Bending Marks Bending Marks Bending Marks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LEGENDA DETECÇÃO E ALARME DE INCÊNDIO
FIRE ALARM LEGEND
DETECÇÃO E ALARME DE INCÊNDIO - CORES
FIRE ALARM COLORS

A DETECÇÃO - LAÇO / EQUIPAMENTOS | FIRE ALARM - LOOP/EQUIPMENTS A

INFRAESTRUTURA - FONTE AUXILIAR | POWER SUPPLY INFRASTRUCTURE

INFRAESTRUTURA PREVISTA PARA O SISTEMA DE DETECÇÃO POR ASPIRAÇÃO


INFRASTRUCTURE PROVIDED FOR ASPIRATION DETECTION SYSTEM

SIMBOLOGIA DETECÇÃO E ALARME DE INCÊNDIO


FIRE ALARM SIMBOLOGY
CENTRAL DE DETECÇÃO E ALARME DE INCÊNDIO
FIRE ALARM CONTROL PANEL
FONTE AUXÍLIAR
POWER SUPPLY
CENTRAL DE DETECÇÃO DE FUMAÇA POR ASPIRAÇÃO | VESDA - h= 1,5 metros
VERY EARLY SMOKE DETECTION APPARATUS | VESDA - h= 1,5 meters
DETECTOR DE FUMAÇA ENDEREÇÁVEL
ADDRESSABLE SMOKE DETECTOR
~ DETECTOR DE FUMAÇA ENDEREÇÁVEL INSTALADO NO ENTREFORRO
B = ADDRESSABLE SKOME DETECTOR BETWEEN LINING
B
DETECTOR TERMOVELOCIMÉTRICO ENDEREÇÁVEL
ADDRESSABLE THERMAL HEAT DETECTOR
DETECTOR TÉRMICO ENDEREÇÁVEL
MM PAINEL
ADDRESSABLE HEAT DETECTOR
M-02
DETECTOR MULTICRITÉRIO ENDEREÇÁVEL
ADDRESSABLE MULTI-CRITERIA DETECTOR | SMOKE + THERMAL HEAT
DETECTOR DE FUMAÇA PARA DUTOS DE HVAC ENDEREÇÁVEL
DFD
AV
ADDRESSABLE DUCT SMOKE DETECTOR
ACIONADOR MANUAL
MANUAL PULL STATION
AVISADOR AUDIO-VISUAL
AV
HORN AND STROBE
PAINEL ELÉTRICO PARA INSTALAÇÃO DE MÓDULOS
MM | MC CONFORME INDICADO EM PROJETO (MC E/OU MM) - h=1,5 METROS
PANEL ELECTRIC PANEL FOR MODULE INSTALLATION AS INDICATED IN THE PROJECT (MC
AND/OR MM) - h=1.5 METERS
C MÓDULO MONITOR C
MM
MONITOR MODULE
~

~
MÓDULO COMANDO
=

=
MC
CONTROL MODULE

MÓDULO RELÉ
M-02 MR
RELAY MODULE

MÓDULO ZONA
MZ
MM PAINEL

ZONE MODULE
M-02
M-02 AVISADOR AUDIOVISUAL DE CHAMADA DE EMERGÊNCIA PARA BANHEIRO PNE.
MM PAINEL MM PAINEL h=ACIMA DA PORTA DE ENTRADA DO BANHEIRO
M-05 EMERGENCY HORN STROBE FOR W.C. DDA
M-03
M-06 h=ABOVE THE W.C. ENTRANCE DOOR

Bending Marks
M-06 M-01

MM | MC MC MM | MC M-03
M-06
MR
MM M-05 MR
MM
PANEL
MM MR AVMC MMMR M-05 MMMR M-05 PANEL BOTÃO DE CHAMADA DE EMERGÊNCIA PARA BANHEIRO PNE - h=0,4 METROS
M-05 M-06 M-12
EMERGENCY BUTTON FOR W.C. DDA - h=0.40 METERS
M-06
MM

