Você está na página 1de 130

Workshop SAP Activate

Rodrigo Silva
THE LAST SHIP
GESTÃO DE
PROJETOS COM
SAP ACTIVATE

• JORNADA:
• SAP ASAP x SAP ACTIVATE
• Vi s ão Geral do SAP ACTIVATE
• Fundamentos da metodologia
SAP ACTIVATE
• Es trutura da metodologia SAP
ACTIVATE
• Mel hores práticas do SAP
ACTIVATE
• Governança, funções e
res ponsabilidades no SAP
ACTIVATE
• Aces sando o conteúdo da
metodologia SAP ACTIVATE
MUNDO SAP

3
ANTES...

4
O AGORA: SUITE INTEGRADA

VISÃO POR PROCESSO


5
MUNDO
SAP
METODOLOGIA ANTERIOR

SAP ASAP

7
NOVA METODOLOGIA

SAP ACTIVATE

8
SAP ACTIVATE

9
SAP ACTIVATE

EVOLUÇÃO METODOLOGIAS
A SAP ACTIVATE é a nova metodologia da SAP a qual abrange todas as modalidades de projetos e visa dar ainda
mais agilidade para a adoção das soluções em S/4 HANA.

10
11

• CARACTERISTICAS:

• SAP BEST PRACTICES — QUE FORNECE


PROCESSOS EMPRESARIAIS PRONTOS PARA
OPERAÇÃO E MELHORES PRÁTICAS PARA
MIGRAÇÃO E INTEGRAÇÃO

SAP • FERRAMENTAS DE CONFIGURAÇÃO — TANTO


ACTIVATE NA NUVEM COMO NO LOCAL

• METODOLOGIA SAP ACTIVATE QUE UTILIZA


TÉCNICAS ÁGEIS PARA IMPLEMENTAR A
SOLUÇÃO SAP S/ 4HANA NA NUVEM OU NO
LOCAL
SAP ACTIVATE PARA GERENTES DE PROJETOS

12
SAP ACTIVATE PARA GERENTES DE PROJETOS

13
SAP ACTIVATE PARA GERENTES DE PROJETOS

14
SAP ACTIVATE PARA GERENTES DE PROJETOS

15
SAP ACTIVATE PARA GERENTES DE PROJETOS

16
SAP ACTIVATE PARA GERENTES DE PROJETOS

17
SAP ACTIVATE PARA GERENTES DE PROJETOS

18
SAP ACTIVATE PARA GERENTES DE PROJETOS

19
RESULTADO
SAP ACTIVATE
BUSINESS OUTCOME

1 2 3 4

Discov
Sales er
Cycle Discov ery Prepare Prepare Explore Realize
Realizeand
andDeploy
Deploy Run Run
Run (Adopt)
(Adopt)

ENABLER COMPLIANCE TO BUSINESS OUTCOMES AND ENABLEMENT STRATEGY


SCOPE

P
R
O
E J
N
E
I BUSINESS OUTCOMES & SUCCESS METRICS ALIGNMENT
A
C
BUSINESS B WORKSHOPS
N CASE T
TECHNOLOGY L FIT-GAP
I SALES E &
T M Customer Success
HANDOFF
VALUE G G Adoption Measurement R
I CONTRACT E SUPPLIER Technology Deployment
ENTITLEMENTS DRIVERS N O O E
A OUTCOME ENABLERS V NETWORK
& T
E STRATEGY
N
L PROGRAM METRICS
R E
INITIAL ALIGNMENT Enablement
RESOURCE & INITIATION S N L Continuous Enablement
W
PLAN ▪ Goals ▪ Efficiency ▪ Business PROCESS T A PROCESS of Users, Suppliers I Roadmap A
S Processes R N Enablement
DEEP DIVE V L
A BEST ▪ Priorities ▪ Compliance A C
PRELIMINARY PRACTICE ▪ Resources T E E
L ROADMAP ▪ Challenges ▪ Cost
EDUCATION E Organization Readiness
E Reduction ▪ Success G ADOPTION
▪ Case for Metrics P Process/Technology
▪ Cash Mgt. Y PLAN
Change L
A
N
PEOPLE

