTAL Combustivel R$ 2,700.00 R$ 27,500.00 R$ 4,000.00 R$ 31,500.00
Topografia de apoio planta e instalações e mina Uni 1 R$ 12,000.00 R$ 12,000.00 R$ 19,500.00
Reservatório Água Potável Uni 1 R$ 5,000.00 R$ 5,000.00 R$ -
Hospedagem R$ 60/dia/10 pessoas diárias 300 R$ 60.00 R$ 18,000.00
Alimentação R$ 20/dia/10 pessoas Uni 300 R$ 20.00 R$ 6,000.00
Caixa Australiana Uni 1 R$ 25,000.00 R$ -
Balança rodoviária Uni 1 R$ 120,000.00 R$ - A pesagem será com carregadeira nos primieros meses. Fechamento com o cliente.
Melhoria escritório/refeitório Uni 1 R$ 30,000.00 R$ 30,000.00
Infraestrutura Construção de vestiários, oficina (tenda e conteiners) Uni 1 R$ 35,000.00 R$ 35,000.00
Laboratório. Adequação e compra de equipamentos Uni 1 R$ 15,000.00 R$ 15,000.00
Fossas, caixa de óleo e graxas Uni 1 R$ 10,000.00 R$ 10,000.00
Mobilia , computadores , impressora, etc Uni 1 R$ 10,000.00 R$ 10,000.00
Antena de rádio e Internet Uni 1 R$ 20,000.00 R$ 20,000.00
Compra de rádios Uni 4 R$ 500.00 R$ 2,000.00
Compra de celulares Uni 3 R$ - R$ -
Mão de obra de apoio Adminbistrativo (DIÁRIAS) Uni 1 R$ - R$ 31,500.00
Apoio Adminbistrativo (carro, passagens, alimentação hotel) Uni 1 R$ 19,500.00 R$ 19,500.00
TOTAL R$ 214,000.00
Equipamento
Escavadeira
Carregadeira
Caminhões
Comboio Abastecim
Motoniveladora
SUBTOTAL 1
Mês 15 Mês 16 Mês 17 Mês 18 Mês 19 Mês 20 Mês 21 Mês 22 Mês 23
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430
MINA
Equipamento Quantidade Valor Unit R$Valor Total
Rompedor 1 ### ### 30800
Escavadeira 2 ### ###
Carregadeira 2 ### ###
Caminhões 4 ### ###
Comboio Abastecimento
1 ### ###
Motoniveladora 1 ### ###
SUBTOTAL 1 11 ###
Mês 24 Mês 25 Mês 26 Mês 27 Mês 28 Mês 29 Mês 30 Mês 31 Mês 32
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430
M
Equipamento
Rompedor
Escavadeira
Carregadeira
Caminhões
Comboio Abastecimento
Motoniveladora
SUBTOTAL 1
Mês 16 Mês 17 Mês 18 Mês 19 Mês 20 Mês 21 Mês 22 Mês 23
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200
2.00 2.00 2.00 2.00 2.00 10,000 10,000 10,000
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430
MINA
Quantidade Valor Unit R$ Valor Total
1 ### R$ 15,000.00
2 ### R$ 50,000.00
2 ### R$ 50,000.00
4 ### R$ 60,000.00
1 ### R$ 15,000.00
1 R$ 5,000.00 R$ 5,000.00
11 ###
Mês 24 Mês 25 Mês 26 Mês 27 Mês 28 Mês 29 Mês 30 Mês 31 Mês 32
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430
Administrativo
Pessoal + Encargos 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80
Telefonia Móvel 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00
Contabilidade 600.00 600.00 600.00 600.00 600.00 600.00 600.00
Transporte Externo 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
Combustivel Veíc.Leves 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00
Alimentação 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00
Seguro de vida 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00
Segurança Patrimonial 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16
Limpeza Predial 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40
Materiais diversos 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00
Total de Custos 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36
KM Rodado/Veículo/mês 3000
Veículos 3
Total KM 9000
Combustível (Lt) 900
Valor (Lt) R$ 3.80
Valot Total / mês R$ 3,420.00
Meses
Mês 8 Mês 9 Mês 10 Mês 11 Mês 12 Mês 13 Mês 14 Mês 15 Mês 16
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430