M-06
MR

M-05 MM PANEL PAINEL DE MÓDULOS MONITORES PARA O VESDA + FONTE DE ALIMENTAÇÃO DEDICADA AO VESDA +
D CENTRAL DE DETECÇÃO DE FUMAÇA POR ASPIRAÇÃO D
DSB-AC-1.1 MODULE PANEL FOR VESDA + VESDA POWER SUPPLY + VERY EARLY SMOKE DETECTION
MM

M-06
MR

MRMM
M-06
M-05
M-05
INFRAESTRUTURA
INFRASCTRUCTURE

MM
M-06

MM
MR
M-06 M-06

MR
M-05
M-06 M-06
M-03 MM | MC
M-05 ELETRODUTO DE AÇO GALVANIZADO ELETROLITICAMENTE
M-05 MR
MM MR
MM M-06 MR PANELMRMM MR
MM M-05
ELECTROLYTICALLY GALVANIZED STEEL ELECTRODUCT
M-05
M-09
M-05 ELETRODUTO DE PVC ENTERRADO NO SOLO
M-02
MM PAINEL MM PAINEL PVC ELECTRODUCT BURIED IN THE GROUND
TUBO FLEXÍVEL CORRUGADO EM PEAD (POLIETILENO DE ALTA DENSIDADE)
PEAD CORRUGATED FLEXIBLE TUBE (HIGH DENSITY POLYETHYLENE)
SGRUTB08-ACP-L01-CL00-1000
NOTAS
M-11 MM
M-05
NOTES

MR
MM
M-06 1 - ELETRODUTO SEM INDICAÇÃO CONSIDERAR Ø1";
E M-01 2 - ATERRAR TODAS AS INFRAESTRUTURAS METÁLICAS;
E
3 - A FIXAÇÃO DE ELETRODUTOS DEVEM SER A CADA 2 METROS;
AVMC

4 - NA REALIZAÇÃO DE PERFURAÇÃO EM PAREDES E/OU LAJES, É OBRIGATÓRIA A SUBSTITUIÇÃO DA PROTEÇÃO


PASSIVA CONTRA INCÊNDIO;
M-05
5 - O INSTALADOR DA INFRAESTRUTURA DEVE FORNECER ARAME GUIA PARA TODA A INFRAESTRUTURA SECA,
DESTINA A INSTALAÇÃO DO SISTEMA;
MMMR

6 - O PROJETO ESTÁ DE ACORDO COM A NFPA 72 E NFPA 76;

=
7 - TODOS OS CIRCUITOS SÃO NAC (CIRCUITO DE APARELHO DE NOTIFICAÇÃO) E DEVEM SER SUPERVISIONADOS POR
MCAV

~
M-01 RESISTORES EOL (END OF LINE);
M-05 M-06
8 - DEVE SER CONSIDERADO UM MÓDULO ISOLADOR A CADA 20 DISPOSITIVOS ENDEREÇÁVEIS CONFORME INDICADO
MR
MM
PELO FABRICANTE;
M-06 9- TODOS OS DIPOSITIVOS EM ÁREAS EXTERNAS DEVEM TER GRAU PROTEÇÃO IP 56.
10 - AS CENTRAIS DE ASPIRAÇÃO SÃO DESTINADAS A DETECÇÃO NO RETORNO DAS MÁQUINAS DE AR CONDICIONADO
ESPECIFICADAS PELOS PROJETOS DE AR CONDICIONADO.
M-05 11 - A CONTRATADA DEVERÁ FORNECER PROJETOS, DIAGRAMAS COM AS DISTRIBUIÇÕES FINAIS DE LAÇO, DETALHES
MMMR

CONSTRUTIVOS E CÁLCULO/DIMENSIONAMENTO DE CADA CENTRAL DE ASPIRAÇÃO PARA APROVAÇÃO DA SCALA.


