Escolar Documentos
Profissional Documentos
Cultura Documentos
FAS LOZORNO
OK
NOK
Risk of warranty-claims
No
0 D3 - Containment
Customer 0 0
Faurecia 0 0
Supplier 0 0
2. Containment Actions
Why is it a problem?
S
p✘
✘
Serial Warranty a Program Logistics
n
i
s
Supplier name h Faurecia Valcea
No
Comments / Conclusions
not requested
NA
NA
Supplier contact:
Ishikawa / 5 WHY OK
0 D5 - Root Causes of Occurrence
Please fill out the worksheets „ISHIKAWA“ & „5Why“ or „Is-Is Not“ & „5 Wh
Root Cause
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
2 2 2 1 1 1 1 1 1 1 1 1 1 1 1
7 /1 9/1 1/1 2/0 4/0 6/0 8/0 0/0 2/0 4/0 6/0 8/0 0/0 2/0 4/0
2 2 3 1 1 1 1 1 2 2 2 2
Customer
0 D8 within 60 days
D8 - Les
Por favor verifique que tem a última versão deste documento.
SAM-F-SPS-4017 - Versão 04 - 04/14
Propriedade da Faurecia.
knowledge management database / product or process
FMEA, control plan, maintenance plan, workstation
documents, audit frequency, boundary samples,
Corrective action
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
12 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2
1 /1 2/0 4/0 6/0 8/0 0/0 2/0 4/0 6/0 8/0 0/0 2/0 4/0 6/0 8/0 0/0 1/0 3/0 5/0 7/0 9/0 1/0 3/0 5/0 7/0 9
3 1 1 1 1 1 2 2 2 2 2 3 1 1 1 1 1
Customer Faurecia Supplier (Quality wall)
The defect type reoccured at Faurecia customer plant. Containment/corrective actions wer
D8 within 60 days
D8 - Lessons Learned
Por favor verifique que tem a última versão deste documento.
SAM-F-SPS-4017 - Versão 04 - 04/14
Propriedade da Faurecia.
Action
Updated CP
RPN = 0
02 02 02 0 2 0 2 0 2 0 2 0 2 0 2 0 2 0 2 02 03
5/ 7/ 9/ 11/ 13/ 15/ 17/ 19/ 21/ 23/ 25/ 27/ 1/
ality wall)
ned
Por favor verifique que tem a última versão deste documento.
SAM-F-SPS-4017 - Versão 04 - 04/14
Propriedade da Faurecia.
Pilot Deadline Status
S O D
25
FAS LOZORNO
Alert/QP Number: 0
What? Problem Description: 0
Traceability, batch number of defective part / component: 43032
REPLACEMENT/NÁHRADA
PARTS OUT OF RECEIVING/DIELY MIMO PRÍJEM
Supplier contact Name: Faurecia SQA contact Name:
Kontaktná osoba (dodávateľ): Kontaktná osoba (dodávateľ):
REPLACEMENT/NÁHRADA
PARTS OUT OF RECEIVING/DIELY MIMO PRÍJEM
Supplier contact Name: Faurecia SQA contact Name:
Kontaktná osoba (dodávateľ): Kontaktná osoba (dodávateľ):
RADA
MO PRÍJEM
m No:
Z_F_SPS_0003_en_sk_Issue01
RADA
MO PRÍJEM
Statistics (D3 + D7)
Faurecia Customer Start date
Sum 27/12/99 28/12/99 29/12/99 30/12/99 31/12/99 1/1/00 2/1/00
NOK 0 0 0 0 0
checked 0 0 0 0 0
comments
3/1/00 4/1/00 5/1/00 6/1/00 7/1/00 8/1/00 9/1/00 10/1/00 11/1/00 12/1/00 13/1/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
3/1/00 4/1/00 5/1/00 6/1/00 7/1/00 8/1/00 9/1/00 10/1/00 11/1/00 12/1/00 13/1/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
14/1/00 15/1/00 16/1/00 17/1/00 18/1/00 19/1/00 20/1/00 21/1/00 22/1/00 23/1/00 24/1/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
14/1/00 15/1/00 16/1/00 17/1/00 18/1/00 19/1/00 20/1/00 21/1/00 22/1/00 23/1/00 24/1/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
25/1/00 26/1/00 27/1/00 28/1/00 29/1/00 30/1/00 31/1/00 1/2/00 2/2/00 3/2/00 4/2/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
25/1/00 26/1/00 27/1/00 28/1/00 29/1/00 30/1/00 31/1/00 1/2/00 2/2/00 3/2/00 4/2/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
5/2/00 6/2/00 7/2/00 8/2/00 9/2/00 10/2/00 11/2/00 12/2/00 13/2/00 14/2/00 15/2/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
5/2/00 6/2/00 7/2/00 8/2/00 9/2/00 10/2/00 11/2/00 12/2/00 13/2/00 14/2/00 15/2/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