18,706.80 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80 18,706.80
2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00
600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00
8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00
3,420.00 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00 3,420.00
6,750.00 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00 6,750.00
3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00
4,808.16 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16 4,808.16
2,003.40 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40 2,003.40
2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00
52,388.36 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36 52,388.36
10.48 10.48 10.48 10.48 10.48 10.48 10.48 10.48 10.48 10.48
TOTAL
Mês 27 Mês 28 Mês 29 Mês 30 Mês 31 Mês 32 Mês 33 Mês 34
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 241,400
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 169,940
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 72,420
14,200 14,200 14,200 14,200 14,200 14,200 14,200 14,200 482,800
10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 140,040
23,430 23,430 23,430 23,430 23,430 23,430 23,430 23,430 796,620
Centros de Custos
Mina 184,222.44 184,222.44 184,222.44
Instalação de Britagem e Classificação - IBC 157,030.15 157,030.15 157,030.15
Administrativo 52,388.36 52,388.36 52,388.36
Transporte / Logísitica 0.00 0.00 0.00
TOTAL CUSTOS 393,640.95 393,640.95 393,640.95
IMPOSTOS
ICMS (18%) 198,000.00 198,000.00 198,000.00
PIS (0,65%) 7,150.00 7,150.00 7,150.00
CONFINS (3%) 33,000.00 33,000.00 33,000.00
CFEM (3%) 25,855.50 25,855.50 25,855.50
IRPJ (25%) 17,237.00 17,237.00 17,237.00
CSLL 1 (9%) 9,307.98 9,307.98 9,307.98
Royaltie 50% CFEM 12,927.75 12,927.75 12,927.75
Crédito (Diesel, insumos) Estimado 20%do ICMS 39,600.00 39,600.00 39,600.00
TOTAL IMPOSTOS 263,878.23 263,878.23 263,878.23
Total
184,222.44 6,263,562.96
157,030.15 5,339,025.10
52,388.36 1,781,204.24
0.00 0.00
393,640.95 13,383,792.30 100.00
80.00
Total
198,000.00 6,732,000.00 60.00
7,150.00 243,100.00
33,000.00 1,122,000.00 40.00 Column AN
25,855.50 879,087.00
17,237.00 586,058.00 20.00
9,307.98 316,471.32
12,927.75 439,543.50 0.00
39,600.00 1,346,400.00 a % % s% % %
in IB
C to tica S
M s
gís TO
263,878.23 10,318,259.82 po Lo US
Im LC
TA
657,519.18 23,702,052.12 TO
### 37,400,000.00
Mina % 260,981.79 28.57
78.73 78.73 IBC % 222,459.38 24.36
Impostos % 429,927.49 47.07
442,481 10,619,540 Logística % 0.00 0.00
TOTAL CUSTOS % 913,368.66 100.00
Column AN
%
Vulcano
Preço de Venda
Granulados @ 38,00 Mn FOB Mina R$/t 220.00
Sinter Feed @ 37,00 Mn Estoque R$/t -
Mn CIF China US$5,2 ponto metalico
Câmbio: 1 US$ = R$ 3,20
CAPEX
Infraestrutura (R$ ) 214,000
Equipamentos de Mina (R$ ) 159,500
Planta de Britagem (R$ ) 120,000
Fluxo de Caixa (R$ ) 140,000
TOTAL CAPEX - R$ 633,500
2 Meses
Base Case Implantação
Mês 1 Mês 2
2,123,908
Mês 10 Mês 11 Mês 12 Mês 13 Mês 14 Mês 15 Mês 16 Mês 17
7,100 241,400
5,000 170,000
2,130 72,420
1,100,000 37,400,000
-184,222 (6,263,563)
-157,030 (5,339,025)
-52,388 (1,781,204)
-263,878 (8,971,860)
442,481 15,044,348
15,044,348
Seguem informações sobre tributação de minério de manganês. Atualmente, o lucro presumido tem teto de
R$78milhões. Veja que em caso de venda para fora de TO, há variação no ICMS. Quando a venda é para o exterior,
não é pago PIS, COFINS e ICMS. Para o IR, eu cálculo 25% diretamente, pois a diferença é pouca e a fórmula fica mais
complicada.
