Workshop SAP Activate

Rodrigo Silva
Rodrigo Silva
▪ Senior Manager na DxC Brasil
▪ Apaixonado por Pessoas e Educação
▪ SAP Activate Project Manager (C_ACTIVATE05)
▪ SAP Associate Project Manager (C_PM_70)
▪ + 80 Certificações Profissionais

Linkedin.com/in/rodrigosilvapmp
contato@rodrigodasilva.com.br

2
+ INSTRUTORES

Jarlei Nascimento Tadeu Bittencourt


https://www.linkedin.com/in/jarlei/ https://www.linkedin.com/in/tadeubittencourt/

3
Estrutura do Treinamento

4
ESTRUTURA DO TREINAMENTO

CARACTERISTICAS:
▪ 15 HORAS DE AULAS AO VIVO
▪ AULAS GRAVADAS (REPOSITÓRIO)
▪ MATERIAL EXTRA (BIBLIOTECA)
▪ 03 INSTRUTORES
▪ TODO MATERIAL DO CURSO EM PPT

FERRAMENTAS
▪ ZOOM
▪ DROPBOX
▪ WHATSSAPP GROUP

5
ESTRUTURA DO TREINAMENTO

Rodrigo Silva – 21.04


• Os desafios na Gestão de Projetos
• SAP ASAP x SAP Activate
• Visão Geral do SAP ACTIVATE
• Fundamentos da Metodologia SAP ACTIVATE

Tadeu Bittencourt – 23.04


• Gestão Ágil de Projetos (Base)
• Scrum, Kaban, Melhores Práticas
• Agile Project Delivery

6
ESTRUTURA DO TREINAMENTO

Jarlei Gonçalves – 28.04 e 30.04


• Melhores Práticas da Activate x Agil
• Gestão da Mudança Organizacional
• Mundo SAP, Evolução dos Sistemas SAP
• Estrutura do S/4 (Visão Geral) - In Cloud, On-Premise
• SAP Fiori, Best Practices, BP

Rodrigo Silva – 05.05


• Acessando o conteúdo da metodologia SAP ACTIVATE
• Melhores Práticas da Activate
• Governança no SAP Activate
• Mercado de Trabalho
• Como obter a sua Certificação SAP Activate
• Revisão Geral SAP ACTIVATE
• Simulado para Certificação SAP ACTIVATE - ACT100 7
ESTRUTURA DO TREINAMENTO

IMPORTANTE:
▪ DINÂMICA DAS AULAS
▪ ENVIO DE QUESTÕES
▪ MOMENTO COFFEE
▪ NÃO FIQUE COM DÚVIDAS!

Simulados com dicas para a


prova de Certificação
(C_ACTIVATE05)

8
SAP CERTIFICATION HUB
CONFIA E SE JOGA!

10
Como são gerenciados os
projetos que você conhece?

11
12
13
Qual valor para o cliente os seus
projetos tem gerado?

14
“Projeto”
Valor Agregado para os Clientes

15
Eu vendo para o CNPJ, mas
quem usa é o CPF
E o mundo SAP?
MUNDO SAP

Complemento
18
MUNDO SAP

Redução para o Abordagem Flexibilidade de


Tempo de Valor Incremental Escolha
WATERFALL

SAP ASAP

20
WATERFALL | ASAP

CARACTERISTICAS:
▪ ESCOPO DEFINIDO
▪ CLAREZA NA GESTÃO FINACEIRA
▪ PREVISIBILIDADE DO PROJETO (VISÃO FUTURA)

DORES:
▪ PROJETOS LONGOS
▪ SILOS FUNCIONAIS (CONSULTOR X CLIENTE)
▪ PERCEPÇÃO DE VALOR TARDIA

21
WATERFALL | ASAP – PERCEPÇÃO DO CLIENTE

“Eu tive que declarar tudo que eu


precisava no inicio, quando o
projeto terminou, eu já não
precisava mais”

22
WATERFALL | ASAP – PERCEPÇÃO DO CLIENTE

“Projetos de 24
meses”
23
SCRUM (FRAMEWORK ÁGIL)

SAP ACTIVATE

24
SCRUM (FRAMEWORK ÁGIL)

ARTEFATOS, CERIMÔNIAS – FOCO NO CLIENTE


FOCO EM VALOR!

25
SCRUM (FRAMEWORK ÁGIL)

26
27
SCRUM (FRAMEWORK ÁGIL)

Valor Agregado
Priorização nos itens de maior valor

Colaboração Iterativo e Incremental


Sentimento de dono, terminou o seu? Repetições com Incremento de ações
Ajuda o colega!

