Ana Freitas
DIRECTOR DO PROJECTO: A. Freitas 2021.09.30
(nome & rúbrica) 16:13:02
+01'00'
REVISÕES DO DOCUMENTO
As secções modificadas na última revisão são identificadas por uma linha vertical na margem direita
CONTENTS
1. Introduction .................................................................................................................................. 3
2. Scope ........................................................................................................................................... 3
3. References ................................................................................................................................... 3
3.1. Project documents .......................................................................................................... 3
3.2. Codes and standards ...................................................................................................... 3
4. Abbreviations ............................................................................................................................... 4
5. Safety Equipment List................................................................................................................... 5
1. INTRODUCTION
Angola LNG is operating a LNG plant in Northern Angola, near Soyo to liquefy and export gas produced
from offshore Angola fields.
Gas is taken from LNG plant to supply the domestic users located in the new industrial area near Soyo.
A Distribution Gas Pipeline (DGP) will be laid between LNG plant and the Gas Receiving Distribution
Unit (GRDU).
This gas will be filtered in the GRDU and distributed to load users in particular the new power plant.
The FALCÃO PROJECT EPC consists in the review and updating of the DGP and GRDU FEED
UPDATE prepared in 2013.
2. SCOPE
The purpose of this document is to give the list of the safety equipment, to be provided for the FALCÃO
PROJECT FEED EPC.
Safety equipment are involved in fire and gas detection, fire fighting and miscellaneous safety.
No new safety equipment shall be installed on DGP inlet area. Therefore this document will only focus
on GRDU.
3. REFERENCES
4. ABBREVIATIONS
Safety Equipment listed in the following table is based on the GRDU “Escape Routes &
Safety Equipment Layout”, Ref. [2], GRDU “F&G Detectors Layout”, Ref. [3], and the Planta
de Segurança contra Incêndios, Ref. [4].
OUTDOOR
INCINERATO TECHNICAL
TYPE PROCESS WAREHOUSE TOTAL
R PACKAGE BUILDING
AREA
Fire and gas detectors
2 2
Flame detector (UV/IR) 11 - 15
(Note 1) (Note 2)
Thermostatic heat 2
- - - 2
detector (Note 2)
3
Temperature sensor - - - 3
(Note 4)
Horn 1 1
Fire fighting
equipment
9 kg powder portable 1
4 - 2 7
extinguisher (Note 8)
50 kg powder wheeled
1 - - - 1
extinguisher
5 kg CO2 portable 5
1 - 1 7
extinguisher (Note 9)
45 kg CO2 wheeled
- - - 1 1
extinguisher
9 L water portable 3
- - - 3
extinguisher (Note 10)
Inert gas total flooding 1
- - - 1
system (Note 6)
1
Twin agent skid - - - 1
(Note 7)
Miscellaneous safety
equipment
1
Portable Eye wash - - - 1
(Note 11)
OUTDOOR
INCINERATO TECHNICAL
TYPE PROCESS WAREHOUSE TOTAL
R PACKAGE BUILDING
AREA
2
First aid kit - - 1 3
(Note 12)
1
Electrical safety kit - - - 1
(Note 13)
1
Stretcher - - - 1
(Note 14)
2
Fireman’s Equipment
(Note 15)
Notes:
1- 2 UV/IR flame detectors shall cover the transformer area.
2- 2 UV/IR flame detectors and 2 thermostatic heat detectors shall be provided in the diesel
generator enclosure.
3- Smoke detectors shall be provided in rooms of the technical building as follows: 1 in
control room + 1 in false ceiling, 2 in electrical room, 2 in instrumentation room, 1 in break
room, 1 in guard room, 1 in storage room, 2 in corridor, and 6 in false floor, for
warehouse 10 smoke detectors (detectors to be provided in a CDI system, for technical
and warehouse building, not on F&G PLC).
4- 3 temperature sensors in the outlet stack of the incinerator (to be supplied with incinerator
package).
5- 3 flammable gas detectors in the air intake of the incinerator.
6- 1 inert gas total flooding system shall be provided in the enclosure of the diesel generator
(to be supplied within generator enclosure package, if diesel generator is in an
enclosure).
7- 1 twin agent skid shall be provided to protect the scrubber (refer to GRDU-EG-SEG-05-
002 for specification of this equipment).
8- 1 in transformer.
9- 1 in control room, 2 in electrical room and 2 in instrumentation room.
10- 1 in control room, 1 in break room and 1 in guard room.
11- 1 in electrical room outdoor exit.
12- 1 in control room and 1 in guard room.
13- 1 in electrical room.
14- 1 in guard room.
15- 1 in control room and 1 in guard room.
16- At HVAC air inlet.