BUSINESS OUTCOME and SUCCESS METRICS/KPIS DEFINITION OUTCOME MEASUREMENT


SAP ACTIVATE PARA GERENTES DE PROJETOS

PHASE – WORK STREAMS - DELIVERABLES 21


SAP ACTIVATE PARA GERENTES DE PROJETOS

PHASE – WORK STREAMS - DELIVERABLES


22
VOU COMEÇAR UM
PROJETO SAP ... E AGORA?

23
SAP ACTIVATE

MONTANDO O SEU CHECKLIST:

1. ENTENDIMENTO DO ESCOPO DO PROJETO (IMPLANTAÇÃO S/4)


2. SELEÇÃO DOS TIMES (CONSULTORES, GERENTE DE PROJETOS, ARQUITETOS)
3. RESISTÊNCIA DO “SAPÊS”
1. ESTRATÉGIA PARA REQUESTS
2. TRANSAÇÕES X APPS FIORI
3. ABAP
4. CONSULTOR BASIS, CONSULTOR FI, CONSULTOR SD
5. EF, ET, ESTRATÉGIA DE DOCUMENTAÇÃO
6. SELEÇÃO DOS KEY-USERS
7. PLANO DE CUTOVER
8. ESTRATÉGIA DE GESTÃO DE ACESSOS
9. JANELAS DE TRANSPORTE
10. MONTAGEM DO SEU GLOSSÁRIO SAP – “O SAP 20”
24
SAP ACTIVATE
• MONTANDO O SEU
CHECKLIST:

• CONTINUANDO...

• ACESSAR A
METODOLOGIA
• ESCOLHER “AGIL”
OU “WATERFALL”
• ESCOLHER ON-
PREMISSE OU ON
CLOUD

25
SAP ACTIVATE

MONTANDO O SEU CHECKLIST:

CONTINUANDO...

PARA CADA “PRODUTO ESCOLHIDO HÁ DIFERENCIAÇÕES NAS ATIVIDADES”

26
SAP ACTIVATE

MONTANDO O SEU CHECKLIST:

ACESSO VIA SAP JAM OU ROADMAP VIEWER


27
SAP ACTIVATE

DETERMINAÇÃO DOS ITENS OBRIGATÓRIOS NO SEU PROJETO (DELIVERABLES)

28
SAP ACTIVATE

DETERMINAÇÃO DOS ITENS OBRIGATÓRIOS NO SEU PROJETO (DELIVERABLES)

29
SAP ACTIVATE

DETERMINAÇÃO DOS ITENS OBRIGATÓRIOS NO SEU PROJETO (DELIVERABLES)

30
SAP ACTIVATE

DETERMINAÇÃO DOS ITENS OBRIGATÓRIOS NO SEU PROJETO (DELIVERABLES)

31
GRANDES MUDANÇAS

32
ACTIVATE – Best Pratices

BEST PRATICES
ACTIVATE – Best Pratices

Quick Start: Você não precisa ( nem deve ) começar do


zero

Reutiliza as melhores práticas, já maduras e comprovadas


em diversas empresas do segmento

Possível selecionar o que se aplica a cada situação


ACTIVATE – Best Pratices
ACTIVATE – Guided Configuration

GUIDED CONFIGURATION
ACTIVATE – Guided Configuration

Agilizar configurações demoradas

Diminuir a complexidade das configurações

Padronização nas configurações


ACTIVATE – Guided Configuration
ACTIVATE – Metodologia
ACTIVATE – Metodologia

O Activate não PRECISA ser implementado de forma ágil,


existe roadmap também para o modelo waterfall
ACTIVATE – Metodologia

A Metodologia é composta de 6 fases, das quais 4 são


etapas dentro projeto.
DISCOVERY

RUN
ACTIVATE – EXPLORE

Modelo de Referência + GAPs Conhecido Preparação dos Protótipos


Apresentação do Sistema Standard Apresentação para o Cliente
Navegação do Sistema Aceitação do Protótipo
Lista de GAPs Lista Final do Backlog
ACTIVATE – EXPLORE

WORKSHOP A
ACTIVATE – EXPLORE

Conhecido como FIT & GAP Analisys ( On Premise ) ou


FIT to STANDARD ( On Cloud )

Objetivo: Processo TO-BE

Apresentar o Processo STANDARD da SAP – Navegar no


Sistema e explora estrutura de processos

Complementa com as necessidades específicas


previamente levantadas ( Via RFP, Discovery, Pré-venda,
etc. )
Capturar os processos e funcionalidades que NÃO deram
FIT e montar um Backlog.
ACTIVATE – EXPLORE