Auto organização Time-boxing


Equipes Ações com tempo
multidisciplinares e auto definido
gerenciadas

Reagir rápido a mudanças


Você está comprometido ou
envolvido?
Framework Ágil Scrum

• Os membros do Time Scrum são chamados “porcos”. Qualquer outra


pessoa é chamada de “galinha”. “Galinhas” não podem dizer aos
“porcos” como eles devem fazer seu trabalho.

Comprometimento x
projetos.sociais@pmisp.org.br

Envolvimento
SCRUM | ACTIVATE

CARACTERISTICAS:
▪ RESPOSTA RAPIDA AS MUDANÇAS
▪ ORGANIZAÇÃO DAS ENTREGAS POR VALOR
▪ ENTREGA CONTINUA PARA OS CLIENTES

DORES:
▪ ENGAJAMENTO DO CLIENTE (TOTAL)
▪ MUDANÇA ORGANIZACIONAL
▪ VISÃO GLOBAL DO PROJETO (FOCO SEMPRE NA SPRINT ATUAL)

31
Which activities are critical for delivering Agile projects?

Sprint planning
Blueprint scheduling
Release planning
Retrospective agenda creation
Which activities are critical for delivering Agile projects?

Sprint planning
Blueprint scheduling
Release planning
Retrospective agenda creation
What does SAP Activate recommend to keep team members
informed and aligned?

Daily e-mail status updates to project manager


Daily team stand-up meeting
Daily status meeting with project manager
Daily progress review meeting with sponsor
What does SAP Activate recommend to keep team members
informed and aligned?

Daily e-mail status updates to project manager


Daily team stand-up meeting
Daily status meeting with project manager
Daily progress review meeting with sponsor
SAP ACTIVATE

36
SAP ACTIVATE

EVOLUÇÃO METODOLOGIAS
A SAP ACTIVATE é a nova metodologia da SAP a qual abrange todas as modalidades de projetos e visa dar ainda
mais agilidade para a adoção das soluções em S/4 HANA.

37
SAP ACTIVATE

CARACTERISTICAS:
▪ Projetos cada vez mais curtos
▪ Foco em Redução de Custos
▪ Valor o mais rápido possível
▪ Sair da abordagem de Big Bang
▪ Abordagem incremental (entregas)
▪ Flexibilidade de Escolha (On Premises, Cloud, Hybrid, Mobile)

38
SAP ACTIVATE

CARACTERISTICAS:
▪ É uma combinação de Melhores Práticas, Guias de Configuração e Metodologia
para simplificar e acelerar a adoção do S/4 HANA
▪ Entrega processos de negócios, prontos para a execução, otimizados para o SAP
S/4HANA como uma solução de referência
▪ Fornece as Melhores práticas para migração, integrçaão e configuração do SAP
S/4HANA

39
SAP ACTIVATE PARA GERENTES DE PROJETOS

+46 anos de Implantação


+ 300 mil empresas
+ 190 países

S4: Configuração Guiada

40
SAP ACTIVATE PARA GERENTES DE PROJETOS

Um company code no S4 e outra no ECC


Ou a migração de módulos no S4, outros no ECC

41
SAP ACTIVATE PARA GERENTES DE PROJETOS

42
SAP ACTIVATE PARA GERENTES DE PROJETOS

43
ACTIVATE e os mitos da agilidade
SAP ACTIVATE PARA GERENTES DE PROJETOS

45
SAP ACTIVATE PARA GERENTES DE PROJETOS

PHASE – WORK STREAMS - DELIVERABLES


46
SAP ACTIVATE PARA GERENTES DE PROJETOS

47
SAP ACTIVATE PARA GERENTES DE PROJETOS

▪ Governança do Projeto
▪ Roadmap do Projeto
▪ Download das Best Practices

48
SAP ACTIVATE PARA GERENTES DE PROJETOS

Delta - Adaptação do Sistema


GAP - Desenvolvimento

49
SAP ACTIVATE PARA GERENTES DE PROJETOS

Modelo de Referência + GAPs Conhecido Preparação dos Protótipos


Apresentação do Sistema Standard Apresentação para o Cliente
Navegação do Sistema Aceitação do Protótipo
Lista de GAPs Lista Final do Backlog

50
1. Ref erence
7. Release &
Value
2. Validation of 6. Verify & Sprint Planning
• Provide Process,
Value and SAP Solution Accept
Strategic Context
3. GAP 5. Data
• Set boundaries Identif ication Design
and expectations • Verify process
• Tie to Business 4. Backlog and solution
• Show and tell • Update Business
Case & Value SAP standard key • Identify and Priorization Models and design
Drivers design elements document gaps to Process Design • Drive acceptance
standard; for delta for release and
• Log additional requirements sprint planning
scope items
4.
• Solution Design
and Visualize for
the gaps

2.

