Escolar Documentos
Profissional Documentos
Cultura Documentos
Parker Hannifin
Candido Lima
Presidente - Grupo Latino Americano
Agenda
A Parker Hannifin
Estratégia Lean da Parker
Resultados e Lições Aprendidas
2
Parker - Líder Global em Movimento e Controle
do Movimento
4
Parker Hannifin - Tecnologias
Exoesqueleto
5
Parker na América Latina
Mais de 40 anos no Brasil
Funcionários 1,600
Plantas de Manufatura 9
Distribuidores 500
6
Agenda
A Parker Hannifin
Estratégia Lean da Parker
Resultados e Lições Aprendidas
7
Estratégia Win da Parker - 2002
8
Parker Lean System – 2002
O Início
9
Parker Lean System – 2002
Brasil
Foco na manufatura
15 16
14
13 17
11 19
18
12
20
07 24
08 23
09 22
06
25 10 21
05 26
01
TPM Kanban 03
04
02 27
Manufatura Celular
Rotas de Abastecimento
10
Parker Lean System – 2004
Evolução
Manuf.
Supply Pricing
Chain
Lean
Finanças TI
Enterprise
Engenharia RH
Vendas e
Mkt
Parker Lean System (PLS)
Dias Atuais - 2014
Baseado no sistema
Toyota de Produção,
criamos o PLS com a
linguagem voltada à
nossa realidade, e
abrangendo toda a
organização (Lean
Enterprise)
12
Parker Lean System
Treinamentos Contínuos
13
Parker Lean System Hoje - Melhorias Em Todas as Áreas
15
Jornada Lean – Divisão Filtração
Implementação
1 A3 - Solução de Problemas
Estabilizar
5 2
Nivelar Padronizar
Nivelamento de Produção
Trabalho Padrão
Manufatura e Escritórios
4 3
Puxar Fluxo
Sistemas Puxados
16
Mapas de Fluxo de Valor Manufatura e Escritórios
Jornada Lean – Divisão Filtração
17
Jornada Lean – Divisão Filtração
Resultados
18
Em 2013 Adotamos o Hoshin
A3 Estratégico
Vendas Macro
Brazil Hydraulics Division FY14-FY18 Strategy A3 Approval:
Subject: Profitable Growth. Sales of $117M by FY18, with 16,5% ROS Future State:
$123M
Performance, Gaps:
CAGR FY14-FY18 STRETCH : 8.7 %
How we win:
Vision $117M by FY18 - Motion & Control Leader in Latin America
Strategic
Core Business Future Growth Organizational Health
Context: Focus
In FY09, the Hydraulics Division developed its Strategic Plan to grow sales from $88M in FY10 to $157M in FY15. Many
q Premier Customer q Strategic Market
factors led
Fluid Connectors the division
Brazil to a Strategy
FY14-FY18 gap of $72M
A3 in sales (planned in FY10 vs probable FY13). Approval: ER ML EI SS Experience
MA (EdevaDM VT RN q Best Place to Work
Added to that, the ROS is also underperforming in the past 3 years, achieving a gap of 13.3% between what was planned l do Bonfi m) Growth
CS EG (Uwe Kraus)
in FY10 (19.2%) versus probable ROS to be achived in FY13 (5.9%). (Edevaldo Bonfim)
q Division + Sales Co.
We have seen that the competition in many of our products and value streams have increased in past 4 years, mainly in
Subject: Profitable Growth. Sales of $73M by FY18, with 14.5% ROS Future State: Alignment q Operational
mobile cylinders but also in valves ans pumps. This scenario brought a huge price competition to our business.