M-06 12 - PARA CADA FUNÇÃO DOS MÓDULOS ALOCADOS EM PROJETO, VER TABELA "TAG'S"
13 - DEVERÁ SER CONSIDERADO MÓDULO RELÉ E MONITOR PARA TODOS OS DAMPERS CORTA-FOGO ALOCADOS EM
M-05
PROJETO.
AVMR

14 - OS ACIONADORES PNE SÃO DE RESPONSABILIDADE DO PROJETO DE ARQUITETURA, ESTÁ APENAS DESTACADO


MCMM

M-06
EM PROJETO, O INSTALADOR DEVERÁ COMPATILIBILIZAR A ALOCAÇÃO DELES COM A INFRAESTRUTURA DESTINADA A
F INTEGRAÇÃO COM O MÓDULO MONITOR E O MÓDULO DE COMANDO. F
M-01
1 - CONDUITS WITHOUT INDICATION SHALL BE CONSIDER Ø1";
2 - GROUND ALL METAL PATHWAYS;
3 - FIXING FOR CONDUITS AND CABLE TRAY SHOULD BE EVERY 2 METERS MAXIMUM;
4 - IN THE PERFORMANCE OF PERFURATION IN WALLS AND SLABS, THE REPLACEMENT OF PASSIVE PROTECTION
WITH FIRE STOP IS MANDATORY;
5 - THE INFRASTRUCTURE INSTALLER SHOULD PROVIDE GUIDE WIRE FOR ALL DRY INFRASTRUCTURE, INTENDED FOR
SYSTEM INSTALLATIONS;
6 - THE PROJECT IS IN ACCORDANCE WITH NFPA 72 AND NFPA 76;
7 - ALL CIRCUITS ARE NAC (NOTIFICATION APPLIANCE CIRCUIT) AND MUST BE SUPERVISED BY EAL RESISTORS (END
OF LINE);
8 - MUST BE CONSIDER A ISOLATOR MODULE TO EACH 20 ADDRESSABLE DEVICES AS INDICATED IN STANDARDS;
9 - ALL EXTERNAL DEVICES SHALL BE IP 56.
10 - THE ASPIRATION DETECTION CENTRALS ARE INTENDED FOR DETECTION IN THE RETURN OF THE AIR
CONDITIONING MACHINES SPECIFIED BY THE AIR CONDITIONING PROJECTS..
11 - THE CONTRACTOR MUST PROVIDE THE CALCULATION/DIMENSIONING OF EACH ASPIRATION DETECTION CENTRAL,
PROJECTS, LOOPS DISTRIBUTION DIAGRAMS AND CONSTRUTIVE DETAIS FOR SCALA'S APPROVAL.
12 - FOR EACH FUNCTION OF THE MODULES ALLOCATED IN THE PROJECT, SEE TABLE "TAG'S"
LEVEL 01-FIRE ALARM SYSTEM 13 - RELAY AND MONITOR MODULE MUST BE CONSIDERED FOR ALL FIRE DAMPERS ALLOCATED IN THE PROJECT
14 - THE ADA PANIC BUTTON ARE THE RESPONSIBILITY OF THE ARCHITECTURE PROJECT, IT IS ONLY HIGHLIGHTED IN
G THE PROJECT, THE INSTALLER MUST MAKE THE ALLOCATION OF THEM COMPATIBLE WITH THE INFRASTRUCTURE G
1 : 75 INTENDED FOR INTEGRATION WITH THE MONITOR MODULE AND THE COMMAND MODULE.