Workshop: Fit-to-Standard
3.
Steps:
1. Delta/Gaps reviewed by Change Control Board for solutioning/desi gn.
2. Approved and prioritized items are added for Delta Design Workshops 1.
3. Sol uti on desi gns and es timates ar e s ent back to Change Contr ol Board for
Approval Workshop: Delta Design
4. Approved items are added to Release / Sprint Backlog

Complemento
Recap: Fit-to-Standard
Workshop
Explore

Execute Fit-to-Standard Identify Deltas / Make


Prepare for Fit-to-Std
Workshop key Decisions
Workshops

SOW Business Demo Scripts Process Flows Backlog / GAP Document


Process / Buy List – as Decision
Channel requirements,
Process flow,
Standard
etc.
Practice / User
Story

Store in project
Drive towards Standard, Identify Gaps, Log Parking Lot Items
repository

Complemento
SAP ACTIVATE PARA GERENTES DE PROJETOS

▪ Configuração para Adequação


▪ Workshop de Apresentação do Sistema
▪ GAP Analysis
▪ Construção do Backlog do Produto
▪ Apresentação dos Protótipos
▪ Lista Final do Backlog do Produto

53
SAP ACTIVATE PARA GERENTES DE PROJETOS

54
SAP ACTIVATE PARA GERENTES DE PROJETOS

55
SAP ACTIVATE PARA GERENTES DE PROJETOS

56
SAP ACTIVATE PARA GERENTES DE PROJETOS

Visão dos Sprint e Interações

2.3 Sprint Execution

2.5 Sprint Retrospective


Delta Requirement A Delta Requirement C
2.1 Sprint Planning

2.4 Sprint Demo


Document
Document

Design
Design

Build
Build

Test
Test

Delta Requirement B Delta Requirement D


Document

Document
Design

Design
Build

Build
Test

Test
2.2 Daily Team Meeting

2-4 weeks time box


SAP ACTIVATE PARA GERENTES DE PROJETOS

▪ Sprints
▪ Demonstrações
▪ Testes
▪ Testes Integrados
▪ Preparação para Produção

58
SAP ACTIVATE PARA GERENTES DE PROJETOS

59
SAP ACTIVATE PARA GERENTES DE PROJETOS

▪ Avaliação de Prontidão
▪ Cutover
▪ Go Live

60
SAP ACTIVATE PARA GERENTES DE PROJETOS

In SAP Activate, Phase Closure is a deliverable. The purpose of this deliverable is to formally
close all project phases: Prepare, Explore, Realize and Deploy.

DISCOVER PREPARE EXPLORE REALIZE DEPLOY

Sales to Delivery Handoff Execution/Monitoring of Project


Project Initiation and Governance Execution/Monitoring of Project Execution/Monitoring of Project

Solution Configuration
Solution Scope Definition Adoption Initiation and Enablement Fit-Gap Analysis / Requirements Capturing Production Cutover / Switch to Production

Solution Extension Development

Project Plans, Schedule and Budget Configuration Definition Execute Initial Integrated Data Load
Reports, Forms & Workflows

Project Standards, Infrastructure, and Solution Extension Deployment on


User Access and Security
Solutions Final Solution Walkthrough Production

Solution Test Preparation


Project Kick-Off and On-Boarding Integration Preparation Organiz ation and Supplier Preparation

Integration Setup in the Test Environments


Phase Closure Solution Extension Preparation End User Training

Legacy Data Migration

Adoption Planning Delivery to Support Handover


System User Roles and Authorization
Administration

End User Training Strategy and Plan Production Hypercare Support


Solution Test Execution

Adoption Execution
Data Load Preparation Project Closure and Solution handover

End-User Training Materials and Resources


Data privacy and consent

Cutover Plan

Phase Closure
Phase Closure

61
One harmonized implementation including Project Quality Gates

• Gerenciamento de valor: Confirme os impulsionadores • Realize workshops para validar cenários de negócios
de negócios, metas e métricas de sucesso (n / a para Cloud)
• Confirme o escopo e o cronograma do projeto • Requisitos e lacunas do delta de documentos (n / d
para Cloud)
• Estabelecer equipe de projeto
• Requisitos de documento para extensões de solução
• Iniciar Landscape do sistema DEV / TST
• (n / a para Cloud) • Prepare-se para a integração