Initiatives q Acquisitions
( Sergi o Montei ro)
(Tadeu Nunes)
Excellence
Performance, Gaps:
Analysis: Mobile cylinders FY10-FY15
are design LA Strategy Plan q Channel Strategy (Marcelo Lopes)
Growth
Future
90
control items. having a Lack CAGR
of cost FY14-FY18:
reduction (Al exa ndre La ba t) q Accountable Mgmt
Mobile Cylinders
$80M 0.19
r = + $6.7M r = - $0.3M r= - $7.9M
6.8% / Six q Innovation
Gear Pumps
80
commodity characteristics
r cum = + $6.6M r cum = + $6.3M r cum = - $1.6M innitiatives (e.g. VAVE Process
CAGR FY10-FY13: 70
0.17
q Margin Protection
0.15
Sigma) (Wi l s on Ri coy)
(Luciano Gomes)
11.2% 60
Poor (Marcelo Lopes)
r =effectivenss
- $ 0.1M in quality
0.13
tools
50 application (e.g.PFMEA Win Strategy
Sales
Not
20 enough cost reduction
not0.07
used as preventive tool)
business
Core
innitiatives
10 to support price 0.05
0 competition Lack
0.03 of strategic review of Prioritized Actions:
FY10 FY11 FY12 FY13 FY14 FY15
past decisions (e.g.bushing Item Task
New products development strategy focused in OEM
Metrics
New product sales
Impact Owner Date
PSP Plan Actual ROS Actual ROS PSP 1 U$1026K Nelson Castro Jan-14
customers (e.g. Excavators) Vision $73M by FY18 - Best Source for Conveying Pressurized Fluid in Brazil
3 Introduce new product launching flawlessly (Valves)
New products
COPQ
- Nelson Castro Jul-13
RH
savings (U$)
Organizational
OEM'sFocus
Health
q Strategic Market
U$287K Joacir Machado Feb-14
and well thought Plan. The outsourcing
actual figuresdecisions
show that sales has remained flat around $50M Increase of supporting q Premier CustomerExperience
India) savings (U$)
8
Do business plan to produce accumulators internaly, using
cylinders assets to improve fixed costs absorption
Accumulators net
sales (U$) q Best Place to Work
-
Jeferson
Sbalchiero
Feb-14
in the last 3 years while the ROS has presented a reduction from almost 13% to 9%. costs (Sales Co & division (Marcos Venanzi / Danilo Miranda ) Growth Mobile cylinders Jeferson
Lack of cost reduction innitiatives Subject: Profitable Growth. Sales of $120M by FY18, with 20.1% ROS,@US$=BRL2.00 Future State:
Industrial Hydraulics
initiatives and ineffective deployment/tracking are some of the flaws to be addressed in Lack of quotation accuracy q Division + Sales Co.
RPPM Carriconde
Mobile Valves
11 Improve productivity by 5%
Mobile cylinders
U$90K
Jeferson
May-14
Instrumentation Latin America FY14-FY18 Strategy A3 Approval:
FY14-FY18 BFD Strategy Plan
Sales/EE Sbalchiero
the future so as to ensure proper timely execution. (Price/GM quoted vs Alignment Gear pumps thrust Gison
$120M Automation Brazil FY14-FY18 Strategy A3 Approval:
12 Improve supply chain focusing in cost reduction U$92K
q Operational
plate savings (U$) Matzembacher
Jan-14
Performance, Gaps: 140.0 25.0%
accomplished) q Acquisitions
& Cylinders
100.0 15.8%
17.0%
17.9 -
- Subject: Profitable Growth. Sales of $52.8M by FY18, with 15% ROS Future State:
for some products (e.g.
15 Implement VAVE comitee VAVE savings (U$) - Nelson Castro Feb-14
14.6% 29.6
q Channel Strategy 2.5 9.2 - 4.9 15.0% Gaps:
Performance, Future State:
Everton
80.0 -
Sales
Denison pumps)
16 Reduce customer RPPM Gear pumps RPPM -
Carriconde
Feb-14
- 3.8 4.1 4.4
(Ma rcos Vena nzi
17)
Develop pricing strategy for OEM customers (according to Gear pumps OEM´s
- - 2.5
ROS
Lack of different pricing strategy BBFY14) SPI
- Denis Sarmento Mar-14
60.0 10.0% ING LA Plan by Country Performance, Gaps:
for OEM's Poor quality performance 18
Review internal supporting costs and sales company
Cost of sales for IH -
Gustavo
Aug-13
40.0
q Accountable Mgmt
allocation Meneghello
25000 $75.8M
in Power Gen. market and 19 Improve quotation accuracy
% accuracy (Quoted vs
- Giovani Zat Sep-13
78.0 78.0 5.0% 80 0.25
q Innovation 78.0 78.0 78.0 78.0
accomplished)
16,000
18,000
CIC Brazil FY14-FY18 Strategy A3 Approval:
40 CAGR FY10-FY13: 0.1 CAGR FY14-FY18:
No product development strategy / (Win Certification, Pricing, Procurement)
7.90%
13,300
Lack of market focus 30
approach to new products and Follow-up: Plan follow-up on a quarterly basis 5000
1,073
429
9,370
11,200
Subject: Profitable Growth. Sales of $11.229 by FY18, with 9,6% ROS Future State: 1.10% 0.05
trends (e.g. load sense valves) strategy/deployment 5,471 20
FY14-FY18 BFD Strategy Plan - Engine & Mobile FY14-FY18 BFD Strategy Plan0- Hydraulic 900 1,000 0
309 300
FY10 FY11
500
FY12