TUBULAÇÃO E PONTOS DE AMOSTRAGEM


ORIENTATIVOS DO VESDA

FUNÇÃO DOS MÓDULOS - MODULES FUNCTION


TAG FUNÇÃO DO EQUIPAMENTO

M-01 MÓDULO DE COMANDO PARA O ACIONAMENTO DO AVISADOR AUDIOVISUAL. CONTROL MODULE FOR HORN/STROBE.
PONTO DE AMOSTRAGEM M-02 PAINEL DE MÓDULOS MONITORES DAS CENTRAIS DE ASPIRAÇÃO: 1-SUPERVISÃO DA FONTE DE BATERIAS, 2-FALHA, 3-ALARME E 4-PRÉ-ALARME, O
INSTALADOR DEVERÁ ENVIAR PARA A SCALA APROVAR O DIMENSIONAMENTO/MEMORIAL DE CÁLCULO DE ASPIRAÇÃO DE CADA CENTRAL, E SE
NECESSÁRIO, A ADIÇÃO DE MÓDULOS MONITORES PARA TUBOS ENDEREÇÁVEIS. FIRE ALARM MODULES PANEL FOR INSTALLATION OF ALL MONITORING
MODULES OF VERY EARLY ASPIRATION PANEL: 1-POWER SUPERVISION, 2-FAIL, 3-ALARM, 4-PRÉ-ALARM.THE INSTALLER MUST SEND TO SCALA TO APPROVE
THE DIMENSIONING/CALCULATION MEMORIAL OF EACH ASPIRATION SMOKE CENTRAL, AND IF NECESSARY, THE ADDITION OF MONITORING MODULES FOR
ADDRESSABLE PIPES.
INFRAESTRUTURA
M-03 PAINEL DE MÓDULOS PARA COMANDO E MONITORAMENTO DA VPA (7 MÓDULOS MONITORES): 1 - STATUS DE OPERAÇÃO, 2 - ALTA PRESSÃO DE AR
P/ LAÇO DE DETECÇÃO COMPRIMIDO, 3 - BAIXA PRESSÃO DE AR COMPRIMIDO, 4 - INTERRUPTOR DE PRESSÃO DE ÁGUA, 5 - PRESSÃO DE AR DA REDE, 6 - VÁLVULA DE
INFRAESTRTURA P/ MANUTENÇÃO DE ENTRADA, 7 - VÁLVULA DE TESTE DE SAÍDA) E 1 MÓDULO RELEASE PARA CADA VPA. PANEL OF MODULES FOR MONITORING AND
H ALIMENTAÇÃO H

Bending Marks
ACTIVATION OF VPA(7 MONITOR MODULE): 1 - STATUS OPERATION, 2 - HIGH PRESSION OF COMPRESS AIR, 3 - LOW PRESSION OF COMPRESS AIR, 4 - WATER
PRESSURE SWITCH, 5 - AIR NET PRESSURE, 6 - INLET MAINTENANCE VALVE, 7 - OUTLET TESTE VALVE, AND 1 RELEASE MODULE FOR VALVE COMMANDO
FOR EACH VPA.
M-05 MÓDULO RELÉ PARA DAMPER CORTA FOGO. RELAY MODULE FOR FIRE DAMPER
M-06 MÓDULO DE MONITORAMENTO PARA O FIM DE CURSO DO DAMPER CORTA FOGO. CONSIDERAR MÓDULO PARA COMPARTIMENTAÇÃO HORIZONTAL E
VERTICAL ONDE NECESSÁRIO. MONITOR MODULE FOR FIRE DAMPER. CONSIDER MODULE FOR HORIZONTAL AND VERTICAL COMPARTMENTATION WHERE
NECESSARY
M-09 MÓDULO RELÉ PARA CORTAR A ALIMENTAÇÃO DAS SAÍDAS DAS FONTES DAS FECHADURAS ELETROMAGNÉTICAS. RELAY MODULE TO CUT OFF THE POWER
MÓDULO DE COMANDO P/ PAINEL SUPPLY OUTLETS FOR THE ELECTROMAGNETIC LOCKS
ELÉTRICO DOS EQUIPAMENTOS M-11 DOIS MÓDULOS DE MONITORAMENTO PARA STATUS DA VÁLVULA SETORIAL E STATUS DA CHAVE DE FLUXO. TWO MONITORING MODULES FOR SECTOR
DE AR CONDICIONADO VALVE STATUS AND WATER FLOW SWITCH.
M-12 MÓDULO DE COMANDO PARA PAINEL ELÉTRICO DOS EQUIPAMENTOS DE AR CONDICIONADO(DESLIGAMENTO DOS EQUIPAMENTOS). CONTROL MODULE
FOR ELECTRICAL PANEL OF AIR CONDITIONING EQUIPMENT (EQUIPMENT SHUTDOWN).
TUBULAÇÃO E PONTOS DE AMOSTRAGEM
ORIENTATIVOS DO VESDA