DADOS DE ENTRADA DADOS DE SAIDA


WORKSHOP
• BEST PRATICES • CONFIRMAÇÃO DE FIT

• BASELINE • NOVOS PROCESSOS

• FLUXOS DE PROCESSO • LISTA DE


FUNCIONALIDADES
• NECESSIDADES NÃO ATENDIDAS
INICIAIS
ACTIVATE – EXPLORE

DELTA SCOPE PRIORIZATION


ACTIVATE – EXPLORE

Listar todos os GAPS e DELTAS identificados no Workshop A

Estima-se o esforço de cada gap ( em nível Macro )

Priorizar a lista conforme valor para o NEGÓCIO

Sugestão para priorizar: Técnica MUSCOW ( Separar cada


gal em MUst, Should, COuld e Would )
ACTIVATE – EXPLORE

DADOS DE ENTRADA DADOS DE SAIDA


PRIORIZATIO
• CONFIRMAÇÃO DE FIT N • LISTA DE GAPS
PRIORIZADA
• NOVOS PROCESSOS

• LISTA DE
FUNCIONALIDADES
NÃO ATENDIDAS
ACTIVATE – EXPLORE

WORKSHOP B
ACTIVATE – EXPLORE

Conhecido como DELTA DESIGN

Objetivo: Demonstrar e validar o processo como um


todo, e obter a aprovação do escopo macro.
Apresentar o processo resultado do Workshop A
adicionado às soluções propostas aos GAPS. ( Se possível
prototipadas )

Desenhar e Validar GAPS.

Capturar os processos e funcionalidades que NÃO deram


FIT e montar um Backlog.
ACTIVATE – EXPLORE

DADOS DE ENTRADA DADOS DE SAIDA


WORKSHOP
• CONFIRMAÇÃO DE FIT • PROJECT BACKLOG

• NOVOS PROCESSOS • PLANEJAMENTO DE


RELEASES
• LISTA DE
FUNCIONALIDADES
NÃO ATENDIDAS

• LISTA DE GAPS
PRIORIZADA
ACTIVATE – EXPLORE

• Preparar o ambiente com as Best pratices


• Montar um Baseline com as necessidades inicialmente identificadas
• Levantar os GAPS desse baseline ( Workshop A )
• Priorizar os gaps ( Priorização de Backlog )
• Detalhar os itens do backlog e desenho dos deltas ( Workshop B )

DETALHAMENTO DO ESCOPO
ACTIVATE – EXPLORE

Exemplo de Agenda de Workshops


ACTIVATE – REALIZE
DESENVOLVIMENTOS
CASE Implantação EWM

56
Implantação EWM YPE – Cedido por SAP Brasil

57
YPÊ

Quadro Kanban
Workshop A – Validação do Escopo

➔Prototipação
Workshop B – Delta Design

Utilização
de Inbound
Delivery
Controle de
Paletes no
EWM
Workshop B – Delta Design

Porta Paletes
Planejamento Release e Sprints
Sprint 0 (Spike de Risco)

Reunião de
Sprint Planning
!

Spike (Visa testar uma arquitetura)


Sprint 0 (Spike de Risco)

Objetivos
SMART!

Reunião de Reunião de
Sprint DEMO Retrospectiva
da Sprint
Entregas Incrementais
Acompanhamento do projeto
Principais benefícios atingidos com a metodologia SAP ACTIVATE
nessa implementação

✓ Acelerou o time to value através de reuso


do conteúdo: acelera a entrega do projeto
✓ Permite entregas de projeto consistente e mais através do uso das SAP Best Practices,
rápidas, reduz a complexidade e aumenta a viabilizou a realização dos Workshops A e
qualidade; B com a visualização da aplicação num
✓ Solução de qualidade superior através de sistema real.
construção incremental, iterativa com pontos de
inspeção frequentes ➔ Fast Failure!
✓ Inovação nos projetos SAP Brasil: Ciclos de testes ✓ Pontos de Atenção:
integrados similar às Sprints ➔ Daily Scrum Participação dos Donos dos Produtos é fundamental
Meetings e Retrospectiva ao final de cada ciclo. para o sucesso do projeto;
Equipe do projeto deve receber treinamento sobre a
metodologia SAP ACTIVATE antes do início do
projeto.
✓ SAP ACTIVATE Quality Gates: Atuação do Agile Coach (SAP) foi fundamental
Melhora a qualidade do projeto;
Minimiza a exposição de riscos do
projeto;
Gerencia expectativa e monitora a
satisfação do cliente;
Melhora a transparência no projeto.
A CERTIFICAÇÃO

68
69
70
71
VOCÊ ESTÁ PREPARADO?

72
Which of the following tasks are required in the Prepare Phase?
There are 3 correct answers to this question.
Response:

A. Train the project team


B. Approve the test strategy
C. Define the communication plan
D. Identify relevant SAP Best Practices
E. Set up the infrastructure to support the project

73
Which of the following tasks are required in the Prepare Phase?
There are 3 correct answers to this question.
Response:

A. Train the project team


B. Approve the test strategy
C. Define the communication plan
D. Identify relevant SAP Best Practices
E. Set up the infrastructure to support the project

74
What information does the product team need so that they can
estimate the relative size of backlog
user story correctly?
Please choose the correct answer.
Response:

A. Test strategy
B. Definition of Done
C. Available project resources
D. Overall project schedule

75
What information does the product team need so that they can
estimate the relative size of backlog
user story correctly?
Please choose the correct answer.
Response:

A. Test strategy
B. Definition of Done
C. Available project resources
D. Overall project schedule

76
Which activities are critical for delivering Agile projects?
There are 2 correct answers to this question.
Response:

A. Sprint planning
B. Blueprint scheduling
C. Retrospective agenda creation
D. Release planning

77
Which activities are critical for delivering Agile projects?
There are 2 correct answers to this question.
Response:

A. Sprint planning
B. Blueprint scheduling
C. Retrospective agenda creation
D. Release planning

78
Which activities are part of the Design and Configuration
application of the SAP Activate methodology?
There are 2 correct answers to this question.
Response:

A. Perform Fit/Gap Analysis


B. Schedule kick-off workshop
C. Conduct Scope Validation
D. Confirm Integration prerequisites

79
Which activities are part of the Design and Configuration
application of the SAP Activate methodology?
There are 2 correct answers to this question.
Response:

A. Perform Fit/Gap Analysis


B. Schedule kick-off workshop
C. Conduct Scope Validation
D. Confirm Integration prerequisites

80
What is the purpose of the SAP Activate Methodology?
Please choose the correct answer.
Response:

A. To accelerate the initial implementation of SAP S/4HANA


B. To provide end-to-end integrated application lifecycle
management
C. To manage project and solution documentation
D. To enable access to the SAP ecosystem

81
What is the purpose of the SAP Activate Methodology?
Please choose the correct answer.
Response:

A. To accelerate the initial implementation of SAP S/4HANA


B. To provide end-to-end integrated application lifecycle
management
C. To manage project and solution documentation
D. To enable access to the SAP ecosystem

82
What is the purpose of the scrumboard?
Please choose the correct answer.
Response:

A. To visualize team progress


B. To document the results of integration testing
C. To manage the resource load
D. To show the functional breakdown of the solution scope

83
What is the purpose of the scrumboard?
Please choose the correct answer.
Response:

A. To visualize team progress


B. To document the results of integration testing
C. To manage the resource load
D. To show the functional breakdown of the solution scope

84
What is the objective of a sprint retrospective meeting?
Please choose the correct answer.
Response:

A. Provide formal feedback to the project manager


B. Define the stakeholder management approach
C. Improve the SCRUM process
D. Review and prioritize the backlog

85
What is the objective of a sprint retrospective meeting?
Please choose the correct answer.
Response:

A. Provide formal feedback to the project manager


B. Define the stakeholder management approach
C. Improve the SCRUM process
D. Review and prioritize the backlog

86
How do you gain access to the SAP Activate Methodology Jam
site?
Please choose the correct answer.
Response:

A. Send e-mail to SAP contact address


B. Join SAP S/4HANA group on SAP Community Network
C. Submit e-mail address via on-line form
D. Register on SAP Service Marketplace

87
How do you gain access to the SAP Activate Methodology Jam
site?
Please choose the correct answer.
Response:

A. Send e-mail to SAP contact address


B. Join SAP S/4HANA group on SAP Community Network
C. Submit e-mail address via on-line form
D. Register on SAP Service Marketplace