16/2/00 17/2/00 18/2/00 19/2/00 20/2/00 21/2/00 22/2/00 23/2/00 24/2/00 25/2/00 26/2/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
16/2/00 17/2/00 18/2/00 19/2/00 20/2/00 21/2/00 22/2/00 23/2/00 24/2/00 25/2/00 26/2/00
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
IS IS N
Wheel problem (is the problem) Suspension problem (Is not the
ÄThe analysis "Is / Is not" shows that the problems occurs only at high
IS IS N
(is the problem) (Is not the
directed wheels
tire
lems occurs only at high speed, with summer tires on the directed wheels.
tained Factors
em
tained Factors
MEASUREMENT
MANAGEMENT METHOD
MEN
MATERIAL
Check
No detection 1
No detection 2
Non Detection D4
No detection 3
No detection 4
No detection 5
occurrence 1
occurrence 2
occurrence 3
occurrence 4
occurrence 5
Check
Check
OK
5th WHY ?
Check
FAS LOZORNO
D1 Problem description
What is the problem ?
D3 Containment actions.
How to contain? <24h
D7 Effectiveness
SPECIAL IDENTIFICATION
Identify the first shipment guaranteed as "Guaranteed concerning QP/Alert nº...." – if not, FAA MOLDADOS will consider it suspicious and not guaranteed by you.
If the parts arrive without identification, the shipment is considered as not guaranteed and it must be sorted 100% by external company at supplier charge.
The unitary box or/and (when asked) the parts should be identified with a special identifiaction to trace the actions.
See example in "Special Identification" used in unitary box/roll/....
CONTAINMENT ACTIONS
Supplier needs to guarantee: all the stock in FAA MOLDADOS, all the stock in the final customer (when asked to) and all the stock in your ( supplier) plant and in external warehouses controlled by your company.
If the parts will be sorted/reworked in our facilities or in external company, we need a Work Instruction defined by the supplier in order to achieved the conformity of the parts.
The management of this action is 100% of the responsibility of the supplier.
Final product can not be returned.
Rejected parts can only be stored on our facilities within 5 working days.
DOCUMENTATION
Control Plan, Workstation Instructions (Self Control or Final Control), PFMEA & documents and any other standard to be updated with the actions concerning to QP.
APQP
APQP file shows checking points agreed during development, and is updated by the supplier after each quality problem.
COST
The supplier are responsible for all the costs involved due to this quality issue caused by your parts.
Potential volume impacted : what is the suspected lot size ? Traceability - first occured, last OK
Are cars already in the field and thus is there a risk to the final users ?
Type
UAP/Line: write here Management Suppliers
Author : write here
CORRECTIVE ACTIONS
WHAT WAS THE PROBLEM? (5W + 2H) WHAT IS THE CAUSE?
What happened? (sharp description of causes here)
write here
Why it is a problem?
write here
When did it happen ?
write here
Who has detected it ?
write here
Where has it been detected ?
write here
How has it been detected?
write here
How many ?
write here
BEFORE AFTER
(place here pictures and notes) (place here pictures and notes)
What we learned
CONTROL POINT
LEARNED FACTOR STANDARD / REACTION RULES
(What to do? how? when? who?)
(pertinent method to apply / (steps to follow) (relevant behavior)
Things to act on)
100% CHECKED
inspection report after QP
FES 7.3.3 Level 3
Delivery No.:
Číslo dodávky: Supplier contact Name:
Kontaktná osoba (dodávateľ):
Date of inspection:
Dátum kontrroly: