KARIMBALA ROAD (KM. 49,7-KM. 54,1 AND KM. 58,1-62.6


KM) AND ATABAE-MOTA AIN ROAD (KM. 85,3-KM. 114,2)

RELATÓRIU ESTÁJIU PROFESIONÁL

Husi Estudante:

APOLOS MONTEIRO (2016 02 02 009)


JONATAS N. DOS REIS (2016 02 02 027)
LIRIA T. GOMES (2016 02 02 059)
MARIA JOSÉ DE J. BELO (2016 02 02 036)
ROFINO CANELAS (2016 02 02 044)
MARIANO A. FREITAS (2015 02 02 030)
SARA DE JESUS (2016 02 02 060)

DEPARTAMENTO DE ENGENHARIA CIVIL


FACULDADE DE ENGENHARIA CIÊNCIAS E TECNOLOGIA
UNIVERSIDADE NACIONAL TIMOR LOROSA’E

DÍLI
SETEMBRO DE 2019
UPGRADING AND MAINTENANCE OF MAUBARA-
KARIMBALA ROAD (KM. 49,7-KM. 54,1 AND KM. 58,1-62.6
KM) AND ATABAE-MOTA AIN ROAD (KM. 85,3-KM. 114,2)

RELATÓRIU ESTÁJIU PROFESIONÁL

Husi Estudante:

APOLOS MONTEIRO (2016 02 02 009)


JONATAS N. DOS REIS (2016 02 02 027)
LIRIA T. GOMES (2016 02 02 059)
MARIA JOSÉ DE J. BELO (2016 02 02 036)
ROFINO CANELAS (2016 02 02 044)
MARIANO A. FREITAS (2015 02 02 030)
SARA DE JESUS (2016 02 02 060)

DEPARTAMENTO DE ENGENHARIA CIVIL


FACULDADE DE ENGENHARIA CIÊNCIAS E TECNOLOGIA
UNIVERSIDADE NACIONAL TIMOR LOROSA’E

DÍLI
SETEMBRO DE 2019
APROVASAUN

Relatoriu estajiu profesionál ida ne’e dezenvolve husi estudante Apolos Monteiro, Jonatas
N. dos Reis, Liria T. Gomes, Maria José de J. Belo, Rofino Canelas, Mariano A. Freitas,
Sara de Jesus ho títulu “Upgrading and Maintenance of Maubara–Karimbala Road
(Km. 49.7-Km. 54.1 and Km. 58.1- Km. 62.6) and Atabae–Mota Ain Road (Km. 85.3-
Km. 114.2)”, ne’ebé aprezenta ona iha enjiñeria sivil iha loron….....de Setembro de 2019, ho
rezultadu aprovadu.

Dili, ........ de Setembro de 2019


Orientador:

1. Alfredo Ferreira, ST. M.Sc. :


Professor Orientador 1

2. Humbelina M.S. Viegas, Bcc.M.Sc. :


Professora Orientadora 2

3. Chung Kwang Woo :


Resident Engineer (DONGSUNG ENGINEERING CO.LTD)

Koñesimentu husi:
Diretor do Departamento de Engenharia Civil

Alfredo Ferreira, ST. M.Sc.:

iii
AGRADESIMENTU
Uluk nana’in hakarak hasa’e agradesimentu ba Na’i Maromak tamba ho Nia domin, grasa,
tulun no protesaun tomak ne’ebé akompaña ona ami nia estajiu hahú husi loron dahuluk to’o
loron dahikus bele termina ho di’ak tuir tempu ne’ebé iha.
Estajiu nu’udar kriteria ida ne’ebé aplika mos iha Departamentu Enjiñeria Sivil, Universidade
Nasional Timor Lorosa’e no sai hanesan etapa ida hodi atinji ba grau lisensiatura. Nune’e
estajiu ida ne’e hala’o tiha ona hahu husi 01 Jullu 2019 to’o 31 Augostu 2019 ho objetivu atu
estudante sira bele halo komparasaun kona-ba teoria ne’ebé hetan tiha ona iha prosesu
aprendisazen ho realidade iha terenu, no mos atu kapasita koñesimentu kona ba
implementsaun obra projetu iha parte téknika, parte administrasaun, kontrola kualidade,
seguransa, no monitoramentu ba servisu iha terenu.
Iha relatóriu ida ne’e hakerek nain rekoñese katak iha termu balun ne’ebé seidauk kompletu
tamba tuir koñesimentu ne’ebé seidauk másimu, nune’e hakerek nain prontu simu krítika no
sujestaun sira atu bele halo kompletu liu tan limitasaun sira ne’ebé sei iha. Hakerek nain mos
hakarak agradese ba:
1. Ho respeitu Sr. Ruben Jerónimo Freitas, PhD nuudar Dekanu Fakuldade Enjiñeria
Siénsia no Teknolojia.
2. Ho respeitu Sr. Alfredo Ferreira, ST.,M.Sc. nuudar Direktor Departamentu Enjiñeria
Sivil no mos Dosente orientador Monitorizasaun.
3. Ho respeitu Sra. Humbelina M.S. Viegas, Bcc.M.Sc. nuudar mos Dosente
Orientadora Monitorizasaun.
4. Ho respeitu tomak ba Dosente sira hotu maka iha Departamnetu Enjiñeria Sivil.
5. Agradese ba kompañia Dongsung Engineering, Co.Ltd., espesialmente enjeñeiru sira
husi Korea, Bangladesh, Pakistan no Filipina. Ami agradese wain tebes mos ba
kompañia Kai Watu Kmanek nuudar konsultan lokal, espesialmente ba enjeñeiru
Timor oan ne’ebé ho imi nia laran luak bele fahe imi nia esperiénsia mai ami.
Agradese mos ba enjeñeiru sira husi parte supplier contractor nian, ne’ebé sempre
atende ami nia difikuldade ne’ebé enfrenta durante iha tempu estajiu nia laran, iha
projetu “Upgrading and Maintenance of Maubara– Karimbala Road (Km. 49.7- Km.
54.1 and Km. 58.1- Km. 62.6) and Atabae–Mota Ain (Km. 85.3- Km. 114.2)”.
6. Ba Almamater Universidade Nasionál Timor Lorosa’e (UNTL), hanesan Kapitál fini
ba Dezenvolvimentu Nasaun.

Laiha buat ida murak liu hakerek nain atu hato’o ba parte hirak ne’ebé temik ona iha leten, so
lia fuan obrigadu wa’in no hein katak ita nia favor sei hetan grasa no bensaun husi Na’i
Maromak.
Dili, ...../ 09 / 2019

iv
INDISE JERÁL

Capa.........................................................................................................................................................................1
Folha do rosto.........................................................................................................................................................2
APROVASAUN......................................................................................................................................................iii
AGRADESIMENTU...............................................................................................................................................iv
INDISE JERÁL.............................................................................................................................................................v
INDISE TABELA.........................................................................................................................................................vi
INDISE FIGURA........................................................................................................................................................vii
INDISE GRÁFIKU.....................................................................................................................................................viii
1 INTRODUSAUN..................................................................................................................................................9
1.1 INTRODUSAUN PROJETU........................................................................................................................9
1.1.1 Background Projetu................................................................................................................................9
1.1.2 Deskrisaun Projetu..................................................................................................................................9
1.1.3 Lokalizasaun Projetu............................................................................................................................10
1.2 Objetivu Estajiu Profesionál........................................................................................................................11
1.3 Limitasaun...................................................................................................................................................11
1.4 Benefísiu Husi Estajiu.................................................................................................................................12
1.5 Estrutura Relatóriu.......................................................................................................................................12
1.6 Dezeñu Estrutura Konstrusaun Estrada.......................................................................................................12
2 REZULTADU HUSI ESTAJIU.........................................................................................................................16
2.1 ADMINISTRASAUN PROJETU...............................................................................................................16
2.1.1 Estrutura Projetu...................................................................................................................................16
2.1.2 Orsamentu............................................................................................................................................17
2.1.3 TIME SCHEDULE....................................................................................................................................18
2.2 LOJÍSTIKA.................................................................................................................................................19
2.2.1 Materiais Konstrusaun..........................................................................................................................19
2.2.2 Ekipamentu Pezadu..............................................................................................................................21
2.3 OBSERVASAUN TÉKNIKA.....................................................................................................................24
2.3.1 Etapa servisu.........................................................................................................................................24
2.3.2 Survey...................................................................................................................................................36
2.3.3 KONTROLU KUALIDADE (LABORATÓRIU)............................................................................................38
3 KONKLUZAUN NO SUJESTAUN..................................................................................................................58
3.1 Konkluzaun..................................................................................................................................................58
3.2 Sujestaun......................................................................................................................................................58
Bibliografia.........................................................................................................................................................59
ANEKSU............................................................................................................................................................60

v
INDISE TABELA

Tabela 1. Lista orsamentu Projetu kada Item.......................................................................................17


Tabela 2. Summary of Main Material Required for the Project...........................................................19
Tabela 3. Pipe production....................................................................................................................19
Tabela 4. Aggregate production...........................................................................................................19
Tabela 5. Grading Requirements for Coarse Aggregate......................................................................20
Tabela 6. Composition and Strength of Concrete for use in Structures................................................20
Tabela 7. Material budget....................................................................................................................21
Tabela 8. Minimum equipment.............................................................................................................21
Tabela 9. Mobilization equipments.......................................................................................................22
Tabela 10. Espesifikasaun pagamentu ba eskavasaun rai nian............................................................24
Tabela 11. Espesifikasaun pagamentu eskavasaun estrutura nian.......................................................25
Tabela 12. Espesifikasaun material ba Embankment...........................................................................26
Tabela 13. Toleransia ba kompaksaun no thickness.............................................................................26
Tabela 14. Espesifikasaun pagamentu ba Subgrade.............................................................................26
Tabela 15. Diameter and thichness of pipe culvert...............................................................................29
Tabela 16. Espesifikasaun pagamentu ba stone masonry retaining wall..............................................29
Tabela 17. Grading requirements Sub base course..............................................................................31
Tabela 18. Testing requirements Sub base course specification...........................................................31
Tabela 19. Thickness tolerances for Sub base Course..........................................................................32
Tabela 20. Espesifikasaun pagamentu ba aggregate subbase-course..................................................32
Tabela 213. Testing requirements Base course specification...............................................................32
Tabela 22. Testing requirements Base course specification.................................................................33
Tabela 23. Thickness tolerances for Base Course................................................................................33
Tabela 24. Grading requirements of Aggregate Surface Course..........................................................34
Tabela 25. Thickness tolerances for Surface Course............................................................................34
Tabela 26. Espesifikasaun pagamentu ba aggregate surface course....................................................34
Tabela 27. Espesifikasaun pagamentu ba bituminous prime coat........................................................35
Tabela 28. Worksheet ba teste Gradation.............................................................................................39
Tabela 29. Kalkulasaun ba Atterberg Limit.........................................................................................42
Tabela 30. Kalkulasaun ba Los Angeles Abrasion Test........................................................................44
Tabela 31. Kalkulasaun Fracture Face................................................................................................45
Tabela 32. Kalkulasaun Laboratory Compaction.................................................................................47
Tabela 33. Kalkulasaun CBR Test........................................................................................................49
Tabela 34. CBR Reading......................................................................................................................50
Tabela 35. Kalkulasaun FDT...............................................................................................................51
Tabela 36. Kalkulasaun Compressive Test...........................................................................................54
Tabela 37. Kalkulasaun Extraction Test...............................................................................................56
Tabela 38. Kalkulasaun Stability Marshall Test...................................................................................57

vi
INDISE FIGURA

Figura 1. Mapamentu Lokalizasaun Projetu.............................................................................10


Figura 2.Lokalizasaun Estrada Maubara – Karimbala (Section 1 & 2)....................................10
Figura 3.Lokalizasaun Estrada Atabae - Mota Ain (Section 3)................................................11
Figura 4. Eskavasaun ba Slope cutting.....................................................................................24
Figura 5. Eskavasaun ba preparasaun estrutura RCPC.............................................................25
Figura 6. Servisu ba Embankment............................................................................................26
Figura 7. Servisu ba Subgrade Preparation...............................................................................27
Figura 8. Foundation Fill..........................................................................................................27
Figura 9. Servisu Lean Concrete...............................................................................................28
Figura 10. Reinforcement concrete Box Culvert......................................................................28
Figura 11. Reinforced concrete Pipe Culvert............................................................................29
Figura 12. Konstrusaun Stone Masonry....................................................................................30
Figura 13. Servisu Lined ditch..................................................................................................30
Figura 14. Konstrusaun Guard Wall.........................................................................................30
Figura 15. Servisu Gabion........................................................................................................31
Figura 16. Pavimentu Sub base course.....................................................................................32
Figura 17. Pavimentu Base Course...........................................................................................33
Figura 18. Prime Coat...............................................................................................................35
Figura 19. Tack Coat.................................................................................................................35
Figura 20. Servisu ba Surface Course.......................................................................................36
Figura 21. Kontrola Elevasaun ba Base course........................................................................37
Figura 22. Kontrola elevasaun ba Cutting Slope......................................................................37
Figura 23. Kontrola elevasaun ba eskavasaun fundasaun RCBC no RCPC.............................37
Figura 24. Kontrola elevasaun ba Lined ditch..........................................................................38
Figura 25. Apparatus of Gradation Test...................................................................................38
Figura 26. Apparatus of Liquid Limit Test...............................................................................40
Figura 27. Apparatus of Plastic Limit Test...............................................................................41
Figura 28. Apparatus of Los Angeles Abrasion Test................................................................43
Figura 29. Apparatus of Fracture Face.....................................................................................44
Figura 30. Apparatus of Laboratory Compaction.....................................................................46
Figura 31. Apparatus of CBR Test...........................................................................................48
Figura 32. Apparatus FDT........................................................................................................50
Figura 33. Apparatus of Slump Test..........................................................................................52
Figura 34. Apparatus of Compressive Test...............................................................................53
Figura 35. Apparatus of Extraction Test...................................................................................55
Figura 36. Apparatus of Marshall Test.....................................................................................57

vii
INDISE GRÁFIKU

Grafiku 1. Gradation Test.........................................................................................................40


Grafiku 2. Grafiku Laboratoty Compaction..............................................................................47
Grafiku 3. CBR Result..............................................................................................................50

viii
Relatoriu Estajiu Profesional 2019

1
INTRODUSAUN
1.1 INTRODUSAUN PROJETU
1.1.1 Background Projetu
Hadia no halo manutensaun ba Estrada Maubara – Karimbala ho Atabae – Mota Ain nu’udar
projetu husi Road Network Upgrading Sector Project (RNUSP), ne’ebé finansia husi Asian
Development Bank (ADB), no implementa husi governu Timor – Leste (GOTL) iha Direktoria
Obras Publika (DOP) nia okos. Projetu ida ne’e Kontrator mak CBMI Construction
Co.Ltd. servisu hamutuk ho CHONGQING Road Engineering Group Co.Ltd. Konsultan
Implementasaun no superviziona ba projetu (KISP) mak DONGSUNG Engineering Co.Ltd.
servisu hamutuk ho Konsultan KAI WATU KMANEK Unipessoal Lda.
Projetu Estrada ida ne’e envolve husi hadia no halo manutensaun ba estrada ne’ebé eziste ona,
luan estrada ba pavimentu superfisie asfaltu mak 6.0 m & 4.5 m ho mahar 50 mm, kompleta
husi shoulder 1 m iha parte sori-sorin.

Road Section Length Station Remark

Maubara – Karimbala Road 8.9 km 49.7 to Km. 54.1 and Section 1


Km. 58.1 to Km. 62.6 Section 2

Atabae – Mota Ain Road 28.9 km Km. 85.3 to Km. 114.2 Section 3

1.1.2 Deskrisaun Projetu

Road Network Upgrading Sector Project Upgrading


and Maintenance of Maubara – Karimbala Road
Project Name:
(Km. 49.7 to Km. 54.1 and Km. 58.1 to Km. 62.6)
and Atabae – Mota Ain Road (Km. 85.3 to Km.
114.2) ICB/077/MPWTC-2015

Upgrading Works: Length = 37.80 kilometers


Time for completion = 900 Calendar Days

Defects Notification Period: Length = 37.80 kilometers


Duration = 12 Months

Performance Based Maintenance: Length = 37.80 kilometers


Duration = 24 Months

Emergency Works: Entire Duration of the Contact

Page | 9
10
Relatoriu Estajiu Profesional 2019

1.1.3 Lokalizasaun Projetu


Projetu ida ne’e nia lokalizasaun iha parte rua mak parte Leste nian estrada ho
diresaun Baukau – Lautem, no parte Oeste nian mak estrada diresaun Maubara – Mota ain,
ne’ebé sei hatudu liu husi mapamentu jerál Timor-Leste nian hanesan tuir mai ne’e:

Figura 1. Mapamentu Lokalizasaun Projetu

Estrada Maubara – Karimbala ho naruk kuaze 8,9 km, ne’ebé fahe ba subseksaun rua (2).
Subseksaun-1 ho naruk kuaze 4,4 km hahu husi parte leste ponte Mausako, Maubara, iha
estasaun 49 + 700 km no remata iha estasaun 54 + 100 km iha parte oeste liu husi Suku
Vaviqunia (Aldeia: Delesuati no Morae). Subseksaun-2 ho naruk 4,5 km hahu husi estasaun
58 + 100 km no remata iha estasaun 62 + 600 km iha Fasili Karimbala ne’ebé liu husi suku
rua mak Guguleur (Aldeia Dair) no Vatuboro (Aldeia Vaupu) ne’ebé hola parte ba Postu
administrativu Maubara, Munisipiu Likisa (Figura 1). Subseksaun-2 ultrapasa area protejida
florestal nian hanaran Parke Nasional Guguleur (Sta. 58 + 270 – 62 + 543 km) ne’ebé presija
tau protesaun espesial ba biodiversidade ida ne’e.

Figura 2.Lokalizasaun Estrada Maubara – Karimbala (Section 1 & 2)

Page | 11
Relatoriu Estajiu Profesionál 2019

Estrada Atabae ba Mota Ain ho naruk 28,9 km hahu husi parte oeste ponte Fatulagung iha
estasaun 85 + 300 km hola parte Postu Administrativu Atabae, Munisipiu Bobonaro no
remata iha estasaun 114 + 200 km iha besik parte leste ponte fronteira ba Indonesia iha Mota
Ain (Figura 2). Estrada ida ne’e liu husi suku haat (4) mak: Suku Aidabaleten (Aldeia
Tutubaba, Sulilaran, Biacou no Miguer), Suku Leolima (Aldeia Duaderok), Suku Sanirin
(Aldeia Subaleco, Palaka no Cacu) no Suku Batugade (Aldeia Batugade no Nu’u Badak).

Figura 3.Lokalizasaun Estrada Atabae - Mota Ain (Section 3)

Koordenada GPS iha inisiu projetu mak: 80 47‟43.15” S; 1250 06‟ 04.80” E no ikusmai mak:
80 57' 26.30” S; 1240 57 15 15.22 ”E. Projetu seksaun ida ne’e la liu husi area florestal ka
area protejida ba biodiversiadade ruma. Laiha area kosteira ne’ebé presija tau protesaun hodi
bele fo influensia ba iha projetu ida ne’e.
1.2 Objetivu Estajiu Profesionál
Objetivu husi estajiu profesionál ida ne’e mak hanesan tuir mai ne’e:
 Atu kompara teoria ho pratika
 Koñesimentu prosesu servisu iha projetu
 Haklean skill no abilidade
 Nu’udar materia ida iha semestre VIII nian, antes tama ba etapa Livre teoria;
 Liu husi estajiu profesionál ida ne’e, atu estudante sira bele hatene klean kona-ba
prosesu servisu iha projetu estrada, liu-liu iha parte administrasaun, kontrola
kualidade, seguransa no monitoramentu servisu iha terrenu.

1.3 Limitasaun

Relasiona ho estajiu profesionál ida ne’e, mak estajiariu sira limita hodi hakerek relatóriu tuir
saida mak hetan iha terrenu. Hahu iha loron 1 Jullu 2019 no remata iha loron 31 Agostu 2019,
item sira ami hetan mak hanesan Structure Excavation, Aggregate Subbase Course,
Aggregate Base Course, Bituminous Prime Coat, Bituminous Tack Coat, Bituminous
Concrete Surface Course, Portland Cement Concrete Pavement, Reinforcing Steel, Concrete
Structures, Stone Masonry, Gabions, Lined ditch, Survey no Quality control. Tamba ne’e
hakerek nain hakarak limita relatóriu ida ne’e bazeia ba durasaun tempu ne’ebé termina ona
iha leten.

Page | 12
Relatoriu Estajiu Profesionál 2019
1.4 Benefísiu Husi Estajiu
Husi estajiu profesionál ida ne’e ninia benefísiu bo’ot tebes ba estajiariu sira, tamba bele
hasa’e koñesimentu estudante sira nian iha terrenu, hatudu realidade servisu ne’ebé relevante
ho prosesu aprendisajen teóriku iha eskola. Tan ne’e benefísiu husi estajiu ida ne’e mak
hanesan:
 Bele hatene konaba lalaok servisu Quality control nian
 Bele hatene konaba lalaok servisu Survey nian
 Bele hatene konaba servisu Site inspector nian
 Bele hatene konaba servisu Quantity nian

1.5 Estrutura Relatóriu


Atu fasilita leitór sira kona-ba lalaok no konseptu relatóriu estajiu ida ne’e, mak nu’udar
eskritór sei konkretiza no simplifika liu husi estrutura relatóriu hanesan tuir mai:
KAPITULU I – INTRODUSAUN
Parte Introdusaun nian mak : Introdusaun Projetu (Background, Lokalizasaun), Objetivu
Estajiu Profesionál, Limitasaun, Benefisiu no Estrutura Relatóriu.
KAPITULU II – REZULTADU HUSI ESTAJIU
Rezultadu Estajiu sei koalia kona-ba : Administrasaun Projetu (Estrutura Projetu, Orsamentu,
Time schedule), Lojístika, Observasaun Teknika (Etapa Servisu, Surveying no Kontrolu
Kualidade).
KAPITULU III – KONKLUZAUN NO SUJESTAUN

ANEKSU
Parte aneksu sei koalia kona-ba : Bibliografia no Aneksu (Foto, Tabela, Dezeñu).

1.6 Dezeñu Estrutura Konstrusaun Estrada

Drawing 1. Typical Roadway Section on Flat Areas

Page | 13
Relatoriu Estajiu Profesionál 2019

Drawing 2. Typical Roadway Section Along Seaside

Drawing 3. Typical Roadway Section Mountainous

Drawing 4. Typical Roadway Section PCCP

Page | 14
Relatoriu Estajiu Profesionál 2019

Drawing 5. Details of Stone Masonry Retaining Wall

Drawing 6. Guardwall Type – 2

Drawing 7. Box Culvert Section

Page | 15
Relatoriu Estajiu Profesionál 2019

Drawing 8. Details of Stone Masonry Breast Wall

Drawing 9. Gabion Gravity Wall Detail

2
Page | 16
Relatoriu Estajiu Profesionál 2019

REZULTADU HUSI ESTAJIU

2.1 ADMINISTRASAUN PROJETU

Jeralmente aktividade sira ne’ebé hala’o iha projetu ida sempre iha ninia administrasaun,
atu nune’e bele mobiliza no kontrola aktividade sira iha projetu refere. Iha projetu Hadi’a no
halo Manutensaun ba Estrada Maubara–Karimbala no Atabae–Mota Ain ida ne’e,
administrasaun projetu iha kompañia konsultan nia servisu mak ko’alia liu kona-ba orsamentu
projetu, progresu servisu no kontrolu kualidade servisu. Nune’e iha parte ida ne’e sei
aprezenta kona-ba estrutura kompañia konsultan nian, orsamentu no progresu servisu.

2.1.1 Estrutura Projetu


Projetu Hadi’a no halo Manutensaun ba Estrada Maubara–Karimbala no Atabae–Mota
Ain ne’ebé iha Direktoria Ministério Obras Pública, Transporte e Comunicações nia okos, ho
nia Estrutura ba kompañia konsultan internasional (Dongsung Engineering Co. Ltd.) no lokal
(Kai Watu Kmanek) iha projetu ida ne’e mak hanesan tuir mai:
TEAM LEADER
CHANG HAI YOUNG

RESIDENT ENGINEER
CHUNG KWANG WOO

SENIOR QUALITY ASSURANCE ENGINEER SENIOR WORKS INSPECTOR


LIM SUK LYUL AHN HYUNG KOO

MATERIAL ENGINEER JR. INSPECTOR


GIL MESQUITA - CARLOS XIMENES SOARES
- ILDEFONSO DE CASTRO

SENIOR QUANTITY ENGINEER SENIOR WORKS INSPECTOR


DANILO M. FLORENDO ABDUL SATTAR KHATAK

JR. QUANTITY ENGINEER JR. INSPECTOR


- JOÃO PAULO PARADA CAMILO MAIA
- DINIS AMARAL

ENVIRONMENTAL SPECIALIST SOCIAL/RESETTLEMENT SPECIALIST


Dr. ASHADUL ALAM MUNEZ PETRONILO Jr.P.

JR. ENVIRONMENTAL ASSISTANT JR. RESETTLEMENT ASSISTANT


DIVINA MARIA MARQUEZ DOMINGOS DOS SANTOS

Dongsung Engineering, Co.Ltd.

Kai Watu Kmanek, Unipessoal Lda.

Page | 17
Relatoriu Estajiu Profesionál 2019
2.1.2 Orsamentu

Orsamentu ne’ebé utiliza ba projetu Hadi’a no halo Manutensaun ba Estrada Maubara–


Karimbala no Atabae–Mota Ain ho montante total US$ 20,748,566.21 husi fundus
empréstimu Banku Dezenvolvimentu Aziátiku. Nain ba projetu ne’e rasik mak Governu iha
Ministério Obras Pública, Transporte e Comunicações Timor – Leste nia okos, liu husi
tenderizasaun ne’ebé loke, no manan nain mak kompañia konsultan Internasionál
DONGSUNG Engineering Co.Ltd. servisu hamutuk ho Konsultan Lokal KAI WATU
KMANEK Unipessoal Lda. no kompañia kontrator mak CBMI Construction Co.Ltd. servisu
hamutuk ho CHONGQING Road Engineering Group Co.Ltd. Tuir mai orsamentu ne’ebé
aloka ba kada item iha projetu ida ne’e.

Tabela 1. Lista orsamentu Projetu kada Item

General Summary Amount (US$)


Section 100: General Requirements 1,098,240.00
Section 200: Earthworks 3,457,315.46
Section 300: Subbase and Base Course 3,457,912.04
Section 400: Surface Course 4,018,982.44
Section 500: Bridge Construction 1,950,760.68
Section 600: Drainage and Slope Protection Structures 3,383,611.69
Section 700: Miscellaneous Structures 273,691.00
Section 800: Bio-Engineering 425,060.00
Dayworks 221,719.30
Sub-Total for Upgrading Works (A) 18,287,292.61
Performance Based Maintenance 261,273.60
Sub-Total for Performance Based Maintenance (B) 261,273.60
Contingency (provisional sum) 2,200,000.00
Sub-Total for Non-Competitive Components (C) 2,200,000.00
GRAND TOTAL AMOUNT IN FIGURES (US$) (A+B+C) 20,748,566.21
GRAND TOTAL AMOUNT IN WORDS (US$): Twenty Million Seven Hundred and
Forty Eight Thousand Five Hundred and Sixty Six US Dollars and Twenty One

Page | 18
Relatoriu Estajiu Profesionál 2019

2.1.3 TIME SCHEDULE

Page | 19
2.2 LOJÍSTIKA
2.2.1 Materiais Konstrusaun
2.2.1.1 Material requirement

Tabela 2. Summary of Main Material Required for the Project

No. Description Unit

1 Reinforcing Steel (grade 40) ton

2 Bituminous Prime Coat (MC-70 Cut – Back Asphalt) ton

3 Bituminous ton

4 Cement (use for concrete) ton

5 Gabions Mesh (2000mmx1000mmx1000mm) EA

6 Gabions Mesh (2000mmx1000mmx500mm) EA

7 Crushed Aggregate for Base Course M3

8 Crushed Aggregate for Bituminous Concrete M3

9 Crushed Aggregate for Concrete M3

2.2.1.2 Production of Material

a. Pipe Production (Spiral rebar)


Tabela 3. Pipe production

Dia. remark
D910 circular rebar 32
D1070 circular rebar 12
D1220  

b. Aggregate Production
Tabela 4. Aggregate production

Size remark
0~5 Motar & Concrete
0~3 Asphalt Concrete
3~5 Asphalt Concrete
5~10 Asphalt Concrete
10~20 Asphalt Concrete
5~37.5 Concrete
0~37.5 Base Course
0~50 Sub base
c. Concrete Produced

Tabela 5. Grading Requirements for Coarse Aggregate

Sieve Designation Mass Percent Passing

Alternate US ClassA Class B Class C Class P Class Seal


Standard
63 21/2” 100
50 2” 100 95-100
37.5 11/2” 95-100 100
25 1” 35-70 100 100 95-100
19.0 3/4” 35-70 100 95-100
12.5 1/2” 10-30 90-100 25-60
9.5 3/8” 10-30 40-70 20-55
4.75 No.4 0-5 0-5 0-15 0-10 0-10

Tabela 6. Composition and Strength of Concrete for use in Structures

Class of Minimum Maximum Consistency Designated Size Minimum Compressive Strength


Cement Water/ Range in Slump of Coarse of 150x300 mm concrete
Concrete
Content per Cement Ratio Aggregate cylinder specimen at 28 days,
m3 MN/m2(psi)
(kg/kg) (Square Opening
mm (inch)
kg (bag**) Std. mm)

A 360 0.53 50 - 100 37.5-4.75 20.7

B 320 0.58 50 - 100 50 – 4.75 16.5

C 380 0.55 50 – 100 12.5 -4.75 20.7

440 100 max. 19.0-4.74 37.7


P 049
(11 bags) (4 max) (3/4”- No.4) (5000)

Seal 380 0.58 100 - 200 25 - 4.75 20.7


Relatoriu Estajiu Profesionál 2019
d. Material Budget
Tabela 7. Material budget

this month
Item size unit last month accu. this month used accu. remain
accu.
Cement P.C Ton 4686 384 5070 5024 46
2
Geo-Textile m 7200 0 7200 7144 56
PVC Pipe m 5240 400 5640 5260 380
2000*100
Gabion Each 100 0 100 0 100
0*1000
Round Bar Φ8 Ton 13.581 0 13.581 11.036 2.545
Round Bar Φ10 Ton 22.642 0 22.642 18.287 4.355
Re-bar Φ10 Ton 18.85 0 18.85 16.023 2.827
Re-bar Φ12 Ton 134.305 15.768 150.073 121.346 28.727
Re-bar Φ13 Ton 79.532 0 79.532 64.285 15.247
Re-bar Φ16 Ton 105.473 0 105.473 88.552 16.921
Re-bar Φ20 Ton 71.454 15.7 87.154 76.174 10.98
Re-bar Φ25 Ton 265.968 15.896 281.864 234.368 47.496
Re-bar Φ28 Ton 88.405 0 88.405 65.625 22.78
Re-bar Φ32 Ton 116.218 63.008 179.226 108.827 70.399
Cut-Back MC-70 Ton 40 0 40 26.9 13.1
Bitumen 60/70 Ton 500 200 700 301 399

2.2.2 Ekipamentu Pezadu


2.2.2.1 Minimum Equipment
No. Requirements
Equipment Type and Characteristics
1 Wheel Loader, 1.8 cu.m, bucket capacity, 160hp
2 Motor Grader, 160 hp
3 Vibrating Roller Single Smooth Drum,10t, 150 hp
4 Pneumatic Tyre Roller 10-15t, 150hp
5 Tipper Truck , 6 cu.m, bucket capacity
6 Bowser, water 9000 litre with spray bar
7 Aggregate Crushing / Screening Plant, 80t per hour
8 Hot mix Asphalt Plant (batch type) 80t per hour
9 Asphalt Distributor
10 Portable Air Compressor , 250 cpm
11 Backhoe Excavator with Concrete Breaker
12 Dump Truck, 7-10 Cu.m.
13 Transit Mixer for Concrete, 6-8 cu.m.
14 Asphalt Sensor Paver, 3.5 - 5.0 width screed
15 Bulldozer, D85
16 Concrete Batching Plant , 50-60 cu.m/hr. Page | 22
17 Power Broom, Towed Type
18 Hydraulic Jack, 100 t
19 Compact Scabbler Machine
Relatoriu Estajiu Profesionál 2019
Tabela 8. Minimum equipment

No. Equipment Type and Characteristics


1 Wheel Loader, 1.8 cu.m, bucket capacity, 160hp
2 Motor Grader, 160 hp
2.2.2.2 Equipment
3 Vibrating Roller Single Smooth Drum,10t, 150 hp
Mobilization
4 Pneumatic Tyre Roller 10-15t, 150hp
5 Tipper Truck , 6 cu.m, bucket capacity
Tabela 9. Mobilization
equipments 6 Bowser, water 9000 litre with spray bar
7 Aggregate Crushing / Screening Plant, 80t per hour
NO. Equipment Name Manufacturer Capacity Unit Remark
8 Hot mix Asphalt Plant (batch type) 80t per hour
1 Crawler excavator
9 SANY
Asphalt Distributor 135kw/1m3 set On site

2 10
Crawler excavator Portable
SANY Air Compressor , 250 cpm
160kw/1.2m3 set On site
11 Backhoe Excavator with Concrete Breaker
3 Wheel excavator SANY 120kw/ 0.6m3 set On site
12 Dump Truck, 7-10 Cu.m.
4 Loader 13 XCMG
Transit 162kw/2.8m3
Mixer for Concrete, 6-8 cu.m. set On site

5 Skid steer14
loader Asphalt
XCMG Sensor Paver, 3.5 - 5.0 2.8m3
162kw/ width screed set On site
15 Bulldozer, D85
6 Dumping truck YATE 247kw/15m3 set On site
16 Concrete Batching Plant , 50-60 cu.m/hr.
Land leveling
7 17 Power Broom, Towed Type
SANY 169-200kw/ 16.5ton set On site
machine
18 Hydraulic Jack, 100 t
8 vibratory roller SANY 20ton/128kw set On site
19 Compact Scabbler Machine
9 Rubber wheel roller SANY 132kw/26T set On site

Double steel wheel


10 SANY 119kw/14T set On site
roller

11 Mobile crane SANY 25T set On site

12 Watering truck YATE 12m3 set On site

13 Concrete mix truck SANY 247KW/ 10m3 set On site

Asphalt distribution
14 XCMG 8000L/25000kg set On site
truck

15 Asphalt spreader SANY 162kw/9m set On site

16 Truck with crane YATE 247kw/ max 8ton lift set On site

17 Trailer YATE 247kw,13m set On site

Sand washing
18 YUANTONG 40t/h、5kw set On site
machine

Stone crusher
19 YUANTONG 100t/h set On site
systems

Page | 23
Relatoriu Estajiu Profesionál 2019
20 Concrete mix station YAANYOU 75m3/h set On site

21 Diesel transfer truck YATE 221kw/ 14000L set On site

22 Light truck YATE 3ton set On site

NO Equipment Name Manufacturer Capacity Unit Remark

23 Pick-up FORD 2.5L set On site

As site
24 Pick-up 2.5L set
required

25 Diesel generator CUMMINS 50KVA set On site

26 Diesel generator CUMMINS 160KVA set On site

27 Diesel generator CUMMINS 700KVA set On site

Laboratory
28 set On site
equipment (ELE)

29 total station set On site

30 GPS set On site

31 Hydraulic Jack JIXIANG 100T set On site

32 Asphalt mix station XCMG 120t/h set On site

Pipe culvert pre-


33 AOLAI max 2000mm set On site
make machine

34 Road line marker RUIDE 80L set On site

Portable Air
35 JIEBAO 250CFM set On site
Compressor

2.3 OBSERVASAUN TÉKNIKA


Observasaun téknika hanesan parte ne’ebe halo atu observa konaba téknika nian hodi hatene
lala’ok servisu sira ne’ebe halo iha projetu ida nia laran. Jerálmente atividade ne’ebe
téknikalmente enjeñeiru sira halao iha terrenu no estajiariu sira observa, Partisipa no aprende mak
sei haktuir iha esplikasaun tuir mai.

Page | 24
Relatoriu Estajiu Profesionál 2019
2.3.1 Etapa servisu

2.3.1.1 Servisu rai nian (Earthwork)

a. Excavation
Eskavasaun ba rai mak atu halo preparasaun hodi harii estrutura no mos hadia inklinasaun iha
foho lolon. Eskavasaun ida ne’e mos ho objetivu atu ke’e to’o hetan rai tos, nune’e konstrusaun
ne’ebe ita harri iha leten bele atinji kualidade ho durasaun tempu ne’ebé kleur. Eskavasaun sei
ke’e tuir elevasaun ne’ebe mak iha ona dezenu laran. Parte eskavasaun mak hanesan tuir mai
ne’e:

 Eskavasaun ba drainajen antigu no existing retaining wall


 Eskavasaun ba cutting slope
 Eskavasaun ba borrow pit area ne’ebe mak sei utiliza ba embankment.
 Eskavasaun hodi haluan estrada nune’e labele afeta ba movimentasaun transporte nian.

Figura 4. Eskavasaun ba Slope cutting

Tabela 10. Espesifikasaun pagamentu ba eskavasaun rai nian

Payment Item Number Description Unit of Measurement


203(1) Unsuitable Excavation Cubic meter
203(2) Surplus Common Excavation Cubic meter

203(3) Surplus Rock Excavation Cubic meter

203(4) Surplus unclassified Excavation Cubic meter

b. Structure Excavation
Eskavasaun ida ne’e mak eskavasaun ba fundasaun Reinforced concrete pipe culvert (RCPC),
reinforced concrete box culvert (RCBC) no sira estrutura sira seluk kona ba estrutura estrada
nian.

Page | 25
Relatoriu Estajiu Profesionál 2019
Tabela 11. Espesifikasaun pagamentu eskavasaun estrutura nian

Payment Item Number Description Unit of Measurement


204(1) Structure Excavation Cubic meter
204(2) Bridge Excavation Cubic meter
204(3) Foundation Fill Cubic meter
204(4) Excavation ordered below Plan elevation Cubic meter
204(5) Shoring, cribbing, and related work Lump sum
204(6) Pipe culverts and drain excavation Cubic meter

Figura 5. Eskavasaun ba preparasaun estrutura RCPC

c. Embankment
Embankment nuudar kamada rai ne’ebé iha fundasaun sira seluk nia okos liu, no sai hanesan baze
fundasaun ida hodi tahan fundasaun sira seluk iha pavimentsaun estrada nian. Nune’e
embankment refere atu asegura to’o tempu naruk, presija atu hatene kualidade material rai ba
embankment nian. Material refere kompostu husi eskavasaun rai no aterru fila fali rai ba area
ne’ebe presija aterru ho material granular ka material selektivu husi borrow pit. Aterru ba
embankment fahe ba parte ha’at mak hanesan; embankment ba rai normal, embankment ba rai
selesionadu, embankment ba rai tahu no embankment ba estrutura granular. Forsa rai nian ba
pavimentasaun depende ba karakteristika no tensaun admessivel do solo/daya dukung tanah. Atu
hatene forsa rai nian tenki halo teste laboratorial mak hanesan hanesan tabela tuir mai:
Tabela 12. Espesifikasaun material ba Embankment

Item Description Test Item Test of control Control Limit Remark


Gradation AASHTO T27-93 100% pass #200 ≤15% Top of embankment
Atterberg limit (LL, PL, PI) AASHTO T89-93, T90-92 PI≤6, LL≤30% (150mm)
205 Embankment Laboratory compaction AASHTO T99-93 Proctor test ≥95% of MDD FDT for every layer
CBR test AASHTO T93-92 CBR ≥5% 200mm
Field density test AASHTO T191-93 ≥95% of MDD Uncompacted thickness

Page | 26
Relatoriu Estajiu Profesionál 2019

Figura 6. Servisu ba Embankment

d. Subgrade preparation

Subgrade preparation nuudar servisu ne’ebe mak kompostu husi preparasaun rai original
molok atu tau/nahe fundasaun agregadu ka sub-base no servisu sira seluk tan ne’ebe mak iha
leten.
Tabela 13. Toleransia ba kompaksaun no thickness

Permitted variation from design +20 mm

Level surface -30 mm


Permitted surface irregularity measured by 3 m straight edge 30 mm
Permitted variation from design crossfall or camber  0.5%
Permitted longitudinal grade over 25 m length  0.1%
Tabela 14. Espesifikasaun pagamentu ba Subgrade

Pay
Description Unit of Measurement
Item Number
206(1) Subgrade preparation (Common material) Square meter
Subgrade preparation Square meter
206(2)
(Existing pavement)
206(3) Subgrade preparation (Unsutibale material) Square meter

Page | 27
Relatoriu Estajiu Profesionál 2019

Figura 7. Servisu ba Subgrade Preparation

2.3.1.2 Servisu ba Estrutura nian

a. Foundation fill
Foundation fill mak servisu ida ne’ebe uja atu aterru fila fali rai no kompakta tuir elevasaun
ne’ebe mak iha ona dezeñu nia laran.

Figura 8. Foundation Fill

b. Lean concrete
Lean concrete mak kamada betaun ne’ebé tau ho objetivu atu halo tetuk armadura ne’ebé sei
monta iha nia leten hanesan RCPC, RCBC no Gabion. Mahar ba lean concrete tuir dezeñu
mak 10 cm.

Page | 28
Relatoriu Estajiu Profesionál 2019

Figura 9. Servisu Lean Concrete

c. Reinforced concrete Box Culvert (RCBC)


Box culvert mak estrutura ne’ebé konstrui husi tipu betaun precast, formadu husi betaun armadu
ne’ebé implementa tuir ninia dezeñu. Box culvert nia funsaun mak hanesan drainase ida ka meiu
ida hodi bee bele ultrapasa ba. Box culvert fahe ba parte rua mak hanesan low grid no Standard
single - double - triple reinforced concrete box culvert.

 Low Grid : mak box culvert ne’ebé ki’ik, hodi simu bee ho volume no velosidade ki’ik,
nia altura la to’o 3 m husi rai orijinal.

 Standard reinforced concrete box culvert : mak box culvert ne’ebé bele simu bee ho
volume ne’ebé bo’ot.

Figura 10. Reinforcement concrete Box Culvert

d. Reinforced concrete Pipe Culvert (RCPC)


Pipe culvert mak parte husi estrutura betaun aramadu, nia funsaun atu kanaliza bee husi fatin ida
ba fatin seluk maibe ho pozisaun iha pavimentasaun estrada nia okos. Diametru Pipe culvert
ne’ebe utilija ba iha projetu ida ne’e mak hatudu iha tabela tuir mai ne’e:
Page | 29
Relatoriu Estajiu Profesionál 2019
Tabela 15. Diameter and thichness of pipe culvert

Diameter & Thickness (mm) Single pipe Double pipe Triple pipe

Int. Dia. Min.Thk.


Area of waterway (m2) Area of waterway (m2) Area of waterway (m2)
(ID) Shell(t)
460 50 0.17 0.33 0.45
610 64 0.29 0.58 0.87
910 86 0.65 1.30 1.95
1070 95 0.90 1.80 2.70
1220 108 1.17 2.34 3.51
1520 127 1.81 3.63 5.43

Figura 11. Reinforced concrete Pipe Culvert

2.3.1.3 Drainage and slope protection structures


a. Stone masonry walls

Stone masonry wall hanesan parte husi konstrusaun, ho nia funsaun atu asegura ba rai monu no
atu tahan mos pavimentasaun estrada ne’ebe mak iha. Material ba konstrusaun ida ne’e utilija
material mortar ho fatuk, ne’ebé iha kualidade di’ak.
Tabela 16. Espesifikasaun pagamentu ba stone masonry retaining wall

Pay Item Number Description Unit of Measurement


609(1) Bed course
Granular Material Cubic meter in-place
609(2) Concrete Cubic meter in-place

Page | 30
Relatoriu Estajiu Profesionál 2019

Figura 12. Konstrusaun Stone Masonry

b. Lined ditch

Lined ditch mak valeta ne’ebe atu kanaliza be’e husi fatin-fatin ne’ebe mak ho elevasaun aas no
suli ba iha fatin ne’ebe ho elevasaun mak klean, hafoin kontinua kanaliza ba iha tasi. Funsaun ida
tan husi Lined ditch atu asegura pavimentasaun estrada nian. Material ne’ebé uza ba Lined ditch
mak mortar no fatuk.

Figura 13. Servisu Lined ditch

c. Guard wall
Guard wall nuudar konstrusaun ida ne’ebe nia pozisaun iha estrada ninin, ho funsaun atu fo
asegura pavimentasaun estrada nian no fo seguransa ba movimentasaun transporte ne’ebé li husi
fatin refere.

Figura 14. Konstrusaun Guard Wall

Page | 31
Relatoriu Estajiu Profesionál 2019
d. Gabion

Gabion mak parte ida husi konstrusaun estrada, ho funsaun atu asegura rai halai no rai monu, atu
nune’e labele tama ba pavimentasaun estrada nian, no estraga pavimentasaun refere.

Figura 15. Servisu Gabion

2.3.1.4 Sub base no Base course


a. Sub base Course
Sub base course nuudar kamada ida husi fundasaun okos, entre subgrade no base course iha
estrutura pavimentu estrada nian, ne’ebé forma husi material rai henek mota.
Tuir mai espesifikasaun sira iha sub base course:
Tabela 17. Grading requirements Sub base course

Sieve Designation
Standard Alternate Mass Percent Passing
US Standard
50 2” 100
25 1” 55-85
9.5 3/8” 40-75
0.075 No. 200 0-12

Tabela 18. Testing requirements Sub base course specification

Item Description Test Item Test of control Control Limit Remark


Gradation AASHTO T27-93 100% pass #200 (0-12%)
Aggregate Atterberg limit (LL, PL, PI) AASHTO T89-93, T90-92 PI≤12, LL≤35%
subbase Los Angeles Abrasion AASHTO T96 Abr.Loss ≤ 50%
301
course Laboratory compaction AASHTO T99-93
For every layer of 150mm
Field density test AASHTO T191-93 ≥100% of MDD
compacted thickness

Page | 32
Relatoriu Estajiu Profesionál 2019

Figura 16. Pavimentu Sub base course

Tabela 19. Thickness tolerances for Sub base Course

Thickness tolerances
Permitted variation from design
 20 mm
Thickness of layer
Permitted variation from design +10 mm
Level of surface -20 mm
Permitted surface irregularity measured by 3 metre straight edge
20 mm

Permitted variation from design crossfall or camber


 0.3%

Permitted variation from design longitudinal grade over 25 m length


±0.1%

Tabela 20. Espesifikasaun pagamentu ba aggregate subbase-course

Payment Item Number Description Unit of Measurement


301 Aggregate Sub base Course Cubic meter

b. Base Course
Base course nuudar kamada fundasaun leten nian, entre sub base course no surface course iha
estrutura pavimentu estrada nian, ne’ebé kompostu husi materiál sira hanesan rai henek mota
no crushed stone. Tuir mai espesifikasaun sira iha Base course:
Tabela 213. Testing requirements Base course specification

Sieve Designation Mass Percent Passing


Standard Alternate US Grading A Grading B
mm Standard
50.0 2" 100
37.5 1 1/2" - 100
25.0 1" 60-85 -
19.5 3/4" - 60-85
12.5 1/2" 35-65 -
4.75 No. 4 20-50 30-55
0.425 No. 40 5-20 8-25
0.075 No. 200 0-12 2-14

Page | 33
Relatoriu Estajiu Profesionál 2019
Tabela 22. Testing requirements Base course specification

Item Description Test Item Test of control Control Limit Remark


Gradation AASHTO T27-93 100% pass37.5mm
Atterberg limit (LL, PL, PI) AASHTO T89-93, T90-92 PI≤6, LL≤25%
Los Angeles Abrasion AASHTO T96 Abr.Loss ≤ 45%
Fractured face BS 812 ≥50%
Laboratory compaction AASHTO T99-93
Aggregate Quality test AASHTO T27,89,90,96
302 Base-course CBR AASHTO T93-92 CBR ≥80%
Field density test AASHTO T191-93 ≥100% of MDD
Thicknes should be measured
on the completed work using the
Thickness GPR prior to placing of succeding
layer & in the inclusion in the
interim payment

Tabela 23. Thickness tolerances for Base Course

Thickness tolerances
Permitted variation from design
 10mm
thickness of layer
Permitted variation from design l +5mm
Level of surface -10mm
Permitted surface irregularity measured by 3 metre straight edge
5mm

Permitted variation from design crossfall or camber


 0.2%

Permitted variation from design longitudinal grade over 25 m length


 0.1%

Figura 17. Pavimentu Base Course

Page | 34
Relatoriu Estajiu Profesionál 2019
2.3.1.5 Surface Course

a. Aggregate surface course

Aggregate surface course mak agregadu sira ne’ebe mak utiliza ba misturasaun asfaltu, antes atu
nahe pavimentu ba surface course. Material agregadu sira nia dimensaun iha variedade hanesan
3-0 mm, 5-3 mm, 10-5 mm, 20-10 mm, ne’ebé hatudu iha tabela mak hanesan tuir mai ne’e:

Tabela 24. Grading requirements of Aggregate Surface Course

Sieve Designation Mass Percent Passing


Standard Alternate
Grading A Grading B Grading C Grading D
mm US Standard
25 1” 100 100 100 100
9.5 3/8” 50-85 60-100 -
,
4.75 No.4 35-65 50-85 55-100 70-100
2 No.10 25-50 40-70 40-100 55-100
0.425 No.40 15-30 25-45 20-50 30-70
0.075 No 200 5-20 5-20 6-20 8-25

Tabela 25. Thickness tolerances for Surface Course

Thickness tolerances
Permitted variation from design
15mm
Thickness of layer
-5mm

Permitted variation from design +15mm


Level of surface -5mm
Permitted surface irregularity measured by 3 metre straight edge
5mm

Permitted variation from design


 0.2%
Crossfall or camber
Permitted variation from design longitudinal grade over 25 m length
 0.1%

Tabela 26. Espesifikasaun pagamentu ba aggregate surface course

Pay Item Number Description Unit of Measurement


401 Aggregate Surface Course Cubic meters compacted in place
401(1) Gravel Surface Course Cubic meters compacted in place
401(2) Crushed Aggregate Cubic meters compacted in place
Surface Course Cubic meters compacted in place
b. Prime Coat

Prime coat hanesan elementu likidu ne’ebe kompostu husi bituminous ho solar ida uza rega ba
iha kamada base-course nia leten atu nune’e para bele kaer metin agregadu labele sai hodi bele
ka’er entre fundasaun leten base course no surface. Material ida ne’e enjeralmente utilija asphalt
Page | 35
Relatoriu Estajiu Profesionál 2019

ida ne’ebe sei tomak ka tos hela ho penetrasaun 60 ho hamanas uja minar-rai to’o nabeen. Prime
coat ne’ebe uja ba iha site mak Prime coat ida ne’ebe nabeen tiha ona ho nia manas ka
temperatura 85oC ba leten, speed distributor mak 2.0-2.2km/h no prime coat nia kuantidade
ne’ebe mak uja ba site mak 1-2 litru/m2.
Tabela 27. Espesifikasaun pagamentu ba bituminous prime coat

Payment Item No. Description Unit of Measurement


402 Bituminous Prime Coat
402(1) MC - Cut-back Asphalt Tonne
402(2) RC - Cut-back Asphalt Tonne

Figura 18. Prime Coat

c. Tack Coat

Tack coat hanesan material likidu ne’ebe kompostu husi bituminous maibe tack coat nia uza ba
iha kamada asphalt concrete wearing course leten ou beton nia leten, funsaun hodi bele ka’er
metin entre kamada asphalt concrete wearing course no asphalt concrete bearing course. Tack
coat nia kuantidade ne’ebe mak uja ba site mak 0.2 to 0.7 litre/m2.

Page | 36
Relatoriu Estajiu Profesionál 2019

Figura 19. Tack Coat

d. Surface Course

Surface course mak kamada iha leten iha pavimentu Estrada nian, ho funsaun atu tahan forsa
roda (trafiku) nian, no atu bee labele nalihun hodi afeita ba pavimentu fundasaun sira hanesan
base course no sub base course. Material ne’ebe uja ba surface course sei kahur ekipamentu
pezadu ida naran Asphalt mixing plant ho nia durasaun tempu mak 45s/one batch. Kompozisaun
material ne’ebé uza ba misturasaun surface mak hanesan Aggregate surface course, bituminous
prime coat, dust).

Figura 20. Servisu ba Surface Course

2.3.2 Survey

Survey mak hanesan servisu topográfiku hodi sukat rai, atu hatene koordenada, elevasaun no
distansia sira ne’ebé iha terrenu atu bele halo dezeñu ba konstrusaun. Instrumentu ne’ebé uza ba
survey topografiku iha parte konsultan projetu ida ne’e nian ne’ebé ami aprende mak hanesan
Nivelamentu (Water pass), Total Station. Atividade ne’ebé mak ami hala’o iha parte survey nian
mak hanesan:
 Kontrola elevasaun ba Sub base course no Base course
 Kontrola elevasaun ba Cutting slope
 Kontrola elevasaun ba eskavasaun fundasaun RCBC no RCPC
 Kontrola elevasaun ba Lined ditch

a. Kontrola elevasaun ba Sub base course no Base course


Page | 37
Relatoriu Estajiu Profesionál 2019

Kontrola elevasaun ba sub base course no base course nuudar levantamentu transversal ida
ne’ebé uza instrumentu water pass hala’o iha terrenu atu hatene elevasaun ba pavimentu tuir duni
dezeñu ne’ebé iha ka lae. Pontu tolu ne’ebé presija atu hatene ninia elevasaun iha pavimentu ida
ne’e mak hanesan parte Right sight, Center line no Left sight. No prosesu levantamentu ida ne’e
hala’o intervalu ba kada 10 m, nune’e bainhira elevasaun pavimentu aas liu presija hatun tan, no
bainhira elevasaun klean liu presija halo ateru.

Figura 21. Kontrola Elevasaun ba Base course

b. Kontrola elevsaun ba Cutting Slope

Levantamentu ida ne’e hala’o uza instrumentu Total station, ho objetivu atu hatene elevasaun ba
cutting slope, nune’e bele identifika katak elevasun slope refere tuir duni dezeñu ne’ebé iha ka
lae. Parte hirak ne’ebé presija hatene ba pontu elevasaun iha levantamentu ida ne’e mak hanesan
parte leten (top slope), parte okos (bottom slope) no eskada (step of slope).

Figura 22. Kontrola elevasaun ba Cutting Slope

c. Kontrola elevasaun ba Eskavasaun fundasaun RCBC no RCPC

Iha levantamentu ida ne’e ho objetivu atu hatene elevasaun ba superfisie eskavasaun fundasaun
iha estrutura hanesan RCBC no RCPC, ne’ebé bele uza instrumentu hanesan Water pass no Total
station, atu nune’e bele choring concrete lean concrete ba.

Page | 38
Relatoriu Estajiu Profesionál 2019

Figura 23. Kontrola elevasaun ba eskavasaun fundasaun RCBC no RCPC

d. Kontrola elevasaun ba Lined ditch


Levantamentu ida ne’e ho objetivu atu kontrola elevasaun ba valeta (Lined ditch), atu nune’e
bainhira konstrusaun refere bele tuir dezeñu no bele kanaliza bee ho di’ak.

Figura 24. Kontrola elevasaun ba Lined ditch

2.3.3 KONTROLU KUALIDADE (LABORATÓRIU)

Kontrolu kualidade nia funsaun hodi halo inspeksaun ba atividade sira iha projetu ida nia laran ho
objetivu atu atinji kualidade ne’ebé diak tuir design no espesifikasaun. Nune’e iha teste hirak
ne’ebé utiliza hodi kontrola kualidade.
2.3.3.1 Soil Testing

Soil testing nuudar teste ida ne’ebé ho objetivu atu hatene konaba kualidade material rai tuir
espesifikasaun ka lae, nune’e bele utilza pavimentasaun estrada.
A. Gradation

Teste ida ne’e ho objetivu atu hatene divizaun materiál (gradasaun) ba agregadu finu no agregadu
grosu ne’ebé utiliza peneira (sieve), liu husi hatudu rezultadu persentajen ne’ebé la pasa iha kada
peneira. Teste ida ne’e hala’o iha laboratoriu.
 Ekipamentu:
a. Sieve set ida
b. Splitter
Page | 39
Relatoriu Estajiu Profesionál 2019
c. Balance
d. Sieve shaker machine

Figura 25. Apparatus of Gradation Test

 Prosedimentu
a. Foti material Base course husi site (quarry) ne’ebé mistura ona, no hafahe uza splitter atu
halo balansu, hafoin tetu
b. Rai ba oven ho temperatura (110 ± 5) °C
c. Hasai husi oven no tetu
d. Fase atu hasai rai tahu, hatama ba oven ho temperatura (110 ± 5) °C , depois hasai no tetu
e. Grading iha sieve, uza liman ou sieve shaker machine ho durasaun minutu 15
f. Tetu gradasaun ne’ebé la pasa iha kada sieve

 Formula

WOS−WODS
 Moisture Content=
WODS

Wt . Retained
 % Retained= x 100
WODS

 Wt . Passing=Wt . Passing−Wt . Retained

 % Passing=100 %−% Passing

Deskrisaun: WOS = Weight of Original Sample (gr)

WODS = Weight of Oven-Dried Sample (gr)

 Kalkulasaun

Page | 40
Relatoriu Estajiu Profesionál 2019
Tabela 28. Worksheet ba teste Gradation

Weight of Original Sample, g : 2971


Weight of Oven-Dried Sample, g : 2937 Moisture Content, % : 1.16
Wash Oven-Dried Sample, g : 2592
Sieve Size Cumulative Specifications
Retained, g. % Retained
Standard, mm Alternative, in. Wt. Passing, g. % Passing % Passing
37.5 1 1/2 0 0 2937 100 100
25.0 1
19.0 3/4
12.5 1/2 475 16 2462 84 60 - 90
9.5 3/8
4.75 #4 1030 51 1432 49 35 - 65
2.00 #10
0.425 # 40 847 80 585 20 10 - 30
0.075 # 200 206 87 379 13 5 - 15
PAN 34 345
Wash Loss 345 0
Total 2937

100 90 100
90
80 84
70
65
Passing (%)

60 60
50 49
40
35
30 30
20 15 20
10 13 10
5
0
0.075 0.425 4.750 12.500 37.500
Sieve size (mm)

Grafiku 1. Gradation Test

B. Atterberg Limit (LL,PL,PI)


Teste ida ne’e atu hatene kadar bee nian ezisti iha rai nia laran ho kondisaun Liquid Limit no
Plastic Limit. Nune’e objetivu ikus husi Atterberg Limit mak atu hatene valor Plasticity Index.
Material rai ne’ebé atu teste, tenki pasa sieve size no.40 (0.425 mm).
 Liquid Limit
Liquid Limit mak kadar bee ne’ebé iha rai, muda husi kondisaun ho bee sai kondisaun plastis.
 Ekipamentu

a. Casagrande elektronika; f. Spatula


b. Grooving tool; g. Oven
c. Kontainer aluminium; h. Bottle bee

Page | 41
Relatoriu Estajiu Profesionál 2019
d. Dasi elektronika; i. Tixu
e. Mankok; j. Kanuru

Figura 26. Apparatus of Liquid Limit Test

 Prosedimentu

a. Foti kontainer ± 4 (mamuk,moos no maran) , tetu ida-idak nia todan tuir nia numeru.
b. Tau rai/sample ba mankok laran no tau bee oitoan-oitoan, kahur ba mai uza spatula.
c. Tau sample ba kontainer Casagrande no halo tetuk ± nia mahar 1 cm.
d. Riska sample iha kontainer casagrande uza grooving tool ho diresaun relogio 12 ba 6.
e. Buti butaun (ON/OFF) iha Casagrande, konta nia pankada/segundu no hare rai halai belit
f. malu ho nia naruk ho medida 13 mm.
g. Koa rai oitoan hatama ba kontainer laran no tetu nia todan.
h. Halo ± to’o dala 4 (hanesan ho etapa b to’o g)
i. Hatama container ba iha oven laran ho ho temperatura 110 ± 5 ℃, ho durasaun 24 ± 4
oras.

 Plastic Limit
Plastic Limit mak kadar bee minimum, iha ne’ebé rai refere nafatin iha kondisaun limite
plastis,
 Ekipamentu
a. Balance; e. Espatula
b. Container aluminium; f. Cawan
c. Oven; g. Vidru Plat
d. Bottle bee;

Page | 42
Relatoriu Estajiu Profesionál 2019

Figura 27. Apparatus of Plastic Limit Test

 Prosedimentu
a. Foti kontainer ± 4 (mamuk,moos no maran) , tetu ida-idak nia todan tuir nia numeru (W1).
b. Kahur rai iha talam laran ho bee to’o ninia kadar air merata.
c. Depois de kadar air merata, halo rai modelu hanesan bola, hafoin guling rai iha vidru pelat
nia leten.
d. Prosesu Guling rai ida ne’e, halo nune’e hela de’it, to’o rai sai modelu pedasuk (naruk), ho
diametru 3 mm. Se karik seidauk atinji 3 mm, signifika rai ne’e nakfera ka tohar. Mas se
karik atinji ki’ik liu husi 3 mm, la hatudu tohar ruma, entaun sampel presiza husik hela de’it
iha minutu hirak nia laran, atu anin bele hamaran, hodi nune’e ninia kadar air bele menus
uitoan. Prosesu kahur no guling rai ida ne’e, hala’o nafatin to’o nia tarjetu hodi atinji 3 mm.
e. Hatama rai pedasuk ne’ebe atinji tiha ona 3 mm ba container laran depois tetu (W2)
f. Halo ± to’o 4 (hanesan ho etapa c to’o e)
g. Hafoin tetu tiha, hatama rai pedasuk ne’e ba oven ho temperatura 110 ± 5 ℃, ho durasaun
24 ± 4 oras.
h. Hafoin sampel ne’e maran, tetu sampel ninia todan ne’ebe hamutuk ho container (W3),
depois halo kalkulasaun sampel nia todan ho kondisaun maran (Ws).

 Formula

weight of wate r
Percentage moisture= x 100
weig ht of dry soil

Plasticity Index (PI) : PI =¿−PL

 Kalkulasaun

Page | 43
Relatoriu Estajiu Profesionál 2019
Tabela 29. Kalkulasaun ba Atterberg Limit

Liquid Limit Plastic Limit


Trial Number
1 2 3 1 2
Container No. MC-6 MC-11 MC-5 SJ-D SJ-E
Wt. Cont. + Wet Soil, g. 30.85 37.22 33.88 22.60 25.11
Wt. Cont. + Dry Soil, g. 28.15 33.34 30.49 20.97 23.15
Wt. Of Moisture, g. 2.7 3.9 3.4 1.6 2.0
Wt. Of Container, g. 14.51 14.58 14.59 12.70 12.63
Wt. Of Dry Soil, g. 13.6 18.8 15.9 8.27 10.52
Moisture Content, % 19.79 20.68 21.32 20 19
No. of Blows 34 25 19 Average: 20

22.00
Sieve No. 10 : 34
Moisture Content,%

MC = 20.68 % Sieve No. 40 : 19


21.32
21.00
No. blow = 25 Sieve No. 200 : 8
20.68
Liquid Limit : 21
Plastic Limit : 20
20.00 Plasticity Index : 1
19.79
Group Index : 0

19.00 Group Classification :


A-1-a(0)
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
No.of Blows

C. Los Angeles Abrasion


Teste ida ne’e ho objetivu atu hatene fatuk nia kualidade (tos) ne’ebé konsisti iha material base
course nian, fatuk refere mak hirak ne’ebé la pasa iha sieve 1/2'' (12.5 mm) no 3/8'' (9.5 mm).
 Ekipamentu
a. Sieve size 12.5 mm; 9.5 mm; no.12 (1.7 mm)
b. Balance
c. Los Angeles Testing Machine
d. Pan

Figura 28. Apparatus of Los Angeles Abrasion Test

Page | 44
Relatoriu Estajiu Profesionál 2019
 Prosedimentu
a. Foti material base course
b. Rai ba oven ho temperatura (110 ± 5) °C
c. Hasai husi oven, grading uza sieve size 12.5 mm no 9.5 mm
d. Hafoin tetu material ne’ebé reteina iha sieve refere ho todan 2500 g ba kada sieve (Todan
bele 2500 ± 10 g)
e. Hatama ba Los Angeles Testing Machine
f. Hamoris Machine refere ho nia rotasaun 500 vezes
g. Hamate Machine, hasai material
h. Grading uza sieve size no.12 (1.7 mm)
i. Tetu material ne’ebé reteina iha sieve refere
j. Tuir mai halo kalkulasaun

 Formula

Weight of Sample
% of Wear =
Weight of retained no .12 after testing

 Kalkulasaun

Tabela 30. Kalkulasaun ba Los Angeles Abrasion Test

Page | 45
Relatoriu Estajiu Profesionál 2019
L.A. ABRASION CRITERIA
SIEVE SIZE (Square Openings) Mass of Indicated Sizes, g
GRADING
PASSING RETAINED ON
A B C
37.5mm (1½") 25.0mm (1") 1250 ± 25 - -
25mm (1") 19.0mm (3/4") 1250 ± 25 - -
19.0mm (3/4") 12.0mm (1/2") 1250 ± 10 2500 ± 10 -
12.50mm (1/2") 9.50mm (3/8") 1250 ± 10 2500 ± 10 -
9.50mm (3/8") 6.30mm (1/4") ---- - 2500 ± 10
6.30mm (1/4") 4.75mm (No.4) ---- - 2500 ± 10
4.75mm (No.4) 2.36mm (No.8) ---- - -

TOTAL SAMPLE WEIGHT 5000 ± 10 5000 ± 10 5000 ± 10

NO. OF SPHERES 12 11 8

TOTAL WEIGTH OF SPHERES, gms. 5000 ± 25 4584 ± 25 3330 ± 20

L.A. ABRASION TEST


NO. OF REVOLUTIONS 500 500 500
A.) WEIGHT OF SAMPLE, gms. 5000

B.) WEIGHT OF RETAINED NO. 12 SIEVE AFTER TESTING 3531

C.) % OF WEAR = (A-B)/A*100 29

D. Fracture face
Teste ida ho objetivu atu hatene porsentajen proporsaun iha kombinasaun material base course
hanesan fatuk mota no fatuk makina nian (crushed stone) ne’ebé la pasa iha sieve no.4 (4.75 mm)
ho 3/4'' (19 mm).
 Ekipamentu
a. Sieve no.4 (4.75 mm) ho 3/4'' (19 mm)
b. Splitter
c. Balance
d. Sieve shaker machine

Figura 29. Apparatus of Fracture Face

 Prosedimentu

Page | 46
Relatoriu Estajiu Profesionál 2019
a. Foti material Base course husi site (quarry) ne’ebé mistura ona, no hafahe uza splitter atu
halo balansu, hafoin tetu
b. Rai ba oven ho temperatura (110 ± 5) °C
c. Hasai husi oven no tetu
d. Fase atu hasai rai tahu, hatama ba oven ho temperatura (110 ± 5) °C, depois hasai no tetu
e. Grading iha no.4 (4.75 mm) ho 3/4'' (19 mm) uza liman ou sieve shaker machine ho
durasaun minutu 15
f. Tetu gradasaun ne’ebé la pasa iha sieve refere
g. Tau iha pan
h. Hili no fahe material refere ba pan tolu, ida ba crushed stone, ida ba crushed mota nian no
ida ba rounded stone. Hafoin tetu kada material ne’ebé iha pan laran.
i. Tuir mai halo kalkulasaun

 Formula
Fractured Surface
% Fractured Surface= x 100
Original wt . of sample

Rounded Surface
% Rounded Surface= x 100
Original wt . of sample

 Kalkulasaun

Tabela 31. Kalkulasaun Fracture Face

Weight of (g) Percentage of


Original Average
Trial
Weight of Fracture Rounded Fracture Rounded percentage of
No.
Sample (g) d Surface Surface d Surface Surface Fractured Face

1 1388 767 619 55 45


2 813 639 175 79 22
3 1111 714 403 64 36 66
4 516 353 158 68 31
5 609 383 227 63 37

E. Laboratory Compaction

Teste ida ne’e ho objetivu atu hatene komparasaun entre todan volume maran rai iha terrenu
ho todan volume maran rai iha laboratoriu. Teste ne’e atu determina maximu dry density (MDD)
no optimum moisture content (OMC) hodi kontrola FDT no CBR. Teste ida ne’e mos hanaran
proctor test no tipu teste bele uza tuir standard ka modified.

Page | 47
Relatoriu Estajiu Profesionál 2019

Klasifikasun husi teste ida ne’e mak:


 Modified Proctor (56 blows ba 5 layer)
 Standard Proctor (25 blows ba 3 layer)

 Ekipamentu
a. Molde
b. Pan
c. Sieve size 19 mm
d. Balance
e. Automatic soil compaction Machine

Figura 30. Apparatus of Laboratory Compaction

 Prosedimentu (Modified Proctor)


a. Prepara material
b. Tetu material ho todan 6500 g, hafoin tau ba oven ho temperatura (110 ± 5) °C
c. Hasai husi oven
d. Tetu bee bazeia ba porsentu ne’ebé iha
e. Kahur material ho bee iha pan laran, depois fahe ba parte lima
f. Enxe material ba molde laran tuir kada layer, ho pankada 56 vezes ba kada layer
g. Kompakta uza manual ka Automatic Soil Compaction Machine
h. Halo kaber superfisie iha molde nian, hafoin tetu molde ne’ebé kompakta tiha ona
i. Foti material tau iha container, hafoin tau ba oven, atu hetan ninia moisture content
j. Repete prosesu hanesan husi parte d to’o i, ba iha molde lima iha teste ida ne’e
k. Tuir mai halo kalkulasaun

 Formula

A−B W1
w= x 100 no W = x 100
B−C w+100
Page | 48
Relatoriu Estajiu Profesionál 2019
Deskrisaun:
W = persentajen moisture, bazeia ba massa oven dry rai
A = massa container no rai úmidu
B = massa container no dry soil
C = massa container
W = massa maran, iha kilogramas por metro cúbico, ba kompaktasaun rai.
W1 = massa úmido, iha kilogramas por metro cúbico.
 Kalkulasaun
Tabela 32. Kalkulasaun Laboratory Compaction

TRIAL NUMBER 1 2 3 4 5 TRIAL NUMBER 1 2 3 4 5

WATER ADDED in (ml) 130 130 130 130 130 CONTAINER NUMBER N1 A12 VIII B4 A1

MOLD + WET SOIL 10576 11217 11436 10898 10556 CONTAINER + WET SOIL 114 112 112.0 113.0 113

MOLD (mass in gram) 6142 6142 6142 6142 6142 CONTAINER + DRY SOIL 110.0 106.0 104.9 104.0 102.0

WET SOIL (mass in gram) 4434 5075 5294 4756 4414 WATER (mass in gram) 4.0 6.0 7.1 9.0 11.0

Volume of Mold, cc 2150 2150 2150 2150 2151 CONTAINER (mass in gram)19.0 16.0 16.0 16 18.0

WT DENSITY, gram/cm3 2.062 2.360 2.462 2.212 2.052 DRY SOIL (mass in gram) 91.0 90.0 88.9 88.0 84.0

DRY DENSITY, gram/cm 3 1.975 2.213 2.280 2.007 1.814 MOISTURE CONTENT, % 4.4 6.7 8.0 10.2 13.1

2.45
MDD, g/cm³ = 2.28
2.35 OMC % = 7.8
2.280
2.25
2.213
2.15
MDD

2.05
2.007
1.95 1.975

1.85
1.814
1.75
1.65
2.00 4.00 6.00 8.00 10.00 12.00 14.00
OMC

Grafiku 2. Grafiku Laboratoty Compaction

Page | 49
Relatoriu Estajiu Profesionál 2019
F. CBR Test

Teste ida ne’e ho objetivu atu hatene kapasidade suporta husi rai, liu husi penetra silinder CBR ba
iha material ensaiu nian. Ho maneira ida ne’e bele hatene valor resistensia/forsa rai baziku atu
uza ba pavimentasaun.
 Ekipamentu
a. Molde
b. Pan
c. Sieve size 19 mm
d. Balance
e. Automatic soil compaction Machine
f. CBR test machine

Figura 31. Apparatus of CBR Test

 Prosedimentu
a. Foti material, tau ba oven ho temperatura (110 ± 5) °C
b. Tetu material 6500 g dala tolu
c. Tetu bee bazeia ba porsentu husi rezultadu proctor nian
d. Kahur material ho bee
e. Foti ninia moisture content iha molde tolu
f. Enxe ba molde primeiru kompakta 10 vezes ba kada 5 layer, tuir mai molde segundu
kompakta 30 vezes ba kada 5 layer no molde terseiru kompakta 65 vezes ba kada 5 layer.
Uza manual ka automatic soil compaction Machine.
g. Tetu molde ne’ebé kompaktadu tiha ona ho material
h. Hoban molde ba bee laran ho durasaun loron 4
i. Hasai husi bee, hafoin tetu
j. CBR reading uza CBR test machine
k. Hasai no foti nia moisture content
l. Tuir mai halo kalkulasaun

Page | 50
Relatoriu Estajiu Profesionál 2019
 Formula

corrected load value


CBR= x 100
standard load

 Kalkulasaun

Tabela 33. Kalkulasaun CBR Test


MOISTURE CONTENT AND WEIGHT OF TEST SAMPLES
MOLD NUMBERS 1 2 3
Number of Layers 5 5 5
Number of Blows Per Layer 10 30 65
MDD, g/cc (ASTM D1557) 2.28 2.28 2.28
Optimum Moisture Content 7.8 7.8 7.8

CONDITION Before After Before After Before After


OF SAMPLE Soaking Soaking Soaking Soaking Soaking Soaking
Wt. Of Wet Sample+Mold 11817 11830 11843 11869 11935 12450
Weight of Mold 6725 6725 6744 6744 6726 6726
Weight of Wet Samples 5092 5105 5099 5125 5209 5724
Volume of Sample Mold 2140 2140 2140 2140 2140 2140
Wet Unit Weight 2.38 2.39 2.38 2.39 2.43 2.67
Average Wet Unit Weight 2.38 2.39 2.55

MOISTURE Before After Before After Before After


DETERMINATION Soaking Soaking Soaking Soaking Soaking Soaking
Can Number VIII & N-1 B-2 & A-B L-2 & U-6 B-4 & VIII N-7 & A-12 C-3 & GRI
Wt. Of Wet Sample+Can 155.5 135.5 141.5 125.5 146.5 131.0
Wt. Of Dry Sample+Can 145.0 127.0 132.0 118.5 138.0 123.0
Weight of Water 10.5 8.5 9.5 7.0 8.5 8.0
Weight of can 17.0 18.5 16.5 16.5 15.5 16.0
Weight of Dry Sample 128.0 108.5 115.5 102.0 122.5 107.0
% Moisture Content 8.2 7.8 8.2 6.9 6.9 7.5
Average Moisture Content 8.0 7.5 7.2
Dry Unit Weight 2.206 2.221 2.383

Page | 51
Relatoriu Estajiu Profesionál 2019
Tabela 34. CBR Reading

CBR PENETRATION DATA: PISTON AREA= 1963.5 mm2 CONSTANT LOAD FACTOR: 0.042
MOLD 1 (10 blows) MOLD 2 (30 blows) MOLD 3 (65 blows)
Penetration Std. Load Test Load Test Load Test Load
inch mm. psi Mpa Reading KN Mpa % CBR Reading KN Mpa % CBR Reading KN Mpa % CBR
0.000 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.025 0.64 45.0 1.89 0.96 38.0 1.60 0.81 35.0 1.47 0.75
0.050 1.27 94.0 3.95 2.01 98.0 4.12 2.10 90.0 3.78 1.93
0.075 1.91 147.0 6.17 3.14 172.0 7.22 3.68 159.0 6.68 3.40
0.100 2.54 1000 6.90 199.0 8.36 4.26 61.69 229.0 9.62 4.90 70.99 440.0 18.48 9.41 136.40
0.150 3.81 297.0 12.47 6.35 418.0 17.56 8.94 435.0 18.27 9.30
0.200 5.08 1500 10.30 387.0 16.25 8.28 80.37 601.0 25.24 12.86 124.81 590.0 24.78 12.62 122.53
0.300 7.62 554.0 23.27 11.85 915.0 38.43 19.57 921.0 38.68 19.70

180
160
140
120
100
CBR (%)

80
60
40
20
0
2000 2050 2100 2150 2200 2250 2300 2350 2400 2450
MDD

Grafiku 3. CBR Result

G. Field Density Test


Teste ida ne’e ho objetivu atu hatene katak rai ne’ebé ita kompakta tiha ona ne’e te ne’e
halao iha kampu no utiliza sand cone method.
 Ekipamentu
a. Plat sand cone
b. Sand cone
c. Balance
d. Balde

Figura 32. Apparatus FDT


Page | 52
Relatoriu Estajiu Profesionál 2019
 Formula
Wet Density
Max . Dry Density=
(1+ Moisture Content /100)

Dry Density of Soil


Compaction Obtained= x 100
Max. Dry Density

 Prosedimentu

a. Tau plat sand cone ba rai, hafoin ke’e rai ho profunidade 15 cm,
b. Enxe rai henek iha cone laran ba kuak ne’ebé ke’e ona no tetu ne’ebe sei restu iha cone
laran, hafoin foti ninia moisture content, no tetu rai ne’ebé ke’e ona
c. Suru fali rai henek iha kuak laran, enxe fali rai ba iha kuak laran
d. Tuir mai halo kalkulasaun, Numeru kuak ba teste ida bazeia ba espesikasaun, katak kada
500 m³ no espesifikasaun ba persentajen rezultadu ikus tenki ≥ 100%