LUCRO PRESUMIDO:
Cálculo do PIS/COFINS:
· Base de cálculo = Receita bruta
· Alíquota PIS= 0,65%
· Alíquota COFINS= 3,00%
Cálculo da CSLL:
· Base de cálculo = 12% da Receita bruta
· Alíquota CSLL = 9%
No caso de a receita bruta anual ultrapassar R$78.000.000, automaticamente, no ano posterior, o regime de
tributação passa a ser Lucro Real.
LUCRO REAL:
Cálculo do PIS/COFINS:
· Base de cálculo = Receita bruta
· Alíquota PIS= 1,65%
· Alíquota COFINS= 7,60%
Cálculo da CSLL:
· Base de cálculo = Lucro tributável
· Alíquota CSLL = 9%
LUCRO PRESUMIDO
IMPOSTOS
ICMS (18%) 18% R$ 198,000.00
PIS (0,65%) 0.65% R$ 7,150.00
CONFINS (3%) 3.00% R$ 33,000.00
R$ 138,600.00 R$ 138,600.00
R$ 5,005.00 R$ 5,005.00
R$ 23,100.00 R$ 23,100.00
R$ 15,400.00 R$ 15,400.00
R$ 18,098.85 R$ 18,098.85
R$ 12,065.90 R$ 12,065.90
R$ 6,515.59 R$ 6,515.59
R$ 218,785.34 R$ 218,785.34
Opção 03 - Mercado Interno
Alíquota
Massa 5,000.00
Preço de NF R$ 220.00
18.00% ICMS R$ 39.60
3.65% PIS+COFINS R$ 8.03
eita líquida 3.00% CFEM R$ 5.17
ita bruta 0.00% Comissão de Ven R$ 0.00
eita bruta Preço Líquido R$ 172.37
Receita Bruta R$ 1,100,000.00
Receita Líquida R$ 835,994.50
R$ 264,005.50
Viagem/dia/Carreta 6
Carreta 8
Ciclo caminhões
Minério Estéril Sinter Feed Total
Movimentação Mês 7,000.00 14,000.00 1,800.00 22,800.00
Capacidade Caminhão (Ton) 27.00 27.00 27.00 27.00
Horas Trabalhadas (mês) 220.00 220.00 220.00 220.00
DMT (m) 1,000.00 1,000.00 1,000.00 1,000.00
Ciclo (min) 15.00 15.00 15.00
Viagens Caminhão hora 4.00 4.00 4.00 12.00
Viagens Caminhão 880.00 880.00 880.00 2,640.00
Produção Caminhão 23,760.00 23,760.00 23,760.00 71,280.00
Disponibilidade 80.00 80.00 80.00 80.00
Utilização 80.00 80.00 80.00 80.00
Capacidade Produção 15,206.40 15,206.40 15,206.40 45,619.20
Quantidade de caminhões 1.00 1.00 0.00 2.00
Consumo /h diesel 22 22 44
Horas trabalhadas 220 220 440
Consumo diesel 4,889 4,889 9,778
Preço Diesel R$3,37 16,475.56 16,475.56 32,951
Consumo /h diesel 22 22 44
Horas trabalhadas 220 220 440
Consumo diesel 4,889 4,889 9,778
Preço Diesel R$3,37 16,475.56 16,475.56 32,951
Wolkswagen
total
40.00
6.00 viagens
Densidade Ton
1.80 ### toneladas/viagem
Projeto Manganês Paranã
Estudo de Pré Exequibilidade Economica
Itens Unit Base Case
Reservas t 241,400
ROM /Mês t 7,000
Meses de Operação ( 3 GU) mês 34
Recuperação % Produção a seco % 70.00
Produção Granulados t / mês 5,000.00
Produção Sinter Feed (Estoque) t / mês 2,000.00
RESUMO - FINANCEIRO
Total Receita Bruta / Mês R$/m 1,100,000.00
Total Despesa / Mês R$/m 657,519.18
Lucro Líquido / Mês R$/m 442,480.82
0.10
IRR % 69.8%
VPL @ 10% Discount Rate R$ 3,289,191
VPL / VPI 5.19
Payback 6 meses
Estudo de Pré Exequibilida
Economica
CAPEX- R$ Total 633,500.00
Infraestrutura 214,000.00 ROM - t/Mês
Equipamentos de Mina 159,500.00 Produção Granulados
Planta de Britagem 120,000.00 Produção Sinter Feed
Capital de Giro 140,000.00
Receita Bruta
OPEX - R$ Mês 657,519.18 Custo de Mina
Custo Mina (Mês) 184,222.44 Custo de Britagem
Custo Britagem 157,030.15 Custo Administrativo
Custo Logística 0.00 Custo Logística
Custo Adminsitrativo 52,388.36 Impostos
Impostos 263,878.23 CAPEX (Pagamento em 6 mes
Cash Flow
Cash Flow Acumulado
Pay Back 6 meses
ANEXO 3 - Estudo de Pré Exequibilidade Econômica
tudo de Pré Exequibilidade
Mês 1 Mês 2 Mês 3 Mês 4 Mês 5 Mês 6 Mês 7 Mês 8 Mês 9 Mês 10