700
c - Lack of focus and training to the sales force inside Brazil and out A q Channel Strategy (Marcelo Lopes) 1 3
C11 q High dependence of imported products (high exposure to exchange rate fluctuations) 0.07M Win Rate
6 Logility Implementation C1 Danilo Miranda Jun-14 q ROS below plan 6p.p. due to: - Take advantage of S.Co capilarity to strenght Parker penetration - Lack of product specialists COMPONENTS
Parts per year Total Sales (USD)
Price
average
Parts per year
Total Sales
(USD)
Price Parts per year
Total Sales
(USD)
Price
(sales, engineering, inventory, services...) FY1 2 v s FY0 5
(too many small customers buying direct)
12a 4 5 7c
q Accountable Mgmt
15
C12 q Jacarei Site: Margin decrease due to slow price increase implementation (analysis and
$ 1 ,6 2 2 K
- Provide service to steel mills, oil &gas and pulp & paper sub-segments
9d
Impact
or 13% 11 6 7b 13b 13a
Expansion Valves 8.868 419.040,37 47,25 142.478 4.365.542,37 30,64 17000 599.014,26 35,24
q Margin Protection
9b
Process
12b
Solenoid Valves 1.628 100.081,31 61,48 87.517 2.514.489,00 28,73 2000 66.082,30 33,04
negotiations too slow for OEM accounts) Effective price increase for key OEMs customers and price 0.83M
SPI & MCR - Diagnosys , Prevention and Theraphy concepts - Inexistent business to business electronic platform
Filter Driers 16.412 136.663,87 8,33 350.430 2.026.447,00 5,78 35000 232.755,45 6,65 Item Task Metric Champion
Target ROS and Sales
2
(Luiz Moura)
9a
Date Impact
7 C12 Bad Factor Marcos Venanzi Jun-14 - No strategic procurement resources - Foster sales to MRO and small HPU manufacturer through Sales Agent - Retail program not prepared to service customers direct Pressostatos 1.405 14.829,91 10,56 57.433 1.542.538,00 26,86 12000 370.641,00 30,89
(Wi l s on Ri coy) 7- Significant increase of material cost Lopes) 8- Inflation not offset by productivity
Current FY13 Gross Margin - 34.5% (rolling) x 38.5% (plan) lists Sales
- No system to grow closer to distribution with reporting and accountability Prioritized Actions: Liquid Indicator 3.308 60.662,95 18,34 60.302 755.535,00 12,53 5000 72.042,82 14,41
(Marcelo 1
Implement logistics and inventory strategy for main pneumatic items
(cylinders, valves, FRL´s and accessories) aligned with market
Sales J. Vilela Oct-13 $1.0M 9c
Margin
C13 q Poor procurement initiatives CAGT Ball Valves 4.412 138.474,15 31,39 67.878 2.086.351,00 30,74 12000 424.167,53 35,35
as % Win Strategy
of sales improvements or passed on to customers
Customer
Win Rate - Develop Breathing Air system to sell in coutries other than Brazil in LA e - Gross margins only analyzed at month's end (after the fact)
Solid core and filter drier 7.251 183.883,03 25,36 68.380 758.068,00 11,09 12000 152.988,28 12,75
Foundation 3 Rearrange regional sales teams by technology Sales E. Bonfim Jun-14 $1.2M
- Keep offering local made N2 Generators for Oil & Gas Off Shore application q Customers Complaints ( Late deliveries) Prioritized Actions:
Provide interaction and technological exchange of Lead time other than Engine &Mobile and Hydraulic 9- Costs not competitive 10- Lack of clear strategy for key markets 6 Implement customer rationalization, moving small customers to distributors Sales E. Guimaraes Oct-13 $0.4M
F3 q Lack of skilled people to prospect potential acquisitions, due diligence and integration 9 F6 - Eduardo Rampinelli Jun-15 - Strength relationship with engineering companies by assigning the product specialist for that B
engineering with other Fluid Connectors Divisions LISC Future Growth 7a Accelerate PCI implementation with local suppliers Material Cost D. Horta Dec-13 $0.4M
F4 q Poor sales growth through system solution initiatives (only IPT project) Career plan: Project with Aon Hewitt concerning Salary vs Productivity Process - Lack of product specialists oriented to markets 7c Leverage material cost savings through supplier symposium Material Cost D. Horta Mar-14 $0.5M
Distribuição
- Lack of innovation in value added services, oriented to end of year results
Divisão 2
1. Lack CIC statistics
F6 q Lack of competitiviness due to technological gap on manufacturing process - Redefine market priorities 9a Global FRL launching ROS J. Vilela Sep-13 $0.3M
Divisão 1 Divisão 3
- Poor interaction between divisions in the region
Divisão 4
Productivity Increase at Assembly areas and TBO > 8% by 0.11M Miscelaneous C q Sales and market follow througt 2. Lack of project backlog development / innovation