ARQUIVO DE REFERÊNCIA DE ARQUITETURA:


SGRUTB12-E-SCE-GE01-AR00-TD101.RVT
SGRUTB12-E-SCE-DC01-AR10-DE-0001
SGRUTB12-E-SCE-DC01-AR20-DE-0001
SGRUTB12-E-SCE-DC01-AR20-DE-1001
TUBULAÇÃO E PONTOS DE AMOSTRAGEM SGRUTB12-E-SCE-DC01-AR20-DE-2001
ORIENTATIVOS DO VESDA
SGRUTB12-E-SCE-DC01-AR20-DE-3001
PONTO DE AMOSTRAGEM SGRUTB12-E-SCE-DC01-AR20-DE-4001
I PAINEL DE MÓDULOS P/ VESDA SGRUTB12-E-SCE-DC01-AR20-DE-5001 I
MM - ALARME SGRUTB12-E-SCE-DC01-AR20-DE-6001
AVISADOR AUDIOVISUAL MM - PRÉ-ALARME
MM - FALHA
MM - SUPERVISÃO DA FONTE DE BATERIA

VESDA PONTO DE AMOSTRAGEM

ACIONADOR MANUAL

PAINEL DE MÓDULOS P/ VPA FONTE DE ALIMENTAÇÃO DO VESDA


MM - STATUS DE OPERAÇÃO
PONTO DE AMOSTRAGEM MM - ALTA PRESSÃO DE AR COMPRIMIDO
MM - BAIXA PRESSÃO DE AR COMPRIMIDO Estado / Status
MM - INTERRUPTOR DE PRESSÃO DE ÁGUA

TUBULAÇÃO E PONTOS DE AMOSTRAGEM


MM - PRESSÃO DE AR NA REDE
MM - VÁLVULA DE MANUTENÇÃO DE ENTRADA
APROVADO APPROVED
ORIENTATIVOS DO VESDA MM - VÁLVULA DE TESTE DE SAÍDA
MR - MÓDULO RELEASE P/ VPA
J J

TUBULAÇÃO E PONTOS DE AMOSTRAGEM


ORIENTATIVOS DO VESDA 00 APROVADO | APPROVED 18/05/2023 FAD MRM PGR
0A EMISSÃO INICIAL | INITIAL ISSUE 28/02/2023 FAD MRM PGR
PAINEL DE MÓDULOS P/ VESDA Versão / Descrição / Description Data / Date Elaborado / Verificado / Aprovado/
MM - ALARME Version Designed by Verified Aproved
MM - PRÉ-ALARME
MM - FALHA
MM - SUPERVISÃO DA FONTE DE BATERIA Tabela de Revisões / Revision Schedule
PONTO DE AMOSTRAGEM
VESDA

K K

FONTE DE ALIMENTAÇÃO DO VESDA

Projeto / Project
TAMBORÉ - SGRUTB12
Fase / Phase
PROJETO EXECUTIVO / EXECUTIVE DESIGN
Disciplina / Discipline
ELÉTRICA / ELECTRICAL
3D TÍPICO - EQUIPAMENTOS NAS SALAS ELÉTRICAS Título / Title

SISTEMA DE DETECÇÃO E ALARME DE INCÊNDIO (SDAI)


L L
NÍVEL 01 - SDAI
LEVEL 01 - SDAI
Data / Date Folha/ Sheet Código SCALA / SCALA Code Versão / Version

18/11 02/07 SGRUTB12-E-SCE-DC01-EL33-DE-1001 00


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Bending Marks Bending Marks DIREITOS AUTORAIS RESERVADOS - PROIBIDA QUALQUER REPRODUÇÃO SEM AUTORIZAÇÃO EXPRESSA - FORMATO ORIGINAL A0

Você também pode gostar