• Governança e padrões de configuração • Realizar oficinas de design, se aplicável


• Prepare e conduza o kickoff • Execute Quality Gate Explore
• Execute Quality Gate Prepare
SAP ACTIVATE
• Go-live Build
Build Smart,
Smart, Run
Run Simple
Simple • Configurar solução (iterativa)
• Execute handover to support / operations • Executar teste unitário (iterativo)
• Closeout project • Executar solução passo a passo com usuários (iterativo)
• Use post go-live support • Integração / DEV / TST
• Desenvolver extensões de solução
• Execute technical & load testing , if applicable
• Execute cutover to PROD
• Prepare for solution adoption
• Execute Quality Gate Deploy • Implemente extensões de solução para PROD
• Plan cutover
• Estrutura de monitoramento de valor de configuração
• Initiate PROD environment
(n / a para nuvem)
• Set-up PROD integration
• Execute Quality Gate Realize
One harmonized implementation including Project Quality Gates
One harmonized implementation including Project Quality Gates
Project Quality Gate
Participants

• Customer • SAP /Partner


- Customer Project Manager - SAP/Partner Project Manager
- Customer Sponsor (Optional) - Delivery Executive (If staffed)
- Customer Key Team Members (Optional) - Account Executive (Optional)
SAP ACTIVATE +
Agile Approach

66
Define Product Backlog
Document all requirements/user stories in the backlog (DRICEFW):

Data Backlog checklist:

Reports ▪ Tasks/activities must have estimated effort.

▪ Tasks/activities must be prioritized.


Interfaces

▪ Tasks/activities must have functional /


Configuration
Project Backlog technical dependencies.
Enhancem ents
▪ Tasks/activities must a assigned owner.
Form s
▪ Tasks/activities must be assigned to a Sprint.
Workflow

Complemento
Backlog Priorization
EXPLORE
Phase
REALIZE Phase

Project Backlog Base Functionality Additional Requirements

Integration User
Priority Days
Test Acceptance
WOULD

16 4 Sign-Off
Walk Through
15 5
(Organization
14 1
Readiness)
13 8 Sprint /
12 2 Iteration 3
BUSINESS PRIORITY

COULD

11 7
10 3
Walk Through
09 4
08 2
SHOULD

07 4 Sprint /
06 3 Iteration 2
05 3
04 6
Walk Through
03 4
MUST

02 5
01 2 Sprint /
Iteration 1
Time

BACKLOG
PRIORIZATION

Complemento
Technical Dependencies
Responsible: Implementation Team

Product Backlog

OK, but in order to


I want to have realize that you need to
requirement #3 as Must set-up your Org Model
have Priority! first.

Business IT
Requirements Requirements
Cross-Functional
Process Owner Team Requirements

Complemento
RECAP!

70
What is the minimum number of quality gates mandated by
the SAP Activate methodology?

▪ 3
▪ 4
▪ 5
▪ 0
What is the minimum number of quality gates mandated by
the SAP Activate methodology?

▪ 3
▪ 4
▪ 5
▪ 0
Energiaaaa!!!

73
Mitos do Activate

74
75
ACTIVATE e os mitos da agilidade

Agilidade é
metodologia?
ACTIVATE e os mitos da agilidade

Agilidade é um
MINDSET
ACTIVATE e os mitos da agilidade

Activate é
metodologia?
Activate é mais que
metodologia
ACTIVATE e os mitos da agilidade

O GP Virou Scrum
Master?
ACTIVATE e os mitos da agilidade

SM

GP

PO

Key
User

Time

Consu
ltores
ACTIVATE e os mitos da agilidade

SM

GP

PO

Key
User

Time

Consu
ltores
Gestor de Processo
SM Facilitador do Scrum
Removedor de impedimentos

Dono do Produto
Responsável por entregar valor PO
Manter e comunicar a visão

Transforma Backlog em incremento Time


Auto organizável

Gerenciamento em alto nível


Garantir a entrega GP
Prazo, escopo, qualidade
ACTIVATE e os mitos da agilidade
Project Manager

Team 1 Team 2 Team n

• SM • SM • SM
• PO • PO • PO
• Scrum tea m • Scrum tea m • Scrum tea m

Support
Team
ACTIVATE e os mitos da agilidade
ACTIVATE e os mitos da agilidade
ACTIVATE e os mitos da agilidade

Projetos ageis são


entregues mais
rapido?
ACTIVATE e os mitos da agilidade

Projetos ágeis entregam VALOR mais rápido


ACTIVATE e os mitos da agilidade

Sem BBP = Sem


escopo ?
ACTIVATE e os mitos da agilidade
ACTIVATE e os mitos da agilidade

9 Workstreams
ACTIVATE e os mitos da agilidade

17 Key Deliverables
ACTIVATE e os mitos da agilidade
ACTIVATE e os mitos da agilidade

• Preparar o ambiente com as Best pratices


• Montar um Baseline com as necessidades inicialmente identificadas
• Levantar os GAPS desse baseline ( Workshop A )
• Priorizar os gaps ( Priorização de Backlog )
• Detalhar os itens do backlog e desenho dos deltas ( Workshop B )
ACTIVATE e os mitos da agilidade

• Preparar o ambiente com as Best pratices


• Montar um Baseline com as necessidades inicialmente identificadas
• Levantar os GAPS desse baseline ( Workshop A )
• Priorizar os gaps ( Priorização de Backlog )
• Detalhar os itens do backlog e desenho dos deltas ( Workshop B )
ACTIVATE e os mitos da agilidade

Entrega em sprints
= menos testes?
ACTIVATE e os mitos da agilidade
Do Explore ao Deploy

101
Explore to Deploy

Explore

Prepare for Fit/Gap Fit-to-Standard Identify Deltas / Prioritize Design Solution


Workshops Workshops Make key Decisions Deltas for Deltas

Complete
Realize documentation
Execute
on Sol. Phase Closure Set up system
Individual Sprint Finalize Backlog,
Adoption and Sign-off
Planning Specs, Final reviews for configuration
& Sign-off

Execute on
Backlog in Deploy
Sprint(s) &
Demo Cleanse Data, Set System Integration End-user training & Phase Closure
Organization and
up Test Realm for & User Testing Update and Sign-off
Supplier Alignment
integration testing documentation

102
CASE Implantação EWM

103
Implantação EWM YPE – Cedido por SAP Brasil

104
YPÊ

Quadro Kanban
Workshop A – Validação do Escopo

➔Prototipação
Workshop B – Delta Design

Utilização
de Inbound
Delivery
Controle de
Paletes no
EWM
Workshop B – Delta Design

Porta Paletes
Planejamento Release e Sprints
Sprint 0 (Spike de Risco)

Reunião de
Sprint Planning
!

Spike (Visa testar uma arquitetura)


Sprint 0 (Spike de Risco)

Objetivos
SMART!

Reunião de Reunião de
Sprint DEMO Retrospectiva
da Sprint
Entregas Incrementais
Acompanhamento do projeto
Principais benefícios atingidos com a metodologia SAP ACTIVATE
nessa implementação

✓ Acelerou o time to value através de reuso


do conteúdo: acelera a entrega do projeto
✓ Permite entregas de projeto consistente e mais através do uso das SAP Best Practices,
rápidas, reduz a complexidade e aumenta a viabilizou a realização dos Workshops A e
qualidade; B com a visualização da aplicação num
✓ Solução de qualidade superior através de sistema real.
construção incremental, iterativa com pontos de
inspeção frequentes ➔ Fast Failure!
✓ Inovação nos projetos SAP Brasil: Ciclos de testes ✓ Pontos de Atenção:
integrados similar às Sprints ➔ Daily Scrum Participação dos Donos dos Produtos é fundamental
Meetings e Retrospectiva ao final de cada ciclo. para o sucesso do projeto;
Equipe do projeto deve receber treinamento sobre a
metodologia SAP ACTIVATE antes do início do
projeto.
✓ SAP ACTIVATE Quality Gates: Atuação do Agile Coach (SAP) foi fundamental
Melhora a qualidade do projeto;
Minimiza a exposição de riscos do
projeto;
Gerencia expectativa e monitora a
satisfação do cliente;
Melhora a transparência no projeto.
Discover e RUN

115
DISCOVER E RUN

116
Papéis e Responsabilidades
(Introdução)

117
Responsibility Frequency

• Prioridades de negócios, metas e • O Comitê Diretiv o deve se reunir no


Level 1 - Steering Committee objetiv os mínimo uma v ez por mês e receber
• Critérios de decisão e direitos de um relatório f ormal de status.
Customer CEO, CPO, CIO,. SAP decisão • Resolv er problemas e riscos
Project Escalation Path