h - Lack of alignment, incentive and knowledge of PES capabilities and reach
9b Implement P1E cost reduction project ROS S. Enamoto Dec-13 $0.2M
O1 q Career development plan is not effective, affecting motivation and engagement and,
100
87
- Assigning dedicated teams for each filtration platforms to help on management and decision making:i - Lack of a penetration plan for strategic lomg term growth markets (i.e.: Life Sciences)
90
Future Growth
79
80 Accelerate six sigma implementation through one addtional black belt and
73 9d ROS S. Scassola Mar-14 $0.2M
Improve absorption on the machining area through additional Future Growth 13- Work environment does not foster employee 70
69 67
6466
14- Lean enterprise implementation pace
two green belts
Percent Favorable
60
consequently, productivity/ROS. Current situation: 14% of employees expecting to be 0.11M Absorved - Poor acquisition integration team allocation 60
57
53 54
57
recognized according to their job performance (Gap: 86%) volume on the product mix (ROS) hours
- Properly allocations
- Poor due diligence in place for prospects D q Lack of business strategy for CIC LA ACTIVITY STEPS
motivation and engagement OWNER A-G TARGET DATE
40
30
32
not aligned with division challenges 11 Create growth strategy for value added systems and services through PES ROS L. Gomes Sep-13 $1.0M
j - Lack of an acquisition pipeline at group level, not aligned with WW manufacturing groups
20
O2 q Managers don't have a clear communication with employees related to targets, Rationalize bar stock at Nocams in order to reduce number 0.05M
- Outsource IT support to provide softwares to matches' needs and acquire existing software to help on product Follow-up: 2 (Global Survey / Labor Litigation)
Develop a tooling or bench marking with seal division to implement Tatical or similar report to CIC division Fernando Santos C August/13
0
Outcomes Reward and
Recognition
Senior
Leadership
Tools and
Resources
Two-way
Communication
12a
Assign resident application engineer to work at MAN / other transportation
customers
Sales S. Enamoto Mar-14 $3.0M
13
of Setups and increase productivity
O4
(ROS)
Set-up time Ricardo Nechar Jun-14
would be in charge of that. development Organizational Health Target
FY13 FY14
E q Quality - Refrigeration lack of Quality Certification ( ISO 9001 2008 ) 3 Project Backlog development Carlos Costa C July/13
Parker Hannifin Overall
Best In Parker
Auto-Brazil Automation
Diversified Industrial Norm
Belo Horizonte
12b Establish roadmap for hybrid technology introduction to mobile market Sales G. Batista Jun-14 $0.6M
performance and business strategy who affects a proactive behavior and, - No social responsibility or sustainability plan at group level, only spots of individual effort
Cause Task Focus Initiative Priority Champion Completion Q4 Q1 Q2 Q3 Q4 4 GAP analisys report development Carlos Costa C July/13
- Structure strategic purchase team Premier Customer 13a Front gate, reception and locker rooms renovation
Empowerment
Survey
L. Gomes Dec-13
consequently, productivity/ROS ("Senior leadership gives employees a clear picture of k - No culture of continuous feeddback. PA process seen as a distraction a Reduce Inquiry to shipment Macro lead time to 15 days on standards Core Business Experience 1 T Silva Dec-14
Copper Filter Supplier Process not appropriated 5 Distribution, Representatives and new Customers development in order to support sales growth
15- Poor deployment and focus hinder
Carlos Costa
strategy execution
D August/13
Establish new communication channels between managers q Organic Growth (CAGT): Breathing air project did not reach expected results due to lack of - Take advantage of pricing activities to support Sales Empowerment
Train every sales company and dedicated sales resource into all 13b Finalize and implement job title / salary project C. Sosnowski Dec-13
Survey
E
Parker
6 Develop a quality certification plan for Refrigeration VS Adriano / Sergio December/13
the direction in which Parker is headed" - Senior Leadership Dimension: 38%). - Lack of cross regional opportunities open/transparent throughout the organization c Instrumentation products at least once a year Core Business Channel Strategy 1 M Catto Jun-14
Market Potential
and employees, e.g.: monthly business meetings, quarterly Productivity - Review S.Co allocation criteria - Trainee program not expanded to students or part time apprentices
d
f
Review all local price lists based on competitive alignment
Revise all core A parts to align breakeven quantities with economic lots
Core Business
Core Business
Margin Protection
Margin Protection
1
1
M Catto
F Delben
Dec-13
Dec-13 Parts per year Total Sales (USD)
Price Parts per year Total Sales (USD) Price Parts per year Total Sales
Price
7 Copper Filter supplier process improvement, new supplier development or insourcing Marcos Correa F July/13 14
Accelarate Lean implementation through partnership with Lean
Institute Brasil
ROS S. Scassola Jun-14 $0.4M
O3 q Working conditions and environment are not suitable for basic needs (locker room, 14
journal, PPP feedback, etc. Create "rewards and
O1 -
support
Carolina Sosnowski Jun-14 response from LINDE ($2M) - Implement "Road Show" and "Blitz" activities to promote products/technologies l - Dislodged training and development programs. Not joined in a university type structure p
develop plan to consolidate monthly self audits aligned with Win
Certification
Organizational
Health
Accountable Mgmt
process 1 T Silva Dec-13
COMPONENTS
Filter Driers
RC2 + AC3
16.412
RC + AC
136.663,87
average
USD
8,33
RC2 + AC3
350.430
RC + AC
2.026.447,00
average USD
5,78
RC2 + AC3
35000
(USD)
RC + AC
232.755,45
average USD
6,65
8 Dry test implementation for Fluid Control process Amarildo Moraes F August/13
15
Improve strategy deployment and execution through management
standard work, layered audits and stand up meeting redesign
Timely
Execution
E. Iwamura Aug-13
Potential G
Organizational 9 Improve the current work conditions, office, workstations, desks, etc.. Marcos Correa July/13
restaurant, parking, equipment, etc.), affecting pride to work at Parker and, recognitions" program to reinforce the good performance. - Diverse and not common benefits throughout the organization q Schedule One Kaizen event a month and a monthly lessons learned meeting Health Operational Excellence 1 T Silva Jul-13
Organizational F Share parts Share U$
Share Share 10 To hire process engineering ( FC and CF VS´s process improvement ) Marcos / Carolina G June/13
consequently, productivity/ROS. Environment Survey: Implement actions mapped by the q Greenfield project (Process Filtration): Lack of market knowledge and skilled people to run m - Poor working conditions at the Diadema plant, ergonomics and well being r Align Daily production meetings with a robust S&OP Process
Prepare plan to restructure and stand alone as a division in Brazil. Include
Health
Organizational
Operational Excellence 1 C Grez Jul-13
parts U$ 10 To hire a product and marketing specialist for Fluid Control VS Marcos / Carolina D-G June/13
n - Lack systemic internal communications at Parker and throughout the region s site, opex, shared resources Health Operational Excellence 1 C Grez 13-Dec 4,68% 6,74% 14,67% 18,23% 11 Develop a PPP, PA and include all employees of site talent development Marcos / Carolina G July/13
O4 q Poor productivity at Assembly areas with avg 20pcs/hr/ee for hose assemblies and "Focus Group" for improving organizational environment, Productivity this business ($3M) - Poor visibibility on inventory inside and outside the organization
Develop a plan to insert Instrumentation Engineering capabilities for value
G
Follow-up: Plan follow-up on a quarterly basis
12 Include team at FY14 talent process and assessment Marcos / Carolina Sep/13
15 O1 - Carolina Sosnowski Jun-14 h added projects at PES Future Growth Innovation 2 C Grez Jun-14
Fluid Control VS Lisc and productivity low performance
50pcs/hr/ee for Tube Bending. Poor productivity iniciatives at machining area (Avg prioritizing working conditions (locker rooms, restaurant, support o - Information systems out of date and cumbersome to reach operational excellence i Execute channel strategy Future Growth Strategic Market growth 2 C Grez Jun-14
13 Monthly meeting, results up date and celebration Marcos / Carolina G May/13
Nocam Set-up time of 155 min) equipments). p - Lack of a culture of continuosu self audits o
Resolve all JDE Operational issues and package management reports
throughout the organization
Organizational
Health Operational Excellence 2 L Fernando Aug-13
14 Develop an independent structure for main positions ( Process Engª, Quality, FC Customer Service ) Marcos Correa G June/13
