RESUMO
Abstract
Tubarão, Santa Catarina, was completed in just 100 days, 20 of which were
site. The construction pace of the approximately 3,300 m² structure makes this
construction model used by BR3: off-site modular construction, that is, outside
the construction site. This means that almost 100% of the construction is carried
out in the fiber park of Ocubo in Brazil, transported to the destination in “slices”
where the components (modules) are coupled to the foundation. Brasil ao Cubo
is another step in its new Gerdau Next business unit. In record time, the office
building was built with 500 tons of steel, equivalent to 25% of the material's
volume
INTRODUÇÃO
Resistência
Versatilidade
CONCLUSÃO