• Propriedade: mudança, processo e escalonados que não podem ser


dados resolv idos em níveis inferiores
• No mínimo, é preciso hav er uma

Feedback Path
• Impulsione a resolução de problemas
Level 2 - Program Governance e riscos de projeto escalados reunião de Gov ernança do Programa
pelo menos uma v ez por semana. O
Customer PM, LoB/ Process
• Monitoramento de escopo, tempo, status f ormal precisa ser distribuído.
SAP orçamento e v alor
Owner(s)/ Architect • Resolv a problemas e riscos
• Desenv olvimento de estratégia de escalados antes de encaminhar para
processo o Comitê Diretiv o.
• Padronização de negócios e adoção
• No mínimo, a equipe do projeto
de melhores práticas; Comunicação
Level 3 - Project Team e relatórios claros
precisa f ornecer atualizações duas
v ezes em uma semana e, se não,
• Requisitos de TI, dependências, diariamente.
Customer Team SAP Team Partner Team opções de implantação
• Resolv a problemas e riscos
• execução e entrega no dia a dia de escalados antes de escalar para a
taref as de projeto especialmente Gov ernança do Programa.
relacionadas à conf iguração,
migração, integração e
gerenciamento de mudanças.
• Teste de processos e interf aces;
v alidação de dados migrados
• Identif icação, resolução e
comunicação de questões e riscos

118
Aonde eu posso encontrar mais
informações?

121
How do you gain access to the SAP Activate
Methodology Jam site?
A - Register on SAP Service Marketplace
B - Join SAP S/4HANA group on SAP Community Network
C - Submit e-mail address via on-line form
D - Send e-mail to SAP contact address

122
How do you gain access to the SAP Activate
Methodology Jam site?
A - Register on SAP Service Marketplace
B - Join SAP S/4HANA group on SAP Community Network
C - Submit e-mail address via on-line form
D - Send e-mail to SAP contact address

123
ACESSO AO SAP JAM

http://bit.ly/SAPActivate

124
ACESSO AO ROADMAP VIEWER

https://go.support.sap.com/roadmapviewer/#

125
ACESSO AO ROADMAP VIEWER

https://go.support.sap.com/roadmapviewer/#

126
ACESSO AO ROADMAP VIEWER

https://go.support.sap.com/roadmapviewer/#

127
Simulados

128
Who determines the priority of user stories in the
backlog of an Agile project?

Project Team
SCRUM Master
Project Manager
Product Owner

129
Who determines the priority of user stories in the
backlog of an Agile project?

Project Team
SCRUM Master
Project Manager
Product Owner

130
What are the benefits of the SAP best practices?

Simple on-boarding to cloud


Fast time to value
Predictable results
Reduced functional scope
Fixed organizational structure

131
What are the benefits of the SAP best practices?

Simple on-boarding to cloud


Fast time to value
Predictable results
Reduced functional scope
Fixed organizational structure

132
What do you do during post cutover?

Setup Operational Support


Perform Technical System Test
Conduct Organizational Readiness Check
Perform the Verification Session of the SAP Going Live Check

133
What do you do during post cutover?

Setup Operational Support


Perform Technical System Test
Conduct Organizational Readiness Check
Perform the Verification Session of the SAP Going Live Check

134
BIBLIOGRAFIA
Link para Roadmap : https://roadmapviewer-supportportal.dispatcher.hana.ondemand.com/
Visão da solução: https://cal.sap.com/
Baixar documentação da Solução: https://websmp109.sap-ag.de/public/solutionpackages
Configuração de solução: https://jam4.sapjam.com/wiki/show/RYLbN0oEv3EoJH1PrJqZOH?_lightbox=true

Novidades do SOLMAN 7.2: https://support.sap.com/content/sap-root/solution-manager/knowledge-transfer/early-


knowledge-transfer.html

Ferramenta de Prototipação: https://www.build.me/splashapp

SAP S/4HANA Extensibility white paper


http://www.sap.com/bin/sapcom/en_us/downloadasset.2015-07-jul-08-12.sap-s4hana--extensibility-for-customers-
and-partners-pdf
http://www.sap.com/bin/sapcom/en_us/downloadasset.2015-07-jul-08-12.sap-s4hana--extensibility-for-customers-
and-partners-pdf.bypassReg.html

Agradecimento à SAP Brasil - Hélio Akabane (Case EWM YPÊ)

Todos os direitos reservados a SAP

135