q - Not incorporating Kaizen event conclusions into daily activities 15 Positions, wages and benefits analisys and corrections Marcos / Carolina G June/13
O5 q Absorption of items outsourced to Divisions and phased out (9404 quick coupling) was Organizational Health e Daily GM reports and weekly analysis of price exceptions Core Business Margin Protection 3 A Viapiana Jul-13 Team not seem properly motivated mainly due to work conditions
20
16 CIC site integration ( Include CIC division in site information e events ) Carolina Sosnowski G on going
- Excessive level of interruptions in the administrative and productive flows Execute development program. Mandatory product training in a continuous Organizational
Organizational team not enough ( Product & Marketing specialist, lean)
l monthly schedule. Monitor HPT's two new ones every year Health Operational Excellence 3 K Itoi Jun-14 17 To hire a dedicated people for lean innitiavies Marcos / Carolina G July/13
- Lack of standardization of daily activities and engagement between commercial and production side
q Acquisition: Incomplete integration process due to lack of resources to manage it
Organizational
not replaced by other additional volume in the local manufacturing mix m Execute investment program Health Best Place to Work 3 C Grez Jun-13
Lack of formal assessment PA, PPP and Feedback 18 Product line analisys, current items and volume, new items and volume suggestion, total Market our participation and opportunities Carlos Costa D July/13
r - Weak S&OP process Organizational
G No talent development 18 Product line analisys, current items and volume, new items and volume suggestion, total Market our participation and opportunities Fluid Control D July/13
O6 q 1Q & 2Q Hose Assembly Volume Shortage (1Q & 2Q FY13 -18% vs. 4Q FY12) - Lack of analysis of risks in our plans and preparation of contingency actions
n Monthly meetings, engage admin personnel into operational meetings Health Operational Excellence 3 C Grez Dec-13
Team do not properly recognized and rewarded
Follow-up: q Organic Growth: Lack of resources to manage capital projects and division has lost talents
Align Commercial strategy within the region and manufacturing strategy with Division/Sales Co
b WW group Core Business alignment 4 C Grez Jun-13
No independent structure just commum service, partial support On Schedule
-Excessive mentality of producing numbers to please management without business fundamentals
Slipping
- No due analysis of all resources required to attain goals g Map all major regional competitors with FTE and inventory Future Growth Strategic Market growth 4 C Grez Sep-13 Positions, wages and benefits not updated
to the Group and competitors - no succession plan in place - Lack of analysis of interactions between simultaneous projects at group, division and sales company level j
Schedule visits to preliminary candidates, fill a prospect pipeline to present
to LAG Future Growth Acquisitions 4 C Grez Jun-13 Site CIC team integration ( Indicators and events )
Late
Organizational Accountable Mgmt
k Close FY13 PA process on time with synchronization in talent review Health process 4 K Itoi Sep-13
No Lean initiatives Follow-up: Plan Monthly follow-up
q No dedicated team for each filtration platform, other than sales team Follow-up: Plan follow-up on a quarterly basis
q Limited IT support related to EDI, RFQ, Pricing and tools to speed process up
Team not seem properly motivated mainly due to work conditions
Organizational team not enough ( Product & Marketing specialist, lean.. )
Lack of formal assessment PA, PPP and Feedback
No talent development
Team do not properly recognized and rewarded
No independent structure just commum service, partial support
Positions, wages and benefits not updated
Site CIC team integration ( Indicators and events )
Agenda
A Parker Hannifin
Estratégia Lean da Parker
Resultados e Lições Aprendidas
21
Produtividade
Aumento de
79%
22
Inventário
Redução de
37%
23
Atendimento ao Cliente
Entrega em Dia (%)
Aumento de
5 p.p.
24
Qualidade
Redução de
99%
25
Metas claras e
mensuráveis
26
TRABALHAR EM TIMES...
Vision $1B Sales - #1 Motion & Control Company in Latin America
Channel Strategy
Win Strategy
Foundation
(Win Certification, Pricing, Procurement)
27
EXECUÇÃO
DISCIPLINADA E...
...PRESENÇA
NO GEMBA
28
Engajamento e Envolvimento das Pessoas
29
OBRIGADO!