 Kalkulasaun
Tabela 35. Kalkulasaun FDT

Te st Number 1 2 3
Location of Test Hole 50+750 50+820 50+920
offset from Centerline LS CL RS
Layer No./Thickness (mm) 150 150 150
Moisture Density Relation : Lab. No. : MDD 2.28
Wate r Conte nt Determination
Can No. -
Wt. of Can, gm. (a) 25 25 25
Wt. of Can and Wet soil, gm. (b) 166 167 141
Wt. of Can and Dry soil, gm. (c) 164 163 138
Wt. of Water, gm. (d) = (b) - ( c ) 2 4 3
Wt. of Dry Soil, gm. (e ) = (c ) - (a) 139 138 113
Water Content (f) = (d) / (e ) x 100 1.44 2.90 2.65
Density Determination
Density Sand Container No.
Wt. of Wet Soil + Container, gms (1) 5856 5717 5732
Wt. of Container, gm (2) 312 312 312
Wt. of Wet Soil, gm (3) = (1) - (2) 5544 5405 5420
Wt. of Sand + jar before Test, gm. (4) 8225 8314 8456
Wt. of Sand + jar After Test, gm. (5) 4395 4708 4820
Wt. of Sand in hole and Cone, gm. (6) = (4) - (5) 3830 3606 3636
Calibrated Wt. of Sand in Cone, gm. (7) 770 770 770
Wt. of Sand that filled hole, gm. (8) = (6) - (7) 3060 2836 2866
Unit Wt. of Density Test Sand, gm./cc (9) 1.281 1.281 1.281
Volume of Test Hole, cc. (10) = (8) / (9) 2388.8 2213.9 2237.3
Wet Density of Soil from Hole, gm./cc.(11) = (3) / (10) 2.32 2.44 2.42
Dry Density of Soil from Hole, gm./cc. (12) = (11) / mc 2.29 2.44 2.42
Obtained Percent Compaction (13) = (12)/mdd x 100 100% 107% 106%
Required Percent Compaction 100 100 100
Comments : (Passed/Failed) Passed Passed Passed
Page | 53
Relatoriu Estajiu Profesionál 2019
2.3.3.2 Concrete Testing
Concrete testing mak teste ne’ebé implementa ba concrete deit, nune’e teste refere sei haree ninia
misturasaun concrete ba slump test no Compressive strenght Test
A. Slump Test
Slump test hanesan teste ba material argamasa (mortar) ne’ebé ho objetivu atu identifika
kualidade argamasa maran liu ka been liu. Iha konstrusaun hotu ne’ebé uza betaun tenke halo
teste slump atu nune’e bele identifika argamasa nia kualiade tuir espesifikasaun ne’ebé define
ona.
 Ekipamentu
a. Cone
b. Plate
c. Tamping rod

Figura 33. Apparatus of Slump Test

 Prosedimentu:

a. Prepara ekipamentu teste slump.


b. Prepara material argamasa (mortar) ba teste slump.
c. Tau cone slump iha plate leten
d. Tau betaun 1/3 ba iha cone laran, blows 25x per layer.
e. Tuir mai tau betaun 1/3 tan hanesan iha leten.
f. Ikus liu tau betaun 1/3 tan.
g. Hatetuk superfisie cone.
h. Hasai Apparatus ka cone.
i. Sukat medida slump.
j. Se valor slump tuir ona kriteria maka bele utiliza ba fui konstrusaun.

Page | 54
Relatoriu Estajiu Profesionál 2019
B. Concrete Compressive Strength Test
Concrete Compressive Strength test mak teste ba sampel ne’ebe ita foti husi site ne’ebe mak ita
fui tuir molde ne’ebe mak ita planeia hodi ensaiu fali atu nune’e bele hatene forsa husi concrete
refere. Forsa husi concrete refere tenki hanesan ho forsa ne’ebe planeia bele mós liu. Teste ba
compresaun ne’e halo dala rua, hahu husi loron pouring concrete ba to’o iha loron dahituk (7), no
mós loron ba dala ruanulu resin -ualu (28).

 Ekipamentu
a. Compressive Strength Test Machine
b. Balance

Figura 34. Apparatus of Compressive Test

 Prosedimentu
a. Hoban concrete to’o tempu ne’ebé mak atu teste (Loron 7 & 28)
b. Halo kaber superfisie leten concrete nian uza material kimiku (sulfon)
c. Tau ba ekipamentu Concrete Compressive Strength test nia laran, hodi bele teste atu hatene
concrete refere bele simu karga kompresaun to’o hira.

 Formula

1
A= π . D 2
4

LOAD
P (Strength) =
A

Deskrisaun : A = Area

P = Forsa Presaun

Page | 55
Relatoriu Estajiu Profesionál 2019

 Kalkulasaun

Tabela 36. Kalkulasaun Compressive Test

MIX REFERENCE Lean Concrete CEMENT FACTOR, kg 6.0 Bags m2


CEMENT TYPE / BRAND Type/Tonasa SOURCE Dili
PART OF STRUCTURE Lean Concrete
SAMPLE ID I II III AVERAGE
DATE SAMPLED 12-03-2018 12-03-2018 12-03-2018
M CONCRETE CLASS Lean Concrete Lean Concrete Lean Concrete
I SLUMP, mm 85 85 85
X
WATER-CEMENT 0.55 0.55 0.55
RATIO
LENGTH, mm 300 300 300 300
DIAMETER, mm 150 150 150 150.0
CROSS-SECTIONAL 176.7 176.7 176.7
176.7
AREA, Cm2
S VOLUME, cm3 5301 5301 5301 5301.5
A WEIGHT, gm. 12705.0 12861.0 12842.0 12802.7
M DENSITY, gm/cm3 2.397 2.426 2.422 2.415
P
DATE TESTED 9-Aug-19 9-Aug-19 9-Aug-19
L
E AGE IN DAYS 7 7 7
MACHINE READING, 172.1 182.3 180.5 178.300
KN
STRENGTH, MPa 9.7 10.3 10.2 10.0
SPECIFICATION,
Mpa

2.3.3.3 Bituminous material testing

Bituminous material testing mak hanesan teste ne’ebé hala’o hodi kontrola kualidade material ba
misturasaun surface nian. Nune’e iha teste ba bituminous sei koalia konaba Extraction test no
Stability Marshall test.

A. Extraction test

Extraction test mak hanesan teste ne’ebé ho objetivu atu hatene agregadu (finu no grosu) sira
ne’ebé konsisti iha misturasaun ba pavimentu surface course nian, liu husi prosesu hasai asphalt
ben (extraction) no grading, nune’e atu hatene gradasaun material ne’ebé reteina iha kada sieve,
tuir duni ninia espesifikasaun ka lae. Course aggregate ne’ebe uza kahur ho asphalt nia tenke liu
Sieve 12.5 mm no para iha Sieve 9.5 mm.

Page | 56
Relatoriu Estajiu Profesionál 2019
 Ekipamentu
a. Balance;
b. Extraction machine
c. Sieve
d. d. Pan

Figura 35. Apparatus of Extraction Test

 Prosedimentu

a. Foti sample iha site bainhira nahe pavimentu surface, no tetu todan sample to’o 1200 g
b. Tetu Filter Paper nia todan (15.2~15.3 g)
c. Tau material Asphalt ba makina Extraction kahur ho gasoel kedok to’o minutu 2 atu nune’e
Bituminous bele husik agregadu sira, se karik uza Bensin entaun kedok ho durasaun minutu 1
de’it no fase to’o dala tolu (3).
d. Hatama sample ba oven hodi hamaran
e. Hasai fali sample no tetu nia todan aggregate ne’e
f. Hatama ba iha Sieve (1 set ba teste refere)
g. Pineira sample uza Sieve shaker to’o 2 minutus
h. Tetu fali Sample ne’ebe hela iha kada Sieve
i. Hafoin halo kalkulasaun ba rezultadu.

Page | 57
Relatoriu Estajiu Profesionál 2019

 Kalkulasaun

Tabela 37. Kalkulasaun Extraction Test

1 . T E S T N um be r 1 2
A . W eight o f M ixture,gm 1 20 0
B . W eight of filter befo re test,gm 82
C . W eight o f filter after test,gm 85
D . D iff. in w eight o f filter,gm.(C -B ) 3
M
E. W t. o f aggregates after extraction,gm. 10 9 4,5
I
F . To tal w eight of aggregates after extraction,gm.(D + E) 10 9 7,5
X
G . W eight o f b itumen extracted,gm(A - F ) 10 2 ,5
H . P ercent b itumen b y w eight o f aggregates, % (G /F )* 1 00 9 ,3
I. P ercent b itumen by w eight o f mix, % (G /A )*1 00 8 ,5
J. A verage,%
2 . PA R TIC L E S IE V E A N A L YS IS A FT E R E X T R A C TIO N
C umulati C umulative P ercent
S IEV E S IZE Ind ividual W eight R etained S pecifications
ve R etained P assing
3 7.5 mm (1 /2 ")
A
2 5 mm (1") 0 0 0 10 0 1 00
G
1 9mm (3 /4 ") 0 0 0 10 0 80 -1 00
G
9 .5mm (3 /8") 19 8 1 98 18 82 6 0- 80
R
4 .75 mm (4 ") 2 01 ,9 39 9 ,9 36 64 4 8- 65
E
2 .36 mm (N o.8 ) 1 74 ,2 57 4 ,1 52 48 3 5- 50
G
0 .60 0mm (N o. 3 0) 2 45 ,8 81 9 ,9 75 25 1 9- 30
A
0 .30 0mm (N o. 5 0) 1 14 ,2 93 4 ,1 85 15 1 3- 23
T
0 .15 0mm (N o. 1 00 ) 7 7,8 1 01 1 ,9 92 8 7 -1 5
E
0 .07 5mm (N o. 2 00 ) 3 7,1 1 04 9 96 4 1- 8
P an 4 8,5 1 09 7 ,5
Total 10 9 7,5

B. Stability Marshall test

Stability Marshall test nuudar teste ba kualidade material iha misturasuan pavimentu surface
course, ho objetivu atu hatene deflexaun ba pavimentu (flow) ka hodi hatene estabilidade ba
flow. Flow mak nuudar mudansa forma husi misturasaun asfalto ne’ebe mak afeta husi pezu
roda (trafiku) hodi hamosu forma ondulasaun (gelombang), alur no bleeding.
 Ekipamentu
a. Asphalt compaction machine
b. Balance
c. Extruder
d. Water bath
e. Marshall test machine

Page | 56
Relatoriu Estajiu Profesionál 2019

Figura 36. Apparatus of Marshall Test

 Prosedimentu
a. Foti sample iha terenu mais ou menus ho temperatua 160-180 oC
b. Fahe sample ne’ebe lori mai utiliza splitter (alat Pemisa Sample)
c. Tetu todan sample to’o 12000 g
d. Hatama ba oven ho temperatura 130 oC durante minute 15 to’o fila fali ba temperatura
ne’ebé normal 160-180 oC
e. Ense Mol hamutuk neen, tenke kose ho masa atu nune’e sample labele belit no kada layer
fai to’o 15 hamutuk layer tolu (3)
f. Kompakta uza Asphalt compaction machine ba parte okos no leten hamutuk 75 Blows

 Kalkulasaun
Tabela 38. Kalkulasaun Stability Marshall Test

IT EM 310-GRADIN G C Penetration Grade: 60-70 Compaction: 75 Blows


Specific Gravity of Combined Aggregates, Gsb 2,6 69 Effective
Specific Specific
Gravity ofGravity
Asphaltof Aggregates:
Cement, Gb Gse 1,0 3 Effective Specific Gravity of Aggregates, Gse 2,5 73
% AC Mass, gms Specific Gravity/Density Stability, lbf
Height of Bulk Max. Sp.Gr. % Air Voids % VMA % VFA Unit Weight,
By Wt. Of By Wt. Of Sample Flow 0.01"
In Air In Water SSD in Air Bulk Volume Sp.Gr.(Speci (loose mix) (4-7) (14-20) (70-80) pcf Reading Correlation Adjusted
Aggregate Mix Ratio
men), Gmb Gmm
5,37 5,10 6,5 1195 677,9 1204 526,1 2,271 222 4,25 943,5 2,4
6,6 1191 673,5 1202 528,5 2,254 280 4,25 1190 2,8
6,6 1191 675,8 1207,1 531,3 2,242 225 4,25 956,25 2,2
2,256 2,390 5,63 19,80 71,59 140,7 1030 2
5,37 5,10 6,6 1186 677,5 1200,6 523,1 2,267 350 4,25 1487,5 3,4
6,6 1187 670,1 1203,7 533,6 2,225 212 4,25 901 3,3
6,5 1196 682,6 1208,3 525,7 2,275 249 4,25 1058,25 3,4
2,256 2,390 5,62 19,80 71,60 140,8 1149 3
Index Retained Strength ( IRS ) ,(S2) 89,6
Stability Loss 24hr , 60° C 25 ≥ 10,4

Page | 57
Relatoriu Estajiu Profesionál 2019

3
KONKLUZAUN NO SUJESTAUN
3.1 Konkluzaun
Husi partisipasaun estudante estajiariu sira nian durante fulan rua nia laran iha projetu
konstrusaun Estrada Maubara – Karimbala no Atabae – Mota Ain, ne’ebé lokaliza iha parte
oeste, hakarak konklui katak progresu servisu ba projetu ida ne’e iha loron 1 Jullu 2019 atinji
ona pursentu 32.32% no to’o iha loron 31 Agostu 2019 atinji ba pursentu 39.23%.