Economica
- t/Mês 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
ção Granulados 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
ção Sinter Feed 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
ta Bruta 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000
de Mina (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222)
de Britagem (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030)
Administrativo (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388)
Logística 0 0 0 0 0 0 0 0 0 0
tos (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878)
X (Pagamento em 6 meses) 0 0 0 0 0 0 0 0 0 0
Cash Flow (633,500) 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481
Cash Flow Acumulado 442,481 884,962 1,327,442 1,769,923 2,212,404 2,654,885 3,097,366 3,539,847 3,982,327 4,424,808
Pay Back 6 meses
Mês 11 Mês 12 Mês 13 Mês 14 Mês 15 Mês 16 Mês 17 Mês 18 Mês 19 Mês 20 Mês 21
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000
(184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222)
(157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030)
(52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388)
0 0 0 0 0 0 0 0 0 0 0
(263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878)
0 0 0 0 0 0 0 0 0 0 0
442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481
4,867,289 5,309,770 5,752,251 6,194,731 6,637,212 7,079,693 7,522,174 7,964,655 8,407,136 8,849,616 9,292,097
Mês 22 Mês 23 Mês 24 Mês 25 Mês 26 Mês 27 Mês 28 Mês 29 Mês 30 Mês 31 Mês 32
7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100 7,100
5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000
2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130
1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000
(184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222) (184,222)
(157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030) (157,030)
(52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388) (52,388)
0 0 0 0 0 0 0 0 0 0 0
(263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878) (263,878)
0 0 0 0 0 0 0 0 0 0 0
442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481 442,481
9,734,578 10,177,059 10,619,540 11,062,021 11,504,501 11,946,982 12,389,463 12,831,944 13,274,425 13,716,905 14,159,386
Mês 33 Mês 34 Total
sub-total 3
sub-total 4
sub-total 2
Total
MINA VARGEM
R$ Mensal
R$ 32,000.00 Produção 2018
R$ 34,000.00 Relação Esterio e Itabirito/Minério
Terça-feira
R$ Mensal Quarta
R$ - Quinta
R$ -
R$ 16,000.00 Troca de Turno ( Perda de 30min/troca)
R$ 8,000.00 Produção por Hora Lavra de ROM (t/h)
R$ 12,000.00 Produção por Hora Esterio e Itabirito / Minério (t/h)
R$ - Lavra de ROM
R$ 36,000.00 Escavadeira 336 CAT
Veículos de Apoio
Caminhonete 4x4 Cab Dupla - Diesel
Gerente de Operações
Supervisor de Transporte Interno (compartilhada)
Supervisão de Mina (compartilhada)
Supervisão da Produção (Compartilhada)
Veículo Leve (Gol)
Administrativo
Infra
Logística
Segurança Patrimonial
Veículo Leve (Saveiro)
Segurança Trabalho / Meio Ambiente
Apanha
Qualidade
215,000 43252
0.7
150,500
9 9 16 14.4
9 9 16 14
9 9 16 14
27 27 52 47
197
1093.813594
765.6695157
QtdeProdução/h/Equip
2 547
9.1 120
QtdeProdução/h/Equip
Qtde Turno
1 1
Qtde Turnos
1 2
1 2
6.076742188 2
1 2
1 2
2 2
83 332 648
Taxa Diária 10,750
Qtde Turno
1 1
1 2
1 2
1 2
1 1
1 2
2 2
1 2
1 1
1 1
1 1