88
When do you perform User Acceptance Testing during the Agile
Build?
Please choose the correct answer.
Response:

A. During each Firm-up Sprint


B. Before Integration Testing
C. After Integration Testing
D. After each Sprint

89
When do you perform User Acceptance Testing during the Agile
Build?
Please choose the correct answer.
Response:

A. During each Firm-up Sprint


B. Before Integration Testing
C. After Integration Testing
D. After each Sprint

90
Who determines the priority of user stories in the backlog of an
Agile project?
Please choose the correct answer.
Response:

A. Product Owner
B. Project Manager
C. Project Team
D. SCRUM Master

91
Who determines the priority of user stories in the backlog of an
Agile project?
Please choose the correct answer.
Response:

A. Product Owner
B. Project Manager
C. Project Team
D. SCRUM Master

92
Which of the following is a Key Deliverable of the Prepare
phase?
Please choose the correct answer.
Response:

A. Release and Sprint Plan


B. Solution Scope and Value Determination
C. Baseline Build
D. Change Impact Analysis and Communication Plan

93
Which of the following is a Key Deliverable of the Prepare
phase?
Please choose the correct answer.
Response:

A. Release and Sprint Plan


B. Solution Scope and Value Determination
C. Baseline Build
D. Change Impact Analysis and Communication Plan

94
Which tool can you use to collaborate with other SAP Activate
methodology practitioners?
Please choose the correct answer.
Response:

A. SAP Jam
B. SAP Solution Manager
C. SAP Implementation Assistant
D. Roadmap Viewer

95
Which tool can you use to collaborate with other SAP Activate
methodology practitioners?
Please choose the correct answer.
Response:

A. SAP Jam
B. SAP Solution Manager
C. SAP Implementation Assistant
D. Roadmap Viewer

96
What are SCRUM of SCRUMS?
Please choose the correct answer.
Response:

A. Frequent inspection of code and configuration prior to


quality gates
B. Mechanism for gathering and validating requirements
C. Alternative to regular SCRUM process for smaller teams
D. Integration meeting between the various project teams

97
What are SCRUM of SCRUMS?
Please choose the correct answer.
Response:

A. Frequent inspection of code and configuration prior to


quality gates
B. Mechanism for gathering and validating requirements
C. Alternative to regular SCRUM process for smaller teams
D. Integration meeting between the various project teams

98
Which navigation option do you use in the Roadmap Viewer to
access the SAP Activate Methodology
content?
Please choose the correct answer.
Response:

A. Navigate by RACI matrix accountability


B. Navigate by assigned Delivery Mode
C. Navigate by work stream
D. Navigate by Project Team Member Role

99
Which navigation option do you use in the Roadmap Viewer to
access the SAP Activate Methodology
content?
Please choose the correct answer.
Response:

A. Navigate by RACI matrix accountability


B. Navigate by assigned Delivery Mode
C. Navigate by work stream
D. Navigate by Project Team Member Role

100
What is a difference between the SAP Activate methodology for
a new implementation of SAP S/4HANA
cloud edition and a new implementation of SAP S/4HANA on-
premise?
Please choose the correct answer.
Response:

A. For on-premise, there are additional deliverables for the


system setup
B. For the cloud edition, there is an additional work stream for
integration with on-premise systems
C. For on-premise, there is an additional Q-Gate for system
installation
D. For the cloud edition, there is an additional Q-Gate for
integration with on-premise systems
101
What is a difference between the SAP Activate methodology for
a new implementation of SAP S/4HANA
cloud edition and a new implementation of SAP S/4HANA on-
premise?
Please choose the correct answer.
Response:

A. For on-premise, there are additional deliverables for the


system setup
B. For the cloud edition, there is an additional work stream for
integration with on-premise systems
C. For on-premise, there is an additional Q-Gate for system
installation
D. For the cloud edition, there is an additional Q-Gate for
integration with on-premise systems
102
Which activity helps the project team to add the user stories to
the product backlog?
Please choose the correct answer.
Response:

A. Assessing Project Risks


B. Planning the User Acceptance Test
C. Preparing a Project Schedule
D. Conducting the Solution Validation

103
Which activity helps the project team to add the user stories to
the product backlog?
Please choose the correct answer.
Response:

A. Assessing Project Risks


B. Planning the User Acceptance Test
C. Preparing a Project Schedule
D. Conducting the Solution Validation

104
How can SCRUM teams be organized?
Please choose the correct answer.
Response:

A. By work stream
B. By project phase
C. By job title
D. By project governance level

105
How can SCRUM teams be organized?
Please choose the correct answer.
Response:

A. By work stream
B. By project phase
C. By job title
D. By project governance level

106
In which phase you execute the User Acceptance Test?
Please choose the correct answer.
Response:

A. Build and Test


B. Final Preparation
C. Deploy
D. Realize

107
In which phase you execute the User Acceptance Test?
Please choose the correct answer.
Response:

A. Build and Test


B. Final Preparation
C. Deploy
D. Realize

108
In which tools can the project team across the SAP Activate
Methodology content including
accelerators?
There are 2 correct answers to this question.
Response:

A. SAP Community Network


B. SAP Service Marketplace
C. SAP Jam
D. Roadmap Viewer

109
In which tools can the project team across the SAP Activate
Methodology content including
accelerators?
There are 2 correct answers to this question.
Response:

A. SAP Community Network


B. SAP Service Marketplace
C. SAP Jam
D. Roadmap Viewer

110
In which phase of the SAP Activate methodology does the team
complete the Transformation Planning?
Please choose the correct answer.
Response:

A. Explore
B. Prepare
C. Deploy
D. Realize

111
In which phase of the SAP Activate methodology does the team
complete the Transformation Planning?
Please choose the correct answer.
Response:

A. Explore
B. Prepare
C. Deploy
D. Realize

112
Which activity is part of the SAP Activate Methodology for a
new implementation of SAP S/4HANA onpremise
edition but NOT of the cloud edition?
Please choose the correct answer.
Response:

A. Technical System Test


B. End-to-End Integration Test
C. User Acceptance Test
D. Unit Test

113
Which activity is part of the SAP Activate Methodology for a
new implementation of SAP S/4HANA onpremise
edition but NOT of the cloud edition?
Please choose the correct answer.
Response:

A. Technical System Test


B. End-to-End Integration Test
C. User Acceptance Test
D. Unit Test

114
What is the key characteristic of Agile project delivery?
Please choose the correct answer.
Response:

A. Frequent and detailed project scheduling


B. Iterative build with frequent inspections
C. Frequent Quality Gates
D. Formal and detailed documentation

115
What is the key characteristic of Agile project delivery?
Please choose the correct answer.
Response:

A. Frequent and detailed project scheduling


B. Iterative build with frequent inspections
C. Frequent Quality Gates
D. Formal and detailed documentation

116
In which phase do you create a prioritized list of user
requirements?
Please choose the correct answer.
Response:

A. Explore
B. Deploy
C. Realize
D. Prepare

117
In which phase do you create a prioritized list of user
requirements?
Please choose the correct answer.
Response:

A. Explore
B. Deploy
C. Realize
D. Prepare

118
Which new project roles are introduced with the SAP Activate
Agile methodology?
There are 2 correct answers to this question.
Response:

A. SCRUM Master
B. Design Thinking Coach
C. Product Owner
D. Integration Lead

119
Which new project roles are introduced with the SAP Activate
Agile methodology?
There are 2 correct answers to this question.
Response:

A. SCRUM Master
B. Design Thinking Coach
C. Product Owner
D. Integration Lead

120
In which phase of the SAP Activate Methodology does the team
complete the System Assessment?
Please choose the correct answer.
Response:

A. Explore
B. Prepare
C. Realize
D. Deploy

121
In which phase of the SAP Activate Methodology does the team
complete the System Assessment?
Please choose the correct answer.
Response:

A. Explore
B. Prepare
C. Realize
D. Deploy

122
Which accelerator can help you document the detailed design
of solution extensions?
Please choose the correct answer.
Response:

A. Sprint Backlog Template


B. Product Backlog Template
C. RICEF Specification Template
D. Change Request Template

123
Which accelerator can help you document the detailed design
of solution extensions?
Please choose the correct answer.
Response:

A. Sprint Backlog Template


B. Product Backlog Template
C. RICEF Specification Template
D. Change Request Template

124
What are key characteristics of the implementation approach in
SAP Activate Methodology?
There are 3 correct answers to this question.
Response:

A. Validate solution
B. On-premise only
C. Premium engagement ready
D. Fixed scope
E. Start with SAP Best Practices

125
What are key characteristics of the implementation approach in
SAP Activate Methodology?
There are 3 correct answers to this question.
Response:

A. Validate solution
B. On-premise only
C. Premium engagement ready
D. Fixed scope
E. Start with SAP Best Practices

126
COMENTÁRIOS GERAIS

127
128
129