Iha projetu konstrusaun estrada ida ne’e estajiariu sira partisipa iha atividade sira mak hanesan
tuir mai ne’e:
 Superviziona ba parte servisu estrutura nian hanesan RCPC no RCBC.
 Superviziona ba instalasaun besi no fui argamasa.
 Survey hodi kontrola elevasaun iha parte konstrusaun nian
 Superviziona servisu sira hanesan retaining wall, lined ditch, guard wall no gabion
 Kontrola kualidade material liu husi halao teste iha laboratoriu no iha terrenu

3.2 Sujestaun

Atu atividade estajiu profesionál iha Departamentu Enjeñaria bele la’o di’ak liu tan iha
periodu sira tuir mai, nune’e nuudar estajiariu ba periodu 2019 nian hakara sujere ba
Departamentu katak:
 Durasaun tempu ne’ebe ami utilija ba estajiu seidauk másimu, tamba iha parte barak
mak ami seidauk aprende, tan ne’e ami sujere ba Departamentu katak iha periodu sira
tuir mai ne’e, presija prolonga tan durasaun tempu estajiu nian.
 Presija estudante sira halo Site visit ba projetu, atu nune’e bele fo koñesimentu jeral ba
estudante sira konaba servisu sira iha terrenu ne’ebé relasaun ho area Enjeñaria Sivil
nian, antes halao atividade estajiu.
 Nafatin fo koñesimentu klean liu tan ba estudante sira iha parte sira hanesan Teste
Laboratoriu nian no Topografiku nian.
 Presija minimija numeru estudante iha kada grupu atu ba halao atividade estajiu iha
terrenu, ho nune’e estudante sira bele iha aproveitamentu diak hodi aprende.

Page | 58
Relatoriu Estajiu Profesionál 2019

Bibliografia

 Special Project specification Manual


 Standard method for embankment materials AASHTO T11-05, T27-06
 Standard method of test gradation materials AASHTO T88-93
 Standard method of test Atterberg Limit AASHTO T89-93, T90-92
 Standard method of test Los Angeles Abrasion AASHTO T96
 Standard method of test Fracture face BS 812
 Standard method of test Laboratory Compaction AASHTO T180-93
 Standard method of test for California Bearing Ratio AASHTO T193-92

Page | 59
Relatoriu Estajiu Profesionál 2019
ANEKSU
A. FOTO

Foti sampel iha terrenu CBR Reading

Monitorizasaun husi Dosente orientador Field Density Test (FDT)

Hanorin estudante uza Total Station Foti Sampel Concrete

Servisu ba Pavimentu Surface course Asphalt Coring

Page | 60
Relatoriu Estajiu Profesionál 2019
B. SPECIFICATION SCHEDULE OF MINIMUM TEST REQUIREMENTS

Page | 61
Relatoriu Estajiu Profesionál 2019
ITEM
DESCRIPTION TEST TYPE TEST ITEM TEST or CONTROL FREQUENCY CONTROL LIMIT
NO
203 Excavation 1.Matrial Test 1. Gradation AASHTO T88-93 For Every 1500 cu.m or fraction there of
2. Atterberg Limit (LL,PL,PI) AASHTO T89-93, T90-92 the same at the above mentioned PI ≤ 6, LL ≤ 30%
3. Laboratory Compaction AASHTO T99-93, T180 the same at the above mentioned
204 Structure 1.Matrial Test 1. Gradation AASHTO T88-93 For Every 1500 cu.m or fraction there of 100% pass 75mm,
Excavation # 200 ≤15%
2. Atterberg Limit (LL,PL,PI) AASHTO T89-93, T90-92 the same at the above mentioned PI ≤ 6, LL ≤ 30%
3. Laboratory Compaction AASHTO T99-93, T180 the same at the above mentioned ≥99% of MDD
2.Compaction Test 1.Moisture Content for every 500 sq.m. or fraction there of
2. Field Density AASHTO T191-93 at least 3 density test ≥95% of MDD

205 Embankment 1.Matrial Test 1. Gradation AASHTO T27-93 For Every 1500 cu.m or fraction there of 100% pass 75mm,
# 200 ≤15%
2. Atterberg Limit (LL,PL,PI) AASHTO T89-93, T90-92 the same at the above mentioned PI ≤ 6, LL ≤ 30%
3. Laboratory Compaction AASHTO T99-93 Evry change in soil properties, 1 complete test
4. CBR Test AASHTO T193-92 For Every 2500 cu.m or fraction there of- CBR ≥ 5%
5.Moisture Content
6.Specific Gravity
1.Moisture Content
2.Compaction Test 2. Field Density AASHTO T191-93 for every 500 sq.m. or fraction thereof ≥99% of MDD
3.Plate Bearing Test at least 3 density test
3.Final Level Test 1.Proof Rolling at least 3 test
206 Subgrade 1.Matrial Test 1. Gradation AASHTO T27-93 For Every 1500 cu.m or fraction there of 100% pass 75mm,
Preparation # 200 ≤15%
2. Atterberg Limit (LL,PL,PI) AASHTO T89-93, T90-92 the same at the above mentioned PI ≤ 6, LL ≤ 30%
3. Laboratory Compaction AASHTO T180-93 Evry change in soil properties, 1 complete test
4. CBR Test AASHTO T193-92 For Every 2500 cu.m or fraction there of- CBR ≥ 5%
5.Moisture Content
6.Specific Gravity
1.Moisture Content
2.Compaction Test 2. Fiel Density AASHTO T191-93 for every 500 sq.m. or fraction thereof ≥95% of MDD
3.Plate Bearing Test at least 3 density test
3.Final Level Test 1.Proof Rolling at least 3 test

Page | 62
Relatoriu Estajiu Profesionál 2019

Page | 63
Relatoriu Estajiu Profesionál 2019
411 Butiminous 1.Aggregate 1. Gradation AASHTO T11-91, T27-93 For every 75 cu, m or fraction there of sq.m
Concrete 25mm 2.Los Angeles Abrasion AASHTO T96 For every 1.500 cu, m or fraction there of Abr. Loss ≤40%
Surface Course 19mm 3.Soundness Test AASHTO T104 Loss ≤12%
Hot-laid 13mm 4.Sand Equivalent AASHTO T176, ASTM D2419 SE ≥35%
10mm 5.Flakiness Index BS 812 FI ≥35%
7mm 6.Fracture face BS 812 >50%
7.Spesific gravity and Absorption AASHTO T84

2.Sand 1. Gradation AASHTO T11-91, T27-93


2.Soundness Test AASHTO T104
3.Spesific gravity and Absorption AASHTO T84
3.Mineral filler or
Cement 1. Gradation AASHTO M17 AASHTO T37 For every 100 metric tons or fraction there of Item 904A
2.LL,PL,PI AASHTO T90 Item 904A.2.2
3.Flow Test
4.Swelling Test
5.Spesific gravity and Absorption AASHTO T84
4.?drated Lime 1. Gradation AASHTO T37 For every 100 metric tons or fraction there of Item 902
2.Spesific gravity and Absorption AASHTO T84
5.Bituminous Materials 1. Quality Test AASHTO M20, 226 For every 40 metric tons or fraction there of Item 903
1.BIN Gradation and
6.HOT BIN Gradation Combined Gradation For every 75 c.m/130tons or fraction there of
7. Mix 1.Mixing Design
2.Stability & Flow AASHTO T245/ASTM D1559 For every 75 c.m/130tons or fraction there of Stability Loss ≤25%
3.Air Void AASHTO T269 4-7%
4.Aggregate Void filled with AC AASHTO T164, T170 70-80%
5.Laboratory Compaction & Sp.Gravity AASHTO T312, T166-93
6.Coating & Stripping AASHTO T182
7.Extraction (bitumen content,gradation) AASHTO T164, T170, T27
8.Retained Strength AASHTO T165,T167 >70% of Marshall stability
9.Temperature
At Plant One every delivery truck
At Site One every delivery truck
8.Compacted Pavement Core Sampling For each full days operation
1.Dencity at least one (1) >95% of Marshall density
2.Thickness but not more than three (3)
samp les shall be teken
9.Acceptance 1. International ASTM, E950 Entire Length of Road for
Roughness Index Class I Both Directions pior to issue
AASHTO, PP43 of taking Over Certificate

Page | 64
Relatoriu Estajiu Profesionál 2019
412 Portland Cement 1.Cement 1. Quality Test AASHTO, M85 For every 2000 bags cu.m
Concrete or fraction there of
Paviment 2. Fine Agrgregate 1.Gradation For every 75 cu.m.
PCCP 2.Clay Lumps & FP AASHTO T11, T27 or fraction there of 100% pass 9.5mm
3.Organic Impurities AASHTO T112
4. Specific Gravity and AASHTO T71
Absorption AASHTO T84
5.Soundness AASHTO T104
6.Test Unit Weight AASHTO T19
7.Salt Content
8.0.08mm Sieve Pass
3. Course Agrgregate 1. Gradation AASHTO T11, T27 For every 75 cu.m. 100% pass 63mm
2. Clay Lumps AASHTO T112 or fraction there of
3.Sp. Gravity & Abs AASHTO T84
4. Test Unit Weight AASHTO T19
5. Soundness Test AASHTO T104
6. LA. Abration AASHTO T96 Abr. Loss ≤40%
7.Alkali Aggrigate Reaction
8.0.08mm Sieve Pass
4. Water Certification from Project Engineer AASHTO T26
Quality Test, if source is questionable
5.Admixture 1.Quality Test One every truck mixer at
batch plant & at Site
6. Concrete 1. Slump Test AASHTO T119 1-set per 75 cu.m. of concrete
2. Flexural Test AASHTO T97 placed each day >3.8 Mpa (550psi)
7. Completed pavement 1.Thickness Five holes per Km. per lane
Determination or 5 holes per 500 m
2. International
Roughness Index
505 Reinforcing Steel 1. Bar Reinforcement 1.Clay Lumps &Shale AASHTO M42, 31, 53. For every10.000 kg. kg
Organic Impurities or fraction there of
2.Specific Gravirty and Absortion
2. Wire and Wire Mesh 1. Unit Weight AASHTO M183 For every10.000 kg.
2.Soundness Test or fraction there of

Page | 65
Relatoriu Estajiu Profesionál 2019
506 Structural Concrete 1.Cement 1. Quality Test AASHTO M85 For every 2.000 bags.
or fraction there of
2. Fine Agrgregate 1.Gradation
2.Clay Lumps & FP
3.Organic Impurities
4. Specific Gravity and
Absorption
5.Soundness
6.Test Unit Weight
7.Salt Content
8.0.08mm Sieve Pass
3. Course Agrgregate 1. Gradation For every 1500 cu. m. or fraction there of
2. Clay Lumps
3.Sp. Gravity & Abs
4. Test Unit Weight
5. Soundness Test
6. LA. Abration
7.Alkali Aggrigate Reaction
4. Water 1.Certificate from project engineer AASHTO T26 - 97
Quality test , if sourse is questionable
5.Admixture 1. Quality Test One every truck mixer at
batch plant & at Site
6. Concrete 1. Slump Test AASHTO T119 1-set per 75 cu.m. of concrete
2. Compressive Strength Test AASHTO T22-92, T23-93 placed each day or fraction thereof
7. Premolded Fille for
Expansion Joint 1. Quality Test AASHTO T42 - 92 For every Sipment
Joint
8. Bar Reinforcement 1. Quality Test AASHTO T42,31,53. For every10.000 kg.
Same as Item 505 or fraction there of
1. Compressive Strength
601
Pipe Culvert and 1.Matrial Test Test AASHTO T22-92, T23-93 more than 25 pipies cast in the field report
Storn Drains 2. Inspection Report for each size for not more tham 25 pipies cast in
605 Riprap and 1. cement 1. Quality test same test as item 506 One for every 2,000 bags or
Grouted Riprap fraction thereof
2. Fine Agrgregate 1.Gradation For every 75 cu.m of fraction
2.Clay Lumps & FP thereof
3.Organic Impurities
4. Specific Gravity and
Absorption Page | 66
5.Soundness
6.Test Unit Weight
7.Salt Content
8.0.08mm Sieve Pass
Relatoriu Estajiu Profesionál 2019
606 Stone Masonry 1. cement 1. Quality test same test Item 506 cu.m
2. Fine Agrgregate 1.Gradation
2.Clay Lumps & FP
3.Organic Impurities
4. Specific Gravity and Absorption
5.Soundness
6.Test Unit Weight
7.Salt Content
8.0.08mm Sieve Pass
3.Stone 1.Inspetion Report Item 606.2.1 Item 606.2.1
4.Water 1.Certificate from project engineer
Quality test , if sourse is questionable
610 Gabions 1.Wire and Wire M esh 1.Quality test AASHTO M183 cu.m
per shipment
2. Rock Fill 1.Quality test AASHTO M63
Inspection Report from engineer Item 610.2.3 Item 610.2.3
701 Curb and/or gutter 1.Concrete Same as Item 506 l.m
704 Metal Beam 1.Steel Post 1. Quality test or For each type and l.m
Guardrail M ill test certificate shipment of metal
706 Road Sign 1.Matrial Test 1.Inspection Report from engineer each
710 Reflectorized 1.Paint 1.Quality test One 20 liter can for every 100 cans or sq.m
Thermoplatic fration thereof
Pevement or one 4 liter can per 100
Markings cans or fracion thereof

900 Box culvert 1.Matrial Test Same as Item 206 each


Backfill 1.Moisture Content
2.Compaction Test 2. Fiel Density AASHTO T191-93 for every 500 sq.m. or fraction thereof ≥99% of MDD
3.Plate Bearing Test 30cm 1 layer,3 layer per 1 test
3.Foundation 1.Bearing capacity which posion

NOTES :
1. The above schedule is mnimum for the quality control and assurance of the works
2. The engineer shall direct any other tests whitch he thinks necessary for quality control an assurance of materials,products and workmanships
3. Refer to relevant Items, section and subsections of the MPWTC standart specificcations as to refference
4. Refer to AAS HTO standart specifications for transportation materias and method of shampling and testing annual book of AS TM standards, and/or any orther documents as the detailed of the test

Page | 67

Você também pode gostar